Loading...
HomeMy WebLinkAboutNCC201031_NOI Application_20200317Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/16/2020 10:20:32 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 3/16/2020 11:37:51 AM (Review- Construction NOI 23097) • The task was assigned to Garcia, Lauren V by round robin distribution 3/16/2020 10:20 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 18, 2020 5:00 PM 3/16/2020 10:20 AM Submit by Garcia, Lauren V 3/17/2020 3:35:37 PM (Payment Verification for NCC201031) * Stuart Presnell Advance • Garcia, Lauren V assigned the task to Garcia, Lauren V 3/17/2020 3:34 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 27, 2020 5:00 PM 3/16/2020 11:37 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name* Advance Concrete Building 1 b. Specific Lot This field any be used to list specifc lot numbers. Numbers 2. County* Wake 3. Highway or Street 4500 Waterfield Drive Address* Street name only is acceptable if no address number assigned yet 4. CityorTownship* Garner 5. State * NC 6. Zip Code* 27529 7. Latitude* Enter the latitude in decimal degrees 35.6853 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -78.5668 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/16/2020 Estimated Construction Project Start Date 10. Date to End * 03/16/2021 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 4.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 6.20 (acres)* 14. Post- 2.61 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2020-Advance Concrete Building Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving White Oak Creek Wate rbody* Nacre of waterbody into which storrrwater runoff w ill discharge 15b. Waterbody 27-43-11 Index No. * NC Waterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Flarnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization SMP Property Group, LLC Name * If pernittee is an individual (i.e., organization does not apply), enter first and last nave in this field. 2. First Name* Lacy "Stuart" If Corporation, enter Fbgistered Agent First Barre 3. Last Name* Presnell If Corporation, enter Faegistered Agent Last Wre 3b. Title Member 4. Permitee E-mail s.presnell@advance-concrete.com Address * 5. Permittee 919-747-9713 Telephone No.* 6. Permittee Mailing Street Address Address* 3708 Conquest Drive Address Line 2 city Garner Fostal / Zip Code 27529 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 3708 Conquest Drive Address Line 2 City Garner Fbstal / Zip Code 27529 8. Type of Non -Government Ownership* State / Frovince / Faegion NC Country USA State / Ffovince / Fbgion NC Country USA C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jamie Contact - First Name * 2. Primary Site Mitchell Contact - Last Name * 3. Title 4. Site Contact E- jamie.z.mitchell@gmail.com mail Address* 5. Site Contact 919-802-7005 Telephone No. 6. Organization Sammax Contracting Name 7. Site Contact Street Address Mailing Address* 405 Swann Trail Address Line 2 City Clayton Postal / Zip Code 27527-6506 8. Consultant Name (Optional) Jonathan Allen First and Last nacre 9. Consultant E-mail jonathan.allen@nv5.com This person will be copied on all correspondence. 10. Consultant 9198581831 Telephone No. State / Rovince / Region NC Country US D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/25/2019 Approved * 2. E&SC Plan Project SEC-025597-2019 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan SEC-025597-2019_Approval- Approval letter or S&EConstructionPlan ReviewChecklist-V.2 WM 11- 276.92KB Grading Permit 25-19.pdf Mast be RFfornal Site Map (Optional) Helpful for linear project review Mast be RDFfornat Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 6. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form SW.pdf 665.7KB Mast be FDFfon-rat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature �rx� aa'rrrpt..�rA. Type Name* Lacy Stuart Presnell Title Vice President Organization SMP Property Group, LLC Date * 03/16/2020 F. Tracking and COC Info NOI Tracking No. 23097 NC Reference No. NCG01-2020-1031 Uses 'count number' variable (incremrented by SP) Certificate of NCC201031 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1031 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)