HomeMy WebLinkAboutNC0032077_Acknowledgement Letter_20200317ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Charles M. Smithwick, Jr.
Contentnea Metropolitan Sewerage District
P.O. Box 477
Grifton, NC 28530
Dear Mr. Smithwick:
NORTH CAROLINA
Environmental Quality
March 17, 2020
Subject: Pretreatment Annual Report
Contentnea Metropolitan Sewerage District
NPDES No. NCO032077
Pitt County
The Washington Regional Office has conducted a review of Contentnea Metropolitan Sewerage
District 2019 Pretreatment Annual Report (PAR). The review indicates that the PAR is in good
order and satisfies the requirements of 15A NCAC 2H .0908(b) and the Comprehensive Guidance
for North Carolina Pretreatment Programs. The next PAR will be due March 1, 2021.
The facility is reminded that the Headworks Analysis is due on September 30, 2020 and the
Industrial Waste Survey is due on October 1, 2020.
As always, Contentnea Metropolitan Sewerage District efforts and continued cooperation are very
much appreciated. Should you have any questions or comments please do not hesitate to contact
me at 252-948-3843.
Sincerely,
::: i //. a
Robbie Bullock
Environmental Specialist II
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc. Renee Smith — Pretreatment Coordinator
Laserfiche
D E Qbi�� North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
vOry rN Cx:40:.itiA �
N. a I E�.w���WQa A� /� 252.946.6481