HomeMy WebLinkAbout20070364 Ver 1_Triage Comments_20070309DW~~ Z66 ? v3 ~ ~ ~ : Dt~e ~ ~ "' 6. ~-- - Who lZeviowed: • V
Plan Detail7ncomplete
^ Please provide a location map for the project. '
[~ Ploas~ sh w ~tream i~pacts including a1i fiI1 elopes, dissipaters, and bank stabilization on the sitaplan, ,~~e ~ ~e ~S~;~J : .
• °~S tcw... , •
^. Please show all wetland impacts including fill elopes on tho alto plan. •
^ Please indicato $11 buffer impacts on the site plan.
^ please indiaate proposed lot layout as overlays on the alto plea, ~•(~~,~
Please indicate the location of the protectod buffixa as ovarlsys on~ '$e pi ~ ~ ~ ~~~~`'~" '
^ Pl a Iecate aII isolated or non-isolated wetlands, ~atroams and othar waters of the State as ovarlays on the site plan.
Please provide cross section details showing the provisions for aquatic life passage.
^ Please locate say planned•sewar lines on the wife plea.
^ Ploeso provide the location of any proposed stormwatiar management practkos as required by QC .
^ Pleaso provide detail for the stormwater management practices ea required by t3C .
^ Ploaso specify tho percent of prroject imparviousnees area based on the ostimated built-out conditions:
^ P e~ indicate all atormwat ~o~alls on the sits ptai~. • '
Plosso'indicate the difRzse flow provision measures do the situ plea ~ ~ •
^ Please indicate whethac ~ar not the proposed impaats already been conducted.
Avoidance.and/or Minim)zatfon Not Provided ~ • '
• The labeled as ~_ on tho plans dons not appear to be necessary. Please oliminato the . or provide additional
informatioti~as to cahy it is nocessary for this project. , ~ .
• . ^ This Office belioires that the labelod on the plans as can be moved. or raoonflgurod to avoid tho impacts to the
• . Ploage revise the plans .to avoid the impacts.. • • •
^. ~ This'Oflice believes that tho •labeled on the plans as• cea bo moved or rocanflgurod to :minimize flee ixgpacts t4 the
• . Ploase revise the pleas to minimize the impacts. ~ .
^ Tho atormwatar discharges at tho location on tho plans labeled ~ will.not provide diffase flow through the buffer because
' ~ . Ploaso i:evise the plans cad provido calculations to •show that difliase~flow w911 be achievod through the ontirebufCxr. If it
is not possiblo to achieve•difii~se flow through.the Sntiro buffar then it may bm aecxssary to' provide stormwatar managotneat
practices that ranove nutrionta .bofore the. stormwatar can bo discharged through the. bt>ffex.
Oilier i
^•. Thd application foo waa inauf5eiont•becauseovar 15`0 feet of stream and/or ovar 1 acre ofwetiand'impacts were requested. Pleaso
provido ffi .' 'This additional foe must be rxeived bofore your application can be viewed.
^ Please complete Suction(s) on tho apglicatioa -
• ~ ^ Pleaso provide a signed spy of tho application.
• ^ Please provide ,copies of the application, . copios of•the alto plans and other supporting information:
^ • Pleasasubmit olectronic CAD files showing ~ ;.vie: email to ian.mcmillan®ncmdil.net and Cl~ ~.
Mitigation
• ^ of compensatory ~ mitigation is required for this piojdot. ~ Pleaso provide'e cpmpaisatory mitigation plan., The
plan must conform to tharequireanents in 15 A NCAC 2H .0500 and moat be appropriate to the typaof impacts proposed.
^ Please indicatewhich 404 Permit tho USACE would use to authorize this project. ~ .
. ~ ~~ C
,~ _ -~
1,
'~ ~ I< 1 Se
~ ~~~wk
c~i~y~l~,k ~-~~
Prb ~'~
~~ ~
(~cv~,