Loading...
HomeMy WebLinkAbout20200200 Ver 1_BR-0123 - Bridge Abandonment_20200313Wanucha, Dave From: Cheely, Erin K Sent: Friday, March 13, 2020 1:46 PM To: Beckwith, Loretta A CIV USARMY CESAW (USA); Wanucha, Dave Cc: Turchy, Michael A Subject: BR-0123 - Bridge Abandonment Lori and Dave, FYI - Bridge 318 in Surry County (BR-0123) will now be abandoned rather than replaced. The bridge will not be removed and it will be turned over to the adjacent property owner. Therefore we no longer need a permit for this project. Apologies that we were not aware of this potential plan until this week. No action is required on your part, just wanted to let you know for your files. Thanks, erin From: Cheely, Erin K <ekcheely@ncdot.gov> Sent: Tuesday, March 10, 2020 11:45:49 AM To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Cc: Turchy, Michael A <maturchv@ncdot.gov> Subject: RE: [External] RE: BR-0123 Final Right of Way - BUILD Grant Project Dang... sorry about that! I guess just go ahead and send it since we already have a 401 and we'll address changes as appropriate once I find out more information. Thanks, erin From: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Sent: Tuesday, March 10, 2020 11:23 AM To: Cheely, Erin K <ekcheely@ncdot.gov> Cc: Turchy, Michael A <maturchv@ncdot.gov> Subject: [External] RE: BR-0123 Final Right of Way - BUILD Grant Project Too late... I just wrote the letter and Monte is currently reviewing it for approval. Do you want me just to send it now and we can address any changes if they come up? Thanks From: Cheely, Erin K <ekcheely@ncdot.gov> Sent: Tuesday, March 10, 2020 11:01 AM To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil> Cc: Turchy, Michael A <maturchv@ncdot.gov> Subject: [Non-DoD Source] FW: BR-0123 Final Right of Way - BUILD Grant Project Lori, Not sure if you are currently working on BR-0123, but if so, hold off on this one for the moment. Apparently the plan has changed from bridge replacement to abandonment. I will be in touch once we find out if the impacts we presented in our application are still necessary, need to be revised, are no longer required, or will be handled by the Division. Thanks, erin From: Cheely, Erin K Sent: Tuesday, March 10, 2020 10:57 AM To: Bowles, Jacquelyn K <jkbowles@ncdot.gov> Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Turchy, Michael A <maturchv@ncdot.gov>; Dagnino, Carla S <cdagn i no@ ncdot.gov> Subject: FW: BR-0123 Final Right of Way - BUILD Grant Project Jacquelyn, Now that the plan for BR-0123 has changed to bridge abandonment, will the existing structure be removed (and if so, will Raleigh be in charge of that or will the Division take it from here)? Will the impacts shown in the final permit drawings we received (attached) still be necessary for bridge removal? If not, what impacts will still be required? We have already submitted the permit application for this project and received a 401 Certification. I am going to reach out to the USACE and tell them to hold off on issuing the 404 for right now until I find out how changing this project to bridge abandonment affects the necessary impacts to the UT to SF Mitchell River. We may need to modify or just rescind our application. Let us know, thanks! -erin From: Bowles, Jacquelyn K <jkbowles@ncdot.gov> Sent: Monday, March 9, 2020 9:06 AM To: Turchy, Michael A <maturchv@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov> Cc: Peterson, Tierre R <trpeterson@ncdot.gov> Subject: FW: BR-0123 Final Right of Way - BUILD Grant Project Michael/Carla, See the below email from Kevin. Let us know if you guys have any questions. Jacquelyn Bowles, PE Engineer III Structures Management Unit North Carolina Department of Transportation 919.707.6559 (office) 0kbowles@ncdot.gov 1000 Birch Ridge Dr. Raleigh, NC 27610 From: Fischer, Kevin <wkfischer@ncdot.gov> Sent: Friday, March 6, 2020 11:44 AM To: Bowles, Jacquelyn K <jkbowles@ncdot.gov>; Muse, Carey C <ccmuse@ncdot.gov> Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Pettyjohn, Michael A <mpettylohn@ncdot.gov>; Burton, J. Dale <idburton@ncdot.gov>; Hanks, Brian <bhanks@ncdot.gov>; Whitaker, Barry W <bwwhitaker@ncdot.gov>; AI-Dhalimy, Nadia A <naaldhalimv@ncdot.gov>; Lacy, Kevin <iklacyl@ncdot.gov>; SMO <SMO@ncdot.gov>; Lewis, Robert W <rwlewisl@ncdot.gov>; Norman, Patrick A <pnorman@ncdot.gov>; Muller, Daniel (FHWA) <daniel.muller@dot.gov>; Dragonette, Cathy A <cadragonette@ncdot.gov>; Harris, James B <jbharris@ncdot.gov>; Twohig, Anna <atwohig@ncdot.gov>; Miles, Daneil S <dmiles@ncdot.gov>; Hatton, Rodney K <rhatton@ncdot.gov>; Patterson, C W <cpatterson@ncdot.gov>; Thomas, Walter L <wlthomasl@ncdot.gov>; Woodard, Robert A <rwoodard@ncdot.gov>; Mcgowan, James R <jmcgowan@ncdot.gov>; AI-Ghandour, Majed N <malghandour@ncdot.gov>; Honeycutt, Nikki T. <Nikki.Honevcutt@stvinc.com>; Bailey, Kevin <Kevin.Bailev@stvinc.com> Subject: RE: BR-0123 Final Right of Way - BUILD Grant Project on Surry County has passed a resolution requesting abandonment of SR1319 in the vicinity of Bridge 318 which was being replaced under the BR-0123 project. Paperwork has also been submitted by the property owners accepting the stipulations of this abandonment. Therefore the Department is stopping all work on this project including any right of way acquisition and utility relocations. It is requested that you reach out to any firms doing work for your unit and advise them of this stoppage and request a final billing of the project. The BR-0123 project was receiving funding from the GREATTER Build Grant and we are working to replace it with another project from Division 11. Once that project is approved by the Board we will place it on the 12 Month Let List for a July letting. Please let me know if you have any questions. Kevin Fischer, PE Assistant State Structures Engineer — Program Management and Field Operations Structures Management Unit North Carolina Department of Transportation 919 707 6514 office wkfischera-ncdot.gov From: Bowles, Jacquelyn K <jkbowles@ncdot.gov> Sent: Friday, January 3, 2020 8:58 AM To: Muse, Carey C <ccmuse@ncdot.gov> Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Fischer, Kevin <wkfischer@ncdot.gov>; Fischer, Kevin <wkfischer@ncdot.gov>; Pettyjohn, Michael A <mpettyiohn@ncdot.gov>; Burton, J. Dale <jdburton@ncdot.gov>; Hanks, Brian <bhanks@ncdot.gov>; Whitaker, Barry W <bwwhitaker@ncdot.gov>; AI-Dhalimy, Nadia A <naaldhalimv@ncdot.gov>; Lacy, Kevin <iklacyl@ncdot.gov>; SMO <SMO@ncdot.gov>; Lewis, Robert W <rwlewisl@ncdot.gov>; Norman, Patrick A <pnorman@ncdot.gov>; Muller, Daniel (FHWA) <daniel.muller@dot.gov>; Dragonette, Cathy A <cadragonette@ncdot.gov>; Harris, James B <jbharris@ncdot.gov>; Twohig, Anna <atwohig@ncdot.gov>; Miles, Daneil S <dmiles@ncdot.gov>; Hatton, Rodney K <rhatton@ncdot.gov>; Patterson, C W <cpatterson@ncdot.gov>; Thomas, Walter L <wlthomasl@ncdot.gov>; Woodard, Robert A <rwoodard@ncdot.gov>; Mcgowan, James R <jmcgowan@ncdot.gov>; AI-Ghandour, Majed N <malghandour@ncdot.gov>; Honeycutt, Nikki T. <Nikki.Honevcutt@stvinc.com>; Bailey, Kevin <Kevin.Bailev@stvinc.com> Subject: BR-0123 Final Right of Way - BUILD Grant Project 0 The ROW Plans for BR-0123 have been approved. Please see the following attachments: BR-0123 Final Right of Way Distribution Letter BR-0123 ROW Title Sheet BR-0123 Deed & Plat Books Completed Project Planning Document: BlockedBlockedhttps://connect.ncdot.gov/site/Preconstruction/division/divll/BR- 0123 % 20Su rry% 20318/Protect% 20Development/BR-0123 % 20Fi na I % 20CE?d=w5b67c7e8ecf94e56862d570ffce6d40b SMU is transmitting this letter to the Right of Way Unit as notification that the Division 11 Right of Way Office may begin Right of Way Acquisition on BR-0123. PLEASE NOTE: BR-0123 is a BUILD Grant project and is considered 'mission critical'. Thank you, Jacquelyn Bowles, PE Engineer III Structures Management Unit North Carolina Department of Transportation 919.707.6559 (office) 0kbowles@ncdot.gov 1000 Birch Ridge Dr. Raleigh, NC 27610 it all correspondence ;,,lcuirdenc e Cxu aird fror�r ffils sondcr is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,, it all correspondence spoindenc e Cxu aird fror�r ffils sondcr is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,, h ell correspondence spoindenc e Cxu aird fror�r ffils ,,cinder is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,,