HomeMy WebLinkAboutNCG080919_Inspection Report_20200317ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Houston Transportation Inc.
Attn: Robert V. Houston
Post Office Box 121
Spruce Pine, North Carolina 28777
NORTH CAROLINA
Environmental Quality
March 17, 2020
Subject: Compliance Evaluation Inspection
Permit: NCG080000
Certificate of Coverage: NCG080919
Mitchell County, North Carolina
Dear Mr. Houston:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on March 3, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4S00 or by email
at Isaiah.reed@ncdenr.gov.
Sincer
Isaiah Reed, C Q, CEPSCI, S4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
D_EQ�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
4Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
o".°na,o enio. --1 exam 828.296.4500
Permit: NCGO80919
SOC:
County: Mitchell
Region: Asheville
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Houston Transportation Inc
Effective: Expiration: Facility: Houston Transportation Inc
526 Ridge Rd
Contact Person: Robert V Houston Title:
Directions to Facility:
19E east from spruce pine nc to ridge rd rt on ridge rd appx. 1 mi.
System Classifications:
Primary ORC: Certification:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Spruce Pine NC 28777
Phone:828-765-1733
Phone:
Inspection Date: 03/03/2020 Entry Time 11:00AM Exit Time: 11:30AM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCGO80919 Owner -Facility: Houston Transportation Inc
Inspection Date: 03/03/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On March 3, 2020 this facility was inspected for compliance. I met with Robert Houston Jr. on site. During the inspection the
following items were noted:
1) A Stormwater Pollution Prevention Plan has been created for the facility.
2) Qualitative Monitoring has not yet been conducted on site.
3) Analytical Monitoring has not yet been conducted on site.
4) The permittee has not confirmed if a large used oil tank on site has integrated secondary containment in its construction.
Please give the above items your immediate attention.
While the site remains in violation, substantial improvements have been made and a direct effort to get into compliance is
evident.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCGO80919 Owner- Facility: Houston Transportation Inc
Inspection Date: 03/03/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
E
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
E
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: See summary for more information.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑
E ❑ ❑
Comment: See summary for more information
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ E ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ E ❑ ❑
Comment: See summary for more information.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
0
❑ ❑ ❑
# Were all outfalls observed during the inspection?
❑
❑ ❑ ■
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ E ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
0 ❑ ❑
Comment
Page 3 of 3