HomeMy WebLinkAboutSW6200101_Wet Pond #1 Calculations_Revised March2020_3/9/2020�I Mason&Hanger noay&zm -.a rim Civil Affairs TEMF Fort Bragg, Cumberland County, North Carolina APPENDIX WET POND BASIN CALCULATIONS Mason & Hanger Page - a.9 - SUPPLEMENT-EZ FORM COVER PAGE Please indicate the types, quantities and locations of SCMs that will be used on this project: Quantity Location(s) Infiltration System Bioretention Cell 1 Bioretention Pond Wet Pond 2 Wet Pond #1 & Wet Pond #2 Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader -Filter Strip Disconnected Impervious Surface Treatment Swale Dry Pond Designer information for this project: Name and Title: Organization: Street address: Mike Mayer, Civil Engineer Mason & Hanger 300 W Vine St Suite 1300 City, State, Zip: Lexington, KY 40507 Phone number(s): 859-280-3557 Email: mike.mayer@masonandhanger.com Designer Seal Signature of Designer Date Applicant: Project Name: SOF Civil Affairs Address Fort Bragg City i Town Fayetteville Environmental Q-11ty Company: Fort Bragg DPW Contact: Lee Ward Mailing Address: Bldg 3-1333 Butner Rd City, State, Zip: Fort Bragg, NC 28310 Phone number(s): (910) 396-2301 Email: lee.p.ward.civ@mail.mil Certification Statement: I certify, under penalty of law: that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; - that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and - that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. I am aware that there are significant penalties for submitting false information including the possibility of fines and imprisonment for knowing violations as well as a report being made to my professional board. Cover Page 1 8:00 AM 10/4/2019 Ft Bragg Civil Affairs Stormwater Pond Volume Comparison Revised March-2020 Bioretention Pond #1 I NCDEQ Requirements (cf) EISA Option #1 Requirements (cf) Provided in Design (cf) I Bioretentin Storage Requirements 15,900 1 16,378 1 16,701 Wet Pond #1 NCDEQ Requirements (cf) EISA Option #2 Requirements (cf) Pre vs Post Development (10-yr) Provided in Design (cf) Volume Main Pool VMv 28,756 37,893 38,959 Volume of Forebay VFB 4,313 5,684 6,330 Design Volume Dv 11,805 21,429 30,501 Wet Pond #2 NCDEQ Requirements (cf) EISA Option #2 Requirements (cf) Pre vs Post Development (10-yr) Provided in Design (cf) Volume Main Pool VMv 89,090 111,165 116,538 Volume of Forebay VFB 13,364 16,675 18,930 Design Volume Dv 36,572 65,830 74,633 NI Mason&Hanger noayazm —.a rim Civil Affairs TEMF Fort Bragg, Cumberland County, North Carolina STORM WATER WET POND #1 (BASIN #2) CALCULATIONS Mason & Hanger. Page - a.12 - WinTR-55 Current Data Description Identification Data User: SCurry Date: 10/3/2019 Project: Ft Bragg CA TEMF_Wet Pond Units: English SubTitle: Pre -Development Wet Pond #1, Qp Areal Units: Acres State: North Carolina County: Cumberland NOAA-B Filename: P:\Projects\017101\02 Design\Civil\Storm Water Design\Basin Design\Basin #2\PreDevelopment_CA_1 --- Sub -Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ Wet Pond # Outlet 4.2 69 0.133 Total area: 4.20 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.55 6.74 7.72 8.75 3.03 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.55 6.74 7.72 8.75 3.03 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier ---------------------------------------------------------------------------------- (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) SUBAREAS Wet Pond # 6.13 10.48 14.35 20.16 25.14 30.48 3.83 REACHES OUTLET 6.13 10.48 14.35 20.16 25.14 30.48 3.83 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Hydrograph Peak/Peak Time Table Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- (hr) (hr) (hr) (hr) (hr) (hr) (hr) SUBAREAS Wet Pond # 6.13 10.48 14.35 20.16 25.14 30.48 3.83 12.00 11.97 11.96 11.96 11.96 11.95 12.01 REACHES OUTLET 6.13 10.48 14.35 20.16 25.14 30.48 3.83 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Summary Table Sub -Area Drainage Time of Curve Receiving Sub -Area Identifier Area Concentration Number Reach Description (ac) (hr) -------------------------------------------------------------------------------- Wet Pond # 4.20 0.133 69 Outlet Total Area: 4.20 (ac) WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Wet Pond # User -provided 0.133 Time of Concentration 0.133 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM SCurry Ft Bragg CA TEMF_Wet Pond Pre -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- Wet Pond #Open space; grass cover 50% to 75% (fair) B 4.2 69 Total Area / Weighted Curve Number 4.2 69 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:21:07 PM WinTR-55 Current Data Description Identification Data User: SCurry Date: 10/3/2019 Project: Ft Bragg CA TEMF_Wet Pond Units: English SubTitle: Post -Development Wet Pond #1, Qp Areal Units: Acres State: North Carolina County: Cumberland NOAA-B Filename: P:\Projects\017101\02 Design\Civil\Storm Water Design\Basin Design\Basin #2\PostDevelopment_CA_ --- Sub -Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ Wet Pond 1 Outlet 4.2 92 0.133 Total area: 4.20 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.55 6.74 7.72 8.75 3.03 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Storm Data Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.67 4.71 5.55 6.74 7.72 8.75 3.03 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Watershed Peak Table Sub -Area Peak Flow by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier ---------------------------------------------------------------------------------- (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) SUBAREAS Wet Pond 1 16.50 22.08 26.54 32.84 37.98 43.38 13.07 REACHES OUTLET 16.50 22.08 26.54 32.84 37.98 43.38 13.07 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Hydrograph Peak/Peak Time Table Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr Identifier (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) ---------------------------------------------------------------------------------- (hr) (hr) (hr) (hr) (hr) (hr) (hr) SUBAREAS Wet Pond 1 16.50 22.08 26.54 32.84 37.98 43.38 13.07 11.95 11.95 11.94 11.95 11.95 11.94 11.95 REACHES OUTLET 16.50 22.08 26.54 32.84 37.98 43.38 13.07 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Summary Table Sub -Area Drainage Time of Curve Receiving Sub -Area Identifier Area Concentration Number Reach Description (ac) (hr) -------------------------------------------------------------------------------- Wet Pond 1 4.20 0.133 92 Outlet Total Area: 4.20 (ac) WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- Wet Pond 1 User -provided 0.133 Time of Concentration 0.133 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM SCurry Ft Bragg CA TEMF_Wet Pond Post -Development Wet Pond #1, Qp Cumberland NOAA-B County, North Carolina Sub -Area Land Use and Curve Number Details Sub -Area Hydrologic Sub -Area Curve Identifier Land Use Soil Area Number -------------------------------------------------------------------------------- Group (ac) Wet Pond 10pen space; grass cover 50% to 75% (fair) B .82 69 Paved parking lots, roofs, driveways B 3.38 98 Total Area / Weighted Curve Number 4.2 92 WinTR-55, Version 1.00.10 Page 1 10/3/2019 2:23:51 PM Ft Bragg Civil Affairs Stormwater Pond Volume Comparison Revised March-2020 Wet Pond #1 Contour Intervals (ft) NCDEQ Requirements (cf) EISA Option #2 Requirements (cf) Pre vs Post Development (10-yr) Provided in Design (cf) Volume Main Pool VMa 233-240 28,756 37,893 38,959 Volume of Forebay VFB 236-240 4,313 5,684 6,330 Design Volume Dv 240-241.50 11,805 21,249 30,501 Pre -Development = 35,502 cf Post -Development = 73,395 cf A = 37,893 cf WET POND #1 SOF Civil Affairs THE DRAINAGE AREA 1 Drainage area number Wet Pond #1 Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) sf Parking / driveway (sq ft) 146003 sf Total surface water area (sq ft) sf Sidewalk (sq ft) sf Total drainage area (sq ft) 182952 sf Roof (sq ft) 1230 sf BUA associated with existing development (sq ft) sf Roadway (sq ft) sf Proposed new BUA (sq ft) 147233 sf Other, please specify in the comment box below (sq ft) sf Percent BUA of drainage area 180% Total BUA (sq ft) 147233 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): Design rainfall depth (in) 1.0 in EISA 438, ARMY LID, FORT BRAGG IDG Minimum volume required (cu ft) 11805 cf Design volume of SCM (cu ft) 30501 cf GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? Yes #4 Are the inlets, outlets, and receiving stream protected from erosion (I0-yearstorm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flaw? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes I #6 What is the method for dewatering the SCM for maintenance? I Other 1#13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 #1 Method used HRT #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 9917 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 38959 cf #6 Elevation of top of shelf (fmsl) 240 ft #2 Average depth of the main pool (feet) 6 ft #6 Elevation of bottom of shelf (fmsl) 239 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 234 ft #7 Diameter of drawdown orifice (inches) 4.0 in #2 Elevation of the top of the permanent pool (fmsl) 240 ft #7 Drawdown time for the temporary pool (hours) 51 hrs #2 Elevation of the top of the temporary pool (fmsl) 241.50 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? No #3 Depth provided for sediment storage (inches) 12 in #8 Does the pond minimize impacts to the receiving channel from the 1-yr, 24-hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? No #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 6330 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment Sod #5 Depth of forebay at entrance (inches) 48 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) 48 in Contractor to provide landscape establishment to achieve 100% coverage throughout site in 12 months. Sod is desired by the User for embankments. #5 Does water flow out of the forebay in anon -erosive manner? Yes #5 Clean -out depth for forebay (inches) 12 in #5 Will the forebay be cleaned out when the depth is reduced to less than the above? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Project based entirely within Fort Bragg (US Gov't property). No easements required. Wet Pond #1 1 1:49 PM 3/9/2020 Permit No. (to be provided by DWQ) ®O�OF W ATF9QG G NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 11)) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Fort Bragg Civil Affairs TEMF - Wet Pond #1 Contact person Stephen Curry, P.E. Phone number 859.280.3581 Date Revised March 9, 2020 Drainage area number Wet Pond #1 II. DESIGN INFORMATION Site Characteristics Drainage area 182,952 ft2 Impervious area, post -development 147,233 ft2 % impervious 80.48 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5 runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 11,805 ft3 30,501 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 3.1 in 0.20 (unitless) 93.00 (unitless) 2.38 in/hr OK 3.83 ft3/sec 13.07 ft3/sec 9.24 ft3/sec 241.50 fmsl 240.00 fmsl 240.00 fmsl 240.00 fmsl 241.00 fmsl Data not needed for calculation option #1, but OK if provided. 233.00 fmsl 232.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Surface Areas Area, temporary pool 17,674 ft2 Area REQUIRED, permanent pool 183 ft2 SAIDA ratio 0.10 (unitless) Area PROVIDED, permanent pool, Apen-pool 9,917 ft' OK Area, bottom of 1 Oft vegetated shelf, Abot shelf 8,536 ft2 Area, sediment cleanout, top elevation (bottom of pond), AW_,nd 2,513 ft' Volumes Volume, temporary pool 30,501 ft3 OK Volume, permanent pool, Vpen-pool 38,959 ft3 Volume, forebay (sum of forebays if more than one forebay) 6,330 ft3 Forebay % of permanent pool volume 16.2% % Insufficient forebay volume. SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 0.10 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vpen-pool 38,959 ft3 Area provided, permanent pool, Apef„_pooi 9,917 ft' Average depth calculated 3.80 ft OK Average depth used in SAIDA, cl , (Round to nearest 0.5ft) 4.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, ApQf1„_pwi 9,917 ft2 Area, bottom of 1 Oft vegetated shelf, Abot shelf 8,536 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 2,513 ft2 "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 8.00 ft Average depth calculated ft Average depth used in SAIDA, day, (Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 4.00 in Area of orifice (if -non -circular) in Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 241.50 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.) (unitless) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 3.83 ft3/sec Post -development 1-yr, 24-hr peak flow 13.07 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.25 ft3/sec Storage volume drawdown time 2.10 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3.4 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? N (Y or N) Insufficient. Recorded drainage easement required. Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Project: Ft Bragg Civil Affairs TEMF - Wet Basin #2 Date: 19-Jun-19 Rv=0.05 +0.9*IA Rv - Runoff Coefficient IA- Impervious fraction Dv=3630*RD*Rv*A Dv - Design Volume (cf) RD - Desing Storm Depth (in) A - Drainage Area (Ac) Impervious Area (Ac)= Pervious Area (Ac)= Total Area (Ac)= IA= RD, Design Storm Depth (in)= Simple Method for Runoff Volume Rv = 0.05 + 0.9 *[A Where: Rv = Runoff coefficient (unitless) IA = Impervious fraction (unitless) DV = 3630 * RD* Rv* A Where: DV — Design volume (cu ft) Ro = Design storm depth (in) A = Drainage area (ac) 3.38 0.82 4.2 0.80 1.0 Rv= 0.77 Dv= 11,805 NCDEQ Minimum Design Volume Project: Ft Bragg Civil Affairs TEMF - Wet Basin #2 Date: 19-Jun-19 Hydraullic Retention Time (HRT) Method Dv - Design Volume (cf) From Simple Method Dv= 11,805 cf VMP = 28,756 cf Equation 1: Main Pool Volume, Vmp VMP = 0.87 * HRT * DV 5 Where: 0.87 = Factor to adjust for the volume in the forebay vv,p = Main pool volume, not including the forebay (cubic feet) HRT = Required hydraulic residence time (14 days) TS = Average time between storm events (5 days) DV = Design volume (cubic feet) Pond No. 1 - Civil Affaris Wet Pond #1 HydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019 12.00 Top of pond EIev.243.00 10.00 16.00 ft Riser WeirA - Elev. 241.50 20.00 ft Cipoletti weir WeirB - Elev. 242.00 8.00 6.00 4.00 2.00 CuIvA - 35.0 LF of 24.0 in @ 1.00% 0.00 Stage (ft) Bottom of pond Elev. 233.00 10-yr 100-yr 5-yr Section NTS 50-yr 2-yr 25-yr 1-yr Inflow hydrograph = 2. SCS Runoff - Basin #2 Post Development Project: Basin #2 Wet Pond Design.gpw Thursday, 10 / 3 / 2019 Pond No. 1 - Civil Affaris Wet Pond #1 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019 12.00 10.00 - 8.00 - 6.00 - 4.00 2.00 — 0.00 Stage (ft) Elev. 233.00 Top of pond —\ EIev.243.00 10-yr 100-yr 5-yr Front View 50-yr 2-yr NTS - Looking Downstream 25-yr 1-yr Inflow hydrograph = 2. SCS Runoff - Basin #2 Post Development Project: Basin #2 Wet Pond Design.gpw I Thursday, 10 / 3 / 2019 Ft Bragg Civil Affairs - Wet Pond #1 Stormwater Pond Riser Summary October-2019 Wet Pond #1 Storm Return Interval (yr) Peak Flow (Qp) w/ Inlet Control Maximum Elevation (ft) w/ Inlet Control 1 0 239.77 2 0.15 240.29 5 0.32 240.76 10 0.44 241.24 25 1.67 241.57 50 5.09 241.69 100 14.02 241.98 Wet Pond #1 Drawdown Time Ft Bragg CA TEMF Revised: 05-March-2020 Orifice Diameter 4 inches Discharge Rate of Orifice (cuft/s) 0.25 Volume of Stormwater for Drawdown 1 45,465 Incremental Storage (cuft): 240 11,354 241 16,437 241.50 17,674 Total Storage (cuft) Drawdown Rate: Volume of Stormwater / Discharge Rate 45,465 181860 sec 51 hrs 2.1 days Wet Pond #1 Main Pond Volume Revised March202O Project: Ft Bragg Civil Affairs Basin Description: Wet Pond #1 Main Pond Volume Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 233.0 1,510.0 N/A N/A 0 N/A 0 234.0 2,513.0 1 2012 2012 1990 1990 235.0 3,587.0 1 3050 5062 3034 5024 236.0 4,734.0 1 4161 9222 4147 9172 237.0 5,945.0 1 5340 14562 5328 14500 238.0 7,212.0 1 6579 21140 6568 21068 239.0 8,536.0 1 7874 29014 7865 28933 240.0 11,354.0 1 9945 38959 9912 38844 Wet Pond #1 - Forebay Project: Basin Description: Contour Contour Elevation Area (sq. ft) Forebay Volume.txt Ft Bragg Civil Affairs Wet Pond #1 - Forebay Depth (ft) 236.0 774.0 N/A 237.0 1,129.0 1 238.0 1,540.0 1 239.0 2,008.0 1 240.0 2,532.0 1 Incremental Volume Avg. End (cu. ft) N/A 952 1335 1774 2270 Page 1 Cumulative Volume Avg. End (cu. ft) 0 952 2286 4060 6330 Incremental Volume Conic (cu. ft) N/A 946 1329 1769 2265 Cumulative Volume Conic (cu. ft) 0 946 2275 4044 6309 Design Volume.txt Wet Pond #1 - Design Volume Project: Ft Bragg Civil Affairs Basin Description: Wet Pond #1 - Design Volume Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume (sq. ft) Avg. End Avg. End Conic Conic (cu. ft) (cu. ft) (cu. ft) (cu. ft) 240.0 12,449.0 N/A N/A 0 N/A N/A 241.0 16,437.0 1.00 14443.00 14443.00 14396.90 14396.90 242.0 18,912.0 1.00 17674.50 32117.50 17660.04 32056.94 Page 1