Loading...
HomeMy WebLinkAboutNCC201009_ESC Approval Submitted_20200316ROY COOPER Governor MICHAEL. S. PLEGAN Secretary BRIAN. WRENN hcung Director H & H Constructors, Inc. ATTN: Brian Walker, Div 2919 Breezewood Avenue, Fayetteville NC 28303 NORTH .CAROLINA Envimn entaf Qivatity March 11, 2020 LETTER OF APPROVAL Manager & Agent Suite 400 RE: Project Name: Eastover North, Section One, Phase Two —Lot 37 Acres Approved: 0.38 Project ID: CUMBE-2020-120 County: Cumberland City: Eastover Address: Trent Drive River Basin: Cape Fear Stream Classification: Other Submitted by: Moorman, Kizer & Reitzel, Inc. Date Received by LQS: February 20, 2020 Plan Type: NEW — Residential Dear Mr. Walker: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 4B.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the.NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc. o�G01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. c larkgncdenr. gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future, the new responsible parry is required to apply for his/her own COG. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Careen Street, Suite 7141 Fayetteville. North Carolina 28301 t�Hri CANCH.EPIA n��c��wao��m mBinr 910.433,3300 Letter of Approval H & 1-I Constructors, Inc. March 11, 2020 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Tn addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, othy L. La nty, PE Regional Engineer DEMLR Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet cc: Moorman, Kizer &Reitzel, Inc. (via email) Michael Naylor, Cumberland County (via email) Fayetteville Regional Office — DEMLR file