Loading...
HomeMy WebLinkAbout20081121 Ver 2_Staff Comments_20091124Lucas, Annette From: Lucas, Annette Sent: Tuesday, November 24, 2009 1:19 PM To: Homewood, Sue Cc: Lucas, Annette Subject: 08-1121v2 Diamonds Keep Subdivision Attachments: 08-1121v2 Diamonds Keep Subdivision.doc 10 Sue, This last submittal was a big step in the right direction. There are a number of comments, but they are technical comments on designs rather than big picture items. Let me know if you have Qs. Thanks, A Annette Lucas, PE NC Division of Water Quality - 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Phone: (919) 715-3425 Fax: (919) 733-6893 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 08-112lv2 Diamonds Keep Subdivision AML comments November 24, 2009 1. Overall, the DWQ accepts your approach of treating offsite area in lieu of providing stormwater treatment for drainage areas 7 and 8. However, please describe the current and future uses of the land in the offsite drainage area as well as an estimation of the current and future imperviousness of the offsite area. 2. For all proposed stormwater BMPs, please provide soils test that has been conducted within the footprint of every proposed BMP to document the level of the SHWT. This information should be attached. Also, the BMP Supplement Forms and plan sheets should be updated to reflect the new information. The DWQ will not approve these BMPs without a soils test that has been sealed by an appropriately qualified individual. 3. For all proposed BMPs, please provide a construction sequence that explains how the BMP will be protected during the project construction. 4. For all Wet Detention Ponds, please fill out the "Volume, temporary pool" blank in the Supplement Forms. 5. Please show the level of the temporary pools on the wet detention pond profiles. 6. Please correct all discrepancies and errors in the Supplement Forms and plan sheets. For example, for Basin 1, the size of the orifice on the Supplement Form is stated to be 2 inches, but the plan sheet says 2.5 inches. 7. Please correct errors in the values of driving head that have been entered into the Wet Detention Basin Supplement Forms. The driving head is equal to the Temporary Pool elevation minus the Permanent Pool elevation. 8. For the sand filters, please provide specifications for the sand media material that is to be used.