Loading...
HomeMy WebLinkAbout20200362 Ver 1_R-2233 BB BA Rutherford March 13 2020_20200313M SUTZ., yd .w'm.,m HO'P y �y STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR March 13, 2020 U.S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 ATTN: Ms. Lori Beckwith NCDOT Coordinator J. ERIC BOYETTE SECRETARY Subject: Application for Section 404 Individual Permit and 401 Water Quality Certification for the proposed Rutherfordton Bypass, US 221 North of US 74 Bypass to North of SR 1366 (Roper Loop Road), Federal Aid Project No. STBG-0024(083), Division 13, TIP Nos. R-2233BB, & R-2233BA. Debit $570 from WBS 34400.LS5. Dear Madam: The proposed action involves constructing the US 221 Bypass of Rutherfordton, in Rutherford County. The proposed Rutherfordton Bypass extends along existing US 221 from north of 74 Bypass to north of US 74 Business (R-2233BA) and new location from north of US 74 Business to rejoining US 221 just north of SR 1366, (R-2233BB). The proposed bypass will be constructed as a four -lane roadway with a 46-foot median and will be approximately 8.5 miles long. Please see the enclosed ENG form, Division of Mitigation Services (DMS) mitigation acceptance letters, permit drawing review minutes (4B and 4C), State Stormwater Management Plan (SMP), Final R-2233BB permit drawings, R-2233BB design plans, and R-2233BA preliminary permit drawings for the above referenced project. Purpose and Need The purpose of the proposed project is to reduce congestion, improve safety, and improve travel time for traffic using the US 221 corridor in the vicinity of Rutherfordton. Mailing Address: Telephone: (919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 1000 BIRCH RIDGE DRIVE ENVIRONMENT ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER Website: www.ncdot.gov RALEIGH NC 27699-1598 MERGER INFORMATION In compliance with the NEPA/404 Merger Process, the following Concurrence Meetings were held for R-2233 BB: 413: March 16, 2017, and 4C: May 16, 2018. PROJECT SCHEDULE This project will be permitted in phases. R-2233BB is currently scheduled to let to construction on July 21, 2020. R-2233BA is currently scheduled to let on June 20, 2023. The impacts reported in this Individual Phased Permit Application for Section R-2233BB are based on final design. The proposed impacts for Section R-2233BA are based on preliminary design. A phased permit modification will be requested for R-2233BA prior to that section's construction letting. RESOURCE STATUS Waters within the project area are located in the Broad River Basin (HUC 03050105), within Sub basins 03-07-08, 03-07-10, and 03-07-15). There are no Outstanding Resource Waters (ORW) or High -Quality Waters (HQW) within the project area. No Water Supply Waters (WS-I or WS-II) waters occur within 1.0 mile of the project area. Wetland and stream determinations within R-2233BB and R-2233BA were conducted using the field delineation method outlined in the 1987 Corps of Engineers Wetland Delineation Manual. These determinations were initially verified in 2004 and 2010. Lori Beckwith from USACE and David Wainwright of DWR, field reverified the wetlands and streams on August 29, 2017. 303(d) Impaired Waters: No streams in the project footprint or within 1 mile of the project area are currently listed on the North Carolina 2018 Final 303(d) list of impaired waters. IMPACTS TO WATERS OF THE U.S. Tables 1 and 2 summarize the impacts to jurisdictional water resources for R-2233BB (impacts for R- 2233BA are only preliminary design and are listed in Table 4). Site numbers correspond with the permit (hydraulic) drawings included in this application. The stream and wetland numbers correspond to the 2017 PJD package. R-2233BB & R-2233BA Individual Phased Permit Application Page 2 of 9 Table 1— R-2233BB Wetland Impacts (acres Permit NRTR Wetland PermanentExcavation Mechanized Hand Site Site NC WAM Classification Size Fill in in Wetlands Clearing Clearing Impact Description Wetlands 8 WA Headwater Forest 0.11 0.11 -- -- -- Roadway fill/Utility excavation Total Wetland Impacts: 0.11 -- -- -- Total Wetland Impacts Requested from DMS: 0.11 Table 2 — R-2233BB Stream Imnacts (linear feet) Permanent Temp. ACOE DWR Permit Stream Name/ Status/ Channel Bank Channel Required Required Impacts Description Site NRTR ID Class Impacts Stabili Impacts Mitigation Mitigation zation 1 UT to Cleghorn Perennial 43 -- 34 43 __ Stream SN will be relocated into a 15" CSP with impacts from roadway Creek / SN C fill to the original streambed. 1 UT to Cleghorn Perennial 24 -- 14 24 -- Stream SN will be impacted by the extension of a 48" RCP. Creek / SN C 4 UT to Cleghorn Perennial 139 -- 18 139 139 Stream SL will be impacted by a channel realignment up and Creek / SL C downstream of a new RCBC. 4 UT to Cleghorn Perennial 766 -- -- 766 766 Stream SL and an intermittent UT (SM) will be impacted by their Creek / SL-SM C relocation into a 10' x 7' RCBC. 4 UT to Cleghorn Perennial 10 -- 7 10 10 Stream SL will be impacted by the installation of a lateral V ditch above Creek /SL C the inlet of the 10' x 7' RCBC. 5 UT to Cleghorn Perennial _ 10 17 __ __ Stream SK will be impacted by the installation of Bank Stabilization at Creek/SK C the inlet of a 7'x 7' RCBC 26' . 5 UT to Cleghorn Perennial 112 -- -- 112 -- Stream SK will be impacted by its relocation into a 30" CSP. Creek/SK C 5 UT to Cleghorn Intermittent 28 -- 21 28 -- Stream SJ will be impacted by roadway fill. Creek / SJ C 6 CleghornCreek Perennial _ 11 9 __ __ Stream SI will be impacted by the installation of bank stabilization at the / SI C I outlet of an 8'x8' RCBC. R-2233BB & R-2233BA Individual Phased Permit Application Page 3 of 9 Permit Stream Name/ Status/ Perm. Bank Temp. ACOE DWR Site NRTR ID Class Channel Stabili Channel Required Required Impacts Description Impacts zation Impacts Mitigation Mitigation 6 Clegho / Perennial 670 -- -- 670 670 Stream SI will be impacted by its relocation into an 8' x 6' RCBC. SlCreek 6 Cleghorn Creek Perennial 34 -- 18 34 34 Stream SI will be impacted by a channel change at the inlet of the 8' x / SI C 6' RCBC. 7 UT to Cleghorn Perennial 832 -- -- 832 832 Stream SH will be covered by roadway fill. A spring box or subsurface Creek / SH C drain will be installed to handle any remaining flow. UT to Hollands Perennial Stream SG will be covered by roadway fill with the flow diverted to a 8 Creek / SG WS-V 445 -- -- 445 445 standard V ditch. 8 UT to Hollands Perennial 32 -- -- 32 32 Stream SG will be relocated into a 36" CSP with impacts from roadway Creek / SG WS-V fill to the original streambed. UT to Hollands Perennial Stream SG will be impacted by the installation of bank stabilization at 8 Creek / SG WS-V _ 25 20 __ __ the outlet of a 36" CSP. UT to Hollands Perennial Stream SF will be impacted by the installation of bank stabilization at 9 Creek / SF WS-V _ 14 9 -- the inlet of a 54" RCP. UT to Hollands Perennial Stream SF will be relocated into a 54" RCP with impacts from roadway 9 Creek / SF WS-V 140 -- -- 140 -- fill to the original streambed. 9 UT to Hollands Perennial 55 7 55 Stream SF will be impacted by an energy dissipater placed at the outlet Creek / SF WS-V __ of the 54" RCP. 10 Hollands Creek / Perennial 72 19 72 72 Stream SE will be impacted by a channel change from the installation o SE WS-V a flood lain bench. Hollands Creek / Perennial Stream SE will be impacted by its relocation into a triple barrel 10' x 10' ] 0 SE WS-V 217 -- -- 217 217 RCBC. Hollands Creek / Perennial Stream SE will be impacted by a channel change from the installation o 10 45 -- 51 45 45 a floodplain bench and temporary impacts from the removal of a double SE WS-V barrel 6' x 6' box culvert. 11 UT to Mountain Perennial 10 27 -- Stream SB will be impacted by the installation of bank stabilization at Creek / SB C the outlet of a 36" CSP. UT to Mountain Perennial Stream SB will be relocated into a 36" CSP with impacts from roadway 1 1 Creek / SB C 151 __ __ 151 __ fill to the original streambed. UT to Cleghorn Perennial Stream SO will be impacted by an energy dissipater placed at the outlet 13 Creek / SO C 35 I -- 19 I 35 __ of a 72" RCP. R-2233BB & R-2233BA Individual Phased Permit Application Page 4 of 9 Permit Stream Name/ Status/ Perm. Bank Temp. ACOE DWR Site NRTR ID Class Channel Stabili Channel Required Required Impacts Description Impacts zation Impacts Mitigation Mitigation 14 UT to Hollands Perennial -- 10 24 -- -- Stream SG will be impacted by the installation of bank stabilization at Creek / SG WS-V the outlet of a standard base ditch. 15 UT to Catheys Perennial -- 22 14 -- -- Stream SC will be impacted by the installation of bank stabilization at Creek / SC WS-V the outlet of a standard base ditch. 15 UT to Catheys Perennial 506 -- -- 506 506 Stream SC will be relocated into a 42" CSP with impacts from roadway Creek / SC WS-V fill to the original streambed. 15 UT to Catheys Perennial 14 -- 19 14 14 Stream SC will be impacted by a standard V ditch. Creek / SC WS-V UT to Hollands Intermittent Stream SD will be impacted by an energy dissipater placed at the outlet 16 Creek / SD WS-V 52 -- ] 0 52 -- of a 60" RCP. 16 UT to Hollands Intermittent 38 __ __ 38 __ Stream SD will be relocated into a 60" RCP with impacts from roadway River / SD WS-V fill to the original streambed. UT to Hollands Intermittent Stream SD will be impacted by a lateral V ditch as part of the energy 16 River / SD WS-V 18 -- 12 18 -- dissipater at the outlet of the 60" RCP UT to Cleghorn Perennial Stream SO will be impacted by its relocation into a 42" RCP with 17 Creek / SO C l43 -- -- l43 -- impacts from roadway fill to the original streambed. UT to Hollands Perennial An UT to Hollands Creek will be impacted by the installation of bank 18 Creek * I WS-V -- 13 13 -- -- stabilization at the outlet of a 30" RCP. Total Stream Impacts: 4,621 115 382 4,621 3,782 Total Permanent Impacts 4,736 Total Stream Impact Requested from DMS: 4,621 * Stream identified after PJD reverification. R-2233BB has 115 linear feet of permanent impacts from bank stabilization. As these impacts are not considered a loss of Waters of the US, mitigation is not proposed. 115 linear feet has been subtracted from total permanent impacts for R-2233BB: 4,736' — 115' = 4,621'. Utility Impacts There will be no Utility impacts to jurisdictional resources on for R-22331313. Utility impacts for R-2233BA will be determined when that section reaches final design. R-2233BB & R-2233BA Individual Phased Permit Application Page 5 of 9 FEDERALLY PROTECTED SPECIES Plants and animals with Federal classification of Endangered (E) or Threatened (T) are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973, as amended. As of November 13, 2019, the USFWS lists seven federally protected species for Rutherford County. Dwarf -flowered heartleaf is present in the project footprint. A Biological Opinion for dwarf -flowered heartleaf was developed for the project on May 12, 2009 but is currently being updated/ prepared for the USACE's submittal to the USFWS (as the USACE is the Lead Federal Agency) for this project. It is anticipated the biological conclusion for this species will be May Affect, Likely to Adversely Affect. Table 3 — Federally protected species listed for Rutherford County Federal Proposed Last Survey Scientific Name Common Name Status Habitat Biological Date Conclusion Glyptemys muhlenbergii Bog turtle T (S/A) No Not Subject n/a 5/23/2019 — Hexastylis naniflora Dwarf -flowered heartleaf T Yes MALTAA Currently Updating 5/22/2016 Isotria medeoloids Small whorled pogonia T Yes No Effect Currently Updating Sisyrinchium dichotomum White irisette E No No Effect n/a Gymnoderma lineare Rock gnome lichen E No No Effect n/a Myotis sodalis Indiana bat E Yes MANLTAA 6/24/2019 Myotis septentrionalis Northern long-eared bat T Yes MANLTAA 6/24/2019 T (S/A): Threatened for Similarity of Appearance T: Threatened E: Endangered MALTAA: May Affect; Likely to Adversely Affect MANLTAA: May Affect; Not Likely to Adversely Affect INDIRECT CUMULATIVE IMPACT ANALYSIS NCDOT completed an Indirect Screening and Land Use Scenario Assessment for R-2233B in January 2010. The findings of this report state that residential, commercial, industrial, and mixed -use development is expected to continue (at a slow pace) in the Future Land Use Study Area (FLUSA) with or without the project. R-2233B will have little to no effect of future stormwater runoff or water quality in the watersheds encompassed by the project. Given the minimal indirect effects of the project, the contribution of the project to cumulative effects resulting from current and planned development patters should be minimal. For these reasons, potential indirect and cumulative effects to downstream water quality should be minimal. CULTURAL RESOURCES Archaeological Resources: An intensive archaeological survey was conducted within the study corridor for the selected alternative during 2010. The archaeological Area of Potential Effect is considered the proposed construction limits of the project. The intensive archaeological survey covered all of the 3-13 proposed construction limits. Subsurface shovel testing was conducted in areas of high probability within the proposed construction limits. As a result of the Phase I archaeological survey along US 221 conducted in 2010, seven new archaeological sites were recorded within the project APE. These cultural resources are one multi - component (prehistoric and historic) artifact scatter (31RF196/196), five isolated finds of prehistoric lithic material (31RF197-31RF201) and one sparse prehistoric lithic scatter (31RF202). These archaeological R-2233BB & R-2233BA Individual Phased Permit Application Page 6 of 9 resources are recommended as not eligible for listing on the National Register of Historic Places. The final archaeological report has been forwarded to the US Army Corps of Engineers and the HPO for review. Under Section 106, no significant archaeological resources were identified. Historic Architectural Resources: The proposed project is subject to North Carolina General Statute 121-12(a). Although no federal funds will be used for the construction of the proposed project, the project will require a permit from the US Army Corps of Engineers. Section 106 of the National Historic Preservation Act of 1966, as amended, applies to federal permit areas along the project. Surveys for historic architectural resources were conducted in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended. A preliminary survey for Historic Architectural Resources was conducted by NCDOT in 1999. The survey consisted of a cursory field survey and limited historical background research. USGS maps were used as guides in the field to identify historic resources and evaluate their potential for National Register of Historic Places eligibility. During the survey, a total of 145 resources at least 50 years old were identified within the Area of Potential Effects (APE). Of these resources, three are listed on the National Register and eight were evaluated and determined to be eligible for the National Register. The State Historic Preservation Office (HPO) concurred with these findings in a letter dated April 25, 2003. Prior to the initiation of construction, NCDOT will record the existing condition of Ruth Elementary School in accordance with the Historic Structures and Landscape Recordation Plan. Copies of the documentation will be deposited in the files of the State Historic Preservation Office and the files of the Historic Architecture Group of NCDOT. NCDOT will compile a historic context documenting the history of Consolidation -Era public schools within Rutherford, Polk and Cleveland counties. The context will compile documentary materials, bibliographical sources, National Register eligibility considerations and digital images. The final report will be in a digital format and will be provided on a CD-ROM to the State Historic Preservation Office. Another copy of the report will be deposited in the files of the Historic Architecture Group of NCDOT. The final digital product will be completed and distributed within three years of the execution of the Memorandum of Agreement regarding the project's adverse effects on Ruth School. The proposed bypass will cross the portion of US 64 which is designated a part of the commemorative motor route for the Overmountain Victory National Historic Trail (OMVNHT). Although there is no trail currently in place along Cleghorn Creek, the primary historic route of the OMVNHT crosses US 64 near US 74A (Railroad Avenue) and follows Cleghorn Creek toward Rutherfordton. NCDOT has coordinated with the National Park Service and local agencies regarding how the proposed bypass can accommodate the OMVNHT. The selected alternative will carry US 64 over the proposed bypass on a bridge. A sidewalk and 42-inch handrails will be provided on the south side of this bridge to allow pedestrians using the OMVNHT to cross the proposed bypass. NCDOT will continue to coordinate with the Park Service and local agencies regarding the OMVNHT. Community Studies: The Community Impact Assessment (CIA) Update was completed in February 2011. While this project is expected to result in residential and business displacements, the project is not expected to have notable community impacts, and the impacts to Environmental Justice communities are not expected to be disproportionately high and adverse. The Indirect Screening and Land Use Scenario Assessment (ICE-LUSA) was completed in January 2010. It concluded that, "Given the minimal indirect effects of the project, the contribution of the project to cumulative effects resulting from current and planned development patterns should be minimal. For these reasons, potential indirect and cumulative effects to downstream water quality should be minimal. No additional ICE study is recommended." R-2233BB & R-2233BA Individual Phased Permit Application Page 7 of 9 Both the CIA Update and the ICE-LUSA remain valid, unless there are new alternatives that extend beyond the 2011 Direct Community Impact Area and the 2010 Future Land Use Study Area. FEMA COMPLIANCE The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. WILD AND SCENIC RIVER SYSTEM The project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers (Public Law 90-542, as amended). MITIGATION OPTIONS The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning and NEPA compliance stages, and minimization measures were incorporated as part of the project design. Avoidance and Minimization • BMPs were used throughout the project for stormwater treatment and to minimize erosion. • The design of the proposed interchange with existing US 221 south of Rutherfordton was changed from a diamond interchange to a half -cloverleaf interchange. No ramps are proposed in the northern quadrants of the interchange, which will reduce stream impacts. • 2:1 side slopes are proposed in jurisdictional areas and in areas containing the federally protected dwarf -flowered heartleaf. • The design of the ramp in the northeast quadrant of the proposed US 64 interchange was changed. The ramp will more closely follow the alignment of the proposed which will reduce stream impacts. • Roadway runoff flows to grass shoulders in fill sections and is collected in median and grass side ditches in cut sections to pipe systems. Pipe systems include riprap pads or energy dissipator basins at outfalls. • Two dry detention ponds will be installed to reduce post construction runoff to the levels of preconstruction discharge. • Ditches include riprap lining where shear stress exceeds allowable for grass. R-2233BB & R-2233BA Individual Phased Permit Application Page 8 of 9 Compensation: The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable as described above. Table 4 summarizes the wetland and stream impacts for each section and summarizes the mitigation requirements for the project. Table 4 — R-2233BB/BA Mitigation Summary HUC Project Section/ Design Level ACOE Required Mitigation (If) DWR Required Mitigation (If) Wetland Mitigation (ac) 03050105 R-2233BB Final Design) 4,621 3,782 0.11 03050105 R-2233BA(Preliminary Design*) 5,664 -- 0.61 R-2233BB Total Mitigation: 10,285 3,782 0.72 *Preliminary design impacts are based on slope stakes plus 25 feet — please see preliminary impact table and preliminary permit drawings for R-2233BA (attached). R-2233BB has 115 linear feet of permanent impacts from bank stabilization. As these impacts are not considered a loss of Waters of the US, mitigation is not proposed. 115 linear feet has been subtracted from total permanent impacts for R-2233BB: 4,736' — 115' = 4,621'. Although R-2233BA is in preliminary design, because the project is scheduled to let within 5 years, mitigation for the proposed 5,664 linear feet of stream impacts and 0.61 acre of wetland impacts has also been secured for this project. Permanent stream and wetland impacts are proposed to be mitigated at a ratio of 2:1 with credits acquired from DMS. REGULATORY APPROVALS Section 404 and Section 10: Application is hereby made for a USACE Individual 404 and Section 10 Permit as required for the above -described activities. Section 401: We are hereby requesting a 401 Water Quality Certification from the N. C. Division of Water Resources. In compliance with Section 143 215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit application previously noted in this application (see Subject line). Thank you for your assistance with this project. If you have any questions or need additional information, please contact Jeff Hemphill at jhemphill&ncdot.gov or (919) 707-6126. A copy of this application and distribution list will also be posted on the NCDOT website at: htlps:Hxfer. services.ncdot. goy/pdea/PennApps/. Sincerely, Philip S. Harris, P.E., C.P.M. Environmental Analysis Unrt Head cc: NCDOT Permit Application Standard Distribution List. R-2233BB & R-2233BA Individual Phased Permit Application Page 9 of 9 U.S. ARMY CORPS OF ENGINEERS Form Approved - APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB No. 0710-0003 33 CFR 325. The proponent agency is CECW-CO-R. Expires: 30-SEPTEMBER-2015 Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Phil Middle - S Last - Harris First - Middle - Last - Company - NCDOT Company - E-mail Address-pharris@ncdot.gov E-mail Address - 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 1598 Mail Service Center Address - City - Raleigh State - NC Zip - 27699 Country -USA City - State - Zip - Country - 7. APPLICANT'S PHONE NOs. WAREA CODE 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax 919-707-6001 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) R-2233BB 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) Broad River Address 15. LOCATION OF PROJECT Latitude: -N 35.37867 Longitude: oW 81.94998 City - State- Zip- 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, DEC 2014 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE Please see attached Vicinity Map and Cover Letter. 18. Nature of Activity (Description of project, include all features) The proposed action involves constructing the US 221 Bypass of Rutherfordton, in Rutherford County. The proposed bypass will be constructed as a four -lane roadway with a 46-foot median. Portions of the bypass will be constructed on new location. Full control of access will be obtained for new location sections of the bypass. Partial control of access (one access per parcel with no other access) will be obtained for sections of the project along existing roadways. The proposed project is approximately 8.5 miles long. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose of the project is to reduce congestion, improve safety, and improve travel time for traffic using the US 221 corridor in the vicinity of Rutherfordton. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge New location road construction and widening of existing will lead to roadway fill need to be placed in jurisdictional feature in the project footprint. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards see attached Cover Letter. 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres or Linear Feet see attached Cover Letter. 23. Description of Avoidance, Minimization, and Compensation (see instructions) see attached Cover Letter. ENG FORM 4345, DEC 2014 Page 2 of 3 24. Is Any Portion of the Work Already Complete? Yes FX—]No IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- see attached Permit Drawings. City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL' IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. /]/% Q 1�[..� tLIA.0 C' SIGNATURE OF APPLICANTIT SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, DEC 2014 Page 3 of 3 ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director Mr. Philip S. Harris, III, P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: NORTH CAROLINA Environmental Quality March 4, 2020 Subject: Mitigation Acceptance Letter: TIP Number R-2233BB — US 221 South of US 74 Business (Charlotte Road) to North of SR 1366 (Roper Loop Road), Rutherford County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information received on March 4, 2020, the impacts are located in CU 03050105 of the Broad River basin in the Southern Piedmont (SP) Eco-Region, and are as follows: Broad 03050105 Stream Wetlands Buffer (Sq. Ft.) Non- Coastal Sp Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts (feetiacres) 0 4,623.0 0 0.11 0 0 0 0 DMS commits to implementing sufficient compensatory wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420. Sincerely, 600M"CVV ames B. Stanfill DMS Asset Management Supervisor cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR File: R-2233BB �EQJ wi!HM�^., A North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director Mr. Philip S. Harris, III, P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: NORTH CAROLINA Environmental Quality March 4, 2020 Subject: Mitigation Acceptance Letter: R-2233BA, US 221 North of US 74 Bypass to Just North of US 74 Business, Rutherford County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on March 4, 2020, the impacts are located in CU 03050105 of the Broad River basin in the Southern Piedmont (SP) Eco-Region, and are as follows: Broad Stream Wetlands Buffer (Sq. Ft.) 03050105 Non- Coastal Sp Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 5,664.0 0 0.72 1 0 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. The impacts and associated mitigation needs were under projected by the NCDOT in the 2020 impact data. DMS will commit to implement sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. Sincerely, bod6i �n Y 1 James B. Stanfill MS Asset Management Supervisor cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR File: R-2233BA North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 ,1-F Dewberr y- R-2233BB HYDRAULIC DESIGN 413 CONCEPTUAL HYDRAULIC DESIGN REVIEW Date: March 16, 2017 Time: 10:00-12:00 PM Location: NCDOT Structure Design Conference Room Purpose: R-2233BB US 221 Proposed Rutherfordton Bypass Rutherford County 4B Conceptual Hydraulic Design Review Meeting In Attendance Name Bill Zerman Organization Phone Email NCDOT Hydraulics Unit 919-707-6755 bzerman@ncdot.gov Matthew York NCDOT Hydraulics Unit 919-707-6765 mjyork@ncdot.gov Cynthia Van Der Wiele USEPA 919-450-6811 vanderwiele.cynthia@epa.gov Monte Matthews USACE Monte.K.Matthews@usace.army.mil Marella Buncick USFWS 828-258- 3939(237) marella_buncick@fws.gov Marla Chambers NCWRC 704-982-9181 marla.chambers@ncwildlife.org Kevin Barnett (By Phone) NCDWR 828-2964657 Kevin. Barnette@ncdenr.gov Jim Mason NCDOT NES 919-707-6136 jsmason@ncdot.gov Mark Staley NCDOT REU 919-707-2948 mstaley@ncdot.gov Amelia Coley NCDOT Roadway alcoley1@ncdot.gov Allison White NCDOT Roadway 919-707-6341 akwhite@ncdot.gov Ali Koucheki NCDOT Utilities 919-707-6699 akoucheki@ncdot.gov Carla Dagnino NCDOT NES 919-707-6110 cdagnino@ncdot.gov Jay McInnis NCDOT PDEA 919-707-6029 jmcinnis@ncdot.gov Ricky Tipton (By Phone) NCDOT Division 13 828-251-6171 rtipton@ncdot.gov Crystal Moore Dewberry 919-424-3745 comoore@dewberry.com Steve Bondor Dewberry 919-636-6334 sbondor@dewberry.com Summary of Discussion The R-2233BB project is new alignment approximately 5 miles long and includes two interchanges. Typical section is divided highway with paved shoulders and median ditches. Purpose of the meeting is to review the potential impact the hydraulic design may have on jurisdictional stream and wetlands. 17 impact sites were identified and shown in the plans. R-2233BB Hydraulics Pre -Design Meeting Minutes 1 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 4B CONCEPTUAL HYDRAULIC DESIGN REVIEW The jurisdictional stream survey was prepared over 10 years ago and will be updated with a current review. The final survey file will be revised to include the current stream delineation. Plan Sheet 6 Site 1— stream located along Y2 sta 34+00 RT, will be entirely covered by proposed roadway embankment. • No comments. Site 2 — stream located along Y2 sta 23+00 LT, section of stream will be enclosed in extension of 48" pipe due to proposed roadway embankment. • No comments. Site 3 — wetland located near L sta 780+00 Lt, will be partially filled by proposed roadway embankment. Section of stream located near L sta 779+00 LT will be filled with rip rap energy dissipater basin due to velocity of 16 ft/sec at outfall of 36" pipe. • No comments. Site 16 — stream located in cul-de-sac 16, near L Sta 780+00 LY, portion of stream will be diverted into roadway ditch along the cul-de-sac. • No comments. Plan ShPPt R Site 4 — stream located near L sta 797+60, section of stream will be enclosed in box culvert. Preliminary culvert size is 2 @ 7' x 6' approximately 460' long at 2.7% slope. Existing stream is approximately 6' wide. Therefore one barrel will be used as low flow and the other as floodplain bench. Sills and baffles will be included due to the slope. • Comment expressed about the possibility of reducing the length of proposed culvert. The roadway profile shows approximately 80' of fill and includes side slopes of 2:1, therefore no practical way to reduce length. • Comment expressed about proposed roadway drainage discharged to stream. Roadway discharge to stream required however to maintain existing drainage pattern. • Comment suggested that invert of proposed pipe outfalls located in side of box culvert be placed at lowest invert elevation as possible to limit erosion of bed material inside the culvert. • Comment suggested that rip rap be used in the floodplain bench barrel of the box culvert to limit erosion of material from the barrel. • Comment noted that burial of low flow barrel may not be required due to length of culvert and would be confirmed at the 4C meeting. Plan Sheet 9 R-2233BB Hydraulics Pre -Design Meeting Minutes 2 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 413 CONCEPTUAL HYDRAULIC DESIGN REVIEW Site 5 - stream located near L sta 815+00 LT, upstream section of stream will be filled by roadway embankment, 36" pipe will be used. • Comment expressed about the need for spring box to drain potential groundwater below embankment. Springbox not shown in plans but can be added in field during construction if groundwater is present. Plan Sheet 10 Site 6 - stream located near L sta 830+00, section of stream will be enclosed in box culvert. Preliminary culvert size is single barrel 7' x 6' approximately 530' long at 2.6% slope. Existing stream is approximately 5' wide. Therefore a low flow channel with a sill 5' wide will be used. Baffles will be included due to the slope. • Comment expressed possible need for outlet protection at discharge end of box culvert. Plans currently show rip rap on banks only. Velocity at the outlet will be confirmed and rip rap energy dissipater basin added if velocity is greater than 15 ft/sec. Site 7 — stream located near L sta 832+00 RT, stream is small trib that will be entirely filled by the proposed roadway embankment. • No comments. Plan Sheet 11 Site 8 — stream located near RPD sta 20+00 LT, upstream section of stream will be filled by proposed roadway embankment and will be enclosed in 36" pipe. Rip rap on banks only will be placed at pipe outfall. • Comment requested the addition of bank stabilization at end of v-ditch at RPD sta 18+50 LT. Plan ShPPt 12 Site 9 - stream located near L sta 866+00, section of stream will be enclosed in proposed 54" pipe. Section of stream at outfall will be filled with rip rap energy dissipater basin due to velocity of 16 ft/sec at outfall of 54" pipe. Proposed roadway drainage system will also discharge to the same rip rap energy dissipater basin. • Comment requested that a separate rip rap energy dissipater basin be used for the roadway drainage system at outfall #1209 at approximate sta L 866+50 RT. This would avoid direct discharge of roadway drainage to the stream. • Comment requested possible reduction of size of the rip rap energy dissipater basin at outfall of 54" pipe if the roadway pipe outfall 1209 is relocated. Rip rap will be added to end of basin to provide transition to existing channel width. Plan ShPPt 1 R R-2233BB Hydraulics Pre -Design Meeting Minutes 3 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 4B CONCEPTUAL HYDRAULIC DESIGN REVIEW Site 10 - stream located near L sta 874+50, section of stream will be enclosed in box culvert. Preliminary culvert size is 3 @ 10' x 10' approximately 200' long at 0.3% slope. Existing stream is approximately 10' wide. Therefore center barrel will be used as low flow and the outside barrels as floodplain benches. Sills will be included to establish the floodplain bench. The center barrel will be buried 1' below the streambed. • No comments. Plan Sheet 20 Site 11 - stream located near L sta 969+00 LT, upstream section of stream will be enclosed in proposed 30" pipe. Section of stream at outfall will be filled with rip rap energy dissipater basin due to velocity of 20 ft/sec at outfall of 30" pipe. Proposed roadway drainage system will also discharge to the same rip rap energy dissipater basin. • This site was noted in the Record of Decision (site 1N) for consideration of additional mitigation • Comment suggested addition of junction box drop structure to the 30" pipe to reduce velocity and eliminate the rip rap energy dissipater basin. Rip rap would be required on channel banks only. • Comment suggested connection of the 18" roadway drainage outfall #2006 to the drop structure. Comment noted that additional group field visit not required. Site photographs adequate for review. Additional mitigation will be provided by addition of drop structure as noted above Plan Sheet 21 Not a current impact site — current stream delineation shows limit of jurisdictional stream downstream of project, L sta 981+50 LT. New delineation may extend stream limit to project footprint however. Proposed drainage design consists of 36" pipe with an outfall that includes a rip rap energy dissipater basin due to velocity of 21 ft/sec at outfall. Proposed roadway drainage system will also discharge to the same rip rap energy dissipater basin. • Comment suggested addition of junction box drop structure to the 36" pipe to reduce velocity and eliminate the rip rap energy dissipater basin. Rip rap would be required on channel banks only. • Comment suggested connection of the 15" roadway drainage outfall #2116 to the drop structure. Plan Sheet 22 Site 12 - stream located near L sta 996+00 LT, section of stream at outfall of 30" pipe will be filled with rip rap energy dissipater basin due to velocity of 16 ft/sec at outfall. Proposed roadway drainage system will also discharge to the same rip rap energy dissipater basin. • Comment suggested addition of junction box drop structure to the 30" pipe to reduce velocity and eliminate the rip rap energy dissipater basin. Rip rap would be required on channel banks only. R-2233BB Hydraulics Pre -Design Meeting Minutes 4 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 4B CONCEPTUAL HYDRAULIC DESIGN REVIEW • Comment suggested connection of the 24" roadway drainage outfall #2207 to the drop structure. • Comment suggested that possibility of relocation of U-turn bulb be investigated. Relocation would reduce length of embankment and would avoid impact to the stream. Plan ShPPt 9R Site 13 — limit of jurisdictional stream located at Y2 sta 15+00 RT at the outfall of existing 72" pipe. Proposed 72" pipe outfall #2303 and endwall will be placed in same location. Stream will be filled with rip rap lining at pipe outfall to prevent enlargement of existing scour hole. • No comment Plan Sheet 31 Site 14 - stream located near Y10 sta 15+00 LT and is enclosed in 60" pipe. Existing 60" pipe will remain if pipe structural condition is adequate. If pipe is replaced location will be moved slightly. Section of stream at 60" pipe outfall will be filled with rip rap energy dissipater basin due to velocity of 19 ft/sec. Comment suggested addition of junction box drop structure to the 60" pipe to reduce velocity and eliminate the rip rap energy dissipater basin. However the Division noted that the drop structure for the 60" pipe would be large and would trap debris and therefore would not be a practical solution. Therefore the rip rap energy dissipater basin will remain as proposed. Plan ShPPt R9 Site 15 - stream located near Y11 sta 21+00, section of stream will be enclosed in proposed 42" pipe approximately 440' long with rip rap on banks only at the outfall. • Comment expressed concern of the length of pipe and if there is possibility to reduce length. The roadway profile shows approximately 90' of fill and includes side slopes of 2:1. The profile is restricted due to connection to the existing roadway at sta 28+00 and the existing greenway trail at sta 15+00, therefore no practical way to reduce length. Plan Sheet 29 Site 17- Stream is located near Y6 sta 10+50 RT. An outfall of a proposed 30" pipe outfall will be located at top of banks of existing stream channel. No proposed fill would be located in the channel. • Comment suggested that because no fill is proposed in the channel, there is no impact at the site and it could be removed as an impact site. • Subsequent to the meeting however, a revision to the hydraulic design was discussed to replace the 30" pipe with a ditch that would tie to the top of banks of the channel R-2233BB Hydraulics Pre -Design Meeting Minutes 5 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 4B CONCEPTUAL HYDRAULIC DESIGN REVIEW and would require bank stabilization. The bank stabilization would be considered an impact therefore the site will remain as an impact location. Plan Sheet 3(l Additional survey work on Plan Sheet 30 may involve impacts to jurisdictional stream. This site will be discussed during the upcoming 4C Meeting after field surveys have been obtained. R-2233BB Hydraulics Pre -Design Meeting Minutes 6 of 6 Dewberry R-2233BB HYDRAULIC DESIGN 4C MERGER MEETING Date: May 16, 2018 Time: 8:00-10:00 AM Location: NCDOT Structure Design Conference Room Purpose: R-2233BB US 221 Proposed Rutherfordton Bypass Rutherford County 4C Merger Meeting In Attendance Bill Zerman Nathan Adima Lori Beckwith (On Phone) NCDOT Hydraulics Unit NCDOT PMU USACE Matthew York NCDOT Hydraulics Unit Marla Chambers NCWRC Marella Buncick Jeff Hemphill Carla Dagnino Mark Staley (On Phone) Kevin Barnett (On Phone) Crystal Moore Steve Bondor USFWS NCDOT EAU 919-707-6755 bzerman@ncdot.gov 919-707-6755 nadima@ncdot.gov 828-271-7980 Loretta.a.beckwith@usace.army.mil (42230 919-707-6765 mjyork@ncdot.gov 704-244-8907 I marla.chambers@ncwildlife.org 828-258-3939 (237) 919-707-6126 NCDOT EAU 919-707-6110 NCDOT 919-707-2948 DENR 828-296-4657 Dewberry 919-424-3745 Dewberry 919-636-6334 Marella buncick(a)fws.00v Ihemphi ll(a)ncdot.gov cdaanino EDricdot.aov mstalev(a)ncdot.aov Kevin.barnett@ncdenr.gov comoore@dewberry.com sbondor@dewberry.com Summary of Discussion The R-2233BB project is new alignment approximately 5 miles long and includes two interchanges. Typical section is divided highway with paved shoulders and median ditches. Purpose of the meeting is to review the potential impact the hydraulic design may have on jurisdictional stream and wetlands. 18 impact sites were identified and shown in the plans. The jurisdictional stream survey was prepared over 10 years ago and will be updated with a current review. The final survey file will be revised to include the current stream delineation. Site 2, 3, and 12 are no longer impact sites. See the site comments below for more information. R-2233BB Hydraulics Pre -Design Meeting Minutes 1 of 3 Dewberry R-2233BB HYDRAULIC DESIGN 4C MERGER MEETING General Comments • Sites 2, 3, and 12 will be removed from the permit package. Based on the current wet file, these are no longer classified as jurisdictional streams nor wetlands. • The JD wetland/stream name will be added to the impact table in addition to the site names. Jeff Hemphill has edited the excel table. He also annotated plan sheets so Dewberry can add names to plans. • The impact table will be revised to include more detailed description of the type of impact. For example: culvert, stream relocation, ditches, and bank stabilization. Footnotes will also be added to the table to help with clarification on the impact type. Site 1 • No additional comments other than the general comments. Site 2 • Lori Beckwith requested NCDOT confirmation that wetland is not jurisdictional. If the wetland is jurisdictional, confirm if it will be a total take and the amount of impact. Jeff Hemphill verified that stream and wetland are not jurisdictional, therefore, will be removed from project impacts. Site 3 • Impact will be removed. The stream is not jurisdictional. Site 4 • Address General Comments • Update the culvert size on the profile and wetland impact table. Site 5 • JS MIT at —L- Sta. 815+00 will be removed. This "J" feature is not jurisdictional. The impact table will be revised to remove this length of impact. • Address General comment for the impact table. Site 6 • Address general comments for the impact table. • Confirm the impact table quantity for existing channel impact permanent. Site 7 • Address General comment. Site 8 • Address general comment • Stop the temporary impact at the ROW. Site 9 • Address general comment R-2233BB Hydraulics Pre -Design Meeting Minutes 2 of 3 Dewberry R-2233BB HYDRAULIC DESIGN 4C MERGER MEETING • Confirm the slope of the existing 30" CMP (2.6%) and the proposed 54" RCP (3.1%). It was recommended that the slope be less than 3% to allow passage through the pipe. Current design indicates inlet is buried V and outlet flows into a dissipator basin. Additional Data Verified o Existing 30" CMP Pipe Slope is 2.6% o Proposed 54" RCP Pipe Slope is 3.1%. o Pending agency review comments, pipe will remain as shown on plans. Site 10 • Address general comment • Turn off impervious dikes from permit drawings • Add temporary impact from the existing culvert to the DUE. Site 11 • No additional comments other than the general comments Site 12 • Impact will be removed. The stream is not jurisdictional. Site 13 • The jurisdiction stream is not in the current jurisdictional wet file, however, it will be added. Site 14 • Move Site 14 note to allow riprap note to appear on the drawing. Site 15 • Extend the jurisdictional stream needs to the ROW on the downstream end. • Address general comment Site 16 • General comments — remove bank stabilization text at dissipator. Retain bank stabilization upstream. Add temporary stream impact to PDE downstream. Site 17 • No additional comments other than the general comments Site 18 • Jurisdictional stream is missing from the JD file. It was agreed upon to keep the impact. No revision necessary. R-2233BB Hydraulics Pre -Design Meeting Minutes 3 of 3 °t Highway North Carolina Department of Transportationr-49 Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BB County(ies): Rutherford Page 1 of 4 General Project Information WBS Element: 34400.1.S5 ITIP Number: R-2233BB Project Type: New Location Date: 3/4/2019 NCDOT Contact: Matthew York, PE Hydraulics Unit Contractor / Desi ner: Steven Bondor, PE Dewberry Engineers Inc Address: NCDOT Hydraulics Unit Address: Dewberry Engineers Inc. 1020 Birch Ridge Road Raleigh, NC 27610 2610 Wycliff Road, Suite 410 Raleigh, NC 27607 Phone: 919-707-6765 Phone: 919-636-6334 Email: mjyork@ncdot.gov Email: sbondor de caber .com City/Town: Rutherfordton Count ies : Rutherford River Basin(s): Broad ICAMA County? I No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 5.01 miles I Surrounding Land Use: lResidential, light industrial, rural undeveloped Proposed Project a Existing Site Project Built -Upon Area ac. 139 (proposedpavement) ac. 60.0 ac. Typical Cross Section Description: The R-2233BB project is new alignment approximately 5 miles long and includes two interchanges. Typical section is four lane divided highway with 46' grass median, paved shoulders and median ditches. Two lane shoulder section along existing alignment that will be widened. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 13,300 / 14,500 Year: 2020/2040 Existing: 7000 Year: 2016 General Project Narrative: (Description of Minimization of Water Quality Impacts) Roadway runoff flows to grass shouders in fill sections and is collected in median and grass side ditches in cut sections to pipe systems. Pipe systems include riprap pads or energy dissipator basins at outfalls. Two locations include dry detention ponds to reduce post construction runoff to the preconstruction discharge. Ditches include riprap lining where sheat stress exceeds allowable for grass. Waterbody Information Surface Water Body 1 : Cleghorn Creek Trib 11 NCDWR Stream Index No.: n/a NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I lihway North Carolina Department of Transportation "Storm -water ... Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 34400.1.S5 TIP No.: R-2233BB County(ies): Rutherford Page 2 of 4 Additional Waterbody Information Surface Water Body (2): Cleghorn Creek Trib 12 NCDWR Stream Index No.: n/a NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (3): Cleghorn Creek NCDWR Stream Index No.: 9-26-(0.5) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (4): 1 Hollands Creek NCDWR Stream Index No.: 9-41-13-7-(1) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V (WS-V) Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) EE See Sheet IA For Index of Sheets PERMIT DRAWING -TI — PR— . — mNo. NRRTR STATE OF NORTH CAROLINA SHEET 1 OF 37 N.CJ R-2233BB I END STATE DIVISION OF HIGHWAYS PROJECT R-2233BB 34400.1.S5 PE 34400.2.55 PW & UTIL `� R UTHERFORD COUNTY Al N�,°.. v° - LOCATION. US 221 SOUTH OF US 74 BUSINESS (CHARLOTTE ROAD) IT P4.1 TO NORTH OF SR 1366 (ROPER LOOP ROAD) 11 N4- TYPE OF WORK GRADING, DRAINAGE, PAVING 2 � AND STRUCTURES 5 7 u 4 BE S T - BB WETLAND AND SURFACE WATER IMPACTS PERMIT 29 VICINHY MAP O -1.3- POT Sta. 1003 + 54.13 �SITE 167 -L3TIE- PT Sta. 17 + 29.95 SITE 13 -Y8- POT Sta. 15 + 3 5. 00 -Y7- POC Sta. 14 + 75.00 -Y2- POT Sta. 17+25.00 12+75.00 -Y3- POT Sta. 13 +10.00 -DR3- POT Sta. 16 + 75.00 END CONSTRUCTION BEGIN CONSTRUCTION END CONS T R T I CONSTRUCTION N BEGIN CONSTRUCTION BEGIN CONSTRUCTION BEGIN CONSTRUCTION END CONSTRUCTION SITE -Yl 0- POT Sta. 12 + 50.00 -Y9- POT Sta. 13 + 50.00 -Y7A- POC Sta.13+75.00 -Yl 8- POT Sta. 14 + 30.00 BEGIN CONSTRUCTION r ' BEGIN BEGIN CONSTRUCTION BEGIN CONSTRUCTION BEGIN CONSTRUCTION SITE 11 ROPER LOOP RD. 23 �SITE 51 y 2 2 A p— -Y22A- POT Sta. 34 + 50.00 0 T S q E 21 2 BEGIN NSTRUCTION G COINS C 25 - BEGIN CONSTRUCTION TG hIAMAt 4 19 Ass �SITC6] 5 17 6 US221 SITE I aGILBOA RcH RD. b SITE 9 8 5 9 27 " ROOF 9 GTy -Y7- POT Sta. 22+50.00 > G) n 13 END CONSTRUCTION 3 SITE 17 OLD 4 RAIL ROAD D END CONSTRUCTION -Yll- POT Sta. 28 + 00.00 -1-3- POC Sta. 739 + 50.00 SITE 4 R K RD END CONSTRUCTION -Y5- POT Sta. 11 -YlO- POT Sta. 29 + 20.35 BEGIN CONSTRUCTION CNURCH cLONG ST. ll�tdp,l END CONSTRUCTION O� BEGIN CONSTRUCTION-Yl -Y19- POT Sta. 30+80.00 2- POT Sta. 11 + 2 5. 00 -Y5- POT Sta. 21 + -1-3- POT Sta. 1004 + 00.00 END CONSTRUCTIONoe END CONSTRUCTION BEGIN CONSTRUCTION -Y2- POT Sta. 42 + 25.00 -Y4- POT Sta. 12 SITE 7 28 -YA- POT Sta. 10+00.00SITE END TIP PROJECT R-2233BB END CONSTRUCTION BEGIN CONSTRUCTION BEGIN CONSTRUCTION -1-3- POC Sta. 738 + 80.79 -Y23- POT Sta. 36 + 60.00 SITE 8 END TIP PROJECT R-2233BA BEGIN CONSTRUCTION BEGIN TIP PROJECT R-2233BB tom POT Sta. 32 + 98.05 -Y6- OR THIS IS A CONTROLLED -ACCESS PROJECT WITH ACCESS END CONSTRUCTION BEING LIMITED TO INTERCHANGES. SITE 18 THIS IS A PARTIAL CONTROLLED -ACCESS PROJECT WITH -Y3- POT Sta. 41 + 50.00 DOCUMENT NOT CONSWEIRED1. .1 END CONSTRUCTION UNLESS ALL SIGNATURES COMPLETED ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD 11. A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWNS OF RUTHERFORDTON, RUTH, AND SPINDALE CITY NCDOT CONTACT: DERRICK WEAVER, P.E. GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR NCDOT BY. - HYDRAULICS ENGINEER 5�0 25 0 50 100 1 1 1 1 ADT 2020 = 13300 ADT 2040 = 14500 LENGTH ROADWAY TIP PROJECT R-2233BB = 4.991 MILES LENGTH STRUCTURE TIP PROJECT R-2233BB 0.019 MILES 2610 WYCLIFF ROAD 411•1•4 SUITE 410 RALEIGH, NC 27607 Dewberry PHONE: 9 9.881.9939 ip NC COA N.. F-0929 1-..ddm - 2012 STANDARD SPECIFICATIONS K = 9 % TOTAL LENGTH TIP PROJECT R-2233BB 5.010 MILES PLANS D = 60 % PX. 50 25 0 50 100 T = 9 % STRUCTURE LENGTH BASED ON -1-3- NB STATIONING. RIGHT OF WAY DATE. DENNIS J. MORY, P.E. SIGNATURE: PROJECT ENGINEER V = 70 MPH JULY 28,2017 ROADWAY DESIGN ENGINEER PROFILE (HORIZONTAL) TTST 5% DUAL 4% OP O10 5 0 10 20 I I FUNC CLASS LETTING DATE: WILLIAM E. TILLITT, P.E. TRA PROJECT DESIGN ENGINEER ARTERIAL JANUARY 21, 2020 REGIONAL TIER P.E SIGNATURE.- PROFILE (VERTICAL) DETAIL 1 RIP -RAP ENERGY DISSIPATOR BASIN DIM. (ft) RIP RAP BASIN TYPE A B C D E A 2.0 2.0 2.5 2.5 2.0 B 1.5 1.5 2.0 2.5 1.5 C 2.0 2.0 2.0 3.0 2.0 D 1.5 3.0 2.0 1.5 1.0 E 7.5 10 10 7.5 5.0 F 20 25 25 20 15 G 15 25 20 15 10 DDE (CY)370 105 244 50 15 GEOTEXTILE (SY) 370 70 185 40 20 CL B RIP RAP TONS) 125 WA CL I RIP RAP (TONS) 105 WA WA WA 15 CL 11 RIP RAP (TONS) 25 50 115 WA WA BASIN # LOCATION (AT OUTLET) TYPE SHEET 1 L3 STA 739+50 LT (CL 1) A 4 2 LPB STA. 17+50 RT CL B B 6 3 L3 STA 778+91 LT (CL 11) A 6 4 L3 STA. 786+61 LT CL B A 7 5 L3 STA. 808+38 LT (CL 1) A 9 6 L3 STA. 824+15 LT CL B A 10 7 RPD STA. 20+15 RT (CL B) A 11 8 L3 STA. 866+75 RT (CL 1) E 12 9 L3 STA. 867+10 RT (CL 1) A 12 10 L3 STA. 947+50 RT (CL B) A 18 11 Yll STA. 13+50 RT (CL B) A 18 12 L3 STA. 965+10 LT (CL 11) C 20 13 L3 STA. 990+58 LT (CL B) C 22 14 Y3 STA. 41+55 RT (CL B) D 28 15 Y10 STA. 14+70 LT CL II B 31 16 Y10 STA. 16+25 RT CL II C 31 17 nl STA. 22+00 LT (CL 1) A 32 I Not to Sc°le)M N-d Ground Ly D 1,FI. d Fill Slop. GEOTDGIIE �' g Min. D=1.5 Ft. u+ Max. d=1.5 F. t B=20 F. U 'When B k < 6.0' b=5.0 F. U-r�. Typef Li.- CL B Rip -Pp DDE O LL LOCATION SHEET CY To SY FROM L3 STA. 745+00 TO STA. 747+80 LT F-M VO SPFV - 9-A rn (TA Oa'ItI 5 e eo 1429 _n 157 ere 430 one DETAIL 3 TOE PROTECTION (Nof to Scole) OQ NATURAL ,1,.SF slope GROUND d Q w GEOIQTILE d= 1.5 F. m� Om Type of Liner= CL 8 Rip-R°p u LL LOCATION SHEET TON SY FROM LPD STA. 16+22 TO 18+08 RT 11 86 250 FROM LPD STA. 18+70 TO 20+41 RT 11 79 230 FROM RPD STA. 16+71 TO 19+00 RT 11 105 300 FROM RPD STA.19+92 TO 20+50 RT 11 27 80 FROM L STA. 814+50 TO 814+68 RT 9 5 12 DETAIL 4 STANDARD BASE DITCH ( Nof to Smlel N.-I Noh,rol G 'Wvn B s < 60 B FF. =3.0 . FROM RPD STA. 19+04 TO 19+86 RT 11 225 59 140 FROM Y5 STA. 11+75 TO 11+77 RT 13 256 1 10 RIP RAP NOT SHOWN r I - CULVERT 2:11 APRONrL F- I:Ix � I RIP RAP NOT SHOWN PLAN � SECTION DETAIL 5 RIRPAP PAD AT JURISDICTIONAL STREAM NM . _I.) (NM. NM..I Ground Z'1 �.'� D Geme.file D= Pipa Dim. EA0 Channel=O4a1Typef WIRY Li,­CL II RiP V z LOCATION SHEET TON SY FROM L3 STA. 814+83 LT 9 15 100 FROM RPD STA. 18+09 LT 11 29 100 FROM L3 STA. 995+71 LT 22 15 100 FROM L3 STA. 981+50 LT 21 27 100 FROM L3 STA. 968+80 LT 20 23 100 FROM Y6 STA. 10+25 RT 29 29 100 FROM Yll STA. 22+33 LT 32 15 100 FROM Y6 STA. 32+05 LT 30 15 100 DETAIL 6 LATERAL 'V' DITCH I Not tot to Sclm. Ground ?'I D �'1Slope - d GeorexRla Min. D=1.5 Ff. t Moz. d=1.5 Ft. - V b-5.0 F. - p d' Typo of Liner= CL II RiP-Rap DDE V �r LO u LOCATION SHEET CY TON SY FROM L3 STA. 798 +1 6 TO 799+00 LT 8 49 103 160 FROM L3 STA. 801+00 TO 802+01 LT 8 51 124 190 FROM L3 STA. 798+42 TO 800+00 RT 8 110 193 300 FROM RPD STA.18+11 TO 26+22 LT 11 970 993 1500 FROM L3 STA. 831+47 TO 838+00 LT 10,11 2048 799 1210 FROM Y18 STA.16+00 TO 17+51 LT 11 104 185 280 FROM Yll STA ll+00 TO 13+50 LT 18 529 245 470 FROM L3 STA. 963+56 TO 966+53 RT 19,20 206 1 360 1 550 FROM L3 STA. 961+50 TO 965+05 LT 19,20 317 435 660 FROM L3 STA. 966+54 TO 968+52 RT 20 121 186 290 FROM L3 STA. 968+55 TO 971+50 RT 20 408 361 550 FROM L3 STA. 989+50 TO 989+87 RT 21 14 45 70 FROM L3 STA. 995+00 TO 996+62 RT 22 113 207 320 FR M Y TA 2 +74 T 21+41 RT 30 24 82 130 FR M Yll TA 2 + T 24+13 RT 32 160 106 660 DETAIL 7 TOE PROTECTION (Nof. Swle) Ground y w d d=2.0 F. V b=3.0 F. Geohziile m Omm Type of Liner= CL B Rip -Rap LOCATION SHEET TON SY FROM L3 STA. 981+57 TO 982+00 LT1210115140 FROM L3 STA. 980+25 TO 980+62 RT 40 FROM Y10 STA. 12+50 TO 13+50 RT 90 FROM L3 STA. 888+00 TO 894+50 RT 685 FROM Y25REV STA.25+00 TO 25+85 LT 167 DETAIL 8 BERM DITCH S-16) O (Nv1to R�12 7.1 NPR 10.0'VC. D d Gewende Min. D=1.5 F. Man. d=1.5 Ft. m U O ommp Type of Liner= CL B RIPRAP DDE d U LL LOCATION SHEET CY TON SY FROM Y2 STA. 31+00 TO 33+00 LT 6 178 92 260 FROM L3 STA.782+00 TO 782+50 RT 7 44 23 70 FROM L3 STA. 811+45 TO 812+20 RT 9 67 35 100 FROM L3 STA. 815+87 TO 824+15 RT 9,10 264 381 1080 FROM L3 STA. 824+15 TO 826+00 RT 10 65 85 240 FROM Y2 STA.19+08 TO 21+00 LT 23 171 88 250 DETAIL 9 SPECIAL CUT DITCH (Not to Scolel Natural 6'NDixh ?'/ rom y°pe Ground D F\plot � d Min. D=1.5 FI. V GeavxSle Mon. d=1.5 F. m�Orc - Type of Liner= CL B Rip -Rap V er t7 u LOCATION SHEET TON SY FROM Y2 STA. 26+21 TO 27+67 RT 6 67 190 FROM L3 STA. 814+71 TO 816+50 RT 9 82 240 FROM Y19 STA. 22+20 TO 27+00 RT 9,26 358 1010 FROM LPD STA.18+08 TO 18+70 RT 11 29 90 FROM L3 STA. 883+96 TO 885+50 LT 13 71 200 FROM L3 STA. 890+50 TO 892+00 LT 14 69 200 FROM Y6 STA.10+00 TO 10+90 LT 29 41 120 FROM Y6 STA. 11+40 TO 13+56 LT 29 99 280 FROM Y22A STA. 35+60 TO 37+00 RT 11,29 64 190 FROM Y10 STA.20+00 TO 22+00 LT 31 92 260 FROM Y10 STA. 31+00 TO 33+02 LT 33 92 260 DETAIL 10 SPECIAL CUT DITCH (Nato Smle) FmM Ground ?:I A \dvoc Ditch � Slope d D Min. D=1.5 R. Type of Liner= PSRM Man d=1.5 Ft. LOCATION I SHEET FROM L3 STA. 807+64 TO 809+50 RT 8,9FROM Y7 STA. 14+75 TO 17+75 LT 21FROM L3 STA. 776+50 TO 779+50 RT 6 �2SY 00 DETAIL 11 LATERAL 'V' DITCH (NMIipGround Ground D�lope d w G.oreatil. Min. D=1.5 Ft. Man. d=1.5 k. b=5.0 m V LOCATION SHEET CY TON SY FROM L3 STA. 765+00 TO 767+15 RT 6 2276 99 170 FROM Y5 STA. 17+50 TO 20+50 LT 13 134 138 230 FROM L3 STA. 885+50 TO 890+50 LT 13,14 176 230 380 FROM Y22A STA. 37+50 TO 40+00 RT 29 199 115 190 FROM Y10 STA. 13+50 TO 14+25 LT 1 31 96 35 60 FROM Y25REV STA. 26+00 TO 28+00 RT 1 5 130 92 259 DETAIL 12 TOEI PROTECTION Not to Smly) Q\°hoc Ground b w d d = F. Sus V 6= 3.0 . Geoteztile 3. F _� - Omm Type of Liner= CL II Rip -Rap V z l� LL 1 LOCATION SHEET TON SY FROM L3 STA. 794+00 TO 796+00 RT 7,8 225 320 FROM L3 STA. 795+98 TO 797+57 LT 8 179 260 FROM L3 STA. 798+00 TO 798+33 RT 8 37 60 FROM L3 STA. 799+00 TO 801+00 LT 8 225 320 FROM L3 STA. 800+00 TO 801+00 RT 8 112 160 FROM L3 STA. 828+72 TO 830+50 LT 10 200 290 FROM Y18 STA. 15+27 TO 15+76 LT 11 55 80 FROM L3 STA. 963+00 TO 963+54 RT 19 1 61 190 FROM L3 STA. 980+75 TO 981+50 LT 21 1 84 120 FROM L3 STA. 989+50 TO 990+50 LT 21 113 160 FROM Y6 STA.26+25 TO 28+50 LT 30 275 360 FROM Y6 STA. 29+00 TO 30+45 RT 30 177 240 DETAIL 13 LATERAL BASE DITCH ( Not to Smlel b Ground ?:) F. Sllepe D\ d GEOTE01.E �� B Min. D=1.5 Ft. Maz. d=1.5 Ft. 'when B I. < 6.0' 11=3.0 Ft. Type of Liner= CL II Rip -Rap 6=5.0 Ft.. DDE V z H LOCATION SHEET CY TON SY FROM L3 STA.832+55 TO 838+00 RT 10,11 1954 332 1190 FROM Y10 STA. 17+80 TO 18+04 LT 31 21 15 60 DETAIL 14 SPECIAL CUT DITCH WHINGE (Not to Smle) Sid-11, N°lur°I Ground 0.02 Ffif. L. 7.1 D d From Geotextile DRch SlopeMin. FL D=1.5Ft.Type of Uner= CL. B Rip-Rp Man. d=1.OF. V LOCATION SHEET TON SY FROM Y2 STA 33+50 TO 40+00 LT 6 299 850 DETAIL 15 STANDARD V-D-ITCH LINING IN- Smle1 � yorye° S I.P SIoPe Dinh F\o6 w Slope Georeaile Man. d= 1.5 Ft. m O rc Type of Liner= CL B Rip -Rap V s O LL LOCATION SHEET TON SY FROM RPD STA. 14+14 TO 16+71 RT 11 118 340 FROM RPD STA. 20+50 TO 23+40 RT 11 133 380 FROM L3 STA. 927+50 LT 17 15 50 FROM L3 STA. 9"+50 LT apnM Lz cre an inn m aTe�nn Ir 18 n 15 zD 50 Tn PERMIT DRAWING SHEET 2 OF 37 DETAIL 16 BERM DITCH I Notro 5<ole) OOq OF 9� 3 ?'7 J 10.0'V.C. D d w Geotexlile?' Min. D=1.5 H. rr Maz. d=1.5 FI.V 00� Type of Liner= CL B RIPRAP DDE U OO LLm LOCATION SHEET CY TON SY FROM L3 STA. 951+32 TO 954+20 RT 18, 19 160 120 320 DETAIL 17 STANDARD 'V' DITCH I_ ro Scale) Naroml N-I Ground 7;y � ,L.1 Ground D d Wmerhl° Min. D=1.5 Ft. Man. d=1.5 Ff. Type of Liner= CL B Rlp-Rop FROM Y3 STA. 3I+OS TO 31+67 RT 11 24 29 90 FROM V12 STA. 28+72 TO 29+20 LT 16 20 25 44 FROM Y12 STA 10+43 TO 11+25 RT 15 40 311 110 II DETAIL 18 STANDARD BASE DITCH (Nor ro Scolel Nararol Ground Nmerol Ground d D Geoteclile B Min. D=1.0 Ft. Maz. 1=1.0 Fd. 'When B m < 6.0' B=4.0 Ft. V Type of Une,= CL B Rip -Rap DDE V ee l7 LL LOCATION SHEET CY TON SY Y6 STA.10+31 RT 29 16 30 90 DETAIL 19 TOE PROTECTION ( Nor ro Scolel R�� t Natural M1.� �VSV°� Ground b F d-1.0F t b=6.6.0 Ft. Geotexfile O U - - H� Ow Type of Liner= CLASS II Rip -Rap i U� OLL LOCATION SHEET TON SY FROM L3 STA. 921+00 TO 922+50 RT 16 1411 240 FROM L3 STA. 996+00 TO 998+58 LT 22 292 475 FROM L3 STA. 997+00 TO 998+50 RT 22 195 315 DETAIL 20 SPECIAL CUT DITCH (Norm Smla) 0, Ditch Groend ?V D hF�O�et Slope d Min. D=1.5 R. Moz d=1.0 Ft. Type of Liner= PSRM PSRM LOCATION SHEET SY I FROM Y12 STA.28+50 TO 29+20 RT 1 16 1 80 1 UtIAIL LI LATERAL BASE DITCH (Not too Smle NaNrol Ground 7;! t'rH. slope d p GEOTEXTILE �� B Min. D=2.0 Ft. A,; d=1.5 Ft. 'When B is < 6.0' B=.0 FI. m U Q rc Type of Li.-CL B Rip -Rap b=5.0 Ff. DDE V oe t7 u LOCATION SHEET CY TON SY FROM Y8 STA. 10+66 TO 12+90 RT F.- It <TA -0i SA - 7-AA IT 31 A S 176 TAd 120 - 320 A55 DETAIL 22 TOE PROTECTION (Nolto Swle) Nateml Groend b w d d= 1.0 Ft U b= 3.0 FI. Geotexfile Om Type of Liner= CL 1 Rip -Rap V rc l7 LL LOCATION SHEET TON SY FROM L3 STA. 865+00 TO 866+49 LT 12 112 200 FROM L3 STA. 969+00 TO 971+00 LT 20 151 270 DETAIL 23 LATERAL 'V' DITCH I Notro Bwbl Naleral �_ Ground" D IV". Fill IN d Geeroiile Min. D=�DD`tE . Maz. d=. b=5.0 _ 5� U Type of Liner= CL I Rip -Rap V c u~Oi O LL LOCATION SHEET CY TON SY FROM L3 STA. 828+00 TO 831+80 RT 10 692 175 600 FROM Yll STA 12+42 TO 12+73 RT 18 62 14 50 FROM Y70 STA.19+19 TO 20+00 LT 31 128 37 130 FROM Yll STA. 15+50 TO 17+09 LT 32 137 73 250 FROM Yll STA. 17+09 TO 18+00 LT 32 81 42 150 FROM Y11 STA. 18+00 TO 18+64 LT 32 15 29 110 FROM Y11 STA. 18+64 TO 19+45 LT 32 25 37 130 FROM Yll STA. 19+45 TO 21+51 LT 32 186 95 330 FROM Yll STA. 21+51 TO 22+03 LT 32 15 24 90 DETAIL 24 TOE PROTECTION (Notro Scolel OYhh LL SLOPE F�,`-0. GROUND d W GEOTI-ILE d= 1.5 H. g -6 U Om Type of Liner= CL 1 Rip -Rap V s 01 LOCATION SHEET TON SY FROM L3 STA. 743+84 TO 745+00 LT 5 133 160 FROM DR3 STA.12+00 TO 14+50 RT 11,27 287 340 FROM Y10 STA.16+50 TO 17+76 LT 31 145 170 FROM Y8 STA. 10+61 TO 11+73 LT 31 129 150 FROM L STA. 744+15 TO 747+50 RT 31 129 150 DETAIL 25 LATERAL •V• DITCH ( Nor to ScolI - a- N-I Fill Ground d p 1 1"ht. Slone Geaearile Min. D=1.5 Ff. Maz. d=1.5 Fl. b=5.0 FI. F. Type of Liner- CL B Rip -Rap 1 DDE V ae a LL LOCATION SHEET CY TON SY FROM Y3 STA. 18+85 TO 20+44 RT 1 11, 27 1 38 1 73 210 DETAIL 26 STANDARD BASE DITCH I Nor to Scole) NMuml N-I Ground Groend d / Georenile J B Min. D=1.5 Ft.�ri Mar.d=1.5 Ft.'When B is < 6.0' B=3.0 H.Type of Liner= CL B Rip-RpDD LOCATION SHEET CY TON SY FROM L3 STA.767+26 TO 768+28 LT 6 596 71 190 DETAIL 27 STANDARD 'V' DITCH I NOI ro Swlel NoNml N-I GroundGround 7.)�,L.� GrourdGrourd w D d Geotenile Min. D=1.5 Ft. Man. d=1.5 Ft. _ V Type of Liner= CL II Rip -Rap L11"AIIVN SH EbI 1Y IVN SY FROM L3 STA. 797+67 TO 798+00 RT 8 18 15 70 DETAIL 28 SPECIAL CUT DITCH (Norm Scolel Front Ditch NaNnI 6'� t Slope Groend 7) D FW 0c Min. D=1S Ft. LOCATION SHEET FROM L3 STA. 779+47 TO 799+60 LT (-CUL16-) 6 DETAIL 29 STANDARD BASE DITCH ( Not I. $mle) cro a FkisT D C�,St G e� e d SHEET GeoleKlilaJ g Min. D= EXIST BANKS MAX d= 2 FI, t 8= EXIST BASE V 'When B is < 6.0'.-- Type of RIPRAP = SEE BELOW V rc V LL LOCATION SHEET TON SY L3 STA. 867+12 RT (CL 1( 12 20 110 DETAIL 30 RIP RAP AT EMBANKMENT I Nof ro Smle) 10'min. Ditch 7- 1.5' Grade GEOTEXTILE U_OmType Fc; of Liner= 5 TONS,CL B Rip-RapGeotaxtile= 6� O LL LOCATION SHEET TON SY FROM L3 STA. 797+65 RT 8 35 70 FROM L3 STA. 864+92 LT 12 35 70 FROM L3 STA. 882+80 RT 13 35 70 FROM Yll STA. 22+27 LT 32 35 70 DETAIL 31 LATERAL BASE DITCH (Not Scolel b Natural r- Fill Groend ?') D� 1"hI. Slope d GEOTEXIIIE �� B w l. Min. D=t' Maz. d=1.5 1.5 H. S� 'When B h< 6.0' B=2.0 H. Type of Liner= CL II Rip -Rap b=5.0 Ft.[-D--DE-1U s O LL LOCATION SHEET CY TON SY FROM Y10 STA.26+25 TO 28+00 LT 15 55 107 390 FROM L3 STA. 910+00 TO 910+50 RT 15 25 83 115 BASIN � MIN. \ VN. TRASH RACK SLUICE (SEE DETAIL SHEET 2D-6) GATE 3 OUTLET PIPE J (P) SIDE 1 DETAIL K DRY DETENTION BASIN DRAWDOWN STRUCTURE 'NOT TO SCALE' SLUICE GATE DO NOT BLOCK OPENING WITH GRADING FROM ACCESS BERM A TRASH RACK jnT�J�jL�TI�� TOP ELEV. SLUICE STEPS @ 12" O.C. " STEPS CJ 12" O.C� (STD. DRWG. 840.66) ORIFICE TRASH RACK (STD. D&G. 840.66) Z (SEE DETAIL SHEET 20.7) S BASIN B M - - S_,�. BASIN B< MIN. EI MIN. ELLEV.EV. V /. .Vl. V/� .V /. .V/. �( �,C V� \A V/. �V,(�,V! .V! VA i OUTLET PIPE (P) UTFLOW 4" CONCRETE —� S (2' xPAD 2' MIN.) B B W OUTLET/ PIPE WI) SIDE 2 SIDE 3 TRASH RACK W TRASH RACK HINGE HINGE NOTES: ORIFICE TRASH RACK (SEE SPECIAL DETAIL( Lu V1 S S S -L T Z. STEPS @ 12" O.C. f (STD. DRWG. 840.66) S -8" MIN. E T 1. TOP ELEVATION OF CONTROL STRUCTURE (WEIR ELEVATION) SHOULD BE SET AT THE WQv ELEVATION. 2. 2" MINIMUM DIAMETER ORIFICE. IF ORIFICE IS GREATER THAN 6", A STEEL PLATE IS NOT REQUIRED. 3. NO BEDDING MATERIAL TO BE USED. THEREFORE, DO NOT FOLLOW OUTLET N STANDARD DRAWINGS FOR METHOD OF PIPE INSTALLATION FOR OUTLET PIPE THROUGH EMBANKMENT. PIPE 1, C) 4. SLUICE GATE IS FOR MAINTENANCE AND SHOULD REMAIN F71 CLOSED DURING NORMAL OPERATION. A GATE VALVE MAY BE f.J USED IN LIEU OF THE 8" SLUICE GATE. 5. SLUICE GATE SHALL PROVIDE WATERTIGHT SEAL. PROVIDE ADEQUATE CLEARANCE FOR GATE OPERATION AND FOR PROPER SEATING OF GATE OVER PIPE. 6. SELECT BOX STANDARD AS REQUIRED TO ACCOMMODATE SLUICE GATE AND ORIFIC RASH RACK WIDTH. SLUICE 7. ENSURE TRASH RACK OPENS FREELY AND WITHOUT INTERFERENCE WITH GATE SLUICE GATE. SIDE 2 8. ADJUST FOOTER DIMENSIONS AS NEEDED FOR ANTI -FLOTATION. PLAN VIEW TRASH RACK NOT SHOWN FOR CLARITY MINIMUM DIMENSIONS FOR DRY DETENTION BASIN DRAWDOWN STRUCTURE STATION STRUCTURE NUMBER (INCHES) 6' MIN. (INCHES) b" MIN. BASIN MINIMUM ELEV. TOP CONTROL STRUCTURE MAX. DEPTH(D) FEET CTL. STR. CTLSTR. . DIMENSIONS (W x L x H) ORIFICE (0) INCHES INV. ELEV. OUTLET DIAMETER(P) INCHES LPB 17+50 RT 655 8 12 957.50 960.50 3.0 956.00 4 X 4 X 4.5 2 957.50 30 L 907+00 RT 1514 8 12 1036.50 1039.00 2.5 1034.00 4 X 4 X 5 2 1036.50 30 Dewberry R 1 3' PROJECT REFERENCE NO. SHEET NO. R-2233BB 2D-3 2W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PERMIT DRAWING SHEET 4 OF 37 EDGE ARMOR EXCAVATION=125 CY BOULDERS CLASS II RIP RAP = 21 TONS CL II RIP RAP (TYP.) GEOTEXTILE = 40 SY EXISTING CL II RIP RAP GRADE 1 WITH GEOTEXTILE 11 ON BENCH CL II RIP RAP 0 WITH GEOTEXTILE (TYP.) � 1y, N 1' SILL CULVERT 1' BELOW STREAM BED F 3'� 5' DETAIL Gl - FLOODPLAIN BENCH INLET CHANNEL DETAIL STA 797+66 (LOOKING DOWNSTREAM) CL II RIP RAP DETAIL G1 CULVERT 797+66 EXCAVATION-40 CY CLASS II RIP RAP = 21 TONS GEOTEXTILE = 30 SY i'I � SILL CULVERT 1' 8' BASE CHANNEL BELOW STREAM BED INLET CHANNEL DETAIL STA 830+03 (LOOKING DOWNSTREAM) DETAIL H1 CULVERT 830 + 02 CL II RIP RAP 3 @ 10' x 10' RCBC WITH GEOTEXTILE (TYP.) EDGE ARMOR CL II RIP RAP EXISTING BOULDERS WITH GEOTEXTILE GRADE CL II RIP RAP (TYP.) ON BENCH (TYP.) �ZO BURY CULVERT 1' r EXCAVATION=160 CY BELOW STREAM BED CLASS II RIP RAP = 41 TONS 10' MAX I 10'MAX GEOTEXTILE = 173 SY BENCH VARIES 10' LOW FLOW BENCH VARIES TIE TO NAT CHANNEL (TYP.) CHANNEL TIE TO NAT CHANNEL (TYP.) FLOODPLAIN BENCH INLET CHANNEL DETAIL STA 874+45 (LOOKING DOWNSTREAM) DETAIL A CULVERT 874+45 EDGE ARMOR BOULDERS CL II RIP RAP (TYP.) EXISTING GRADE 1 CL II RIP RAP WITH GEOTEXTILE J` ON BENCH EXCAVATION=190 CY CLASS II RIP RAP = 84 TONS GEOTEXTILE = 130 SY CL II RIP RAP WITH GEOTEXTILE (TYP. N H J Y SILL CULVERT 1' N y I 'BELOW STREAM BED DETAIL G2 - FLOODPLAINI BENCH OUTLET CHANNEL DETAIL STA 797+66 (LOOKING DOWNSTREAM) DETAIL G2 CULVERT 797+66 8' x 6' RCBC r CL II RIP RAP r EXISTING - WITH GEOTEXTILE (TYP.) / GRADE ?'I EXCAVATION-35 CY CLASS II RIP RAP = 30 TONS GEOTEXTILE = 40 SY 1' SILL CULVERT 1' 8' BASE CHANNEL BELOW STREAM BED OUTLET CHANNEL DETAIL STA 830+03 (LOOKING DOWNSTREAM) DETAIL H2 CULVERT 830+02 CL II RIP RAP 3 @ 10' x 10' RCBC WITH GEOTEXTILE (TYP.) EDGE ARMOR CL II RIP RAP EXISTING BOULDERS WITH GEOTEXTILE GRADE CL II RIP RAP (TYP.) IN ON BENCH (TYP.) r;�4 EXCAVATION -30 CY CLASS II RIP RAP = 33 TONS 10' MAX 10' MAX GEOTEXTILE = 131 SY BENCH VARIES 10' LOW FLOW BENCH VARIES TIE TO NAT CHANNEL (TYP.) CHANNEL TIE TO NAT CHANNEL (TYP.) FLOODPLAIN BENCH OUTLET CHANNEL DETAIL STA 874+45 (LOOKING DOWNSTREAM) DETAIL J2 CULVERT 874+45 PERMIT DRAWING SHEET 5 OF 37 Boa n.wbe T E 1 I • rr,, DENOTES IMPACTS IN �SN �"� PERMIT DRAWING SURFACE WATER I SITE 1 SHEET 6 OF 37 PR6LIMIN Y PLANS DENOTES TEMPORARY I M �� 'NAD 83 i i j ® IMPACTS IN SURFACE WATER 111 i iu�.eus '�• /.1ATCN Tp V IN SHEET 23 iA 1 2 INy[.o..w I I o 23 .DO TRAFFIC DATA €L s 14 \ /. .I '1Y ``'+,wuwA°,'.'✓ .m�e I II Ilm_2 �i \ ` B 1,2 l4 A / ss li 128 / `✓ --C i I II F \ j/ 88 �P�s 145 / v � I I II ygo -r�- Pm LTa• '. R / sa 94 2 D /92 \31.�. •.,i.. n.•,R, ,w " c jP• LL.`. �. a // c^�� ti :; ffE — -- I Q +s Al \ \ ME ��� ,_ .s/ +,y� _ �"' ��.� z..,e . �yy� . - n' '•�sagdl>�-_cso its i z �I� I _ � \ a. z. cry 77 46 :3 ni. s a21} -moau. g"'891 i' o �''%f � -rzs- Pc ��' u } �•�� b� �� �. z° ., �a � _ _ n+ � —� 2;? fi' 11'i II 'F ` - © \' \ \ m m � 1 � $ -aPB SC Sda n.mm m v - -sro.kr.reMzwww ��E, u �" � nwTuic � - 8 • - I � —r—\�� •�� ' °� -F�°" —r \�`°"'E/� 0- POT Ri:nzs`wjR .E. POT ■%L= .�./ � - e.,� `,.. \ - _ i � -LPC- sc s%n+svoo Pa I s � .. I I /a � ■BL .z � ..° •� / i �+— — `� � °°" c / -u- POC sram•nao= a� t71 II ' I \ rz- Ac 3z.zx+v � r — FoPREk�..P, % -�■ m �\\C // 301I ME — Am u- Par rss.SonD• �.°" o m \ �� L� \ '�, � \ \ I 'Ec.M, \`\.,"'" Wl� lei= l/ l �#� � a ro.oDm aaga�m. �' v � � �.� �� �'��• i a .. 11 /l / l I // / NL. ..N w. ?/ 33 w. A •, s.mw.w 3+ «z -LPC- Sr 9a le-16 u / 7IN V-Prsw.z�«s.zu ��� .,� `�r' `�r r e ©A�• p \36 31 hJ.--;% SITE a17 - ''�� �/ �l -rzs sRa �«���/ "%u•� \ �ry� �/ �/ fi + } F • 1 norv: US 311 SOUTH OF US 74 BUSINESS \ / SITE 17 ICHARLOTIE RO wl TO NORTH OF ROPOSFO 5u SR 1366 (ROPER LOOP ROAD) GRAPHIC SCALE •°..3333ea RurHERPortD '_fl`f SQoozr /- so 3s p so SO 120 .rv.P RES —18 EME,, �Mill Q—twilo—m— lit Hr r I f NEEN. d �y�1J��- �.. � � �" �•a r:9rewi �+.i®Irri. i4W0 �1671�g " - _ _ - �� �� K�ww�ami ,r.,mrar�rt•F f 1 - ter ` - - - - - - ; �" _ � _ -- '��l����►i,�.�� .. ..----------------------- �-- - -- --- - ..rir i �.n�am,.:el�.r�nsr.��mnmr,.��r.;l�l --- - -- _ ianw�i®tee:• i Oft— p lot Ali ri lyl �e i t _ _ �1J 1d' � _ ,�� •m � � .; �., m�:. � � �. m - ear '� °' :a ��yw� �- "� <. s 'J'r � rip \� H• .. �� \ \� ;� `i� � { / FIB f� l^-�< V �w f;v m £ SITE 4 EIPO S [Ism BM' -III CHANNEL CHANGE �L- ST '' 2`36 44 WITH FLOODPLAIN 287'I�EFT BENCH SEE DEf ELEV. N 2$ 22 2 2Og 5\ CL 11 RIP RAP P CLIFFORD WHITESIOEBVKS MICHAEL WHITESIDE DB 90E PG 63 51 DB 2 OTCB 0 56 Fn ._ ,F O -' O TOE PROTECTION O Ln01 SEE DETAIL 12 W EIP V) N M J I 15" RCPIII F- Lu UU VI PERMIT DRAWING PROJECT REFERENCE NO. SHEET NO. SHEET 8 OF 37 8 INN SHEET NO. I„ ROADWAY DESIGN HYDRAULICS N 0 W DB I033'PG 597R 1 I ONC TII _ _ ENGINEER ENGINEER 83 N 19°25'0� PB 7 PG 24 LJ FILL EXISTING CHANNEL WITH CL. II RIPRAP TO EL. 925 EST. 80 TONS 80 SY GEOTEXTILE FABRIC L3 +60 287' LT P�F 471 SY +1 1�E WARREN 4 LTG 12T B LATERAL V DITCH SEE DETAIL 6 L3 +75 190.12'1 i TOE PROTECTION SEE DETAIL 12 O PROP. GUARDRAIL •' S1 �I F- S� 6 = JAMES BRIGHT COMPANY,INC. BL 181 DB 681 PG 7T3 c U m N J TOE PROTEC I Q y lD'1 =1PP SEE DETAIL 12 < 'rR TI r m TEE PROTECTION _ LAT V DITCH SEE DETAIL 12 Ij `^ SEE DETAIL 6 m � o j m FENCE HEW R. O / DAVID A. BROW O / IP DB 886 PG 75 OTCB \F P / BY17-231 F a 20 TONS CL B RIP RAP L3 +45 TOE PROTECTION m SEE DETAIL 12 5a 237.11' RT FILL EXIST CHANNEL EIP WITH CL. II RIPRAP /1 TO ELEV. 935 . - EST. 19 TONS 20 SY GEOTEXTILE FABRIC Z� (I 2, RT L3 +00 0. CL II RIP RAP 275' RT ' RT ON BANKS STANDARD V DITCH CHANNEL CHANGE SLOPE WITH FLOODPLAIN SE SEE DETAIL 27 BENCH SEE DETAIL GI RIP RAP EMBANKMENT SEE DETAIL 30 IL EIP � � N ST EIP I CONC 'W °' o N Illy I I / WD�N Iz m o f - � .7 N• P N IS°55'26" W ' 114.46' W MTL /,9 Cpal I S 06.46'12" E EIP 197.46' EIP DAN LYNELL L USBY b 109.81' IP UJ � 3 ;�. - PATRICIA SUE CAUSBY W C EIP p £� p III DP867 PGG243 II a 59 o p4J p 8 p�m Q 48" ww z X- N 07°5 0 JAMES L. PROCTOR cc� f3 p m JAMES L. PROCTOR EIP 2 I� SHIRLEY PROCTOR ti' p I SHIRLEY PROCTOR II2.42 \ o ® DENOTES IMPACTS IN p - - DB 938 PG 839 JOHN W. MARTIN HEIRS SURFACE WATER DB 687 PG 616 - �JOHN W. MARTIN H S a DB 340 PG 206 � 0 4j - m DB 299 PG 64 30,00' z OB 341 PG 517 DB 328 PG 73 s _ PB 7 PG 24 DB 344 PG 354 d £ E 'oo n `pi PB 7 PG 24 % J _ ® DENOTES TEMPORARY n o PB 7 PG 24 IMPACTS IN SURFACE WATER o � a oN U 4Y pG3• EIP rMON -Y17- P Sto. /2+57.54 I a6' c -} T EIP 0\\1, W EIP mow' � GERALDN2, F. G ENE I I ���llllll 39 A' 23.86' to p �'� KENN GREENE I II N S 80.41'36' W V DB 967 PG 487 N 2q•as'D\^W c��n,, � �p � � �3 ---I W C F// I I PLmL z0.9e / 0 63 O 76RT I p I o No \ 48'C L 'S3900\\1.W L3 +08 6� - LATERAL DITCH 1 S m EIP 179.21' LT �, NORTH CAROLINA .o SEE DETAIL 6 1 p EPARTMENT OF TRANSPORTATION DB 1043 PG 635 CON X 68 H^ PB 7 PG 24 N \9q;16' f) \ �3 C S •�l F qj - P FFNCF p 5 9 CL. B RIP RAP EIP o ° p9 N 3� EST. 1 TONS n C EST. SY GFD /7- Pato. +96.6/ - op o OTCB FENCE ROBP DIANNA ENOLETO Ia oo O _ C D PB 2 PG I1740 ° _ pX� - m \�c� + +55 --- O p ' END SBG - pp I F `C -may 00 rr / C 00 PROP. GUARDRAIL 2GI 2GI 1p GlaU TL-�' 2GI S-C Q 15" RCP -I r H EIP N 14°37'13' W 161.30' _ \/\ i,Co p� N 95' BL-86 N h y �Nc . y 1 J P H Y WILLIAM TO o N 12' 15' 18.4° W 2GI -L3- FS-B BL-184 OS i,m� _ T d qo = _ DB IIE PG 59 UJ A Lu N e? 2GI p o DB 527 PG 66 65 a = PB 2 PG 117 N MATTHEW R.BROWN _ Z O Cf`T-1 DAVID A. BROWN Z T " p Y/7-' PC� f0. 16 2 A °W GI FS-A r\, +00 DB 886 PG T56 END SBG o N �m CONC N - - 356• 61 HN, _ U ON DB 10 PG 80 •_-BGP,__ g C BETH AUTRY SCOGGINS c� EIP El \�� 9a / CONC Id CONC DB IOE PG 609 4, m / 21 PC -OT Sta.803+�� DP822 PG 1575 ,n 5 ��C \ -L350.73= �� o _ SPECIAL \ -Y17- C Sto.15+2825 / cn, cur DITCH STAGY LEO 81W RAP SEE DETAIL 10 \1• W \ ,i2•g6'\8° 62 r C 6. W- MARY KATHERINSTRIBBTLAIkONS -5y°05 OB 896 EBT.136 SY GFD N 35018 rJ8 \6 W o 1 CAROLYN W. SKID E EI{6 I o DB 778 PG 341 \ VAO /"�/ a � DB 4 I ;PGC;292TOWALyL.,,Y�� JAN EDWA D FOX DB T03 540 67 PB 2 54 O \$ 1 117 CHADD EVERETTE MURK P' 35°285 'C'U8]3 " I /C� °�-Y17- PCC Sfo. I8+34.40 \ \IN D81081 PG 851 \� PB IO PGT / W m -// 9' o \ 1`\ MATTHEW R. BROWN i / BYI8-234 � 00 DAVID A. BROWN DB 886 PG 756 �\ Tn, JOSH LEWIS E PRO T m -BREXLES, LL,C/ `�' SHEILA E. WHITE PRO ANT _. DB IOTO-PG 93 G DB 940 PG I15 - z 6GON DB 940 PG I18 / 20 \EIP ' m EIP Nc � 019 � y SEE SHEET 38 FOR -1.3- PROFILE SEE SHEETS 2D-1 THRU 213-5 FOR DRAINAGE DETAILS 10, BE,'A B sss ossu,c Po Q�x ... ®111'ii/� � ,•ate ,,.r•�� �e.��\A`� ����-. J7� �� '• \ IYr��mw - VMS ����i�� yq '� �� � � r �.t�� � �EE�EE11¢�'� a e+`.=•-�i=c®�If f �� _ >r Rio _ ® �INII . Q ., ;t �'�► :-�..i"`rr� -sue �» ✓ ��"" �� ®ll\ _ ; vw _ _LL �Ma�.�3�a�_ TRAFFIC DATA u 84 B A 5 \' l45 � 90 arsvnss l9 85 N DENOTES IMPACTS IN I SURFACE WATER \ O6 / 3S66�q ® 1 TEMPORARY DENOTES IMPACTSIN SURFACE WATER 133 PERMIT DRAWING 1Ge SHEET 22 OF 37 GARRY HUDGNS TRACY HUDGINS OB 1034 PG 578 El '74 PC DB �FLOODPLAIN ImU BENCH BEGIN I OCA6T- L WITH NATIVE "TERIAL � Gi►,_r"ice ITE 10 135 SE DANIEL W. MITCHUM LIVING TRUST DB 873 PG 574 q' CL. I RIP RAP EST.2 TONS e p EST. 6 SY GFD a E 1304 C CL. B RIP F EST. 2 1 7 SY F F _--_- F _ F -- PROP. GUARDRAIL V END 2' SILL 2GI 2GI MARK MILES 4'LI MEGAN RENAY SUPPLING y �k DB 1140 PG 456 nl MELANIE STERLING DB 1095 PG 178 SIP N0370 a DB 345 PG 453 -L3- STANDARD BASE DITCH -\ LENA MAE HUDGINS PROP. GUARDRAIL CAT-1 SEE DETAIL 4 +END DB 239 PG'66 134 NE PB6PG8 m 2' SILL F PER _____ r:OLLAR ____-___ __-_-__-- ____- AND EXTEND _-- V EXISTING F F F .. F -.F- ' it F CHANNEL C .. 01322 D I& 'xb BO C „ F BENCH - 1321 + E D d-�� TAPER EXCAVATE CHANNE BENCH SEE DETAIL F �/ SSE DETAIL J2®-, -- 6 - N O W e< go DANEL W. MITCHUM LIVING TRUST DB 873 PG 574 135 YS +18 2� -0- �D 38.21' PT a UE / Y5 +37 e ' c PUE // 59' RT //,0' / DANIEL W. MITCHUM LIVING TRUST DB 873 PG 574 P G /' -Y5- PC Sta.13+09.41 , , -Y5- PT Sta. l .08 a LATERAL V DITCH /SSFD SEE DETAIL 11 00 ° 135 a DANIEL W. MITCHUM LIVING TRUST , DB 873 PG 574 7\ Ii 50, 1317 r -Y5- 01.43 1 END CONST. -Y5- POT Sta.21+12.60 RETAIN 6' -ss- - CL II RIP RAP - OUTLET PROTECTION 20' LONG X 16' WIDE Ey IOVF HW ----- 7/ - TIE TO EXISTING DITCH COLLAR AND EXTEND PUE- p�c�lil���iIIilddd 7tbIN GUNJ1 FYUG11UN -Y5- POC Sto. 11+75.00 135 DANIEL W. MITCHUM LIVING TRUST DB 873 PG 574 CULVERT #2 TWO BARRELS NORTH EAST ELEV. CUL1 610338.56 1119924.74 924.54 CUL2 610343.60 1119921.49 924.56 CUL3 610344.01 1119921.17 924.56 CUL4 610349.03 1119918.00 924.48 CE1 610346.70 1119919.53 930.54 HW1 610343.63 1119921.24 932.20 CUL5 610320.95 1119897.84 924.81 CUL6 610326.05 1119894.54 924.73 CUL7 610326.45 1119894.21 924.74 CUL8 610331.40 1119891.11 924.77 CE2 610323.74 1119896.11 930.79 HW2 610326.45 1119894.56 932.45 CURVE DATA FOR -Y5- P1 Sto 11+54.71 Pt Sto 15+74.87 L = 0° 07' 56J" (LT) L = 61*04' 21.4" (LT) D = 0° 02 33.9" D = 12' 43' 56.6" L = 309.41' L = 479.66' T = 154.71' T = 265.45' R = 134,045.00' R = 450.00' SE = EX. SE = 0.06 DS = 35 mph RUNOFF = 120.00' 210 DS = 35 mph 2- J•pS,q OS 2S. 9e n h`O 5 TONS CL. B \ � RIP RAP O DALE D. SMITH JANICE 5. SMITH DB 552 PG oI gY33-3 �3a C sc E C -- Y y A'GlFAArf F T'AI A _0- EMBANKMENT s ��--1C ---- a 8' CONC HW -L3- CS Sto.883+54.48 i a a PROJECT REFERENCE NO. SHEET NO. 13 INN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER j �� I . f. I r1 ��-MELANIE JACKSO i O p -sJyc ---- -- =DIj O Is'CMP AP36 X -� UEII Pposed to replace ro with0. BST 8"PVC wGtar PVC I 3- ST S 885+54.48 139 III DIAMOND SENIOR LIVING. LLC DB 14 PG 43 (MERGER) ISBK REST HOME D8 646 PG III S 61 6\ 6\ Z CD � o UT N U1 O = �I Ln W Lfl (D O ❑ ❑ W Ln �I cn z C m< O n HIP_ D ,0 t0 tD i9 fn 71 O O O N N 01 W a N N 01 W W W \ CURVE DATA FOR -L3- / P1s Sto 860+48,88 Pl Sto 872+38.56 Pls Sto 884+21J5 6s = 0° 29 53.6" L = 1i 09' 17.8" (LT) Os = 0' 29' 53.6" / Ls = 200.00' D = 0° 29' 53.6" Ls = 200.00' LT = 133.33' L = 2,258.94' LT = 133.33' / ST = 66.67' T = 1,123.02' ST = 66.67' R = 11,500.00' SE = RC RUNOFF = 90.00' SEE SHEET 44 FOR -1-3 PROFILE / SEE SHEET 78 FOR -Y5- PROFILE [SEE SHEETS 21D-1 THRU 21D-5 FC 'A Z O Dewberry PROJECT REFERENCE NO. SHEET NO. R-2233BB 23 RW SHEET NO, ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CO00 Q Z EIP�� PG KAREN MAC1NN15 WORKMAN EIP DB 927 617 TEIP o PERMIT DRAWING ARTHUR BRYANT HEIRS ISBLKD SHEET 27 OF 37 DB K PG 392 I L)� O -EN MACIN PG 535KMAN pg 147 PG 587 I CONC \ pB 930 � XENRY J. CARSON CJ _� ® S IN LILA M• CARBON DENOTES IMPACTS RICKY LEE MILLER OB 868 PG 341 + CV rI $ PVG ss� SURFACE WATER O pg 697 PG 127 Pp 9 PG 5 1i'1 -1 ISBL Ln p 60' WD ISBLKD \1 r f I ® DENOTES TEMPORARY EIP (/) EIP _x I -p IMPACTS IN SURFACE WATER O � I Pld OJ// Q --K D F_ -� O KAREN MACINNIS WORKMAN � pg 927 PG 617 h I V KAREN MAQNMS WORKMAN N I KD DB 930 PG 535 G MORLOGRIS ISBLKD ISBLKD IS ELLA MAE ABAND I / IIj�1L DAMES EPG 373 'j / V \ EIP pB 034 PG 75 El \ IRS 9' BRK _ _ _ ss Exl Ic av i� I X SLIE LAT7IMORE� I EORGE ULMER �i S _ - BST JOSEP 1) L PG 277 \ pIARJGRIE HA14 GL 5 OB 91E PG 47T a�I s' all g 562 PG 228 0�11 //— / �\ \ /�` BST --- �` _ __ - JA1A RWELL. JR- D{ '� �� - sq \ Y H. BU n RM DITCH OB 16E PG 423 TAIL 8 LATTIMORE OB 149 PG 226 g l — .. Ri— 2 JOSEPH � ISBKD MH DB AMES BRIGHT FENCE /+ O 219 OMPANY INC. WW y N 7N00�1'f 682 PDi 20 4 T THA C. MILLER �BC_� / I RRY O. MILLER (51 -C _ _ _ _ . . 6o.ao' P C i1T 562 PG 214 ��'` SIDE ExIsnNG Riw ( RIEs - � 6•tG // 1 T EG. FE 562 PG 210 ? I 0 E O` __�� - l5F/I - -_ y (4) I200 PR 1 _ _ / ss 600 PR PDE CAD 55'85T mac \ 1 .. HW - ----- - /Tc W/L I S C - c Riw IVARIEsI _ _ REMOVE Exlsiwc Ri�cvaSlEsl_—= 4d� J_ dDtl .91`d3UT51 -- —� 15" RCP -III I1 o R,rS%'�=d01 .Z6'616=dOS1 D� Z, N N REMOVE— 1 !E%IST y/I B0 QI D ---� � �� _RUTHERFORDTON REMOVE "-'REMEAKDVE _E_,Y 4- - - - - - - - -- -- - yy CCMM 4 '3STLtLP � '3 P- GB/ _-C+�etEPi� CI 6 T ss _ - - - - ° -- ' Ga v. DATUM CB - x0ydd,V) dwa + =�I CB _ 2 c = ss dWO .eb� _ C--- REMOVE 72" CMP—r—� �r L--ram 54" RCP -III II-k - - \ AND ENDWALL�_ EXISTING RiW <vnRIEEl INV=916.0 TOP=920.53' / II - I Tr A$ -_- \ —� -� - BS -AN ' PROPER S. 1-04 nll E -�! m FLAG PO E�3dOv H�Z�& _ _ CHRISTOPXER A. JOKES THERSBEE REMOVE 4 1N011tl gIACCUM \ �¢ CONC-� 9D dW .b "1tl0I1213A fi _ T I I '1 56 PLI�G�FILL O PROPERTIES. LLC - - - - WITH FM O WEA7HERSBEE COLLEEN B. JOKES. v DB 964 PG 780 d �x ROXT I "III X02idd8'&'•C�NC -_- d0A_. �.-pye=§2�•�R p�\ \ I l DB 799 PG 7T9 'i ,� 547 PG 780 1PP 51 1 rr S 3dOH �81 _ _ _ - \-BOiH 6' PVCs II PIPE \ RETAIN PIPE LT DB 964 PG 300 I1 0 / 2/�EMOYE I \ II __= FEED 10'TCl II O //m/ g y P _ II \ ��-- ✓ 1N011V00 BddVl dW�,84 I INI W11BVC CE3 illl BST EM \ I I &STRUCTURE ��� 48° CMP $1 -I - I I u DW -3 RETAIN PIPE II IBST \ I \\I1z I DVJpppp d6P - N-f- �_ �- -� BST EN ALi J II���A7� __- -- � � SYSTEM �____ I � N \ I CL II RIP P OTCB Sp //'/-/ - `o BST SEE DETAIL D C` Il 2GI29 �Q iwll 8' �R6•IAIN ',PIPE CONC QI SI(STEM� I I NI I 42 PD e° /1X / Il I ISBKBUS I I II, J E �,� // \�l GVQ CAR WASH I I I CAROB BANK �II B� EIUTHERFORO SQUARE PARTNERS. LLC -_JS �$0�p '/ �e EI /I� �` X]' c\ - _ I 25 FR FIRST I \� I DB 923 PG 59 CLEGHO�-�RE6K- o / iH,A 25' BST \ I II /)5 TRIBUATARY 11 �S / P�Eo= \ir=Sr 8 ONG • O \ I II WILLIAM F. MCBRAYER, JR. OB 1037 PG 742 �cS STEM PIPE \ JOEY M. BUCHANAN - . _ - _ ED J / DB 986 PG T34 \�5' BEGIN C`4^�J TION JANIC HOLDINGS. LLC -Y2- POC Sto. 17 2 OB 978 PG 14T SITE13 / �O \\O�e WILLIAM F. MCBRAYER. JR. SO O / OB 1037 B 742 \ \ \\ ��_ BST � I \ ISBLKBUS \\ \ \BST CURVE DATA FOR -Y2- \ I \ PI Sto /4+39.59 \\ ouT ' CONc D = /' 35' 25.9 S\ �' L = 874.86' " T = 43959' 43 \ Bs \ o R = 3 602 33' SE _ .03 R' RUNOFF = 117.00' Smm SEE SHEET 54 FOR -Y2- PROFILE �Eg ©\ SEE SHEETS 2D-1 THRU 2D-5 FOR DRAINAGE DETAILS WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. JD ID Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 SN L3 778+97 TO 779+40 LT ROADWAY FILL < 0.01 < 0.01 43 34 1 SN Y2 22+05 LT 48" Pie < 0.01 < 0.01 24 14 4 SL L3 797+64 TO 798+03 LT CHANNEL REALIGNMENT 0.01 < 0.01 96 18 4 SL/SM L3 797+66 10' X 7' RCBC 0.09 766 4 SL L 797+63 TO 798+0 RT CHANNEL REALIGNMENT < 0.01 43 4 SL L3 797+63 TO 797+70 RT V DITCH < 0.01 < 0.01 10 7 5 SK L3 814+76 LT TO 814+87 LT BANK STABILIZATION < 0.01 < 0.01 10 17 5 SK L3 814+76 LT TO 815+43 RT ROADWAY FILL/30" CSP 0.02 112 5 Si L3 815+11 TO 815+46LT ROADWAY FILL < 0.01 < 0.01 28 21 6 SI L3 828+19 TO 828+28 LT BANK STABILIZATION < 0.01 < 0.01 11 9 6 SI L3 830+00 8' X 6' RCBC 0.06 670 6 SI L3 832+25 TO 832+56 RT CL. II RIPRAP ON BANKS < 0.01 < 0.01 34 18 7 SH L3 831+35 TO 836+42 RT ROADWAY FILL 0.11 832 8 SG RPD 22+04 RT TO 18+22 LT ROADWAY FILL 0.05 445 8 WA RPD 17+38 TO 22+04 LT ROADWAY FILL 0.11 8 SG RPD 18+26 TO 18+08 LT 36" PIPE < 0.01 32 8 SG RPD 18+08 TO 17+76 LT CL. II RIPRAP ON BANKS < 0.01 < 0.01 25 20 9 SF L3 864+92 LT BANK STABILIZATION < 0.01 < 0.01 14 9 9 SF L3 866+00 54" RCP-V 0.01 140 9 SF L3 867+00 TO 867+28 RT RIIP RAP ENERGY DISSIPATOR BASIN/CL. I RIP RAP IN CHANNEL < 0.01 < 0.01 55 7 10 SE L3 875+24 LT FLOODPLAIN BENCH 0.01 < 0.01 72 19 10 SE L3 874+42 3 - 10' X 10' RCBC 0.05 217 10 SE L3 874+16 RT FLOODPLAIN BENCH 0.01 45 10 SE L3 873+90 RT REMOVAL OF EXISTING CULVERT 0.01 51 11 SB L3 968+69 TO 968+88 LT BANK STABILIZATION < 0.01 < 0.01 10 27 11 SB L3 968+64 36" STEEL PIPE < 0.01 151 13 SO Y2 15+24 RT CL. II RIPRAP 0.02 < 0.01 35 19 14 SG Y6 10+23 RT BANK STABILIZATION < 0.01 < 0.01 10 24 15 Sc Y11 22+50 LT BANK STABILIZATION < 0.01 < 0.01 22 14 15 Sc Y11 22+80 42" CSP 0.05 506 15 Sc Y11 19+88 RT LATERAL V DITCH < 0.01 < 0.01 14 19 16 SD Y8 17+18 LT RIP RAP ENEGY DISSIPATOR/CL. B RIPRAP LINING CHANNEL < 0.01 < 0.01 52 10 16 SD Y8 18+04 60" PIPE < 0.01 38 16 SD Y10 15+63 RT LATERAL V DITCH < 0.01 < 0.01 18 12 17 SO Y2 33+41 TO 34+50 RT ROADWAY FILL 0.01 143 18 N/A Y6 32+02 TO 32+09 LT BANK STABILIZATION < 0.01 < 0.01 13 13 TOTALS": 0.11 0.58 0.05 4736 382 0 'Rounded totals are sum of actual impacts NOTES: Site 4 SL/SM is comprised of both the main jurisdictional stream and a trib to the left of the main stem. Site 7 begin on sheet 16 of 37. The stream is completely covered by roadway. The drainage that would have gone to the stream is being picked up in the proposed lateral V ditch to the right of 1-3. Site 17 is a small area between piped streams that has been covered up by the roadway. Site 2,3, and 12 have been removed due to those sites not being jurisdictional. Site 18 was not in the original JD file, therefore it never received a JD ID. During the 4C meeting, it was agreed upon to keep the impact site. 2016 09 09 See Sheet to For Index of Sheets See Sheet 98 For Conventional Symbols STATE OF NORTH CAR OIL I N A STATE STATE PROJECT RBPBRBNCB NO. 31@8T ST YlAL R-2233BB ENDS STATE DIVISION OF HIGHWAYS TB PRw.xO A.PRw.x oeecmm�ox PROJECT R-2233BB 344005 PE 34400.2..2.5 RNV & UTIL - 34400.3.4 CONST. - UTHERFORD C 0 UNTY M.R N4 L 7- LOCATION: US 221 SOUTH OF US 74 BUSINESS (CHARLOTTE ROAD) TO NORTH OF SR 1366 (ROPER LOOP ROAD) �4 ' • ��' TYPE OF WORK: GRADING, DRAINAGE, PAVING, RETAINING WALL ° a '° 2 AND STRUCTURES STATE END CONSTRUCTION ri1 j� BE IN PROJECT R-22338B \ -1-3- POT Sta. 1004+10.00 VICINNY MAP `^tQ O -L3- POT Sta. 1003+54.13= N BEGIN CONSTRUCTION 3 \ BEGIN CONSTRUCTION -Y9- POT Sta. 13+50.00 -L3TIE- PT Sta. 17+29.95 1� -Y25REV- POC Sta. 17+50.00 BEGIN BRIDGE BEGIN CONSTRUCTION BEGIN CONSTRUCTION-Y2- BEGIN CONSTRUCTION -Y3- POC Sta. 25+50.52 END CONSTRUCTION BEGIN CONSTRUCTION -Y8- POC Sta.36+60.00 -Y7- POC Sta. 14+75.00 POC Sta.14+66.70 -Y19- POT Sta. 6+75.00 -Y3- POC Sta. 11+38.87 ND CONSTRUCTION s� ay Y25EXT- POT Sta. 13+55.00 END BRIDGE BEGIN CONSTRUCTION BEGIN CONSTRUCTION BEGIN CONSTRUCTION -Y7A- POC Sta. 13+75.00 -Y78- POT Sta.14+30.00 -Y8- POT Sta. 15+00.00 � BEGIN BRIDGE -L3- POT Sta. 774+97.75 / Z BEGIN BRIDGE o ROPER LOOP RD. L3- POT Sta. 773+94.15 23 vy -Y19- POT Sta. 20+03.44 D CONSTRUCTION c �' /-DR3- POT Sta. 16+75.00 oy 21 ` 4 '4arP 25 / 19 )i ` ro�astl°N- s 5 6 \ BEGIN CONSTRUCTION 31A 17 US221 _i -Y22A- POT Sta. 34+50.00 31 � 7 -- ___ _Y _ - TOWN OF RUTHERFORDTON ---�\ U5221 GILBOA CHURCH RD. N uszi� 8 � 27 RO To BEGIN 3-10'x10' RCBC 15 9 ba ,loko6 of -L3- Sta. 874+27.90 ROToN ' 0 f o. �O END CONSTRUCTION 11 3 _nz s0o>� -Y7- POT Sta. 22+50.00 A \ 2 7-.� A- oLD Us221 32 END BRIDGE - q \ L3- POT Sta. 774+88.77 _y¢ END CONSTRUCTION I RAILROAD h END CONSTRUCTION BEGIN' RIDGE qyE. D -Y12- POT Sta. 33+00.00 END CONSTRUCTION -DR2- POT Sta. 19+44.66 -L3- POT Sta, 773+85.37 0F,'o? R� � 26 BEGIN CONSTRUCTION END CONSTRUCTION -Yll- POT Sta. 28+00.00 END CONSTRUCTION to¢ ' HURC N sT. , -Y5- POT Sta. 11+75.00 -Y10- POT Sta.29+20.35 -Y2- POT Sta. 42+25.00 END BRIDGE ��<? �O�J END 3-10'x10' RCBC BEGIN CONSTRUCTION -Yl9- POT Sta. 21+84.94 --- o END TIP PROJECT R-2233BB BEGIN PAVING 0 2 -L3- Sta. 874+61.45 -Y12- POT Sta. 10+35.00 °� END CONSTRUCTION i -L3- POT Sta. 744+75.00 1 ze ti END CONSTRUCTION -L3- POT Sta. 1004+00.00 -Y19- POT Sta. 30+70.00 41 / N- si ¢ -Y5- POT Sta. 21+33.23 BEGIN CONSTRUCTION ON END TIP PROJECT R-2233BA -Y4- POT Sta.17+00.00 SD BEGIN CONSTRUCTION BEGIN TIP PROJECT R-2233BB END BRIDGE to'NscN -Y6- POC Sta. 9+82.30.00 BEGIN CONSTRUCTION -Y3- POC sta. 27+69.52 010. O -1-3- POT Sta. 738+79.82 BEGIN CONSTRUCTION V THIS IS A CONTROLLED -ACCESS PROJECT WITH ACCESS END CONSTRUCTION -Y23- POT Sta. 36+50.00 DOCUMENT NOT CONSIDERED FINAL BEING LIMITED TO INTERCHANGES. -Y3- POT Sta. 41+62.86 UNLESS ALL SIGNATURES COMPLETED THIS IS A PARTIAL CONTROLLED -ACCESS PROJECT WITH �' • ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. NCDOT CONTACT: NATHAN ADIMA, P.E. (, GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR NCDOT BY: HYDRAULICS E1VGr1VEEl20'.'....••.... l LAR011!,, v 50 25 0 50 100 ADT 2020 = 13300 ADT 2040 = 14500 LENGTH LENGTH ROADWAY TIP PROJECT R-2233BB = 4.999 MILES STRUCTURE TIP PROJECT R-2233BB = 0.026 MILES 2610 WYCLIFF ROAD SUITE H, �•••� Dewberry RALEIGH, NC 27607 �!i!� NCO COA9Nog F-0929 ,, �� 2?'FESS%p •• 9's : O N''•. Jv� 9r. � ? SEAL � 1z78e 1 ®* � 2012 STANDARD SPECIFICATIONS K = 9 % TOTAL LENGTH TIP PROJECT R-2233BB = 5.025 MILES PLANS ° D = 60 /D SIGNATURE: P.'•';N '•quu.u�� 50 25 0 50 100 T = 9 % * STRUCTURE LENGTH BASED ON -1-3- NB STATIONING. RIGHT OF WAY DATE: DENNIS J. MORY, P.E. cm® e ,,..•S...A�...I V = 70 MPH DULY 28, 2017 ROADWAY DESIGN �tN ........... oti'o, C���pFESS�N.;�9S PROJECT ENGINEER ENGINEER (HORIZONTAL) * TTST 5°/D DUAL 4°/D SEAL ®9p, OPROFILE 10 5 0 10 20 FUNC CLASS = LETTING DATE. ANNE MARIE PRIETO, P.E. 020031 4Rh�� ARTERIAL JULY 21, 2020 PROJECT DESIGN ENGINEER �'.�O'• NG INEEa C V PROFILE (VERTICAL) REGIONAL TIER SIGNATURE: 62� 0.O"O 9° Dewberry 2\�02 PROJECT REFERENCE NO. SHEET NO. R-2233BB 4 S g6 REV SHEET NO. / NADD �3 ROADWAY DESIGN HYDRAULICS 8-r ENGINEER ENGINEER i H CA p� oQtH,CARp� 2r�OFESS/6�99: ESS v �. ' v SEAL " ' SEAL ?T 020031 i = c 12786 N4: F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED S O SNE6 + 50 `n = h H y �1 /M tr o . MptC Eve 5l1^• ` EIP ^ ETXE .. \ SEEERAT BASE: ITCH V T ____ _ 36 __ { TA 744+00 5+00 IT AIL 2 LEE (25R C -_-_______________________________________ 1_________ _ yl 1 -_____ STOEEPOFORLD DITCH U OE OPIPE OB 48 8. eu \a*\ i6soiC-------------"_--- ------------------------------ 70 y �\ -L3- POT to.�43+46. 4= S 07.1 '37• E Y25REV o0 Sta. +53J0 REBAR �� lH0 .ZL 469.84' Om \ Z \ BEGIN T UCTI X-\ \ -L3- St 744 50.00 XORTON-AMERICAN PROPERTIES. LLC �Oa \ �% N \ Q� O \\ AC OB 745. PG 622 04.50 \ L3 +86 \ \ NS L3 +83.53TAT\ 170' LT F , A 150.47' LT I END FENCE \ OT < \ BEG. FEN E BEG. FENCE L3 +30.77 \ 9\6 CH \ \ XN 150' LT _ WVy FENCE \ • �S �- it°9P 4 GEDRGE E. HOLLAND 8 _ \ HO T ;AME I \ WW FENCE 33 506 NS \'7S DB 860. G065EOAT ON OFNDTRACT FIVE Xr I "_______________________________________ OTCB i \ P II P R ------_----_ C. BTRIP RAP oR O \\ _________________ 1 - T FD CL. B RIP RAP \5 t m Y .S �� 504 O I; Ln EST.2 TONS O EST.2 SY GFD '\\ -F FUTl1RE vBRIDG o o I� w SEE DET 24 N � IL g _I__ ___________ 1 1 F_ _ _____________ 91 FUTURE BYPASS ° ° _swzc. - - - - I� ti V =_ \ r Ln m _� n _ r xI ' �� _ L L3 -'� ' I \ FS- m RCS III d J v� / \ 2G I N 5.54' 08.9" W N 5/ 54 - _ z11=cc====_= FUTURE BYPASS / ___________________ 1 _ 1\ ____ _________________FUTURE BRIDGET\\�G�� LLJ LIJ _ _ - _ a 1 _..._... � F- A p t a Q' Y25REV f'C O \ �s -L3- POC Sta.738+81.68 \\ PEPAIR(FIELD y� N n'" _ END TIP PROJECT R-2233BA o\ I `6, \\ 0 5 Pa F BEGIN TIP PROJECT R-2233BB =k p ' \ \ A \\ DRAp C WW FENCELINE FENCEC CURVE DATA FOR -Y25REV- AF L3 +79.82 La +za. AJ E __- SS , 149.51 ITT 149.65' RT L3 +30.77 ��' \ TO6-nPROTECTION G \ �. �'' ° EXISTING R/W RUNS ALONG PRGpE BEG.1 FENCE O TI I SEE�ETAIL 24 PI SfG 15+5/99 PI Sta 22+34.65 PI Sta 3/+10.35 cq La +24.27. 150' RT 50+RT O o 6 La + .1e 0 = I8' 50' 34.9 (RT) L = 26' I3' 38.7" (RT) L = I5' 00' 00.0' (RTJ 159.76' RT T L3 +92.42 D = 5. 27' 24.3" D = 5. 27' 24.3" D = 9' 32' 57.5" ` RrW MON 60' RT BEG � � �. _ . _ � 150' ITT � BEG. FENCE L = 345.32' L = 480.64' L = 157.08' END FENCE T = 174.23' T = 2446/' T = 7899' -FJs- sr Y25REV +z1.a�z "li o -Y25REV- PT W 94.56' RT u Sta. 3/+88.4; R = 1,050.00 R = 1,050.00' R = 600.00'\caNc NG R, RNNS alo SE =EXIST. SE _ .05 SE _ .06 cWWcww -Y25REV- POT St 33 4 °M° PR R=. A r "` '0 CONc NW\ ° u -Y74- POC St 2 7 2GII Y25REV +314 CURVE DATA FOR -L3- CURVE DATA FOR -Y74- / s\ \ >z• a� 02 - EXISTING PI Sto 720+78.08 PI Sta /5+/6.42y 0a0 Wp RqC M 4a w RAIL p = 9 45' 08.4" fLTJ D = 0' 14' 56.8" p = 24 /9' 03.7" fRTJ / Fq \\ D = 2' 33' 11.8" o. R F4sF \\\+ / SFF ''p F"r 3 TONS IP OUTLET GEO T - 10 SN oao 18" a IAT-1 OTCB END CONSTRUCTION L = 3,914.84' L = 952.41' \\ 0 �F \\ I -Y74- POC Sto. 17+50.00 T = /,962J6' F T = 483.48' '\ \\ e _ t°y \\ / FN> CL B IlTILE 5 TONS CL B RIP RAP 9B° OUTLET PROTECTON \ co R = 23 SE = NC R = 2,244.09 F \ SE =EXIST. E -Y74- \\o \\ 0 009,000.00' 14 S.Y GEOTEXTILE z MTL c P PC Sta. 10+3293 \ - tuw _ _ _ _ _ _ - _ - _ _ - _ TG_ t� z _ _�-__--_--- Pis a BEGIN CONSTRUCTION ss ss - - - PIS -Y74- POT Sta. 10+00.00 --- T + t _ _ s= = €3f'Af.�96�i9.7{9�7 ----=%`74-`_-_ 2SG'I-A APPR�JB CMP C 24nNDPE REMOVE +/- b' OF 1 2q=C C US 7,A BYP 30'BST EXIST. 24" CMP ---- - i r _ / rn N I� 550'TURN LANE l1W i- o---_r_-i--_1_--r o__.\\z--_, FF \\ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . .. ..P --z--- ° �'`/�/ PLE //// `" '// o j50 .. - .. F4 4sF_ F9SFTFror \\\ SEE SHEET 85 FOR -Y25REV-PROFILE PROFILE 1N SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS o o PROJECT REFERENCE NO. SHEET NO. ' Dewberry R-2233BB 4A CURVE DATA FOR -Y25REV- CURVE DATA FOR -Y25EXT- Fp \� O PW SHEET NO, ROADWAY DESIGN HYDRAULICS PI Sto 15+51.99 PI Sto 22+34.65 PI Sto 3/+10.35 PI Sto 11+53A PI Sto 14+91.68 o W ENGINEER E".NIIR p = I8" 50' 349" (RT) D = 5` 27' 24.3" p = 26° I3' 38.7" (RT) D = 5' 27' 24.3" p = I5" 00' 00.0" (RT) D = 9 32 57.5" p = 46° 01' 04.5" (RT) D = 28.38' 52.4" p = 2° 09' 18.4" (RT) D = i 48' 47.4" s> N w ¢ 'Al CAao�'o ... 14'r, `'20Q"........... ��`tN �ARo°%., L = 345.32' L = 480.64' L = 157.08' L = 16063' L = 11886' T = 84.93' T = 59.44' SEAL - SEAL T = 17423' R = 1,050.00' T = 2446/' R = 1,050.00' T = 78.99 R = 600.00' R = 200.00' R = 3J60.00' �`5 _ - '•. ozoost N`: 127se SE = EXIST. SE _ .05 SE _ .06 SE _ .06 SE = EXIST. �� • uu:�� roo. a ,gyp.\' ,,,��''�m�,,� '•i�nuiiu�„ , P \,• \\.\"o\off zM m\�Z�P ti eQ A6 DOCUMENT NOT CONSIDERED FINAL 00 �'p01 UNLESS ALL SIGNATURES COMPLETED 9 \� -Y2 EX PT ?ta. /5+5/./0 O ems, g2 \ssF o P v"g9zg -Y25EXT- PC Sto. 14+ 24 END CONSTRUCTION -Y25EX 9mPOT Sto.13+ -Y25EXT - PT Sta. 12+2884-6V,,fl� o. \a 'c0P9 � � s so°ate w \�g' ��p� I oPJ��S' � „P ��+� • ; + ; ; 275.36' � / N 6- 168.20' O y,PQ 00 +53.37 '. 76 �s. 00�0 aA N 75.43 L, ./ O. Qi �w' �'� 'S / F • 96,S632e4, 0QO \ ry \ // / O• ozp 1 + 4.94 040, a, ti i O Y25REV + .55 a o ai N WOODS 201�2 LT O Y25REV +63.84 \ 156.34' LT D s AA og // /,� \,Pe 0 O �� • f s s 6 ws a Y25REV +54.74 o°°,g 25REV- PTA a.24+70.69��y Gpf? 'oo, v2132.73' LT Y25REV- PC 75 Sta. 19+90.04 -Y25EX - PC Sta.10+68` p1 Y25REV +09.25 \SFlu y9l 79.841 , P. O Y2 V +15.99 cP �` o 1 '� Y25REV +70.69 Fl. BEGIN CONSTRUCTION Y25REV + 21, 60' LT oQS 5 O j 760' Lr • Y25RTV +21.23 -Y25REV- POT Sto.17+50.00 ` pDETAIL TN�EEN - s� TOE PR -Y25REV- PT Sto. 17+23.07 KNO �6 Sg9ARPG 5p1 it BEGIN R/W ACQUISITION ZIP WOODS 12' /� �/ oopS 3 S 18" RCP IIR a °� ^ 21� 3301 OTCB g N -Y25REV- POC Sto. 17+00.00 TIE To EXISTING Y25REV +00 DITCH 28.99' LT CpV LT gFtFpRp G 213 y( c i - Woods P 5R' " c. woods NZP 2c _ o -Y25REV- PC Sta. /3+77.75 i .. _ = : s o. 30 ---- - - F caeu o 0 33!l .REL H� // Y25R a 2 22 / - _ - - C 082' RT P ET W p3 Y25REV +90.04 �� uj ftEgOpR / / 60' RT +15.00 WOODS OPgg%P/N 4 // W0005 $ m o / -- 71' RT �,LL_ . cam' / // TAP X7ST. + 75 m 32,\Q26g Y25REV +00 TIE I 000 N Zy05 2 / / s 31.01'RT EXIST a 60' RT R�1��42 Y25 +90 118'RT tig - � gw Woods E\P O7 -Y25EXT- POT Sto.10+00.00= -Y25REV- POC Sta.23+00.00 w4- a qP0 G' Z� Pg m 5m t \N0, so o RV��E�ZA A QG SEE SHEET 85 FOR -Y25REV- PROFILE \ / SEE SHEET 86 FOR -Y25EXT- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS I \ 0.O'1O `•/ c'M, q1 '-\ \ ,ySEPTIC TANI�_I Dewberry J. 1�C:CLOS5GA��NGGA \ m NT cW N �I R DB 812EPGL160A 2g3 PROJECF REFERENCE NO. SHEET NO. R-2233BB 5 RhV SHEET NO. ell, • ``r 3q 46.W �\OS SEPTIC TANK ^`� / \ "�Q� _ _\ eks" ' • (,� 2/'�6 °79, -\N 80 l qq� 2� i. ti .- "CR q 86 �T F ROADWAY DESIGN R HYDRAULICS ENGINEER �Y EIP srF'l xR 'El T N / F ,NGINE...... CARp�W.p pQ- �.``tN CAR01 �. NAD TDEESS/p 83 •.:9'� �.?::�FESS/pN..9 �� ~ \ SEAL SEAL i SEPTIC TANK \ HTR f cn, ~ 00@s Fxsr \\°40 'sA�.r\ 1' �'o 4Y Nc \ OI Q , 2 i aw sR \ k ,Io;�l 020031 i ° F ?:' NG is , INE 12 86 �N.�'•.F Q:'•Oa;: N E: p�6`''•. ,G I NE,.• �Oj /%. e 2 \W CIS JEFFRIES & / ,'° eN �2p,@ \\ 11 \ SHIRLEY MILLER 0��.`� „nuu��:� ��''i%.nuuu`�♦ oDB 698. PG 204 RAY WATKINS / E DB 6T4, PG 28 DOCUMENT NOT CONSIDERED FINAL ONWBV \ Y25 +65.71 ERAXJ WflIR5N5 �\ ro TC X- H1H ��\ l\\ REPAIR UNLESS ALL SIGNATURES COMPLETED i k 30' LT 8 6L9�IFJ 2>DORACT ONE K ARE AREA 1 CY SEDIMENT \ '00.o0.3 CL. B RIP RAP +'r.\ 4& ^\'CJ \ �j\ m EST.1 TONS 12 N OR \�\�� EST. 5 SYFD Q -RPB PT S to. ' 00.00 47.00' L 4 rFs w/ e o • \ S / I l(1O \ LOUISE RILING 8 X/ EMOV�k \c�\I \!J -CULL- / ) ' _________ �RNEI✓ •a ARNER rJ ~ REMOVE DRIVEWAY \ \ / +70.10 / /� SEPTIC TANK O O G 689 o SEPTIC EMBANKMENT AND \`� II 20.25' RT �( 3 GRADE TO DRAIN �_ \ 3T5\° E / "\\/Y( RE AIR AREA 3 80 HARLES CA SON Sr. & BAB 86,P 635ON `' �:;/ J �. +72.46 n \� \ v w DBPliO3flT o �� /2. O 1 / o" DR IN LINE O °"',REF. D.B. 200. PG. 444 • %m / i O C/ v P/ - ; Z 7 DALLAS JERRY OW BY & MARY ELLEN OWNBY '^ O STANLEY McENTIRE s W 11� I .�. L3 +46.63 I RPB +00 � SEPTIC / DB 939. PG 261 173.13' LT TANK DB 456 PG ny TRACT TWO . , L3 +82 _ .. s 136' LT 181'LT UNKNOWN OWNER L3 +00 BUSTER DE & /; \ I/x 170' LT .- _ NOIRF,�1 E PUFs C WW FENCE,1F0 o / \--_-� M,o Tp•48' ,A Mc+�,, LATERAL BASE DITCH 0 �iY z - T L3 +87.27 SEE DETAIL 2 fpN F L3 +49.313 +33.16m C 125.80'LT z v WW FENCE ' C - -3.75' LT '/ ; - O O C LC L3 +45.21 C \ __--- �o-- I--� ----10 163.34'LT \ 20 O o _---- - F -- 300'UNIFORM TAPER S80'ACCELERATION LANE \� \ _--_-- ILLI HI Y H H \ ______-___- r +00 _-\ '-- - F .- 2G1� 500 ova i DB- 619P .StO. 18+82J35 \�� END SBG IP '�9 + + '0 FS-A + GREU TLC ;�a F URE ' I M J F� N ° a36 - F • F o _ � � J 1 I v 18"RCP-III N 5'54'08.9"W Fsa 2GIy 501 -L3- ,oti (� z P I F `D F- a PROP. CABLE GUIDERAIL 6 953 3°. z`F PROP. CABLE / I ' GUIDERAIL / LU LU Lu LLJ �7 EIP/' P „�' �• N r �-• r-, CAT-1� _ 1J _____ FUTURE GUARDRAIL N 06°24'14' E - F �2GI 14.29' .- 502 - I i , o�%,h¢, ,C' N E'S L137.95'RT N O F- _ U L3 +09.04 m _ ------ ----- -___ 2SS ,� ,pBR09 INC _ 143.50' RT _ - EIP L3 C - I � 699v2e°F S13 _ _ +10.65 130' RTO -' "'ryo 1$ o N 04 0 � O __ ,yam - -- C ----- S I N F- < <Q 1 F NCE . G T_---C--P ti"C I -p i• _ �T� o ,� l\' L3 +00 L3 +08.52 c>'------- L3 +13.20 115' RT 117.0V RT L3 + A °o - - N / . SY MOSLEY C. 128.80` T TgNK PG 398 , 4 / 156.76 RT z ' J WW FENCE RT y_ ,v m 1 ---------- _ - - p 0 F� �- + o e 60.85' RT s rR - DALLAS JER� & MARY ELLEN OWN�Y °, , , \ A •4, INC. P DB G III, TRACT ONE m� _ 2 PUE 158.95' RT V� DB o ER WHI -- --- L3 +80 o + 18T RT a -DR2- POT o. l9 44.66 L3 60 rJ L3 +89.71 L3 +00.55 3 g /\ \215 DR2 +95.78 2 b 157.6 ' RT O 194.78 RT GRA 1 0 NG & ESSIE YOUNG 3.98' - bw S@y. 35' LT �` 16 �g TOE PROTECTION ISO. PG 249 N e N'. 6R9KB6� ry o'� 17 ',RT--- 161, o �, ° l a 738, PG IO A T B. ., a w�zo + Fi PG. 56 52' LT @ DR2 +50 o- ' LT • � ti .UNS ALONG] �R°PERTT }INE R/W MON TANK M F/P °ryC °Fo s oyo3,9z ss9'9j w CURVE DATA FOR -RPB- F> PIS Sto W } PIS Sto 11+20.02 P1 Sto /6+2991 PIS Sto 2/+09.66 / +85.34 _ \ 6s = 3° 0/' 59.9" A = 29' 38' S0.3" (LT ) 6s = 2' 3/' 39.9" -Y74- PT Sta. SEPTIC TANK i % Ls = 180.00' D = 3` 22' 13.2" Ls = 150.00' i_, m } LT = 120.02' L = 879.65' LT = 100.0/' - 3 -Y74 POTS .20+05.41 14 ST = 60.02' T = 449.91' ST = 50.0/' 10 ERNESTINE WOODS " R = 1,700.00' _ DB 343, PG 51 SE = D6 coNc_°sCURVE DATA FOR -Y74- CURVE DATA FOR -Y25- .o/, %011 _ P1 Sto 15+16.42 P1 Sto 1/+75.00 PI Sto 17+27.25 "-q gYPAS 3p S Zzru cue \ \ 0 = 24'19'03.7°(RT) A = 5'59'12.9 (RT) A = 3'27'46.4"(RT) y D = 2' 33' 8.8" D = 1° 42' 43.6" D = 1° 06' 44.8" L = 952.41' L = 349.68' L = 311.29' T = 483.48' T = 175.00' T = 155.69' SEE SHEET 34 FOR -L3- PROFILE SEE SHEET 56 FOR -RPB- PROFILE ° •Co 8�. \ p ?29925.5 R = 2,244.00' R = 3,346.59 R = 5,150.42' RU7H NC �.7 ©qqq UTHFRF SB. °H" SE = EXIST. SEE SHEET 85 FORPROFILE -Y25REV- SEE SHEET 86 FOR -DR2- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS CURE DATA FOR -LPR- CURVE DATA FOR -LPC- Pls St, 1r+20.41 Bs=O13'I2e PI St, 20 0390 0=14848'/1.4 Pis St, 18+2854 Pls Slo 1I+2098 UR 0s=18'55'57f Ds=2225'l23' Pl St, 15+8493 L= 120'4R26.0'(LT) Pls St, F+1615 0s=165157F oe oxwa. > Os = 2 25' 285' Ls = 160A0 D - P4154' 40.4 L = 5— Ls = 152A0 LT = IO192' Ls = 160A LT = 120-W D = 2151401 L = 48495' Ls = 15— LT IO 1 \\ LT = 120.4Y T 82390' ST = 5/20 ST = 6069' T = 40493' ST = 5120' `ae� ST = 61S1 R = 230-00' R = 230LO' SE AB SE CURE DATA FOR -RPR- CURVE DATA FOR PIS S U 11+20D2 Bs = SOY 595' PI S U 16+2991 = 29'3B'S03'lLTI Pls Slo 2I+0966 Bs = 3Y 399' 2' Pls Sta 23+32.48 P/ SY 25+7432 eS = S56'033' L = 3403'LO5 O?TI PI St, 74+5522 t1 = F21'O95'ILTI Ls = IBOAD' LT I20A2' D = S22'l32' L 819I Ls = 150A LT IOOAI' Ls = I84A0 LT 122b2' D: 942'40f L 3506 D = 0.1456e L = 2550JY ST 60A2' T 4499Y R I.700A0' ST 50AY ST 61.48' T 1806 R 5SU1 T = 127636' R = 23A00S7 SE = A6 SE - OS 45 45 mp SE = NC \ - CURE DATA FOR RPC- . 0PIS 6 Sta I4+13.48 05 443'30fJ' PISA11+ 14 0 222G 146'IRTI 06 Sio 20+3806 05 - S46'48A' PIS - 56r 4697 B - SSB'48.0' PI5/0 24+40J3 - 1543'31.4'!LT) - Ls AOA0 LT 140A5' D - 96,5r /J' L Ls I6HA0 LT - HLOY Ls 1147 LT - 161. 4 D L - 1IJ6' OA' L / ST - 7005' 2525 T = 25254' R = 1. Sf = 56A2' ST = 6/.40 106D T - 86W R = B8/.41' D7 SE =.07 SE=AB CURVE P15YO /1+2I25 OATH FOR -Y25- PI UY 2l Tlbl P15YO 2I+067/ CURE DATA PI SA, 32+54.T8 FOR -Y2- P15YO 3r+312] LT nrs �� /RP -SRS Sta. 22+0965 A= S2T'46.4 RTI D = 106 e n - S59 fl9 RTI D = f04'443' A= fOY04.0'(LT) D = O'1604f � = I722'IIT RTI D: S5l'363' A= 255'O1e(ffT) D = Sl0259' ti L = 3/12Y T = 155SS' L = 369.41' T = 1842f L = 380.03' T = 1SO.OZ L = 26186' T = 13129' L = 6633r' T = 3459Y f R 5J50.42' R 5310f/' R 21394JY R = /.44683' R = 1766.41' RUNOFF.•• RUNOFF 156M - v - _ j✓ s�� ell /WIN I � , R V � � ��•'ropp R, RR ////���� � ® �'lill y%) ail® � �� � 7lSi3iWi'y-��► ` ` `� a�0 Oxxci.i a"e x y , L3 POT Sta.Tl4+41.49= aD �. j or - T. \ e u O R - °' : Y POT S1a.29tA3.4 •v w a4'c I r I '\fee t1 I00'55'llf c LPC SC __- Sl0. 11+8000 3 •u s / e �2`` Oar r`« rove r e L3 PCC Sio. nl+]]Ap - "f Y2 «PC 31+2349 s � O :O 9 ♦° r ,vwn, P �� \\ O; C \ l9/l /I 14/ POE IUE wn�Fa O c.,iw L3 POr T56+SOA0 • 0 . \ \ �. ,�\ \ @;'� m ��%�, � PP POT o.10+0000 m a R . •T \ W / °15 /// LPC CS St,. 16+64S, L> W ° ° / gs , � \\�� a~�J �aa.. / a ° ^a� w,,,z ��%O / � o \ • ^ ° °",,,�� tPc sr stale+l6ss.f N / :: xx 37 ��'B�` /� oa ,•a a,© ��� �� x ,., �\E,*. � Oj'� ;/���o v e ^-� .. �.. ,«e`,. it l L wwvcm / m/ \ RP �� �>1taE�� a'FIC III�IIr1,f1101tl] 7/tea®� �'-�'[N�- �����lVfl� _•111'HIMII/IIlY1WE �, �,�� �77��L7®illllllls�l1�111'���: -LPC- POT SYo. 19+94J6 a..sTRAFFIC DATA ET B e4 A ,o —5 2 65 1 128 ITT U5 21J � i45 B PA c —24 c I D l92 N ®moll ®,®.'�s�4' ` /Fi w,�Rraw cow*u w uaa F— a US 321 SOUTH OF US 94 BUsiNESS /'O -RPC- POr SYa. , (CnaRLOTTE ROADITO NORTH OF SR 1366 (ROPER LOOP ROAD( M9TSA O ShFFj• / �� �� _ LE GRAPHIC SCALE NAL 33R �W RI—EREDRD XSQ�ZY ® ° - - E 50 J15®UcnE e??RESR 9/Y1019 PLAN$ axn •". D1M mh_ 9/Y1019 / C GLENN HAMILTON RACHEL D.HAMILTON CURVE DATA FOR -L3- Dewberry PROJECT REFERENCE NO. R-2233BB SHEET NO. 7 N 10°24'37' W EIP 25.32' EIP 7� J DB 278 PG 320 ¢ / / DB 278 PG 93 /I 1, 72 N 19°0825� P1 Sto 774+55.22 _ 141.26' L = 6° 21' 09.5" (LT) ELAINE W. CURETON RhV SHEET NO. 101 PC / / D 0° l4' S6.8" N o DB 909 PG 347 EIP ROADWAY DESIGN HYDRAULICS 46 O UN CHA YU LANDRUM 3 c/0 DAVID LANDRUM y -Y16- u POT Sto. 10+00.00 L = 2,550J1' : ENGINEER ....0 1,,,,, CA Rp/Ii ENGINEER ��,4411111,,, CARp�,i� COUNTY DB ICE PG 160 OB 838 PG 834 '. _ - T 1.276.36'/'� R , 2;•'FESS/p�9�'9% ,.��� BOARDRFOORDD UCATION ^ / flflQfl = 23000.00' N 27 9a'6°, /O NC Nq �. ' ��?.:oFESS/aq v DB 509 PC 337 DB 509 PG 337 `° n 0 RT6 2 / / �-I- £ - SE = 83 ' ` SEAL `i - : SEAL `' - DB 4T0 PG 95 16 Q o0- \ - l EIP - 020031 F � F ? ' N F,. 1 12786 i I!•°•. F Q:' O� F• ,,,,� 34' RT , I \ A:' O�,,,, ��' EIP N 06'S4'26• W PI \ ','1S Iii11 •.I IIi11O,, 01.51' 1 O m 11 -Y16- PC Sto. /0+96.9/ L�� 3 D VID J. TINKH M la CONc II �« alll fi oo `` �, DOCUMENT NOT CONSIDERED UNLESS ALL SIGNATURES FINAL COMPLETED TOMMYE J. TINK M w DB 1063 PG 823 �, r'II H< Z nb +27. 5 0 z 40. 7'RT N OS°3o' I n6 +30.50 LIP 25.17' 24' W RN 5°30'24• W II I I/ I 20' LT _ 49 _ GAY ZIZES c^ DB 486 PG 127 Q) n6 05 87.02' t\ DB 464 PG 664 .99"RT26 106.99' RT I MOUNTAIN VIEW BAPTIST CHURCH TRUSTEES PB IOI PG 52 n6+28.05 20' RT I \� Dpg269 PG PG 420 m -Y16- P7� �. l2+ 2.42 EARL P!/q y�i� HAROL9/GREEN.EN TJR.UD F I `rG Y b. 85 CEM J KENNFTR LEE GRE% DB SIS PG 218 `yI O w 0.9£e11 N RETAIN CLEAN I 30' I /1 ' -Y16- C Sto. 12+95J3 ' JAMES BRIGHT COMPANY, INC. DB 681 PG 773 1 CY SEDIMEI� L3 +92.74 .h y 1 `4.8 +70 flfll� I /o C / L3 +10 153", LT 48 L3 +86.57 176.98' LT 160.42'LT `O m 170'LT fl - �'(tEMOVE ___ JELAINE L�NCE C E OO y/W FENCE C" ''C GI GILL ET AL _ -L3- PT Sto. 787+28.97 F"' C o- --- - - OB 278 PG 191 PB 101 PC 5 L3 +25.33 9ga•45°W 2 m O C --_- W 72' WW L BK 16E, PG 425 127.5' LT N 66 7 pN m RIP RAP ENERGY \69• �'�� L3 +00 DISSIPATOR BASIN L3 +50 121.44' LT 7 CONC �C 119 LT SEE DETAIL 1 106.30' LT E h m , w `� _ > ?� O EIP12' q5• -3�"�' �>Cfl I C' L3 +45 > /3 O W N li°I2'45' o M1 (j C£3} N 17°3 - _-__- __-- C 105' LT F�'i O i- QCUL3- +03.91 o �- N I7° ' C _- --' _ - ��----- _- C _ p C 80FF/1RD WHITESIDE. OR. C F F -' - a o o = CV 00 55 v 20.92' LET I O \\\\-------- - -- MICHAEL CARPENTER WHITESIDE \`\� // PC 63 708 2G� +50 BE 1 SBG REU TL-3 vd 4y I III -Y16- PT StG. 14+21.92 703 DDB B 2 BE PG 343 N. FS-C i CAT-1 Q FIn --I J D 92 PG 142 FS-B ' m FS-B v OD - e 4GI N 12 l5' 18.4" W L3- ' RCP -III I I \� II _ 7D2 PROP. CABLE 707 GUIDERAIL I W F LU w J = -� c' I I �� �� BEGIN SBG N IJ50'ACCE RA ONLANE _„ 0 705 ai 6 f3 o� 76.57 0 fl X III I BEG. LANE FS-C Zo >i GREU TLC - E\P S + €10 F� PROP ARDRAIL �1GI ���,_ V 18" ryGh°I2'I9"� N I7°I3'5TW I I TAPER +27.00 2GI orc F A U Fu z3.79' 18" CSP $`"� DELORES MILL E7!'" I I -L3- POC Sto. 784+43.0/= d O 701 W a 9•\s'2A° W Jr N 2 42' C F o 00 'TOE PROTECTION JOHN MILLER X I 16 B 254 PG R I I JJ -Y16- POT Sta.lS+19.05 u \68• EIP -CL3 ro SEE DETAIL 12 O O \ -- , / 704 fl EIP I � -Y16- PC Sto .16+67.84 BDO �� �� --- - C - -- L3 +80 +00 91' RT w � a a BERM DITCH _ X \�N W �__-_ 145' RT o J SEE DETAIL 8 WW FENCE - 17-03'57' -44'L3 I C --- -'�C WW FENCE L3 +50 +50 168'RT C 178' RT w n L3 +37 o 192' RT L3 +81 r^ PUE ---_ 208'RT -Yl - P t l7+ 4 1 VICKIE B. SHEHAN DB 742 PC 552 RUTHERFORD COUNT BOA F EDUCATION n� 9 PB 101 PC 52 51 DB 5 337 / Ll 53 �470 PG 95 A FI +82.39 I 19.25' R 0 11 \\ 9. 9 I 1 3465+00 4' LT W le so / Y16 +20 I 85' RT N 1 oo n G ti N z9•\7'23' o _ w 1 Y16 +65 20' RT P EIP Zin 6 +52 RT 1 7 -5 68 cn� 'EIP JOHN F. ADAMS 2339.a w •- 9o.0p, w� 5.75' 1 m OB 1099 PG 486 Y16 / 1-74.75 16 LT �. Y16 +b a2 PB 101 PG 52 1 0 / CURVE DATA FOR -Y16- o E LIE 51, ri653, 2 y T Pl Sto 11+74,86 Pl Sto 13+58.60 Pl Sto 17+01.15 9" 57' 00.8 (LT) L = 6° 44' 04.4" (LT) L = 9" 15' 12.4" (RT) " " P1 Sto 18+72.03 L = 15° 5/' 05.9 (RT) Pl Sto 20+41.30 p = 13" 11' 55.6" (RT) 6 +86.37 20' LT %` D = 6' 23' 53.3 D = 5' 18' 41.4 D = 13' 55' 20.5 VICKIE B. SHEHAN DB 742 PG 552 L = 155.52' L = 126.7- L = 66.46' T = 77.95' T = 63.47' T = 33.30' D = 5' 47' 31.0" L = 273.68' T = 137.72' D = 19' 54' 11.8 L = 66.3/' T = 33.30' o 3 / ® 27.0z' " 2p0•p2 R = 895.51' R = 1,078.71' R = 411°54' R = 989.23' R = 287.87' SEE SHEET 37 FOR -L3- PROFILE -------------- o ,`<! SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS Dewberry On PROJECT REFERENCE NO. SHEET NO. \ EIP N Ig o329�- ry 1914'25� 93.65' n A � m R-2233BB 8 RhV SHEET NO. ROADWAY DESIGN HYDRAULICS ,\ EIP�115.12' ENGINEER ENGINEER EIP -Y17- PC Sta. /O+OO.00 r! ' S S%p`N..y @SEAL N 06°I7' 10 t•C� SEAL - \ EIP ROY ROBERT OWENS a 1, 020031 112786 ' TONY RAY TURNER OB 1033 PG 597 SHELLY CROOK OWENS DB 719 PG 269 ti N EIP N 013Q5615 W a �I N F - 109.446, I S .i '� �� •� ,�l2y •........ •:gyp GINS O, '�F'••., G I NE pro 'i$ J. 1 1J. NV II1i111��1-�, ��J i111 M ITp P7 P24 q of II coUc DOCUMENT NOT CONSIDERED FINALAAL�83 No cowc I Q UNLESS ALL SIGNATURES COMPLETED 72' WD X�X EIP EIP EIP U65' .7 MTL 19'COry EIP Ib Iq S 06°96'12°E 3 Z q = N 16°03'31'W 191.03' I04.81' V 3 . PATR CIAN SUE CAUSBY I L3 +58 Z EIP 325' LT. y w d $ EIP GS Q (� ° 6C o III 3 DB 648 PG 123 I PB 7 PG 214 °l 4a ww I X- N 07'52'12' - �% J JAMES L. PROCTOR C3 Q r-,IL W JAMES L. PROCTOR IF 112.42' V FILL EXISTING CHANNEL SHIRLEY PROCTOR €% d "' I SHIRLEY PROCTOR CHANNEL CHANGE WITH CL. II RIPRAP WITH FLOODPLAIN I TO EL. 925 / 3 DB 667 PG 616 - - OB 340 PG 206 0 � d A ^� DB 938 PG 839 JOHN W. MARTIN HEIRS - Q 30�0p"z �JOHN W. MARTIN H S DB 341 PG 5R i O BENCH SEE DE'F 6 ' 2 i $, N 28'222 8 p3� L3 +40 4 EST. 80 TONS /PO 80 SV GEOTEXTILE FABRIC \ No �' L3 +60PB 287'LT PQF DB 328 PG 73 Q DB 344 PG 354 E a 7 PG 24 .. U f EIP 14.5' LT DB 291 PG 64 00' M u pg 7 pG 24X I / Id CONC w 4 I El -PB 7 PG 24 _ m �" MON ~ 208 280' LT1u�a�c .. a ,RT I 3 : HL I E3) P CCIpLL11 RIP RAP 41 SY ICE WARREN -Y17- P to. 12+57,54 ti' Y17 + 5- T EIP _ I GERALD�{ F.G ENE II 1" W g9 p�\A' 23.86' EIP - CLIFFORD WHITESIOEJ RNKS MICHAEL WHITESIDE 814 4O L G 12T 75 �� KENNEFA GREENS I N g S 80°41'36' W DB 90E PG 63 DB 2 OTCB E 818 15" C w OTCB LATERAL V DITCH SEE DETAIL b P EIP W i gl'14° f`;i. C N 2\41.9\' W y.?ULS, F 4Y 6'RT fi / V .p DB 96T PG 48T I '" y ``r_3 ~ PAL 6 63 `- \ W o O O L3 +00 8 200' LT _ m 800 \��\ g 60 _ O 4a 48•AL LVa- .N 39.p�\1 _ O Lr)\ �� \ C EIP LATERAL V DITCH 1 m NORTH CAROLINA w SEE DETAIL b p I + DEPARTMENT OF TRANSPORTATION T° DB 1043 PG 635 29°0\3 N C3 �'�-F�--- - ^� NC m X S b8Do O V O a m PB 7 PG 24 \gq:16' fl \ + .. ... LT 172.41' LT L3 +00 105' LT O 00 Q ✓ ^� r TOE PROTECTION FFNCF EIP 119567LT2 I� o \� •0 3 5 g W 145' LT CL. B RIP RAP Q r N �' F ^ '. 3 SEE DETAIL 12 _ l7- PCSto. +96.6 my jog• N ti' - - C EST. 1 TONS EST. 5 SY GFD H N . � � EIP ry 2 f7 OTCB L3 +00 FENCE VN4 _ v--- � -__ +b . - C C J Ch J TOE PROTECTION SEE DETAIL 12^\9'30 \ ,,, - 10T LT �,� ROB' t X N 1p DI DB 90 +86. _ 811 ¢ _-- _ _C -- f3flfl PGL2 B 2 PG II71 1.71 T>4-, �" G4 \`�--C n / Elm N +55 _-_S,3 m END SBG I C3 �,C -1 - O� ' 0j7 802 0/° 0 f o Qfl 808 2 /[) 807 O c+ /_J F + W S-C H W1'oEP 2O l/�0 PROP. GUARDRAIL 2GI 2GI ld Gd811 TL-3N //� d� N j259.g8 810 2GI W N 15" RCP -I EIP N 14°3735' W 6 J F a N H GI Boa eos P TH NY WILLIAM TO 'o�, 813 O a 15" RCPIII- N 12' 15' 18.4" W 2GI v = U FS-B PROP. CABLE 'DERAIL FS-B p5 W i i '� F- I z - N \4A0 DB IIE PG 59 �, 2GI PB 2PG Ili - PS PROP. GUARDRAIL O $� 2GI 8:1 MATTHEW R. BROWN +00 �T-1 DAVID A. BROWN Z T AI DB 8 END SBG 86 PG T56 -+ 5 ' Ci P to. 16 Z 2 Y/7- 1 \\,3 8' Coll N 5 'J 1 0 GI FS-A Aq' \ P i 3569816 JAMES BRIGHT COMPANY, INC. DB 681 PG T13 < 66 812 0 7S+ HW TOE PROTECTION m DB II PG 490 3 +50 DB 1114. '- _-8 �� SEE DETAIL 12 �' EI 96' RT ��38 EIP _ C �� CON, -' CONC BETH AUTRY SCOGGINS �+ Id DB ICE PG 609 4, TOE PROTECTION SEE DETAIL 12 LAT V DITCH ,- SEE DETAIL b i // \ -L3- POT Sta. 803+50.73= �`��r7 \ -Y17- C Sto. 15+28,25 {) � \\� DB 221 PG 575 PB 2 PG 117 o ' ' C �/ L3 2 15 EENCE +30.7 £j +25 THEW R.IC$1 0 819 DAVID A. B T / IP/ DB 886 PG L3 +00 / \ \ 148.31' W EIP \8° C / \ 32•A6' 62 T I C L3 20 L3 +72.82 189 185 RT .29' RT (: 8. W 112' STACY LED C iOL JRB MARY KATHERISETLIJIl 69 OB 896 l RAP W <l" GFD N 50�8 OTCB 166' RT I rJ8 \6 ` o CAROLYN S 1 Fb 6 e 1RpJN DB 778 PG 341DB 9 L3 +20 20 TONS CL B RIP RAP �F\ � 820 �' D� t - ? � W o I "� p��C 190'WALL m m n mc� j'� `�EIPQ �\ L3 +45 TOE PROTECTION SEE DETAIL 12 58 I 1 t� �- I \ \ FOX. 0.30 OB T03 540 b7 I _ PB 2 II7 y 237.11' RT \ 1 \ y5 W EIP �UL6- \� \ P' zl N' " /C� ° --Y17- PCC Sta. 18+34.40 L3 -00 RT CHAE EVERETTE MURR 35°28 78•Ta \\N DB 'OBI PG BSI, 17 PB IO PG \ \ Y17 5 '0 /15 FILL EXIST CHANNEL EIP WITH CL. 935 o \ "+ ES 19 T EST. 19 iEOT 20 SY GEOTEXTILE FABRIC 262' RT L3 +00 DO 275' RT oo °� o CIL II RIP RAP E '\ \ \ 14.5 RT 7.55 ON BANKS STANDARD V DITCH " 2% SLOPEL��\¢14.5' \Y17 LT 5' LTCHANNEL \�s CHANGE 1 WITH FLOODPLAIN SEE DETAIL 27 RIP RAP AT EMBANKMENT \ \ MATTHEW R. BROWN \ DAVID A. BROWN ccn�,, i `v' a, BENCH SEE DETAIL GI CURVE DATA FOR -Y17- SEE DETAIL 30 _ \ / \ Ln, JOSH LEWIS PROWANT DB 886 PG 756-BREXLES, L C- \ `w' cn, SHEILA E. WHITE PROWANT DB 1070 GS93 W OB 940 PG I15 P1 Sto 11+28.79 P1 Sto 14+99.60 P1 Sto 17+18J2 P1 Sto 19+47.85 EIP WC DB 940 PG I18 p = 2' /3' 445" (RT) L = 12' 07' 17.0" (LT) L = 1'46' 36.4" (LT) 'L = 4 43' 29.0" (LT) z 6.G0 �\ 20 D = 0° 51' 55.8" D = 5` 54' 24.4" D = 0' 45' 50.2" L = 257.54' L = 205.21' L = 232.58' D = 2° 05' 00.5" L = 226.77' N \ w w• �\ \\ \OF o il\ a A Yg Oo T = 128.79' T = 102.99' T = 116.30' T = 113.45' # @\ m \\ P R = 6,620.00' R = 970.00' R = 7,500.00' R = 2,750.00 �_ N EIP N �m SEE SHEET 38 FOR -L3- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS CURVE DATA FOR -Y18A CURVE DATA FOR -L3- CURVE DATA FOR -Y18- Dewberry PROJECT REFERENCE NO. SHEET NO. v \ R-2233BB 10 Pl Sta //+46.96 PI Sta 12+8/.88 PI Sto /3+79.30 Pl Sta 15+24J0 Pls Sta 8/6f54.67 Pl Sto 825f28.78 Pls Sta 833f82J4 Pl Sto 10+98.60 A = 25° /5' 57.7' (RT) A = 66° 49' 05.9 (RT) A = 13° 09' 32.9° (RT) A = 23° 12' 17.3" (LT) Bs = 1'36' 4/.2" A = 22' 35' 44.0" (RT) Bs = r 36' 41Z A = 45° 49' 10.r (LT) RhV SHEET No. D = 18° 2/' 49.3' D = 560 55.0' D = l4° 26' 34.1° D = 79° 19' 00.Y Ls = 225.00' D = 1'25' 56.6' Ls = 225.00' D = 49` 49' 20.7° 3p�109 s ROADWAY DESIGN HYDRAULICS J, L = /37.59 L = 118.93' L = 9IJl' L = 2926' LT = 150.0/' L = 1,577.47' LT = 150.0/' L = 9/.97' ENGINEER ENGINEER CA CA 3 T = 69.93' T = 67.27' T = 45.76' T = 14.83' ST = 75.0/' T = 799J2' ST = 75.0/' T = 48.60 ��`�FES.....FESS a�;Ir''o / ✓\ R = 3I2.0/' R = l0/ 98' R = 396.7/' R = 72 24' R = 4,000.00' R = 115.00 N - SE _ .05 - = 1 _ :`ate° N9! i _@O N'� i a 'm - + zl SEAL SEAL ve"oo• \$A- POT 510. 1Of00.00 Nol 020031 F + 12786 £LL \�/ n8-10+30.42 37.2'RT zl N is N E; a XJ \BEGIN VMT PATH Off` �qu J. '�T.Iip.U• t �_ N !!!� i O h a0 A� h E PUE \ 'i,, S J. f/ y R TRINITY SCHOOL INC ti� ati `L /^� \ L3 +12.04 \ 9 a.V m 3 `\(\ 1 \ DB 424 PG 574 2 /E \ `\\ 5y m 'J � _ I` \ DB 407 PG 222 a� \ \V `yS� o m c o� \ PB 4 PO 54 G. JUSTIN ZIZES JR ah / \ \\ r \ n z DOCUMENT NOT CONSIDERED FINAL DB r42 PG szz •^� e e �� UNLESS ALL SIGNATURES COMPLETED c dv;i o PB 4 PG 54 Z.Q fER HEIRS /�._. %p / / O/ o , 3g7 HOWARD G. CARPENTER I n8A +50.11 \ ®\\ \ m a V w � 42 MARTHA CARPENTER 3 O \ 31.28' RT ��++++,, I \ \ \ \ £ c v DB 453 PG 526 •�; 04 \ / TRINITY SCHOOL INC G-/ n8A +62 4 m Nan E a s m PB 4 PG 42 r ^`� si 2.43 R c O aI I \ DB 4II PG 177 \ m�1�0 hP �'l� J I k FN \\ p 83 DB 642 PG 77T {� c -a th 0 S E/ o PB 4 PG 54 4 -Y2/- PC Sta. 16+6/.09 1 EI Eu m �Q o -Y2/- PT Sta.17+68J2 a m / ✓s ✓\\ -YlBA- PC Sta. l0 77.03 U a. 3 N \ -YIBA- POT Sto. 15+8989= a r CO MOW ; \ TRINITY SCHOOL INC -Y2/- POT Sto. /$+45.64 N N O JOE JAMES PCDANIEL. R /E \ DB 4II PG 167 6- -i )•- M of O y DB T99 PG 896 DB 642 PG TT7 "O 1 + 9 O O a PB 4 PG 42S \ PB 4 PG 54 m -Y21- POT Sta. l8 /5 s.7r RT ddaLLa� 090,3 \... ` \Sy\ N S 3°26'31.9E o NS�bop p -YlBA- PT Sta.15f3853 wi w V W 0 0 o'c c h�'h� 96 Do/ E y ryry. m v -Y18A- PC Sta. 15+09.27 l 2 PPNWmN = 91 Y21 +60 \ \ a 89 ^ O ' CL II RIP RAPI3' LT \ �� \ % -YlBA- PCC Sta. l2+1 , \ m m m x m v 8A +5 \\ c c c m[ v �P c / ON BANKS 1\ O h 7' RT II [ a / r pR 11.44' Lr n8A +to -YIBA- PCC Sto. 13+3355 / O I J /MARY LUCILDO E SIMMGS90N HEIRS 'h ,h. do / Js L3 +05 / \ \ 12 LT h h P . CLT,,,,, RAP WO DB 6T3 PG 549 = ES. 0 TONS L3 +45 198.30, LT L3 +35/ ��O / �\ RETAIN 2z9r LT -Yl$A- PT Sto. /4+24.66 / \ / U W . +��' 9U PB 4 PG 42 h P 23 SY GFD / REEVES BROTHERS. INC. 232' LT - 200' LT I / DB 16E PG 591 = RIP RAP ENERGY O DB 429 PG 585 4p s / \ 102 CQ Z 3 3 3 3 RDISIP RAP BASIN 95 DB 429 PG 726 L3 +21 L3 +00 000 O �` L3 +39 / SEE DETAIL 1 / DB 429 PG 729 \ 187.10' LT 1021 I TOE PROTECTION O KKK 184' LT \ \ OTCB \ / 135.80' LT DB 656 PG 34I \ / SEE DETAIL 12N:/ L. "' F OTCB WW 165' LT DB 340 PG 580 w / L3 +36/ DB 395 PG SOI L3 +48 F ��� FFNCE A1N,.�__i ecpL3 +91 DB 230 PG 302 F �' R p• ^� L3 +88 J�i'LT 121.54' LT PB 4 PG 42 168.67' LT % C,S 3 CSP g ¢ 133' LT 1005 173' LT L3 +30 1007 1014 �, ® -L3- CS Sto. 833+07J3 d L3 +71 F c -- E 130' LT _ 149' LT m -� EIP �' ® LATERAL V DITCH L3 +15.97 J L3 +64 LU i _ 140.44' LT E E 1000 L3 +50 - CL I RIP RAP CHANNEL---- OTCB L3 +55 132.48' LT EST. 4 TONS FILL GULLY TO E £ ,�_' 149' LT 120 LT C' EST. 8 SY GFD a MATCH EXISTING !,� 7013 q, \p OT 142' LT ,� CHANGE 'L , Q +45.08 m £ L3 +20 DUE ,F ' V SEE DETAIL H2 GRADE .� 40.03 LT °m v LL 105'�1E F c hh _ - _ _ _ EIP 1 h� oo. SWANEE CA ­ FACE_ - - O F F__.--- \;• h LYNETTA B.FLI ryw cco D 1 �• FEN IP F _ __-__-_____F - 300'UN1, D PGI © O SE ADA4E HENDERSON 1008 HELEN FLACK „� O m y H 3 6o �2S/. BB 269 PG 250 PROP. GUARDRAIL JB vA.1H o 18T P 419 _ .+ ovv� n JBvtlM- -_-- 97 '/S" 2T5PG376 + 98 > >-o FHB 4 PG 42 .o �•+ 99 $IF - AC1 .45' clCO o m m V Q CAT-1 z z 0 o w o3 < o'^- n w .o o-•v a to ms mm m N [ a o-- = m � 2GI-A �n �x �zm �- d O o o m �1 PROP. CABLE FS-B 2GI 1009 aa[ � GUIDERAIL 'o O a FS-BN > i>> a I 0i�� r �- 15 100 FNn W y �QQ W o• I I I I 1 hREMOVE GREU TL-3 2GI 15" 2GI Na y C N M N V7 N 1002 2GI-A Y20- PT StG. 15+50J6 1010 1011 PROP. GUARDRAIL h �� \ -Y20- POT Sta.l + - ___ c F ----- - - - - _ y. h V V V D m ? PSG -___� F F _ -__� SEE DELV DITCH By �C,S• �y Q 1 o L3 20 oJ- FS N_ Y2OB= P9�- l # BEGIN - SEE DETAIL 23 ,yC',F�o� fd+ 10 OD - Y - FENCE n daaa N o 10' T; O SBG +70 - --_ N I I tJ 3 +71.73 DITC L3 +75 - Ce'�Cs 9tiOCe \;:. / SWANEE CALVIN FLACK and - ao + ,�P Pe OB AS 10 2' ETAIL 8 100' RT W FENCE \ �.0 p ife, LYNETTA BERNICE FLACK N N N C = } 13' L� 497 -Y20- PC Sto. 18+82.05 L3 +00 �91��i•ll. W DB DB 959 PG 4131 Y20- PC Sta. /5+92.06 125.16' RT J E N - - P ' PB 4 PSAT18tAL BASE DITCH m m m \\ s } Pue 20- PRC Sto. 16+555 j �\ �` \ SEE DETAIL 13 m a c c c BERM y 9F \ Y20 +91 ^ DB 13E PG 431 a a a TAIL / D �Fcl. 13' LT -Y20- PT Sto. $.68 � \^^ 1016 102 HW O ` 95 I I I I I S-CUEV � �I a I 1004 \�s� ' ;O �i �uw�uw LUCIL8T9 PG 945 '/ J R �6` �Ex,,r� °� - -__-_- �eeaeeeae \^^ 1017 OOOOO PROPOSE 6 \\ Q I�F /� / ON 2" AL \\2 p' +20 io 60 / TO A 6'DI�� 7g TC Qr 13' RT +sr4 \ O OTC- L3 +25 22 9 /pp % >Z\\ Y20 +56.66 9rj\\ \ \\ / REEVES BROTHERS. INC. / 1018 7p1q ^^ 170' RT TB BROT At +72.72 \\ 13' RT / DB 429 PG 585 Yy- 20B PG 588.67' RT \\\ 32' RT \ DB 429 PG 726 13' RT DB 42 PG 739'RT +\ / DB 429 PG 729 / DB 429 PG 729 \ DB 656 PG 341 L3 +93.62 SE p1TG12 / v Y206 +08.DB 41 7 +25 \\E DB 340 PG 580 / 231.05' RT S\ tERF•E BPD�p'IE T' e 28' LT 340 P,$'98p \\\ 1 U \\\ �� -Y20- PCC Sta. 19+66.43 D PB34 PG 422 ON I RIP RA BANKS �` SEE s 13' LT DB 395 PG 501 T r� / \,• Y20B +97.4PB 230 PG 302 \\ �:Y W Q GE CHANNEL CHAN d 3LT PB 4 PG 42 \\\ - a /\+\ j SEE DETAIL H7 13' L }0 13' LT 0\\ RETAIN / \ L3 +42.02 246.03' RT 34.85+iT CURVE DATA FOR -Y20- CURVE DATA FOR -Y20B- ° P1 Sto 14+53.86 Pl Sto 16+23.79 Pl Sta 16+77.10 Pl Sta /9+24.35 Pl Sta /9+91.42 P1 Sto 13+53.77 A = 5° 05' 18.8' (LT) A = 3° 0/' 45.6" (RT) A = 9 11'02.r (LT) A = 10' 17' 09.7 (RT) A = 53° 06' 23.4' (RT) A = 7° 38' 04.0" (LT) D = 2° 38' 25.3' D = 4° 46' 28.7' D = 0° 25' 33.6' D = 12° 1/' 26J' D = 114° 35' 28.3" D = 122' 49.0' L = 192.72' L = 63.45' L = 43.18' L = 84.38' L = 46.34' L = 225.85' T = 96.42' T = 31.73' T = 21.59' T = 42.30' T = 24.99' 95 T = 113.09' R = 2✓70.00' R = 1,200.00' R = 13,450.00' R = 470.00' R = 50.00' R = 1,695.00' SEE SHEET 40 FOR -L3- PROFILE SEE SHEET 74 FOR -Y18- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS Oo � 103 W�^y. -ns- PRc so. ro+91w' -. g CURVE DATA FOR -r18- 118 PCC s" 13i0584 '- Pl Sla 11+9895 ,a = 405'W lRTI PI 510 14+ 01 p = Z29'539lRTI Pl S,, 15+86.41 PI510 I711023 p = 3" 2/J•lLTI A= 240Z4JS lRTI D r5458S D r13'O88' D 225'059 D 2Z55'059 BEGII BEGY L = 2I3B]' T /Ol5 8 L = 2049Z T I0241' L = 1469Z L = 1049Z T 7585' T 532Y R 2990A0' SE = EX. R 4.J(roD0' SE EX. R 250L R 250A RUNOFF 64.fA'Y R OF �s`!t0' eos�iei ,_ Ael1. p r• • �'': � " (III, J3 �� 73 a, � 111511 Bill / -L3 Sia. 838H2J3 0 oe ro >r p U.N. s� a` �� •�.51 ME M,CURVE ® �1mtii E:=\EL.EI�I DATA FOR Y4- • q3 ' Cy ��\���1 �Ai�ll ���1�ISI1 ee C3 .n.�.--....- ...... • r, � .wit,MM - - ►cam ra+aw » >r m : PJ 1\ • �„ - . � � � tea, o�\�i,> o +r l{ , v >o- >r >4 >r >P TRAFFIC DATA 67 84 B � A ! 5 128 JO I45 C 4 9 85 38 p 7N- -F - 6,,-�� ��mi nP�M1 � nu+ O uo..iYv Ati9 " Y CURE DATA FOR -RPA- h Pls Sfo 12+9859 Pl St, 16 fi' 39 Pls Sfo 20+85J1 P' sra 23+2516 PI St, 24+5282 Tosr6 O Bs = 66,W A D - 345'OOB'lRTI Bs = 66,9 qA LT 545'36.0' D rjTv6001OPfLT1 Ls = 168.G9' D = 345Z Ls = 16810' Ls I1217 D - 6,66 LT = 52A2' L 6345Z LT = I12AZ LT - I28A]' L 1535e 5AZ T = 34284 Sr = 5AZ ST = 6406 T = 63.5Z 8<*. SE _i89' SE 9M ' CURE DATA FOR -RPD- PP xro ,y uueii � = Pls Sfa I2+GAJ9 PI Sia 15+2]2l Pls St" 18+122] Pls Sto 20+6833 Pl S,, 23+567] see oer.L� Bs i45'009 p = 23'09'289lLTl Bs = 45J'369 Bs Tl5'23P p = 33'00"l2e(RTI 3LUA0 D - 510'OO9 Ls 192A9' Ls 192 D - T33'31T 200J9' L 4462Z LT - lw.OT LT - 128J1' L 436ZZ If 1 T - 22]2Y Sf 6405' ST 64JU T - 22456' see R U0695R 758A0' c"�� BEOIN OOPOC S7 34+ N SE m SE A8 Y71A" � n & dN T? $ o +¢ CUR✓E- N a PIs 51a I0+6323 5ioA6+55.4!PA- 5 PIs St, 16+93J8 r3Y453' p 13500'49b'lLTI Bs = 165YX IIDZD. aSOT 0-54/958440. LT = 10/9z ? v LT - 6323' T - 555.45' ST = 5I20' 5T R 230LYY SE _ '• p O- o C(/RVE DATA FOR -1P0- ��ti Pls Sta 10+80A3 Pls 5f° /4+p234 PI Sio l9+]899 Pls Sfa 20+15.111 Bs - S3O'412 Bs = 2453'36.4 p = 13O30'268•(RTI Bs - 1655'Sf 240A0' Ls = 2401V D - 2454' 40.4 Ls - /52.00' ��`'�°� .f•• N �� '�/. --- .© \\ ��+/�„h">sw�" / s ST 80A3' Sr 82Jx T 49899 ST 512 sm SE M IY23 PCC'SY°. CURVE DATA FOR -L3- \ \ 7 Pls Sta 816+546J Pl S, 825+28,78 Pls Sia B33+82J4 Pls Sfo 83J+]224 Pl Sfo 843+0/8] Pi SYo 848+1949 'i a v@ LLL Bs = f36'4l2' p - 2235'94A'IRTI Bs = f36'4l2' Bs = 523'58.6 p - 2412'SJA'fLTI Bs = 523'58e 2251A' Cs = 360A0 D = 2*59592 Cs = 360A0' CT = 150.O1' L = l5T/.4]' LT - 150DY LT = 240JF L = 60125' LT = 24011 75.01 T = 7991Z ST J50r Sr = 12010' T = 40974' S( 120la R 4=A0 R9=Il0A0' Aa SE A5 SE = AB ^°"- us SE SauRN OF US 74 OUBUSINESS le ICNARL 66 (R PER I-D N—Il OF SR 1366 (ROPER LOOP ROAD( CURE DATA FOR -Y23- Sta o+191K PI Sto 23+34% Pl Sto 25+1673 PI Sto 27+34,69 Pl Sto 29+49.41 PI St° 32+45,69 c°1N = 3'4]'362'lLTI p = 402'S9.4lLT) p = r35'S3.4'!LT) p = 6l9'049lLTI p = O'40'092 fRT1 p = 429'386'lRTI 33R —ERPORD = fle3le D = 3'25S12' D = 61 0419 D = 3'l9 9.1 D = O'16445' D = fl6'237• GRAPHIC SCALE o"eo 3/38Z L = n8A4 L - 122. 3 L = 19022' L - 119.71 L = 352%' 50Ioo a RES 9iv1o19 = 56.9�13Ro T = 18.01 T = 45,53' T = 9022' T = 39.4 T = 5296' B . ��r� = 4740,W R = 1870A0 R = 8,450A0' R = 1725A0' R = 20535.00' R = 4500A0' ILLLI�— aeo mh. = EX. SE = EX. SE = EX. S£ = EX. SE = EX. S£ = EX. PIANS "� D. 9A'1o19 \ \•d- JACK HICKSON D VIS 2 \ 0.010 PROJECT REFERENCE NO. SHEET NO. \ Ile- •y) pe• / Qp, Yi i i FAMILY TRU Dewberry v 0 3 OB 808 PG 4 R-2233BB 12 DB T44 P 826 RhV SHEET NO. S,'-�•�� \\ oe \ �\ 6 , +5 �� Ppl��\ G9 th\\ /S•RCp yrNC PB 6 8 P�\ ROADWAY DESIGN HYDRAULIC \y S ��rv' �w EIP 31 ENGINEER ENGINEER 6C -GINS. SR,"��Kn����h pti \\ O� �y ° I �/' LENA MAE HUDGINS \ CA,Q07/�oRtH CAR �o / C''� K/ 5 Fksr �96 DB 488 PG 3T6 �.`'2�: oFESS /p9'�. z.`�?�:oFESS/p`;;•..;f-1. v° PB6PG8 _ 7@ 9•. 7@ 9 SEAL - - '4 SEAL DUKE POWER COMPANY\\ 020031 1 C N;. 12786 �� DB 307 PG 535 DB 157 PG 468 Q �'� g. `' % F'1' F@' '� '•FN EQ: O: 107 �. ' ,\ \\ KE DBETH 1045APG J771SUP ( \ l `woe, XI�1� v' ',',,,,,''��5� i���MO,,, ,,, '•ii��iiiUA, \\\\\\\\ O \ PB6PG8 �� oP .. -L3- SC Sto.86I+15.54= �syr �\ f E WELL, �3 DOCUMENT NOT CONSIDERED FINAL .w -RPA- POT Sto.10+00.00 - 47.00' LT O _ \ 99�.�s L3 +6' LT . 0 1 L +9a.61 j1 UNLESS ALL SIGNATURES COMPLETED 1.46' LT \ \ \_ yJ�• \ .hh ^�O LA "BOBBY HORTON �u \ JAMES HORTON \\.,_ \ \ DB 1090 PG 283 C 0 /-y S9 �� �� 8 .7 ' LT DBA� �b9 O - \ RIP RAP AT - PB 6 PG 8I' E3 127 \ \ EMBANKMENT pUE RETAIN EXISTING \ \ $EE DETAIL 30 DITCH u VEVA R. WILSON \ L3 +91 \ / RETAIN MICHAEL GARRON WILSON�\' L3 +00 127.27' LT I OB 729 PG 188 155' LT L3 +83 \ +81t2i lq7 Z H 0 112.71' LT Y PB 4 PG 51 \\ 1ST LT \q, `�' 2. 2' LT y. i \ 1219 +77 v 0a +25 s 132' -L3- SC Sto. 86/+155 \\\ O 131. ' LT \ \ °o �� L3 +02.44?^�00' 1 0' LT +09.58 ,�, es> 7 �(,� �� / RETAIN CE pp. J' OS' LT is 62.93' LT CONC ,P \ FEN L3 +62.16 F+ . F EENC C MON ySTCO is. ��'% ONE 133 1 105' LT c� C Vyyy HW ^ C __---- C FENCE \ F-----_ C - _ ,Ah, _ 'DITCH 1214 O --� F -F - O . S'BOBBY CHARLES HORTONDFTAIL IS DI ---- O 2GI _ \ --- / L3 +19.4 DB 807 PG 307 -i'-' ,t--s�--�- --- -I /% 4 DB 807 PG 310 fiL ti 2GI S-Q O O S �F - BEGIN 111.80' LT `�?; o `W U) 9 59. > a O \\ PROP. GUARDRAIL TOE PROTECTION ° L3 +28.70 I `V ? 1203 5-A 'SBG +26 SEE DETAIL 22 ` PB 6 PG 8 _ + SBG Z v/ O -RPq-H - T-1 2GIFG \ 2GI 9GREU TL-3' 1$1 2 Rc 1210 CA m W 15. R P-III RE OV EIS- T7'I Q N a \ r, t� -I H 2GI-A FS-B 1204 s c, \ 1211 PROP. CABLE _ �\ • \ M - GUIDERAIL J 6' 0.01' ry r -� s- REMOVE O I -A 1205 Do v W o 0 0 o \\ \ \ G 1 UJ rn N5" RCP -III C �wA1H SLEY HUDGINS, SR 00 o ENA MAE HUDGINS H + «e ed°GI -FG 2GI FG / \� EIP _ \ I o e I 1218 �B 239 PG 266 N °gym 18" CSP END / PROP. GUARD L. . - .. ,o \ "' I P + O gO A c 60�P°w � s WRLBOWS SBG +02 / \\� 58 'AC EL ON LANE s M0N m of-- _------ ; DD'LINIFORM AP R� - - 0 ITYP 1 CHRIS F v _ - �\ _ .- ' eMH ,r3 1220 w S `' I 9.5'1RT89 BRIAN 30IMSDALE I F f 00 ___ L3- PO � i' 8 +75= O y i pZC P 6 PG 8 I L. II RIP RAP F --F _ F ----- F ----- / 1U7 1217 \ 2�' m F -- F --4, -RPD- PO / 00 - 47' R N� 1y¢M 132 �' 1201 EST 2RTONSP F ---_ \\ �. ---- p � / NCF 1212 \ _ T.3 TONS , IP �v ___ 8 SY . _ _ EST. 7 SY GFD"%P F F F ----- F - F - --F F \°s L 29.55 . T RTO f`A, L3 RPD Z90Y W 1209. `iI� 1 7' RT llfl -RPD- SC to. 13+00 127 23'24' ' C 24°07' ' FE QJ<( 115' +75 � P L3 MATCH TO SHEET 29 �� 6.. P 24H. PUE P L3 +141ze.8'RrQJ u 36" UP+90.55 L3 + 193' RT -ram L3 +39.Sa L3 +83.80 150.54 RT RETAIN EXISTING '9 15 181.03' RT 181.5' RT 196' RT 3.85' RT L3 +79.67 I L3 +52 f�-� L3 +0 199.5T RT Off' +27 DITCH C 181.93' RT `� l 3 3 +20 Q 190' RT \ t�:� RIP RR�� ENERGY 207' RT 204' RT +02 10 ", CI O1 L3 +41. 0 I `air DISSIPM E BASIN S>` 175' RT / UE � 1240.79' T LINE EXISTING CH NEL \ 20 L3 +01.14 L3 +83 WITH CL EXISTING RAP o0 235' RT 203.65' RT �\ \ \ L3 +RT II fl 30' LONG 0.5% PE MIN. _ O128 N W SEE DETAIL 29 - I=j 240' RT \\� \ X�I I 127 12v JS�' I m w I I R HERMAN J. HENSLEY yE1VA R. WILSON © KENNETH R. HENSLEY 130 O g v U DB 533 PG 236 MICHAEL APRON WILSONQ fit O O S I Ih DB 263 PG 333 jl PRISCILLA HENSLEY `W I I D8, 7 9 PG 151 © DB 430 PG 298 \ L015 FREDERICKSEN p0 PG 51 DB 533 PG 230 OK DB 02E PG 33 m I� LI Q DB 294 PG 438 PB \P �JS\ L3 56 `WW M/r +y 333' RT I m L3 +7b:. I alp 1 5 fl c3l a sS 1 i Q Ji/ BARRY K.JONES \ \ o>> i DB 1157 PG 15I lI i �I y ISFO I I© ` I N 22'14'2�' WI 3 I Jy 27 40' I N 22°14'2 ImI 4r' �'� - N 74.46 3 42° N I ICI €3 n = I 1 I I `ii� 6• NC\ O� ,,,rrryyy3 ;a r�l N?R /, \� L "I .DUKE POWER , _ _ _ _ _ _ _ EI�P�ti cj', i % �� ' ISAg7L 8US /� mI COMPANY ' PB6PG8 a m _- 10 . CI '-,r--z -U r-`01a'cMP=�s m' 10 CURVE DATA FOR -RPD- CURVE DATA FOR -L3- 5 Pls St 12+OOJ9 PI Sto 15+2721 PIS Sto 18: 12.27 PIS Sto 860+48.88 PI Sto 872+38.56 PIS Sto 884+2/.15 Oo \ nN 6s = 45' 00.0" 0 = 23" 09' 289' (LT) 6s = 4" 57' 36.0" es = 0` 29' 53,6" L _ lI" 09' 17H (LT) 6s = 0` 29' 53,6" �\- D� Ls = 70JF D = 5'/0'00.0" Ls = 192.00' Ls = 200.00' D = 0° 2953.6" Ls = 200.09LT .L = 4482Z LT = 128.05' LT = 133.33' L = 2,238.94' LT = 133.33' �\ST = T = 2272/' ST = 64.05' ST = 6667' T = 1,123.02' ST = 6667' \ SEE SHEET 43 FOR -L3 PROFILE R = 1J0895' R = 11,500.00' SEE SHEET 67 FOR -RPA- PROFILE SE _ .08 RUNOFF C= 90.00' SEE\+\��� SEE SHEETS 72D-11 THRUDPROFILE 2D 7FOR DRAINAGE DETAILS � j.o o •• 0.OPD PROJECT REFERENCE NO. SHEET NO. MARK MILES SUFFLI 00 Dewberry / 2/ R-2233BB 13 1 06Y2, 1 6 S0, MEGAN RENAY SUPPLING / - DB 1140 PG 456 °cq z/ + ' •F �� B02939'� 1W SHEET NO. `\� li NoF/�' ROADWAY DESIGN HYDRAULICS ca-/�\ + `` \ ` �F x / MELANIE STERLING ENGINEER ENGINEER n� -A q �Vannn EIP //� ` v3 +� oQtN CARp�?HECARO°?N'. I CARRY HUDGINS k C P 3 `� ` ` ` �. 2;•'FE %p° 9 : _ E %p`'• s TRACY HUDGINS \ EIP / •: 0� SS N°' �� ?•@O $$ N°'; '. DB 1034 PG 578, g32g3 �2 Z\ L 2/SEAL .SEAL 020031 12786 EIP\• La +70 N ,......070 E---DOCUMENT NOT CONSIDERED FINAL L3 +60 4, L3 +6o <F� .'�+ ae �`�/ Q UNLESS ALL SIGNATURES COMPLETED 48.92'LT LT L308TLOIP5130LT L3 +40 OSTEPHEN DOUGLAS GOSNELL CL. I RIP RAP ,I,100LT �L \ / 6• PVC L3 +60 -ti °0 5 TONS CL. B SPECIAL CUT DITDENISE H. GOSNELL + __DB 574 PG 549 W 120 LT EST. 2 TONS 13b32L3 +53 e� \�• RIP RAP�.1 p +60 EST. 6 SY GFD ` 22 3JS,\ 124' LT ®'° 38 'h3>25 0 'c- 6 ° 0�� SEE DETAIL 9 CflAL CHANGE WITH L3 +13 CL. B RIP RAP •9", } ^� REMOVE - to 110' LT 109.87' LT 4 DANIEL W. MITCHUM LIVING TRUST STEVE WILLIAM STONE � 0 F L3� 86 k �, DALE D. SMITH 117' L > FLOODPLAIN BENCH E 1304 EST. TONS DESSIE STONE O JANICE S. SMITH L3 +42.26 plj RETAIN > + F FSEE DETAIL AF 2' SI 120' LT OB 873 PG 574 EST. 7 SY GFD 100 1' L - - CV - - _ _ _ _ _ OB 345 PG 453 D8 552 PG OI 100' Q I2" L FL D 0 \ WW FIE E - � CE a 325LT7 --I W : \� --__- = -__-_ F -_-_ F - F _--_- F 1314 CL II RIP RAP C ____ � _-_-- C ---- _ � C F OUTLET PROTECTION - o Q CAT-1 T PROP. GUARDRAIL V --_- I- F 1303 LON X16'WIDE C --- o HA 2' SILL __- _ - -- N N 27°33'37' IN GREU TL-3 O ,pC;o6' ^YREMO E RII�¢' 130 a 1313 YSr M295.10, 2GI ISBKD ISB N J F = 0 _ I pn _ n m CN t PROP. CABLE 2GI "-' 1302 O /s GUIDERAIL 15" RCP -III 2GI 1305W `W 30. RCP -III ~ I�a w 1306 1310 2GI-A ¢' � p 30" RCP -III A - -L3- 2cl W F FS-B MELANIE JACKSON NI I W 111.1 -CON 2/'. o.� II 7 APG 30 = o N WITH NATIVE MATERIAL � W II o KE'IN LLAY W O An ISFD - J I DB 1003 PG 31 �> En w LENA MAE HUDGINS ILL o m PROP. GUARDRAIL CAT-1 SEE DETASTANDARD SASE DITCH IL EMBANKMENT 20 FS-CGI I I m 45 A Q 5 G 30 D f" h vv WESLEY HUDGINS. ------ �1319 IIII VJV/BFENCE WD _ END LANE a 239 PG 266 134 2' SILL _00 F F .. OL1322ND EXTEND ---_- _ A _J \ °0 139 PB6PC8 TAPER lCOLLAR - RETAIN F--- L N E9.29 I Q I� --00 -- ._ I Q� 10 1312 - ` ss O @ 'xb BO VC EXISTING J o CHANNEL C BENCH 40.76' RT Ol F F 1 F i , 1321 ---- yyW F IS RETAIN ' \ L3 57.20 F T\ _ EXCAVATE CHANNE SE DETAIL 12 YS +26.40 I® - - BENCH SEE DETAIL F P7 C WW FEN E o II 'O - ---- W 6 PG r4 91 8 72' RT 0 1318 x71 YS+62 ' RT � 72RT a w R 0 0' nP -m nN 'S2o � 0 \ 9p\ 6 CO C W Exl nNG o 1a - - 18' CMP-- --- ---------- of . /a CMP � LD US 2 BST � RETAIN REMOVE HW P DI _ L3 +87.96 P 8'CONC HW APPBOX IS CMP =--__- W" e' PVC exisnue ai s s - -- ---- -- D R T1316 EXISTING DITCH 107.01' RT Hx4BOXCON I Illu a5T c C H W e'CI A/G s .. .- .. .. -. w.- �. .. .. .. -. .. _ --- 20, 1315 CULVERT C IPm - - "- - D R COLLAR AND EXTEND CONNECTS U`I O Y5 +00 � O L3 +89 L3TO+W CMP FM YS +60 '� 168' RT25 'UMP / 40' RT 7 R '.' 15' LT �°: �o, 178' RT 167' IT I YS +18 + .41 oy. F 179 RT I L- 50' LT pr o ed to replace ENO®/ 38.21' RT 50' LT pUE -L3- CS Sto. 883+54.4�P c w°ter wl+n DUE a Y5 +50 3% o^ PVC Ys +37 LT 3- ST S 885+54.48 Y5 +87 R PUE L3 +72 / / 53.21'LT f� O-_ --� 139 D/ �� / YS +73 VS +65`i;�;� -Y5- PC Sto.10+00.00 211' RT / 97' LT 97' LT Y5 +00 // iy /O / 11O' LT 110, DIAMOND�! i I 4 DB646 PGPG III SENIOR IMIVING, LC 40'RT // /� ISBK REST HOME / , O a / Y5 +75 / ' / DANIEL ' / W. MITCHUM LIVING TRUST So' LT 135 OB 873 PG 574 0 DANIEL W. MITCHUM LIVING TRUST ' BEGIN CONSTRUCTION DB 8T3 PG 574 ' ryo Q. x -YS- POC Sto. 11+75.00 YG 49'b8 //7 50' LT 00 Y5 +89.08 / 'os / -Y5- PCSta 13+09.41 50' RT / / .ps, / / ��GP �' EIP ,° N 0 /07 / Y5 +89.08 -Y5- PT Sto. 55' LT N � oZ ;; \ / �• / LATERAL V DITCH / SEE DETAIL 11 SSFO mac. � 5�y9 �Ti �DCSi CURVE DATA FOR -YS- CURVE DATA FOR -L3- rya PI Sto 11+54.71 P1 Sto 15+74.87 PIS Sto 860+48.88 PI Sto 872+3856 PIS Sto 884+21J5 / a < L = 0. 07' 56✓" (LT) L = 61*04' 21.4" (LT) es = 0' 29' 53.6" L = 1P 09' 17.8" (LT) es = 0' 29' 53.6" D = 0' 02' 33.9" D = 12' 43' 56.6" Ls = 200.00' D = 0' 29' 53.6" Ls = 200.00' 50 1317 Yc� % % L = 309.41' L = 479.66' LT = 133.33' L = 2,238.94' LT = 133.33' / T = 154.71' T = 265.45' ST = 66.67' T = IJ23.02' ST = 66.67' Y5 +60 R = 134,045.00' R = 450.00' R = //,500.00' 55, LT I SE = EX. SE = 0.06 SE = RC -Y5- POT Sto. 2I+12.60 DS = 35 mph RUNOFF = 120.00' RUNOFF = 90.00' / SEE SHEET 44 FOR -L3 PROFILE Y5 +08.68 2� DS = 35 mph / SEE SHEET 78 FOR -Y5- PROFILE eo' Lr SEE SHEETS 2D-1 THRU 2101-7 FOR DRAINAGE DETAILS o,rx Roes PROJECT REFERENCE NO. SHEET NO. uc� \ N\\i.i', / `\ \ Dewberry r91io F-°o °e° R-2233BB 14 / v ' Q EUGENE R. HARDIN \ c; // G \ PB 7 Pr� 0 \ �' 36°W PW SHEET NO. CON \ / Q MARSHALL L. CONNE \ \ / OB 13E P@;395 `' g\°\9' EIP /5 ti LINDA A. HARDIN \ z' / \ °: NO ROADWAY DESIGN HYDRAULICS 0 PATSY ENSLEY CONNER _ c\ DB 377 PG 142 "'Q DB 573 PG 39 , \ Qon Q DB 647 PG 354/ NN / ENGINEER ENGINEER DB 345 PG 292 Q Q PB 7 PG 30-__- y,�o EIP x rr ,,�x , PB T PG 30 'C \ \\ 0 sg CA 1 anon`:,,, Q / c Q � / IZ '�/-\°�F °� IP >'.w, ,: Q N CARP I .R �,, CARD i \ // \ CON \ /} 2 $N �.`2�:'FESS/`':'�-v'�. �.`?�:'ESS/'•:'is'�,� N 33°41'41'W EIP Eiz/'��/ Q !\ �y/ 6°W EI A03'A3 w`j, :: �0 �N'• of aN'• IP 217.59' 0.27' \ / Q Q O5 ' \ \ \ N Y'.��1 5\`\9 5 N 52 g - ' 4 SEAL 9�' '� _ : 4@ SEAL O DAVID SCOTT MCMAHAN s T ' / EIP SUSAN HALL MCMAHAN > J STEPHEN A. SEARCY F,3 020031 i ? 12786 w DB 798 PG 546 - o \ c GHRYSTAL D. SEARCY ;' �� F i Oj �'�F` / LAVER PETRUCKA / A • PB 7 PG 30 C, DB 998 PG 761 F ? r .:•'• Q c+� ••.,SINE O / / \ ' y ". \ PB T PG 30 �Ci'•�,� `` ',�Gn. .........•�J DB E PG 67 ,9 ',''4 \\ IF / /G / I D 407 PG 235 / 48° G \ Q k`O o ` \ ,�'''r aunw�J`,, �rNirnM'ru�TT{-� / B T PG 30 THELMA KATE JOHNSON \ \ 3 i DB IIE PG 257 mom• v / . / / Pa BBIPG 3091 AE DOCUMENT NOT CONSIDERED FINAL � IO%C��_o UNLESS ALL SIGNATURES COMPLETED N wo / N 5\�95•A9' F1 // \02?5' \ >_ N EIP 39.10' EIP N 3334'10' W EIP N 3396'39' W EIP 18.14' IP N 33°13 43' W EIP �� N 3393'43' W N s Ap•W /-\ 'ti' m-'w, 91.86' N 33°59' 109,62' Q Q 175.76' \\ EIP mf��1 \` 55 p3. \\ EIP GONG NANCN P. THOMAS \� `W DB PG 7829I� 2 B T \\\\ / a•C\� 313.73' PB T PG 30 \\\ �C zll \v MEIvJIN YANG DB 9 HUA GAO ROBERT BURB K '" RETAIN EXIST SYS /X w DB 968 PG 822 _ A GONG N AYNE FORD • IMA BURSA HENRY W. GOODE AVID LEE MOORE \ \1'o TH15 SIDE, ENTIRE LE GTH ,��` +07 s 2 \ / J EIp \�' / jCON�/ qe w 0 PG T63 DB 874 PG 6 GWENDOLYN H. GOODE o ` m �, W Q -' v P 7 PG 3 DB 556 PG 261 ,,, DB 1048 PG 598 T PG i \\� OF SASSAFRAS ROAD 311' LT > ,,,A6°3T}3° 30 \'� s PB T PG 30 \ \\\\ \ 146 \\ , N 50°32y6 b. \�23 \\� Q - DPB 47 PG 301 a S \ 145 // 21'CONC oh JAMES HOWELL SPIKES \� .Q ^%D., x^' PEGGE O JE R TTFt,� \ q 8 911 P�ryG{,E�4 DK�' X Q D8 12E PG 233 G J DB 802 PG 824 m N PB 7 PG \30 °' :�I 'o X� I tt• Nc PB 7 PG 30 \ s o LIDBA935 BPGE 378ERPUE L3 +OS L3 +13PB 7 PG 3048' CONC 1P194' LT 1IOU LI f \ \ \�\ ki 94'LT1.25' LT W L3 +92 \\ +_\ 9,22° I 162' LT `W \ �-L'� \ \\ 173' LT �\ 1 \18' SC2 ( 1 N \ DR. J. BOURNE SA E \ Q \\ 180' LT � lY \9A•8� BETHANY T. SAY / L3 +00 (' / ' \ \ \ I p o 19 LATERAL V DITCH Q I \ PUE POOL 51.20' LT / ON 3- -L3- , 12 3 LT OB 435 RlU818 \ Q SEE DETAIL 11 ECIAL CUT DITCH b C �I \ 'LT _/ \\\ 6 B449 MIS 5 I I I E ql N2_ 69.79 L3 +80.3�\ $ 50 RETAIN 149 0 PB 7 3 . LT DET 9 \\\ �\ U Oss__-_-_ sT Nc R _ 174 7 _ 1' LT 149. ' LT � ERI. �- o Ex115'RCPWa`I5"HOPE 29 _ T _-====a---- - IS'RCP o 0 15"HOPE v \ L3 +33.01 -- o s _--s==_____ _____ _____________________ ___ ___---_------ - O WW F6 ER�; Tr 6 "` REMOVE REMOVE C CE O O --- �— —yy----_ __----- _ 7 �J. ----- �c-------- IP 12'CMP U EIP EIP 1401 1— -- —,�------- ---- SASSAFRAS RD 20"BST C 'T� L3 +42.23 `W-- WW10 FENCE C 1R EIP C EIP E O 00 - -FEN 98.24' LT C -- --- -- a o g d n G Q ,c� C, _ _ _------------ -------___ --_ - -- LATERAL V I>`C I a o f psc./ i i 3�0NC ------ " I Q }12 ' fti O` Ol N T 10 5 TO SP CIAL I I o I oo// .� FS-A 1407 - �-1 va y@a CUT 1 LI F o M -�„ CONC oW, 2 A P Q�5-B D 30" I Q 2GI-A — X I'Y� Q /e 24" RCPIII/ -L3 _ N 147 1405 - :' 24" RCP -IN' r� o`", '�+} - - - TB DI J _� w W 1400 / 1462 - p PGU%CABLE - / 33° 36x l.2" FS-e 2GI-A ARDEN 2GI-A S-B "RCP -III r GI -A LLJ la X 24" RCP -II CONC Lu ,Im v 14 + -� N h Q v, MORGAN W, B4S$ TODD GILLESPIE 'v a ` \ Q FS-C 2GI 14 _ _ TIMOTHY BASS O COLLEEN GILLESPIE 4 1143 EARL KEITH (iRIMMETT WILLIAM L. HULLEN 1403 XCHRISTINE M. MORGAN WNITT Q Q JENNIE ELIZAB 1Ty AY CARTER 4$ - _ _ - DB I088 PG 213 141 DB 96 764 DB T02 PC 718 I IA HUL N DB ... PG 678 \X / 145 DB 05 RG 70 ORT S .. .. -" \ FS-C ' - DR. J. BOURNE SAYRE 2GI 1409 BETHANY T. SAYRE Q r = C) / B 4 PG13 P PG 30 - 32 -- _ 78" CSPm PB 8 P 0.48' PG 1 PB P .. .. - ZPfi _ _ - _ EI �x DB 435 PG 318 DB 449 PG 676 P -_ FEN P 6 1 w /ELBOW C _ _ _ p U . FENCE EP EI EIP � �_--_------- ss s6 ss SSGGNG - --------- —------------- _5 _ RETAIN EXIST OLD -------------- -------_ ___ ss_ - - - US 221, TYP. DIT. - - - - - - - - - - - - -�+� - - - _ _ L3 +10.83 _ - - -T 8 'PV 1410 4 --- T ---- .11'RT II 96-- - w— ---- _� ------- SR /536 OLD U 2 20, - - ------------------- EXIS�W ---- --- --w-- ---- ---- ---- w— P-- — P9 N5N6°36'34'E RETAIN EXIST 4.85' EIP I.3 _ 1 _ 4'x4' CONC HW L DITCH, TYP. EIP 4'x4' CONC HW "" - " - - " - '+\ EIP JWATER I GEIP EIP 15.29' �.�\ PLACE FS-C IN - - " - -" 0 PUE TOE PROTECTION ,� PUE PUE ,�MM`' "1 EXISTING DITCH CONC DIAMOND S IVING. LLC "' ' SEE DETAIL 7 a KAYE Y. MCDANIEL L3 +20 `GJ PUE `O 4 o ROBERT LEWIS FREEMAN ENLOE DB I4 PG 3 ERGERI p �• / / L3 + / DB 829 PG 623 L3 +72 L3 +80c�`•} \ JESSICA UE DB IOE PG 450 PG 169' RT 170'RT DB - cal 646 III 170' RT -- - -- --D 181L3 T+94 / 140 180'RT 181'RT DB 563 PG 237 %\\ 15U 61 Rtaru+ey° 190, 169' RT 141A r� \ 201' RT 3 II ,I; 181' RT `cis \ L3 +69 90' RT C�S�j \ 202' RT Jy., \ '� Q N/ C ' z -Y12- POT Sto.9+89.37 II gl I C� / Ae Too-7� fh /e --_ �'• Cj ----� - _ a o p Q 4�XJ x SHEET 45 FOR -L3- 07 \k FILE SEE SHEET 2 CONC.13-5 FOR ISLAND I Q 1 J "\, \ SEE SHEETSD-1 HRU 2D-SEE •ae•67" FOR DRAINAGE DETAILS 1 ° CURVE DATA FOR -L3- Dewberry xo�o PROJECT REFERENCE NO. SHEET NO. PIS Sto 902+26.67 PI Sto 906+96.70 PIS Sta 9I1+6492 R-2233BB 15 f 6s = 2' 37' 39-r L = 191/' 34.4" (LT) Bs = 2' 37' 39.3' KW SHEET NO. ARRELL AND JANE WHITESIOE Ls = 360.00' D = i27352° Ls = 360.00' ROADWAY DESIGN HYDRAULICS FAMILY LIVING TRUST LT = 240.03' L = 69825' LT = 240.03' ENGINEER ENGINEER DB II35 PG 546 ST = 120.02' T = 350.05' ST = 120.02 A-,N\ nRol ,o`t0��^Ro°?.,, PB 35 PG 106 R 3925.00' Q�FESS/p. �v'�. ?6R�FESS/pN SE 05 _ "� SEAL 9! : v@ r� 152 1. SEAL 020031 = 12786 -Y10- STA. 22 + 00.00 ` FN ��•: :f'•. FN �Q:' off: SHEET 31 - ,,�,•..,cINE.. O�,..`� MATCH TO oz .oz ',' F Y10 +05 Q 65' LT DARRELL AND JANE WHITESIDE DOCUMENT NOT CONSIDERED FINAL Q Q I UNLESS ALL SIGNATURES COMPLETED FAMILY LIVING TRUST DB 110305 130 PG 546 ,n PB 5 PG 106 / 70 TII \\ TRAFFIC DATA 34 54 Ar 2 II \ 151 � 158 149 EVELYN FRANCES MOORE HEFLIN B 2/ A y � rI 158 Ol EVELYN FRANCES MOORE HEFLIN DB OTE PG 49 9q j/ rn O DB 07E PG 49 I I DB 473 PG 260 70 /` y �6 92 DAVID EDGERTON DB 4T3 PG 260 IP PUE _ CAROLYN EDGERTON I I 90 US AS /l3 /J -L3- TS Sta.900+6/.l8 L3 +19 DB I090 PG 396 I h BYPASS � 152' L� '` -L3- SC Sta. 902+4/J8 PB 35 PG 106 I I ro 1,T5�CT I a -L3- CS Sto. 9//+50.43 6 /h6 PUE 153 T C - ---� io 1 LT/ L3 +04 r p +79 Y10 +65 17 L ISBKD \\ Yl + } 0 II 60' LT C D 6s' RT 12' 12' , 26 zoao .70' LT - I BEGIN FENCE 37 `vao u loos 11�141' LT : a END FENCE I n PUE - 149' LT UE - -L3- POC Sta.909+44.60 r� $ Dl no +a7 L3 +75 EFdTA13 C 1 CAMILLA GERTONTl3 +27 . +35.43 59.34'LT 135' LT 14 , L `, , L -Y10- POT Sto.25+79 I Z I 75' LT O DB 23 _----_- = 1 8' ---- --- 1 14872'LT T L3 +36.LT YIO +35 L3 'LT ----1.•, (,' L3 +2 7 143.99'LT O O A C 135.69' LT C DUE7 KI II Os' LT O -- ----_ C 42°I2'22'W 3 +2 o _ BAR N 42'13' FENCE C I45.03' L3 +20 O I '-�� 1 .� 150.0 P 13 DUE DUE-DUE +1 r y I1 105.24'LT .F i � i CT o - _ ® VINEYARD Q CA OIBL 468 P LT 125' LT A .Ol 1 .NW FENCE O` Z � 1512 _ OO r 1\ O i C _ � i - --- 9------------ C ,q 14' 81.2611 - _ 0 _ -�-E , I _ 33+2 71 154 � F _-__- +81.26 02 �1 F C �TYPd N Q -' _ ,,rr``--�� CL. B RIP 2GI 45 C,rr+� -_G Q'tW vi FS-A =° (7YP.J ;� ti.� --__ C ----- C F EST. TO �F ----_ - o lrvP.1 C - EST. 21 SY GFD F Q-� /1s15 a n W E� d A vN 1 N ( 8' R 1 W W N 2GI "---- 1503 9 r � 1 1511 ls1 15" RCP- 2GI W LLI H O `1 h 2GI O I ISFo _ .Ol L3 +85.23 -_'__ l P'1 - L+ 1513 L3 +38.80 , JB vaMH yo RSO 1509 118.29' RT _ F p a O „N C tA- ------ _ 06.22 _ _ - R iSJ __--- - C --- ------ 7 RT L3 +88.7��. �/ i' Ur,; , GR � E ``;. L `,; �, o - 1514 ___---- 5 - 1s04 - � ,02 r +15 X 48 O F C -- -_-- 12C 60'RT i �• i--- _ - _ - - - 154 _ � (rvP.) _ � q 1a' la• 2>�s2sT- ss tsn ww c V€"ZAMILLA- fh. Ep6ERT9PH-- �-1±C P`) F I Ti X CATS P O =1AY a o o No 0 0 exlsrlrvc. Riw�-EJP 4.2� EIP. % . `, ti.� DB 468 PC 271 +65'87 ss N 12 PRIT _ o I R.qD@ TO DIVA', I EIP _ 27' cxisnrvc aiw F - - LI5 - -- AT 12° CMP> 1522 R --� - 16< 1520(1YP. Hq DRAIN 12^ DWY Y12 +35 E 1519 g s C , ` A sT - • CONC HW V'N`I EN I6 .P w I 5 I 14.89'RT �,la�, C ��\\ � \ ., F � �Y12 +98.16 "� �- �� "- -� �- � �� �� � L3 +10.95 L3 +60.47 LIP I r� ' 1521 50, RT c . _ _ _ ` L1 +92.38 Y10 +60.91 / 9 R E'(45' LT 127.41' RT N 42°4I'06' E 159.36 RT 157.72' RT .0 69.61' LT PUE ". ._ _L3�+ II ',,- 80 12'12' z� oa �UE Ba- B§eaao r�plece r A; \ - Yl +90 198PRT +er Ith R�I�% MATTHEW OU�,�Q TT +48 I �o I DB 872 PG YV�6 --= �� Y12GP✓-s0 F� •� 0 53.88' LT BEGIN I0' PVc O .Ol' RT 20 RT 1 16� o .. o ------ 40'RT \ G M1.' \\ $BG +46 156 Y12 +53 \ p \1305 1506 Y12 AMWLA H. HODG ON \ 65'� HEN 129 p N\ 161 DB 46E PG 129 14J7 0 +65 0 ( I ? I 1 Y70 + 0 15Q 8T ^R'T 59 DB 468 PG 271 y10 +70 z �. O I BEG. F CE o �� ,(� � y 1507 � 'I '< �' In 65' L P�Sto. l2+ .37 Y12 +68L PUE \ �fv'i a 65' RT 1'�' \J 79 Y12 +62 4tij Y12 +8s FENCE , 68' RT 50.41 RT _ q \5Fp JOEY M. GODFREY N o w O / 1 I MARG ET M. DYE v= /_T DB 786 PG 485 \ 'a jOROA _ ' hT D 1 6'R 4T9 BEGIN / HTR j$5 \ o oh GG Yi 5' 50 as'Lr 2 +30 oe / I I Y12 bs' CONSTRUCTION . ', g j� O \ >° o" �O'�ss'Lr p� lsFo 1 ' 12'+20.35 I zr , _c-' � 0 -Y12- POT Sta. 11+25 Q II �1y J \\lsoe s �(�� I-� --------i \ SBG a Vi, Mtn \ F (TYP.) A o 0 S CL. B RIP W Uj 5 ESr.2 TOP a \ a -Y12- PC Sta. k X CURVE DATA FOR Y 2-y m' Pl Sta 13+99.88 Pl Sta 18+83.05 PI Sta 25+1397 jm s = 29 /5' 23.2° (RTJ p = 41' 4/' 12.7° (LTJ p = 39' //' 55.8° (LT) a D = li 27' 33.0" D = 11' 27' 33.0° D = 11' 27' 33.0° v� L = 255.31' L = 363.79' L = 342.07' T = 13050' T = 190.37' T = 178.04' X° R=500' R=500' R=500' ° SE = .06 SE = .06 SE = .06 RUNOFF = 126' RUNOFF = 126' RUNOFF = 126' N q5°06'S9� - > 3.23' \� \ PROP. GUARDRAIL c c OPHER DILLON RSON MIRANDA CARSON TL 2 DB 1124 PG ----- C p,5 EVELY FRANCES MOORE HEFLIN C OB O7E PG 49 F F q 52' Y12 +49.28 DB 355 PG 37 Y105' R N 14 63.72' RT +93.18 Vl 2.23' Y12 +65 122' RT RT NR,6 3'53' w -Y12- . PC Sta. 23+35.93 " N 43°32'30' W 266.57' '14 Y12 DORICIA M. PPARRIS -Y12- PT Sto. 20+56.47 01'RT 69.01' RT PATDB 1027NPGP54515H SEE SHEET 46 FOR -L3- PROFILE 2 +38.89 -Y12- POT Sto.21+9523= DB 150 PG 272 SEE SHEET 79 FOR -Y10- PROFILE 88.41' RT -Y10- POT Sta. 29+82.35 SEE SHEET 80 FOR -Y12- PROFILE SEE SHEET 28-5 FOR CONC. ISLAND DETAILS SEE SHEETS 213-1 THRU 213-7 FOR DRAINAGE DETAILS EVELYN FRANCES MOORE HEFLIN DB 07E PG 49 S DB 473 PG 260 � -L3- ST Sta.913+30.43 /m CL. B RIP RAP / EST.1 TONS EST.5 SY GFD / L3 +30.43 3 105, LT o L3 +86 L3 +63105' LT 105.31' LT w 125' LT 129' LT DUE > F --___ F - -_-- + y -- __- 1 0 25 C 1 'v o F N m N 45 03' rn 2GI S CT ( �� � o I r k N N 45 + D (3 STEPHANDIBE TOWARDS MCLEAN C3 yyJFEIF{ xl n R/ 10 13.51'� 55 N 0 - EXISTING R/w 13.91 EIP O 23 L3 +16 165 WE EOWARDS 1 N DB 771 PG 70 / / w Vp is I+r N 32°I7'26• 134.Iz' W EIP ROGER PAUL CRAWFORD DB 742 PG 729 166 3- T a.9/4+8 SC Sta. 9A old' = F PAULCRAWFORD 742 PG 729 50'g Y 8*1 � _CAN CAN +b 1 05' L a �•X 0K� i I ,h o WW FENCE M - --- I IOU C n2 +85 a 24° CONC' C 47' RT ��� N "IHERINE K. BEAM DB 1094 PG 805 167 PATRICIA A. HARDIN DB 12E PG 438 DB 339 PG 413 DB 347 PG 530 105' LT L. B RIP RAP YJV'I FENCE EST.1 TONS -- E5T.5 SY GFD/` IllI!IffiA=Ii 0 Q( \ - SO' RT n2 0 34' RT Dewberry PROJECT REFERENCE NO. SHEET NO. R-2233BB 16 P,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER oQtHY CARp�? CA p����� �. 2: •�FESS %p�;.:-v'�. ` ,,poQtN SS/QN.:s'� • v SEAL SEAL •. '• " 020031 i = ',' 12786 �Q : o ''i�K7 SOY;•°.,•GINE,.O�.`�� ���'�✓✓''�M� '•..GINE,.:�Q�: a�u--�Yw" DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED STEVENS FAMILY FOUNDATION. INC \ DB 979 PG 99 no• LT F 0 PROP. SHOP CURVE ---__-F (25 R) to a t v Q 1605 F� ~ H a 1606 I In I J I I � ' W -- N O ING R/W \ w CONC MON 1.64' ,�+� r I� c. Yi?-+58'b Q 15' L O 173'RT PUE n2 +41 RT PUE PUE 171' RT C Y72 +91.58 _ _ >f„ m aoQ a o n2 +Yb L3 +25 Y12 + p R ISBKD ISB D3 RTo • P ` 8' RT V L3 3 CES MOORE HEFLIN 45.94' LT 3' C 56.83' RT ��w.' Q f3� TR 07E PG 49 186, 355 PG 37 .M `L / CJ'� EVELYN FRANCES MOORE HEFLIN a 163 r L3 +13 t;l 161 iaa DB 07E PG 49 . z END CO mTRUCTION a 184' RT DB 355 PG 37 7HELMA G. L�1 KEN P . O O C' / Y12 +75 LINCOLN TODD BL�HI m ,�,y/2- P Sta. +OO 47'RT DB 969 PG 143130 • t3 4;.5 '• ADAM J. ROLLINS ". _ n2 ' LT GRANDEE D. ROLLINS 45' LT zCi 161 .' (3 d DB 915 PG 386 { 166 N (� 164 MARGARET WILLIS ti.> F'� J ES WESLEY SIMPSON i i O C3 O O S DB 93E PG 190 'W DB 848 PG 6115 -Y12- PT Sta. 35 D8 357 PG 228/+48J5 N 4a° o'lo° w Io .o -Y12- PCC Sta.35 9/9/3 ��' {� EIP 4 ' ww EIP 2 LT S \ e\ v C3 X�X -X- X 48 WW X N 48°20'I0' I00.01' _ L- 2 c3 \ o -Y12- PRC St 37 8 DEBORAH FRAN LAFONTAINE DB 1112 PG 224 RUINS N s 16 � -Y12- PC Sta. 28+46.01 -Y12- PC Sta. 32+59.31 EIP N x Z 33 Oq'29^ t;J �J 162 zoz.so' �� HT EVELYN DB A07E PG NCES 49RE HEFLINR ABAND n2 +20 8 OB 355 PG 3T 5 ' T 5 �X� 156.6s' t3 o 11 49°53'19 W 200.00' a -Y12- PT Sta.26+78.01 {33 Y'A Y12 +25 45' RT CURVE DATA FOR -Y12- CURVE DATA FOR -L3- PI Sta 25+1397 PI Sta 30+01.85 PI Sta 34+26.32 PI Sta 36+75.27 Pls Sta 901+81J8 PI Sta 906+97.73 Pls Sta 912+10.43 PIS Sta 916+06.01 PI Sta 924+88.88 PIS Sta 933+5/.11 v` A = 39° ll' 55.8 (LT) L = 34° 37' 235" (RT) L = 12° 57' 49.0' (RT) L = 2° 20' 38.0' (RT) es = 1'16' 35.0" L = 12' 53' 42.4' (LT) es = l' 16' 35.0, es = i l3' 48.4' L = 2Z 12' 42.1' (RT) es = 1'13' 48.4' k D = 11° 27' 33.0" D = Ii 27' 33.0' D = 3° 53' 51H D = r 24' 21.7' Ls = 180' D = r 25' 05.6" Ls = 180' Ls = 180' D = 1'22' 00.4' Ls = 180' p 48^ ww x c L = 342.07' L = 302.14' L = 332.69 L = 166.79 LT = 120' L = 90925' LT = 120' LT = 120' L = 1,625JO' LT = 120' T = 178.04' T = 155.84' T = 167.01' T = 8306' ST = 60' T = 456.55' ST = 60' ST = 60' T = 822,88' ST = 60' o r R = 500' R = 500' R = 1,470' R = 4,075' R = 4,040' R = 4J92' SE _ .06 SE _ .06 SE _ .04 SE = EX. SE = .04 SE = .04 SEE SHEET 47 FOR -1-3- PROFILE RUNOFF = 126' RUNOFF = 126' RUNOFF = 84' SEE SHEET 80 FOR -Y12- PROFILE SEE SHEET 2B-5 FOR CONC. ISLAND DETAILS SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS \XIOD CURVE DATA FOR -L3- / / r on PROJECT REFERENCE NO. SHEET NO. PIS Sto 916+06.0/ PI Sto 924+8888 PIS Sta 933+5/.// ° / 61 -L3- Dewberry o R-2233BB 17 6s = P 13' 48.4" 0 = 22' l2' 42J" (RT) es = P 13' 48.4" ----GR --- I °9ro a /' KW SHEET NO. Ls = l80' D = r22'00.4" Ls = 180 q _ J Ay i' o •�/ ROADWAY DESIGN HYDRAULICS LT = 129 L = 1,625J0' LT = 120' ✓ / o'' % ST = 60' T = 822.88' .;T = 60' % 0 /, �/ % o°ZHGCAaO.. Io �o`tH CIARO� ro' ONc R = 4,192' L� — � oR .... % SE _ .04 y I / :o�P2:•oFESS/p�.:r: ?::oFFSS 0\\\\ \ I/G�/�?c G�j o 4� SEAL 9! . _ : 4@ SEAL '� •• o\ // I /z� � o� 4 ti� 020031 i i 12786 1 tC43 : \\ I �II ❑ pl �� �� // gS �` FGINE I � � c may; , � �Q;•.,N E . N E ......MO . ,may,, ......... J. gyp/ �\\ / 111111111.\. IIIIIIIIIIII \\\ FT-P����--_ �.y —�• ���� �"� �� �pc DOCUMENT NOT CONSIDERED FINAL \p 2 . // "'moo e ��•�� o UNLESS ALL SIGNATURES COMPLETED ,M !`1 CONC _-___ 4 CMP___- DI `ti� - �=—a jLFAll'llY END NOT 24'RUTHERFORD COUNTY BOARD OF EDUCATION / O �� 11= FOUND BST DB 496 PG 385 hilIIIL\IES. LN.�113\///�O8SO PG ER DI 3__I/ �� // PUE .- - - - -P- - - - - - - 1L,- IIp 1�REMOVE FES AND STONE. cn �- RUTHERFORO COUNTY BOARD OF EDUCATION II---ffP"CLEAN OUT 1 CY SEDIMENT PU •� OB 496 PG 385 FROM PIPE CL.I RIP RAP PUE-L3- CS Sto. 932+9LI0 II %CESTR1TONs -L3- ST Sto. 934+7/./0EST. 3 TONS FES EST. SYFDEST. 7 SY GFD E L3 +90 L3 +66_r- - 400 PR ExisrlNc aiw 187' LT R188' LT 00PrPUE Ir-RETAIN450 PRF3 �PUE STANDARD V D TCH L3 +25---- 6 1710PV_ EIP _r400 PR_ STEVENS FAMILY FOUNDATION, INC - F _ _ r_— m'PI D RETAINII U5 22/ 36' BSr DB 979 PG 99 F -- -_—� - —�_ II 6 O 1712 + 170 O F _ n F -____ F 1702 spec iw —_ _ - $i '00 PR 400—PR d;, 1711 O I 168 FS_q 2GI -D --S W --ICE_ F -r _ I- co 56.80 Q y. u'^. = w F Ol I n � Q F N rnE� 1703 / 2GI 2GI-0- 2GI 1700 \ .) 1705 F5-B I O - - e _ N 24" 22' - M Bai U .. - SR 15 US 221 - O Y12 +65 LILT �N �0 1704 2GI 2GI - Y12 . .. .. 15' LT - �ss�--- a �� rP r W D_-}-_C -_-__ C - __- C , -- - - � � i C - - __ N 4.�- C I EN �.6R' EI L3 + F F F _-__ _1709 y CL.I RIP O Ul _.i - it�-� �EST.7 SV GFD O YC Y12 +65 Q--06iS��- �' �'��� �'`a'' F F ^ EST TON '- © "caPUE 'i a,`� 105+RT - "� P �' 48, CONC V OO —� � 0.31'L QP � PUE ©L3 +7 � L3 +63 L3 +86 � CON C ISBKD EFFR� MON L3 +00E- •O +1 138' 128' RT C3123' RT '� 173 105' RT Q \I'g2 E\ / \� I�i 1 133' ITT I CONC CARMEN MATES ROTHROC ROTHROCR 0 U << o / �' c — ©- - PT a. 43 41.6/L EIP IP 0g2' PUE _ J I Zr 0-,-% DB 1003 PG 41 P Y12 +26.76 Y12 +10 --� \ iY120+ PUE ` DB 489 PG 484 OF PU 'I p 43,29' RT 15' RT f� a5.30' R 2SBKD 41' ITT © ��—/ L3 +70 +81.81 �n III SHA RAY ND10' RT I 54' RTj J,NO`. 42. 4' RT IN p G 77 2 +35 0L ELL LOUISE FORNEY 9 / n W 131' RT � 45PSTIT PG 31 90' RT ""L � . F 0 2 \ II• d l Yl +80 GP ' DB LOU PG 661 135' RT ___ 172 ,cam%, }03' HHG REAL PROPERTY, LLC L3 +73 _ z `W DB 1085 PG 536 4� DB 401 PG 553 159' RT DAVID W. EDGERTON CALVIN LEE FTIRNEY 000 y 16$ II I I ISFD CAROLYN EDGERTON 174 DB 848 PG ITT w m DB 653 PG I12 I9 B 415 PG 237 - El LUCY G. GRIFFIN 1 PB IT PG 31 PB 17 PG 31 ➢'" I ,� •W DB 234 PG 329 CONC - 4r� 11��--�� EIP �, \169 170 171 •� Q EINB2°3 N N 34-40'04' W 1� \ \\ GOLD RUN i EIP %B'BSr ONE .n co C 26 W DOROTHY M. PARRISH 400 5 ��POOL x m W N l 2\\p0 PATRICIA ANN PARRISH N 42 C �\ v I EIP 68' DB 11527 PG 545 I EIP A9' DB 150 PG 272 A 4� o C3� a co c S _ I - v��S, N J• a 166 0 N _ LAURIE ANN MCWH Ns �s DB 1049 PC 4152 y BILLY RAY CRAW g5.00' "� OB 87 62 J J; o JOANNE L. CRAW 0 PG 368 c^ ¢ - OB 707 PG 7T2� PB 17 PG 31 PB IT P la ca CI CURVE DATA FOR -Y12- IF PI Sta 40+50.12 N EIRJ I MATTHEW R. PUTNAM 9� N 34°35 ERRY ALLEN SEARCY D DB 68NNA 4 PG TI, i 34.00' D = 0° 09' 01.4" K 0 EIP OB 727 PG 802 II PS 17 PG 31 L = 58Y lla PB I7 PG 31 �I J T = 291.51' • F- \ I _ _ - R = 38J00' • �� � I SE = EX. \ \p SEE SHEET 4 SEE SHEETS2D-IOTHRU 2� 7 FOR DRAINAGE DETAILS PROJECT REFERENCE NO. SHEET NO. oN� Dewberry p Q x, x3Z.oel R-2233BB 18 ry 34°33'I7'W N 35°405� •' f f) \ / PUT RW SHEET NO. EIP 99.86' EIP _ N 34°33'13' W 125.64 ,.„ LP 9 +76 85.15' EIP f�j 40 LT ROADWAY DESIGN HYDRAULICS N 3 ENGINEER ENGINEER, EIP N 24°SI'S8' W E3 Y 0 o, A�R� 16' LT punnr ,Nnngp ANNETTE DALTON a 36' R Y / GEDBB 3 PGi 576 ` OQZN., ,,�OR� 88.73' CONC DB 909 PG 296 DB 1071P 7 �� 2: • EES$/p''./•v �. ��?.:`FF.SS DB 1046 PG T80 77 I e�0 N,y •; @O MO s \ N A, © 9 $4 BOOK 6EPPG3 T9 • a SEAL - • 4 SEAL '2 N , v��1020031 1 12786 BY41- ¢F c .•, F4' i?; '` %N•�'•. F�l, EQQO�: �� .� o @ C. V 4pBw+,\ P G I NE•, . ��.�` 'p,6` •••.DINE �3 M ,,t........ EPo -Y9- PT Sto. 12f69J5 • • o 2SBLK BUS ...... -� > r ¢ HIP a�} ��EIP 1 184 X\ DOCUMENT NOT CONSIDERED FINAL SUNBEAM LODGE TRUSTEES `` \ � � UNLESS ALL SIGNATURES COMPLETED DB 205 PG 414 INSET -Y9- STA. 13+00.00 EIP - �.' N � 36=p4.41"W Blp MATCH TO INSET -Y9- STA. 13+00.00.EIP 113.81, 16.31,52' W N 36 0 I EIP IA 176 `' 'PLUGND ABANDON" - = 9 +50 ir 45' LT 16' LT GOLD HILL BAPTIST CHURCH TRUSTEES CON' 7R'UCTIOPg�� 5 T m _ OB 64 PG 457 DB 544 PG 298 WILLIAM HICKS SHEHAN - POT O. 13>� O I 84 0 BST DB 68 6 PG 463 SRDB E046 APG S783 AN P6'PVCed to rePla e _ - DB 538 PG 363 DB 1046 PG 786 10'PVCr wIt p O- TIE TO EXISTING I 11 8 17rJ `W ❑I _C ', `i.i EIP 74.21' EIP 177 E)QDITCH EI1 r g to �T Zoe 84 1`v'1 `, M MARTHA J. KEYSER 675 PG 364 N a. wsf"1 S I ©© III' I I CANOPY ,cam EIP ~ Q 76 RUINS G ✓ Q III LLJ I 0 `. O) CANOPY 0, 75 KERRY LANE NIX r - -L3 POT StG. 50+76 = nIII r D 1 35 PG 991 I O N I �, - `W �N © p �j'9 POT St 17+ F� I - Yll- t4&10+00 1 BST -L3- CS Sto. 945+78.89 © Y9 +25 -L3- TS Sto. 938+97.55 - w 34 F N © rn� O L3 +10.02 I +40 ` n / i = c I I IZt 93' T _ O 198.29' LT +1 0 _ L3 +50 157.03' LT 139.5' LT s l� Q JC/ c� I END FULL UA I BEGIN PARTIAL UA ��' `G� Y9Q+60 11' 11' p O D L3 +12 2 .27 T Io m� BEGIN PARTIAL A BEG. FENCE C3it�i}-L3- ST 947+5 .89 PUE O 192.29' LT ma I m i Q © Y9 J Q E E O PUE L3 +55 O /�� 4:0 ©54.52 O` $ ,cam 1 /ANGELA C. PRITCXARO OD UE I 188'� 1`Z •W W �\ 90' RT I r I MI AEL E. P TCxA A o' coNc PUE p s rio.79' 11 ©p - 14 +9a Is LICE pg pG QP I)^ S 51°oe1625, EI I'� © F�£3y-i PUE ,ao' LT !1� 0 1 Y50+L60 . , --ml r ' - 400 PR T EIP -L3- +22.37 3 \ \~ Yam- ' -C3 Z I .02 155. L3 +8 -� 127.71 LT C3 "C �' I STANDARD V ITCHY EIP 26.3T ' N 28°59'07' W tN - 1 ACCESS POINT SE�DF1AlL15 - _ / _- - Q�p ,P N 33°37I023W N 31°56'19"W 74.63' __ _ `�a ANDOVE PIPE EIPp r W W FE C 11 o r r ,q7 _ cMPi 600 PR SPLICE C -L3- SC Sto. 940+77.55 \\ I H�9.n'P�C 4' 3' coNc Hw Io ffi �, o .0 16' I �� -_'zt o PR \kL VIQ -=wL r- REMOVE rGUARDRAIL 1808 - w r - � __ ___$=,lac--- --FENf£- - - -L M _ 3u PR - z-+a - 600 PR I�x; cR O 1 00 PR �n ,��T---_ _- -- I us 2GI w ♦- .� 60' 00 PR + l ss'esT - - - 6 (/1 W _ _ TYP. 6 C T- 00 R m I _ W _ 4 '+ VC P FS-A _�_ FS-A 1 m _ --�rrl N �� P B, 1802 ��FS-!V-1 -_ __r(#Pil-- '�__ _ - PR F- 1810 I� _ w+ <-m•I T A v `O + 327`�D DI �t PIWcE °pose 4'22' 44.7 by I^ \ ,Boor- c X F W � "PVC 26her Pth I AIR -RELEASE \ 2GI PY \ VALVE C el < O ONC WALL K 0-�' W A 1+ .O a SBG +50 ---- - -__-_ F _---_--- m ---- F -- F w ' � PROPOSED GUARD 1 G, F --_ F __---F-- \- °` . RAIL (TYP. d 1819 J7818�H 1817, /..ice`_. O � J BEGIN RI I 1811 �o � � � O• �o f --� ---- --- F------� r= _-- __'� _ O JB vvMH 'RT 0 C CL. B'RIP RA,P F _ EST.2 TONS QFQC• B 5 a F '- X 15" RCP II \ 105' RT O PUE L31103RT 7 WW FENCE _ _ ---- F -- F 79 ----__ I �C ,R O0 X 70,1 Y11 UE +20 -PUE- L3 +54 --- L3 +50 F - --- - CLRIP RAP ONC J V S / 83.20' LT O\`\\\` EST.4 TONS 128'RT 174 1801 \ \ + 2TIMOTHY D.T0144 \'-________________ 110'RT - Y7 LTO L3 +50 105' RT O L3 +16 PU llo' RT DB 75T PG 186 X-x gSELECx X >c k'W FENCE 1806 EST. 14 SY GFD / I 75' LT 756 PG 671 12" c END FULL C/A HHG REAL PROPERTY, LLC 128' RT \ X X- C 1812 / 75" CSP 18,3 0 73 BEGIN PARTIAL UA DB 1085 PG 536 \ l-X 2GI DB 401PG 553 14 L3T+42.67\ \\ `v� E - /W/ELBOWS k I Y710+ 9 64 999R 1 +R X 6 1LT 141.55' RT - w 62 04' R 1 6 T END C END FENCE \ \ -A 1 T 175' RT T yll + / 1814 _ _ _ < (Zi RIP RAP ENERGY N m 145' RT X X� +2 181 DISSIPATOR BASIN END FENCE 165' RT SEE DETAIL 1 :' n CL.B RP' P \ v MARK OLAN FLYNN \ X CA WILLIAM LEDBETTER DB 655 PG 98 EST.4 HIS JULIE ATKINS LEDBETTER EST. 14 SY FD \ DB 500 PG 526 TOE PROTECTIO z LV I 1$3 Z \ SEE DETAIL I LI ENRY RUFF \\ \ JVONNE fiY�FA1 IMSD \\ TOE PR TECTI N PG 684 s \ m\ Im Y11 +22 DB 1�i9J'1 Cn,1 6120 T1 SEE DE T IL 7 = Y11 +LT 205' RT a \ a\ 32•0o X RIP RAP ENERGY 124.43' RT DISSIPATOR BASIN PDE I LATERAL V DITCH }o A SEE DETAIL 1 y71 +45 ly SEE DETAIL 6 CURVE DATA FOR -L3- CURVE DATA FOR -Y9- \, z 255' RT 815 Pls Sto 940+17.56 PI Sto 943+28.38 Pls Sto 946+38.90 Pl Sto 11+34.60 m os lz 6s = 0' 53' 12.4" 0 = T 56' 23.r ILTI 6s = 0' 53' 12.4" L = 2' 45' 13.5" (RT) 30" CSP 1B,6 nN Ls = 180' D = 0' 59' 07.1" Ls = 180' D = r 0/' 23.3" MATCH TO Y7 LT 70' LT % LT = 120' L = 501.34' LT = 120' L = 269J5' SHEET 32 - _Y11_ STA. 13+65.00 v ° ST = 60' T = 250.83' ST = 60' T = 134.60' SEE SHEET 49 FOR -L3- PROFILE R = 5.815' R = 5,600' SEE SHEET 81 FOR -Y11- PROFILE '- SE = .03 SE = EX. SEE SHEET 83 FOR -Y9- PROFILE SEE SHEET 213-6 FOR CONC. ISLAND DETAILS SEE SHEETS 213-1 THRU 2D-7 FOR DRAINAGE DETAILS TDB° 10 PG 576 // Dewberry 0.O"O PROJECT REFERENCE NO. $HEFT NO. DB IOTIPG 557 CURVE DATA FOR -L3- Dewberry eii i v PB 31 PG 3 LIP R-2233BB 19 BOOK I6E PG T9 PIS StG 954+01JO P/ StG 956+89.43 PIS StG 959+77.52 �� "��° 29 W Afi�'6 b� N r91io r-oez RhV SHEET NO. p2 P \6 es = 0' 53' 09.7" 0 = 4° 29' 36f (RT) es = 0' 53' 09.7" N A Z\ 6g g GR \33• o w ROADWAY DESIGN HYDRAULICS /V Ls = I80 D = 0 59' O4J" Ls = l80' 8 LT = l20' L = 456.43' LT = I2O' / DARIUS CXARLES FULLER 84 DP o f. . - �Q 3 a`\: N DB 803FULL R po ♦ ♦ pV ' 3 ENGINEER ENGINEER 0 = _ = far nm! 1 anon`♦♦♦ w _ a \ . 0 CARP' .. O� 0 CA iP E,P ST 60' T 228.33' ST 60' . Q •, .• R = 5,820 Q � - mmmti• ss/20e.e =. 2.��FESS /p�99'p ,.?:@�EESS/QNq 9♦��: x ae SE .03 '' _ X MARVIN F• TONEY _ \ C SEAL �'. : v SEAL j020031 12786 IF BRENDA TONEY 1$5 j F ?O;A_,: %.x'•F Qi O� �i'•:I;GINE;;: ' Ke` 'I;GINE`<::' Oj DB 487 PG 748 ^ 19U EIP ,�.�,1✓9M� .. M ��i��t,,;.•• ...... �� OB 583 PG 25 RUTHERFORD CHURCH OF CHRIST / ',',♦4i♦r $ J. �po, N M. �� DB 1024 PG 6411 EARL GENE FULLER• JR ♦rrrrr�rr�" ♦nrn�ua� MARVIN F. TONEY X yl PB 32 PG 66 LAROLYN MARIE FULLER BRENDA TONEY I 51' DB 777 PG 352 No9`j9- 52^3' Us Og./EIPP DB487 PG 748 q'DB 583 PG 25 DOCUMENT NOT CONSIDERED FINAL DONALD G.ARROWOOD �UNLESS ALL SIGNATURES COMPLETED BETTYARROW000 DB 234 PG 481 ti ro v -___________ m - � © II \\ ____ _______ / Q x� ,�1" EIP GR Ur)NN 3/ Q \SFD N N 33'21'4' r� R - - " 33•2414° w 3.3- CS StG. 959+17.52 QQ .f / W �/ ✓' 143T L3 +34 108.36' LT ; / N 4090 i - m BEG. PARTIAL UA, L3+50 215' LT Y9 +92 EIP / /!' _ I I ,,, 189 BEG. FENCE /\ L3- 2END FULL UA 120'LT �/ M "�'= ISMTLCH o-6 PROPERTY INVESTMENTS BEGIN PARTIAL UA \\\5° P/, �// `vJ EIP -LND - .120' LT DB 879 PG 5961NC mC^, 0 3 LEP ENTERPRI J -L3- SC Sta. 954+6v0 I _ FE CE _3 191 192 L3 +76 L3 +79 _ --_ m mtim ,,ma�yy EIP 145' LT 75g' LT ^' ' ,�m',h ,MES MILL FULLER WALTER MORRIS. ET AL p Y9 +08:84 �'3 `\:� _ 1 II L3 0 0 .22'LT L14TLT �� M m +00 130 PLT 493 DB 447 PG 161 1 L3 +65._ , _ CC` 144.36' LT _L3- TS Sta. 952+81JO - RUTHERF R r-� 164,LT ` i i ! ND PARTIAL UA J- 0 D CHURCH OF CHRIST 1 N `�' BEG. PAR UA L3 +g7 .o DB 1024 PG 641 BEG. FEN 155' LT PV L3 + ©R4 P ; BEGIN FULL UA tl°j oh PB 32 PG 66 146' LT oe ,py; BEG. FENCE ^^ ati• NCE J MICHAEL E. PRI7CHARD L3 +---C'LC/A 1 > 13 NC om ' PlJ +11 / v7NJ FE _.---- - Q L3 +00 ANGELA C. PRITCHARD END PARTIAL C/A / p, . ,- D 7 END FENCE 185 - AL CAR 00 98 LT +60' 97. 1907 JB v�A1H I T LT P9 496 THOMPSON EIP , c, 0' LT 178 122' LT L---- DB 1080 PG 855 PARTIAL UA G. pE), L UA L3 +36 £ 1 ACCFS ND FENCE BEf3 ENCE. U oO44 PUE P E -- T F N I F 109.39' LT (�< EIP ww N°2 LAT. V DITCH PROP. 3 EIP Q 3- SEE DETAIL b SHOP O yo P O II Q 3 p o 1904 C ESQ POJNT p 60' N, \ C m G 03 ,7/ .6 CURVE}' CFENCE E _ BL�$ - ° aGC-830� v 0191 15•• ~ --y�-EIP m ---3ISF9 BUS - , - Y_60.)-n+ \ �7 �- PROP. GUARDRAIL 1911 (2i5'mR(WW SBG +50 IIInQ•Y`,^0p3 O F + +LO 10 i , , CAT 1 O d � �-----�--_� '.— 01 'n gym; GR EI +5 IP 8 2 +F CONC ' N 8 •21'33" W z = E� / ~ N BST o + Ln �. _8-600 PR =0M11T11 CM 1909 ^° F h 3 - — r 'O 0 o _ r Lu Lu w I: fll TC- 60• FS- I --- D SR 1532 —Gi ` 183 mm �60 q GPy 193 s\E + P PROP. GUARDRAIL °„xtol a 30' 2 0 PR �y`+O2�,`v / u N f 3 _ A CHURCH RD �� `7 P'O SA AN PER \ .. .. --- —__ `0 mm ROBERT D. JOLLEY 1902 - .CO C F �—cxlsTING Riw 'Z'� b VIQ O __C SL.B + IP . - _ _ . _ - _ _ - /sBST +' D 1079 PG 3 PF, 1 -' y '•� 196 MAXINE H. JOLLEY Q / REMOVE GUARDRAIL �$�vO'a DB 352 PG 692 _ - RIP RAP + C. TIE DIT IV 2 Q c` \\ " FENCE C - ,o p 0 _ O BERM DITCH WW FE CEy \ 1912 h0 G" a // 1914 U L3 +56.08- O $EE DETAIL 16 Aej HENR7 UFF O TIE EXISTING ROADWAY 4 /X L3 +10.80 +85 sB cF _-- DITCH TO BERM DITCH / E 138.30' RT L3 + 7 ' o , \E 155' RT1 5 �o �`" 19 L3 +58. '}' 155'. Al o L3 +00 110' RT 145.43' RT A 0 3' S /V42 + .11 DBYI�G 43SON i �M°� a END PARTIAL C/A HW FENCE T i °kl 17' LT Y42 +60 �y ¢ BEGIN FULL C/A 0 183 G DE TO D \ \ 17 _LT 1PUE Q v POOpP LA7. V DITCH "� - L SEE DETAIL b ---_-- 3 +21 P30 \ ma o' TOE PROTECTION s - -Y42- POT StG. IEft6. 2. 185.65' RT L3 +30 a L3 +50 153' RT `' SEE DETAIL 12 +50 END FULL UA 188. ' RT __- 200'RT M. MORRIS -Y42- POT Sta. 14+21 /7 /Q \ 200'd4T 197 TAMDB 655E L0684 IS BEGIN PARTIAL UA 4 3' RT 8 /0 I �� `v� REMOVE 20' OF 30" CMP Y42 +2 G i�� PLUG & FILL REMAINDER / WITH PLOWABLE MATERIAL EIP Y Y42 +60 4 170' RT � \ � AR ,y�Q b�. e F + 4, 85' RT 42 +5 / / : '' •`''°�"' TER 5m tim^m J WAL DB 44�RPC 161 RIS, ET AL \ e\ 'lip \\ \ QQ \Q Q Q / a0 M aQ \ )� LILLIAN HARDING /d = Q`� DB 159 PG 625 O / MICHAEL OB 4 o� 25 PG 255 198 1 \ Q = ISBKD PVC m 6 O' Q ". I m E3 II Q Q ,�`'y ;� EIP I 2 I i1DE LOUIS GODLOCK h ROBERT DEAN ADKIN a / , 1 BERTIE MA -m k DB 682 PG 357 WALTER MORRIS. ET A 6 /v / l �� / X—XPo j- Q 6' CONC�HW DB 3 PG 546 CK .Bi'lll EIP N 25°24'S7' W y D8 447 PG 161 L C'N II Fi mEIP Exi o N 25°24'S7' W - - `O M .LO.L 0.9Z N �t� m ,yh -- �--y � nN 124.03' 145.00' N 25°24'S7' W N 25°24'S7- W W---- ------ 9� 136.38' 12I.01' _ SR 1532 O EIPO SEE SHEET 50 FOR PROFILE 5 ______-_-___ - _ _ -. .. 60.00' chi I .. - - - .. .. .. .. .. .. .. .. _ � SEE SHEET 26-6 FOR CONC. ISLAND DETAILS SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS RIP RAP ENERGY DISSIPATOR BASIN SEE DETAIL 1 S WALTER 4L L3 +50 246.34"1 LT END PARTIAL PG DB 447 PC 1161 L3 +67 BEGIN FULL C/A 232 LT 254' LT 192 L3 +81 240.94" LT E 253' LT CE C W 2010 F 3b ___ F _____ F F _�� _ -_ -00 UB v I I � I / I I I I I O O o O+ /PROP.GUARDPAIL In O Q� TRENCHLESS INSTAL 36" WELDED STEEL NOT BURIED Kf -1 REMOVE Al 0- ,/n, zz z• uY 2 W-F� CHARLIE M. MORRIS MAMMIE MORRIS TAMMY MARIELLE MORRIS DB 655 PG 684 197 'r- JOE LOUTS GODLOCK BERTIE MAE GODLOCK DB 3392 PG 546 `D F3 RIF JU SEI -L3- A wMH 00 Dewberry1-1 Rojo PROJECT REFERENCE NO. SHEET NO. IRI;R-2233BB 20 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS J�, ENGINEER ENGINEER 'TT,gO 8 oQtHLCABp�?�,��� ,,poQtN CA p� i��� a� �. 2: •GFESS /p�;.:9 �. SS/QN.:9 F ' v SEAL 020031 i 12786 i �- uuiiu„'OO: _ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TOE PROTECTION ''" SEE DETAIL 22 NORTH SOUTH HOMES & RENTALS, I DB 1101 PG 631 1J L3 +85 EIP C 160' LT +00 120' LT C END FULL C/A C _-_-_ -- BEGIN PARTIAL C/A PNCF 4,,. L3 +10 O /5„ 110' LT CSP - INLET REQUIRED TO AVOID O �F r- FLOW DIVERSION L() ,O 2GI 200 - rLSY REMOVE J V�'>s"" PROP. SHOP �I PROP. GUARDRAIL a // / CURVE (25' R) I LAT V DITCH Q LAT V DITCH Isla'{ SEE DETAIL 6 //� PLUG & FILL WITH SEE DETAIL 6 _ JBI �FLOWABLE MATERIAL -'N 14 - 2012 4' CONC HW REM O - - - \ FENCF 28-36" CSC SFD "4 PVC, DATUR VI 198 JOE LOUIS GODLOCK BERTIE MAE GODLOCK DB 392 PG 546 0oG \ G \ /\ �l✓I�N �W 6' CONC HW W TL-3 160", RT BEG. FENCE L 1�-^" 180' RT M �O Ol 2�F vi G Q r VI 9 o I I I N �). US v 24iB5T LLJ W O H TROY L.CRAWFORD P - - - N DB 1064 PG 606 PO JOHN HENRY TOMS J+z N DB 1072 PG 285 f�P `�-' 201 CURTIS MAY TOMS END 50 160' FIT ro LIP DB 277 PG I49 / ¢¢AAjjtt _ m S 1664 DB 229 PG 315 r-� 215+ U. ff��JJ EIP1`,Wr1'�'� EIP 199 J C3 p p _ 3 TROY CRAWFORD Z JAMES 0. WASHBURN DEBBIE CRAWFORD DB 383 PG 597 DB 1064 PG 606 / p 3 DBy10T2 PG 285 `v� L .^�� '•23 �� �� 3� `t✓DINS J� ,,©� � � '- / � _ .. L r " —X3LIP E z 661 CONC HW o v .a✓,.,.1��' R6P 4Q WBv-r, PREP- 15 RLP'= _r, _ _ ✓-�:.^--..� �,.��C 4 •, V Q SEE SHEET 51 FOR -L3- PROFILE SEE SHEET 2B-7 FOR CONC. ISLAND DETAILS SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE s N q 30 07- / 1 Y7 +97.95 / /� 0.O"D PROJECT REFERENCE NO. SHEET NO. 3g ry x I -Y7A- P t I f// q 30' RT / Dewberry R-2233BB 21 rry = IT. = �- ♦ Y7 +95.12 �c �p� JOSE ELISE0 RAMOS -- --- __ : / KVV SHEET NO. DB 964 PG 836 ____ 40.55'RT JOHN RAMS ER CL B RIP RAP / RONALD TRAVIS KEETER CURVE DATA FOR -Y7A- ROADWAY DESIGN HYDRAULICS Y7 +75 �� OUTLET / H.q DB 90E PG 129 PI Sto 13+67.47 PI Sto 14+53.79 Pl Sto 16+79.18 ENGINEER ENGINEER LT BEGIN CONSTRUCTION PROTECTION / Y7 +80.58 Q DB 224 1 225 pomp mmrr 03 ( a EIP 2 TONS 4,j� // BEG FENCE 8`? DB 144 PG 64 0 = 6' 24' 48.6" (LT) 0 = li 46' 16.0" (LT) 0 = l9' 36' 2/.6" (RT) QZN CARp�oRtH CARO°o� o -Y7A- POC Sta. 13+75 I g S.Y. GEOTEXTILE AZ D = 5' 43' 46.5" D = 19' 25' 20.3" D = 22 55' 05.9° 0 Y7A +06.98 O N'•. �. 'UF 73.69'LT -Y7A- P t l4+ `°� d L = 111.94' L = 60.61' L = 85.55' .a@ 9�. ram.: 01 N zz°49'sG^ w �5 ^ v7 +15.55 T = 56.03' T = 30.41' T = 43.20' _ SEAL _ SEAL o� R = /,000' R = 295' R = 250' i, 020031 : 12786 d Qn 1010 �� 41205' I �' 48.92'RT BEGIN R/W ACOUISITION F @;% = °.�'•.F Q;'On�: p 0 PE IAL G DE EIP Y7 +24.26 ' s SE = EX. SE = 04 SE = 044'G I NEB � 'p,F'••.',I'G I NE`� : O� I 3 DIT H -Y7A- PT Sto. 14+83.98 3 30' RT I f °� -Y7- PCC Sta. 13+80.58 RUNOFF = 68' RUNOFF = 68' ��' ,` "'M '•,,�,EA�"" "'�;o� 0 ,Q JUDY MCCLURE Y7 +7 I II DS = 20 mph DS = 20 mph rrr�rr� nnrr�`� I'. G DB 997 PG 714 / 30' RT p m / BEGIN CONSTRUCTION 15 CURVE DATA FOR -Y7- n1 I N EIP '0 8 + ° -Y7- POC Sta. 14+75 Pl Sto 11+96.29 P1 Sto 14+5688 Pl Sto 16+90,69 DOCUMENT NOT CONSIDERED FINAL Z5 0 = 34' 36' 42.5" (LT) A = 34' 35' 50.O" (LT) 0 = 14' 46' 23.I" (RT) UNLESS ALL SIGNATURES COMPLETED h °C -Y7- PT Sto, I + D = 9' 05' 40.4" D = 23 23' 09.7" D = 1913' 53.0" B ° Y7A +39.03 " 34s 999 W Q. I 101u L = 38058' L = 14794' L = 144.39' + 77.a7' Lr _ 1 T = 196.29' T = 76.30' T = 72.60' CURTIS TOMS. JR., ET AL 1 _ _ Y +bs o h R = 630' R = 245' R = 560' DB 757 PG 188 55 RT I SE = EX. SE = EX. SE = 02 ° O 0 u RUNOFF = 38' o DS = l5 mph 0') I \ Y7A +86.07 \. \a 55.05' LT -Y7A- PC Sta,l + ° I Y7 +18 �', rn \� -Y7- PC Sta. 16+18.09 I \n eksrNCp TISB TOMS J 188 ET AL 2119 66.13' RT _ +03 \ ° \ Y7A +57 O _ -1 a \ PECIAL CUT DITCH 169' LT Y7A +68 g59° W EIP L3 +55 I:� r SEE DETAIL 10 .I. OEIP 0 \ \ PUE 201' LT N 3 206.13 J HN �1 p 7A +86JAMES LEWI9�AP'��S, JR ONAL TRAM IFEETER I ® PDE \\� A 'LT DB 931 PG"r32 D PG 129 TI 1A 107,1 JOHN B.KEETER L3 +50 \ (� D 224 PG 225 RONALD TRAVIS KEETER 177' LT L3 -G +sr a (0 Y7A +90 144 PG 64 0 I A DB 90E PG 129 I I 175 T %q w 206' LT FED I 0 I DB 224 PG 225 L3 +35 RAP PAD AT o_ 'I Y7 + I I u OB 144 PG 64 160' LT \ J ISDICTIONAL 70' RT I Q I W L +10 I. \ TREAM SEE I I I� °+I 1 155, LT 3 DETAIL 5 TOE NANCY DAMES 1 I +91 \ T PROTECTION TI I r1I DB 693 PG IB --1 \n Y + .38 SEE DETAIL 7 I 1 TOE PROTECTION +LL 1p 1 5.9 0� LT ry NRCP-III 1 11I I m ^ SEE DETAIL 12 NORTH SOUTH HOMES gA2SGI p \1 \ c I .02 m+ll C _--- DB IIOI PG �f I 7A- PT Sto, l7 /..� ---� v I - L3 +54.37 C 0 - - - P C 106.31' LT - C i O O ,p �, JB wA1H I+45 A 6' 7 � � _ 4-- - �\ L3 +50 U O , ' a 7 T/ 0 p 95' LT z +50Lr).65 W .Ol +54.53 110' LT 2106 SA \ +7 . 1 ' / S- -Y7- PT Sta. 17+62.48 JB vaMH•� O + 2100 ^ _ +- F a 134 M JB MVMH + 2GI Aso 2GI �C B wM jO 2115 2GI 15" RGP-III 2GI �Gl 2136 LO O` +55 FS C 1y. ♦A - 6' CAT-1 PROP. GUARDRAIL o " ,°`° - <>FIC O �FS-C PROP. GUARDRAIL O+ 2114 1 210\ R a; = 2116 CAT-7 O` 15 • o , F, N � , F F I c Q N _ F `•' Z •� OT BURIED // F DI^I = 21 2127 DI ry + N + II H I N J 21 3 �� 2GI FS-B 15" RCP -III 104 2GI \ 18" P 1 /j 2107 DI - ara F^ - 24' 49' 37. W //.� 2GI 75" RCP -Ill = - - PLUG AND FILL WITH J FLOWAB,,E MATERIAL ry II O na '-T,- °- N -)► 100 PR _ / ^ �7♦ 2108 2126 v DI / T REMOVE GUARDRAIL i11 WPR SFCI FLOWABLE MATERIAL // GUARDRAI SPLICE �" P SLICE � 1 400 PR 1 + II M.1 ry �- - -- GREU TL-3 TL MTLT- + °m 1.. PROP. GUARDRAIL REMOVE N MO E, CA 1 M L Q PROP. GUARDRAIL 2I rr �8'-36" CSP / 2133 + _ _ ® _ 4' 1 \ s� y 2GI IS _ ~ 2105 8P F W F - - - - - F / + E n 2132 EIP ,.rv• 2112 'GR� 5/ - 0 _ 15" 2GI h' / -L3- POT Sto.977+95,26 �' O= C /I F -Y7A- POT Sto.18+45.84 130'RT \ 10 = AD L3 2121 L3 +58.51 110' RT W 105' 6 n 2123 C PUE Mo / I I �C LAT V DITCH L3 +00 h I CL. II RIP RAP / I 'L,,q In EST. 7 TONS / 2122 L3 +40 _ SEE DETAIL 6 12 159, RT EST. 17 SY GFD ry I < C �C m PUE 159' RT ^ ° / / I 125' RT \ \ \ REMOVE GUARDRAIL , I i I I L3 +45 e e°°-1� L3 +05115.00'ITT = lid L3 +98 a L3 98 +09.91 I C 143.54' RT \\`� ----- C 09 BEG. FENCE CA 155' RT '. �' I167S9T +zo / 8.48' RT nl I b Z -L3- POT Sta. 982+79.74 END PARTIAL UAT L3 +59 �� ', 130.71' RT -Y7- POT Sta. 18+64.30 FRANCIS WARD &*EIf E JOHN HENRY TOMS 139.46, RT 167' RT / c w LISA JUNE CARPENTER CURTI$ MAE TOMS 158' RT I Z L3 +85 - OB 1007 PG 150 DB 277 PG 149 200' RT !� N EIP OB 229 PG 315 ZO1 0 // Z nl n Z RONALDNTRAVIS KEETER DB 90E PG 12m 1. 5 3m O DB 4 PG cX. a m I DB 144 PG 64 64 14a h m I N m 3m +50 10 1 JOHN B. KEETER I I BOBBY LYNCH, JR RONALD TRAVIS KEETER I HELEN LYNCH 3 DB 90E PG 129 1 w I DB 489 PG 143 DB 224 PG 225 I DB 144 PG 64 I ~ nl O E t E E Z a I No .. .. ?5 6' b' 0^In POT St 23 3 mN p 48.9 END CONSTRUCTIONILL fi1��1 / 1 1 7190 -Y7- P o. + 0. 0 DATER _ oi/ END FEN 60� BEG. LT(p 98 II7 E Y7 +05.55 .02 .01 70' RT CE / .O1TIRG R/ w .- .- -. .. .. .- .. .. .- .. -- . .. .. .. .. .. .. .. .. EIP 7 84 j EXISTING R/W ' - -. 48' WW IS HOPE w w_____ .. 4 " VC DATER fin, _------_ -- -. .. v ----- '----- -- . P COLLAR SR 1532 GILBOA CHURCH RD l8'BST ---=� �- nN10 DI -_ �/ 10 DI ----------- . '. SEE SHEET 52 FOR -1-3- PROFILE SEE SHEET 83 FOR Y7A PROFILE N 84°31'17' E - - - - - - - E / 0 9.Iv N 21°28'07' w 29z,9p. - SEE SHEET 84 FOR -Y7- PROFILE 5 MILL OERLAY 2137 2138 MILL Y7 +2094 ° ' II 60.74' RT II 70.76' LT SEE SHEET 213-7 FOR BULB OUT DETAILS SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS PROJECT Dewberry x°en T REFERENCE NO. SHEET NO. CURVE DATA FOR-L3T1E-''' R-2233BB 22 PI Sto 11+82.87 PI Sto 15+47.85 fl Ill SHEET NO. = 9 07' 27.8 fRT) p = 9 07' 27.8" fLTI s ROADWAY DESIGN HYDRAULICS D = 2" 30' 00.0" D = 2" 30' 00.0" �yy �-y ENGINEER ENGINEER �s caCA L = 36498' T = 182.87' L = 364.98' T = 182.87' H otN ,. �;•oEEss/oN.,r : ESS/aN.,r'� R = 2,291.83' R = 2 29/ 83'83 9� 4@ 9` ` WADE D. KING SE = 06 SE = 06 _ SEAL - SEAL • •• 020031 5 ruse I OBS600 PC 460 RUNOFF = 162 WADE D. KING GI ELA B. K1 RUNOFF = l62 N'. ` F %."•°F Q:'•O 4'GINE;;: F�LINE�:' Oj ,,,,� , �,,,,,,,•, 460 muu�MO,,, ••iTnuiiuT„ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED �, \ EIP 19'28" W Lr) 260.9- \ \ H � d S / O- S S 20] O EIP RIP RAP PAD AT N 19°I7' 2215 - W " f� RANDY S. MONTIl o C1 �{{�-�BARBARA R. MONTIETH DBIO16 PG 492 L3 ' LT 245' LT JURISDICTIONAL STR SEE DETAIL 5 11 \ L3 +35 272' LT L3 +98 PDE 268'L3 +98 N 19°I9'46" W i / _ - '1 I\ EIP \ COOG NANCY DAMES f3fl ^( \ L3 +32 DB 693 PG IB r `) 231'LT L3 +04 W 245'LT O 246.78' LT 215 L3 +98 228.5' �K / ZR N tl O N 19°37'58' W I �/ 199.80, EIS' fl EIP RIP RAP \ a _ L3 +27 EN ER DI IPATOR BASIN ©� 217.06' LT L3 +48 203.50' LT C F Zj(J �`\ \ T -`_. _.©N 20°I7'43'I _ OEIP 246.92" SEE TAIL ©©[3 _ 221' LT L3 +75 190' LT F END FULL C/A G \ \ \ \ o n CONC I BT L +26. jk MA{9 JOHN B. KEETER O'L '!1 TRAVIS KEETER M j4 0 170' 90E PC 129 _ A� RCP -III BEG. ENCEBEGIN TIAL UA e \ -L3TIE- P StO. 1 64.98 \ j] END R/W AC U1SIT10N �- �a DB 224 PG 225 i� A° ALVIN H.PUTNAM 1 ALDA W. KEETER L3 +6$ LT 1 -L3- POT S a. 1004+10.00 20 L3 94.30 64 F L3 +991�' i� / 1 .9T LT +97 END PARTIAL UA E JB wMH JB vdA•1H DB 96E PG 399 DB 318 PG 194 zo ^ 3 BEG. PARTIAL UA VE A DAY634IDGES6O OD S C3 PC - BEG. FENCE PB 12 PG 138 1 3 - E TIP PROJECT R-223388 +9o.a6 133' LT �p••,, Q� BEGIN FULL UA i� 1 8.39' LT E9' ©Mfl + W BEG. FENCE O F F 2218 L3 +0 .3' LT \ ^' END P TIAL UA \ N —L POT Sto. 10 +00 (�a 116.17' L IC HA D NEE Of B ND NELO '\ I,�// END FE CE ----_ fi-� `W \ 133' LT . d L 15+ TO D G T47 / \ V "- UE/ LHARLES DONALD TAYLOR L3MA�ij'0 TAFTHENIA TAYLOR j q CE INt C $ UIQ + L +08 90, LT . _ 75' LT 873 PG 328 L +42 PUE � Lf'J + 2217 PROP. SHOP ---- / \F V� O CURVE (25'R) I ____ = -_ F / I \�I END BEGIN 209 I TOE PROTECTION J 2GI BG ' '__ � 5'LT i '�_ L3 i/0 ACC �, 75'Q LT PB 7 PC 139 L3 +36 �' LT L3 +73 102'LT 218 53.27' LT O PU +45 74'LT E 57' LT ARY JANE MARLOWE DAMS O L3 +22 ' LT SP / 1 SBG +50 +40 I SEE DETAIL 19 1 74 / L3 +38 DB 09E PG 407 +86 71.27 LT DB 334 PG 467 Ol END PARTIAL UA PARTIAL VIQ - I / \ ' 51.53' LT 1. PB 7 PG 139 O� PROP. GU RAIL END FENCE GREU TLC AT-1 - 2 RI P~ I + - - F / 27 -/`�' "� \ -- 73' LT o Q 9r ai11 + PROP. GUARDRAIL - -� ry ---- P.) T�1 a `�'' C3 C L3 +10 - -----_ 35'LT, ,G GI 2211 C - - _ _ 15' LT C N F / + + 205 .. GREU TLC f --- --_ - C END FENCE I F FIo � o o-L3TlE- � ' - J � � N4 -L3- zo - IP„ •3 �- �d IwGI ° P 8' XISTING R/W � 49'373"W "RCP -I s �zl -�18"RCP�II - .FS o MTL c-- �T- - -- - - - - -T- _ -r- - ? 2210 III �). I 0 PPIPR LU y N REMOVE GUARDRAIL %� po '�' 2S8 PR -- --- ---- -_-_ h vdr r 36' �_-__ --T-- 24' 24' _________ GR 200 -__, E I ASPH ASPH •GREU•` 2 I 8'CMPII .. m O .. .. .. - - _--- --T-- CAT 1 -_ R_ _ - M 2GI _ --T-- --r-- m. O 2201 __�_ 15" _-__--_�_ I 30' P. GUARDRAIL _--_____ ASP H ~P22 ___-- ___ EIP = SS POINT PLUG AND FILL WITH C S C'� _ - C („) - [3 L3 +00 96.98' RT LAT V DITCH PLOWABLE MATERIAL \ _ N L3 +10 END PARTIAL UA HAROLD VAN SHEHAN END (Ffi IHDJDREN BET ENDREN D FENCE L� B 5 ENDp¢E18QEG 184 B D QI G 184 PUE PUE D8 675 PG 676 6 SEE DETAIL 6 2219 22164 l��aMH �C 2213 PUP L +00 ' ____ ,,cc��''��,, `W 105' RT, 85' RT IN PARTIAL BEGIN PARTIAL UA L3 +81 L3 +45 I "- L3 +84 11 RT ' END FENCE BEG. FENCE 114' RT P 121' RT 3 PUE 125 RT OF HW / -- G 1�_R= _� L393 L3 +50 135' RT L3 P110 ISMTL Bus Oil FENCE 3 +00 CONC CONC CONC - ----- L3 +80 95' 13 T 130' RT S z I 122' RT +91 I145 T L3 +95 100' RT 210 99 w 6.70' RT BEGIN FULL C/AI RT _ /n I BEG. FENCE `O ml I I QVE 3 +15 END PARTIAL CIAL3 END FENCE L3 +40 97.81' IT ISBK BUS '� BE G. PARTIAL C/AI 3 BEG. FENCE -L3TlE- P S I L3 +46 162' RT +29.95 - 35' RT= n _ m V mP ISMTL BUS � TOE PROTECTION 170' RT SEE DETAIL 19 L3— POT to a. lO(�3+54J3 ti . _____________ N � - 2 \ L3 +75 181.73' RT JANIC HOLDINGS, LLCj I \� N I2•I9'36. W 286,3 206 87 RT BEGIN PARTIAL UA D8 978 0 PI 147 -L3T1E- PC Sto.10+00 - 23' Ll8=3 28 211 \ BOBBY LYNCH.JR EIP HELEN LYNCH DB 489 PG 143 N I2`26'10•W \ + -L3- POT Sta.996+2726 '1j2 \� 774'UNIFORM APER LANE DROP HTR BUS L--- 0 s ti� k / 25285, O HTR I I MICHAEL DEAN MONTIETH DB 444 PG 5T0 A`Z DB 931 PG 629 =o PB 7 PC 139 ' I I P EIP I I I I E e o EDGAR W.TANNER,JR EDGAR W. TANNER, A'- ro DB BIT PC 281 OB 817 PG 281 - 'DES K IE- -}� N © O 2 E N MjUS - SEE SHEET 53 FOR 43- PROFILE °3 SEE SHEET 84 FOR-L3TIE- PROFILE ��� ° EIP 8.520 DETAILSUT 4a•cHL CONC ' nMON _- /SEE SHEETS TOHRUU2D-7LB FOR DRAINAGE DETAILS on PROJECT REFERENCE NO. SHEET NO. Dewberry v R-2233BB 23 RhV SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CA CA Q 2:•�FESS/p�;.:•v'�. SS ' SEAL Na SEALS 82°28'OS' E 18228'05' E 00127$b163.45' 151.10' 9002060231 ��- O 2� S 74°0'0 �i,, $'pNpO,'•4y',•... .ate. - 6" E J , q 4� 1 " "iiYil 1 � 238.39' 1 111111 1111111 5 79°512� 00' EIP 5 85°50'06' E 176.49,23^ E KAREN MACINN15 WORKMAN DOCUMENT NOT CONSIDERED FINAL �97' 84.50' Elp DO 927 PG 617 UNLESS ALL SIGNATURES COMPLETED EIP Z O- __ ART" BRYANT HEIRS ISBLKD C' WORKMAN pB K PG 392 \ REN MACINNIS WO LO DB 147 PG 587 KA D9 930 PG 535 I S w m HENRY J. CARBON "� f'i 0 + \ MILLER - LILA M° CARBON O KICKY LEE pg 860 PG 341 + N _jy� O pg 697 PG 127 - - PB 9 PG 5 p ss /� ISBLKD \ I ISBL / O Ln _ O 60' WD 1 I� N � EIP l/1 Ell S 82°21'36' E S 83°39'35" E 5 85°I7'05' y. N 69°42'00' E , 185°55'26 E 70.63 w 40.69'5.90'----_-- D 70.00' O XIS KARE DB927NI GW60IRKMAN u� $ 87°46'43' E 5 87°46'43' E I I� WORKMAN KD 6II / V KAREN MALIGN F 535 1) 93 I S MAE MORRIS ISBLKD N ISBLKD I 8� ` / e ELLA JAMECA S E. 373 P I W J�/',,f/IY 0795 W II2.35 u. sac,9 s Ell P OB DIE zle DB 349 PG 75 I }gyI / \9" 8RK H '_ - I IRS ' s5 ExlsnN� 10.23' \ MR J ULMER - -w- - _ BST \/ JOSEPH LESLIE LATTIMORE� MARJORIE XAIGL of /\_- __ - DB 1062 PG 277 OB 91E PG 47T ', ai 5 •all - ..------- -- --Y2 94 7 B 91E PG 228 o�1J // 122 LT / 1 Y2 +02 Y11 +80 > BST GR•, '= 122' LT 110' LT D H. -- _ /LT Y2 +03 BURWELL.JR. �4 _ RM DITCH Y2 +45- II \ 110' LT J DB 86E PG 423 m\z CP / - -' 10' LT 119 PG 226 —%{' �. 2 TAIL 8 Y2J06 LATTIMOR� 2 aa" Y2 +00 U6 ppGG�� 10.87 JIUI PUE Y87'+T7 90 LT �Y FENCE `. D 8 ti 65' MH J ° / 2 +71.49 AMES BRIGHT SSxss Ha P/ /V2 +38.6262. 77.66'LT Y2 +07 219 OMPANY. INC. 30 WV'J ONo��la w\ I I 93' LTe 682 PG 420 ISBK " _ _ �' JB <n g51 57j \ Y2 +06 ILLER q o --- I t .�2 1V 80' LT RR®23J.MILLER o_ No c5) p C �C .G 1T1 19 /J sa.ao' YBG1¢ _ - z B'C _ ..- / SIDE Exlsnec ww 1 RIEs R1 (5)F/0 / 2314' EG. FE 56288' C' _ -A? -- �� 01 1471200 PR 41L.79 I 55 600 PR 31. 046.b6 PDE I \ 48.9T L z C f?. N 00°24'V' - HVf 5-9- LASTING AD 55'BST 1 LL33 ETC ��/L R/W IVARIE 1 rtVP1 I _ R/JL(YARIE51—rg —_ i _ 4dV — d�tl .8\`d911 S \• • — — — — — — -- — — — --_ - N p °34'34° E 231 5)15" RCP -III 1 a RCP -III -FSS- - I - 2316 r - - N �'-•' _ ExlsnNc R/W ' y/I 80 UII RUTHERFORDTON R OVE 3 "o3 -- - - - -- CCAM4P TEt 30 Ly l tl011H�3A _ (w1 4 �- S 771Rnl °2'S3' E Y2 +75 - r r-r 54" RCP -III '2'5 ° R REBAR d m N s Y2 IS R/W (VARIES 1 i II P \� �Y2 A '-PROPER S. '�mdlll EpCH1 RISTOPHER A. JONESEATHERSBE4 �\ E3d�OPERTIES. LLC COLLEEN B. JONES " pg 964 PG 300 �\ OX\ 11 REMOVW011tl CONC CCUM 5 -- 4! - - BS / q. CDNC-C T I I W TH PM O ,gip p gqT PG 780W \PP 51XOHddB'4 b . R dOF. 19 RETAI \ I RETAIN PIPEDBG 30BT99 PG 7t91 l 5,31"t r_II SYST & STRUCTURE�T OB 549 PG /EMOVE \ _ Y2 +00 II EM-A3_ 98_ 6 65 'lam_--tldtll dW0 .841.2TRT wll B�Y2 +OOCE 1��A7� _---e\ 'IN011tl�O1 RETAIN PIPE BST 60'RT $p \ mo, I 95'RT p - ,- BI------------- __ CL II RIP RAP 11 ----'� I I B�SYSTEM__; -III 7I I5 END FENC�zll I \\ \0 1 SEE DETAIL D �p� '21' W 01°22' - T \ III BST 22.31'fCB29.2 RETAIN ,PIPE CONC r Y2 +66. S 7I 40 4I4.61' 30 TO 2GI /(Q is Il O I —� SYSTEM y� r � o I I I� 119.17� m P E bz y% ISBKBUS I BIT J \ I l CAR WASH I I CAROgWA AS 1 5' b Y2 +74.13 / / CpQ FIRST BANK I �� I I UTHERFORoB 923RPGP59TNER5. LLL T °OS-Sf $ h ye 142.79' RT c\ 25 Pk 25'BIT \ I 3 °9 �OIZ.SB 5 5 CLEGHO�R --CREEK 66. (o`e' 'h o // _ - ' -O TRIBUATARY 11 56• SE y / tJ�o= \-\� BST ID \ I I II BEGIN R/W es -Y2- POC Sto. I4+67J2 s - - _ __ _ } _ � ��� � \b"0 LT S3CDA AS'8£ p5 PRECISION CABINETRY. LLC /OaG/ �' ? //, RETAIN PIPE B - ' v .. . - 3.85.Ob.Ob N �pB 1168 PG 40g C�v SYSTEM JOEY M. BUCHANAN 2 ^ry Q a� _ DB 986 PG 734 ZS'9Z tioti BEGIN CO TION JANIE 1%7Lc 3.11.£0.61 N� .m ° -Y2- POC Sta. l7 .C�Q °B `V, \ •�' \ I -�-_ ,Ob'IZ p0 Off/ \\be US PRECISION CAB INETRY. LLC M .91,5691 S 0� G \\ OB 168 PG 408 T 4 \ BIT N-\ 3.SG19.,S N �.f0 w \ £1'Zh •2p�Z�S � A\� S qBo 52+F \\ z \\ p LZR S \\ ISBLKBUI \\ \ 'SS 5BIT65087E I \\ CURVE DATA FOR -Y2- CLEAN - o Pt Sto /4+39.59 EIP \ OUT I I CONIC -m D = P 35' 25.9 S\\ \ y - 5� L = 874.86' T = 439.59' �a vOL R = 3,602.33' X D SE = 03 RUNOFF = 117.00' F 5 SEE SHEET 54 FOR -Y2- PROFILE r„ C? \ SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS PROJECT REFERENCE NO. SHEET NO. N RUTHERFORD COUNTY BOARD OF EDUCATION \ 2Sp Dewberry DB 384 PG 634 g \ 92 �3S R-2233BB 24 WOODWAY RUTHERFORDTON, LLC 3 CCA \ DB 509 PG 337 0 DB 898 PG 484 '+ ps s k PW SHEET NO. PB 26 PG POT Sto.10+00.00 32.3 9 ROADWAY DESIGN HYDRAULICS 46 m 9�Kq ENGINEER ENGINEER -Y25A- " ..., ""��„ 'IF 839, ,,QZH CARp�?,, p•QtN CAROB?. -Y25A- PC Sto. /0+69.07ESS/ �9'p ?o:''ESS% O.y'•, i of pN'•• SEAL SEAL a�NF N 020031 i C N;. 12786 \\� +F \ qq 03'W s/eso3•w MCA F'�GINE��'.`�� ��F``F'I;GINEE?: Q0. -Y25A- PCC Sto. 11+6I.85 \ N >> O ��'''•�S� Jo,"��, ` °'`�%%,EME.�`•'�• 0. 3gg02'W "3sg0z. 6ti (( y \\ C bo \\ \ 3g DOCUMENT NOT CONSIDERED FINAL " g0,zp UNLESS ALL SIGNATURES COMPLETED a y S a s os. o S 55°51'O4' E 5 (E o \oyc \ \ +0J 9.83• W ��0J5���6 20.69' \oc+ y° Gs \ \�SyxP�.OJS� \ EIP e 5 1 `9s j ° w5°96//� ti \N�oNRBI 9 � i�1RARB PROPERTIE LC DB 846 PG 696\ \ ,„ /CTO � le/v,2e•H' .xx, `i)) p0• a 60' CH Ad .O /LT . Qa{+-gy, \ �/L .� �5 _ "'CONC \\ `I- pO' 6p© /----�4`L'ONC -C&T'- {`i`vt`-1 �r. 05 ,y'ti�S EIP zsesr }7 48°39vr E �a = - _ -vI ,T\ \�\yo �0�� / ;O® .. eenooNoas �� Iz.9r °c i �•��/ o o.) / Y/ IP CUR\\ • \� Z20� `v��y�P II \ aJP 4P y_\ [� / mac, O / �l' I- "�-�� ,, -� o,%� ' Pro �Q� I ,x Ilti li ISBLKBUS GPM SOUTHEAST, LLC z ek +27.98 END RITE AID Y\ \ �. / / \ \ yp�0 `'�P \ DB 1099 PG 724 p -Y2- PO Sto.41+36.76= a SrNc \ I 24` G', I PAVEM IN RESURFACIN Iz �\ XISTING R/W R c c °u°" a -Y2- �OT Sto. / wl` I\ o -Y25- P T Sto. 36+8099 Y2 +62f7 °PER LINE11 IU a/ O 88.41' LT A- POT Sta. 13+48.28 I I CE END FENR v\a I < I \ o Y2 +30 23LT o 11CONC 122' LT Y2 +65 0 11 ��- 001 \ 86.12' LT moo\ \ o cif / \ \ c Y. 3 PUE °0 100' Lr aaaal \ V Y2 +00 2 +32 9 o�o\D�5 OUT I BETSY-FRANCES PGo58RTIE5, LLC 1�1HdN SNDH OB B� 95'LT FE E �.' OVE 1 b q (") yao \ PB 24 PG 54 Z I � BST -- d�a_ZI __-� w51Et0___C -� -- C ao '1 _ �1 (4)1200 PR ---- ______-�--_-5 ___C / 111 \B 2 9 60• `v' SI o E%ISTINC R/W / �,�('� 4„ rnn F°LL°ws \v c� \ \ gTyA \ •"'c,� N O /�� 2700 PR 6B91D1146/g191P1DI ICH CB // i-fq EIP �00 PR �` SEE DETAIL 14 ` IG T • G )yY25 - PT Sto. 12+g 0�-- \ \\ " \ Via. ,� _ Vl a 8' CONC. SIDEWALK HL 60' CHLX-x-X--•- / \1\ \ Go�G \ --y\I \ - �_ - r - - - C�----- - • \ G FILL II REMOVE 40 /i MI 40 M 39' a 40 F 24•CONC C&G O` 405 c I _ _ N DI + EX. F 2411 DI BST I \ \\\ 1 . DI 24„ _ CONC. ISLAND 24" RCP -III 15„ P I =e I I 11 I\\ - - S 55' S0' 2/.9 E 1 z nN I p1EE kE kFrl E EX.-� V Al N o N REM E 2' • C&G -- I YEU HAM s -ST GRARFTAI SPINOALE __ ---- ewe O ---- /REMOVE BEHIND 1 )b - - -S/ - 1� Y2 �+65 \ £ J 0 R 5\� C �ix0 \\ 12)f3800 PR / __ $/ - ° _ _ - ��-_---- 1500 PR IIF � 408 T &STRU�WCITURES% F41pVE � �'nvMH ao�CC 3 ' \G LEA 21500 PRR rc------Tc------------- �r- - ---_w.y}-_Tc-__ � _-_W-- REM. / / � • / � - - - _ _ _ _ W 0� $ 18" NC CUR 60"CHL \ • 1\ // 8 ', DATUR dWO ,SI _ _ _o IP J 1 - OT1d, 109.84 R �L d� OyE SHOULDER I OU7" ,� EXISTI R/NG W FOLLpWs PROPERTY LINE 60 CHL U\ Vj 1\ e SIGNAL + REMOVES 8 END FE C �\\�� I pow I ISxG \1 1 POLE Sad�_---- �' 2410 / \ I 0 �.r)55+74.89 BEGIN I EX. Ek. S cv \I \ 1\ Z FRCP/Y2\�VENI NT RESURFACIU},0009 fix- f'// a GR O 1s er sa3 �t \ b \ ad ooezll ^0 �o" al O DI \Il Sg R_ __ EIP a 2 si�� BST °O,I REf / \ _ 4'STEEL ss (\ Y2 +61.75 Y �_ \ I RE IIAy el l a/CON I i {` 3a1M1 S31 - - -N - �- - 533 a5 C 1 122.1+14 of a� \ �i�� J J � � ' b �� B� �_ _ H PC +14.4 / '0F 03/b"a b \\ I I M I _ - of 43.14' RT I. .71 d pp �s� �,_ I - JN07 ,9 B57_- -_-- -C - W -P- \ �c� \ ® / s ��_ _ _ AA j / CL 4ECY \- Ad - ISB,SZ S 4/g S 2 °06'04'E', �- IALL _ - 11 ""�� ILLIMTLD. INC. n SEDIMENT tilt '6b 24 69$°E 22.8 - - - - - - - _ l V1^ Ilro ulEl h - I .b ,6 .gS N_ _ -sisoI - - -\ DB 1070 PG 31 (WRONG DESCRIPTION) m FROM 30" CMPm (� e Y2 +90. \ LU - _X OaVU W --L4ALl-1 STEPS 7W I� DB 484 PG 49 (OLD DEED FOR DESCRIPTION) EIP IO ZI _ / WEE ONE PROPERTIES. LLC BST \ \ 2"III p 1 I -Ila�� / -j ad 009 I 48ST F/0 - \ I DB 1057 PG 294 "I 37 ad oo/� vv 900 PRv���� �� _ / s 7o°zrlr w ad OOZI lbl I \ 100 PR \ \ \1- ,� 1 1� 1 0/d l57 p 29.28 I / 39' BST moll \ 1 ExlsnN° R/w Ruus 'I 11 \ WITH PROPERTY LINE 3 m \\ END CONSTRUCTION / -Y2- POT Sta. 42+25.00 II No gl I II � NII m x y I I CURVE DATA FOR -Y2- i�I �' 9 PI Sto 37+31.27 �I 0/1 IS"o/d moral 3 I m p = 2/' 55' 0/6" (RTJ Jsan D = 112' 25.9" 36 III -Y25- PT Sto.33+33.39 L = 68337' RIIJ J CRAIG V. MULLIKIN \ o IIII PAULINE 0. MULLIKIN M ° T = 345.91' III DB 87I PG 150 M3 m R = 1,786.47' IIp WEE ONE PROPERTIES. LLC SE = 04 I oll OB 1057 PG 294 0 RUNOFF = 156.00' lIII DIN DIN III U 21, m N 9T59 A 9 pb° CURVE DATA FOR -Y25- CURVE DATA FOR -Y25A- - ¢a C N _ N 59'41'14' W N TI , �O 83.59' 21.62' 24?5 y0'S W S PI Sto 3/+82.46 PI Sto 11+15.74 Pl Sto 12+35.95 N s9°I9'23 w N 59°I9'23' W 59°03B13' N T6.2 0 = 4 28' l88" fRTJ _ /5° 18' 499 fRTJ p = 58 20' 47.8" (RT) " y I u� N 62'05'54' w W D = P 28' 50.6" D = 16' 30' 22.9" D = 43' 09' 49.7" _m z L = 302.01' L = 92.78' L = 135JT CROWE'S. INC. isl" m T = 151.08' T = 46.67' T = 74.10' nN MATCH TO SHEET 6 - -Y25- STA. 32+00.00 06 418 PTRACT ONEI R = 3869.43' R = 347.1/' R = 132.74' ll¢ w 2 m x0 as . 239.88' SEE SHEET 55 FOR -Y2- PROFILE ° N 62°56'46' W CROWE'S, INC. SEE SHEET 213-2 FOR CONC. ISLAND DETAILS \ DB 418, PG 761, TRACT Two SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS v 0� Y\ oe s O6 qp, p F 3630poO• b' TERRY \ R OB OfN Fl, 65g M/f �SR� ' pC/q FfNOP ORFCr/ Dewberry • w_ m _ m. Iw aoen PROJECT REFERENCE NO. SHEET NO. R-2233BB 25 KW SHEET NO, ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER i��� CARD,,!,,- oQtH,CARp� �.2:•oFESS /p�;.:r: ���oRtH ��- ESS 104, r� '!? 4� SEAL SEAL " 02003112786 J. J' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GR h/SFO •__� BST / p/ / �0 � 29 +'LT x---} _ b, �X X gyp. I p. , `.y YI9 +95.91 89.56LT X yG ( �4i - �u' 277.69' LT Y19 +57.61 273.14' LT B. vcP � ss .eG � LI) / / w ,.M AG L _// / .. .. .- __— `NAI ss CE ST BST A w ,49.77 w o — _ / __ REE �X_X lid, 251 4'LT WITH 6RANCH 9f���`� �.. Exsln�c a/w 32 LMP/ --- _ PEE" 9f - END NOT-_= - o / 2 HERN "m GpR \'6'0 ///'`N -Y19- r Sta. /0�"00 0 FOUND //���' I I o 9• FO / / 5 o PORS \\� / SECOND BAPTWvrUR 2 LT �N� / p w CAROLYN WARLILK LANE PL1E - / MT D8 44 8 PC �7114 I& /O DB 12E PG 73 CARTL BEGIN R/W / QU15/T10N B SOP I RCP n YI +55.92E OB 333 PG 7 BST DB 389 PG 202 '44'LT -Y19- PR /Sta. 6+50.00 AWW G I DO R3 PG 562 BEGd //CONSTRUCTION p I DB 244 PG 613 I /o (CHOR URL R -Y19'' OC Sta. 5+75.00 / y DO 249 PG 63 ' I -Y19- PT Sta. /4+54.65 RETAIN ///Q REMOVE 24" u9 °hCTy NqC \ E`T 23, \�\ ///Q` REMOVE CB s -Y19- PT Sta. 7+95.0 / xm AdONW° -Y19- C Sta. 12+86.28 II X_X—X� A. \ BST ///^ PLUG AND FILL / na WITH FLOWABLE SSBKD ¢ MATERIAL aSr X Sz CR RNG R/W // O E SITING )}'� l ISTEpS "ECTR Mc� I SCE AND L SIGN gB4hr l% / mfN W E EN RF s 0 / qp• 2517 1 C9 I ` I X O ALL A - I NC / CONC� m I \ 2515 XX O m c I M NAIc I 15" RCP -III I 1 \ X 2SF0 f `•�9 ' Op �!NC I rtS �L N 509 C. E CP_lll 2 R�NERF-OROTON 2514 I 50 n35'LT5 I I TO n45, �00 15FD LLT M4/CfRY ✓ Y79 Sp RT 0 Qw� 25 9 + .93 E 36 _ P_lll 7 pp\ 50 D x60, X r- OB qRf Sfq qMf 29.23' RT ?TO pC 4R� B jR6pp�4N0 RTIS P / by \Mp h / • OR,y SIDEWIALK Y19 0 36, ss �— ONOJ w - J _ _ F N ?06 Y Og ONNq FRS 'B?• °o. ? /0>B411, 8" RCP- _ _ _ _RCP 111 C _ _ _ _ 60• C Bo + - 20' o _ _ _ GR 50 F b /Og9 L 0 3i? , oe FF Y19 +37.12 / . o �`- _ ASPH 2,_6" +� 1 — I pC //F,,• � ?36 2 '271 29 4�}` T NC C Ir E� EXISTING R/W i�j� N p/•q O 4 0 ,o M/ONCCq 2516 __ l RCP_III ��N o' C s /e pz/• 69 v�'N OOgfL 4 'R4 / Y19 .80 CWAL e a - W 30^ RC - CB" 30" RCP -III CB ^ 6' CURB 2'-b" C&G - - - - I OS paY29S, F S 990 4NR o Y19 +44.34 _ C NC ss SIDEWALK _ _ - _ - - - Np 'so e'dV Sg 0•N S9s, s g 4i' '1YORo 40'RT / / RTA _ --YT9 +03C 50 -c*� - _ _ II BO r(1 [q,°9`F /SM c /p F/a N /94 oa F m / CLYD E. S 0 a' PLUG AND FILL WI H _ zc 36" RC - _ _ _ 2y zALL BK LL O" RCP -III 8' CONC � 30"- - H N2p Sp /SF ST '°2•F •"� LOR 5 DA SMITH m PLOWABLE MATERIAL �_-'� MOIDEWALK 2/•�`} gsbT O TRY O OpNYf 0 _ _ 00 ,f� / 0 / 480 PG 220 Y19 +48 REMOVE 18 - ,,-' _ _ . CM F - p 2501 : F W 2T oS •F Moo, F oNC � 00 N4 R,RI/ �m-s2yp/�jOR,yq ISFp 55, PIT VC"CURB-INLES 2512 2513 - C R V = 3i• F 6jS �T?SpNO fS �, OT 4' /\. f/,E ______AND_JR D REMOVE 6'OF: N BR C CNfS& T/ / l 0 2SF0 - O Y19 +02.69 2�11 Y19 +70 49.1T RT 2 / 1 Y19 + 2 E 8" CMP 9 +50 'n c+ 6• Mq ,\, W 50.4 V'aCE : 60'RT Q B3° / EIP--- _ 86' RT 19 +78 91� /-' _ -''N -,qv 3/ R,0 9• 98, / O a,- - B9p pT. l 2 zq pT'E - CAROLYN WARLI K14ANFb7 8 ND BAPTIS R �7 b /l / PIJ ~ DB 80EPPC 7744 Y19 +75 DB T' RT 1053 P . 4'RT m/ 29 Y19 -+45 = _ 7 _ FioL.y„ 00 qL NIB 2 OR 213 PG 491 Too, RT / N Y19 +26.11 92' RT V o O Y f 3'23• PB 4 PG 120 2 a m yb Oghp q?.0 m,zo O y0g NORY/ - / r".i.\ .4v f // / : 79.91' RT Q c^ per, OO gC4RHi ti JS2 , \Nc ANC /NvfsiOCO on-0titi pC I've EIP Ogg /Ne RF20 0 \ 1 OB S � FNJS� O® 9?B ao PC� - I / ISFO � DONALD L. BEAM TRUST g6•BB i DB 779 PG 439 PB 4 PG 120 o' ETP OS N 2?O qy, Sp• f j IP/' mEIP 6 F •3q\W \BS• o ;o \ N &l3 MICHAEL L. HEFFNER \ / /ie po i/•H• 29729B•F 3 pNC ��\ DO 290 PG 422 /SFgpT = W / \C E\ "8379.39,� A,63 SHEDB 945 FAMILY 78LLP 10B139•F PB 16 PG 95 EIP EIP EIP cn N a2�9zS I x /zi e CURVE DATA FOR -Y19- _m P1 Sto 11+43.16 P1 Sto 13+70.68 0 = 2' 20' 35.7" (LT ) L = 10' 06' 04.4" (LT ) D = 0' 49' 06.6" D = 5' 59' 58.4" 12 L = 286.28' L = 168.37' xo h1 T = 143J6' T = 84.40' �� • o R = 7,000.00' SE =9 5.09 5 SEE SHEET 62 FOR -Y19- PROFILE C", I- SEE SHEETS 2D-1THRU 2D-7 FOR DRAINAGE DETAILS 0 �I\ =oti• INSIDE TpwN OF RUS,O7 THERFpRpTpN tIAq�ls7. \ I Ly 37 ap ALLEN STEVEN TAYLOR DB B56 PG 425 1 PUE / Q PB 3 PG 61 �I DR3 Z 210' DR3 4 205 u DR3 +53 m / EIP 192' LT ? 13.98• DR3 +59 D°s 19T LT S 69. -DR3- PC Sta. l3 8.63 / e EIP 3328' DR3 +08.27 k 50.00, E -DR3- PT Sto. 12+51 T18.30' LT S 69 1p15z, a°E DR3 +02 DR3 +50 132' LT , EIP S 68.59'32. 89°25'48"F 100'88? 9'13' EIP le•aw \ / - 73.19, E 24.61' 123 4 OA T�.y -SS. - L. e CL.T RIP RA 'rSJ� %. JOAN BRAD Y SCOGGINS y ss/ens, -DR3- PC Sto.10+74.87 DB 99 +17.64 F 6 FD s� 0 / DB PO12511' LT /� � F �• , SL. /+ P 3 P4Hf8 +89 FY � S�iC�7FFT 0/I / 36 52.21' LT a, \4b/ /CAROLINA ENERGIES. INL� DB 765 PG 828 PB 21 PG l38 ke /611RE POWER COM NY h 1I/MMATTHEW $ARA7 J� / OB 307 PG 535 DARREN SHAUN MILLS RIBELL SARA / DB 15T PG 468 / IMRAN YASEEN / o/ ;" AMY JO MILLS D 999 PG w / Y3 +15.34 CHAITALI PATEL .�� / o DB 1031 PG 482 PB PG 1 J� 182.66' LT DB 1028 PG 609 �.` i�® / o PB 3 PG 61 DR3 2�' 3 DB 1028 PG 617 y `e v 59'L ® Q E 44 S/Jg �, N ti •' _ TOE PROTECTION / 70°06,33° SEE DETAIL 24 70 a Y3 +10 393' Y3 +23 / 16 ou 63' LT UNIFORM 113' LT +15 // 47.78'LT n Y3ER 60 52 / 3 +88.79 a uou �� on 1 ' LT '���� �/ DR36+85 5' RT o �`--- + 87'LT XOM .ZbX 7 BOBBY WILLIAR7'�EST m l � Y3 PCC •` f • 12+8� R3 +24.41 /� 40 MARSNA CRAIG WEST O �BY25-344 , - Y3 +00 . T LT ,w / 392.48' DB I100 PG 346 1za.3r L PUE 46 +o O Y3 +34 f S 5 TO UNIFORM I 63 LT 50 // l• Y + 7 6 LT PUE OdSI CL 1281 RA1 TAPER Y3 +77.16 9 u- Y3 24. VE Y3 +33 Y3 +5 /� 91.55' LT Y3M� T X LA /53.533�87 U p 34' LT _ _ _CBOJ ,9£ R 75' LT I B NGE C 93 LT 0 12T LT Ol PUE $ JF 0 7/OS/NO _ r _-- F --_ _ F N ^��'• /�� �� - - _ - e _ I ��� 00. 3 P m PROP. I GUARDRAIL I 85 E MOUNTAIN S7 OEIP __moo _�I-�- CBST �� CBI( CI - - 4'CO I D 3NQj +54 '-07' A O h I C / / j K 2701 7S,. _ == = Lu W O 2 .35' a 3, I ysao. _ f- r _ _ o S 81°411s9" E P �P.) 'O 1 �o� '° E + e, -- 0 49s9' PUE 5 g '11WSI CAROLINA OUNI'SI l 101 1 N OF 270 Q I 3 sn 3 +03.63 I SEVENT NTISTS•INi 'r �I_ o' q'47°E 11 MO SO 1.04' RT 9. Y3 +00 703 _ -Xx NX g S • ^:o k X� / ---- DB 358 G 471 I X !V" • HEATH TA ER HYDE Y3 +10 n I DB 266 PG 571 45' RT P M -91+9 ,0� _ _ _ _ x � / PROP. H i� o DB 1033 PG 738 45' RT DB "' PG 598 "1/M ' 70A F _ GUARDRAIL 000 16'RT ^' I I PB 3 PG 61 1 z�-+_ , __F -- L _ _--_---__-- U / I h X 1'1/M I WW FE CE F- 1�/M 5 88°4 L ul Y3 +31 N PIM 330.00' 39 JNOJ �86 c P Y3 +20 Y3 +50 Q Lam- Q of 100'RT l s�o o Q QI CL. B RIP RAP LIE 90' RT I LATE L \ DITCH 86.75' RT < CL DEVELOPERS. LLC ll/ 39 I EST. TONS SEED A L 2s o BEGIN CONSTRUCTION DB 783 PG 568 I EST.5 SY GFD _ f� PUE E'P -Y3- POC Sto. 13+10.00 3 Q I ' Y3 +4 .I IY3 js I ImI L3 75' RT, /� II119' R c BEGIN R/W ACQUISITION - zselccH BEG•.TENCE I�gg1 -Y3- POC Sto. 11+39.87 - SEVENTH DAY ADVENTIST C ROLINA FERE I \ \ CHURCH OF RUTHERFORDTON �- L..33 ASSOCIATION OF I Q SEVENTH DAY \ \ Q � VE11T1114'PGS765 -Y3- PC Sto.10+00.00 -Y3- POC Stoto. / 0 00 PB 7 PG 206 - fa.10+01-00 -Y3-FRC Sto. 16+78.75 S 86,09,01,E I \ S 86°02'O7' E FIE EIP _ 5 88.05,30 E 3 14 �i CL DEVELOPERS. LLC \ \� hN DB 783 PG 568 lol z / C� O N "100HJ5 y,BSZ CURVE DATA FOR -Y3- CURVE DATA FOR -DR3- P1 Sto I1+4725 P1 Sto 14+81.00 P1 Sto 29+65.27 P1 Sto 11+83.42 P1 Sto 14+40.80 - m = 38' 38' 27.3' (RT) p = 0' 36' 50.8' (RT) L = 65° 38' 00.8' (LT) = 81*56' 20L' (RT) L = 83. 48' /9.5' (LT) - ;m D = I3° 38' 30.7' D = 0° 09' 19.0' D = 2° 52' I9J" D = 45" 50' 11.8° D = 45" 50' 110 nN L = 28325' L = 395.50' L = 2,285.32' L = 178.76' L = 182.84' 12 T = 14725' T = 197.75' T = 1286.52' T = 108.54' T = 112.17' x o R= 420.00' R= 36,900.00' R= 1,995.00' R= 125.00' R= 125.00' L Q D SE = EX. SE = NC SE = 04 ---- ------------------------- --_ DS = 35 mph DS = 40 mph RUNOFF = 144.00' • s DS = 40 mphe as 4 W \ M 77bM �. I X Dewberry PROJECT REFERENCE NO. SHEET NO. R-2233BB 27 KW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CARp� i H CA p����� oQtH, A. ' v SEAL " 020031 'r7 � J. .......... DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SEE SHEET 64 FOR -Y3- PROFILE SEE SHEET 74 FOR -DR3- PROFILE SEE SHEET 28-4 FOR CONC. ISLAND DETAILS SEE SHEETS 2D-1THRU 2D-7 FOR DRAINAGE DETAILS CURVE DATA FOR -Y3- CURVE DATA FOR -Y23- P1 Sta 29+65.27 P1 Sta 25+16.73 P1 Sta 27+34.69 P1 Sta 29+49.41 L = 65" 38' 00.8" (LT) L = 1° 39' 53.4" (LT) L = 6" 19' 04.8" (LT) L = 0" 40' 04.8" (RT) D = 2" 52' 19.1" D = 0" 40' 4/.0" D = 3" 19' 17.4" D = 0" 16' 44.5" L = 2,285.32' L = 245.53' L = 190.22' L = 239.41' T = 1,28652' T = 122.77' T = 95.20' T = 119.71' R = 1,995.00' R = 8,450.00' R = 1,725.09 R = 20,535.00' SE = 04 SE = EX. SE = EX. SE = EX. RUNOFF = 144.00' i x GE SSOC ATION m d 1092 PG 21T ,r� 0 mi Yf m Q 123 �N 11N 9m 12 4 �T 0 / N43 52'59"E 00 / > 4.50' N 33°I6'16' E / 22.92' ds6 'P' Y F . N 435'6915•F \` Q DONALD RAY FAULKNER BEVERLY ANN FAULKNER DB 862 PG 480 Q Q r XATTIE SMITH PARKER `W DB 08E PC 441 I�DB 364 PG 528© N ,J: + 1 .4T LT r +, LOCATI N F ST it3 ; 9Y3. ENCE P MCE CE PO T76 / C - a, N N -- 9.48 AIR 241 s r' 1 3Y PT Q ta. 35 ' CJJI i 13 +50 70' LT _ 1 J END PARTIAL Oi 3 +50 END FENCE J'LT Y3 5 Y,+2 Z y 110 LR , `C 90T A IFER EN'. r '023 PG �Q P(�F + 310 PG Y Anna r_ PUF d T N S7 9+ AS Dewberry � I J `❑ � ISFD z HTR r\ AUSTIN/ W. HARDIN Q \ 1 m �S a ANDERSON FAMILY TRUST VIRGINIA M. HARDIN NI� \ N \ DB 1002 PG T63 \ DB 1029 PC 663 I \ I ` i PB 4 PG 49 \ PB 4 PG 49 Q \ USTIN W. HARDIN - 10 \ or HTR DB T80 PG 444 ft \ PB 4 PG 49 I I SMTL I O � \ EIP X $ RICHARD FRANCOIS _ SHARON MARIE FRANCOIS DB 902 PG 161 PB 4 PG 49 '_-_-_-_- a9 EXISi1N- G R/�W JC HW- LONGaIWEST C, , C E EIP EIP El II 1 20.4 •O N 32° 5'34' E �E II I I N 33°I7' 19.J- 9.14' IL � J 1 II$ 159 I II _ I III-N � �� I u �--- Q _ � CIDI I v, It I BLK WALL I 1 lil Q F— II Igo I 1 -XJ u ua Q IIT i Ilm It P� It 0 I III APPROX J n JB END STRUCr, © III BIBLE TAB II DB 892 P 40 -Y3 �T Sta. 4, II DB 892 P ��--� 35.26 1°° II DB 819 4 3L DII. DB 811P 615 D sl zna I R T� N It"I Y34 P T d809 Y3 +20 II _= 65.Q7LLT II 80 Y3 +50 R I1 a J 62' LT _ 16'LT Cgpi-_- III GR _2 OI - 30" RCP -III I -NI FS-A 5 REMOVE 8 DII v+ E1- 12" RC�DPE R CK WALL PVC,uct b a srl I -Y 'B DI ilt- Io I o x o o /R BP EIP Y3 + 0 + REMV E 16' RT 32, m 0. 0 C =---5-�•?o C\ Y3 +62.86 (ITF F 60'RT -_----- Q\ 80 U, c - I - / Y_ 4 /P RT Y3 +4 ` ; Y3 +00 RT 12 RT Y3 +50 / 76' RT PVE m02U U J 13 `p y 89' RT ISMT�+75 LOCATION F Y3( - n nC D POSSIBLET 87.67'RT Y +53I s = _ 12" HD PE ISMTL STORAGE END FENCE RT m f a , o "Am _ Ym8' +45 130' RT It 4 s 124 II HEATH MCSWAIN 4 N'"m ➢=143',�T O 1dll ERIN MCSWAIN N -_--_- --' 'ill I DB 824 PC 322 \ ISM7 0,11 DB T32 PG 246 L STORAGE DB 983 PG T84 �1 I1I1 o DB 1069 PG 126 �I a Y3 +35 3,1,44 ` STORAGE 1 N DII IS GIB'P )PE =N 3=Y34 +'8✓M2if \ .\ ISMTL m� Im ISMTL BUS -� I 231 S,1ti-- E J 32°01'47' E 30•Ip E 17.69' m PROJECT REFERENCE NO. SHEET NO. R-2233BB 28 RAN SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CARp� i H CA p����� oQtH, •�FESS/p�;.:•v: 9 * @ 9 T SEAL - 020031 i = c N4: 12786 ` DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED )2 j DAVID Ijl SARA JO H4RRILL HARRILL 1\DB 221 PG 277 N y m O N 32°09'12' E I ��--a--_-_- -- -_ - Z n! SS N f y m I ISMTL BUS 0 z cONC _ A ---- --- _ N I---------------- G or a v - EIP 212.93' EEI JOSEPH D.KLASSEN ROBIN KLASSEN 1 I OB 1093 PG 405 0 I 6 3 a JNOG Qoo o �d P I 8 DI Y3 +8 2 _. ...,2.48,.. , I� 1 J r esr es7 0\ I W asr Y3 +83.05 39.79' R, N lw ISBLK BUS � N 1 ISFD m I -.A 70, RT S �J Y3 +95 170' RT FILL F,7 WING D H TO bBiAl MIN VER Vf30" RIP RAP ENERGY P P . WITHIT TO BA51 aa R�ERTSYFEIP E BA BARA M•HODGE 80 D T68 PG 760 Y3 +00 ql' 692' E 35.. 1 ^ BARNEY HODGE JOSEPHINE HODGE OB T22 PG 107 DB 02E PG 207 DB 508 PG 397 ql°46'p9• E _ = 108.77 q N441*45'23- F..6 LINDA S. CAMPER DB 13E PC 694 IDS 480 PG 314 +e b O 0 O O 10 H N SEE SHEETS 65 & 66 FOR -Y3- PROFILE SEE SHEET 77 FOR -Y23- PROFILE SEE SHEET 2B-4 FOR CONC. ISLAND DETAILS SEE SHEETS 2D-1THRU 2D-7 FOR DRAINAGE DETAILS Y616 RT.30 VII Y61+8 �E/ Dewberry xo"o PROJECT REFERENCE NO. SHEET NO. w S 2 / I X IQ ... 7 R-2233BB 29 RhV SHEET NO. REMOVE 1�`� BEG CONSTRUCTION Y6 +90.28 1 92 ` ROADWAY DESIGN HYDRAULICS Y6 +95.69 .48' RT yl� �' X 6- PRC Sto. IO+00 ENGINEER ENGINEER 1©71 RAON 1 3.9 N OQtN, CARp.I,,�OR�H'CARp. i�, )CH ' I' 2: •�FESS /p�;.:•v �y �.?..�FESS 14%;f 1, M , 1 pF _ gd • 1 EE DE5AJR99 LT l e v� 9� ; _ SEAL RTjJj 62 Z1 °B s /Y6 +ae.9 �,F \ I SEAL Lb 02 031 12786 a Y6 +10 QQ / 43.44' RT 1 I : N :, 245'PT Lu _ 9 �E 30" Q 92 Y6 +20 POE 111 A Ij 2� ,,,u'N``O,, 7 _ Y6 ' RT a 92 150' RT '0 m 2913 ' I' N 250' RT 92 10 -Y6- PRC Sto. 11+ll.11 • Q: 7 r6 +5� 42.95 6 TOTCB , I DOCUMENT NOT CONSIDERED FINAL O 210' RT / o I UNLESS ALL SIGNATURES COMPLETED ~ NDARD BASE CHLLw n ('� 4 00 _ EE IN 1 of w.o� I 1 5 TC71 REBECCA A. JOHNSON ; I; I: fl Q U y I A OB 895 PG 792 ,1r1 2 Y6 +85.41 a 4C} 57.3LTl3tlM i l I 261 OOciZZn co Q m aim ISFD O I ;1" ; ` W • - ° Q x : s -Y6 PC Sto. 20+33.49 3� 6 ; j W 55Ir-GONG 1 \ SPECIA C DITCH' SEE Qam (^ S LM lll___ 7Y6 +OD--- II !i! Y6 +67 \( 127 Z 6 _ so' RT 145' Lr o 63 Y6 +37 N 258.54' OM ,ZL _ ---( \ ,I' k'143'LT � � Z BRENDA WATERS \ x DB 86E PC 238 ' z S 11 .�iaC of DB 209 PC 38 G O `Y6 +69 NOJ 1 i 2901 x I'll 51.93' LT m' SDI NNEY MORRIS -o �N.+ os 1 \ -Y6- POC Sto.13+55= © 51.56' LT , ' P B 331 P 3 ite -Y22A- POT Sto.40+35.15 PROP C'. - C% W GUARDRAIL LLARDS / j'-Y6- P o i� C o; BOa ` 0 _ 25FD-Y23- OT Sto.39 0 1 z)' •.� J Y6 +93.16 �/ o i4 0�5 1 " 2GI 41.27' LT y9,8 O, -Y�A- T S J`11 RIB"RAP +12.28 { ��REU ` 'o / �� �i�^ 1p E5Ttl Sy TGFD G E d C\PE G��' -E i� I i � 2915 d/d �m 0 {f+y v�J¢mo Y22A+T0.47VV 65 �I1DI,I ° m -I ro 0 ��� M"tram Y22 -PRC Sfa. 39+00. az.ez 7 1 4$ �S 1r IEpdi D. H .. tim 1 gym M coNcu SE gllA 1 W ! \ 1 Y dam ili M Wmti �•¢ m CURVE DATA FOR -Y6- mm S s D LL _ z :III mOp � Pl Sto 10+55.56 P1 Sto 15+90.64 P1 Sto 23+39.06 I o 0 = 0" 45' 51-5" (RT) A = 100" 20' 0/°8" (LT) A = 74" 45' 15.9" (RT) I I s M da9p'Yz46.65RT7 D = 0*41'16Z D = 14°19'26.2" D = 14"19'262 II; €ti18s s/92 r-- +30.33 L = 110' L = 700.46' L = 521.88' N 68°19'54 E I I' Y2 + 3 + ` a 50' RT T = 5556' T = 479.53' T = 305.57' CL . kIP RAP - ^Fi 3 R = 8,330.00' R = 400.00' R = 400.00' EST2 TONS o EST. 7 SY GFD a` Y2 0 bl' L 'r / 0 Y23 +18 SE = EX. SE = 06 SE = 06 -Y22A- PRC Rch I ' 2 73' " J , �� ? � 49 DS = 35 mph RUNOFF = 108.00' RUNOFF = 108.00' Sto. 37+02.83 B_I c~ r LT e DS = 35 mph DS = 35 mph 90 II I 0 � 'w III 3• LT �^� �� ' �. r� i� �� �� Cl CURVE DATA FOR -Y23- Pl Sto 32+45.69 Pl Sto 35+18.06 Pl Sto 38+60.88 RETAI L R I - o 4' 1 am m o p = 2-938.6" (RT) A = 30" Ol' 055" (RT) 0 = 33' 58' 51.3" (LT) N RETAIw��o D = 1'16' 23.7" D = 16" 00' 15.9" D = 57" /7' 44.8" Ecl 'A 9 'T-EH W� 2 L = 35296' L = 187.56' L = 59.3/' 23- . T , .3 +09i 3 o a qb D T= 176.57' T= 95.99' T= 3055' s f 30.3' RT R = 4,500.00' R = 358.00' R = 100.00' j III' biz GlN CONSTR 1ON SE = EX. SE = EX. SE = 06 m s 23- POT: to. 36+60 DS = 35 mph DS = 20 mph RUNOFF = 108.00' MATCH TO SHEET 11 - -Y22A- STA. 36+00.00 DS = 20 mph CURVE DATA FOR -Y22A- PI Sto 32+70.82 PI Sto 35+65.41 Pl Sto 38+01.76 P1 Sto 39+46.88 L = 0° 56' 34.2" (LT) L = T 35' 36Z (RT) L = 6" 44' 25.9 (LT) L = 4947' 48.1" (RT) D = 0" 18' 00.8" D = i 40' 13.6" D = 3" 24' 37.7" D = 57" /7' 44°8" z L = 314.05' L = 274.98' L = 197.64' L = 86.91' o T = 157.03' T = 137.56' T = 9894' T = 46.41' N R = 19,085.00' R = 3,430.00' R = 1,680.00' R = 100.00' SE = EX. SE = EX. SE = EX. SE = .04 DS = 35 mph DS = 35 mph DS = 35 mph RUNOFF = 72.00' o DS = 15 mph _m CURVE DATA FOR -Y23A- �� Pl Sto 44+55.25 Pl Sto 45+75JO P1 Sto 46+8450 P1 Sto 48+15.42 P 32' 38.7" (RT) L = 6° 33' 34.4" (RT) L = /9" 55' 5/.0" (RT) L = 35" 04' 00.6" (RT) v� D = r 09' 35.4" D = 6° 09' 39.0" D = 17" 54' 17.8" D = 23" 52' 23.7" x o L = 133.13' L = 106.47' L = lll°3/' L = 146.89' T = 66.57' T = 53.29' T = 56.23' T = 75.83' '- •. R = 4,940.00' R = 930.00' R = 320.00' R = 240.00' > SE = EX. SE = EX. SE = EX. SE = EX. Y6 +75.17 43.11' RT s Y6 +10 80' RT RT Y6 +64 132' RT 89' RT �a BRIAN VIBBERT/� VIBBER-1;/ 6o. 9 s"2'9�' •�3����., \\ DB 1019 PO 879 MARIA DB DB 58 558 �o fys EVERARDO MORALES TORRES LETICIA HUERTA DE MORALES DB 1019 PC 110 fl \ fl s I y a2s I i SEE SHEETS 75 & 76 FOR -Y6- PROFILE SEE SHEET 77 FOR -Y22A- PROFILE SEE SHEET 77 FOR -Y23- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS AC C' S� 9 ap p�p'z \ pJ000 O� y23.9 I� h gs'�2B c� Y23 +28.28 s o 0' LT '�. ,9F' �•" s TIE E T DITCH TO ab1F9/ ym,� CUL E SAC DITCH j b GRADE TO DRAIN 0h� Y6%+56.5LT A /0h/ aC7 50' ^' N 23q, a' PC S10 '- ao Tg•p20o B tiV N e` 60 ° ki • T / RIP RAP♦� °j 24" RCP -III / / •ov 9 ST: O JOO r T O p MATCh Tp ' D I �' e yQ� SHFFT 29 �V 30 4p o^ Dewberry PROJECT REFERENCE NO. SHEET NO. R-2233BB 30 ti h PW SHEET NO. e� p -Y23A- PCC Sta. 48+86.48 � �j,� � ROADWAY DESIGN HYDRAULICS - ENGINEER ENGINEER Z /d13�/ - PCC49+35.76 2:��FESS l SEAL " - 14 SEAL 020031 1 12786J. PCC Sta. 50+0/20 Ilk��' I NE : O�p`� �6`�''y•,..�C I NE .. O� R RAP D T J� I✓ �uww wuu0° JU $DIC ON L SE DETA 5 .. Y6 +95 DOCUMENT NOT CONSIDERED FINAL DAVID ARTHUR LANE S \ 3000 188, LT UNLESS ALL SIGNATURES COMPLETED DB 1032 PG 416 Y6 +18-Ineu�i PB 4 PG 49 f`.Z a naU p . ` � � M \ , .' SF,•NF'� � Y6 +82.42 REMOVE J •� Y6 +23�. m o � 159.62' mm // -Y2 PCC Sta. 50+57.34 Pe'��p,P�� Y6 +35 Y6 ��6?IP O 150' LT O t�0 14 .41' LT TOE PROTECTION �E 00y' \ �9\j._ REMOVE / / y _ SEE DETAIL 12 W / / - Y6 +70 JB vaM 1EY6 +99.03 SPEpp�NR��L{^p'� µDgRpGq{y; © �\ C _ _ - - gg•56Z /-��X�X-k 100+ T8 94.49' LT 300 \ AO NOGj� 111.78' LT / / LINE rrDB'1593PG "872^ _ _ - \ ,saa T2' C L X� \ / P \_ 3.IZ,LLb9 GRADE TO DRAIN k Y6 +25 FILL DITCH 6 +55 95.34' / Y6 +A5.11 �1 d13 Y6 +25.87 Y6 +00 REMOVE RIP RAP Y6 +00 k\ II F Y6 +9 3 9•£1 p•3 O 0' LT 60' LT I 60' LT 65' LT _ �s - 70' LT k R p R II 63.50 } 13 /}P�o -Y6- Sto.2 5537 I -Y23A- PCC Sta. 5/+55.63 / Y2 JJ �8.28 I REMOVE e�p X�X II m Y60'LT0 --_- F --_ s \ �O / 3001 I om I Y6 J 5' LT R 3 r PROP. GUARDRAIL p+ G a CP 7p,I �x 72 CH�,W/3SBW x - - i N I r GR U TL-2 4 G tU I"REMOVE p J i i i T T T T T T T T + oa _ \ o Y6 PROP. GREU TL-2- y- i 300 II GI ♦ I30, ,AAIL 2GI / + J 0' + )T1'P.)+ GUARDRAIL --F oi18' c i--I+- G ♦I I Y> G� m 300 G IDI O°P pC SJ`a. Jr/f 3 O C5 Y6 +78.40 E R II 3012 72.681RT --- R IIX C, 3011a, q 6bl' ,£9'691 __ D IL 1 \F R o .i II OQ I ' 0.49, RT7 1 ,BZ. U♦ ���a ❑ a0, l II Q +-Y3-�`p0C Sto.S 9/.82 _HDPEI �S I J L•B. WALKER HEIRS 0 G Y6 +15.66 S --� I Y6 +3&47 J �' + _ _ I1_ 59.15' RT d �!r1 X 45' RT Y6 +00 o q -Y6- RQT Sta. 33+�3/ � i7 RETAIN II1 x e y a , RETAIN DB 130 PG 491 r Ir'V' 93' RT n a TOE PROTECTION �o// eei ♦s �� / - I `� I I I i p o m T SEE DETAIL 12 q°'// EX z Q ocooa jy/ RETAIN III C +00 oIp( 1 \� 53+O qo CJ INVERT s I -Y6- POT Sta.26+0 •53= uNoBT AINABLPAl i •♦O ALD THONAS VICKERS.B'1AL� I ^:II II`1hIIM' -Y23A- PO , Sta.5/+ 4.42 cpNGRS p NO z„q'' DB 645 PG T23 ,00 oa IiR111X - / .ZZ,6b.19 N nl I I /F •pO�OJ�� r. I I P NOD I •+I G S4v0 _ II �I I Y�745'RTS Si`o0�\"5'�"C%o a�700d IX +60 \\ mpw -� - I I I J-��� %X�X + o dl3 `C1•I 50 .90' -XI I �I •SZ'[4 b5'Z61 `-X POSSIBLEX�X�X PUEM-� X Oda--=------------ .61,SZ.Z9 N �� -�- �� V I �BHDFE CLEANOUT $ x0 Y6 +.4 �Y'�I \� I I / /� X - I I al 56,00°Bb S M.SZ,9£<Sb NI y 74'RT �- / I � MI T. v DITCH E 1 eNo� x -Y23A- PRC Sta. 5'4+4354 SEE DETAIL 6 p p• Q " I o 4 PT Sto. 48+72.98 I I RE MOV PIPE © o o ANDS pJVA'hp "II HEADWALL ,69'6LI I II L ON0.7 SO.00 cc)M ZZ,6b.19 lJ x l a x ^ I CURVE DATA FOR -Y6- P1 Sta 23+3906 Q - ,L = 74. 45' 15 9 (RT) J X Lsa D= l4.19' 26.2" L= 52/ 88' I x o I M -- T = 305.57' I I �I SE =4 06 RUNOFF = 108.00' - NORMAN ARROWOOD DS = 35 m h p CURVE DATA FOR -Y3- X S x i > GLpJ I I 3II %' DB 723 PG 14 DB 723 PG 18/\ I II ' PB 2 �116/ S / 55 ' Pl Sta 45+64.98 Pl Sta 47+5328 Pl Sta 52+83.59 CONc zo 0 = 0.33' 33.7° (LT) L = 0.40' 00.6" (RT) D = 0' 24' 28✓" D = 0' 16' 42.7' 0 = /2.16' 55.8' (RT) D = 4' 45' 17.4' ---- L = 137J6' L = 239.42' T L = 258.31' T 24 CONc N T = 6858' = 119.71' = 129.65' R = 14,050.00' R = 20,570.00' R = 1,205.00 - o SE = EX. SE = EX. SE = EX. \ II -Y - PR t , q f C,ems _o CURVE DATA FOR -Y23A- MATCH TO \ I nN St Sto35°04' St St 9.49 PI St 57 PI St 49.55(RTI SHEET 28 -y3_ SrA• 46+0 QPl 00.6" (RT) L 27 24'' 47.6' (RTI p 42°36' 295" (RT) � l7*23?07.T (RTJ p 8°34��.9" (RTI p 4506 0. 00 D = 23° 52' 23.7" D = 55. 37' 37./' D = 65° 06' 31.8' D = 30° 58' 14.5' D = 8. 43' 14.9' D = i 25' 43.8' v o L = 146.89' L = 49.28' L = 65.44' L = 56.13' L = 9829' L = 287.91' • T = 75.83' T = 25J2' T = 34.32' T = 28.28' T = 4924' T = 144.02' R = 240.00' R = 103.00' R = 88.00' R = 185.00' R = 657.00' R = 4,010.09 5 > SE = EX. SE = EX. SE = EX. SE = EX. SE = EX. SE = EX. SEE SHEETS 75 & 76 FOR -Y6- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE DETAILS o o PROJECT REFERENCE NO. SHEET NO. Dewberry S? CURVE DATA FOR -Y8- o�>a R-2233BB 31 ao//Ss, PI Sto 16+37.55 PI Sto 22+89.77 PI Sto 24f86.43 Pl Sto 28+64.40 RW SHEET NO. \� ROADWAY DESIGN HYDRAULICS = 5. 49' 3/.0" (RT) L = /8• /4' 44.9' (RT) Q = 0' 26' 26.8" (LT) Q = 3. 0/' 15.1" (LT) ENGINEER ENGINEER D = 2• /7' 30.6" D = 11 27' 33.0° D = 0' 11' 14.0" D = 0' 34' 49.8" L = 254.18' L = /59.22' L = 235.44' L = 520.39 q0 `8�Aa "' � cn T = 12720' T = 8029 T = 117.72 T = 26025' 'AlQtN""" °�)ti•,, o oR�� .R0IjN• R = 2,500.00' R = 500.00' R = 30605.00 R = 9,870.00' 3 �4�oEEssioN9lr ,,?4@oFESS%aNglr''o, SEAL - SEAL 020031 i = c N4: 12786 ` t<",N+'.1'GINE�Q`00�` \ \\ N 1337.42' W ��� S i "HMO,,,,, ,, '•ii��iiiUW, DOCUMENT NOT CONSIDERED FINAL • \\ - - - � UNLESS ALL SIGNATURES COMPLETED Lj LINEEXISTIIG'FHA EL WITH CL B RIP RRppP O 20%NG. SEE'DETAIL 914.9 iJ s 1 +36' LT I11p1 RIP ISSI�P TORE IN �GSFo�\S Y8 9.41 SEE DTAIL I .173.4 `LT \ V10=1 .4 5.23'LT N°ey �\ \ - P a 410= OPE=0.05 c �o\\�E3 �8- PI Sto.2/+32J3=PI \ �� P �sr o -)1l0 POC Sta.17f55.52 \ DO PI NV=975.0 �. � � � } Y8 +19.63 Y8 +3"0 `� � y LU S I N. REGORY HODGE `� .� 6 ENV=976.0 0 Q \ ��w1,,pp $$II((,,BB�EW!q 100' LT 169.10' LT ` C3 -/DII L0R(YOSK OC Z1+1+40 = 12 LT -''` Y8E+29.1 BE,GlN CONSTRUCT/ N TEPNEN RODGE \ FEED TAIL DITCH OC Sto.l+40.93 Y '' 126.78'LT -Y POT Sta. 15+0 O6E PG 12y1y - _ -Y - P t + 1 3.2T 6 Y8 +29.4 . i B 343 PG by �. \ 145'LT ------- ----- ____ 11 .78'LT O - i �.4B=Fv=4- 9s2'LT� O ItY ��__c� _ }gg_ �X - .. P +OO.00= ¢ R 96.39'LT pUE \� O Y8 +04.5 (V 7 - �- .o --- - - --_-R- - __-_R = PT 3+58J4 \ CL B RIP \\ + a 69.93 LT fl 8 4 piE O Cam-________ _ GR CLO N --- �� '� --- REMOVE 60" AT y 8 +348 -- F CV 3.24' LT y 2 YB +30 \ l =1 5. 6�T, X E p o INTERFERES TH I 70.41' LT 90.32' LT X 22' \ IYB TALE ON h n w A OF 60 EXISTING .. .. + (FYP.) 400 PR \ 58.85' LT v RYP.J m 3125 O �� 40 -- .. T- -T= �S�T- - -- =T-- Q o CB TO 7.2- F F \ _Y8- INV=1017.2 _ /Y o 400 R o �_____ M GREU TL-3 30 PR • ' 7 1� i o P X 7 " CNL X N �, 16°36'4 I \ TNG R- n s �j 7Si 5 ✓�� LEE ANNA EDGERTO�J '� �` N 5412'39'E 8 + 0 � ' �- C 104.02' EIP 'GONG HW � - f. -0 DO 834 PG 691 P=O0 - -F TO PR TEGTION F -c; -- REMOVE u -� a `� SE DET 7 F 'T- HEADWALL „ PL8- to.20+75J = c - _ UG AND ABAND N ' B 1 ` 74.87'RT �""b "THAT DOE$ NO F RAB- POC 34 3140 ) NV=1023.0 // Y +00 H Y"= 1 LAP �piJTSE 1 w WITH �� ^ TOP=1027. s' CB ` I INSTAL 12 - 4C 3138 0' RT < 0 l(3 AS F INV=990.0 INV=1022.0 / < ff ----- F ----- F ---\ NV=1DETAIL 2 02)2./ 313 SE RAL E DITCH PIPE INV=987.0 \ 36" RC HW = �j Q Q w BED INV=988.0 36,. II A I +32.22 ^n T +49.77 70 L-� 0=20 FT/S 3. TOPS-1 `v't-1, -- P� 0• 1� 1 11 Y81M\S8 8.1 1 I LA ERAL 'V' DITCH Q� RIP RA ENERGY I m Y8 +66.37 DISSIPATO ASIN 130' RT SE DETAIL 23 1 c 1 11 I Q Q© 158.21' RT Z El DETAIL 1 I 8 II -Y10- C Sto. fig4- 955 = : �., -RAB- OC Sta.2+45.8/ DBROT EPGN49 RE IN 9� 65 1 11 1 �'_ I 3135 \\ � 43• INV=TOP=1102 P 0TOP=10 INV=1022 INV=1 11.5 IMV=10.0 CB 5• \o 55AD, W % O \ SPECIAL GUT DITCH 9 p3,0 N 2 \ CL B RIP RA \ EE DETAIL 9 114.91' .. \ \\ 1 TO F 158 N 29°03\� 5 SY GEOTEXTIL 136 \ \O Y10 +7� \ 105' � 1 152 DARRELL AND JANE WHITESIDE DAVID EDGERTON \\ Q \ FAMILY LIVING TRUST CAROLYN EPC RTO396N 72 ' RT \ Da I100 PG 546 DO 1090 PG 396 72.9' RT PB 35 PG 106 PB 35 PG 106 O � ca p . ElP -�O GN m CURVE DATA FOR -Y10- CURVE DATA FOR -RAB- �.P m ^� Pl Sto 18+75.18 Pl Sta /+6396 PI Sta 3+04.88 �N 0 = 26. 55' 04J" (LT) A _ 141*39' 34.3" (RT) A = 218. 20' 25.7" (RT) v� D = 11.27' 32.9" D = 100.3/' 08.1" D = 100.3/' 08.1" so L = 234.90' L = 140.93' L = 217.21' T = 119.66, T = 163.96' T = 163.96' R = 500.00' R = 57.00' R = 57.00' SEE SHEET 78 & 79 FOR -Y8- PROFILE ° SEE SHEET 79 FOR -Y10- PROFILE 5 SEE SHEET 79 FOR -RAB- PROFILE SEE SHEETS 213-1 THRU 213-7 FOR DRAINAGE DETAILS P1 Sto 33+03.I8 ,L = 1'26' 30.8' (LT) D = 0° 49' 53.7" \ L = 17309' T = 86.70' R = 6,890.00' �N 0 4 \ CATHERINE K. BEAM o DB 1094 PG 805 m g \ . \o CURVE DATA FOR —Y8— Pt Sto 34+94.23 L = 0' 59' 23.9 (LT) D = 0° 28' 27.5' L = 208.72' T = I04-56' R = 12,080.00' Pt Sta 38+76.36 L = 0' 3I' 48.4' (LT) D = 0° 05' 43.5" L = 555.54' T = 277.77' R = 60,045.00' CL. B RIP RAP - REBAR EST.2 TONS E EST. 7 SY GFD. UE Y+ 98 LT l Y +64.9 91'LT OO 0.02'LT\o f N 16264 -. 73.�' LT 4' LT 1.09' \\ Y+2 09 v \ REBaR 0 �fl 6 2T� lR N122 5•gs OBERT HUDGIN /� \ CL B RIP RAP 3113 2 TON$ - F RffiSH'fi H6DISN5 NO 459 3PLT 7 SY GEOTEXTILE CO \ PR `<Ip RETAIN I 00 - .TLC' 15" RCP -III i- _ -- re n --- 00 PR fl- F1 G Hw �6> rMA, - ----iJ/1��--i E E�� I ` Y850' RT82 / 0 +4 £ / I .B4' RT fl 60'SRT ISBXD 0.p00.aNY^NGO4S9 OOOOgi6 P o 0 / 5 RT O Dewberry a 1 8 lygp� m 3 3 h I II II f II M ti 3 I III � � IM G_ END CONSTRUC ION -EEs IIQ PIII 03 -Y8- POC Sto. 6+60 -YB- PCC Sta.35+ .59 II II II II m II 167 E+55 II LSE 11 1278' P `9E IT CL BRIP RAP 320' LT jNE0. A PG ROW ONLY L3 +40 •li II C 0:0 TON IV P 0 4 SY GEOTEXTILE 3i4' LTHt- L I 311 II E- F 300' PH-----F F - —� p Na'Se � ppIS\c,ZE p , a:�0 00 - ?G S i 3 i fl ° EP F o Q�zy��// {g= RCP-m -F PROJECT REFERENCE NO. SHEET NO. R-2233BB 31A KW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER i��� CA p� oQtH,CARp� �06% ?ESS v ' v SEAL 'A.- ' SEAL " 020031 i = 12786 F J. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED OONO9PZ:ON°\NG F pµw19 PG g SS0.v0.NS p0 9 0 SM wp,S�EPG 6 .eME�O ga0 T SEE SHEETS 78 & 79 FOR -Y8- PROFILE SEE SHEETS 2D-1 THRU 213-7 FOR DRAINAGE DETAILS SEE DETAIL 7 1Q In 1 i M F Q ,- I— N r -1 +75 115' RT 00 FiP N 67°52_ E 65 75' Dewberry CURVE DATA FOR —Y11— �p Sto3963.4 57 L 36.2' (RT) �6 D = 9. 32' 57.5' L = 416.72' T = 217.16' R = 600.00' p SE = .06 2Q -_- Csr LAT V DITCH �� 'OTC'--OTCB 18" SEE DETAIL 23 _ 3209 / PROP. GUARDRAIL \ YT Yll +9C c c 4 223.91' L c p)' \ - 4., CSP 320 OTCB n• BEGIN \ SBG +04 PROP. GUARDRAIL \ \ y\ nl +90 40' RT 320 2GI h 2GI Yll +13.06 109.56' RT 7Gi F 5 6 320 6 Yll+ JAMES.EJ�TILL. JR 197.52' RT 20 SHARON D. STILL DB 849 PG 681 L0.'O9 g3,1q \ 3212 \ HW �� OTCB \ DB 280 PG 429 DB 230 PG 499 5 99' RIP RAP ENERGY DISSIPATOR BASIN SEE DETAIL 1 6 3211 I ��N I I I � I I RIP RAP PAD AT I JURISDICTIONAL STREAM I RT BANK ONLY I SEE DETAIL 5 I 180' RT 2 IT F \ \ \ - m 2 0 3213 0 _ 3dld 1331S .9£ - 11 +67.32 LAT V DITCH _____----- ___-- _ 283.84'RT „� STANDARD V DITCH SEE DETAIL R 6% MIN SLOPE ;c 181 Q �J SEE DETAIL 17 420+RT Y11 +OS ///7 120' RT RETAIN l W +41.70 45, 174 HHG REAL PROPERTY, LLC ®� DB 1085 PG 536 DB 401PG 553 RETAIN b F/p N 68°59'16' E / 48.55' NE & EXISTING RAW TO BEABANDONED 00 y// II II II II x o wIw � III X > 180 ml � wIw II c+ss"'c II i II ml / II II n X. Iz c9 N II o� c� X—x I II 4, /p'. II p MphV N 69'15'4 E I HHG REAL PROPERTY, LLC III }o 47 68' DB 1085 PG 536 0 ® DB 401PG 553 11 � 179 II _m II nN i� SO PR II II 5; a� PROJECT REFERENCE NO. SHEET NO. R-2233BB 32 P,W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CARp� i H CA p����� oQtH, S ' v SEAL SEAL " 020031 i = 12786 J. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED JAMES E. STILL, JR RIP RAP AT EMBANKMENT SHARON 0. STILL SEE DETAIL 30 DB 849 PG 681 DB 280 PG 429 N 64°09DB 230 PG 499 � 107.72' S 5T.03 89 qs, N 73'14'18' E 59.30' se. S 22 �S• 9S 220 2p 2� Q Y 7 LT O 0' LT 174 \ \ P OY11 +16.06 \\'Q 40' RT \ \ \ \ C � \ P SPECIAL CUT DITCH SEE DETAIL 20 174 END CONSTRUCTION —Yll— POT Sto.28+00 END R/W ACQUISITION —Y11— POT Sto.28+10 0 0 HHG REAL PROPERTY,LLC DB 1085 PG 536 DB 401PO 553 Yll +10 40LT, 16' LT RETAIN // RT, ' 16' RT HHG REAL PROPERTY,LLC DB 1085 PG 536 DB 401PG 553 `\S ra 0 SEE SHEETS 81 & 82 FOR -"- PROFILE SEE SHEETS 2D-1 THRU 2D-7 FOR DRAINAGE pq M N N See Sheet 1A For Index of Sheets See Sheet 1B For Conventional Symbols STATE [a-TX-u �w .� STATEO F NORTH CARD ILA PERMIT DRAWING SHEET 1 OF 50 DIVISION OF HIGHWAYS R UTHERFORD COUNTY LOCATION: RUTHERFORDTON BYPASS FROM US 74 BYPASS TO US 221 SOUTH OF US 74 BUSINESS (CHARLOTTE ROAD) Z TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURES PRELIMINARY WETLAND AND SURFACE WATER PERMIT DRAWINGS wA Y POTS 14 5000 SITE 7 WD STATB 6TATH PROIHCT RERHRHNC6 NQ SID;HT xo. TOTAL xReTs N.C. R-2233BA I 9TATR PROl.N0. P.APROl.N0. P69CR@TION 34400.1.S5 PE 34400.2.S5 RNA & UTIL w SITE 4 SIX N + BEGIN CONSTRUCTION SITE 8 SV \ SITE 3 WF �qo SITE 5 WE BEGIN BRIDGE?+69 +/- SITE 9 SU 9�Nq ?0)J 20.00 SITE 2 SY BEGIN POT Sta. 26+78 +/- -BEGIRI- POT NSTR CTION \ BEGIN BRIDGE BEGIN CONSTRUCTION -Y16A- POT Sta.12+35.00 SITE 11 ST BEGIN CONSTRUCTION a . 10 BEGIN CONSTRUCTION �a -DRW4- PC Sta.10+50.00 BEGIN CONSTRUCTION c - POC Sta. 12 +00.00 = N IN CONSTRUCTION =A N� -Y Qc -DRW3- POT Sta. 11 +60.00 `ILL nZ N END CONSTRUCTION aN -Y16A- POT Sta. 28+56 +/- -DRW2- POT Stc BEGIN CONSTRUCTION -SR3- POT Sta. 14+38.54 END CONSTRUCTION - POT Sta. 29+67 I+/ - END BRIDGE -Y17A- POT Sta. 18 + 91 +/- END BRIDGE .43+80.00 -Y17A- POT Sta. 32 STRUCTION END CONSTRUCTIC -L3- 10+10.00 J Ia. 701+18 BEGIN BRIDGE BEGIN CONSTRUCTION SITE 10 END TIP PROJECT R-2233AB zN END BRIDGE END �,RID, AL -L- POT Sta. 565+95.27 BK( 8.3'RT)= of -Y16A- POT Sta.37+50.00 SITE 6 SW BEGIN TIP PROJECT R-2233BA END CONSTRUCTION SITE 12 SS POC Sta.13+00.00 1 -L3- POT Sta. 543 + 00.00 AH END CONSTRUCTION ilp SITE 1 SZ °� A PORTION OF THIS PROJECT IS CONTROLLED -ACCESS WITH ACCESS �o BEING LIMITED TO INTERCHANGES. SITE 13 SR A PORTION OF THIS PROJECT IS PARTIAL CONTROLLED -ACCESS WITH ACCESS BEING LIMITED TO POINTS AS SHOWN ON THE PLANS. SITE 14 SQ CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD XX. A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF SPINDALE. `°aSTRU TION SITE 16 WB GIN BRIDGE 3- P 0.701+18. +/- SITE 15 S� IN BRIDGE s� -L 12+48 +/- END BRIDGE -L3- POT Sta. 743 + 00 +/- BEGIN BRIDGE -L3- POT Sta. 743+68 +/- END BRIDGE 3E -L3- POT Sta. 743+12 +/- BEGIN BRIDGE -L3- POT Sta. 743+80 +/- END BRIDGE END TIP PROJECT R-2233BA END CONSTRUCTION -L3- POC Sta. 744+50.00 INCOMPLETE PLANS DO NOT USB FOR R/ W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NCDOT CONTACT: NATHAN ADIMA, P.E. GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR NCDOT BY. HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2022 = 10400 LENGTH ROADWAY TIP PROJECT R-2233BA = 3.589 MILES 2110 WYCLIFF ROAD SUITE H, r..% Dewberr410 27607 y RHO �!�! ADT 2040 = 12900 K = 8 % LENGTH STRUCTURE TIP PROJECT R-2233BA = 0.227 MILES TOTAL LENGTH TIP PROJECT R-2233BA = 3.816 MILES E;, 19 81.99 NCO COA9No88F0929 @' � ®e 20I2 STANDARD SPECIFICATIONS PLANS O D = 55 /D P.E. 50 25 0 50 100 T = 7 % V = 70 MPH * TTST 2% DUAL 5% STRUCTURE LENGTH BASED ON -L3- NB STATIONING. RIGHT OF WAY DATE: J U N E 19, 2 020 DENNIS J. MORY, P.E. SIGNATURE: ROADWAY DESIGN ENGINEER PROJECT ENGINEER PROFILE (HORIZONTAL) 10 5 0 10 20 FUNC CLASS = ARTERIAL REGIONAL TIER LETTING DATE: JUNE 20, 2023 BRYAN LAMBETH, P.E. P.E. SIGNATURE: OP, TRA'A PROJECT DESIGN ENGINEER PROFILE (VERTICAL) F N CURVE-L3 P/ Sto 551+ .35 P1 Sto 560+23.56 Pls Sto 565+92.43 fRTJ p ° I D = 0°29 53.6°D = O'29'53.6(LTJ es = r38354.8" ' I T = 434.3/' T = 438. �' LT = 130.98' ' R = lI°500.00' R = 11,500.00' ST = 94.04' I Se = NC Se = NC I I CURVE DATA FOR -DRW4- I I P1 Sto 10+25.04 P1 Sto 11+01.60 PI Sto 11+58.36 a' G BASE, 1:1 z:1 SIDES I p = T 38' 22.0" (LT) p = 32° 55' 322° (LT) p = 38 44' 19.7° (RT) a'-B' BANK HEIGHT D = 15° 16' 43.9" D = 63° 39' 43J° D = 63' 39' 43.1° 0.5' FLOW, GRAVEL BOTTOM I I L = 50.00' L = 51.72' L = 60.85' BARE so I ACTIVE ERR OSIONON / T = 25.04' T = 26.60' T = 31.64' O R = 375.00' R = 90.00' R = 90.00' MAX R HAMRICK & - MARGARET R HAMRICK m DB 344 PG 434 r ,7 -D 4- POC Sto. 10+00.00 / o GRASS V DITCH STABLE RDI TCH ITCH AND RI IT DITCH___ 99.16'D RT -IJl ISF&BK -AT 2' BASE DI CIS Q i SEE DETAIL A N=53' W 1071.0 n MAX HAMRICK 'V DB 464 PG 458 -DRW4- P, Sto, 10+75.00 to -DRW4- PRC to.11+26.72 I 1° -DRW4- PT Sto. 1+87.57 ry1II E%ISTING R/W to III RETAIN DITCH I � GRASS V (7IT� STABLE i � o MTLs-_ m4l S PR Tom= - H RASS V DITCH STABLE " o� 3' LAT BASE DITCH +95.56 SEE DETAIL C 95.42' A 110.37' 1 DITCH OUTFALL STABLE WOODED 1 RIPRAP PAD PERMIT DRAWING SHEET 2 OF 50 3 allod -L�- r -DRW3- EXISTING DAM Wr- PnT C'+n In+n POND NORMAL FLOW BEGIN OUTLET TO CONC. WEIR -DRW5- F FLOW 3' D X I'W �2'-4' BASE 2:1 SIDES MILL RACE 0.5' FLOW, STABLE NO FLOW EARTH CHANNEL POINT NlO.O E' DR� O WHEEL 2 OUT OW FROM P / IEBC R HOLE DENOTES IMPACTS IN / SURFACE WATER In DENOTES TEMPORARY ko IMPACTS IN SURFACE RUCTION 1.4 FT. FLOW I SILT ��TT 0= VARIES 2-4 FT o I D +30,00 6= VARIES 3-6 FT IPE n� TOOFPLVE Is 15 ^� ko 2 TANKC I RAID (INE O ' SEPTIC REPAI AREA (71 I Gv�eisahl a I MILL I� U G SS V DITCH TAB 6 p W5 +20 S NNEEY E J I Q 16.86' RT E .7U w RH I CT I ' m DB 845 G 063 60° 0/' 1ta SI 'wI WWII RUITHERFORDTOA1 PON= -- R - adc;ijl - - 4 JI 1�I 57 CL II RIP RAP c SITE EX S WITH GEOTE%TILE (TYP.I CL II RIP RAP GE WITH GEOTEXTILE ON BENCH -{ EXISTING d LEXIBTING GRADE 10' WIDTH AT CULVERT OURET. TRANSRION TO EXISTING CHANNEL AT END CHANNEL CHANGE DETAIL B (LOOKING DOWNST�AM) CL II RIP RAP c SITE EX S WITH GEOTE%TILE (TYP.I CL II RIP RAP GE WITH GEOTEXTILE ON BENCH -{ EXISTING d LEXIBTING GRADE 10' WIDTH AT CULVERT OURET. TRANSRION TO EXISTING CHANNEL AT END CHANNEL CHANGE DETAIL B (LOOKING DOWNST�AM) CROW FAMILY TRUST DB 850 PG 55 (Nm t. Sc.I.)) N.t.r.l 1Rt. Fill dD 1� slope -TEXTILE�� B Min.D=1.5 F. M...d=1.0 Ft. -Wh- B Is < 6..' B=2.0 Ft. Type of Liner- CL 1 Rip -Rap b=5.0 FL FROM LR STA. SSR,Sn RT TO 554+AO RT a DETAIL C ."' LATERAL BASE DITCH 0 Ground I.V .L.� t•Rj 511 d D .pe GEOTE%T1LE �� B Min. D=1.5 Ft. M... d=1.0 R. ' h- B is < 6.0' B=3.0 Ft. Type of Liner= CL 2 Rip_Rop b=5.0 Ft. FROM L3 STA. 554+60 RT TO 555+60 RT c 4 c a 11.30' RT \ Q v + 3' LAT BASE D H l3 +61 12 m TI 1 a 19.65' RT SEE DETAIL D 4 ... I m= GRASS V DITCH STA LE 108.67' RT N 59° 41' 0/,5" E I DRAIN 5 T uT V DITCH y - y SEE 71L E LINE � 4'-6' BASE, 0.8' FLOW DRW3 +70 lV 2:1 SIDES, GRAVEL COBB E 15.92' RT / 1 m= BRUSH SIDES STABLE III DRW3 +70.00 SEVERAL LOCATIONS I 16.83 IT BANK UNDERCUT DRAIN UNE n MARCUS S. WHITE B NNA E. WHITE END CONSTRUCTION / I i B�TRncT G i6 -DRW3- PC Sto.11+60.00 I - -DRW3- POT Sto. 11+85: 0\l I I SEPTIC\\ II O o TANKr; KAYTRO CROWE I ( . DB TE PG 134 C3 DN .90 % Q DETAIL D LATERAL BASE DITCH !T) I_ -.1.) N.t ro-.I.) DETAIL E _ b _'I, LATERAL V' DITCH 16.3T G. (Nw.Smle) Grou.d Z.l D� t^mt. 91epe b S I: d _ GEOTEXTIIE �� PROP B G-7 K t",FL. siope 0 PAVED SHOULDER Min. D=1.5 F. M... Z= 'O Ft. Min. D=1.5 Ft. SEE SHEET 26 FOR -1-3- PROFILE •whe. a i, < 6.0' B=3.0 Ft. b=5.0 Ft. SEE SHEET 51 FOR -DRW3- PROFILE Type .f Liner= CL 1 Rip -Rap b=5.0 Ft. I SEE SHEET 52 FOR -DRW4- PROFILE FROM L3 STA. 561+30 RT TO 563+50 RT FROM DRW3 STA. 10+80 IT TO 11+50 IT SEE SHEET 52 FOR -DRW5- PROFILE SEE SHEET 2B-2 FOR INTERSECTION DETAILS �a •. •- ♦ • • • • . • I � Dewberry .9 ROADWAY DESIGN HYDRAULIC � E DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED OW INA m-WI • i. ; .... i .yc °'9 1�R'♦ !' -J. I _ate ' i== ► . �� ,{��51'. ass NO �����5!2�i?a_r� ��5���srr��s����� rt ��+ - ��..-.r. I ' � ���L�r\\W��►[�\\II•\�\\\�1/ mom �IIIIIIIII IIIIII / � •.•�-. III • • ,�dr���� � � '- s ¢SY a ., - s GEOTEXTI 5 lllr► ' '• ail II � I ,� ��. FOR .. ,. PROFILE Ell I, III pill III I SEE SHEET 52 .. ,.PROFILE SEE SHEET 2B-2 FOR DETAILS Dewberry PROJECT REFERENCE NO. SHEET NO. f gx e1 R-2233BA 7 �0c, IW✓ SHEET NO. 3 I o So CURVE ZAFOR -L3- oco NO F-0 Pl a 581+26.54 ROADWAY DESIGN HYDRAULICS PERMIT D RAW I N G ENGINEER ENGINEER q = 49 26' 19.7" (LT) �2 D= r 27' S53" y SHEET 4 O F 5 0 INCOMPLE E PLANS 3 k /� 275964' DO NOT USE FOR /W ACQUISCCION TES IMPA L3 +29 / / R = 3,9/0.00' ® SURFOACE WA ER75 IN e {�� I 438' LT ,+�, I Se = 0. 5 �ti2 DENOTES TEMPORARY yes � W E I� Im \ I39+LT0 k / / / 2�'0d� IMPACTS IN SURFACE WATER E /'BEGIN CONSTRUCTION \ • %/ \ F� DE NOTESWETLFILL IN ND ow -DRWI- POT StO.10+00.00 _ ; DOCUMENT NOT C ONSIDERED FINAL /O +/+ UNLESS ALL SIGNATURES COMPLETED 'T /k PROP PAVED SHOULDER 2 + DRWI +184' 60.5 —c— —— 4'STEEL _ _ _ --- - � I DRWI +62 } E y �+ \• ---------- ppil 106' RT �c / \ 'F KEN C M 3 DRWI +98 Co m / / / \\ .ZHob E 71gp5•P 63 / / 9 I SITE 3 WF + no Lr L3 +oo Mess a iH ,z x�+/ too L C 6 / 107.65' LT" / 105.35' LT 11 TOE PROTECTION I P E 175' LT +6 .5 SEE DETAIL A DI -L3- POC Sta. 577+00.38= THE TIMKEN COMPANY 164. 2' T Z— DI -DRWI- POT Sta. 14+29.14 D8 405, PC 633 +20.28 END SBG +50 DRWI +00 t� �� 157.95' LT E 1 3 09' LT --A e of a d 65.5' LT +23.61 a O ��"6a 0�%ti W h 139.87' + 05.00'LT s c , X _ in d I RCP-11120.00' LT R —4 +0 BEGIN SBG +16 I8 _-----C/ 101.Oo• LT Jew JB O TOE PROTECTION — v1H 1 "RCP -III h ,\1t DI ` � + SEE DETAIL A - N !� / 7 1 w c----- C R 90.00'L = h / Nct m • a 2GI -- C -- -- c ----_ c ml OD au MINOR MWEEN-0 lit -L3 - IF +1 \w� \ C --- — — -- _ F 98.00'RT ��\� \\ \C — —__—__ F —_--F—___--F _ �F � m 483.55 �RT a36 \ � \ \ \\ TOP o8.00' RT `� F _ +32.00 k \k k 5. 9j139.86'11T —F \ / 1/,y/ r5 34' -MH -Y10- POT Sta Ox 00.00 '23 l � \\ \ \ 13 00 RT F F THE i1MKEN COMPANY TOFd'Rt 7ECTION 08 405, PG 633 01� DE AIL A +44.04 17 .00' RT Sewa get 51 160.40.20 T�f SDE 172 863 �op.0 54A11g j GOa 3. �/�\ \\S�\ 57ING CL RIPRAP + q. 1-1.65' R b© SITE 2 S \ 12 CHANNEL SKETCH +8. DORT� STEVO 0.2 F7.FLOw o I� \� D.B. IE.PGNTLEY C REF, s 171, �TURI B' VARIES 1-2 FT. SILTY EO7TOM a i iRACPd�O 1C� \�\\ ^=n „// / �j \\ \\\\ GRASS V DITCH STABLE `�o�3 \\ \ \\ B a rD d J9sss9 ljbm e Q80\ ^' 4TVR� q�TFR a.0j / 10- POT Sta. 25+00.00 l� T y0 B•0i p� //C7 BAD/ �2 yc �� / / 6. DI T,3 \ \\ \\ DF4FR4T0R HODS I a / OEEEOAR? g50 \ 0 M SA 55 \ m/ 10 / A NRG. INC \ / \\ PC D.B. 640, Pg. 777 / on / \ \ \ OB y� `= ss 8 \q TO RI,Ty \ ° PR SeW89, CCESS N 8' V ' LEE EGANRweNvco & RF 4�RT�C Y/ �W�C� W \ FHF \ �� ss / q, eu SEE SHEET 28 FOR -L3- PROFILE� °mac p„ SEE SHEET 51 FOR -DRWI- PROFILE SEE SHEET 28-2 FOR INTERSECTION DETAIL I �S�O�as ZAFOR oT �� CURVE -L3- PI o 581+26.54 = 49 26' 19.7" (LT) = 1' 27' 553" m Ic - 2.759.64' =\1.440.10' T R = 3,910.00' e / Se = 0.'C?5 81 LT / ��b2 EGIN CON TRUCTION ti \ DRWI- POT to.10+00.00 I 9RSf ro / IT ti I (�•/ —S— — 4' EEL '� R . s3 � q + �• � � 1 6 / 1055 10 3 ' AT P E 175 LT L3 C to. 577 0038= TH / f -DR I - .14 .I4IZW Tl B Q- i DI IB SS C � I 5.5' .5' LT T C �J f_ 10 � I� / 8. 640 Pg IN 0 SITE 3 WF ♦ \. Gp711�0���61 q+i��l I o r M� IV R` f:�: Dewberry PROJECT REFERENCE NO. SHEET NO. C,v' NCCOA No R-2233BA 7 RW SHEET NO. PERMIT D RAW I N G ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SHEET 5 OF 50 FINCOMPLE rE PLANS �O DO NOT USE FOR / W ACQUISMON DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY 4 IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND a _ DOCUMENT NOT CONSIDERED FINAL ;1p5 - UNLESS ALL SIGNATURES COMPLETED \� \ PROP PAVED SHOULDER O (P Z m a I 9 Tq TC N 5 RP E Tp� MEO6SA PO 550 p0 109 s Es 8' MEGA. ENico & RFp4�RTLC n, u SEE SHEET 28 FOR 43— PROFILE SEE SHEET 51 FOR —DRWI— PROFILE SEE SHEET 28-2 FOR INTERSECTION DETAIL \ CURVE DATA FOR -L3- CURVE DATA FOR -RPB- Pls Sto 602+94.24 Pt Sto 615+05.64 Pls Sto 10+66.68 6s = 5' 09 23,8' L = 57' 14' 50.0' (RT) 6s = 2° 47' 56.4' Ls = 360.00' D = 2' 51' 53.2' Ls = 200.00' LT = 240.10' L = 1,998.30' LT = 133.35' ST = 120.09 T = 1,091.50' ST = 66.68' RO = 360' R = 2,000A0' RO = 200' Se = 0.08 0 N o � I s N s� f T JOHN ROBERGRAYSON, Jr. � \ 9p• 5 DB 643. PG 321, TRACT ONE $ 11-19 82' E 8 96• 1pNv' so" a ti N l U �S frl 14 BRUCE PUTMAN & MARTHEL SWINK MATHENY DB 821. PG 23. EXHIBIT A 17 ggUtE SwWK H'N0 TRyPCB /\ppRtHP� 01.5 23 EXHIe\T p0 82p0 g21 PO - REF • p , ON A5 5 BRUCE PUTMAN & MARTHEL SWINK MATHENY A 821, PG N EXHIBIT A R F-B 2GI-A / 24' RCP -III 0 8l" 112 w 011 -� A N� m F '"v�TP BERM DITCH 2GI ,o 92J,o ix/ SEE DETAIL E 11ko�ollf, 18 i IR/7 pti 00? �GT4( RICHARD S DAVIS o & DE80RAH A SIERPIEJKO r '� SPRI A %D ®IRRIC ""E'GN D.B. 895• Pg. 838 , ® GSO O QI°PpEFO IRRIC GOFGR SP VE ANNr _ p NFR�4 INVp RINKLER' PEp ` _ 3dOH_ZI a i IR SPq Gq TI NKLER �gRIVAT10N�, O i SPRINKLER' p Jt IRRIGAT ,� SPRMK�ERO iRRIGATIpN i RINK�E�1 IRRIGATI VA RINKLAERO��ppE�dOH .ZI 2VpPF0 ®E�LE E PLANS DO N USE DO NOT USE FOR ACgVISITION 19 \ � FRANCES JUANITA OLIVER & LINDA GAIL OLIVER BINGHAM D.B. 780. Pg. 714 REF. D.B. 208, Pg. 395 SITE 5 PERMIT DRAWING DOCUMENT NOT CONSIDEREDFINA SHEET6 O F 5 0 UNLESS ALL SIGNATURES COMPLEET k LI W WE DB 780 PG 714 I DB 245 PG 638 DB 13E PG 29 3pe` CS S} � � i � � 74TOp LTC Sto 60'`00,00, 1 3t8B54 � r '�►-- ,� ,___�e���.; •�� N��� ,�,t� ` � ; gal � \ '1 -L3 - 4'LATERAL BASE SEE DETAIL B x � /-x SITE 4 i +/ Sx 0.3 FT. FL 0= VARIES B= VARIES X+� / \ SS ED +� SANG, GRAVEL,COBBLE SOME UNDERCUT BANKS STABLE r CURVE DATA FOR -RPC- #pis Sto 11+10.95 PI Sto 16+72.02 Pls Sto 2/+48.76 es = 2° 55' 58.0' 0 = 59 32' 10.6' (RT) es = 5° 43' 46.5" es = 5° 43' 49.9" D = 5` 43' 46.5" Ls = 200.00' Ls = 200.00' L = 882.02' LT = 133.40' LT = 110.95' T = 472.02' ST = 66.73' ST = 89.43' R = 1,000,00' RO = 200' RO = 200' Se = 0.08 -LJ- rUL. (47.00' RT) P 19 06 5Q OLIEDDA BINGGAIHAM L DBB 7B0 PG 714 DB 245 PG 638 ��y` 9B. DB 13E PG 29 W o�c FS-8 2GI A s c TRISA 21 HINSEE DETAIL C ES 8 LATERAL BASE DITCH ��` sN DB 381PG 653 DB 74IPG 359 -RPC- SC Sto. 12+00.00 5ew DB 4E PG 501 22 0 LARRY DAVID HEAD & ANNETTE IRIS HEAD DB 383, PG 618 y os. 09 +� IRIS ANNETTE HEAD / DB 13E PG 220 DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 0 PROP PAVED SHOULDER \ CURVE DATA FOR —L3— Pls Sto 602+94.24 *— Pl Sto 615+05.64 ��t c 6s = 5' 09' 23�� = 57° l4' 50.0° (RT ) Ls = 3608�---,�U = 2 Sl' 53.2 �- LT 0ze �98.30 NEW Ar A �'A SON � RI R' R� m I o D,' a z I h L i �qP gTION ill V SITE 5 WE SITE 4 SIX U 5 \ 9J�4CL«7 = 4 L — 8 LT = 133.40' � — 472.02' ST = 66.73' S7 - .4 ' R = 1.000.00' RO = 200' RO = 200' Se = 0.08 11 Dewberry I PERMIT DRAWING SHEET 7 OF 50 Im - �_ I s�maPl.���� 0 DENOTES FILL IN WETLAND DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER 0 PROP PAVED SHOULDER FOR -L3- PROFILE 2 FOR -RPB- PROFILE 3 FOR -RPC- PROFILE Y k/: CURVE DATA FOR —L3— Pl Sto 666+39.0/ i/ \ . = D = 0' /4' 56B' L = 4,326.77' T = 2J69.79' R = 23.000.00' Se = NC SITE 8 SV_ SITE 7 WD LATERAL BASE DITCH SEE DETAIL A- 61 BL-124 0.4 FT. FLOW \--Ll SAND. GRAVEL, D= VARIES 2-3 FT. COBBLE, ISOLATED B= VARIES 6-8 FT. BOULDER,BEDROCK T= VARIES 8-10 FT. CL 1 RIPRA\ � 5 TOE PROTECTION SEE DETAIL C R _ -'t'b 1R16 RAP 30" RCP -II OTCB B voMH JB OMH f� NO FLOW u �: ORY BEO DRY LE AVE S. PSTREA Q 0= VARIES 0.2-0.5 FT. STEEPER BANKS v B= VARIEB I-2 FT. ERODED —LJ — I N 7 24' 08.3" W y TOE PROTECTION / SEE DETAIL C 3S- +2 260.00' RT / 32 . \ OSEPH W. JONE EVOCABLE TRUST D.B. %, P 563, TRACT ONE � P J l / DRY 2GI BEDROCK EP POOLS MINOR K UNDERCUT ON I,�FS SIDE TI S NO FLOW DRY BED .. IMAW,§ARP.LG kW B= VARIES 2-A FIT.—! DB8t$ff PG 609 T= VARIES 3-5 FT. CL 1 RIPRAP Dewberry x o PERMIT DRAWING SHEET 10 OF 50 z� DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND 0.1 ET. - EL �D ' j� \ FLOW, INTERER MITTENT 83F--�. O '80.00' L n CL 1 o= � :MH i A $" RCP -Ill i� JB vuMH JB VWMH to n BEGIN WET v 9 2GI 2GI TOE PROTECTION SEE DETAIL D FS-B a BIT. I +00.00 TOE PROTECTION \Iw.uu rtl -- 0.00' RT SEE DETAIL D EIP TOE TI`_ DETAIL R SEE DETAIL D SITE 9 SU �/ 35 _ EXISTING THA L SK�drNE CARD HYATT 05.48'04'E SBX•91' NO FLOW f o DB 12E PG 609 DRY BED B DRY.SAND; AVEL, L, EXISTING G CHANNEL SKETCH T 'A _ .. SOME COBAND; INCH I 8= ARIES 1-2 IT. BANK EROSION' T T= RIES 2-3 FT, BENDB _ 0.1 FT. FLIN \ 0= VARIES 0.5-2 FT-T.!!- STABLE VEG 36 B= VARIES 3-4 FT. SAND, GRAVEL T= VARIES 5-7 FT. PHILLIP J. CULBRETH & GAL L. CULBRETH D.B. 505. PG. 621 BE $95E DETAIL F +50.00 SPECIAL CUT D CH 125.00' RT SEE DETAIL E \ ANGELRR DBI131 PG 818 \ SEPTIC GRAIN S REPAIR FIELD\LI—NE'{ ` \ �I \ C n \ �0 PROP PAVED SHOULDER • C NSW CURVE DATA FOR -L3- CURVE DATA FOR -SRI- Pt Sto 666+39.01 Pt Sto 28+77,65 Pt Sto 3/+17.50 A = 10' 46' 42.6' (RT) p = 46' l7' 48.5" (LT) A = 45' 28' 11.4' (RT) D = 9 /4' 56.8" D = 19' 05' 54.9" D = 19° 05' 54.9" L = 4,326.77" L = 242.41' L = 238.08' T = 2,/69.79' T = 128.26' T = 125.71' R = 23,000.00' R = 300.00' R = 300.00' Se = NC Se = 0.06 Se = 0.06 RO = 108' RO = 108' / / EXISTING CHANNEL SKETCH I II I 0.6 FT. FLOW KATHY PA QfR_GPI}RAVEL SOME D= VgRIES $YNI4 AT BLE. STABLE VEG D= VARIE9�1BiF T= VARIES T, BANKS 5 4T.-y5'jj3 zz• �� p SBG +75 CHANNEL CHANGE R 9 4 CEO 7 / ur o �O WSEE DETAIL E Fop 0 SEPl NIz°q9 ORA �ANF LlNf4 DOUGLAS W. ARROWOOD 9I, D.B. 866, PG. 358 PORTION OF P.B. 6, PG. 152 F - ,'PAlAI - v4MH 12°97' 21' w ` - - - G N 0 I 24" RCP -III 31.56I I SL 2GI 2GI G 2GI TOE PROTECTION SEE DEEYYAAIL A 1 SBG +00 KATHY PATE MORGAN LYNN PATE DB HINT PG 785 43 O PERMIT DRAWING f Dewberry SHEET 12 OF 50 NAD 83 PROJECT REFERENCE NO. SHEET NO. R-2233BA 13 RM' SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PL DNS DO NOT USE FOR / W ACQUISITION ABLt SP,�o7 IS DOCUMENT NOT CONSIDERED FINAL k �TL aq UNLESS ALL SIGNATURES COMPLETED - ---- 0 PROP PAYED SHOULDER k / Of, DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER O\ x 1 CL B RIP OUTLET RAP k PROTECTION O Z SBG +00 PASTURE STABLE GRASS % y Q � av p 4C6ppyy w Z EEHtYD LLpp/ _ GRASS CL B RIP RAP 44 fi W PASTU S OUTLET PROTECTION / p ' 0�,' AO CL B RIP RAP O TJ / OUTLET PROTECTION Fi' 00 j � A - +31.36 \ j 2 .9 LT !,\ i JB WMH +2 1 \ r TOE PROTEC ' I 219.9 T � N SEE DETAIL D ' R 1 I� _ BERM DITCH SEE DETAIL C Q x 2GI 15" RCP-1 - �9.. O I� I 2GI _-�,\ Cyr Ui co .y FS-B ' 21-I 2GI FS-B 1 -L37 X I 2G-1 ------ FS-C l -_ ----- /F m 2GI _ x' .x.---T�33`Br-F--- F F -_ IiI _G C c XI SBG +50" - LOYD C. PATE 46 ~ _x k y 47 I 4SBw p BL-134 45 L ROGER MCCWNEY & AY GAIL McCLUNEY HAMMETT TOE PROTECTION DB 1077 PG 879 j SEE DETAIL B KEVIN MARTIN PATE D.B. 697. PG. 371 � CEA T, CHANGE X' SEE DET IL E x SITE 11 ST P TD U. I�TING CHANNEL To L. 4s � x S! a SEE SHEET 35 FOR -1.3- PROFILE CFPTIf .IC_ SEE SHEETS 49 & 50 FOR -SR1- Dewberry I.DENOTES PROJECT REFERENCE NO. SHEET NO. IMPACTS IN .. R-2233BA 15 SURFACE WATER RV SHEET NO. I ® DENOTES SINE SURFACE WATER PERMIT D RAW I N G ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER I SHEET 14 OF 50 IIc USED ��.�N� W NOT USE FOR /W ACOVISITION -6 I NAD �$ BM �5 S DOCUMENT NOT CONSIDERED FINAL SPREAD ANALYSIS L3 700+80LT DA= 1.19 7 1= 4.0 irvhr UNLESS ALL SIGNATURES COMPLETED L C= 0.9 Q= 4.3 As ^y LONGITUDINAL SLOPE0.004 ff10 CROSS LWIDTH=DM FT. V SHOULDER SPREAD= 12.6 FT. � Q N, 1I I I I NO DECK DRAINS REQUIRED SITE 12 SS ; a h§I 47 I SBG +60 TO END OF BRIDGE ROGER MCCLUNEY & LT AND RT CALMAY GAIL Mc LUNEY HAMMETT 2 m 48 I DB 1077 PG 879 / ( A. L. COHEIRS � D.B. 156, 6. P.G.P.G468 +65.00 84.00' LT a m R z +00.00 ----_ c 140.00'+45.00 100.00' LT ' -` � Ln } O co/S 2GI \ \ RCP/l/ \\ Lo o / Ol ^O FS-C I IS" `O _ RCPIII Q d-137 Rl -138 7 2GI Ln ■ N r1 - I M 1 FS-B 18" RCP -III 2GI '2GI N 3'22' 34.3" E BL-141 I � BL-139 H - W W - v 15"MOM H W RCP -III W N FS-A 2GI < 2GI-A 15 RCP -III 2 I JB vdMH 30^RCP Q r �� 30" RCP -III '�30" RCP -III y7/ JB wMH JB vNMH '+ / Q F- R R C 2 RC 30 _ _- ---� 10RT +00: / ' 20.00O.OoRT ' RT ---- _ - - - - - /�`, 100.00' RT 122.04' RT +8.07.00 142.00' RT RIP P ENERGY BASIN _-_-- 100.00' RT CL II RIPRAP E TSIPATOR 142.00' RT 845 TONS S DETAIL 1 SHEET 2D-2 1 4.95' RT - R __--- \yTG�Y PIPE REQUIRED DOWN SLOPE TO AVOID EROSION OF STEEP SLOPES P j0 / ROGER MCC UNEY & i CALMAY GAIL MCCLUNEY HAMMETT DB 1077 PG 879 ' SPREAD ANALYSIS L3 700+80RT DA= 1.19 -c 1= 4.0 irvhr Q= 43 d, LONGITUDINAL SLOPE= 0.004 fHt / CROSS SLOPE- .0215 hN $HOULDER WIDTH= 12.0 FT. SPREAD= 1].6 FP. / NO DECK DRAINS REQUIRED / STEVEN HOWARD ROSS & ALLISON B. ROSS / D.B. 982° PG. 698 EXISTING CHANNEL SKETCH � D I�I^^LI/I D= VARIES I-3 FT. SANU.GRAVEL, / 6= VARES 3-5 FT, COBBLE,STABLE VEG T= VARIES 5-7 FT. NIA 2Z GAW _'yro o /-�l Sf 0 PROP PAVED SHOULDER Sfi -.- is 15---- JS Sf -L3- PROFILE �4CONC COP .FOO OO I� I �/ 1 Dewberr a' PROJECT REFERENCE NO. SHEET NO. WW - POT td• to o I I '�"� R-2233BA 16 -YI- I CURVE DATA FOR -L3- 3zRONA PIW SHEET NO. " I1 N ROADSIGN HYDRAULICS 1s Sto 715+38.01 P/ Sto 722+34.44 i�D.B. ENGINEER ENGINEER 6s 0° 38' 11.8" L = 8'00' 19.6(LT) Ls = 200.00' D = 0' 38' 11.8" w PERMIT D RAW I N G � NOT USE FOR / W ACQUISITION 1 BNC®NgII�LE E I�L.�N3 LT = /33.33' L = l 257.49' SHEET 16 OF 50 ST = 66.67' T= 629.77' RO = 200' R = 9,000.00' so I a _ Se = 0.03 NAD 83 I a BY6A-213 ® p4°3DENOTES IMPACTS IN 1 5'00° E �� I ti 130.3T SURFACE WATER CURVE DATA FOR -Y7- CURVE DATA FOR -Y6B- DENOTES TEMPORARY IMPACTS IN SURFACE TER Pl Sto 12+00.31 P/ t I + Pl t 14+ 4 I 5UA \\ \ "� - I S o 3 25.65 S o 25 6 O \ _ g L = 12° 41' 05.4" (LT) L = 0° 48' 24.9 (RT) L = 2° 45' 4/.0" (LT) I JAMES A. CILONE 7 MELINDA C. CILONE \\\ p ti h DOCUMENT NOT CONSIDERED FINAL I Ipl D = 25° 09' S6.9" D = P 34' 21°9" D = P 5/' 28J" j D.B. 712, Pg. 786 / \ �y yy UNLESS ALL SIGNATURES COMPLETED Ip L = 50.40' L = 51.31' L = 148,64' 8A T = 25.31' T = 25.65' T = 74-53' h C \ p od DONE ARD R = 227.67' R = 3,643.01' R = 3,084.04' S 05°13'41'W 345 1 qq\/\� KEV�NOLIl S & KENNETH EDWARD COOPER & I = Se = Exlst. 260 37' fiP \ ��- \ d LACHANCE T WENS, CHRIS DB 827.. PG 766 COOPER Se = Exlst. Se = Exlst. a I aI z RO = Ex)st. RO = Exlst. RO = Exlst. 9\\ / \'�'4 \ \ Pg. 753 I oI w IO // ' SITE 13 SXJ1^ 6° l / / /CHARLES 39.PCY EVANS \2p � DB 839. PG 166 + o0 / ERSON 230.00'LT RED OWENS McPH SITE 14 SX11D.B. 849, PG. 316 tiP O �' PR __--_- - I 50 e \ A. L. COSTNER HEIRS AZALEA INVESTMENT CORP. -7- Q$ I I D.B. 156, P.G. 468 EXIS tNG CHANNEL SKETCH REMAINING PORTION OF D.B. 326, Pg. 628 A. L. COSTNER HEIRS N I I D P I� / / / + 0 D.B. 156. P.G. 468 m.l FT. FL w _ I 171.00' LT / W 1•-- 2:1 SIDES 'V 2� 3g,'; I _ _ _ p G I I 3B" PIPE OUT B= VARIE 1.5-3 FT. STABLE VEG N 02°34'39- - -- �r Q / I 2 FT. ABOVE GRADE D= 0.5-1 T. 35 9 •95" E --I / - J / �O SCOUR HOLE 4'X4'Xl' EIP I /,m� / �" /\ STABLE CHANNEL D/S PIPE CONNECTION REQUIRED TO AVOID EROSION " 'F9° BY6A-2 �"� O''y�/\/^�\,`/ 36 "'e•/e W'` O I I ON STEEP SLOPE. EROSION OBSERVED ALONG SLOPE 2 0 / '•> h• / 969 F // / 1 UPSTREAM OF EXISTING 30'RCP ALONG Yl STA 15+36. + 1 00.00, S -L3- POT Sto. 70 +84.84= t14.95' LT / ® \ //'/; Ln �� I -Yl- POT Sto. l5 36J3 100.00,LT °F ? \ p ./ FOREST E HAR@FF & // / / + p HEADCUT AT U/S LIMIT 715.00' LT Yt$ o = 790 '26J" COLLAPSED BANK$ 9° QiT / / CAROLYN HA IN \p / / /Ol C R 7 7 _ C P \ � DB 391, PG Ik O 100.00' LT p Wi a o + I a18 v/MH ---- iLF -Ao 2GI-A �9.160' BL-142 30" RCP -III / / •3 / / to 10 30" 11 �\ \� / / / mGi / F- E GOOD CON IT ON ■ BL-143 A - N - v / 3 L END OF UNMARKED STREAM F B / " RCP -III FS-B C" p' 24" RCP -III \ W a ,N N L2 LLJ _ N +� BL-144 l 4tij.' \\ 2GI 2� ;} Z 2GI WILLIAM WYMAN . ASS//V DITCH ABL fq Qn !s 4P \ 2 b� U IZ I / \rq pq f.° 0 O3 F YELTON & REBEC 55 e. EIP TAMMY LARKIN LEE Q H Z > R --- AIRIER 7EPG01 // ¢¢� B� QP/ esr �\ TDB 1115 PG 395 ND o 2 . _ 1164 RT C7 / IDANADI{/BRA®LEY& 9 2 O 'j` \ �X R 52 : O8 54 . PC 45 \ �� STABLE I I� a 189.66'RT yea WILLIAMON MqN� FI 1 C -I I I\�YS \ \\ BL-146 TTI es7\\\\ Gy REBECCA BARIIiFt 1 2 5° \ 4'GT 1\ R YELTON A I O ii-I E I I = 1 E TI HANNEL SKETCH + 0 I RIPRAP //+7 900.00' RT 1037 TONS EIP S 12'I \ -- /l / y ° \ + 1 159.00' RT 89. W \\ ° I \ 9, 7- Sto. 12+25.401 I n\i / oy g \ 12 \ 191.0 ' �Q / / D BAND. GRA EL I + 9.0 EIP 3'16� I K, / :i F S 52'S9° W 1 1 FT COBBLE.3 D LK 1 111.00' R] a= s1m-1s FT. \ 159.o0'RT F\p ( II AND qT ACTUAL PIPE TIES WITH 1 :2 FT.LOW BANK P N TOP JB AT THIS P NT I \ DA Q m I -5' HIGH BANK FLDO L PoRCK 4 .3 ' RT 1' s .Y6B- PC StO. I +OO Q IP 85.00' 2 I \ OB 31q PG 0 - c+ 4CC /F 1'PIN IS NOT IN : \ I ^. \ I s. o E DO 16E %�23 �� ��TH S OCATION .P o \ �c°4- F SUSAN C. FOSTER ERIC C. FOSTER DO 812 PG Y6B PR Sto. 13+5/.3/ • �J_- 2s3 8.00' 21'37" 8.00' RT z P W I I I \ / � 4 N 39g� -Y OT 13+50.00 88.75" R O \\ --------"- % EIP '12 65 M I I 1 r1 _ c� t3 y N \2• I I� I1 - iE.ao. x III Q G I `\ / \ LISA B HOPPES I y \©Q / 64\\ q62 11 '23'25� W I\ B't0 0`' \\ ti9�D8 1149 PG 749 2 Oti0 zs/ EIP S 02\ s As• I� I _70' >I sq 1 �3a7.eo' BY7-216 WI II �� \'� F ram, 1 a• es INDA B WILSON 6 I� I d LIO.IO' II •B. 932. PG. 605 5 Zyg5,gV2 e< IN I I oN B-/PT Sto. 14+99.94 srRnss R 4329 D// I I 60' RCP 1 III / ti°y� c;Y \ \ / 57 ,K 4' DBTRAOAY UR5 R 5 1AZq 62l Z" I - I 1 ANGELA A TAUB & \ ANGELAOA TAUB & � > MICHAEL B TAUB \ S MICHAEL B TAUB o __o BM '7 DO 829. PG 390. TRACT TWO �P 92° DO 829. PG 390, TRACT ONE DAVID JAMES EIGHT &� \ REMAINING LANDS ' �' l - 30' CMP y� M�n,, I OF AZALEA INVESTMENTS, CORP o / s CORINA TSERING CARL 0 \cy I 1 20 DB 295 PG 599/: G ^\ /� \ % /� O O•� °, D.B. 1009, PG. 850,' 'd I \ %/� o2g \ � ^ I 1 I �\,., y -,/ 0 PROP PAVED SHOULDER N3666 \ i / 1 h g°PVC 55 D/S CHANNE SIABLE. PE B�KEN p° b /' 6 �a I �1 g•pvc HEAVYILY VE E E "" S �A A ar��N PIPS °o.o� / 6 pz2a��? o ti'S \ SEE SHEET 38 FOR -L3- PROFILE y`' � Jo 9 & Pp 2 PR ti � J a Y � � BY8-217 WILLIAM WYMAN YELTON D.B. 731, PG. 536 m s L p O O Ln 4 - °1 61 TAMMY LARKIN LEE Q OB 1115 PG 395 H- N J I ■ BL-148 I �O HILDA MULL B 319 PG 109 y� 6E\/LPG 23f�o, PO O NR) �r� j 63 f ERIN R STRICKLAND � DB 8T5. PG 42/0\ S 6."a 4FO I k � \ h `L 0 0 t (/ e CURVE DATA FOR —L3— P1 Stc 722+34.44 = 8" 00' 19.6" QT) D = O° 38' 1i.8" L = 1,257.49' T = 629.77' R = 9,000.00' Se = 0.03 Pis Sta 729*28.83 6s = 0' 38' 11.8" Ls = 200.00' LT = 133.33' ST = 66.67' RO = 200' 9�N /1IMp, Dewberry PERMIT DRAWING DETAIL E LATERAL A DITCH (Nal to Swlel SHEET 18 OF 50 No", Fill - Gro-d ?'I D d , 11R, Slope 1 Gii.-Ie NAD NA - Mi, D-1.5 Fr. 83 ; Max. d-1.5 Ft. Type of Um—CL 1 Rip -Rap b=5.0 F1. / FROM L3 STA.727+50 TO 728+50 RT N g26a6W SITE 15 26' RU D.B. 64 , COUNTY y\ D.B. 692. Pg. 273 S P F/P �FSS— - " .. '- Jg . '� _ � S�— 30'SEWER EASEMENT JS------- "- 30'SEWER EASEMENT E In' +36.21. 66 LIDM AZALEA INVESTMENT CORP. REMAINING PORTION OF 0.8. 326, Pg. 628 GEORGE E. HOLLAND & LOUISE A.HOLLAND DB 860. PG 116. TRACT SIX 183 OO�L O 240.00' LT i CL 1 RIPRAP CL 1 RIPRAP OUTLET PROTECTION OUTLET PROTECTION U i� J + 187.0O' LT 58.000 158.00'L --- � FJ f I F i \ ^ / i JB vdm,H `� + 5.Co 128.00' L JB H 115.00' L ` 20.00' LT +000 100.00'LT C \F \\ ^ �- N \ F —F---_---F \ CAT-1 --__— F / _ _ r z T _ 2GI Fb$ 2GI S-C > 121I 2 B?33 EP HILDA MULL HANIE J. RYDER & / DB 540 PG 58 - DAVID RYDER ��C DB 16E PG 236 DB 1161GP 358 98.GO'RT 2� .>_- ________ \ 5 2A? - F. DITCH }) + SE ILA _ 1 3.00' R S S IP$� a El \ UP \/� JOHN ADKINS& / MARGARET ET PAGE ADKINS DB 333, PG 451 P BRYSON W. FISH & / KORTNEY P. FISH DB 1153 PG 554 70 / 00, A535 �, JEREMY SHANE ROWE & 22g' 608 HELINA ROWE cn, I JOHN RUSSEL NEWTON & 5 57-0093 OB 1094 PG 863 4Y /� PENNY \\ W. NEWTON DB 784, PG 814 n FTDENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER GREU TYPE TL-3 — — — — F------_ ---- `\ R 00 1 III TONS + 115.00' RT CL 1 RIPRAP PAD 100.00' RT +40.00 TOE PROTECTION +55.00 120.00' RT 140.00, RT 140.00' RT SEE DETAIL B LATERAL DITCH LATERAL V DITCH SEE DETAR C SEE DETAIL E GEORGE ET.HOLLAND & LOUISE A.HOLLAND DB 860. PG I16. TRACT SIX 0 PROP PAVED SHOULDER T PROJECT REFERENCE NO. SHEET NO. a Dewberry R-2233BA 18 CURVE DATA FOR -Y25REV - PERMIT D RAW I N G wva SHEET NO. 'I SEPTIC TANK " r PI St0 3/+/0.35 oo/y ROADWAY DESIGN HYDRAULICS Q= 15` 00' 00.0" (RT) S H E ET 20 OF 50 DENOTES IMPACTS IN ENGINEER ENGINEER SURFACE WATER D = 9'32'57.5" `\ DENOTES TEMPORY In0 NOT USES FOR /NCOMPLE w acuLnsrrEos L = 157.08' _ \\ \ \ IMPACTS IN SURFARACE WATER R = 600.00' NAD $\` \\\ \� DENOTES WEXCAVATION Se = Exist. ` \TLA ND RO = Exist. \\ \ \\ i �p'y� ❑ Sta525+00 p0 �\\ �\ M `offSITE 1 / ` \ \ DOCUMENT NOT CONSIDERED FINAL SITE 15 7 UNLESS ALL SIGNATURES COMPLETED / \ \ \\ \ � W DB 69 W13 BM # rn \ EIP N \ v \ c o-�hM�o, t k SP �� N, k \ \\ EI N/S9 . y m "' ^ a ETHEL LOU SILOU SI E \\ \ 1 /0� 2/�"E h J. W. LOGANyNLEEE'VLA"RNER S/ 7 \,�1FRANCEo LO OT��4\ \ _ / DB 81 . G 1 DB PG 689ALLAS JERRY OWNBY//REMOVE 0" CMP A\MARY ELLEN OWNB 4Y EIP ` . _ AQ \ _ 456 PG III. TRAC TWO :� GEORGE E.HOLLAND & .. .. -. .. .. .. �^�\j0Q \\ F _____---___� Op 2 3 PDE 259.23' LT LOUISE A. HOLLAND } _ 259.23'LT /" OB 860, PG I16. PORTION OF ACT FIVE_______________________________________________________________________________'\\9 _______________ 7105 I_\_-----__ A -L3- POT S' .743+46. 5= + a�`q__ \ Y25REV- POT5to. 29+ 3.10 DALLAS A 240.00' LT B .� O\ J\TP MARY Ei' OTCB REBAR v 72 CHL ,r S 469.84�^ E �,, 'CHL \ \ \ \ P 2 DB 456 PG \ Ip X �X� `- \ � X 9 � LT HORTON-AMERICAN PROPERTIES. LLC l/`L'"•'�'/\J \7 I \\JC� _ 1 `o HTR DB 745. PG 622 y`�,. ETH C- LJiSE SEED DITCH \ �. \ �\ _ 1 V TER R & 0 0 3' LATERAL BASE DITCH S END \ 1 c LEE VARNER 2' LATERAL BA i + _ SEE DETAIL D BRIDG I \ _ RED DB 488. PG 6B ETAIL C. \FP,r OTCB - 1 F 150-47' T ROW UI ED AS-PART-96LC�L 'F FTIPAP FCT R-2233BT----------------- 5 0' \ 1 X ACCZ \�y l2 �� H 23 _ _ _ _ _ _ _ OF TIP �ROJE T R_2-- - _ _ \9 & ---- 3' LATERAL BASE DITCH .�\\\, Am q \\ __ a O �CA X SEE DETAIIJD ___ _____________ _ _ \ \� I' �� Og, 7ii JECT R-2233 n TOE PROTECTION cP II y_ _ F - F ' >- \ POT to.744+50.00 BK= + �.\ `� SEE DETAIL B B wM _ _ �— ('HHI \\ \ - 4 BEGIN TIP PROJECT R-2233BB M '.` W'. - �-' L BASE DASANDONED STORAGE N \`. \ �; -P- 3-POT Sto.7 AR ssj O / i HTR SEE DETAIL 1 YARD TALL GRASS \ ` \ \ M - - \ 2GI i � a \ I - BL-156 j'_ - %�>- r', HTR r-----r--r------r 9e.z`F h` FS-9 / A 'i A N Vim \-� FS-B zGI N 5' 4' 08.9 W v HTR LLJ '. `,I n n '� �. HTR WRA _1___t____________ O , A _ _ _ - _ - - - - - - _- ___ - i r \ TLY S E BANKS �- --- SEPTIC y F Q �4 �$ ��0 \ F BfORTbN=Afi1ERlLL�MM PROP.ERLES LC REPAIR FIELD Q� `__YI SREV- PC F OB 745.PG 622 `F ----- _-___ _ _ to. 30+31.35 SPR G LOUISEEORGE EA. HOLLANDB y� HTR F --�� / I m I °v `� \ \ DB 860. PG I16. PORTION T FW9RE ERODING BANK,,HTR D A 30"R - --c____ 5FTP �F Oj�ED AS PART___ �%_ _I I Ob al �F TIP AT OUTSIDE OF BEND 5-S FT. HIGH F LINES - I TI AS PART O Fh' PTp __ CP III SS .�, ��� -- �— 36 CONC _+�T N/ L B RAP I i/ ET�R 3 �r 7/ -� ------ -- GUILE .RRIOT5 ION BY45-371 �L I /� 149.51' R 05 S.Y. GE s E SBG END I m 1 �I E%ISTINC q/W F OF BRID I I q/ MON � � A PgOPERTY Llry m +20. 18 vdM 30" _ �L X � I' I ISMTLBUS � 183.00' RT ❑ ROCK STEPEI OOLS i I - - EXISTING ROADWAY DITCH .. .,� 3' LATERAL DITCH PROTECTION p04.00' RT "' O I I I SEE DETAIL A EE DETAIL B "NC, xr rr I I I Y25REV PT pAL�A + +1 ZC WW N R,W RUNS I I I Sta. 31+88.v 220.00' RT 218.3T / atom I I POE NW \ L �r 7 '4 C GOOD CONDITION "IL _ 1 40s o. '. ' R7\ w/LT 251.70' -PT '' f ��CONC B^W�XMON EXISTING q/W PR %IS PV R N ��� R4/< I �I I v 48'W RAIL X FILL EXISTING CHANNEL s S \\ I I TO EL. 935.0 F�F A \\ z o. I C1t r I I R HOLE \\\\ BY45-372 - 3 FT. MTL SA IN SGo R Jr"' ss S MILL z- Tc _ cxflaaea oflca eaaa 6'CONC JB c appAPPROX ------- - =2q' cMP _ -Y25REV - POT — __-------- o 24" HDPE _ 53 74 A BYPASS 30, EST CONc US 74-A BYP 30' BST i = c 24°CMP � \\ SEE SHEET 47 FOR -L3- PROFILE _::................mi:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::--- ..............................■■■■■■■■■■■■■■■■■■■■■■■■■■■■.......................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.!!!!!■■■r!!!!!!r■!!!!!NONE ..■■■■■..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..................................................................................■.■--,......■■■■■■■■.■■■■■■■■..■■■■■■N.■■■■■■■.r■■■■■■N■.■■■■■■■. -C.............................■■■■■■■■■■■■■■■................................................................................!!.. 1.....................!!!!!!!!!!l...........................■!!!!!!!l.......■■■■■■■■■■■...:...::.... ................................. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ r■■■■■■■■■■■■■■■■............................................. ■■■■■■N.■■■■■■■■■■■■■■■■■■■■■■.....■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.!■■■■■■N■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■.■■■■■■■■. I............■■■■■■■■■■■■■■■■................................r ■ ■■■■■■■..■■■■■■■■■■■■■■■■■■■■■■.........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■■■■■■.■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■.■■■■■■■■■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■r - - . - ■■■■.■...■■■■■■■■.■■■■■■■■■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■■■■■■.■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■.■■■■■■■■. 1!lNNNNNN■■■...■■■■■■■■■■■■■■■■NNNNN■NN■■■rNNN■NN■■NNNNN■NN■■r ■ ■.■■.■...■■■■■■■■.■■■■■.......■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■.■■■■■■■■■■!■■■................■■■■ 1■■■■■■■■■■■■■■■■■■■■■■■■N■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 ■ ■.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!■■!!!!!!!!■■■■■■■■■. 1!lNNNNNN■■N■■■■■■■■■■■■■■■■N■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■r .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..........................................■■■■■■■■■■■■■■■!■■■■■■.■.. 1!!lNNNNN■■N!!N!!!!■■!!!!!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r 1 : l o000000000000000000000000o00000000000000000000000■■■0000■io■00000■oo l000000000000000■■■■■■■■■■■■■■■■■■■■■■■■■■■■■n 1 ■ r '' l" ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■----------- r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 ■ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■::::::::::■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 ■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 I r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...■■■■E■■■■■■■■■■■■■..■■■■■■■■■.■■■■■■■■■.■■■■■■■■■■■ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■DENT NOT CONSIDERED FINAL ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L SIGNATURES COMPLETED ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■'®®r.::::::::::::: 1 . I r■■■■■■■■■■■■■■■■■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■_ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...............■■■■■ .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■............................................................■■■.....■■........■■........■■........■■........■■........■■........■■........■■........■■........■■■.......■■.......■.■...■■■■■■■■■■■■■■■■■■■■■■■■■■■....■■■■■ .■■■■■■■.■■■■■■■■■■■■■■■r-------------------■■.■■■■■■■■....■...........................................................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.....■■........■■■■■■■■■■■■■■■.....■■........■■■■■■■■■■■■■■■.....■■■.......■■■■■■■■■■.■■■■■■■■■■.■■■■■■■■■..........■■■■■■■.■■ ■■iii■i■.■■■■■■■■■■r■i!!I room■r■iii■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■■lNNNNNNN■NNNNNNN■!■NNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■- ■■■■■■■■■■■■■■■■■■■■■■■■I 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .!!!!■■■■■■■■■■■■■■■■■■!I r■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■NNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...........■■■■■■■■■■■■■■■■■■■■ r■■■■■■■■■■■■■■!■■■■■■■■I r■!!!■■!!!!■■■■■.....ENEEN..!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■....N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■.....................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ r■■■■■■■■■■■■■■E■E■■■■■!Ir■■■■■■■■■■■■■■■■■■■■■■.....!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 1 1 1 r■■■■■■■■■■■■■■■■■■■■■■■I 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■® =■■■■■■■■■■■■■■■■■■■■■...I 1': 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ r!■■■■!!!■■!!!!■!!!■■!!!I 1■!!!■■!!!!■■■■■■■■■■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!!!■■!!!N!!l...............■■■■■■■■■!N■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■..■...■■■■■■■...■■.■......■■....■...■■....■■..■■....■....■■■■■■■■■■■■■■■■■■■■■■■■■■........................................................................................■■■■■■■■■■■■■■.........................................■■........■■...■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■....■....■......■■■■■■■■■■■.■■........■■........■■........■■........■■........■■........■■........■■........■■..................■■........■■........■■........■■........■■■...■■■■■■■■■■■■■■....■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■... ■■■■■■■■■■■■■■■■■■■■■■■.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■....■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■- ......■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ..............................■■■■■.■■■■■■■■■■■■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NNNN■NNNN■■■■■■■■■■■■■■■■■■■■■ .■■■■■................................................................■■.■.■■■■■■■■■■■■■■■..........................................................................................■■■■■■■■■■■■■■■■........................■■■■■■■■■■■■■■■■■■■■........................................ .■■■■■■■■■■■■■■■■■■■■■■......■.......................................■■■■■■■■■■■■■■■■■■■■■■.........................................................................................■■■■■■■■■■■■■■■■ 1' I r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .............. ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.......................................■ 1' 1 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ............................ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■........................................................................ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■.■■■■■■■■■.■■■■■■.■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■■■■■■■■■■■■....... .................................■■.■■■■■■.■■■■■■■■■■■■■■■........................................................................................■■■■■■■■■■■■■■....■■■■■■■■■■■■.■■■■■■■■■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.N■ .........■■....■...■■....■...■■........■■....■...■■....■....■........■■........■■........■■........■■........■■........■■........■■........■■........■■........■■........■■........■■........■■.........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■- ■■■■■■■■■■■■■■■■■■■■■■■....... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ mmmmmmmmmmommmmommmmommmmmmmmmmmmEmmmmmmmmmmommmmommmmmmmmmommommommoommmmmomommoommoommommomommmmmmmmmommoommoommoommoommommommmommmmmmmmmommmmmmmmmommommommommommommommommommoommommommommommoommommommommommommommommommommommommommoommommommommoommommonomoommommommoommommommom mmmmmmmmmmommmmommmmommmmommmmommmEmEmEENEEEmEmmmmommmmommmmoommomommoommmmmomommommommommommoommmmmEmEmommommommommommommmoommmmmommmmmmmmmommmmmmmmmommommommommommommommommommoommommommommoommommommommommoommoommommommomommommommommommoommommoommmmmmmmmoEmommosommosommommosomom 1 e r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■E■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■oo ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 1 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.\nc:;aFz;a mL•\■■■■■■■■■■■■■■■■■■■■■■■■■...........................■■■■■■■■■■■■■■■■■■■■■ENEEEEEEE............................................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■■■■.■■ .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■rsJ■!!■!!!■■!!!lNrGs]■!!!!!!lENNEEEEEEEEEN .........■■....■...■■....■...■■.....cam■■!!!!■!!!■■!!!!■!!!!■ca:!\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNN!!NNE■NNNNNNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■ ...........................................■E■■■■■■■■■■■■.....................................■■■■■■■■■■NNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNN!!NNE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■■■■.■■ .........■■....■.■.■■....■...■■.LZ7r!!!■■!!!!■!!!■■!!!!■!!!!■!!!!■iC\■■!!!!!!!!■■!■■■■■■■■E■E■E■E■E■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■E■E■E■■■■■■■E■E■■■■■■■■■■■■■■■■■■■■■■N■■...NNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNN!!NNE■NNNNNNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■- ■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■ri!!!!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!lorC\!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!■■■■■■■■■■■■■■■■■■■■■■■!!!!!!!!■■!!l ...............................!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■■■■■■■■■■■■■■■■■■.Gi■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r.7\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .........■■...■...■■....■■r7r■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!\GZ\r!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!E■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NN!!NNE■NNNNNNNN■■!!!■■■■■■.■■■■■■■■■.■■■■■■■■■■■■■■■■..■ .................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■r=r\■■■■■■■■l7Yr■■O!!!!!!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!E■rori!\■■■■■■■■■■■■■■■E■■ENEE■E■E■EENEE■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 I r■■■■■■■■■■■■■■.r■i..ir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.c■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ...................N■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■o■■■■■■■■ 1 1 00000._=m.■o■■0000u0000u0000u0000■0000■u0000uorwoou0000u0000■oo■..mrsrnmi0000000000o00o00o00o0o00o00o00o0o00o0o0o0o0o000000o000000o0000000000lml00000000N r■■■■■■■■■■■!■!■■..■z=e�■N\r■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!■■!!!!!!!!■■!■!!rr\!■■!!!!!!!!■■!!!!!!!!■■n..■enuauuue■.....■■........■■.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■........■■........■■........■■........■■...■■■■■■.■■■■■■■■eyNa■.■■■■■■■■■■■■■■■ r■■■■■■■■■■■!!!■■■■■■■■■■N■■■:=-_•.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!!!!■■!!!!!!■:car!!!!!!!■■!!!!!!!!■■■!!!Ir_r.�Innr\!!■■■■■■!!!E■■■■■■!l.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■N!!N!!!!■■N!!N!!!N■■!!!■■■■■■■NNNNNN.ZL■L[9ClJ■■■■■■■■■■■■■■■ 0000■u0000u0000uoo■..iG= i■■■r■u000000000o0o00000000mbI mp0000000rA■o■.1.Utnfprli000u00000000o0o0000000000o0000o00000000000000000000000000o0000000000.■Il000000000 mmommommmo mmo ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■m■ooG== Emommommommommommommoommommommommommommommoommommommommommommommomommommommommoommoom HII !■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!■■!!■■■.-==!...■■!!!■■!!■!!!!!■■■■■■■■■!■=PmEmm\mEmm■■■■■■■■■mo !!!!!!!!!■■!!!!■!!!■■!!!!■!!!■■!!!!!!!!■■!!!!■!!!■■!!!!!!!!!■■■■■■■■■■■■■■■!!!!■■!!■..iG==!�■■\r!!!■■!!!!!E■■■■■NYC!\EEENEENE!!l.7GGiGLZ!!!■■!!!!!!!!■■lNNNNNNN■■!!lNNNNN■■NNNN!!!!■■!lNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■!!!N!!!!■■!!!N!!!!■■!!!■■■■■■.■■■■■■■■■■II■■■■■■■■■■■■■■■N 1 l ■mmm■mo■■■■■■■■■■■■■■■■■mzImn ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■N■■■■■■■■■■...N ■mEo ■mEm 1 1 o000000o0000o000000000o00■0000E000E■■■■■■■■■■■■■■■■■■■■■■■■■■..■__ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■.GG=T...■r■■■■■■.r.rr.7■■1■\■■■G\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■ _..u000000rcr.q000v!■oo■r,vo■00000000000000■■■0000E0000■■■0000■■0000■■0000u0000u0000u0000■■■■■■■■■■■■11■■■■■■■■■■■■■■■■ •■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■•■■■■■■■■■■■■!!!!!■■!!!!!!!!fJ■lr..GG==•.■!r!■■r%a,•7.♦./77r!■■!!!!!!!!■■!lNNNNNN■■!!N■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NNNNNN■■NNNNNNNN.........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■■■■■■■■■■ !!!!!!!!!■■!!!!■!!!■■!!!!■!!!■■!!!!!!!!■■!!!!■!!!■■!!!!■!..!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!ri■!!!!!!!!■■■■..G= =r■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lENEENE■■■■■■■!!!!!!!■■!!!!!!!!■■■.EGG=_...rC■NNNN!■■NNNNNNNN■■NNNNNNNN■■!!lNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNlN!!NNE■NNNNNNNN■■!!!■■■■■■■■■■■■■NN■lIIN■■■■■■■■■■■■■■■■■- !...biumzern■■■■■■■■■.R\■■NNNNNN■■lNNNNNNN■■NNNNNNN!■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNNNNNN■■NNNN!!NNE■NNNNNNNN■■!!!■■■■■■.■■■■■■■N■!II■■■■■■■■r■■■■■■■■■ mNmmmom momm oo !■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rN:[.:11/Ill:IIr1Cm9!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!NlGiZI.■..GG7n••.\!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■NNN■lIINNNNNNN■lNNN■N■NNE lmommEm mm mmu mmom omoomm mmm !!!!!!!!!■■!!!!■!!!■■!!!!■!!!■■!!!!!!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!llf1Y,:J/.Illi/.!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!NOON!!!!\G!■■!!!!!llo_r I l l r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L'.I..SGa■■■■■■■■■■■■■■■■...■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.l\■■■■■■■■■.■■■■■■■■■.■___-__ =o•.■■■r■_■■■■■■!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.NOON■■!!■!II!!!!!!!■■■■■■■■■!■ ....■\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■ 1 1 1 r■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\rl■7GGZ■■■■■■■■■■■■■■■■■N■NNNN■.imM -�...------..■■■\■■rr■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■rs■■■■■■■■■■ -r\rN■■■.■..o000G=== ___TTm____••••• -MIUMo■ =■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.7csJcs�■■■■■■■■■■■■■■■■■■■■■■■i�� !!!!!!!!!■■!!!!■■r!■■!!!!■!!!■■!!!!!!!!■■!!!!■!i!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■lNNNNNNN■■NNNNNNN■rr■■■r.7A■■■■■■■■■■■■■■■■■■■■■■00000.F !!!!!!!!!■■!!!!■■r!■■!!!N■!!!■■!!!!!!!!■■!!!!■o!■■!!o.!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■lNNNNNNN■■NNNNNNNN■■NNNNN\ia!■NNlN!!!N■■NNNNNN!!■■!!lNNNNN■■NNNN!!■.rmenp■!■■!!!■■■■■■.■■■■■■■■■!I:i■■■■■■■r■■■■■■■!■ = �..■■■■_■■■■■■■■■00000■■■■■■■■■■■II■7Gi■■■■■■■■■■■.■■ r■■■■■■■■■■■■■■■■r■■■■■■N■■■■■■■■■■■■■■■■■■■■■■r■■■■■o■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!!!!■■!lNNNNNN■■lNNNNNNN■■NNNNN■■■■■■■■■■■■N■ri\■■■■■■■■■NNNNN!!■■!!lNNNNN■■NNNN!!NN■■NNNNNN■.iGoo"■■■■■■■■■■■.Larll■N■■■■■■■■■■■■■■■■- ■!!!!!!!!■■!!!!■■■!■■!!!!■■■!■■!!!!!!!!■■!!!!■■■!■■!!!!■■!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!■■■■■■►r\■■■■■■■■■■■■!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■■■■o■rG-sm!!!a■■■■II■■■■■■■■■■■■■■■■■■ !!!!!!!!!■■!!!■■■r!■■!!!N■■■!■■!!!!!!!!■■!!!■■■N!■■!!o■.!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■!lNNNNNN■■NNNNNN!!■■NNNNNNNN■■NNlNtir\■■NNNNNN!!■■!!lNNNNN■■NNNN!!NNE■NNNNNNNN■■!!!■■■■■■.\^N■■.Gi-.:!i�■\■■■■■■■■■■■!■ !!!!!!o.■■!!!■■■r!■■!!!N■■■!■■!!!!!!!!■■!!!■■■N!■■!!o■.!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■!lNN...N■■NNNNNN!!■■NNNNNNNN■■NNNN!lNiJ\NNNNNN!!■■!!lNNNNN■■NNNN!!NNE■NNNNNNNN■■!!!■■o.!i■■■■■■■■■■II■■■N■r:Go■■■■■.■■ • • r■■■■■o.■■iii■■■r■■■■■■N■■■i■■■■■■■■■■■■■ii■■■r■■■■■o■.iii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rL7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r\qG■■■■■■■■■■■■■■II■N■■■.N■■■■■■■■.■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\■■flP■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G■i.■■■■■■■■■■■■■■■11■\■■■■■■■■■■■■■■■■� -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iZ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■ !■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NP■■■■■■■■■■■■■■■■■■■■■■■■■■■!7G■r■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■■■■■N■■■■ !!!!!!!!!■■!■■!■!!!■■!!!!!!!!■■!!!!!!!!■■!■!!■!!!■■!!!!!!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i\!■■■■■■■■■■■■■■■■■■■■■■.fGi■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■!■■!!!!!!■ !■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■..1r\■N■■■■■■■.■r■■■E■■La■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■NNN■■■■■■■■■■■ !!!!!!!!!■■!■!!■!!!■■!!!!!!!!■■!!!!!!!!■■!■!!■!!!■■!!!!!!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!ll....■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NL•\NN■l7Y.rriaGir■N!N!!!!■■!!!■■■■■■■■■■■■■■■■■IINNNNNNN■!■■!!!■■■■- ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■E!lraGL■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■NEENNEENNIrEENE■■!■!■■!!!!!!■ !!!!!!!!!■■!!!!■!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■!!!■■!!!!!!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!■■■!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■IINNNNNNN■!■■■■o■■■ !!!!!!!!!■■!!!!■!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■!!!■■!!!!!!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■IINNNNNNN■!■■■■■■■■■ •!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I1■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■■■■■■■■■■■■� mm -!■■■■■■N■■■■■■■■■r■■■■■■N■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■N■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■N■■■■■r■■■■■■N■■■■■■■■■r■■■■■■N.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■ !!!!!■!N.■■!!!!N■r!■■!!!N■■■■■■!!!!■!!!■■!!!!■■N!■■!!!■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■!lNNNNNN■■NNNNNN!!■■NNNNNNNN■■NNNN!!NNE■NNN■■■■■■■■■■■■■■■■■■r■■■■■■N■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■ .■■■■■■r.■■■■■■■■r!■■■■■N■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■NNNN■NNNNNNN■!■NNN■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■!- mmmmmmmmmmmM.■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■oomom ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■............■■miiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI ■■■■■■■■■■■■■■■■NmmmmmmmmmmmmNE■NNN■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■! � ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!■■■■■■.■■■■ .!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!■■■■■!!!!!!!!■■!!■■■■■■■■■■■■■■■■■■!!!!!!!!■■!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.....■ ............... ■■■■■■■■.■ ■■■■■■■■■■■■■■■■■.■ ■r!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■NNNNNNNN■■NNNNN....■■■■■■■■■■■NNNNNNNN■■NNNNNNNN■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■ mmmm ON ■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■.!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■mmmmmmmmmmmmmmmmm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .!!!!■!N.■■!!!!■■r!■■!!!N■■■■■■!!!!■!!!■■!!!!■■N!■■!!!■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■NNNNNNNN■■NNNNNNNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■NNNN■NNNNNNN■!■NNN■■■■■■.■■■■■■■■■■■■N■■■■■■■■■■■■■.■■ ■■ !■■■■■■•.■■■■■■■■•...........■■!!!!i!!!■■!!!!■■!!■■!!!■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■!!!■■■■■■■■■■■■■■!■!!!■■■■■■.■■■■......■■■■■■■■■........■■ •!!!!!!!N■■■■■■■■■r!■■!!!N■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■N■■■■■■■■■l I ..............■■■■■■■■■■■■■■■■■■■■■■■■■■ ' 1 • r■■■■■■■■■■■■■■■.■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ • !!!!!!!!!■■!!!!■!!!■■!!!!i!!!■■!!!!!!!!■■■■■■■■■■■■■■■■i■■■■■ !■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!■■■■■■■■■■■■ -•!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■!!!!!!!■!!!!!!!■■■■■■■■■■■■■ ......................................................................................................................................................................................!■■■■■■.■■■■■!■■■■■■■■■■■■■■■■■■■■■■■ .......................................................................................................................................................................................■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■ !!!!!!!!!■■!!!!■!!!■■!!!!!!!!■■!!!!!!!!■ ..... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■!!■■■■■■■■■■■■■■■■!!!!!!■■■■■!!!!!!!■■■■■■■■■■■■!■■■■■■■■■■■■■.!!!■■■■■■■■■■■■■■ii m■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!■■■■■■■■■■■■■■■!!!!!!!■■■■■!!!!!!■■N■■■■■■■■rNNNNNN\■■■■■lNNNNN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rNN■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!■!ommoommoommm !!!!■■■■■■■■■■■■■■■ !!!!!!!N■■■!!!!■!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■!!!■■!!!■.!!!!■!!!!!!mmmmmmmmmmmmEEN !!!!!!!N■■■!!!!■!!!■■!!!!i!!!■■!!!!!!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!l.........!l....■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ !!■■!!!!E■■■■■!■■!!!!N■■!!!!!!!!■■!!!!!!!!■■!!!!!!!■.■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!lNNNNNN■■!!!!!!!N■■N!!!!!!!■■NNNNNNNN■■■r!N!!!N■■NNNN!!!!■■!!lNNNNN■■■!!N!!!NN■NNNNNNN■!■NNN■■■■■■.■■■!!!!!■!!!!!■■■■■■■■■■■■■■■ / ■M.■mommmm !!!!!!!N■■■■■■■■!!!■■!!!!■!!■■■!!!!!!!!■■!■■!■!!!■■!!!!■!!■■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■■■■■■■■■■■■■■■■EEEEENEEN ....................................................................................................................................N■................■■■■■■■■■■■■■■•■ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ !!!!!■!N■■■■■■!■!!!■■!!!!■!!!■■!!!!!!!!■■!■!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■EEEEEEEEENEEN .■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■ .....................................................................................................................................................■■■■■■■■■■■■■■■!■ .•■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!mommommommommommom !■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!■!■■!!!!!!!!■■!!!!!!!!■■!!!■■■.■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■!■ mommommommoommoom ■i!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■...............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■■■■■■■■■■■■■■■................................................................................................................................■.............................. ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■.■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ..............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■■■■■■■■■■■■■■■■■■■■ ...........................................................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ...........................................................■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .......... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!..!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■- ■■■■■■■■■■■■■■■■■■...............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■......!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ M■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ NEENEEN NEEN■ •■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!ll ................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■...............■■..............!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!�. .............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .... ■■■■■■sm • -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ..................................................................!!!■■!!!!!■■■■■■■■■■■■■■■■■■■■..............................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■ .......... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.....................................................................■■!!!!!!!!■■!!■■■■■■■■■■■■■....................!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■ll.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■.......■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.........■■■■■■■■ .................■■■■■■■■■■■■■■■■■■■■■■■■ .......... ■■■■■■■■■■■■■■■■■■■■■■■■N■- ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!mm .!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ iiiiiiiiiiiiiiillmmmmmmmmmmmmoom I, iiiiiiiiiiiiiiiiiiiiiillillillillilloommom ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ moommommommoommommommommommommommommommommoom ................................... I, ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■............................ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ....................................................................■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■■■■■■■■■■ -■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■= ...............................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..............................................................................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ momom moommo •■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■o mm moommommommommommommoommommommommommommommoommommom■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■moommommommommommomm000mmoommommommommommommommoommommommommommommommomoom ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ mmmmmmm ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!ll -■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■- ..............■■!!!!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ...... ■■■■■■■■■■■■■■■...............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..........................■■■■■■■■!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■!■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ............................................!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ..............■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■..........■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!■■■■■■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■...!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■..........!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ moommommommommommommoommommommommommommommoommomoom■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.■■■■■■■■■i■■■■■■■■■■■■■■■■■■■ ..........................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■mmmmmmmmmmmmmmmommommommommom ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■mom ■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■■■■■■■■■■■■■■■ .......................!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!■■■■■■■■■■■■■■■■■■■■■■■ENE ..................................................!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!■■■■■■■■■■■■■■■■ .................... ■■■■■■■ ..................... ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .................■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■!■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!!!■!!!!■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!!!!!■■!!!!■■■■■■■■■■■■■■■ .......................... ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ................... .......... ■■■■■■■■■■■■■■■■■■■■■■■■■■ III ---------------------------i!■■!!!!■!!!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■----------------------------------- WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. JD ID Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. A Natural Stream Design (ft) 1 Sz L3 561+11 TO 561+24 RT 2 -5' x 6' RCBC 0.02 136 1 Sz L3 561+11 TO 561+24 RT CHANNEL REALIGNMENT < 0.01 < 0.01 24 18 2 SY L3 584+19 TO 585+04 54" RCP 0.03 0.02 < 0.01 323 60 3 WF L3 584+16 TO 585+35 ROADWAY FILL 0.47 0.02 3 WF L3 584+16 TO 585+35 TEMPORARY BYPASS CHANNEL 0.01 4 SX L3 606+50 TO 617+50 54" RCP 0.21 < 0.01 1509 43 5 WE L3 607+66 TO 608+22 LT ROADWAY FILL 0.04 6 SW L3 616+76 TO 618+60 8' X 6' RCBC 0.09 583 6 SW L3 617+00 RT CHANNEL REALIGNMENT < 0.01 < 0.01 21 5 6 SW L3 618+58 LT CHANNEL REALIGNMENT 0.01 < 0.01 75 18 7 WD L3 643+23 TO 643+80 RT ROADWAY FILL 0.01 8 Sv L3 643+38 RT TO 643+91 LT ROADWAY FILL < 0.01 102 9 SU L3 643+13 RT TO 645+10 LT 66" RCP 0.10 < 0.01 702 29 9 SU L3 645+10 LT CL II RIPRAP ON BANKS < 0.01 < 0.01 20 10 10 L3 649+55 LT TO 651+18 RT 30" RCP 0.03 < 0.01 620 29 10 L3 649+55 LT CL II RIPRAP ON BANKS < 0.01 < 0.01 8 10 11 ST L3 671+97 LT TO 672+82 RT 9' x 8' RCBC 0.10 582 11 ST L3 672+08 RT CHANNEL REALIGNMENT < 0.01 < 0.01 44 23 11 ST L3 672+34 LT CHANNEL REALIGNMENT < 0.01 < 0.01 36 35 12 SS L3 705+00 RT TO 705+10 LT TEMPORARY WORK BRIDGE 0.03 272 13 SR L3 706+79 RT TO 707+02 LT TEMPORARY WORK BRIDGE 0.08 290 14 SQ L3 706+90 RT TO 707+54 RT TEMPORARY STREAM CROSSING < 0.01 67 15 SP L3 733+34 LT TO 736+81 RT 8' X 8' RCBC 0.14 605 15 SP L3 731+47 TO 732+16 LT CHANNEL REALIGNMENT 0.02 92 15 SP L3 732+16 TO 732+71 LT ROADWAY FILL 0.01 60 15 SP L3 732+71 TO 733+34 LT CHANNEL REALIGNMENT 0.02 76 15 SP L3 731+22 TO 731+47 LT CHANNEL REALIGNMENT < 0.01 24 15 SP L3 736+81 TO 737+26 RT CHANNEL REALIGNMENT 0.01 46 15 SP L3 737+26 TO 737+36 RT CHANNEL REALIGNMENT < 0.01 18 16 WB L3 733+46 LT TO 733+80 LT CHANNEL REALIGNMENT < 0.01 TOTALS: 0.56 0.02 0.02 0.81 0.15 5664 951 0 *Rounded totals are sum of actual impacts NOTES: 2016 09 09