Loading...
HomeMy WebLinkAbout20200086 Ver 1_1915_SIA_2nd CD Submittal_20200309FedEx Freight STORMWATER IMPACT ANALYSIS 5203 Chin Page Road Durham, North Carolina Horvath Associates Project Number: 1915 i � � i�, 2019 RRe4ed Q^t r23:2-0 Revised March NCBELS NO: C-0676 Prepared by: Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919) 490-4990 Table of Contents Project Narrative Stormwater Development Review Submittal Checklist Reference Materials Peak Flow Analysis Summary of Results HydroCAD Runoff Analysis SCM Sizing Calculations Nutrient Loading Calculations Maps Narrative A. Project Data  Project Name: FedEx Freight  PIN: 0748-91-06-3841, 0748-91-73-3991  Address: 5203 Chin Page Road  Stormwater Regulatory Basin: Lower Neuse  River Basin: Neuse  Existing Impervious Area: 18,075 sf (On Baseline Date for Stormwater Calculations)  Proposed Impervious Area: 1,141,350 sf  Area of Disturbance: 40.25 ac  TMDL: None  Watershed Protection Overlay: None B. Site History The site in its current state is mostly wooded and vacant. There are a few single-family homes and driveways located on the property. Aerial photographs indicate that no impervious surface has been added to the property since at least 1994. 1994 Aerial Photo 3/28/1998 Aerial Photo 2/28/2002 Aerial Photo 2013 Aerial Photo C. Project Description The project will involve constructing a FedEx freight transfer facility. The development will include a main warehouse building, two ancillary buildings, loading docks, parking areas for trailers, and a parking lot for employee vehicles. The development will also involve extending Crown Parkway from the development northeast of the site to Chin Page Road to the south. D. Quantifying Land Disturbance and Changes in Impervious Surface The project will involve greater than 12,000 sf of land disturbance and will add more than 2,000 sf of new impervious area. This exceeds all thresholds found in the City of Durham Stormwater Performance Standards; therefore, the site will not be exempt from any stormwater requirements. The pre-development impervious surface utilized in the runoff and nutrient loading calculations is that which existed on the baseline date. This was determined from historical planimetric data provided by the City of Durham and verified through aerial photographs. The existing impervious area shown on the site plan is based on the provided survey and may not include driveways that have been overtaken by vegetation or buildings that were removed. There is at least one building in the southern portion of the site that was removed between 2002 and 2013 E. Watershed Protection Overlays The property is not located in a watershed protection overlay. F. Streams There are four streams visible on the Durham County Soil Survey within the property limits. An environmental assessment was performed, and two streams near the southwest property corner were determined to be subject to the Neuse stream buffer rules. A 50- foot buffer has been applied to each subject stream. G. Floodplains There is no FEMA regulated floodplain on the site. H. Applicable Requirements Peak Runoff Requirements Sec. 70-738. Peak runoff control requirements.(a)Purpose. The purpose of this section is to ensure that the increases in volume, velocity, and peak flow of stormwater discharges from development are addressed, in order to mitigate the impacts on downstream properties and receiving waters. All development, including development that may be exempt from pollutant reduction requirements set forth in remaining sections of this article, is subject to the requirements of this section unless exempted in subsection (b) below. (b)Applicability; calculation of prior impervious area. This section 70-738 applies to the following development, assessed in comparison to pre-development prior impervious conditions as defined in subsections (1) and (2) below: (i) relocation of existing impervious area on a multifamily and other lot; (ii) increase in impervious area on any lot subject to limitations on impervious area in an approved plat or plan for reasons such as watershed protection or stormwater control measure requirements; (iii) increase of more than 200 square feet in impervious area on a multifamily and other lot; (iv) increase of more than 2,000 square feet of impervious area on a limited residential lot. For purposes of calculating these thresholds, subject development that is part of a common plan of development shall be assessed with other portions of such common plan that have not previously complied with peak flow requirements. (1)For purposes of applying peak flow requirements for the two- and ten-year storms, the land cover (including type and location) existing as of April 23, 1997 shall be considered the "pre-development conditions"; (2)For purposes of applying the peak flow requirement for the one-year storm, the land cover (including type and location) that existed as of March 9, 2001 for land in the Falls Basin and Lower Neuse Basin, and as of March 17, 2009 for land in the Jordan Basin shall be considered the "pre-development conditions"; (c)Requirements. (1)Stormwater impact analysis. Development that is not exempt under subsection (b) above shall submit a stormwater impact analysis or approved alternative to such analysis that complies with city stormwater standards as part of the application for site plan or subdivision plat approval, or if such is not required, as part of submittals for construction drawings or utility permit approval. Calculations shall be made in conformance with city stormwater standards. No subdivision plats, site plans, utility permits, or construction drawings shall be approved in the absence of a determination by the stormwater division that required submissions have been made and approved. (2)One-year storm. Development that increases the peak runoff rate from the one-year storm from pre-development conditions shall provide stormwater management facilities in accordance with city stormwater standards such that there is no net increase in peak runoff rate. Peak Runoff Analysis There is one location where concentrated runoff leaves the property in the southeast corner of the property. The runoff at this location is channelized and enters an existing pipe where it is conveyed underneath the access road for the property to the west. This location was utilized as the analysis point to demonstrate the development will not negatively impact the existing streams or downstream infrastructure due to increase in runoff. Two wet detention basins are provided to attenuate the peak flow to below pre- development levels for the 1-, 2-, and 10-year rainfall events. An analysis is provided that demonstrates the post-development peak flow rate in the stream channels the wet detention basins discharge to (labeled DP#1 and DP#3) do not increase for the 1-year rainfall event. The peak flow rate leaving the site (DP#1) does not increase for the 2- and 10-year rainfall events when compared to the pre-development rate. Water Quality Per section, 70-739 of the City of Durham Stormwater Ordinance the project is located in the Lower Neuse Regulatory Basin, is part of a Common plan of development, and disturbs more than 0.5 acres; therefore, the project is subject to the requirements for stormwater pollutants found in sections 70-740 and 70-741 of the City of Durham Stormwater Ordinance. Required Reductions for Nutrients Sec. 70-740. Required reductions for nutrients and TSS; alternatives; calculations. Nutrient loading rate limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in subsections (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in section 70-741. Table 2 Nutrient Export Loading Rate Limits Project Location Export Limit lbs/acre/year Nitrogen Phosphorus Falls Basin 2.2 0.33 Lower Neuse Basin 3.6 not required On-Site Percentage Removal Requirements Sec. 70-741. On-site treatment requirements; offsite purchase and credit options; bacteria control. (a) On site nutrient treatment requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Jordan and Falls Basins a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment, in the amount shown in Table 4 below. In addition to meeting the percentage reductions below, in the Jordan and Lower Neuse Basins, nitrogen export loading rates from the site must not exceed six pounds per acre per year for limited residential, and ten pounds per acre per year for multifamily and other (Note: offsite credit purchases do not meet TSS removal requirements which must be met onsite). Table 4 Onsite Nutrient Treatment Requirements Project Location Minimum Onsite Nutrient Treatment Nitrogen Phosphorus Falls - General *50% of required reduction *50% of required reduction Falls Downtown Area *30% of required reduction *30% of required reduction Falls exceeding thresholds but with less than 1 acre land disturbance *30% of required reduction *30% of required reduction Lower Neuse No Percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met Not required *The "required reduction" is the difference between the post development loading in pounds per acre per year multiplied by the site area in acres before treatment minus the loading target, in pounds per acre per year multiplied by the acres. The percentage shown in the chart above is applied to that difference and the resulting number is the amount in pounds/year of nutrient reduction that must be achieved onsite. (b)Offset payments to state approved nutrient mitigation banks. Development and redevelopment shall have the option of purchasing nutrient credits from state- approved nutrient banks to partially offset nitrogen and/or phosphorus loads as allowed by state law and regulation, including but not limited to 15A NCAC 02B.0235, 15A NCAC 02B.0282, and 15A NCAC 02B.0240, as they may be amended from time to time. In the Jordan Basin, calculation of credits required shall reflect state approved delivery factors. The number of pounds for which credits are purchased shall be increased by five percent if the nutrient bank is not located in the city. The following additional requirements shall apply: (1)Location of nutrient banks. Development in the Falls Basin must use nutrient banks located in the upper Falls portion of the Falls Basin—the portion that is north and/or west of Highway 50. Development in the Jordan Basin must use nutrient banks located in the Upper New Hope arm of such basin, as defined in state regulations. (2)Certification of nutrient bank provider. Offset credits may only be obtained from nutrient banks certified by the state. (3)Utilization of NC Ecosystem Enhancement Program. Credits may also be obtained from the NC Ecosystem Enhancement Program if such credits are available, and if applicable state requirements regarding utilization of private nutrient banks are first met. (4)Certification of credits. Credits purchased pursuant to this subsection (b) shall be verified by the state and proof of such verification that meets city requirements shall be presented prior to approval of a final plat, or if no plat is required, prior to issuance of the first building permit within the project, or such earlier deadline as may be required by city stormwater standards. The project is located in the Lower Neuse Regulatory Basin and is not considered limited residential development; therefore, the nitrogen loading rate leaving the site cannot exceed 10 lbs/acre/year. Through a combination of on-site treatment and purchase of nutrient offset credits, The total nitrogen loading rate for the site must not exceed 3.6 lbs/ac/year. There are no phosphorous loading limits in the Lower Neuse Basin. Nitrogen loading calculations demonstrate that the total site nitrogen loading does not exceed 10 lbs/ac/year. Additional loading that exceeds the 3.6 lbs/ac/year limit will be mitigated by purchasing nitrogen credits from a state approved mitigation bank or NC DMS. Bacteria Control Sec. 70-741. On-site treatment requirements; offsite purchase and credit options; bacteria control. (d)Bacteria removal; control of other identified stormwater pollutants. All development which constructs stormwater control measures in order to comply with this article and which is located in an area that is subject to a state approved total maximum daily load for bacteria shall be required to have at least one SCM for each stormwater discharge that is rated as medium or high for its ability to remove bacteria from stormwater. Ratings shall be those that appear in the most recent version of the NCDENR Stormwater SCM manual or as determined or approved by the director. In addition, SCMs required to be constructed under this article must also treat any other pollutant for which a total maximum daily load has been identified for the area within which the SCM is located. This project is not located in an area that is subject to a state approved total maximum daily load for bacteria or turbidity; therefore, no bacteria or turbidity removal is required. TSS Reduction Sec. 70-740. Required reductions for nutrients and TSS; alternatives; calculations (e)TSS reduction. When the impervious percentage of a development that increases impervious area equals or exceeds 16 percent in the Falls or Jordan Basins, or 24 percent in the Lower Neuse Basin, TSS removal is required as further described in this subsection (e). All impervious surfaces, as reasonably practical, must drain to an SCM that is designed to provide a minimum of 85 percent TSS removal and is sized to capture runoff from the first one inch of rainfall from all surfaces that drain to the SCM. These requirements are expanded, and/or modified as follows: (1)Piped areas in low density projects. Projects that do not require construction of SCMs because their impervious percentage is less than that described in the paragraph above must treat TSS from stormwater runoff that is conveyed in non-vegetated conveyances, such as stormwater pipes, but excluding road and driveway crossings. (2)Overtreatment to address untreatable areas. Where treatment for TSS is not reasonably practicable, as determined by the department, such as when impervious areas include offsite transportation improvements or small noncontiguous areas at the edge of a project, additional reductions of TSS may be required in treatable areas, such as overtreatment in other project areas or treatment of offsite runon. (f)Calculations for nutrient loading and TSS removal. Pollutant loading calculations shall be made using city stormwater standards. All increases in impervious surfaces shall be included, including but not limited internal and off site transportation improvements. Approved methodologies for calculating pollutant loading shall be maintained in writing by the public works department, and shall include those methodologies and calculations required to be used by the division of water quality or DWQ-approved alternate methodologies. (g)Submittals. An applicant shall submit pollutant loading calculations for the pre- and post-development conditions as part of its application for approval of a subdivision or site plan, utility permit, or construction drawings for a street or utility. This project is subject to TSS removal requirements. All runoff from on-site impervious surfaces will be captured in the proposed wet detention basins which will provide 85% TSS removal. Diffuse Flow Each proposed stormwater outfall will discharge directly to the steam and has a wet detention basin that provides 85% TSS removal for runoff from all added impervious surfaces. This meets the Neuse Stream Buffer requirements for diffuse flow. I. Methodology  United States Geological Survey Map is the Southeast Durham Quadrangle.  The FEMA Map associated with the site is Map 3720074800K; effective date October 19, 2018.  Soil data to determine curve numbers in the watershed are from USDA Durham County Soil Map # 36. Onsite soils are a mixture of HSG ‘B’ and HSG ‘C’. J. Conclusions 1-, 2-, and 10-year rainfall event peak runoff rates will not exceed pre-development levels at the site’s discharge points. Two proposed wet detention basins will provide on-site nitrogen loading reduction so that the loading rate leaving the site does not exceed 10 lbs/ac/yr. Any remaining nitrogen loading exceeding 3.6 lbs/ac/yr will be mitigated by purchasing offset credits. 85% TSS removal will be provided in the wet detention basins for all on-site impervious area. Stormwater Development Review Submittal Checklist CITY OF DURHAM – STORMWATER SERVICES SITE PLAN SUBMITTAL CHECKLIST Department of Public Works 101 City Hall Plaza | Durham, NC 27701 919.560.4326 | F 919.560.4316 Date: ____________________ www.durhamnc.gov PROJECT INFORMATION Project Name: Phase: Planning Case Number: Previous Project Name(s): PIN(s): Contact Person: Phone: Company: Fax: Email Address: INSTRUCTIONS For each review submittal, including re-submittals, the entire Stormwater Impact Analysis (SIA) and submittal checklist shall be submitted. Partial SIA and checklist will result in notification of an incomplete submittal with no review performed. Contact Stormwater Services regarding redevelopment or expansion projects for modified requirements. The following checklist outlines submittal requirements. Initial in the space provided to indicate the following submittal requirements have been met and supporting documentation is attached. A. GENERAL REQUIREMENTS Initials _____ (Check One) __ INSIDE __ OUTSIDE Watershed Protection Overlay (WPO). Indicate the WPO(s) where the project is located: (Check all that apply) __ F/J-A __ F/J-B __ E-A __ E-B __ M/LR-A __ M/LR-B If inside WPO, notation of WPO Standards is required on plans. _____ (Check all that apply) __ Jordan Basin __ Falls Basin __ Lower Neuse Basin _____ A legible copy of the United States Geological Survey 7.5 Minute Quadrangle map is provided, including map reference, with site boundary clearly shown and labeled. The map clearly shows all streams. _____ A legible copy of the published Durham County Soil Survey is provided, including map reference, with the site boundary clearly shown and labeled. The map clearly shows all streams, soil types and soil type boundaries. _____ Tops of banks for the streams are shown on the plan. [Contact the North Carolina Department of Environment and Natural Resources for stream identifications in the Neuse River Basin (Falls and Lower Neuse Basins). Stream determinations in the Jordan Basin shall be submitted per the Letter to Industry found on Stormwater Development Reviews’ web site at New Stream Buffer Requirements [First Revision to LTI 07-03-08] (25August2011)]. _____ All Watershed Protection Overlay, Neuse River Basin, Jordan Basin, and City riparian buffers, measured from the tops of the stream banks, are shown on the plan. Page 1 of 6 11/26/2019 FedEx Freight N/A D1900260 N/A 0748-91-06-3841, 0748-91-73-3991 Matt Jones, PE Horvath Associates, P.A. (919) 490-4990 (919) 490-8953 matt.jones@horvathassociates.com MJ MJ ✔ MJ MJ MJ MJ ✔ _____ The 10-foot no build setback, measured from all riparian buffers, is shown on the plan. _____ Diffuse flow is achieved into riparian buffers. _____ (Check One) __ Yes __ No Regulated floodplain located on site. _____ A legible copy of the effective Federal Emergency Management Agency National Flood Insurance Program Flood Insurance Rate Map is provided. Map number, map date, and site boundary are clearly shown and labeled. [This map is required regardless of whether floodplain is located on the site.] The effective and/or future FEMA 100-year floodplain, with base flood elevations (if applicable), are shown on the plan. _____ All applicable notes, per the Standard Notes section of the Reference Guide for Development, have been added to the plan. _____ Stormwater Impact Analysis (SIA) sealed and signed by a registered North Carolina Professional Engineer (NCPE) is provided, including narrative report and drainage calculations. Note: If a site is exempt from stormwater requirements then a narrative advising of the exemption can be submitted by any designer. B. PEAK DISCHARGE RATE EVALUATION Initials _____ An introductory narrative describing pre- and post-development site conditions and site improvement changes, is provided. Note: The baseline conditions for the 1-year event varies based upon the regulatory basin in which the project is located. _____ Drainage area maps (one map for pre-development and one map for post-development) are provided with the following items: _____Scale and north arrow (Note: Except in the instance of site-to-drainage area maps, the scale of each drainage area map shall not exceed 1” = 30’). _____Sub-basin area(s) delineated with area(s) in acres indicated. _____Analysis points clearly identified and labeled. _____Segmented TR-55 time of concentration flow paths showing and labeling each segment. _____ Methodologies and procedures are fully described. _____ A site plan with contour lines or grading plan identifying pre- and post-development drainage patterns is provided. _____ Pre- and post-development times of concentration, calculated by TR-55 segmented approach, are provided. _____ Calculations for the pre- and post-development peak discharge rates are provided for the 1-, 2-, 10-, and 100-year, 24-hour storm using TR-55, TR-20, HEC-HMS, HEC-1 or Rational Method as applicable. Note: The Rational Method is not accepted for the 1-year analysis, areas that drain more than 50 acres, or watersheds that are not homogeneous. Page 2 of 6 MJ MJ MJ ✔ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ _____ A Summary of Results is provided in the following format: Site Analysis Point #__________ Site Condition Storm Event (cfs) 1-year (cfs) 2-year (cfs) 10-year (cfs) 100-year (cfs) ____-year (cfs) Pre-Development Post-Development without Detention Post-Development with Detention _____ Conclusions providing detailed findings are provided. _____ Stormwater control measure(s) (SCM[s]) are provided (indicate number of each type of SCM): ____Level Spreader w/ Vegetative Filter Strip ____Stormwater Wetland ____Wet Detention Basin ____Sand Filter ____Bioretention ____Grassed Swale ____Restored Riparian Buffer ____Dry Extended Detention Basin ____Permeable Pavement ____Green Roof ____Disconnected Impervious Surface ____Rainwater Harvesting System ____Proprietary Systems or Other________________________________________________ ____Not required (provide explanation): ____________________________________________ _____ The SCM(s) indicated above are required to control the following peak discharge rates: ____1-year ____2-year ____10-year ____100-year ____Other_________________________ _____ A downstream analysis in accordance with the Reference Guide for Development is provided with findings, or is ______Not required (provide explanation): C. POLLUTANT CONTROL REQUIREMENTS Initials _____ The project is exempt based upon cumulative land disturbance as of the applicable baseline date. _____ 7KHSURSRVHGSURMHFWLVBBBBB•LPSHUYLRXV )DOOVDQG-RUGDQ%DVLQV BBBBB• impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. OR The proposed project is _____ <16% impervious (Falls and Jordan Basins) / _____ <24% impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal for all runoff from non-vegetated conveyances is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. _____ The project is low density without non-vegetated conveyances, thus TSS removal is not required. Page 3 of 6 MJ MJ MJ 2 MJ XXX N/A MJ Post-development peak flow rates will not exceed pre-development rates. N/A MJ X N/A _____ SCMs for TSS removal are provided (indicate number of each type of SCM): Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. ____Level Spreader w/ Vegetative Filter Strip ____Stormwater Wetland ____Wet Detention Basin ____Sand Filter ____Bioretention ____Grassed Swale ____Restored Riparian Buffer ____Dry Extended Detention Basin ____Permeable Pavement ____Green Roof ____Disconnected Impervious Surface ____Rainwater Harvesting System ____Proprietary Systems or Other________________________________________________ ____Not required (provide explanation): _____ Both hard copies, and Excel-format electronic copies on a DVD or compact disc, of the following: x Pre- and post-development nutrient calculations using the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool found at : http://portal.ncdenr.org/web/jordanlake/implementation-guidance-archive or http://durhamnc.gov/ich/op/pwd/storm/Pages/SWDevReview.aspx Note: Nutrient calculations are always required regardless if the project is exempt from treatment requirements. x The Nutrient Reporting Form (including the Compliance Worksheet tab) per the 3/7/2013 Letter to Industry http://durhamnc.gov/ich/op/pwd/storm/Pages/LTI-SWDevReview.aspx _____ Pre- and post-development land use area maps that correspond to the categories used in the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool for the nutrient calculations, to scale no smaller than 1 inch = 100 feet. The maps shall show the map scale, north arrow, and are to have the different land uses either hatched or shaded with areas indicated in a legend on the maps. Note: The land use area maps are always required regardless if the project is exempt from treatment requirements. Page 4 of 6 MJ 2 MJ MJ _____ SCMs for nutrient control are provided (indicate number of each type of SCM): ____Level Spreader w/ Vegetative Filter Strip ____Stormwater Wetland ____Wet Detention Basin ____Sand Filter ____Bioretention ____Grassed Swale ____Restored Riparian Buffer ____Dry Extended Detention Basin ____Permeable Pavement ____Green Roof ____Disconnected Impervious Surface ____Rainwater Harvesting System ____Proprietary Systems or Other________________________________________________ ____Not required (provide explanation): _____ After meeting the minimum on-site treatment requirements, additional treatment and/or offsite credit purchases, if needed, is provided by: ____Additional SCMs ____Nutrient Offset Payment to the North Carolina Ecosystem Enhancement Program ____Nutrient Offset Payment to an Approved Nutrient Bank ____Land Bank Credit Transfer (Commitments shall be made prior to October 1, 2015) _____ The project site is located in an area subject to a state-approved Total Maximum Daily Load (TMDL) for bacteria. (As of April 2014, only Northeast Creek has a TMDL for bacteria). _____ SCMs rated as medium or high for bacterial removal are provided (indicate number of each type of SCM): ____Bioretention Area ____ Stormwater Wetlands ____Wet Detention Basin ____ Sand Filter ____Level Spreader w/ Vegetative Filter Strip ____Restored Riparian Buffer ____Dry Extended Detention Basin ____ Permeable Pavement ____Other (specify)_____________________________________________________________ ____Not required (provide explanation): Page 5 of 6 MJ 2 MJ X N/A MJ MJ The project is not located in a watershed that has a TMDL for bacteria. D. WATERSHED PROTECTION OVERLAY REQUIREMENTS Initials _____ 85% Total Suspended Solids (TSS) removal is required for this project, and 100% of the impervious area will be treated by an SCM. Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. _____ SCM for TSS removal are provided (indicate number of each type of SCM): ____Level Spreader w/ Vegetative Filter Strip ____Stormwater Wetland ____Wet Detention Basin ____Sand Filter ____Bioretention ____Grassed Swale ____Restored Riparian Buffer ____Dry Extended Detention Basin ____Permeable Pavement ____Rooftop Runoff Management ____Disconnected Impervious Surface ____Rainwater Harvesting System ____Proprietary Systems or Other________________________________________________ ____Not required (provide explanation): Page 6 of 6 N/A N/A Reference Material USGS The National Map: Orthoimagery. Data refreshed April, 2019.National Flood Hazard Layer FIRMette05001,0001,5002,000250FeetÜ78°50'24.55"W 35°54'4.69"N 78°49'47.10"W 35°53'35.55"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUTSPECIAL FLOODHAZARD AREASWithout Base Flood Elevation (BFE)Zone A, V, A99With BFE or DepthZone AE, AO, AH, VE, ARRegulatory Floodway0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone XFuture Conditions 1% AnnualChance Flood HazardZone XArea with Reduced Flood Risk due toLevee. See Notes.Zone XArea with Flood Risk due to LeveeZone DNO SCREENArea of Minimal Flood HazardZone XArea of Undetermined Flood HazardZone DChannel, Culvert, or Storm SewerLevee, Dike, or FloodwallCross Sections with 1% Annual Chance17.5Water Surface ElevationCoastal TransectCoastal Transect BaselineProfile BaselineHydrographic FeatureBase Flood Elevation Line (BFE)Effective LOMRsLimit of StudyJurisdiction BoundaryDigital Data AvailableNo Digital Data AvailableUnmappedThis map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standardsThe flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 7/29/2019 at 4:18:13 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time.This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes. LegendOTHER AREAS OFFLOOD HAZARDOTHER AREASGENERALSTRUCTURESOTHERFEATURESMAP PANELS81:6,000B20.2The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.SITE 1915 - Chin Page Road Industrial (FedEx Freight) USGS MAP - SE Durham Quadrangle SCALE 1:24,000 N +\GURORJLF6RLO*URXS²'XUKDP&RXQW\1RUWK&DUROLQD )HG([)UHLJKW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI  ƒ  1 ƒ  :ƒ  1ƒ  :ƒ  1 ƒ  :ƒ  1 ƒ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²0D\7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUHFRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQGLPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJRIPDSXQLWERXQGDULHVPD\EHHYLGHQW+\GURORJLF6RLO*URXS²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²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²'XUKDP&RXQW\1RUWK&DUROLQD )HG([)UHLJKW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI SITE tt- Water Resources Environmental Quality June 11, 2018 Bethpage Acquisition Partners II, LLC Tri Properties, Inc. Attn: Rob Griffin 4309 Emperor Blvd, Suite 110 Durham, NC 27703 Determination Type: ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interior Director Subject: Buffer Determination Letter NBRRO #18-156 Durham County Buffer I Intermittent/Perennial ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico (15A NCAC 2B .0259) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Chin Page Road Site ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) Address/Location: 5203 Chin Page Road, Durham Stream(s): UTs to Stirrup Iron Creek Determination Date: 06/08/2018 Staff: Jeremiah Dow Stream ER/Plrl Not Subject Start@ Stop@ Soil USGS Feature Subjectt2> Survey Topo A 1/P X DWR Flag, OffProp Property X 35.897535,-78.835355 B E X NA NA X C E X NA NA X D UP X DWR Flag, Confluence with X 35.897003,-78.835767 Feature A E E j X j j NA NA X � Nothing Compares: State of North Carolina I Environmental Quality I Water Resources [ Raleigh Regional Office 1628 Mail service Center I Raleigh, North Carolina 27699-1628 919 7914200 Chin Page Road Site Wake County 06/11/2018 Page 2 of 2 Stream EQ/P(t> Not z) Subject Start@ Stop@ Soil USGS Feature Subject( Survey To o F Previously classified as "not subject" in buffer determination #17-446. Pond 1 NA X NA NA X (1) E = Ephemeral, I = Intermittent, P =Perennial, NP=Not Present (d) Refers to riparian bufferrules only. Stream. wetlavd or vnnd impacts are still suhievr rn annlinahle.vnmr n.arw �m.,,lnme sad ..- «:......,...:.- Explanation: The stream(s)/pond(s) listed above has been located on the most recent published NRCS Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1: 24,000 scale. Each feature that is checked "Not Subject" has been determined to not be an intermittent stream, perennial stream, a pond connected to a stream feature, or the feature is determined not to be present. Stream features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be subject to the buffer rules. There may be other streams located on the property that do not show up on the maps referenced above and are therefore not subject to the buffer rules. However, if the stream features are present on the tract they are subject to all other applicable North Carolina stream standards and permitting requirements as outlined in 15A NCAC 0213, and maybe considered jurisdictional according to the US Army Corps of Engineers. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. Ifsending via US Postal Service: c/o Karen Higgins, DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins; DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Jeremiah Dow at (919) 791-4 48. Si cerel , Danny S th Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Kelly Roth, McAdams Company, via email at roth@mcadamsco.com 5203 Chin Page Road, Durham Buffer Determination #18=156 1 1 VIisE // ..,,: .. , f� . r Feature A: Subject, W$C1% « Start at DWR Flag located Feature F: Not Subject per at 35.897535,-78.835355 Buffer Determination 17-446 At pt[ MfE it FeatureE: Not Subject OFF ., t \\ �- J 1l,, i rw. n+ C �.. k Feature D: Subject, Start at DWR Flag located at 35,8970031-78,835767 1 M, Legend: - Approximate Site Boundary r -� Feature C: Not Subject Feature B: Not Subject Map provided by NCDEQ Division of Water Resources Locations are approximate and are pro- vided for reference only:: I Pond 1: Not Subject Legend: - Approximate Site Boundary 5203 Chin Page Road, Durham Buffer Determination #18-156 `_J fH11W E J Map provided by NCDEQ Division of Water Resources Locations are approximate and are pro- vided for reference only :: Peak Flow Analysis Summary of Results HydroCAD Runoff Analysis 1915_Summary of Results.xls Summary of Results Matt Jones, PE 3/4/2020 Site Condition DP#1 DP#2 DP#3 Pre-Development 12.66 3.97 3.42 Post-Development without Detention 140.03 64.63 70.11 Post-Development without Detention Percent Increase 1006% 1528% 1950% Post-Development with Detention 11.86 1.88 2.94 Site Condition 2-year (cfs) 10-year (cfs) Pre-Development 22.42 65.88 Post-Development without Detention 169.51 269.85 Post-Development without Detention Percent Increase 656% 310% Post-Development with Detention 15.96 58.72 Runoff Analysis - Summary of Results 1915 - FedEX Freight 1-Year Peak Flow (cfs) Storm Event DP#1 1 DP#1 TC Test 2 DP#2 TC Test DP#1 Subcat DP#1 DP#2 Subcat DP#2 DP#3 Subcat DP#3 1L DP#1 Routing Diagram for 1915_SIA_PRE Prepared by Horvath Associates, PA, Printed 10/23/2019 HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 2HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: DP#1 TC Test Runoff=0.00 cfs 0.000 af Subcatchment 2: DP#2 TC Test Runoff=0.00 cfs 0.000 af Runoff Area=19.93 ac 5.72% Impervious Runoff Depth>0.44"Subcatchment DP#1: Subcat DP#1 Flow Length=1,765' Tc=21.1 min CN=59/98 Runoff=5.86 cfs 0.731 af Runoff Area=19.68 ac 0.00% Impervious Runoff Depth>0.33"Subcatchment DP#2: Subcat DP#2 Flow Length=1,566' Tc=20.3 min CN=60/0 Runoff=3.97 cfs 0.541 af Runoff Area=6.19 ac 9.80% Impervious Runoff Depth>0.60"Subcatchment DP#3: Subcat DP#3 Flow Length=1,105' Tc=15.3 min CN=61/98 Runoff=3.42 cfs 0.308 af Inflow=12.66 cfs 1.580 afLink 1L: DP#1 Primary=12.66 cfs 1.580 af Total Runoff Area = 45.80 ac Runoff Volume = 1.580 af Average Runoff Depth = 0.41" 96.19% Pervious = 44.05 ac 3.81% Impervious = 1.75 ac Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 3HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1: DP#1 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 417 0.1030 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 509 0.0180 4.3 17.39 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 17.8 1,001 Total Summary for Subcatchment 2: DP#2 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.9 779 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 19.6 1,502 Total Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 5.86 cfs @ 12.18 hrs, Volume= 0.731 af, Depth> 0.44" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 4HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Area (ac) CN Description 3.17 70 Forest, good, HSG C 12.74 55 Forest, good, HSG B 0.79 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG C 0.30 74 Open, good, HSG C 2.58 61 Open, good, HSG B 0.10 98 Parking, good, HSG B 0.15 98 Roof, good, HSG B 19.93 61 Weighted Average 18.79 59 94.28% Pervious Area 1.14 98 5.72% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 618 0.0710 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 642 0.0420 5.5 10.96 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 2.2 430 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 21.1 1,765 Total Summary for Subcatchment DP#2: Subcat DP#2 Runoff = 3.97 cfs @ 12.20 hrs, Volume= 0.541 af, Depth> 0.33" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 3.41 77 Forest, good, HSG D 15.31 55 Forest, good, HSG B 0.56 80 Open, good, HSG D 0.40 61 Open, good, HSG B 19.68 60 Weighted Average 19.68 60 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.6 843 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 20.3 1,566 Total Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 5HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 3.42 cfs @ 12.10 hrs, Volume= 0.308 af, Depth> 0.60" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 2.98 55 Forest, good, HSG B 0.91 77 Forest, good, HSG D 0.00 98 Roof, good, HSG D 0.09 80 Open, good, HSG D 1.59 61 Open, good, HSG B 0.08 98 Parking, good, HSG B 0.08 98 Roof, good, HSG B 0.45 98 Offsite Impervious, good, HSG B 6.19 64 Weighted Average 5.58 61 90.20% Pervious Area 0.61 98 9.80% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.7 802 0.0510 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 228 0.0530 6.2 12.31 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 15.3 1,105 Total Summary for Link 1L: DP#1 Inflow Area = 45.80 ac, 3.81% Impervious, Inflow Depth > 0.41" for 1-Year event Inflow = 12.66 cfs @ 12.16 hrs, Volume= 1.580 af Primary = 12.66 cfs @ 12.16 hrs, Volume= 1.580 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 6HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: DP#1 TC Test Runoff=0.00 cfs 0.000 af Subcatchment 2: DP#2 TC Test Runoff=0.00 cfs 0.000 af Runoff Area=19.93 ac 5.72% Impervious Runoff Depth>0.65"Subcatchment DP#1: Subcat DP#1 Flow Length=1,765' Tc=21.1 min CN=59/98 Runoff=9.95 cfs 1.071 af Runoff Area=19.68 ac 0.00% Impervious Runoff Depth>0.53"Subcatchment DP#2: Subcat DP#2 Flow Length=1,566' Tc=20.3 min CN=60/0 Runoff=8.01 cfs 0.864 af Runoff Area=6.19 ac 9.80% Impervious Runoff Depth>0.83"Subcatchment DP#3: Subcat DP#3 Flow Length=1,105' Tc=15.3 min CN=61/98 Runoff=5.25 cfs 0.429 af Inflow=22.42 cfs 2.364 afLink 1L: DP#1 Primary=22.42 cfs 2.364 af Total Runoff Area = 45.80 ac Runoff Volume = 2.364 af Average Runoff Depth = 0.62" 96.19% Pervious = 44.05 ac 3.81% Impervious = 1.75 ac Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 7HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1: DP#1 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 417 0.1030 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 509 0.0180 4.3 17.39 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 17.8 1,001 Total Summary for Subcatchment 2: DP#2 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.9 779 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 19.6 1,502 Total Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 9.95 cfs @ 12.17 hrs, Volume= 1.071 af, Depth> 0.65" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 8HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Area (ac) CN Description 3.17 70 Forest, good, HSG C 12.74 55 Forest, good, HSG B 0.79 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG C 0.30 74 Open, good, HSG C 2.58 61 Open, good, HSG B 0.10 98 Parking, good, HSG B 0.15 98 Roof, good, HSG B 19.93 61 Weighted Average 18.79 59 94.28% Pervious Area 1.14 98 5.72% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 618 0.0710 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 642 0.0420 5.5 10.96 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 2.2 430 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 21.1 1,765 Total Summary for Subcatchment DP#2: Subcat DP#2 Runoff = 8.01 cfs @ 12.18 hrs, Volume= 0.864 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 3.41 77 Forest, good, HSG D 15.31 55 Forest, good, HSG B 0.56 80 Open, good, HSG D 0.40 61 Open, good, HSG B 19.68 60 Weighted Average 19.68 60 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.6 843 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 20.3 1,566 Total Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 9HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 5.25 cfs @ 12.09 hrs, Volume= 0.429 af, Depth> 0.83" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 2.98 55 Forest, good, HSG B 0.91 77 Forest, good, HSG D 0.00 98 Roof, good, HSG D 0.09 80 Open, good, HSG D 1.59 61 Open, good, HSG B 0.08 98 Parking, good, HSG B 0.08 98 Roof, good, HSG B 0.45 98 Offsite Impervious, good, HSG B 6.19 64 Weighted Average 5.58 61 90.20% Pervious Area 0.61 98 9.80% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.7 802 0.0510 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 228 0.0530 6.2 12.31 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 15.3 1,105 Total Summary for Link 1L: DP#1 Inflow Area = 45.80 ac, 3.81% Impervious, Inflow Depth > 0.62" for 2-Year event Inflow = 22.42 cfs @ 12.16 hrs, Volume= 2.364 af Primary = 22.42 cfs @ 12.16 hrs, Volume= 2.364 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 10HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1: DP#1 TC Test Runoff=0.00 cfs 0.000 af Subcatchment 2: DP#2 TC Test Runoff=0.00 cfs 0.000 af Runoff Area=19.93 ac 5.72% Impervious Runoff Depth>1.49"Subcatchment DP#1: Subcat DP#1 Flow Length=1,765' Tc=21.1 min CN=59/98 Runoff=28.29 cfs 2.467 af Runoff Area=19.68 ac 0.00% Impervious Runoff Depth>1.35"Subcatchment DP#2: Subcat DP#2 Flow Length=1,566' Tc=20.3 min CN=60/0 Runoff=26.55 cfs 2.214 af Runoff Area=6.19 ac 9.80% Impervious Runoff Depth>1.76"Subcatchment DP#3: Subcat DP#3 Flow Length=1,105' Tc=15.3 min CN=61/98 Runoff=12.68 cfs 0.907 af Inflow=65.88 cfs 5.588 afLink 1L: DP#1 Primary=65.88 cfs 5.588 af Total Runoff Area = 45.80 ac Runoff Volume = 5.588 af Average Runoff Depth = 1.46" 96.19% Pervious = 44.05 ac 3.81% Impervious = 1.75 ac Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 11HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment 1: DP#1 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 417 0.1030 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 509 0.0180 4.3 17.39 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 17.8 1,001 Total Summary for Subcatchment 2: DP#2 TC Test Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.9 779 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 19.6 1,502 Total Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 28.29 cfs @ 12.16 hrs, Volume= 2.467 af, Depth> 1.49" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 12HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Area (ac) CN Description 3.17 70 Forest, good, HSG C 12.74 55 Forest, good, HSG B 0.79 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG C 0.30 74 Open, good, HSG C 2.58 61 Open, good, HSG B 0.10 98 Parking, good, HSG B 0.15 98 Roof, good, HSG B 19.93 61 Weighted Average 18.79 59 94.28% Pervious Area 1.14 98 5.72% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 618 0.0710 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 642 0.0420 5.5 10.96 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 2.2 430 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 21.1 1,765 Total Summary for Subcatchment DP#2: Subcat DP#2 Runoff = 26.55 cfs @ 12.15 hrs, Volume= 2.214 af, Depth> 1.35" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 3.41 77 Forest, good, HSG D 15.31 55 Forest, good, HSG B 0.56 80 Open, good, HSG D 0.40 61 Open, good, HSG B 19.68 60 Weighted Average 19.68 60 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.6 843 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.2 648 0.0220 4.8 19.22 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 20.3 1,566 Total Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_PRE Printed 10/23/2019Prepared by Horvath Associates, PA Page 13HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 12.68 cfs @ 12.09 hrs, Volume= 0.907 af, Depth> 1.76" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 2.98 55 Forest, good, HSG B 0.91 77 Forest, good, HSG D 0.00 98 Roof, good, HSG D 0.09 80 Open, good, HSG D 1.59 61 Open, good, HSG B 0.08 98 Parking, good, HSG B 0.08 98 Roof, good, HSG B 0.45 98 Offsite Impervious, good, HSG B 6.19 64 Weighted Average 5.58 61 90.20% Pervious Area 0.61 98 9.80% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.7 802 0.0510 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 228 0.0530 6.2 12.31 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 15.3 1,105 Total Summary for Link 1L: DP#1 Inflow Area = 45.80 ac, 3.81% Impervious, Inflow Depth > 1.46" for 10-Year event Inflow = 65.88 cfs @ 12.14 hrs, Volume= 5.588 af Primary = 65.88 cfs @ 12.14 hrs, Volume= 5.588 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs DP#1 Subcat DP#1 DP#3 Subcat DP#3 WDB#1 Subcat WDB#1 WDB#2 Subcat WDB#2 1P WDB#1 2P WDB#2 1L DP#1 2L DP#2 3L DP#3 Routing Diagram for 1915_SIA_POST Prepared by Horvath Associates, PA, Printed 3/4/2020 HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 2HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.45 ac 19.74% Impervious Runoff Depth>0.81"Subcatchment DP#1: Subcat DP#1 Flow Length=374' Tc=12.2 min CN=60/98 Runoff=5.68 cfs 0.436 af Runoff Area=2.42 ac 18.56% Impervious Runoff Depth>0.81"Subcatchment DP#3: Subcat DP#3 Flow Length=602' Tc=11.6 min CN=61/98 Runoff=2.19 cfs 0.163 af Runoff Area=18.39 ac 79.42% Impervious Runoff Depth>2.29"Subcatchment WDB#1: Subcat WDB#1 Tc=5.0 min CN=63/98 Runoff=64.63 cfs 3.503 af Runoff Area=23.26 ac 61.45% Impervious Runoff Depth>1.94"Subcatchment WDB#2: Subcat WDB#2 Tc=5.0 min CN=68/98 Runoff=70.11 cfs 3.762 af Peak Elev=345.68' Storage=103,978 cf Inflow=64.63 cfs 3.503 afPond 1P: WDB#1 Outflow=1.88 cfs 1.742 af Peak Elev=344.69' Storage=103,701 cf Inflow=70.11 cfs 3.762 afPond 2P: WDB#2 Outflow=2.94 cfs 2.247 af Inflow=11.86 cfs 4.588 afLink 1L: DP#1 Primary=11.86 cfs 4.588 af Inflow=1.88 cfs 1.742 afLink 2L: DP#2 Primary=1.88 cfs 1.742 af Inflow=2.94 cfs 2.247 afLink 3L: DP#3 Primary=2.94 cfs 2.247 af Total Runoff Area = 50.51 ac Runoff Volume = 7.864 af Average Runoff Depth = 1.87" 39.39% Pervious = 19.90 ac 60.61% Impervious = 30.62 ac Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 3HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 5.68 cfs @ 12.05 hrs, Volume= 0.436 af, Depth> 0.81" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.23 77 Forest, good, HSG D 1.17 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG D 0.36 80 Open, good, HSG D 1.78 61 Open, good, HSG B 0.00 98 Parking, good, HSG B 2.81 55 Forest, good, HSG B 6.45 67 Weighted Average 5.18 60 80.26% Pervious Area 1.27 98 19.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0533 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 187 0.1180 5.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 112 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 12.2 374 Total Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 4HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#1: Subcat DP#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 1-Year Rainfall=3.00" Runoff Area=6.45 ac Runoff Volume=0.436 af Runoff Depth>0.81" Flow Length=374' Tc=12.2 min CN=60/98 5.68 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 5HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 2.19 cfs @ 12.05 hrs, Volume= 0.163 af, Depth> 0.81" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.09 80 Open, good, HSG D 0.08 77 Forest, good, HSG D 0.45 98 Offsite Impervious, good, HSG B 0.45 55 Forest, good, HSG B 1.35 61 Open, good, HSG B 2.42 68 Weighted Average 1.97 61 81.44% Pervious Area 0.45 98 18.56% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 341 0.0760 4.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 186 0.0540 16.7 52.57 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.6 602 Total Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 6HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#3: Subcat DP#3 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)2 1 0 Type II 24-hr 1-Year Rainfall=3.00" Runoff Area=2.42 ac Runoff Volume=0.163 af Runoff Depth>0.81" Flow Length=602' Tc=11.6 min CN=61/98 2.19 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 7HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#1: Subcat WDB#1 Runoff = 64.63 cfs @ 11.95 hrs, Volume= 3.503 af, Depth> 2.29" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 2.27 61 Open, good, HSG B 0.38 80 Open, good, HSG D 0.31 77 Forest, good, HSG D 0.14 100 BMP, good, HSG D 0.05 98 Roof, good, HSG D 9.33 98 Parking, good, HSG B 3.82 98 Parking, good, HSG D 0.82 98 Roof, good, HSG B 0.44 100 BMP, good, HSG B 0.81 55 Forest, good, HSG B 18.39 91 Weighted Average 3.78 63 20.58% Pervious Area 14.60 98 79.42% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment WDB#1: Subcat WDB#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 1-Year Rainfall=3.00" Runoff Area=18.39 ac Runoff Volume=3.503 af Runoff Depth>2.29" Tc=5.0 min CN=63/98 64.63 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 8HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#2: Subcat WDB#2 Runoff = 70.11 cfs @ 11.95 hrs, Volume= 3.762 af, Depth> 1.94" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.65 77 Forest, good, HSG D 0.20 98 Offsite Impervious, good, HSG D 0.94 98 Roadway, good, HSG B 0.21 98 Roadway, good, HSG D 0.15 98 Sidewalk, good, HSG D 0.31 98 Sidewalk, good, HSG B 0.80 98 Parking, good, HSG D 4.83 61 Open, good, HSG B 1.91 80 Open, good, HSG D 9.83 98 Parking, good, HSG B 1.32 98 Roof, good, HSG B 0.01 98 Offsite Impervious, good, HSG B 0.53 100 BMP, good, HSG B 0.58 55 Forest, good, HSG B 23.26 86 Weighted Average 8.97 68 38.55% Pervious Area 14.29 98 61.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 9HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment WDB#2: Subcat WDB#2 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 1-Year Rainfall=3.00" Runoff Area=23.26 ac Runoff Volume=3.762 af Runoff Depth>1.94" Tc=5.0 min CN=68/98 70.11 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 10HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 1P: WDB#1 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 2.29" for 1-Year event Inflow = 64.63 cfs @ 11.95 hrs, Volume= 3.503 af Outflow = 1.88 cfs @ 13.95 hrs, Volume= 1.742 af, Atten= 97%, Lag= 119.9 min Primary = 1.88 cfs @ 13.95 hrs, Volume= 1.742 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 345.68' @ 13.95 hrs Surf.Area= 31,911 sf Storage= 103,978 cf Plug-Flow detention time= 401.2 min calculated for 1.738 af (50% of inflow) Center-of-Mass det. time= 275.4 min ( 1,034.0 - 758.6 ) Volume Invert Avail.Storage Storage Description #1 342.00' 256,908 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 342.00 22,247 0 0 342.50 25,486 11,933 11,933 343.00 26,567 13,013 24,947 344.00 28,777 27,672 52,619 344.01 29,241 290 52,909 345.00 30,835 29,738 82,646 346.00 32,417 31,626 114,272 347.00 34,018 33,218 147,490 348.00 35,641 34,830 182,319 349.00 37,288 36,465 218,784 350.00 38,961 38,125 256,908 Device Routing Invert Outlet Devices #1 Primary 340.40'36.0" Round Culvert L= 165.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 340.40' / 339.50' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 342.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 344.00'6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 345.80'30.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #5 Device 1 347.40'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.50'50.0' long x 40.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.88 cfs @ 13.95 hrs HW=345.68' (Free Discharge) 1=Culvert (Passes 1.88 cfs of 61.59 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.45 cfs @ 9.1 fps) 3=Orifice/Grate (Orifice Controls 1.44 cfs @ 5.8 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 11HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 1P: WDB#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=18.39 ac Peak Elev=345.68' Storage=103,978 cf 64.63 cfs 1.88 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 12HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 2P: WDB#2 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 1.94" for 1-Year event Inflow = 70.11 cfs @ 11.95 hrs, Volume= 3.762 af Outflow = 2.94 cfs @ 13.32 hrs, Volume= 2.247 af, Atten= 96%, Lag= 81.7 min Primary = 2.94 cfs @ 13.32 hrs, Volume= 2.247 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 344.69' @ 13.32 hrs Surf.Area= 31,897 sf Storage= 103,701 cf Plug-Flow detention time= 351.0 min calculated for 2.243 af (60% of inflow) Center-of-Mass det. time= 236.2 min ( 1,005.2 - 768.9 ) Volume Invert Avail.Storage Storage Description #1 341.00' 292,968 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 341.00 22,011 0 0 341.50 25,135 11,787 11,787 342.00 26,278 12,853 24,640 343.00 28,660 27,469 52,109 344.00 30,938 29,799 81,908 345.00 32,321 31,630 113,537 346.00 33,723 33,022 146,559 347.00 35,146 34,435 180,994 348.00 36,587 35,867 216,860 349.00 38,049 37,318 254,178 350.00 39,530 38,790 292,968 Device Routing Invert Outlet Devices #1 Primary 337.20'30.0" Round Culvert L= 90.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 337.20' / 336.70' S= 0.0056 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 341.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 343.00'8.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 344.90'18.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 347.30'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.30'60.0' long x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=2.94 cfs @ 13.32 hrs HW=344.69' (Free Discharge) 1=Culvert (Passes 2.94 cfs of 59.06 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.45 cfs @ 9.1 fps) 3=Orifice/Grate (Orifice Controls 2.49 cfs @ 5.6 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 13HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 2P: WDB#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=23.26 ac Peak Elev=344.69' Storage=103,701 cf 70.11 cfs 2.94 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 14HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 1L: DP#1 Inflow Area = 50.51 ac, 60.61% Impervious, Inflow Depth > 1.09" for 1-Year event Inflow = 11.86 cfs @ 12.06 hrs, Volume= 4.588 af Primary = 11.86 cfs @ 12.06 hrs, Volume= 4.588 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 1L: DP#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=50.51 ac 11.86 cfs11.86 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 15HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 2L: DP#2 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 1.14" for 1-Year event Inflow = 1.88 cfs @ 13.95 hrs, Volume= 1.742 af Primary = 1.88 cfs @ 13.95 hrs, Volume= 1.742 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 2L: DP#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)2 1 0 Inflow Area=18.39 ac 1.88 cfs1.88 cfs Type II 24-hr 1-Year Rainfall=3.00"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 16HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: DP#3 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 1.16" for 1-Year event Inflow = 2.94 cfs @ 13.32 hrs, Volume= 2.247 af Primary = 2.94 cfs @ 13.32 hrs, Volume= 2.247 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 3L: DP#3 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)3 2 1 0 Inflow Area=23.26 ac 2.94 cfs2.94 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 17HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.45 ac 19.74% Impervious Runoff Depth>1.07"Subcatchment DP#1: Subcat DP#1 Flow Length=374' Tc=12.2 min CN=60/98 Runoff=7.92 cfs 0.574 af Runoff Area=2.42 ac 18.56% Impervious Runoff Depth>1.07"Subcatchment DP#3: Subcat DP#3 Flow Length=602' Tc=11.6 min CN=61/98 Runoff=3.08 cfs 0.216 af Runoff Area=18.39 ac 79.42% Impervious Runoff Depth>2.73"Subcatchment WDB#1: Subcat WDB#1 Tc=5.0 min CN=63/98 Runoff=76.96 cfs 4.180 af Runoff Area=23.26 ac 61.45% Impervious Runoff Depth>2.35"Subcatchment WDB#2: Subcat WDB#2 Tc=5.0 min CN=68/98 Runoff=85.25 cfs 4.560 af Peak Elev=346.07' Storage=116,666 cf Inflow=76.96 cfs 4.180 afPond 1P: WDB#1 Outflow=4.40 cfs 2.268 af Peak Elev=345.28' Storage=122,642 cf Inflow=85.25 cfs 4.560 afPond 2P: WDB#2 Outflow=4.60 cfs 2.929 af Inflow=15.96 cfs 5.987 afLink 1L: DP#1 Primary=15.96 cfs 5.987 af Inflow=4.40 cfs 2.268 afLink 2L: DP#2 Primary=4.40 cfs 2.268 af Inflow=4.60 cfs 2.929 afLink 3L: DP#3 Primary=4.60 cfs 2.929 af Total Runoff Area = 50.51 ac Runoff Volume = 9.530 af Average Runoff Depth = 2.26" 39.39% Pervious = 19.90 ac 60.61% Impervious = 30.62 ac Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 18HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 7.92 cfs @ 12.05 hrs, Volume= 0.574 af, Depth> 1.07" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 0.23 77 Forest, good, HSG D 1.17 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG D 0.36 80 Open, good, HSG D 1.78 61 Open, good, HSG B 0.00 98 Parking, good, HSG B 2.81 55 Forest, good, HSG B 6.45 67 Weighted Average 5.18 60 80.26% Pervious Area 1.27 98 19.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0533 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 187 0.1180 5.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 112 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 12.2 374 Total Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 19HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#1: Subcat DP#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)8 7 6 5 4 3 2 1 0 Type II 24-hr 2-Year Rainfall=3.50" Runoff Area=6.45 ac Runoff Volume=0.574 af Runoff Depth>1.07" Flow Length=374' Tc=12.2 min CN=60/98 7.92 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 20HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 3.08 cfs @ 12.04 hrs, Volume= 0.216 af, Depth> 1.07" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 0.09 80 Open, good, HSG D 0.08 77 Forest, good, HSG D 0.45 98 Offsite Impervious, good, HSG B 0.45 55 Forest, good, HSG B 1.35 61 Open, good, HSG B 2.42 68 Weighted Average 1.97 61 81.44% Pervious Area 0.45 98 18.56% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 341 0.0760 4.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 186 0.0540 16.7 52.57 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.6 602 Total Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 21HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#3: Subcat DP#3 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)3 2 1 0 Type II 24-hr 2-Year Rainfall=3.50" Runoff Area=2.42 ac Runoff Volume=0.216 af Runoff Depth>1.07" Flow Length=602' Tc=11.6 min CN=61/98 3.08 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 22HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#1: Subcat WDB#1 Runoff = 76.96 cfs @ 11.95 hrs, Volume= 4.180 af, Depth> 2.73" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 2.27 61 Open, good, HSG B 0.38 80 Open, good, HSG D 0.31 77 Forest, good, HSG D 0.14 100 BMP, good, HSG D 0.05 98 Roof, good, HSG D 9.33 98 Parking, good, HSG B 3.82 98 Parking, good, HSG D 0.82 98 Roof, good, HSG B 0.44 100 BMP, good, HSG B 0.81 55 Forest, good, HSG B 18.39 91 Weighted Average 3.78 63 20.58% Pervious Area 14.60 98 79.42% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment WDB#1: Subcat WDB#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 2-Year Rainfall=3.50" Runoff Area=18.39 ac Runoff Volume=4.180 af Runoff Depth>2.73" Tc=5.0 min CN=63/98 76.96 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 23HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#2: Subcat WDB#2 Runoff = 85.25 cfs @ 11.95 hrs, Volume= 4.560 af, Depth> 2.35" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.50" Area (ac) CN Description 1.65 77 Forest, good, HSG D 0.20 98 Offsite Impervious, good, HSG D 0.94 98 Roadway, good, HSG B 0.21 98 Roadway, good, HSG D 0.15 98 Sidewalk, good, HSG D 0.31 98 Sidewalk, good, HSG B 0.80 98 Parking, good, HSG D 4.83 61 Open, good, HSG B 1.91 80 Open, good, HSG D 9.83 98 Parking, good, HSG B 1.32 98 Roof, good, HSG B 0.01 98 Offsite Impervious, good, HSG B 0.53 100 BMP, good, HSG B 0.58 55 Forest, good, HSG B 23.26 86 Weighted Average 8.97 68 38.55% Pervious Area 14.29 98 61.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 24HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment WDB#2: Subcat WDB#2 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 2-Year Rainfall=3.50" Runoff Area=23.26 ac Runoff Volume=4.560 af Runoff Depth>2.35" Tc=5.0 min CN=68/98 85.25 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 25HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 1P: WDB#1 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 2.73" for 2-Year event Inflow = 76.96 cfs @ 11.95 hrs, Volume= 4.180 af Outflow = 4.40 cfs @ 12.74 hrs, Volume= 2.268 af, Atten= 94%, Lag= 47.4 min Primary = 4.40 cfs @ 12.74 hrs, Volume= 2.268 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 346.07' @ 12.74 hrs Surf.Area= 32,535 sf Storage= 116,666 cf Plug-Flow detention time= 360.2 min calculated for 2.264 af (54% of inflow) Center-of-Mass det. time= 240.5 min ( 996.8 - 756.3 ) Volume Invert Avail.Storage Storage Description #1 342.00' 256,908 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 342.00 22,247 0 0 342.50 25,486 11,933 11,933 343.00 26,567 13,013 24,947 344.00 28,777 27,672 52,619 344.01 29,241 290 52,909 345.00 30,835 29,738 82,646 346.00 32,417 31,626 114,272 347.00 34,018 33,218 147,490 348.00 35,641 34,830 182,319 349.00 37,288 36,465 218,784 350.00 38,961 38,125 256,908 Device Routing Invert Outlet Devices #1 Primary 340.40'36.0" Round Culvert L= 165.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 340.40' / 339.50' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 342.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 344.00'6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 345.80'30.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #5 Device 1 347.40'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.50'50.0' long x 40.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.39 cfs @ 12.74 hrs HW=346.07' (Free Discharge) 1=Culvert (Passes 4.39 cfs of 65.29 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.47 cfs @ 9.6 fps) 3=Orifice/Grate (Orifice Controls 1.62 cfs @ 6.5 fps) 4=Orifice/Grate (Orifice Controls 2.30 cfs @ 1.7 fps) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 26HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 1P: WDB#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=18.39 ac Peak Elev=346.07' Storage=116,666 cf 76.96 cfs 4.40 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 27HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 2P: WDB#2 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 2.35" for 2-Year event Inflow = 85.25 cfs @ 11.95 hrs, Volume= 4.560 af Outflow = 4.60 cfs @ 12.89 hrs, Volume= 2.929 af, Atten= 95%, Lag= 56.0 min Primary = 4.60 cfs @ 12.89 hrs, Volume= 2.929 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 345.28' @ 12.89 hrs Surf.Area= 32,714 sf Storage= 122,642 cf Plug-Flow detention time= 344.3 min calculated for 2.929 af (64% of inflow) Center-of-Mass det. time= 234.1 min ( 1,001.4 - 767.2 ) Volume Invert Avail.Storage Storage Description #1 341.00' 292,968 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 341.00 22,011 0 0 341.50 25,135 11,787 11,787 342.00 26,278 12,853 24,640 343.00 28,660 27,469 52,109 344.00 30,938 29,799 81,908 345.00 32,321 31,630 113,537 346.00 33,723 33,022 146,559 347.00 35,146 34,435 180,994 348.00 36,587 35,867 216,860 349.00 38,049 37,318 254,178 350.00 39,530 38,790 292,968 Device Routing Invert Outlet Devices #1 Primary 337.20'30.0" Round Culvert L= 90.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 337.20' / 336.70' S= 0.0056 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 341.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 343.00'8.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 344.90'18.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 347.30'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.30'60.0' long x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.59 cfs @ 12.89 hrs HW=345.28' (Free Discharge) 1=Culvert (Passes 4.59 cfs of 61.77 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.48 cfs @ 9.8 fps) 3=Orifice/Grate (Orifice Controls 2.98 cfs @ 6.7 fps) 4=Orifice/Grate (Orifice Controls 1.13 cfs @ 2.0 fps) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 28HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 2P: WDB#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=23.26 ac Peak Elev=345.28' Storage=122,642 cf 85.25 cfs 4.60 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 29HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 1L: DP#1 Inflow Area = 50.51 ac, 60.61% Impervious, Inflow Depth > 1.42" for 2-Year event Inflow = 15.96 cfs @ 12.06 hrs, Volume= 5.987 af Primary = 15.96 cfs @ 12.06 hrs, Volume= 5.987 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 1L: DP#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=50.51 ac 15.96 cfs15.96 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 30HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 2L: DP#2 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 1.48" for 2-Year event Inflow = 4.40 cfs @ 12.74 hrs, Volume= 2.268 af Primary = 4.40 cfs @ 12.74 hrs, Volume= 2.268 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 2L: DP#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)4 3 2 1 0 Inflow Area=18.39 ac 4.40 cfs4.40 cfs Type II 24-hr 2-Year Rainfall=3.50"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 31HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: DP#3 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 1.51" for 2-Year event Inflow = 4.60 cfs @ 12.89 hrs, Volume= 2.929 af Primary = 4.60 cfs @ 12.89 hrs, Volume= 2.929 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 3L: DP#3 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)5 4 3 2 1 0 Inflow Area=23.26 ac 4.60 cfs4.60 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 32HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=6.45 ac 19.74% Impervious Runoff Depth>2.05"Subcatchment DP#1: Subcat DP#1 Flow Length=374' Tc=12.2 min CN=60/98 Runoff=16.73 cfs 1.099 af Runoff Area=2.42 ac 18.56% Impervious Runoff Depth>2.06"Subcatchment DP#3: Subcat DP#3 Flow Length=602' Tc=11.6 min CN=61/98 Runoff=6.51 cfs 0.415 af Runoff Area=18.39 ac 79.42% Impervious Runoff Depth>4.18"Subcatchment WDB#1: Subcat WDB#1 Tc=5.0 min CN=63/98 Runoff=117.53 cfs 6.410 af Runoff Area=23.26 ac 61.45% Impervious Runoff Depth>3.74"Subcatchment WDB#2: Subcat WDB#2 Tc=5.0 min CN=68/98 Runoff=136.08 cfs 7.244 af Peak Elev=347.25' Storage=156,070 cf Inflow=117.53 cfs 6.410 afPond 1P: WDB#1 Outflow=25.80 cfs 4.264 af Peak Elev=347.09' Storage=184,035 cf Inflow=136.08 cfs 7.244 afPond 2P: WDB#2 Outflow=11.27 cfs 5.309 af Inflow=58.72 cfs 11.087 afLink 1L: DP#1 Primary=58.72 cfs 11.087 af Inflow=25.80 cfs 4.264 afLink 2L: DP#2 Primary=25.80 cfs 4.264 af Inflow=11.27 cfs 5.309 afLink 3L: DP#3 Primary=11.27 cfs 5.309 af Total Runoff Area = 50.51 ac Runoff Volume = 15.168 af Average Runoff Depth = 3.60" 39.39% Pervious = 19.90 ac 60.61% Impervious = 30.62 ac Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 33HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 16.73 cfs @ 12.05 hrs, Volume= 1.099 af, Depth> 2.05" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 0.23 77 Forest, good, HSG D 1.17 98 Offsite Impervious, good, HSG B 0.10 98 Offsite Impervious, good, HSG D 0.36 80 Open, good, HSG D 1.78 61 Open, good, HSG B 0.00 98 Parking, good, HSG B 2.81 55 Forest, good, HSG B 6.45 67 Weighted Average 5.18 60 80.26% Pervious Area 1.27 98 19.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0533 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 187 0.1180 5.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 112 0.0100 3.2 12.96 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.035 12.2 374 Total Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 34HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#1: Subcat DP#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.10" Runoff Area=6.45 ac Runoff Volume=1.099 af Runoff Depth>2.05" Flow Length=374' Tc=12.2 min CN=60/98 16.73 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 35HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 6.51 cfs @ 12.04 hrs, Volume= 0.415 af, Depth> 2.06" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 0.09 80 Open, good, HSG D 0.08 77 Forest, good, HSG D 0.45 98 Offsite Impervious, good, HSG B 0.45 55 Forest, good, HSG B 1.35 61 Open, good, HSG B 2.42 68 Weighted Average 1.97 61 81.44% Pervious Area 0.45 98 18.56% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 341 0.0760 4.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 186 0.0540 16.7 52.57 Pipe Channel, 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.6 602 Total Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 36HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment DP#3: Subcat DP#3 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 10-Year Rainfall=5.10" Runoff Area=2.42 ac Runoff Volume=0.415 af Runoff Depth>2.06" Flow Length=602' Tc=11.6 min CN=61/98 6.51 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 37HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#1: Subcat WDB#1 Runoff = 117.53 cfs @ 11.95 hrs, Volume= 6.410 af, Depth> 4.18" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 2.27 61 Open, good, HSG B 0.38 80 Open, good, HSG D 0.31 77 Forest, good, HSG D 0.14 100 BMP, good, HSG D 0.05 98 Roof, good, HSG D 9.33 98 Parking, good, HSG B 3.82 98 Parking, good, HSG D 0.82 98 Roof, good, HSG B 0.44 100 BMP, good, HSG B 0.81 55 Forest, good, HSG B 18.39 91 Weighted Average 3.78 63 20.58% Pervious Area 14.60 98 79.42% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment WDB#1: Subcat WDB#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)130 125 120 115 110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 10-Year Rainfall=5.10" Runoff Area=18.39 ac Runoff Volume=6.410 af Runoff Depth>4.18" Tc=5.0 min CN=63/98 117.53 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 38HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#2: Subcat WDB#2 Runoff = 136.08 cfs @ 11.95 hrs, Volume= 7.244 af, Depth> 3.74" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.10" Area (ac) CN Description 1.65 77 Forest, good, HSG D 0.20 98 Offsite Impervious, good, HSG D 0.94 98 Roadway, good, HSG B 0.21 98 Roadway, good, HSG D 0.15 98 Sidewalk, good, HSG D 0.31 98 Sidewalk, good, HSG B 0.80 98 Parking, good, HSG D 4.83 61 Open, good, HSG B 1.91 80 Open, good, HSG D 9.83 98 Parking, good, HSG B 1.32 98 Roof, good, HSG B 0.01 98 Offsite Impervious, good, HSG B 0.53 100 BMP, good, HSG B 0.58 55 Forest, good, HSG B 23.26 86 Weighted Average 8.97 68 38.55% Pervious Area 14.29 98 61.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 39HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment WDB#2: Subcat WDB#2 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 10-Year Rainfall=5.10" Runoff Area=23.26 ac Runoff Volume=7.244 af Runoff Depth>3.74" Tc=5.0 min CN=68/98 136.08 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 40HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 1P: WDB#1 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 4.18" for 10-Year event Inflow = 117.53 cfs @ 11.95 hrs, Volume= 6.410 af Outflow = 25.80 cfs @ 12.11 hrs, Volume= 4.264 af, Atten= 78%, Lag= 9.7 min Primary = 25.80 cfs @ 12.11 hrs, Volume= 4.264 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 347.25' @ 12.11 hrs Surf.Area= 34,425 sf Storage= 156,070 cf Plug-Flow detention time= 252.1 min calculated for 4.255 af (66% of inflow) Center-of-Mass det. time= 148.1 min ( 899.5 - 751.4 ) Volume Invert Avail.Storage Storage Description #1 342.00' 256,908 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 342.00 22,247 0 0 342.50 25,486 11,933 11,933 343.00 26,567 13,013 24,947 344.00 28,777 27,672 52,619 344.01 29,241 290 52,909 345.00 30,835 29,738 82,646 346.00 32,417 31,626 114,272 347.00 34,018 33,218 147,490 348.00 35,641 34,830 182,319 349.00 37,288 36,465 218,784 350.00 38,961 38,125 256,908 Device Routing Invert Outlet Devices #1 Primary 340.40'36.0" Round Culvert L= 165.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 340.40' / 339.50' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 342.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 344.00'6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 345.80'30.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #5 Device 1 347.40'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.50'50.0' long x 40.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=25.68 cfs @ 12.11 hrs HW=347.24' (Free Discharge) 1=Culvert (Passes 25.68 cfs of 75.20 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.53 cfs @ 10.9 fps) 3=Orifice/Grate (Orifice Controls 2.08 cfs @ 8.3 fps) 4=Orifice/Grate (Orifice Controls 23.07 cfs @ 4.6 fps) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 41HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 1P: WDB#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=18.39 ac Peak Elev=347.25' Storage=156,070 cf 117.53 cfs 25.80 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 42HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 2P: WDB#2 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 3.74" for 10-Year event Inflow = 136.08 cfs @ 11.95 hrs, Volume= 7.244 af Outflow = 11.27 cfs @ 12.47 hrs, Volume= 5.309 af, Atten= 92%, Lag= 31.0 min Primary = 11.27 cfs @ 12.47 hrs, Volume= 5.309 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 347.09' @ 12.47 hrs Surf.Area= 35,270 sf Storage= 184,035 cf Plug-Flow detention time= 284.3 min calculated for 5.309 af (73% of inflow) Center-of-Mass det. time= 187.4 min ( 950.6 - 763.3 ) Volume Invert Avail.Storage Storage Description #1 341.00' 292,968 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 341.00 22,011 0 0 341.50 25,135 11,787 11,787 342.00 26,278 12,853 24,640 343.00 28,660 27,469 52,109 344.00 30,938 29,799 81,908 345.00 32,321 31,630 113,537 346.00 33,723 33,022 146,559 347.00 35,146 34,435 180,994 348.00 36,587 35,867 216,860 349.00 38,049 37,318 254,178 350.00 39,530 38,790 292,968 Device Routing Invert Outlet Devices #1 Primary 337.20'30.0" Round Culvert L= 90.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 337.20' / 336.70' S= 0.0056 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 341.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 343.00'8.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 344.90'18.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 347.30'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.30'60.0' long x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=11.27 cfs @ 12.47 hrs HW=347.09' (Free Discharge) 1=Culvert (Passes 11.27 cfs of 69.46 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.58 cfs @ 11.8 fps) 3=Orifice/Grate (Orifice Controls 4.14 cfs @ 9.3 fps) 4=Orifice/Grate (Orifice Controls 6.54 cfs @ 6.5 fps) 5=Orifice/Grate ( Controls 0.00 cfs) 6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 43HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 2P: WDB#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=23.26 ac Peak Elev=347.09' Storage=184,035 cf 136.08 cfs 11.27 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 44HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 1L: DP#1 Inflow Area = 50.51 ac, 60.61% Impervious, Inflow Depth > 2.63" for 10-Year event Inflow = 58.72 cfs @ 12.07 hrs, Volume= 11.087 af Primary = 58.72 cfs @ 12.07 hrs, Volume= 11.087 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 1L: DP#1 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=50.51 ac 58.72 cfs58.72 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 45HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 2L: DP#2 Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 2.78" for 10-Year event Inflow = 25.80 cfs @ 12.11 hrs, Volume= 4.264 af Primary = 25.80 cfs @ 12.11 hrs, Volume= 4.264 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 2L: DP#2 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=18.39 ac 25.80 cfs25.80 cfs Type II 24-hr 10-Year Rainfall=5.10"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 46HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Link 3L: DP#3 Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 2.74" for 10-Year event Inflow = 11.27 cfs @ 12.47 hrs, Volume= 5.309 af Primary = 11.27 cfs @ 12.47 hrs, Volume= 5.309 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 3L: DP#3 Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)12 11 10 9 8 7 6 5 4 3 2 1 0 Inflow Area=23.26 ac 11.27 cfs11.27 cfs WDB#1 Subcat WDB#1 WDB#2 Subcat WDB#2 4P WDB#1-100 YR 5P WDB#2-100 YR Routing Diagram for 1915_SIA_POST Prepared by Horvath Associates, PA, Printed 3/4/2020 HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 2HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=18.39 ac 79.42% Impervious Runoff Depth>6.34"Subcatchment WDB#1: Subcat WDB#1 Tc=5.0 min CN=63/98 Runoff=177.62 cfs 9.718 af Runoff Area=23.26 ac 61.45% Impervious Runoff Depth>5.84"Subcatchment WDB#2: Subcat WDB#2 Tc=5.0 min CN=68/98 Runoff=212.59 cfs 11.311 af Peak Elev=348.21' Storage=28,440 cf Inflow=177.62 cfs 9.718 afPond 4P: WDB#1-100 YR Outflow=161.66 cfs 9.717 af Peak Elev=348.18' Storage=31,791 cf Inflow=212.59 cfs 11.311 afPond 5P: WDB#2-100 YR Outflow=197.19 cfs 11.308 af Total Runoff Area = 41.64 ac Runoff Volume = 21.030 af Average Runoff Depth = 6.06" 30.62% Pervious = 12.75 ac 69.38% Impervious = 28.89 ac Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 3HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#1: Subcat WDB#1 Runoff = 177.62 cfs @ 11.95 hrs, Volume= 9.718 af, Depth> 6.34" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.40" Area (ac) CN Description 2.27 61 Open, good, HSG B 0.38 80 Open, good, HSG D 0.31 77 Forest, good, HSG D 0.14 100 BMP, good, HSG D 0.05 98 Roof, good, HSG D 9.33 98 Parking, good, HSG B 3.82 98 Parking, good, HSG D 0.82 98 Roof, good, HSG B 0.44 100 BMP, good, HSG B 0.81 55 Forest, good, HSG B 18.39 91 Weighted Average 3.78 63 20.58% Pervious Area 14.60 98 79.42% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment WDB#1: Subcat WDB#1 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.40" Runoff Area=18.39 ac Runoff Volume=9.718 af Runoff Depth>6.34" Tc=5.0 min CN=63/98 177.62 cfs Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 4HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment WDB#2: Subcat WDB#2 Runoff = 212.59 cfs @ 11.95 hrs, Volume= 11.311 af, Depth> 5.84" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.40" Area (ac) CN Description 1.65 77 Forest, good, HSG D 0.20 98 Offsite Impervious, good, HSG D 0.94 98 Roadway, good, HSG B 0.21 98 Roadway, good, HSG D 0.15 98 Sidewalk, good, HSG D 0.31 98 Sidewalk, good, HSG B 0.80 98 Parking, good, HSG D 4.83 61 Open, good, HSG B 1.91 80 Open, good, HSG D 9.83 98 Parking, good, HSG B 1.32 98 Roof, good, HSG B 0.01 98 Offsite Impervious, good, HSG B 0.53 100 BMP, good, HSG B 0.58 55 Forest, good, HSG B 23.26 86 Weighted Average 8.97 68 38.55% Pervious Area 14.29 98 61.45% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 5HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Subcatchment WDB#2: Subcat WDB#2 Runoff Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Type II 24-hr 100-Year Rainfall=7.40" Runoff Area=23.26 ac Runoff Volume=11.311 af Runoff Depth>5.84" Tc=5.0 min CN=68/98 212.59 cfs Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 6HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 4P: WDB#1-100 YR Inflow Area = 18.39 ac, 79.42% Impervious, Inflow Depth > 6.34" for 100-Year event Inflow = 177.62 cfs @ 11.95 hrs, Volume= 9.718 af Outflow = 161.66 cfs @ 11.99 hrs, Volume= 9.717 af, Atten= 9%, Lag= 2.1 min Primary = 161.66 cfs @ 11.99 hrs, Volume= 9.717 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 348.21' @ 11.99 hrs Surf.Area= 35,979 sf Storage= 28,440 cf Plug-Flow detention time= 1.5 min calculated for 9.697 af (100% of inflow) Center-of-Mass det. time= 1.5 min ( 748.7 - 747.2 ) Volume Invert Avail.Storage Storage Description #1 347.40' 95,681 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 347.40 34,667 0 0 348.00 35,641 21,092 21,092 349.00 37,288 36,465 57,557 350.00 38,961 38,125 95,681 Device Routing Invert Outlet Devices #1 Primary 340.40'36.0" Round Culvert L= 165.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 340.40' / 339.50' S= 0.0055 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 342.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 344.00'6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 345.80'30.0" W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #5 Device 1 347.40'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.50'50.0' long x 40.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=157.69 cfs @ 11.99 hrs HW=348.19' (Free Discharge) 1=Culvert (Passes 81.59 cfs of 82.36 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.58 cfs @ 11.9 fps) 3=Orifice/Grate (Orifice Controls 2.39 cfs @ 9.6 fps) 4=Orifice/Grate (Orifice Controls 32.97 cfs @ 6.6 fps) 5=Orifice/Grate (Weir Controls 45.65 cfs @ 2.9 fps) 6=Broad-Crested Rectangular Weir (Weir Controls 76.10 cfs @ 2.2 fps) Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 7HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 4P: WDB#1-100 YR Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=18.39 ac Peak Elev=348.21' Storage=28,440 cf 177.62 cfs 161.66 cfs Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 8HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Summary for Pond 5P: WDB#2-100 YR Inflow Area = 23.26 ac, 61.45% Impervious, Inflow Depth > 5.84" for 100-Year event Inflow = 212.59 cfs @ 11.95 hrs, Volume= 11.311 af Outflow = 197.19 cfs @ 11.98 hrs, Volume= 11.308 af, Atten= 7%, Lag= 1.9 min Primary = 197.19 cfs @ 11.98 hrs, Volume= 11.308 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 348.18' @ 11.98 hrs Surf.Area= 36,847 sf Storage= 31,791 cf Plug-Flow detention time= 2.2 min calculated for 11.285 af (100% of inflow) Center-of-Mass det. time= 2.0 min ( 761.1 - 759.2 ) Volume Invert Avail.Storage Storage Description #1 347.30' 101,365 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 347.30 35,578 0 0 348.00 36,587 25,258 25,258 349.00 38,049 37,318 62,576 350.00 39,530 38,790 101,365 Device Routing Invert Outlet Devices #1 Primary 337.20'30.0" Round Culvert L= 90.0' RCP, square edge headwall, Ke= 0.5? Inlet / Outlet Invert= 337.20' / 336.70' S= 0.0056 '/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 341.00'3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 343.00'8.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 344.90'18.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #5 Device 1 347.30'60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Primary 347.30'60.0' long x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=190.95 cfs @ 11.98 hrs HW=348.16' (Free Discharge) 1=Culvert (Passes 65.43 cfs of 73.64 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.63 cfs @ 12.8 fps) 3=Orifice/Grate (Orifice Controls 4.70 cfs @ 10.6 fps) 4=Orifice/Grate (Orifice Controls 8.23 cfs @ 8.2 fps) 5=Orifice/Grate (Weir Controls 51.88 cfs @ 3.0 fps) 6=Broad-Crested Rectangular Weir (Weir Controls 125.52 cfs @ 2.4 fps) Type II 24-hr 100-Year Rainfall=7.40"1915_SIA_POST Printed 3/4/2020Prepared by Horvath Associates, PA Page 9HydroCAD® 10.00-24 s/n 03736 © 2018 HydroCAD Software Solutions LLC Pond 5P: WDB#2-100 YR Inflow Primary Hydrograph Time (hours) 2423222120191817161514131211109876543210Flow (cfs)230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 Inflow Area=23.26 ac Peak Elev=348.18' Storage=31,791 cf 212.59 cfs 197.19 cfs SCM Sizing Calculations FedEx Freight N/A 0748-91-06-3841, 91-73-3991 D1900260 Matt Jones, PE Setzer Properties 490919 4990 919 669 6295Scott Bender 354 Walker Ave, STE 200, Lexington, KY, 40504 TBD TBD TBD TBD X X X 10.5 N/A 335.5 342.0 344.0 344.0 345.7 345.8 346.1 345.8 347.3 347.5 **349.5 "settled"350.0 348.2 22,247 20,988 34,425 18.4 10 N/A WDB#1 64.63 1.88 64.63 3.97 1.88 22.42 169.51 15.96 65.88 269.85 58.72 4.40 76.96 25.80 117.53 84,340 52,619 240,410 156,070 341,248 16,861 3.8 4.8 2.62 3 81 0.5 2.5 100 20 36 5'x5' Riser 50 2.5 DP#2 DP#1 DP#1 MJ MJ MJ MJ MJ N/A MJ 1.5:1 Per 2009 NC BMP MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ 1915_WDB#1.xls Surface Area Calcs (85% TSS) Matt Jones, PE 3/4/2020 1915 - FedEx Freight WDB#1 Surface Area Drainage Area to Basin = 18.39 acres Impervious Area to Basin = 14.02 acres Impervious Percentage = 78% Avereage Depth (Volume/SA) = 4.20 ft Average Depth (Vol/SA) (ft) % Impervious 4.0 4.2 5.0 Lower Boundary 70%2.40 2.07 <- from table below Site % impervious 78%2.70 2.62 2.32 <- interpolated Upper Boundary 80%2.78 2.38 <- from table below SA/DA = 2.62 Surface Area Required = 20,988 sf Surface Area Provided = 22,247 sf 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Percent Impervious Cover Permanent Pool Average Depth (ft) Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual , July 2007) Interpolation to Determine SA/DA Ratio 1915_WDB#1.xls Below NP Volumes Matt Jones, PE 3/4/2020 1915 - FedEx Freight Below Normal Pool Volumes Forebay Volume Stage/Storage Calculations Contour Elevation Stage Contour Surface Area Average Contour Surface Area Incremental Volume Cumulative Volume (ft) (ft) (sf) (sf) (cf) (cf) Forebay Bottom 336.5 0.0 1894 0 0 0 Bottom of Aquatic Shelf 341.5 5.0 3942 2918 14590 14590 Permanent Pool 342.0 5.5 5141 4542 2271 16861 Forebay Volume = 16861 cf Main Pool Volume Stage/Storage Calculations Contour Elevation Stage Contour Surface Area Average Contour Surface Area Incremental Volume Cumulative Volume (ft) (ft) (sf) (sf) (cf) (cf) Main Pool Bottom 336.5 0.0 9213 0 0 0 Bottom of Aquatic Shelf 341.5 5.0 14607 11910 59550 59550 Permanent Pool 342.0 5.5 17106 15857 7929 67479 Main Pool Volume = 67479 cf Total Pond Volume Forebay Volume = 16861 cf Main Pool Volume = 67479 cf Total Pond Volume = 84340 cf Forebay Percentage of Total Volume = 19.99% 1915_WDB#1.xls Average Depth Matt Jones, PE 3/4/2020 1915 - FedEx Freight Average Depth Calculation Abot_shelf = 18549 sf Aperm_pool=22247 sf Abot_pond=9213 sf Depth= 5.0 ft 18549 sf 18549 sf + 9213 sf 5.0 ft 22247 sf 2 18549 sf Avearage Depth = 4.20 ft 1915_WDB#1.xls WQ Volume Matt Jones, PE 3/4/2020 1915 - FedEx Freight Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 18.39 Acres Impervious Area = 14.02 Acres Impervious Fraction (I A) = 0.76 Rainfall Depth (RD) = 1.00 Inch RV = 0.73 (RV = 0.05+0.9*IA) Runoff Volume (V) = 48732 cf (V = 3630*RD*RV*A) Normal Pool Elevation = 342.00 Temporary Pool Elevation = 344.00 Temporary Pool Volume = 52619 cf (From HydroCAD Report) Temporary Pool Surface Area = 28777 sf (From HydroCAD Report) 1915_WDB#1.xls Drawdown Orifice Sizing Matt Jones, PE 3/4/2020 1915 - FedEx Freight Drawdown Orifice Sizing Water Quality Drawdown Orifice Sizing 3in(Orifice Size) A1= 28,777 sf (Area of pond at the beginning of drawdown) A0= 22,247 sf (Area of pond at the orifice outlet elevation) Cd= 0.6 (Orifice Coefficient of Discharge) a=0.049 sf Orifice Area (calculated) g=32.2 ft/s2 Acceleration of Gravity (constant) H1= 2.00 ft (Maximum head (t=0)) T=3.39 days (Time for water level to fall from H1 to Permanent Pool Elevation) 1915_WDB#1.xls Anti-flotation Matt Jones, PE 3/4/2020 1915 - FedEx Freight Riser Anti-Flotation Calculations Input Data ==> Invert of Extended Base = 337.60 feet Riser Top Elevation = 347.40 feet Invert of Outlet Barrel = 340.40 Inside Dimension of Riser =5.0 feet Wall thickness of Riser =0.5 feet Height of Base =0.50 feet Inside Barrel diameter = 2.5 feet Area of Weir Openings =5.25 sf Weight of Structure ==> Volume of Riser Walls = 102.30 cf Volume of Base = 18.00 cf Total Volume of Concrete = 120.30 cf Opening for barrel = 2.454 cf Total Volume of Openings in Concrete = 5.079 cf Total Concrete in Riser Section Minus Openings = 115.22 cf Depth of Concrete Fill Layer = 2.30 ft Volume of Concrete in Fill Layer = 57.50 cf Total Volume of Concrete Present in Riser = 172.72 cf Concrete unit weight =150 lb/cf (From National Precast Concrete Assoc.) Total Weight of Concrete = 25908 lbs Amount of water displaced ==> Volume of Water Displaced by Riser Structure = 352.8 cf Unit Weight of water = 62.4 lb/cf Weight of water displaced =22015 lbs Determine if Anti-Flotation Block is Required ==> Desired Saftey Factor =1.15 (recommend 1.15 or higher) Safety Factor =1.18 1915 - FedEx Freight Dam Settlement Calculation Top of Dam Elevation = 350.0 ft Inv Down of PSP = 339.5 ft Dam Height = 10.5 ft Settlement Factor = 5% Settled top of Dam = 349.5 100-Year WSE = 348.2 Freeboard Provided = 1.3 1915 - FedEx Freight Riprap Outlet Protection WDB #1 Outfall Pipe Diameter (D0)= 36 inch Number of Barrels = 1 Use D = 3ft(D0) Q10 = 26.00 cfs V10 = 6.55 ft/s Apron Slope > 10%?No Zone From Chart = 2 Use Recommendations for Zone 3 Apron Length = 24 feet Upstream Apron Width = 9 feet (3*D) Downstream Apron Width = 13 Stone Class = Class '1' Stone Layer Thickness = 24 Design procedure explained in Chapter 8 (Section 8.06) of North Carolina Erosion and Sediment Control Planning and Design Manual FedEx Freight N/A 0748-91-06-3841, 91-73-3991 D1900260 Matt Jones, PE Setzer Properties 490919 4990 919 669 6295Scott Bender 354 Walker Ave, STE 200, Lexington, KY, 40504 TBD TBD TBD TBD X X X 13.3 N/A 334.5 341.0 343.0 343.0 344.7 344.9 345.3 344.9 347.1 347.3 **349.3 "settled"350.0 348.1 22,011 19,614 35,270 23.3 10 N/A WDB#2 70.11 2.94 70.11 3.42 2.94 22.42 169.51 15.96 65.88 269.85 58.72 4.60 85.25 11.27 136.08 84,174 52,109 268,209 184,035 377,142 19,048 3.8 4.8 1.94 3 81 0.67 1.5 100 20 30 5'x5' Riser 60 1.5 MJ MJ MJ MJ MJ N/A MJ 1.5:1 Per 2009 NC BMP MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ MJ 1915_WDB#2.xls Surface Area Calcs (85% TSS) Matt Jones, PE 3/4/2020 1915 - FedEx Freight WDB#2 Surface Area Drainage Area to Basin = 23.26 acres Impervious Area to Basin = 13.77 acres Impervious Percentage = 59% Avereage Depth (Volume/SA) = 4.22 ft Average Depth (Vol/SA) (ft) % Impervious 4.0 4.2 5.0 Lower Boundary 50%1.73 1.50 <- from table below Site % impervious 59%2.01 1.94 1.69 <- interpolated Upper Boundary 60%2.03 1.71 <- from table below SA/DA = 1.94 Surface Area Required = 19,614 sf Surface Area Provided = 22,011 sf 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Percent Impervious Cover Permanent Pool Average Depth (ft) Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual , July 2007) Interpolation to Determine SA/DA Ratio 1915_WDB#2.xls Below NP Volumes Matt Jones, PE 3/4/2020 1915 - FedEx Freight Below Normal Pool Volumes Forebay Volume Stage/Storage Calculations Contour Elevation Stage Contour Surface Area Average Contour Surface Area Incremental Volume Cumulative Volume (ft) (ft) (sf) (sf) (cf) (cf) Forebay Bottom 336.0 0.0 2348 0 0 0 Bottom of Aquatic Shelf 340.5 4.5 4879 3614 16261 16261 Permanent Pool 341.0 5.0 6271 5575 2788 19048 Forebay Volume = 19048 cf Main Pool Volume Stage/Storage Calculations Contour Elevation Stage Contour Surface Area Average Contour Surface Area Incremental Volume Cumulative Volume (ft) (ft) (sf) (sf) (cf) (cf) Main Pool Bottom 335.5 0.0 9394 0 0 0 Bottom of Aquatic Shelf 340.5 5.0 13711 11553 57763 57763 Permanent Pool 341.0 5.5 15740 14726 7363 65125 Main Pool Volume = 65125 cf Total Pond Volume Forebay Volume = 19048 cf Main Pool Volume = 65125 cf Total Pond Volume = 84174 cf Forebay Percentage of Total Volume = 22.63% 1915_WDB#2.xls Average Depth Matt Jones, PE 3/4/2020 1915 - FedEx Freight Average Depth Calculation Abot_shelf = 18590 sf Aperm_pool=22011 sf Abot_pond=9394 sf Depth= 5.0 ft 18590 sf 18590 sf + 9394 sf 5.0 ft 22011 sf 2 18590 sf Avearage Depth = 4.22 ft 1915_WDB#2.xls WQ Volume Matt Jones, PE 3/4/2020 1915 - FedEx Freight Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 23.26 Acres Impervious Area = 13.77 Acres Impervious Fraction (I A) = 0.59 Rainfall Depth (RD) = 1.00 Inch RV = 0.58 (RV = 0.05+0.9*IA) Runoff Volume (V) = 49208 cf (V = 3630*RD*RV*A) Normal Pool Elevation = 341.00 Temporary Pool Elevation = 343.00 Temporary Pool Volume = 52109 cf (From HydroCAD Report) Temporary Pool Surface Area = 28660 sf (From HydroCAD Report) 1915_WDB#2.xls Drawdown Orifice Sizing Matt Jones, PE 3/4/2020 1915 - FedEx Freight Drawdown Orifice Sizing Water Quality Drawdown Orifice Sizing 3in(Orifice Size) A1= 28,660 sf (Area of pond at the beginning of drawdown) A0= 22,011 sf (Area of pond at the orifice outlet elevation) Cd= 0.6 (Orifice Coefficient of Discharge) a=0.049 sf Orifice Area (calculated) g=32.2 ft/s2 Acceleration of Gravity (constant) H1= 2.00 ft (Maximum head (t=0)) T=3.36 days (Time for water level to fall from H1 to Permanent Pool Elevation) 1915_WDB#2.xls Anti-flotation Matt Jones, PE 3/4/2020 1915 - FedEx Freight Riser Anti-Flotation Calculations Input Data ==> Invert of Extended Base = 333.70 feet Riser Top Elevation = 347.30 feet Invert of Outlet Barrel = 337.20 Inside Dimension of Riser =5.0 feet Wall thickness of Riser =0.5 feet Height of Base =0.50 feet Inside Barrel diameter = 2.5 feet Area of Weir Openings =1.45 SF Weight of Structure ==> Volume of Riser Walls = 144.10 cf Volume of Base = 18.00 cf Total Volume of Concrete = 162.10 cf Opening for barrel = 2.454 cf Total Volume of Openings in Concrete = 3.181 cf Total Concrete in Riser Section Minus Openings = 158.92 cf Depth of Concrete Fill Layer = 3.00 ft Volume of Concrete in Fill Layer = 75.00 cf Total Volume of Concrete Present in Riser = 233.92 cf Concrete unit weight =150 lb/cf (From National Precast Concrete Assoc.) Total Weight of Concrete = 35088 lbs Amount of water displaced ==> Volume of Water Displaced by Riser Structure = 489.6 cf Unit Weight of water = 62.4 lb/cf Weight of water displaced =30551 lbs Determine if Anti-Flotation Block is Required ==> Desired Saftey Factor =1.15 (recommend 1.15 or higher) Safety Factor =1.15 1915 - FedEx Freight Dam Settlement Calculation Top of Dam Elevation = 350.0 ft Inv Down of PSP = 336.7 ft Dam Height = 13.3 ft Settlement Factor = 5% Settled top of Dam = 349.3 100-Year WSE = 348.1 Freeboard Provided = 1.2 1915 - FedEx Freight Riprap Outlet Protection WDB#2 Outfall Pipe Diameter (D0)= 30 inch Number of Barrels = 1 Use D = 2.5 ft (D0) Q10 = 20.00 cfs V10 = 8.95 ft/s Apron Slope > 10%?No Zone From Chart = 2 Use Recommendations for Zone 3 Apron Length = 20 feet Upstream Apron Width = 8 feet (3*D) Downstream Apron Width = 11 Stone Class = Class '1' Stone Layer Thickness = 24 Design procedure explained in Chapter 8 (Section 8.06) of North Carolina Erosion and Sediment Control Planning and Design Manual Nutrient Loading Calculations nutrient offset intro Is this Redevelopment? Yes No Development Type (Please check all that apply) Commercial Duplex Residential Industrial Single-Family Residential Institutional Multi-Family Residential Mixed Use WATERSHED INFORMATION (See online map or alternative source for 12-digit and 6-digit IDs) Upper Falls Basin, 12-digit Watershed ID: Lower Falls Basin, 12-digit Watershed ID: Neuse/Outside of Falls Basin, 03020201 Jordan Lake (Upper New Hope) 6-digit Small Watershed ID: Neuse/Falls Lake Delivery Factors: There are no delivery factors, so the Delivery Factor = 1. N: P: N:YES P:N/A NUTRIENT OFFSET REQUEST (Must meet the offsite thresholds – see above) Nitrogen Loading / Offset Needs (For the Jordan, Falls, and Neuse/Outside of Falls Watershed areas) Phosphorus Loading / Offset Needs (For the Jordan and Falls Watershed areas) FedEx Freight ___________________ (J) (H) State Buy Down Amount Delivered (lbs) D * E * F * G 3354.08 (H) Offset Duration (yrs) 30 (F) Impervious Cover (%) Pre-Construction: 0.8 (D) Name of Bank Off-site treatment threshold (%): Impervious Cover (%) Post-Construction: 55.2 Offset Duration (yrs) (E) Project Size (square feet) 2,265,174 (E) 30 (F) -78.8833 0748-91-06-3841, 0748-91-73-3991 State Buy Down Amount Delivered (lbs) D * E * F * G N/A (G) Site Delivery Factor 1.00 (G) Site Delivery Factor 1.00 Nutrient loading limits and on-site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) Responsible Professional Engineer’s Name: PE #: Staff Name: Staff e-mail: Project Size (square feet) 2,265,174 Phone #: Matt Jones, PE Site: 39170 Total Delivered (lbs) H + I Name of Bank N/A Additional 5% if bank not in City limits (lbs) 167.70 (I) (Where Applicable) Additional 5% if bank not in City limits (lbs) N/A (J) Total Delivered (lbs) H + I 3521.78 (I) (Where Applicable) Required on-site reduction achieved? Bank: Phosphorus Site: Bank: Applicant Name : Setzer Properties Prepared by : Matt Jones, PE Project Name (& Previous name, if applicable): Site Plan #: D1900260 Project Locatn: Lat: (dec. degrees)Long: (dec. degrees)PIN/PID #s: 35.897518 Reduction Needed (lbs/ac/yr) (from Compl. Worksheet) Untreated Loading Rate (lbs/ac/yr) Treated Loading Rate (lbs/ac/yr) CITY OF DURHAM Neuse, Falls Lake and Jordan Lake Developer Nutrient Reporting Form Please complete and submit the following information to the City of Durham Stormwater Services to characterize your project and assess the need to purchase nutrient offsets. See the City Stormwater Performance Standards.For nutrient offset information, see Jordan Lake Delivery Factors (%) Nitrogen PROJECT INFORMATION 0.79 0.82 8.01 (B) 5.75 2.20 NONE Project Address (if available): Street: City/Town: County: 5203 Chin Page Road Durham Durha Date: (mo/d/yr) 10/23/2019 2.15 Load Rate Target (lbs/ac/yr) 2.14 (D)(C)   Untreated Loading Rate (lbs/ac/yr) Treated Loading Rate (lbs/ac/yr) Load Rate Target (lbs/ac/yr) (A) Reduction Needed (lbs/ac/yr) (from Compl. Worksheet) (A) (B) DURHAM STORMWATER PERFORMANCE STANDARDS FOR DEVELOPMENT COMPLIANCE ALTERNATIVE (C) Version 2, July 10, 2013 Watershed (Select from Menu) 3 Falls Lake Basin Jordan Lake Basin Lower Neuse Basin Compliance Alternative (Pick one alternative, see descriptions and calculations below) 1 Nutrient loading limits and on-site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) 0 0 0 Alternative for low impact development in Falls Basin. Exempt from Stormwater Pollutant standards (Section 70-739) Project Area Disturbance (Fill in yellow cell below) 1,753,290 square feet 40.250 acres The Project is Located Outside the Downtown Area (select from menu list) The Project Type is (select from menu list) Other key definitions from Section 70-736: Alternative percentage reduction option for Redevelopment that does not increase impervious area (Section 70-740(c)) Redevelopment means Development on a site where structures or impervious surface already exists. It is a category of new development. Per Section 70-736, Limited Residential means single family and duplex residential and recreational development. Multifamily and Other Development means development not included in Limited Resdiential, and includes but is not limited to multifamily and townhomes, and office, industrial, institutional (including local government institutional), and commercial development. Note that if a nutrient bank is used to buy offset credits in order to achieve compliance with the alternative selected below, the bank must be located in the same watershed as the project site. Multifamily & Other Land DisturbanceProject Location Alternative percentage reduction option for Redevelopment that increases impervious area (Section 70- 740(b)) Multifamily and Other Falls Basin Jordan Basin 1 acre 0.5 acres 1 acre 0.5 acres 12,000 square feet 0.5 acres Limited Residential TABLE 1 THRESHOLDS FOR APPLICATION OF STORMWATER POLLUTANT REQUIREMENTS Lower Neuse Basin Per Section 70-736, Downtown Area means the Downtown Tier, Compact Neighborhoods, and Suburban Transit Zones as shown on the Durham Comprehensive Land Use Plan most recently approved by the Durham City Council. Note: Thresholds are based upon land disturbance since the applicable basin Baseline date. Development means Land Disturbance which increases impervious surface on a property, or alters its location, or results in an increase in runoff from a property or a decrease in infiltration of precipitation into the soil. It includes both existing development and new development. It does not include agriculture, mining, or forestry activities. COMPLIANCE WORKSHEET Version 2 DRAFT, April 5,2013 Nutrient Loading Limits and On-Site Treatment Minimum ORDINANCE REQUIREMENTS Sec. 70-740. (a) Nutrient Loading Rate Limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in 70-741. Sec. 70-741 (a) On site nutrient treatment requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Jordan and Falls Basins a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment, in the amount shown in Table 4 below. In addition to meeting the percentage reductions below, in the Jordan and Lower Neuse Basins, nitrogen export load from the site must not exceed 6 lbs. per acre per year for Limited Residential, and and 10 lbs per acre per year for Multifamily and Other. (Note: offsite credit purchases do not meet TSS removal requirements, which must be met onsite.) Phosphorus 2.2 2.2 0.82 Jordan - General *40% of required reduction TABLE 2 NUTRIENT EXPORT LOADING RATE LIMITS Nitrogen Minimum Onsite Nutrient TreatmentProject not required Project Location Export Limit lbs/acre/year Jordan Basin Falls Basin Phosphorus TABLE 4 ONSITE NUTRIENT TREATMENT REQUIREMENTS 3.6 0.33 Nitrogen Lower Neuse Basin *40% of required reduction Falls - General *50% of required reduction *50% of required reduction *30% of required reduction *30% of required reduction Falls and Jordan within Downtown Area Version 2 DRAFT, April 5,2013 *The “required reduction” is the difference between the post development loading in pounds per acre per year multiplied by the site area in acres before treatment minus the loading target, in pounds per acre per year multiplied by the acres. The percentage shown in the chart above is applied to that difference and the resulting number is the amount in pounds/year of nutrient reduction that must be achieved onsite. CALCULATIONS - ENTER VALUES IN YELLOW CELLS TRUE Required Onsite Reduction Achieved? Nitrogen Phosphorus 0 YES N/A Onsite Reduction Required (%) Lower Neuse No percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met No percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met Treated Loading Rate (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) 5.75 *30% of required reduction *30% of required reduction Nitrogen 2.15 Untreated Loading Rate (lbs/ac/yr) Falls and Jordan exceeding thresholds but with less than 1 acre land disturbance Phosphorus Untreated Loading Rate (lbs/ac/yr) Treated Loading Rate (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) 3.68.01 2.14 0.79 NONE NONE ONSITE CALCULATIONS - ENTER VALUE IN YELLOW CELLS BASED ON TABLE 4 In the Jordan and Lower Neuse Basins, the nitrogen export loading rate from the site does not exceed 6 lb/ac/yr for Limited Residential, or 10 lb/ac/yr for Multifamily and Other. Version 2 DRAFT, April 5,2013 12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061AB C D E F G HIJK L M N O P Q R S T UWatershed Characteristics Ver2.0PART A     Parking lot 1.44 0.16     ⅛‐ac lots‐‐ ‐‐ ‐‐     Roof 1.08 0.15     ¼‐ac lots ‐‐ ‐‐‐‐     Open/Landscaped 2.24 0.44     ½‐ac lots‐‐ ‐‐ ‐‐     1‐ac lots‐‐ ‐‐ ‐‐     Parking lot 1.44 0.39 1,035,736     2‐ac lots‐‐ ‐‐ ‐‐     Roof 1.08 0.15 95,620     Multi‐family‐‐ ‐‐ ‐‐     Open/Landscaped 2.24 0.44 868,409     Townhomes‐‐ ‐‐ ‐‐     Custom Lot Size‐‐ ‐‐     High Density (interstate, main)3.67 0.43 PART B     Low Density (secondary, feeder)1.4 0.52 49,836‐‐1.4 0.52     Rural 1.14 0.471.0 1.44 0.39 8,201     Sidewalk 1.4 1.16 19,810‐‐1.44 0.39‐‐1.08 0.15 9,874     Managed pervious 3.06 0.59‐‐1.4 1.16     Unmanaged (pasture) 3.61 1.56‐‐2.24 0.44 202,734     Forest 1.47 0.25 150,715‐‐3.06 0.59‐‐1.47 0.25 2,044,365     Natural wetland‐‐ ‐‐‐‐ ‐‐ ‐‐     Riparian buffer‐‐ ‐‐‐‐ ‐‐ ‐‐     Open water‐‐ ‐‐‐‐ ‐‐ ‐‐LAND TAKEN UP BY BMPs 1.08 0.15 45,048‐‐1.08 0.15*Jurisdictional land uses are not included in nutrient/flow calculations.Total Post‐Development Calculated Area (ft2):2,265,1742,265,1742,265,174Custom Lot Size (ac)     Forest     Managed perviousTotal Development Area Entered (ft2):LAND USE AREA CHECKLAND TAKEN UP BY BMPs     Lawn     Sidewalk/Patio     Roof     Natural wetland*     Riparian buffer*     Open water*INDUSTRIALTRANSPORTATIONCOMMERCIAL     Parking lot     Driveway     RoadwayPERVIOUSJURISDICTIONAL LANDS*Total Pre‐Development Calculated Area (ft2):InstructionsAdditional Guidelines     1. Select your physiographic/geologic region. (see map on 'instructions' page)Physiographic/Geologic Region:TP EMC(mg/L)Pre‐Development(ft2)     2. Enter the area of the entire development in square feet (ft2).     4. For each applicable land use, enter the total area of that land use that lies within the development under pre‐development conditions.     5. For each applicable land use, enter the total area of that land use that lies within the development under post‐development conditions, before BMP implementation.     ‐ Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage        values of the appropriate land use(s) and treated.     6. Ensure that the sum of pre‐ and post‐development areas entered equal the orginal development area. Post‐Development(ft2)Matt Jones, PEPost‐Development(ft2)RaleighTotal Development Area (ft2): 2,265,174Soil Hydrologic GroupBPrecipitation location:Age(yrs)TN EMC(mg/L)TN EMC(mg/L)TP EMC(mg/L)Pre‐Development(ft2)COLUMN 2 -- RESIDENTIAL LAND USESCOLUMN 1 -- NON-RESIDENTIAL LAND USESModel Prepared By:      7. Continue to "BMP Characteristics" tab.     3. Select the location that is most representative of the site's precipitation characteristics. (see map on 'instructions' page)FeEx FreightTriassic Basin     ‐ Residential areas may be entered by average lot size (column, part A), or may be separated into individual land uses (column 2, part B) ‐‐ do NOT list out individual land uses within an         area already described by lot size.      ‐ For non‐residential watersheds, indicate acreages of each land use type in Column 1 for both pre‐ and post‐development conditions.     ‐ For residential watersheds, complete the required information in Column 2 for both pre‐ and post‐development conditions.      ‐ If a given land use is not present in the given watershed, leave the cell blank or enter a zero.     ‐ Ensure that land use areas entered for both pre‐ and post‐development conditions match the total development area entered in cell O21.Development Name:Clear All ValuesReturn to InstructionsProceed to BMP CharacteristicsSkip to Development SummaryClear All ValuesReturnto InstructionsProceed to BMP CharacteristicsSkip to Development SummaryClear All ValuesReturn to InstructionsProceed to BMP CharacteristicsSkip to Development Summary BMP Characteristics Ver2.0Instructions     1. Select the type of BMP for each catchment.     2. Enter the area of each land use type in the contributing drainage area for each BMP. 0.12     3. Continue to "Development Summary" tab.0.120.20Additional Guidelines0.26     ‐ This spreadsheet allows the development to be divided into as many as 6 smaller catchments. 0.15     ‐ BMPs 1, 2, and 3 for a given catchment are assumed to operate in series, with the outflow from 1 serving as the inflow to 2, etc. 0.150.39     ‐ Not all BMP or catchments must be utilized. Simply leave fields blank in the columns not needed.0.14     ‐ Leave cells blank or insert zeroes if a land use is not present in the area draining to the BMP.0.15     ‐ For water harvesting BMPs, be sure to enter the percent volume reduction that will be achieved by your system.  Volume detention (catch‐and‐release mechanisms) will not be considered ‐ only proven volume reductions are valid inputs. 0.11     ‐ The BMP undersizing option should only be used for existing development or retrofit sites.0.12*if treating commercial parking lot, TP effluent concentration = 0.16 mg/L     ‐ IMPORTANT: for the land area calculation checks to occur, you MUST press enter after entering a value for area to be treated by a BMP (not just click on the next cell).     ‐ See User's Manual for instructions on modeling oversized BMPs.BMP #1 BMP #2 BMP #3 BMP #1 BMP #2 BMP #3 BMP #1 BMP #2 BMP #3 BMP #1 BMP #2 BMP #3 BMP #1 BMP #2 BMP #3 BMP #1 BMP #2 BMP #3Type of BMP:Wet Detention PondWet Detention PondIf BMP is undersized, indicate the BMP's size relative to the design size required to capture the designated water quality depth (i.e. 0.75 = BMP is 75% of required design size):*For water harvesting BMP, enter percent volume reduction in decimal form.Catchment 1:‐‐ ‐‐ ‐‐no no no no no no no no no no no no no no noCatchment 2:no no no‐‐ ‐‐ ‐‐no no no no no no no no no no no noCatchment 3:no no no no no no‐‐ ‐‐ ‐‐no no no no no no no no noCatchment 4:no no no no no no no no no‐‐ ‐‐ ‐‐no no no no no noCatchment 5:no no no no no no no no no no no no‐‐ ‐‐ ‐‐no no noCatchment 6:no no no no no no no no no no no no no no no‐‐ ‐‐ ‐‐COMMERCIAL     Parking lot00     Roof00     Open/Landscaped00INDUSTRIAL     Parking lot 572,711 463,0251,035,736 1,035,736     Roof 38,083 57,53795,620 95,620     Open/Landscaped 151,181 258,766409,947 868,409TRANSPORTATION     High Density (interstate, main)00     Low Density (secondary, feeder)49,83649,836 49,836     Rural00     Sidewalk19,81019,810 19,810MISC. PERVIOUS     Managed pervious00     Unmanaged (pasture)00     Forest6,6156,615 150,715RESIDENTIAL     2‐ac lots (New)00     2‐ac lots (Built after 1995)00     2‐ac lots (Built before 1995)00     1‐ac lots (New)00     1‐ac lots (Built after 1995)00     1‐ac lots (Built before 1995)00     ½‐ac lots (New)00     ½‐ac lots (Built after 1995)00     ½‐ac lots (Built before 1995)00     ¼‐ac lots (New)00     ¼‐ac lots (Built after 1995)00     ¼‐ac lots (Built before 1995)00     ⅛‐ac lots (New)00     ⅛‐ac lots (Built aŌer 1995)00     ⅛‐ac lots (Built before 1995)00     Townhomes (New)00     Townhomes (Built after 1995)00     Townhomes (Built before 1995)00     Multi‐family (New)00     Multi‐family (Built after 1995)00     Multi‐family (Built before 1995)00     Custom Lot Size (New)00     Custom Lot Size (Built after 1995)00     Custom Lot Size (Built before 1995)00     Roadway00     Driveway00     Parking lot00     Roof00     Sidewalk00     Lawn00     Managed pervious00     Forest00LAND TAKEN UP BY BMP 23,037 22,01145,048 45,048TOTAL AREA TREATED BY BMP (ft2):785,012 0 0 877,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0TOTAL AREA TREATED BY SERIES (ft2):Drainage Area Land UseArea treatedby BMP #2 that is not treated by BMP #1(ft2)Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area Treatedby BMP(ft2)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 1    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Total Land Use Area Treated By All BMPs(ft2)Allowable Total Land Use Area to be Treated Based on Post‐Dev. Areas(ft2)Does BMP accept the outflow from another Catchment? If so, indicate which one(s). (Land use areas entered below are in addition to the watershed areas treated by contributing catchment(s).)Area treatedby BMP #2 that is not treated by BMP #1(ft2)Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area Treatedby BMP(ft2)Area Treatedby BMP(ft2)Area treatedby BMP #2 that is not treated by BMP #1(ft2)Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area Treatedby BMP(ft2)Area treatedby BMP #2 that is not treated by BMP #1(ft2)Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area treatedby BMP #2 that is not treated by BMP #1(ft2)785,012000877,600‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 2    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Area Treatedby BMP(ft2)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 3    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 6    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 5    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area treatedby BMP #3 that is not treated by BMPs #1 or #2(ft2)Area Treatedby BMP(ft2)Area treatedby BMP #2 that is not treated by BMP #1(ft2)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    CATCHMENT 4    ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐BMP DETAILSTP Effluent Concen. (mg/L)BMPTN Effluent Concen. (mg/L)Volume Reduction (%)0Grassed SwaleGreen RoofLevel Spreader, Filter StripPermeable Pavement*Sand Filter1.441.211.081.200%20%50%35%1.081.01Water HarvestingWet Detention Pond0%user definedDry Detention Pond0% 1.201.0015%0.95Bioretention without IWSBioretention with IWS     ‐ Volume reduction efficiencies for undersized BMPs are calculated based on a 1:1 ratio (a BMP that is 60% smaller than the required design size is assigned a removal efficiency equal to 60% of the standard efficiency       value). Effluent concentrations remain the same as full‐sized BMPs.0.92     ‐ If the outflow from an entire catchment (including outflow from selected BMPs) drains to another BMP, indicate this in the drop down menu below the BMP type and leave all cells for individual land uses blank. 5%5%Wetland15% 1.08Clear All ValuesReturn to InstructionsReturn to Watershed CharacteristicsProceed to Development Summary 3. Development SummaryWATERSHED SUMMARY Ver2.0Bioretention with IWS35% 0.95 0.12Bioretention without IWS15% 1.00 0.12Dry Detention Pond0% 1.20 0.20Grassed Swale0% 1.21 0.26Green Roof50% 1.08 0.15Level Spdr, Filter Strip20% 1.20 0.15Percent Difference Between:Sand Filter5% 0.92 0.14 *Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an increase. *if treating commercial parking lot, TP effluent concentration = 0.16 mg/LBMP SUMMARY Ver2.0BMP 1BMP 2BMP 3BMP 1BMP 2BMP 3BMP 1BMP 2BMP 3BMP 1BMP 2BMP 3BMP 1BMP 2BMP 3BMP 1BMP 2BMP 3Wet Detention Pond‐‐ ‐‐Wet Detention Pond‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐18.02‐‐ ‐‐20.15‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐2,311,560‐‐ ‐‐2,255,279‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐5%‐‐ ‐‐5%‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐1.42‐‐ ‐‐1.41‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐11.33‐‐ ‐‐9.83‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐0.367‐‐ ‐‐0.395‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐2.94‐‐ ‐‐2.76‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐7.99‐‐ ‐‐6.97‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐1.06‐‐ ‐‐0.95‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐0.390.150.110.12Permeable Pavement*Water HarvestingWet Detention PondWetland0%user defined5%15%1.441.081.011.08551%‐44%403%Pre‐Dev. &Post‐Dev. without BMPsPost‐Dev without BMPs &Post‐Dev with BMPs‐5%‐24%‐28%‐61%‐63%0%54%853%‐5%807%43%1267%Pre‐Development &Post‐Development with BMPs54%808%‐‐‐‐‐‐‐‐‐‐CATCHMENT 6‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ ‐‐‐‐0.9451.06164%‐‐‐‐29%0.1402.14FeEx FreightMatt Jones, PENovember 26, 2019Development:Prepared By:Date:Post‐Development w/ BMPs55.0%4,452,5061.085.750.150.79REGION:TOTAL DEVELOPMENT AREA (ft2):Triassic Basin29%Catchment Outflow Phosphorus EMC (mg/L)Percent Reduction in Nitrogen Load (%)CATCHMENT 1Total Nitrogen EMC (mg/L)Total Nitrogen Loading (lb/ac/yr)Total Phosphorus EMC(mg/L)Total Phosphorus Loading(lb/ac/yr)Total Nitrogen Loading (lb/ac/yr)Total Phosphorus EMC (mg/L)Total Phosphorus Loading (lb/ac/yr)Percent Impervious (%)Annual Runoff Volume (c.f.)Total Nitrogen EMC (mg/L)18%‐‐Total Inflow Phosphorus(lb/ac/yr)BMP OutflowNitrogen (lbs/ac/yr)Total Area Treated(ac)Percent Reduction in Phosphorus Load (%)6.97CATCHMENT 2CATCHMENT 31.05 1.05Catchment OutflowTotal Nitrogen (lb/ac/yr)7.99Percent Volume Reduced(%)BMP OutflowPhosphorus (lbs/ac/yr)Total Inflow Volume(c.f.)Total Inflow Nitrogen(lb/ac/yr)Inflow Phosphorus EMC(mg/L)Catchment Outflow Nitrogen EMC (mg/L)CATCHMENT 40.143‐‐‐‐Catchment OutflowTotal Phosphorus (lb/ac/yr)Volume Reduction (%)TN Effluent Concen. (mg/L)1.500.880.270.16TP Effluent Concen. (mg/L)BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONSInflow Nitrogen EMC(mg/L)CATCHMENT 5Percent Impervious(%)Annual Runoff Volume (c.f.)490,149Post‐Development Conditions55.0%4,672,3251.438.010.382,265,174Pre‐Development Conditions0.8%‐28%Return to Watershed CharacteristicsReturn to BMP CharacteristicsPrint SummaryReturn to Instructions Maps STIRRUP IRON CREEKTRIBUTARY CCHIN PAG E R O A D TO DP#1 AREA=19.93 AC DRAINAGE AREA BOUNDARY (TYP) PROPERTY LINE (TYP) TC PATH SHEET FLOW=75' TC PATH SHALLOW FLOW=843' TC PATH CHANNEL FLOW=430' TEST TC PATH DP#1 TEST TC PATH TC PATH SHEET FLOW=75' TC PATH SHALLOW FLOW=618' DP#3 DP#2 STREAM BUFFER (TYP) TO DP#1 AREA=19.68 AC TO DP#3 AREA=6.19 AC TC PATH CHANNEL FLOW=642' TC PATH CHANNEL FLOW=648' TC PATH SHEET FLOW=75' TC PATH SHALLOW FLOW=802' TC PATH CHANNEL FLOW=642' © DRAWN BY: CHECKED BY: DATE SCALE PROJECT NO. SHEET NO. 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 www.horvathassociates.com HORVATH A S S O C I A T E S 5203 CHIN PAGE ROADDURHAM, NORTH CAROLINATJS JULY 31, 2019 1915 <SITE PLAN> PIN: 0748-91-73-3991 PID: 157676 FEDEX FREIGHTOCTOBER 1, 2019 PER 1ST CITY REVIEW COMMENTS JC1 PIN: 0748-91-06-3841 PID: 157785 MJ AS NOTED SW1 PRE- DEVELOPMENT DRAINAGE MAP 0 SCALE: 1" = 50 100 200 100'NSCALE: PRE-DEVELOPMENT DRAINAGE MAP 1"=100'SW1 1 DP#2DP#2 2 V HC HCHC HC HC HCHC V HC TO WDB#2 AREA=23.26 AC TO WDB#1 AREA=18.39 AC TO DP#1 AREA=6.45 AC DRAINAGE AREA BOUNDARY (TYP) PROPERTY LINE (TYP) TC PATH SHEET FLOW=75' TC PATH SHALLOW FLOW=341' TC PATH PIPE FLOW=186' TC PATH SHALLOW FLOW=187' TC PATH CHANNEL FLOW=112' TO DP#3 AREA=2.42 AC DP#1 DP#3 STREAM BUFFER (TYP) TC PATH SHEET FLOW=75'DP#2 COPYRIGHT 2020 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED© DRAWN BY: CHECKED BY: DATE PROJECT NO. SHEET NO. 1 6 C O N S U L T A N T P L A C E , S U I T E 2 0 1 D U R H A M , N O R T H C A R O L I N A 2 7 7 0 7 P 9 1 9 .4 9 0 .4 9 9 0 F 9 1 9 .4 9 0 .8 9 5 3 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com HORVATH A S S O C I A T E S CIVIL ENGINEERING LAND PLANNING LANDSCAPE ARCHITECTURE STORMWATER MANAGEMENT TJS November 27, 2019 1915 PUBLIC WORKS DEPARTMENT APPROVED CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING CONSTRUCTION DRAWINGS MARCH 6, 2020 1ST CD REVIEW AND OWNER REVISIONS MJ1 PRELIMI N A R Y NOT FO R CONSTR U C T I O N DATE DATE DATE 811 - CALL BEFORE YOU DIG PRELIMI N A R Y NOT FO R CONSTR U C T I O N5203 CHIN PAGE ROADDURHAM, NORTH CAROLINAFEDEX FREIGHTPIN: 0748-91-73-3991 PID: 157676 PIN: 0748-91-06-3841 PID: 157785 TS JC SW2 POST- DEVELOPMENT DRAINAGE MAP 0 SCALE: 1" = 50 100 200 100'NSCALE: POST-DEVELOPMENT DRAINAGE MAP 1"=100'SW2 1 PROPERTY LINE (TYP)PROPERTY LINE (TYP) WDB#1 WDB#2 DRAINAGE AREA BOUNDARY (TYP) PRE-DEVELOPMENT LAND USE MAP 0 SCALE: 1" = 50 100 200 100' N DRIVEWAY ROOF LAWN FOREST TOTAL 8,201 SF 9,874 SF 202,734 SF 2,044,365 SF 2,265,174 SF LAND USE AREAS PARKING LOT ROOF OPEN/LANDSCAPED ROADWAY SIDEWALK FOREST LAND TAKEN UP BY BMPS TOTAL ENTIRE SITE 1,035,736 SF 95,620 SF 868,409 SF 49,836 SF 19,810 SF 150,715 SF 45,048 SF 2,265,174 SF LAND USE AREAS TO WDB#1 572,711 SF 38,083 SF 151,181 SF 0 SF 0 SF 0 SF 23,037 SF 785,012 SF TO WDB#2 463,025 SF 57,537 SF 258,766 SF 49,836 SF 19,810 SF 6,615 SF 22,011 SF 877,600 SF POST-DEVELOPMENT LAND USE MAP 0 SCALE: 1" = 50 100 200 100' N