Loading...
HomeMy WebLinkAboutWQ0041543_Final Permit_20200313 (4)DWR State of North Carolina Department of Environment Quality Division of Water Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE-04-16) Entity Applicant Name: MIKE LOVOY, PE Project Name for which flow is being requested: 2019153 - AASHNA LIVING More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: Water Reclamation Facility NC0024911 c. WWTP facility's permitted flow: d. Estimated obligated flow not yet tributary to WWTP: e. WWTP facility's actual avg flow: f. Total flow for this specific request: g. Total actual and obligated flows to the facility: h. Percent of permitted flow used: All flows are in MGD 40 8.7973 21.5927 0.0028 30.3901 76% II. Complete this section for each pump station you are responsible for along the route of this proposed water flow. List pump stations located between the project connection point and the WWTP Pump Station (Name or Number) Firm Capacity,* MGD (A) (B) Design Approx. Average Daily Current Avg. Flow** (Firm / Daily Flow, pf) MGD MGD (C) (D)=(B+C) Obligated, Not Total Current Yet Tributary Flow Plus Daily Flow, Obligated Flow MGD * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <= 0. Downstream Facility Name (Sewer): MSD of Buncombe County Collection System Downstream Permit Number: WQCS00004 III. Certification Statement: (E)=(A-D) Available Capacity *** certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data . This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Date Page 1 of 1 FTSE 04-16