Loading...
HomeMy WebLinkAboutWQ0041525_Final Permit_20200313WGLA Engineering, PLLC 724 51h Avenue West , I Hendersonville, NC 28739 W Q oar�i525 (828) 687-7177 wgla.com March 5, 2020 Mr. Tim Heim, P.E. Rp,3C315TTWater Quality Section NCDEQ MAR 0 b 2020 2090 US Highway 70 Swannanoa, North Carolina 28778 Water Quality Regional Operations Asheville Regional office RE: Daystar Machining— Henderson County Fast Track Sewer Application WGLA# 14151 Dear Mr. Heim: Please find enclosed the completed fast -track application for a sewer aumo station and force main to serve Daystar Machining. You may recall that this project was originally permitted as a --gravity extension through the Cane Creek Sewer District. The Owner had to abandon this option for service due to the cost of extreme site conditions. They have worked with their neighbor and Cane sewer on a system to pump up to a gravity sewer service from Cane Creek. Along with this letter please find attached the following: -original and one copy of the completed fast track application -completed Flow Tracking form -site map showing the location of the project -check for the permit fee If you have any questions about this submittal or if you need more information, don't hesitate to contact our office. Sincerely, WGLA Engineering, PLLC William R. Buie, P.E. CC: Mr. Marcus Jones, P.E.; Henderson County C I V I L E N G I N E E R S & L A N D P L A N N E R S State of North Carolina �i1 ' u ,T•...'' Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300— FAST TRACK SEWER SYSTEM EXTENSION APPLICATION °Dlvlsion of Water Resources INSTRUCTIONS FOR FORM: ETA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good emaineerine practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in l5A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for of ➢ Projects that require an environmental assessment in accordance with 15 ➢ Projects that do not meet any part of the minimum design criteria (MD( c , ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; pt+ ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or s gr(ARpon62026 ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ vacuum sewer systems. Water Quality Regional Operations AStIeVide Regional Uff ice General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item H.I shall be consistent with the project time on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Er ig neer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: ETA 04-I6 & SUPPORTING DOCUMENTATION Pagel of3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143. 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel me available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T 0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: ETA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 State of North Carolina Department of Environmental Quality NY, Division of Water Resources . 'rn'll ISA NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources ETA 04-16 & SUPPORTING DOCUMENTATION Application Number (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Lytle Family Limited Partnership (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ® General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑State/County ❑ Municipal 2D� [�h 3. Signature authority's name: Jimmy Lytle perl5ANCACO2T 0106(b) lr�yJ'I/i1J4"�y, Title: III II 4. Applicant's mailing address: PO Box 1361 MAR 0 6 2020 City: Fletcher State: NC Zip: 28732- 5. Applicant's contact information: Water Quality Regional Operations Phone number: 8281 712-0456 Email Address: iimmv.lvtle@,daystumachining.com Asheville Regional Office IL PROJECT INFORMATION: I. Project name: Daystar Machining Pump Station 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Henderson 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.3876o Longitude:-82.5672' 5. Parcel ID (if applicable): 9663-14-4544 & 9663-13-6980 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: William R. Buie License Number: 22989 Firm: WGLA Engineers PLLC Mailing address: 724 5°i Avenue West City: Hendersonville State: NC Zip: 28739 Phone number: (BU8 687-7177 Email Address: wbuie@w Ig a com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION 1. Facility Name: Woodfin WWTF Permit Number: NCO024911 Owner Name: Metropliton Sewage District V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Numbers) (if applicable): WQCS Owner Name(s): Cane Creek Water and Sewer District FORM: ETA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No EN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM' DEVI been attached? ❑ Yes ❑No EN/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM, FICA) been attached? 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities E Businesses / offices / factories ❑ Yes ❑No EN/A ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater: 100% Domestic/Commercial %Commercial ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) Industrial (See 15A NCAC 02T.0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(Dl Daily Design Flow.,b No. of Units Flow Existing Manufacturing Facility 25 gal/employee 122 3,050 CWK gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Tarns D 3 IS-0 a See 15A NCAC 02T 0114(b)- (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates l.e., minfmdm flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T 01141 shall be determined using available flow a, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by proj t: 3 050 PH (per 15A NCAC 02T .0114) ➢ Do not include future flo soy r ously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Seweral: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the AMC Vlll. PUMP STATION DESIGN CRITERIA (If Applicable)—02T.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT L Pump station number or name: Daystar Puam Station 2. Approximate Coordinates (Decimal Degrees): Latitude: 35,443029' Longitude:-82.486746° 3. Design flow of the pump station:.072 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 50 gallons per minute at 63 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 3 960 PVC-C900 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(I): ® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(l)(B)., ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per d0y: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T 0305(f) & (a) ® Yes ❑ No ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class 11 impounded reservoirs used as a source of drinking water too feet ** Waters classified WS (except WS-I or WS-V), B, SA, DEW, HOW, or SB from normal high water Lot tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 1 5 feet Any swimming pools 10 feet Final earth grade (vertical)36 inches ➢ 15A NCAC 02T 0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboaue ➢ If noncompliance with 02T.0305(t) or (a) see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) N Yes ❑ No ❑ N/A ➢ Seethe Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .02009 N Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes N No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? / / W Yes El No Per 15A NCAC 02T 0105(c)(6), directly related environmental permits or certification applicationsarebeing prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T 0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to cousin undermines undermines or deteriorates the sewer. ElYes! E No ElN/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Approval of the reauest is required Prior to submittal of the Fast Track Application and surmortiniz documents 2. Professional Engineer's Certification: name from Application Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, V i-9wR6 J, )-, yn1 --n - P;l4fT4)aL attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application ace not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature:.. /- �/4� Dale: 2 '2D2d —� FORM: FTA 04-16 Page 5 of WQo°'��sz5 State of North Carolina Department of Environment Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications Dlvislon of Water Resources IFTSE-04-16) Entity Applicant Name: CANE CREEK SEWER DISTRICT Project Name for which flow is being requested; 2020008 - DAYSTAR MACHINING SEWER EXTENSION-CCWSD X00109( doom tram. one F7SE ram) bu mgnired for•. single prnject iftlre oaner oftbe 11'll'IP is not mope otble for all pmrrp,l tiaras./ong tde route oflhe prnpossd wnsleavnlerJlou. I. Complete this section only 1l'you are the owneroflhe wastewater treatment plant. a. W WTP Facility Name: Water Reclamation Facility b. WWTP Facility Permit 9: NC0024911 All Jloms are in MGD c. W WTP facility's permitted Dow: 40 d. Estimated obligated flow not yet bibutary to W W'I'P: a. W W'IP facility's aclual avg flow: f. Total flow for this specific request g. Total actual and obligated vows to the facility: h. Percent of permitted flow, used: :I r .' �II�1���II►�Ii1 ®I II II. Complete this section for each pump station you at responsible for along the route of this proposed List pump stations located between the project connection point and the W WTP (A) (B) Design Approx. Pump Station Firm Avclvge Daily Current Avg. (None or Capuclty * Flow*' (Finn / Daily Flow, Number) MGD pQ MGD MGD Carrier Bridge 22.600 9.040 7.358 (C) (D)=(B+C) (E)=(A-D) Obligated, Not 'fatal Current Yet Tributary Flow Plus Available Daily Plow, Obligated Fluor Capacity MGD 2,6764 10.034 -0.994 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can he achieved with the largest pomp taken out ofservlce. ** Design Average Daily Flow is tine firm capacity of the pump station divided by a peaking factor di not less than 2.5. "" A Planning Assessment Addendum shell be attached for each pump station located between the project connection point and the W WTP where the Available Capacity is <= 0. Downstream Facility Name (Sewer): MSD of Buncombe County Collection System Downstream Permit Number: WQCS00004 111. Certificati0�' Statement: 1 /� j�%`(� C-,( ( cerlily to the best of my knowledge that the addition ofthe volume ofwastewaler to be permitted in this project has been evaluated along the I'oule to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or oval burden any downsucum pump station en route to the receiving treatment plant under normal Circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data .'this cot fification applies to those items listed above fit Sections I and I I plus all attached planning assessment addcndunns for which 1 am the responsible party igna is form indycates accQuiree of this wastewater flow. / / Page I of I FTSE 04-I6 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section 11 where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 26.7 %and 2.6764 MOD of the Available Capacity (E) in Pump Station Carrier Bridge ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.177 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Carrier Bridge PS Replacement is in design or under construction with planned completion in early 2024 ; mid/or d. The following applies: The French Broad Interceptor - Carrier Bridge PER (completed by CUM Smith in 2019) recommends replacing the existing pump station with a new 34 MGD pump station (expandable to 40 MGD) to accommodate future wastewater flows through 2070. The project will add approximately 12 MGD of additional firm capacity by em'ly 2024. This project is incorporated into MSD's 10-yr Capital Improvement Plan which provides funding for land purchase (in FY 19/20), engineering design (FY 19/20 and FY 20/21), and construction (FY 21/22 and FY 22/23). Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G,S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signature Dale Page 3 of 6 FTSE 10-18 ƒ / \( }0 ■ N C- CU G O V y ,,N^^ V/ (0 r L � A ova, W a c ewx x..�w 4p r J l ro m bi'a c w