Loading...
HomeMy WebLinkAboutNCC200964_ESC Approval Submitted_20200313Wake County Environmental Services Department Water Quality Division, Watershed Management Section WAKE 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 COUNTY TEL 919 856-7400 • FAX 919 743-4772 KVIU 11 C Ilk"i 111 SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Tingen Property Project Name Subdivision Date Received 3/22/18 Disturbed Acreage 7.40 Watershed Swift Creek Date Processing Initiated 4/4/18 Jurisdiction Town of Garner Project Number S-6158 Plan Review Fee $1,850 PAID Permit Fee $1,850 PENDING Applicant: Engineer: Name JBH Development, LLC CE Group, Inc. / Joe Faulkner, RLA 1814 Euclid Avenue 301 Glenwood Avenue, Suite 220 Address: Charlotte, NC 28203 Raleigh, NC 27603 Phone: 704-805-4801 919-367-8790 ext. 102 Email: BHopper@HopperCommunities.com Joe@CEGroupinc.com Plan Date/Revision Date: 3/5/18 Approval Date: ® Construction Plan Approved with the following Conditions of Approval and Applicable Standards: 4/4/18 1. Place silt fence with silt fence outlet on lower elevation side of stockpile on Sheet 4 of 19. Conditions of Approval Items marked with an "X" were noted as conditions of the Sediment and Erosion Control Plan approval. Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to ® 1' issuance of the Land Disturbance Permit. The permit fee is due at that time. [10-30-7(C)] Once condition No. 1 stated above is applied to Sheet No. 4 of 19, please contact Karyn Pageau at 919-796-8769 to schedule the preconstruction meeting and provide four (4) full-size sets of plans at the meeting. ® 2. Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to the issuance of a Certificate of Compliance. [10-30-7(D)] Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field ® 3. modifications to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County. Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during the project it is determined that the Erosion ® 4. and Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control Ordinance of Wake County, this office may require revisions in the plan and its implementation to ensure compliance with the Ordinance. All projects that have approved plans for an E&SC permit on or after Aug. 3, 2011 are covered by the NPDES Construction Stormwater General Permit, NCG 010000. In addition, effective October 1, 2010, persons ® 5' conducting land -disturbing activities larger than one acre must inspect their project after each phase of the project, and document the inspection in writing. A packet with information on the NPDES General Permit and the Self -inspection Program will be provided at the preconstruction meeting. Permits and inspection reports shall be maintained on site. 1 APPROVAL S&EConstructionPlan ReviewChecklist-V.2 WM l�— WAKE COUNTY KVIU 11 C Ilk"i 111 Wake County Environmental Services Department Water Quality Division, Watershed Management Section 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL ® 6' SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre (including non-contiguous lots). Applicable Regulations Unless otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted 04/17/06. 10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2 ® 7. calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year period, the erosion and sedimentation control plan approval becomes null and void. ® 8. 10-30-8 Actions Required Prior to Land Disturbance S&EC plan approval and land disturbance permit issued must be prominently displayed until all ® a. construction is complete, all permanent sedimentation and erosion control measures are installed and the site has been stabilized. A copy of the approved plan must be kept on file at the job site. ® b No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land - disturbing activity will begin. ® 9. 10-31-1 Authority County officials may enter any property, public or private, at reasonable times for the purpose of investigating and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access ® a• to any authorized representative or agent for the County who requests entry for purposes of inspections, and presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representatives while in the process of carrying out their official duties. Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance ® b. with the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or issued pursuant to this article, and to determine whether the measures required in the erosion and sedimentation control plan are effective in controlling erosion and sedimentation resulting from land - disturbing activity. ® c' Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing activity, including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the erosion and sedimentation control regulations of this article. 15A NCAC 28.0233 - Due to the location of this project, it should be noted that a rule to protect and maintain existing buffers along watercourses in all of Wake County became effective in 2006. The Neuse River Riparian Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds and estuaries in Wake County with forest vegetation on the adjacent land or "riparian area". In riparian areas with existing forest vegetation in the first 30 feet directly adjacent to the stream, the rule prohibits land disturbance, ❑ 10. new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with forest vegetation that is less than 30 feet wide, the rule prohibits land disturbance, new development and fertilizer use within the area that contains forest vegetation (but not the entire 50 foot riparian area). For more information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at 919-807-6300. Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse River Basin except when superseded by the Jordan Buffer Rules[15A NCAC 02B.0265]. 2 APPROVAL S&EConstructionPlan ReviewChecklist-V.2 WM WAKE COUNTY KVIU 11 C Ilk"i 111 Wake County Environmental Services Department Water Quality Division, Watershed Management Section 336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602 TEL 919 856-7400 • FAX 919 743-4772 SECPA - SEDIMENT AND EROSION CONTROL CONSTRUCTION PLAN APPROVAL Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401 (Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit requirements. The approval issued in this letter cannot supersede any other required permit or approval. Wake County PE: Contact Info: barney.blackburn@wakegov.com 919-418-3791 Barney Blackburn, PE 3 APPROVAL S&EConstructionPlan ReviewChecklist-V.2 WM