Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0020401_201 FACILITIES PLAN_20070316
NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0020401 Hickory - Northeast WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Speculative Limits 201 Facilities Plan Instream Assessment (67B) Environmental Assessment (EA) Permit History Document Date: March 16, 2007 wzore any Michael F. Easley. Governor 0�04 wArFRQG 0 Nii-c MEMORANDUM William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources March 16, 2007 TO: Susan Wilson, P.E. West NPDES Unit FROM: Jennifer HayniegrtN Environmental Assessment Coordinator SUBJECT: City of Hickory Amended 201 Facilities Plan Project No. CS370389-18 Alan W. Klimek, P.E. Director Division of Water Quality MAR 2 DEER - WA ER Q01-1 t a V I -DINT SOURCE eRANC; ! W00 �0�,o Please find enclosed a revised copy of the City of Hickory's Amended 201 Facilities Plan entitled 201 Facilities Plan for City of Hickory, N.C.: Northeast Wastewater Treatment (Revised March 14, 2007) and the Addendum to the Environmental Assessment for this report that were submitted by Hayes, Seay, Mattem & Mattern, Inc. The West NPDES Unit has previously k concurred with this report, and this document is intended for your files. Thank you for your cooperation and responsiveness. If you have any questions, please contact me at (919) 715-6223 at your earliest convenience. JH1sd Enclosure cc: Daniel Blaisdell, P.E. Scott Smart, P.E. Jennifer Haynie FEU1S RF Construction Grants and Loans Section One �-+ 1633 Mail Service Center Raleigh NC 27699-1633 1�l 0lC'O1Tla Phone: 919-733-69001 FAX: 919-715-622911ntemet: www.mcgi.net l� An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Awmalzy 201 FACILITIES PLAN QI� CITY OF HICKORY, N. Ce r�� NORTHEAST WASTEWATER TREATMENT HSMM Commission No. 60402A September 10, 2004 Revision 1: February 1, 2005 Revision 2: November 18, 2005 Revision 3: March 14, 2007 Prepared by: -Z pLnL 02725$ 0 1 l p] ARCHITECTS ENGINEERS PLANNERS �i�L FJ� 141`�` •. � c � t+ � � .` •i� J HAYES, SEAY, MATTERN & MATTERN, INC. 181 EAST EVANS STREET SUITE 23 BTC-105 FLORENCE, SC 29506 Hayes, Seay, Mattem & Mattern, Inc. CITY OF HICKORY ' Technical Review Comments For Hickory 201 Facilities Plan (Revised November 18, 2005) Project No. CS370389-18 April 10, 2006 ' NOTE: Please provide a response to all comments on a "comment for comment" basis. Where appropriate, add or revise narrative in the text of the 201 Plan that addresses the issues discussed in the comments. In addition, the comments and responses may be included as a part of the ' report (e.g. in an appendix). 1. General ' 8. Not all sections of the plan are in agreement on the scope of the project. For example, on page 19, the two new aeration basins are projected at 2.2 mgd but in Appendix C and on Figure 4, they are listed at 3.0 mgd. Also, the various scopes of necessary piping do ' not agree_ The site work piping on page 30 and in Appendix C is not in agreement. These and other discrepancies should be amended in a revised report. The response is acknowledged. However, the 4200 l.f., 42-inch diameter outfall listed in the Appendix C, Sitework item 2 is not discussed in Section 4.08 of the 201 Plan. Also, the 700 I.f., 18-inch force main discussed on page 31 of the 201 Plan is ' not listed in Appendix C, Sitework item 2. Please revise Section 4.08 and Appendix C as needed. RESPONSE. Discussion of the 2,000 If of 42-inch diameter outjall included in fire probable cost has been added to the report on page 31. The 700 If of 18-inch force main was already included in the probable cost under [tent 8 "Influent Punnping Station': Therefore no adjustment has been nnade for this itent. ' Ill. Section 3, Future Situation 2. (Reference Page 18) In the proposed design section, influent parameters of BOD = 265 mg/l, TSS = 320 mg/l, and TKN = 35 mg/l are shown. While these parameters are within ' an acceptable range, they are higher than normally would be expected. What is the source of these parameters, and is there an explanation for their relatively high concentration? ' The response is acknowledged and provides information concerning the source of the data for the parameter concentrations. However, the response does not provide any explanation for the relatively high concentrations. Please answer this question also. RESPONSE. Data fn-onn the existing Long Tern Monitoring Plan, as approved by NCDENR, reveals residential loadings q f' BOD — 148 mglL and TSS — 102 nng/L. While this data is justifiable for use in the fl'eadfvorks Anal3kcis process, we believe Page 1 of 6 background loading levels of BOD — 200 mg/L and TSS — 325 nlg/L are more appropriate for use as design parameters for background loading, and more in line with medium strength municipal wastewater design criteria as include in the 2004 Edition of the Great Lakes — Upper Mississippi river Board Recommended Standards (Ten State Standards). By itsi►lg these adjusted background loadings, the associated design will ensure a greater level of'protectio►1 to Lake Hickoly and the surroundi►rg environment. Combining the new background levels with the permitted industrial discharger loadings result in i►'fluent desig►r parameters of BOD — 265 mg/L and TSS — 320 rng/L. As for the design parameter for TKN, we do not believe this is an elevated level for average strength domestic wastewater. In fact the design parameter is in line with the design parameter as included in the 2004 Edition of the Ten State Standards. 3. (Reference Section 3.04) Preliminary calculations for each unit in this section should be provided to support the adequacy of the proposed design to process the expected hydraulic and pollutant loadings, and provide the treatment required to meet NPDES permit limits, reuse effluent requirements, and sludge disposal requirements. The response is acknowledged. The calculations in Appendix G are based on various manufacturers equipment including the Carrousel system, which may be proprietary. As noted in our previous comments, the approval of the Facilities Plan does not constitute approval of sole source procurement. Plans and specifications must comply with N.C. General Statute Chapter 133, Section 3, prior to their approval. RESPONSE. Plans and specifications submitted for review to NCDENR will comply with N.C. General Statute Chapter 133, Section 3. W. Section 4, Alternatives 3. (Reference Page 25) it is noted on this page that both roof drains and storm drains empty directly into sewers. It is also documented that if the drains were disconnected from the system, a storm collection system would need to be installed. This implies that no storm collection system is currently in place. ■ Please verify that the 5-block by 5-block area -in -question does not have a storm collection system, and discuss. How is the storm flow other than from roofs (e.g. streets, parking lots) handled? ■ What is the diameter of the pipes currently carrying the combined wastewater/stormwater flow in this area? ■ If the area does have a storm collection system, discuss why one would need to be constructed if the roof drains were disconnected from the sewer system. ■ Also, provide a map showing the location of the 5-block by 5-block area. Providing the requested information does not require an SSES or a great amount of detailed research. Since the inflow issue is a significant part of the city's wastewater problems, please provide the requested information, which is relevant to the inflow problem and the alternatives analysis. Page 2 of 6 ' RESPONSE: City of Hickory personnel have conducted a preliminary investigation of the area in question. As a part of this investigation several stormwater collection ' devices were located which are generally associated with stormwater collection fi•onr roads (i.e. storm boxes); however, without incurring significant costs to smoke test and pe►form a detailed survey the City cannot state with any assurance where there are ' separate stormwater collection lines and where the collection devices empty directly to the sewer system. As included in the maps in Figure 7, the sewer collection lines in the area range.fronr 8-inch to 15-inch. These maps also identify the location of the 5-block 1 by 5-block area. While the presence of separate stormwater collection lines cannot be verified, the opinion of probable costs included far the construction of a new stor•nnvater collection system are included to demonstrate the worst case scenario costs. ' It is possible that the costs may be lower if'there are some stormwater collection pipes in the area; however, it is evident that the costs would be much greater than the costs to implement all equalization basin at the wastewater treatment plant. Again, it was our understanding from early conversations with NCDENR personnel that a detailed analysis of the downtown sewer system could likely be avoided if the City put.forth a good faith effort of providing available information and provided the inflow would be handled at the plant in a financially responsible manner. We !rope that lire infor•nration included in this response satisfies this criteria. ' 5. Reference Page 25 If Alternative 7 is implemented as the most cost effective ( � ) p alternative, one negative result will be that extraneous inflow will continue to enter the system. In order to reduce the resultant strain on plant facilities, delay future expansions to reduce yearly O & M costs due to the extraneous flow, the city should institute an ' aggressive inflow identification/rehabilitation program in order to eliminate as many inflow sources as possible. Please discuss, and provide any plans by the city to seek out and eliminate inflow sources. ' Please add the information that is discussed in the response to the narrative in the 201 Facilities Plan. ' RESPONSE: The tnfor►nation requested was included as a part of the previous 201 Facilities Plan submittal (page 29). Therefore, no additional changes have been made. 6. (Reference Page 25) Alternative 7 calls for a 2.2 rngd equalization basin to handle extraneous inflow and buffer peak flows to the plant. Please provide calculations used to size this basin and demonstrate that the basin will successfully buffer peak flows. ' The response is acknowledged. The NCAC regulation says "at least 25%". Please provide calculations to support the consultant's belief that the 2.2 MG basin with 37% capacity will be adequate to successfully buffer peak flows. ' RESPONSE: The equalization basin as included in this option is not the sake method of *ha►tdling the inflow at the plant. The unit processes, to include tr•eatrrrerrt basins and Page 3 of 6 ' piping, have been sized to hydraulically pass the rated flow of 6 MGD and a peak flow of'21 MGD. When the plans and specifications are submitted for review, the hydraulic ' profile calculations will confirm this. In addition to adequately sizing the treatment basins and piping, the equalization hasin will be used to serve as a second lute of defense against hydraulic problems at the plant. Therefore, file 2.2 MG of storage ' proposed will be adequate. V. Section 6, User Char-,e and Financial Capability ' 3. (Reference Page 36) The user charge should be based on the user charges for the typical residential customer using 5,000 gallons per month. The estimated cost for the typical user should be provided before and after the project. Please note in the narrative the current total monthly user charge for a typical residential customer using 5,000 gallons per month (e.g. $25.00 per month at ' $5.0011000 gallons). Also, state in the narrative the total estimated monthly user charge, as a result of the project, for a typical residential customer using 5,000 gallons per month (e.g. $30.00 per month at $6.00/1000 gallons). ' RESPONSE: A review of the previous submittal found that the user charges were given in the faun of rate per thousand gallons and annual costs on pages 36 and 37. ' Following phone conversations with NCDENR personnel, an additional statement concerning monthly rates has beer added to the discussion on these pages. ' VI 1. Appendices 1. (Reference Appendix A) What is the status of the request for Speculative Limits? ' Please include in Appendix A a copy of DWQ's September 1, 2004 letter, which is referenced in the response, and any other relevant subsequent correspondence. RESPONSE: The requested infor►►cation has been included in Appendix A. ' 2. (Reference Appendix B) The current NPDES permit expires on April 30, 2005. What is the status of permit renewal`? ' Please include in Appendix B a copy of the draft NPDES permit and the city's October 7, 2005 response, which are referenced in the response, and any other relevant subsequent correspondence. ' RESPONSE: The requested information has been included in Appendix B. ' VIII. Ne-*+, Comments 1. It is preferred for the engineering report and environmental assessment to be included together in one binder. 1 RESPONSE. Due to the size of these documents, we are unable to bind them as one documnntt. 1 Page 4 of 6 1 2. The table of contents should list the individual figures and appendices. A ' descriptive title should be provided for each item along with the page number where it is located. ' RESPONSE: The Table of Contents have been adjusted to Show each figure and appendix individually with a title and page number. 3. The current CG&L budget for the city's loan is $15M. Please provide a summary of the proposed sources of funding for the project, including the amount and type of funding (e.g. grant, loan, etc.) that indicates how all of the project costs will be ' funded. The total of the project funding should equal the estimated project cost. Also, make any revisions that are needed in the user charge calculation. ' RESPONSE: Funding ,for the project beyond the CG&L budget of $15M will be acquired through a traditional batik louts with an anticipated interest rate of 5%. The user charge calculations have been updated to account for this information. ' 4_ Figure 5: ' a. Figure 5 shows a new 30-inch sewer coming into the WWTP site. How will this flow be transported to the proposed headworks? RESPONSE: The line was shown incorrectly its the previous drawing The sower lute is simply used as a means of rerouting existing server around the proposed ' location for the equalization basin. The drawing has been adjusted so that the proper connections are shown. ' b. It is unclear whether the proposed flow equalization basin will intercept flow before the influent pump station or in the gravity portion flow the influent flow, or both. If the flow equalization basin will not intercept flow before the influent ' pump station, how are the overflows at the pump station being. addressed? Please provide a detailed description/explanation. ' RESPONSE: The flow equalization basin will not be used to intercept flow prior to the influent pump station. Tlie overflows at the pump station are being addressed by upsizing the pumps front their current design flow of'4.6 MGD with two pumps ' running to 12 MGD per two pumps running. Tizis iiter•ease izt flow capacity sJtould alleviate any concerns for overflows at the pump station. The equalization basin will be utilized when the flow surpasses a pre progranrrned set point. At such tinte as this flow has been reached flow will be diverted to the equalization basin to ensure that there are no hydraulic problems within the plant. ' c. Pursuant to NCAC 21-1.0219(j)(5)(3) treatment units must be 50 feet from any property line. Please confirm that this is the case for the proposed facilities. While approval of the planning document can proceed if the 50-foot set back is Page 5 of 6 not specifically addressed in the 201 Plan, the design plans and specifications must comply with the 50-foot set back requirement. Please address. RESPONSE: The City of Hickory and HSMM realize that all proposed facilities must be located at least 50 feet from property lines. Final design drawings submifted for review will incorporate the .specified 50 foot setback. d. It is unclear why the flow equalization basin is configured with an anoxic zone on the east side of the basin. What will be the purpose of this structure? RESPONSE: The flow equalization basin is configured with an anoxic zone because the structure will be initially operated as a treatment basin during the construction of'the two basins that will ultimately be used for treatment. Following this initial treatment use of the equalization basin the anoxic/anaerobic zones will simply be used to provide more equalization volume in the basin. 5. Please provide a description of the equipment proposed to be installed in the flow equalization basin. Based on costs in Appendix C it appears to be identical to the equipment proposed for the aeration basins. Please address. Also see the previous comment. RESPONSE: The equipmennt proposed fir use in the flow equalization basin is in fact identical to the equipment included in the proposed aeration basins. This is again used NO that the structure can be initially operated as a treatment basin during the construction of the two basins which will ultimately be used for treatment. When a high flow event is detected the plant personnel will be committed to filling the basin and using the aeration equipment fir miring and prevention of'septic conditions. Page 6 of 6 ' TABLE OF CONTENTS ' 1.0 SUMMARY, CONCLUSIONS, AND RECOMMENDATIONS ..................................... 1 2.0 CURRF..N'r Sn'UATION....................................................................................... 3 ' 3.0 FUTURE SITUATION ........................................................................................ 16 4.0 ALTLRNA`I'IVES.............................................................................................. 22 ' 5.0 PRESENT WORTH ANALYSIS.......................................................................... 34 ' 6.0 USER CHARGES AND FINANCIAL CAPABIL.ITY................................................ 36 7.0 PUBLIC PARTICIPATION., ................................................................................ 38 8.0 REFERENCES.................................................................................................. 39 9.0 FIGURES.........................................................................................................40 ' 1. CURRENT FLOW DIAGRAM............................................................................................. 41 2. DRAINAGE: BASIN... ........................................................................................................ 42 ' 3. PLANNING AREA............................................................................................................ 43 4. CENSUS MAPS................................................................................................................. 44 5. PROPOSED SITE LAYOUI................................................................................................. 45 ' 6. PROPOSED FLOW DIAGRAM........................................................................................... 46 7. DOWNTOWN SEWER SYSTEM LAYOUTT........................................................................... 47 10.0 APPENDIX...................................................................................................... 50 A. SPECULATIVE L1MI'I'S..........•••••..................................................................................... 51 ' B. CURRENTNPDES PERMIT............................................................................................ 53 C. OPINIONS OF PROBABLE COSTS..................................................................................... 83 D. FLOW CHARTS DURING RAIN EVENTS.......................................................................... 88 ' E. CITY OF HICKORY SEWER USE ORDINANCE.................................................................. 98 F. CITY OF HICKORY SEWAGE SPILL RECORDS................................................................ 144 G. DESIGN CALCULATIONS.............................................................................................. 149 ' H. SLUDGE PRODUCTION CALCULATIONS........................................................................ 178 1. SYSTEM -WIDE WASTEWATER COLLECTION SYSTEM PERMIT ...................................... l79 J. CORRESPONDENCE....................................................................................................... 193 ADDENDUM NO. 1 - ENVIRONMENTAL ASSESSMENT 201 FACii,rr ES PLAN NOwn lFAST W W*I'P UPGRADE HICKORY, NC PAGE i TABLES TABLE 2.1 - ANALYSIS OF INFLOW............................................................... ......... 13 TABLE 3.1 - PROJECTED POPULATION AND FL.OWS.................................................. 17 TABLE 4.1 - ALTERNATIVE RANKINGS..................................................................... 33 TABLE 5.1 - ALTERNATIVE COST SUMMARY............................................................ 35 201 FAC[LITIFS PLAN NORTEIEAST W WTP UPGRADE HICKORY, NC PAGE 11 1.0 SUMMARY, CONCLUSIONS, AND RECOMMENDATIONS 1.01 SUMMARY The City of Hickory, NC, owns and operates two wastewater treatment plants (WWTP) ' in Catawba County, and the City has recently purchased Catawba WWTP. The drainage basin served by the City's Northeast WWTP (NPDES Permit No. NCO020401) is ' approximately 19,200 acres in size. The plant was upgraded and expanded in 1988 to a capacity of 6 MGD. In late 2003 the North Carolina Division of Water Quality issued a compliance schedule as a portion of the City of Hickory's System -Wide Wastewater Collection System Permit. The compliance schedule was set to address hydraulic capacity issues at the Northeast WWTP'-.; influent pump station. The City of Hickory requested an extension in the compliance schedule on June 27, 2005 so the necessary pump station modifications can be completed as a portion of the proposed project as presented herein. As stated by NCDENR personnel in a letter dated September I, 2004, Lake Hickory is showing signs of nutrient enrichment. While this nutrient enrichment is likely attributed to non -point source discharges, it is possible the State may regulate point source discharges as a way to lower the overall impact. The plant as currently configured is incapable of achieving nutrient removal. 1.02 CONCLUSIONS This report has concluded the following. 1. It has been projected that wastewater treatment capacity requirements over the next twenty years will approach 6 million gallons per day (MGD). 2. In order to ensure the ability to handle inflow entering the plant and prevent solids washout, treatment process upgrades are necessary. The process 201 FACILITIES PLAN NORTHI-AST WWTP UPGRADE HICKORY, NC PAGE ' upgrades will also ensure regular compliance with State discharge limitations. These upgrades are considered essential due to the inadequacy of the processes to handle peak flows seen during large rain events and the extended length of time current equipment has been operating. ' 3. The most cost effective manner to provide inflow control and plant upgrades is to install a 2.2 million gallon equalization basin along with sweeping ' process changes. The major process changes proposed are: ' a. Replacement of the existing aeration basins with an extended biological aeration process. ' b. Renovation of the sludge handling process to include more storage and the use of a rotary drum Filter. c. Replacement of the existing chlorination/dechlorination equipment with on -site generation of sodium hypochlorite and sodium bisulfite. ' d. Enlargement of plant processes to provide increased hydraulic capacity. 4. The proposed alternative will not have an adverse effect on the environment. 5. The estimated cost including construction and engineering for the proposed wastewater treatment system improvements is approximately $22,900,000. 1.03 RECOMMENDATIONS It is recommended that the City of Hickory proceed with the wastewater treatment plant improvements found to be most cost effective by this 201 Plan. It is further recommended that copies of the 201 Facilities Plan and other information as required be formally submitted to the North Carolina Department of Environment and Natural Resources (NCDENR). 201 FACILITIES PLAN NORTHEAs'r WW"rP UPGRADE Flicv,oltY, NC PAGE 2 2.0 CURRENT SITUATION 2.01 COLLECTION SYSTEM The City of Hickory's sewer collection system is comprised of more than 1,250 inch - miles of pipe. Included in the collection system are approximately 750,000 fleet of 8-inch pipe, 4.7 miles of 24-inch pipe, and 0.8 miles of 18-inch pipe. Portions of the City of Hickory collection system have been in place since the early 1900's. Sewer service is available throughout Hickory's city limits. However, an area of Alexander County located within the drainage basin is experiencing problems with existing septic tanks. The approximately 2,500 residents are likely to begin receiving sewer service from the Northeast Wastewater Treatment Plant (WWTP) because of the problematic septic tanks; however, the inclusion of these residents will not necessitate an expansion of capacity and will not be included in this project. The Northeast WWTP includes three interceptors and thirty nine pump stations located throughout the collection system. The pump stations range in age from two to twenty three years. Approximately two thirds of the plant flow enters via gravity line, and the remaining flow is from the influent pump station (IPS). The IPS has a maximum pumping capacity of 3,286 gpm (4.7 MGD) when all three pumps are running. Flow to the IPS includes flow from the 20-inch diameter Falling Creek Interceptor and three (3) system pumping stations. Peak flow to the influent pump station is summarized as follows: • Falling Creek Interceptorr..................................... 3,083 gpm • Snow Creek Pumping Station .............................. 3,200 gpm • Lakeshore #1 Pumping Station ............................... 850 gpm • Olde Mill #2 Pumping Station ............................. 100 gpm TOTAL !,2D v m (10.4 MGD) 201 FACILITIES PLAN NORTIiI_AST WWTP UPGRADE HICKoR�,, NC PAGr_ 3 The IPS, as currently configured, may overload during peak influent periods. As a result, Hickory has reported three spills to NCDENR since May 30, 1998. The North Carolina Division of Water Quality issued a compliance schedule to address hydraulic capacity problems at the IPS. The City of Hickory requested an extension in the compliance schedule on June 27, 2005. The extension of the compliance schedule was requested so the necessary pump station modifications can be completed as a portion of the project as presented herein. 2.02 TREATMENT SYS ENI The City of Hickory's Northeast W WTP was upgraded and expanded in 1988 to a capacity of 6 MGD. The plant currently receives an average daily flow of 3.97 MGD, and a calculated peak flow of 15.0 MGD following significant rainfall. The peak flow is based on a peaking factor of 2.5 and the addition of infiltration/inflow. ' Wastewater enters the plant via two (2) gravity sewer lines and an influent pump station. The IPS handles approximately one-third of the influent wastewater. Wastewater entering the 1PS passes through a mechanical bar screen before being pumped to the plant. 1 Wastewater influent to the plant passes through a mechanical bar screen prior to being ' routed to one of two (2) grit chambers. Grit chamber effluent is split into two separate and parallel treatment trains. The oldest treatment train consists of original plant components with some upgrades and modifications made in 1988. The newest treatment train was constructed in 1988, and is designed to handle 42% of the plant flow. Following grit removal, treatment is carried out utilizing conventional activated sludge techniques. Primary clarification is accomplished via rectangular clarifiers in the oldest treatment train, and a circular clarifier in the newer train. Wastewater is then treated in 201 FACILITIES PLAN NORTI-II:ASr W WTP UPGRADE ' HICKORY, NC PAGL4 one of two aeration basins, where aeration is accomplished using coarse bubble diffusers. Aeration basin effluent is directed to a splitter box before being sent to one of two (2) circular secondary clarifiers, both of which were installed in 1988. Wastewater is dosed with chlorine following secondary clarification in a rectangular chlorine contact chamber. Effluent from the contact chamber is subsequently dechlorinated using sulfur dioxide prior to post aeration. The final step in liquid treatment prior to discharge is post aeration, where the liquid is aerated using coarse bubble diffusers. Primary and secondary waste activated sludge is dewatered on two gravity belt thickeners prior to hauling via tanker trucks to the Hickory Regional Compost Facility located in Ne,kvton, NC. A flow diagram of the present treatment plant is included as Figure 1 in Section 9. The following design criteria were utilized for the 1988 upgrades. 1. Current Flow - January 03 thru December 03 Monthly Average Day 3.95 MGD Maximum Day 10 MGD 2. Design Flow Average Day 6.0 MGD Peak Day 15.0 MGD 3. Influent Wastewater Design Parameter a) BOD$ 350 mg/l b) TSS 200 mg/l c) NH3-N ; 25 mg/l 4. Effluent Discharge Limits a) BODS 30 mg/1 b) TSS 30 mg/l 201 FACILITIES PLAN NORTHEAST W WIT UPGRADE 1-11CKORY, NC PAGE. 5 M Ic) NH3-N None d) Fecal Coliform 200/100 ml e) DO 5 n1g/1 5. influent Pumping Station ' a) Number of Pumps 3 b) Type of Pumps Aurora 610 - Non -Clog Centrifugal c) Capacity of One Pump 2300 gpnl (3.3 MGD) cu 51' TDH d) Capacity of Two Pumps 3,186 gpm (4.6 MGD) a 60' TDH c) Capacity of Three Pumps 3,286 gpm (4.7 MGD) a 64.3' TDH t) Rated Capacity of Pump Station' 3,186-gpm (4.6 MGD) g) Force Main f 1,200 L.F. 14-Inch DIP 11) Wet Well: ' Length 24' Width IV Depth 10.5' Volume 20,735 Gallons (Maximum) i) Incoming Flow to Influent Pump Station ' 1} b Interceptor Falling Creek Ifor p • 20" DIP {t 0.023`%a ' • Full Pipe Capacity 3,083 gpm (4.4 MGD) 2) Snow Creek Pumping Station • 3,200 GPM rr 162' TDH • 18-Inch Diameter Force Main 3} Lake Shore #I Pump Station • 850 gpm at 125' TDH • 8-Inch Diameter Force Main 4) Olde Mill Landing #2 Pump Station • 42 gpm @ 38' TDH Mechanical Bar Screen at Influent Pump Station 1) Capacity 12 MGD 2) Type Step 3) Screen Openings 1/4-Inch 4) Screen Width 39" ' 5) Manufacturer Huber 6) Model SSL 3500 x 865 x 6 7) Number of Screens One 8) Dewatering Unit Ram Press 9) Manual Bat Screen Yes 10) Age 3 Years 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE 6 6. Mechanical Bar Screen ,, WWTP: a) Number of Units b) Capacity of Unit c) Width of Screen d) Width of Channel e) Maximum Water Depth 7. Grit Chamber: a) Number of Units b) Capacity of Each Unit c) Aerated d) Channel Width e) Grit Removal by 0 Air Blowers g) Channel Effective Length S. Influent Flow Measuring: a) Number of Units b) Capacity of Each Unit c) Type 9. Primary Clarification: l . Existing (4160 S.F.) a) Number of Units b) Size c) Overflow Rate cr 5.0 MGD: 2. New a) Overflow Rate b) Number of Units C) Size ; 10. Aeration: 1. Reactor Volume: 1 6 MGD Average 15 MGD Peak Y-0" 4'-2" 3'- l 0" 2 7.5 MGD Yes Y-6" Chain & Bucket 2 ca ct 124 ICFM u 7.0 psi 29,-a„ 2 0.32 MGD to 15 MGD Parshall Flume 4 16'W x 65'L x 10' SWD 1202 gpd/SF 836 gpd/SF cr Average Flow 2091 gpd/SF a Peak Flow 1 65' Diameter x 1 2' SWD 201 FACILITIES PLAN NORTHEAs'r W WTP UPGRADE HICKORY, NC. PACE 7 a) Total : 2,000,000 Gallons b) Existing 1,149,678 Gallons c) New 850,322 Gallons 2. Hydraulic Detention Time 8.0 Hours IVolumetric Loading 40 Pounds BODS/1000 Ft.3 4. New Basin Size : 4 a 23'-4" x 122' x 10' SWD 5. Type Aeration Coarse Bubble Diffusers G. Oxygen Transfer 780 Pounds O,/Hour (Actual) 1157 Pounds 0,/Hour (Standard Conditions) 1.4 Pounds 02/Pound BODS Removed 7, Blower Requirements I @ 7,000 SCFM (Future) 2 u 7,0001CFM 3 @ 3550 1CFM (Existing) 11. Secondary Clarification (New),: a) Number of Units b) Diameter c) Overflow Rate 12. Sludge Return Pump Station: a) Number of Pumps b) Capacity/Pump e) Type 13. Sludge Transfer Pump Station a) Number of Pumps b) Capacity/Pump c) Type 2 90' 800 gpd/SF a Average Flow 1200 gpd/SF a Peak Flow 4 6250 Total Capacity) 150% 2 Pumps @ 1328 gpm (New Side) 2 Pumps a 1827 gpm (Existing Side) One Variable Speed, Centrifugal Dry Pit,Wetwell; One Regular Speed 2 215 gpm, Variable Speed Progressive Cavity 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 8 14. Chlorine Contact Chamber: a) Number of Units b) Overall Size c) Detention Time d) Chlorine Dosage e) Chlorinator 15. Effluent Flow: a) Number of Units b) Type 16. Post Aeration: a) Number of Units b) Detention Time e) Type 17. Dechlorination: a) Type b) Detention Time e) Storage 18. Sludge Storage a) Wet Well of Return Sludge Pump Station 19. Gravity Belt Thickener: a) Size b) Number of Units c) Solids d) Polymer e) Solids Capture f) Backwash Pumps g) Type 20, Effluent Outfall Line: a) Approximate Length b) Inside Diameter C) Outside Diameter 2 48'x 48'x 8'SWD 30 Minutes a 6.0 MCD 5 mg/I V-Notch w/ Ton Containers 1 4'-0" Rectangular Weir : 1 5 Minutes Coarse Bubble Diffusers SOz 1 Minute 150 Pound Cylinders 16,000 Gallons 2.0 Meters 2 5% to 7% 3 to 6 Pounds/Ton 95% to 98% 2 Each c7 50 gpm a, 87 psi Vertical Turbine 2900 L.F. 36.85" 3 9.47" 201 FACILITIES PLAN NORTHEAST WW'IT UPGRADE HICKORY, NC PACE 9 d) Material High Density Polyethylene e) SDR 32.5 21. Odor Control: a) Three PEPCON Odor Master I scrubbers to serve the following: + 60' Diameter Primary Clarifier • Mechanical Bar Screen and Grit Chamber • Return Sludge Wet Well • Sludge Dewatering Building; b) Covers are provided over the weirs of the 60' diameter primary clarifier. Plant processes currently in use are not capable of handling the large amounts of inflow seen at the plant following periods of significant rainfall_ Significant rain events cause ' the influent pump station to hydraulically overload the secondary clarifiers. This condition causes solids to be washed out of the system, reduces the process efficiency, and may cause NPDES permit violations, The Northeast W WTP has been issued five (5) notices of non-compliance with their NPDES permit since August 23, 1999, due to the ' hydraulic overloading of the secondary clarifiers. All five of these incidents were directly caused by stormwater inflow. Hydraulic overloading is also a problem at the influent pump station. The pump station has a maximum pumping capacity of 3,286 gpm (4.7 MGD) when all three pumps are running. The pump station receives flow from the 20-inch diameter Falling; Creek ' Interceptor and three (3) system pumping stations. Peak flow to the influent pump station is summarized as follows: • Falling Creek Interceptor ....... ............. ...... I.......... 3,083 gpm ' • Snow Creek Pumping Station .............................. 3,200 gpm • Lakeshore #1 Pumping Station ............................... 850 gpm • Olde Mill #2 Pumping; Station ............................. 100 gpm TOTAL 7 23 m (10.4 MGD) I 201 FACILITIES PLAN N0R'1'li1:AST W WTP UPGRADE ' HICKORY, NC PACE 10 ' As can be seen from the summary above, the influent pump station can overload during peak influent periods. The City of Hickory has reported three spills to NCDENR since ' May 30, 1998, all of which resulted from influent pump station overloading. The North ' Carolina Division of Water Quality issued a compliance schedule to address hydraulic capacity problems at the IPS. In addition to hydraulic deficiencies inherent at the Northeast WWTP, the unit processes ' have not been taken offline for any extended period to perform necessary maintenance and repairs. The newer treatment train, designed to handle 42% of the flow, is 16 years old and the oldest treatment train is now over 35 years old. Due to the inability of either treatment train to handle the entire plant flow, the maintenance and repairs needed are ' virtually impossible to perform in the current arrangement. The secondary clarifiers have been in continuous operation since they were installed in 1988. The mechanical components of the clarifiers are in need of maintenance and repair. A similar situation exists for each of the major unit components of the treatment plant. Another treatment deficiency exists in the operation of the sludge dewatering system, due to lack of adequate sludge storage. The only storage available for unthickened sludge is a small portion (16,000 gallons) of the sludge return pumping station wet well. There is currently no storage available for thickened sludge. Therefore, the gravity belt thickeners have to be started each time a tanker truck arrives for loading. Once the truck has been loaded, the thickeners must be shut down, The cycle of starting and stopping the gravity belt thickeners is repeated 4 to 6 times daily in order to keep pace with sludge production, making this a very inefficient process. 2.03 POPULATION AND DP MOGRAPIi1CS Hickory's Northeast WWTP serves a drainage basin bounded by Lake Hickory on the north, Springs Road on the east, Highland Avenue on the south, and US 321 on the west. 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE A map of the drainage basin and sewer layout is included as Figure 2 in Section 9. The WWTP provides sewer service to approximately 18,160 people in Catawba County through 7,235 residential taps. A map of the drainage basin in relation to the planning area is included as Figure 3 in Section 9. Census 2000 data was used to determine the total population in the Northeast WWTP service area. The Census maps were broken into census tracts in an effort to accurately define the service area population. Figure 4 in Section 9 presents the Census tract breakdown. The populations for census tracts not fully within the service area boundaries were estimated based on the approximate percentage of land coverage lying within the service boundaries. The service area is comprised of all or a portion of nine Census map tracts. Analysis of Census 2000 data, summarized in Table 3.1, yields a total population in the service area of 35,180. 2.04 INFLOW AND INFILTRA` ION Inflow is defined as water discharged into a sewerage system from such sources as, but not limited to, roof leaders, drains from swamps or springs, manhole covers, cross - connections from stone sewers, cooling water discharges, surface run-off, and street wash water. NCDENR's Construction Grants and Loans Section estimates inflow using flow records following a one -inch rain event. The rain event selectee for the analysis must be preceded by at least five dry weather days. From January 2002 to December 2003, eight rain events were recorded by the City of Hickory that met these requirements. These rain events are summarized in Table 2.1 and plant flow charts for these days are presented in Appendix D. NCDENR defines excessive inflow as non -industrial peak flows at the WWTP that exceed 275 gpd per capita served. Based on this criterion, seven of the eight rain events included in the analysis resulted in excessive inflow_ This finding is not surprising due to the presence of stormwater in the downtown sewer system. There are two possible methods for handling the inflow, rehabilitating the downtown sewer system as a whole or 201 FACILITIES PLANE NORTHEAST WWTP UPGRADE HICKORY, NC PAGE. 12 ' installing an equalization basin at the existing wastewater plant to allow for better control of plant hydraulics. ' The two options have been examined based on an initial construction cost and present worth analysis. The preliminary cost estimate for the sewer rehabilitation is estimated at ' $1 1.87 million, and the construction cost estimate including contingencies for the equalization basin is approximately $2.1 million. The operation and maintenance costs ' for the storm drainage system is estimated at $178,700 per year, and the O&M costs for the equalization basin are cstimatcd at $1 10,000 annually. TABLE 2.1 ANALYSIS OF INFLOW Aver .g A . - / 1 ` 1 r 03/02/2002 1.13 5.9 5.7 313.88 06/26/2002 1.21 4.9 4.7 258.81 03/30/2003 1.09 6.1 5.9 324.89 04/ 17/2003 1.10 9.1 8.9 490.09 05/15/2003 1.21 7.1 6.9 379.96 06/15/2003 1.29 6.8 6.6 363.44 09/22/2003 1.08 5.5 5.3 291.85 12/10/2003 1.06 7.5 7.3 401.98 The proposed equalization basin is essentially a biological aeration system with t additional aeration equipment added to yield a 2.2 MG basin. The installation of this basin will provide the City of Hickory with the flexibility to eliminate the inflow over an ' extended period of time, while allowing improved treatment of influent wastewater. 201 FACILITIES PLAN ]NORTHEAST W WTP UPGRADE ' H[CKORY, NC PAGE 13 Infiltration, as defined by NCDENR's Construction Grants and Loans Section, is the average daily flow of the three wettest consecutive months minus the expected flow. Infiltration greater than 3,000 gallons per day per incli-mile (gpdim) is deemed excessive by NCDENR. The Northeast WWTP collection system consists of more than 1250 inch - miles of pipe. The average daily flows and the expected flows for the months of March — May 2003 are given below. FLOWS FOR MARCH — MAY 2003 Plant Average...........................................4.45 MGD Water Billing.............................................3.50 MGD 90% Water Billing.....................................3.15 MGD 85% Water Billing.....................................2.98 MGD The infiltration based on a 15 percent consumptive loss is calculated as 1,169.15 gpdim, and 1,030.35 gpdim assuming a 10 percent consumptive loss. The infiltration experienced in the Northeast WWTP collection system is not excessive as defined by NCDENR Construction Grants and Loans Section. 2.05 CURREN'r FLOWS City of Hickory water billing records were analyzed in an attempt to estimate the amount of sewer system infiltration and also to estimate the cuETent plant flows. From January to December 2003 Hickory billed residents in the service area for an average of 3.50 MGD. Assuming a 10% consumptive loss, the expected wastewater flow from residential and commercial users is 3.15 MGD. In addition to this water billing flows, industries with permitted wastewater discharges contributed an average of 0.17 MGD for the 2003 calendar year. Influent flow to any wastewater treatment plant will include some amount of inflow and infiltration. Using the water billing records supplied by the City of Hickory, average expected flows and average measured plant flows were calculated for each three month period throughout the year, From these flow calculations, peak and average infiltration was calculated. As shown below the total current flow for the Northeast WWTP may be 201 FACILITIES PLAN NORTHFAST W WTP UPGRADE HICKORY, NC PAGE 14 estimated at 3.97 MGD based on flow records. The average daily plant flow as calculated in this manner will be used for all future plant projections included in this document. CURRENT NORTHEAST WWTP FLOWS (2003) Average Daily Water Billing ............ 3.50 MGD ................................ . 90% Water Billing............. ... 3.15 MGD ............................................... Average Permitted Industl-ial.............................................. 0.17 MGD Infiltration (Peak Tri-Monthly)...........................................1.30 MGD Infiltration (Average Tri-Monlhl})...................................... 0.65 MGD Total Average Daily Flow: 3.97 MGD 201 FACILITIES PLAN NORTI IEAST W WTP UPGRADE HICKORY, NC PAGE 15 3.0 FUTURE SITUATION 3.01 GENERAL A vital portion of a 201 facilities plan is the projection of the future situation within a given service area. The following sections outline a twenty-year forecast within the Northeast WWTP service area, as well as a proposed plan for handling the future growth within the area. 3.02 POPULATION PROJECTIONS A twenty-year population projection for the Northeast WWTP service area was developed in conjunction with the Western Piedmont Council of Governments (WPCOG). WPCOG personnel developed a population projection for Catawba County, NC. The WWTP service area was then broken into tracts, as identified by Census 2000 maps, in order to disaggregate the countywide population projection. In addition to the drainage basin served in Catawba County, approximately 2,500 residents in Alexander County who are currently experiencing problems with their septic tanks are included in the future service population. Ratios of current census tract populations to county populations were found for each census tract within the drainage basin. Populations were projected for each tract by maintaining identical ratios in relation to the projected county populations supplied by WPCOG staff. Where a tract was divided by the service boundary, an approximate percentage of land coverage within the service area was utilized to detennine the service population of the area. The current and projected 2024 populations arc given in Table 3.1. 201 FACILITIES PLAN NORTH EAsT W WTP UPGRADE HICKORY,NC PAGE 16 3.03 Ft,ow PROJECTJONs Anticipated flows in the service area are based on the population projections summarized ' below. The projected flows attempt to account for industrial, residential, and commercial growth within the service area across the twenty-year planning period. The initial wastewater flow used in future flow projection is assumed to be 3.97 MGD as derived in Section 2.05, As outlined by NCDENR, projected residential flows are based on 70 gpd per capita growth and commercial growth is estimated at 15 gpd per capita growth. The projected flows developed in this manner are summarized in Table 3.1. TABLE 3.1 PROJECTED POPULATION & FLONN'S Total .. _s o Couhty q- ' i 111 �aNAM-Flows .Population Catawba County 141,685 199,858 Tract 103.01 4,385 3.095% 6,185 Tract 103.02 5,111 3.607% 7,209 1 Tract 103.03 1,596 2.971 % 2,251 Tract 103.04 (10%) 402 2.840% 568 Tract 104.01 6,272 4.427% 8,847 Tract 104.02 4,995 3.525% 7,046 Tract 105 6,408 4.523% 9,039 Tract 106 (90%) 5,608 2.639% 7,910 Tract 108 403 0 284% 568 Alexander County 2,500 0.18 MGD Total Drainage Basin 35,180 24.830% 49,625 -4.98 MGD 0.22 MGD_ Total flow forecasted includes residential flow, commercial flow, and a 10% industrial reserve based on current tows: At the end of the twenty year planning period, the total 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE ' HICKORY, NC PAGE 17 ' projected residential and commercial flow within the drainage basin is 5.4 MGD. With a 10% industrial reserve built in the total flow becomes 5.9 MGD. Based on this projection the plant capacity of 6 MGD will be sufficient to handle the forecasted influent flow for tthe drainage basin. 1 3.04 PROPOSED DESIGN ' As stated by NCDENR personnel in a letter dated September 1, 2004, Lake Hickory is showing signs of nutrient enrichment. While this nutrient enrichment is likely attributed ' to non -point source discharges, it is possible the State may regulate point source dischargers as a way to lower the overall impact. As a result of the information contained in this letter, the proposed preliminary design for .Hickory's Northeast WWTP upgrades has been based on possible recommendations by NCDENR for point source dischargers. Based on the anticipated limits, current plant configuration, and the need to efficiently Handle inflow at the plant the following design criteria were used for preliminary design calculations. A site plan for the proposed layout is presented in Figure 5 in Section 9, and the proposed flow diagram is presented in Figure 6. 1. Flow Average Daily Flow 6.0 MGD Leak Hourly Flow 15.0 MGD 2. Influent Parameters BOD 265 mg/l TSS 320 mg/l TKN 35 mg/l 3. Effluent Parameters BOD 10 mg/1 TSS 15 mg/1 NH3-N (Future) 1.0 mg/l 4. Influent Pumping Station 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE 1$ a) Number of Pumps 3 b) Capacity per Pump 6 MGD a 100' TDH c) Rated Capacity 12 MGD @ 100' TDH d) Motor 150 HP e) Speed Variable f1 Mechanical Bar Screen • Number 1 New, 1 Existing • Type Step + Screen Openings 1/4-Inch • Channel Width 4'-6" • Screenings Compactor Yes g) Flow Metering : Sonic 5. Mechanical Bar Screen at WWTP a) Type Climber b) Number 2 c) Capacity/Unit 15 MGD d) Screen Openings 1/4-Inch e.) Screen Width 6. Grit Chamber a) Type Aerated b) Number 2 c) Capacity of Each Unit 15 MGD 7. Equalization Basin a) Type Carrousel Oxidation System b) Number 1 c) Basin Volume 2.22 MGD 8. Aeration a) Type Carrousel Oxidation System b) Number 2 c) Basin Volume 2 @ 3 MGD = 6 MGD d) SRT 14 Days e) MLSS 4,000 mg/1 0 Waste Activated Sludge 15,886 Lbs. TSS/Day g) Aerators/Basin • Type Low Speed, Dual impeller 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE 1•1ICxoRv, NC PAGE 19 • Nameplate HP 2 cr 200 = 400 • Brake HP 2 a 1 15 230 • Number 2 • Motor Speed Two -Speed 9. Final Clarifiers a) Number 2 b) Diameter 100, c) Side Water Depth 14' d) Overflow Rate : Average Flow - 317 gpd/SF Peak Flow - 990 gpd/SP e) Solids Loading Rate Average Flow - 21.1 Lbs./Day/SF Perak Flow - 289.9 Lbs./Day/SF f) Mechanism Spiral Blade g) Concentration of Underflow 1.5% 10. Sludge Return Pumps a) Number 3 b) Type Cavity Progressing c) Capacity/Unit 6 MGD d) Motor Speed Variable 11. Chlorination a) Chemical (Liquid) : On -Site Generation of Sodium HypochIorite b) Number of Units 1 c) Size for 450 ppd Chlorine Equivalent d) Brine Maker 40 Tons e) Product Storage Tank 2 cr 7,500 Gallons f) Backup System Commercial Sodium Hypochlorite @ 12% Concentration 12. Dechlorination a) Chemical (Liquid) Sodium Bisulfite (SBS) b) Type Commercial a 30% Concentration c) Design Requirement 1.6 mg/l SBS to Remove 1.0 mg/l Chlorine Residual d) Size for 240 ppd SBS 100 gpd SBS.@ 30% e) Storage Provided 30 Days f) Bulk Tank 3,000 Gallons g) Automatic Control System ORP 201 FACILITIES PLAN NOR'nn-AST WWTP UPGRADE HICKORY, NC PAGE 20 13. Sludge Storaue a) Waste Activated Sludge • Number of Tanks 2 • Diameter 80, • Depth 24' Volume 2 u 0.90 MG • Decant Levels 3 • Aeration Coarse Bubble Diffusers b) Thickened Sludge • Number of Tanks i • Diameter 60' • Depth 20' • Volume 0.422 MG • Aeration : Coarse Bubble Diffusers 14. Sludge Thickenin a) Type Rotary Drum Thickener b) Number of Units 2 c) Size : 100 gpm d) Solids Concentration 5% to 6% c) Polymer 5 l.bs./Ton Dry Solids f) Solids Capture 95% g) Backwash Pumps 2 @ 50 gpm a 90 psi h) Sludge Transfer Pumps • Number 2 • Capacity/Pump 200 gpm • Type Progressing Cavity • Speed Variable 15. Post Aeration a) Hydraulic Detention Time Average Flow - 5 Minutes Peak Flow - 2.5 Minutes b) Aeration Type Coarse Bubble Diffusers 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 21 ' 4.0 ALTERNATIVES ' 4.01 GENERAL ' The WWTP is currently experiencing problems with hydraulic overloading due to infiltration/inflow, as well as inefficiencies in sludge dewatering process. Also, many of the treatment plant components are old and need to be replaced. These problems, if left unaddressed, may affect the quality of the area waterways and be potentially hannfitl to ' the health of residents in the surrounding area. ' Preliminary planning to address the current deficiencies at the Northeast WWTP included evaluation of several alternatives. The alternatives included taking no action, optimizing the operation of the existing facilities, land -applying wastewater, rehabilitating downtown sewers, designing/constructing a regional wastewater treatment plant, implementing a complete water reuse system, and upgrading the current treatment facility. The analyses are summarized below. 1 4.02 AurERNATlvE 1- No ACrtON 1 The Northeast WWTP currently receives an average influent flow of 3.97 MGD, or 66% ' of the design plant capacity. However following periods of significant rains, the calculated peak flows reach 15 MGD. The current plant configuration cannot efficiently handle this flow. The lack of sufficient ' hydraulic capacity throughout the plant has resulted in five (5) notices of NPDES Pcrmit non-compliance issued by NCDENR over the past five years. Following significant rain events, the influent pump station hydraulically overloads the secondary clarifiers, causing washout of solids. If allowed to continue, the quality of recreational water in and around Lake Hickory could be affected. 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE?? In addition to the overloading of secondary clarifiers, the Northeast Plant influent pump station hydraulically overloads during extended rain events. The peak capacity of pump stations and gravity sewer lines received by the influent pump station is 10.4 MGD, while the pump station capacity is 4.7 MGD. The pump station is unable to handle these flows for extended periods. This inadequacy has resulted in a compliance schedule being issued for the City's collection system permit. The City of Hickory requested an extension in the compliance schedule on June 27, 2005 so the necessary pump station modifications can be completed as a portion of an overall plant upgrade project_ Plant equipment is also in need of repairs that cannot be completed because neither treatment train is able to adequately handle the entire plant flow. Some plant components have been in place since the expansion in 1988, while other components have been in operation for over 35 years. Many of these components are in need of replacement. Due to the current condition of the Northeast WWTP, taking no action is not a feasible alternative. 4.03 ALTERNATIVE 2 —OPTIMIZING OPERATION OF EXISTING FAC1LTr1ES Due to the many inadequacies of plant processes to handle the hydraulic capacity entering the plant, the optimization of plant operations would have very little impact on the NPDES violations experienced at Hickory's Northeast WWTP. Furthennorc, some equipment in use at the plant has been in place for over 35 years, and is need of replacement. 'In addition to these limitations, the current treatment processes are inadequate in their ability to provide the level of treatment that may be required to meet future NPDES permit limits. Therefore, this alternative may be eliminated as a viable alternative. 4.04 AI TERNATIvE 3 — LAND APPLICATION Analysis of land application of wastewater as a practical alternative included three application processes: rapid infiltration into soils, slow rate processes, and overland flow. 201 FACILITIES PLAN Noin,iJEASr WWTP UPGRADE H ICKORY, NC PAGE 23 The use of a rapid infiltration system would require the presence of rapidly permeable soils. The prevailing soils in the area surrounding; the existing WWTP are characterized by moderate or slow permeability, therefore rapid infiltration was eliminated as an option. Likewise, according to the United States Environmental Protection Agency (USEPA) manual, Cast of Lund Treatment Svstem.s, an overland flow system should be comprised of soils with slopes of 2-8%. The areas feasible to utilize a land treatment system consist of slopes predominantly greater than 8%, therefore an overland flow operation was also eliminated from consideration. Based on these preliminary evaluations the option of a slow rate process was chosen for further analysis. The land application cost analysis assumed the following conditions could be met: (1) Adequate land is available to handle an average flow of 6 MGD and (2) Secondary treatment of wastewater prior to land application. The aforementioned USEPA manual was used as a reference for cost estimation. Based on Figure 7 on page 23 of the EPA manual approximately 1,400 acres of contiguous land would be needed in order to land apply the treated effluent, provide adequate buffers, and provide storage ponds. Contiguous land tracts of this magnitude are.not readily available in the area surrounding the WWTP. Neglecting the lack of adequate land, the cost analysis was performed assuming a land cost of $5,000 per acre in order to examine the financial feasibility of land application. All other monetary values of land applying the treated wastewater were taken from Section 3 of Cost of Land Treatment Svstem.s manual. Costs were adjusted to account for price changes from 1980 to 2004. Design assumptions made to perform the land application cost analysis included: (1) Two miles of 24-inch pipe would be required to transport treated effluent to the land application site, (2) Adequate storage for two weeks of treated effluent, (3) A solid set 201 FACILITIES LAN NOItTIdEAST W WTP UPGRADE H ICKORv. NC PAGE 24 sprinkling system would be used to land apply treated effluent, (4) A nonoperating time of weeks is used for area of land, and (5) The design application rates are 0.2 inches per hour and 1.5 inches per week per acre. Secondary treatment of wastewater is necessary for land application; therefore, the use of a land application process would still require plant upgrades in order to provide sufficient treatment. It is assumed that the best alternative for upgrading the WWTP is identical to the plan developed in Alternative 7. Based on the above assumptions, total capital costs for land application, including construction and design was estimated at nearly $44,000,000, The operation and maintenance costs for a Iand application facility, including the secondary WWTP, were estimated to be approximately $2,400,000 per year. As a result of the large cost to land apply secondary treated wastewater and the lack of sufficient land in the surrounding area; land application is not a feasible alternative. 4.05 ALTERNATIVE 4— DOWNTOWN SEWER SYSTEM CONSTRUCTION The City of Hickory's downtown area currently utilizes a sewer system receiving stormwater, which introduces large amounts of inflow into the waste stream during periods of rain. The downtown sewer system consists of both roof drains and storm drains emptying directly into sewers. Portions of the downtown sewer system have been in place in excess of 100 years. Therefore there are also deficiencies in the sewer system that increase the amount of inflow entering the system. An alternative to treating the stonnwater as if it was wastewater is to eliminate the introduction of the stonnwater into the waste stream. This would require the removal of all roof and stone drains discharging directly to sewage lines. An additional stormwater system would need to be installed in order to properly drain stornwater. This would include design of the system, installation of the stone drain 201 FACII-ITIFS PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 25 lines, owner compensation, and replacement/repaving of any roads or sidewalks damaged during installation. A preliminary cost estimate for this work is outlined in Appendix C. According to City of Hickory personnel the approximate area of the downtown sewer system is a 5 block by 5 block area. The estimated construction cost of a separate sewer system in the downtown area is approximately $11,870,000. Assuming operation and maintenance to be 1.5% of the total construction costs, the annual costs are approximately $178,000 per year. This cost estimate includes only removal of stormwater from the sewer system and does not address the need for plant rehabilitation to replace processes that have been in operation for more than 15 years. It is assumed that the cost estimate. for upgrading plant equipment would be similar in capital costs as those outlined in Alternative 7, with the elimination of the equalization basin. The cost estimate presented in Appendix C includes the additional costs. The overall cost of constructing; a downtown sewer system and ensuring reliable treatment at the plant is estimated at approximately $33,720,000, Operation and maintenance costs for the associated project are estimated at $1,015,000. As a result of the downtown sewer system being; located in a congested business area, the complications of implementing a construction plan in the area must be considered. Construction of a new stormwater system in the downtown area would require rerouting of traffic and demolition of sidewalks throughout the area, thereby potentially crippling; business owners in the thriving business districts. Apart from the monetary damage to downtown business owners, the construction of a separate sewer system in the downtown area would include numerous complications. The cooperation of property owners in the area would be required to effectively eliminate all roof drains entering the downtown sewer system. Also, the majority of public utility lines in this area are underground, which would require extreme caution to be implemented during planning; and construction to ensure gal FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 26 that lines are either circumvented or rerouted. Extensive surveying; would be required to determine the actual areas of the downtown sewer system. Based on extensive costs, disruptions to business owners in the area, and complications with installation; construction of a separate sewer system is not an attractive alternative ' for residents in the Northeast WWTP drainage area. 4.06 ALTERNATIVE 5— REGIONAL WASTENVATER TREATMENT FACILITY ' The City of Hickory is divided into three distinct drainage areas: Lake Hickory, Henry Fork, and Clark Creek basins. The Northeast WWTP is the sole provider of wastewater ' treatment in the Lake Hickory drainage area, thereby essentially establishing the plant as a regional wastewater treatment facility for the drainage basin. In order to establish a true ' regional WWTP serving multiple drainage basins, an existing facility site would have to be abandoned. The alternative of a regional WWTP was examined as a portion of the ' 201 Facilities Planning Study for the Hickory -Newton Complex as submitted to the Western Piedmont Council of Government in 1980. The alternatives analysis in the ' referenced study concluded that the use of a regional WWTP was not economically advantageous. The most likely scenario for implementation of a regional WWTP would eliminate the Northeast WWTP. Construction of the regional WWTP would have to be completed at the Henry Fork site due to the lack of adequate space at the Northeast WWTP. In order for this to happen approximately 59,000 if of 42-inch force main would have to be installed. The topography of the region would place in excess of 150' of static head on pumping wastewater from the Lake Hickory Drainage Basin to the Henry Fork Drainage Basin. The installation of multiple pump stations capable of transporting wastewater in these conditions would be financially prohibitive. In addition to the long pipe runs and the high static head that must be overcome the force main would have to pass through congested areas of the City. This would make the securing of right of ways for the large force main much more difficult. Additionally, A regional WWTP at the Henry Fork 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE 27 WWTP would require plant construction costs similar to an upgrade of the Northeast WWTP. In addition to the financial difficulties relating to the implementation of a regional WWTP, the elimination of one of the City's treatment plants would increase the environmental impacts to the area. The waste loadings seen by either the Henry Fork River or Lake Hickory would increase drastically due to the increase in wastewater flow. Also, by concentrating the waste treatment into one facility a previously undisturbed area would have- to be disturbed to provide adequate treatment capacity. Additionally, incorporation of 11 miles of new force main would likely impact wetlands, forest resources, soil, topography, and water resources to a much greater extent than upgrading the existing facility. The associated construction could also potentially impact prime agricultural lands, archaeological areas, and scenic or recreational lands. Based on the financial, technical, and environmental drawbacks to instituting a regional wastewater treatment facility in place of the existing facilities, and the findings of the 201 Facilities Planning Study for the Hickory -Newton Complex submitted in 1980, this alternative is not considered a reasonable alternative and therefore a detailed present worth analysis was not performed for the alternative. 4.07 ALTERNATIVE 6 — WATER REUSE SYSTEM The largest industry discharging to the Hickory Northeast Wastewater Treatment Plant is Hickory Dyeing and Winding who contributes approximately 0.054 MGD of wastewater to the facility. There are no facilities with a process water demand significant enough to reuse the amount of inflow currently seen at the Northeast WWTP. Also this option would not address the treatment processes at the treatment plant. Therefore, reuse of treated wastewater is not a viable option. 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 28 4.08 ALTERNATIVE 7—NORTHEAST PLANT UPGRADE The final alternative evaluated was to upgrade the City of Hickory's existing Northeast WWTP, including the installation of an equalization basin to handle inflow. Preliminary design calculations were performed in an effort to establish a cost basis for analysis. The proposed project entails significant renovations and the installation of a 2.2 MG equalization basin on the site of the Northeast WWTP. The design upgrades and modifications included in this analysis are outlined in this section. In an effirt to reduce the volume of extraneous inflow received at the WWTP, the City of Hickory plans to implement an aggressive inflow identification program consisting of the following measures. Data for wet weather versus dry weather flows will be maintained and analyzed to isolate problem areas within the system. Following the identification of problem areas; visual inspection of manholes during periods of wet weather will be used to identify deficient manholes and sewer lines. The deficient manholes will be rehabilitated as needed. The City will also use television of lines to identify sewers with high levels of inflow. Any deficient manholes or lines will be rehabilitated or replaced as necessary. These lines will be evaluated as to impact and placed on the Capital Improvement Plan for rehabilitation or replacement as necessary. The construction of three (3) 3 MGD biological aeration wastewater treatment systems within the current WWTP property boundaries is proposed. Each.reactor was sized to be 230 feet long by 64 feet wide with a sidewall depth of 23 feet. After installation of all plant processes and upgrades, one extended aeration basin will be converted to a 2.2 MG equalization basin to handle system inflow. The first extended aeration reactor would be erected south of an existing primary clarifier and aeration basin in order to allow continuous operation of the plant. After placing this unit online, the existing aeration basin and primary clarifier would be demolished in order to make room for the remaining reactors. 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 29 A new headworks facility would be constructed and contained in a single story brick masonry building with a concrete foundation and an area of 1,800 square feet. This facility would contain a. once -through Odor Control Scrubber manufactured of High Density Cross -linked Polyethylene, which would replace the existing Pepeon odor control system. The Odor Control Scrubber would be installed in order to prohibit excess odor from affecting residential areas surrounding the WWTP. The existing influent pump station would be upgraded to eliminate the overloading during significant rain events. The pump station would be upgraded to have a rated capacity of 12 MGD. After construction of the extended aeration reactors, the remaining aeration basin, primary clarifier and the single stage anaerobic digester at the existing plant would be demolished and removed in order to allow space to construct two (2) new final clarifiers of 100' diameters and a waste activated sludge (WAS) storage tank with a diameter of 80 feet. Following construction of one WAS storage tank, the onsite CRP digester and secondary containment would be demolished and removed. The demolition and removal would allow roam for construction of an additional waste activated sludge storage tank with a diameter of 80 feet. The existing gravity belt thickeners would be removed and replaced by new rotating drum thickeners capable of thickening the waste activated sludge from a 12 MGD oxidation ditch. A separate thickened sludge holding tank would be constructed on -site with a diameter of 60 feet. The thickened sludge holding tank would allow for more economical operation of the thickening system than the current practice of only operating long enough to fill a single tanker truck. The WWTP chlorine contact chamber would also need to be enlarged from 55-feet long by 50-feet wide to 1 10-feet long by 504cet wide in order to provide adequate contact 201 FACILITIES PLAN NORTHEAST W W'I'P UPGRADE HICKORY. NC PAG1.30 time. Existing gaseous chlorine and sulfur dioxide equipment would be removed and replaced by onsite generation of liquid sodium hypochlorite and sodium bisulfite in chlorination and dechlorination applications.` Adequate aeration equipment will be included to ensure the effluent dissolved oxygen limits are met. Influent piping around the plant would be upgraded to include approximately 700 linear feet of 18-inch force main that would parallel an existing 14-inch force main. In addition, approximately 400 linear feet of 30-inch force main and approximately 300 linear feet of 42-inch gravity sewers would be placed within the WWTP boundaries. Approximately 500 linear feet of 30-inch gravity sewers would nearly parallel existing gravity sewer lines entering the WWTP. The combined length of influent piping is approximately 1,900 linear feet or approximately 0.4 miles of pipe. Additionally, approximately 2,000 linear feet of 42-inch gravity sewer will be installed for discharge of treated effluent to Lake Hickory. The construction of a maintenance building on the existing WWTP site will be included as a portion of the proposed project. The maintenance building would be a single story building of approximately 1,900 square feet. The proposed project would also include the construction of an administration building and a laboratory building. The original plans proposed construction of these buildings adjacent to the WWTP south of Falling Creek; however, after the collection of additional information the proposed buildings will be constructed on the existing WWTP site. The administration building would have a floor plan of approximately 4,100 square feet, and the laboratory building would require floor space of roughly 3,000 square feet. Both buildings would be single story buildings. The total footprint for the proposed project would be approximately 135,000 square feet, and will comprise less than 5 acres. The construction and demolition associated with the proposed project would take place within the boundaries of the current Hickory NE WWTP property or in the area of existing influent pump station. This is an area of 201 FACILITIES PLAN Nop'nIEAST WWTP UPGRADE HICKORY, NC PAGE 31 approximately 10 acres. The disturbance of no more than 3 acres would be necessary to allow construction of the laboratory and administration buildings on the W WTP site. The construction costs, including engineering fees, for the proposed project as outlined above are estimated to be $22.9 million. Operation and maintenance costs for the associated project are estimated to be $1,125,000 million. 4.09 ALTERNATIVE RANKING Composite alternative rankings were performed based on cost and environmental effects. Table 4.1 below summarizes the composite rankings assigned to each alternative. In the rankings used, possible values ranged from 1 to 5 with 1 representing the most desirable alternative. When more than one alternative appear to have similar rankings, the scores so reflect. 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE 1-1ICKORY, NC PAGE 32 TA131.E 4.1 Alternative Rankings Evaln ion Factor Monetary Cost Factor 0.15 Rank Val 1 0.15 I 3 0,45 I 1 2 0.3 Reliability 0,2 1 0.2 1 0.2 1 0.2 Energy Use 0.05 2 0.1 3 0.15 1 0.05 Iniplementability 0.1 1 0.1 3 0.3 4 0.4 Contribution to WQO 0.3 1 0.3 1 0.3 1 0.3 Environmental Impacts Topography 0:005 1 0.005 2 0.01 1 0.005 Soils 0.005 1 0.005 2 0.01 1 0.005 Land Use 0.005 1 0.005 2 0.01 1 0.005 Wetlands 0.005 1 0.005 1 0.005 1 0.005 Agricultural Lands 0.005 1 0.005 2 0.01 1 0,005 Public Lands 0.005 1 0.005 1 0.005 1 0,005 Historical Areas 0.005 1 0.005 1 0.005 1 0.005 Air Quality 0.14 1 0.14 1 0.14 1 0.14 Noise Levels 0.005 1 0.005 1 0.005 1 0.005 Water Resources 0.01 2 0.02 1 0.01 2 0.02 Forest Resources 0.005 1 0.005 1 0.005 1 0.005 Fish and Wildlife 0.005 2 0.01 1 0.005 2 0.01 TOTAL RANKING 1 1,065 M 1.62 jM 1.465 1 4.10 RECOMMENDA'rIONS ' Based on the alternative analysis outlined above, it is recommended that the best alternative to handle plant inflow and process limitations at the Northeast Plant be ' through upgrade and modification of the existing plant with the addition of an equalization basin. 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 33 1 5.0 PRESENT WORTI1 ANALYSIS 5.01 GENERAL ' The primary tool employed in evaluating alternatives is present worth value, which is an alternative's capital cost plus annual operation and maintenance (O&M) cost, and salvage ' value converted to present day dollars. The capital cost estimates include cost for contractor mobilization, structures, mechanical equipment, piping, site work, buildings, ' electrical work, instrumentation, construction contingencies, and technical services. Land is assumed to retain its value. Operation and Maintenance costs include both fixed ' and variable items including labor, power, chemical, supplies, and equipment repairs. Capital costs presented in this report are preliminary and arc based upon information currently available. The cost estimates were developed from a variety of sources ' including equipment manufactures, contractors, in-house calculations, and published CPA cost data. They are intended to be used for comparative purposes only and may not ' represent the actual costs for the facilities proposed. Actual costs will be influenced by final site conditions, regulatory requirements, detailed engineering design, market ' conditions at the time of bidding for construction services, inflation, time constraints, and other factors outside the scope of this analysis. The discount rate used in the present worth cost analysis was 5.625 percent. 5.02 ALTERNATIVE COST SUMMARY Presented in Table 5.1 is a summary of the estimated probable cost of capital, annual O&M, salvage value, and present worth value for each of the three viable alternatives. Salvage values were calculated using straight line depreciation for all items over the following useful life spans: equipment — 20 years, collector sewers — 40 years, pumps and force main 20 years, and structures — 50 years. At the end of the useful life span the 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE34 salvage value was assumed to be $0. Present worth analysis was conducted over the 20 year planning period. The land purchased for the land application is assumed to retain its value, which is represented in the land application salvage value. Based on the information presented in Table 5.1, upgrading the existing Northeast WWTP and maintaining; the existing effluent discharge into Lake Hickory is the most economical choice. TABLE 5.1 ALTERNATIVE COST SUMMARY f iM IN Upgrade Northeast WWTP wI 6 MGD Discharge to Lake $22,898,278 $1,125,000 $3,298,980 $22,898,278 $1,125,000 $3,298,980 Hickory $35,099,933 Upgrade Northeast WWTP wl $22,568,073 $1,125,000 6 MGD Effluent to Land $21,153,396 $1,277,736 $ l 0,148,980 $43,721,469 $2,402,736 $10,148,980 Application $68,742,698 Upgrade Northeast WWTP $20,525,636 6 MGD Discharge to Lake $13, 197,483 $1,015,000 $6,816,733 $33,723,119 $1,015,000 $6,816,733 Hickory & Rehabilitate $43,446,339 Downtown Sewer System Discount Rate = 5.625% Term = 20 years 201 FACILITIES PLAN NoR'rIIFAST W W'1'P UPGRADE HICKORY, NC PAGE 35 6.0 USER CHARGES AND FINANCIAL CAPABILITY 6.01 GENERAL An opinion of probable cost has been prepared in order to establish user charges based on construction costs and the associated debt services on the State Revolving Loan. The opinion of probable cost is outlined below, and provided in detail in Appendix C. The cost estimate for upgrades at the existing plant Was $22,898,278 in total costs and $1,125,000 per year for operation and maintenance. Assuming the City of Hickory is able to obtain a State Revolving Loan for $15 million at 4% for 20 years and a traditional bank loan for the remaining $7,898,278: Construction Costs $18,723,346 Contingencies $1,872,335 Engineering Design $1,235,741 Engineering Construction $617,870 Closing Fee $448,986 TOTAL $22,898,278 Revolving Loan First Year Principal $750,000 Revolving Loan First Year Interest $600,000 Bank Loan First Year Principal $394,914 Bank Loan First Year Interest $394,914 Annual O&M Costs $1,125,000 TOTAL ANNUAL COSTS $3,264,828 201 FACILITIES PLAN NORTIIEAST WWTP UPGRADE HICKORY, NC PAGF 36 ' 6.02 USER CHARGES ' Based on Census 2000 data, the median household income in Catawba County in 1999 was $40,356. The current charges for Northeast WWTP users are approximately $4.06 ' per thousand gallons within the city limits, and $5.97 per thousand gallons outside city limits. For the typical residential customer living outside of city limits this translates to ' $358.20 per year ($29.85 monthly), or 0.89% of the median household income, based on ' a usage of 5,000 gallons per month. ' User charges following project implementation are based on the project's first year billable flow and the first year of the SRF loan repayment. The total first year of loan ' repayment based on an interest rate of' 4.0% t6r $15,000,000 and another loan of $7,898,278 at 5% interest is calculated to $2,139,828. The operation and maintenance ' associated with the plant is estimated at $1,125,000 annually. The current average flow, 3.97 MGD, at the Northeast WWTP is used for the project's ' first year billable flow. Based on these figures the increase in cost per thousand gallons is estimated at $2.25 ($1 1.25 increase monthly at 5,000 gallons per month). Therefore the adjusted sewer charges for a typical residential user living outside the city will increase $ 135.00 per year. This represents 0.33% of the median household income in Catawba County. The total user charges for the typical user outside the city are expected to be approximately $493.20 ($41.10 monthly for 5,000 gallons @ $8.22 per thousand gallons), or 1.22% of the median household income for Catawba County, North Carolina. The total user charges for the typical user within the city are expected to be approximately $378.60 ($31.55 monthly for 5,000 gallons @ $6.31 per thousand gallons), or 0.94% of the median household income for Catawba County, North Carolina. Therefore the financial impact on the area residents should not be overly burdensome. 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 37 7.0 PUBLIC PARTICIPATION 7.01 GENERAL, Public participation is an integral part of any 201 plan. Public hearings will be held to allow the public to comment oil the proposed plan. The hearings will be scheduled after the initial 201 Facilities Plan review period. 201 FACILITIES PLAN NORTHEAST W WTP UPGRADE HICKORY, NC PAGE 38 8.0 REFERENCES 1) Combined Seater- Ove4low Technology Fact Sheet. EPA-832-F-99-035. United States Environmental Protection Agency. September 1999. 2) Reed, C.S. et al. Cost «f Land TI-eatment Systems. EPA-43019-75-003. United States Environmental Protection Agcney. September 1979. 201 FACILITIES PLAN [NORTHEAST W WTP UPGRADE HICKORY, NC PACE 39 9.0 FIGURES Figure 1 — Current Flow Diagram................................................................... 41 Figure 2 — Drainage Basin.............................................................................. 42 Figure 3 — Planning Area................................................................................43 Figure 4 — Census Maps.................................................................................. 44 Figure 5— Proposed Site Layout ........................ Figure 6 — Proposed Flow Diagram................................................................ 46 Figure 7 — Downtown Sewer System Layout ................................................. 47 201 FACILrrIES PLAN NORTHEAST WWIT UPGRADE HICKORY, NC PAGE 40 i� - m- - - r - - M - M M- ffm H I LULUKAIV - "" . CONOYER BROOKFORQ ! J Ln 1 J yf , I WRye I , II a' ly e r ♦ � sr r- � n ` ~ .- 1 � lEhersgoee NEWTON 1-7 DRAINAGE BASIN �f PLANNING AREA SCALE: PLANNING AREA DWG. , "4 1 "=12500' NORTHEAST HICKORY WWTP N0. h1C7RBCM B431IMM r1Via6 COMM. NO.: 60402A HICKORY, NORTH CAROLINA j i 1 roAYES, SEAM- MATTER'N t ► ATTERN. INC- I���'I ///f 101 E. EVANS ST. ErC—T0a SOME a3 DATE. 4/20/'2005 (843) CE.. 1 FIGURE 3 C (843) 689-449T WWW,namm,com ©r v WLES\fir.'.; 4iE5\6oAo2A\C4b0\pYYG\PIANNING AREA OWC 60A02A 03/rA/2007 66'.33:-7 GAHMEJ (G1191f 4AMYLRIN MCY11-Fall,— RF —F 11Ef,' N1E'.re(1RY GTT7!ANG7TIE 10.0 APPENDIX A. Speculative Limits B. Current NPDES Permit C. Opinion of Probable Costs D. Flow Charts During Significant Rain Events E. City of Hickory Sewer Use Ordinance F. City of Hickory Sewage Spill Records G. Design Calculations H. Sludge Production Calculations 1. System -Wide Wastewater Collection System Permit J. Correspondence 201 FACILITIES PLAN NORTHEAST WWTP UPGRADE HICKORY, NC PAGE 50 APPENDIx A SPECULATIVE LIMITS �O y i Michael F. Easley, Governor State of North Carolina William G. Ross, Jr., Secretary Department of Environment and Natural Resources d.0 - -=_ - --- Alan W. Klimek, P.E., Director Division of Water Quality September 1, 2004 ■ Mr. Johnathan P- Hunt HSMM I81 East Evans Street, Suite 23 BTC-105 Florence, South Carolina 29506 Subject: Speculative Limits City of Hickory/ Hickory Northeast WWTP NPDES Permit NCO020401 Catawba County Dear Mr. Hunt: This letter is in response to a request for speculative effluent limits for the potential expansion of the Hickory Northeast wastewater treatment plant. Your letter dated April 22, 2004 indicated a potential expansion of the Hickory Northeast plant from 6 MGD to 9 MGD with discharge into Lake Hickory in the Catawba River Basin. Environrrierital Assessments of New Projects and Expansions Any entity proposing to construct new or expanded wastewater treatment facilities using ' public funds or public (state) lands must first prepare an environmental assessment (EA) when wastewater expansions equal or exceed 0.5 MGD. Please contact the Division's State Environmental Policy Act (SEPA) coordinator, currently Alex Marks, at (919) 733 - 5083, ext. 555 for further information on EA requirements. DWQ will not accept a permit application for a project requiring an environmental assessment until the Division has approved the EA and sent a Finding of No Significant Impact (FONSI) to the state Clearinghouse for review and comment. Engineering Alternatives Analysis (EAA) In accordance with the North Carolina General Statutes, the most practicable wastewater treatment and disposal alternative with the least adverse impact on the environment is required to be implemented with any expansion- Therefore, a detailed engineering alternatives analysis (EAA) must be prepared. The NPDES Unit requires the EAA as part of the Environmental Assessment. The EAA must justify requested flows and provide an analysis of potential wastewater treatment alternatives. Alternatives to a surface water discharge. such as a spray/drip irrigation. wastewater reuse, or inflow/infiltration reduction, are considered to be environmentally preferable. Permit applications for new or expanding flow will be returned as incomplete if all EAA requirements are not adequately addressed. You may also wish to refer to the NPDES Unit website for more information regarding requests for expansion, http://h2o.enr.state.jic.us/NPDES/. Speculafive Effluent Limits Based on the available information, limits for the proposed discharge of 9MGD flow into Lake Hickory cannot be given at this time. AIthough the lake is not currently listed as impaired, historic monitoring data has indicated elevated dissolved oxygen and pH values, which suggest the possibility of algal blooms (a condition of nutrient enrichment). As part of its FERC relicensing, Duke Energy is developing an extensive dissolved oxygen/nutrient response model for the chain lakes along the Catawba. This model should he completed towards the end of 2005. In addition to this model, USGS developed a CQUAL W2 model in the early 1990's. North Carolina Division of Water Quality (919) 733-7015 1617 Mail Service Center FAX (919) 733-0719 Raleigh, North Carolina 27699-1617 On the Internet at ht1p://h2o.enr.state.nc.u5/ Mr. Hunt ' Page 2 The Division of Water Quality recommends that the City and its consultants contact USGS and Duke Energy to determine if the framework of these models may be used to assess the impact of an expanded discharge into Lake Hickory. It may be possible for Hickory to use the framework of the USGS model, along with more recent data, to evaluate the localized impact of the discharge to the lake. You or the City may wish to contact Brian Jacobsen, Environmental Modeler, Modeling and TMDL Unit, at (919) 733 - 5083, ext. 552, for more information regarding the types of models and potential uses. The Division also suggests that a dilution model be developed for the expanded flow. This will determine the dilution of the discharge, which in turn will help determine potential toxicant limits and whole effluent toxicity testing dilution. If you have any questions about the information presented in this letter, feel free to Contact Ms. Susan A. Wilson at (919) 733-5083, extension 510. Sincerely, "W / David A. Goodrich, Supervisor Point Source Branch Surface Water Quality Section cc: Winston-Salem Regional Office/ WQS Alex Marks, SEPA Coordinator Brian Jacobsen, TMDL Unit Central Files NPDES Unit Files Mr. B. Gary McGee City of Hickory P.O. Box 398 Hickory, NC 28603 APPENDIx B CURRENT NPDES PERMIT LIMITS . REEL 'Y Where B�rsiness and Pleasure Grow Together October 7, 2005 Ms. Jackie Nowell NCDENR / DWQ / NPDES Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Re. Comments to Draft NPDES Permit City of I Iick.ory-Northeast W WTP (NPDES 4 NC0020401) Hickory, NC Dear Ms. Nowell: ! (Jfr /V k R.FCFTVEID _. OCT 2 0 2005 BY: The City of Hickory has reviewed the. draft NPDES permit for the Northeast W-WTP (NPDES # NC0020401) and we believe several items require addressing prior to proceeding to finalize it. The following lists these items along with the City's proposal for how to address each. 1. Part I. Section A, (L) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS. Based on our review of the reasonable potential spreadsheet and the derived permit limits, the daily maximum and weekly average concentrations for both total cyanide and total nickel are reversed. During the telephone conversation on September 30, 2005 between the City's engineer, Mr. Jonathan Hunt -� ith I-ISMIVI, and NCDENR, you concurred with this. The table should be revised to reflect a weekly average of 22 µg/L and a daily maximum of 38 µg/L for total cyanide. Likewise, the table should be revised to reflect a weekly average of 261 µg/L and a daily maximum of 656 µg/L for total Mickel. GREATER METRO Ms. Jackie Nowell October 7, 2005 Page Two 2. Part 1. Section A. (L) EFFLUENT LIIVIITATIONS AND MONITORING REQUIREMENTS and Part I. Section A. (3). TOTAL RESIDUAL CHLORINE. The Northeast WWTP currently uses gaseous chlorine for disinfection and sulfur dioxide for deehlorination. In order for the WWTP to meet the specified limit of 28 ' µg/L, it will be necessary for the WWTP to significantly expand its deehlorination system and storage area. Plant operators indicate that ton cylinders will be required along with new, larger delivery lines, valves and headers. Since there is limited space in the existing deehlorination chemical storage area, a new storage area for the ton cylinders will also be required- Since a complete and total renovation of the existing facility is currently under design, which will include onsite generation of sodium hypochlorite for disinfection and sodium bisulfite for deehlorination, the expansion of the existing system and the construction of a new deehlorination chemical storage area would be an unjustified expense at this time. We note that the Clean Water Act ' allows for up to three (3) years to achieve compliance with new effluent Iimitations. Therefore; we request that the compliance schedule for the total residual chlorine limit be extended for the full three (3) years allowed by the Clean Water Act so that ' compliance can be achieved through the upcoming renovation of the WWTP. 3. Page 2 of cover letter of draft NPDES permit, final bulleted item. As mentioned, a complete renovation of the existing WWTP is currently under design. The new treatment system will include biological nutrient removal along with provisions for additional treat=nt. During the telephone conversation on 30 September 2005, between the City's engineer and NCDENR, you indicated that a brief report identifying sources of total phosphorus and total nitrogen and describing thow the new WWTP will be capable of nutrient removal would be sufficient to comply with the requirement to conduct a nutrient optimization study. You further stated that no implementation of optimizing techniques would be required following the nutrient optimization study. Please confirm the methodology and anticipated implementation in writing. I Ms. Jackie Nowell October 7, 2005 Page Three ' 4. Reasonable Potential Methodology (7Q 10 Flow). ' The 7Q10 flow that is currently utilized by NCDENR is a relic of past NPDES permits when the discharge from the Northeast WWTP was to Falling Creek, a tributary of the Catawba River, In 1988, the discharge was relocated to the main channel of the Catawba River within Lake Hickory. The decision to relocate the discharge at considerable expense to the City was largely driven by the expectation that effluent limitations would not be as stringent since the main channel of the Catawba River provides greater dilution than Falling Creels. However, following the relocation of the discharge; the 7Q10 flow used in reasonable potential calculations has never been adjusted upward and, therefore, effluent limitations imposed upon the WWTP have been unnecessarily stringent. This has placed an unnecessary burden upon the City. Not only does the City incur a significant expense from laboratory analyses that would otherwise be unnecessary, the more stringent effluent limitations increase the risk that a process upset will lead to a permit violation and result in an enforcement action against the City. ' We request that the NCDLNR modify the Northeast WWTP's NPDES permit to reflect a 7Q 10 flow of at least 228 cfs. We note that the reasonable potential calculations for the Town of Valdese's WWTP are based on a 7Q10 flow of 228 cfs. ' The Northeast WWTP's discharge is located downstream from the location of the discharge from the Town of Valdese's WWTP to bake Rhodhiss. In fact, several tributaries converge with the Catawba River between the two discharges, only ' increasing flows downstream. Furthermore, the location of both discharges share similar chat-acteristics. Both the discharge from the, Northeast WWTP and the discharge from the Town of Valdese's WWTP are located within the main channel of ' the Catawba River, approximately 7 miles upstream from the respective dam and each discharge is located well downstream from the beginning of the lake to which it enters. Ms. Jackie Nowell October 7, 2005 Page Four We further note that the 7Q 10 flow used for the Falling Creek discharge was based on the minimum instantaneous release from the Rhodhiss dam since, in the view of NCDEI\TR, the location of the discharge to Falling Creek would likely not receive the flow through belief is of a location within the main channel. Although this may have been a reasonable approach for the previous location, it does not accurately reflect actual miring conditions at the current discharge location. Clearly, a minimum instantaneous release from a dam is a much more conservative value than a 7Q 10 flow, the time scales being vastly different. The City of Hickory only wishes to receive the benefit of greater dilution of its effluent from the Nofheast WWTP's effluent ikz the form of a 7Q10 flow that accurately reflects actual mixing conditions at the point of discharge. Therefore, -ve again request that the NCDENR modify the Northeast WWTP's NPDES permit to reflect a 7Q10 flow of at least 228 cfs. Thank you in advance for your assistance and consideration towards this draft permit. Should you have any questions, please do not hesitate contacting me at (828) 323-7427 or via e-mail at k-greer@ci.hickory.nc.us. 1 Sincerely, Kevin B. Greer, PE Asst. Public Services Director/ Public Utilities pc: Chuck Hansen, PE, Public Services Director City of Hickory .Jonathan P. Hunt, HSMM David DePratter, PE/HSMM HSMM NPDES & Reading Files APPENDIX C OPINIONS OF PROBABLE COSTS HSIMM Opinion of Probable Project Cost Hickory NE WWTP Upgrades Hickory/Catawba County o9-Aug-04 Item Description Estimated Unit Unit Price Amount Total Quantity 1 DEMOLITIONIREMOVAL Concrete Structures 8.200 CY $100.00 $820,000.00 Mechanical Equipment 1 EA $150,000,00 $150,000.00 $970,000.00 2 SITE WORK Flow Distribution Structure 60 CY $450.00 $27,000.00 30" Gravity Sewer 50o LF $90.00 $45,000.00 42" Gravity Sewer 300 LF $145.00 $43.500.00 42" Outfall Sewer 2,000 LF $135.00 $270.000.00 30" Force Main 400 LF $65.00 $26,000.00 Fence 800 LF $21.00 $16,800.00 Erosion Control 1 EA $37.750.00 $37.750.00 Seeding 1 EA $30.500.00 $30.500.00 Submersible Pumping Station 1 EA $96,000.00 $96.000,00 $692,550.00 3 HEADWORKS Mechanical Bar Screen 2 EA $77,000.00 $154,000.00 Grit Removal Equipment 2 EA $86,000.00 $172.000.00 Installation 1 EA $56,500.00 $56,500.00 Building 1,800 SF $140.00 $252,000.00 Caustic Storage tank 1 EA $20,500.00 $20,500.00 Metering Pumps 1 EA $7,500.00 $7,500.00 Flow Monitonng 1 EA $16,000.00 $16,000.00 $678,500.00 4 EQUALIZATION BASIN 1.2.2 MGD1 Equipment 1 EA $375,000.00 $376,000.00 Installation 1 EA $112,500.00 $112,500,00 Concrete 1,403 CY $450.00 $631,350.00 Excavation 47,800 CY $16.00 $764,800.00 Stone 2,820 TON $20.00 $56,400.00 $1,940,050.00 5 AERATION SYSTEM 13 MGDI Equipment 2 EA $375,000.00 $750,000.00 Installation 2 EA $112,500.00 $225.000.00 Concrete 2,806 CY $450.00 $1,262,700.00 Excavation 95,600 CY $16.00 $1,529,600.00 Stone 2,820 TON $20.00 $56,400.00 $3, 823.700.00 6 CLARIFIERS (100' x 14') Equipment Equipment Concrete Excavation Stone 7 SLUDGE HOLDING TANKS Aeration System Installation Progressive Cavity Pumps Piping and Valves -Prestressed Concrete Tank (80' x 24') -Prestressed Concrete Tank (60' x 22) - Excavation Stone Concrete Retaining Wall Aeration System Installation Piping and Valves 2 EA $132,500.00 $265,000.00 2 EA $33,000.00 $66,000.00 1,236 CY $450.00 $656,200.00 24,980 CY $16,00 $399,660.00 1,234 TON $20.00 $24,680.00 $1,311,560.00 1 1 2 1 2 1 14,581 2.357 330 1 1 1 8 INFLUENT PUMPING STATION Variable Speed Pumps, Motors & Controls 3 Mechanical Bar Screen 1 Installation 1 Piping, Valves, & Fittings 1 Modification to Building & Wet Well 1 18" DIP Force Main 700 EA $51,000.00 $51,000.00 EA $18,000.00 $18,000.00 EA $55,000.00 $110,000.00 EA $36,750,00 $36,750.00 EA $250.000,00 $500,000.00 EA $183,500.00 $183,500.00 CY $16.00 $233,296.00 TON $20.00 $47,140.00 CY $4%00 $148,500.00 EA $38,750.00 $38,750.00 EA $13,750.00 $13,750.00 EA $33,000.00 $33,000.00 $1,413,686.00 EA $95,000.00 $285,000.00 EA $93,000.00 $93,000.00 EA $60,000.00 $60,000.00 EA $115,000.00 $115,000.00 EA $160,000.00 $150.000,00 LF $50.00 $35.000,00 $738, 000.00 9 MISCELLANEOUS BUILDINGS Learning Center 1,200 SF $140.00 $168,000.00 Administration Building 4,100 SF $140.00 $574,000.00 Maintenance Building 1,900 SF $140.00 $266,000.00 Process Lab Buildings 3,000 SF $140.00 $420,000.00 $1.428, 000.00 10 SLUDGE THICKENING Rotating Drum Filter 1 EA $117,000.00 $117,000.00 Installation 1 EA $41,500.00 $41,500.00 Polymer System 1 EA $14,750.00 $14,750.00 Piping, Valves, & Fittings 1 EA $18,250.00 $18,250.00 $191,500.00 11 RENOVATE EXISTING CLARIFIER Equipment 1 EA $107,000.00 $107,000.00 Installation 1 EA $56,000.00 $56,000.00 $163,000.00 12 CHLORINATIONIDECHLORINATION Sodium Hypochlorite Equipment 1 EA $365,000.00 $365,000.00 Installation 1 EA $117,000.00 $117,000.00 Sodium Bisulfite Equipment 1 EA $183,500.00 $183,500.00 Installation 1 EA $81,500.00 $81,500.00 Contact Chamber 134 CY $450.00 $60,300.00 Miscellaneous Metal 1 EA $35,500.00 $35,500.00 $842.800.00 13 ODOR CONTROL SYSTEM Equipment 1 Installation 1 EA $1,000,000.G0 $1,000,000.00 EA $500,000.00 $500,000.00 $1,500.000.00 14 EXISTING CONTROL BUILDING SCADA SYSTEM 1 EA $76,500.00 $76,500.00 Installation 1 EA $28,500.00 $28,500.00 $105,000.00 15 ELECTRICAL Power & Lighting 1 EA $740,000.00 $740,000.00 Generator 1 EA $205,000.00 $205.000.00 $945, 000.00 16 MISCELLANEOUS Stream Restoration 1 EA $1,200,000.00 $1,200,000.00 Landscaping 1 EA $500,000.00 $500,000.00 Clearing & Grading 5 ACRE $4,000.00 $20.000.00 Admin Building Parking Lot 1.300 SQ YD $30.00 $39,000.00 Admin Building Access Road 700 SQ YD $30.00 $21,000.00 Light Load Bridge 1 EA $300.000.00 $300,000.00 $2, 080, 000 A0 Construction Costs $18,723,346,00 Contingencies $1,872,335.00 Engineering Design $1,235,741.00 Engineering Construction $617,870.00 2% Closing Fee $448,986.00 TOTAL $22,898,278.00 The above opinion of probable construction costs are based upon empirical cost data, published cost data, previous bid data and knowledge and experience for similar work. ILUe ", @Y M k"EES Opinion of Probable Project Cost Hickory NE WWTP Sewer Rehabilitation Hickory/Catawba County 09-Aug-04 tern Description Estimated Unit Unit Price Amount Total Quantity Sealing Existing Storm Drains 360 EA $200.00 $72.000,00 Removal of Roof Drains 1,500 EA $100.00 $150,000.00 Installation of New Roof Drains 1,500 EA $100.00 $150,000,00 Cut and Replace Asphalt Roads 31,500 LF $50.00 $1,575,000.00 Resurface Asphalt Roads 6.575 TON $75.00 $493,125.00 Remove/Replace Brick Sidewalk 5,280 LF $80.00 $422,400.00 - Install New 30" Storm Drain Line 13,185 LF $125.00 $1,648,125A0 - Install New 24" Storm Drain Line 15,750 LF $100.00 $1,575,000.00 - Install New 12" Storm Drain Line 15,400 LF $60.00 $924,000.00 - Install New 8" PVC Roof Drain Headers 50,000 LF $35.00 $1,750,000.00 - Install boxes 360 EA $3,000.00 $1,080,000.00 - Road Striping 1 EA $50,000.00 $50,000.00 Traffic Control 1 EA $100,000.00 $100,000.00 Owner Compensation 1 EA $50,000.00 $50,000.00 Relocation of Existing Utilities 1 EA $200,000,00 $200.000.00 Storm Water ControliManagement 1 EA $500,000.00 $500,000.00 Aesthetics 1 EA $10,000.00 $10.000.00 Field Work to Locate Combined System 160 HRS $70.00 $11,200.00 - Additional Survey Work 320 HRS $95,00 $30.400.00 Plant Upgrades 1 LS $16,783,296.00 $16,783,296.00 $27, 574, 546.00 Construction Costs $27,574,546.00 Contingencies $2,757,455.00 Engineering Design $1,819,920.00 Engineering Construction $909,960.00 2% Closing Fee $661,238.00 TOTAL $33,723,119.00 The above opinion of probable construction costs are based upon empirical cost data, published cost data, previous bid data and knowledge and experience for similar work. APPENDIX D FLOW CHARTS DURING SIGNIFICANT RAIN EVENTS i 1NF N[F Saturday March 2, 2002 09:24:08.66 am m_5.0000 (D:4.5000 Z 4L4.0000 L3.5000 L3.0000 L2.5000 L2.0000 11.5000 L1.0000 L0.5000 10.0000 9.5000 9.0000 i 8.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 5.0000 V * 4.5000 4.0000 0 3.5000 3.0000 0 r 2.5000 y 2.0000 r 1.5000 a 1.0000 i 0.5000 f 0.0000 MGD OY02/2002 0310 IM2 r � r � r r r■� r� sr av �■ ■r r� rr r � r r it 4NF IF C9 C-,)_5.0000 ( DA . 5000 a a-i4.0000 A 5000 L3.0000 L2. 5000 12,0000 L1.5000 11.0000 10,5000 10.0000 9.5000 z <5 9.0000 n w 8.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 CD5.0000 CV m 4.5000 v m co4.0000 as .3.5000 3.0000 0o v 2.5000 c-i 2.0000 1.5000 Wednesday June 26, 2002 09:11:44.56 am m m � 0,5000 - m 0.0000 MGD I 061M002 013f271200: INF NZF m15.0000 (LIJ14.5000 Q 0-14,0000 13.5000 13,0000 12.5000 12.0000 11.5000 11.0000 10.5000 10,0000 9.5000 z <1 9.0000 w 8.5000 z 8.0000 7.5000 7.0000 6.5000 Sunday March 30, 2DO3 Q8;49:15.07 am 6.0000 - 5.5000 - 71- 5,0000 - cv m 4.5000 - v m ' 4.0000co - N m .3.5000 - 3.0000 - CD 2.5000 - rTi 2,0000 1,5000 m N 1.0000 0.5000 m 0.0000 MGD M INF s F' Wednesday April 16, 2003 11:44:15,81 pm Lo mL5.0000 5000 d ELI4.0000 13.5000 13.0000 12.5000 12.0000 11.5000 11.0000 10,5000 10,0000 9.5000 zuJ 9.0000 w 9.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 5.0000 m 9.5000 rr 4.0000 co ago .3.5000 3.0000 co 2.5000 2.0000 1,5000 CD CD 1.0000 °' 0.5000 m 0.0000 — MGD ow"'r, m 04/17/2003 Ift", ME m m m= m m m r= w ow""Uw- w m = INF IF Thursday May 15, 2003 03:39:01.05 pm Cl5,0000 W14.5000 a-14.0000 13.5000 13.0000 12.5000 12.0000 11.5000 11.0000 10.5000 10,0000 9.5000 J 9.0000 8,5000 z 8.0000 7.5000 7.0000 6.5000 6.00DO 5.5000 m 5.DODO `m 4.5000 MLAA m 4.0000 w c 3,5000 3.0000 co 2.5000 2.0000 v 1.5000 m 1.0000 0.5000 m 0.000Q MGD �r---r� r �■ r r rr �r r �s 105J15 2m rr ^Vw-- m s m m r r r F m.5. 00 00 LJ.4.5000 a-.4 , 0000 .3.5000 _3.0000 k2.5000 L 2 . 0000 U , 5000 L1.0000 10,5000 10,0000 9.5000 z J 9.0000 w 8.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 m 5.0000 w 4.5000 v m 4.0000 m m 3.5000 3.0000 Q 2,5000 2.0000 m 1.5000 CD 1,0000 0.5000 m 0.0000 MGD Sunday June 15, 2003 12:32:50.33 pm ! NI= 106J16l2003 m'-sr m = m INF F Monday September 22. 2003 09:54:00.88 am m 5.0000 (Ld 4.5000 a CL4.0000 3.5000 .3.0000 .2.50d0 .2. 0000 .1,5000 i1 .0000 10.5p00 t0.0000 9.5000 z J 9.0000 w 8.5000 z 6.0000 7.5000 7.0000 6.5000 6.0000 5.5000 m 5. 0000 N CO 4.5000 4.0000 co 3.5000 3.0000 CID 2.5000 4 2.0000 m 1.5000 m 1.0000 0.5000 m 0.0000 MGD Nw".. M �fF m.5.0000 LW:4.5000 ILA 0000 L3.5000 L3.0000 L2 .5000 12 .0000 11.5000 11.0000 10.5000 10.0000 9.5000 z J 910000 w 8.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 Co5.0000 m 4.5000 v m 4 .0000 m 3,5000 3.0000 2.5000 2,0000 v 1.5000 Co m 1.0000 0.5000 m 0,0000 INF Wedr±eaday December 10, 2003 10:26:36.43 am f 12/1012003 11211112003 INF C IF D r'L5.0000 WL4.5000 d 41.4.0000 13.5000 13.0000 12.5000 12.0000 11.5000 11.0000 10.5000 10.0000 9.5000 z J 9.0000 IL 8.5000 w 8.0000 7,5000 7.0000 6.5000 6.0000 5.5000 v 5.0000 m 4.5000 v W 4.0000 coo .3.5000 3.0000 v 2.5000 -, 2.0000 v 1.5000 m m 1.0000 Uri 0.5000 my 0.0000 Tuesday April 13, 2004 05:11:07.84 am RAIN FXLI` 0Vf9K 1 �< L.a-3+ Week 104113120064 s w w w r• w S I• w w Will "4F r'L5. 0000 LCdF314.5000 a a-14.0000 13.5000 13.0000 12.5000 12.0000 11,5000 11,0000 10.5000 1.0.0000 9.5000 z <1 9.0000 a- 8.5000 La z 6.0000 7.5000 7.0000 6.5000 6. 0000 5.5000 v 5.0000 m clq 4.5000 m 4.0000 m C 3.5000 3.0000 voo 2.5000 2.0000 v 1.5000 Lu 1.0000 0.5000 0.0000 ThuMday April 8, 2004 12:00:39.06 pm INF plpei l 8 100y i2AM .+o M4AA F40w Ta6AI0 pct rZ A; Ca No RA-LL J P6 2. 04l09/2004 n ♦wn wNmv r m r r r r r r r r �■ ^r rr iNF iF Thursday April 8, 2004 12:00:39.23 am —1.5. 0000 L11_4.5000 0.4.0000 :3 .5000 L3. 0000 L2.5000 L2.0000 11.5000 11.0000 l0.5000 10.0000 9.5000 J 9.0000 w 0.5000 z 8.0000 7.5000 7.0000 6.5000 6.0000 5.5000 5.0000 m 4.5000 v m 4.0000 co?.500d 3.0000 2.5000 2.0000 v 1.5D00 c\4 1.D000 0.5000 Zr 0.0000 F(. & W T KEN D D ti a.TIV G N o RArN Pa 1 APPENDIX E 1 ' CITY OF HICKORY SEWER ' USE ORDINANCE CITY OF HICKORY SEWER USE ORDINANCE SECTION 1 GENERAL PROVISIONS 1.1 Purpose and Policy This Ordinance sets forth uniform requirements for direct and indirect contributors into the wastewater collection and treatment system for the City of Hickory, hereafter referred to as the City, and enables the City to comply with all applicable State and rederal laws-,nclud'sng the Clean Water Act (33 United States Code ' 1251 et seq.) and the General Pretreatment Regulations 140 CFR, Part 403). The objectives of this ordinance are: (a) To prevent the introduction of pollutants into the ' municipality wastewater system which will interfere with the operation of the system or contaminate the resulting sludge; (b) To prevent the introduction of pollutants into the ' municipal wastewater system which will pass through the system, inadequately treated, into receiving .,rater or the atmosphere or otherwise be incompatible with the system; (c) To promote reuse and recycling of industrial wastewater and sludges from the municipal system; (d) To provide for equitable distribution of the cost of the operation maintenance and improvement of municipal wastewater system. (e) To protect both municipal personnel who may be affected by sevrage, sludge, and effluent in the course of their employment as well as protecting the general public; ( f ) To ensure that the municipality complies with its NPDES or NON -discharge Permit conditions, sludge use and disposal requirements and any other Federal or State laws to which the municipal wastewater system is subject. This Ordinance provides for the regulation of direct and indirect contributors to the municipal wrastewater system, through the issuance of permits to certain Non -domestic Users and through enforcement of general requirements for the other Users, authorizes monitoring and enforcement activities, requires User reporting and provides for the setting of fees for the equitable distribution of costs resulting from the program established herein. This Ordinance shall apply to all users of the municipal wastewater system. Except as otherwise provided herein, the POTW Director shall administer, implement, and enforce the provisions of this Ordinance. Any powers granted to or imposed upon the POTW Director may be delegated by the POTW Director to other City personnel. Industrial users outside the City limits agree to comply with the terms and conditions established in this ordinance. 1 i.2 Definitions And Abbreviations ' (a) Unless the context specifically indicates otherwise, the following terms and phrases, as used in this 'Ordinance, shall have the meanings hereinafter designated: ' (1) Act or "the Act". The Federal Water Pollution Control Act, also known as the Clear Water Act, as amended, 33 U.S.C. 1251, et. seq. (2) Approval Authority. The Director of the Division of Environmental Management of the North Carolina Department ' of Environment, Health and Natnral Resources or his designee. (3) Authorized Representative of an Industrial User. (i) If the Industrial User is a corporation, authorized representative shall mean: A) the president, secretary, or vice-president of the corporation in charge of a principal business function, e or any other person wrho performs similar policy or decision -making functions for the corporation, or S) the manager of one or more manufacturing, production, ' or operation facilities employing more than two hundred fifty (250) persons or having gross annual sales or expenditures exceeding twenty --five million dollars (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (ii) If the Industrial User is a partnership or sole proprietorship, an authorized representative shall mean a general partner or the proprietor, respectively. (iii) If the Industrial User is a Federal, State or .local government facility, an authorized representative ' shall mean a director or highest official appointed or designated to oversee the operation and performance of the activities of the government facility, or their designee. (iv) The individuals described in paragraphs i-iii above may designate another authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the overall operation of the facility from which the discharge originates or having overall responsibility for environmental matters fcr the company, and the :mitten authorization is subinitted to the City. (4) Biochemical Oxygen Demand (BOD). The quantity of oxygen utilized in the biochemical -oxidation of organic matter under standard laboratory procedure for five (5) days at 20 degrees centigrade usually expressed as a concentration (e.g. mgfl). ( 5 ) Building Sewer. A serer conveying wastewater from the premises of a User to the POTW. (6) Categorical Standards. National Categorical Pretreatment Standards or Pretreatment Standard. (7) Bypass. The intentional diversion of wastestreams ' from any portion of a user's treatment facility. (8) Environmental Protection Agency, or EPA_ The U.S. e Environmental Protection Agency, or where appropriate the term may also be used as a designation for the Adminis- trator or other duly authorized official of said agency. ' (9) Grab SaMple. A sample which is taken from a waste stream on a one-time basis with no regard to the flow in the waste stream and over a period of time not to exceed 15 minutes. (10) Holding Tank Waste. Any waste from holding tanks, including but not limited to such holding tanks as ' vessels, chemical toilets, campers, trailers, septic tanks, and vacuum -pump tank trucks. (11) Indirect Discharge or Qischarae. The,discharge or the introduction pollutants from any nondomestic source regulated under section 307(b), (c), or.(d) of the Act, (33 U.S.C. 1317), into the POTW (.including holding tank waste discharged into the system). (12) Industria.l User or User, Any person which is a source of indirect discharge. (13) Interference. The inhibition, or disruption of the POTW treatment processes, operations, or its sludge process, use, or disposal, which causes or contributes to a violation of any requirement of the POTW"s NPDES or -3- Non -Discharge Permit or prevents se: -:age sludge use or disposal in comnLiance with specified applicable State ' and Federal statutes, regulations or permits. The term includes prevention of sewage sludge use cr disposal by the POTW in accordance with section 405 of the Act, (33 ' U.S.0 1345) or any criteria, guidelines, or regulations developed pursuant to the Solid `haste Disposal Act (SVIDA), the Clean Air Act, the Toxic Substances Ccntrol Act, the Marine Protection Research and Sanctuary Act ' {14IPRSA) or more stringent State criteria (including those contained in any State sludge management plan prepared pursuant to Title iV of SWDA) applicable to the method of disposal or use employed by the POTW. (14) Medical Waste. isolation ;castes, infectious agents, human blood and blood products, pathological wastes, ' sharps, body parts, contaminated bedding, surgical wastes, potentially contaminated laboratory wastes, and dialysis wastes. (15) National Categorical Pretreatment Standard or Categorical Standard. Any regulation containing pollutant discharge limits promulgated by EPA in accordance with section 307(b) and (c) of the Act (33 U.S.C. 1317) which applies to a specific category of Industrial Users, and appears in 40 CFR Chapter 10. Subchapter N, Parts 405--471. ' (6) ddrDischarge Standard Di�charge Standard. Any regulation developed under the authority of 307 (b ) of the Act and 40 CFR, Section 403.5. (17) New Source. (i) Any building, structure, facility, or installation ' from which there may be a discharge oz pollutants, the construction of which commenced after the publication of proposed Categorical Pretreatment Standards under section e 307 (c ) of the Act which will be applicable to such source if such standards are thereafter promulgated in accordance with section 307(c), provided that: (A) the building, structure, facility, or installation is constructed at a site at which no other source is located; or ' (E) the building, structure, facility, or installation totally replaces the process or production equipment that ' causes the discharge of pollutants at an existing source; or ( C ) the production or ,-sasteYvrater generating processes of the building, structure, facility, or installation are substantially independent of an existing source at the same site. In determiiing whether these are substantially independent, factors such as the extent to which the new facility is integrated .ith the existing plant, and the extent to which the new facility is engaged in the same general type of activity as the existing source, should be considered. (ii) Construction on site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility, or installation meeting the criteria of section (i) (B ) or ( C ) above but other-iise alters, replaces, or adds to existing process or production equipment. (iii) For purposes of this definition, construction of a new source has co=enced if the oftener or operator has: (A) Begun, or caused to begin, as part of a continuous on -site construction program: 1. Any placement, assembly or installation of facilities or equipment; or 2. Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or (B) Entered into a binding contractual obligation for the purchase of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this definition. ' (18) Noncgntact Cooling relater. Water used for cooling which does not come into direct contact with any raw material intermediate product, waste product, or finished ' product. (19) National Pollution Discharge Elimination SSste or ' NPDES Permit. A permit issued pursuant to section 402 of the Act (33 U.S.C. 1342), or pursuant to N.C.G.S. I43-- 215.1 by the State under delegation from EPA. W_ ' (20) Non -discharge Permit. n disposal system permit issued by the State pursuant to NCGS 143-215.1. (21) Pass Throu,hh.. A discharge which exits the POTW J into waters of the State in guan Cities or concentration which, alone or with discharges front other sources, causes a violation, including an increase in the magnitude or duration of a violation of the POTW's NPDES or Ncn-discharge Permit er a downstream rater quality ' standard. (ZZ) Paxson. Any 4ndividual, firm, company, trust, partnership, copartnership, corporation, association, ' joint stock company, estate, governmental entity or any other legal entity, or their legal representatives, agents or assigns. This definition includes all Federal, ' State, and local government entities. (23) pH. A measure of the acidity or alkalinity of a substance. The logarithm (base 10) of the reciprocal of the concentration of hydrogen ions expressed in grams per liter of solution. ' (24) Pollutant. Any "Waste" as defined in NCGS 143-213 (13) and dredged spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, medical ' wastes, chemical wastes, biological- materials, radioactive materials, heat -wrecked or discharged equipment, rock, sand cellar dirt and industrial, municipal, and agricultural waste and certain characteristics of wastewater (e.g., pH, temperature, TSS, turbidity, color, HOD, COD, toxicity, or odor). ' (25) POTW Director. The City of Hickory Director of Public Utilities. (26) POTW Treatment Plant. That portion of the POTW designed to provide treatment to wastewater. (27) Pretreatment or treatment. The reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater prior to or in lieu of discharging or ' otherwise introducing such pollution into a POTW. The reduction or alteration can be obtained by physical, chemical or biological processes, or process changes or other means, except by diluting the concentration of the pollutants unless allowed by an applicable pretreatment standard. I. (28) Pretreatment Program. The program for the control of pollutants introduced into the P07W from ,son -domestic sources which was developed by the City in compliance ' with 40 CFR 403.8 and approved by the Approval Authority as authorized by NCGS 143-215.3(a)(14). (29) Pretreatment Requirements. Any substantive or procedural requirement related to pretreatment, other than a Pretreatment Standard. ' (30) Pretreatment Standards. Prohibited discharge standards, categorical standards, and "Local 'limits. (31) Publicly Owned Treatment Works (POML) or Municipal Wastewater System. A treatment works as defined by section 212 of the Act, (33 U.S.C. 1292) which is owned ' in this instance by the City. This' definition includes any devices or systems used in the collection, storage, treatment, recycling, and reclamation of municipal sewage ' or industrial :castes of a' liquid nature. It also includes sewers, pipes, and other conveyances only if they convey wastewater to the POTW treatment plant. For the rypurposes of this Ordinance, "POnVl shall also include any sewers that convey wastewaters to the POTW from persons outside the City who are, by contract or agreement with the City, users of the City's POTW. ( 32 ) Significant Industrial User, Any Industrial User of the wastewater disposal system who (z) has an average daily process -wastewater flow of f 25,000 gallons or more, or (i.i) contributes more than 5% of any design or treatment capacity (i.e., allowable pollutant load) of the wastewater treatment plant receiving the indirect discharge, or ' (iii) is required to meet a National Categorical Pretreatment Standard, or (iv) is found by the City, the Division Of Environmental Management or the U.S. Environmental Protection Agency (EPA) to have the potential for ' impact, either singly or in combination with other contributing industrial users, on the wastewater treatment system, the quality of sludge, the ' system's effluent quality, or compliance with any pretreatment standards or requirements. ' ( 33 ) Severe Property Damagg. Substantial physical damage to property, damage to the user's treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably by expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. -7- (34) Significant Noncompliance or ReDortable Noncompliance. A status cf noncompliance defined as follows: (i) [Violations of waste -.later discharge. A. Chronic violations. Sixty-six percent or more of the measurements exceed (by any magnitude) the same daily maximum limit or the same average limit in a six-month period. B. Technical Review Criteria (TRC1 violations. Thirty-three percent or more of the measurements are more than the TRC times the limit (maximum or average) in a six-month period. There are two groups of TRCs: For conventional pollutants: HOD, TSS, fats, oil and grease TRC = 1.4 For all other pollutants TRC = 1.2 C. Any other violation (s� of an effluent .limit (average or daily maximum) that the control authority believes has caused, alone or in combination with other discharges, interference or pass -through; or endangered the health of the sewage treatment plant personnel or the public. D. Any discharge of a ollutant that has caused imminent endangerment to human health/welfare or to the environment and has resulted in the POTW's exercise of its emergency authority to halt or prevent such a discharge. (ii) Violations of compliance schedule milestones, contained in a pretreatment permit or enforcement order, for starting construction, completing construction, and attaining final compliance by 90 days or more after the schedule date. (iii) Failure to provide reports for compliance schedule, self -monitoring reports, 90-day compliance reports, and periodic compliance reports within 30 days from the due date. (iv) Failure to accurately report noncompliance. (v) Any other violation or group of violations that the control authority considers to be significant. we (35) Slua Load. Any pollutant ('including BOD) released in a discharge at a flow rate or concentration which ,rill cause a Violation of the specific discharge prohibitions in Section 2.1 of this Ordinance and is of a non -routine, episodic nature, including but not limited to an accidental spill or a non -customary batch. discharge. (36) Standard Industrial Classification fSICI. A classification pursuant to the Standard Industrial 1 Classification Manual issued by the Executive Office of the 'resident, Office of Management and Budget, 1987. ' (37) Storm Water. Any flow occurring during or following any form of naturai precipitation and resulting therefrom. ' (38) Suspended Solids. The total suspended matter that floats on the surface of, or is suspended in, water, wastewater or other Liquids, and which is removable by laboratory filtering. (39) Superintendent. The person designated by the City to supervise the operation of the publicly owned treatment .corks and who is charged with certain duties and responsibilities by this article, or his duly authorized representative. ' (40) Wastewater_._ The liquid and water -carried industrial or domestic wastes from dwellings, commercial building, ..j .industrial facilities, and -institutions, together with may be present, whether treated or untreated, which is contributed into or permitted to enter the POTW. ' (41) Upset. An exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment ' facilities, inadequate treatment facilities lack of preventive maintenance, or careless or improper operation. e (42) W tewate Pe m' As set forth in section 4.2 of this ordinance. (43) `,haters of t e State. All streams, lakes, ponds, marshes, watercourse, waterways, wells, springs, reservoirs, aquifers, irrigation systems, drainage ' systems and all other bodies or accumulations of water, surface or underground, natural or artificial, public or private, which are contained within, flow through, or border upon the State or any portion thereof. _9- 'his ordinance is gender neutral and the masculine gender shall include the feminine and ;rice -versa. Shall is :�andatory; may is permissive or discretionary. The use of the singular shall be construed to include the plural and the plural shall include the singular as indicated by the context of its use. (b) The following abbreviations shall have the designated meanings: (1) BUD - Biochemical Oxygen Demand (2) = - Code of Federal Regulations (3) COD - Chemical Oxygen Demand ' (4) EPA - Environmental Protection Agency (5) 1 - Liter (6) pq - Milligrams (7) mall - Milligrams per liter ' (8) PN DEw- National Pollutant Discharge Elimination System (9) 5= - Standard Industrial Classification (10) SiSiDA -- Solid Waste Disposal Act, 42 U.S.C. 6901, et.seq. (11) iM - United States Code (12) T,SS - Total Suspended Solids (13) TKN - Total Kjeldahl Nitrogen 1.3 Regulations Requiring Use of Public Sewers (a) No one will be allowed to connect to facility without first making application to the City of Hickory. The City does not require connection to public sewer system on existing structures where no sewer, is available at time of construction. All new construction and subdivisions must connect to the public sewer system ,There it is available at time of construction. The City will require anyone within 50 feet of sewer to connect. (b) Any landowner required to connect to the Hickory public sewer system has 120 days to do so. 1.4 Regulations Concerning Private Sewage Disposal (a) Local county health department has authority over septic tanks so local health department regulation will apply. No septic tanks, privies or cesspools will be allowed where city sewers are available with the City of Hickory and Health Department regulation. (b) Discharge is prohibited of septic tank effluent or cesspool overflow to any open drain., ditch, stream or well penetrating water -bearing formations. (c) The City has the authority to approve or reject any private sewage disposal into our system. Permit for any disposal must be approved before any disposal will be allowed. Periodic inspections will be made by city officials or the Catawba County Health Department. 1 (d) The forth Carolina plumbing code will apply to the regulations concerning the building of sewers and connections. 1 -10- IS==IQ 2 47E`..1f ERAL SEWER USE iiEQUIREDME `iTS 2.1 Prohibited Discharge Standards (a) General, Prohibitions. No User shall contribute or cause to be contributed into the POTq, directly or indirectly, any ' pollutant or wastewater which will interfere with the operation or performance of the POTW. These general Prohibitions apply to all Users of a POTW whether or not the ' User is a Significant Industrial User or subject to any National., State, or local Pretreatment Standards or Requirements. (b) Specific Prohibitions. No User shall contribute or cause to be contributed into. the POTW the following pollutants, substances, or wastewater; ■ (1) Pollutants which create a fire or explosive hazard in the POTW, including, but not limited to, wastestreams with a closed cup flashpoint of less than 140 degrees F using the test methods spec-Lfied in 40 CFR 261.21. (2) Solid or viscous substances which will cause obstruction to the floor in the POTW resulting in interference. (3) Any wastewater having a pH less than 6.0 or more than 9.0 or wastewater having any other corrosive property capable of causing damage or hazard to structures, equipment, and/or personnel of the POTW. 1(4) Any wastewater containing toxic pollutants including oxygen -demanding pollutants, (HOD, etc.) in sufficient quantity, (flow or concentration) either singly or by interaction with other pollutants, to cause interference with the POTW. (5) Any noxious or malodorous liquids, gases, or solids or other wastewater which, either singly or by interaction with other wastes, are sufficient to create a public nuisance or hazard to life or are sufficient to prevent entry into the sewers for maintenance and repair. ' (6) Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin, in amounts that will cause interference or pass through. ■ ow ' It 7 ) Any substance which may cause the POTW's effluent Or any other product of the POT4a1 such as residues, sludges, or scums, ' to be unsuitable for the reclamation process. In no case, shall a substance discharged to the PU'.W cause the POTW to be in noncompliance with sludge use or disposal regulations or permits issued under Section 405 of the Act; the Solid Waste Disposal Act, the Clean Air Act, the Toxic Substances Control Act, or State criteria applicable to the sludge management method being used. (8) .Any wastewater which imparts color ,rhich cannot be removed by the treatment process, including, but not. .limited to, dye wastes and vegetable tanning solutions, which consequently imparts sufficient color to the treatment plant's effluent to render the waters injurious to public health or secondary recreation or to aquatic life and wildlife or to ' adversely affect the palatibility of fish or aesthetic quality or impair the receiving waters for any designated uses. (9) Any wastewater having a temperature greater than 150 degrees F (66 degrees C) or which will inhibit biological activity in the POT'vT treatment plant resulting in interference, but in no case wastewater with the temperature at the introduction into the POTW to exceed 104 degrees F. (10) Any wastewater containing any radioactive wastes or isotopes except as specifically approved by the POTW Director/Superintendent in compliance with applicable State or Federal regulations. (11) Any pollutants which result in the presence of toxic gases, vapors or fumes within the POTW in a quantity that may cause acute worker health and safety problems. (12) Any trucked or hauled pollutants, except at discharge points designated by the. POTW Director/Superintendent in accordance with section 2.9 of this ordinance. (13) Storm water, surface water, ground water, artesian well water, roof runoff, subsurface drainage, swimming pool drainage, condensate, deionized water, noncontact cooling water and unpolluted industrial wastewater, unless specifically authorized by the POTW Director/Superintendent. (14) Fats, oils, or greases of animal or vegetable origin in concentrations greater than one hundred (100) mg/l. Any authorized by (15) medical wastes, except as specifically the POTW DirectorJSuperintendent in a wastewater discharge permit. (As defined in section 1.2-14 of this ordinance) (16) Any sludges, screenings or other residues from the pretreatment of industrial wastes. -12- t(17 ) Any material containing ammonia, ammonia salts, or other chelatirg agents which will produce metallic complexes that ' interfere with the municipal wastewater system. (18) Any material that would be identified as ha-zardous waste according to 40 CFR Part 261 if not disposed of in a sewer e except as may be specifically authorized by the POT'W Director or Superintendent. (19) Any wastewater causing the treatment plant effluent to violate State Water Quality Standards for toxic substances as described in 15A NCAC 2B .0200. (20) Recognizable portions of the human or animal anatomy. (21) Any wastes containing detergents, surface active agents, 1 or other substances which may cause excessive foaming in the municipal wastewater system. (22) Wastewater causing, alone or in conjunction with other sources, the treatment plant's effluent to fail a toxicity test. I (23) At no time, shall two successive readings on an explosion hazard meter, at the point of discharge into the system (or at any point in the system) be more than five percent (5%) nor any single reading over ten percent (10%) of the lower explosive limit (LEL) of the meter. Pollutants, substances, wastewater, or other wastes prohibited by ' this section shall not be processed or stored in such a manner that they could be discharged to the municipal wastewater system. All 1 floor drains located in process or materials storage areas must discharge to the Industrial User's pretreatment facility before connecting with the system. 1 When the POTW Director/Superintendent determines that a User(s) is contributing to the POTW, any of the above enumerated substances in such amounts which may cause or contribute to interference of POTW operation or pass through, the POTW Director/Superintendent shall: 1) advise the User(s) of the potential impact of the contribution on the POTW in accordance with Section 5.1; and 2) take appropriate actions in accordance with Section 4 for such User to protect the POTW from interference or pass through. 2.2 National Categorical Pretreatment Standards Users subject to categorical pretreatment standards are required to comply with applicable standards as set out in 40 CFR Chapter 1, Subchapter N, Parts 405-471 and .incorporated herein. (a) Where a categorical pretreat only in terms of either the mass pollutant in wastewater, the POTW impose equivalent concentration o with 40 CFR 403.6(c). -13- anent standard is expressed or the concentration of a Director/Superintendent may r grass limits in accordance ( b ) When -wastewater subject to a categorical pretreatment standard is mined wit?3 wastewater not regulated by the same standard, the P=4 Director/Superintendent shall impose an alternate .limit using the combined wastestream formula in 40 CFR 403.6(e). (c) A user may obtain a variance from a categorical pretreatment standard if the user can prove, pursuant to the procedural and substantive provisions in 40 CFR 403.13, that factors relating to its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standard. ( d ) A User may obtain a net gross adjustment to a categorical standard in accordance with 40 CFR 403.15. i 2.3 Local Limits To implement the general and specific discharge prohibitions listed in this Ordinance, Industrial. User --specific .local -limits have been developed ensuring that the POTW's maximum allowable headworks ' loading is not exceeded for particular pollutants of concern for each Industrial User. Where specific local limits are not contained for a given parameter or pollutant in an Industrial User permit, the following limits will apply to all Users: 250 mg/1 EOM? 250 mg/l TSS 40 mg/1 TKN 0.003 mg/l arsenic 0.003 mg/l cadmium 0.061 mg/1 copper 0.010 Ong/l cyanide 0.049 mg/1 lead 0.0003 mg/l mercury ' 0.021 mg/l nickel 0.005 mg/1 silver 0.025 mg/1 total chromium 0.10 mg/1 zinc 16.0 mg/1 nitrogen ammonia 100 mg/l oil & grease 300 mg/l COD Domestic sewage levels for pollutants not listed above shall be determined by the Superintendent and shall be based on either actually measured local domestic sewage levels or literature values. -14- 2.4 State Requirements ' State requirements and li.-nitations on discharges shall apply in any case ;•where they are more stringent than Federal requirements and limitations of those in this Ordinance. ' 2.5 Right of Revision The City reserves the right to establish limitations and require- ments which are More stringent than those required by either State or Federal regulation. 2.5 Dilution No User shall ever increase the use of process dater or, in any way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in the National Categorical Pretreatment Standards, or in any other pollutant specific limitation developed by the City or State. 2.7 Pretreatment of Wastewater (a) Pretreatment Facilities Users shall provide wastewater treatment as necessary to comply with this ordinance, and :wastewater permits issued under section [4.21 of this. ordinance and shall achieve compliance with all National Categorical Pretreatment Standards, local limits, and the prohibitions set out in t section [2.1] of this ordinance within the time limitations as specified by EPA, the State, or the POTW Director/ Superintendent, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the User's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the City for review, and shall be approved by the POTW Director/Superintendent before construction of the facility. The review of such plans and operating procedures shall in no way relieve the User from the responsibility of ' modifying the facility as necessary to produce an effluent acceptable to the City under the provisions of this ordinance. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be approved by the POTW Director/Superintendent prior to the User's initiation of the changes. (b) Additional Pretreatment Measures 1. Whenever deemed necessary, the P0TW Director/ Superintendent may require Users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, ' separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the POTW and determine the User's compliance with the requirements of this ordinance. 1 2. The POTW Director/Superintendent may require any person discharging into the POTW' to install and maintain, on their property and at their expense, a suitable storage and fluw--control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for ' flog equalization. J. Grease, oil and sand interceptors shall be provided when, in the opinion of the POTW Director/Superintendent., they 1 are necessary for the proper handling of wastewater containing excessive amounts of grease and oil, or sand; except that such interceptors shall not be required for residential Users. All .interception units shall be of type and capacity approved by the POTW Director/ Superintendent and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired regularly, as needed, by the User at their expense. 4. Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. 2.8 Accidental Discharge/Slug Control Plans At least once every two (2) years, the POTW Director/Superintendent shall evaluate whether each significant industrial User needs an accidental discharge/slug control plan. The POTW Director/ Superintendent may require any User to develop, submit for approval, and implement such a plan. Alternatively, the POTW Director/Superintendent may develop such a plan for any User. An accidental discharge/slug control plan shall address, at aminimum, the following: (a) Description of discharge practices, including nonroutine ' batch discharges; (b) Description of stored chemicals; (c) Procedures for immediately notifying the POTW Director/ Superintendent of any accidental or slug discharge, as required by section 5.6 of this ordinance; and (d) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic - organic pollutants, including solvents, and/or measures and equipment for emergency response. -16- 2.9 Eauled Wastewater (a) Septic tank waste may be introduced into the POTW only at ' locations designated by the POTIW Director/Superintendent, and at such times as are established by the POTW Director/ Superintendent. Such waste shall not violate section 2 of ' this ordinance or any other requirements established by the City. The POTW Director/Superintendent may require septic tank waste haulers to obtain wastewater discharge permits. (b) The POTW Director/Superintendent shall require haulers -of industrial waste to obtain. wastewater discharge permits. The POTW Director may require generators of hauled industrial waste to obtain wastewater discharge permits. The POTS Director/Superintendent also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this ordinance. (C) Industrial waste haulers may discharge loads only at locations designated by the POTW Director/Superintendent. No load may be discharged without prior consent of the POTW Director/ Superintendent. The POTW Director/Superintendent may collect samples of each hauled load to ensure compliance with applicable standards. The POTW Director/Superintendent may require the industrial waste hauler to provide a waste analysis of any load prior to discharge. (d) Industrial waste haulers must provide a waste -tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit -r` number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste_ The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes. -17- 1 2.1O Regulations Relating to Fate of Discharge (a) No wastewater discharge will be allowed into Hickory's ! storm sewer system without exception. (b) No one ril? be allowed to dispose of certain wastes which prove to be detrimental to the sewage system (ie. :rood, glass, whole blood, feathers, ashes, cinders, sand, straw, rags, hair, bones, plastic, tar and paper products) are prohibited but are not limited to just the above. (c) The discharge of any flammable substances or materials (i.e. gasoline, kerosene, naphtha, benzene, toulene, zylene, ether's, alcohols, ketones, aldehydes, peroxides, chlorates, percholorates, bromates, carbides, hydrides, and sulfiedes) are prohibited Lrom entering the system. (d) The City will not permit any discharge of uncontaminated cooling water into the sanitary surer system in accordance. with State and Federal laws, however, uncontaminated cooling ;,rater may be allowed to discharge into the city's storm sewer. -17a- SECTION 3 - FEES 3.1 Purpose It is the purpose of this chapter to provide for the recovery of costs from Users of the City's wastewater disposal system for the implementation of the program established herein. The applicable charges or fees shall be set forth in the City's Schedule Of Charges And Fees. 3.2 yseg Charges A User charge shall be levied on all Users including, but not limited to, persons, firms, corporations or governmental entities that discharge, cause or permit the discharge of sewage into the POTW. (a) The User charge shall reflect at least the cost of debt service, operation and maintenance (including replacement) of the POTW. (b) Each User shall pay its proportionate cost based on volume of flow. 1 (c) The City Manager shall review annually the sewage -! contributions of users, the total costs of debt service, operation and maintenance of the POTW and will make recommendations to the City Council for adjustments in the Schedule Of Charges And Fees as necessary. ( d ) Charges for flow to the POTW not directly attributable to the Users shall be distributed among all Users of the POTW based upon the volume of flow of the Users. 3.3 Surcharges All Industrial Users of the POTW are subject to industrial waste surcharges on discharges which exceed the local limits listed for the following: TSS 350 mg/l HOD 350 mg/1 TKN 50 mg/1 TP 10 mg/I Discharges that exceed the. above limits will be subject to the following surcharges: ' TSS $0.20 per lb BOD $0.07 per lb TKN $0.54 per lb ' TP $1.69 per lb -18- The amount of surcharge will be based °u€cn the mass emission rate (in pounds per day) discharged above the levels. listed above. The amount charged per pound of excess will be set forth in the schedule of charges and fees. (a) The volume of flow used in determining the total discharge of wastewater for payment of User charges and surcharges shall be based on the following: (1) Metered water consumption as shown in the ,records of meter readings maintained by the City; or (2) if required by the City or at the individual dischargers option, other slow monitoring devices which measure the actual volume of wastewater discharged to the sewer. Such devices shall be accessible and safely located, and the measuring system shall be installed in accordance with plans by the City. The metering system shall be installed and maintained at the Users expense according to arrangements that may be made with the City. (3) Where any User procures all or part of his dater supply from sources other than the City, the User shall install and maintain at his own expense a flow measuring device of a type approved by the City. (b) The character and concentration of wastewater used in determining surcharges shall be determined by samples collected and analyzed by the City. Samples shall be collected in such a :Wanner as to be representative of the actual discharge and shall be analyzed using procedures set forth in 44 CFR Part 136. ' (c) The determination of the character and concentration of wastewater discharge by the POTW Director or his duly appointed representatives shall be binding as a basis for charges. 1 3.4 Pretreatment Program Administration Charges The Schedule Of Charges And Fees adopted by the City may include charges and fees for: (a) reimbursement of costs of setting up and operating the Pretreatment Program; (b) monitoring, inspections and surveillance procedures; (c) reviewing slug control plans, including accidental and/or slug load discharge procedures and construction plans and specifications; (d) permitting; (e) other fees as the City may deem necessary to carry out the requirements of the Pretreatment Program. -19- tSECTION - WASTEWATER DiSCHARCE PERIA17T A2PLICATION AND ISSUANCE ' 4.1 Wastewater Dischargers It shall be unlawful for any person to connect or discharge to the POTW without first obtaining the permission of the City of Hickory. When requested by the POTW Director/Superintendent, a User must submit information on the nature and characteristics of its wastewater within thirty (30) days of the request. The POTW Director/Superintendent is authorized to prepare a .form for this purpose and may periodically require users to update this information. ' 4.2 Wastewater Permits All Significant Industrial Users shall obtain a Significant Industrial User Permit prior to the commencement of discharge to the POTW. Existing Industrial Users who are determined by the POTW Director to be Significant Industrial Users shall obtain a Significant Industrial User Permit within 180 days of receiving notification of the POTW Director's determination. Industrial Users who do not fit the Significant Industrial User criteria may at the discretion of the POTW Director be required to obtain a wastewater contribution permit for Non -Significant Industrial Users. (a) sicrnicant Industrial User Determination All persons proposing to discharge non -domestic wastewater, or proposing to change the volume or characteristics of an existing discharge of non -domestic wastewater shall request from the POTW Director a Significant Industrial User determination. If the POTW Director determines or suspects ' that the proposed discharge fats the Significant Industrial User criteria he will require that a Significant Industrial User permit application be filed. (b) Significant lntustrigj User Permit Application Users required to obtain a Significant Industrial User Permit shall complete and file with the City, an application in the form prescribed by the POTW Director, and accompanied by an application fee in the amount prescribed in the Schedule Of Charges And Fees. Significant Industrial Users shall apply for a Significant industrial User Permit within 90 days after notification of the POTW Director's determination in 4.2(a) above. In support of the application, the User shall submit, in units and terms appropriate for evaluation, the following information: (1) Name, address, and location, (if different from the address); (2) Standard _industrial Classification (SIC) codes for pretreatment, the industry as a whole, and any processes for which categorical pretreatment standards have been promulgated; 20- (3) Analytical data on wastewater constituents and characteristics including but not limited to those mentioned ' in section 2 of this ordinance, any of the priority pollutants (section 307(a) of the Act) which the applicant knows or suspects are present in the discharge as determined by a reliable analytical laboratory, and any other pollutant of concern to the POTW; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR, Part ' 136, as amended; (4) Time and duration of the indirect discharge; ' (5) Average daily and 30 minute peak wastewater flow rates, including daily, monthly and seasonal variations if any; ' (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, floor drains, sewer connections, direction of flow and appurtenances by the size, ' location and elevation; (7) Description of activities, facilities and plant processes ' on the premises including all materials which are or could be discharged; (8) Where known, the nature and concentration of any pollutants in the discharge which are limited by any City, State, or Federal Pretreatment Standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional Operation and Maintenance (O&M) and/or additional pretreatment is required for the User to meet applicable pretreatment standards; (9) If additional pretreatment and/or O&M will be required to Meet the Pretreatment Standards; the shortest schedule by which the User will provide such additional pretreatment. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standard. The following conditions apply to this schedule: (i) The schedule shall contain progress increments in the forms of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards. No increment in the schedule shall exceed nine (9) months. (ii) No later than 14 days following each date in the ' schedule and the final date for compliance, the User shall submit a progress report to the POTW Director including, at a minimum, whether or not it complied with the increment of progress, the reason for any delay, and if appropriate, the steps being taken by the User to return to the established schedule. In no event shall more than nine (9) months elapse between such progress reports to the POTW Director/ Superintendent. (10) Each product produced by type, amount, process or processes and rate of production; ' (11) Type and amount of raw materials processed (average and maximum per day); (12) Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system; (13) If subject to a categorical standard, a baseline monitoring report in accordance with 40 CFR 403.12(b) and 15A NCAC 2H .0908(a), as outlined in section 5.1 of this ordinance. (1) Any other information as may be deemed by the POTW 1 Director/Superintendent to be necessary to evaluate the permit application. . (c) =lication Signatories and Certification All wastewater discharge permit applications and User reports must be signed by an authorized representative of the User and contain the following certification statement; "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility eof fine and imprisonment for knowing violations." (d) ApRlication Review and Eval2ation ' The POTW Director/Superintendent will evaluate the data furnished by the. User and may require additional information. t (1) The POTW Director/Superintendent is authorized to accept applications for the City and shall refer all applications to the POTW staff for review and evaluation. (2) Within 30 days of receipt the POTW Director/ Superintendent shall acknowledge and accept the complete ' application; or if not complete, shall return the application to the applicant with a statement of what additional information is required. 1 -`2_ 1 (e) Tentative Djeterminaticn and craft Permit ' (1) The POTW staff shall conduct a review of the application and an on -site inspection of the Significant Industrial User, including any pretreatment facilities, and shall prepare a written evaluation and tentative determination to issue or deny the Significant Industrial User permit. (2) If the staff's tentative determination in Paragraph () ' above is to issue the permit, the following additional determinations shall be made in writing: ' (i) proposed discharge limitations for those pollutants proposed to be limited; (ii) a proposed schedule of compliance, including interim dates and requirements, for meeting the proposed limitations; and ' (iii) a brief description of any other proposed special conditions which will have significant impact upon the discharge described in the application. (3) The staff shall organize the determinations made pursuant to paragraphs (1) and (2) above and the City's general permit conditions into a Significant industrial User permit. (f) Pe m't Synapsis ' A fact sheet providing a brief synopsis of the application shall be prepared by the POTW staff for submission to the applicant, the Approval Authority and made available to the ' public upon request. The contents of such fact sheets shall include at least the following information: (1) a sketch and detailed description of the industrial facilities and pretreatment facilities including the location of all points of discharge to the POTW" and all established compliance monitoring points: (2) a quantitative description of the discharge described in the application which includes at least the following: (i) the rate or frequency of the proposed discharge; if the discharge is continuous, the average daily flow; (ii) the actual average daily discharge in pounds per day if any limited pollutant and any pollutant identified in the application as known or suspected present; and, ' (iii) the basis for the pretreatment limitations including the documentation of any calculations in applying categorical pretreatment standards. -23- (g) Final yctipn On Significant Industrial User_ Permit Applications (1) The POTW Director shall take final action on all applications not later than aU days following receipt of a ' complete application. (2) The Director/Superintendent is authorized to: ' (i) issue a Significant Industrial User permit contain-ing such conditions as are necessary to effectuate the purposes of this Ordinance and N.C.G.S. 143--215.1; ' (ii) issue a Significant Industrial User permit containing time schedules for achieving compliance with applicable pretreatment standards and requirements; (iii) modify any permit upon not less than 64 days notice and pursuant to section 4.2(i) of this Ordinance; ' (iv) revoke any permit pursuant to section 8.1 of this Ordinance. (v) suspend a permit pursuant to section 8.1 of this Ordinance; ' (vi) deny a permit application when in the opinion of the POTW Director/Superintendent such discharge may cause or contribute to pass -through or interference of the ' wastewater treatment plant or inhere necessary to effectuate the purposes of G.S. 143-215.1. (h) Hearings " (1) Initial Adjudicatory Hearings. An applicant whose permit is denied, or is granted subject to conditions he deems unacceptable, a permittee/User assessed a civil penalty under section 8.2, or one issued an administrative order under section 8.1 shall have the right to an adjudicatory hearing before a hearing officer designated by the POTW.Director upon making written demand, identifying the specific issues to be contested, to the POTW Director within 30 days following ' receipt of the significant industrial user permit, civil penalty assessment, or administrative order. Unless such written demand is made within the time specified herein, the action shall be final and binding. The hearing officer shall make a final decision on the contested permit, penalty, or order within 45 days of the receipt of the written demand for a hearing. The POTW Director shall transmit a copy of the hearing officer's decision by registered or certified mail. ( i ) New Permits. Upon appeal, including judicial review in the General Courts of Justice, of the terms or conditions of a newly issued permit, the terms and conditions of the 1 -24- 1 entire permit are stayed (process no discharges) and the Permit is net in effect until either the conclusion of ' judicial review or until the parties reach a mutual resolution. (ii) Reneged Permits. Upon appeal, including judicial review in the General Courts of Justice, of the terms or conditions cf a renewed permit, the terms and conditions of the existing permit remain in effect until either the conclusion of judicial review or until the parties reach a mutual resolution. (2) Final Appeal hearings. Any decision of a hearing officer made as a result of adjudicatory hearing held under section 4.2(h)(1) above may be appealed, to the City Council upon filing a written demand-vrithin 10 days of receipt of notice of the decision. Hearing held under this Subdivision shall be conducted in accordance with the City of Hickory Sewer Use ordinance. Failure to make written demand within the time .specified herein shall bar further appeal. The City Council, shall make a final decision on the appeal within 90 days of the date the appeal was filed and shall transmit a written copy of its decision by registered or certified mail.. (3) Official record. When a final decision is issued under section 4.2(h)(2) above, the City Council shall prepare an official record of the case that includes: (i) All notices, motions, and (ii) A copy of all documentary (iii) A certified transcript of testimony is transcribed. and not transcribed, then any testimony taken. other like pleadings; evidence introduced; all testimony taken, if If testimony is taken a narrative summary of (iv) A copy of the final decision of City Council. (4) Judicial Review. Any person against whom a final order or decision of, the City Council is entered, pursuant to the hearing conducted under section 4.2(h)(2) above may seek judicial review of the order or decision, by filing a written petition within 30 days after receipt of notice by registered or certified mail of the order or decision, but not thereafter, with the Superior Court of Catawba County along with a copy to the City. Within 30 days after receipt of the copy of the petition of judicial. .review, the City Council shall transmit to the reviewing court the original or a certified copy of the official record. (i) Permit Modification (1) Modifications of permits shall be subject to the same procedural requirements as the issuance of permits except as follows: ( i ) changes in the o rinership of the discharge when no other change in the permit is indicated,- MV2412 1 (ii) a single modification of any compliance schedule not in excess of four months, (iii) modification of compliance schedules (construction schedules) in permits for new sources where the new source °Trill not begin to discharge until control ' facilities are operational. Any changes or new conditions in the permit shall include a ' reasonable time schedule for compliance. (2) Within g months of the promulgation of a National Categorical Pretreatment Standard, the Wastewater Discharge Permit of Users subject to such standards shall be revised to require compliance with such standard 'within the time frame prescribed by such standard. Where a User, subject to a ' National Categorical Pretreatment Standard, has not previously submitted an application for a Wastewater Contribution Permit as required by 4.2(b), the User shall apply for a Wastewater ' Contribution Permit within 180 days after the promulgation of the Applicable National Categorical Pretreatment Standard. (3) A request for a modification by the permittee shall constitute a waiver of the 60 day notice required by G.S. 143-215.1(b) for modifications. ' (j) Permit Conditions (1) The POTW Director shall have the authority to grant a '} permit with such conditions attached as he believes necessary to achieve the purpose of this Ordinance and N.C.G.S. 143- 215.1 such conditions shall include but are not limited to the ' following: (i) a statement of duration (in no case more than five years) ; (i.:i) a statement of non -transferability; (i.ii) applicable effluent limits based on Categorical Standards or local limits or both; ' (iv) applicable monitoring, sampling, reporting, notification, and record keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling ' frequency, and sample type based on Federal, State and local law. (v) notification requirements for slug loads; (vi) a statement of applicable civil and criminal penalties for violation of Pretreatment Standards and ' Requirements. 1 -26- 1 ( 2 ) In addition, permits may contair., but are not limited to, the f of lo-dirg : ( i ) Limits on the average and/or maximum rats of discharge, and/or requirements for flow regulation and equalization. _ (ii) Limits on the instantaneous, daily and monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. (iii) Requirements for the installation of pretreatment technology or construction of appropriate containment devices, etc., designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment .corks. (iv) Development and implementation of spill control plans or other special conditions including management ' practices necessary to adequately prevent accidental, unanticipated, or non -routine discharges. (v) Development and implementation of wastewater minimization plans to reduce the amount of pollutants discharged to the municipal wastewater system. 1 (vi) The unit charge or schedule of User charges and fees for the management of the wastewater discharged to the system. (vii) Requirements for installation and maintenance of inspection and sampling facilities and equipment. ' (viii) Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types, and standards for tests, and reporting. ' schedules. (ix) Requirements for immediate reporting of any instance of noncompliance and for automatic resampling and reporting within thirty (30) days where self - monitoring indicates a violation(s). (x) Compliance schedules for meeting pretreatment standards and requirements. ' (xi) Requirements for submission of periodic self - monitoring or special notification reports. (xii) Requirements for maintaining and retaining plans records relating to wastewater discharges as specified in Section [5.13] and affording the POTW Director/Superintendent, or his representatives, access ' thereto. 1 -27- (xiii) Requirements fcr prior notification and approval by the POTW Director/Superintendent of any new introduction of wastewater pollutants or of any significant change in the .Tolume or character of the .,rastewater prior to introduction in the system. ' (xiv) Requirements for the prior notification and approval by the POTW Director/Superintendent of any change in the manufacturing and/or pretreatment process ' used by the permittee. (xv) Requirements for i=ediate notification of excessive, accidental, or slug discharges, or any discharge which could cause any problems to the system. (xvi) A statement that compliance with the permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State pretreatment standards, including those which become effective during the terms of the permit. (xvii) other conditions as deemed appropriate by the Director/Superintendent to ensure compliance with this Ordinance, and State and Federal laws, rules, and regulations; the term cf the permit. ( is ) Permits Duration Permits shall be issued for a specified time period, not to exceed five (5) years. A permit maybe issued for a period --' less than a year or may be stated to expire on a specific date. The User shall apply for permit reissuance a minimum of 1 180 days prior to the expiration of the User's existing permit. (1) Permit Transfer Wastewater Discharge Permits are issued to a specific User for ' a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new User, different premises, or a new or changed operation. ' (m) Permit Reissuance A significant industrial User shall apply for permit ' reissuance by submitting a complete permit application in accordance with section [4.2] a minimum of 180 days prior to the expiration of the existing permit. 1 -28- ' SECiIV - REPORTING REQUIREMENTS ' 5.1 Easeline i{Qr:4toring R ports s (a) Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 4C CFE 403.6(a)(4), whichever is later, existing categorical Users currently discharging to or scheduled to discharge to the POTW shall submit to the POTW Director/Superintendent a report which contains the information listed in paragraph [(b)) below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become categorical Users subsequent to the promulgation of an applicable categorical standard, shall submit to the POTW/Superintendent a report which ' contains the information listed in paragraph [(b)] below. A new source shall report the method of pretreatment it .intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (b) Users described above shall submit the information set forth below. (1) Identifying Information. The name and address of 1 the facility, including the name of the operator and owner. (2) Environmental Permits. A list of any environmental control permits held by or for the facility. (3) Description of Operations. A brief description of ' the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such User. This description should .include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. (4) Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403,6(e). (5) Measurement of Pollutants. ' (i) The categorical pretreatment standards applicable to each regulated process. ' (ii) The results of sampling and analysis identifying nature and concentration, and/or mass, where required by the standard or by the POTW Director/Superintendent, of regulated pollutants in the discharge from each regulated process. 1 _29-. 1 Instantaneous, daily maximum, long-term average concentrations, or :;.ass, :here required, shall e I reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 5.10 of this ordinance_ ' (iii) Sampling must be performed in accordance with procedures set out in section 5.11 of this Iordinance. (6) Certification. A statement, reviewed by the User's authorized representative and certified by a qualified ' professional, indicating wheth.er pretreatment standards are being net on a consistent basis, and, if riot, whether additional operation and maintenance (O&M) and/or ' additional pretreatment is required to meet the pretreatment standards and requirements. ' (7) Compliance schedule. If additional pretreatment and/or 0&M will be required to meet the pretreatment standards, the shortest schedule by which the User will provide such additional pretreatment and/or O&M. The I completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to I this section must meet the requirements set out in section 5.2 of this ordinance. (8) Signature and Certification. All baseline monitoring reports must be signed and certified in accordance with section 4.2(c) of this ordinance. 5.2 Compliance chedule Progress Reportq The following conditions shall apply to the compliance schedule required by section 5.1(b)(7) of this ordinance. (a) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the User to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); ( b ) No increment referred to above shall exceed nine ( 9 ) months; (c) The User shall submit a progress report to the POTW Director/Superintendent no later than fourteen (14) days following each date in the schedule and the final date of -30- ' comoliarice including, as a minimu n:, .hether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the User to return to the established schedule; and (d) In no event shall more than nine (9) months elapse ' between such progress reports to the POT1W Director/ Superintendent. 5.3 Reports on Compliance with Categorical Pretreatment Standard Deadline Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater the POTW, any User subject to such pretreatment ' standards and requirements shall submit to the POTW Director/Superintendent a report containing the information described in section 5.1(b)(4-6) of this ordinance. For Users ' subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the User's long-term production rate. For all. other Users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the User's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 4.2(c) of this ordinance. 5.4 Periodic Compliance Reports (a) All Significant Industrial Users shall, at a frequency determined by the POTW ➢irector/Superintendent but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with section 4.2(c) of this ordinance. (b) All wastewater samples must be representative of the User's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and ' maintained in good working order at all times. The failure of a User to keep its monitoring facility in goad working order shall not be grounds for the User to claim that sample results are unrepresentative of its discharge. (c) If a User subject to the reporting requirement in this section monitors any pollutant more frequently than required by the POTW Director/Superintendent, using the procedures prescribed in section 5.10 of this ordinance. 1 -31- 5.5 Reports of Chanced Conditions Each User must notify the POrIW Director/Superintendent of any planned significant changes to the User's operations or systems which might alter the nature, quality, or volume of its wastewater at mast thirty (30) days before the change. ' (a) The POTW Director/Superintendent may require the User to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 4.2 of this ordinance. ' (b) The POTW Director/Superintendent may issue a wastewater discharge permit under section 4.2 of this ordinance or modify an existing wastewater discharge permit Sander section 4.2 of this ordinance in response to changed conditions or anticipated changed conditions. ' (c) For purposes of this requirement, significant changes include, but are not limited to, flow increases of twenty percent (20%) or greater, and discharge of any previously unreported pollutants. 5.6 Reports of Potential Problems (a) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or a slug load, that may cause potential problems for the POTW, the User shall immediately telephone and notify the POTW Director/ Superintendent of the incident. This notification shall include the location of the discharge, type of waste, ' concentration and volume, if known, and corrective actions taken by the User. ' (b) Within five (5) days following such discharge, the User shall., unless waived by the POTW Director/Superintendent, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the User to prevent similar future occurrences. Such notification shall not relieve the User of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the User of any fines, penalties, or other liability which 3nay be imposed pursuant to this ordinance. (c) A notice shall be permanently posted on the User's bulletin board or other prominent place advising employees ' whom to call in the event of a discharge described in paragraph (a), above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification. procedure. -32- 5.7 Reports from UnDermitted Users All Users not required to obtain a wastewater discharge permit shall provide appropriate reports to the PJT`W Director/ Superintendent as the POTW Director/Superintendent may require. 5.8 Notice of Violation/:repeat Sampling and Reporting If sampling performed by a User indicates a violation., the User must notify the POnq Director/Superintendent within twenty-four (24) hours of becoming aware of the violation. The User shall also repeat the sampling and analysis and submit the results of the repeat analysis to the POTW Director/Superintendent within thirty (30) days after becoming aware of the violation. The User is not required to resample if the POTW Director/Superintendent monitors at the User's facility at least once a month, or if the POTW Director/Superintendent samples between the User's initial sampling and when the User receives the results of this sampling. 5.9 Notification of the Discharce of Hazardous Waste (a) Any User who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional 'Taste Management Division Director, and State hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the pane of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge ( continuous, t batch, or other). If the User discharges more than one hundred (100) kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and ' readily available to the User: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharge during the calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All notifications must take place no later than one hundred and eighty (180) days after the discharge commences. Any notification under this paragraph need be submitted under section 6.5 of this ordinance. The notification requirement in this section does not apply to pollutants already reported by Users subject to categorical pretreatment standards under the self -monitoring requirements of sections 5.1, 5.3, and 5.4 of this ordinance. (b) Discharges are exempt from the requirements of paragraph (a) above, during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous :-castes unless the wastes are acute hazardous wastes as specific in 40 CFR 261.30(d) and 261.33(e). Discharge cf more than fifteen (15) kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. -33- Subsequent months during which the User discharges more than such quantities of any hazardous ,caste do not require additional. notification. 1 (c) In the case of any new regulation under section 3001 of RCRA identifying additional characteristics of hazardous waste ' or listing any additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the User must notify the POTW Director/Superintendent, the EPA Regional [;taste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. (d) In the case of any notification made under this section, the User shall certify that it has a program in place to reduce the: volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (e) This provision does not create a right to -discharge any substance not otherwise permitted to be discharged by this ordinance, a permit issued thereunder, or any applicable Federal or State law. W 5.10 Analytical Requigements ' All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA. 5.11 Sample Collection (a) Except as indicated in section (b) below, the User must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the POTW Director/Superintendent may authorize the use of time proportional sampling or a minimum of four (4) grab samples where the User demonstrates that this ' will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (b) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (c) Samples collected for analyses by Industrial Users must be submitted to a State certified laboratory. -34- 1 5_12 Timing Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. 5.13 Record Keeping Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities ' required by this ordinance and any additional records of .information obtained pursuant to monitoring activities undertaken by the User independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and ' the name of the person(s) taking the samples: the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three(3) years. This period shall be automatically extended for the duration of any litigation concerning the User or the City, or where the User has been specifically notified of a longer retention period by the POTWDirector/Superintendent. 5.1 Monitorina Facilities The City requires the User to provide and operate at the User's own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the User's premises, but the City may, when such a location would be impractical or cause undue hardship on the User, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The'faciiity, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition. at ' the expense of the User. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the City's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the City. L 6.2 Insoection and Samolin The City will inspect the facilities of any User to ascertain whether the purpose of this ordinance is being met and all requirements are being complied with. Persons or cccupants of premises where wastewater is created or discharged shall allow the City, approval authority and EPA or their representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination or in the performance of any of their duties. The City, approval authority, and EPA shall have the right to set up on the User's property such devices as are necessary to conduct sampling inspection, compliance monitoring and/or metering operations. Where a User has security measures in force which would require proper identification and clearance before entry into their premises, the User shall mane necessary arrangements with their security guards so that upon presentation of suitable identification, personnel from the City, approval authority, and EPA will be permitted to enter, without delay, for the purposes of performing their specific responsibilities. Denial of the POTW Director's/Superintendent's approval authority's or EPA's access to the User's premises shall be a violation of this ordinance. Unreasonable delays may constitute denial of access. 6.3 Search Wa ants ' If the POTW Director/Superintendent, approval authority or EPA, has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be violation of this ordinance, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the City designed to verify compliance with this ordinance or any permit or order issued hereunder, or to protect the overall public health, safety and welfare of the community, then the POTW Director/Superintendent, approval authority or EPA may seek issuance of a search warrant from the City of Hickory Police Department. SECTION 7 - Confidential Information Information and data on a User obtained from reports, questionnaires, permit applications, permits and monitoring programs and from inspections shall be available to the public or other governmental, agency without restriction unless the User specifically requests and is able to demonstrate to the satisfaction of the POTW Director that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets of the User. Any such request must be asserted at the time of submission of the information or data. When requested by the person furnishing a report, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public but shall be made available upon written request to governmental agencies for 1 -36- ' uses related to this Ordinance, the Rational Pollutant Discharge Elimination System (NPDES) permit, State Disposal System permit and/or the Pretreatment Programs; provided, however, that such portions of a report shall be available for use by the State or any State agency in judicial review or enforcement proceedings ' involving the person furnishing the report_ Wastewater constituents and characteristics will not be recognized as confidential information. All records relating to compliance with Pretreatment Standards shall be made available to officials of the approval authority and EPA upon request. ' SECTION 8 - ENFORCEMENT ' 8.1 Administrative Remedies (a) Notification Of Violation ' Whenever the POTW Director/Superintendent finds that any Industrial User has violated or is violating this Ordinance, wastewater contributor permit, or any prohibition, limitation or requirements contained therein, the .POTW Director/ Superintendent may serve upon such a person a written notice stating the nature of the violation. Within 30 days from the date of this notice, a plan for the satisfactory correction thereof shall be submitted to the City by the User. Submission of this plan does not relieve the discharger of liability for any violations occurring before or after receipt of the Notice of Violation. (b) Consent Orders The POTW Director/Superintendent is hereby empowered'to enter into Consent Orders, Assurances of Voluntary Compliance, or ' other similar documents establishing an agreement with the person responsible for the noncompliance. Such orders will include specific action to be taken by the discharger to correct the noncompliance within a time period also specified by the order. Consent Orders shall, have the same force and effect as an Administrative Order issued pursuant to Section i 8.1.(d), below. (c) ahow Cause _Hearin The POTW Director/Superintendent may order any Industrial User who causes or is responsible for an unauthorized discharge, has violated this ordinance or is in noncompliance with a wastewater contributor permit to show cause why a proposed enforcement action should not be taken. In the event the POTW Director/Superintendent determines that a show cause order should be issued, a notice shall be served on the User 37- ' specifying the time and place for the hearing, the proposed enforcement action, the reasons for such action, and a request that the User show cause why this proposed enforcement action should not be taken. The notice of the hearing shall be served personally or by registered or certified rail (return receipt requested; at least ten (10) days before the hearing. Service stray be made on any agent or officer of a corporation. The POTW Director/Superintendent shall review the evidence presented -at the hearing and determine whether the proposed enforcement action is appropriate. A show cause hearing under this section is not a prerequisite to the assessment of a civil penalty under section 8.2 nor is any action or inaction taken by the POTW/Superintendent under ' this section subject to an administrative appeal under section 4.2(h). (d) Administrative Orders ' When the POTW Director/Superintendent finds that discharge violates the prohibitions or effluent Limitations of this Ordinance, or those contained in any permit issued hereunder, the POTW Director/ Superi.ntendent may issue an order to cease and desist, and direct those persons in noncompliance to do any of the following: 1) Comply forthwith 2) Comply in accordance with a compliance time schedule set forth in the order 3) Take appropriate remedial or preventative action in the event of a continuing or threatened violation 4) Disconnect unless adequate treatment facilities, devices or other related appurtenances are installed and properly operated within a specified time period. (e) Emergency Suspensions The POTW Director may suspend the wastewater treatment service and/or wastewater permit when such suspension is necessary in order to stop an actual or threatened discharge which presents or may present an imminent or substantial endangerment to the health or welfare of persons or the environment, interferes with the POTW or causes the POTW to violate any condition of its NPDES permit. Any User notified of a suspension of the wastewater treatment service and/or the wastewater permit shall immediately stop or eliminate the contribution. A hearing will be held within 15 days of the Notice of Suspension to determine whether the -38- suspension may be .sifted or the User's waste discharge permit terminated. In the event of a failure of the person to comply voluntarily with the suspension order, the POTW Director/ Superintendent shall take such steps as deemed necessary including immediate severance of the sewer connection, to ' prevent or minimize damage to the PICTIR system or endangerment to any individuals. The POTW Director/Superintendent shall reinstate the wastewater permit and the wastewater treatment service upon proof of the elimination of the noncompliant discharge_ The Industrial User shall submit a detailed written statement describing the causes of the harmful contribution and the measures taken to prevent any future ' occurrence to the POTW Director/Superintendent prior to the date of the above -described hearing. (f) Termination Of Permit Any User who violates the following conditions of this ' Ordinance, or applicable State and Federal regulations, is subject to having its permit terminated: 1) Failure to factually report the wastewater constituents and characteristics of his discharge; 2) Failure to report significant changes in operations, or wastewater constituents and characteristics; 3) Refusal of reasonable access to the User's premises for the purpose of inspection or monitoring; or 4) Violation of conditions of the permit. Noncompliant industrial Users will be notified of the proposed termination of their wastewater permit and will be offered an opportunity to show cause under section 8.1 of this ordinance why the proposed action should not be taken. 8.2 Ciyi3- Penalties - (a) Any User who is found to have failed to comply with any provision of this Ordinance, or the orders, rules, regulations and permits issued hereunder, may be fined up to ten thousand dollars ($10,000) per day per violation. (b) In determining the amount of the civil penalty, the POTW Director/Superintendent shall consider the following: (i) The degree and extent of the harm to the natural resources, to the public health, or to public or private property resulting from the violation; (ii) The duration and gravity of the violation; -39- ' (iii) The effect on ground or surface -V:ater quantityor quality or on air quality; ' (iv) 'The cost of rectifying the damage; (v) The amount of money saved by noncompliance; (vi) Whether the violation was committed willfully or intentionally; (vii) The prior record of the violator in complying or failing to comply with the pretreatment program; (viii) The costs of enforcement to the City. (c) Appeals of civil penalties assessed in accordance with this section shall be as provided in section 4_2(h). 8.3 Other Available Remedies Remedies, in addition to those previously mentioned in this ordinance, are available to the POTW Director/Superintendent who may use any single one or combination against a noncompliant User. Additional available remedies include, but are not limited to: ( a ) Criminal Violations. The District Attorney for the. Hickory 1 Judicial District may, at the request of the City, prosecute noncompliant Users who violate the provisions of N.C.G.S. 143- 215.6B. } b unctive Relief Whenever an Industrial User is in violation of the provisions of this Ordinance or an order or ' permit issued hereunder, the POTW Director/Superintendent, through the City Attorney, may petition the Superior Court of Justice for the issuance of a restraining order or a preliminary and permanent injunction, which restrains or compels the activities in question. (c) Water Supply Severance Whenever an Industrial User is in violation of the provisions of this Ordinance or an order or permit issued hereunder, ' water service to the Industrial User may be severed and service will only recommence, at the Users expense, after it has satisfactorily demonstrated ability to comply. ' (d) Public Nuisance Any violation of the prohibitions or effluent limitations of this Ordinance or contained in a permit or order issued hereunder, is hereby declared a public nuisance and shall be corrected or abated as directed by the POTW Director/ ' Superintendent. Any person(s) creating a public nuisance shall be subject to the provisions of the Citzi of Hickory Sewer Use Ordinance ' governing such nuisances, including reimbursing the POTW for any costs incurred in rencving, abating or remedying said nuisance. ' 3.4 Remedies Nonexclusive The remedies provided for in this ordinance are not exclusive. The ' POTW Director/Superintendent may take any, all, or any combination of these actions against a noncompliant User. Enforcement of pretreatment violations will generally be in accordance with the ' City's enforcement response plan. However, the POTW Director/ Superintendent may take other action against any User when the circumstances warrant. Further, the POTW Director/Superintendent is empowered to take more than one enforcement action against any noncompliant User. SECTION 9 - ANNUAL PUBLICATION OF SIGNIFICANT NONCOMPLIANCE At least annually, the POTW Director/Superintendent shall publish in the largest daily newspaper circulated in the service area, a list of those Industrial Users which were found to be in significant noncompliance, also referred to as reportable noncompliance in 15A NCAC 2H .0903(b)(10), with applicable pretreatment standards and requirements, during the previous 12 months. SECTIQW 10 - AFFIRMATIVE DEFENSES TO DISCUARGE VIOLATIONS 10.1 Upset (a) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the requirements of paragraph (b) below are met. (b) A User who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that; (1) An upset occurred and the User can identify the cause(s) of the upset; ( 2 ) The facility was at the time being operated in a prudent and workman -Like manner and in compliance with applicable operation and :maintenance procedures; and (3) The User has submitted the following information to the POTW Director/Superintendent within twenty-four (24) hours of becoming aware of the upset. A written submission must be provided within five (5) days following the oral report of upset: (i) A description of the indirect discharge and cause of noncompliance; -41- ' ( ii ) The veri od of noncompliance, including exact dates and times Cr, ii of corrected, the ' anticipated time the noncompliance is expected to continue; and ' (iii) Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. ' (c) In any enforcement proceeding, the user seeking to establish' the occurrence of an upset shall have the burden of proof. (d) Users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. (e) Users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails. ' 10.2 Prohibited Discharge Standards Defense J} A User shall have an affirmative defense to an enforcement action brought against it .for noncompliance with the general prohibitions in section 2.1(a) of this ordinance or the specific prohibitions in ' sections 2.1(b)(2), (6), (4), (9), and (11) of this ordinance if it can prove that it did not know, or have reason to know, that its discharge, alone or in conjunction with discharges from other sources, would cause pass through or interference and that either; ' (a) A local limit exists for each pollutant discharged and the User was in compliance :lith each limit directly prior to, and during the pass through or interference; or (b) No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the City was regularly in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal ' requirements. 10.3 Bypass ' (a) A User may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of paragraphs (b) and (c) of this section_ -42- ' (b) ( i } If a UserJk�ro..s in advance of the need for a bypass, ' it shall submit prior notice to the POTW Director/ Superintendent at 'Least 10 days before the date of the bypass, if possible. ' (2) n User shall submit oral notice to the POTW Director/Superintendent of an unanticipated by pass that exceeds applicable pretreatment standards within twenty- four ( 24 ) hours from the time it becomes aware of the bypass. A urritten submission shall also be provided within five (5) days of this time the User becomes .aware ' of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and tines, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The POTW Director/Superintendent may :-naive the ' written report on a case -by -case basis if the oral report has been received within twenty-four (24) hours. (C) (1) Bypass is prohibited, and the POTW Director/ Superintendent may take an enforcement action against a User for a bypass, unless, (i) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; (ii) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive ' maintenance; and (iii) The User submitted notices as required under ' paragraph (b) of this section. (2) The POTW Director/Superintendent may approve an anticipated bypass, after considering its adverse effects, if the POT'd Director/Superintendent determines that it will meet the three conditions listed in paragraph (c)(1) of this section. 1 1 -43- ISECTION 11 - SEi,TR.iEILITY 1 If any provision, paragraph, Yaord, section cr article of this Ordinance -Ls invalidated by any court of competent jurisdiction, the remaining provisions, paragraphs, words, sections, and chapters shall not be affected and shall continue in full force and effect. SECTION 12 - CONFLICT All other ordinances and parts of other ordinances incons-istent or conflicting with any part of this Ordinance are hereby repealed to the extent of such inconsistency or conflict. 1 -44- SECTION 13 - EFFECTIVE DATE This ordinance shall be in full force and effect from and after its passage, approval and puhlication, as provided by law. On the 16th day of August , 19 94 INTRODUCED the '!nd day of August , 19 94 . FIRST READING: Au,<! ._3t_ z s 9 94 . SECOND READING: .1,11gust 16 , 19 94 ' PASSED this lath day o: Au ust 19 94. AYES: McDonald, Ililler, Moore, Melsner, iloyle, Foy:, and 'Moss NAYS: none ' ABSENT: None NOT VOTING: None APPROVED by me this 17tit day of Nagust-, 19 94 ' /4,y Y / /),• MAYOR, CITY OF HICKORY ATTEST:`_A:t&6C 4 i C (SEAL } City Clerk Published the day of , 19 F -45- APPENDix F CITY OF HICKORY SEWAGE SPILL; RECORDS APPENDLV t SFWAG L SPILL REPORT PAGE DATE _'S hlc,-97 3-Jun-97 'EL51E. N071F1EU TLVII: ARRIVE. l'1]aE ENDED LUCATIORISOURCE Bebmd Elhs Mills Plant 42 - 719 Old Lenoir Road P—P Stauoo at hIDI SURFACE WATER I?IPACI'ED VDLUME(GALLONS) �00 ?Slam 9.'ata Discharge CAUSE J REPAIRS IP17) k CURRECUVI.,I(:11U:, PUIILI, 1O 17CE REQUIRED 1.1-Au -97 3-0ct-97 4-Nov-97 26-Not-97 Grace Chad Road near MOI lath Street. NW and 2nd Amu. Nw Catawba Valle+ 13.1 rd PS Behind Catauba Villas Alall 200-300 100 0 1000 1-Dec-97 S.nlhnics Fmish,ng .569 HI hwav 321 500 5-Dec-97 fit haa. i0 near Galewa Wid 50o I I-Dec•97 Lake Ei�ckon Couolrr Club 40 I-tan-9x w I'-� Sven Di,. Sw off W a. 70 500 Iddan-9x Behind Hickory Dail, Record loon 20-Feb-% 131h Sum SW 1500 Black 500 13-A r-98 Maoet Club -61h Strmt, NW 100 28•Mav-98 01d Lmoir Rmd A 7tk Avenue NW 10DO 11-Jnn.9E Nonheas<Plant - 710 Clonin er ""'I Road 1n000 7-lul•98 ❑ Attnue_ SE 300 18-1u1. Va11n Crossln PS off Catawba Valley B-1—d 200 25-1u1.98 Catauba Valln 8wlevmd near Cma,b. Maii 1000 '2O-Au -9k Ontfall Line off Fh h.var 7n bc1. ^-2nd St, k 771h SI SE 500 20-St -9R Eastern end of .. WWIP arillel +nth Clmm a h1111 Pmd Road 300 2.Oct-98 vac, c$--9 PS of Catauba Vailn 13.0 and 150 28-No+--98 1C mdc frun Old NC 70 a1 27ih Aamue NE m WIWI W., line 250 1bDcc-9x Sn Creek Road 100 2l-Ian-99 Fum Suer Cw-� NW at LaI mm Subdt siam 100 ?I -Jan -97 2911, A,rnue Drnc, NE d- Snow Crxk aad 23rd Street 500 I'. FrG99 IOth A+Ynu SE off Ht w 1'_75 200 27mFc6-'a9 300 Dock of 17th Alm— h-F 100 02-m -991 127 S and 8th Strttt Dmc, t;E 300 I7-hIu99 IOIh Street Place. N'E at stud Avenue Lan,, NE SO IR-h:ax-99 2550 faghna, 70 SE Behind CVCC IDO 29 h1ao-79 13[h Si,-, SW a 14DO Block i20fA1 03 Ap,-091 117Lh A—e .\•E OD of5th Sven NE 100 I8-A r-99 YMCA, Fica Sven NW 25 23-1un99 500 Block of '1st A+Ynue NW 60 29-Iun-99 Swoon Horse Outfall Llne near Ma.hrook Subd++von l00 15-Au -991 71h A, enue. NE at HL hun 127 VW 27-Oc1.49� Off Fa,,Irro,c Church Road at'_ON A—rn SE near Corn Plan; 1500 29-Ot1-99 111h A-. SE Nfof Fair — Bl,d . SU and Sweet -at, Road S00 30-0c1-99 0ulfall line along Section Howe Road behind Idlc Wrid Aves 1700 is No, -99 Oulfa6 line near Ma,blook Subd Off of Section House Road 510 31-Ds-99 400 Block of 21 n A+mue \ V 0 IO-Jan-00� Hauks Rid e.4 arvoenlsoffof kith Avenue Place Nw loo I 1-11n-00 100 Block of Hi hua, 721 Noah 200 1 J-Ian tan 700 Block of 11L Sv--t Plarc SE 300 ❑2-Feb-p0 SSI - 111h A+iove Ciree NV 6ix1 09-Feb-Olt IJth Sueel. SW off of Hal 70 8000 nl-Mu�DO Sth Street ti'E at 2Jrd A+cvue. NE 600 APPENDIX a SEWAGE SPILL RT.PURf PAGE DATE .1a1E BUT lF1ED TIME ARRIVE TIME ENDED LOCATIONISOURCE SURFACE WATER IMPACTED VOLUME (GALLONS) CAUSE REPAIRS (PIT) k CORRECFIVEACf1UN PUBLICVUTICE REQUIRED mi.mm-w I 1-1ut-00 Scorn Ho— Road Sectinn Roux Road w Adam Slim 1500 700 Debris d: Grease 7-Au -00 16m Snap P—P Simon 150 EltSd " 23-Au -00 953 - 4th Street Plar; 'F SW Maahate m.erts I3.Oct-00 Sulphur $Prw s Rotd 3OU Pate Flll.cf.6dcul 150Jut-01 15W A,muc. SE sit Tait Cmia beside l-W 9W Cnanrvction E to eat 27-Feb-al Hwr. 321 & 121h St Dr NW 10,0001 F.ral'On bf creek bank en sn,a —ssin 310 Clonin er Mill Road SOW Very hen+ run 500 31-L d Ht w4+ 121 N '200D Debris in serer line 2 1 V Snett SE off Catawba Valle, Blvd SW s�tndallsro Is..a 426-17Lh A,amc NE IOW-250I) moss Section Huse RO&VS611nrt How Owf111 Line 3 Greax. Jul Seclmn Horse Road at Adam Slrect 7% dcbris end sae m line Maares Fur, a4 Pusn Sutton 2'DD G tar (Iilere N rapll0l aACf 164h Su SE F—p Station 2$0 elecerieal I I-oct-01 ShuTcd P—p Statim 01 21St Av.). at 81h St Dr NW 450 Bubbler Tube exppdeq, Ya I I.On-01 20th Snw. SE a Mara Mwielra ',SW 17p.iecatas pip, is Qea-.sour 2-Nor-01 Clmin Mill Road aea NE W WTP eW r Week w xwa roam No 14•N000l 17w Se NE near Ct,itaa Park SOU Plastic bap in senor hue No 14•Jao473 21n A-14W 1000 Roos m serer. line No 1S-12e-02 12sh A.. NW sear Old Lebow Rd ID 000 ROals m sera line N. 122/2002 Moores 1— Rl P—p Station 8W Eleuncal Fag= Ir•J2002 Ek h-P ftp 54arim 400 5 Ir312002' 377 H— 70 SW SW Gnaw w scru line =12002 a ch A.e NW - 4t50 Ram —1a —b.. .lo the scoa S,srem 11211`102 aW Blkd22nd A.e h'E 2SW Roar in serer lae 221 fM2 Hid— Opauiam Park 400 ROM a scr.line V512W2 lAotXe3 Fern+ el Pump Stzm 300 Eloamcal 3r2&2002 Hams Tmc P—p SlUm 50 Vandalism I S722002 Lar:esbore 41 PL, Station 1a St NW 2500 Elesukal Future Sr0/2002 Wmdrnae Subd 200 Rod Ind debris m serer hoc W4r0W 3Lud 51 N-FJs ee Rd Ootlall 92q Greaw NS2W2 13th St SWlHdhlnd Ward Hosiery IOW Sod: and rags in sewn line 3,th A—c Plan: MN Wtndmae Subdt+islon wo Grease in uric line ' 9110i3W2 91102002 1.O0 PM 2:00 PM Tatt Bid Clak Creel: Outfall 5W Grease in serer line lonw20U2 1N18/2002 200AM 245 AM NE Plant Luc Htckon 5000Excau.erai6 IW3112002 Iill P2002 4.IS PM 4:35 PM 251h 51 DrNW p=P 5=011 Lake liickon 300 E w lent Failure 1U1112WZ It/II2002 10 00AS1 12.-15 Mm 1:«tbnf1 Sera plant Lake llicaary Hen'rem IWZW3 1 Uo2Wl 2.30 PNI 330 PM Lakc EA— Co=w, Oub Lakt HKkm 2D00 Gradm canuaator broke 16' Fora Main 3124rwol 312412W3 9.30 AM 12 30 PM Hur 127 S B oWotd 111— Rice [ODD ibgt eretk Iris due to bca- tam 3240M 3r4rW3 10 30 Al-S 3-3n pm Loh St Bi.d r41V at 1I A e 14W ICn a Creek 1300 High toted: k.el da w Lea.. rain 32413W3 3rrrW3 7.30 ASS WOO A.I 16th SA NE Lift Sulloe Tnbtun,toLakelliel on' 60DO.aloadducluhm-ran 32412W3 3rW2W3 3WAM I100 AM WE Waaemefa Trealmmt Plan) Trdbaa wLakelllick a fi.DDD O+wkmd dae m beam rain 3f,4!_'W3 3/30 -M3 7 W Aid 10 W AM Shasord el Lift Sntior Tnbttlan w Lake Heckon 7 OW Omdue w 4ea•.'rarn 3rN1'_W3 3242003 2:3D PM 5.30 PM Clark Crecx tkufatl tlR22nd St SE ClukCatrl Soo Silt la sera line w101J003 I 41IW=3 I:30 PM 5 30 PM I 19 51 SE Heap R—Baia 100D Strom at. 4110f2063 1 VI&21111131 12 00 PM 2-W PMJ Itbh Sa PI 'IV Cri Cra& Sq0 Rain ,sal. 41111200) arl If2063 7 W PM 11 ODM Secum Houu oulfall line Webb Murray Sehmk TnbutMv to Herrvan Crack GOD Roors 41141;003 4114f2W3 5:30 PM 7-30 PM 400 bind of 22od Atv:2CE 1 Triboun• of FalhoX Creek Aw Grease 4/2212003 ar2212W} ? 3O AM 11:39 AM Scum House Ouitall Line NIA 500 Oebns in sever line I 51211,003 OD AM 12.00 PM 3100 B0, cf SDm Creek Rd Snow Creek 3000 Wolm Faee MI.. 712912603 4:45 Pbl 9.45 PM 1M AM S— Creek Lill Statim Tributan de Lake Htekm 12 W0 Ekcfaiul faun. Lightning bier- lust m mawr Vcs sa 112003 2_IS PM 1-45 PM 2.15 PM Lakeland Al Life Stan. T.Wtarr lu Lack. HKlen 2S0 Bnb61a Fuhtre 912312W7 2.5o I'm 1130 PM 2:30 PM Tine Bled bekmd ;rill Grading Credo 1.756 G,.dwg conuw. hit mmbde d filled wth dirt W12W3 1 9.45 AM A. IS P1v1 5 30 PM M.,brmk SubdrVnam Oulflll Tn Wiur to Lake Hlckon 2 300 Grease @ rigs IOJ ag-o 3 1:30 Pbl 1 3O PM 3.30 PM 1lth St NE near C,,�etur Park T.Wum to Cauaba RWvef +ODD Grease de ra s IM_a1211D3 1.3D PM 1.30 PM 3:30 PM Regal Manufammi off Tale Blvd TarW1LV to Cairn--ba Rlvv 53W Oehrts iu bne res 1 V IUM03 9.15 AM 9:15 A%% 9 45 AM Moores Ferry as Pamp Strum lake HocLory 100 P—p Station EWpmmi Fail— I 1112s12003 1.30 PM 1.30 PM 1.40 PM Moores Perry sac P—p Statim Lake kekwy 300 Pimp Station Vquipment Failurc 11312Wa 2 30 P,%l I OD PAI 7 W PM Isi St PI NW oatfall Im manbole TnWury to Lake Hiclor, 4500 Roots 715f30W 2-N7 PM 2:3OPM 3-30 PM Ellis Hmiea Otdfall Ntm"e Cramer Branch 600 4 Sacks 31 OO.1 1:45 PM 1:45 PM y_ 45 PM Mavbrool Subdrvisem Oatfa0 manhole at fkry meta TriWtan to Catarba Re— 3500 Ras Vxs 31412004 4,li p,%jl 418 PM 500 PM Manhole 46022nd A,e NL F.Ilmi Creek 20W Grease yes 311612004 3.30 PM 1 30 Phl 6.10 PM 100 block 7th A,, NW Manhole at uack Cn it Crack 4 650 Roots Vcs 3126^_OD4 5 W PNII S W PAI 7.01) PM Manbule back stilt of Haoda Cars of &Am tWm 70 9200 Grease 3/36f'_OD: t0 OD AM I0 00 AM 10 30 AM Mambole oR US 70 ^ mkkr sb north of tbty 70 L- u. Creek 750 Ueb- inIme 5A312004 7 �50 PM 750 Phl 9. S S PM Manhole off 1.1576 ¢ sprinkler sbpp north a lij 70 Lmigvim Creek 3975 Manhole detcric+anm . Bricks fell off amd uopRLdur line 12W 5R8a 6:10 PM 1 6 30 PM 9 30 PM 111-hole offCua,.ba Valle5 Blvd 0mt:m w of Chucks Cheese Muddv Crack - 9 200 Debris m I7ne ti/Mow 12:IUI 1210 3 W PM sc�v trine in Oakvarmd C® at aack Gi Se Creek I0,000 Clav cWlaWA COnOatfm *ill MMPL-Lc;twra 9 rJOI 900 AM 900 ANI 1000 AM Yphole at creek mown b*W web Murray Scbotr Lyle Cyeek 36M+teary-+am doom umiw x Franns res 91MM4 9,00 9 W AM 12.00 PM I Sk ufwd 47 Pmp station off Sib 51 W NW —=d usbutary to Lake Hickary 27 OW Hca-run dirt to ical Rom Francis yes 9B/2Wa TA5 AM r aS AM 10 00 AM NE Seuar Plant Lffistaum F.Mu Creek 32 . fle.-rain due to teal alo+m Francis ,es g/Sf200a 10451 10 a5 I t:50 AM Manh de behind Mell's Su eft off Old Ltni it Rd u neck -UK N adord Creek 1 200 !feat+ rain due ra hopmo alarm Francis ses INI 112Wa R 301 10 3- 10 30 AM IMmhuIc at creek off Clooin er 4bll Rd at NE Smv PMamts lwv to FaBm Crack 6 000 ISebns in line APPE.\6rx I SE'AAGE SPILL, REPORT PAGE I uATF: fUIE ti0'ElFIEO S 30 PM 7"]?IF: ARRIVE 8�30 PM T1,1]F. ENDED 4: i0 PM LOG]"]O \l50 DACE 91h A-e NE Manhole m toad at mvanu to Harris Tener Station SURFACE RATER INPA(TED �'OLU\[E(GALLONS) CAUSE REPAIRS q'fCl k CORRECTIVE ACflpi� PU BL]C NOIICE REUTAEU t 9 00 A.M 9 00 Atit 10'00 A\I Man2loleatcreekrnasvn belndWebMnnav Sahool Lsle Creel» 9.00 9.00 AM 12.00 PM Shufod a1 Pum SWICO aft 81h St Dr N'W unnamed utht— to Lake Ifi&— 21.000 Heal rain due t. tr icat storm Francis as 7 d5 A%I 7 45 AM 10 00 AM \E Sn-er Plant LtOslatieu Fafl= Creel: 72.320 Hea+ rain due to vo ical storm Francis R7J2,,X�14Oa 0» {0..9 1045 11.50 A.M Manhole behind hldl's Su nm aft Old Lenoir Rd at creek crossm f-forsefwd Creek 1200 He,- rain due t. vo ical norm Francis)4 _4 8 30 00 PM 10. 30 a Go PM 10.30 Ahl 9.00PM Manhole at creek offClonia a,LAU Rd n NE Ses-er Platds Iowa sale Manhle al veek b1rin41he met at Cn le Creek00 FA= Creek Gp00 pebtis in hne Raors-0a 1 10 PLl 1'.30 PM 3.30 PM Acnak at Moose Cluh Lt0 Start. Zak-Hicko, 500 A vee limb broke off cansine aorta] to shtfl a sma11 leak occvrted at i r oinl-04 1:29 PM 1-. 29 PM 1.65 PM Moores F— 04 Pum Station Lake Htck— 250 �Pnna Station E ment FilureA4 9 21 Ah1 i I:(O AM I?Ih A+'r NE bet— 5th S. 6th St NE Id creek Fallmg Czeck 3975 IC,.L bank eroded ...,ng pipe 10 break 7-D—G4 5 30 AM 9 15 PM Shuford/1 Pam S-ation oR2l n Are NW JCjTauba Rim I 3000 Pum 5.1— E ui mrnt Failure 3-Dac-01 11.30 AM 3 30 PM Old L-rmtr Road at Crl lc Creek Cri Ic Crttk 7000 pchns in line Ia-Ja 05 7.30 AM 1 00 PMl Maybro-k Ou-fall Line Section H— Rd Lvle Creek 5000 W s &Debris to ime 22-Mar 05 9 30 AM I 12 10 PTA C-eek -rosin be ,— Adam St & Section House Rd L%le Creek I D p00 I Broke. creek —smg pw. Pt a p.Itd due to -rock bank erosion. 24-Mar-05 2 30 A\I 3,30 PM M-hol-ld tn-ersrction d 171h Ave `W & 2nd St NW Tnbularr to Cal-th Rtm 1500 Cleric '6-idar-OS a.UO PM 330PM Farm Hills enLmce. MH easlsidc of;. 15f St SE Muddv Crcck 8775 Grease&debris in ire 2?elan-05 5 30 PM 7T. 30 PM IOth A+e NW Pmes 11 Subd. C.ppl. Creel 0.tfi11 C,,pple Creel 75M lnflw & Inftltratim APPENULK a SEWAGE SPILL REPORT PAGE I DATE TIME �'OTIFIE➢ 111IE ARRIVE TIl7£ ESIIE➢ LOCATIUNISOURCE SURFACE WATER ENSPACFE➢ VOLUME ;GALLONS) CAUSE REPAIRS(P/P) CORRECTIVE ACTION PUSLICNOTICE RE DIRE➢ 7M2005 10: 15 AM 2 15 PM 10th Aw Pmc Tua SLbd Cripple Crc& Onfall IrnppLc Crmk S250 V— E.- Rmn -1.1-051 106 PM 700 Pu:v'E V—P Ie PS Falfiae Creel. 53000 Ven li— Ram ics 28-M-05 A 00 PM 9 30 FM Mohole Pone 11 Subd Cri Ic Creek 4 500 Hence Rain ,cs I I I I I I I I I V I I I I I I I I I I I I I I I I 1 I I APPENDIX G DESIGN CALCULATIONS I ' PROJECT Hickory NE WWTP TITLE Influent Pump Station Calculations COMM NO 60402A ARCHITECTS ENGINEERS PLANNERS DATE 04/05105 DES BY MW DEPT REV DATE CKD BY SKETCH SK - SHEET NO. 1 OF 3 Design Point: 2 pumps running ' 12 MGD (8333 gpm) The system will be divided into two (2) legs. The first leg will include parallel 18-inch and 14-inch force mains (700 10. The second leg will be the 30-inch force main (400 10. For the first leg the flow in each 1 pipe will be balanced so that the friction head is equivalent in each pipe. Leg 1-A: 14-inch FM Minor Losses Qt� Total Le 14" 90-deg bend 2 35 70 14" 45-deg bend 2 16.5 33. 14" Check valve 1 90 90 14" Plug valve 1 38 38 Enlargement 1 36 36 267 1f Q — 3 003 -pm C— 110 Lp — 267 If+ 700 if = 967 if fl,— 12.01' LeL, I -A: 18-inch. FM Minor Losses 18" 90-deg bend 18" 45-deg bend 18" Check valve 18" Plug valve 18" Thru tee Enlargement 2 3 1 1 1 1 Q — 5330 gpm C110 Lp — 436.1 Ifs- 700 1f= i,136.1 If f}, 1 1.99' v >7 fps -�/ L� Total L, 45 90 21.2 63.6 116 116 48.5 48.5 91 91 27 27 436.1 If v»fps[ These flows will be used as the design point for Leg 1, as the friction heads are nearly identical. PROJECT Hickory NE WWTP COMM NO 60402A TITLE Influent Pume Station Calculations ARCHITECTS ENGINEERS PIANNEU p f //� DATE 04/05/05 DES BY MW DEPT REV DATE ■ CKD BY SKETCH S�- SHEET N0. 2 OF 3 Leg 2. 30-inch FM Minor Losses Qly Total Le 30" 90-deg bend 1 76 76 30" 45-deg bend 2 35.3 70.6 Exit 1 90 90 236.61f Q — 8333 gpni v �� fps \f C-110 Lp — 236.6 lf+ 400 If= 636.6 1f 1.28' Static Head — 85' TDH = 12' + 1.28' + 85' = 98.28' A TDH of 100' will be used for pump selection, each pump sized for 6 MGD at 100' TDH. COST-EFFECTIVE PUMPING, AFP 3002 60 Hz Hickory IPS nt 1 16 t 14 1 1 11 10 9 7 6 5 4 3 2 1 P2 (h 1 12 70= t3 0 60� 0= 50- 0= 30= 20- 0: 0: 0= 0 = I 0- 0= i3 - 0 0� 0' 0 pf 60 473 o~ � 20- �s Testnorm ISO 2548C u luuu Euuu suuu auuu 5uuu ttuuu ruuu U.P.111•! 2004-09-27 Operating data specification Flow 4557 US g.p.m. Mead 105 fl Static head 75 ft Efficienoy 85.2 % Shaft power 142 hp NPSH 12.3 ft Fluid Wastewater Temperature 39 °F Nature of system Single head pump No, of pumps 1 Pump data Type AFP 3002 60 Hz Make ABS Series AFP M4-M0 (18,5kW-1 MW) Impeller 2-vane channel impeller N° of vanes 2 Impeller size 18.6 inch Free passage 5 x 4 318" Suction port DN300 Discharge port DN300 Motor data Rated voltage 460 V Frequency 60 Hz Rated power P2 168 hp Nominal speed 1175 rpm Number of poles 6 Efficiency 91.3 % Power factor 0 803 Rated current 214 A Starting current 1036 A Rated torque 749 Ibf it Starting torque 1356 Ibf It Degree of protection IP68 Insulation class F ABS reserves the right to change any data and dimensions without prior notice and can not be held rewnsibie for the use of ABSEL 1.7.1 12003-07-09 information contained in this software. Testnorm ISO 2548C u luuu Euuu suuu auuu 5uuu ttuuu ruuu U.P.111•! 2004-09-27 Operating data specification Flow 4557 US g.p.m. Mead 105 fl Static head 75 ft Efficienoy 85.2 % Shaft power 142 hp NPSH 12.3 ft Fluid Wastewater Temperature 39 °F Nature of system Single head pump No, of pumps 1 Pump data Type AFP 3002 60 Hz Make ABS Series AFP M4-M0 (18,5kW-1 MW) Impeller 2-vane channel impeller N° of vanes 2 Impeller size 18.6 inch Free passage 5 x 4 318" Suction port DN300 Discharge port DN300 Motor data Rated voltage 460 V Frequency 60 Hz Rated power P2 168 hp Nominal speed 1175 rpm Number of poles 6 Efficiency 91.3 % Power factor 0 803 Rated current 214 A Starting current 1036 A Rated torque 749 Ibf it Starting torque 1356 Ibf It Degree of protection IP68 Insulation class F ABS reserves the right to change any data and dimensions without prior notice and can not be held rewnsibie for the use of ABSEL 1.7.1 12003-07-09 information contained in this software. ABS reserves the right to change any data and dimensions without prior notice and can not be held rewnsibie for the use of ABSEL 1.7.1 12003-07-09 information contained in this software. AAL COST_PFFPCT1',1E PUSiPIDIG AFP 3002 60 Hz Hickory IPS AFP/M4-M9 Type: AFP 3002 60 Hz ABS submersible pumps from 7.5 to 900 kW for reliable and economic pumping of heavily polluted sewage in commercial, industrial and municipal applications. Water pressure -tight encapsulated fully flood -proof motors in standard or explosion -proof versions supplied as standard with jacket cooling system. Suitable for both wet and dry installation. Hydraulics with open or closed, single or multi -vane impellers suitable for handling of clear water, polluted water, sewage containing solids, faecal slurry and sludge. Capacity up to 6,700 m31h Head, max. 80 m Technical data Delivery rate : 4557 US g.p.m. Delivery head : 105 ft Hydr. efficiency : 85.2 % Shaft power : 142 hp NPSH : 12.3 fit Speed : 1175 rpm Impeller type : 2-vane channel impeller Impeller diameter : 18.6 inch Motor output : 168 hp Voltage : 4B0 V Frequency : 60 Hz Discharge outlet : DN300 ABS reserves the right to change any data and dimensions without prior notice and can not be held responsible for the use of ABSEL 1.7.1 i 2003-07-09 information contained in this softwam I of 4 LAKESIDE SPIRAGRIT DATE: 12-Jan-05 PROJECT: Hickory, North Carolina ENGINEER: Hayes, Scay, Niattern and Mattern I. SPIRAGRIT I)ESIGN The SpiraGrit is a vortex grit removal system which relies on a mechanically induced vortex to capture grit solids in the center hopper of a circular tank. The SpiraGrit operates efficiently over a wide range of daily flowrates. This is achieved by rotating paddles which maintains the flow velocity inside the grit chamber. This collector can be sized to handle peak flows ranging from 1.0 to 70.0 mad. Grit is removed from the hopper by an air lift pump or a centrifugal pump, and piped to a Grit Classifier. Backwash from the Grit Classifier flows back to the grit tank. For the most efficient operation, the Grit Classifier should be positioned above the water level in the grit tank to permit backwash to return by gravity to the grit basin. II. INFLUENT FLOW DATA VALUE Average Dry Weather (Qadw) Flow, mad 25 % of Qaa) - 2.250 Average Annual (Qaa) Flow, mad - 9.000 Maximum Wet Weather (Qmww) Flow, mgd 150 % of Qaa) - 13.500 Peak Instantaneous (Qpiww) Flow, mgd 333 % of Qaa) - 30.000 III. GRIT CHAMBER VALUE Number of SpiraGrit Units - 2 SpiraGrit Model Number SG- 16 - 20.0 Grit Chamber Diameter, feet 16.00 Inlet Channel Width, feet - 50 Outlet Channel Width, feet - 7.00 IV. DOWNSTREAM CONTROL POINT Parshall Flume - 1 Effluent Weir - V. DESIGN CALCULATIONS Calculate the water depth at the grit chamber outlet based upon the influent flow parameters shown above: Parshall Flume width for the SpiraGrit Model 20.0 is 4.tt0 foot The suggested channel width leading from the SpiraGrit to the Parshall Flume is 350 feet 2of4 FLOW WATER DEPTH CHANNEL WATER DI.PTH A INFLUENT FLOW PARAMETER Parshall Flume HEADLOSS ** OUTLET (mgd) (feet) (inches) (inches) Minimum Day (Qmin) Flow; mgd 1.125 0.25 0A ] 0.35 Average Day (Qave) Flow, mgd 4.500 0.59 0.29 0.88 Maximum Day (Qmww) Flow, mgd 6.750 0.76 0.39 1,15 Peak Instantaneous (Qpiww) Flow, mgd 15.000 1 1.27 0.68 1.95 ** NOTE: Not knowing the channel configuration, we have assumed the headloss between the Parshall flume and grit chamber to be based upon two (2) 90 degree bends and an outlet loss. The detention time can be calculated based upon the influent flow parameters and the grit chamber volume. Note, the grit chamber volume for the 16.0 foot diameter SpiraGrit will vary based upon the water depth in the grit chamber and the influent flow: INFLUENT FLOW PARAMETER FLOW GRIT CHAMBER VOLUME DETENTION TIME (mgd) (cubic feet) (seconds) Minimum Day (Qmin) Flow, mgd 1.125 472.92 271.7 Average Day (Qave) Flow, mgd 4.500 578.79 83.1 Maximum Day (Qmww) Flow, mgd 6.750 633,05 60.6 Peak Instantaneous (Qpiww) Flow, mgd 1 15.000 1 793.62 1 34.2 The velocities of the inlet and outlet ports of the grit chambers are as follows: Note, the inlet port depth is based upon the outlet port depth plus 0.25 inches (assumed headloss through the grit chamber). OUTLET PORT OUTLET PORT INFLUENT FLOW PARAMETER FLOW WIDTH DEPTH VELOCITY (mgd) (feet) (inches) (feet / second) Minimum Day (Qmin) Flow, mgd 1.125 7.00 0.35 0,71 Average Day (Qave) Flow, mgd 4.500 7.00 0.88 1.13 Maximum Day (Qmww) Flow, mgd 6.750 7.00 1.15 1.30 Peak Instantaneous (Qpiww) Flow, mod 1.5.000 1 7.00 1.95 1.70 INLET PORT INLET PORT INFLUENT FLOW PARAMETER FLOW WIDTH DEPTH VELOCITY (mgd) (feet) (inches) (feet / second) Minimum Day (Qmin) Flow, mgd 1.125 3.50 0.60 0.83 Average Day (Qave) Flow, mgd 4.500 3.50 1.13 1.76 Maximum Day (Qmww) Flow, mgd 6.750 3.50 1.40 2.13 Peak Instantaneous (Qpiww) Flow, mgd 15.000 1 3.50 2.20 3.02 CARROUSEL® A'C'm SYSTEM DESIGN CALCULATIONS for Hickory, North Carolina WWTP A. DESIGN CONDITIONS AVERAGE FLOW (MGD)......................................................................... 9.00 DESIGN BOD(mg/1)................................................................................. 265 DESIGN TSS (mgll)................................................................................. 320 DESIGN TKN (mg/1)................................................................................. 35 DESIGN TP (mg1l).................................................................................... 7 EFFLUENT BOD(mg/I)............................................................................ 10 EFFLUENT TSS(mg/1) .....................................................................1....... 15 EFFLUENT NH3-N(mg/1).......................................................................... 1.0 EFFLUENT NO3-N (mg/1)......................................................................... 5.0 EFFLUENT TKN(mg/1). ..................... ..................................................... 1 2.0 EFFLUENT TP (mg/1) .............................................................................. 1.0` 'Chemical polishing may be required B. DESIGN ASSUMPTIONS PROCESS SRT (Nitrification) (days)........................................................ 14.0 MINIMUM WASTEWATER TEMP.(°C)...................--............................ 15.0 MAXIMUM WASTEWATER TEMP.{°C)................................................... 28.0 MLSS CONCENTRATION (mg/1)............................................................. 4,000 NET YIELD (Ib TSS / lb BODremo ed).....................•................................... 0.83 OXYGEN COEFFICIENT (lb Oa / Ib BODr. ,)....................................... 1.25 (lb 02 / lb N.,ohZ.d).............................................. 4,60 ALPHA(a)................................................................................................ 0.92 BETA(5).................................................................................................. 0.97 ELEVATION(ft.)...................................................................................... 800 C. DESIGN CALCULATIONS 1. AERATION VOLUME BOD REMOVAL SLUDGE PRODUCTION 06/29/04 Q x (BODi - BODe) x 8.34 9.D0 x ( 265 - 10 ) x 8.34 19,140 lbs BOD/day Y x Q x (BODi - BODe) x 8.34 0.83 x 9.00 x (265 -10) x 8.34 15,886 Ibs TSSI day CONFIDENTIAL page 1 CARROUSEL A2CT' SYSTEM DESIGN CALCULATIONS SYSTEM MASS = SRT x Y x Q x (BODi - BODe) x 8.34 14.0 x 0.83 x 9.00 x (265 - 10) x 8.34 = 222,410 Ibs TSS SRT x Y x Q x (BODi - BODe) CARROUSEL VOLUME = -------- —-------------------- ---------- MLSS 14.0 x 0.83 x 9.00 x (265-10) 4,000 6.667 M.G. 2. AERATION ROWER NITROGEN SYNTHESIS = NITROGEN OXIDIZED (Npx) _ 5.0 % OF WAS 10.6 mg1l TKNin — TKNeff - Nassimlation 35 - 2.0 -10.6 22.4 mg1I 1,683 Ib-N/day ACTUAL OXYGEN REQUIREMENTS @ 1.25 Ibs 021 Ib BODFToved 4.60 ibs 021 lb No,ddized AOR = 1.25 x 19,140 + 4.60 x 1,683 31,666 Ibs 021day 9.02 STD 02 REQUIREMENTS = AOR x------- ------ --- x 1.024(20'TMAX) a x ((i x C'„ - Co) a = 0.92 R = 0.97 Co = 2.0 CS,,,, at 28.0°C and 800 feet elevation = 7.48 mg/I 02 06129/04 CONFIDENTIAL page 2 CARROUSEL® A2C'm SYSTEM DESIGN CALCULATIONS 9.02 SOR= 31,666 x---------------------------------------- x 1.024120- 211.07 0.92x ( 0.97x 7.48 - 2.0 ) - 48,832 lbs O2/day 48,832 POWER REQUIRED =------------ 3.5 x 24 = 581 H P DENITRIFICATION CREDIT @ 2.86 Ibs 02/ lb NO3- N reduced Lbs NO3 - N reduced = (TKNin - TKNeff - Nawimilation — NO3-Nett) x Q x 8.34 Total (35 - 2.0 - 10.6 - 5.0) x 9.00x8.34 1,307 lbslday 02 CREDIT = 2.86 x (Ib NO3- N reduced) = 3,739 lbs 02/day 9.02 SOR CREDIT = 02 CREDIT x-------------------- x 1.024(21-111 ax(QxCSw-CO) = 5,766 Ibs 021day - 5,766 HORSEPOWER CREDIT =-- ------------ 3.5 x 24 = 69 HP 06/29/04 CONFIDENTIAL page 3 CARROUSEL® A2C"" SYSTEM DESIGN CALCULATIONS 1 1 1' 1 1 1 1 1 1 1 1 1 3. CARROUSEL BASIN LAYOUT NO. OF BASINS - 3 VOLUME PER BASIN = 2.222 M.G. 'AERATORS PER BASIN = 2 at 200 HP 'VFD-controlled single speed aerators are recommended 4. ANOXIC VOLUME SPECIFIC DENITRIFICATION RATE (SDNR) = 0.0452 gNO3-N/(gTSS*day) (IR/Q) Ib NO3- N .ed... d = INox — (Nreduced in Carrousel)] x ----- ----------- ----------- in Anoxic Basin (1 + (IR/Q) +(QR,s/Q)) 5.80 - (1,683 - 0) x —----- —--------- --------- (1 + 5.80 + 0.65) 1,311 Ibs/day ---------lb NO3Nredu ---ced --- ANOXIC VOLUME _ SDNR x MLSS x 8.34 1,311 ANOXIC VOLUME _ ----------------------------------- 0.0452 x 4, 000 x 8.34 - 0.869M.G. 06/29/04 CONFIDENTIAL page 4 CARROUSEL° A2C'N SYSTEM DESIGN CALCULATIONS 5. ANOXIC BASIN LAYOUT NO. OF ANOXIC BASINS = 3 VOLUME PER BASIN - 0.290 MG MIXERS PER BASIN = 1 at 7.7 HP 6. ANAEROBIC VOLUME HDTxQ ANAEROBIC VOLUME _ --- ---------- 24 2 x 9.00 ANAEROBIC VOLUME _--------- ---- 24 ANAEROBIC VOLUME - 0.750 M.G. 7. ANAEROBIC BASIN LAYOUT NO. OF ANAEROBIC TRAINS = 3 VOLUME PER TRAIN = 0.250 M.G. NO. OF ANAEROBIC BASINS = 6 MIXERS PER BASIN = 1 at 4.8 HP (HST in hours; Q in MGD) 06/29/04 CONFIDENTIAL page 5 WATERTE'CHNOLOG IES PLATE 2 THREE 100-FT cry CLARIFIERS OPERATING 6.0 MGD AVG 121.0 MGD PEAK; MAX RAS = 9.0 MGD SUMMARY OF CLARIFIER DESIGN Number of clarifiers operating Diameter, ft. Side water depth, ft. Average Design Flow (ADP), MGD Mechanism tvne C4 3 100 Biological Basin Vol 16 (MG) 5.02 6,00 SVl (mL/g) 200 -al Scraper Tarzet MLSS 4,000 O L'erating, Parameters Units, Average Flow Design RAS _ . Peak Flow . Design RAS Peak Flow Max RAS Flow Used In Evaluation MGD 6.00 21.00 21.00 RAS rate MGD 4.20 6.00 9.00 RAS rate %4ADF 70% 100% 150% Hydraulic loading gal/sf--day 255 892 892 Solids loading lb/sf-day 14.4 22.4 29.7 RAS solids g/l 9.7 10.5 9.3 Increase in sludge blanket ft - 4.5 3.6 Aeration MLSS lnwfl 4,000 2,345 2,805 50 45 y, 40 b w 35 m 30 25 s 20 b �I 15 75 U) 10 5 a Clarifier Operating Diagram 1 1 I Diameter _ 100 ft TOTAL RAS RAT: MGD %d1DF [] Avg Flow, HLR = 255 gallstld Clarilln Service = 3 EA , 12.13 202;6 i l 0 Peak Flow, HLR = 892 gailsfld Total Avg Flaw = 6.00 MG0 11 1774 Total Peak Flow = 21-00 MGD I - Numbers Next ToPoints Are MLSS Rated AdF = 6.00 MGD / ]9.42 157 baNres / I. 8.24 131! 7.07 118% / 2I05 I 5.a9 9s% 2644 2442' 4.71 79% /.46Q0 0 40p0i] 2189 a.53 59 40000•.-' .. '•. ' , ' �.•'' .40 O Q 1674. /•'l i.•''4000 I 2.36 i 39% h 4060 147 ' /_.:: ' •' .SAFE' i !.... I I 1.18 20% ... .... l=l i3n . ......"...� . 1 i �`•`.`:-".�r- -.-- J----------•---•,.,. I SVI-250 StJ9=2D0 0 2 4 6 8 10 17 11 15 18 20 22� Underflow FRAS Concentration (gl) Hickory NW, NC December 1, 2004 Recommendations For Clarifier Sizing Attachment -- Page 3 I v& PARKSON CORPORATION Hyc®r" ThickTech` Rotary arum Thickener Woven wire meshfor impressive water release High output solids content 98% plvs recovery of solids - w The Hycor ThickTechT" Rotary Drum Thickener shear floc tank, followed by dewatering with a (RDT) is a sludge. thickening system that is high performance rotary drum screen. setting new standards for volume reduction. The thickener commonly reduces sludges by Low Shear Flocculation 90% with a 98% capture rate. The ThickTech The ThickTech system is designed to achieve system is quite compact and requires less floor flocculation with a minimal amount of space than other thickeners. It is economical to expensive chemicals. The floc tank has operate with low horsepower and water tangential inlet and outlet openings to consum Lion maximize P flocculation The ThickTech RDT increases digester capacity, by reducing reduces hauling costs and can be used as a pre- shear from thickener to increase capacity of other turbulence. dewatering equipment. This design creates a The patented ThickTech system is performance proven for applications in municipal water and wastewater treatment plants, industrial facilities and pulp and paper milts. It is fabricated of stainless steel and engineered to provide years of reliable senice. The system utilizes a low gentle swirl that combines the sludge with the polymer. This swirling motion also increases the overall sludge detention time for floc development. A specially designed impeller maintains the swirl without breaking down the flocs. Staged Dewatering Through Screening Dewatering takes place along a multi -zone drum cylinder. The zones can i have different size mesh media to j augment 51� yk✓ 4R "': ;'r capture efficiency as the sludge moves along the length of the cylinder. Finer mesh is generally used in the feed end where material is thinner, while downstream zones have larger openings to enhance removal of water. Rings with adjustable ports control detention time in each zone. The result is high capture efficiencies — as much as 98% — without sacrificing high inlet flow rates. High capture efficiency alone can substantially reduce polymer usage. Model A B C kerGth width heigki we;9h RDT 25 78 32 38 1000 RDT-50 1 ] 1 42 61 1400 RDT 100 142 49 66 2500 RDT 150 166 49 66 3000 RDT-200 182 61 84 6500 RDT-300 206 61 84 7000 RDT-400 276 66 84 7500 All dimensions, in inches or pounds, are approximate and nor intended to take the place a` engineered specs. Operator friendly The ThickTech RDT was designed MLh ease of operation and maintenance in mind. Once the system is set, only periodic checks are required. If ever needed, the cylinder screens are easy to replace. A spray bar with a manually operated cleaning system runs the entire length of the cylinder. The orifices in the spray bar become progressively smaller to minimize rewetting the thickened sludge. The spray nozzles can be cleaned quickly by simply turning a handwheel. r tie rei]150M - why Thick7ech is Your best r ��tk •r �x choice quickly addr�l�,F up: law installed cost, high capture, simple operation, low polymer cost, low energy consumption and minimal water. A C s F7ordda Parkson Illinois Parkson Michigan AParkson A Corporate $62 Bunker Court 2001 waldort St. NW PARKSON CORPORATION 2727 NW 02na Street Vernon Hills 11. Suite 300 Fort Lauderdale FL 00001-1831 Grand Rapids MI www.parkson.com 333091721 P847.816.3700 49544.1437 Ro. Box 408399 F 847.810 3707 P 616.791,9100 Fort Lauderdale Fi. F 610.453.1833 AN AXELIMINSON INC. COMPANY 33340-8399 P 954.974.6610 F 954.974.0182 r B P Parkson Canada Parkson do Brasil Lida. 9045 Cote de-Uesse CalFada dos Mirtilos, 15 Suite 201 Baruert Sao Paulo Dorval CtC HOP 2W CEP 0453,000 Canada Brazil P 514.636.4o18 E°/F55.11.4195.5084 F 514. o3o, 9718 > Printed In the U.S.A. on Recycled Paper 02004, 2002, 1409 Parkson Corporation 1 /05 ENVIROQUIP, INC. 7404 Rutland Drive, Suite 200 -Austin, Texas 78758 AERATION EQUIPMENT (512) 834-6020 -fax: (512) 834-6039 February 24, 2005 David DePratter HSMM 145 N. Church Street #124 Spartanburg, SC 29306 Via E-mail: ddepratter@hsmm.com IRE: Hickory WWTP, North Carolina ' Dear David, Attached are design calculations and an equipment layout for the Hickory WWTP aerobic Idigesters. The tanks have been designed as we discussed with 2 unthickened tanks at 75' x 38and 2 thickened tanks at 36.5' x 38'. IA summary of the air requirements for these tanks is provided in table 9 of the design calculations. More than half the design air is used just to keep the unthickened tanks _ mixed. That evaluation is based on a typical state requirement of 30 scfiz�/kcf. In reality, we have seen tanks stay mixed at far less. Thus, if North Carolina will allow you to design at a lower value, I suggest designing the blowers at 20 scfm/kef (1,254 scf n per I tank) and/or providing redundant blowers at 50% so that only one blower can be operated for both tanks at low flows. In the thickened digesters I suggest tying the air supplies together so that air can be balanced between the two tanks. For both applications I suggest considering centrifugal blowers that can be throttled up and down from the ' design value of 1,414 scfm for additional flexibility. All blowers should be put on timers so that on/off operation can be used. The equipment shown in the attached layout to be supplied by Enviroquip includes: ' Digester #1 (unthickened): ♦ 60 1" TransMax Diffusers complete with orifice tee assembly, stainless steel drop pipes, and HDG steel supports ♦ 60 12" Polyethylene Shear Tubes complete with HDG steel supports ♦ Lot of air piping and fittings to supply air to the AirBearns, terminating 1' off the basin wall ♦ Three 8" butterfly valves (optional, may be changed to one 12" valve) to regulate airflow ♦ One Hallsten Aluminum Air Beam flat panel cover I♦ Field Service ♦ Freight 1 Page 1 ' ENVIROQUIP, INC. I- AERATION EQUIPMENT 2404 Rutland Drive, Suite 200 - ,4ustin, Texas 78758 (5 12) 834-6020 -fax: (512) 834-6039 ' Digester #2 (unthickened) ♦ 60 1" TranSMax Diffusers complete with orifice tee assembly, stainless steel drop pipes, and, HDG steel supports ♦ 60 12" Polyethylene Shear Tubes complete with HDG steel supports ♦ Lot of air piping and fittings to supply air to the AirBeams, terminating P off the basin wall ' ♦ Three 8" butterfly valves (optional, may be changed to one 12" valve) to regulate airflow ' ♦ One Hallsten Aluminum Air Beam flat panel cover ♦ Field Service ♦ Freight fDigester 43 (Thickened): ~ ♦ 80 1" TransMax Diffusers complete with orifice tee assembly, stainless steel drop pipes, and HDG steel supports ♦ 80 12" Polyethylene Shear Tubes complete with HDG steel supports ♦ Lot of air piping and fittings to supply air to the AirBeains, terminating 1off the basin wall ♦ One 12" butterfly valves to balance airflow between Digester #3 and #4 ♦ One Hallsten Aluminum Air Beam flat panel cover ' ♦ Field Service ♦ Freight ' Digester 44 (Thickened) ♦ 80 l" TransMax Diffusers complete with orifice tee assembly, stainless steel drop pipes, and HDG steel supports ♦ 80 12" Polyethylene Shear Tubes complete with HDG steel supports ♦ Lot of air piping and fittings to supply air to the AirBeanns, terminating P off the ' basin wall ♦ One 12" butterfly valves to balance airflow between Digester 43 and #4 ♦ One Hallsten Aluminum Air Beam flat panel cover ' ♦ Field Service ♦ Freight ' Best regards, Deborah Bohot Aeration / Aerobic Digestion Regional Applications Manager Enviroquip, Inc. Page 2 Enviroquip's PAD-M Process Design Proiect Description Project name: Hickory NE WWTP Project Location: IlickorT,NC Proposal Number: Owner: Engineer: MINIM Re resenlative: Alike Davis/Monte Ridenhour Design Date: February 23, 2005 lDesiQn�Sceita'rio �'y`:i '����'''• ~'De�ikb`a°',-Flow,,.. `"'"��= Plant Flow: 9.00 MGD Sludge Flow: 15,886 PPD Thickener Type: GB'r Table 1: WAS Profile PARAMETER UNIT NOTES Plant Fiow: 9.00 m d Plant Influent BOD: 0 m Studee Production: 0.00 Influent WAS Cone.: 1.00% Sludge Flow: 190,480 d 15.886 d Volatile Fraction: 0.75 Use 0.75 if Extended Aeration Process, 0.8 if Conventional Tablet: Design Parameters PARAMETER UNIT INOTES Minimum Temperature: 18 degrees C Maximum Temperature: 30 degrees C Unthickened SRT: 4.9 days Thickened SRT: 12.0 da s l SRT: 16.9 days Class B=(1.08^(20-T))*40 (Take 30% reduction if series operation) Class A= 10-20 days F2!� Table 3: Tank Dimensions TA,1K NAME U/DIA, feet WIDTH feet HEIGHT feet VOLUIIF Icubic feet Digester 1 - Unthickened 75.00 38.00 22.00 162,700 Digester 2 - Unthickened 75.00 38.00 22.00 62,700 UnEhickened Storage Volume: 1125,400 Digester 3 - Thickened 136.50 138A 22.00 130,514 Digester 4 - Thickened J36.50 138M 122.00 130,514 Thickened Storage Volume: 61,028 Total Volume 1186,428 Table 4: 'thickener Performance PARAMETER UNIT NOTES Influent WAS Conc.: 1,00% Influent WAS Flow: 190,480 gpd Winter Concentration: 5.00% Winter Flow Removed: 152.384 Ppd Winter Thickened Flow: 38,096 gpd Summer Concentration: 5.00% Summer Flow Removed: 152.384 gpd Summer Thickened Flow: 38,096 gpd Date Printed: 2/24/2005 1 Table 5A: Dif!estcr 1 Process Calculations PARAMMETER U`1'C EQUATION SRT: 2.46 days Total SRT * (Digester I Vol./Total Vol.) WAS Volatile Fraction: 0,75 WAS Volatile Solids: 11,915 ppd Volatile Fraction * WAS Sludge Flow WINTER: Min. Temp x SRT: 44.33 C-days ISRT * Min. Tem Min. Volatile Solids Red.: 6.821% r MOP 8 813 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Max. Digested Sludge: 15,073 ppd WAS SIudge Flow - WAS Volatile Solids Reduced Max. Digester Conc: 0.950/0 - Digested Sludge/Thickened Flow/834 SUMMER: Max. Ternx SAT: 173.89 C-days SRT * Min. Temp Max. Volatile Solids Red.: 1137% - per MOP 8 1354 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Min. Di ested Sludge: 14,532 ppd WAS Sludge Flow - WAS Volatile Solids Reduced Min, Digester Conc.; 0.91 % Digested Sludge/Thickened Flow/8.34 Ist Stage Volume Req'd: (Based on Min. 7'emp) 1468,996 62,700 of gallons (Digested Sludge * SRT) / Digester Conc. / 7.48 / 8,34 Table SB: Dicester 2 Process Calculations PARAMETER JUNIT 1EQUATION SRT: 2.46 days ITotal. SRT * (Digester 1 VoldTotal Vol,) WAS Volatile Fraction: 0.75 AIAS Volatile Solids: 11,915 ppd Ivoiatile Fraction * WAS Sludge FIow WLNI TER: Min. Tem x SRT: 44.33 C-days SRT * Min. Temp Min, Volatile Solids Red.: 6.82% er MOP 8 813 ppd WAS Volatile Solids * Volatile Solids Reduction Perccntate Max. Digested Sludge: 15.073 ppd WAS Sludge Flow - WAS Volatile Solids Reduced Max_ Digester Conc_: 0.95% - Digested StudgefMickened Flow/8.34 SUMMER: Max. Temp x SRT: 73.99 C-days SRT * Min. Temp Max. Volatile Solids Red.: 10.20% er AlOP 8 1,215 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Min. Digested Sludge: 14.671 ppd WAS Sludge Flow - WAS Volatile Solids Reduced Min. Digester Conc.: 0.92% Digested Sludge/Thicicened Flow/8.34 1st Stage Volume Req'd: 162,700 (Based on Min. Temp.) 1468,996 cf gallons (Digested Sludge * SRT) / Digester Conc. / T48 / 8.34 Data Printed: 2/2412005 2 1 Table 5C: Digester 3 Process Calculations PARAMETER I UNIT 1EQUATION SRT: J5.99 days Total SRT * (Di ester I VoL/fotal Vol. WAS Volatile Fraction 0.75 - WAS Volatile Solids: 111.915 ppd jVolatilc Fraction * WAS Sludge Flow WINTER: Min. Temp x SRT: 1107.S7 IC -days I SRT * Min. Temp Max. Volatile Solids Red.: 12.54% 1perMOP 8 1.494 Ippd WAS Volatile Solids' Volatile Solids Reduction Percentage Max. Digested Sludge: 13,580 Ippd WAS Sludge Flow - WAS Volatile Solids Reduced Max. Digester Cone.: 14.27% Divested Sludge/I'hicl<ened Flow/8.34 SUMMER: Max. Temp x SRT: 1179.79 C-days SRT * Min. Tern Max. Volatile Solids Red.: 112.900 erMOP 8 1,537 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Min. Digested Sludge: 13,134 ppd WAS Sludge Flow - WAS Volatile Solids Reduced Min. Digester Cone.: 4.13% Digested Sludgef[hickened Flow/8.34 1st Stage Volume Req'd: (Based on Alin. Temp) 30,514 228,245 Igallons cf (Digested Sludge * SRT) / Digester Cone. / 7.49 / 8.34 Table 5D: Digester 4 Process Calculations PARAMETER UNIT EQUATION SRT: 5.99 days Total SRT * (Digester I Vol./Total Vol.) WAS Volatile Fraction: 0.75 - WAS Volatile Solids: 11,915 ppd Volatile Fraction * WAS Sludge Flow WINTER: Min. Temp x SRT: 1107.87 C-days ISRT * Min, Temp Max. Volatile Solids Red.: 7.17% er MOP 8 855 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Max. Digested Sludge: 12.725 ppd WAS Sludge Flow - WAS Volatile Solids Reduced Max. Digester Conc.: 4.01 % Digested SludgeMickened Flow/8.34 SU.'1'111ER: Max. Temp x SRT: 1179.79 C-days SRT * Min. Temp Max. Volatile Solids Red.. 5.68% - per MOP 8 677 ppd WAS Volatile Solids * Volatile Solids Reduction Percentage Min. Digested Sludge: I2,457 e2d WAS Sludge Flow - WAS Volatile Solids Reduced Min. Digester Conc.: 3.92% Digested Sludge/Thickened Flow/8.34 Ist Stage Volume Req'd: (Based on dint Temp) 30,514 228.245 cf gallons (Digested Sludge * SRT) / Digester Cone. / 7.48 / 8.34 Date Printed: 2/2412005 3 able 6: Air Demands PARAMETER JUNIT I EQUATION/,NOTES Oxygen Requirement: LO.6,4::: lbs 02I lb Volatile Solids Reduced (Nitrification included) AOR/SOR 1per.40PISOR Table, below DicEsTER 1: Diffuser Submergence: 16 feet SRT * Min. Temp Viscosity Correction: 1.00 Poh mer thickened solids az#ustmenf Rimer OTE: 14.00% Winter Process Air: 716 scfm 11 scfm/kcf Summer OTE: 11.90% Assume 13% less than winter due to tem erature a eeu Summer Process Air: 1.404 scfm 22 scfm/lccf Min. Mixing Air: 1,254 scfm 20 scfmlkcf Max. Mixing Air: 1,881 scfm VCF * 30 scfnA-cf DIGESTER 2: Diffuser Submergence: 16 feet SRT * Min. Temp Viscosig, Correction: 1.00 Poh nwr thickened solids adjustment Winter OTE: 14.00% Winter Process Air: 710 scfm 11 scfm/kCf Summer OTE; 11.90% Assume 13% less than winter due ro lem erature e(Tacts Summer Process Air: 1-)60 scfm 20 scfm/kcf Min. Mixing Air: 1.254 scfm 20 scfm/kcf Max. Mixing Air; 1.891 scfm VCF * 30 scfm/kcf DIGESTER 3: Diffuser Submergence; 116 feet SRT * Min. Temp Viscosity Correction: 1.20 Polymer thickened solids adjusment Winter OTE: 14.00% Winter Process Air: 1,:580 scfm 52 scfm/kcf Summer OTE: 11.90% Assume 15% less than winter due to temperature effects Summer Process Air; 1,912 scfm 63 scfm/iccf Min. Mixing Air 915 scfm 30 scfin/kcf Max. Mixing Air: 1,099 scfm VCF * 30 scfm/Ircf DIGESTER 4: Diffuser Submergence: 16 feet SRT * Min. Temp Viscosity Correction: 1.06 Polymer thickened solids adjustment Winter OTE: 14.00% Winter Process Air: 170 scfm 6 scfrnikcf Summer OTE: 11.90% Assume 15% less than winter due to rem erature a fefels Summer Process Air: 743 scfm 24 scfhv cf Min. Mixing Air: 915 scfm 30 scfm/lxf Max. Mixing Air: 970 scfm VCF * 30 sef n&-ef Data Printed: 2/24/2005 4 Table 9: Air Flow Summary TALK \A\1R Process air Iserm Scfm/Kef Allin. Mixing lscfm Max. A4ixing lscfm !WINTER: Digester 1 716 11 1,254 1,881 Digester 2 716 11 1,254 1,881 Digester 3 1,580 52 915 1,099 Digester 4 170 6 915 970 Iota WinterfAtr SUMMER: Digester I 1.404 22 1,254 11881 Digester 2 1,260 20 1,254 1,981 Digester 3 1,912 63 915 1,099 Digester 4 743 24 915 970 Total nmme der � . 170m we Table 10. AOR/SOR Calculations Note: More than half the lotai air is just to keep these tanks mixed] This is yet another reason to reduce the unthickened storage R the owners are comfortable. In order to save operations or capital costs consider providing 3 blowers at 501/6 or, if NC regulations allow, consider designing the blowers at 20 scfmAccf. AOR/SOR = a ( it C,,,,e P -C } / C,,20 j x 1.024 au1 PARAMETER I IUNIT NOTES Water Tem erature: 25 Degrees C Minimum AOR/SOR at 25C Elevation: 500 ft msl Diffuser Submergence: 16.00 feet Site Pressure: 14.44 psia Standard Pressure: 114.70 psia P : 1.19 Ratio of barometric pressure at 50% submergence to Psite, accounting for oxygen depletion C : 2.00 mgA Dissolved oxygen concentration to be maintained in the wastewater C,,20: 9.09 mgA Oxygen saturation in clean water at 20C and 14.7 Asia C,,, : 8.24 mg/l Oxygen saturation in clean water at water temperature C,,u, : 8.09 mgA Oxygen saturation in clean water at water temperature and site altitude a (AI ha) : 0.72 Ration of OTE in wastewater to OTE in clean water 13 (Beta) : 10,95 Ratio of oxygen saturation in wastewater to oxygen saturation in clean water AOR/SOR: 0.640 Table I I: Operating Horsepower 'BLOWER NAME Air scfm lPressure psig AP (each) Redundancy # Blowers Notes Unthick. Blowers (Max. 3,762 8,00 176.9 2 Centrifugal Blowers for throttlingand with timers Thickened (flowers 1,414 8.00 6b.5 3 Centrifugal Blowers for throtding and with timers Dale Printed: 2/24/2005 5 r' J err Wallace & Tiernan Products 11SFilter r Wallace and Tieman 1901 Garden Rd, Vfneland, NJ 08360 Telephone: (856) 507-9000 Facsimile: (856) 507-4079 OSEC - On -site Sodium Hypochlorite Generation System PROJECT NAME: PROJECT LOCATION: PROPOSAL NUMBER: REVISION NUMBER: PROPOSAL DATE: OWNER: ENGINEER: SPECIFICATION SECTION: ADDENDUM NUMBER: ADDENDUM DATED: BID DATE: BID TIME: WT APPLICATIONS ENGINEER: WT SALES MANAGER: WT SALES REPRESENTATIVE: BUDGETARY PROPOSAL HICKORY, NC WWTP Hickory NC USA 252046 1 10/7/2005 City of Hickory, NC HSMM, Inc. None None None NIA N/A Tony Spadaccini Ron Bowman Heyward Incorporated - NC 2101-A Cambridge Beltway Drive Charlotte, NC 28273 Contact: Jim Cooper Tel: (704) 583-2305 Fax: (704) 583-2900 FOREWORD This PROPOSAL for the USFilter/Wailace and Tiernan OSEC on -site sodium hypochlorite generation system is prepared based on the design conditions provided by the addressee. The scope of supply is reflective of the equipment necessary to meet or exceed your disinfection requirements in a reliable, cost-effective way. Thank you for your expressed interest in our OSEC on-line disinfection system. We look forward to reviewing this information with you at your earliest convenience. Regards, 'Ron Bowman Regional Sales Manager USFilter Chem Feed and Disinfection Group ' Proposal 252045 Revision 1 Page 1 of 4 Wallace & Tiernan Products 1. OSEC SYSTEM FOR HICKORY NC WWTP 1.1 Design Conditions 1.1.1 Peak Chlorine demand: 500 ppd 1.12 Average Chlorine Demand: 225 ppd 1.1.3 Minimum Water Temperature_ 40 F 1.1.4 Maximum Water Temperature: 70 F 1.2 Proposed System 1.2.1 OSEC Electrolyzer model: 132-200-500 1.22 Electrolyzer capacity_ 500 ppd 1.2.3 Number of duty units: 1 124 Number of standby units: 1 1.2.5 Installed capacity: 1000 ppd 1.3 Scope of Supply USFilter I Wallace and Tiernan 1901 Garden Rd, Vineland, NJ 08360 Telephone: (856) 507-9000 Facsimile: (856) 507-4079 oty Description 1.3.1 OSEC Electrolyzer Equipment 2 OSEC 82-200 Electrolyzer Assembly with Two (2) 8" Acrylic Electrolytic Cells for a total capacity of 500 ppd. Footprint: 4'-2" x 2'-4" Corrosion resistant Epoxy -Coated Steel Frame consisting of the following pre -plumbed major components • Electrolyzer Cell Assemby(s) • Electrolyzer Electrolyte Level Switch • Electrolyzer Outlet & Inlet Temperature Sensor • Water & Brine Flow Meter with critical -flow proximity switch • Water Flow Control & Pressure Regulating Valve • Brine Inlet Back Pressure Valve • Valves for brine and water sampling • Valved connections for acid cleaning and draining of cell 2 DC Power Transformer/Rectifier, 460 Volt, 3 Ph, 60 Hz Input, 1700 Amps at 32 Volts 2 Lot of DC Power Busbar with end attachments and boot covers 2 Water Inlet, Diaphragm Type, 3/4" Soleniod Valve 1.3.2 OSEC System Control Panel 2 OSEC 62-200 System Control Panel, Allen Bradley SLC 5/03 with touchscreen HMI 1.3.3 Water Softener Equipment 2 Water Softener, Twin Tank Type for continuous operation (sized for Generation capacities up to 500 ppd) 1.3.6 Brine Saturator Equipment 1 Salt Saturator, 60-Ton capacity, with provision for loading from pneumatic tank delivery truck. Size. 12ft D x 15ft straight shell height. To include Plasta-Therm foam insulation & heat tracing to maintain a temperature 60F at a minimum ambient temperature of 5F, Binmaster salt solids indication, liquid level control tie down lugs (316 SIS), lifting channels (316 S/S), dust collection bag, 24• side & top manways, FRP ladder with safety cage, handrail around top dish and designed for Seismic Zone 1, 1.3.6 Brine Feed Equipment 2 Brine Pump, U_S.FilterNUallace & Tieman Chem -Ad D, 44 gph Diaphragm Metering Pump 2 Relief Valve 2 Calibration Column 2 Pulsation Dampener 1.3.7 Hydrogen Gas Dilution Equipment Proposal 252046 Revision 1 Page 2 of 4 _ -- — USFiNer 1 Wallace and Tiernan 1901 Garden Rd, Vineland, NJ 08360 Wallace & Tiernan Products Telephone: (856) 507.9000 Facsimile: (856) 507-4079 ' 2 Hydrogen Dilution Blowers, set of main and redundant, 500 scfm 1 HP each, for floor mounting alongside hypochlorite tank, including Orifice Plate Assembly, Hydrogen Flow Switch and Backflow Damper 2 Hydrogen Gas Detector 1.3.8 Hypochlorite Storage Equipment 2 Product Solution Tanks 8,000 gallon capacity units, FRP construction. Approximately 10' D x 14' H straight shell. Each tank includes Plasta-Therm foam insulation & heat tracing to maintain a temperature 60F at a minimum ambient temperature of 5F, tie down lugs (316 SIS), lifting channels (316 S/S), 24" top manway, liquid connections, two-(2) 6" D dilution air connections, FRP ladder with safety cage, handrail around top dish and designed for Seismic Zone 1. 2 Hypochlorite Storage Tank Ultrasonic Level Transmitter/Controller, Militronics MiniRanger 1.3.9 Hypochlorite Feed Equipment 3 Encore 700 Diaphragm Metering Pump, Size 6.5 Liquid End, 317 GPH capacity at 144 SPM, 45 PSIG max pressure, manual stroke control and 4-step pulley for expanded turndown, 1 HP TEFC Variable Speed DC Motor, mounting base 1 3 Product Meter Pump control panel, DC SCR Nema 4X fiberglass enclosure, 115VACl60hzl1 PH power input to enclosure, H-O-A stop start control, local -remote speed input selection, local speed control potentiometer with digital speed indication display, pump running and pump failure indication lights 3 1-112" PVC Pressure Relief Valve 3 1-112" PVC Back Pressure Valve 3 PVC Pulsation Dampener 3 Calibration Column w130 Sec. Drawdown @ Max.Pump Cap_ 1.3.10 Accessories 1 Acid Cleaning Kit, consisting of Acid 'tank, circulating pump, connecting hose and hardware for B150 thru B2-200 systems 1 OSEC Analytical Test Kit for determining Product Strength PROJECT City of Hickory NE WWTP T COMM NO 60492 M l ® 4 TITLE Disinfection ARCHITECTS ENGINEERS PLANNERS DATE 04/05/05 DES By KPB DEPT Environmental REV DATE CKD BY SKETCH SHEET NO. ]—OF 4 SODIUM HYPOCHLORITE DISINFECTION CALCULATIONS ' GIVEN: ' Q ava = 9 1V1GD Qpcak = = 30 MGD ' Minimum detention time (peak flow) = i peak = 15 minutes Minimum detention time (average flow) = t �,.� = 30 minutes FIND: Dimensions of contact chamber ' SOLUTION: Volume = V = Qt At peak flow, 3 0 x 10^6gal I day l hr of ' V ={ )x,( )x( )x( }x15min day 24hr 60min 7.48ga1 V = 41,778cf ' At average flow, 9 x 10^6ga1. 1day 1 hr cf V = ( )x( )x( )x( )x30min day 24hr 60 min 7.48gal V = 25,067c f Water depth = 10 feet ' Surface area = Volume 1 depth Surface Area = 41,778 cf / 10 feet = 4,178 sf ' Dimensions: 100 ft X 42 ft For redundancy, provide two chambers each 21 feet wide X 100 feet long (NCDENR requires dual chambers which can be isolated that can handle'/2 the total flow required) 1 HSA,16} Fours PrOG (Rev.07htt) P:WaswjsIFMms ProdConK*Paa *x PROJECT City of Hickory NE WWTP COMM NO HE 3 k MkTITLE Disinfection 60492 ARCHITECTS ENGMECRS PLANNERS DATE 04/05/C5 DES BY KP5 DEPT Environmentai REV DATE CKD BY SKETCH SHEET No. 2 OF 4 ' GIVEN: Q a,g = 9 MGD Qp`.; = 30 MGD SODIUM HYPOCIlimi rr,, DISINFECTION CALCIJI.ATIONS Target chlorine dose = 5 mg/L FIND: Pump requirements for 0.8 % NaOCI solution at peak flow and average flow. SOLUTION: The daily hypochlorite requirements (assuming a specific gravity of 1.14 and strength of 0.8 %) would be: Available chlorine (%) by weight = 0.8 %/ 1.14 = 0.70 % Sodium hypochlorite dosage (lb/gal) = (8.33 lb/gal) (0.007 availble chlorine)= 0.058 lb/ gal Required sodium hypochlorite dosage = gal / mil gall 5n?g nr^3 1kg 1000L 8.341b gal x x x x x L 10^3kg 10"6nig m^3 gal 0.0581b = 719 gal NaOCI / mill gal At peak flow, required NaOCI solution = (30 x 10^6gal) x ( 719gal } day 177illga/ = ? 11,570 gal NaOCI / day = 15 gpm of 0.8 '/o NaOCI At average flow, required NaOCI solution ( 9 x 10^6ga1 )x( 719ga1) day mil Ig al = 6,471 gal NaOCl/day = 5 gpm cif 0.8 % solution Need 1-2 day storage, so provide two tanks with 8,000 gallon capacitor. Provide three pumps ►vith 300 gph capacity. 1 HSWA Form Prod? (Rev C71d7) P.VAaslarslF ormslProd ConllC atcPad, doc PROJECT City of Hickory NE WWTP ^� COMM NO A LVA TITLE DeChiorination 60492 ARrKTECTS FNGINEERS PLANNERS DATE 04105/05 DES BY KP3 DEPT Envirc:nmr-,al 'REV DATE CKD BY SKETCH SHEET NO. 3 OF 4 GIVEN: IChlorine residual = 1 mg/L FIND: Dose of Sodium Bisulfite required to dechlorinate wastewater effluent 1 - SOLUTION: Theoretically, 1.46 mg/L of sodium bisulfite required to neutralize 1 mg/L of C12 As such, the sodium bisulfite dosage required is: I Theoretical Sodium bisulfate dose = lrrrg C12 x 1.46nig/ Lsodiumbisulfrle = 1.46 mg/L sodium bisulfite L ling I LC12 Under good mixing, 10 % extra dechlorination chemical is required above theoretical values. Sodium bisulfate dose (mg/L) — Theoretical 1.46 mg/ FIND: Pump requirements for 40 % sodium bisulfite required at peak L + 10 % = 1.61 mg/L sodium bisulfite ' flow and average flow SOLUTION: Dose Rate at Average Flow — 1.61rrrg x 8,341b/MG 9MG x = 121Lb 1 day L mg / L day At 121 1bs/day and a 40 to 100 ratio, the solution volume per min. is calculated as follows: 1001bm,ater xlvater 40ilbssodiumbisrrlfite 121lbssndiumbisuffite 302.5 Ibs water = x 302.51bs x gal = 3 .s `6 gal �vaterf 121 Ibs sodium bisulfite 1 8.34lb 36gcr1 x 3785rnL x clay =95mL/min of a 40% solution to dechlorinate I mg/L C12 at 9 MGD dcry gal 1440 min HS64d Form Prod? tRey. 07101) P:thlastersTormsTradContYCalsPad,doc 1 PROJECT City of Hickory NE WWTP COMM NO 60492 717LE DeChlorination ' ARCMITLCTs ENC,]r.FERS PLANNERS DATE 04/C5ICS DES BY KPB DEPT E mironmental REV DATE CKD BY SKETCH SHEET NO. 4 OF 4 Dose Rate at Average flow = 1.61 mg x 8.341b / .rllfG x 30MG _ 403 Lb / day L mg / L clay At 403 lbs/day and a 40 to 100 ratio, the solution volume per min. is calculated as Vollows: 1001bs► ,aler xwaler 40ilbssodiumbisu file 4031bssodiumbisulftle 1008Lbs water = x 1008lbs x gal = 121 gal water/403Lbs sodium bisulfite 1 8.3411)s b 121gal 3783mL day _ der}, x gal x1440min —317mLImin of a 40% solution to dechlorinate 1 mg/L C12 at 30 MGD FIND: ' Minimum contact basin requirements SOLUTION: A minimum of 30 seconds for mixing and contact time shall be provided at the design peak hourly flow ' 30 x 10^6gal lclay lhr cf I min V=( )x( )x( )x( )x30secx( ) clay 24hr 60min 7.48gal 60sec V = 1392cf ' Area V / D Where D = Depth = 8 feet Area = A = 1392sf 174 sf g.f Length = 17 ft Width = 10 feet IHSMM Form PrOV (Rev.001( P:Sh mMrsiForms4ProdCortCatPad.doc APPENDIX H I SLUDGE PRODUCTION CALCULATIONS CARROUSEL® A'C SYSTEM DESIGN CALCULATIONS for Hickory, North Carolina WWTP A. DESIGN CONDITIONS AVERAGE FLOW(MGD)............................................................................. 6.00 DESIGN130D (mg/1)...................................................................................... 265 DESIGN TSS(ing/1)...............................................................I..................1.1.. 320 DESIGN T'KN{mg/l)........................................................................................ 35 DESIGN T'P (mg/1)............................................................................................ 7 EFFLUENT BOD (mg/1).................................................................................. 10 EFFLUENTTSS (mg/1).................................................................................... 15 Ef FLUENTNH3-N (mg/1)............................................................................... 1.0 EFFLUENT NO3-N (mg/1)............................................................................... 5.0 EFFLUENTTKN (mWI).................................................................................. 2.0 EFFLUENT TP (mg/1)................... * * Chemical polishing may be required 13. DESIGN ASSUMPTIONS PROCESS SRT (Nitrification) (days).............................................................. 14.0 MINIMUM WASTEWATER TEMP.(aC)..................................................... 15.0 MAXIMUM WASTEWATER TEMP.(aC).................................................... 28.0 MLSS CONCENTRATION (ing/1)................................................................ 4,000 NET YIELD (lb T'SS / lb BODrelnavc i)...................................................... 1..... 0.83 OXYGEN COEFFICIENT (lb Oz / lb BODnmov,j).......................................... 1.25 (Ib OZ / lb Nax;aim+)................................................. 4.60 ALPHA(a)...................................................................................................... 0.92 BETA(0)......................................................................................................... 0.97 ELEVATION(R.)............................................................................................ 800 C. DESIGN CALCULATIONS 1. AERATION VOLUMF, BOD REMOVAL = Q x (BODi — BODe) x 8.34 = 6.00 x (265-10) x 8.34 = 12,760 Ibs BOD/day SLUDGE PRODUCTION = Y x Q x (BODi BODe) x 8.34 = 0.83 x 6.00 x (265-10) x 8.34 = 10,591 Ibs TSS/day APPENDIX I SYSTEM -WIDE WASTEWATER COLLECTION SYSTEM PERMIT ,d;r.-^�•�-.,,RQ ap�r ��� ivl'aciraa! F. Easley, Governor William G. Ross IT., Secretary jti= I North Carolina Department of l avircrimcnt and Natural Resources ecnn Klimek, P-E., Director CoteCn H.. S Sullins, Deputy Director -Division of Water Quahty ID Fr j December 4, 2003, Gary McGee,, City ManageDEC 2 ° 2003r ' City of Hickory PO.Box 398 r,;ltY C,� WD..ORY i Hickory, NC 28603 CITY p!APiA.[; ,�5 l <:i;Cf __ Subject: Porinit No. WQCS00020 City of Hickory Wastewater Collection System Catawba County ' Dear vlr. McGee In accordance with your application received on August 15, 2001, as well as the additional inforination received on August 29, 2003, September 29, 2003 ,;6id November 18, 2003, we are forwarding herewith Permit ' No. WQCS00020, dated November 30, 2003, to the City of Hickory for the operation and maintenance of the subject wastewater collection system. ' This permit shall be effective from the date of issuance until November 30, 2008. This permit shall be subject to the conditions and linutations specified herein. It is your responsibility to thoroughly review this permit. Please pay particular attention to the monitoring and reporting requirements in this permit and any compliance schedules shown in bold. The Division eliminated the 1999 point system used to determine enforcement options for sanitary sewer overflows in October 2003. The evaluation of enforcement options after a sanitary sewer overflow will be determined considering the criteria listed in condition 1(2)(a) and I(2)(b) of the permit. Compliance with all conditions of the pernut as well as all statutes and regulations pertaining to the collection system mast be ' maintained or appropriate enforcement actions may be taken as notes! in Condition VI(')). A reportable SSO is a SSO greater than 1,000 gallons to the ground or a SSO of any amount that reaches surface water (including through ditches, storul drains, etc,) Below is the procedure to use foi- reporting SSOs to ' the Division: a) Report by telephone to a person (not facsimile or voicemail) to your regional DWQ office during ' regular business hours (Monday to Friday, 8AN1 to 5PM) as soon as possible, but in no case more than 24 hours after the SSO is known or discovered. To report outside of regular business hours, call (800) 858-0368. ' b) follow up the verbal report by sending a completed written report can the most current Division approved fDrm within five days. Non-DischarWe Permitting Unit Internet htq,a/h?o.enrst;tte nc.u51ncipu i'•a_'�IrCi':-. 1017,M;iil Service Ccrucr. Raleigh. NC 27691.1-1617 "]'c lcpliune (919)733-50,:3 Fnx (1)19) 715-rjO.48 DEVR Cusurmer Service Center 'I•clephone I SOG 623-774$ ' An Egnah Opporronir; Anon Employer 5017 rucycicd/ I OF,, post -consumer Impc:r To provide a uniform method for all systems covered under this permit and to provide useful and consistent information pertaining to SSOs, a new spill reporting form has been developed (October 2003). Form CS-SSO consists of two_,pat-ts. Part I serves to provide to the Division the required information that has always been necessary. Part 11 serves as an area to provide a justification for the spill, as -optional under Condition 1(2) of ' your permit, Fomt-CS-SSO'can be downloaded from http://h2o.6nr.state.nc.Lis/ndceu/ from the Collection- Systems area. ' An NOV, civil penalty, and/or a moratorium on the addition of waste to the system may be issued'if adequate justification. for an SSO is NOT submitted to the regional office. in order to submit a claim for justification of an SSO,.,you must use the Form CS-SSO with additional documentation as necessary, DWQ staff ' will review the justification claim and determine if enforcement action is appropriate. Please be advised that the information needed to justify a spill is very comprehensive. Begin using this form immediately to report SSOs from the collection system. Continue 0 use our old form for reporting bypasses at the wastewater treatment plant ' until further notice. The time frame for submittal of both Part I and Part II, if pertinent, is five days. The Permittee has conducted a Management, Operation and Maintenance audit for the Environmental Protection Agency's (EPA) Region IV POTW INIOM program. The audit was submitted to the EPA in the year 2000. The audit did not rK,-veal any deficiencies in the collection system operation and maintenance that would be covered under this permit. 1 Failure to abide by the conditions in this permit may subject the Permittee to enforcement action. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty days following the receipt of this permit- This request must ' be in the form of a written petition, conforming to Chapter.150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. 1 If you have questions regarding compliance contact your regional office or the Non -Di sch rge Compliance and Enforcement Unit of the North Carolina Division of Water Quality at (919) 733-5083. If you need additional information concerning this permit, please contact Marie Doklovic in the Non -Discharge Permitting Unit at (919) ' 733-5083 extension 371. S incerel v ' Alan W_ Klimek, P.E. ' cc: Catawba County Health Department Nevin Greer, PE. City of Hickory Shawn Pennell. City of Hickory John Harkins, Region IV EPA (wnter � mg.emcnt Division Enforcement branch, 61 Forsyth Street, Atlanta. GA 30303-8960) Barbara Sifford, iVlooresville Regional Office, Water Quality Section Technical Assistance and Certification Unit ' Water Quality Central Files 1,iDPU files (VVQCS00020) 10/03 NOIZT14 CAROLINA ENVIRONNIENTAL N'IANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH SYS'1'ENI-WIDE WASTEWATER COLLECTION SYSTEM PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PER11r11SSION IS HEREBY GRANTED TO City of Hickory Catawba County ' FOR TF E operation and maintenance of a wastewater collection system consisting of, at the time of permit issuance, approximately 465 miles of gravity sewer, approximately 1.3 miles of pressure sewer, approximately 13.9 Fzriles of force riiain, 32 simplex pump stations that discharge ton pressure sewer and serve a single building, :.. 51 duplex pump stations, and all associated piping, valves, and appurtenances required to make a complete • and operational wastewater collection system to serve the City of Hickory, any deemed permitted satellite - communities and the tributary wastewater collection systems serving Burke County and the Town of Longview that are themselves subject to an individual collection system permit, pursuant to the application received on August 15, 2001, and in conformity with the documents referenced therein and other supporting ' data subsequently Filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall he effective from the date of issuance until November 30, 2008 and shall be Subject to the following specified conditions and. limitations: L PERFORNIANCE STANDARDS 1. The sewage and wastewater collected by this system shall be treated in one of the following wastewater treatment plants-. City of Hickory Northeast (NC0020401); City of Hickory Henry Fork (NC0040797); City of Conover Northeast (NC0024252) or City of Newton (NC0036196) prior to being disposed into their respective receiving stream_ This collection system permit will be 1 referenced upon renewal or modification of your NPI)ES perrnit(s). 2. The wistewater collection system shall be effectively managed, mainLoned and operated at all ' times so that there is no discharge to land or surface waters, nor any contamination of groundwater. In the event that the wastewater collection system fails to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective actions, including actions that may be required by the Division of Water duality (Division), such us the construction of additional or replaceniciii sewer lines and/o► equipnter�t. 1 10/03 The Director may take enforcement action against the Pem-Littee for sanitary sewer system discharges that must be reported to the Division as stipulated in Condition IW(2). This includes discharges that were caused by severe natural conditions or exceptional events unless the Permittee demonstrates through properly signed, contemporaneous operating logs, or other relevant evidence that: a. The discharge was caused *by severe natural conditions; there were no feasible alternatives to the -discharge,' such as the use • of auxiliary - treatment facilities, ieteniidh of `tintreated ' wastewater, reduction of inflow and infiltration, use of adequate back-up equipment, or an increase in the capacity of the system. This provision is not satisfied if, in the exercise of reasonable engineering judgment, the Permittee should have installed auxiliary or additional ' collection system components, wastewater retention or treatment facilities, adequate back-up equipment or should have reduced inflow and infiltration; or b. the discharge was exceptional, unintentional, temporary and caused by factors beyond the ' reasonable control of the Pertnittee; the discharge could not have been prevented by the exercise of reasonable control, such as proper management, operation and maintenance; adequate treatment facilities or collection system facilities or components (e.g., adequately enlarging treatment or collection facilities to accommodate growth or adequately controlling and preventing infiltration and inflow); preventive maintenance; or installation of adequate brick -up equipment; The Permittee can submit a claim to the Division Regional Office that the discharge meets' the criteria of this condition. The Permittee has the option of submitting this claim along with the spill report .required by Condition IV(2) (i.e., within five clays) in order to be considered for immunity ' from enforcement action. Form CS-SSO Part II, or most current Division approved 'forin, shall be used for any claims. The Permittee has the burden of proof that the above criteria have been met_ 'The following location has documented hydraulic capacity problems and has the potential to result in a sanitary sewer overflow (SSO). The Permittee currently has active plans in place to correct the problem at the NEWWTP lift station (outside the plant) with the required completion dates shown in parentheses. a. Environmental Assessment/201 Study (June 30, 2004) b. Engineering/Planning (.June 30, 2005) c.. begin Construction (July 31, 2003) d. End Construction (,Tune 30, 2006) 11' a capacity -related SSO occurs at the above location before construction is completed, ' enforcement actions shall not be taken by the Division against the Permittee for violating this condition. This relates to capacity -related SSOs only, and in no way absolves the Permittee from responsibility for discharges that were preventable, including but not limited to SSOs missed by grease, roots, etc. This exemption shall be valid for this condition only and shall be effective from the date of this permit's issuance until the correction Completion date listed above oractual construction completion date, if before the estimated completion (late. The Pertnittee shall notify the LN'looresville Regional Office Division of Waiter (duality within Lett days of each compliance date shown above. This written notification shall indicate compliance or nort-compliance therein. ' 3. The Permittee shall have the legal authority to .implement the requirements of Condition I(4); require new sewers be properly constructed; ensure proper inspection and testing of sewers and laterals; and address flows from satellite systems. 4. The .Pertnittee small maintain an educational and enforcement program that requires the proper operation and m.iirnenance of all grease traps land septic tanks connected to the wastewater collection systc1n. The educational larogram should target both residential find commercial users. 2 ! 0/03 'The _1['errnittee shall implement a residential education program by ,January 1, 2004. The Mooresville Regional Office Division of Water Quality shall be notified in writing when this compliance schedule is met. 5. The Permittee shall implement a Capital Improvement Plan (CIP) to designate funding for reinvestment into the wastewater collection system infrastructure. The CIP should address the ' short-term needs and -long-term "master plan":concepts: The CIP should typically cover a three to five -year -period and include a goal statement, description -of the project area, description of the existing facilities, known deficiencies (over a reasonable period) and forecasted future needs. Cost analysis is integral to the CIR G. Existing overflow piping from manholes and pump stations, excluding piping to approved ' equalization structures, known or discovered after perrnit issuance shall be immediately removed or permanently capped. .Plugged emergency pumping connections are allowable for portable pumping or rerouting witlidut intentionally bypassing the wastewater treatment facility. 7. The Permittee shall maintain a contingency plan for pump failure at each pump station. If one of the pumps in a pump station containing multiple pumps fails, the process of repairing or replacing ' the pump shall be initiated immediately and the new parts or pump s11211 be installed as soon as possible. If the pump in a simplex pump station fails, it shall be replaced immediately. 8. Each pump station shall be clearly and conspicuously posted with a pump station identifier and an emergency contact telephone number at which an individual who can initiate or perform emergency service for the wastewater collection system 24 hours per day, seven days per week can be contacted. This emergency contact telephone number shall be coupled with instructions for ' anyone to call- if the visual •alarrn illuminates,, if the audible alarm sounds, or if an emergency is apparent. ' y The Permittee shall post the audible/visual alarms at the following stations in a conspicuous location by December 31, 2003.' ' Moose Club Harris 'Teeter Snow Creek Shuford #1 Catawba Springs The Mooresville Regional Office Division of Water Quality shall be notified in writing when this compliance condition is met. 9. Pump station sites, equipment and components shall have restricted access, per 15A NCAC 2H ' .0219(h)(7). 10. Pump stations that do not employ an automatic polling feature (i.e. routine contact with pump ' stations from a central location to check operational status of the Corr7munteatron system) shall have both audible and visual high water alarms.. The alarms shall be weather-proof and placed in a clear and conspicuous location. Permits issued for the construction of pump stations that included high- water alarms in the description must maintain the alarms even if simple telemetry (i.e. notification of an alarm condition initiated by the pump station control feature) is installed. ' 11. For all newly constructed, modified and rchabilitatUl pump stations, equipment and components located within the primp station shall be corrosion -resistant and components in close proximity of the pump statior, slTall be sealed within a corrosion -resistant coating or encasement. 12. All construction and rehabilitation of the wastewater collection system (i.e., permitted or deutned permitted) shall be scheduled to minimize the interruption of service by the existing utilities. Construction and rehabilitation shall not result in the violation of Condition 1.2. of this permit. ' 10/03 1 [I. OPERATION AND MAINTENANCE RE UIREIIIENTS ' 1. Upon classification of the collection system by the Water Pollution Control System Operators Certification Commission (WPCSOCC), the Pennittee shall designate and employ a certified operator to be in responsible charge (ORC) and one or mote certified operator(s) to be back-up ORC(s) of the facilities in accordance with 15A NCAC SG _0201. The ORC shall visit the system within 24 hours of knowledge of a bypass, spill, or overflow -of wastewatei froril the system, unless visited by the .Back -Up ORC, and shall comply with all'bther colidi.fions-of 15A NCAC 8G ' 0204. 2. The Permittee shall develop and maintain a schedule for reviewing all inspection, maintenance, operational and complaint logs. Once recurring problems are identified in the wastewater collection system because of the review process, the Pernuttec shall establish a plan for addressing the problems) if they can not be resolved in a short time period. The Permittee shall define and adhere to a review period. 3. The Pernittee shall develop and maintain a schedule for testing emergency and standby equipment. 4. The Permittee shall develop and conduct a routine pump station inspection and maintenance program, which shall include, but not be bruited to, the following maintenance activities: a. Cleaning and removing debris from the pump station structure, outside perimeter, and wet well; b. Inspecting and exercising all valves; ' c. Inspecting and lubricating pumps and other mechanical equipment according to the rnanufacturer's recommendations; and d_ Verifying the proper operation of the alarms, telemetry system and auxiliary equipment. a5. For each pump station without pump reliability (i.e. simplex pump stations serving more than a single building or pump stations not capable of pumping at a rate of 2.5 times the average daily ' flow rate with the largest pump out of service), at least one fully operational spare pump capable of pumping peak flow sliall be maintained on hand. ' G. The Pennittee shall maintain on hand at least two percent of the number of pumps installed, but no less than two pumps, that discharge to a pressttre sewer and serve a single building, unless the Permittee has the Ability to purchase and install a replacement pump within 24 hours of first knowledge of the simplex pump failure or within the storage capacity provided in any sewer line extension permit. 7. Rights -of -way and/or easements shall be ,property maintained to allow accessibility to the ' wastewater collection system. S. The Permittee shall assess cleaning needs and develop and maintain a program for appropriately ' cleaning, whether by hydraulic or mechanical methods, all sewer lines_ At least 10 percent of the wastewater collection system, selected at the discretion of the ORC, shall be cleaned each year. Preventative cleaning is not required for sewer lines less than five years old unless inspection ' otherwise reveals a necessity or as required by a sewer line extension permit. 9. Adequate measures shall be taken to contain and properly dispose of Sanitary Sewer Overflows (SSOs) and spills. The Permittee shall maintain a Response Action Plan that addresses the following minimum items: 4 t 0/0-) a. Contact phone numbers for 24-hour response, including weekends and holidays; b. Response tine; c. Equipment list and spare parts inventory; d. Access to cleaning equipment; e. .Access to construction crews, contractors and/or engineers; f. Source(s) of emergency funds; g. Site sanitation and clean up materials; and h. Post-overflow/spill assessment. 10. The Permittee shall conduct an on -site evaluation for all SSOs and spills as soon as possible, but no more than two hours after first knowledge of the overflow and/or spill. 11. In the event of it discharge from or blockage within the wastewater collection system, the Permittee shall restore the system operation, remove visible solids and paper, sanitize any ground area and restore the surroundings. RECORDS Records shall be maintained to document compliance with Conditions I(4),' II(2) - I1(4), 11(7) - II($), IV(3) and V(1) -V(4). Records shall be kept on file for a minimum of three years. 2. The Permittee shall maintain adequate records pertaining to SSOs, spills, and complaints for a minimum of three years. "These records shall include, but are not limited to, the following information: a. Date of overflow and/or spill or complaint; b.- Volume of wastewater discharged as a result of the overflow and/or, spill or nature of complaint; c. Location of overflow and/or spill or complaint; d. Estimated duration of the overflow and/or spill; e. Individual from the Division who was informed about the overflow and/or spill or complaint, when applicable; f. Final destination of the overflow and/or spill; g, Corrective actions; h. Known environmental/human health Impacts resulting from the overflow and/or spill; and i. How the overflow and/or spill was discovered. 3. The Permittee shall ma;ntam an up-to-date, accurate, comprehensive map of their wastewater collection system that also notes the locations where other wastewater collection systems become tributary. If a comprehensive snap of the collection system has not been established, a rough sketch shall be drawn. The Permittee shall map approximately 10 percent of their collection system each year for the next ten years, or until complete, whichever is sooner-. The comprehensive map shall include, but is riot limited to: pipe size, pipe material, pipe location, flow direction, approximate pipe age, number of active service taps. and each pump station identification, location and capacity. 4. The Pcrmittee shall maintain records of all of the modifications and extensions to the collection system permitted herein. The Permittee shall maintain a copy of the construction record drawings and specifications for modifications/extensions to the wastewater collection system for the life of the modification/extension. Information concerning the extension shall be incorporated into the map of the wastewater collection system within one year of the completion of construction. The System description contained within this permit shall be updated to include this modification/extension information upon permit renewal. 5 10103 /' { T . IV. MONITORING AND REPORTING REOUIREt1IENTS 1. Any monitoring (including, but not necessarily limited to, wastewater flow, groundwater, surface water, soil or plant tissue analyses) deemed necessary by the Division to ensure surface water and groundwater protection will be established, and an acceptable sampling and reporting schedule ' shall be followed. 2. The Permittee shall verbally report to a person at 'the Mooresville Regibnal' Office, at'telephone number 704-663-1699 as soon as possible, but in no case more than 24 hours following the occurrence or fast knowledge of the occurrence of either of the following: a. Any SSO and/or spillover 1,000 gallons; or b. Any SSO and/or spill, regardless of volume, that reaches surface water. Voice snail messages or faxed information is permissible but this shall not be considered as the ' initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the -Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing ' Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Per Condition 1(2), Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 3. The Permittee shall meet the annual reporting and notification requirements provided in North ' Carolina General Statute §143-215.IC. V. INSPECTIONS ' .1. The Permittee or the Permittee's designee shall inspect the wastewater collection system regularly to prevent malfunctions and deterioration, operator errors, and discharges that may cause or lead to the release of wastes to the environment, threaten human health or create nuisance conditions. The Permittee shall keep an inspection log or summary including at least the date and time of inspection, observations made, and any maintenance, repairs, or corrective actions taken by the ' Permittee. 2. Pump stations without Supervisory Control and Data Acquisition (SCADA) systems or telemetry shall be inspected. everyday (i.e. 365 days per year). Pump stations equipped with SCADA systems or telemetry shall be inspected at least once per week. 3. A general observation of the entire collection system shall be performed throughout the course of ' every year, 4. inspections of all high priority lines (i.e_ aerial line, sub --waterway crossing, line contacting surface waters, siphon, line positioned parallel to stream banks that are subject to eroding in such a manner that may threaten the sewer fide, or line designated as high -priority in a permit) shall be performed at least once per every six month period of time. A list of high -priority lines is presented as Attachment A and is hereby incorporated into this permit condition_ New high priority lines installed or identified after permit issuance are incorporated by reference and Subject to this permit condition until permit renewal where they shall be referenced in writing in Attachment A. 6 10io I VC. GENERAL CONDITIONS ' 1. This permit shall become voidable unless the wastewater collection system is maintained and operated in accordance with the conditions of this permit and other supporting data. 2. This permit is not transferable. In the event there is a desire for the wastewater, collection system to change ownership, or there is a name change of the Perrnittee, a formal permit request shall be submitted to the Division. The request shall. be accompanied by•documentation from',the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 3. Failure to abide by the conditions and limitations contained in this permit inay subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C, and a sewer moratorium may be established. 4. The issuance of this permit does not exempt the Permittee from complying with any and all statutes, rules; regulations, or ordinances that may be imposed by other government agencies (i.e., local, state, and federal) having jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, soil erosion and sedimentation control requirements in 15A NCAC Chapter 4 and under the Division's General Permit NCGO10000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 21-I .0500and all applicable North Carolina Occupational Safety and Health Act health and safety standards. 5. The issuance of this permit does not prohibit the Division from reopening and modifying the permit, revoking and reissuing the permit or terminating the permit as allowed by .the laws, rules, and regulations contained in 15A NCAC 2H .0200 and North Carolina General Statute §143-215.I et. al., or as needed to address changes in federal regulations with respect to the wastewater collection system. 6. ,The Permittee shall pay'the annual fee within thirty (30) days after being billed by the Division. Failure to pay the fee accordingly may cause the Division to initiate action to revoke this permit ' as specified by 15A NCAC 2H .0205(c)(4). 7. The Permittee shall request its renewal at least six months prior to the expiration of this permit. ' Upon receipt of the request, the Conunission will review the adequacy of the wastewater collection system described therein, and if warranted, will extend the permit fora period of time and under such conditions and limitations, as the Commission may deem appropriate. The Permittee shall notify the Division's Non -Discharge Permitting Unit in writin& at 1617 Mail Service Center, Raleigh, North Carolina 27699-16.17 of any changes to the name and/or address of the responsible party (i.e. mayor, city/town manager) of the wastewater collection system. 9. Any duly authorized officer, employee, or representative of the Division may, upon presentation of credentials, enter and inspect any property, premises or place on or related to the collection system at any reasonable time for the purpose of determining compliance with this permit, may inspect or copy any records that must be maintained under the terms and conditions of this permit, and may obtain samples of wastewater, groundwater, surface water, soil, or plant tissue. 10. This permit shall become voidable unless the agreement between the City of Hickory and the City of Newton and also between the City of Hickory and the City of Conover for the collection and final treatment of a portion of wastewater is in full force and effect. 10/03 Permit issued this the 4'h day of Deccrnber, 2003 NORTH C OLI1vA E VIRONNfENTAL MANAGEMENT CONIMISSION Alan W. Klimek, P.E., Director Division of Watez Quality By Authority of the Environmental Management Commission Permit Number WQCS00020 9 10/03 APPENDIX III Attached for Condition V (4) Permit No. WQCS00020 City of Hickory LINES CROSSING SURFACE N'VATERS CC Creek -Crossing BC Bridge Crossing DC Direct contact with surface water UC Under Creek CC Section House Road Webb Murray School 3 crossings CC Section House Road Flow Meter CC 10 Ave Ct NW --- 2 crossings CC Old Lenoir Road behind Mel's CC Old Lenoir Road behind River Run CC Behind CIyde Campbell School BC Horscford Creek Force Main BC 321 Force Main DC 127 Force Main CC Appalacian Hardwood Floor — 2 crossings CC Longview Sewer Plant CC 1-40 behind Ward Hosiery — 3 crossings CC The Pines I CC The Pines II CC The Pines 111 CC 61h St NW & 9`h Ave NW — 2 crossings CC Oakwood Cemetery — 2 crossings CC 15`h St SE & Tate Blvd CC 15`h St SE & North of 4"' Ave SE CC Behind K-Mart CC Catawba Cemetery & H A y 70 SE CC Compost Plant 3 crossings CC 600 Block of 12`" Ave NE CC 8"' Ave NE & College Park School — 3 crossings CC 15`' Ave NW & 10"' St P1 NW CC NE WWTP — 3 crossings CC Moore's Ferry #I Lift Station CC Shuford # 1 Lift Station CC Moose Club Lift Station CC CVCC Maintenance Building CC Valley Crossing Lift Station UC Shuford #1 Lift Station Force Main UC Valley Crossing Lift Station Force Main CC 161h Street Lift Station CC 12`h Ave NE behind Public Works DC Falling Creek CC Brookford Faith Church of Christ UC Mostellar Estate over Muddy Creek CC Windsong Subdivision at Bridge CC Stonebrook Subdivision over Barger Branch CC Brookford at Century Furniture CC Zion Church Road at Wallace Dairy Road CC Frye Creek at Woodland Park Apartments CC Clark Creek at Sweetwater Lift Station CC 14'h Ave SE at The farm Apartment Complex CC 4`h St Dr NW at Oakwood Cemetery and YMCA CC Eastside Thoroughfare at Rock Quarry at Duke Power Right of Way CC Rock Quarry at 19`h St Pl SE CC Clark Creek at I-40 East Ramp CC SOPPS property at McDonald Parkway CC CIark Creek at DT Golf Driving Range CC Frye Creek at Extreme Motor Cycles/IFH CC Frye Creek at Synthetic Hosiery CC Falling Creek at Old Mill Landing Rock Falls HIGH PRIORITY LINES NEAR STREAM BANKS 1. Section House Outfall from Meridian Park to Section House Road parallel to Lyle Creek 2. Health services line parallel to Millers Branch frorn 11'h St Dr SE to Tate Blvd 3. Horseford Creek Outfall from Geitner Road to Hilton Park 4. Cripple Creek Outfall from 61h St PI NW to Magnolia Grove Townhomes V�rhere Business aid °�as�,c: Gra.v �og��ner a1 Public Utilities Tune 27, 2005 Ms. Marie Doklovic, PE NC DENR —Division of Water Quality Non -Discharge Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 F6 2005 SUBJECT: City of Hickory Collection System 'Permit WQCS00020 Dear Ms. Doklovic: Post Offr-e Box .7.'a Hickory, NC Zl MM98 Phone: (M).3a7427 Far- (M)M-7403 etr�: kgrthiekory�s The purpose of this correspondence is to request an extension to the time table on a compliance schedule as stipulated in the above referenced collection system permit. The Northeast WWTF Influent Pump Station was placed on a compliance schedule to be designed by .tune 30, 2005, which has been completed; and permitted and uB.der construction by Judy 31, 2005. Hayes, Seat', Mattern and Mattern Engineers, Jmc., is the consultant preparing the design of the NE WWTF lift station and plant upgrades as well as the Environmental Assessment and 201 Facilities Plan. The E.-k and 201 Facilities Plan have been submitted to the NC DENR Construction Grants and Loan Group who have pending approval awaiting final comments from our consultants on some questions on the 201 facilities Plan. Due to the process this project was designed by, the Construction Grants and Loans Staff will not recommend the lift station for individual permitting and desire for this to remain as one project in lieu -of the lift station then plant upgrades. We anticipate final comments on the 201 Facilities Plan to be sent by the end of July 2005. Therefore, we respectively request and propose the following amended schedule: Q EA/201 facility Plan Approval by October 31, 2005_ Plans & Specifications to Construction Grants & Loan by.March 31, 2006. n Construction Grants & Loan Approval & Permitdn,g by November 30, 2006. • Begin Construction by March 31, 2007. * Complete Lift Station Construction. by March 31, 2008_ © Complete NT Wu'TF Upgrades by Tarch 31, 2010. -_P .E.I . ,s. Marie Do%lovic. PE ne 27, 2005 ige Two The City of I-ickory has continued to maintain and update the NE WV"TF Lift Station as necessmy to ensure proper operation and improve efficiencies so as to limit potential instances of overflow. Updates have lacluded two (2) new influent pumps, one (1) in 2003 and one (1) is 2004, replacement of outdated clutch drives with new variable frequency drives in FY 04-05 and replacement of the bar screen in 2003. Ali the above-meatioried updates have restored pumping capacity, unproved pump efficiencies and response due to updated drives and improved the quality of screening all of which in turn improve the stations ability to work and improves the quality of water discharged at the NE WWTF. These improvements along with the approximately - 200 gpm capacity based on maximum design flows appear to have significantly improved the capacity of this lift station_ Thank you in advance for any consideration and assistance your office cxi render towards this request. As always, should you have any questions or concerns, please do not hesitate contacting me at (828) 323-7427 or ktrreer(a7ci_hickorv.nc.us. Sincerely, Kevin B. Greer, P.E. Public Services Manager pc: Rex Gleason, PE/NCDEN'R-1IRO-WQS Barbara Sifford, NCDE-NR--i�O-WQS Keith Rhyne, ORC/NE WWTF Shawn Pennell, Collections Supervisor Da,,,id Depratter PE/IISMM APPENDIX J CORRESPONDENCE Martv Watson From: Larry Horton [larry.horton@ncmail.net] Sent: Monday, April 10, 2006 10:36 AM To: Marty Watson Cc: Daniel Blaisdell; Bobby Blowe Subject: Hickory Northeast WWTP Upgrade Attachments: 06.04.10 Tech. Review Comments.doc �a 06,04.10 Tech. 2eview Comments... Marty, Technical comments for the 201 Facilities Plan (Rev. Nov. 18, 2005) are attached. One of the new comments is concerning the amount of funding available for this project. HSMM and/or the City should contact Bobby Blowe (CG&L's Section Chief) concerning funding. If there are questions, Tease contact me. Larry 1 CITY OF HICKORY Technical Review Comments For Hickory 201 Facilities Plan (Revised November 18, 2005) Project No. CS370389-18 April 10, 2006 NOTE: Please provide a response to all comments on a "comment for comment" basis. Where appropriate, add or revise narrative in the text of the 201 Plan that addresses the issues discussed in the comments. In addition, the comments and responses may be included as a part of the report (e.g. in an appendix). 1. General 8. Not all sections of the plan are in agreement on the scope of the project. For example, on page 19, the two new aeration basins are projected at 2.2 mgd but in Appendix C and on Figure 4, they are listed at 3.0 mgd. Also, the various scopes of necessary piping do not agree. The site work piping on page 30 and in Appendix C is not in agreement. These and other discrepancies should be amended in a revised report. IThe response is acknowledged. However, the 4200 1A., 42-inch diameter outfall listed in the Appendix C, Sitework item 2 is not discussed in Section 4.08 of the 201 Plan. Also, the 700 U., 18-inch force main discussed on page 31 of the 201 Plan is not listed in Appendix C, Sitework item 2. Please revise Section 4.08 and Appendix C as needed. M. Section 3, Future Situation 2. (Reference Page 18) In the proposed design section, influent parameters of BOD = 265 ' mg/l, TSS = 320 mg/l, and TKN = 35 mgll are shown. While these parameters are within an acceptable range, they are higher than normally would be expected. What is the source of these parameters, and is there an explanation for their relatively high concentration? The response is acknowledged and provides information concerning the source of the data for the parameter concentrations. However, the response does not provide any explanation for the relatively high concentrations. Please answer this question also. 3. (Reference Section 3.04) Preliminary calculations for each unit in this section should be provided to support the adequacy of the proposed design to process the expected hydraulic and pollutant loadings, and provide the treatment required to meet NPDLS permit limits, reuse effluent requirements, and sludge disposal requirements. The response is acknowledged. The calculations in Appendix G are based on various manufacturers equipment including the Carrousel system, which may be proprietary. As noted in our previous comments, the approval of the Facilities Plan Page 1 of 4 does not constitute approval of sole source procurement. Plans and specifications must comply with N.C. General Statute Chapter 133, Section 3, prior to their approval. IV. Section d, Alternatives 3. (Reference Page 25) It is noted on this page that both roof drains and storm drains empty directly into sewers. It is also documented that if the drains were disconnected From the system, a storm collection system would need to be installed. This implies that no storm collection system'is currently in place. ■ Please verify that the 5-block by 5-block area -in -question does not have a storm collection system, and discuss. How is the storm flow other than from roofs (e.g. streets; parking lots) handled? ■ What is the diameter of the pipes currently carrying the combined wastewaterlstormwater flow in this area? ■ If the area does have a storm collection system, discuss why one would need to be constructed if the roof drains were disconnected from the sewer system. ■ Also, provide a map showing the location of the 5-block by 5-block area. Providing the requested information does not require an SSES or a great amount of detailed research. Since the inflow issue is a significant part of the city's wastewater problems, please provide the requested information, which is relevant to the inflow problem and the alternatives analysis. 5. (Reference Page 25) If Alternative 7 is implemented as the most cost effective alternative, one negative result will be that extraneous inflow will continue to enter the system. In order to reduce the resultant strain on plant facilities, delay fitture expansions to reduce yearly O & M costs due to the extraneous flow, the city should institute an aggressive inflow identification/rehabilitation program in order to eliminate as many inflow sources as possible. Please discuss, and provide any plans by the city to seek out and eliminate inflow sources. Please add the information that is discussed in the response to the narrative in the 201 Facilities Plan. 6. (Reference Page 25) Alternative 7 calls for a 2.2 mgd equalization basin to handle extraneous inflow and buffer peak flows to the plant. Please provide calculations used to size this basin and demonstrate that the basin will successfully buffer peak flows. fThe response is acknowledged. The NCAC regulation says "at least 25%". Please provide calculations to support the consultant's belief that the 2.2 MG basin with 37% capacity will be adequate to successfully buffer peak flows. V. Section 6, User Charge and Financial Capahilitti 3. (Reference Page 36) The user charge should be based on the user charges for the typical residential customer using 5,000 gallons per month. The estimated cost for the typical user should be provided before and after the project. Page 2 of 4 Please note in the narrative the current total monthly user charge for a typical residential customer using 5,000 gallons per month. (e.g. $25.00 per month at $5.0011000 gallons). Also, state in the narrative the total estimated monthly user charge, as a result of the project, for a typical residential customer using 5,000 gallons per month (e.g. $30.00 per month at $6.00/1000 gallons). VII. Appendices 1. (Reference Appendix A) What is the status of the request for Speculative Limits? Please include in Appendix A a copy of DWQ's September 1, 2004 letter, which is referenced in the response, and any other relevant subsequent correspondence. 2. (Reference Appendix B) The current NPDES permit expires on April 30, 2005. What is the status of permit renewal? Please include in Appendix B a copy of the draft NPDES permit and the city's October 7, 2005 response, which are referenced in the response, and any other relevant subsequent correspondence. VIII. New Comments 1. It is preferred ,for the engineering report and environmental assessment to be included together in one binder. 2. The table of contents should list the individual figures and appendices. A descriptive title should be provided for each item along with the page number where it is located. 3. The current CG&L budget for the city's loan is $15M. Please provide a summary of the proposed sources of funding for the project, including the amount and type of funding (e.g. grant, loan, etc.) that indicates how all of the project costs will be funded. The total of the project funding should equal the estimated project cost. Also, make any revisions that are needed in the user charge calculation. 4. Figure 5: a. Figure 5 shows a new 30-inch sewer coming into the WWTP site. How will this flow be transported to the proposed headworks? b. It is unclear whether the proposed flow equalization basin will intercept flow before the influent pump station or in the gravity portion flow the influent flow, or both. if the flow equalization basin will not intercept flow before the influent pump station, how are the overflows at the pump station being addressed? Please provide a detailed description/explanation. Page 3 of 4 c. Pursuant to NCAC 21-1.0219(j)(5)(J) treatment units must be 50 feet from any property line. Please confirm that this is the case for the proposed facilities. While approval of the planning document can proceed if the 50-foot set back is not specifically addressed in the 201 Plan, the design plans and specifications must comply with the 50-foot set back requirement. Please address. d. It is unclear why the flow equalization basin is configured with an anoxic zone on the cast side of the basin. What will be the purpose of this structure? 5. Please provide a description of the equipment proposed to be installed in the flow equalization basin. Based on costs in Appendix C it appears to be identical to the equipment proposed for the aeration basins. Please address. Also see the previous comment. Page 4 of CITY OF HICKORY Technical Review Comments For Hickory 201 Facilities Plan Project No. CS370389-18 March 29, 2005 NOTE: Please provide a response to all comments on a "comment for comment" basis. Where appropriate, add or revise narrative in the text of the 201 Plan that addresses the issues discussed in the comments. In addition, the comments and responses may be included as a part of the report (e.g. in an appendix) 1. General I. If the total construction Cost for the selected alternative exceeds $10 million, the recipient must provide a value engineering study. For more information on value engineering, see the Internet website at.www.value-ciig. c 0 M. Response: It is our understanding from a conversation with Rob Brown of the Construction Grants and Loans Division that the threshold requiring a value engineering study has been raised to $25 million. As the proposed alternative is less than this value no value engineering study will be performed as a portion of the 201 Facilities Plan. 2. Please be advised that the city should have an approved user charge system and sewer use ordinance to provide for funding the sewer system operation and maintenance and repayment of the SRH loan. The user charge system and sewer use ordinance must be approved before a loan recipient can get more than one reimbursement request processed. The two documents do not have to be adopted by the loan recipient until the end of construction. Response: A copy of the City of Hickory's Sewer Use Ordinance has been included as Appendix E of the 201 Facilities Plan. 3. The selected alternative does not appear to involve the acquisition of real property. However, note that any real property acquisition associated with the project must be acquired in accordance with the Uniform Relocation and Real Property Assistance Act of 1970. The purchase of land is eligible for funding if the land will be an integral part of the treatment process (i.e. land for spray application of effluent or land application of biosolids). The following costs are not eligible for funding under the Act: a. The costs of acquisition of sewer rights -of way (i.e., legal, administrative, and engineering). b. Any amount paid by the recipient for eligible land in excess of just compensation based on appraised value, negotiation or condemnation of proceedings. Response: The selected alternative as described in the Facilities Plan will not include the purchase of land. 4. A loan from the North Carolina Water Pollution Control Revolving (loan Fund (SRF) is ' contingent on the review and approval of the proposed loan by the Local Government Commission. Response: The City of Hickory is aware that a loan from the North Carolina Water Pollution Control Revolving Loan Fund (SRF) is contingent on the review and approval of the proposed loan by the Local Government Commission. ' 5. Please note that approval of the Facilities Plan does not constitute approval of sole source procurement. Plans and specifications must comply with N.C. General Statute Chapter 133, Section 3, prior to their approval. Response: The City of Hickory understands that approval of the Facilities Plan does not constitute approval of sole source procurement. G. The owner and consulting engineer should be advised that after approval of the 201 Facilities Plan, there are several construction project permits, approvals, certifications, etc. that must be obtained before the project plans and specifications can be approved and the project is advertised for bids. Therefore, it is strongly recommended that preliminary work to obtain the following items, if applicable, begin as soon as possible: a. Sedimentation and Erosion Control Permit from the Division of Land Quality, or a ' letter from them stating that no permit is required for this project. Response: The City of Hickory and HSMM are aware that a Sedimentation -and Erosion Control Permit will be necessary before approval of plans and specifications. It is our plan to apply for this permit upon completion of plans for this project. b. A reasonable subsurface investigation that must be made available to the ' contractor. If it is not included in the specifications, the specifications must advise where a copy of the report can be observed. "Typically, CG&L expects a boring about every 500 feet and at each road crossing for linework and at all major 1 structures like pump stations, aeration basins, and clarifiers. Response: The City of Hickory and HSMM are aware that a subsurface 1 investigation will be necessary. The subsurface investigation will take place during the development of construction plans to facilitate structural design for the project. ' 7. Currently, SRF loan participation in Laboratory/Administration buildings funding is limited to $150.00 per square foot. This participation amount is revised annually based ron construction cost indices. Please provide a total square footage, and list these buildings separately in the bid form so that eligible costs can be determined after receipt of bids. Response: The City of Hickory will include the Laboratory and Administration buildings separately in the bid form and will include the square footage of each building as individual entries. ' 8. Not all sections of the plan are in agreement on the scope of the project. For example, on page 19, the two new aeration basins are projected at 2.2 mgd but in Appendix C and on Figure 4, they are listed as 3.0 mgd. Also, the various scopes of necessary piping do not agree. The site work piping on page 30 and in Appendix C is not in agreement. "Chese and other discrepancies should be amended in a revised report. ® Response: The aeration basins, as listed in Appendix C and on Figure 4, are 3 mgd ■ basins, the narrative on page 19'has been adjusted to reflect this information. Also, the site work piping quantities as included on page 31 are correct, and corrections have been made to the opinion of probable cost in Appendix C to bring the Facilities Plan into agreement on these issues. 11. Section 2, Current Situation 1. (Reference Page 12) This page references plant flow charts contained in Section 11. There is no Section 11. Response: The narrative should refer to the plant flow charts in Appendix D. The description has been modified to correct this discrepancy. 2. (Reference Section 2.04) What percent of the inflow quantified in Table 2.1 on page 13 can be attributed to the downtown sewer system? The infiltrationlinflow section should provide documentation of the amount of inflow attributed to the downtown portion of the system as apposed to the amount of inflow attributed to the remaining portion of the system in order to determine if areas outside of the downtown area are cost effective to rehabilitate. Response: At the onset of this project HSMM representatives met with Mr. Larry Horton of the Construction Grants & Loan Section to discuss the proper method of handling the more difficult portions of this project. One point of discussion was the high levels of inflow and infiltration likely to be occurring in this area and its effect on the requirement to perform a SSES. Mr. Horton stated that if we were able to show that the system could handle the infiltration/inflow at the plant in a more fiscally advantageous manner than replacing the system then the SSES and its corresponding detailed analysis of the sewer system would not be required. To adequately quantify the percentage of inflow resulting from the downtown area, the City of Hickory would have to undergo an extensive study (much like an SSES). Therefore, we ask that we be relieved of the duty to provide this detailed information. 3. (Reference Section 2.04) If the presence of stormwater in the downtown system results in overflows or bypasses, a health or environmental problem could result. Lavery effort must be made to avoid this situation. Please discuss any history of overflows and provide copies of any NOV's. Response: A copy of the City of Hickory's sewage spill records is included as Appendix F. The highlighted entries are those that correspond to the downtown ' system. I11. Section 3, Future Situation ' 1. Please provide a map that shows the service area for the WWTP and the Hickory - Newton 201 Facility Planning Area. Response: A map showing the Lake Hickory Drainage Basin and the Hickory - Newton 201 Planning Area has been included as Figure 3. 2. (Reference Page 18) In the proposed design section, influent parameters of BOD = 265 mg/l, TSS =320 mg/l, and TKN = 35 mg/1 are shown. While these parameters are within an acceptable range, they are higher than normally would be expected. What is the source of these parameters, and is there an explanation for their relatively high concentration. Response: The design influent parameters as included in the Facilities Plan were reflective of the influent parameters as submitted to NCDENR as a portion of the actual daily reports. The influent parameters were averaged over a one year time frame, and therefore should be an accurate portrayal of the loading received at the Northeast WWTP. 3. (Reference Section 3.04) Preliminary calculations for each unit in this section should be provided to support the adequacy of the proposed design to process the expected ' hydraulic and pollutant loadings, and provide the treatment required to meet NPDES permit limits, reuse effluent requirements, and sludge disposal requirements. ' Response: Preliminary design calculations have been included as Appendix G in the Facilities Plan. It should be noted that there are three aeration basins listed in the design calculations; however, as described within the Facilities Plan one of these basins will he placed into operation as an equalization basin. Also, most of the design calculations present a design flow of 9.0 MGD. The preliminary design was completed in this manner to ensure that in the event the plant would need to be expanded to 9.0 MGD the plant process equipment would be arranged so as to allow for the additional equipment within the plant boundaries. ' IV. Section 4, Alternatives 1. (Reference Page 23) is there any SOC for the collection system and/or the WWTP? Please advise and include SOC's and/or Moratoriums in Appendix. SOC's and/or 1 Moratoriums should be mentioned in the "201 Executive Summary," the "201 Current Situation," and in the Environmental Assessment "Need for Project" section. Compliance schedules should be included in the 201 narrative. Response: The North Carolina Division of Water Quality issued a compliance ' schedule concerning hydraulic capacity problems at the City of Hickory's Northeast WWTP lift station. The City has since requested an extension in the compliance schedule dates. The City's System -Wide Wastewater Collection ' System Permit and a request for extension in the compliance dates are include as Appendix 1. The compliance schedule has been added to the relevant sections of the revised 201 Plan. ' 2. (Reference Page 23) It is documented on this page that "... the current treatment processes are inadequate in their ability to provide the level of treatment that will be 1 required to meet future NPDES permit limits." 'The following should be addressed: a. What are the expected future NPDES permit limits? Response: As stated in Mr. David Goodrich's letter dated September I, 2004, "historic monitoring data has indicated elevated dissolved oxygen and pH values, which suggest the possibility of algal blooms (a condition of nutrient enrichment)" in Lake Hickory. Therefore it is anticipated that the future limits may include nutrient removal requirements. b. Why cannot the current treatment process meet the future limits? ' Response: As addressed above, nutrient removal may be required for dischargers into Lake Hickory due to nutrient enrichment of the lake ' attributed to non -point sources. The plant as currently configured is incapable of achieving the necessary nutrient removal. c. Include in the discussion of' the current WWTP's inability to provide the level of treatment in the `Executive Summary," "FUtUre SItuatIon," and the Environmental Assessment. Response: The narrative has been amended to include discussion of the current WWTP's inability to provide adequate treatment in the Executive Summary (page 1), Future Situation (page 18), and Environmental Assessment (pages A-4 — A-5). 3. (Reference Page 25) It is noted on this page that both roof drains and storm drains empty directly into sewers. It is also documented that if the drains were disconnected from the system, a storm collection system would need to be installed. 'Phis implies that no storm collection system is currently in place. • Please verify that the 5-block by 5-block area -in -question does not have a storm collection system, and discuss. How is the storm flow other than from roofs (e.g. streets, parking lots) handled'? • What is the diameter of the pipes currently carrying the combined wastewater/stormwater flow in this area? • If the area does have a storm collection system, discuss why one would need to be constructed if the roof drains were disconnected from the sewer system. • Also, provide a map of showing the location of the 5-block by 5-block area. Response: Again, early discussions with NCDENR personnel resulted in the decision that a detailed analysis of the downtown sewer system could likely be avoided provided the inflow could be handled at the plant in a financially responsible manner. Therefore, we ask that we be relieved of the requirement of supplying this detailed information on the downtown sewer system at this time. 4. (Reference Page 25) Although it does not appear that the land application alternative would be cost effective, the cost of supplying secondary treatment to facilitate the system should be generated and included in the cost of spray irrigation, in order to determine if it is cost effective. Response: It is assumed that the cost of supplying secondary treatment to the amount of flow currently entering the Northeast WWTP would be identical to the costs for Alternative 7. The integral operations of Alternative 7 would still be necessary to ensure adequate treatment processes and hydraulic capacity. This additional cost has been added to the narrative on Page 25 and also the Opinion of Probable Cost in Appendix C. 5. (Reference Page 25) If Alternative 7 is implemented as the most cost effective alternative, one negative result will be that extraneous inflow will continue to enter the system. In order to reduce the resultant strain on plant facilities, delay future expansions to the plant, and reduce yearly O & M costs due to the extraneous [low, the city should institute an aggressive inflow identification/rehabilitation program in order to eliminate as many inflow sources as possible. Please discuss, and provide any plans by the city to seek out and eliminate inflow sources. Response: In an effort to eliminate extraneous inflow in the collection system the City of Hickory will maintain an aggressive inflow identification and rehabilitation program through the following methods. Data for wet weather/dry weather flows from various areas in the collection system will be maintained and analyzed to ' isolate problem areas within the system. Following the identification of problem areas, visual inspection of manholes during periods of wet weather will be used to identify deficient manholes. The deficient manholes will be rehabilitated as needed. The City of Hickory will also use television of lines to identify sewer collection lines demonstrating high levels of inflow. These lines will be evaluated as 1 to impact and placed on the Capital Improvement Plant for rehabilitation or replacement as necessary. 6. (Reference Page 25) Alternative 7 calls for a 2.2 mgd equalization basin to handle extraneous inflow and buffer peak .flows to the plant. Please provide calculations used to size this basin and demonstrate that the basin will successfully buffer peak flows. Response: The minimum design requirements for wastewater facilities are regulated by the North Carolina Administrative Code. Regulation 15 NCAC 02H.0139 refers specifically to the minimum design requirements for point source discharges. A portion of this regulation is as follows: "All facilities requiring a permit pursuant to this Section shall be designed following good. engineering practice and comply with the minimum design requirements as specifies! in Rule 02H .0219 of this Subchapter." The Rule contained in the referenced regulation applicable to equalization basin sizing is referenced below. 15 NCAC 02H.0219 "(j) for treatment works and disposal systems: (6) flow equalization of at least 25 percent of the facilities permitted hydraulic capacity must be provided for all seasonal or resort facilities and all other facilities with fluctuations in influent flow which may adversely affect the performance of the system;" The equalization basin as proposed in the 201 Plan (2.2 MG) is well above the specified sizing of 25% of the hydraulic capacity. In fact, the basin has been sized for approximately 37% of the proposed hydraulic capacity. Therefore, we believe the basin is sufficiently sized to handle fluctuations in influent flow based on existing regulations. 7. (Reference Page 26) 'fhe discussion of Alternative 4 references Section 8 for a summary of costs to upgrade plant equipment for this alternative. The referenced cost summary is not in Section 8. Res onse: The summary of costs is included in Appendix C, and not in Section 8 as mentioned in the original Facilities Plan submittal. The narrative in this section has been edited to reference Appendix C. 8. (Reference Page 26) In projecting the cost of Alternative 4, "Downtown Sewer System Construction", the costs should reflect the elimination of the extraneous flow from the system. Since it would no longer be necessary to transport and treat this flow, plant capital costs and 0 & Mi costs would be reduced. Verify that the cost estimate for this alternative reflects this reduction by addressing the following: a. The need for the equalization basin and, thus, the cost for this basin would be eliminated. Response: The cost for the basin has been removed from the estimated cost as presented in Appendix C and also within the narrative on Page 26. b. The size of various plant units does not have to be as large to handle large inflow amounts. Response: The plant equipment is sized to treat the design average daily flow and to handle the peak daily flow. The sizing would therefore not be reduced by the elimination of all inflow. c. The WW"rP O & M costs would be reduced to account for the reduction in flow. Response: The WWTP O&M costs have been reduced to exclude the O&M costs associated with operating the equalization basin. It is assumed that all other O&M cost reductions would be minimal at best, and therefore are not included in the analysis. d. The pumping and O & M costs within the collection system would be reduced to reflect the reduction in flow. Response: While the O&M costs associated with the system may be minimally reduced by a reduction in flow it is difficult to reflect these costs without accurately quantifying the amount of flow reduction. At this time this level of 1 analysis has not been completed based on previous conversations with NCDENR personnel. ' e. All costs including O & M should be evaluated based on a 20-year present worth analysis. Response: A 20-year present worth analysis has been presented for each viable alternative. This present worth analysis includes O&M costs. 9. (Reference Page 4.06, Alternative 5) The Regional Wastewater Treatment Facility alternative should be evaluated based on cost effectiveness, using a present worth analysis to determine if it is the preferred alternative. Response: A present worth analysis for a Regional Wastewater Treatment Facility was included in the 201 Facilities Planning Study for the Hickory -Newton Complex submitted in 1980. The present worth analysis in this study concludes that a regional facility is not economically advantageous to the maintenance of separate ' facilities. In order to implement a regional plant, flow would have to be sent from the Northeast WWTP to the Henry Fork WWTP due to the lack of land available at the Northeast WWTP. It is reasonable to assume that the proposed construction at the Northeast WWTP would have to be conducted at the Henry Fork WWTP to adequately handle the additional flow. In addition to the large plant costs, an additional pump station would need to be constructed to overcome the large static ' head from pumping across multiple drainage basins. Also, ,approximately 59,000 If of 42-inch force main would be necessary to convey peak flows from the Northeast WWTP (—$8,850,000). Based on the findings of the existing 201 Facilities Planning Study for the Hickory -Newton Complex and the large construction costs, a detailed present worth analysis is not necessary to conclude the alternative of a Regional ' Wastewater Treatment Facility is not economically advantageous. 10. (Reference Page 39) Please provide information concerning the proposed sludge ' treatment and disposal: a. Sludge production calculations at the design flow. Response: Sludge production from the Carrousel@ A2C"" has been estimated for the Northeast WWTP. A summary of these calculations has been included as Appendix H. b. Provide assurance that there is adequate capacity at the Newton Compost Facility to ' handle the residuals from Hickory, and that the facility is willing to accept the residuals for the design period. Response: The sludge disposal facility is correctly identified as the Hickory Regional Compost Facility. The City of Hickory owns 70% of the facility and ' therefore no letter of acceptance would be necessary for disposal of the residuals at the composting facility. 11. (Reference Page 30) Was ultraviolet disinfection considered in lieu of the recommended modifications to the existing chlorination/dechlorination facilities? Provide a present worth analysis to justify the proposed modifications or, otherwise, justify the modifications to the existing disinfection system. Response: Ultraviolet disinfection was considered in lieu of the chlorination/dechlorination disinfection proposed. It has keen our experience that filtration of effluent wastewater is necessary prior to irradiation for ultraviolet disinfection to be reliable. .Therefore, the capital costs associated with this option ' are much greater than the chlorination/dechlorination capital costs. Below is a summary of this present worth analysis, which was conducted in the manner stated in response to question 12. Manufacturer data was used to accurately portray the operation and maintenance costs of both alternatives. Option Capital Costs O&M Costs Salvage Value Present Worth Costs Chlor/Deck $842,800 $73,659 $36,180 $1,701,886 Filter/UV $2,088,068 $30,685 $141,210 $2,854,510 12. (Reference Page 34) Please discuss the method used to project salvage values. For example, what value was given to the land from the land application system? A useful life of 15 years For equipment, 40 years for collector sewers; 20 years for pump stations and force mains, 50 years l'or structures, and 20 years for all other facilities should be used for salvage value present worth calculations. Response: The salvage values for all equipment, sewers, pumps, force mains, and structures were calculated based on the useful lives suggested above. For each case an end of useful life salvage value of $0 was used. Present worth analyses were conducted over the planning period of the project, 20 years. Salvage values for items not yet at the end of their useful life were calculated using straight line depreciation. The useful life for equipment was assumed to be 20 years (the entire project planning period). Land purchased as part of the alternatives is considered to retain 100`'/0 of its purchased value. In the land application system, this correlates to $6,985,000 ($5,000 per acre). The useful life for structures was estimated at 50 years, and the useful life for sewer was estimated at 40 years. 13. SRF loans are subject to a 2% closing fee based on the loan amount. The projected cost for each alternative should include this fee. Response: The opinions of probable costs have been adjusted to include a 2% closing fee into the total project cost. 14. Please confirm that the proposed project design will comply with NCAC 21-1.0219 — Minimum Design Requirements, and NCAC 21-1.0124 — Reliability Requirements. (A copy of .0219 & .0124 is attached for reference.) Response: The proposed project design will comply with NCAC 2H.0219 — Minimum Design Requirements, and NCAC 21-1.0124 — Reliability Requirements. 15. Please provide calculations to demonstrate that the peak hourly flow will pass through the WWTP, and confirm that the WW'IT will be able to hydraulically handle the peak hourly flow (including inflow) with the largest unit out of service. Note that the plant must meet limits at storms of less than 25-year intervals, and must pass the flow hydraulically at storms of less than 100-year intervals. Response: Preliminary design calculations have been included as Appendix G in the Facilities Plan. It should be noted that there are three aeration basins listed in the design calculations; however, as described within the Facilities Plan one of these basins will be placed into operation as an equalization basin. Also, most of the design calculations present a design flow of 9.0 MGD. The preliminary design was completed in this manner to ensure that in the event the plant would need to be expanded to 9.0 MGD the plant process equipment would be arranged so as to allow for the additional equipment within the plant boundaries. ' V. Section 6, User Charge and Financial Capabilitv I. (Reference Page 35) A loan interest rate of 3.0% was used to estimate the SRF loan debt service. We cannot guarantee that this will be the rate at the time of the loan. Therefore, a rate of 4%, which is the maximum the loan interest can be, must be used to estimate the user charge. Response: The calculated debt service and estimated user charges have been adjusted to account for a loan interest rate of 4%. ' 2. (Reference Page 35) The user charge calculation must be based on the first year of the SRF loan repayment and the project's first year billable flow. The First year's payment must be determined based on equal principal payments over the 20-year period and simple interest with declining annual payment. For example; Loan amount = $22,567,873 Interest rate = 4% Principal payment = $22,567,873/20=$1,128,394 tFirst Year's interest = $22,567,873*0.04 = ' 902,715 "Total First Year Payment = $2�031._l� ' Response: The user charge calculation has been adjusted to be based on the first year of the SRF loan repayment and the project's first year billable flow. 3. (Reference Page 36) The user charge should be based on the user charges for the typical residential customer using 5,000 gallons per month. The estimated cost for the ' typical user should be provided before and after the project. Response: The Facilities Plan has been modified to clearly state the estimated cost for the typical user both before and after the project. Vl. Section 7, Public Participation 1. When the public hearing is scheduled, a 30-day notification should be provided. The following guidelines should also be observed: a. A copy of the Facilities Plan should be available for review by the public at least 15 days prior to the public hearing. The hearing should identify the problem, discuss the selected alternative, identify the sire of the projected loan, discuss any associated inter -local agreements, and identify the effect this project will have on the monthly sewer bill for a typical residential user. ' Response: The City of Hickory will ensure the Public Participation hearing is adequately advertised, and also follow all guidelines concerning the Public Participation portion of the Facilities Plan. 1 b. Place an advertisement for the hearing in the local newspaper that identities the time and location of the public hearing, advises when and where a copy of the Facilities Plan can be observed, provides a brief description of the proposed project, advises how much funding is required, and identifies the source of funding. Response: The City of Hickory will place an advertisement in the local newspaper identifying all pertinent information prior to the date of the public Ihearing. c. Provide a transcript or detailed summary of the hearing and an affidavit of publication of the hearing notice. The Public [[caring must be held and this information must be provided before the FNSI can be sent to the State Clearinghouse. The public hearing transcript or summary of the hearing must include the following: Information concerning attendance of the meeting by citizens (i.e. names and/or 1 how many attended), whether or not anyone spoke in favor of or opposition to the project, and what they said. ' • Documentation that user charges and other financial impacts were discussed including the estimated increase in the user charge amount. Details of other project information that was discussed at the meeting. I d Copies of handouts or other information that was available to the public at the hearing. ' Response: Following the completion of the Public Participation hearing the . City of Hickory will provide a detailed summary of the proceedings, including all information outlined above. Vll. Appendices 1. (Reference Appendix A) What is the status of the request for Speculative Limits'? Response: Speculative limits were originally requested on April 22, 2004 at an expanded discharge of 9 MGD at the Northeast WWTP. However, as stated in a letter from Mr. David Goodrich dated September 1, 2004 the Division of Water Quality was unable to issue speculative limits for a 9 MGD discharge. Between the April request for speculative limits and the September response, preliminary design indicated that the expansion from 6 MGD to 9 MGD would not be necessary. Concurrently, a NPDES permit renewal application was being prepared for the WWTP.. Therefore we believed that the new NPDES permit limits, when issued, would provide a better basis for final design than speculative limits. Therefore speculative limits at the 6 MGD flow were not formally requested. 2. (Reference Appendix 13) The current NPDES permit expires on April 30, 2005. What is the status of permit renewal? 1 Response: An NI'DES permit renewal application was mailed to NCDENR ' personnel on October 21, 2004. A draft permit has been received by the City of Hickory and a response letter was sent to Ms. Jackie Nowell with NCDENR on October 7, 2005. ' 3. (Reference Appendix Q In the opinion of probable project cost for the Hickory, NE WWTP Sewer Rehabilitation, a cost. estimate for 50,000 linear feet of Roof Drain ' Headers is included. Please verify that this is correct; and, if so, explain where they will be used. Response: The 50,000 linear feet of 8" Roof Drain Headers included in the opinion of probable cost is correct according to our plan for installing a dedicated storm drainage system. These roof drain headers would route flow from the various roof drains in the dense commercial district to the storm drain boxes. Michael F. Easley, Governor William G. Ross Jr., Secrclary N01711 cuolina Department of Environment acid Natu€al R.-sources Alan W. Klimek, P.E. Director Division of Water Quality March 29, 2005 The Honorable Rudy Wright, Mayor City of lilckory Post Office Box 398 1•l ickory, North Carolina 28603-0395 SUB.]ECT: City of Hickory ' 201 Facilities; Plan Project No. CS370389-18 ' Dear Mayor Wright: The Construciion Grunts and Loans Section has completed its technical review of the ' subject 201 Facilities Plan. A copy of the comnncnts resulting frog'this review is attached for your reference. These comments are also being sent directly to your c011sulting engineer, Hayes, Seay, Mattern & Mattern, by copy of this letter- A revised I-acl I I Ilan that ' incorporates responses to these comments should be submitted for our review and approval as soon as possible. Providing thorough and complete responses to these review col-ninents in a tirnely manner is necessary to avoid delays of the project approval. ' If ou or our engineer have an uestions concerning the technical review issues, lease Y Y � any � P contact Rob Brown at (919) 715-6213. Also, if there are questions concerning this review, you ' may contact nle at (919) 715-6225. Sllicerely, K. Lawrelicc Horton, i[l, P. E., Supervisor Facilit ies'Lvaluation Unit RB/dr ' Attachment (all ce's) cc: James C. Tindall, P.E., Hayes, Seay, Mattern & Mattern, Inc. DWQ Mooresville Regional Office Daniel Blaisdell, P.E. Amy Simes, P.E- Hannah Stallings DMU/FEU/SRF ■ Construclicn Grants and Loans Section One 1633 Mail Service Cenier Raleigh NC 27699-1633 ' Phone: 919-733-69001 FAX: 919-715-62291 Internet: wwv+.nccgl.net NOrtiG r Oi lga At Fn1aOnnnrii ritufafrrnmilvo ArYinn Fr ninwr - rna. Rafwrinrlli no Q—f r"",—'fln'. Nituiraffil ' CITY Y OFHICKORY Technicai Review Comments ' For Hickory 201 Facilities Ilan Project No. CS370389-18 ' March 29, 2005 NOTE,-. Please provide a response to all comments on a "comment for comment" basis. Where appropriate, add or- revise narrative in the text of the 201 Plan that addresses the issues discussed in the comments. in addition, the comments and responses may be included as a part of the report (e.g. in an appendix). 1. General 1. if the total construction cost for the selected alternative exceeds $10 million, the recipient must provide a value engineering study. For more information on value engineering, see the Internet website at www.vnlue-en(g.com. 2- Please be advised that the city should have an approved user charge system and sewer use ordinance to provide for funding the sewer system operation and maintenance and repayment of the SR17 loan. The user charge system] and sewer Ilse ordinance must be approved before a loan recipient can get more than one reimbursement request processed. The two documents do not have to be adopted by the loan recipient until the end of construction. 3. The selected alternative does not appearto involve the acquisition of real property. However, note that any real property acquisition associated with the project must be acquired in accordance with the Uniform Relocation and Real Property Assistance Act of 1970. The purchase of land is eligible for funding if the land will be an integral part of the treatment process (i.e. land for spray application of effluent or land application of biosolids). The following costs are not eligible for funding under the Act: a. The costs of acquisition of sewer rights -of' --way (i.c., legal, administrative, and engineering). b. Any amount paid by the recipient for eligible.land in excess of just compensation based on appraised value, negotiation or condemnation proceedings. 1 4. A loan from the North Carolina eater Pollution Control Revolving Loan Fund (SRF) is contingent on the review and approval of the proposed loan by the Local Government Commission. 5. Please note that approval ,of the Facilities Plan does not constitute approval of sole source procurement. Plans and specifications must comply with N.C. General Statute Chapter 133, Section 3, prior to their approval. Pa,e I of 7 6. The owner and consulting engineer should be advised that after approval of the 201 Facilities Plan, there are several construction project permits, approvals, certifications, etc. that must be obtained before the project plans and specifications can be approved and the project is advertised for bids. Therefore, it is strongly recommended that preliminary work to obtain the following items, if applicable, begin as soon as possible: Sedimentation and Erosion Control Permit from the Division of Land Quality, Or a letter from them stating that no permit is required for this project. b. A reasonable subsurface investigation that must be made avai [able to the contractor. If it is not included in the specifications, the specifications must advise where a copy of the report can be observed. Typically, CG&L expects a boring about every 500 feet and at each road crossing for- linework and at all major structures like pump stations, aeration Basins, and clarifiers. Currently, SRi- loan participation in Laboratory/Administration buildings funding is limited to $150.00 per- square foot. This participation amount is revised annually based on construction cost indices. Please provide a total square footage, and list these buildings separately in the bid form so that eligible costs can be determined after receipt of bids. Not all sections of the plan are in agreement on the scope of the project. For example, on page 19, the two new aeration basins are projected at 2.2 mgd but in Appendix C and on Figure 4, they are listed at 3.0 sngd. Also, the various scopes of necessary piping do not agree. The site work piping on page 30 and in Appendix C is not in agreement. These and other discrepancies should be amended in a revised report. I1. Section 2, Current Situation 1. (Reference Page 12) This page references plant flour charts conlarned in Section 11. There is no Section 11. 2. (Reference Section 2.04) What percent of the inflow quantified in Table 2.1 on page 13 can be attributed to the downtown sewer systern? The infiltration/inflow section should provide docurnentation of the amount of inflow attributed to the downtovti°n portion of the system as opposed to the amount of inflow attributed to the remaining portion of the system in order to determine if areas outside of the downtown area are cost effective to rehabilitate. (Reference Section 2.04) If the presence of stormwater in the downtown system results in overflows or bypasses, a health or environmental problem could result. Every effort must be made to avoid this situation. Please discuss any history of overflows and provide copies of any NOV's. Pane 2 of 7 111. Section 3, Future Situation 1. Please provide a neap that shows the service area for the WW'1'P and the ' 1-lickory-INewton 201 Facility Planning Area. 2_ (Reference Page 18) In the proposed design section, influent parameters of BOD = 265 mg/l, TSS = 320 mg/l, and TKN = 35 mg/1 are shown. While these parameters are within an acceptable range, they are higher than nonnally would be expected. What is the source of these parameters, and is there an explanation for their relatively high concentration? 3_ (Reference Section 3.04) Preliminary calculations for each unit in this section should be provided to support the adequacy of the proposed design to process the expected hydraulic and pollutant loadings, and provide the treatment required to meet NPDES pen -nit limits, reuse effluent requirements, and sludge disposal requirements. ' IV. Section 4, Alternatives 1. (Reference Page 23) Is there an SOC for the collection system and/or the tii WTP? 1 Please advise and include SOC's and/or Moratoriums in Appendix. SOC's and/or Moratorlums should be mentioned in the "201 EXCCUt]Ve Summary," the "201 Current Situation," and in the Environmental Assessment "[Need for Project" section. Compliance schedules should be included in the 201 narrative. 2. (Reference Page 23) It is documented on this page that "... the current treatment processes are inadequate in their ability to provide the level of treatment that will be required to meet future NPDES permit limits." 'file following should be addressed: a. What arc the expected future NPDES permit Iimits? b. Why cannot the current treatment process meet the firtLl:'C limits? c. Include discussion of the current WWTP's inability to provide the level of treatment in the "Executive Summary," "l=uture Situation," and the Environmental Assessment_ 3. (Reference Page 25) It is noted on this page that both roof drains and storm drains empty directly into sewers. It is also documented that if the drailis were disconnected from the system, a stortrt collection system would need tb be installed. This implies that no storm collection system is currently in place_ Please verify that the 5-block by 5-block area -in -question does not have a storm collection system, and dISCUSS. How is the storm flow other than from roofs (e.g. streets, parking lots) handled? ■ What is the diameter of the pipes currently carrying the combined wastcwater/stormwater flow in this area? Page 3 o f' 7 • If the area does have a storm collection system, discuss why one would need to be constructed if the roof drains were disconnected from the sewer system. • Also, provide a map shoving the location of the 5-black by 5-block area. 4. (Reference Page 25) Although it does not appear that the land application alternative would be Cost effective, the cost of supplying secondary treatment to facilitate the system should be generated and included in the cost of spray irrigation, in order to determine if it is cost effective. 5. (Reference Pa;e 25) If Alternative 7 is implemented as the most cost effective altcrilative, one negative result will be that extraneous inflow will continue to enter the system. In order to reduce the resultant strain on plant facilities, delay future expansions to tine plant, and reduce yearly O & M costs due to the extraneous flow, the city should institute an aggressive ' inflow identification/rehabilitation program in order to eliminate as many inflow sources as possible. Please discuss, and provide any plans by the city to seek out and eliminate inflow sources. 6. (Reference Page 25) Alternative 7 calls for a 2,2 nhgd equalization basin to handle extraneous inflow and buffer peak flows to the plant. Please provide calculations used to size this basin and demonstrate that the basin will successfully buffer peak flows. 7. (Reference Page 26) The disCUSSidrh of Alternative 4 references ' Section S for a summary of costs to upgrade plant equipment for this alternative. The referenced cost summary is not in Section S. ' S. Reference Page 26) In projecting the cost of Alternative 4, "Downtown Sewer Systern Construction", the costs should reflect the elimination of the extraneous flow from the system. Since it would no longer be necessary to transport and treat this flow, plant capital costs and O & M costs would be reduced. Verify that the cost estimate for this alteniative reflects this reduction by addressing the following: ' a. The need for the equalization basin and, thus, the cost for this basin would be eliminated. ' b. The size of various plant units does not have to be as large to handle large inflow amounts. e. The WWTP O & M costs would be reduced to account for the reduction in flow. d. The pumprng and O & M costs within the collection system would be reduced to reflect the reduction in flow. e. All costs including O & M should be evaluated based on a 20-year present worth analysis. Pa e4of7 ' must be determined based on equal principal payments over the 20-year period and simple interest with declining annual payment. For example: Loan amount = $22,567,873 Interest rate = 417o ' Principal payment = $22,567,873/20 = $1,128,394 First Year's interest = $22,567.873x 0.04 = $ 902.715 Total First Year Payment - 2.031 109 3. (Reference Page 36) The user charge should be based on the user charges for the typical residential customer using 5,000 gallons per month. The estimated cost for the typical user should be provided before and after the project. V1. Section 7, Public Participation 1. When the public hearing is scheduled, a 30-day notification should be provided. The following guidelines should also be observed: a. A copy of the Facilities Plan should be available for review by the public at least 15 days prior to the public hearing. The hearing should identify the problem, discuss the selected alternative, identify the size of the projected loan, discuss any associated inter -local agreements, and identify the effect this project will have on the monthly sewer bill for a typical residential user. ' b. Place an advertisement for the hearing in the local newspaper that identifies the time and location of the public hearing, advises when and where a copy of the Facilities Plan can be observed, provides a brief description of the proposed project, ' advises how much funding is required, and identifies the source of funding. c. Provide a transcript or detailed summary of the hearing and an affidavit of publication of the hearing notice. The Public Hearing must be held and this information must be provided before the FNS1 can be sent to the State Clearinghouse. The public hearing transcript or summary of the hearing must include the following: • Information concerning attendance of the meeting by citizens (i.e. names and/or ' how many attended), whether or not anyone spoke in favor of or opposition to the project, and what they said. ' Documentation that user charges and other financial impacts were discussed including the estimated increase in the user charge amount. • Details of other project information that was discussed at the meeting. • Copies of handouts or other information that was available to the public at the hearnlg. Page 6 o!_ 7 9. (Reference Page 4.06, Alleviative 5) The Regional 'Wastewater Treatment Facility ' alternative should be evaluated based on cost effectiveness, using a present worth analysis to determine if it is the preferred alternative. 1 10. (Reference Pagc 39) Please provide information concerning the proposed sludge treatment and disposal: 1 a. Sludge production calculations at the design flow. b. Provide assurance that there is adequate capacity at the Newton Compost Facility to handle the residuals from Hickory, and that the facility is willing to accept the residuals for the design period. 11. (Reference Page 30) Was ultraviolet disinfection considered in lieu of the recommended modifications to the existing chlorinationldechlorination facilities'? Provide a present worth analysis to justify the proposed modifications or, otherwise, justify the modifications to the existing disinfection system. ' 12. (Reference Page 34) Please discuss the rnetllod used to project salvage values. For example, what value was given to the land from the land application system'? A useful life of 15 years for equipment, 40 years for collector sewers, 20 years for pump stations and force mains, 50 years for structures, and 20 years for all other facilities should be used for the salvage value present worth calculations. 13. SRF loans are subject to a 2% closing fee based on the Ioan amount. The projected cost for each alternative should include this fee. 14. Please confirm that the proposed project design will comply with NCAC 2H.0219 - Minimum Dcsign Requirements, and NCAC 2H_0124 - Reliability Requirements. (A copy of .0219 & .0124 is attached for reference_) 15. Please provide calculations to dernonstrate that the peal; hourly flow will pass through the WWTP, and confirm that the WWTP will be able to hydraulically handle the peak hourly flow (including inflow) with the largest unit out of service. Note that the plant must mect limits at storms of less than 25-year intervals, and must pass the flow hydraulically at storms of less than 100-year intervals. V. Section G, User Char2e and Financial Caual)ility 1. (Reference Page 35) A loan interest rate of 3.0% vas used to estimate the SRF loan debt service_ We cannot guarantee that this will be the rate at the time of the Ioan. Therefore, a rate of 4%, which is the maximum the loan interest can be, must be used to estimate the user charge. 2. (Reference Page 35) The user charge calculation must be based on the first year of the SRF loan repayment and the project's first year billable flow. The first year's payment Page 5 of 7 V 11. AlIJOCTMACC 1. (Referencc Appendix A) What is the status of the request for Speculative Limits? 2. (Reference Appendix Q) The current NPDES permit expires or April 3V 2001 Plot is the status of permit renewal? 3_ (Reference Appendix Q In the opinion of probable project cost for the Hickory, NE WWTP Sewer Rehabilitation, a cost estimate for 50,000 linear feet of Roof Drain Headers is included. Please verify that this is correct.; and, if so, explain where they will be used. Age 7of7 ENR-ENVIRONMENTAL-..ANAGEMENT COMMISSION 775A: 02II.0100 the staff shall use either the "rational method for determination of runoff" or the "SCS method for determination of runoff" to establish whether a discharge occurs at rainfall events of less than the 24-hour, 25-year rainfall. (e) Impact EIvaluation. Utilizing the results of the site evaluation and the runoff evaluation required in Paragraph (d) of this Rule, the staff shall through mathematical modeling determine .whether pollutants discharged as a result of rainfall runoff will cause a violation Of water quality standards at flows in existence during the runoff period. (f) Final Determination and Fact Sheet. Upon a final determination that a permit is not required, the staff shall prepare a fact sheet which delineates the reasons which have been established for requiring the pernut, the corrective actions if any necessary to control the discharge of pollutants, and an implementation schedule for completing such actions, If no corrective actions are required, the fact sheet shall specifically state that none are required and provide the justification for not requiring corrective actions. Upon completion of the fact sheet, the staff shall prepare an NPDES draft permit containing a description of needed corrective actions and a schedule for implementation and process the permit in accordance with Rule .0107 of this Section. NrstorvMote: AwhorityG_S. 143-213(24); 143-215:143-215.1; 143-215.3(a)(1),(4); Eff' December 1, 1976; Amended Eff. March 1, 1993; October 1, 1987: December 1, 1984; June 7, 1981. 15A NCAC 0211 .0124 RELIABILITY All facilities shall provide adequate reliability measures, which, in the opinion of the Director, will insure continued treatment and disinfection where the interruption of such treatment would render the waters unsafe for their best intended uses. The reliability measures shall include the followirtg: (1) For new or hydraulically expanding facilities with mechanically openatcd components, and for any facility designated by the Director, multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment; and (2) At least one of the following: (a) dual or standby power supply on site, or (b) approval by the Director that the facility: (1) serves a private water distribution system which has automatic shut-off at power failure and no elevated water storage tanks, and (ii) has sufficient storage capacity that no potential for overflow exists, or (iii) can tolerate septic wastewater due to prolonged detention, and (iv) would have de minimus impacts as a result of power failure, or (c) a demonstration that the waters that would be impacted by a power failure are classified as C Waters, the applicant may be allowed to show a history of power reliability that would demonstrate that an alternative power source .would not be needed or demonstrate other measures which provide comparable assurances that surface waters will not be impacted during power failures; (3) For new or hydraulically expanding mechanical facilities, the treatment plant must contain parallel units for components in the liquid line (screening, primary sedimentation, biological treatment units, chemical and physical treatment units, clarifiers, disinfection and effluent filters), unless the applicant can demonstrate to the satisfaction of the Director that this requirement is unwarranted for a particular case; and (4) For mechanical facilities with a design capacity equal to or greater than 5.0 mgd, continuous operation, 24 hours, seven days per week, with each shift staffed by at least one certified wastewater operator shall be provided on or before October 1, 1993, unless the applicant can demonstrate to the satisfaction of the Director that this requirement is unwarranted for a particular case; and (5) For facilities permitted under this Section, the permittee must designate an Operator in Responsible Charge and a back -tip operator as required by the Water Pollution Control System Operators Certification Commission as established in 15A NCAC 8A .0202; and (6) In order to insure the proper operation and maintenance of facilities permitted under this Section, the Operator in Responsible Charge, or back-up operator when appropriate, trust operate and visit the INORT11 CAROLINA A11MI\ISfRATIVF, COI)I? _ Effective April 1. 2003 1'at_e 17 of34 ENR-Er1JIMONMENTAL.JANAGEMENTCOMMISSION T15A: 0211.0100 facility as required by the Water Pollution Control System Operators Certification Commission as established in ISA NCAC SA .0202; and (7) Compliance with other reliability measures that, in the opinion of the Director, are necessary in a particular case. Hisfoly Note: Authority G.S. 143-214.1; 143-215.1(15); 143-215.3(a)(I); F_Jf. December 1, 1984; Aniended Eff. March I, 1993; October 1, 1987, I5A NCAC 021I .0125 PERMIT REQUIRE11ENTS FOR PEAT ALINING (a) Policy. Studies on peat mining in North Carolina have identified effects that could adversely impact the existing uses of the waters of the state. As there is no experience with peat mining in similar ecological systems, the effectiveness of proposed control and mitigation measures has not been demonstrated and must be estimated by using methods of analyses Illat are not well tested by experience_ Many of the impacts of large-scale peat mining and subsequent reclamation may be ineversible and may not be realized until years or decades after peat mining is initiated. In addition, the estuantlehvetland systems have intricate interconnections which are not well understood at present and which are essential to the viability of the very valuable public estuarine resources. Recognizing the unknowns associated -with peat mining, this Rule specifies procedures and requirements that are necessary to ensure compliance with the water quality standards and protection of the uses of the waters affected by peat mining operations. The water quality standards and uses of the waters sha11 be protected during all phases of.a peat alining project, and the curnulative impacts of other peat mining or land uses shall be considered in the evaluation of each penult. (b) Applicability. Tlie requirements of this Rule are to be met during mining, reclamation, and, to the extent necessary to protect water quality standards, after reclamation for all peat mining operations that could contribute significant increases ill pollution (including freshwater) into estuarine nursery areas, or any other area, identified by the Commission on a case-bv-case basis when it is determined that potential exists for significant adverse effects on water quality and existing uses. Estuarine nursery areas arc areas that function as important breeding or development grounds for estuarine or marine fishes, crustaceans or molluscs, These areas include: ( I ) all designated Primary Nursery Areas, (2) all designated Secondary Nursery Areas, (3) all anadrornous fish spa,.%,ring grounds and nursery areas identified in publications of the N.C. Division of Marine Fisheries, and (4) all other nursery areas designated or otherwise identified by the Nlarine Fisheries Commission, or the Wildlife Resources Commission. (c) Drainage: (1) Canals draining peat mines shall not outlet directly into estuarine nursery areas and shall be directed towards appropriate freshwater bodies if possible. (2) if the drainage could contribute significant flow, directly or indirectly, into estuarine nursery areas or other areas determined by the Commission to require this protection, the project must be desi�lled such that the total annual water released from the site would not exceed that expected from the site covered with mature natural vegetation. Mature natural vegetation is the assemblage of indigenous plants expected to occur on a proposed project site if it were allowed to develop undisturbed. This expectation may include periodic disturbance by fire at natural fi-equencies and intensities. Also, the peak Bows from the site shall be controlled by the use of basins or other- management techniques which moderate release rates so that flows do not exceed those expected from the site undrained and with mature natural vegetation. For purposes of this Rule, undrained is the state of the proposed project site without structures or- features imposed by human agency intended to facilitate removal of surface or subsurface water. In modelling or other analysis required by this Rule, major canals existing at the time of rule adoption, at a density no greater than one per, mile by one per 1/2 mile (or 320 acre blocks), may be allowed at the discretion of the Commission when it is determined that accurate evaluation of "undrained" conditions is not practicable. Water management systems must be designed to meet these criteria utilizing models or other quantitative methods in accordance with Paragraph (g} of this Rule and considering a wide range of rainfall eonciittons. Tile frequency -duration distribution for flows leaving the site durill" and after mining should as much as 1 N0RTII CA It01.I1NA ADNIIN'ISTI� ATIVE C-0DE _ Effective April 1.2003 Pattie IS uf34 ENR-EA'VIRONMENTAL r11ANAGEMENT COIM MISSION T15A: 02H.0200 Pending during the quarter. The quarters begin on January 1, April 1, July 1, and October 1, and the report shall be submitted within 30 days after the end of each period. (c) Approval of Local Programs. The staff of the division shall acknowledge in writing receipt of an application for a local sewer system program, review the application, notify the applicant of additional information that may be required, and make a recommeridation to the Commission on the acceptability of the proposed local program. final action on the proposed local program shall be made by the Commission within 180 days of receiving a complete application. (d) Adequacy of Receiving Facilities. Local sewer system programs shall not issue a permit for a sewer project which would increase the flow or change the characteristics of waste to a treatment works or sewer system unless the local program has received a written determination from the Division that, pursuant to C.S. 143-215.67(a), the treatment works or sewer system is adequate to receive the waste. The Division staff may, when appropriate, provide one written determination that covers all local permits for domestic sewage sewer projects with total increased flow to a particular treatment works less than a specified amount and which are issued within a specified period of time not to exceed 60 days_ In no case shall the local sewer system program issue a permit for additional wastewater if the receiving wastewater treatment is in noncompliance with its Division issued permit unless the additional flow is allowed as part of a special order or judicial order- (e) Modification of a Local Program. After a local sewer system program has been approved by the Commission, any modification of the program procedures or requirements specified in Paragraph (a) of this Rule must be approved by the Commission to assure that the procedures and requirements remain at least as stringent as the state-wide requirements of the Commission. (i) Appeal of Local Decisions. Appeal of individual pernrit denials or issuance with conditions the permit applicant finds unacceptable shall be made to the local program authority or to an appropriate judicial level. The Commission will not consider individual permit denials or issuance %with conditions to which the permittee objects. This Paragraph does not alter the enforcement authority of the commission as specified in G.S. 143-215.1(f). (g) The Division shall maintain a list of all local units of government with approved local sewer system programs and make copies of the list available to the public upon request and payment of any reasonable costs for reproduction_ The list can be obtained from: Permilting and Engineering Unit Supervisor, Division of Environmental Management, Water Quality Section, 1'. O. Box 29535, Raleigh, North Carolina, 27626-0535_ History Note_ Authority G.S. 143-215.1; 143-215.3(a)(1); Eff February 1, 1986; Amended Eff. February 1. 1993; October 1, 1987. 155A rNCAC 02H .0219 rMINIrNIUNI DESIGN REQUIREMENTS (a) All facilities requiring a permit pursuant to this Section shall be designed following good engineering practice. The plans and specifications for all projects must be scaled by a Professional Engineer. The only exceptions from the Professional Engineer requirement arc those allowed in Rule .0205(d)(1)(A)(iii) of this Section. (b) Waste, including treated waste, shall not be placed directly into, or in contact with, GA classified groundwawer unless such placement will not result in a contravention of GA groundwater standards, as demonstrated by predictive calculations or modeling methods acceptable to the Director. (c) Impoundments, trenches or other excavations made for the purpose of storing or treating waste will not be excavated into bedrock unless the placement of waste into such excavations will not result in a contravention of assigned standards, as demonstrated by predictive calculations or modeling methods acceptable to the Director- (d) The bottoms of earthen impoundments, trenches or other similar excavations with the exception of nitrification fields, infiltration systems, and sewer line excavations shall be at least four feet above the bedrock surface, except that the bottom of excavations which are less than four feet above bedrock shall have a liner with a hydraulic conductivity no greater than I x 10-7 centimeters per second. Liner thickness will be that thickness necessary to achieve a leakage rate consistent with the sensitivity of classified broundwaters. Separation distances or liner requirements may be reduced if it can be demonstrated by NOI TII C.', R01,1:NA A1),NIIN1S RATI1T1,.: ('-:01)E Effective April 1, 2001 25 n1'44 EAIR-ENVIRONMENTAL_ MANAGEMENT CONIN11SMON TI5A: 02H.0200 predictive calculations or modeling methods acceptable to the Director, that construction and use of these treatmcnl and disposal units will not result in contravention of assigned standards. (e) Waste shall not be applied or discharged onto or below the land surface when the vertical separation between the waste and the seasonal high water table is less than one. font. If the area is to be utilized for industrial waste and has a separation of less than three feet, and in other areas as designated by the Director, a demonstration must be made using predictive calculations or modeling methods, acceptable to the Director, that such placement will not result in contravention of classified (,IYotrndWater standards. (f) Treatment works and disposal systems utilizing earthen basins, lagoons, ponds or trenches, excluding nitrification Fields, infiltration systems, and holding ponds containing non -industrial treated effluent prior to spray irrigation, for treatment, storage or disposal shall have either a liner of natural material at least one Coot in thickness and having a hydraulic conductivity of no greater Than l x 10-6 centimeters per second when cornpactcd, or a synthetic liner of sufficient thickness to exhibit structural integrity and an effective hydraulic conductivity no greater than that of the natural material liner. (g) Except as. otherwise provided by these requirements or by terms of a pe17nit, all waste treatment, storage and disposal facilities must maintain and operate a groundwater monitoring system as approved by the Division. The monitoring system must be designed to assess. the impact of any discharge on the quality of the underlying groundwaters and must be based on the results of the hydrogeologic investigation. (h) For pumping stations: (I ) no by-pass or overflow lines; (2) multiple pumps shall be provided capable of pumping at a rate of' 2.5 times the average daily flow rate with any one pump nut of service. Pump-on/Pump-off elevations shall be set such that 2-8 pumping cycles per hour may be achieved in the pump station at average flow. if extended detention timcs are necessary due to phased (levelopment, the need for odor and corrosion control must be evaluated by the applicant; (3) at least one of the following shall be required: (A) dual source or standby power supply on site or; (B) telemetry systems with sufficient numbers of standby generators and personnel for distribution or; (C) approval by the Director that the pump station: 0) serves a private water distribution system which has automatic shut-off at power failure and no elevated water storage tanks, and (ii) has sufficient storage capacity that no potential for overflow exists, and (iii) is connected to facilities that can tolerate septicwas[ewatcr due to prolonged detention or; (D) where the waters that would be impacted by a power failure are classified as C, the applicant may be allowed to show a history of power reliability that would demonstrate that an alternative power source or other reliability measures would not be needed; (4) screened vents for all wet wells; N high water audio and visual alarms; (G) protection from a 100 year flood; (7) restricted access to the site and equipmcnt; (S) all-weather roadway to the site. (i) For sewer systems and sewer system extensions: (1) All building drains and building sewers which are approved by the local building inspector in accordance with the North Carolina Building Code are deemed to be permitted by the Environmental Management Commission; (2) All sewers shall be designed based upon at least minimum standards which include: (A) flow rate at design loading should result in the sewer flowing approximately half full. The sewer must also be evahraled as to its ability to carTy peak loadings; (13) a velocity of two feet per second; (C) construction and operation shall not result in water pollution; (D) infiltration rate limited to 100 gallors per day per inch of pipe diameter per mile of pipe; flit) construction and operation consistent with all applicable local ordinances; NORTH C.-11tQl.,lNA ;klJNlINIS•I'RATIVF, CODE Effective Atpril 1. 2001 I'.r«e 26 of'44 Ufa ENR-EN FIR 0NVENT4L RIANAGEMENT COMMISSION TI5A: 02H.0200 (F) for public gravity sewers, a minimum eight inch diameter pipe and for private gravity sewers, a minimurn six inch diameter pipe; (G) minimurn separations (1) Storm sewers (vertical) 12 inches (ii) Water mains (vertical -water over sewer) 1Siriches or (horizontal) 10 feet (iii) In benched trenches (vertical) 18 inches (iv) Any private or public water supply source, including any WS-1 waters or Class I or Class I I impounded reservoirs used as a source of drinking water 100 feet M Waters classified NVS-11, WS-111, B, SA, O;;W, I-1QW, or SB [from normal high water (or tide clevation)j 50 feet ("0 Any other stream, lake or irnpoundment 10 feet (vii) Any building foundation 5 feet (viii) Any basement 10 feet (ix) Top slope of embankment or cuts of 2 feet or more vertical height 10 feet (x) Drainage systems (1) Interceptor drains 5 feet (11) Ground water lowering and surface drainage ditches 10 feet (xi) Any swimming pool 10 feet (xis) Ferrous sewer pipe with joints equivalent to water main standards, shall be used where these minimum separations cannot be maintained. The minimum separation .shall however not be less than 25 feet from a private well or 50 Ft from a public water supply well; (1-I) three feet minimum cover shall be provided for all sewers unless ferrous material pipe is specifiers. Ferrous material pipe or other pipe with proper bedding to develop design supporting strength shall be provided where sewers are subject to traffic bearing loads; (1) the maxinnun separation between manholes shall he 425 feet unless written documentation is submitted with the application that the ownerlauthority has the capability to perform routine cleaning and maintenance on the sewer at the specified manhole separation; 0) drop manholes shall be provided where invert separations exceed 2.5 feet; (K) manholes shall be designed for f 00-year flood protection; (L) an air relief valve shall be provided at all high points along force mains; (\9) odor and corrosion control must be satisfactorily addressed by the applicant for all sewers and force mains with extended travel times. (�) For treatment works and disposal systems: ( I ) no by-pass or overflow lines; (2) multiple pumps if pumps are used; U) at least one of the following: NOR'Fl l CAROLI`A AD) I I`ISl'RA TIVE CUl)1 Effective April 1, 2001 Paf_-c 27 uf'44 E11'R-EAII IRONIIENTAI 111ANACEIVIENT COMLYIISSION TI5A: 0211.0200 (A) dual source/dual feed or automatically activated standby power supply on site, capable of powering all essential treatment components under design conditions; or (B) approval by the Director that the facility: (i) serves a private water distribution system which has automatic shut-off at power failure and no elevated water storage tanks, and (ii) has sufficient storage capacity that no potential for overflow exists, and (iii) can tolerate septic wastewater due to prolonged detention; or (C) where the waters that would be impacted by a power Failure are classified as C Waters, the applicant may be allowed to show a history of power reliability that would demonstrate that an alternative power source or other rclwbility measures would not be needed; (4) protection from 100 year flood; (5) buffer zones of at least the foIlowin;g distances, and greatcr where necessary to comply with Section .0400 of this Subchapter or to address particular site or waste characteristics: (A) Any habitable residence or place of public assembly under separate ownership or which is to be sold: (1) for spiry irrigation systems (application area) not covered by Rule .0219(k) 400 feet (ii) for surfitce residual application 400 feet (iii) for subsurface residual injec6011 200 feet (iv) for facultative lagoons 400 feet (v) for activated sludge plants or surface sand filters 100 feet (vi) for soil remediation sites 100 feet 03) Any private or public water supply source 100 feet (C) Streams classified as WS or B: (i) for subsurface disposal 50 feet (ii) for non -discharge surface disposal except for high rate infiltration Systems 100 feet (iii) high rate infiltration syslems 200 feet (D) Waters classified SA or SB: (i) all systems except for high rate infiltration systems 100 feet from mean high water (ii) high rate infiltration systems 200 feet from mean high water (F) Any other stream, canal, marsh, or coastal waters: (1) for subsurface disposal 50 feet (ii) for non -discharge surface disposal except for high rate infillralion systems 100 feet (iii) high rate infiltration systems 200 feet (iv) �,�,astewatcr treatment facilities 50 feet (1-) Any Class 1 or Class 11 impounded reservoir used as a source of drinking water: \'p.ilTH (:�RCJL1\:1 :11):111:\!5"I'IZ:�"{'1�'E (:01)l: Vffective Anri1 1, 2001 ! auc 28 nf'44 ENR-L•'NVIRO,N'AIErVTAL AL-INAGE]WENT COMMISSION TIS_4: 02H.0200 (i) all systems except for high rate infiltration systems 100 feet from normal high water (ii) high rate infiltration systems 200 feet from normal high water (G) Any other lake or impoundment: (i) for subsurface disposal 50 feet (ii) for surface disposal except for high rate infiltration systems 100 feet (iii) high rate infiltration systems 200 feet (H) Any building foundation except treatment facilities: (i) for subsurface disposal 10 feet (ii) for surface disposal 15 feet (1) Any basement: (i) for subsurface disposal 15 feet (ii) for surface disposal 15 feet (J) Any properly line: (i) for spray irrigation 150 feet (ii) for other surface disposal systems 50 feet (iii) for subsurface residuals iniection 50 feet (iv) for other surface treatment systems 50 feet M for other subsurface systems 50 feet (vi) for soil remediation sites 50 feet (K) Top of slope of embankments or cuts of two feet or more in vertical height; (i) for systems other than rapid infiltration systems 15 feet (ii) for rapid infiltration systems 100 feet (L) Arty water line from a disposal system 10 feet (m) Drainage systems (Ditches, drains, surface \4ater diversions, etc): (i) Interceptor drains and surface water diversions (UpSIOpC): (1) for subsurface disposal 10 feet (11) for surface disposal other than spray irrigation systems and rapid infiltration systems 10 feet (11[) for spray inigationsystems 100 feet (IV) for rapid infiltration systems 200 feet 01) Interceptor drains and surface water diversions (downslope): (1) for subsurface disposal 25 feet 01) for surface disposal other than spray irrigation systems NORTH C: AR01,1NA AD.NJ1VISTRATIVE 0-ME Ia'fective April I. 2001 Pa_c 29 ol'at z w w +z ca m J Q U z Q T U w INFLUENT PUMP STATION MECHANICAL BAR SCREEN CURRENT FLOW DIAGRAM NORTHEAST WASTEWATER TREATMENT PLANT HICKORY, NC NEWEST NEWEST PRIMARY CLARIFIER AERATION BASIN 42% SECONDARY a CLARIFIER O O m FLOW w � ckf t CHLORINATION POST 0 � DECHLORINATION AERATION SPLITTER BOX TO LAKE HICKORY OUTFALL SECONDARY PRIMARY AERATION CLARIFIER +� CLARIFIERS BASIN RTN SLUDGE TO REGIONAL COMPOST FACILITY TANKER TRUCK SLUDGE GRAVITY BELT PUMP STATION THICKENER FIFTY YEARS CIVIL FIGURE 1 /20/0 60402A 1 1 M:\FILES\60000SERILS\60402A\CADD\DWG\CURRENTFLOWDIAGRAM.DWG 60402A 03/14/2007 09:05:59 GABRIELE (GABI) VANKURIN RE: NONE IMG' NONE PROPOSED FLOW DIAGRAM NORTHEAST WASTEWATER TREATMENT PLANT HICKORY, NC z w w U Cf) AERATION BASIN Z a SECONDARY O m x CLARIFIER Z J Q 7 O m O U w F O CHLORINATION POST CD cn DECHLORINATION AERATION SPUTTER BOX TO LAKE HICKORY OUTFALL SECONDARY CLARIFIER AERATION BASIN EQUALIZATION BASIN INFLUENT THICKENED PUMP STATION RTN SLUDGE SLUDGE STORAGE TO REGIONAL MECHANICAL COMPOST BAR SCREEN FACILITY P p Qp TANKER TRUCK SLUDGE ROTATING DRUM PUMP STATION WAS FILTER STORAGE FIFTY YEARS CIVIL FIGURE 6 8/20/0 60402A 1 1 M:\FILES\60000SERIES\60402A\CADD\DWG\PROPOSEDFLOWDIAGRAM.DWG 60402A 03/14/2007 08:32:38 GABRIELE (GABI) VANKURIN RF: NONE WG: NONE GRIT CLASSIFIER DRIVE MOTOR GRIT PUMP DRIVE MOTOR AIR OR WATER SCOUR SOLENOID BLOWER DRIVE MOTOR PADDLE ASSEMBLY DRIVE MOTOR CONTROL PANEL ALL CONDUIT AND WIRE CONNECTIONS BETWEEN CONTROL PANEL AND GRfT COMPONENTS BY OTHERS. i.� TM" H.P. PADDLE DRIVE STEEL BAFFLE AIRLIFT AIR REOUIREMENTS MODEL INFLUENT M.G.D. DIA. A DIM, B DIM. C DIM. 0 DIM. f DIA. F SEE NOTE 1 DIA, ,H ANG. J� SEE NOTE 1 PADDLE DRIVE H.P. M DIA N INLET VOLUME cFr� DISCHARGE PRESSURE pslc BLOWER H P G 1 G L j L 2 SG-6--1.0 1.0 6'-0' 2'-0' V-O" 3'-8" 5'-0" 3'-0" V-0" l'-O" 1'-0" 45- l'-5" V-8" 3/4 3'-6" 50 4.0 2.0 SG-7-2.5 2.5 7'-0' 2'-6" i'-3" 3'-8" 5--0' 3'-0' 1'-3- 1'-D' 1'-0" 45- 1'-11" 2'-2" 3/4 3'-6' 50 4.0 2.0 5G-8-4.0 4.0 8'-0" 3'-0" 1'-6" 4'-0" S'-0' 3'-Q" 1'-4' 1'-0" 1'-0" 45^ 2'-2" . 2'-4" 3/4 3'-6" 50 4.0 2.0 SG-10-7.0 7.0 10'-0" 4'-0" 2`-0" 4'-9" 5'-6' S'-0' 1'-6" 1'-D" 1'-6" 45� 2'-6' 2,-6" 1 5'-6" 50' 5.0 3.0 SG-12-12.0 12.0 12'-0' 5'-0' 2'-6" 5'-0' 6'-8" 5'-0' 1'-11' 1'-9" 1'J' 60- 3'-1" 3'-1" 1 5'-6" 50 5.0 3.0 SG-16-20.0 20.0 16'-0' 7'-0' 3'-6" 5'-6' 6'-10" 5'-0" 2'-2' 2'-0' 1'-6" 60- 3'-6" 3'-6' 2 5'-6" 75 5.0 3.0 SG-18-30.0 30.0 18'-0" 8'-0" 4'-0" 5'-6" 7'-0" 5'-0" 2'-8" 2'-3" V-6" 4'-3" 4'-3". 2 5'-6" 90 6.0 5.0 SG-20-50.0 50.0 20'-0' 9'-0" 4'-6- 7'-0' 1 8'-0' 5'-0" 1 3'-9" 3'-5' 1'-6" 60- 5'-10" 5'-10' 2 5'-6' 90 6.0 5.0 SG-24-70.0 70.0 24'--0' 1V-0' 5'-6" 7'-0" 8'-0' 6'-0" 3'-9" 3'-9" i'-6" 60� 5'-1l" 5'-11" 2 6'-6" 90 6.0 5.0 GRIT DISCHARGE LINE GRIT PUMP AIR OR WATER SCOUR LINE V MWE ASSIOW AIR " - _ • STEEL BAFFLE 'N �� -INLET RAMP X � � Q � ME 4 ROTATING ,F, PADDLES TWO PIECE STEEL • It FLOOR PLATE z 1) DIMENSIONS "C" AND "L" CHANGE ACCORDING TO TYPE OF SYSTEM: DIMS. G t AND L ARE USED FOR FREE FLOWING FLUME SYSTEM. DIMS. G 2AND 1. 2ARE USED FOR PARSHALL FLUME SYSTEM. REFER TO DRAWING D--66918-S FOR DIMENSIONS OF THE PARSHALL FLUME. 2) RECOMMENDED INLET STRAIGHT CHANNEL LENGTH IS 7 TIMES CHANNEL WIDTH ("C" DIMENSION) OR 15 FT, WHICHEVER IS GREATER, 3) ALL CONCRETE, GROUT, HANDRAIL AND CRAZING BY OTHERS. 4) ALL DIMENSIONS ARE PRELIMINARY AND SHOULD NOT BE USFD FOR CONSTRUCTION, 5) STEEL BAFFLE IS NOT REQUIRED ON UNITS 30 MGD AND OVER. o- 70 -s 40