Loading...
HomeMy WebLinkAboutNC0040045_Authorization to Construct_19921231 �1'rs�1TEs 4 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street-Raleigh,North Carolina 27611 James G.Martin,Governor A.Preston Howard,Jr.,P.E. William W. Cobey,Jr.,Secretary Acting Director December 31, 1992 Bill's Truck Stop C/O Bob Walser Route 1 Linwood, NC 27299 Subject: Permit No. ACB040045 Authorization to Construct Bill's Truck Stop Wastewater Treatment Facility Davidson County Dear Mr.Walser: A letter of request for an Authorization to Construct was received October 6, 1992 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction and operation of approximately 2,234 linear feet of six inch gravity sewer, a 32 GPM pump station with duplex pumps and high water alarms, and approximately 1700 linear feet of three inch force main to serve as an effluent pump station and effluent line with discharge into South Potts Creek in the Yadkin-Pee Dee River Basin pursuant to the application received October 6, 1992 and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO040045 issued August 28, 1992 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0040045. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action,including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Regional Offices Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O.Box 29535,Raleigh,North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer Permit No. NCO040045 Authorization to Construct Bill's Truck Stop December 31, 1992 Page 2 The Winston-Salem Regional Office, telephone number 919/896-7007 shall be notified at least forty-eight(48)hours in advance of operation of the installed facilities so that an in-place inspection can be made. Sucl-i notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday,excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit,P.O. Box 29535, Raleigh,NC 27626-0535. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC)of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within thirty days after the wastewater treatment facilities are 50%complete. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state,and federal)which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Randy L. Kepler, telephone number 919/733- 5083. Sincerely, Preston Ho/ard, P.E. cc: Davidson County Health Department Winston-Salem Regional Office,Water Quality Training and Certification Unit