HomeMy WebLinkAboutNC0039446_Authorization to Construct_20020129 McGiff
A S S O C I A T E S
;anu?219, 2002
KKerr T. Stevens, Director
orth Carolina Department of Environment and ! 200
Natural Resources Div QF 2
l•.
Division of Water Quality �,nt-A � 1'
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
RE: Linville Resorts Wastewater Treatment Plant
ATC No. 039446ACD
NPDES Permit No.NCO039446
Engineer's Certification
Dear Mr. Stevens:
Please find attached the engineer's certification for the construction of the above
referenced project. This certification is being submitted in accordance with the
requirements of the Authorization to Construct issued by your office on October 16,
2000.
If you need additional information regarding this project, please advise.
Sincerely,
McGILL ASSOCIATES, P.A.
MIKE WARESAK, P.E.
Project Engineering Manager
Enclosure
Cc: Bentley Parlier
Ed Greene
Gary Davis
Harry Buckner
99728/ks29jan02.doc
E n g i n e e r i n g P l a n n i n g • F i n a n c e
McGill Associates, P.A. -P.D. Box 2259, Asheville, NC 28802 - 55 Broad Street, Asheville, NC 28801
828-252-0575 - FAX 828-252-2518-
State of North Carolina
Department of Environment
and Natural Resources i • •
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary NCDENR
Kerr T. Stevens, Director
PROFESSIONAL ENGINEER'S CERTIFICATION
FOR
CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES
ATC PROJECT NUMBER: 039446ACD
Linville Resorts
NPDES Permit No. NCO039446
I, Michael J. Waresak , am a duly registered Professional Engineer
(please print)
in the State of North Carolina and have been authorized to observe (circle one: eriodical , wee6�-' }l
am&)the construction of the subject project for the Permittee:
Project No.: 039446ACD
Project: Linville Resorts, Inc.
Avery County
Flow expansion project
Location: corner of US Hwy 221 and NC Hwy 105
Linville North Carolina
The project consists of: D,,Mon
f WSW� ��
• Installation of new influent splitter box �,$�atipn
• Installation of an additional flow equalization pump Oft Iwo
• Installation of a 28,000 gallon equalization tank
• Installation of an additional 9,400 gallon sludge holding cap a
• Installation of an additional 50,000 gallon aeration basin
• Installation of an additional clarifier
• Installation of a 1,077 gallon chlorine contact chamber
• Installation of associated flow monitoring equipment
�
I hereby certify that I did regull" > roject with due care and diligence and that the
construction was completed in with the Authorization to Construct and with the
approved plans and specifi atic,
Signature Registration No. 19950
Date /-Z F- G 2. e r y
�ts�eeaaR
Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the
Division with a certification from a professional engineer certifying that the permitted facility has been installed in
accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications.
The Certification should be submitted to:
NCDENRIDWQ, NPDES Unit, 1617Mail Service Center, Raleigh, North Carolina 27699-1617
State of North Carolina
Department of Environment kl?WA
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary NCDENR
Kerr T. Stevens, Director
October 16, 2000
Mr. Bentley Parker
Linville Resorts,Inc.
P.O.Box 99
Linville,North Carolina 28646
Subject: Authorization to Construct
ATC No. 039446ACD
NPDES Permit No. NCO039446
Linville Resorts
Avery County
Dear Mr.Parker:
The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at
the Linville Resorts WWTP. The Division finds the proposed modifications to be satisfactory and hereby
grants authorization for the following:
• Installation of new influent splitter box
• Installation of an additional flow equalization pump
• Installation of a 28,000 gallon equalization tank
• Installation of an additional 9,400 gallon sludge holding capacity
• Installation of an additional 50,000 gallon aeration basin
• Installation of an additional clarifier
• Installation of a 1,077 gallon chlorine contact chamber
• Installation of associated flow monitoring equipment
This Authorization to Construct is issued in accordance with NPDES Permit No. NCO039446 and shall be
subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms
and conditions of the permit.
The Permittee shall notify the Water Quality Supervisor of the Asheville Regional Office, telephone number
(828) 251-6208, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in-place
inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00
p.m., Monday through Friday.
Engineer's Certification
Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide
the Division with a certification(copy enclosed) from a professional engineer registered in North Carolina
certifying that the permitted facility has been installed in accordance with the NPDES Permit, this
Authorization to Construct, and the approved plans and specifications. The Certification should be submitted
to: NCDENR/DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh,North Carolina 27699-1617.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919)733-0719
An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/
Linville Resorts, Inc.
NPDES Permit No. NCO039446
ATC No. 039446ACD
Page 2
Requirements for Certified Operator
The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC)
of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by the
Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate
type and grade to comply with the conditions of Title 15A,Chapter 8G, .0200. The ORC of the facility must
visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding
weekends and holidays; and must properly manage and document daily operation and maintenance of the
facility and comply with all other conditions of Title 15A, Chapter 8G, .0200.
Additional Requirements
The Operational Agreement between the Permittee and the Environmental Management Commission is
incorporated herein by reference and is a condition of this Permit.Noncompliance with the terms of the
Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation
of or failure to act in accordance with the terms and conditions of this Permit.
Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee
to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute
143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and
all statutes, rules,regulations,or ordinances which may be imposed by other government agencies (local,
state, and federal) which have jurisdiction.
The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the
facility. One(1)copy of the approved plans and specifications is enclosed for your records.
If you have any questions about this Authorization to Construct,please contact Mike Myers, at(919) 733-
5083, extension 508.
Sincerely,
Kerr T. Stevens
Director
Enclosures: Project Plans and Specifications(approved)
Engineer's Certification Form
cc: Asheville Regional Office, Water Quality
Technical Assistance and Certification Unit
Central Files
NPDES Unit Files
Mr. Dana Bolden, P.E.—McGill and Associates
P.O. Box 2259
Asheville,North Carolina 28802