Loading...
HomeMy WebLinkAboutNC0039446_Authorization to Construct_20020129 McGiff A S S O C I A T E S ;anu?219, 2002 KKerr T. Stevens, Director orth Carolina Department of Environment and ! 200 Natural Resources Div QF 2 l•. Division of Water Quality �,nt-A � 1' 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Linville Resorts Wastewater Treatment Plant ATC No. 039446ACD NPDES Permit No.NCO039446 Engineer's Certification Dear Mr. Stevens: Please find attached the engineer's certification for the construction of the above referenced project. This certification is being submitted in accordance with the requirements of the Authorization to Construct issued by your office on October 16, 2000. If you need additional information regarding this project, please advise. Sincerely, McGILL ASSOCIATES, P.A. MIKE WARESAK, P.E. Project Engineering Manager Enclosure Cc: Bentley Parlier Ed Greene Gary Davis Harry Buckner 99728/ks29jan02.doc E n g i n e e r i n g P l a n n i n g • F i n a n c e McGill Associates, P.A. -P.D. Box 2259, Asheville, NC 28802 - 55 Broad Street, Asheville, NC 28801 828-252-0575 - FAX 828-252-2518- State of North Carolina Department of Environment and Natural Resources i • • Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary NCDENR Kerr T. Stevens, Director PROFESSIONAL ENGINEER'S CERTIFICATION FOR CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES ATC PROJECT NUMBER: 039446ACD Linville Resorts NPDES Permit No. NCO039446 I, Michael J. Waresak , am a duly registered Professional Engineer (please print) in the State of North Carolina and have been authorized to observe (circle one: eriodical , wee6�-' }l am&)the construction of the subject project for the Permittee: Project No.: 039446ACD Project: Linville Resorts, Inc. Avery County Flow expansion project Location: corner of US Hwy 221 and NC Hwy 105 Linville North Carolina The project consists of: D,,Mon f WSW� �� • Installation of new influent splitter box �,$�atipn • Installation of an additional flow equalization pump Oft Iwo • Installation of a 28,000 gallon equalization tank • Installation of an additional 9,400 gallon sludge holding cap a • Installation of an additional 50,000 gallon aeration basin • Installation of an additional clarifier • Installation of a 1,077 gallon chlorine contact chamber • Installation of associated flow monitoring equipment � I hereby certify that I did regull" > roject with due care and diligence and that the construction was completed in with the Authorization to Construct and with the approved plans and specifi atic, Signature Registration No. 19950 Date /-Z F- G 2. e r y �ts�eeaaR Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENRIDWQ, NPDES Unit, 1617Mail Service Center, Raleigh, North Carolina 27699-1617 State of North Carolina Department of Environment kl?WA and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary NCDENR Kerr T. Stevens, Director October 16, 2000 Mr. Bentley Parker Linville Resorts,Inc. P.O.Box 99 Linville,North Carolina 28646 Subject: Authorization to Construct ATC No. 039446ACD NPDES Permit No. NCO039446 Linville Resorts Avery County Dear Mr.Parker: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the Linville Resorts WWTP. The Division finds the proposed modifications to be satisfactory and hereby grants authorization for the following: • Installation of new influent splitter box • Installation of an additional flow equalization pump • Installation of a 28,000 gallon equalization tank • Installation of an additional 9,400 gallon sludge holding capacity • Installation of an additional 50,000 gallon aeration basin • Installation of an additional clarifier • Installation of a 1,077 gallon chlorine contact chamber • Installation of associated flow monitoring equipment This Authorization to Construct is issued in accordance with NPDES Permit No. NCO039446 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. The Permittee shall notify the Water Quality Supervisor of the Asheville Regional Office, telephone number (828) 251-6208, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in-place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m., Monday through Friday. Engineer's Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification(copy enclosed) from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR/DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh,North Carolina 27699-1617. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919)733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/ Linville Resorts, Inc. NPDES Permit No. NCO039446 ATC No. 039446ACD Page 2 Requirements for Certified Operator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A,Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit.Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules,regulations,or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One(1)copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct,please contact Mike Myers, at(919) 733- 5083, extension 508. Sincerely, Kerr T. Stevens Director Enclosures: Project Plans and Specifications(approved) Engineer's Certification Form cc: Asheville Regional Office, Water Quality Technical Assistance and Certification Unit Central Files NPDES Unit Files Mr. Dana Bolden, P.E.—McGill and Associates P.O. Box 2259 Asheville,North Carolina 28802