Loading...
HomeMy WebLinkAbout20170785 Ver 1_401 Application_20170627W Kimley>>> Horn Transmittal 2 0 1 70 7 85 Date: June 26, 2017 Job Number: 015016170 Project Name: X CLT 132T Design To: Karen Higgins NC DWR, 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, North Carolina 27604 We are sending these by ❑ U.S. Mail ® FedEx ❑ Hand Deliver Other: JUN z 7 2017 , We are sending you ®Attached ❑ Under separate cover via the following items: Shop Drawings D Prints/Plans F-] Samples F-] Specifications E] Change Orders ® Other: 404/401 Pre -Construction Notification Package (NWP#27) Copies Date No. Description 4 06/26/2017 1 404/401 Pre -Construction Notification Package (NWP#27) 1 06/26/2017 2 PCN Application Fee Check 2 06/26/2017 3 Full -Size Plan Sheets 4 06/26/2017 4 Half -Size Plan Sheets These are transmitted as checked below: ® For your use Approved as submitted F-] Resubmit 7 Copies for approval As requested Approved as noted ® Submit F� Copies for distribution For review and comment Returned for corrections F-] Return F-1 Corrected prints Remarks: If you have any questions, please feel free to contact me at 704-409-1802. Copy to: File Signed Chris Tinklenberg, PWS Corps Submittal Cover Sheet Please provide the following info: 1. Project Name: Cross -Charlotte Trail - Brandywine Road to !)vola Road 2. Name of Property Owner/Applicant: City of Charlotte 3. Name of Consultant/Agent: Kimley-Horn & Associates, Inc. *Agent authorization needs to be attached 4. Related/Previous Action ID number(s): N/A 5. Site Address: Brandywine Road to Tvvola Road 7. City: Charlotte 8. County: Mecklenburg 9. Lat: 35.165123 Long: -80.846275 (Decimal Degrees Please 10. Quadrangle Name: Charlotte East 11. Waterway: Little Sugar Creek 12. Watershed: HUC: 03050103 13. Requested Action: X Nationwide Permit # 14&27 L_ -A U General Permit # D X Jurisdictional Determination Request 2 7 zQ17Pre-Application Request (Mitigation Proposal) DE"2!1 The following information will be completed by the Corps office: AID: Prepare File Folder Assign number in ORM Begin Date Authorization: Section 10 Section 404 Project Description/ Nature of Activity/ Project Purpose: Site/Waters Name: Keywords: Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW- 2017 Begin Date (Date Received): Prepare file folder ❑ Assign Action ID Number in ORM ❑ 1. Project Name [PCN Form A2a]: Cross Charlotte Trail - Brandywine Road to Tyvola Road 2. Work Type: ❑Private 1:1 Institutional ❑✓ Government ❑Commercial 3. Project Description / Purpose [PCN Form B3d and 133e]: The purpose of this project is to construct a greenway trail and implement natural channel design techniques in order to stabilize bed and banks, increase dissolved oxygen, improve habitat diversity and to protect low-water trail crossings. This submittal is to request a PJD and submit PNC pursuant to NWP 14 & 27 for the Cross Charlotte Trail - Brandywine Road to Tyvola Road segment. 4. Property Owner / Applicant [PCN Form A3 or A41: COC-E&PM; POC: Erin Shanaberger 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Kimley-Horn; POC Mr. Chris Tinklenberg, PWS 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: Located along Little Sugar Creek (LSC) from Brandywine Road to Tyvola Road in Charlotte, North Carolina 8. Project Location —Tax Parcel ID [PCN Form Bla]: Multiple -Linear Project 9. Project Location — County [PCN Form A2b]: Mecklenburg 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Charlotte 11. Project Information — Nearest Waterbody [PCN Form B2a]: Little Sugar Creek 12. Watershed / 8 -Digit Hydrologic Unit Code [PCN Form 132c]: Lower Catawba (HUC 03050103) Authorization: Section 10 ❑ Section 404 ❑✓ Regulatory Action Type: Standard Permit ✓ Nationwide Permit #14 & 27 Regional General Permit # ✓ Jurisdictional Determination Request Section 10 and 404 ❑ Pre -Application Request Unauthorized Activity Compliance No Permit Required Revised 20150602 Kimley»>Horn June 22, 2017 Mr. David Shaeffer Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Ms. Karen Higgins NC DWR, 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Re: 404/401 Pre -Construction Notification (NWP 14 & 27) & Preliminary Jurisdictional Determination Request Cross Charlotte Trail — Brandywine Road to Tyvola Road (62T) Charlotte, Mecklenburg County, NC Dear Mr. Shaeffer and Ms. Higgins: On behalf of our client, The City of Charlotte, Engineering and Property Management (City or E&PM), Kimley-Horn (KH) is submitting the enclosed joint Section 404/401 Preconstruction Notification for the above referenced project for your review pursuant to Nationwide Permits 14 & 27 and General 401 Water Quality Certification numbers 4088 & 4087 as well as a Preliminary Jurisdictional Determination (JD) request package for your review for the above referenced project. Authorization is requested to construct a 12 -foot multi -use trail (i.e. greenway) along Little Sugar Creek as well as in -stream enhancements to provide uplift to the aquatic environment while protecting greenway infrastructure. The center of the project area is located at 35.165123°N, -80.846275°W. The following information is included as part of this application submittal: • Project Summary Sheet • Pre -Construction Notification Form Project Site Figures ■ Figure 1 —Vicinity ■ Figure 2 — USGS 7.5' Topo (Charlotte East Quadrangle) ■ Figure 3 — Meck. Co. SSURGO Soils (2016 Meck. Co. Aerial) ■ Figure 4 — PJD Field Sketch (2016 Meck. Co. Aerial) ■ Figure 5 — Proposed Conditions ■ Figure 6 — Representative Photographs Figure (by CWS) • 70% Construction Plans of Proposed XCLT Trail — Brandywine Road to Tyvola Road • Jurisdictional Determination Request Form • Field Data Forms ■ NCDWR Stream Identification Forms ■ Wetland Determination Data Form — EM&P Region • Project Site Photographs • Agency Correspondence Kimley>»Horn Project Background Page Z This project area is defined as Little Sugar Creek (LSC) from Brandywine Road to Tyvola Road located in the City of Charlotte, North Carolina (Figure 1). The Little Sugar Creek watershed currently is a developing urban area. Per the U.S. Census Bureau, the population of Charlotte has increased from 540,828 people in 2000 to 731,424 people in 2010. Based on historical aerials (1938, 1948, 1951, 1956, 1965, 1973, 1983, 1996, 2006, and 2008), most of the development in the watershed occurred between 1973 and 1993. Over the last two decades, this watershed and Little Sugar Creek have been a focus of the Charlotte -Mecklenburg Stormwater Services who has implement over a dozen projects in the watershed focused on improving water quality in LSC. The watershed at the downstream end of the project area is approximately 37 square miles. It is located in a developing watershed and partially drains parts of urban and sub -urban Charlotte, NC. The North Carolina Division of Water Resources (NC DWR) classifies Little Sugar Creek as a Class C water. The site is located in the Catawba River Watershed (12 -digit Hydrologic Unit 030501030102). The Cross -Charlotte Trail (XCLT) is a proposed 26 -mile greenway trail proposed to stretch from the North-South Carolina state line, through the UNC Charlotte Campus and to the Cabarrus County line. Through a partnership between the City of Charlotte and Mecklenburg County, this trail will connect parks, landmarks, and major employment centers and will serve both passive and active recreational opportunities for greenway users, while maintaining and preserving the natural aspects of the corridor. The 132T segment includes the construction of 1.5 miles of 12 -foot wide greenway trail and in -stream enhancements located along Little Sugar Creek. This segment of trail will tie into the existing Little Sugar Creek Greenway at Brandywine Road and will extend south to Tyvola Road. In general, the 26 -mile corridor will utilize existing and maintained sanitary sewer easement corridors in order to reduce clearing impacts, however, the B2T section of XCLT is heavily constrained by a number of factors including topography, access, grade -separation issues, aerial and above -ground utilities and private commercial/residential properties. Existing Conditions The Preliminary JD information reflects site conditions evaluated by Kimley-Horn staff (Chris Tinklenberg, PWS) and Carolina Wetland Services staff (Gregg Antemann, PWS) on December 1, 2014. The delineation was performed using a Trimble Geo7X sub -meter GPS to locate data form locations. Stream centerlines, edge of water and Ordinary High Water Marks (OHWM) were obtained from survey performed by CES Group Engineers, LLC. North Carolina Division of Water Resources (NCDWR) stream identification methodology was used to identify potentially jurisdictional streams. Complete stream forms, including NCDWR Methodology for Identification of Intermittent and Perennial Streams and Their Origins, Version 4.11 (NCDWR, September 2010) were completed for each stream. NCDWR Stream Classification Forms representative of Streams A -C are attached (SCP1-SCP3). A Wetland Determination Data Form representative of on-site non -jurisdictional upland areas is attached as DP1. See Figure 4 for locations of the stream classification points and the upland Wetland Determination Data Form. The project area is comprised of forested riparian areas paralleling Little Sugar Creek with adjacent commercial and residential areas (Figure 2, attached). Typical on-site vegetation includes sweetgum (Liquidambar styraciflua), red oak (Quercus rubra), American sycamore (Platanus occidentalis), Japanese honeysuckle (Lonicera japonica), kudzu (Pueraria lobata), green ash (Fraxinus pennsylvanica), glossy privet (Ligustrum lucidum), Chinese privet (Ligustrum sinense), English ivy Kimley»>Horn Pt�i�3 (Hedera helix), river cane (Arundinaria gigantea), golden bamboo (Phyllostachys aurea), poison ivy (Toxicodendron radicans), greenbriar (Smilax rotundifolia), and various grasses (Festuca spp.). Jurisdictional Delineation Results The results of the on-site field investigation indicate that there are three jurisdictional stream channels (Streams A -C) located within the project area (Figure 5b & 5d, attached). On -Site jurisdictional waters drain to and include Little Sugar Creek. Little Sugar Creek is part of the Lower Catawba River Basin (HUC 03050103) and is classified as "Class C Waters" by the NCDWR. According to the NCDWR, Class C Waters are defined as: "Waters protected for uses such as secondary recreation, fishing, wildlife, fish consumption, aquatic life including propagation, survival and maintenance of biological integrity, and agriculture." Perennial Relatively Permanent Waters (RPWs) The results of the on-site field investigation indicate that there are two perennial RPWs (Streams A -B) located within the project area (Figure 5d, attached). Stream A (Little Sugar Creek) originates off site in the northern portion of the project area and flows southwest for approximately 8,188 If before continuing off site. Stream B (Briar Creek) originates off site in the southern portion of the project limits and flows west for approximately 200 If to a confluence with Stream A. Stream A (R3UB1) exhibits evidence of strong continuity of channel bed and bank, strong in -channel structure, strong particle size of stream substrate, strong evidence of grade control, strong depositional bars or benches, strong evidence of recent alluvial deposits, strong evidence of sediment on plants or debris, and strong evidence of organic debris lines or piles. Stream characteristics indicate that continuous flow is present year-round in a typical year. Stream A scored a 42.5 out of a possible 63 points on the NCDWR Stream Classification Form, indicating perennial status (SCP1, attached). Stream B (R3UB1) exhibits evidence of strong continuity of channel bed and bank, strong in -channel structure, strong particle size of stream substrate, strong active/relict floodplain, and strong evidence of organic debris lines or piles. Stream B also exhibits evidence of moderate depositional bars or benches, moderate evidence of recent alluvial deposits, moderate sinuosity, and moderate grade control. Biological sampling within Stream B revealed a weak presence of fish and a weak presence of aquatic mollusks. Stream characteristics indicate that continuous flow is present year-round in a typical year. Stream B scored a 40 out of a possible 63 points on the NCDWR Stream Classification Form, indicating perennial status (SCP2, attached). Seasonal Relatively Permanent Waters (RPWs) The results of the on-site field investigation indicate that there is one seasonal RPW located within the project area (Stream C). Stream C originates off site and flows south for approximately 104 If to a confluence with Perennial RPW A (Figure 5, attached). Stream C (R4SB313) exhibits strong continuity of bed and bank, strong evidence of sediment on plants or debris, moderate in -channel structure, moderate particle size of stream substrate, moderate evidence of depositional bars and benches, and moderate evidence of recent alluvial deposits. Stream C scored 28.5 out of a possible 63 points on the NCDWR Stream Classification Form, indicating seasonal status (SCP3, attached). Kimley>>> Horn Agency Correspondence Cultural Resources Pc,qe 4 A letter was forwarded to the North Carolina State Preservation Office (SHPO) on January 20, 2016 to determine the presence of any areas of architectural, historic, or archaeological significance that would be affected by the project. A response was received from the SHPO on February 11, 2016 indicating that there are no known archaeological sites within the proposed project area. CWS also consulted the SHPO online GIS service and found no sites of architectural, historic, or archaeological significance within the project corridor. In addition, CWS consulted the Charlotte- Mecklenburg County Historic Landmark Commission and found no properties adjacent to, or within, the project limits. Protected Species A data review was conducted using North Carolina Natural Heritage Program (NCNHP) Data Explorer on January 20, 2016 to determine the presence of any federally -listed, candidate endangered, threatened species, or critical habitat located within the project area. Based on the NCNHP review, there are no records of federally -protected species within the project limits or within a mile of the project site. A copy of the data review report is attached. However, the recent listing of the Northern long-eared bat (Myotis septentrionalis) now requires consultation with the United States Fish and Wildlife Service (USFWS). The Northern long-eared bat (NLEB) is one of the species of bats most impacted by the white -nose syndrome disease. Habitat for the NLEB includes forested areas of any age, rocky areas with boulders, and culverts greater than four feet wide. Due to recent population declines of almost 89% caused by white -nose syndrome and continued spread of the disease, the NLEB now receives protection as a Threatened species under the Endangered Species Act. A Threatened species is defined as a taxon likely to become endangered within the foreseeable future throughout all or a significant portion of its range. This project takes place within the NLEB habitat range. Due to the nature of this project, a thin row of trees and shrubs will be cleared along Little Sugar Creek totaling approximately 1.0 acre. Due to the minimal clearing required, we believe this project may affect, but is not likely to adversely affect the NLEB. A letter was forwarded to the USFWS requesting consultation regarding the NLEB on January 20, 2016. A response was received on January 20, 2016 from USFWS indicating that there are no records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. Proposed Impacts to Jurisdictional Waters In order to protect users of the trail by eliminating at grade crossings of busy roads, the alignment is proposed to pass through a culvert located beneath Park Road and East Woodlawn Road. East Woodlawn and Park Roads are very busy thoroughfares. Moreover, the route is designed to be compliant with the Americans with Disabilities Act (ADA) and Charlotte -Mecklenburg standards for trails and pathways, thus requiring a maximum slope of approximately 5%. For this slope to be maintained and for the route to pass beneath Brandywine Road, E Woodlawn Road and Park Road, grading and construction activities associated with the trail installation will impact Little Sugar Creek below the OHWM. These impacts will also allow for the preservation of mature canopy species along the top of bank of Little Sugar Creek. A total loss of channel bed and stream function is not proposed Kimley>>> Horn Pt , e 5 by this project — only minor bank/bed impacts on one side, as the trail runs parallel and below OHWM in a few locations (due to constraints). The overall project includes the construction of approximately 8,100 linear feet of a 12 -foot wide greenway trail. Streamside impacts below OHWM have been reduced to the maximum extent practicable to minimize impacts to stream functions already degraded by the urban watershed. Two sections of greenway will necessitate excavation and fill below the OHWM resulting in 966 linear feet of permanent — no net loss of WoUS in order to construct the trail running parallel along the edge of water, including applicable retaining walls, grading, and bank stabilization. Natural channel design techniques will be implemented to install four rock cross -vanes and associated constructed riffles at the low-water trail crossing locations. The purpose of the structures will be to stabilize the bed and banks, increase dissolved oxygen concentrations, improve aquatic habitat diversity, and to protect the low-water crossings from the hydraulic forces during storm events. 460 linear feet of stream enhancement (permanent — no net loss of WoUS) is proposed as part of this project. Due to the highly -constrained project area, it is necessary for a portion of the construction activities to be conducted within the channel bed of LSC. Due to the size and drainage area of LSC, it is not feasible to utilize measures, i.e. impervious dikes and pumped diversions, in order to work in dry conditions. 4,700 linear feet of temporary stream impacts are requested to conduct construction activities including tracked back -hoe access, where greenway construction from the banks is not feasible. Temporary impacts have been minimized to the greatest extent practicable in order to meet the needs of the project and do not pose adverse alterations to the existing channel bed. An application to work in the wet will be submitted to NCDWR, Sediment and Erosion control which is typical for these type of projects. Compensatory Mitigation As part of the pre -application process, the USACE recommended conducting an NC SAM evaluation in order to qualitatively assess the existing conditions within areas of proposed stream -side impacts. In addition, an assessment of these areas in the proposed conditions was completed to determine what sub functions might be degraded, if any, as a result of the greenway construction. Based on the results of the qualitative assessment, the USACE recommended developing a project specific methodology for interpolating a quantitative value based on the qualitative assessment. The results of the quantitative assessment were then utilized in determining the appropriate compensatory mitigation requirements for impacts associated with the project. Based on the results of the NC SAM evaluation and methodology for calculating compensatory mitigation to offset stream -side area impacts, 36 stream credits will be purchased from the City of Charlotte's Stream and Wetland Mitigation Bank for offsetting impacts associated with this project. Based on the current rate schedule of $502 per linear foot, the project proposes mitigation payment in the amount of $18,072. Kimley>>> Horn ria c 6 Please feel free to contact me at (704) 409-1802 if you have any questions or if additional information is necessary. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Chris Tinklenberg, PWS Environmental Scientist Attachments Cc: Joe Frey, P.E. Project Manager City of Charlotte Kimley>>> Horn Project Summary Sheet Project Name: Cross -Charlotte Trail — Brandywine Road to Tyvola Road (132T) Applicant Name and Address: City of Charlotte POC: Erin Shanaberger Stream Channel 600 East Fourth Street Open Water Wetland Charlotte, NC 28202 NWP Telephone Number: 704-336-3927 Perennial and/or Important Type of Request: ® Nationwide PCN (NWP # 14 & 271 ❑ Individual Permit Application ® Jurisdictional Determination ❑ Other: Aquatic Function Included Attachments: ® Project Plans ® USGS Map ® NRCS Soil Survey ® Agent Authorization ® Delineation Sketch ❑ Delineation Survey ® Data Forms (Up & Wet) ® NCDWR Stream Forms ® USACE Stream Forms ❑ NCEEP Confirmation ® Aerial Photo ® Site Photos ® Agency Correspondence ❑ Other: ❑ Other: Check if applicable: ❑ CAMA County ❑ Trout County ❑ Isolated Waters ❑ Section 7, ESA ❑ Section 106, NHPA ❑ EFH ❑ Mitigation Proposed (❑ NC EEP ❑ On -Site ❑ Off -Site ❑ Other) County: Mecklenburg Nearest City/Town: Charlotte Waterway: Little Sugar Creek H.U.C.: 03050103 Property Size (acres): —31 Site Coordinates (in decimal degrees): 35.165123 ON River Basin: Lower Catawba USGS Quad Name: Charlotte East, NC Approx. Size of Jurisdiction on Site (acres): 3.88ac -80.846275 °W Project Location: The project area parallels Little Sugar Creek from Brandywine Road to Twola Road in Charlotte, NC. Site Description: Existing land use in the vicinity of the project includes forested riparian areas that parallel Little Sugar Creek with adiacent commercial and residential areas. Impact Summary (if applicable): The project will result in 966 linear feet of permanent -no net loss impacts to potential non -wetland waters of the US. The proiect will result in permanent -no net loss impacts to 460 If of potential non -wetland waters of the US from implementing natural channel design techniques to install four rock cross -vanes and associated constructed riffles. 4,700 linear feet of temporary stream impacts are requested to conduct construction activities. Kimley-Horn Contact: Chris Tinklenberg, PWS Direct Number: -(704) 409-1802 Email: chris.tinklenbergna,kimley-horn.com Stream Channel Open Water Wetland NWP (acres) (acres) Intermittent and/or Unimportant Perennial and/or Important Aquatic Function Aquatic Function # Tem Perm. Tem Perm. Temp. Perm. Temp. Perm. If ac If ac If ac If Ac 14 966 0.25 27 460 0.21 14&27 4700 2.16 Total Total Permanent — No Net Loss Impact to Waters of the U.S. (If/acres) 1,426/0.46 Kimley-Horn Contact: Chris Tinklenberg, PWS Direct Number: -(704) 409-1802 Email: chris.tinklenbergna,kimley-horn.com OF W ATF9 O� OG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 & 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): N 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes N No For the record only for Corps Permit: ❑ Yes N No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Cross -Charlotte Trail — Brandywine Road to Tyvola Road (62T) 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Charlotte and Right of Entry Agreements 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 14 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Public Agency 4b. Name: Erin Shanaberger, WPIT 4c. Business name (if applicable): City of Charlotte, Engineering and Property Management 4d. Street address: 600 East Fourth Street 4e. City, state, zip: Charlotte, NC 28202 4f. Telephone no.: 704-336-3927 4g. Fax no.: 4h. Email address: Erin.Shanaberger@charlottenc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Chris Tinklenberg, PWS 5b. Business name (if applicable): Kimley-Horn and Associates 5c. Street address: 200 South Tryon Street, Suite 200 5d. City, state, zip: Charlotte, NC 28202 5e. Telephone no.: 704-409-1802 5f. Fax no.: 5g. Email address: Chris.Tinklenberg@kimley-horn.com Page 2 of 14 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): City of Charlotte and Right of Entry Agreements 1 b. Site coordinates (in decimal degrees): Latitude: 35.165123 Longitude: - 80.846275 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 31 acres (Project Boundary) 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Little Sugar Creek proposed project: 2b. Water Quality Classification of nearest receiving water: Little Sugar Creek - Class "C" 2c. River basin: Lower Catawba; NCDWR Subbasin 03-08-34; HUC 03050103 Page 3 of 14 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This project area is defined as Little Sugar Creek (LSC) from Brandywine Road to Tyvola Road located in the City of Charlotte, North Carolina (Figure 1). The Little Sugar Creek watershed currently is a developing urban area. Per the U.S. Census Bureau, the population of Charlotte has increased from 540,828 people in 2000 to 731,424 people in 2010. Based on historical aerials (1938, 1948, 1951, 1956, 1965, 1973, 1983, 1996, 2006, and 2008), most of the development in the watershed occurred between 1973 and 1993. Over the last two decades, this watershed and Little Sugar Creek have been a focus of the Charlotte -Mecklenburg Stormwater Services who has implement over a dozen projects in the watershed focused on improving water quality in LSC. The watershed at the downstream end of the project area is approximately 37 square miles. It is located in a developing watershed and partially drains parts of urban and sub -urban Charlotte, NC. The North Carolina Division of Water Resources (NC DWR) classifies Little Sugar Creek as a Class C water. The site is located in the Catawba River Watershed (12 -digit Hydrologic Unit 030501030102). The project area comprises forested riparian areas paralleling Little Sugar Creek with adjacent commercial and residential areas. Typical on-site vegetation includes sweetgum (Liquidambarstyraciflua), red oak (Quercus rubra), American sycamore (Platanus occidentalis), Japanese honeysuckle (Lonicera japonica), kudzu (Pueraria lobata), green ash (Fraxinus pennsylvanica), glossy privet (Ligustrum lucidum), Chinese privet (Ligustrum sinense), English ivy (Hedera helix), river cane (Arundinaria gigantea), golden bamboo (Phyllostachys aurea), poison ivy (Toxicodendron radicans), greenbriar (Smilax rotundifolia), and various grasses (Festuca spp.). Three jurisdictional stream channels (Streams A -C) located within the project area. On -Site jurisdictional waters drain to and include Little Sugar Creek. Little Sugar Creek is part of the Lower Catawba River Basin (HUC 03050103) and is classified as "Class C Waters" by the NCDWR. According to the NCDWR. No jurisdictional wetlands were identified within the project area. 3b. List the total estimated acreage of all existing wetlands on the property: Oac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The total length of all on-site streams is approximately 8.492 linear feet. 3d. Explain the purpose of the proposed project: The purpose of the project to construct a greenway trail and implement natural channel design techniques in order to stabilize bed and banks, increase dissolved oxygen, improve habitat diversity and to protect low-water trail crossings. Page 4 of 14 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: The Cross -Charlotte Trail (XCLT) is a proposed 26 -mile greenway trail proposed to stretch from the North-South Carolina state line, through the UNC Charlotte Campus and to the Cabarrus County line. Through a partnership between the City of Charlotte and Mecklenburg County, this trail will connect parks, landmarks, and major employment centers and will serve both passive and active recreational opportunities for greenway users, while maintaining and preserving the natural aspects of the corridor. The B2T segment includes the construction of 1.5 miles of 12 -foot wide greenway trail and in -stream enhancements located along Little Sugar Creek. This segment of trail will tie into the existing Little Sugar Creek Greenway at Brandywine Road and will extend south to Tyvola Road. In general, the 26 -mile corridor will utilize existing and maintained sanitary sewer easement corridors in order to reduce clearing impacts, however, the 62T section of XCLT is heavily constrained by a number of factors including topography, access, grade -separation issues, aerial and above- ground utilities and private commercial/residential properties. In order to protect users of the trail by eliminating at grade crossings of busy roads, the alignment is proposed to pass through a culvert located beneath Park Road and East Woodlawn Road. East Woodlawn and Park Roads are very busy thoroughfares. Moreover, the route is designed to be compliant with the Americans with Disabilities Act (ADA) and Charlotte -Mecklenburg standards for trails and pathways, thus requiring a maximum slope of approximately 5%. For this slope to be maintained and for the route to pass beneath Brandywine Road, E Woodlawn Road and Park Road, grading and construction activities associated with the trail installation will impact Little Sugar Creek below the OHWM. These impacts will also allow for the preservation of mature canopy species along the top of bank of Little Sugar Creek. A total loss of channel bed and stream function is not proposed by this project — only minor bank/bed impacts on one side, as the trail runs parallel and below OHWM in a few locations (due to constraints). The overall project includes the construction of approximately 8,100 linear feet of a 12 -foot wide greenway trail. Streamside impacts below OHWM have been reduced to the maximum extent practicable to minimize impacts to stream functions already degraded by the urban watershed. Two sections of greenway will necessitate excavation and fill below the OHWM resulting in 966 linear feet of permanent — no net loss of WoUS in order to construct the trail running parallel along the edge of water, including applicable retaining walls, grading, and bank stabilization. Natural channel design techniques will be implemented to install four rock cross -vanes and associated constructed riffles at the low-water trail crossing locations. The purpose of the structures will be to stabilize the bed and banks, increase dissolved oxygen concentrations, improve aquatic habitat diversity, and to protect the low-water crossings from the hydraulic forces during storm events. 460 linear feet of stream enhancement (permanent — no net loss of WoUS) is proposed as part of this project. Due to the highly -constrained project area, it is necessary for a portion of the construction activities to be conducted within the channel bed of LSC. Due to the size and drainage area of LSC, it is not feasible to utilize measures, i.e. impervious dikes and pumped diversions, in order to work in dry conditions. 4,700 linear feet of temporary stream impacts are requested to conduct construction activities including tracked back -hoe access, where greenway construction from the banks is not feasible. Temporary impacts have been minimized to the greatest extent practicable in order to meet the needs of the project and do not pose adverse alterations to the existing channel bed. An application to work in the wet will be submitted to NCDWR, Sediment and Erosion control which is typical for these type of projects. Track hoes and other earth moving equipment is anticipated to be used on this project. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / EI Yes ®No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 5 of 14 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. When complete, the Cross-Charlotte Trail will include 26 miles of trail and connectors. Currently, half of the overall trail is in design or under construction. Per coordination with USACE and NCDWR, any impacts associated with future phases of the project require compensatory mitigation, therefore, compensatory mitigation is proposed as part of this project. The City of Charlotte will continue to address future phases of the project and mitigation requirements associated with those phases with USACE and NCDWR when necessary. Page 6 of 14 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction Page 7 of 14 PCN Form — Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) (if known) DWQ — non -404, other) (acres) or Temporary T W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) intermittent DWQ — non -404, width (linear or Temporary (INT)? other) (feet) feet) (T) Stream -side area LSC — Impact 1 impact (below OHWM), LSC ® PER ® Corps 20 622 ® P ❑ T construction of ❑ INT ® DWQ (0.17ac) greenway Stream -side area LSC — Impact 2 impact (below OHWM), LSC ® PER ® Corps 20 344 ® P ❑ T construction of ❑ INT ® DWQ (0.08ac) greenway Stream enhancement; LSC — Impact 3 installation of LSC ® PER ® Corps 20 90 ® P F -1T constructed riffle and ❑ INT ® DWQ rock -cross vane Stream enhancement; LSC — Impact 4 installation of LSC ® PER ® Corps 20 100 ® P ❑ T constructed riffle and F-1INT® DWQ rock -cross vane Stream enhancement; LSC — Impact 5 installation of LSC ® PER ® Corps 20 140 ® P ❑ T constructed riffle and ❑ INT ® DWQ rock -cross vane n Stream enhancement; LSC — Impact 6 installation of LSC ® PER ® Corps 20 130 ® P ❑ T constructed riffle and ❑ INT ® DWQ rock -cross vane Page 8 of 14 PCN Form — Version 1.3 December 10, 2008 Version LSC —Impact 7 Temporary impacts ® PER ® Corps ❑ P ®T necessary to conduct LSC [_1 INT ®DWQ 20 4,700 construction activities 3h. Total stream and tributary impacts 6,126 3i. Comments: Two sections of greenway will necessitate excavation and fill below the OHWM resulting in 966 linear feet of permanent — no net loss of WoUS in order to construct the trail running parallel along the edge of water, including applicable retaining walls, grading, and bank stabilization (Impacts 1-2). Natural channel design techniques will be implemented to install four rock cross-vanes and associated constructed riffles at the low-water trail crossing locations resulting in 460 linear feet of permanent — no net loss of WoUS (Impacts 3-6). 4,700 linear feet of temporary construction impacts are necessary to conduct construction activities including tracked back-hoe access, where greenway construction from the banks is not feasible. The project will not result in a linear loss of WoUS, however, 0.25 acres of permanent stream-side area impacts below the OHWM are necessary to construct the greenway trail. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody type Area of impact (acres) — Permanent (P) or Temporary 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4E Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then com tete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 9 of 14 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse E] Tar -Pamlico El Other: Project is in which protected basin? ® Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T B1 ❑P❑T EI Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P El Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Avoidance and minimization efforts for the greenway include the avoidance of 555 linear feet of imacts below the OHWM/stream-side area in two locations. The project will construct approximately 930 feet of elevated boardwalk in order to avoid additional stream impacts. Moreover, instead of installing culverted crossings within LSC, the project is proposing four low-water crossings and to install in -stream structures around those crossings in order to protect the infrasture as well as to provide aquatic uplift. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Temporary impacts have been minimized to the greatest extent practicable in order to meet the needs of the project and do not pose adverse alterations to the existing channel bed. Erosion control measures implemented during construction of the greenway will be removed immediatedly following the activity and any disturbance will be returned to preconstruction conditions. Temporary bridge crossings will be utilized along haul roads in order to avoid additional temporary stream impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ® Corps ® Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: City of Charlotte Stream and Wetland Mitigation Bank 3b. Credits Purchased (attach receipt and letter) Type Stream Quantity 36 Page 10 of 14 PCN Form — Version 1.3 December 10, 2008 Version 3c. Comments: As part of the pre -application process, the USACE recommended conducting an NC SAM evaluation in order to qualitatively assess the existing conditions within areas of proposed stream -side impacts. In addition, an assessment of these areas in the proposed conditions was completed to determine what sub functions might be degraded, if any, as a result of the greenway construction. Based on the results of the qualitative assessment, the USACE recommended developing a project specific methodology for interpolating a quantitative value based on the qualitative assessment. The results of the quantitative assessment were then utilized in determining the appropriate compensatory mitigation requirements for impacts associated with the project. Based on the results of the NC SAM evaluation and methodology for calculating compensatory mitigation to offset stream - side area impacts, 36 stream credits will be purchased from the City of Charlotte's Stream and Wetland Mitigation Bank for offsetting impacts associated with this project. 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 11 of 14 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? <5% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: B2T is a linear facility and Little Sugar Creek has been grandfathered, therefore, the project is being treated as one facility and is not subject to the additional impervious built upon area requirements 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 12 of 14 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 13 of 14 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A review of the North Carolina Natural Heritage Program (NCNHP) database on January 14, 2016 did not indicate known occurences of threatened or endangered species within the project boundary. Additionally, a letter from USWFS dated February 22, 2016, concurred that no listed species or their habitats are present within the project boundary. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCNHP element occurrence database did not indicate the presence of EFH within the project boundary. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ® Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? A letter from the North Carolina State Historic Preservation Office (SHPO) dated February 11, 2016 states that there are no known archeological sites within the project area, however, the project will occur within the National Register -eligible Selwyn Village Historic District (MK2113). NCSHPO recommends minimal mature tree removal in order to avoid adverse affects to the property's view shed. Minimal tree clearing will occur as part of this project and will be predominately limited to those areas immediately adjacent to LSC where the vegetation is made up of primarily invasive species and young hardwoods. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A flood impact analysis report, no -rise impact certification, and individual floodplain development permit will be submitted to Mecklenburg County for review and approval prior to construction/restoration activities. The results of the flood impact analysis show that there is no net increase in base flood elevations. 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM No. 3710454100K STORM Digitally signed by Erin W Erin T. Shanabergerp WPIT WATER Shanaberger s..e.,= Date: 2017.06.2313:0124-04'00' 6/19/2017 Applicant/Agent's Signature Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 14 of 14 PCN Form —Version 1.3 December 10, 2008 Version Huntemvllle iarlotte I Concord _ nes ad a chj/n do tOw oTra ; 0 2'"hrohe Ave f a s�° 3 'k a o e o' C" aOxlord;. ve Q' h^wood Ot o h c oq ?t Oevon 0 5 r 10 : IMkc v ° 0 � Miles 4)// freedom Hill o 4 Q.�9 MonM.mn O` qve o sae ad Park Club p Elam•May „ CIVb � e i (a On4� ^Me R Reece Vr L^rene Ave °a (� T arr9A'/qv .. E g Freedom RPeA el Ro l e 10 eta qve las Q•O � 9� e - qve Is rn Colony Rd - E WOodl Drexel PI �.•,' I::..sa Bra^dYwine Rd n c O qve 0 O Yale PI n z �Orexmor y a c4°egq °°a _ 1. Montlotd Or e a � 4 a M4rrarhr//,po p ga I� Rd = Abbey PI 3 y U 0.ockbroo* h'oodl`oJen p MicAasJQ akar S.'.0.401 j� Gen Nn `- Pnnceton Ave O ckrngrnrd Ln e°dDek, Mn oro ad n 3 Granum Mi Odle ads o � sOO Hasuno maw, n annytn c a S c aYhr/, R c e"ur horn Pineville Indian nes ad a chj/n do tOw oTra Y, t ° YHsPa 1° 'N l_'1" netdad O ,peel e o' C" 9Aa h^wood Ot o h c oq ?t Oevon 0 5 r 10 : IMkc O don Rock � Miles 4)// PukRe ode Ove RroD ood Myers Dark gran Hill Q.�9 MonM.mn O` qve u Club p Elam•May „ CIVb � e i (a On4� ^Me R Reece Vr L^rene Ave °a (� T arr9A'/qv a Ua Or Ur ern eVo' Or Ro l e 10 eta Q•O � ,..,a„ v n' Colony Rd - E WOodl Drexel PI �.•,' I::..sa Bra^dYwine Rd a n Rd ., P Rd ° c+ bank o E Woodl awn Hassell PI Ra ea j'Ln M n z �Orexmor �rll.. a Park Ngh Count? v Ctab °°a _ 1. Montlotd Or e a � 4 a M4rrarhr//,po p ga I� Rd = Abbey PI 3 y U 0.ockbroo* h'oodl`oJen p MicAasJQ akar °rp �a0a� ead p` Rn, ac pl I.—tan, x ado S°rye4 Sa°� G Ql MadlsOn p/ O ckrngrnrd Ln e°dDek, Mn Fara At., Gene LnawxJtl Park ' �atec Ale r o00o Granum Mi Odle ads o � o Len na^nuvy M n w a annytn c a S G aYhr/, R c Cooper' Seneca Pt ° Pt da .>, p` n Z5m 4 Ebb p, `% Senecao Y Q' d3 aa� e S c ya0.etil° artlay 3 d 3 Wheelock ad Vice 7yvola o°a Rd y i �F J Downs O Ctat enop°a >ninhMfk.rdeeryol O a 'i, in _rnaional m` `e1 as p^e i rase YRd S n saR 0' Iy Ctele e,wYc eau c lanxrage<atrdak• � >a� Co,dand rk a 4 6eV n a c 4ah°a F � Ate. ba^xx Msr. n tM<N nmunm vwk O Jas. e a of v ; Ra r dsot` Rrchat sorb° t O c.. y,°° J a ,yon Ridge oras lei y u^ Ra thocae QO� cC ar n v u 1°� v n aa° 0 °ca 7y1 Rexro'are ShajOCTOx6. '40 0/ eRa d n(n w a/ ..r <aaP tdaa era SaO tors Fd`° Montclair! ? nM�r.,rl oa Q' Madison K hp Park %oi o„r did Ot pcan N 3 qp a Q,b cGl lYe^SrerO �O ort > Blvd vaOn Bj qua - EI•nentay St-ewo d°` BulAn” . . o d n f date Pt Z Go1(1nB r} y nP°ar� Cgnnuney Park O ° n C j %% /oddo trek, N n R o Rd o CortsDafe Rd �m /,• ��had S 1e Ur 't 16,Park Fat toed FalrmeadowsQ W �.. c Legend Archdale Or P�chda a 0 F.44o°ybrne (H f o Farr � s � Parkstone o z 0 2,000 4,000 Project Area G a N Feet • Figure 1: Vicinity Cross -Charlotte Greenway - Brandywine to Tyvola — Kimley>Morn Charlotte, Mecklenburg County, NC (:1URLOTTE_ June 2017 ENGINEERING a PROPERTY MANAGEMENT Writ 01 a� dop i "ridt 1 r �.� � � � - • � � may. a� � _� . Ap LN 01 ere Vol 40 h .a a .r Dr • 1 �t r r , w rY .. Ir a �: •r t r Legenda bury` !; 0 1,000 2,000 Project Area 7= Feet • Figure 2: USGS Topo (Charlotte East) Cross -Charlotte Greenway - Brandywine to Tyvola Kimley>Morn Charlotte, Mecklenburg County, NC June 2017 ENGINEERING 6 PROPERTY MANAGEMENT Jurisdictional Determination Request US Army Corps of Engineers Wilmington District This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as described within each category, with your request. You may submit your request to the appropriate Corps Field Office (or project manager, if known) via mail, electronic mail, or facsimile. A current list of county assignments by Field Office and project manager can be found on-line at: http://www.saw.usace.army.mil/Missions/RegulatoLyPermitpro rg am.asI)x , by telephoning: 910-2514633, or by contacting any of the field offices listed below: ASHEVILLE REGULATORY FIELD OFFICE US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 General Number: (828) 271-7980 Fax Number: (828) 281-8120 RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 General Number: (919) 554-4884 Fax Number: (919) 562-0421 WASHINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 General Number: (910) 251-4610 Fax Number: (252) 975-1399 WILMINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 General Number: 910-251-4633 Fax Number: (910) 251-4025 Version: December 2013 Page 1 Jurisdictional Determination Request INSTRUCTIONS: All requestors must complete Parts A, B, C, D, E and F. NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a paying client or your agency, please note the specific submittal requirements in Part G. NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that all JD requests must include the current property owner authorization for the Corps to proceed with the determination, which may include inspection of the property when necessary. This form must be signed by the current property owner to be considered a complete request. NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for JD requests associated with North Carolina Department of Transportation (NCDOT) projects will be conducted according to the current NCDOT/USACE protocols. NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should also request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Version: December 2013 Page 2 Jurisdictional Determination Request A. PARCEL INFORMATION B. C. Street Address: City, State: County: Directions: Cross -Charlotte Trail — Brandywine Road to Tyvola Road (62T) Charlotte, NC Mecklenburg The project begins at Brandywine Road and parallels Little Sugar Creek until Tyvola Road Parcel Index Number(s) (PIN): REQUESTOR INFORMATION Name: Mailing Address: Telephone Number: Electronic Mail Address' City of Charlotte and Right of Entry Agreement Erin Shanaberger, WPIT City of Charlotte, 600 East Fourth Street Charlotte, NC 28202 704336-3927 erin.shanaberger@chadoffenc.gov Select one: ❑✓ I am the current property owner. ❑ I am an Authorized Agent or Environmental Consultant ❑ Interested Buyer or Under Contract to Purchase ❑ Other, please explain. PROPERTY OWNER INFORMATION Name: Mailing Address: Telephone Number: Electronic Mail Address 3: City of Charlotte and Right of Entry Agreements ❑ Proof of Ownership Attached (e.g. a copy of Deed, County GIS/Parcel/Tax Record data) 1 If available z Must attach completed Agent Authorization Form 3 If available Version: December 2013 Page 3 Jurisdictional Determination Request D. PROPERTY OWNER CERTIFICATION I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Property Owner (please print) Property Owner Signature E. JURISDICTIONAL DETERMINATION TYPE Select One: Date I am requesting that the Corps provide a preliminary JD for the property identified herein. This request does include a delineation. F] I am requesting that the Corps provide a preliminary JD for the property identified herein. This request does NOT include a delineation. I am requesting that the Corps investigate the property/project area for the presence or absence of WoUS5 and provide an annroved JD for the property identified herein. This request does NOT include a request for a verified delineation. F] I am requesting that the Corps delineate the boundaries of all WoUS on a property/project area and provide an approved JD (this may or may not include a survey plat). ❑ I am requesting that the Corps evaluate and approve a delineation of WoUS (conducted by others) on a property/project area and provide an approved JD (may or may not include a survey plat). 4 For NCDOT requests following the current NCDOT/USACE protocols, skip to Part E. S Waters of the United States Version: December 2013 Page 4 Jurisdictional Determination Request F. ALL REQUESTS Map of Property or Project Area (attached). This Map must clearly depict the boundaries of the area of evaluation. Size of Property or Project Area 31 acres Iv -71 I verify that the property (or project) boundaries have recently been surveyed and marked by a licensed land surveyor OR are otherwise clearly marked or distinguishable. G. JD REQUESTS FROM CONSULTANTS OR AGENCIES (1) Preliminary JD Requests: 17Completed and signed Preliminary Jurisdictional Determination Form6. Z Project Coordinates: 35.165123 Latitude -80.846275 Maps (no larger than 11x17) with Project Boundary Overlay: Longitude ❑✓ Large and small scale maps that depict, at minimum: streets, intersections, towns ❑✓ Aerial Photography of the project area ❑✓ USGS Topographic Map ❑✓ Soil Survey Map ❑✓ Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps) 6 See Appendix A of this Form. From Regulatory Guidance Letter No. 08-02, dated June 26, 2008 Version: December 2013 Page 5 Jurisdictional Determination Request Delineation Information (when applicable): Wetlands: ❑ Wetland Data Sheets Tributaries: ❑ USACE Assessment Forms ❑ Upland Data Sheets ❑✓ Other Assessment Forms (when appropriate) Landscape Photos, if taken ❑✓ Field Sketch overlain on legible Map that includes: ■ All aquatic resources (for sites with multiple resources, label and identify) ■ Locations of wetland data points and/or tributary assessment reaches ■ Locations of photo stations ■ Approximate acreage/linear footage of aquatic resources (2) Approved JDs including Verification of a Delineation: ❑ Project Coordinates: Latitude Longitude Maps (no larger than 11x17) with Project Boundary Overlay: ❑ Large and small scale maps that depict, at minimum: streets, intersections, towns ❑ Aerial Photography of the project area ❑ USGS Topographic Map ❑ Soil Survey Map ❑ Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps) 1987 Manual Regional Supplements and Data forms can be found at: http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/reg supp.aspx Wetland and Stream Assessment Methodologies can be found at: http://Portal.ncdenr.org/c/document library/get file?uuid=76f3c58b-dab8-4960-ba43-45b7faf06f4c&groupld=38364 and, http://www.saw.usace.army.mil/Portals/59/docs/regulatory/publicnotices/2013/NCSAM Draft User Manual 130318.pdf a Delineation information must include, at minimum, one wetland data sheet for each wetland/community type. Version: December 2013 Page 6 Jurisdictional Determination Request Delineation Information (when applicable): Wetlands: ❑ Wetland Data Sheets Tributaries: ❑ USACE Assessment Forms ❑✓ Upland Data Sheets ❑ Other Assessment Forms (when appropriate) ❑ Landscape Photos, if taken ❑ Field Sketch overlain on legible Map that includes: • All aquatic resources (for sites with multiple resources, label and identify) • Locations of wetland data points and/or tributary assessment reaches • Locations of photo stations • Approximate acreage/linear footage of aquatic resources Supporting Jurisdictional Information (for Approved JDs only) ❑ Approved Jurisdictional Determination Form(s) (also known as "Rapanos Form(s)") ❑ Map(s) depicting the potential (or lack of potential) hydrologic connection(s), adjacency, etc. to navigable waters. 9 Delineation information must include, at minimum, one wetland data sheet for each wetland/community type. Version: December 2013 Page 7 Jurisdictional Determination Request I. REQUESTS FOR CORPS APPROVAL OF SURVEY PLAT Prior to final production of a Plat, the Wilmington District recommends that the Land Surveyor electronically submit a draft of a Survey Plat to the Corps project manager for review. Due to storage limitations of our administrative records, the Corps requires that all hard- copy submittals include at least one original Plat (to scale) that is no larger than 11"x17" (the use of match lines for larger tracts acceptable). Additional copies of a plat, including those larger than 11"xl7", may also be submitted for Corps signature as needed. The Corps also accepts electronic submittals of plats, such as those transmitted as a Portable Document Format (PDF) file. Upon verification, the Corps can electronically sign these plats and return them via e-mail to the requestor. (1) PLATS SUBMITTED FOR APPROVAL F] Must be sealed and signed by a licensed professional land surveyor F] Must be to scale (all maps must include both a graphic scale and a verbal scale) ❑ Must be legible ❑ Must include a North Arrow, Scale(s), Title, Property Information F] Must include a legible WoUS Delineation Table of distances and bearings/metes and bounds/GPS coordinates of all surveyed delineation points ❑ Must clearly depict surveyed property or project boundaries Must clearly identify the known surveyed point(s) used as reference (e.g. property corner, USGS monument) ❑ When wetlands are depicted: • Must include acreage (or square footage) of wetland polygons • Must identify each wetland polygon using an alphanumeric system Version: December 2013 Page 8 Jurisdictional Determination Request ❑ When tributaries are depicted: • Must include either a surveyed, approximate centerline of tributary with approximate width of tributary OR surveyed Ordinary High Water Marks (OHWM) of tributary • Must identify each tributary using an alphanumeric system • Must include linear footage of tributaries and calculated area (using approximate widths or surveyed OHWM) • Must include name of tributary (based on the most recent USGS topographic map) or, when no USGS name exists, identify as "unnamed tributary" all depicted WoUS (wetland polygons and tributary lines) must intersect or tie -to surveyed project/property boundaries ❑ Must include the location of wetland data points and/or tributary assessment reaches Must include, label accordingly, and depict acreage of all waters not currently subject to the requirements of the CWA (e.g. "isolated wetlands", "non - jurisdictional waters"). NOTE: An approved JD must be conducted in order to make an official Corps determination that a particular waterbody or wetland is not jurisdictional. ❑ Must include and survey all existing conveyances (pipes, culverts, etc.) that transport WoUS Version: December 2013 Page 9 Jurisdictional Determination Request (2) CERTIFICATION LANGUAGE F]When the entire actual Jurisdictional Boundary is depicted: include the following Corps Certification language: "This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, the determination of Section 404 jurisdiction may be relied upon for a period not to exceed five (5) years from this date. The undersigned completed this determination utilizing the appropriate Regional Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual." Regulatory Official: Title: Date: USACE Action ID No.: When uplands may be present within a depicted Jurisdictional Boundary include the following Corps Certification language: "This certifies that this copy of this plat identifies all areas of waters of the United States regulated pursuant to Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is change in the law or our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to exceed five years from this date. The undersigned completed this determination utilizing the appropriate Regional Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual." Regulatory Official: Title: Date: USACE Action ID No.: Version: December 2013 Page 10 Jurisdictional Determination Request (3) GPS SURVEYS For Surveys prepared using a Global Positioning System (GPS), the Survey must include all of the above, as well as: F✓ be at sub -meter accuracy at each survey point. ❑✓ include an accuracy verification: One or more known points (property corner, monument) shall be located with the GPS and cross-referenced with the existing traditional property survey (metes and bounds). ainclude a brief description of the GPS equipment utilized. Version: December 2013 Page 11 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM A. REPORT COMPLETION DATE FOR PJD: June 19, 2017 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Erin Shanaberger, City of Charlotte, 600 East Fourth Street Charlotte, NC 28202 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Mecklenburg city: Charlotte Center coordinates of site (lat/long in degree decimal format): Lat.: 35.165123 Long.: -80.846275 Universal Transverse Mercator: 17 Name of nearest waterbody: Little Sugar Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resource in review area (acreage and linear feet, if applicable) Type of aquatic resource (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) Stream A 35.164295 -80.47675 83188 If non -section 10 -- non -tidal Section 404 Stream B 35.164295 -80.47675 200 If non -section 10 -- non -tidal Section 404 Stream C 35.164295 -80.47675 104 If non -section 10 - non -tidal Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be"waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ■❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: 0 Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ■❑ U.S. Geological Survey map(s). Cite scale & quad name: 1:24K; Charlotte East Quad Natural Resources Conservation Service Soil Survey. Citation: Meck. Co. SSURGO ■❑ National wetlands inventory map(s). Cite name: NWI Digital Database ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100 -year Floodplain Elevation is: .(National Geodetic Vertical Datum of 1929) ■❑ Photographs: ■❑ Aerial (Name & Date): 2016 Mecklenburg County Aerial or ❑■ Other (Name & Date): Site Photos, December 1, 2014 ❑ Previous determination (s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ❑ Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ❑ U.S. Geological Survey map(s). Cite scale & quad name: ❑ Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: 101 In State/local wetland inventory map(s): FEMA/FIRM maps: ❑ 100 -year Floodplain Elevation is: ❑ Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): (National Geodetic Vertical Datum of 1929) ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessaril been verified by the Corps and should not be relied upon for later jurisdictional determinations. ch ,,, M k, b.,9 Digitally signed by STORM Erin Shanaberger i1 WATER Date: 2017.06.23 Services 13:00:56 -04'00' Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' ' Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. WETLAND DETERMINATION DATA FORM - Eastern Mountains and Piedmont Region Project/Site: tS,, �(� G' City/County: Lc. l t: �� �'1/( I� �- Sampling Date: 1 L t"+ Applicant/Owner: vtllt� ( " S l/l�l !' ✓ State: L Sampling Point: tif-e( Investigator(s): Section, Township, Range: U Lir Landform (hillslope, terrace, etc.): I 1 -evi(1 U, Local relief (concave, convex, none):1f Slope (%):C� Subregion (LRR or MLRA): JALa. 1� L& 33 , I b��aeK Long: ' t��b % S� A Datum: Soil Map Unit Name: JA' 1(AVApI4X Tr S NWI classification: NfA Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain In Remarks.) Are Vegetation , Soil , or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes __X_ No Are Vegetation - Soil , or Hydrology naturally problematic? (if needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes Nome Hydric Soil Present? Yes No Is the Sampled Area within a Wetland? Yes No4— Wetland Hydrology Present? Yes No Remarks: N ��� (�cl��-�- i5 r�:��s,✓ti��,�VY rte- a c�c�v'—� �v l�r�- l)�l�l UPc�� tU r c c - HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired) Primary Indicators (minimum of one is reautred: check all that apply) _ Surface Soil Cracks (86) _ Surface Water (Al) _ .True Aquatic Plants (814) _ Sparsely Vegetated Concave Surface (88) _ High Water Table (A2) _ Hydrogen Sulfide Odor (Cl) _ Drainage Patterns (B10) Saturation (A3) _ Oxidized Rhizospheres on Living Roots (C3) ` Moss Trim Lines (1316) _— Water Marks (B1) _ Presence of Reduced iron (C4) _ Dry -Season Water Table (C2) _ Sediment Deposits (82) _ Recent Iron Reduction in Tilled Soils (C6) _ Crayfish Burrows (C8) _ Drift Deposits (83) _ Thin Muck Surface (C7) _ Saturation Visible on Aerial Imagery (C9) Algal Mat or Crust (134) _ Other (Explain in Remarks) _ Stunted or Stressed Plants (131) _ Iron Deposits (135) _ Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) _ Shallow Aquitard (133) _ Water -Stained Leaves (139) _ Microtopographic Relief (04) — Aquatic Fauna (B13) _ FAC -Neutral Test (D5) Field Observations: Surface Water Present? Yes No Depth (inches): Water Table Present? Yes No Depth (inches): Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes NO—Y-- (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous Inspections), If available: Remarks: [nalWors -�r vvdlOyid hjd(ojojj jr prrm4t US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Absolute Dominant Indicator Tree_Stral�,u�my�(Plot size: ) Cover Species? Status 1• �rGlu+=uus �& nnS#112V I CY r ttn,rY.Y/ 2. 3. 4. 7. = Total Cover 5 50% of total cover: 20% of total cover: Sap in ! hrub Stratum (Plot size: 1. 1qt I 1.4nAM II&IAUrn _ 2. .t, /0 fFA ll 3. ulif'1 150 ht /.AA A 1A i f o 1 i M W) 4. 5. 6. 7. 8. 1 = Total Cover 50% of total cover: l y C, 20% of total cover: (Plot size: : ) 6. 7. 8. 9. 10. 11 r•ANEW911 1 i , r= Total Cover 50% of otal cover:.' 20% of total cover:oZ StratumWoody Vine (Plot size: 1 ) 1. lZMr.,pra 24 �1 SAG 2. 3. 4. 5. _0 = Total Cover 50% of total cover: 10 20% of total cover:,,_ or on a separate Sampling Point, p1- ( C h9{ Number of Dominant Species That Are OBL, FACW, or FAC: _� (A) Total Number of Dominant Species Across All Strata: 5 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: � U 1�_ (A!B) Prevalence Index worksheet: Total % Cover Multl In of; 081- species v bv: x 1 = FACW species x 2 = FAC species X3= FACU species x 4 - UPL species x 5 = Column Totals: (A) (B) Prevalence Index - B!A z _ 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50% _ 3 - Prevalence Index is 53.0' _ 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) _ Problematic Hydrophytic Vegetation' (Explain) 'indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Tree - Woody plants, excluding vines, 3 In. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/Shrub - Woody plants, excluding vines, less than 3 In. DBH and greater than or equal to 3.28 R (1 m) tall. Herb - All herbaceous (non -woody) plants, regardless of size, and woody plants less than 3.28 R tall. Woody vine - All woody vines greater then 3.28 ft In Hydrophytic Vegetation Present? Yes No �0lal 6� 'ihe c�rn�nur� Jn,�c�fiu�r� art. 1,("16 0( w4cr, US Army Corps of Engineers Eastern Mountains and piedmont - Version 2.0 SOIL Sampling Point: MVp1ah4 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Futures (inches) �1 �,Qidt�� � Calor (moist) % l�ygn Loc � Remarks !� ou ou L ! U6 10rn_ 'Type: C=Concentration. D-DeDletlon. RM=Reduced Matrix. MS=Masked Sand Grains. ?Location: PL=Pore Linina. M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric Soils': — Hislosol (Al) _ Dark Surface (S7) _ 2 cm Muck (A10) (MLRA 147) _ Histic Epipedon (A2) _ Polyvalue Below Surface (S8) (MLRA 147, 148) _ Coast Prairie Redox (A16) Black Histic (A3) _ Thin Dark Surface (S9) (MLRA 147,148) (MLRA 147,148) _ Hydrogen Sulfide (A4) _ Loamy Gleyed Matrix (F2) _ Piedmont Floodplain Soils (F19) _ Stratified Layers (A5) _ Depleted Matrix (F3) (MLRA 136, 147) _ 2 cm Muck (A10) (LRR N) _ Redox Dark Surface (176) _ Very Shallow Dark Surface (TF1 2) Depleted Below Dark Surface (A11) — Depleted Dark Surface (F7) _ Other (Explain in Remarks) _ Thick Dark Surface (Al2) _ Redox Depressions (178) _ Sandy Mucky Mineral (S1) (LRR N, _ Iron -Manganese Masses (F12) (LRR N, MLRA 147, 146) MLRA 136) _ Sandy Gleyed Matrix (S4) _ Umbric Surface (F13) (MLRA 136, 122) 'Indicators of hydrophytic vegetation and _ Sandy Redox (S5) _ Piedmont Floodplain Soils (1719) (MLRA 148) wetland hydrology must be present, _ Stripped Matrix (S6) _ Red Parent Material (F21) (MLRA 127,147) unless disturbed or problematic. Type: Depth (inches): Indicdaa-dor hyclnc SdilS are net Hydric Soil Present? Yes No Y US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0 NC DWO Stream Identification Form Version 4.11 Date: C71 Project/Site: CVO SQO �� � Latitude: 3CJ I L d Evaluator: (,--n (A CT- County: M Longitude: Total Points: Stream is at least Intermittent Jia 5 _I Stream Determinationcirc Ephemeral Intermitte t rennia Other `j C�� ,I e.g. Quad'tame: SGi yvt �- Uz 19 orerennial if t 30' 2. Sinuosity of channel along thalweg 0 A. Geomorphology Subtotal = ') ) Absent Weak Moderate Strog 18- Continuity of channel bed and bank 0 1 2 Cy 2. Sinuosity of channel along thalweg 0 1 0 0.5 3 3. In -channel structure: ex. riffle -pool, step -pool, sequence 0 1 2 a.)ripple-pool 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 2 0.5 6. Depositional bars or benches 0 1 2 3- 7. Recent alluvial deposits 7, 0 1 2 8. Headcuts 0 1 2 3 9. Grade control 0 0.5 1 F: 10. Natural valley 0 0.5 1 1. 1 1. Second or greater order channel No = 0 Yes " artificial ditches are not rated; see discussions In manual B_ Hvdroloav (Subtotal = 10i � 1 12_ Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 1 2 3 14. Leaf litter 1. 1 0.5 0 15_ Sediment on plants or debris 0 0.5 1 16. Organic debris lines or plies 0 0.5 1 17. Soil -based evidence of high water table? No = 0 Yes = C Bininnv (Subtotal = 1n 1 _ 18. Fibrous roots In streambed 2 1 0 19. Rooted upland plants In streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 1 2 3 22. Fish 0.5 1 1.5 23. Crayfish 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5ther = `perennial streams may also be idenlifled using other methods. See p. 35 of manual. Notes: Sketch: NC DWO Stream Identification Form Version 4.11 Date: I d�l (t.� Project/Site: �&CkUA_U� Latitude: Evaluator: LST r{- CT_ 1 v l County: Longitude: ��� gl��slr lD Total Points: Stream Is at least Intermittent N2 19 orperennial If 2 3/" Stream Determinationt�hS Ephemeral Intetvnitte Other �; ( e.g_ Quad Name: l'Y(LLVI�(r i5riar yeer- A. Geomorphology (Subtotal = -5) Absent Weak Moderate Strong 10 Continuity of channel bed and bank 0 1 2 15. Sediment on plants or debris 2. Sinuosity of channel along thalweg 0 1 0 0.5 3 3. in -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 2 1.5 4. Particle size of stream substrate 0 1 2 24. Amphibians 5. Active/relict floodplain 0 1 2 0.5 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 IM 3 B. Headcuts 1 2 3 9. Grade control 0 0.5 n1.5 10. Natural valley 0 <zp1 1.5 11. Second or greater order channel No = 0es - 3 1. artificial ditches are not rated; see discussions in manual B. Hvdrologv (Subtotal = 10 1 12. Presence of Baseflow 0 1 2 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 .5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3 C. Bioloav (Subtotal= 'I ..S ) 18. Fibrous roots in streambed M 2 1 0 19. Rooted upland plants In streembed 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 0 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0.5 1 1.5 24. Amphibians 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 er = 'perennial streams may also be Identified using other methods. See p. 35 of manual. Notes: Sketch: NC DWO Stream Identification Form Version 4.11 Date: (� L Project/Site: S S t � ti �( f' IGL{ Latitude: g.6, h aLj 7_47 " Evaluator: C C�' County: JA44 V !! "" ``�� Longitude: '� ��7-W Total Points: Stream is at least intermittent ^ Stream Determination (circle e) Ephemeral Intermittent Perennial Other VN e.g. Quad F t44,if 219 or erenniat If a 30" a 2. Sinuosity of channel along thalweg 0 A. Geomorphology Subtotal = Absent Weak Moderate Strong 10- Continuity of channel bed and bank 0 1 2 1 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex_ riffle -pool, step -pool, ripple -pool sequence 0 1 1 3 4. Particle size of stream substrate 0 1 1.5 3 5. Active/relict floodplain 1 1 2 3 6. Depositional bars or benches 0 1 FACW = 0.75; OBL = 1.5 3 7. Recent alluvial deposits 0 1 2 3 B. Headcuts 0 2 3 9. Grade control 0 0.5 1 10. Natural valley 0 1 1.5 11. Second or greater order channel 040 = 0 Yes = 3 artificial ditches are not rated; see disco, sions In manual B. Hvdroloav (Subtotal= q 1 12. Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 1 2 3 14. Leaf litter 1 0,5 0 15. Sediment on plants or debris 0 0.5 1 .5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3. 1.5 C. Biolotav !Subtotal = (D 18. Fibrous roots in streambed 2 1 0 19. Rooted upland plants In streambed 2 1 0 20. Macrobenthos (note diversity and abundance) 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae Cw 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Mer= *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asheville, North Carolina 28801 February 22, 2016 Mr. Chris Tinklenberg Kimley-Horn and Associates, Inc. 200 South Tryon Street, Suite 200 Charlotte, North Carolina, 28203 Dear Mr. Tinklenberg: Subject: Cross -Charlotte Trail (XCLT) — Brandywine to Tyvola Segment; Charlotte, Mecklenburg County, North Carolina Log No. 4-2-16-249 The U.S. Fish and Wildlife Service (Service) has reviewed the information provided in your letter received on January 26, 2016. We submit the following comments in accordance with the provisions of the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-667e); the National Environmental Policy Act (42 U.S.C. §4321 et seq.); and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Project Description The purpose of this project is to complete a 1.5 -mile segment of the XCLT from Brandywine Road to Tyvola Road in a developed area of Charlotte, North Carolina. This proposed segment would be one of at least three that would provide alternative transportation options and access to recreational amenities for the surrounding community. This segment would be approximately 8,000 linear feet in length and 150-200 feet wide. No design or construction plans were included in your correspondence that describe a proposed construction schedule, construction methods, or impact minimization measures. Federally Protected Species Suitable habitat may be present at the project site for the federally threatened Northern long- eared bat (Myotis septentrionalis). However, we believe that the amount of suitable habitat that may be lost as a result from the proposed project would have an insignificant or discountable impact on the species. Therefore we would concur with a determination that the proposed project may affect, but is not likely to adversely affect this species. Based on the Service's species records, no other federally protected species or their habitats occur in the project area. Please be aware that in accordance with the Act, it is the responsibility of the appropriate federal agency or its designated representative to review its activities or programs and to identify any such activities or programs that may affect endangered or threatened species or their habitats. If it is determined that the proposed activity may adversely affect any species federally listed as endangered or threatened, formal consultation with this office must be initiated. The Service recommends that you contact the U.S. Army Corps of Engineers if the proposed development may impact streams or wetlands, and contact the North Carolina Wildlife Resources Commission concerning potential impacts to state -protected resources. Invasive plant species are present at the site and the Service is concerned that disturbances resulting from the proposed project may allow them to spread. Without active management, including the revegetation of native species in disturbed areas, project corridors will likely be sources of, and corridors for, the movement of invasive exotic plant species. Therefore, we strongly recommend that only species native to the natural communities within the project area be used in association with all aspects of this project. The Service appreciates the opportunity to comment on this project. Please contact Mr. Byron Hamstead of our staff at 828/258-3939, Ext. 225, if you have any questions. In any future correspondence concerning this project, please reference our Log Number 4-2-16-249. Sincerely, - - original signed - - Janet A. Mizzi Field Supervisor 2 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Secretary Susan Kluttz February 11, 2016 Chris Tinklenberg Kimley-Horn and Associates, Inc. 200 South Tryon Road, Suite 200 Charlotte, NC 28203 Office of Archives and History Deputy Secretary Kevin Cherry Re: Construct the Cross Charlotte Trail Along Little Sugar Creek from Brandywine Road to Tyvola Road, Charlotte, Mecklenburg County, ER 16-0148 Dear Mr. Tinklenberg: Thank you for your letter of January 14, 2016, concerning the above -referenced undertaking. We have reviewed the materials submitted and offer the following comments. There are no known archaeological sites within the proposed project area. Based on our knowledge of the area, it is unlikely that any archaeological resources that may be eligible for inclusion in the National Register of Historic Places will be affected by the project. We, therefore, recommend that no archaeological investigation be conducted in connection with this project. It appears work will occur within the boundaries of the National Register -eligible Selwyn Village Historic District (MK2113). The removal of trees along the east bank of Little Sugar Creek may adversely affect the property's view shed. The project will not adversely affect the historic property if the removal of mature trees is limited to the greatest extent possible. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or environmental.reviewgncdcr. og_v. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, jam' Ramona M. Bartos Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 ® North Carolina Wildlife Resources Commission Gordon Myers, Executive Director 4 February 2016 Mr. Chris Tinklenberg, PWS Kimley-Horn and Associates, Inc. 200 South Tryon Street, Suite 200 Charlotte, NC 28203 Subject: Cross -Charlotte Trail (XCLT) — Brandywine to Tyvola Segment, Charlotte, Mecklenburg County, North Carolina. Dear Mr. Tinklenberg: Biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the subject document and we are familiar with the habitat values of the area. Our comments are provided in accordance with provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667e) and North Carolina General Statutes (G.S. 113-131 et seq.). The City of Charlotte proposes to construct a trail within an approximately 8,000 linear foot corridor along Little Sugar Creek from Brandywine Road to Tyvola Road. The proposed trail (XCLT- B2T) will connect two County greenway segments. It will offer transportation choices to surrounding residents and encourage redevelopment of some underutilized/underserved properties. In addition, the trail will connect to public amenities and the business community. Little Sugar Creek in the Catawba River basin flows through the project boundaries. The site is located within a developed area; however, forested areas are located adjacent to the stream. The U.S. Fish and Wildlife Service has listed the Northern long-eared bat (Myotis septentrionalis) as threatened under the Endangered Species Act. The Northern long-eared bat may be present within or in the vicinity of the project site. Therefore, the project may impact this species and consultation with the U.S. Fish and Wildlife Service may be required. For more information, please see hnp://www.fws.gov/midwest/endangered/mammals/nleb/KeyFina]4dNLEB.htmi or contact the U.S. Fish and Wildlife Service at (828) 258-3939 to ensure that any issues related to this species are addressed. Although we do not have any records for threatened or endangered species on or adjacent to the site, an on-site survey is the only definitive means to determine whether the proposed project would directly impact a threatened or endangered species. We offer the following general recommendations regarding greenway trails to minimize impacts to aquatic and terrestrial wildlife resources. 1. Wetlands and streams within the site boundaries should be identified through on-site surveys prior to any land disturbing activities. If wetlands and/or streams will be impacted by Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 Page 2 4 February 2016 Cross -Charlotte Trail — Brandywine to Tyvola Segment construction activities, then the project should be coordinated with the U.S. Army Corps of Engineers and the N.C. Division of Water Resources. 2. Streams and wetland areas should be avoided where possible. Boardwalks should be used in wetland areas. Bridges, rather than culverts, should be used for stream crossings. If culverts must be used for stream crossings, then these should be designed to allow passage of aquatic life. 3. Where feasible, maintain a minimum 100 -foot undisturbed, native, forested buffer along perennial streams, and a 50 -foot buffer along intermittent streams and wetlands. Maintaining undisturbed, forested buffers along these areas will reduce impacts to aquatic and terrestrial wildlife resources, water quality, and aquatic habitat within and downstream of the project area. In addition, these buffers will provide an adequate travel corridor for wildlife species and may increase opportunities for the observation of a greater diversity of wildlife. 4. Avoid development and fill in the 100 -year floodplain. Development and fill in the floodplain increases the potential for flooding and interferes with the natural hydrologic process of the waterways. It also disrupts the continuity of migration corridors for wildlife. 5. Sediment and erosion control measures should be installed prior to any land clearing or construction. The use of biodegradable and wildlife -friendly sediment and erosion control devices is strongly recommended. Silt fencing, fiber rolls and/or other products should have loose -weave netting that is made of natural fiber materials with movable joints between the vertical and horizontal twines. Silt fencing that has been reinforced with plastic or metal mesh should be avoided as it impedes the movement of terrestrial wildlife species. These measures should be routinely inspected and properly maintained. Excessive silt and sediment loads can have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species. Thank you for the opportunity to comment on this project. If we can be of further assistance, please contact our office at (336) 449-7625 or shari.biyant@ncwildlife.org. Sincerely, Shari L. Bryant Western Piedmont Coordinator Habitat Conservation Division ec: Allen Ratzlaff, USFWS NORTH CAROLINA DEPARTMENT OF NATURAL AND CULTURAL RESOURCES Pat McCrory Bryan Gossage Susan Kluttz Governor Executive Director Secretary Clean Water Management Trust Fund January 20, 2016 Kaitlin McCulloch Carolina Wetlands Inc 550 East Westinghouse Blvd Charlotte, NC 28273 kaitlin@cws-inc.net RE: Phase I Cross Charlotte Trail; 2014-3497 Dear Kaitlin McCulloch: NCNHDE-1165 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources from our database that have been compiled for the project referenced above. A query of the NCNHP database, based on the project area mapped with your request, indicates that there are no records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for site-specific surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists and is included for reference. Tables of natural areas and conservation/managed area within a one -mile radius of the project area, if any, are also included in this report. The location of the natural areas and conservation/managed areas can be viewed online on the Natural Heritage Data Explorer found at: https://ncnhde.natu reserve, ora/. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve (DNP), Registered Heritage Area (RHA), or Federally -listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact John Finnegan at john.finnegan ncdenr.aov or 919.707.8630. Sincerely, NC Natural Heritage Program Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Phase I Cross Charlotte Trail Project No. 2014-3497 January 20, 2016 NCNHDE-1165 ement Occurrences Documented Within a One -mile Radius of the Project Area ixonomic EO ID Scientific Name Common Name Last Element Accuracy Federal State Global State roup Observation Occurrence Status Status Rank Rank Date ascular Plant 13743 Delphinium exaltatum Tall Larkspur 1800S D Natural Areas are Documented Within a One -mile Radius of the Project Area anaged Areas Documented Within a One -mile Radius of the Project Area anaged Area Name Owner ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County ecklenburg County Open Space Mecklenburg County Page 2 of 4 Status Historical 5 -Very Species of Endangered Low Concern Owner Type Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government Local Government G3 S2 anaged Areas Documented Within a One -mile Radius of the Project Area anaged Area Name Owner Owner Type ecklenburg County Open Space Mecklenburg County Local Government .finitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.ora/content/help. Data query generated on January 20, 2016; source: NCNHP, Q4 October 2015. Please resubm ur information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 3 of 4 NCNHDE-1165: Phase I Cross Charlotte Trail January 20, 2016 ❑ Project Boundary ❑ Buffered Project Boundary Managed Area (MAREA) :.�: i•"�.: •.::�.:�:':• Btijtjl:x FJir rllCa JOl�3 � $futon Cmobws HedMore mortocroft Page 4 of 4 1:22,897 0 0.175 0.35 0.7 mi 0 0.3 0.6 1.2 km Sources: Esti, HERE, NI-orme, Internlap, increment P Corp., GEBCO. USGS, FAO, NPS. NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, IHU 61Jr-1PJrk ? mann: klaxdxr: .,ot aenecl un Marreucft ElanerU.c - Plaoe Park �Alaga Mal Seneca Square Frx: •eoo0 .. n.:. Ekmznlay - �'"r Ilm,'n r ' lM `� Interns' tntemehonal . I Mall LJnyuewe Mdde - P., 'k rr ,,.,. '•�.t(iriair2Srebk , s January 20, 2016 ❑ Project Boundary ❑ Buffered Project Boundary Managed Area (MAREA) :.�: i•"�.: •.::�.:�:':• Btijtjl:x FJir rllCa JOl�3 � $futon Cmobws HedMore mortocroft Page 4 of 4 1:22,897 0 0.175 0.35 0.7 mi 0 0.3 0.6 1.2 km Sources: Esti, HERE, NI-orme, Internlap, increment P Corp., GEBCO. USGS, FAO, NPS. NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, 61Jr-1PJrk ? mann: klaxdxr: un Marreucft ElanerU.c Park �Alaga Mal January 20, 2016 ❑ Project Boundary ❑ Buffered Project Boundary Managed Area (MAREA) :.�: i•"�.: •.::�.:�:':• Btijtjl:x FJir rllCa JOl�3 � $futon Cmobws HedMore mortocroft Page 4 of 4 1:22,897 0 0.175 0.35 0.7 mi 0 0.3 0.6 1.2 km Sources: Esti, HERE, NI-orme, Internlap, increment P Corp., GEBCO. USGS, FAO, NPS. NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, 9 Charlotte -Mecklenburg STORM ..WATER Services June 21, 2017 Mr. Joe Frey City of Charlotte 600 East Fourth Street Charlotte, NC 28202 Subject Project: Cross -Charlotte Trail: Brandywine Road to Tyvola Road HUC#: 03050103 (Lower Catawba) 600 E. Fourth Street Charlotte, NC 28202 Fax 704.353.0473 The purpose of this letter is to notify you that the City of Charlotte Umbrella Stream and Wetland Mitigation Bank ("Umbrella Bank") is willing to accept payment for stream impacts associated with the subject project. Please note that the decision by the Umbrella Bank to accept the mitigation requirements of this project does not assure that this payment will be approved by the U.S. Army Corps of Engineers or the North Carolina Division of Water Quality 401/Wetlands Unit. It is the responsibility of the applicant to contact these agencies to determine if payment to the Umbrella Bank for impacts associated with this project is appropriate. This acceptance is valid for six (6) months from the date of this letter. The following documents must be submitted to the Umbrella Bank within this time frame for this acceptance to remain valid: 1. 404 Permit Verification 2. 401 Water Quality Certification 3. Executed Departmental Transfer Invoice (DTI) between Engineering Services and Storm Water Services detailing the use of and payment for the credits described in the table below. Based on the information supplied by your office, the stream and wetland credits that are necessary to satisfy the compensatory mitigation requirements for this project are detailed in the table below. The total mitigation credits available for this project are also indicated in this table. Stream linear feet Wetlands acres Credits Requested for This Project 36 0.0 Credits Available for This Project 36 0.0 Mitigation Project Names Sedgefield Park- Dairy Branch The stream and wetland mitigation will be provided as specified in the Section 404 Permit or corresponding 401 Water Quality Certification for impacts associated with the subject project in Hydrologic Unit 03050103 of the Catawba River Basin. The mitigation will be performed in accordance with the Agreement to Establish the City of Charlotte Umbrella Stream and Wetland Mitigation Bank in Mecklenburg County, North Carolina, dated June, 16, 2004. If you have any questions or need additional information, please contact me at (704) 336-4495 or ihinson&charlottenc.eov. Sincerely, Charlotte Storm Water Services DigilaXy signed by Isaac Hinson Isaac DN cn=Isaac Hlnson, o=Oly of Chado-,o Stwm Water Sens Divlslon, Hinson=lhinaun@charlttfnc.gov. Daft. 2017D611 13:39:25 -04W Isaac J. Hinson Mitigation Bank Administrator cc: File To report pollution or drainage problems, call: 311 http://stormwater.charmeck.org COVER SHEET_....................................................................._.....__. 1 Nip. ..................... »»........... ._.... PLAN AND PROFILE SHEETS ... _.... ....................... _..-- 5 TO 20 .............................. _............ _....... _...».._. STREAM PLAN AND PROFILE ................................. _._.... 26 TO 27 GF4AB TG 111;:4PI...... „:.,,--.n:,,,.. ...=z am... 28- .... . ............................. _...... __.. TOTAL SHEETS 112 VICINITY MAP NTS -Ll- STA: 100+64.6 r -Yl- STA: 199+00.00 AA2- -Y3- ' I CHARLOTTI 1 - ENGINEERING 8 PROPERTY MANAGEMENT Construction Plans of Proposed Cross Charlotte Trail - Brandywine Road to Tyvola Road Project No. 512-15-015 Project Features: ASPHALT & CONCRETE GREENW'AY, RETAINING WALLS, DRAINAGE STRUCTURES, ASPHALT PAVEMENT, PREFABRICATED BRIDGES, BOARDWALK, WATER & SEWER UTILITIES, AND UTILITY ADJUSTMENTS 5/11/2017. PE SEAL. I CONVENTIONAL SIGNS Proposed Sanitary Sewer Manhole ....»-_....._»».___. Existing Storm Drain Manhole ..........._..___.__.._. ° Proposed Storm Drain Manhole. .............. . ... ...... ......... ------ Existing Telephone Manhole ........ »................... _.............„.....„......._. T� - \ NewProperty Line ...................... .....- Proposed Telephone Manhole ._...__....._.._...__.._...._...__...__.......... TO ` j Existing Property Line_____. Existing Electric Manhole _....__._»».___..._»....._...._..._..__—___ O \.. \\\\\ Maintained as R/W Line ................. Proposed Electric Manhole ........._........."-_„. ............... __.-._-__.O 12 Vert. Profile ............ !✓r~~ -Ll- STA: 162+07.35 = ' -Y4- STA: 600+09.06 Existing Structures ........ __............. -- -- — — -- -- l� Cross Section ........... Railroad Tracks .......... . ..................... Proposed Edge of Pavement ....._....__ Fence.. . ..................... ....._................... ___ x x Slope Stake Line ............ .............. __._..._. Temporary Construction Easement...----- — e e — Record Drawings Permanent Greenway Easement..._....... - Sidewalk Utility Easement ............ _...._._.». —as—an— Storm Drainage Easement ....... _... — aar— =— Existing Gas Line ............................. .. c c — Existing Water Line ........................ w w — Existing Sanitary Sewer _................ ss ss — Existing Underground Telecommunications — Ur UT — Existing Underground Electric ........_........._ — UE UE — Existing Storm Drainage .._........... _....—__--- Proposed Storm Drainage .............._»._..-. �— ExistingTree ........... ........ .................... _._.._._._...»...».__....._......._ Existing Water Meter ___.._....»_.__.____._...._»..-__._.—._.._ ❑ Existing Water Valve _...__.__.._._...._..»_»....... ........... _ >< Existing Gas Valve ...... ......................... ... ....................... _...._.___.... Pa Existing Sanitary Sewer Manhole ............. ................ 5 Proposed Sanitary Sewer Manhole ....»-_....._»».___. Existing Storm Drain Manhole ..........._..___.__.._. ° Proposed Storm Drain Manhole. .............. . ... ...... ......... ------ Existing Telephone Manhole ........ »................... _.............„.....„......._. T� y -y O Existing Light Rttan l l '`,,..��� Proposed Light Pole ...... ................. „........................... _____._»....� Existing Utility Pole............................................................ „_... _.......__ til -Y4- �,., .t Gov Wve..................... ......................................... Proposed Utility Pole .._ ..... ..................... _........_.........__._..._......... `W �� Iron Pin Q 1.unicsl r. �a(a1 r1: •A -- -- �;``-_ _ __ Ll- STA: 115+18.74 BEGIN CONSTRUCTION Y{ Y3- STA: 500+00.00 I-L1- ,STA: 102+96.41 \ SEE BRIDGE TO PARK ROAD SHOPPING CENTER PLANS, PROJECT #512-15-015, FOR -Yl- PLANS PREPARED BY: - CITY of CHARLOTTE: PROJECT LENGTH 1.50 MILES CONTACT -JOE FREY, P.E. TOTAL CONNECTION LENGTH = 0.32 MILES Kimley)))Horn.) 2.17 NC LICENSE #F-0102 200 South Tryon Street Suite 200 Charlotte, North Carolina 28202 Phone: (704) 333-5131 PROJECT MANAGER 704-336-5276 KIMLEY-HORN: CONTACT - GABE DOBBS, P.E. PROJECT ENGINEER 704-319-7688 GABE.DOBBS@KIMLEY-HORN.COM LOCATION MAP 11 PROGRESS PLANS NOT FOR CONSTRUCTION Knowwhat's omI Call = nefpe you c6g. \ V. .......... _......... __.......... ............. „.»»»_.............. __•__......... Existing Fire Hydrant ........ ............ ... „..„........................... _..._„.„„ � /- END CONSTV I'T' [ON Proposed Fire Hydrant ........ „.... .„...................... � `! Existin D -Ll- STA: 180+75:; ' gro Drop Proposed DropInlet . k� \ Accessible Ramp _ ............. _..................... _...................... __... _.......__.® ......aFP f Tree Protection ....................................... _.._............ ._._.„__„.. i, Proposed Handrail .. . .............. _................ _.._......._...-_----' SiltFence................... ................... ..... .... _.......... _„..._...._... Proposed Rip Rap Ditch ... „..... __.._-_..__.._..._........._........... • '*•-' -- Proposed Curb & Gutter, Cone. Drive, Sidewalk __..-......... Proposed Asphalt Pavement ............. ............ ...... ____.............. Proposed Concrete Greenway .............. _.........».....__............ Proposed Asphalt Greenway ............ t Proposed Ditch Lioe .__.._............»»»____....._.._...._..._„_. —>— Proposed Precast Gravity Retaining Proposed Soil Nail Wall ........................ _„............... ... __._._ j Proposed Soldier Pile Wall ............ _..................... _.„....... _.... _�..� '•,,✓` ` r' i” Stream Side Zone S.W.I.M. Buffer ..... ............. __.»„»_..... -YS- rf Proposed Bridge ........ „.................. _..___...._......_ Proposed Chan -I St.,bihv t -tun ...»_..„._..___ - GRAPHIC SCALES y • - \ 611 Proposed Telephone Manhole ._...__....._.._...__.._...._...__...__.......... TO ` j 20 40 Existing Electric Manhole _....__._»».___..._»....._...._..._..__—___ O \.. \\\\\ Proposed Electric Manhole ........._........."-_„. ............... __.-._-__.O 12 Vert. Profile ............ !✓r~~ -Ll- STA: 162+07.35 = ' -Y4- STA: 600+09.06 GRAPHIC SCALE IN FEET Z 0 '--5{ Yd Existing Catch Basin _ ........................... ».._...................... .... _._.__..._8 Proposed Catch Basin . ..............M .......... y -y O Existing Light Rttan l l '`,,..��� Proposed Light Pole ...... ................. „........................... _____._»....� Existing Utility Pole............................................................ „_... _.......__ til -Y4- �,., .t Gov Wve..................... ......................................... Proposed Utility Pole .._ ..... ..................... _........_.........__._..._......... `W �� Iron Pin Q 1.unicsl r. �a(a1 r1: •A -- -- �;``-_ _ __ Ll- STA: 115+18.74 BEGIN CONSTRUCTION Y{ Y3- STA: 500+00.00 I-L1- ,STA: 102+96.41 \ SEE BRIDGE TO PARK ROAD SHOPPING CENTER PLANS, PROJECT #512-15-015, FOR -Yl- PLANS PREPARED BY: - CITY of CHARLOTTE: PROJECT LENGTH 1.50 MILES CONTACT -JOE FREY, P.E. TOTAL CONNECTION LENGTH = 0.32 MILES Kimley)))Horn.) 2.17 NC LICENSE #F-0102 200 South Tryon Street Suite 200 Charlotte, North Carolina 28202 Phone: (704) 333-5131 PROJECT MANAGER 704-336-5276 KIMLEY-HORN: CONTACT - GABE DOBBS, P.E. PROJECT ENGINEER 704-319-7688 GABE.DOBBS@KIMLEY-HORN.COM LOCATION MAP 11 PROGRESS PLANS NOT FOR CONSTRUCTION Knowwhat's omI Call = nefpe you c6g. \ V. .......... _......... __.......... ............. „.»»»_.............. __•__......... Existing Fire Hydrant ........ ............ ... „..„........................... _..._„.„„ � /- END CONSTV I'T' [ON Proposed Fire Hydrant ........ „.... .„...................... � `! Existin D -Ll- STA: 180+75:; ' gro Drop Proposed DropInlet . k� \ Accessible Ramp _ ............. _..................... _...................... __... _.......__.® ......aFP f Tree Protection ....................................... _.._............ ._._.„__„.. i, Proposed Handrail .. . .............. _................ _.._......._...-_----' SiltFence................... ................... ..... .... _.......... _„..._...._... Proposed Rip Rap Ditch ... „..... __.._-_..__.._..._........._........... • '*•-' -- Proposed Curb & Gutter, Cone. Drive, Sidewalk __..-......... Proposed Asphalt Pavement ............. ............ ...... ____.............. Proposed Concrete Greenway .............. _.........».....__............ Proposed Asphalt Greenway ............ t Proposed Ditch Lioe .__.._............»»»____....._.._...._..._„_. —>— Proposed Precast Gravity Retaining Proposed Soil Nail Wall ........................ _„............... ... __._._ j Proposed Soldier Pile Wall ............ _..................... _.„....... _.... _�..� '•,,✓` ` r' i” Stream Side Zone S.W.I.M. Buffer ..... ............. __.»„»_..... -YS- rf Proposed Bridge ........ „.................. _..___...._......_ Proposed Chan -I St.,bihv t -tun ...»_..„._..___ - GRAPHIC SCALES y • %W ENGINEERING A PROPERTY MANAGEMENT.. Bid Set No. APPROVED COUNTY ENGINEER DATE: .7 '0 all 611 Plan View ..... _.......... 20 40 611 Hoa. Profile ............ 4 # 12 Vert. Profile ............ 5 10 l� Cross Section ........... %W ENGINEERING A PROPERTY MANAGEMENT.. Bid Set No. APPROVED COUNTY ENGINEER DATE: .7 SURVEY INFORMATION SHOWN ON THIS PLAN PROVIDED BY CES GROUP ENGINEERS, LLC. SURVEY COMPLETED USING NAVD 88 BENCH MARK 1: ALUMINUM DISK IN WING WALL NO. LSUC-13 ELEV: 610.22 (NAVD 88) It \ t �r a 1" 1 1 �1 1 1 II Y 0 Z GRAPHIC SCALE IN FEET 0 10 20 40 LEGEND F'tF(MANtN I \ ti \ TOBY R SPENCER STREAM IMPACT PIN: 175151-05 MARTHA EGRIFFIN 1 DB2458P085 15104 DB 191844PG 8005 "`` MB 5 P0187 z, ;' - �. a\•'` __._ msµ°'@ \ \drl, Lortt 1672�� LOT I3BLOCI(2:::; a TEMPORARY �C8\ e STREAM IMPACT -.. ,.8 •'' _ -1� \ aw 'kN+* Yui •, � � a / / i \ � __��`.,\ \ = �' \ � \ ...... .-� 1 m 2 MEc1aENBuaGcouNry ` \ a"§k��� r R 104+00 / Y PIN: 17s im m -;;;r �V A ,t � <s6 � A -t° OB11684PG220 MB 215 LOT 7 BLOCK LOCKE 4 MECKLENBURC COUNTY - - p PIN: 175173-03„ .�' DB 11744 PG 265 u :MB'SPG215 �'a` x -,' a'too LOT III BLOCK S MECKL.ENBURG COUNTY PW: 175173-01 \ MECK G� IN. 175 \ \ OB 12254 PG 815 \ -:. '"• / / \ �` / / MECKLENBURG COUNTY `'u ..-MB5 P0. .215 DB 11884 PO 250 \ PW: 175-173-04 \ \ LOT 5 BLOCK E MB S PG 215 Z } , '\ DB 12028 PG 348` \ LOT 10 BLOCK E �� 2P ` - MB PG 215 \ �. \ LOT 9 BLOCK E �.• PRSC HOLDINGS, INC. / {' y PIN 175181-01 / DB 26531 PG 26 \ \ \ DB 012937 PG 177 OOeg« a '5 d w A w Z. �te o � UE.Z z _ N t \� U i� O _ W F E"I w O w H •a.1 U � a a rA A z a 2 a a a 5 98+60 99+00 99+50 100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104 88 +50 = Bn $ n /H 1801 PONT ELEV. 604.97 620 1801 PONT STA: 7 59.47 PN STAt 54 PN Sl k102+76.64 PI I STA103t84.35 AD:GJM A It 3.75X 110:1.09[ IC71.02'18.86 IC 47.58 616 71W VC 7 LOW VC 51100, vc 616 PEDESTIRANIDLE 612 EE PLANS BYO ERS ELEV: 10.05 EXI T16'0tP 612 BOB—DYWINE I — 808 ---- "." —� ELEV: --- w u r F� Xa 600 n� \ �^ 598 _ 596 O PROFILES OWN FROM 9+75MM _V710 TO 02+96 FOR NFORMATION ONLY. \ `— 592 EXIST (4) 24• P 69 568 OOeg« a '5 d w A w Z. �te o � UE.Z z _ N t \� U i� O _ W F E"I w O w H •a.1 U � a a rA A z a 2 a a a 5 98+60 99+00 99+50 100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104 88 +50 = Bn $ n /H I d m LEGEND ® PERMANENT STREAM IMPACT TEMPORARY STREAM IMPACT IMPACT #1: PERMANENT, NO NET LOSS 622 LF, STREAMSIDE AREA IMPACT (BELOW OHWM), CONST. OF GREENWAY (SEE SHEETS 6 AND 7) MATTHEW MOSEY I STEPHEN DEUTSCH MATTHEW PAUL L 8 CATHERINE / / d KELLY MOSEY 1F 8 CATHERIEBLAN NE DEUfSCH ANN ANN MELLON LEBUWC \ / PIN: 175-151-09 PIN: 175-151-10 PIN: 1751 S.11 \ �� / DB 28763 PG 525 DB 20947 PG 257 LOW PC NT STA 108+324 / DB 28671 PG 324 DB 22011 PG 649 DB 25964 PG 309 DB 9576 PG 977 DB 15M PG 523 DB 25884 PG 305 MB 5 PC 187 DB 15263 PG 382 DB 19134 PG 410 LOT 11 BLOCK 2 DB 2584 PG 188 TORY R SPENCER GRAPHIC SCALE IN FEET / PIN: 175-151-05 / 0 10 20 40 DB 29908 PG 991 LOT 10 BLOCK 2 DB 9126 PG 756 \ DB 24582 PG 385 DB 19184 PG 605 /LOT A MB 5 PG 187 9BLOCK 2 MB 5 PG 187 / JOHN BLAKE SPURRIER LOT 13 BLOCK 2 / PIN: 175-151-39 DB 12269 PG149 MB 5 PG 1877 / I LOT 12 BLOCK / IMPACT #1 / / I 804 e \ \ e 6 e e e e e e.. e PGE— --PGE / / PGE�— fPGE-- MATTHEW MOSEY I STEPHEN DEUTSCH MATTHEW PAUL L 8 CATHERINE —\� / d KELLY MOSEY 1F 8 CATHERIEBLAN NE DEUfSCH ANN ANN MELLON LEBUWC \ / PIN: 175-151-09 PIN: 175-151-10 PIN: 1751 S.11 \ �� OB 30026 PG 107 DB 28763 PG 525 DB 20947 PG 257 LOW PC NT STA 108+324 / DB 28671 PG 324 DB 22011 PG 649 DB 25964 PG 309 DB 9576 PG 977 DB 15M PG 523 DB 25884 PG 305 MB 5 PC 187 DB 15263 PG 382 DB 19134 PG 410 LOT 11 BLOCK 2 DB 2584 PG 188 OB 16431 Pc 628 GRAPHIC SCALE IN FEET / MB 5 PG DB 13759 PG 514 0 10 20 40 / LOT 10 BLOCK 2 DB 9126 PG 756 \ /LOT 1 MB 5 PG 187 9BLOCK 2 \ ` _ / I IMPACT #1 / I 804 e \ e �_--_POE — ---PGE —I — _...... J.. .. ,. 9r �- 5 /LIQ . m„."� 8:: Waif .H➢MFi—✓ o 1.017 IT ELEV.' 589.36 612 LOW PC NT STA 108+324 P STA -108+&L12 M:3.195 BOB KI&M 50.00• vc _ 60B 804 604 Boo ST1 AERIAL 600 596 -- �♦ Zoo ti 981 598 / wl� 8.5- 592 592 \ ��-- — --- --_ — sae — ------ ----- — _ _ — 566 584 564 580 wTvv IDDIDD w7+UU 107+50 108+00 108+50 109+00 109+50 N .r cn c rn a V O 00 0 Do 0 CID0 0 Wing name: K:\CHL-PRJ\015016 My of Charlotte\166 X -CLT Seg 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dwg 8 Jun 26, 2017 3:35pm by noncy.mancuso doaenet toe — elq qe meat! and —so. I—— hwln, ee an h—t of ee' . le e— Pryer end dMt b Ma It eae Pavel. a.. of and I.,— rYimce en .1. — .1-1 water e,gonen. and adglalim by.—e H. — —Ialn• Inc. -A ee elgeut HabMty to —M H. and 4 tee Inc. L 133HS 33S OS+YbI tl1S 3N1IFI�1tlW HIGH POINT V. 596.1! NIGH POINT STA: 119+49.77 OL_ v LNA yI iR O m mrrAy c1 toONo. JB NO. OB AS 140- 11 PROGRESS SET NOT FOR CONSTRUCTION i�0. DATE BY OE:iCRlPIiC;� __.. Plans PreDered BY: KimlepMorn NC LICENSE NO.F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 m DO—�1m CAD FILE PATH m aR 112 PLAN AND PROFILE SHEETS cn"1 I I I I { I 1 I PREPAREREDBY o C) m S 1 7 111+7 V zpvz z 3m c D Z L Mae: (704)3315131 a0 zm� Mancuso. Nancy Sheet Set: Croce Charlotte Trail La,aut:8 I K:\CHL—PRJ\015016 Cit, of Charlotte\166 X—CLT Sea 1\04—CADD\02—PLANS\CORP SUBMITTAL\40—PLAN AND PROFILE—CORP.d.. .1m0�TIQ ODy U) z s� 3 D m fn D t n D i1�^_T n 0 EE011 TELA. TY 7 034 St I t t r t r { I I I E'vl: 1 ! 1 I I x N / y A \ 1 t � I I t t \ 1 5 I I I I ! y � a 1 I I 1 r I I I ! I j t { I 4 i i I I 6139 ?t. t t t t I I I \ t t t [plpt UmI �I HIGH POINT V. 596.1! NIGH POINT STA: 119+49.77 OL_ v LNA yI iR O m mrrAy c1 toONo. JB NO. OB AS 140- 11 PROGRESS SET NOT FOR CONSTRUCTION i�0. DATE BY OE:iCRlPIiC;� __.. Plans PreDered BY: KimlepMorn NC LICENSE NO.F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 m DO—�1m CAD FILE PATH m aR 112 PLAN AND PROFILE SHEETS cn"1 <X;0Z PREPAREREDBY o C) m S 1 7 V zpvz z 3m c D Z L Mae: (704)3315131 a0 zm� Mancuso. Nancy Sheet Set: Croce Charlotte Trail La,aut:8 m K:\CHL—PRJ\015016 Cit, of Charlotte\166 X—CLT Sea 1\04—CADD\02—PLANS\CORP SUBMITTAL\40—PLAN AND PROFILE—CORP.d.. .1m0�TIQ ODy U) z 3 D m fn D v� n D n 0 SHEET 8 CROSS CHARLOTTE TRAIL toONo. JB NO. OB AS 140- 11 PROGRESS SET NOT FOR CONSTRUCTION i�0. DATE BY OE:iCRlPIiC;� __.. Plans PreDered BY: KimlepMorn NC LICENSE NO.F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 CRARLOT r� 1'E. CAD FILE PATH aR 112 PLAN AND PROFILE SHEETS " 0D CHECKED BY PREPAREREDBY ao S 1 7 APPROVED BT DATE L Mae: (704)3315131 Plotted Rv Mancuso. Nancy Sheet Set: Croce Charlotte Trail La,aut:8 June 26. 2017 03:35:12om K:\CHL—PRJ\015016 Cit, of Charlotte\166 X—CLT Sea 1\04—CADD\02—PLANS\CORP SUBMITTAL\40—PLAN AND PROFILE—CORP.d.. N O C C U C N N O N N N 0 W O A O N A O name: K:\CHL-PRJ\015016 City of Chorlotle\166 X -CLT Seg 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dwg 9 Jun 26, 2017 3:35pm by: noncy.mancuso L tO.M.I .Iq M c.netPtt and d.l­ p...nlM h.r.ln... an Intbi.n.l of .tile., I. M1ndN .ly M M..«Inc yurpt..nd dWt I. t 11 .a. Fr.Pertl. R...f and tilt .tomtit .newt d odupkut dy NirdeY'Ka.n mW A4.xintt., Inc. aitM 111 .1-1 .—It, to KM.y-Xom and A.ociate. Nc. \ T- � a o`^ \ oy 0 z SHEET 9 CROSS CHARLOTTE TRAIL o1W1l170 JOB N0. AS N010 SCALE PROGRESS SET NOT FOR CONSTRUCTION no. OAT[. BY DEKE P11T, P16R9 PreaBrea By: KimlerMorn NC LICENSE NO. F-0102 © 2017 200 South Tryon Suite02 Charlotte, Ciro 20 — MAap L E CAD FILE PATH OF 112 PLAN AND PROFILE SHEET NJA 0D CHECKED BY PREPARED BY f r a1 APPROVED BY DATE 1`6sne: (709)3333131 Potetl By Mancu.a. Nancy Sheet Sel: C.o.. Charlolte T-11 La t:9 June 26. 2017 03:35:26om K:\CHL-PRJ\015016 Cit, of Chorlotle\166 X -CLT Sao 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE -CORP. a we .- f / i g 1 } E SB ] ) R}H� A f 1 ) N ) I C I I I I I I I V V l l 1 ( x FAQ+ j4:4 .2 >ux ) 1 $a6 � � T Npt ( x� Ng qm \ T- � a o`^ \ oy 0 z SHEET 9 CROSS CHARLOTTE TRAIL o1W1l170 JOB N0. AS N010 SCALE PROGRESS SET NOT FOR CONSTRUCTION no. OAT[. BY DEKE P11T, P16R9 PreaBrea By: KimlerMorn NC LICENSE NO. F-0102 © 2017 200 South Tryon Suite02 Charlotte, Ciro 20 — MAap L E CAD FILE PATH OF 112 PLAN AND PROFILE SHEET NJA 0D CHECKED BY PREPARED BY a1 APPROVED BY DATE 1`6sne: (709)3333131 Potetl By Mancu.a. Nancy Sheet Sel: C.o.. Charlolte T-11 La t:9 June 26. 2017 03:35:26om K:\CHL-PRJ\015016 Cit, of Chorlotle\166 X -CLT Sao 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE -CORP. a we Drawing name: K:\CHL—PRJ\015016 City of Charlotte\166 X—CLT Seg 1\04_CADD\02_PLANS\CORP SUBMITTAL\40—PLAN AND PROFILE—CORP.dwg 10 Jun 26, 2017 3:35pm by. nancy.moncuso Thio d --t. to — — a -mt. and dAAI pM1A -W., pA m YIA 1 . AAM I, Intended Y 1. Ilse Apealic p.—. and — Iv —n� I A prrypr d. Fw AA .1 and 1—— r.1— - NIA Opcums 1 .1-1 AHIIAn uulnoia— and adpptalion dY HY 4,11— and A.—IAA, Inc. MUY 0..iNpul Ii—ly Ip HmIAyHem and NAecloleA, Nc. n U C n u C a c N V O N O o I I 1 I I 1 I i i I I t 4 I �yy Pip§ ry� I $Xr \ \ \ 1 \ I I I I r I 11-7 I 8mr E Sys I 1 I { I I I I I / i I i 1 1 I I i t I I � f H i I z I / r 1 1 t N I N I O / / I i I I I x I I I 1 y�� p 335 6 133HS S 3N1'1H31dW 05+4ZL tll �'It n x I1 i G I N \ m Ya o a3 ui P 1 I I 11 III � 1 n o 1;� r I v yx:p� a, i ui r' i` O el ' 1 n I / m 2 (b� o \ e / a rY MA TC ° o� r SEF S FFT >;29*SO c Zai 2 `HLL.1. 015018170 AS NOTED ., DAIE By Df.S('.ftt?1.C;, Plans Prepared %: CROSS CHARLOTTE JDB.0 �(ALt 10 TRAIL CADFILE PATH PROGRESS SET Kimley>>>Horn NJA W © 2017 OF PRLPAREDBY CHECAED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 /.� rM ■ 112 PLAN AND PROFILE SHEETS JL0 5/11/2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 APPROVED BY NIL Phone: (70J)33J-5131 y�� p 335 6 133HS S 3N1'1H31dW 05+4ZL tll �'It n x I1 i G I N \ m Ya o a3 ui P 1 I I 11 III � 1 n o 1;� r I v yx:p� a, i ui r' i` O el ' 1 n I / m 2 (b� o \ e / a rY MA TC ° o� r SEF S FFT >;29*SO c Zai 2 `HLL.1. 015018170 AS NOTED ., DAIE By Df.S('.ftt?1.C;, Plans Prepared %: CROSS CHARLOTTE JDB.0 �(ALt 10 TRAIL CADFILE PATH PROGRESS SET Kimley>>>Horn NJA W © 2017 OF PRLPAREDBY CHECAED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 /.� rM ■ 112 PLAN AND PROFILE SHEETS JL0 5/11/2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 APPROVED BY NIL Phone: (70J)33J-5131 335 6 133HS S 3N1'1H31dW 05+4ZL tll �'It n x I1 i G I N \ m Ya o a3 ui P 1 I I 11 III � 1 n o 1;� r I v yx:p� a, i ui r' i` O el ' 1 n I / m 2 (b� o \ e / a rY MA TC ° o� r SEF S FFT >;29*SO c Zai 2 `HLL.1. 015018170 AS NOTED ., DAIE By Df.S('.ftt?1.C;, Plans Prepared %: CROSS CHARLOTTE JDB.0 �(ALt 10 TRAIL CADFILE PATH PROGRESS SET Kimley>>>Horn NJA W © 2017 OF PRLPAREDBY CHECAED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 /.� rM ■ 112 PLAN AND PROFILE SHEETS JL0 5/11/2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 APPROVED BY NIL Phone: (70J)33J-5131 2 `HLL.1. 015018170 AS NOTED ., DAIE By Df.S('.ftt?1.C;, Plans Prepared %: CROSS CHARLOTTE JDB.0 �(ALt 10 TRAIL CADFILE PATH PROGRESS SET Kimley>>>Horn NJA W © 2017 OF PRLPAREDBY CHECAED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 /.� rM ■ 112 PLAN AND PROFILE SHEETS JL0 5/11/2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 APPROVED BY NIL Phone: (70J)33J-5131 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dwg 11 Jun 26, 2017 3:36pm by nancy.mancuso ThM d—t. 1•p.Mi .XM1 Vh -u, ane d.WI I-- b•In. a. an In•Itum•nt of vM•A I. Int— rly lar W pWlk P•par end tlMt b a1tkA 11 and odaptotlon .1 KM•y-Ilom eM M•rcNt•.. Inc. 1.11 e..TTIMaut u luy to KM•rlt•tn ona A.wlolr. In•. �m v 0 C c N O w N w 0 w 0 A O \PGE / O% A�\ f \ P Mq Tch</ lvt q / SFF yFFTq'34,so xx d \\N\ xx r m 0 — v m m m Z Q 3 z m < ( Cn A D D n SHEET CROSS CHARLOTTE R m N oo DATE By DESCRIPTIOR _.._.. ( I I t ) . 11 TRAIL PROGRESS SET NOT FOR CONSTRUCTION . Kimley>>)Horn NC LICENSE NO. F-0102 E%—S: 12 OF NW °D PREPARED By J I 1 l 112 PLAN AND PROFILE SHEETS CHECKEDBy 200 South T on Stree Suite 200 North LT `. Cd L.IR I E, 5AIl m7 Charlotte, Carolina 25202 APPROVED By DATE Phone: (704)333-5131 —1— --u•n. Nencr SNeet Set: Goad CKdnlotte Trail Lawwt: 11 June 26. 2017 03:36:04om K:\CHL_PRJ\015016 City of Cnorlolt•\166 X -CLT Sda 1\04_CADD\02_PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CMP.tlwe I ( \ \\ / / / t t 1 i \ 1 \ / 1 n ay}+ / / / D V I I V 1 I I ( J 1 I I I / � \ H Y 1 J I I I I I 1 1 I I r 1 i t t t t 1 I v Dal pp {1p� ppb ppb \PGE / O% A�\ f \ P Mq Tch</ lvt q / SFF yFFTq'34,so xx d \\N\ xx r m 0 — v m m m Z Q 3 z m < ( Cn A D D n SHEET CROSS CHARLOTTE 015014170 !OB N0. AS NOTED SCALE oo DATE By DESCRIPTIOR _.._.. Plans Prepared BY: . 11 TRAIL PROGRESS SET NOT FOR CONSTRUCTION . Kimley>>)Horn NC LICENSE NO. F-0102 CAD FILE PATH OF NW °D PREPARED By 112 PLAN AND PROFILE SHEETS CHECKEDBy 200 South T on Stree Suite 200 North LT `. Cd L.IR I E, 5AIl m7 Charlotte, Carolina 25202 APPROVED By DATE Phone: (704)333-5131 —1— --u•n. Nencr SNeet Set: Goad CKdnlotte Trail Lawwt: 11 June 26. 2017 03:36:04om K:\CHL_PRJ\015016 City of Cnorlolt•\166 X -CLT Sda 1\04_CADD\02_PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CMP.tlwe Drawing name: K:\CHL_PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02_PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE -CORP. dwg 12 Jun 26, 2017 3:36pm by, noncy.mancuso Thla document, q r — IM cmcepla and d q presented M1ereln, oa m mt—,t & aero , la In ded .1y Me apeclllc pu —and ellen! fa MIC1 d .ca prep— Reuse of and Imp op rellonce on t1la docu— --I erlltan puNprixotim and -platten by— ­H. and Aaapciptee 1nc. ,nett be elNoul lloblllty tp HMIeYHorn and Aaaoclolee Inc. LL L93HS 33S Og+vcL d1S 3N1-IH3,Lvw A I I �il to I 0 W 0 W a 0) 0 w 0 4 0 �a g 00 O s W �i o I I I i I � a � Bib i I I I I I I r I I I I I I I { 1 1 S I r r f Ir �Y u1e 4 �g� A al 71 1 s i l i i I I s$4 hx yTE 8 I gy I i I 1 I I I r a i I r r I I I I 1 i r r It' 2 9S�i6SaN��t3�� n 6f Ls iFomII"'� I I i 11 �n i I I I n I a i It i I 1T tt I, a r r d MATCHLINE STA 139+50 SEE SHEET 13 a Aa o �1:p o2 62 0 �O 010016170 AS NOTED Plans Prenared BY: "EET CROSS CHARLOTTE ICB 10 SCALE Q %x76 BT OE3CR(P pry 12 TRAIL CAD f IEE PATH PROGRESS SET Klmley*Horn CC I OF NW CD N ©'°" PREPARERL D BY cHLa:ED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 112 PLAN AND PROFILE SHEETS LD 5/11/2017 200 South Tryon Street, Suite 200 MW"TTE. Charlotte, North Carolina 25202 APPROV ED DY DAfE Phone: (704)373.!131 Platted By. Mancuso, Nancy Sheet Set:Crosa Chcrlolte Trail Layout: 12 June 26, 2017 03:36:19pm K:\CHL_PRJ\015018 City of Chorlotts\166 X—CLT Seo 1\04—CADD\02_PLAN6\CORP SURMITTAI\4o—PI AN ANn PRnrll c—rnao— 2 9S�i6SaN��t3�� n 6f Ls iFomII"'� I I i 11 �n i I I I n I a i It i I 1T tt I, a r r d MATCHLINE STA 139+50 SEE SHEET 13 a Aa o �1:p o2 62 0 �O 010016170 AS NOTED Plans Prenared BY: "EET CROSS CHARLOTTE ICB 10 SCALE Q %x76 BT OE3CR(P pry 12 TRAIL CAD f IEE PATH PROGRESS SET Klmley*Horn CC I OF NW CD N ©'°" PREPARERL D BY cHLa:ED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 112 PLAN AND PROFILE SHEETS LD 5/11/2017 200 South Tryon Street, Suite 200 MW"TTE. Charlotte, North Carolina 25202 APPROV ED DY DAfE Phone: (704)373.!131 Platted By. Mancuso, Nancy Sheet Set:Crosa Chcrlolte Trail Layout: 12 June 26, 2017 03:36:19pm K:\CHL_PRJ\015018 City of Chorlotts\166 X—CLT Seo 1\04—CADD\02_PLAN6\CORP SURMITTAI\4o—PI AN ANn PRnrll c—rnao— I I I n I a i It i I 1T tt I, a r r d MATCHLINE STA 139+50 SEE SHEET 13 a Aa o �1:p o2 62 0 �O 010016170 AS NOTED Plans Prenared BY: "EET CROSS CHARLOTTE ICB 10 SCALE Q %x76 BT OE3CR(P pry 12 TRAIL CAD f IEE PATH PROGRESS SET Klmley*Horn CC I OF NW CD N ©'°" PREPARERL D BY cHLa:ED BY NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 112 PLAN AND PROFILE SHEETS LD 5/11/2017 200 South Tryon Street, Suite 200 MW"TTE. Charlotte, North Carolina 25202 APPROV ED DY DAfE Phone: (704)373.!131 Platted By. Mancuso, Nancy Sheet Set:Crosa Chcrlolte Trail Layout: 12 June 26, 2017 03:36:19pm K:\CHL_PRJ\015018 City of Chorlotts\166 X—CLT Seo 1\04—CADD\02_PLAN6\CORP SURMITTAI\4o—PI AN ANn PRnrll c—rnao— HARRY SIBOID RENEE M ALLEN PIN: 949 P t.'� \ PINI 175.13157 DB 15949 PG 140 DS 21848 PG Bal DB 11238 PG 385 DB 9835 PG 964 DB 7909 PG 944 DB 9573 PG 395 L MB127 DB 9351 PG 598 LOTT 3 MB 28 PG 330 + LOT BLOCK 1 COLEY MCKNIGHT ` tl NICHOLSON \ 8 SAMUEL D NICHOLSON\ PIN: 175-131-08 DB, IBM PG 571 DB 8758 PG � 218 e MBaPG4z7 1 LOT z 9 3 E b z NZ ym m1 � N � n i + o m s / a ; K 0 5 ol� a � `; rc 0 0 i a - � s 604 N a a § ® PERMANENT STREAM IMPACT � In 2 800 Z J n X 1121 K 17.04 67.27 VC a r i 9 596 0 5 a a X.186 K 1185 50. W' U c b � a3ELAMBERT ssYERs LAMBERT) 6 in 592 U � b 558 �Q DB 9888 PG 794 DB 9094 PG mo �s O o �s PERMANENT, NO NET LOSS, 90 u 584 O m � e o m - U L INSTALLATION OFz CONSTRUCTED RIFFLE AND " u = ` z e z O 580 �e al 6 j = 576 s >` E 8 L 572 / / — IMPACT #3 / ml VICTOR M PINEIRD 8 HILDA H PINEIRO PIN Y 175-13150 DB 23342 PG 505 DB 18825 PG 424 DB 16519 PG 543 DB 9084 PG 890 MB 28 PG 330 LOT 8 BLOCK 1 /`_ PQr .. �—PCF — l'���� PCE a �L e g e—PCF e p� PGE 9 o e e e CHARLOTTE D. GIBSON PAYNE e / 175-14601 / (FRANCISCAN TERRACE CONDOMINIUMS) ( / e OB 4383 PG 815 o e CRARLOTTED. GIBSON PAYNE \ e TERRACE ' (FRANCISCJW TERRACEE CONDOMINIUMS) / O / DS 4383 PG 815 y1d, GRAPHIC SCALE IN FEET 0 10 20 40 PN SLA:140+39.1 LEGEND LOW T DEN 5M1 LOW T SIX 141+7A 6 3 P11 STA:142+09.16 ® PERMANENT STREAM IMPACT •I X 4.461 m7. 6(1.00' w X 1121 K 17.04 67.27 VC ANDREWERB TER L. KREICHER X.186 K 1185 50. W' (FORMERLY BRIAN a3ELAMBERT ssYERs LAMBERT) TEMPORARY STREAM IMPACT = r PIN 1117513149 DB 11561 PG 239 �Q DB 9888 PG 794 DB 9094 PG mo IMPACT #3: O o MB 28 PG LOT 7 BLOCK 1 PERMANENT, NO NET LOSS, 90 m � LF, STREAM ENHANCEMENT, m � e o m - INSTALLATION OFz CONSTRUCTED RIFFLE AND " u = ` z e z ROCK CROSS VANE A u F (SEE SHEET 13) z 4 >` i /`_ PQr .. �—PCF — l'���� PCE a �L e g e—PCF e p� PGE 9 o e e e CHARLOTTE D. GIBSON PAYNE e / 175-14601 / (FRANCISCAN TERRACE CONDOMINIUMS) ( / e OB 4383 PG 815 o e CRARLOTTED. GIBSON PAYNE \ e TERRACE ' (FRANCISCJW TERRACEE CONDOMINIUMS) / O / DS 4383 PG 815 y1d, GRAPHIC SCALE IN FEET 0 10 20 40 PN SLA:140+39.1 LOW T DEN 5M1 LOW T SIX 141+7A 6 3 P11 STA:142+09.16 PN STA 1441 .62 X 4.461 m7. 6(1.00' w X 1121 K 17.04 67.27 VC X.186 K 1185 50. W' 0.921 J, AERIAL SS ND SEEM A-FESUPPORT S UCTURE -0. ;1 r, 15" RCP SU FACE ELEVATION 139+50 140+00 140+50 141+00 141+50 142+00 142+50 143+00 143+50 144+00 144+50 o iO4 IDD e F� J < Y i96 i92 0 o s iea $84 160 i76 572 145+00 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 %-CLT Seg 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dwg 18 Jun 26, 2017 3:38pm by: nancy.manc— MAT SEE SHE TA 16S+00 ET 17 r e. 1 Q a a 00 m a rn 0 + + O o m o m 0 rn v CD o rn V Ch CROSS CHARLOTTE TRAIL 015018170 JOB 10 AS NOTED SCALE PROGRESS SET NOT FOR CONSTRUCTION CRY of Charlotte\166 —X -CLT Sea 1\04_CADD\D2_PLAN$\CORP "° DATE BY : DESCRIPTiOf�' Plans Prepared Br. ■ Kimley>))Horn Q 3017 NC LICENSE NO. F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 26202 Phons: (704)337-5131 - a i' I i CAD FILE PATN OF 112 Plotlea By PLAN AND PROFILE SHEETS Mancuso. Nancy Sheet Set Cross Charlotte Trail Loyout:18 NJA PREPARED BY oC CHECKED BY an APPROVED BY June 26, 2017 5/11/2717 DATE 03:38:01pm K:\CHL-PRJ\015016 SURM, TTA,\an-Pi Au Aun —4r-1— I I 1 4 I c I r � `T h�R 8 1 ! i E%CF- 37142 I \ d pa T m� rD y p t 225 1\ ' \ 1 I I yQy I! PSV N ryfl �~ I I I I i P�q " I I 1 I I r I I I 1 t 1 t I I I I I I SHEET 18 CROSS CHARLOTTE TRAIL 015018170 JOB 10 AS NOTED SCALE PROGRESS SET NOT FOR CONSTRUCTION CRY of Charlotte\166 —X -CLT Sea 1\04_CADD\D2_PLAN$\CORP "° DATE BY : DESCRIPTiOf�' Plans Prepared Br. ■ Kimley>))Horn Q 3017 NC LICENSE NO. F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 26202 Phons: (704)337-5131 - a i' CAD FILE PATN OF 112 Plotlea By PLAN AND PROFILE SHEETS Mancuso. Nancy Sheet Set Cross Charlotte Trail Loyout:18 NJA PREPARED BY oC CHECKED BY an APPROVED BY June 26, 2017 5/11/2717 DATE 03:38:01pm K:\CHL-PRJ\015016 SURM, TTA,\an-Pi Au Aun —4r-1— Drawing name: K:\CHL-PRJ\015016 City of Chorlotte\166 X -CLT Seg 1\04-CADO\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dwg 19 Jun 26, 2017 3:38pm by noncy.mancuso Tna aaume,l, Iawge Nq qa -t. and ap p awwnW hnaln, as m y,ptrvnpnt d prwtt IY InWda1 .1y b IM 9adht DwPaw ant dhnl Is MIM n nap -W. Rww Wand Ynpragr 1— an qlp wn,mwl pigeul pdttan authvimtlm ane aaoplotlan by NMa)-Nam aM N�sbM,, Inc. awl b� alge,l IIm11[y Ip NM�y-Hom anC Nwtlalac, Ir,c. Mq T� Y41N l SFE SF/FFrq 1 ?0'00 O O N O N O V 0 A 0 A 0 C) O Aa KXJI N P O + O N Q CAD FILE PATH UM �m ! t t t I t BB CHECKED BY D D ;0 19 S 1 7 DATE o A D z D M z < { NK � -cn{ I { y T 3 X � � S H 0 I ,B {B { I {z + i I� i I I I I I I I I ( B ( I i I I I "wh H H I i t t t I I t t I i I t 1 4 1 V 1 I �� KXJI r ASICALL PROGRESS SET NOT FOR CONSTRUCTION L�YJ m 0 �tB1�IB t L�HLOTTE CAD FILE PATH UM �m m BB CHECKED BY D D ;0 19 S 1 7 DATE o A D z D M z < -Cn NK � -cn{ �� NORTH T 3 X � � S SHEET 19 CROSS CHARLOTTE TRAIL 01 OB O. ASICALL PROGRESS SET NOT FOR CONSTRUCTION •�. De Te ¢r DtscftlPTlan Plans Prepared By: KimlepMorn NC LICENSE NO. F-0102 ©2017 200otTryonStreet,a200 Charlrlottee, North Carolinn28 a 28202 Phone: (704) 333-5131 0 �tB1�IB t L�HLOTTE CAD FILE PATH OF 112 PLAN AND PROFILE SHEETS "J" PREPARED BY BB CHECKED BY JLD APPROVED BY S 1 7 DATE Platted By. Maacusa. Na-, Sheet Set:Croaa Charlotte Troll Loyout:19 June 26, 2017 03:38:17pm X:\CHL-PRJ\015016 City of Chorlotte\166 X -CLT Seg 1\04-CADD\02-PLANS\CORP SUBMITTAL\40-PLAN AND PROFILE-CORP.dw9 Drawing name: K:\CHL–PRJ\015016 City of Charlotte\166 %–CLT Seg 1\04–CAOD\02–PLANS\CORP SUBMITTAL\40–PLAN AND PROFILE–CORP. dwq 20 Jun 26, 2017 3:38pm by nancy.mancuso ml. mam..t, s .stn u. op.p pt• ppa a.ayn p.....t•e h.rNa .. ml.em.m of ..m.., i. 1—e.e y 1w et .oe Im.r.pm •.nm.... mi. a.<em..l duo,t .ml....uah.uP o.4 mopt.u.. by--- — --t.., m.. -1 b.-- impty to --H- ..e --t., x.. + 0 1 I MAT EST CHLIN q 175+00 S S SEE SHEET 19 -2 ja Ss I s 0 t, 1 rm 9y F / 3 S„ 1 1 /I O0 + c0 1 / I N I �D / 0 / 0 \ + \ 17 1 OD I ^� I � � +cn \, fi s o i Vz i CD 1 / I Ln cV0 / I , I cl I I N \Ns I �a I m D (m/3 mDr 3n x = M> —�tq ° � _ : O to S N4 r� O O O z z + 00, 0 Z 1— n 0 3 m �g OZzr —aim W'O m ° ch cf) 0 ;0 � � Z cn cn �n p _ PM: 10 75. Dn 30 z cn � as _ D I mm n ° 3� 3z N O < D � � z m QO. m N T O Op N Obi SHEET CROSS CHARLOTTE 015MO1o0 ASNOTED NO, DATE BY pESCRIMC1, Plans Prepared BV: JQB 20 TRAIL I CADFILE PATH PROGRESS SET Kimley»>Horn UF PREPARED BY CHEwDBr NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 ©eon 112 PLAN AND PROFILE SHEETS AD s/11/2on 200 South Tryon Street, Suite 200 CMP"TTE. Charlotte, North Carolina 28202 APPROVED BY DAIS Phone: (704)33}5131 Plotted By Mancuso, Nancy Sheet Sel:Crone Charlotte Trail Layout:20 June 26, 2017 03:38:34pm K:\CHL_4\015016 City of Chortotte\188 —X–CLT Seg 1\04_CADD\02_PLANS\CORP SDBMITTAL\Lp–PI 4N 4un plxnci —1— — Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02_PLANS\43-STREAM PLAN. dwg 26 STREAM PLAN AND PROFILE Jun 26, 2017 10:15am by, noncy.mancuso — x . I_.b, N - --1. mU d.# a nm nrtof .o . . en — M. a — r a,r n"— m - u. n '—I wtbwmamer MHe e.. uy rm cna ,Nwdet.. I„c IO Tf^ \ O+ # O N P O by` g O Y i I ra \1 TIE TO EXISTI t^ 6 c / � N \ j � la` �• m \ y 1 90' M 1 ° + A1E W .Z�1 1 'r •}nt 'J{_�.,Ir��-�• '-V�� J1,r`v �� ° ,i 0� G) .� , a r1 �J:., g O I N Zo I .f m it yl It� I o o + 1 I / t= j i 2P. �f % � ROCK VANE C y n � � r ELEY 73A o < 1 n � 111 t I i ,. �S � ° .off •,,�1 . \ I I SHEET01=0170 A9 NOIID 6'1% DATE : BY pE9-RtPTION Plans Prepared By: CROSS CHARLOTTE JOB ND r 26 TRAIL CAD FILE PATH PROGRESS SET Klmley*Horn OF N oo NOT FOR CONSTRUCTIONNC LICENSE NO. F-0102 ©2017 PREPARED BY CHECKED BY 112 STREAM PLAN AND PROFILE 200 South Tryon Street, Suite 2001/��ii��'I'ri'E -AD S 1 017 Charlotte, North Carolina 26202 APPROVED BY DATE Phone: (704)1}3-5171 ' Plattea By Mancuso. Nancy Sheet S -C.... Charlotte Tra11 Lay -t:26 STREAM PLAN AND PROFILE June 26, 2017 10:15:18am K:\CHL_PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02_RLANS\13-51REAV P,au. a.wg z I II I I I \ ROCK CROSS VANE p m -f �yIDyfaI � 0z ,i i ,I itII ELEV-W&l i 1 i i I r I RIFFLE ELEV-578.0 1 I 1 ROCK CR099 VANE ELEv-sn.e t I I I I Tf^ \ O+ # O N P O by` g O Y i I ra \1 TIE TO EXISTI t^ 6 c / � N \ j � la` �• m \ y 1 90' M 1 ° + A1E W .Z�1 1 'r •}nt 'J{_�.,Ir��-�• '-V�� J1,r`v �� ° ,i 0� G) .� , a r1 �J:., g O I N Zo I .f m it yl It� I o o + 1 I / t= j i 2P. �f % � ROCK VANE C y n � � r ELEY 73A o < 1 n � 111 t I i ,. �S � ° .off •,,�1 . \ I I SHEET01=0170 A9 NOIID 6'1% DATE : BY pE9-RtPTION Plans Prepared By: CROSS CHARLOTTE JOB ND r 26 TRAIL CAD FILE PATH PROGRESS SET Klmley*Horn OF N oo NOT FOR CONSTRUCTIONNC LICENSE NO. F-0102 ©2017 PREPARED BY CHECKED BY 112 STREAM PLAN AND PROFILE 200 South Tryon Street, Suite 2001/��ii��'I'ri'E -AD S 1 017 Charlotte, North Carolina 26202 APPROVED BY DATE Phone: (704)1}3-5171 ' Plattea By Mancuso. Nancy Sheet S -C.... Charlotte Tra11 Lay -t:26 STREAM PLAN AND PROFILE June 26, 2017 10:15:18am K:\CHL_PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02_RLANS\13-51REAV P,au. a.wg Urowing name: K: \L:MLJ'NJ\U1] leY 1 mol, laeaM MN tlw , m�upl ant 1 1 czi u L, cc z b t,% y i\ VANE CAD FILE PATH Z O o� Z L< $m � g sm 8 G O 9 f� _ ROCK CROSS ELEV-575.5 VANE of Charlotte\166 X—CLT Seg 1\04—CADD\02—PLANS\43—STREAM PLAN.dwg 27 STREAM PLAN AND PROFILE Jun 26, 2017 10:15em by noncy,manc-o b apwn, as an Fa4unanl d wciea. b NIwQaM/ v1Y b tlu apatlee en�pa. ant tl4�1 Iv �N�M it nc pepv nr of ane Imp R rNivice en Ihlc Nxumv� c�mwl nnlcn oulnvizotlm ma Y y- am ane A.—t.c, int, coon en O T i n r" 7 O rA mI G m� Z0 I L N 8 �3 czi u L, cc z b t,% y G) VANE CAD FILE PATH Z O )A-� ,• � Z � ` � of Charlotte\166 X—CLT Seg 1\04—CADD\02—PLANS\43—STREAM PLAN.dwg 27 STREAM PLAN AND PROFILE Jun 26, 2017 10:15em by noncy,manc-o b apwn, as an Fa4unanl d wciea. b NIwQaM/ v1Y b tlu apatlee en�pa. ant tl4�1 Iv �N�M it nc pepv nr of ane Imp R rNivice en Ihlc Nxumv� c�mwl nnlcn oulnvizotlm ma Y y- am ane A.—t.c, int, coon en O T i n r" 7 O rA mI G m� Z0 I L < to O �ar 4 m Q K4 m 8 O O 8 N 8 U mmy�0 PROGRESS SET NOT FOR CONSTRUCTION b z b I l ROCK CROSS E -6 .3 VANE < to O �ar 4 m Q K4 m 8 O O 8 N U AS NOTED SCALL PROGRESS SET NOT FOR CONSTRUCTION tt 1 t I I I z b I l ROCK CROSS E -6 .3 VANE CAD FILE PATH Z O )A-� ,• � C � ` � to Z I I I 'I I I V2m7 DATE O iPm ROCK CROSS ELEV-575.5 < to O �ar 4 m Q K4 m 8 O O 8 ,HEFT015015170 27 N U AS NOTED SCALL PROGRESS SET NOT FOR CONSTRUCTION tt 1 t I I I z b I l ROCK CROSS E -6 .3 VANE CAD FILE PATH Z STREAM PLAN AND PROFILE CD CHLCRk:D BY CHE PREPARED BY I I I 'I I I V2m7 DATE O ROCK CROSS ELEV-575.5 VANE i I I I I I I P MAX RIFFLE N'> I i I I i I ELEV=671 I I I I I I KSI a m N O O ,HEFT015015170 27 CROSS CHARLOTTE TRAIL 'JOB '0 AS NOTED SCALL PROGRESS SET NOT FOR CONSTRUCTION tt 1 t I I I Plans Prepared By: KlmlerMor=n nlcLICENSE No.e-otoz Charlotte, 200 South TryonStreet,Suite xe2062 Pb.-: 1704)33}5131 • ('map` � "�URLV�` CAD FILE PATH Z STREAM PLAN AND PROFILE CD CHLCRk:D BY CHE PREPARED BY JILD APPROVED BY V2m7 DATE O ROCK CROSS ELEV-575.5 VANE P O N'> I 1 1 r � \ \ 30' MAX. 1\ 1 I I I i I t 1 1 ROCK CROSS VANE I I 1 ELEV�373.8 1 I I I I I ( I 0 N Oc O ,HEFT015015170 27 CROSS CHARLOTTE TRAIL 'JOB '0 AS NOTED SCALL PROGRESS SET NOT FOR CONSTRUCTION NQ DATE BY DE3CRIPi10N Plans Prepared By: KlmlerMor=n nlcLICENSE No.e-otoz Charlotte, 200 South TryonStreet,Suite xe2062 Pb.-: 1704)33}5131 • ('map` � "�URLV�` CAD FILE PATH OF 112 STREAM PLAN AND PROFILE CD CHLCRk:D BY CHE PREPARED BY JILD APPROVED BY V2m7 DATE INDEX OF SHEETS C(N I SIIF. FT.........._....................................................................... I GENERALNOTES........................................................................... 2 DETAILS...-._._------- _.......... „................ _......... _..._... 2A TO 2E TYPICAL SECTIONS ..-..-_. ......... -.......... .....„-....... -........ 3 TO 2G OVERALL PLAN AND KEY SHEET ......... . ............................»..... 4 PLAN AND PROFILE _»_................. ._.... _........................ 5 TO 22 STREAM PLAN AND PROFILE ...... _.r ................... .,.,, 26 TO 27 Y4 -GRADING PLAN ...................................... ................ _... .... __.. 28 CONSTRUCTION ACCESS PLAN ............. _................. .... - CA -1 Y4 -PAVEMENT MARKING AND SIGNING PLAN....»_.... PM -01 ECNOTES _........ _................ _.......... »......... _............................. - EC -1 EC DETA[LS..»...__..-..-__..__-__.._»......-._.__ EC -2 TO EC -3 EROSION CONTROL PLAN .... _-........... _.»»...»... EC -4 TO EC -19 CROSS SECTIONS._.__......-._.....- ... ...... _......... XS -01 TO XS -24 RETAINING WALL___-.....-___......_.»__,_ RW -01 TO RW -14 STRUCTURAL PLAN 1 .............. .................. __.... S-01 TO S -M TOTALSHEETS / PARK 11,tMMIN PARK - — Maintained as R/W Line. -� - - - ---- PROJECT r LOCATION a SF:LWYN PARK -L1- STA: 180+24.60 Fence....... ._-............................. .................. — % % - -r Slope Stake Line ........._.._._.._..._-.._....__ e — ItARCLAI M)N15 Temporary Construction Easement _........... — e e — Permanent Greenway Easement VICINITY MAP NTS •` Od -Y3- t CH i— ENGINEERING & PROPERTY MANAGEMENT 70% Construction Plans of Proposed Cross Charlotte Trail - Brandywine Road to Tyvola Road Project No. 512-15-015 Project Features: ASPHALT & CONCRETE GREENWAY, RETAINING WALLS, DRAINAGE STRUCTURES, ASPHALT PAVEMENT, PREFABRICATED BRIDGES, BOARDWALK, WATER & SEWER UTILITIES, AND UTILITY ADJUSTMENTS 4/19/2017 t 3: o .tom �` t. . n 1 � a / • `'L -Ll- STA: 108+74.74 = ` -Y2- STA: 400+22.60.00 \ r 7fEGIlY CONSTRUCTION STA: 115+18.74 = STA: 102+96.41 -Y3- STA: 500+00.00 UDGE TO PARK R SHOPPING CENTER PLANS, PROJECT #512-15-015, FOR -Yl- PLANS PREPARED HY: Kim1ey)))Horn@ M7 NC LICENSE #F-0102 200 South Tryon Street Suite 200 Charlotte, North Carolina 28202 Phone: (704)333-5131 CITY OF CHARLOTTE: CONTACT - JOE FREY, P.E. PROJECT MANAGER 704-336-5276 KIMLEY-HORN: CONTACT - GABE DOBBS, P.E. PROJECT ENGINEER 704-319-7688 GABE.DOBBSCKIMLEY-HORN.COM -L1- STA: 162+11.08 = -Y4- STA: 600+09.97.00 µ� PE SEAL 1 Record DraFs'in-.S I GRAPHIC SCALE IN FEET 0 125 250 rd Z -Y4- - - - Existing PropertyLine ._...... ....................... - - - -- - — Maintained as R/W Line. -� - - - ---- - - - Existing Structures ................................ - - - - - - - ND CONSTRUCTION -L1- STA: 180+24.60 Fence....... ._-............................. .................. — % % - -r Slope Stake Line ........._.._._.._..._-.._....__ e — — Temporary Construction Easement _........... — e e — Permanent Greenway Easement PROJECT LENGTH =1.50 MILES TOTAL CONNECTION LENGTH = 0.25 MILES LOCATION MAP is PROGRESS PLANS Know wbars below. NOT FOR CONSTRUCTION Call before you dig. GRAPHIC SCALES 20 411 60 Plan View ......... _...... 20 40 611 Herz. Profile ............ 4 8 12 Vert. Prorde ...... s 10 I5 Cross CONVENTIONAL SIGNS New Property Line .................... _............ -� - - -a-- - - - Existing PropertyLine ._...... ....................... - - - -- - — Maintained as R/W Line. -� - - - ---- - - - Existing Structures ................................ - - - - - - - Railroad Tracks .......... Proposed Edge of Pavement .._............ _.._... Fence....... ._-............................. .................. — % % - -r Slope Stake Line ........._.._._.._..._-.._....__ e — — Temporary Construction Easement _........... — e e — Permanent Greenway Easement Sidewalk Utility Easement ..................... Storm Drainage Easement .......... ..__.._._... — a— mr— Existing Gas Line ...... _.............. ._........-_ — c c — Existing Water Line.. .................................. — w w — Existiog Sanitary Sewer . ........ ss ss Existing Underground Telecommunications UT UT — Existing Underground Electric ................... — ue ue Existing Storm Drainage ........ _._........... -----�_---- ----------- Proposed Storm Drainage ........ ............. -.. �— Existing Tree ................ _.... _..-..__.........-.._..._.._......»...._....._......._� Existing Water Meter......................ft_...._.........._._..........._................_ ❑ Existing Water Valve....._.._.___._....._.....__..._._._........................ wr oa ExistingGas Valve .... _.................... »._..... _.......................... _......... ..... ou Existing Sanitary Sewer Manhole ................._._.. s Proposed Sanitary Sewer Manhole ....._ ................_._..... -......_............. (D Existing Storm Drain Manhole ........................ Proposed Storm Drain Manhole ......... __................ .............. ._ .......... � Existing Telephone Manhole...._._ ..... ............................................. T Proposed Telephone Manhole _._._ ..... _......-...»_.._........................... (DT Existing Electric Manhole......... . ....... . ............... . ....................... @ Proposed Electric Manhole._._.........__..-- ......... ._... ........ _......... _O Existing Catch Basin ..................................... _........ _............. _............ _8 Proposed Catch Basin .-. ........ ..._._..._..._.........-.._-....-._............_._� Existing Light Pole ......................................... »....... _............. ....... .... if Proposed Light Pole...............__._.._...__.»..__...-_.__.......__.-._........ � Existing Utility Pole ....._........._..........._ . .......... .................... .............. .a GuyWire _._.. ....... _-..... ........... -._...........»..-..-............. ...._..—< Proposed Utility Pole _ ........... _....._....___......».....-...__._ ............._..._.111, IronPin ....................... _...... ................................................. O Existing Fire Hydrant .__...._.-. . Proposed Fire Hydrant ........................... ........... _............................. Existing Drop InleL..._..___.._._..__.._._.....-._...-........_._....._.._......� Proposed Drop Inlet.._ ........... ............. ........._........._...-__........._....-.... � Accessible Ramp ............. ........ ......._................ __..-....................... ® TreeProtection ......... ........... .-...... _....»...._...__....__..._.... ProposedHandrail .... . ............... »._................... »...-.................. . . . SiltFence ................... ._....... _..-.... _.... -.......... ................... . Proposed Rip Rap Ditch .... _.... _................. _.... _......................... IM Proposed Curb & Gutter, Cone. Drive, Sidewalk _.._............ Proposed Asphalt Pavement .._- ......................_..........._.......... Proposed Concrete Greenway ................. __........ ............... ....... Proposed Asphalt Creenwap....-._.__._.-..._._._.....-.._..-..._.. Proposed Ditch Line ............... ._....._._.._..._._...._._......... .-.. -, Proposed Retaining Proposed Soil Nil a611......_...._....._�- ......... _............ Proposed Soldier Pile Wall ... -................. .... ..._._...._...__._.. �.. Stream Side Zone S.W.I.M. Buffer ...... »._-..... ..... _...... .... � ProposedBridge.............._......_......._....-..-..._....._._._.....»..... Proposed Bank Stabilization ... . .......... 0 • Bid Set No. clumm 11 - ENGINEERING & PRof:IERTI' MAMGEMENT APPROVED COUNTY ENGINEER DATE a GENERAL NOTES DRAINAGE STRUCTURES GENERAL EROSION CONTROL CONSTRUCTION SEQUENCE RIPRAP WXRM3 SINE tONPLr rM ML QiY. COIMTT Alp STATE EGMATINS ND DDDR ANI) 0.1µ.A , TIONS MO LOCATIONS ]NON AE Amm"N"Am As CmECRD BY M ENCEEE. TET wT E AONSXD ro wAa< 1 N1 NCRR NIMBI NMOT N YECMH6IIK CgNiY ARMY IX MT MAL TAE RACE NTMR ALL PEIYR Ac ANMAN"C'M AN IRE`NCMPI TMaTLO11 sEATOq sFsls AND OEYATMa REFFA ro M COREn 6 DROP HE19, E M V NA GWI BASS ALL PPES SINE E RIX QAS X II Mp M BOE& MOM TO LTRE35 OBERNY NO1FD. EEPIMII AE ro ! ODaIRUCtID M AIL DRAINAGE s1IR1c1LTE4. A YNNRAI O I EEDIIOLE M FOLDENc •colsmLlgn YGAILY a FINBB9m ASA mFYAL N2DE Fm PREPMATDN OF A gQBNIE 6 ETRIn AmnOq a2Enda Alp GpaTM1LlgI 9PEfi1CA11015 EASING STIUCIURS NTN M COaH1CRN UMn ME ro E AHMpONM AElIKMI OR RODCAM M NELE,15My. ALL COSI SAIL NO!®N PW SIRICIOE EDNOLEs WW ro E DONS TED M M OCITRR1 1/3 OF 3mLI0E ANO MIRav ON M CLIME OF M SIRUCME BY A BAO YAE pI R1E11 FAaBC Np Fllym Nm xLL M>fIGTOlS 9DLLD E YEE ws NPPRD'IEATF. 9IoNl ON M RMS OOP RLFSL E %MARNRAP AND mm m BTg1AE m A Oµ E R APAOBYNES ND GRAC 00 M MAIOIpNC IT6bnA® • E Xg BD. FAI 510E TiTE E N) gPN1AlE PATpT EW TIS NOOL I. OBTAIN OUOI1OAiAkT . CN1Ra PI/µ ,,BC AL ,ON M YECx121lIAO MNTr NpQINNI OEpARTlIIT. WXrAL N O,EF11 DVE�PIN NM RA ROD1E 96191, TTEEI sTNpg Nq OpB1l mEC1101AL A EXX/_ OJT M 9aNA0E }iFICE1IRY OEFP NAT M FM9m GRADE Of UGHS. CTOI 9WLL E AE5o019B1E fW All TEM A COFO Np1p BUT NOT AUIH lq NL IIINTF3. STORY OIMIAR $XNS ETC AS REOIEED. NL pN STALL E N A190DMCE NM WMANIO NIINOEIES 9PECil1C511OI5 Np MULL E i PROM ro CIEAIND Alp EARMpNI ICTINIE3 M N1IRACTOR SMALL wE A PE�ISIglC11ON ODREDME rM M S MINiT N9PECIOt FR09O1 MM11pL EMCES 9SfiEO ND AS RpFAXD N M ORANM4S, AND TEN M RPIIM RLL ! AT M OEw11ON 0' M SLAERDIOIC ATEA. C NAIREL3 9DULD E EIFAVAXD 9BTlIXARY ro ALOE MCEN NT W M RERAP N A YMNR 9101 TMT M PVN EO B®E BBiNBON, NEI y APRIOLON BT 9.101. Nl COST SMNL O N EM N BAY Bp AEN m E dmBaD SINE E NPRO,ED PEA M ORL S PLANS N E3TDEn ro iFEH ONOtIN N 6ETFA opNAIIDL MNtnActN STALL EPAn MY RILING fEATRES ■ NN ONTMN M APPT101ID NAOYw PENNTI. oINNc EAON PNAE O SLE DDISTRUCIRDI M CONRKTOt SNAIL ID.A15E. ELDCAE MD/V1 OBT.I.RRINVl AB GRACE O' M IMM IEET OE9O1 9PESXICAITNi tWT ARE DIMA® PRIG ORNSM1cnN ro M EASING N BETTER GOpIT101 MAINTENANCE PLAN MRN!ME AIL FTI®µ ,NTRa. Eµ03 M O SDNElnr QsaNARE PAa M MTE SAND ANO aME1 RIBA aAREr - RACE M RIFF BLANKET YEOAIFLY VIER M aNBN FauDATNM b SLE BaRDMI; IOPONAPIIT, UEITT ND ROW NFONATON TANK PATI A 96ET BT JIBES YAIINEY k As30CIAlES ALL - - 1 NSTML ARL 90IE/1 BASINS IEAPNMR AES SERND BASNS 1Y FENCE. HET PRNECIION FON ER1NG STaKI1H3, DIaR9ON d1OE5. QEOL GAYS TIRE PROIECIIpN, CO151RI1cTICIN E1IRMNOs Ara onER YFA9TE5 AS PIEPAIEC, PN GuvRL 3PRFA0 R1FP 510E N A ONOBI LATER ro M 3A6ED aFPT1 NEE YOE MAN OE LATER IX RTU w1FAML a u92A 9PIEM M LATFRS rM WEAL YRNK BFONAlM1 a ro ! PEND EEPm BY M aDRRAcIN PRNIN W CNS1NlCiMI 3NON1 N RNIB CEMNNc DLr As NEON35ARY ro µSTALL TEE ENLE4 4EIN NYTFIt drDEs YIN QEIX DKb xD N09Rx ocNlRn wTTBp SCOL E NSTILIID I M CONIRACIp1 R IE?o1901E WR YANINNICE O' EN090N NO YOEdT NIIII0. EMOS 2 M ONTUCTpI SCOL CSCR NL NO9D1 MO SEIAABR LO11R0. PRA[ORS FN STABILITY MIT GPM" iRL(IIC M CONTRACTOR SNAIL FANCY KL MFS.SMY BMNLGOES 90MS PAIRS. M9Nc UWTS TRIED YN, EIC, fN AT INS THE ro ELP PREW NT M NOItiSELAEER LROER NATIO FRN EN,,M, M anDm NEA sTRMTIc RTCII FAMNC - R/LE M aMN RTN CEECILY N M PRDMED PDIRDATIDL DEmAP 5 YANIONMCE NO O PRO ICNBI ' TR- AS REGAINED By M NOBN CNg1N DEPT. O' T ANSPORTATI N (µMOT} EMNY R016F PRMINNNC RMFAl1 MR N NI GY LE4 IMM ONE EENT' EF1L ALIT INBRED 1EPAIa SELL ! YME YED1A14T er M EONMALIN ro YMRAN AL. PPACIIO3 As ®GNm A CALL QTY ARBORW M APPROVAL OF TIRE NpEC RR LOCATION AND LAIR O OFAING. mCEi w Ar LEAK 12 NOES. AND PAR AI10NN PNS EqR 2 R NHD M aEEIP. RLMY M ITPSIEAAN M W M CIDM A IMN O' II12 MOBS BEI NN MD TEE MECESMBOR M Sr LONER MW M OEITRACIDt 94ML PROFIT All Y0INE1111 rDl PNS ND PROPERTY COIE/R 41µC C061RKTIX X90 IEA WTxNK IS411TMT p30IME EIARNATN SY51E11 (IEE57 LpgAL SIORNIVA PENT. A RMI CNIE COST E NSFAIIID d1 STE M RMI CM14E Y113T ! IOPT 0191E AMD S CMl i0t OItiB1E NSPEL•RQI Bi' E�ECIQL YNII N9ROTFp• M9EL1Oi a9.1E5 M OIMNO PEPIBT Mp OEAgNO µp NII�IO M S N OYVRL P NM M NEEi a cnN As REaTIEo. TAKE CME Nor ro DAYAE M OlIT1 NEN PLACING IMAP i OMACE OOg1E5 EypLE M RFRM Np R@M M 9EFf w RENO NMMN LATER OF L© �` MTROVK 6 T6 RM a MOT M AUTIOEIAININ ro WADE AOJAaENr PROPNTEE MT WMNc EYOp M VIrs S M9TIIIONS Br M CONIRACIOR ELISE E VIDE Nq TDO® AFIµ E1EQ NA1P IIOI Q' RMFAI,L MD OINCE A NDC WT BEW R1E1 w1EW14 NM A YIIYN O,QM O' 12 NOQ AROIO M OMIACE MEA i Ei1FN9LE OWACE b O NRIMICIION A3 910r1 ON M WAOIK MO ORIEIACE PIAN NTIOUT AVRIOE2ATON a 9B,ECf ro A ElE YIFN FE2D OOpIRNS BMIMR OT-91E WEL'f/L. PEYS901N WSf E ®TAMED PPON M a M ORNiMCIOR 9VLL IFEIOE meNi PRDR SEDR�IT xE1 NPJN SIOIARE CNACIIY NM ®I APPROINIAMY SOC NPm DUEL NL. 0. M CONTRACTOR SLIME ONGNILT MC ONNTHIWSEY NAZI TAPI ALL ER090N CONTROL RACE AID SIRNCIIIE& wwom , IEYpLE ME, REPLACE M ENTIRE SLEET. = NRECIFD PROPERTY ONEA9 MD g YEQRDBWC CONMTE > E CLEANED OR RRA® NEN M YOO1T PODL NO LONER CINAINS NIORLT. a M NIIMCiW STILL RODAE 9]IAFNT FRM RONp aT PENE NIp1 R ELOAES a1 FEET O® AT M PEAR MT iDICE !1 E IEPAED M M[CESSIRY m MAINTAIN A BMREA. ]. FVt /X140 F/1®OI O1NTRa PL AM CNTRACTOR SCOL IEET NTN EROMp, OQIIROL B�EyIOR RMN m WRpNAp NN FAOI PTIASE d- ON090M NPIR0. IEA4 NEE LME STONES ME 119EO N YAQaE SAO•lpT R DEEICULT, A ANN LATER O' ENE GRAFI N BMp NAT! M®m m P141ECf M RIOT ORRL T •• i r/J - LONTRIiCIOR AGREES m RE►M ANY oAYALE ro M P11MD OOIT-6-RAY N ACCODMIO NM M STNOMpS OF M MOIOr MD 1EOOflNUB COTITY. S IN CONI CETAl SAIL PEATEJh. IEE4ED M EC6LRT. Mp YOpI ALL YIDED MEAS ACGOpMG m NECy%A NM3 N M EIETATE SIDE MLOpIT - PL.CmE1T E IMM 91gRO POLOB RIEOAAY KIER PLACEEpIr OF M Rm B ^ - M CONTRACTION 9MLL BBEpATELY REPORT ro M ONLI. MY 05OVAIROLS FOM PVN ro YMRNN A NGOROuS. OpIY ECETATE COSEC B. M CONTRACTOR SINE PROADE CROND M,FIt ON FEPOSED SCFE N OIIEit MFRS TTN IS PARC Gn N A a ELN FMM1pN/VRWTD ACTY11F3 BEv1 RACING O' FLL sRFEs MAINTAIN MD ERIICAILY AD.A13T ALL TFAPORARY Ofm OI0-M ROD( CHECK DAYS, 98E ORMMa MD aY N MQ RROMIWT GRMNC ACMTES ro YAITTAN ORMAGE PArlpaa ro PLACE RFIIAP xi TMT IT FOPS A OEIML ELL-GRADED YAM OF STOW IBM A ANNRN W Cops DESIGNED DaTR6UTION OF SIDES TaOIW WT M wsS WY E WTMED w 93ECME IDAONG ATM TIN 8El1EN M AC111K FEED NpITIQIs ARD M MMiIRLN;TIRN DODAFENrs Mp NAIL NMT FOA FaTRUcll01 PRIOR ro PRO®Na CNDOM wn (rgETER rs 9grgt} fTILDEIa MIBEETIv1 a' Mr P11AY a: WADMR PEEIALEENT WaTNOMIDt PN NL DsnBaID MFRS NAN IS EDRNO an N ! GRECIAN, CA's (rRDEEEt a MONBER) VO LUNµ TEYPORMT gnBEENr BA9Ni OUAmT AN OD1T1011ID aAPND MINING PNAL RAOIpIE PLACE IMM m 1R RIL TFaCEsS OE ENAIMI CO NOT RACE IMM BY dlAD M llNagl CIpTEs a M CONTRACTOR, SNAIL YMITAM EACH STRIAE CiEM OR BA NI A91 ONKEL N A ODBDRILIFD STATE AAp 9VLL 1E110E FROI COPLEMM w NOTRILTON ON OEELOYANT. a !aI DOrs1NKTN V 310µI 9!EA 3rsTEX ALLTEYPa1Mr AS STINAL MNL IEENEIN N RAD: ORL ONIIRNJIING MCAS ARE STAl12FD. As slaty STRJCTTE3 /RE wsTALLID. MMIRICTN 9NALL NSMLL N1ET PROtECnOlI N OTTR YET1m3 TMT GtIY S G AclI C, SIDE SER THE CAE NOT m Oi00E M RSDFELTNNc M4 N RXN YEEI1 PV�IXNi M lITO E1 S W �, an M OIMNQ AMD BALMNKS M SYREANPAOU ILL RHES LOCA. iTO MR AH( AID OTEA MN[) EACH sTwcnBE la E1G21LY ND MIRIIOIXT YMRAN NL EA0901 OOIIROL EMCES MD STRIICILMS M FIOiD MtPE 9NMD E FEE PODEn Z E i NIRACIN SCOL N1.MST MD/OR DIT EASING PAEIEAT M EGSSMY ro A39TE A 9RNxI/N FIT IRO NNINEIOus A CON WAGE m rr]E FRO9aL M MNiRACTaR SCOL NMNTAM CIR1Y CONTACT rM M OOINTY INSPECTOR SR TMT PERRdc N9ECTOIS CAN E PEIEMNID AT APPRPRAE STAGS G' ff 69Rµ1 SIDE N 0,1sTEPR O LME SIDE& RACBRI wY E IB]]aERY m BETE M PRIXµ u151IBMBOR 6 SIDE m PRmllOi A IElATELY s EROSION CONTROL NOTES 0O1S1R1DT0IL 9100.E DNGN a9FME. M RAISED GME a IMM 9IDID BLVD rM M aBMaODNG ME. NO, ChIMMI N PROTRISION OF RPRM 91µ1D C.1 - MNMACTan 51W1 POSE A9pRT BIaDNNC PEEerr NIBIEIt AN AOOFEss N AIMING - I1. WAGED LDAs AND Ru ARE ro E RIMED DA PDAYS FD NM ,OBER SIRPICplT ro ESTRAN lR090IN Az SOON AS E APPARENT. z�a n ONFKT M LARIAT DEPNI'(ro NDERRELOCATE MT EE LARIAT AND L1WT PDE& ALL— FAQl1E5 rMN $ COIlKT Nlll M MppOSpplli lRDf1R M PRACTICABLE BUT M MT ELRR NTN T OAEIOM Gn FPI M l.I3T LAIp OISTTIISIC ACIIYTI: ALL DATER DISTNFD AREAS E LABy LA MULL E RN1pFD TAF[NMf 01 PEAIMpT sTAERATM rm GMRp OOlpl M SGOT AS RMLM QT BU} M MISE APC TTN MAINTENANCE N U LlYl3 Ci AMNO MOM N M PLAN ARE wAYIN Wn M EF0.9N CONTROL PONOSES IN, I SCOPE 6 Tp PRaECT Y11ST E RFLOGIFD AT M EA+FNSE O Tw < � � AGONAL ITT. MY. 9HLEYN m DET ERPE lA'm Gn AON M LIST VM-dSTA91G ACTLCTY. EIIEOT CMNMli AT AEQRMR NERVNS M TELL M Klpt YA.MI RMIg, MIO YMW R@M4 PIp1PTLY TE 6 CNIP/Lipl aNNL W06NAE ALL East rM Y[DIDNM COMCr. 12 MOOIAE NM EN", CONTROL N9PECIN Pr01 ro REMOVAL s REN, NNG MOBON CMNN L N ABLE& SPECIAL ATTENTION TO M OITLT MD HLE ZCIMR Al0 OIID1 POMa Y[EIE OTNCpmM1ID rtOA ALTERS CERMET OEOC STAEIIY AT ROW NOSSBSS Aro 100( FW TMunpa O' ANS sM6 IMEs, W BAN( NL •SIR• PROP m YEOCp6WG COMIY I.MD DEElIX1t)Ir STANOMp3 YApIL MIO M NCOEO STNDARD arw AIO sPEarrAIIDRs I] ALL I- CONTROL YEA9ANE3 NAIL E OO s"%ICIFD IN ACCORDANCE NM M aC EBNMM //p Mg,,,Y CONTpL RNNNc AID pMAWA�YAIAIAL, YEQOE6URC MUNn EAo9DN OORROL ONAMNR MD M YEQREDITa MINTT l.No CEElt>PIpIr RMDMD9 FANlE1 NAAE RAPARrs NIImIAX y. YMTTAN ALL ECETANN MAJACMT ro M ONNREL. N A HE LNY TIMRails NNON10I ro PROTECT M MEA PTCY ER0901 Ma 3EgI1 OBNIG OTT-6-BANG ROa OONM11 O' EEO AND BPV91 NOTIIN wY E MERGED N SOAR LOCATIONS GRADING NOTES AAL IN µ-9E BINK RTS ELME Mµ-9E mNUTION IAlDPa1 PEIEi FRa M zDNNc NiNNRR5111Am IL REYwN NL EI1o9DN axTRn CEa¢s MW ro CEMININ IC ADI SLAB MY NAOIf BETGp M CEARBm t1NTS BORN N M MN a A YQ - OF M QTY/CCANI ENCRI CONTROL uMNOICE MD a BORER W A AE FENCES _ .TREE PROTECTION NOTES LAMING 11LYE lllAl OE ACRE IIPIIIOIIT M MgpED FF0901 CNIR0. PLAN R A M0.A1NN 6 M O1T/COIITY EA09N NNTRGL DIRTIER ANO a 91BEIT W A- 0 M QN1RAc101 MIST GAIL M APFROVBAE uTBJTr aDPMEs AT IF.LST n NOI65 mvE MY AYGYATON ro PRIEST $ NINON CONN LDCAlION E U1RRE& R SNAIL E M RENO THE P O M NITRACTN ro Elfll'AE ALL EASING UR11E5 NMN RELICT rlx M PRNOfD RPROIEAIDIT3 SDN N M RMS All PERIMETER EEI M NIIRKIOI 91X1 REYOE ND RE4C fFElO3 AS MOIFD N M BANS NO/µ M QaCiED BY am M ENGINEER. K bi rzrz S". g 9wEA PENREIID aDES, MD ML TOE STEPFR TLM ] NpY2NTAL ro 11FRTCAL (al) MULL E PROYOD TE2PONANT W PF/YMOII STNXPATN rM ODITD COIETI M sON M AACIpAME MIT M X15' ETENT 1. eooE DFAN0IIRDL GEMNf OR CONSM1011d1 BNNS CALL uaMl fOF3T1T 9PEdW5T ICER N9'ECRQN OT TFE RMRCRN RAMGORM M CNITAC.IDt SCOL CLEAN ALD W6 M SLE a 6 1MD m AFROILNM PROELTCEOIEONCAI OCEEf8GCONTRACTOR,N.MC=KVNAENAL PEPAED Br m, m NTN T CNEIDNt DAn FARM M UST LAID DI3TIBarlc ACIIMTY. ALL Dnell usTIENm MFRS NAIL E PIlOIpO) TFEPWANY ON PERNAE", srANLnAIIN rM WONp LQwP AS SON As PRACRCABE BIR a AL NATE"IL MULL E PPPROED BY NE CEOIEONCIL ENCE411 PRIOR m MOIENT. N MY F.TpT rIIN lA CKRTDAP DAYS PINY M l/5T WO-p511xBNG -YY. n 5 ANL YMRNIES MD OIMIACE SIRICRNES TUT AE COIRIERED ro D-INNG HTM IIWT PR'S STALL E CNSTNNTID NMA MTW 11011 CONFLIIN Ym1 BOM M IPSMAY MIO OOYNISISM AOIRIOINAL IEISIRS ro 0011110. ER0901 Mp 9DBEi1T wT E EOIBED BY A EPE9J1rATIE 6 M COUNTY Sas L ATL MA23 N RMRC PEPFAIT AE AOECXD BY O D94A E AAD RODVK YLIST E AF 1 W M QTY ARBNST. ABBREVIATIONS PPE YCIpMi 0 CEPMt11EE1T. 1 TREE PROIECIMN BAMCARS Ylar MEET N E110EID IEE OMINMcE STMDMNb M IWDODNINc cOINTr COORT TEE atimAILE Uj 6 M CNTRACTOR SCOL MODNIAE rM M CEMEONCAL EMOEIM fOl APPROPRIATE SAE RABN12A1NN ON NL 9.OPE3 STEEPEN TLM 21. SLOE STILL E WADED NO SIEFPFII iNAI1 21. F SLOPES GEATR TUM Id EON A WAE TERRACING (CI p1B1RlE3 N LAD CEEI>pENT STMONps YANK). MAMNID NA3 NR ro SCALE EaR) 1. NO GNIBNK SEPTAN TREE PROECTN 200 LEAF SLR AID V LTT EE IIS. 9PRER]NT NM 1-2 NOES O' MT.DI F M fO1IRACilN1 SINE CIEOp1AE YYM M CEOIEDMCAL FNOIEFR FOI MY POD/EILMD IM16 MEOSSMMY ro O 3 A NAIAD PLM Mar E slaErRD FN Mr WIDNc HINT NVS MOT PRENOIIYY APINOLm NcEmL E-SEED rM WAS ONLY IN d5I1THD/VMDFD AREA& R � N 0. OM---GER IE/O PARLOR PEACRAIMI S MEMY FE)YT fT1R LOISTNICIIN EMMNNES N µMOT RANT 6 MT NIST E PRESENTED AT RE-COIRMUCRN S Mµ91. NEI. Alp STALL MES (LM TUN 1' N DLAAETM N M BAWL AS 2' N CARPER) µSDE M Y19ACR WY E APABNL_ M4R®IAIFLY or N CALM M ONiRA<IN 9MLL NTM ALL PFWEa RECLINED FOR BIASING ROIX i MAST ROIX b FNCOUNTOED. CONTRACTOR µALL E BEEP RE9VMS RIR rM YFEINa MNODFAIED OILY QlE fLY91 NM GIQIO sIIFALE. E115RIG 11EEi Wr E 11® IP W B iEEf (AT IE/ST 2/2 OF M EAAMEIE3 MCIBp ! LETT) B A_ d IX O OIB MVf_ PALEIpT o oA E NL BASING AID STONEY EOINE1p11$ ONNO IN PING AMD NOTES µMOR M PINI CQIYIR R ME ONIA. INS REPRESENTATIVE. N M NOmR DONMy WY ro µPNM Y59JIT. PC ^O! T O alvAT11E W___2RANNMS NA .1 3 All OEf N FLL SAFES 9NALL E 2:1 N MTIFII IINE55 ONAfE NIIFD. BE LAK OR M E GUY iN M qRt m E 11NALOPTMIE E EA�OgD TREE ROOTB INUSr E DEARLY OR NM A MAP NUIND TOM- BAOOBL ASM W NRNES ,,RINE ro M ML �____ PFAYMQT N BDIN YAR( O Q 8 QNSMICIIOI 91X1 COPLY NM ALL IPPIICNBE 401pONIC CCOE ANI E COISTaLIID W SAYE 5 ERONN CNM0. IEASIY'S SINE E NSTMIID MOI W CCNSRYICIMN M EMOpAME NM M ROIAE11FEl13 O' M NAPM CARONA SEOI9NIAll01 P0ILIIOI CO1MOL ACT O' Ii7; M IDCAL JlBR9N.lMNAL ARICY, M APPROEO ). MO SOL dSTRBNNCE N CEYPACIIpL C0a1R1CRN µAXI K TAFFIG BANK PIIS IENONIc N OREP LAID DISTI9IC ACIIMTY MLOED N M ITER PACE EARNC NO _JON, O M 4L_--_ G1W BA4N 6 ML PROg9D NI1011R5 NO SPOT EIEVAlxYO REIECT iER9m WAGES N®pl MN1R1 PFAYR, AIp TREY RMB AIO 9EQRCAIxNS PROECIIN 201E ERCIDT AS SNON N ON N9ROED PLANOL ._RR NAIL SET CJG�'_ONI6 MD plTiN W OB AIL E1EVAlIOR ME F EFFPVIR ro M MNOYNaC MD TNs AR15T E YONID BY M OERAL UNTRACTN PROI ro S,EF1ppT ER0901 CLAMS AAC110E5 M= E IDTNIID MD YARMRD W RETAEI 9ApIT YR1N M MBIDIRE ON M BE M SON AS PRACIKMIE BUT MMT ETEM LrIIE1 Y C= D Wn m0µ M LASE LINO DISRTRNC ACIIY}Y. n T>Y BARKERS SCOL EItRlO AM1OIM M MES NM A RAIX15 ON' Ip 1215 IRAN ONE FOOT (Y) POM EERY OE TNN (I OL IX TNTµ uKEr1l -N- { M 1EEOIr v M TEL (F ANNU11 ROM} NN OENR R NNEAWI• µNLS NIERYtY PP__-_JOEA POE CIEMANR 1T� Z 6 mallo MEMNa z T All OPER orsTTIBm MFRS µALL E RROLpID tOPNMT N PEHNAFBOIT STAEI2ATIN IT1N oNMD MEA AS xiDl M APPnOLFD N M RMNOUAL BA9s By M IpBM FOESMY STAFF. CAL PENCE-IX/µ IARC FEND: P� REN BB ESR O ` M CONTRACTOR 94V1 E PEMdBE FN lDG1BIC MD PROIECTNC EASING vTE1TES, Np STALL REPAIRMl wYML ro PRACTICABLE BUT M MT RABATT NIIµ 14 CNETDM wn FROM M t. sr LAIN)-ON510ENc ACna1Y. a ALL TIFF PROMLIIN BAwEAs SERE E NsrALLm WEN ro MT LTAEN• aEalR1C1101 N onEA WD-d31U1eK OP_._-- NaR1CAXD Y1L PPE PT---_POUT ff TMQMCY ORIF CONCRETE 8 BASIN IIEl11E3 MAT NxnM OTNC COa1NUCTOI M Y➢NONT NIPS AID OER9N ARES MULL ! CILM1E0 OUT N1FN M 31OIAE CMAmY TEAS Bepl APNIONATEII KTMTY. TEr BALL E OOIS'MULIFD PRW MR WIRRAL 9BSTMTK µd101 ro PROECT M NMI; TRH( Np OMEN a- M TEE PN .a0 Q' ERT M OOaT� 00aRNCTN f NI1TACM SAINT 9E2D TEN EMMVONL 91OOIRLY ro TRN1911N BALI m EA3NC WAGE. BOR RNID. CMVFl NAIL E CIFA� N EPLKID NOI M SEDNINT POOL MO LNOIP NNa PIIOERY. 9101 AS AIME SAFETY Fp1We ON IEIK POSTS YgMF11 z• x 1• STMDAIDS ZEIN 1• iA• RAL; N Y IRI aT FQICE NM rtAao"a R2µ UTLm MT OY Km BNC Nr-_AAEa (� 6 AMD dMNAa: PLM AE BA4D LP01 M APPROAYAE CUT Alp RLL SEOE Wil AIL FA090p AND 9DNEM OWNS PRAC1103 91X1 E NPECTED aY A aRNFD NPEOIN INCE A EFF]( Aro ATFR BERT ns NN PANNE ELpT. GIRT N NI GY LRS HIEN TLNE EERY ALEX NEIDID EPA"s NAIL E HTAIFD NTN TEE BIRRCADFS MIST BE NS'TKLID EsvE MY CEWIIIDI. WAONc N CaaMucnDl MD NOTBODED INR M DROP µBET �---� ER Ao NE OTER WALNIG REG9OENiS b 2A 11QIIB ff RIPELIIgI B1BATr wTTE11 EPNr NM LAN NSEEOIaN ro M ONE]R. MTn FLAK N9'ELIMI BY - FOREMEN. BY NP EW® AiMAICONNEPPE NAy - Y M CLYIIR.II'TOR b RE�OOME FORM ESM Mp YPWWAX Alipl O' ALL SEEING. SPARC COMIC ND SADµ 'a YEA91i5 RMViE m INRr FEDBRAI. STAB MD LOCAL EQIA1M15 N,1 NS11NR YDRE]IT Yl1 E EYOED RMY BOPO M aT N NONG MM R ECOES FOIQES OID AT M RNR M PFNOIG VLL oCA BA, 11. TEES WU�MJI RTN M SREET RWT-0.-RAY ND M IRFZ PANECIION ZOE (MWpD YtBACIt WERE pgOEgTy ABUTS M RflAAIE dIL_-- pplBlN RfR NST Of FAY IVMT Z ro M NBTM1Al,L 6 METO N ME O N TREY NANICS M OE9p1 NQEDI ACCEPTS NO RYPISHIIY FW M E90µ(5) ro µSTALL d E REPAED AS l�4ART W EEANTMI 9BElCEMT 9MElL NM1C - VAT) STALL XE PRORCIFD ONMCE N RONOVK PFIE M YmOLDING DAINTY TQ OONMNE. E eA� rT� O SADEpKATD o; b AL. Y2nm MEAS Yu E RrttNOD, REBID A3 IF>E�AIRY, AID MBBm AECOIDNG m M PLANS MD 9'MXITATNNs W YARAN A EIOOgIIi CONY EgTATE WEA 12 MY PRmRsn ED15nucnDN N WADRNc ADJACENT W IRa3 N Ta HOOT 3TSM MRT ! APPIIOED n M CAIRN PQEsmr STMT O' M Qn ENOIEFENM: AIp PROARIT YMAOEpIT EIEV FIEVATN s mI U B M OO/MECIN NAl1 NCELOE N M CONTRACT INCE MY OENAEEIG IIP 1MS11BE CODllxxrD EOSMT ro L OIaIRX.T M PID.TST AT STOW N M AlN1i ML 011MIACE STYPES MIST E CMSSED MO RP�RM MIST E IFPLADD AS BONED m adnROL ETI090L NP��IM OFPARTRNT MO QTR' IIBNST. T/5 nnJ1oE M /W TIM FCILOENa STAN DRINALT IllpptWdllO UtiTE9. MEWYS EEaNJE1 EIC. U1lM WY E TNF1ID N M RMT 2µE AT N• ARINAr 1xPM EOP._._-.EDOE OF PAWNNT SM fElla:_ SILT RAL FENCE � p 4 WARS EIEVAT MO LOA_ 9NEN ARE M4RONATE M BY M ENGINEER. TEY NAT E A0.UST0 Ell CQ®ST W W ro in POND BN EB PLA® AT ALL HEAGNALIA MD IEIE NOMI N ODNIrdICIIN OIMNNNS (SLE F PVR WE BREI M4ROED 9NIENC M LOCARN Elp YEMOOL E91T__ EA4PE/IT EAiE_ OFSDNC ¢ SINTMR SEBA v O m ="M Z COMTOO STATINS CFTSM MO FIEVAIM)rs REFFA ro M mNIER 6 DROP µLER YMNQF3 DETAIL 9EET POR OUTFALL NINE SLE NMn la N 3WE CA gs. Amin Wr E aBED ro AL,DE XEPNMr (]O GTS) ACAS AON065 M TREE PROIECIIDI ZONE- MT.OI, 4• IN F STA STAIN /L_.PAR Q' QTN L1 ,� MO AMCIMI BOxm ND M AEPIXNT CT M V POR GlN BASINS MAITMIAL PAa90N LVRRIRL YEA10E3 N XT BARIEJa m BE nA® AS oY¢Tm w M LRxx ANR9CTONAL RNA B' DEEP. rLL E EOAIID ro ACT M A N9NON ro PELRIT R OOPALTOI. DO NOT staE MA1FRNs N PAIN YAQNLAT N M PRMECTFD ROOT LOIE `PPP VANDMD AAK FEL- RATED END SECIM1 O S MT ICT ENC O DN IE RISE NIIµ M ALFAS ILECT T TED M RAMNAY ONR`C) T) BY BOOpIRT TIE W MMMAY a p51RCT OINOMCINOIT MM- LTE R 9IB.ECi m M ESIRCIIONIS NPoMD er M FLONYPY NE I " "C a• TEN MT COaM BOpERs A ORNIACE NINY: IA MR NBNT1lD a PON1rTID N M PROIECiFD Nxrt 2nE sTIRR or,AD TREES, Aro Aw 9µN6 amR1N ro E RF]IOEO STALL E CIT ALUM W CRMNO Fm O NTNMT POOR m1D CME TAN- x TAxG]IT H � O W ECICDIMNC CQINIY. - M M Af.IOR 7 FOR EENOOIC MT N N OTFA 01(f. TC MNsr E9rt YALE TE2P__ TE,PNMY /� Z p O � 11llF1�T pEAA1O A TOTAL 6 A.OM 9OIIME FEET O' BPFRMOA MEA y10E 9PRNEA Iiia EL EOUBE STOBN O CA S X DUTY OTE GCAVAE A EPE ORT, IEREON I A TRAM W COMMMNE ETC, TROY M WMNM{ AREA SIION IOEOI N A FA4QMU5 YNIWII AS IS M NOT READER 8A1MEA5 0111 FLAIL OOMSETONI Q' PRaECT. NOEZ-_ MORNTK 1RAENIN P01T R T w o M M CONTRALI01 FWr ACEES m STOP ALL NMf ND EWCNE TEg RMI IPOI MQYpICA MI By M 111VL J0N9BCIIONAL NSECIN in pF TIE CUIa NO W �OFPM 0' 1V0 fAB90.FET ERGOT MBNc EOIMENf SINE E NFPT 91µP mRAIX D19IE TMT POJa AIE CIN, OLMLT AIO ME NN BRdEN N 1001 w OLLL W 1R190TAaL EOi1OIT. MY ENPOSEp 110015 P T � � __.­ERT TVP__ T1 sr PI1 YT RETAINING WALL NOTES NOfR M ONEA SLIME E OOIEIm NI1N A M SON AS P059ME W YYNp ExPNA1IE ro IEt L Y/O .UpBI WOAD aRixAL CDE E_ LET, FOOGE WNT_ o a FN ML CONSTRUCTION NAND NDAOR ALTOS WIEANAYI BANG PROIECIIOI MO STIILRATI01 SNAIL E EOIIIIFD AS PER LOCATE Al9ILII0IAL ENCENN CONTROL LABS IT. RMNC IX PASTING TIRES TINE E oaE ACOppNG W M LAXSf Edl1O1 CE NAlM1I1 AIBONST ASSOOATI011 MAA) 3TANDMp.S LT_..___ LETT 10"IcAl. E WMTARIFD PR ND ORAL O1 NEM" BE AL1E5 SAIL E N PLACE MLR m MEINMIONC NaM MI)ML NHL BE nN2 RNEC IN PROPER TDIRp1C aaBM RNIL ALL ds1O6ED AEA3 IRE N A YANNFIP MAi P1E9]I56 M NATPAL OMRALIEA O M WONT. A PEJNTT a REOINED PON MNrp MES N M STREET OWT�-M1 AID TIRE NIOIECII01 ZOE Fp1 M ITBAN FORSTRY RAii. pCIro X NSF vIT POE D Y Q OESMI a: ALL RETgING µN13 rs ro E PER AA9110 THD anoGE DE9W 9PECE1GIIDS � L BAITED ILTAENC NAIL OE9W ONANN6, SEAIID BT M llC UD]IgD NO1EID µl1 E 90NT1FD W M LOYL ARR11Wn MN ro Na1R1CTON. srAB4fOD MD PTOTIC DOER a FSTAMI9ED. IS N aRIrSTla1C1M1 ENTRANCE PWS SMML E MSrAL1E0 w M adNMKIN AT MNSRRI1cIIN ALrss PgRS MOR m LA10 Oa"IINBM¢ I.REBS OMACED BY OOISTRUCTN SMALL E FFRa21ED BY M GRIL NCE N DEEP ROOT LMB, M{CIMI TEMPO PER NAA SEAIpM1O1 YAx.___. YAAMY NIL_ NAM EEM INN ._�_ ANNIIN N VMLT__ NATN VAIILT YON,_ w--__ EOW YALE _ V 6 M TIC lICNSID ENIXQA MIST PEHONI ODISTRI1C1tCN M CONTRACTOR MULL RED A COPY OF M APPROIm IMO, ORTIIMIQ PVN AD P, BB, ON SLE *eW,,N LMP 051111µ1C K'IMtt R M PROLTas1 14 NATONE EIRAC a rM AT N,1 1MEE AR M�114T01 TEEN THEE OOINICE Wp11aN6 MD�AS�ORI�'.REOTE YONcRJ RC Iw RAR NOM M' SRIY PONY NAL SET _ OB9mA1101, E1P1NC N A YNID lE'rTR ro M LOCAL o : AMT110fIY TUT REEATNLI rC AE CObMIN:RD PER M NOFENC ORANNN$ N COgJANQ rM SECTOR feta] O' Br M 06M FnEETRr STAF IRDAOR an AI6pN5T. IErAL CC a M NREM CARONA MIlDN1C CME INSTAL, aT PENCE Nblc M DorISIEAY SLE 6 ALL PPOPO9D CIT ND PBL Na1TII1C11101 AN,,, AS RaCwTED N PLA,_ A X T TRY dLvnN swALE WT E USD N LWII OF AT FOILS ■EEE RUIOF GN E EECED m A IOPNMT TM"P M Y VCNS w IEE PROTECTION EO9EAETII3 ME M6.ER m FINES IRD/m NEHAE NNECIM1E ACNIMIRGTIaL h. Nl WL6BINC a BPEIYfIEp N M PROECtID MOOT TOLE STEPS DEAD TREE Np MY 9aR6 WORM ro E RO10ED NAIL E aNIN NNMI/1OR1IrIC -__Jxal _ r UTILITY NOTES IT M THE R R M cDRRACIRR3 RESE'OISa1IT ro PETFON ARII RtJOrED YQIMICE O AAL ID RADION AYI>1E1tT MNTR,E,NCDOT DE W EN9BE THEIR FLNCUON AT ALL HES. aT NT A snAP papm N OR ro croup uBm onrTBBY APAo m 22 NL PAMa MI) OBER BTAXNY RORt b ro E DOE AMOpNG m WTONAL MEgiST ASSOCIATION AI) MSL AYDD-20OI 2012 STANDARD DRAWINGS D m % NIMI41OR MWL YAEITAN ALL ENOB01 COtTR1 IEA9RES IN1L FERN ENT EGETAVN NAS BEEN MABLI ED. B EIE S DREAD IS TIMSP♦CRIED ALTO A PARD N P191C ROW s AR. M ROW SBR A E 9NML E CIFAED STANOMpn 11 No OIENc Pws TL. E PEEERFD N MTNNa 1FA1DON1 91115, Ax0 PFENc Mbr E ATmFLL PROPER PRLTrIG 1ECIMQlES COST E EYEE114p SD IENDONLS 9i1TS MD PRANG O' BARK OOS NOT 023N. o C O ' Z y _ - E I. M ccmTRACIN Is EHOISE FOR NORNTALLT zu A ERmALLY LOCAOIc AND PIIOXCONc A11 PUBLIC N MVAE j UIIRES (91011 N RIOT 9NIIN) NRI lE N N WJAfENT ro M EaNSTRucIIN 91E AT LEAST AB NaTb MOR W TIOMROLT ATM M W EACH OAY. 9DROR STALL E REANEED FRN M ROWS By M,,LNC N SEDMG MD TRANSPORTED ro A 9HE21T CONROL OPOSAL AEA SHEET NAsIND STALL E ALDND OILY AFIFT SCROTA R 2w lD 16PRD. RaNDINC GEN. 316 aJR W AJI91 CRS 20aTP YET1O0 ff OF/ANC - YETMD N WNW TNG - VEN s ANY CEAlOJ11Q1 WApf N NOMUCRON ACIIMiY. M NRRACIOE SNL NIIfY M NORM CMONA C E_'JAL .^- 6 U � IDCION S RACE (IIDM) AT (RDRJ632-NLS iN ROFN ®I1B1CAT01 6 EASING "NL,m r11µ M RFEDED N TRS WNEII 25. MR TEE R00T4 EPOYO OE m INV~ N OMA MIaTRKTON MRT E CLEA LY M NM A 91µP 1a1RAENr A D BIOOELID m IX WE 'M INETHOOEOIW W WEIDFA @41M/0M1 Q,ETpO I) µFII A ON9ED BMW COW"W CN NIRMN.E NM BEEN ME2m NM ]! N N W BFHI PV9EB INTO, MSR BY AS SOON AS POSSIBLE M YNNEZE ERPMW ro NL BSLOR O PAEEE•RT IIDMIL B s; 2 SIMAD ANY IRIOWtIFD W INCORRECTLY NM1FD UOI1E3 E ENCO NTEI®, M CONTRACTOR MALL CONTACT M CCN­IRAFE. R BINE E PERILED NM A CEPA 0 310E MALW TMT O' M ORWAL MLNMINNL 10. TEES TTN M SIRET TONT O' wT NE NNTECIID w LAN A PFTAIT O REOND MOI M CITY ABQKT -V M BLa1a DROP FIETlEf FINE EY WARE VO OVER INNEDIAMY PN ONECTORIL N N1IRK'IN W PRQR.T M EASING FYPp.MD YNIAw K.E. YANgF3 AT EII lY6 OBNG M Na1R11CT1011 ROIOVAL IX MY RNM O NAT TLS ILL T� OMNI F N OMlXR AS YFA9TE3 ALS' IBOE WOAD MO IACAIm rnN M 9.IBIO( ARE PROTECTED BY LAX CONTACT LAID OETRAPEl1T FN REOMFD PEEE11 aD.9 RAPT a CONTRACTOR BINE COODBIAE MT ICEM1I11ON W UTIM SEANCE rM OXEN AND ERPFDTE UIN1Y COPMT ° $ �� A fNK M]IIICI111J O' Nl 9EDNENT CNIIIR lMCES SEfCIE EEDEIIAIMt BIa]A TRAFFIC EAINc JlNC11O1 BOY ONL3 L C� REN®RATTE MTNTNY_ a.. AID FAaaDI mnp NaIFs -CONCRETE CLINE, ORM AID DIB t GRaN t1M.d L l AT EAST M IB a RP9R TO FTN, M LOGTIN Aro PTd1FL1101 IX ML F26111C E CONT CTOR aRaTRRcnN. LA o T LEAST PROP ECIMLY M CONTRACTOR STATE NEIiY M ANY O:I1Q1T1OL WRAC N MNSI"MIN TER 1. SILT FENCE SNL E MIMTMED ARCANE M PFNEI6I W ALL AMMNON AREA, TO NEEM SECTOR MANBPORT 0110 ADAMENT PIDIQES N OF9E RO SA WCUTS pal EIEC ADVANCE ELAND Spa "01.02 XENPawR SHOULDER atBBEs O W U PO R T VINTT NIOLpO1 FON FAa4Et DENIiICATNw 6 EASING u1ElILs NTN M PROWCI SITE CINAM M MR1GaL IM.M, pM ZONE ERFOE AN1E5 IM TIONKIRAFZ NECONTROL L E9W TREES 1 MY PINNED BIXHwTN O IATNTr SEAE10E 9YLL E LEN A H IIOIn NOTICE ro M UIRRtt cOPANY AOM - v olNm. 2 baRaT�EIA TN e"aEu MALI. E MSrAILm AND YANTANm INR CNSlICTIDN a ONPLLIE nD wo9;IPMcQ 111602 PORTABLE NDOR TOE 9p6 N 0 a Q 6 0. CONRPKIpI SNAIL SAE CIT, NODS[ AID RFPUfE A9TIALT PAVA]IQIT M EfESSERT ro BaiAL1 ITaNWallo a M CONIRACTN NAL. NEOAIELY CIEAIIP AND REPAIR AL ER®ON OMNAQ ATN d9COLDtY MD REMINL M aDITREc1DM 91µL STROP EfFSINC A9RNALT ND/OP LOWEIE 91NFACE3 RYNan m IEIIOVAL 111ILESS onEANY aBEDED ar M NOBEA SAE M ALL STILL E 1 FOOT YIMIY PROI mm RA�OVK lYRS 12OLM PAEIIIf ISI z EIEi BC,RERNOE. EEIL Mm Mo EOYRIKATN ODDITIS a MEWAX CMITRGL EASOEi M ECE55Mr TO PESETA REO MBR,,, O' DANA¢ M EASING EDGE O' PAEANR. SAYI OR PAEYNT NAIL E RERAOD AS NLL AS ADOIIBNAL PAME" EOOND TO TE-IN M FACE a: PRa+OMD MINE! MD OTTER. YNNICS =04 sACIAI gDWR NNTR iF210E 9+EOK SOIM M PPI d 5 1. KL RECTACAL Nlif MULL E OLYE N A0.MDMNCE ■M 111U1 PEA QNPMY STNpMN71 l ALL FIm9N ND EONEER C01TIL0. PRALINE 91µL E N9PECIEO REDLY MO APIFR EERY a3 /ION 11MFML ESOT. BUT N MO GY 1135 MM ONE EV2RT IEEE M®m REPMb SCOL E YMA NR@AELY. BEET "ETIµ EPNr NM PAN IILaPEc1IRN ro M aNEIL n BAB" IM __ XWKRARY POOR aT CEM TM A Ilium XIFOtMT ION 1T OEOL TYPE a CITY OF GRIPED OND D SIF) M NT' fly r ` V rA W GEOTECHNICAL NOTE u Y GREENWAY MAINTENANCE NOTE ML RDNEIFII !EZ 3rNR NEIN ORM 3L.' AND ML 9DR5 GFAXIT s ORMIN WAIN ] IMRONTAL ro 1 ERMK (-I) 9uu! PROLEFD TEE'DIMT N PWIMEMT svaaATMI BM p1DIID MLsn AS 3Oµ Ai �Ba z TKIFAME BAIT N MT EVLM NTN) DYEDM DAYS fRN M LAST LAID ORR6EIC ACTNTY. NL OILER OSRINID MEAS 91A11. E PIIOIpm 1FYPOIMY W REIIYEENT STAMLAAl1Ol YM ORGANO MET AS ;"A-.AD0S9SE RAP STNOMO NM PIAIIRIC 311µP (Y-F CkC) O V ROIX M1NPg N BDBDpb ENE OBSEAED M B01µ M MIT101 AMO NOD M BENIq O UT1lE }TCM CREEL AOEOIDRK m M CE0IFHWCAL EROMINN EP'NR w BORE CON911NC ON'0IEE6, NC APICAL POMAINM3 iN PETAINIC rY13 EID HORS CMNOT EM N EMSWK RDOR W BOI.EDFA$ TQPM ALIQRIATE fOUDATNM ME EIIG o0190QE0. a SOON AS PRACTICABLE BLITIN MIT E50R NMI 11 CALENDAR OAn iR01 M LIST l/ID-0SIIIBN• ACTYT'. T. CCNSiNUCNN PDNT W AODM m WT GF109n CP EMM MO anlER MALTED WTERLILS a110 M WMCENT IDT. M 00111NAC10R MAIL RCUEEI.Y PRINT ALL 9DY]R OEPo9n MO OFARS IO9B_ACO9ME RNP SECigI rM RANIWC STIP Yom• DIB AID p1T1lA 1_-A{YEIa_ RMP WMI MD rMyl RMHB STi Y-f CNc la�_ARYE59AE RNP SECIMNS NMOUT RNRNC SRP Y-F CAG IBA....V, RMEIENf a' NCI�IE RNP RAINP NEIFS r ` 1. AOCWAAIFD 4D•♦plT 9NML E YMA®m gEEIXT 16ATE BPAG15 OT M EREDI M.iTFA ND PEDORMI, 6 NM,EMC PROPER R AL ND O9p5N. O"EER Mµ1 ARAI =WAX' OEHNS FROI GEQ1w1 MALS MD RNPRELII NTN 24 TO b TIONS ITER TATER RFgDES NM LARCE bla OI9roSD d• OUT91E M MAFFA AND PIDmPlAE1 NO FN SODS R1191m Mm M TATER RMT RM\DED TEES a NO OROAIIaE NDIFASE N TA®fTY iA01 gOAp1MY AS TET o001R ET- WI POLII DATOI9 AT N NEM M Q®N BOTIOI rLL NEID M E STAMPED rM A LATER OF Ao RM. M sTAamn MEA .11p 10.]04-MIRICAXp POP'S pLMI MD CIRbE RAT NI E ]a2t_IMM AAAI AT PFA OIJiFU P. BE TIM INNµ v 3 EFTS STILL FJRIOD A YNIIY 6 ] FEET N ML SLOES a M OE9O1 FOOIRNT. AiIA-ERRED OD TEMMBI 77 RPE p 1=SN1Y BNIir RNRi�nNPb M FCawp1NY O_A_. 20.2L_OMAIFAIC SIOIN pGMACE/31lTMR SENOR EA4EOITS EAYIOR OPppRS FOR S1PN BRAN PPEM!Mtl W me ]OE T w VIC O M - O ° xiaA_sMETr BPL 3 SOIL NAIL (TYP) s 3 GROUT (TYP) "s E 5 E x s DRILL HOLE DIA. TYP 6 - 10 a m 6 / IIx a a Y 5 �8 a a 0 A. z � a $ 6" MIN (TYP) of SOIL NAIL RETAINING WALL u FINISHED GRADE OR CONCRETE DITCH AND IF APPLICABLE, END BENT SLOPE-- CONCRETE SLOPE PROTECTION' FINISHED GRADE- --J BOND BREAKER WITH DITCH - GRADE ELEVATION EPDXY COATED OR ENCAPSULATED STEEL BAR (TYP) GEOCOMPOSITE DRAIN STRIPS ® 10' MAX HORIZONTAL SPACING CL CENTRALIZER (TYP) BOTTOM OF WALL TOP OF LEVELING PAD MIN NO. 57 STONE SOIL NAIL WALL — TYPICAL SECTION 'SEE CONCRETE DITCH BEHIND WALL DETAILS. "SEE PLANS FOR FINISHED GRADE OR END BENT SLOPE DETAILS. AGGREGATE SHOULDER DRAIN IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 816.02 NOTES: FOR SOIL NAIL RETAINING WALLS, SEE SOIL NAIL RETAINING WALLS PROVISION. FOR STEEL BEAM GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. SEE PLANS FOR CONCRETE BARRIER RAIL WITH MOMENT SLAB DETAILS. A FENCE OR HANDRAIL IS REQUIRED ON TOP OF RETAINING WALL N0. _ SEE ROADWAY PLANS FOR FENCE OR HANDRAIL ATTACHMENT DETAILS. A __ ARCHITECTURAL FINISH IS REQUIRED FOR THE CAST -IN-PLACE REINFORCED CONCRETE FACE FOR RETAINING WALL NO. _. A BRICK VENEER 15 REQUIRED FOR RETAINING WALL NO. _ AS SHOWN. SUBMIT BRICK SAMPLES FOR APPROVAL BEFORE BEGINNING SOIL NAIL WALL CONSTRUCTION. BEFORE BEGINNING SOIL NAIL WALL DESIGN FOR RETAINING WALL N0. SURVEY WALL LOCATION AND SUBMIT A REVISED WALL PROFILE VIEW (WALL ENVELOPE) FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THE REVISED WALL ENVELOPE IS ACCEPTED. DESIGN RETAINING WALL NO. _ FOR THE FOLLOWING: 1 H = DESIGN HEIGHT + EMBEDMENT 2 DESIGN LIFE = % or 100 YEARS 3 MINIMUM EMBEDMENT ELEVATION = _ FT 4 IN -SIN ASSUMED MATERIAL PARAMETERS ABOVE -ELEVATION ------ FT: UNIT WEIGHT, Y = __ LB/CF FRICTION ANGLE, A = _- DEGREES COHESION, c = _ LB/SF 5) -IN -SITU -ASSUMED-MATERIAL_PARAMETERS_BELOW-ELEVATION------ FT: UNIT -WEIGHT, -y-= ----- LB/CF FRICTION-ANGLE,_0_ ___DEGREES COHESION. -C-= ___LB/SF THE MINIMUM EMBEDMENT ELEVATION FOR RETAINING WALL NO. _ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. _ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. _ FOR THE POINT, -LINE -or -STRIP SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL NO. _ FOR A PIPE EXTENDING THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING SOIL NAIL WALL DESIGN OR CONSTRUCTION. FOUNDATIONS FOR SIGNS, _LIGHTING_or-SIGNALS WILL BE LOCATED BEHIND RETAINING WALL NO. _ AND WILL -or -MAY INTERFERE WITH SOIL NAILS. SUBMIT PROPOSED CONSTRUCTION METHODS FOR THESE FOUNDATIONS WITH THE SOIL NAIL WALL CONSTRUCTION PLAN. EXISTING OR FUTURE OBSTRUCTIONS SUCH AS FOUNDATIONS, GUARDRAIL, FENCE OR HANDRAIL POSTS, PAVEMENTS, PIPES, INLETS OR UTILITIES WILL -or -MAY INTERFERE WITH SOIL NAILS FOR RETAINING WALL NO. _. FOUNDATIONS FOR END BENT NO. _ LOCATED AT STATION ___---- WILL_or-MAY INTERFERE WITH SOIL NAILS FOR RETAINING WALL NO. - SEE "FOUNDATION LAYOUT" SHEET FOR FOUNDATION LOCATIONS. DESIGN RETAINING WALL NO. FOR A LATERAL LOAD FROM FOUNDATIONS LOCATED BEHIND THE WALL APPLIED AS A FACTORED UNIFORM PRESSURE OF __ LB/SF TO THE BACK OF THE CAST -IN-PLACE REINFORCED CONCRETE FACE. "TEMPORARY SHORING" IS -or -MAY -BE REQUIRED FOR RETAINING WALL NO. _ IN ACCORDANCE WITH THE TEMPORARY SHORING PROVISION. SEE ROADWAY,-STRUCTU RE -or -TR AFFI C_CON TROL PLANS. :I'I I PI>I'i TOP OF WALL (SEE NOTE FOR FENCE OR HANDRAIL ON TOP OF WALL, IF APPLICABLE) EXTENSION 6 MIN WITHOUT DITCH — 12" MIN WITH DITCH NAIL HEAD (TYP) ETE N CAST -IN-PLACE REINFORCED CONCRETE FACE w w a o YP > z � w (7 = J 3 H Z w WALL FACE z 8.. MIN SINGLE FACED PRECAST CONCRETE BARRIER, IF APPLICABLE FINISHED ORGD 6:1 FLATTEW SOIL NAIL WALL — TYPICAL SECTION 'SEE CONCRETE DITCH BEHIND WALL DETAILS. "SEE PLANS FOR FINISHED GRADE OR END BENT SLOPE DETAILS. AGGREGATE SHOULDER DRAIN IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 816.02 NOTES: FOR SOIL NAIL RETAINING WALLS, SEE SOIL NAIL RETAINING WALLS PROVISION. FOR STEEL BEAM GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. SEE PLANS FOR CONCRETE BARRIER RAIL WITH MOMENT SLAB DETAILS. A FENCE OR HANDRAIL IS REQUIRED ON TOP OF RETAINING WALL N0. _ SEE ROADWAY PLANS FOR FENCE OR HANDRAIL ATTACHMENT DETAILS. A __ ARCHITECTURAL FINISH IS REQUIRED FOR THE CAST -IN-PLACE REINFORCED CONCRETE FACE FOR RETAINING WALL NO. _. A BRICK VENEER 15 REQUIRED FOR RETAINING WALL NO. _ AS SHOWN. SUBMIT BRICK SAMPLES FOR APPROVAL BEFORE BEGINNING SOIL NAIL WALL CONSTRUCTION. BEFORE BEGINNING SOIL NAIL WALL DESIGN FOR RETAINING WALL N0. SURVEY WALL LOCATION AND SUBMIT A REVISED WALL PROFILE VIEW (WALL ENVELOPE) FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THE REVISED WALL ENVELOPE IS ACCEPTED. DESIGN RETAINING WALL NO. _ FOR THE FOLLOWING: 1 H = DESIGN HEIGHT + EMBEDMENT 2 DESIGN LIFE = % or 100 YEARS 3 MINIMUM EMBEDMENT ELEVATION = _ FT 4 IN -SIN ASSUMED MATERIAL PARAMETERS ABOVE -ELEVATION ------ FT: UNIT WEIGHT, Y = __ LB/CF FRICTION ANGLE, A = _- DEGREES COHESION, c = _ LB/SF 5) -IN -SITU -ASSUMED-MATERIAL_PARAMETERS_BELOW-ELEVATION------ FT: UNIT -WEIGHT, -y-= ----- LB/CF FRICTION-ANGLE,_0_ ___DEGREES COHESION. -C-= ___LB/SF THE MINIMUM EMBEDMENT ELEVATION FOR RETAINING WALL NO. _ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. _ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. _ FOR THE POINT, -LINE -or -STRIP SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL NO. _ FOR A PIPE EXTENDING THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING SOIL NAIL WALL DESIGN OR CONSTRUCTION. FOUNDATIONS FOR SIGNS, _LIGHTING_or-SIGNALS WILL BE LOCATED BEHIND RETAINING WALL NO. _ AND WILL -or -MAY INTERFERE WITH SOIL NAILS. SUBMIT PROPOSED CONSTRUCTION METHODS FOR THESE FOUNDATIONS WITH THE SOIL NAIL WALL CONSTRUCTION PLAN. EXISTING OR FUTURE OBSTRUCTIONS SUCH AS FOUNDATIONS, GUARDRAIL, FENCE OR HANDRAIL POSTS, PAVEMENTS, PIPES, INLETS OR UTILITIES WILL -or -MAY INTERFERE WITH SOIL NAILS FOR RETAINING WALL NO. _. FOUNDATIONS FOR END BENT NO. _ LOCATED AT STATION ___---- WILL_or-MAY INTERFERE WITH SOIL NAILS FOR RETAINING WALL NO. - SEE "FOUNDATION LAYOUT" SHEET FOR FOUNDATION LOCATIONS. DESIGN RETAINING WALL NO. FOR A LATERAL LOAD FROM FOUNDATIONS LOCATED BEHIND THE WALL APPLIED AS A FACTORED UNIFORM PRESSURE OF __ LB/SF TO THE BACK OF THE CAST -IN-PLACE REINFORCED CONCRETE FACE. "TEMPORARY SHORING" IS -or -MAY -BE REQUIRED FOR RETAINING WALL NO. _ IN ACCORDANCE WITH THE TEMPORARY SHORING PROVISION. SEE ROADWAY,-STRUCTU RE -or -TR AFFI C_CON TROL PLANS. :I'I I PI>I'i -I - STEEL BEAM GUARDRAIL, IF APPLICABLE SEPARATION GEOTEXTILE (OMIT FOR CONCRETE PAVEMENT, FULL DEPTH ASPHALT OR CEMENT TREATED BASE) i SEPARATION GEOTEXTILE—J 1 NO. 57 STONE —T-� 1 I 1 I 1 1 I I 1 BACKFILL MATERIAL I 1 18" MIN 1 I 1 4" DIA. PERFORATED DRAIN PIPE, IF REQUIRED (SEE NOTE FOR PIPE) CAST -IN-PLACE UNREINFORCED CONCRETE FOOTING (SEE FOOTING STEP DETAIL) GRADE ELEVATION 7RICTION ANGLE COHESION STEEL BEAM LB/CF DEGREES BACKFILL FOUNDATION GUARDRAIL, IF APPLICABLE FINISHED GRADE* 6" MIN PAVEMENT SECTION, �� TOP OF WALL IF APPLICABLE FINISHED GRADE* GRADE ELEVATION L J SEPARATION GEOTEXTILE (OMIT FOR CONCRETE PAVEMENT, � PAVEMENT SECTION, TOP OF WALL UNREINFORCED PRW CAP UNIT FULL DEPTH ASPHALT IF APPLICABLE ry OR CEMENT TREATED BASE) 6 OVERHANG -- - 1/2 SEPARATION GEOTEXTILE- �- UNREINFORCED PRW TOP UNIT WALL BATTER w w NO. 57 STONE S--1 WALL BATTER 9 DEGREES AX CL 9 DEGREES MAX UNREINFORCED PRECAST RETAINING > '' I 1 UNREINFORCED PRECAST RETAINING WALL (PRW) UNIT (TYP) Ii WALL (PRW) UNIT (TYP) WALL FACE = J j WALL FACE BENCH w a = 3 i BENCH NO. 57 STONE, IF APPLICABLE 4' MIN z w w 1 BACKFILL MATERIAL i NO. 57 STONE, 4' MIN I SNGLE FACED vl w " 1 18" MIN IF APPLICABLE SINGLE FACED PRECAST CONCRETE o PRECAST CONCRETE BARRIER, BOTTOM6:1 IF APPLICABLE FINISHED GRADE' (H: V) OR FLA i 1 BOTTOM IFAPPLICABLEFINISHED GRADE* 6:1 (H: V) OR FLA OF WALL 7 1 OF WALL TOP OF 2%—r 4" DIA. PERFORATED— TOP OF 29.~ FOOTING 1- Z DRAIN PIPE, FOOTING w Z IF REQUIRED o � (SEE NOTE FOR PIPE) 6" MIN TYco P 12" MIN FINISHED GRADE* w CAST -IN-PLACE UNREINFORCED----- --� 6" MIN TYP 72" MIN FINISHED GRADE* 2:1 (H:V) OR FLATTER CONCRETE FOOTING 2:1 (H:V) OR FLATTER (SEE FOOTING STEP DETAIL) FN FOUNDATION MATERIAL �� MATERIAL �f PRECAST GRAVITY WALL WITH PRECAST GRAVITY WALL WITH CAP PRW UNIT - TYPICAL SECTION TOP PRW UNIT - TYPICAL SECTION *SEE ROADWAY PLANS FOR FINISHED GRADE DETAILS. *SEE ROADWAY PLANS FOR FINISHED GRADE DETAILS. UNREINFORCLL PRECAST NT(TI)WO)UNIT D D o e D' D X` 1 STEP TOP OF FOOTING 12" MIN IN INCREMENTS OF PRW UNIT HEIGHT CAST -IN-PLACE UNREINFORCED 6' MIN CONCRETE FOOTING FOOTING STEP DETAIL ( \ PRECAST GRAVrrY RETAINING WALL �a NOTES FOR PRECAST GRAVITY RETAINING WALLS, SEE PRECAST GRAVITY RETAINING WALLS PROVISION. FOR STEEL BEAM GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. -. SEE PLANS FOR CONCRETE BARRIER RAIL WITH MOMENT SLAB DETAILS. USE PRW UNITS WITH A FACE FOR RETAINING WALL NO. _. USE PRW UNITS WITH A COLOR FOR RETAINING WALL NO. _. A DRAIN PIPE IS -or -IS -NOT REQUIRED FOR RETAINING WALL NO. _ BEFORE BEGINNING PRECAST GRAVITY WALL DESIGN FOR RETAINING WALL NO. SURVEY WALL LOCATION AND SUBMIT A REVISED WALL PROFILE VIEW (WALL ENVELOPE) FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THE REVISED WALL ENVELOPE IS ACCEPTED. DESIGN RETAINING WALL NO. - FOR WALL HEIGHTS EQUAL TO THE DESIGN HEIGHT PLUS DEPTH TO TOP OF FOOTING (DIFFERENCE BETWEEN GRADE ELEVATION AND TOP OF FOOTING ELEVATION). DESIGN RETAINING WALL NO. FOR THE FOLLOWING: 1)MAXIMUM FACTORED VERTICAL PRESSURE ON FOUNDATION MATERIAL = LB/SF 23 MINIMUM EMBEDMENT ELEVATION = FT 3 IN-SITU ASSUMED MATERIAL PARAMETERS: MATERIAL TYPE UNIT WEIGHT 7RICTION ANGLE COHESION (Lt/SF LB/CF DEGREES BACKFILL FOUNDATION THE MINIMUM EMBEDMENT ELEVATION FOR RETAINING WALL NO. _ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. _ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. - FOR THE POINT,_LINE_or_STRIP SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL N0. - FOR A PIPE EXTENDING THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING PRECAST GRAVITY WALL DESIGN OR CONSTRUCTION. DO NOT PLACE CONCRETE FOR FOOTINGS FOR RETAINING WALL NO. - UNTIL EXCAVATION DIMENSIONS AND FOUNOATION MATERIAL ARE APPROVED. "TEMPORARY SHORING" IS -or -MAY -BE REQUIRED FOR RETAINING WALL N0. IN ACCORDANCE WITH THE TEMPORARY SHORING PROVISION. SEE ROADWAY, -STRUCTU RE_or_TRAFFIC_CONTROL PLANS. AT THE CONTRACTOR'S OPTION, "TEMPORARY SHORING FOR WALL CONSTRUCTION" MAY BE USED TO CONSTRUCT RETAINING WALL NO. SEE PRECAST GRAVITY RETAINING WALLS PROVISION FOR TEMPORARY SHORING FOR WALL CONSTRUCTION. W o U F - Ln Z w O rV U 0 0 0 NQ W ~ r, O a o � W I U cn 1n 0 a U FINISHED GRADE OR CONCRETE DITCH AND END BENT SLOPE' � �IF APPLICABLE, CONCRETE SLOPE PROTECTION - MIN FINISHED -� GRADE ­ GRADE ELEVATION BOND BREAKER WITH DITCH--/ 4" MIN TIMBER LAGGING (AS NEEDED) GEOCOMPOSITE DRAIN STRIPS ® 10' MAX HORIZONTAL SPACING BOTTOM OF WALL TOP OF LEVELING PAD NO. 57 STONE o STEEL H -PILE i CONCRETE OR GROUT r g FOR DRILLED -IN PILES::::�� n c� F NOTES: CAST -IN-PLACE REINFORCED CONCRETE COPING TOP OF WALL FINISHED GRADE OR CONCRETE DITCH AND IF APPLICABLE. END BENT SLOPE- CONCRETE SLOPE PROTECTION* TOP OF WALOP COPING CONCRETE 12" MIN WITH DITCH - 12" MIN WITH DITCH - �- 21, -BOND BREAKER VI TH DITCH �- 4" MIN FINISHED 2" MIN 6" MIN GRADE•• F- 4" MIN 6" MIN BOND BREAKER WITH DITCH* DOWEL w w � & a GRADE ELEVATION w 6" MIN > a- -WALL WALL FACE & a o FRONT OF H -PILE yJi TIMBER LAGGING--- WALL FACE & FRONT OF H -PILE I �! (!, FINISHED GRADE OR CONCRETE DITCH AND IF APPLICABLE, - PRECAST CONCRETE I z w (AS NEEDED) PRECAST CONCRETE w END BENT SLOPE** CONCRETE SLOPE PROTECTION* PANEL �' x - SINGLE FACED PRECAST GEOCOMPOSITE DRAIN _ PANEL U a CONCRETE BARRIER, w a H 3 STRIPS ®10' MAX w H SINGLE FACED PRECAST x 3 TOP OF WALL x IF APPLICABLE HORIZONTAL SPACING CONCRETE BARRIER, Z w (SEE NOTE FOR FENCE OR HANDRAIL z w IF APPLICABLE u w ON TOP OF WALL, IF APPLICABLE) 2 N BOTTOM OF WALL rn In v FINISHED GRADE** w " 6:1 (H: V) OR FLATTE TOP Of LEVELING PAD FINISHED GRADE- EXTENSION 6: 1 (H: V) OR PLATTE 6 MIN WITHOUT DITCH NO. 57 STONE - 12" MIN WITH DITCH _2% FINISHED IM' 6" MIN GRADE`* +Ifl WALL EMBEDMENT EMBEDMENT BOND BREAKER WITH DITCH * e4 11 nw' WALL FACE 12 MIN LEVELING PAD _WALL 12 MIN GRADE ELEVATION FRONT OF H -PILE a 6 MIN AGGREGATE SHOULDER AGGREGATE SHOULDER TIMBER LAGGING fl CAST -IN-PLACE I DRAIN IN ACCORDANCE WITH ROADWAY STANDARD STEEL H -PILE DRAIN IN ACCORDANCE (AS NEEDED) �� REINFORCED CONCRETE FACE m w DRAWING NO. 816.02 WITH ROADWAY STANDARD DRAWING NO. 816.02 GEOCOMPOSITE DRAIN = j 0 1 STRIPS ®10' MAXSINGLE FACED PRECAST = 3 CONCRETE OR GROUT HORIZONTAL SPACING CONCRETE BARRIER, FOR DRILLED -IN PILES IT IF APPLICABLE w BOTTOM OF WALL N w TOP OF LEVELING PADI FINISHED GRADE**o fl 6:1 (H:V) OR FLATTEE SOLDIER PILE WALL WITH N0. 57 STONE PRECAST PANEL - TYPICAL SECTIONS G� AT THE CONTRACTOR'S OPTION, CONNECT COPING TO PANELS WITH DOWELS OR EXTEND COPING DOWN BACK OF PANELS AND PILES. *SEE CONCRETE DITCH BEHIND WALL DETAILS. **SEE PLANS FOR FINISHED GRADE OR END BENT SLOPE DETAILS. run JULUILR HILL RETAINING WALLS, SEE SOLDIER PILE RETAINING WALLS PROVISION. FOR STEEL BEAM GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. _. SEE PLANS FOR CONCRETE BARRIER RAIL WITH MOMENT SLAB DETAILS. A FENCE OR HANDRAIL IS REQUIRED ON TOP OF RETAINING WALL NO. _ SEE ROADWAY PLANS FOR FENCE OR HANDRAIL ATTACHMENT DETAILS. DRILLED -IN H -PILES ARE REQUIRED FOR RETAINING WALL NO. _. AT THE CONTRACTOR'S OPTION, USE DRIVEN H -PILES FOR RETAINING WALL NO. _. USE A SOLDIER PILE RETAINING WALL WITH PRECAST CONCRETE PANELS THAT MEET SECTION 1077 OF THE STANDARD SPECIFICATIONS FOR RETAINING WALL N0. _ AN EXPOSED AGGREGATE FINISH THAT MEETS ARTICLE 1077-12 OF THE STANDARD SPECIFICATIONS IS REQUIRED FOR PRECAST CONCRETE PANELS FOR RETAINING WALL NO. _. PAINT GALVANIZED H -PILES GRAY -or -BLACK IN ACCORDANCE WITH ARTICLE 442-12 OF THE STANDARD SPECIFICATIONS FOR RETAINING WALL NO. _ USE A SOLDIER PILE RETAINING WALL WITH A CAST -IN-PLACE REINFORCED CONCRETE FACE FOR RETAINING WALL NO. A ARCHITECTURAL FINISH IS REQUIRED FOR PRECAST_CONCRETE-PANELS-or-THE_CAST-IN-PLACE_REINFORCED-CONCRETE_FACE FOR RETAINING WALL NO. _ A BRICK VENEER IS REQUIRED FOR RETAINING WALL N0. AS SHOWN. SUBMIT BRICK SAMPLES FOR APPROVAL BEFORE BEGINNING SOLDIER PILE WALL CONSTRUCTION. BEFORE BEGINNING SOLDIER PILE WALL DESIGN FOR RETAINING WALL NO. SURVEY WALL LOCATION AND SUBMIT A REVISED WALL PROFILE VIEW (WALL ENVELOPE) FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THE REVISED WALL ENVELOPE IS ACCEPTED. DESIGN RETAINING WALL N0. FOR THE FOLLOWING: 1 H =DESIGN HEIGHT + WALL EMBEDMENT 2 DESIGN LIFE = 75_or_100 YEARS 3 IMNIMUM WALL EMBEDMENT ELEVATION = FT 4 MNIMUM PILE PENETRATION INTO ROCK = FT 5 IN-SITU ASSUMED MATERIAL PARAMETERS ABOVE_ELEVATION FT: UNIT WEIGHT, FRICTION ANGLE, 0 LB/CF COHESION, c = LB/SF 6)JN-SITU-ASSUMED_MATERIAL-'ARAMETERS_BELOW_ELEVATION FT: UNIT -WEIGHT, LB/CF FRICTION_ANGLE,_�_-bEGREES COHESION, _c_= -_LB SF 7)JN-SITU-ASSUMEDiATERIAL-PARAMETERS-BELOW-ELEVATION FT: ROCK _M ASS -SHEAR -STRENGTH, -Sm _= ----- LB/SF THE MINIMUM WALL EMBEDMENT ELEVATION FOR RETAINING WALL NO. _ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. _ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. _ FOR THE POINT,_LINE-or_STRIP SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL NO. FOR A PIPE EXTENDING UNDER OR THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING SOLDIER PILE WALL DESIGN OR CONSTRUCTION. AT THE CONTRACTOR'S OPTION, USE A TEMPORARY SLOPE INSTEAD OF TEMPORARY SUPPORT OF EXCAVATIONS FOR RETAINING WALL NO. _. "TEMPORARY SHORING" IS -or -MAY -BE REQUIRED FOR RETAINING WALL NO. _ IN ACCORDANCE NTH THE TEMPORARY SHORING PROVISION. SEE ROADWAYSTRUCTURE_or_TRAFFIC_CON TROL PLANS. SOLDIER PILE RETAINING WALL �c STEEL H -PILE CONCRETE OR GROUT FOR DRILLED -IN PILES AGGREGATE SHOULDER DRAIN IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 816.02 SOLDIER PILE WALL WITH CAST -IN-PLACE FACE - TYPICAL SECTION *SEE CONCRETE DITCH BEHIND WALL DETAILS. **SEE PLANS FOR FINISHED GRADE OR END BENT SLOPE DETAILS. H R 0 OF r U o 4'-6 RETAINING WALL SEE PLANS. SAFETY RAIL 11/4" RAIL (TYP.) 1. PIPE RAILING 8 POST: SCHEDULE 40 GALVANIZED STEEL PIPE MEETING THE REQUIREMENTS OF ASTM A53. 2. BASE PLATE: BASE PLATE SHALL BE IN ACCORDANCE WITH ASTM 8209, 3. JOINTS: ALL FIXED JOINTS ARE TO BE EITHER WELDED ALL AROUND AND GROUND SMOOTH OR COMMERCIALLY DESIGNED FIXED JOINT SYSTEMS (SOLDERED, BRAZED, FUSED, BONDED OR SHRINK FITTED). 4. WELDING: ALL WELDING BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY STRUCTURAL WELDING CODE. 5, RAIL ANCHORS SHOWN IN THIS DETAIL REFER TO ATTACHMENT TO CONCRETE GREENWAY WITH FOOTINGS. IN LOCATIONS WHERE CONCRETE PAVEMENT IS ON TOP OF OR ADJACENT TO RETAINING WALLS, THE SAFETY RAIL SHALL BE INSTALLED TO THE RETAINING WALL PER MANUFACTURER'S RECOMMENDATIONS. (_! \ SAFETY RAIL 20 �CONCRITE JOINT FILLER CONCRETE SHOULDER 6" NOTE: SEE TYPICAL SECTIONS FOR PAVEMENT THICKNESS. _ 2 TRANSVERSE EXPANSION JOINT 2D POST (IY4" SCH. 40 STEEL �`� TUBING) \ BASE MOUNT-. GALVANIZED HEX NUT &SQUARE s-. re BOLT EPDXIED INTO CONCRETE POST (lY4" SCH. 40 STEEL TUBING) BASE MOUNT `� GALVANIZED HEX _ w BOLT EPDXIED ;INTO CONCRETE t I r.d ry WASHER \ BEHIND RETAINING WALL NUT & SQAUUHRR \\ , i O $o RETAINING T RAIL CONNECTION W O &tFMER N U D_ 6" O 6" H NATURAL FINISHED GRADE GROUND jh a D= 1.0' B= 1.0' -'>.- (MIN.) (MIN.) i � z r `o SEE TYPICAL SECTIONS ! 13' yt /W' ; ? z 2 FOR FOOTING DETAILS 3' (MIN.) MIN.) 24" G o z a HANDRAIL ANCHOR ON CONCRETE GREEN WAV OR RETAINING- WALL W L p ANc CONCRETE FOOTING CLASS AA CONCRETE � o HANDRAIL ANCHOR OUTSIDE OF CONCRETE GREENWAY Y . - / `—TOP RAIL VERTICAL RAIL — - _��.......-ate.,, BOTTOM RAIL �'...f........_. o E- Z __ O BEHIND RETAINING WALL U ( Hot to Sale) cn F- RETAINING cn N Z RAIL CONNECTION W O &tFMER N U D_ O H NATURAL 1 FROM -Y3- STA. 502+40 TO STA 502+63 RT DITCH DETAILS 2D DETAIL 2 SPECIAL'V DRO1 ( Not to Sale) Front Natural 'L� Drtch slope d D Min. D= 1.0 FL Type of Liner= PSRM Max d= 0.5 FL FROM -Y3- STA 501+32 TO STA 503+20 RT FROM -LI- STA 135+32 TO STA 137+95 RT DETAIL 3 TOE PROTECTION ( Hot m Srale) NATURAL Q GROUND b S d= 2 FL d b= 2 FL FILL SLOPE Type of Liner= PSRM FROM -Y2- STA TO STA RT DETAIL 1 CONCRETE DITCH BEHIND RETAINING WALL ( Hot to Sale) RETAINING &tFMER B ti NATURAL 1 GROUND a D= 1.0' B= 1.0' FROM -Y3- STA. 502+40 TO STA 502+63 RT DITCH DETAILS 2D DETAIL 2 SPECIAL'V DRO1 ( Not to Sale) Front Natural 'L� Drtch slope d D Min. D= 1.0 FL Type of Liner= PSRM Max d= 0.5 FL FROM -Y3- STA 501+32 TO STA 503+20 RT FROM -LI- STA 135+32 TO STA 137+95 RT DETAIL 3 TOE PROTECTION ( Hot m Srale) NATURAL Q GROUND b S d= 2 FL d b= 2 FL FILL SLOPE Type of Liner= PSRM FROM -Y2- STA TO STA RT ol EXISTING GROUND HEADER BOULDER ,TYP. SEE PROFILE FOR 1DING WELL GRADED MIX ELEVATION INCLUDING NATURALCHANNELMATERIAL (SND AND COBBLE). BACKFILL TWTH 16" DEEP WELL -GRADED MIX OF rry SCOUR POOL, `BACKFILL MATERIAL 2"-6" RIP RAP FLOW FILL GAPS WITH WELL -GRADED MIX OF 2"-6" RIP RAP ? EXISTING GRADE NON -WOVEN N— I TYPE It �« BOULDERS 2' x 3' x 4' MIN. PLACE LARGER BOULDERS AS FOOTER ROCKS (PLACE FOOTER O© « a Y 2' - - ��, -rs - ROCKS NTO BELOW BOTTOM ELEVATION OF J _ r CHANNEL). BOULDERS ARE BE APPROVED e '•d r BY DESIGNER PRIOR TO INSTALLATION. -- = 4 y e BACKFILL (lYP) m O 3 ^ .45 s 2 BOULDER TOE PROTECTION W e y �Za�O EXCAVATED TRENCH FOOTER BOULDER 2F � FOR W -VANE BOULDERS IN VANE ARM SHOULD NOT BE U V CONSTRUCTION GAPPED OR HAVE ANY SIGNIFICANT SPACES 5 FOOTER BED. 6" DEPTH OF /57 STONE Z `s {HEADER BOULDER ,TTP. r (J NONWOVEN CEOTEXTILE FABRIC, TYP. SEE PROFlUE FOR ELEVATION Ye �D I I z'-izQ'mjg��R.v iro PER BNKFULL HEADER BOULDERS PLAN FLOW FLOW PER PLAN b SLOPE r _ _ FU 9Ria� mix NEl1 RtADED mix OF �>uRK EIUVATm P00. PER PfNilE 2" IT RW RAP AND , f 1fAVIL (pN®E NATURAL CHANNEL r Y (� Im Mm sal Y FOOTER BOULDER MATERIAL (COBBLE �..~ BOILDOtS N VANE ARM 9WULD NOT BE GAPPED OR HAVE ANY 'tom" NONWOVEN FOOTER BOULDERS 90NICANT SPACES WELL GRADED MIX OF 1"-12" L e RIP RAP, /57 STONE AND GEABRIC, BOULDERS IN VANE ARM SHOULD FILTER FABRIC rf EXCAVATED TRENCH FOR FOOTER BED. 22' DEPTH OF 2'-12" RIP RAP ROCK vAHE CONSTRUCTION 812"A -A 5 SIGNIFICANT SPACES / PO4 A TTOHEN H,EOIEXTILE FABRIC, IYP. o. s :LCTION B -B BANNFULL N3 (aITFR ARMS) BOULDER EEXCAVAIFD PER BASE FLOW HEABOULDER c - ROPE PER E BOULDER a BANKFULLxEr iN VANE TO _ HEADER TER BOULDERS BANK NINIYUY OF I• T1E11 RNP pM µjyxjU NATURAL WOVE" WO� GEOlEXTILE E b FLOW 2 �� �W CHANNEL YAlOIA1 Z W. BOULDERS N VANE ARIL 94OULD ` O 6 SLOPE PER PLAN _. NOTE£ GAPPED ES NAYS ANY Z 9GNIFICIWT 9'AOS r , O B i NOTES. � U £ f�l 1 VANE ARM TIES INTO THE TE OF SLOPE PART OF POOL TO BE N LINE WITH w� 7/•1 NONWOVEN FOOTER BOULDERS VL o; b RIPGRADED MIX OF 1"-12" 2' GEOTEXTILE ]Z. Orr--tz"RAP P STO�Gw BE UgD TO FOX)CE VOIDS W RIP RAP, /57 STONE AND FABRIC, TYP. BOULDERS IN VANE ARM SHOULD BEIv:EER NEADERS AND FOOTERS. BOULDERS SHOULD NATURAL CHANNEL MATERIALNOT OR p i SIGNIFICANCES HAVE ANY NOT HAVE GAPS O < a r l BOULDERS SHALL BE A WNNR11 2iUY0T. W O g 3 ROCK VANE H c I£CRON C -C 2F (PHFR ARMs) COVER UPSTREAM FACES O a _ WITH NONWOVEN NO Li 1-R-1 ~ J 5 %TILE FABRIC. 71P. HEADER BOULDER ,TYP. e A SEE PROFILE FOR O U' Y 3 - FLOW ELEVATION /"1 Z o " I F-1 I v e RIP RAP. 7 STONE NO .,- --- .,...�,......... . ,.-,_...,.. .... o 6 W PER PIAN —----. N WELL GRADED MIX OF 1"-12" It o i NATURAL CHANNEL MATERIALIF y o BED z 8 111 may_ Y EXCAVATED PNATURAL CHANNEL OOL < 6 J ` {,,, INCLUDING # STONE MND ., g o 2' MAX. FOOTER BOULDER. TYR. _ VI^\ :r�r- r �_ MATERIAL, i DEEP NOT BBE G TAPPED OR N VANE MHAVE ANY rn f F Tlf �� I I �\� ` -•/' I{`"" T �`,..,✓-9, 1 T} P 1 PER PLN SIGNIFICANT SPACES NONWOVEN GEOTEXTIIE FABRIC 8E<-"f10N A -A FOOTER BED. 6" DEPTH OF /57 STONE r FILTER FABRIC. TYR. u z m Nv KEY INTO BANKA O 4' z o MINIMUM OF 6.0' ✓ IIy..3- SS ` n y y 1 _j 4 $i � � 3 i i PER PIAN i u o % � P <Y ` � �� _ � ___ � .�__- - i V I ' HEADER PER PLAN BOULDER E" aA Q + m ¢ C I WELL GRADED K - 1� BOULDER I4 o MIX OF 1"-12" F ,Ny '^ HEADER BOULDER RIP RAP ; 1"-12" WELL GRADED MIX W H ..� b FLOW INCLUDING #�557 STONE AND PLAN VEW Q FOOTER BOULDER o B NATURAL CHANNEL aI v S MATERIAL, 12" DEEP ►+�1 �j w U S W 11 V H n, / POOL NOTES: x 1 ROCK CROSS VANE (SINGLE OR DOUBLET 0 2F A 1. VOID SPACES BETWEEN BOULDERS SHOULD BE PLUGGED A� E g EXCAVATED POOL 'PATH APPROPRIATE SIZED STONE. Irk, Cc 6 (SEE TYPICAL FOR Pte' DEPTH) U 2. POOL DEPTH SHOULD BE ACCORDING TO THE PROFILE. E a 3. BOULDER SHALL BE 2' X 2' 2'. L=_ \ ROCK SILL P� O 2F � N 0 l— -L1- 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 102+96 104+50 0 SEE MA -L1- TYPICAL SECTION NO. 2 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 104+50 106+11 -L1- 2A FDR 1RANSt SEE PLANS DWANSIM JONT TYPICAL SECTION NO. 3 12' WIDE GREENWAY ALIGNMENTBEGIN STATION END STATION -L1- 106+11 109+76 -Ll- 112+51 115+10 WOODLAW'N ROAD IAN. DEPTR e• cmawm ]BO PS W/ IJE111Q1 BROW n" PERPENDIQAAR ro TRAFFIC r SUP DOIWLS NP DRAINAGE neEAGALSS MEI AWIVE ANN l�� -`\�`° CHEL FOR REINFORCEMENTl tL ��5��1i�2. �EMMC QUADRUPLE BOX CULVERT (IZW if IS- H) TYPICAL SECTION NO. 4 12' WIDE GREENWAY THROUGH CULVERT ALIGNMENT BEGIN STATION END STATION -L1- 110+41 111+67 NOTE: STRUCTURAL AND HYDRAULIC CALCULATIONS AND DESIGN TO BE SUBMITTED FOR NCDOT REVIEW. NCDOT ENCROACHMENT REQUIRED. PAVFMFNT.qC'.HPnI II F ® 6"CONCRETE QPROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE (S9.SB) AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. 1 PROPOSED 1.5- ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE (119.88) AT AN AVERAGE RATE OF 171 LB5. PER SO. YD. O6" AGGREGATE BASE COURSE PRECAST MODULAR BLOCK RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 © SOIL NAIL WALL -SEE NOTE 4 SOLDIER PILE WALL- SEE NOTE 4 OEARTH MATERIAL NOTES: 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. J. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A - 2C. O Z ` i E -L1- -L1- oil C2' TO 5' -'j ---1 I I2-�2.1 SEE PLANS TYPICAL SECTION NO. 5 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 115+10 117+51 ��fiL0UFM1 TYPICAL SECTION NO. 7 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -1-1- 118+70 119+70 -1-1- 124+50 127+85 -L1- -L1- E-+ Z wo ry 2' TO 5' 12'—f-2' TO 5' 2' TO 5' 12' S' U) 6-B SAFETY SEP DETAIL SNEEr 6• 6, O SFA 111+50 TO 116+50 w U SAFELY SIX OETNL SHEET EASTMIG E1p51NC z 2 D z - SEE wA(t 0 O PGL 2°% P0. O z0�O�z 2.D RM+S OZ ��� a TYPICAL SECTION NO. 6 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION L1- 117+51 118+70 L1- 119+70 124+50 L1- 171+17 176+96 TYPICAL SECTION NO. 8 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION 1-1- 127+85 127+95 PAVFMFNT S( .Hp:ni II F ® I -CONCRETE QPROPOSED 1.5- ASPHALT CONCRETE SURFACE COURSE, TYPE (S9.5B) AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. PROPOSED 1.5 -ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE (119.08) AT AN AVERAGE RATE OF 171 LBS. PER SO. YD. Q6- AGGREGATE BASE COURSE PRECAST MODULAR BLOCK RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 © SOIL NAIL WALL - SEE NOTE 4 SOLOIERPILE WALL-SEENOTE4 OEARTH MATERIAL NOTES: 1. SEE PLANS FOR SPECIFIC GREEN WAV LO(',ATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A- 2C. W PROPOSED' DETAIL BEOW PRSEE Ol TYPICAL SECTION NO. 9 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 134+20 134+30 -L1- TYPICAL SECTION NO. 10 12' WIDE GREENWAY ALIGNMENT BEGIN STATION?' END STATION -L1- 134+30 138+03 clsl SEE WALL TYPICAL SECTION NO. 11 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 138+03 139+01 SEE WALL -L1- 6"CONCRETE QPROPOSED ILS"ASPHALT CONCRETE SURFACE COURSE. TYPE(S9.5B) 2 AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. PROPOSED ILS" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE (119.08) AT AN AVERAGE RATE OF 171 LBS. PER SO. YD. 6" AGGREGATE BASE COURSE ' SAFELY SFE OTE © SOIL NAIL WALL - SEE NOTE 4 SOLDIER PILE WALL- SEE NOTE 4 91EET STA. 139+50 TO 140+84 MATERIAL 5 PGL EXMTM calauro 2.OS "o 2.OR 2.0 E195TW0 TYPICAL SECTION NO. 12 12' WIDE GREENWAY ALIGNMENT BEGIN STATION FEND STATION -L1- 139+01 140+84 DETAIL 1 STANDARD V DITCH (NOT TO SCALE) NATURAL NATURAL GROUND ?'� D 21 GROUND Min. D=1.0FT TYPE OF LINER = PSRM PAVFMFNT.grHFmII F ® 6"CONCRETE QPROPOSED ILS"ASPHALT CONCRETE SURFACE COURSE. TYPE(S9.5B) AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. PROPOSED ILS" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE (119.08) AT AN AVERAGE RATE OF 171 LBS. PER SO. YD. 6" AGGREGATE BASE COURSE PRECAST MODULAR BLOCK RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 © SOIL NAIL WALL - SEE NOTE 4 SOLDIER PILE WALL- SEE NOTE 4 OEARTH MATERIAL NOTES: I. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A -2C. W F -L1- 6•�8• [%� EFS'71NG SUGAR CRIXK� Z 3 :���: RIP RAP TOE PR07ECYION. SEE PINTS TYPICAL SECTION NO. 13 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION'' -L1- 141+54 143+15 TYPICAL SECTION NO. 14 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION L1- 143+15 144+82 L1- 145+42 145+52 -L1- 150+25 151+28 -L1- 155+58 156+59 -L1- 157+18 159+18 SAFETY SEE DET STA 147+50 TO EMSTING GROUND E10SIHG UT L' COSTING GROLRO E145TlIG calaLRo 144— T TYPICAL SECTION NO. 15 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 145+52 147+95 -L1- 151+28 153+21 TYPICAL SECTION NO. 16 12' WIDE GREENWAY TD ETasim ALIGNMENT BEGIN STATION END STATION L1- 1 147+95 150+25 * PAVING NOTE: INSTALL PAVING FABRIC AND PAVING COURSES SHOWN ON EXISTING PAVERS. PAVFMFNT.qrHFni II F ® .-CONCRETE QPROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE (S9.5B) AT AN AVERAGE RATE 01 1. LBS. PER SO. YD. PROPOSED 1.5' ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE (119.013) AT AN AVERAGE RATE OF 171 LBS. PER SO. YD. Q6" AGGREGATE BASE COURSE PRECAST MODULAR BLOCK RETAINING WALL (LARGE BLOCK)- SEE NOTE 4 © SOIL NAIL WALL - SEE NOTE 4 SOLDIER PILE WALL - SEE NOTE 4 OEARTH MATERIAL NOTES: 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A - 2C. 12' 5 -I VARIES 5 2 TO 5 •...'1 weuVESTING I I i EXISTING cEealNo TYPICAL SECTION NO. 17 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION L1-1 153+21 154+00 -L1- -L1- vewmc i GREENWAY 10 ]( OF CURB TYPICAL SECTION NO. 19 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 156+59 157+18 -L1- VARIES 1 2' TO 5'12' - WALL /HANDRAIL SEE DETAIL SNIFF I SEE WALL PLAITS I IfPGL-7—. EXISTING manor T 1 TYPICAL SECTION NO. 18 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 154+00 155+58 -0' TO 2' 6'CONCRETE 9' MIN ETRATF GROUND PER STRAIFOTA PVNS, APPRo1ED 4h/2014 AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. `SFE WALL PLANS PROPOSED 1.5' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE TYPICAL SECTION NO. 20 12' WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -L1- 159+18 161+70 -L1- 163+03 166+55 PAVFMFNT SrHF:ni II F ® 6'CONCRETE QPROPOSED 1.5" ASPHALT CONCRETE SURFACE COURSE. TVPE (S9.5B) AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. PROPOSED 1.5' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 (I19.OB) AT AN AVERAGE RATE OF 171 LBS. PER SO. YD. 6' AGGREGATE BASE COURSE PRECAST MODULAR BLOCK RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 © SOIL NAIL WALL - SEE NOTE 4 SOLDIER1ILEWALL-SEENOTE4 OEARTH MATERIAL NOTES'. 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED, 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE, REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A- 2C. N 0 u -Ll- /IDISTIM MCUNG PIR STRATFOW PLANS. APPROYM 4/3/2M4 ANs TYPICAL SECTION NO. 21 12'WIDE GREENWAY ALIGNMENT F BEGIN STATION END STATI -Ll- 1 161+70 _j62+502�_1 -Ll- qST 40' SPAN VARIES VARIES 0 ' To 2 EXISTING PIER 6. 0 40 O.C. w z GRADE TO NOT d WACT ENSTING PIER EMSTING LITTLE SUGAR a*u I t TYPICAL SECTION NO. 22 12'WIDE GREENWAY UNDERPASS ALIGNMENT EBEGINSTATION END STATION _Ll- 162+50 163+21 TYPICAL SECTION NO. 23 -9' MIN - —CRETE PROPOSED 1.1"ASP—T C NCRETE SURFACE COURSE, TYIE (sq.58) 7'---- AT AN AVERAGE RATE OF IN LBS� PER S.. YD. P POSED 1.1"ASPHALT —CRETE INITRIVIEDIATE COURSE, TYPE NAUL PLANS (119-OB)ATAN AVERAGE RATE OF 171 LBS. PER SO. YO. 12'WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -Ll- 163+21 166+83 2- 11 COSTING GRMIND TYPICAL SECTION NO. 24 12'WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -Ll- 167+47 169+52 PAVFMFNT 1;(,'HFDLJI F @ - —CRETE PROPOSED 1.1"ASP—T C NCRETE SURFACE COURSE, TYIE (sq.58) AT AN AVERAGE RATE OF IN LBS� PER S.. YD. P POSED 1.1"ASPHALT —CRETE INITRIVIEDIATE COURSE, TYPE (119-OB)ATAN AVERAGE RATE OF 171 LBS. PER SO. YO. AGGREGATE BASE .-RSE PRECAST ... 11-R .1-1 RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 OlL —1 -ALl - SEE NOTE 4 @ SOLDIER PILE —11 - SEE NOTE 4 MATE. NOTES. 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAIL SHEETS 2A - 2C. CA L_@ , o - i 12 lUt. E_ z W o cn �-_ C) LD cn cn U) z Pq 0 U 0 C P4 0 z 0 c z t U u u 40 � (= en I " t- TYPICAL SECTION NO. 25 12'WIDE GREENWAY ALIGNMENT BEGIN STATION END STATION -Ll- 177+86 180+75 -Y2- TYPICAL SECTION NO. 26 6'WIDE CONNECTION ALIGNMENT NTION END STATION -Y2- 400+00 401+18 E3 -Y2- TYPICAL SECTION NO. 27 6'WIDE CONNECTION ALIGNMENT F:� �EGIN STATION END STATION -Y2- 1 401+18 401+96 -Y2- TYPICAL SECTION NO. 28 6'WIDE CONNECTION ALIGNMENT BEGIN STATION END STATION -Y2- 401+96 403+15 r)r-!TAII 0 STANDARD V DITCH (NOT TO SCALE) NATURAL NATURAL GROUND GROUND Min. D = 1.0 FT TYPE OF LINER = PSRM PAVFMFNT.qrHi=ni 11 F NOTES 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2- PAVEMENT EDGE SLOPES ARE 1.1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAJL SHEETS 2A - 2C. a al" � 01 0 z J! u u 7E pl, E- z pl� o C) 1D It U) z 0 0 0 0 0 R4 z 81" 1 C z u U cn u u 15- CON.ETE PROPOSED 1.5- ASPHALT CONCRETE SURFACE COURSE, TYPE (S9.58) AT AN AVERAGE RATE OF 168 LaS. PER SO. YD. PROPOSED 1.5- ASPHALT CONCRETE INTERMEDIATE COURSE TYPE (119.0B) AT AN AVERAGE RATE OF 171 LBS. PER SO- YD. - AGGREGATE —E COURSE PlRFCAST M.D— .—I RETAINING WALL (LARGE BLOCK) - SEE NOTE 4 ...1- NAIL WALL - SEE NOTE 4 SOLDIER PILE WALL - SEE NOTE EARTH MATERIAL NOTES 1. SEE PLANS FOR SPECIFIC GREENWAY LOCATIONS. 2- PAVEMENT EDGE SLOPES ARE 1.1 UNLESS OTHERWISE NOTED. 3. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. REFER TO CROSS SECTIONS FOR PROPOSED SUPERELEVATION. 4. SEE WALL PLANS AND DETAJL SHEETS 2A - 2C. a al" � 01 0 z J! u u 7E pl, E- z pl� o C) 1D It U) z 0 0 0 0 0 R4 z 81" 1 C z u U cn u u S1 IEL 1 4 CROSS CHARLOTTE TRAIL 01501618 JOB NO 6 AS NOTED � It,. PROGRESS SET NOT FOR CONSTRUCTION NO, E)ES�MPTION I A- .1 Plans Prounred It, KimlepMorn 0 2017 NC LICENSE NO. F-0102 (AD HLE PA!H - T OF OVERALL PLAN AND KEY NJM — GO CHLI-�W By I PHLVA8LD BY 70 SHEET 200 Son h Tryon Street, Suite 200 Charlottite, Nor Is Carolina 28202 09/01/2016 WPM— a, D,1L I 's_ : (t04) 333-5131 -Ll- CURVE 1 -Ll- CURVE 2 -Ll- CURVE 3 -Ll- CURVE 4 PISTA.=101+54.08 PISTA.=102+56.0 PISTA.=103+66.6 PISTA.=104+07.1 A=99*53'1 1" A=78*38'37' A=17*24'11" A=10*21'32" L=217.92' L=54.90' L=30.37' L=18.08' T=148.67' T=32.77' T=15.30' T=9.06' R=125.00' R=40.00' R=100.00' R=100.00' ART- I GRIFFIN PIN� 175-15 -.4 US 4025 PG 48 Me 5 PG 187 LOT 14 BLOCK 2 dD �1_0 X/ 1, -XISTING VALL ol�+ "X z "'5 MECKLENBURG COUNTY Pik 175-173-02 DB 11684 PG 220 -A Me 5 PC 215 MECKLENBURG COUNTY LOT 7 BLOCK DB 11744 PG 285 Pi 175-173-oa Me 5 PG 215, A TEMPORARY CONSTRUCTION EASEMENT (TYP) TOBY R SPENCER PIN: 175-151-05 PERMA14EN DO 29906 PG 991 EAS' CREENWAY DO 24582 PG 385 EMENT (TYP) 011 11114 P', Wl Me 5 PC 187 L6T13BLOCK2 e -10 PGZ + EL +0,) 10 +00 It— LOT 8 BLOCK E 32.35' S16-5i'25"E ICU; ZI, BEGIN ALIGNMENT -Ll- STA:99-73.06 PROPOSED12' GREENWAY (-Ll�), BEGIN CONSTRUCTION TIE TO EXIST GREENWAY STA,1102-96.41 lb CDOT ENCROACHMENT SLIBMITTA L REQUIRED FOR UNDERPASS" PIN: 175-173-04 DB 12026 PG 348 _MECKLIENSURG COUNTY Me 5 PG 215 LOT 9 BLOCK E PIN: t75,IT3-01 MECKLE BURGCOUNTY MECKLENBURG COUNTY PIN: 175-liWS DS 12254 PG 845 DB 116M PG M Me 5 PG 215 6 BLOCK E HOLDIN OT 10 BLOCK E, R' Me 5 PG 215 LOT L "_-4RSC GS, INC EXISTING BRIDGE DO 26531 PG 26 OB 02937 MI 77 'Z— 'PA (p GRAPHIC SCALE IN FEET 0 1 . 0 2 . 0 4 HIGH PONT aE%I. 6"97 62V HIM POIT STA, 1)0+59. 7 PM STA. 100" &84 otw 31 L102+7&Z4 FM I ST&-I03+I!ICM iil� " E AG:6.8= 5 A& I Q= MECKLENBURG COUNTY PIN 115�11-301 DO 11657 PG 131 Me 5 P 215 LOT 11 BLOCK E MI.02 1 :1&66 r_- 47.58 616 7&0(r VC W VC 5moa w 616 A TEMPORARY CONSTRUCTION EASEMENT (TYP) TOBY R SPENCER PIN: 175-151-05 PERMA14EN DO 29906 PG 991 EAS' CREENWAY DO 24582 PG 385 EMENT (TYP) 011 11114 P', Wl Me 5 PC 187 L6T13BLOCK2 e -10 PGZ + EL +0,) 10 +00 It— LOT 8 BLOCK E 32.35' S16-5i'25"E ICU; ZI, BEGIN ALIGNMENT -Ll- STA:99-73.06 PROPOSED12' GREENWAY (-Ll�), BEGIN CONSTRUCTION TIE TO EXIST GREENWAY STA,1102-96.41 lb CDOT ENCROACHMENT SLIBMITTA L REQUIRED FOR UNDERPASS" PIN: 175-173-04 DB 12026 PG 348 _MECKLIENSURG COUNTY Me 5 PG 215 LOT 9 BLOCK E PIN: t75,IT3-01 MECKLE BURGCOUNTY MECKLENBURG COUNTY PIN: 175-liWS DS 12254 PG 845 DB 116M PG M Me 5 PG 215 6 BLOCK E HOLDIN OT 10 BLOCK E, R' Me 5 PG 215 LOT L "_-4RSC GS, INC EXISTING BRIDGE DO 26531 PG 26 OB 02937 MI 77 'Z— 'PA (p GRAPHIC SCALE IN FEET 0 1 . 0 2 . 0 4 i&60 99+00 99 50 100+00 10 50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 z 'z u A t u Z s E- C) D 11 cf) z 0 0 0 I I 1;,P 0 HIGH PONT aE%I. 6"97 62V HIM POIT STA, 1)0+59. 7 PM STA. 100" &84 otw 31 L102+7&Z4 FM I ST&-I03+I!ICM iil� " AG:6.8= A k&75X A& I Q= MI.02 1 :1&66 r_- 47.58 616 7&0(r VC W VC 5moa w 616 p 6 1. N ON g � PEDESTIRAN 8 GE x PLAN. BY Tr 1,. 612 E. 10.05 G F; rlDZE EXIST WDIP 612 E LEV:610.D5 I J 608 606 604 __604 Hi 600 am 596 ;9+75 596 NO PROFILE SHOM FROM -[TO 102+96 FOR NFORMAPON NLY. �2j lulv— 592 1 92 FOUR 23 LF 5�24' RCP @ 12 i&60 99+00 99 50 100+00 10 50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 z 'z u A t u Z s E- C) D 11 cf) z 0 0 0 I I 1;,P 0 Eli 3 1 � 5 61: 601 60, 60( 594 59: 5M 584 580 104+50 A A -L1- CURVE 5 -L1 -CURVE 6 __ -L1- CURVE 7 - -Y2- CURVE 401 MATTHEW MOSBY STE H N DEUTSCH & KELLY MOSBY 8. CATPERINE DEUT CH PI STA.=104+83.62 PI STA.=105+97.13 PI STA.=107+12.44 PI STA.=400+13.06 175-151-09 PIN: 175-151-10 A=49*50'22 A=13*21'02" A=8*13'29" A=90*00'00' DP131N: 30026 PG 1�1 DB 28763 PG 52 28671 PG 324 D PPGG 854239 L=43.49' T=23.23' L=23.30' T=11.70' L=28.71' T= 14.38' L=6.28' T=4.00' De 957 PG 977 D: 12SM61818 B 5 64 187 DII 11.1 PG 3112 GRAPHIC SCALE IN FEET R=50.00' R=100.00' R=200.00' R=4.00' LOT11BLOCK2 DB 25M PG 188 MB 5 PG 187 a 10 20 40 -L1- CURVE 8 -L1- CURVE 9 -L1 - CURVE 10 -Y2- CURVE 402 -EXIST fr IN LOT 10 BLOCK 2 PROPOSED WALL #3 PI STA.=108+17.6C A= 10'34'40" PI STA.=108+54.3� A=10'23'33" PI STA.=109+35.78 A=8'03'1 9" PI STA.=400+84.55 A=8*03'1 9* LARGE OCK GRAVITY WALL PROPOSED 6' SEE SHEETS RW.01 TO RW -14 NECTION (-Y2-) C 1 0 1 N AERIAL S -WER L=18.46' L=18.14' L=14.06' L=15.89' T=9.26' T=9.09' T=7.04' T=7.96' R=100.00' R=100.00' R=100.00' R=1 13.00' A - - - - - - - - - - - - - -- - - - - 8.5' TOBY R SPENCER PIN 175-151-D5 JOHN BLAKE SPURRIER PIN: 175 -151-39 (-LI-XCLT MAINLINE): 108+63.43 0 co 0 8 29906 PG 991 D8 12249 PG 149 (-Y2- XCLT CONNECTION):400+00 e DII 24112 PG DB PC PG 187 LOTBI2 BLOCK 2 e - - -- - - - - - - - - - - - - - - - - - - - - M8 5 PC 187 PCE LOT 13 BLOCK 2, PGE-- PGE L) PROPOSED WALL#1 0 0. PERMANENT GREENWAY LARGE BLOCK GRAVtTY WALL SEE S I HEETS RW -01 TO RVV-14 I-: (L + EASEMENT (FYP) e �p a e V-- e e - e, e PGc e e C', 9+ UJ U) W PROPOSED) SAFETY rE Gr P 109+ Ill U) RAIL (TYP.) 3 uj j uj co x co --S43-32' 10 +00 S� .0 ell L) # c; PCE + + + + + + CP 06 CP + 5A'4 lz� CL S38'24'34"E 106+00 fo5'+o6 n_ S54'06'48"'E PRoP6sEp' WALL #4 v UvUbLD 12" GREENWAY (-LI-) 18.49' LARGE BLOCK q1RAVITY WALL SEE SHEETS RW -01 TO HW -14 LITTLE SUGAR CREEK PROPOSED WALL #2 LARGE BLOCK GRAVITY WALL PROPOSED WALL #1 SEE SHEETS RW -01 TO RW.14 SOIL NAIL RETAINING WALL SEE SHEETS RW -01 TORW-14 . .. ... . .... ... . .. ----------- . . ........ 61: 601 60, 60( 594 59: 5M 584 580 104+50 1 Ub+UU lu5+5u lub+00 106+50 107+00 107+50 108+00 108+50 109+00 H2 i0a iO4 i0o $96 592 m 584 580 109+50 z z Z u E- z W o U) cr) U) z 0 0 cr 0 0 P4 0 z p 0 �T. z 0 LOW I Wff E". 510-311 LOW PC W ST&, 108+.M4 A&..119X K:15.M mw VC -EXIST fr IN AERIAL S -WER — -------------- - - - - - - - - - - - - - -- - - - - 8.5' ---------- - - -- - - - - - - - - - - - - - - - - - - - - 1 Ub+UU lu5+5u lub+00 106+50 107+00 107+50 108+00 108+50 109+00 H2 i0a iO4 i0o $96 592 m 584 580 109+50 z z Z u E- z W o U) cr) U) z 0 0 cr 0 0 P4 0 z p 0 �T. z 0 Eli m a 0 F-1 r -L1- CURVE 11 -Ll- CURVE 12 - -L1 -CURVE 13 PISTA.=110+16.87-PISTA.=112+19.1; CURVE TABLE PISTA.=114+23.49 A=50*05'31" A=19*23'23" A=7'29'54" RADIUS LENGTH CHORD BEARING CHORD L=52.46' L=67.68' L=26.17' CU7 65 T=28.04' T=34.17' T= 13.11' - c R=60.00' R=200.00' R=200.00' e 21 __AO3+ 3Q +-45.. URVE 403 _CU Y2- CURVE 405 F __�6.3Q 50�+ -Y2- C -Y2- URVE 404 P - I STA.=403+02.31 A END CC&STRUCTION _Y2 c PI STA.=401+36.50 PI STA.=402+39.03 A=4*27'23" A=37'07'16" A=86*28*04" ST -A:403+14.76 L=7.78' L=19.44' L=15.09' PC: 2 1 9 .91. TIE TO EXISTING SIDEWALK prc T=3.89' T=10.07' T=9.40' /OE�\ R=100.00' R=30.00' R=10.00' PRO OSED 6' CONNECTION (-Y2-) PROPOSED 6'CONNECTION (.Y3-) PROPOSEDTIEMPORARY REMOVE 40 LF OF EXIST CONSTRUCTION EASEMENT CONCRETE FLUME AND PROPOSED WALLS #4 40 +48.39 -L REDIRECT FLUME AROUND TRAIL CC N ECTION LARGE BLOCK GRAVITY WALL CONTRACTOR MLIST SEE SHEETS: I TO RW 14 COORDINATE SEQUENCING SUCH 'THAT TIEREDWALLS DO NOT A - PROPOSED PERMANE141 COMPROMISE EACH OTHER GREENWAY EASEMENT PARK,SELWYN. LLC zl� PIN: 175-134-01 FEDERICO BROCCOLI PROPOSED 6' DB 08578 PG 713 EXISTING POLE -6.5tFROM EDGE OF TRAIL PINA75-134-14 CONNECTION (-Y2-) ..PROPOSEDWALLS #7 .N. SOLDIER PILE RETAINING WALL E.CTI.NG.Y WIRE IMPACT TO BE DB 22659 PG 121 RE . RtNG UTUTY, COORDINATION DB 11523 PG 393 PROPOSED WALLS #3 4 623 ..SEES41ETS BIN 01 TO RIN-14 095M PG 623/ LARGE B K GRAVITY WALL MECKLENBURG COUNTY 0 DB DB 08452 PG LECCS RW -01 TO RW -14 PIN: 175-134-96 SEE SHE PROPOSED 280 LF FENCE FROM DB 29762 PG 884 STA112,MA15TOSTA115-2386 If 70 t2 DB 8578 PG 713 0 PROPOSED WALLS #5 v M8 28 PG 809 N PERMANENT GREENWAY _y WALL EASEMENT (TYP) RGE BLOCK CRAVIT E SE SHEETS RW 01 TO RW -14 1611-1 70 0 7 E 70 PROPOSED STORM (TYP) 111+00 S14'25'36"W PROPOSED SA ETY - _-:i_437U ----------- + C RAIL TYR) PROPOSED V E I cy! ,,DITCH(TYP) PROPOSED BELOW CRATE �o GROSSING (-Ll-) T� �(IIJCj END BOARDWALK A. CULVERT BEGIN CONCRETE 17.3. 0 �3 NWAY MAINTENANCE L) -Ll-STA:112.51.41 A31 NOT SHEET 2,,FOR GREENWAY THROELIGH CULVERT END BOARDWALK L? BEGIN CULVERT MODIFICATION 71� MH -Ll- STA:110441.28 GRAPHIC SCALE IN FEET END CONCRETE END CULVERT MODIFICATION BEGIN BOARDWALK 0 1 4p V.X BEGIN BOARDWALK 00 -L1 - STA: 109, 76.28 -Ll-STA:111+67.50 INSTALL COLLAPSIBLE CENTER, ,j Lij BOLILARD. SEE DETAIL SHEET 2A PROPOSED WALL #6 cl) I E CENTER LARGE BLOCK GRAVITY 'NALL PROPOSED YYA1,1_#2 INSTALL COLLARS FILE CENTER LARGE BLOCK GRAvrry WALL 101 LARD. SEE DETAIL SHEET 2A PROPOSED12' SEE SHEETS RW -01 TO RW -14 OE SEE SHFF.Tb RW -01 TO RVY-14 GREENWAY (-LI-) A LINE TABLE CURVE TABLE LINE LENGTH BEARING CURVE RADIUS LENGTH CHORD BEARING CHORD DELTA TANGENT Ll 25-00 S6 -T1 5'26.a4E C501 6.00' 9.4v N71'19'06 -E 8.49' 90'00'DO' G.Ow L2 T7.15 N26'19'05.62 -E C502 la000- 23.56- NWV4!03-E 23.54� 729*54' II.w_ L3 154-11 N33 -48-59.49-E C503 110.00- 4.3.91- N45'15`04"E 4-3,61' 2252'09' 22.25' L4 34.67 N56*41'08.45'E C504 40.00' 19.45' N4T45'Z2'E 19.26' 27'51'32' 9.92' L5 3.00 S61'10'2&70'E C505 6.00' 9.42' N7,T4V36'E 8.49' 90'00'00" 6.00* L6 15.42 S28*49'36.30'W C506 6.00' 9.42' SIG'10'24"E &49' 9O*OO'OOr 6.00' L7 3-00 SGI*10'23.70*E C507 6.00- 9.42' S16*10'24E 8.49' 90MO'00' 6.00' L8 26.59 N2a-49'36.30-E C508 6.00` 9.42' N73*49`36'E 8.49' 9O'DO'OC­ 6.00` L9 3.00 SSI'10'23.70'E C509 &00' 9.42' N7T49`36"E 8.49' 9O*OO'OC` 6.00' L10 32.59 s2a*49*36.3o"w C510 s.00l 9.42' S16'10'24E 8.49' 90'00*00' 6.00' U1 3.00 S61*10'23.7WE C511 6.00' 9.42' S16'1(Y24E &49' 90100'OCr 6.00' L12 16,45 N2849*36.3(fE C512 6.00' 9.42' N7.T49r36'E &49' 90MO-00- 6.00' L13 10-46 N54*5,V56.49"E C513 80.00' 36.4 36.11- 26-05-20- 18.53- L14 22-69 N655'46.3G*E C514 25.00- 20.94- N30 -55'21'E 20.33- 47*59-10- 11.13 - PROPOSED PERMANE141 COMPROMISE EACH OTHER GREENWAY EASEMENT PARK,SELWYN. LLC zl� PIN: 175-134-01 FEDERICO BROCCOLI PROPOSED 6' DB 08578 PG 713 EXISTING POLE -6.5tFROM EDGE OF TRAIL PINA75-134-14 CONNECTION (-Y2-) ..PROPOSEDWALLS #7 .N. SOLDIER PILE RETAINING WALL E.CTI.NG.Y WIRE IMPACT TO BE DB 22659 PG 121 RE . RtNG UTUTY, COORDINATION DB 11523 PG 393 PROPOSED WALLS #3 4 623 ..SEES41ETS BIN 01 TO RIN-14 095M PG 623/ LARGE B K GRAVITY WALL MECKLENBURG COUNTY 0 DB DB 08452 PG LECCS RW -01 TO RW -14 PIN: 175-134-96 SEE SHE PROPOSED 280 LF FENCE FROM DB 29762 PG 884 STA112,MA15TOSTA115-2386 If 70 t2 DB 8578 PG 713 0 PROPOSED WALLS #5 v M8 28 PG 809 N PERMANENT GREENWAY _y WALL EASEMENT (TYP) RGE BLOCK CRAVIT E SE SHEETS RW 01 TO RW -14 1611-1 70 0 7 E 70 PROPOSED STORM (TYP) 111+00 S14'25'36"W PROPOSED SA ETY - _-:i_437U ----------- + C RAIL TYR) PROPOSED V E I cy! ,,DITCH(TYP) PROPOSED BELOW CRATE �o GROSSING (-Ll-) T� �(IIJCj END BOARDWALK A. CULVERT BEGIN CONCRETE 17.3. 0 �3 NWAY MAINTENANCE L) -Ll-STA:112.51.41 A31 NOT SHEET 2,,FOR GREENWAY THROELIGH CULVERT END BOARDWALK L? BEGIN CULVERT MODIFICATION 71� MH -Ll- STA:110441.28 GRAPHIC SCALE IN FEET END CONCRETE END CULVERT MODIFICATION BEGIN BOARDWALK 0 1 4p V.X BEGIN BOARDWALK 00 -L1 - STA: 109, 76.28 -Ll-STA:111+67.50 INSTALL COLLAPSIBLE CENTER, ,j Lij BOLILARD. SEE DETAIL SHEET 2A PROPOSED WALL #6 cl) I E CENTER LARGE BLOCK GRAVITY 'NALL PROPOSED YYA1,1_#2 INSTALL COLLARS FILE CENTER LARGE BLOCK GRAvrry WALL 101 LARD. SEE DETAIL SHEET 2A PROPOSED12' SEE SHEETS RW -01 TO RW -14 OE SEE SHFF.Tb RW -01 TO RVY-14 GREENWAY (-LI-) A lutt"'ou 11 U+UU 11 U+bU 111+UU 111+50 112+00 112+50 113+00 113+50 114+00 114+50 Gel J5 Q z t. z g z ;p" E_ z P4 o co F- C) :D U) F_ U) J) z pq 0 0 0 0 Z 0 o C) 0.0 z U 0 t- 616 Py $T&'109+a&57 PVI STkI1 +97j9 72 FM 51lik-112.M.15 A01. Z: 7% 30.0(r Vc K.- 17.16 K' 23.09 612 4OLW VC 5mw Vc 512 608 wa a, PVC 604 SEWER LIINE 604 -EXISTING QUADI tUPUE BOX CULVE RT 600 12- (WIDTH) X 16 (HEIGHT) 596-- 596 592 OAM 592 5B5 25 LF 0: 15- RCP 1.36-A 5B3 lutt"'ou 11 U+UU 11 U+bU 111+UU 111+50 112+00 112+50 113+00 113+50 114+00 114+50 Gel J5 Q z t. z g z ;p" E_ z P4 o co F- C) :D U) F_ U) J) z pq 0 0 0 0 Z 0 o C) 0.0 z U 0 t- -Z� PROPOSED 6' CONNECTION t -Y3-) A,, PERMANENT GREENWAY EASEMENT SEE SHEET 6 INVESTMENTS LLC ITYP) PIN 175-133-11 (SELWYN VILLAGE CONDOMINIUMS) PROPOSED12' DB 4257 PG 405 GREENWAY(-Ll-) IN FEET GRAPHIC SCALE REMOVE AND REPLACE 215 SF D 10 20 40 SIDEWALK REMOVE AND RESET EXISTING TEMPORARY CONSTRUCTION FENCE l'BEHINO EXISTING FENCE EASEMENT (TYP) PROPOSED GATE CUT LIMITS (�P) PROPOSED 280 LF FENCE FROM PROPOSED STA 112-61.14 TO STA 115-23.86 REMOVE EXISTING FES GATE AND TIE TO EXISTING FENCE- CONSTRUCT MH C"FXISTPIPE FENCE TYPE TO BE CONFIRMED e c c c 7:7- - - c PGE-� e —:�e C PGF c PGE PGE c c PIGE S29'30'05-WII-8++ - ------ C", e SDE e PGE. -165 �Z POE 117� ce P C14 c Gr e 00 c c ----- c c END CONCRETE 115+00 157.35 cp — + BEGIN ASPHALT -Ll- STA: 117+51.40 CL c LITTLE SUGAR CREEK (-LI- XCLT MAINLIN41 t5+18.74 + (-Y3- XCLT CONNECTION)500+00 0) co w PROPO ED WALL #6 Lu -T LARGE SBLOCK GRAVITY WALL Z to S FILL LIMITS rrYP) 0 ED WALL #5 EET RVV-01 TO RW -14 LOCK GRAVITY WALL RETAIN EXISTING SEE SHBETS RW -01 TO RW -14 PROP S SEE SH LARGE to ITPIPE CONTRACTOR TO ADD COLLAR AND EXTEND IPE. RETAJN EXISTING FOOTHILLS ABBEY LLC REMOVE 278 LF OF EXISTING FENCE INVERTSP PIN: 175-142-12 AND REPLACE AS SHOWN ON PLANS De 29088 PG 455 De 3612 PG 867 WPWD CO: -Ll-CURVE14 -Ll-CURVE15 PIN: 175-142-05 PI STA.=l 16+21.69 PI STA.=l 18+58.09 DS 3846 PG 256 GRIF/FIfm,iCCOMPAhY'--'7" A=3*11'00" A=46'55'20" PIN: t7S 4Z4 i L=55.56' L=81.89' OB 979SPG 78S T=27.79' T=43.40' R=1000.00' R=100.00' .. - I -- I I 1�uu 117+50 118+00 118+50 119+00 119+50 0, 0 z 1:0 z o C.) Of U) z 0 C) Of 00 0 0 ;4 0.4 0 U 0 P4 u N&72 STX. 11"5.16 PONT 1E�l 5OZ82 612 PM -11 = 0 L w LOW I PONT S rA, I BI(MI2 .1.5= P%4 Stk' 18+25.82 37- Alk . 0a 0 �75X K.1 .82 amc 11 VC 601! 604 �---604 TIE E� 600 ELEV -Y3- 6 cc 596 ------------ —, — — — — — — ------ — — --- — — — — — — — — —ou --------------- --------- 592 -T— f 592 W8 RCP @ 4.6D% E IIST 1, ROP] 584 584 580- .. - I -- I I 1�uu 117+50 118+00 118+50 119+00 119+50 0, 0 z 1:0 z o C.) Of U) z 0 C) Of 00 0 0 ;4 0.4 0 U 0 P4 u E o c3r m a 611, PIA PV Of 6 A 60c 59', 5& 584 PIN,.475433-Al ....... .... (FORMERLY SARA-H.VOGT) (SELWYN VILLAGE CGNDOMINIUMS) DB 4257 PG 405 TEMPORARY CONSTRUCTION PROPOSED 300 LF FENCE EASEMENT (TYP) FR6msTA 120-01.83 TO STA 123�2 97 CONTRACTOR TO AVOID IMPACTS TO EXISTING GUY WIRES. PILL LWITS (TYP) PERMANENT GREENWAY .3 Ar— e —4, e e — a - L G-0 c PROPOSED SAFETY RAIL (TYP REMOVE 260 LF OF EXISTING FENCE EASEMENT (TYP) + e e e e IF4 e e e i? C-4 X —X X X— c IL CE p -=—Pt-- PGE —PGE i 0 'o C17 +00 C19 F 5 16 F F F F -It + + c"I CNI FtL L L IMITS (TYP) EL IL LITTLE SUGAR CREEK PROPOSED12' GREENWAY(-LI-) ELEW593L33— -Ll- CURVE 17 -Ll- CURVE 18 -Ll- CURVE 16 PISTA.=119+96.5' IDISTA.=1211+28.2� PISTA.=121+75.59 A=89*57'27" A=2*42'44" A=5*25'29" AD -.&R= mm" amar %c L=157.01' L=47.34' L=47.34' T=99.93' T=23.67' T=23.69' R=100.00' R=1000.00' - -Ll Vff 20 - CUP PI STA.=123+54.F8 R=500.00' -Ll- CURVE 19 PI STA.=122+22.9, A=2'42'44* A=67*25'21" L=47.34' L=141.21' c/y4//v T=23.67' T=80.06' A. 7-1 1.24, R=1000.00' R= 120.00' 6 INVESTMENTS. LLC ?- 7, SO 611, PIA PV Of 6 A 60c 59', 5& 584 PIN,.475433-Al ....... .... (FORMERLY SARA-H.VOGT) (SELWYN VILLAGE CGNDOMINIUMS) DB 4257 PG 405 TEMPORARY CONSTRUCTION PROPOSED 300 LF FENCE EASEMENT (TYP) FR6msTA 120-01.83 TO STA 123�2 97 CONTRACTOR TO AVOID IMPACTS TO EXISTING GUY WIRES. PILL LWITS (TYP) PERMANENT GREENWAY .3 Ar— e —4, e e — a - L G-0 c PROPOSED SAFETY RAIL (TYP REMOVE 260 LF OF EXISTING FENCE EASEMENT (TYP) + e e e e IF4 e e e i? C-4 X —X X X— c IL CE p -=—Pt-- PGE —PGE i 0 'o C17 +00 C19 F 5 16 F F F F -It + + c"I CNI FtL L L IMITS (TYP) EL IL LITTLE SUGAR CREEK PROPOSED12' GREENWAY(-LI-) ELEW593L33— LC N �T El". 592 29 L(m PONT ST&' 120+9 123 PV ",!��120"2=M HIGH NOT ELEV. 594"l U). POINT S.E�k . 59150 HIGH POP IT ST&- I23+4ILa2 LOW PMT STA: I t"1&92 PIA "Tk-1 SIL" I'm STA.124+1&" kM &73% IL&I7 PLocr )OC AD -.&R= mm" amar %c AD, 3-51M K-11.17 K' 14,311 4QW VC ao.W vc A Z 7::- M+50 120+00 120+50 121+00 121+50 122+00 122+50 123+00 123+50 124+00 GRAP SCALE IN FEET *oil HIC 0 la 20 40 A2 We 304 Soo 596 592 5w 584 5w 124+50 L—g g Ci z Z - u z u E- z pc� 0 U) z 0 c) p C 0 z 0 10 t— 9 0 0 U 4 -Ll- CURVE 21 -Ll- CURVE 22 -Ll- CURVE 23 S"31. PV1 S' k. 129�.30 PI STA.=125+82.66 PI STA.=127+89.37 PI STA.=129+03.57 A. A=l 1 *30'08" A =13*19'37" A=4*58'27" L=40.15' L=69.78' L=26.05' ,fINVESTMENTS. LLC, T=20.14' R=200.00' T=35.05' R=300.00' T=13.03' R=300.00' : PIN:175-133�11 (FORMERLY SARAH VOGT) (SELW�YN VILLAGE CONDOMINIUMS) PORARY CONSTRUCTION 08 4257 PG Q5 POLE IMPACTS TO BE ADDRESSED j PROPOSED12' DURING UTILrrY GREENWAYI-LI COORDINATION 601 01 5 59: 581 58, sm 578 124+50 I�ETAJN SSMH PERMANENT GREENVVAY EASEMENT (TYR) e e INSTALL CGLLAPSIB E e e CENTER BOLLARD. INSTALL COLLAPSIBLE CENTER SEE DETAIL SHEET 2E CONTRACTOR TO AVOID IMPACTS BOLLARD. SEE DETAIL SHEET 2E FOR TO FENCE AND DUMPSTER SPACING AND LOCATION OF WOOD CONTRACTOR TO BOLLARDS ALONG ROLL CURB STRADDLE PILES OVER EXISTING UTILITIES 11'9AWCUT PROPOSED 104 LF FENCE V-16" RO FROM STA t23-84.56 TO ILL CURB S . TA 1 1 Z4- , 88-56 PCE GE —PIGE PGE' PGE i-GE—pGE p— e 6 PC C21 12 0 F _,_�L9'2T16"E 127+00 — —*--I[ C22 151.66' 8�o POE -4 PC, 0 'A a S56 -0739-E 66-44' M 7 Sgo- 57' + F to m A41 .0 + E + 1 CIO (P F F F R- LARGE B PROPOSED WALL 98 LQCK GRAVITY WALL SEE SHEETS RVY-01 TO RVV-14 L) F ILL LIMITS (TYP) J CL REMOVE80LFOF LITTLE SUGAR CREEK REMOVE 54 LF 0� EASTING FENCE,_., . —77-7 —EI4D ZS LT EXISTING FENCE BEGIN CON ETE �U-STA:12 +85.00 L) C4 CONTRACTOR TO ADU COL A AND EXTEND PIPE. RERTAIN EXISTING INVERTS. END C RET BEGIN BOARDWALK -Ll- STA:127+95.00 POLE TO BE RELOCATED. CONTRACTOR TO UTILIZE LOCATION WILL BE CONSTRUCTION METHOD TO DETERMINED DURING CONSTRUCT BOARDWALK UTILITY COORDINATION PARK PLACE TOW HOUSES DB 5799 PC 667 -4 GRAPHIC SCALE IN FEET 0 10 20 40 CONTRACTOR TO CONSTRUCT BOARDWALK WITHOUT 'MPACTI G SANITARY SEWER VAULT ----------- ----- - --- - ....... ..... HIrH POINT EUEY-. 595.39 HIGH PONT ST&- 1 Z5+34.55 PM ST&'125+1&62 LOW POINT ELEV 59&01 LOW POINT ST&- 126+54. PV STA 125+ HI.40 'ICE 129,00 pcc S"31. PV1 S' k. 129�.30 03 45 8;1 17 'T AD. IIX IC-I&S7 4O.W W: D'. 4.5OX Ij(. '27.22 &W VC ci 0, HIrH POINT EUEY-. 595.39 HIGH PONT ST&- 1 Z5+34.55 PM ST&'125+1&62 LOW POINT ELEV 59&01 LOW POINT ST&- 126+54. PV STA 125+ HI.40 PV1 S' k. 129�.30 AD, 4.53Z K.- 2 � 2 9 Ilmw Vc AD. IIX IC-I&S7 4O.W W: D'. 4.5OX Ij(. '27.22 &W VC - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - E 3ST 12- DIJ P 125+00 125+50 126+00 126+50 127+00 127+50 128+00 128+50 129+00 ;08 iO4 ioO 596 592 m 5134 5w 578 129+50 0 0 12E z u T Z , E - z o C) cn V) z Pq 0-) fr 0 ILL. 0 �-- 0 C) �T. 0 u 0 = I , = 114 0 t- E No H A� 6 INVESTMEUTS. L" (FORMERly SARAH V116T) ,F""" LAGE CONDOMINIUMS) 6 4257 PG 405 AX# 1 75-133-01 'S PROPOSED EASEMENT TO BE RETAIN EXISTING' RE IN EXISTING DONATED By PHILLIPS 12- PIPE JrTA SELWYN, Ll -C PER PIPE ,AGREEMENT WITH THE CITY e OF CHARLOTTE PROPOS E , DPERM" PCE PCF EASEMrMT ANENT'GREENWAY RETAIN EXISTING a 12. PIPE PHILLIPSIS L�WYN LLC ROWAL I PIN 175- 31-37 DO 22826 PG 39 SEE STRUCTURE PLANS 0822 PG 415 368 DO 22368 PG 4 0 D B 9486 PG 235 08 9426 PG 363 TEMPORARY CONSTRUCTION EASEMENT (TYR) \REMOVE TREE Z11SIAIL 1.11�111111 ll� III G�--.�QQ�ZSEE DE�All- SHEET 2E_ N PROPOSED12' GREENWA Y (-LI-) -Ll- CURVE 24 -Ll-CURVE25 I -LI-CURVE26 PISTA.=129+99.77 PISTA.=131+5?.59 PISTA.=133+33.IC A=14'10'43" A=91*06'37 A=23*32'26" L=74.24� L=159.02' L=82.17' T=37 * 31 T=101.96' T=41.6T R=300 00, R=100.00' R=200.,00' I-- Ho I luv 1.3 1 �Z)u I Jz+uu 132+50 133+00 133+50 134+00 134+50 ,GRAPHIC SCALE IN FEET 10 20 4 =J!!!� 0 AH. 7 > E, u E- z W o C/) PZ :D cr U) z 0 Of 0 0 z w C) - - I I = 0 t., HIGH POINT ELEV-. 504,17 KH POINT STA. la 1+34-32 PARK PLACE TOWNHOUSES DO 5799 PG 667 10 616 'V END BOARDWALK C-3 BEGIN CONCRETE Ll- STA;134+20.00 AN . ........... END CONCRETE Alk.&3IX E!EGIN ASPHALT GOLDEN TRIANGLE -11-1- STA:l 34+30.00 HEDGEMORE LLC Pft 175-146-88 ,RETAJNING WALL #9r �ARGE OCK GRAV17Y WALL DO 295W PG 653 D8 17851 PG 631 D8 7581 "Z7 ETS RVV-01 TO RW -14 It' 20.46 PG 620 I-- Ho I luv 1.3 1 �Z)u I Jz+uu 132+50 133+00 133+50 134+00 134+50 ,GRAPHIC SCALE IN FEET 10 20 4 =J!!!� 0 AH. 7 > E, u E- z W o C/) PZ :D cr U) z 0 Of 0 0 z w C) - - I I = 0 t., HIGH POINT ELEV-. 504,17 KH POINT STA. la 1+34-32 616 PM STA. -131+17 '05 Alk.&3IX It' 20.46 612 170.01f VC 612 608 604 —604 600 596 — — — — — — — 596 — — — — — 592 — 592 18* RCP 588 -588 58 I-- Ho I luv 1.3 1 �Z)u I Jz+uu 132+50 133+00 133+50 134+00 134+50 ,GRAPHIC SCALE IN FEET 10 20 4 =J!!!� 0 AH. 7 > E, u E- z W o C/) PZ :D cr U) z 0 Of 0 0 z w C) - - I I = 0 t., o 3400 SELWYN AVE SITE PLAN BY OTHERS A A RICHARD V PACELLA COLBY MCKNIGHT PIN: 175.1 31-09 NICHOLSON DB 2TF76 PG' SAMUEL D NICHOLSON OB 27425 PG 188 PIN: 1 75-131-08 DB 25603 PG 283 D6 16273 PG 571 0 De D: 2 P B36 M8 58PG248 PROPOSED EASEMENT TO BE DONATED Z�l 215396587 PG 728 B74 PIS 427 By PH ILLIPS SELWYN, LLC PER PHIL PS SELWYN LLC 00 3920 PG 264 LOT 2 AGREEMENT WITH THE C T� OF P:N: 175-131-12 MB 4 PG 427 A3 CHARLOTTE DS 22826 PG 393 LOT PHILLIPS'SFLWYN . LLC D 22368 PG 415 PIN: 475-131-37 DS 2236a PIS 4AQ. TEMPORARY Do 220X PG 39 OB 9486 PG 235 CONSTRUCTIOtC RETAINING WALL StO SLOC OB Z2368 PG415 PERMANENT STORM DB 9426 Pr, 363 EASEMENT.(TYP) LARGE _K GRAVITY WALL, DI3 22368 PG 41 0 DRAINAGE EASEMENT (TYP) OB81 3prw. SEESHEETSRW-01TORW-14 D6 9486 PG 235 DQ 782 T7 PC 726 D6 W6 PG 363 Me 3 G 302 PROPOSED12' CUT LIMITS (TYP) I LOT 16 GRE . ENWAY(-LI-)t e e e e e e—,e— e WE e WE SDE— SDF ME— SDE— SPE.. SDE� lee -- Fe —PCE— P PGE SDE— SDE PGE SDE— PCE-:::,--_PGE—PGE PGE—PGE 01 :�:� - c PGE—PGE PCE c PROPOSED V- D4TCH (TYP) pGF c c < e 120 < I 'CE > n— — — — -- cn c, 36+Oq S '±7158"W -t-0-0 �38160 5 0 Sao-35'43"VV 13 302.02' In + 0 0 00 rn U) 6 m -4 - e F F F p P GE e �ONS EASEMEU' NI PROP. GREEI e L S. PCE_ _P P c < < 5-00 43. sa 13 WALL G Ty WALL to 0. 5 1 P. 15 - 3 F F F + E 1 20 C22- + (a LU + - PROPOSEUSTCiRM(TYP), P7 ui x z 'o �21 FILL LIMITS (TY Q. Lu RETAINING WALL �9 LLJ BLOC CA _K GRA LARGE - VITY WALL S s S T. EE SHEETS RW-01'rO RVV-14 LITTLE SUGAR CREEK"', ... . ....... GOLDEN TRIANGLE -[END ASPHALT HEDGEMORE LLC PIN 175-146-88 BEGIN CONCRETE D8 29560 PG 653 L.I. STA:139+00.64 313 1785 PG 631 -L1 - CURVE 27 -L1 - CURVE 28 -L1- CURVE 29 OB 75811PG 620 PI STA.=135+42.92 PI STA.=138+77.0 P1 STA.= 139+44.45 A=33*53-57- A=4'12'16" A=24'31'18" L=22.01' L=42.80' L=88.75' T=11.01' T=21.73' T=45.72' R 300.00' R=100.00' R=150.00' 60 60 60 59 59� 581 58, 580 578 134+50 135+UU 135+51) 136+00 136+50 137+00 137+50 138+00 138+50 139+00 $08 504 '100 i96 m 5a4 580 578 139+50 GRAPHIC SCALE IN FEET 0 10 20 40 all s J - z Z z o :D cn V) z P4 0 U 0 0 C=> 0 t— :1c I I STA; =1 IM 6 '5' LOI PmT 0". 59MI 5 U= IOWT ST&. 1 -,*+5- 6, v ST& -13"61;18 HIQH PONT ELEV. ! QZ21 N CH PONT STA-. 137 "&05 STX- 137+9Q 99 AM. 1.35X V- 74.18 ,omw C AM &3GX It 25.21 I(Lw Vc AD, 7.40X V� 17.30 mar VC ;R - - - - - - - - - - - - - - - - - - - - - - - - - - - - - \-23 LF OF 15- RCP @ 0.58% 135+UU 135+51) 136+00 136+50 137+00 137+50 138+00 138+50 139+00 $08 504 '100 i96 m 5a4 580 578 139+50 GRAPHIC SCALE IN FEET 0 10 20 40 all s J - z Z z o :D cn V) z P4 0 U 0 0 C=> 0 t— :1c I I r cr 60( a 59 A -Ll- CURVE 30 -Ll- CURVE 31 HARRY SIBOLD PIN: 175-131 39 P1 STA.=140+63.27 PI STA -=141+75.71 DO 1 1238P. A=45*11'15" A=29'07'26" D815 ",..S L=23.66' L=25.42' DB 7809 PG 944 MB 4 PG 427 T= 12.48' T=12.99' LOT 3 END CONCRETE R=30.00' R=50.00' GRAPHIC SCALE IN FEET BEGIN PROPOSED BRIDGE A. A. 0 10 20 40 -1-1. STA:140+83.80 RENEE M ALLEN -Ll- CURVE 32 -Ll- CURVE 33 ANDREW L. KREICHER & TERI L KREICHER A PIN# 175-131-51 PI STA. = 142+27.5 Pi STA.=144+75,11 (FORMERLY BR COLBY MCKNIGHT PB 24648 PG 664 END PROPOSED BRIDGE N BEGIN CONCRETE A=20 47'06" A=7*20'26" NICHOLSON D8 9835 PG 9M LAMBERT SAMUEL D NICHOLSO DO 9573 PG 395 Ll. STA:141+53.80 VICTOR M PINEIRO L=18.14' L=12.81' JESSICA E SAWY RS PIN: 175-131 INSTALL COLLAPSIBLE 08 9351 PG598 & HILDA H PINEIRO PI LA BERT) -08 1 \ T=9.17' T=6.41' N # 7175-13149 09 16273 PG 57 CENTER BMLARD MB 28 PG 330 PIN# 175-131-50 DO 11561 PG 239 DB U58 PG 248 SEE SHEET 7E LOT9BLOCK1 DB 23342 PG 505 R=100.00* MB 4 PG 427 DB 18825 PG 424 08 9668 PG 794 LOT2 DO 16519 PG 543 DO 9094 PG 890 MB 28 PG 330 D8 9094 PG 890 LOT 7 BLOCK 1 MB 28 PG 330 Gr- PROPOSED WALL LOT 8 BLOCK I LAR( BLOCK GRAVITY W" P PG,- S41'29'08"VV PROPOSED PERMANENT SEE SHEETS RW -01 TO RW -14 e PCE. PROPOSEQYYALL412 GREENWAY EASEMENT P 30.22' 0 P� - LARGE BLOCK GRAVITY WALL" c \.EE SHEET 21 F R TREA- o GRADING DETAILS e SEE SHEETS RW -01 TO RW -m e e + ? , e Go cp PCE e rE PCE VrTLE s e q � e — ------ PCE UGARCREEK C 2 C31 POE 30 co H, S62'16 -14-w PGE PrE GE 23Z2 4+oo PCE p --- 15"RCP C, 0 e e e a. e e GE p9l, C e DI PCE F- Lu INSTALL COLLAPSIBLE 1 30 V) Lu CENTER BOULARD. SEE 'DE Lu m PROPOSED IN L Al 1 7 Lu DETAIL SHEET 2E 'SOLDIER PILE RETAINING WALL PGEA SEE SHEETS RW -01 TO RW -14 ROPOSED STORM (TYP) F X INSTALL COLIAPSiBl- CENTER L) U) CUT LIMITS (-TY P) BOLLARP. SEE DETAILESHEET 2E ENI PROPOSED BRIDG SEE STRUCTURE PLANS CONTRACTOR TO PROVIDE ACTIVE SHORING 5% TI MPORARY CONST END CONCRETE BEGIN BOARDWALK GREENWAY(-LI-) EASEMENT (TYP) -Ll- STA:144.82.13 A�, 5& ADl.5.IZ9 K. 17. 87.2-T VC PEDESTRIAN BRIDGEOS e CHARLOTTE 0. GIBSON PAYNE SEE 'fURE PLANS (FRANCISCAN TERRACE CONDOMINIUMS) DB 4383 PC 815 E; —&ARLOTTE D GIBSON PAYNE 175-146.01 57f �F RANCISCAN TERRACE CONDOMINIUMS) DO 4383 PG 815 A -Ll- CURVE 30 -Ll- CURVE 31 HARRY SIBOLD PIN: 175-131 39 P1 STA.=140+63.27 PI STA -=141+75.71 DO 1 1238P. A=45*11'15" A=29'07'26" D815 ",..S L=23.66' L=25.42' DB 7809 PG 944 MB 4 PG 427 T= 12.48' T=12.99' LOT 3 END CONCRETE R=30.00' R=50.00' GRAPHIC SCALE IN FEET BEGIN PROPOSED BRIDGE A. A. 0 10 20 40 -1-1. STA:140+83.80 RENEE M ALLEN -Ll- CURVE 32 -Ll- CURVE 33 ANDREW L. KREICHER & TERI L KREICHER A PIN# 175-131-51 PI STA. = 142+27.5 Pi STA.=144+75,11 (FORMERLY BR COLBY MCKNIGHT PB 24648 PG 664 END PROPOSED BRIDGE N BEGIN CONCRETE A=20 47'06" A=7*20'26" NICHOLSON D8 9835 PG 9M LAMBERT SAMUEL D NICHOLSO DO 9573 PG 395 Ll. STA:141+53.80 VICTOR M PINEIRO L=18.14' L=12.81' JESSICA E SAWY RS PIN: 175-131 INSTALL COLLAPSIBLE 08 9351 PG598 & HILDA H PINEIRO PI LA BERT) -08 1 \ T=9.17' T=6.41' N # 7175-13149 09 16273 PG 57 CENTER BMLARD MB 28 PG 330 PIN# 175-131-50 DO 11561 PG 239 DB U58 PG 248 SEE SHEET 7E LOT9BLOCK1 DB 23342 PG 505 R=100.00* MB 4 PG 427 DB 18825 PG 424 08 9668 PG 794 LOT2 DO 16519 PG 543 DO 9094 PG 890 MB 28 PG 330 D8 9094 PG 890 LOT 7 BLOCK 1 MB 28 PG 330 Gr- PROPOSED WALL LOT 8 BLOCK I LAR( BLOCK GRAVITY W" P PG,- S41'29'08"VV PROPOSED PERMANENT SEE SHEETS RW -01 TO RW -14 e PCE. PROPOSEQYYALL412 GREENWAY EASEMENT P 30.22' 0 P� - LARGE BLOCK GRAVITY WALL" c \.EE SHEET 21 F R TREA- o GRADING DETAILS e SEE SHEETS RW -01 TO RW -m e e + ? , e Go cp PCE e rE PCE VrTLE s e q � e — ------ PCE UGARCREEK C 2 C31 POE 30 co H, S62'16 -14-w PGE PrE GE 23Z2 4+oo PCE p --- 15"RCP C, 0 e e e a. e e GE p9l, C e DI PCE F- Lu INSTALL COLLAPSIBLE 1 30 V) Lu CENTER BOULARD. SEE 'DE Lu m PROPOSED IN L Al 1 7 Lu DETAIL SHEET 2E 'SOLDIER PILE RETAINING WALL PGEA SEE SHEETS RW -01 TO RW -14 ROPOSED STORM (TYP) F X INSTALL COLIAPSiBl- CENTER L) U) CUT LIMITS (-TY P) BOLLARP. SEE DETAILESHEET 2E ENI PROPOSED BRIDG SEE STRUCTURE PLANS CONTRACTOR TO PROVIDE ACTIVE SHORING PROPOSED12' TI MPORARY CONST END CONCRETE BEGIN BOARDWALK GREENWAY(-LI-) EASEMENT (TYP) -Ll- STA:144.82.13 A�, ADl.5.IZ9 K. 17. 87.2-T VC PEDESTRIAN BRIDGEOS e CHARLOTTE 0. GIBSON PAYNE SEE 'fURE PLANS (FRANCISCAN TERRACE CONDOMINIUMS) DB 4383 PC 815 —&ARLOTTE D GIBSON PAYNE 175-146.01 �F RANCISCAN TERRACE CONDOMINIUMS) DO 4383 PG 815 P%l ST&'140+39.1! LOW LOW P P� -ONT ELEV. 5110.17 MIT STk- t4I+74A! 5 14,=.16 I STA. 2 ST&I�W,62 AD. 4.46X K.- 17.93 M. Vc ADl.5.IZ9 K. 17. 87.2-T VC AD, XMI K.- 1.165 5aolr m: (Lon A- - - - -- - - -- - - - - - - - - - E XIST 8- Df -J A A tMAL WATER SUI !FACE ELEVATION 572 139+50 14U�Uu 14U+oU 141 +Uu 141+bU 142+00 142+50 143+00 143+50 144+00 144+50 104 100 M $92 A8 $84 MID 06 572 145+00 z >*4 Z: cuu m e i t E U u E- o 8 A U) 0 0 0 0 0 z 1!2 w 0 0 z U 4 W) z C 1:9 u 5i IC) r*- c all SAL or E STEVE TAYLOR & JILL BAINBRIDGE DAVID MISENHEIMER RETAI EX STORM & JENNIFER PIN # 175-131-56 ..TO OUTFAL I L c%. DB 290M PIG 499 MISENHEIMER DB 27609 PG 200 PINAP 1 75- 121-35 RETAIN EXISTING FENCE DB 22458 PG 443 DB M89 PG 214 D 20081 PG 357 DO 24679 PG 808- 6 DO 4451 PG,3r6 OB19628PG 91 MB " RD 712 MS 7 PG $13 LOT 6 LOT 4 ADJUST MH TO GRADE & COWRACTOR TO INSTAI L PAVING FABRIC AND SURFACE COURSE ASPHALT OVER E�STING PAVERS SEE I-YPICALS e RETAIN EXISTING 15'PIPE RETAIN EXISTING 24" PIPE INSTAL' COLLAPSIBLE CENTER BOLLARD SEE D�TZ SHEET ZE TEMPORARY CONSTRUCTION EASEMENT (TYR) MECKLENBURG COUNTY 0 DO 7029 PC K3 PROPOSED WALL #13 RW -01 TO RW -14 CONVERTDI LARGE BLOCK GRAVITY WALL SEE SHEETS TCJB ETAI. I CONTRACTOR TO AVOID 0 IMPACTS TO EXISTING STOOPS AND FOUNDATION PROPOSED STORM (TYR) MECKLENBURG COUNT PROPOSED12' OB 7029 PG 503 FES 140 RE MANENT GREENWAY ............ GREENWAY (-Ll-) 7 EASEMENT (TYR) 0 -Ll- CURVE 34 -Ll- CURVE 35 -Ll- CURVE 36 - -PISTA.=145+55.59 PISTA.=146+25.86 PISTA.=147+14.90 14 A=14*05'04" A=21'29'06" A=10*28'34" ILE�� L=24.58' L=37.50' L=18.28' T=12.35' T=18.97' T=9.17' R=100.00' R=100.00' R=100.00' C35 19'21' 15" CP 61-75 PCE FILLUMIT v PGE PGE -Ll- CURVE 37 -Ll-UU-RVE38 I -Ll-CURVE39 e FOOT ENE) BOARDWALK, BEGIN CONCRETE P1 STA.=147+89.39 P1 STA.=148+19.89 P1 STA.=149+93.6� F 4 A=50*06'57" A=26'49'32" A=8*02'59" L=43.73' L=19.90' L=14.05' T=23.38- T=10.13' T=7.04' R=50.00' R=42.50' R=100.00' all SAL or E STEVE TAYLOR & JILL BAINBRIDGE DAVID MISENHEIMER RETAI EX STORM & JENNIFER PIN # 175-131-56 ..TO OUTFAL I L c%. DB 290M PIG 499 MISENHEIMER DB 27609 PG 200 PINAP 1 75- 121-35 RETAIN EXISTING FENCE DB 22458 PG 443 DB M89 PG 214 D 20081 PG 357 DO 24679 PG 808- 6 DO 4451 PG,3r6 OB19628PG 91 MB " RD 712 MS 7 PG $13 LOT 6 LOT 4 ADJUST MH TO GRADE & COWRACTOR TO INSTAI L PAVING FABRIC AND SURFACE COURSE ASPHALT OVER E�STING PAVERS SEE I-YPICALS e RETAIN EXISTING 15'PIPE RETAIN EXISTING 24" PIPE INSTAL' COLLAPSIBLE CENTER BOLLARD SEE D�TZ SHEET ZE TEMPORARY CONSTRUCTION EASEMENT (TYR) MECKLENBURG COUNTY 0 DO 7029 PC K3 PROPOSED WALL #13 RW -01 TO RW -14 CONVERTDI LARGE BLOCK GRAVITY WALL SEE SHEETS TCJB ETAI. I CONTRACTOR TO AVOID 0 IMPACTS TO EXISTING STOOPS AND FOUNDATION PROPOSED STORM (TYR) MECKLENBURG COUNT PROPOSED12' OB 7029 PG 503 FES 140 RE MANENT GREENWAY ............ GREENWAY (-Ll-) 7 EASEMENT (TYR) 0 E z � 1, — J�. 140 q 1 4 ' 'F I , -- F O� A� 14 (L 2;04 ILE�� RETAIN EXISTING WMCI CHARL TTE XV LLC MGM POINT �rk- 4"Z7-81 PM STA. 148+1 IL70 PIA STA 145.!a25 STA 1"+28.78 CIL : WV 14 +0 16 24' PIPE PIN# 1 75-121-03 DO 2 PG 203 RETAIN EX G NG 'N IT S� C35 19'21' 15" CP 61-75 PCE FILLUMIT v PGE PGE D8 28506 D13 266224819 PPGG 1512 DO 22154 PG 979 e FOOT ENE) BOARDWALK, BEGIN CONCRETE e F DI F 1401 GE F F F F 4 RETAIN EXISTING STORM DO 21299 PG 275 1) P 298 962 PG DGB 148340 G 243 08 13188 PG 661 -Ll- STA:145+42.13 CUTLIMIT P) e DB 4944 PG 637 END CONCRE E e e e A-, w I BEGIN ASPHALT I -Ll- STA:145+52.13 PROPOSEDPERMANENT C OORDIkATE WTTFLrLT WATER GREENWAYSECTION AND SHOULDER FILL OVER SANITARY SEWEPL FILL HORIZON DEVELOPMENT PROPERTIES. INC. (PARK SENECA HOUSING, INC.) GREE14WAYFASEMENT d a. i. z REIGHIT INCREASE - I FT 604 600 DB 6720 PG 844 MB 25 PG 96 Z� WMCI CHARL TTE XV U -C PIN# 175-121-03 DB 285M PG 203 DO 26289 PG 160 DO 26241 PG 512 DO 22154 PG 979 0 21299 PG 275 DB 18342 PG 298 DB 14960 PG 243 DO 131aa PG 661 DO 4944 PG 637 —1w 14D�Dlj 1140�UU 14O+z)U 141+uu 147+50 148+00 148+50 149+00 149+50 150+00 GRAP EET RIC SCALE IN F a 10 20 40 U u E- o F- C) z 0 -) o 0 R40 z: w �T. 0 (0) z 0 ;4 u HIGH PONT E". 599.93 612 ILE�� PIA ST&- 147+6&9 1 MGM POINT �rk- 4"Z7-81 PM STA. 148+1 IL70 PIA STA 145.!a25 STA 1"+28.78 W m 2 A&.&Iox A& 2-a2x AG Z71X AD - X 608— moor VC K.- 9. 49 30.0(r VC IC t011 K 11.06 K. 116. 2O.W Vc 3=11 VC )w w ; 604- w + d a. i. z 604 600 596 596 �T Fl— I!XIST 24- WP 592 - ------ 592 588 CIST 8' DI 58 L OF 15- RCP @ O.� 51% 564— 11 EXIST 8" D 554 V11 LF OF T RCP a 0.50% 1 EXIS 6- DFJ wo —1w 14D�Dlj 1140�UU 14O+z)U 141+uu 147+50 148+00 148+50 149+00 149+50 150+00 GRAP EET RIC SCALE IN F a 10 20 40 U u E- o F- C) z 0 -) o 0 R40 z: w �T. 0 (0) z 0 ;4 u 4:1 E "'AiEMOVE 50 LF _EXISTING .118 REMOVE STRUCTURE AND PLUG PIPE TO GRADE RETAIN EEXISTING FE"CE T 0 E G RA D 9�' JU TIN L GEREN P M 175�121-31 is De 26302 PG 709 HELEN 11 MCOLIAID Do 23616 PG 98 PIN# 175-121-30 Do 12041 PG 510 MB 4 PG 427 DB 775 PG 569 LOT 11 AND P MB 4 FG 427 LOT Ir OF LARGE LOCKGRAVITY WALL DAVID ALLEN TYSON PROPOSEDWALL#14 LOT 10 a SEE SHEETS RW -01 TO RVV-14 & SUSAN INGRAM 'FILL LIMITS MP) RETAIN EXISTING PIN# 175-121-29 24'PIPE DB 5914 PG 622 MB 3 PG 431 LOT 18 & PART OF LOT 19 F 'COW�GTQR TO AVOID F � F TRANSFORMER. /BETTY JEANETTE COKER IN PIN# 175-121-28 6 1�" 0 OB 28M PG 19, DB 27:95 PG 342 CA0_ DS 16147 PG 602 f k DB 167 PG 140 G7 DO 7460 PG 558 8 3 PG 431 0 M F F." 17 'r L T BLOCK I + "e ke WALL"" IT, ALI 0. TGRW-14 Oo T..;.RAR (TYP) -"C7'N EASEMENT Y CONS PROF... SAFITY RA XIS RETAIN E TING DROP INLET_ -CONTRACT R '-TALL GRADE FILL PAVING PASR' M.S.111 SLOPE TO DRA N COURSE ASPHALTQVER A TO EXISTING DI EXISTING PA 4L VERS. SEE TYPICALS PERMANENT GREEWAY EASEMENT (TYP) - UR E 4( 1 +09 1�9 i L PFI STAC=15V1+09.90 `E ,$Er SHEET 2A �OR �D�ETAI� + C43 154 �00 GE e PGE PROPOSED 12" GREENWAY (-Ll-) A, STRATFORD VENTURE LLC PIN# 175-121-05 DS 29019 PG 89 DB 26902 PG 105 D8 26723 PG 47 DB 265113 PG 849 MB 14256 PG 345 MB 4 42 PG 190 LOT 2 - 8 BLOCK 1 1�5Ito—o GRAP EET I HIC SCALE IN F 40 0 10 W) F- LLI U) Lu ul z :j uj A=28*13'35" A=55*46�2" L=49.26' L=97 ' 32 T=25.14' T=52 90' R=100.00' R=100'.00, 612— -Ll- CURVE 42 -Ll- CURVE 43 PISTA.=153+11.76 PISTA.=154+15.34 A=32'54'1 3" A=18*30*07" L=57.43' L=129.17' T=29.53' T=65.15' R=100.00'— R=400.00' `E ,$Er SHEET 2A �OR �D�ETAI� + C43 154 �00 GE e PGE PROPOSED 12" GREENWAY (-Ll-) A, STRATFORD VENTURE LLC PIN# 175-121-05 DS 29019 PG 89 DB 26902 PG 105 D8 26723 PG 47 DB 265113 PG 849 MB 14256 PG 345 MB 4 42 PG 190 LOT 2 - 8 BLOCK 1 1�5Ito—o GRAP EET I HIC SCALE IN F 40 0 10 W) F- LLI U) Lu ul z :j uj . I-- I lul.v I D I �Iju 10 1 �Du I bz+uu 152+50 153+00 153+50 154+00 154+50 155+00 I's u z L� SD U Of V) 10 'o' LL o ol w 0 0 9 z U z 0 9 u LOW Pm T 6xv. 394-01 PW ST&'150+4140 PM STA. 151+40. Fa LOW POINT Sm 13W2-17 612— PM STkI54+5100 AD. I.a= �21.28 K- 71.29 .612 �w Vc 13&OW Vc xw Vc 608— X 608 04— I -EXIST MH 6G4 ru ST DI 600 596 596 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LEXIST IT :ZCP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 592 - - - - - - - - - - - - - - - - - - - - - - - - - - 592 588 584 �EXIST W4 24' RCP 582 . I-- I lul.v I D I �Iju 10 1 �Du I bz+uu 152+50 153+00 153+50 154+00 154+50 155+00 I's u z L� SD U Of V) 10 'o' LL o ol w 0 0 9 z U z 0 9 u 2 4 1 DO 9059 PC 987 DB 11186 PG 4 LOT 9 & PART OF LOT 10 DB 8328 PG 245 LOT 14 BLOCK I DO 8467 PC 927 BLOCK 1 DO 8197 PG 168 Me 3 PG 43 MO 3 PIS 431 LOT 11 & PART OF LOT 10 LOT 15 8, PART OF LOT 16 BLOCK I BLOCK 1 LITTLE S U G A R CREE�- _4 ROCK OUTCROPS OR BOULDERS AT SURFACE FROM APPRO.,STA 111,10 r-PROPOSEQ,WALl-*15 TO S_ 1_,o SEE GEOTECHNICAL LARGE BLOCKGRAVFTY WALL NOTE SHEET 2 SEE SHEETS RW-0I.TO RVV-14 RETAINEXISTING R PROPOSED WALL #16 STORM C OSSING LARGE BLOCK GRAVITY WALL SEE SHEETS RW -01 TO RVY-14 PROPOSED HANDRAIL. SEE DETAIL SHEET ?D FILL LIMITS (TYPI 13; + + < 1S6 ------ I-- LLI (L U) uj a. 0- 159+00 —C 7 LW 15 LOQ Lu X 06 '41" Lu U) 'd I — C45 Lu + —S 12'16'5 'W 157+00 s 60+00 Lu e 93.42' C46 — .09, PGE u) X: LU e c PGE c pc� c w Z L) j LU + .0 —PGE— GE PROPOSED PERMANENT GREEWAY EASIEMENT (TYP) e e e e e e 0 e e INS. ALL COLLAPSIBLE CL PROPOSED WALL #17' CEMTrR SOL LARD. SEE DETAIL SOLDLEFLPILERETAINING WALL SHEET 2E FOR SPACt4r, AND A- SEE SHEETS RW -01T RW -14 LOCATION OF WOOD STRATFORD VENTURE LLC BOLLARDS ALONG ROLL CURB PIN# 175-12-105 PROPOSED12' DB 29019 PG 89 TEMPORARY T TIONT DB 902 PG 105 EASEMENT (EYE) GREENWAY(-LI-) D82266723 PG 47 DB 26583 PG 849 END ASPHALT Me 14256 PIS 345 BEGIN CONCRETE Me 4742 PG 190 -LI-STA:158.98.45 LOT2-8BLOCK1 -Ll-CURVE44 -Ll- CURVE 45 -Ll- CURVE 46 -Ll- CURVE 47 PI STA.=155+73.28 PI STA. = 156+36.91 PI STA.=157+51.61 PI STA.=158+16.Od A=17*15'11" 1=15*05'40" A=9*22' 16" A=9*22'15" L=30.1 1' L=26.34' L=16.36' L=16.36' T=15.17' T=13.25' T=8.20' T=8.20' R=100.00' R=100.00' R=100.00' R=100.00' 612-- MGM PC NT CLEM 59125 Poo T STA. 157+"' PV, !T&-Im.XL47' HEATHER MARIE AMIER SAM BRAKE 8, JARDINE WILLIAM GEORGE JR qmw Vc y a HUL A E BRAKE JOHN PETERMAN JR WILLIAM L WALLIS ELIZABETH HICKS PLYLER PIN# 175-121 _26 OR 28896 PG 851 DB 22687 PG 729 — PINg 175-121-25 D 29 53 PG 580 a DO =967 PG 404 JENNIFER REESE PIN# 175-121-24 PIN# 175-121-23 04 DB 2 23 P 408 1 JEFFREY REID PLYLER PIN# ;75-121-22 DB 1 2160 PIS 884 DO 1 0946 PG 506 DB 25483 PG 988 DO 22977 PIS 533 D6 12503 PIS 268 DEI 69 PIS 608 D818 DB 1 290 PG 2 2 Ge 16944 PG 895 6625 PG DO 12 88 PG 735 D 9150 PIS 384 DB 10094 PIS 292 B DM2808 PG 137 8 3 PG 431 Me 3 PG 431 LOT 12 & LOT 13 BLOCK 1 259 1852 PG 536 D 11385 PG 826 BIB 3 PG 431 DO 9059 PC 987 DB 11186 PG 4 LOT 9 & PART OF LOT 10 DB 8328 PG 245 LOT 14 BLOCK I DO 8467 PC 927 BLOCK 1 DO 8197 PG 168 Me 3 PG 43 MO 3 PIS 431 LOT 11 & PART OF LOT 10 LOT 15 8, PART OF LOT 16 BLOCK I BLOCK 1 LITTLE S U G A R CREE�- _4 ROCK OUTCROPS OR BOULDERS AT SURFACE FROM APPRO.,STA 111,10 r-PROPOSEQ,WALl-*15 TO S_ 1_,o SEE GEOTECHNICAL LARGE BLOCKGRAVFTY WALL NOTE SHEET 2 SEE SHEETS RW-0I.TO RVV-14 RETAINEXISTING R PROPOSED WALL #16 STORM C OSSING LARGE BLOCK GRAVITY WALL SEE SHEETS RW -01 TO RVY-14 PROPOSED HANDRAIL. SEE DETAIL SHEET ?D FILL LIMITS (TYPI 13; + + < 1S6 ------ I-- LLI (L U) uj a. 0- 159+00 —C 7 LW 15 LOQ Lu X 06 '41" Lu U) 'd I — C45 Lu + —S 12'16'5 'W 157+00 s 60+00 Lu e 93.42' C46 — .09, PGE u) X: LU e c PGE c pc� c w Z L) j LU + .0 —PGE— GE PROPOSED PERMANENT GREEWAY EASIEMENT (TYP) e e e e e e 0 e e INS. ALL COLLAPSIBLE CL PROPOSED WALL #17' CEMTrR SOL LARD. SEE DETAIL SOLDLEFLPILERETAINING WALL SHEET 2E FOR SPACt4r, AND A- SEE SHEETS RW -01T RW -14 LOCATION OF WOOD STRATFORD VENTURE LLC BOLLARDS ALONG ROLL CURB PIN# 175-12-105 PROPOSED12' DB 29019 PG 89 TEMPORARY T TIONT DB 902 PG 105 EASEMENT (EYE) GREENWAY(-LI-) D82266723 PG 47 DB 26583 PG 849 END ASPHALT Me 14256 PIS 345 BEGIN CONCRETE Me 4742 PG 190 -LI-STA:158.98.45 LOT2-8BLOCK1 -Ll-CURVE44 -Ll- CURVE 45 -Ll- CURVE 46 -Ll- CURVE 47 PI STA.=155+73.28 PI STA. = 156+36.91 PI STA.=157+51.61 PI STA.=158+16.Od A=17*15'11" 1=15*05'40" A=9*22' 16" A=9*22'15" L=30.1 1' L=26.34' L=16.36' L=16.36' T=15.17' T=13.25' T=8.20' T=8.20' R=100.00' R=100.00' R=100.00' R=100.00' 612-- MGM PC NT CLEM 59125 Poo T STA. 157+"' PV, !T&-Im.XL47' qmw Vc —612 608 — —608 604 600 600 596- 596 592 — — — — — — — 592 588 588 5154 1XIST 18 RCP—\ 5" —1. . I.— I -vv I oo�z)u ID/+UU 157+50 158+00 158+50 159+00 159+50 160+00 a 011h. �lq GRAPHIC SCALE IN FEET 0 10 20 40 m z u u Z U" E- z pl� o F— !D cr) 0 Of 0 L, l'- 0 z U 0 ME PROPOSED BRII �GV SEE STRUC�TYRE PLANS - PROPO SE 09' CONNECrio, 1-11-1 SEESHEEr" ID BRIDGE ONCRETE Z -Ll- CURVE 48 -Ll- CURVE 49 -L I - C'_0`RVP5_0__1 HIC SCALE IN FEET P1 STA.=162+10.R P1 STA.=163+53.i5 P1 STA.=164+07 28 0 ia 20 40 A=73'23'04" A=7*14'51" A=4*33'54" 41, 'T fir N.C. Y L=140.89' L=25.30' L=15.93' " a a STATE HIGHWA T=81.97' T=12.67' PUBLICWORKS T=7.97' Co# SION Pff� T-121-13 R=1 10.00' R=200.00' R=200.00' DB01913PG,3� /IES\ 0 COOT ENCROACHMENT SUBMITTAL REQUIRE MB 3 PG 431 -Y4- STA:600-23.63 LOT 7 & PART OF LOT 6 13LOCK I PROPOSED WALL 91 F LARGE BLOCK GRAVITY WALL 8" - 11 HANGING S� N -R SEE SHEETS RW -01 TO RVV-14 LIN�- SIIQWN PER CLT 04 WATF�A� BU:LT3 (.Y4.A/61-C (NN MAINLINE):162191 LT 0 ECTION)::6004:09 w I JNOFR �ARK ROAD PROPOSEDIT 10 GREENWAY PROPOSED SAFETY RAIL PGE DOMINIQUE LACRO SEE SHEET 2A FOR DETAIL. PC, & LORI LACRODI PIN# 175-121-21 e DB 30144 PG 20 PROPOSED De 24285 PG 374 3 Yp) OB 2782 PG "7 TORM (T MB 3 PG 431 SEE GREENWAY CONTRACTOR TO LOT 8 BLOCK I MAINTENANCE NOTE AVOID IMPACTS TO SHEET2 EXISTINGrWALL PROPOSED PERMANENT - ", r GREENWAY EASEMENT UNDERPASS�LOCATIONI BASED ON SURVEY REC=8Y CES ON e 61712016 AN OT BRIDGE INSPECTION REPORT INFORMATION 60 59 59 58 56 5m 571 11 FOR UNDERPASS PROPOSE[) WALL #17 5'EBURG-BAKER A. \OANN RIM 175-12-117 08 10263, PIS 963 LINDA B. HUNNICUTT & MET3 PG 431 STANLEY P. HUNNICUTT �FORMERLY LINDA B PAAR) LOT BLOCKl PIN* 1 11-111-18 12'GREENWAY,-LI, DS 17311 PG 300 END BRIDGE -,N BEGIN CONCRETE 00 5326 PG 932 -Y4- STA:600-73.63 MB 3 PG 431 LOT 5 & PART OF LOT 6 D82 9019 PG 89 D8 21.91.2 P13 1.0,1 BLOCK 1 CONFIRM WATERLINE DEPTH. Za OB 2 7 pa, 06 26583 PG 849 SELWYN FAJR U�C PIN# 171-18145 RETAINING WALL #19 co WILLIAM F SAMPLE JR & BETTY J SAMPLE M&S PG 428 MB 5 Pr 408 PIN# 175-121-20 OB 2530 PG 242 BEGIN PROPOSED BRII �GV SEE STRUC�TYRE PLANS - PROPO SE 09' CONNECrio, 1-11-1 SEESHEEr" ID BRIDGE ONCRETE Z -Ll- CURVE 48 -Ll- CURVE 49 -L I - C'_0`RVP5_0__1 HIC SCALE IN FEET P1 STA.=162+10.R P1 STA.=163+53.i5 P1 STA.=164+07 28 0 ia 20 40 A=73'23'04" A=7*14'51" A=4*33'54" 41, 'T fir N.C. Y L=140.89' L=25.30' L=15.93' " a a STATE HIGHWA T=81.97' T=12.67' PUBLICWORKS T=7.97' Co# SION Pff� T-121-13 R=1 10.00' R=200.00' R=200.00' DB01913PG,3� /IES\ 0 COOT ENCROACHMENT SUBMITTAL REQUIRE MB 3 PG 431 -Y4- STA:600-23.63 LOT 7 & PART OF LOT 6 13LOCK I PROPOSED WALL 91 F LARGE BLOCK GRAVITY WALL 8" - 11 HANGING S� N -R SEE SHEETS RW -01 TO RVV-14 LIN�- SIIQWN PER CLT 04 WATF�A� BU:LT3 (.Y4.A/61-C (NN MAINLINE):162191 LT 0 ECTION)::6004:09 w I JNOFR �ARK ROAD PROPOSEDIT 10 GREENWAY PROPOSED SAFETY RAIL PGE DOMINIQUE LACRO SEE SHEET 2A FOR DETAIL. PC, & LORI LACRODI PIN# 175-121-21 e DB 30144 PG 20 PROPOSED De 24285 PG 374 3 Yp) OB 2782 PG "7 TORM (T MB 3 PG 431 SEE GREENWAY CONTRACTOR TO LOT 8 BLOCK I MAINTENANCE NOTE AVOID IMPACTS TO SHEET2 EXISTINGrWALL PROPOSED PERMANENT - ", r GREENWAY EASEMENT UNDERPASS�LOCATIONI BASED ON SURVEY REC=8Y CES ON e 61712016 AN OT BRIDGE INSPECTION REPORT INFORMATION 60 59 59 58 56 5m 571 11 FOR UNDERPASS PROPOSE[) WALL #17 5'EBURG-BAKER STEPHE'N AJD��IL15E \OANN RIM 175-12-117 08 10263, PIS 963 P'. IDS 11508 PG 945 MET3 PG 431 11113 PG 431 LOT BLOCKl \L.T 3 & PART OF LOT 2 12'GREENWAY,-LI, BLOCK I END BRIDGE -,N BEGIN CONCRETE IX -Y4- STA:600-73.63 / PROPOSED BRII �GV SEE STRUC�TYRE PLANS - PROPO SE 09' CONNECrio, 1-11-1 SEESHEEr" ID BRIDGE ONCRETE Z -Ll- CURVE 48 -Ll- CURVE 49 -L I - C'_0`RVP5_0__1 HIC SCALE IN FEET P1 STA.=162+10.R P1 STA.=163+53.i5 P1 STA.=164+07 28 0 ia 20 40 A=73'23'04" A=7*14'51" A=4*33'54" 41, 'T fir N.C. Y L=140.89' L=25.30' L=15.93' " a a STATE HIGHWA T=81.97' T=12.67' PUBLICWORKS T=7.97' Co# SION Pff� T-121-13 R=1 10.00' R=200.00' R=200.00' DB01913PG,3� /IES\ 0 COOT ENCROACHMENT SUBMITTAL REQUIRE MB 3 PG 431 -Y4- STA:600-23.63 LOT 7 & PART OF LOT 6 13LOCK I PROPOSED WALL 91 F LARGE BLOCK GRAVITY WALL 8" - 11 HANGING S� N -R SEE SHEETS RW -01 TO RVV-14 LIN�- SIIQWN PER CLT 04 WATF�A� BU:LT3 (.Y4.A/61-C (NN MAINLINE):162191 LT 0 ECTION)::6004:09 w I JNOFR �ARK ROAD PROPOSEDIT 10 GREENWAY PROPOSED SAFETY RAIL PGE DOMINIQUE LACRO SEE SHEET 2A FOR DETAIL. PC, & LORI LACRODI PIN# 175-121-21 e DB 30144 PG 20 PROPOSED De 24285 PG 374 3 Yp) OB 2782 PG "7 TORM (T MB 3 PG 431 SEE GREENWAY CONTRACTOR TO LOT 8 BLOCK I MAINTENANCE NOTE AVOID IMPACTS TO SHEET2 EXISTINGrWALL PROPOSED PERMANENT - ", r GREENWAY EASEMENT UNDERPASS�LOCATIONI BASED ON SURVEY REC=8Y CES ON e 61712016 AN OT BRIDGE INSPECTION REPORT INFORMATION 60 59 59 58 56 5m 571 11 FOR UNDERPASS PROPOSE[) WALL #17 Z/ Al PQ� JGLILLC S01-DIER PILE RETAINING WALL 26 LF C TV SEE SHEETS EG4 TO RW -14 PIN` 771-181-44 PROPOSED BELOW GRADE WiMlIG11- 12'GREENWAY,-LI, Dq,. I PC 121 I E111LL *11 LARGE BLOCK GRAVITY WALL �PRIPS SEE SHEETS RVY-01 TO RW -14 co e �00 PCE - 572 570 160+00 I-- I-- I-- IOZ�Uu IbZ+bU 163+00 163+50 164+00 164+50 Soo 596 592 m 584 580 $76 572 570 165+00 ,sell z W'e� Z. Cu S E_ z o L) Of U) 0 U Of 0 0 LL E4 , Z__ J w u 0 9 u 0 t— PROPOSE[) WALL #17 e -PARK ROAD BRII K�E PQ� S01-DIER PILE RETAINING WALL 26 LF C TV SEE SHEETS EG4 TO RW -14 STA. 162�.I Soc �A tERPNf: SHOWN PER CLT RICH P014T STk 164+06 53 PM Wk14�23.32 ST&-I�8191 c" OF I CP 0 STRATFORD VENTURELL 07 PIN# 175-121-05 NATERA&BUILTS UNDER LITTLE SUGAR CREEK. p TEST HOLE NEEDED TO CIE, co 70 D82 9019 PG 89 D8 21.91.2 P13 1.0,1 Z� CONFIRM WATERLINE DEPTH. Za OB 2 7 pa, 06 26583 PG 849 SELWYN FAJR U�C PIN# 171-18145 RETAINING WALL #19 co MG 14256 PG 34�� C', M64 2PG 74 190 M&S PG 428 MB 5 Pr 408 SOLDIER PILE RETAINING WALL SEE SHEET§�WQ, TO RW -14 4.On LOT2-8BLOCKi LOTS 1-5&LOTS64-71 e 572 570 160+00 I-- I-- I-- IOZ�Uu IbZ+bU 163+00 163+50 164+00 164+50 Soo 596 592 m 584 580 $76 572 570 165+00 ,sell z W'e� Z. Cu S E_ z o L) Of U) 0 U Of 0 0 LL E4 , Z__ J w u 0 9 u 0 t— LOW P)INT a". 577-79 LOW P01 4T STA. 162.X41 -PARK ROAD BRII K�E RICH PwIT El EM 5aMSS STA. 162�.I EUEV:598.95 RICH P014T STk 164+06 53 PM Wk14�23.32 ST&-I�8191 AD'. 9.6n K'&25 !__EUD� A&.:L� i1X A& O."X saw VIC K.. I & m It. 4IL69 5mw %c 30.W Vc 4.On Iz= 3Q)w %T HEX -------------- IST 8' LAL SEWE I A.E R WE _QU L26 LF OF 15* CLASS IV RCP 4.78% -E I STAA62+07. 1 A ELEV�M.7 r R �-27 4 LF OF 48- CLAS I TV RCP @ 0.5", LF OF 15"CLASS IV 1 cp @ 2.53% 572 570 160+00 I-- I-- I-- IOZ�Uu IbZ+bU 163+00 163+50 164+00 164+50 Soo 596 592 m 584 580 $76 572 570 165+00 ,sell z W'e� Z. Cu S E_ z o L) Of U) 0 U Of 0 0 LL E4 , Z__ J w u 0 9 u 0 t— E cr 01 z d� jj 1 E -Ll- CURVE 51 -Ll- CURVE -52 -Ll- CURVE 53 P1 STA.=166+60.69 P1 STA.=167+76.97 P1 STA,=168+46.00 A=38'1 612" A=23*16'00" A=42'1 3*59" Z/4,, L=26.72' L=32.49' L=58.97' T :,13 08 1.: T=16.47' T=30.90' R R=80.00' R=80.00' A 0% TEMPORARY CONSTRUCTION EASEMENT (rYP) END CONCRETE BEGIN BOARDWALK -Li- STA;169-52.00 JGL I LLC PIW 171-181�44 DO 101.93 PG 110 D13 9904 FIG 325 INSTALL COLLAPSIBLE PROPOSED WALL #20 CENTER BOLLARD. SOLDIER PILE RETAINING WALL, e SEE DETAIL SHEET 2E SEE SHEETS RW -O 1 TO RW -14 6\ ROBERT DEJAGER END CONCRETE END PROPOSED BRIDGE PIN# 171-181-10 BEGIN PROPOSED BRIDGE BEGIN CONCRETE DO 20972 PG 437 DS 6997 -Ll-STA-1 PROPOSED IT PG 119 -LI-STA:167.47.83 G1 I ii�NWA Y (-L I-) x 9 MG 5 PG 428 LOT 78 & 79 sr X'6c INSTALL COLLAPSIBLE OSED GREEN AY POE CENTER BOLLARD. EASEMENT (TYP) + SE w PROPOSEDWALL 916 E DETAIL SHEET 2E PROPO IDGE PGE SEE STRUC E LARGE B OCK GRAVITY WALL P S SEE SHEE T S RVV­O ITORW-14 LITT "j2 1681+00 LE SUGAR CREEK e GE + e PROPOSED WALL �21 LARGE BLOCK GRAVITY WALL I c SEE SHEETS RW -01 TO RW -14 A co Ud o + 0 LU 11 ?Gr' 0 S8 �59'0 co 0 Lu X Lid 3W 0 A, PGE MH SELVVYN FAIR L.0 E—PGE--PGE P114#111-181-45 80 MB5PG4 8 M8 5 PG 408 Pce e 0 e LOTS 1:5 1 & LOTS 64 - 71 15'CLASS IV RCP --- e CE DEE GREENWAY e PROPOSED WALL #19 "AINTENANCE NO I'll, SDbWF-R_ PILE RETAINING WALL 'SHEET 2 SEE SHEE t RI0(zQLj2RVV­14 e 'e 59; 5W 58( 57( 57', 561 564 56 165+00 165+50 166+00 166+50 167+00 167+50 168+00 168+50 169+00 169+50 592 584 580 576 572 558 564 56 2 170+00 GRAPHIC SCALE IN FEET 0 1.0 2.0 40 0.11114 gAg z u u z z o C) cf) z 0 U Z 0 0 0 t_ P A ST& 166+35,4315 LOW POINT El `kk 575.16 LOW POINT STA 167+63-N P. ST&.10 F+m AD, Z04% K' 2� smw Vc 4" M K-15 m amoly Vc X UZ -24 LF OF IV CL SS IV RCP @ 2-14 Y. ER SURFACE EL v TION 564 56 165+00 165+50 166+00 166+50 167+00 167+50 168+00 168+50 169+00 169+50 592 584 580 576 572 558 564 56 2 170+00 GRAPHIC SCALE IN FEET 0 1.0 2.0 40 0.11114 gAg z u u z z o C) cf) z 0 U Z 0 0 0 t_ E �3 0 E lu GRAP EET HIC SCALE IN F 0 1 20 40 I I .— if I�vu If I'DU I I zlUv 1 [Z+50 173+00 173+50 174+00 174+50 175+00 -25 "A z E- z o 0 U) z 0 C) 0 0 0 z 1!0 0L 0 U V) z u 0 FILL LIMITS (TYt')V ..... MECKLENBURG COUNTY' PIN# 171-181-39 HIG 4 PONT 0". 50" " END CONCRETE cellql�OPG311 " HIM POINT STA. M +Q .12 BEGIN:ASPHALT M.4 UT Llmli� 596— -LI - STA 171 'l 7.00 14 STk 171+36.53 P- ST&' 73+OM34 F PROPOSED12' AD.:.22X 596 F F GREENWAY(.Ll-) 7.33 K -45.12 INSTALL COLLAPSIBLE CE 4ER BOLLARD. SEE DETAIL SHEET IE C-56— —css 1724L60 c .... .... .. - vc 592 S-18*46'WE c c c c 19 .21 c + c ZL--- c 1-- c AR c S21 07'45*vv C QL c lsq� lg7 AX END BOARDWALK C c 0 L174-90 BEGIN CONCRETE IST Ir PVC c 584 -Ll- STA:171,07.00 c X, c c SIM c c LITTLE SUGAR CREEK -Ll- CURVE 54 -Ll- CURVE 55 -Ll- CURVE 56 P1 STA.=170+59.56 PI STA.=171+38.30 A=58*13'35" A=42*29'1 3" PI STA.=171+96.8E A=11*07'15" JUDY GREATHOUSE MARIAN GRACE L=35.57' L=37.08' L=38.82' PIN# 171-181-08 08 WARREN T=19.49' T= 19.44' T=19.47' 6673 PG 716 M" PG 428 PIN# 171-181-07 11111107 PG 4110 R=35.00' R=50.00' R=200.00' LOT 81 MS 5 PG 428 MICHAEL WARREN -Ll -CURVE 57 -Ll- CURVE 58 THOMAS GOUDELOCK SIR PIN* 1 09 '11. LOT 82 TABITHA D CARNES PIN# 171-181-06 WITTEN ADAM�-8 -- 'ES J BREW R 7,IN PISTA.=174+04.43 PISTA.=174+82.52 11 PlG DS 25254 PG 39 DO 1"55 PG PA L TRAN I 71-181-04 A=39*54'40" A=56'26'36" MB5PG408&MB5PG428 796 PIN# 171-181-09 DO 30264% 751 DO 25782 L=55.73' L=59.1 1' LOT SO DO 4181 P 166 M 8 5 PG 42B LOT 83 08 5627 PG 668 PG a36 08 21259 PG 57 7 DO 19133 T 29.06 T=32.20' 56a 566 0 i MB 5 PG 428 LOT 84 7 PG 619 DO 3 PG 738 MB5PG42()5LOT95 R=80.00' R=60.00' I I .— if I�vu If I'DU I I zlUv 1 [Z+50 173+00 173+50 174+00 174+50 175+00 -25 "A z E- z o 0 U) z 0 C) 0 0 0 z 1!0 0L 0 U V) z u 0 HIG 4 PONT 0". 50" " HIM POINT STA. M +Q .12 596— 14 STk 171+36.53 P- ST&' 73+OM34 AD-.& AD.:.22X 596 7.33 K -45.12 oar %c vc 592 592 AR 583 IST Ir PVC 584 SIM wo 576 — 575 572— —572 8 56a 566 I I .— if I�vu If I'DU I I zlUv 1 [Z+50 173+00 173+50 174+00 174+50 175+00 -25 "A z E- z o 0 U) z 0 C) 0 0 0 z 1!0 0L 0 U V) z u 0 ii E 596 592 5aa 584 580 576 572 568 566 175 -Ll- U VE 59 -Ll- CURVE 60 -Ll- CURVE 61' P1 STA.=175+89.43 P1 STA.=176+59.98 P1 STA.=178+49.96 PROPOSEDIT A=42*37'18" A=82*58'20" A=94'43'1 1 L=44.63' L=43.44' L=82.66' MECKLENBURG COUNTY GREENWAY(-LI-) 4� P1N# 171-181-39 ROCK OUTCROPS OR BOULDERS AT T=23.41' T=26.53' T=54.30' OB11020P 318 SURFACE FROM APPROX STA M-00 R=60.00' R=50.00' GRAPHIC SCALE IN FEET MB 4 PG 345 TO STA 178-50. SEE GEOTECHNICAL R=30.00' 10 20 40 NOTE, SHEET 2 GREEN WA Y 42'00"E /?4' 2- -2. 7 9' C60 w LLARD. SEE DETAIL SHEET 2E 'A" ED TALL COLLAPSIBLE CENTER J C ___� rn z: rr7 x m 60" rt? , sl—, C59 -41",W — ____ c - EN6 ASPHAL'j BEGIN CONCRETE + -L1- STA:176+85.91 END CONCRETE— BEGIN PROPOSED BRIDGE -Ll- STA:176+95.90 �CUTLIMITSJYP) P 0 POSED 36 LF NCE FILL LIMITS (TYP) PROPOSED BRII GW oil \-e 5 SEE STRUCTURE PL. cp JULESRPRIMM& \7 c HELEN C & MARK RICHARD PRIMM END CONSTRUCTION PIN# friXt-01, TIE TO EXISTING GREENWAY THOMAS 0 PUNZKE & DO 5715 108 P INZKE MS 5 PG 428 -L.1. STA:180+75.00 MONICA LOT PIN4L 171-181-02 2 PIG 312 OV 081574 /REMOVE TREE 3 PG 508 REM E TREE MICHELLE ANNETTE MOORE DO 573 & DELVIN L HARFORD MS 5 PG 428 END CONCRETE C, &P 19, PIN# 171-181-03 LOT 87 BEGIN ASPHALT DO 27167 PG 254 DO 24524 PG 77 END PROPOSED BRIOG ..LI-STA:177+86.93 C63 DO 19993 PG 484 DO 5110 PG 487 BEGIN CONCRETE ME 5 PC 428 Ll EXISTING; REMOVE 46 LF EXJSTING; FENCE EXISTING FENCE LOT 86 -LI-STA:177-76.03 MECKLENBURG c_O, i C C PIM 171-184 CORNER LOCATION TO BE . ... .. CONFIRMED c 0 12 EX7S77NG GREENWAY (BY OTHERS) 75+50 176+00 i 76+50 177+oo 177+50 178+00 178+50 179+00 179+50 180+00 180- Z J' u t t� >_ 1z u s u z E_ z W o cf) co z pq 0 u P4 cif 00 0 PA 4 0 Z 0 �121 1 1"Pilki` LT. 0 LOW POINI E" 574.00 SA.175+34.90 LOW POINT STA. 177+1112-11 HIGH POINT E HIGH PONT ST F"m :178+07 39 0,131% NO 5. C 17.00 9.05 AD, 7. e (LW VC 50: Dar vc 'aK: & 00 ----------- ----------------- -- -------- EXIST BEGN (F PROJECTJ TIE TO EM TING ----40419 5Y 0 1 Ht:RS Sr'180 24.49 LEV:585m8O _��N.R AAL WATER E ELEVATION 75+50 176+00 i 76+50 177+oo 177+50 178+00 178+50 179+00 179+50 180+00 180- Z J' u t t� >_ 1z u s u z E_ z W o cf) co z pq 0 u P4 cif 00 0 PA 4 0 Z 0 �121 1 1"Pilki` LT. 0 D—Ing K:\CHL-PRJ\015CI6 City f Ch.riotte\166 X -CLT Seg I \C4-CADD\G2-PLANS\4G- Y4- PLAN AND PRC�ILE —g 21 Apr 19, 2017 5: 1 Opm by: Gino Stroga CROSS CHARLOTTE 01501616' AS NOMI S1111 NQI DAa ph", Pirep—d B, 0 (E) 2017 NJM GD NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 70 Y4 - PLAN 200 South Tryon Street, Suite 200 CHARLOM. &D /01/2016 Charlotte, Noirlh C—Iiiiia 29202 D—irg n..e: K:\CHL-PRJ\015016 Cty of Ch.,Iotte\166 X -CLT Seg I \04-CADD\02-PLANS\41 - Y5- PLAN dwg 22 Apr 19, 2017 5: 1 1pm b)r. GI—Str.g. 015010186 X-0 —I. I�— th, -I, wd —­ ...t 1. A.. f J,npr­ — w - -wt —t -h—'l- Plm Pre—ed By: AimlerMorn NC LICENSE NO. F-0102 Q 2017 0 M CD OF NM MEPARLD BY OD CHECKED BY c z Y5 - PLAN 200 South Tryon Streetn Suite 200 ChAY10 te, North Carolina 28202 "Phon.: t CHAP&ME. JLD 09/01/2016 m io Gin, Sh-t S,t.C.... Ch-,- T,,il z DA I Clt,, .( Ch -1-\166 X -CLT %.,, 174 rADn\nl 3�- m rc-0 It Z -g 2 0 0 0 c IA �j 2 c: a 6 d to z > CO M U! Iq 14 8 T.. 700+75.20 P* +97.55 c L to, �jd ORTH z SHEE I 22 CROSS CHARLOTTE TRAIL 015010186 X-0 AS N010 SC�U- PROGRESS SET NOT FOR CONSTRUCTION Plm Pre—ed By: AimlerMorn NC LICENSE NO. F-0102 Q 2017 0 M CAD FILE PA 111 OF NM MEPARLD BY OD CHECKED BY 70 Y5 - PLAN 200 South Tryon Streetn Suite 200 ChAY10 te, North Carolina 28202 "Phon.: t CHAP&ME. JLD 09/01/2016 P -ted B,.St,c-. Gin, Sh-t S,t.C.... Ch-,- T,,il I kPPROYED BY DA I Clt,, .( Ch -1-\166 X -CLT %.,, 174 rADn\nl (704) 333-5131 Drawing name: K: \CHL—PRJ\015016 City of Charlotte\166 X—CLT Sag I \04—CADD\02 —PLAN S\42—CONNECTION PROFILE dwg 23 Ap, 19, 2017 5:12pm by: Gin..Str.ga YbI. ­. tt,tt.. .11b .. .—t. d ... 11. ­­ ­.. .. � I,,— It —1. 11 1,— w,ly 11 th. a—fill bb� w,d d— I, �I,A It ­ ~,w. R., It ­ .­ . IN. -t .1 b,Jbpt�tl. by KwI.rMb,, bul Abb-11t,* III, � 6. — —ty W --H. d A.-, M 41 0 0 10"X + I ; : 0 1 1 1 1 1 1 V; I I I I I I I F __-F] I I I I .1011 1 1 1 1 1 1 1 1 \1 I I I I I I I I I I I I + I I . 0 1 1 1 1 1 1 1 1 N I I I I I I I I I I I I I I I I I 1 1 1 1 1 "1 1 W I I I I I I I I I I + 0 A I I I I A \1 I I I I I I I I I 8 I .A, Ln ut -SHLL 1 23 CROSS CHARLOTTE TRAIL 015018106 No 77S _7,10L7 PROGRESS SET NOT FOR CONSTRUCTION ob 0 CHARLOM. - (ADIILLPAiH 70 Y2- PROFILE SHEET NJM 111ILPARLD BY to ILD vMOvLD BY 09/01/2016 a �I E ob 0 4 Ul 4 - IM: 40 H,00.00 + EL 59IA3 C) CD M 41 0 0 10"X + I ; : 0 1 1 1 1 1 1 V; I I I I I I I F __-F] I I I I .1011 1 1 1 1 1 1 1 1 \1 I I I I I I I I I I I I + I I . 0 1 1 1 1 1 1 1 1 N I I I I I I I I I I I I I I I I I 1 1 1 1 1 "1 1 W I I I I I I I I I I + 0 A I I I I A \1 I I I I I I I I I 8 I .A, Ln ut -SHLL 1 23 CROSS CHARLOTTE TRAIL 015018106 No 77S _7,10L7 PROGRESS SET NOT FOR CONSTRUCTION PlaHs Prepared 13): Kimley)))Horn (D 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carol "a 28202 (704)333-5:11 0 CHARLOM. - (ADIILLPAiH 70 Y2- PROFILE SHEET NJM 111ILPARLD BY GD CHU KLU BY ILD vMOvLD BY 09/01/2016 a �I E Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02-PLANS\42-CONNECT10N PROFILE.dwg 24 Apr 19, 2017 5!12pm by_ Glr..Staga -.7 -d 1-— --1. h... —.1 .. .— wly 11 o- N ­w d f. .1 Rw, It to 2 + 4 0 P. J 0 595.4 Ln (Jn cn C? W Lq S Pi Lin Ln + M C� c.n Ln Ul 0 cn + Lin 23-a4i CD 4 CD + 2 SHLE 1 CROSS CHARLOTTE 015016too JOB No I AS NOTED SCAa H.- P --d By: 0 24 TRAIL PROGRESS SET NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (D .1017 CADYILLPA[H OF NAA GD 70 Y3- PROFILE SHEET j cHuchLD BY 200 South Tryon Street, Suite 200 (HADME. 09/01/2016 Charlotte North Carolina 28202 1 n, D� I 1i 11 11- K \- PR -15- rik� �# Ch.1-t. 66 777 s- 4 C.M\02 P-S\12-CO-ECTION PROFILE.d- Ph-: (7D4)333-5131 name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Sag 1\04-CADD\02-PLANS\42-CONNEC RON PROFILE.d.g 25 Ap, 19. 2017 5:12pm by, Gina.Strago --.d Y.- .1 -*.. 1. .1.4. b,l, � 0. ..ft -. d 11 ol. — b— B. -1 W0- by —­— - A—k- b, — k —t -41ty t, —­— - A—%� ft. L -j 0 CROSS CHARLOTTE *1 AS N0711 I I BY 4 . . . . . . . . 4 25 TRAIL PROGRESS SET NOT FOR CONSTRUCTION KimlepMorn Nc LICENSE NO. F-0102 0201' CADFILLPAIH OF 1 Go PHLPARLU BY Y4 AIND Y5 PROFILE SHEET CHECKLOBY I M 01ARUME. JLD 09/01/2016 70 Cluarloutte, North Carolina 28202 PV11 700 D�IE 11 — . \,- -A ...... I -. .1 ---\166 -CLT S.. 1\04 CADD-2 -A-42--N-110N PRMLE.d.. Phone: (7D4)333-5131 +1 1 1 0 -4 -4 -4 0 12 + 0 ?Y A + C" . c JR+ a) -4 a to C> NO w ME '-V, 70 1 EL 190.00 0 NJ + -4 CD w -4 -4 -4 0 cn --4 cp c:1 0 L L 0. !42,21 001 1 1 Ill I I I I 1 11 1 1 1 1 1 1 1 1 + IT I I � l[-FT-F-F-T-FTTT -F-F-f I I 0 0) M CROSS CHARLOTTE 015016166 oBNo AS N0711 I I 4 . . . . . . . . 4 25 TRAIL PROGRESS SET NOT FOR CONSTRUCTION KimlepMorn Nc LICENSE NO. F-0102 0201' CADFILLPAIH OF NJA Go PHLPARLU BY Y4 AIND Y5 PROFILE SHEET CHECKLOBY I M 01ARUME. JLD 09/01/2016 70 Cluarloutte, North Carolina 28202 WMOYED BY —11 1. In,, .1 D�IE 11 — . \,- -A ...... I -. .1 ---\166 -CLT S.. 1\04 CADD-2 -A-42--N-110N PRMLE.d.. Phone: (7D4)333-5131 +1 1 1 0 0 + a) NO w ME !42,21 001 1 1 Ill I I I I 1 11 1 1 1 1 1 1 1 1 + IT I I � l[-FT-F-F-T-FTTT -F-F-f I I 0 0) M CROSS CHARLOTTE 015016166 oBNo AS N0711 I I 4 . . . . . . . . Pl— PlIP—d 1111: 25 TRAIL PROGRESS SET NOT FOR CONSTRUCTION KimlepMorn Nc LICENSE NO. F-0102 0201' CADFILLPAIH OF NJA Go PHLPARLU BY Y4 AIND Y5 PROFILE SHEET CHECKLOBY I M 01ARUME. JLD 09/01/2016 70 Cluarloutte, North Carolina 28202 WMOYED BY —11 1. In,, .1 D�IE 11 — . \,- -A ...... I -. .1 ---\166 -CLT S.. 1\04 CADD-2 -A-42--N-110N PRMLE.d.. Phone: (7D4)333-5131 +1 1 1 M Ln 0 0 con -4 SHEL CROSS CHARLOTTE 015016166 oBNo AS N0711 I I 4 . . . . . . . . Pl— PlIP—d 1111: 25 TRAIL PROGRESS SET NOT FOR CONSTRUCTION KimlepMorn Nc LICENSE NO. F-0102 0201' CADFILLPAIH OF NJA Go PHLPARLU BY Y4 AIND Y5 PROFILE SHEET CHECKLOBY I 200 S h Tryon Street, Suite 200 01ARUME. JLD 09/01/2016 70 Cluarloutte, North Carolina 28202 WMOYED BY —11 1. In,, .1 D�IE 11 — . \,- -A ...... I -. .1 ---\166 -CLT S.. 1\04 CADD-2 -A-42--N-110N PRMLE.d.. Phone: (7D4)333-5131 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Sag 1\( .0 rn X 0 < CIO 0 0 00 0 M -o z X 17 4 G )D\02-PLANS\43-STREAM PLAN d" 26 STREAM PLAN AND PROFILE TT" CAOFILLPAIH NJA GD 0- - 25 + -n JLD 0who 09/01/2016 APPROVED BY p'- M 0 c 0m, 'I CA M VANE m TIETOEXI z H, 0 Z 0 EIEV=57 x c o' zmH )D\02-PLANS\43-STREAM PLAN d" 26 STREAM PLAN AND PROFILE TT" > SHLE 1 015018166 AS NOTED CROSSCHARLOTTE SCALE 1A OF 70 STREAM PLAN AND PROFILE CAOFILLPAIH NJA GD 0- - 25 + -n JLD 0who 09/01/2016 APPROVED BY p'- ZO-40 :* . 0 0 B -z M c 0m, 'I CA z'59 VANE m TIETOEXI ING H, 0 Z > SHLE 1 015018166 AS NOTED CROSSCHARLOTTE SCALE 1A OF 70 STREAM PLAN AND PROFILE CAOFILLPAIH NJA GD 0- - 25 + CHLULDBY JLD 0who 09/01/2016 APPROVED BY p'- ZO-40 :* . 0 0 B -z c 0m, '0 z'59 VANE m TIETOEXI ING H, 0 Z EIEV=57 co I -RIFFLE 4,v z 30, ROCK CROSS --`� VANE 1 rn r2B1'- I I rn I rn z 0 > SHLE 1 015018166 AS NOTED CROSSCHARLOTTE SCALE 1A OF 70 STREAM PLAN AND PROFILE m 6 (n 0 1�k M IROGRESS SET NOT FOR CONSTRUCTION y 19, 201 5:13prn by Glra.St,.g. d A.—I.- 1� CAOFILLPAIH NJA GD PKLPAHLL)BY + CHLULDBY JLD 09/01/2016 APPROVED BY DAIE m 6 (n 0 1�k M IROGRESS SET NOT FOR CONSTRUCTION y 19, 201 5:13prn by Glra.St,.g. d A.—I.- 1� + c z X 0 ROCK CROSS ELEV=578.1 VANE TIETOEXI ING H, 0 Z EIEV=57 7 I -RIFFLE z 30, ROCK CROSS --`� VANE ELEV r2B1'- I I I + 0 TIETOEXI ING EIEV=57 7 z UPI Z 0 + Ln 30'MAX.— ROCK VANE ELEV�111.4 cn Pluns Prepared BY: "y Kimley)))Horan NC LICENSE NO. F-0102 02017 200 South Tryon Streel; Suite 200 Charlotte, North Carolina 28202 (HARIMM. Pi (704) 333-5131 Drawing name: K:\CHL—PRJ\015C)16 City of Charlotte\166 X—CLT Seg I \04—CADD\02—PLANS\43— STREAM PLAN.d.g_27 STREAM PLAN AND PROFILE Apr 19, 2017 5:13prrt by. G,n..St,.g. --t. --t It I, —dwl mly W kk W� ­ Wd d— 11 — It Rw, W thl. —mt MMwt W -wt .W. Itl —N. It. .—I 1.0t, 1. It—l— — --l.A + 0 0 n, 0 > M IZ 0 80 Le 015016166 JOB NO, AS NOTED SCkl-!, cn rn 0 (RAMJOM- 03 X M > G) -0 M ROCK CR rLEV=575.8 SS VANE &D APPRO�LD BY STREAm PLAN AND PROFILE WIZ I—T-Ahl P1 IZ 0 80 0 0 :F.00 0 % 1711 G) M 0 rn ;a Ox A In, rri rn G) W 7 . ..... . ...... . .... 0 0 ;5 OF PARK ROAD ..gCt 0 (EXISTING PUBLIC R/W) < a: .0 . 0 CA 0 mk W A M cy c Ln C, 0 0 (D CD 0 T W Le 015016166 JOB NO, AS NOTED SCkl-!, SET NOT FOR CONSTRUCTION K:\CHL PRJ\015016 Clt� of Ch,,I,tt,\ rn 0 (RAMJOM- CAD FILL PA III c z C) z 20 -0 NJM PKEPARLD BY ROCK CR rLEV=575.8 SS VANE &D APPRO�LD BY STREAm PLAN AND PROFILE 09/01/2016 DA I V A,,il 19. 2017 063:44— I—T-Ahl P1 rr, 0 0 rrT ITT Cl oo nn m < M 0 0 ELEV=1113 IN M 0 0 :F.00 0 % 1711 G) M 0 rn ;a Ox A In, rri rn G) W 7 . ..... . ...... . .... 0 0 ;5 OF PARK ROAD ..gCt 0 (EXISTING PUBLIC R/W) < a: .0 . 0 CA 0 mk W A M cy c Ln C, 0 0 (D CD 0 T W SHEL 1 27 Le 015016166 JOB NO, AS NOTED SCkl-!, SET NOT FOR CONSTRUCTION K:\CHL PRJ\015016 Clt� of Ch,,I,tt,\ rn 0 (RAMJOM- CAD FILL PA III c z C) z 20 STREAM PLAN AND PROFILE Gin, Sh— S,t-C.... Ch,-tt, T,all L—t:27 NJM PKEPARLD BY ROCK CR rLEV=575.8 SS VANE &D APPRO�LD BY STREAm PLAN AND PROFILE 09/01/2016 DA I V A,,il 19. 2017 063:44— I—T-Ahl P1 x C) 3 z oo nn m ELEV=1113 -All RIFFLE ELE =575.7 .-30"MAX—] RIFFLE ROCK CR=S VANE 0. MAX. ELEV=57 .2 CK St L E EV -571.1 SHEL 1 27 CROSS CHARLOTTE TRAIL 015016166 JOB NO, AS NOTED SCkl-!, SET NOT FOR CONSTRUCTION K:\CHL PRJ\015016 Clt� of Ch,,I,tt,\ Plans Prepared BY: Kimlep0orn NC LICENSE NO. F-0102 (D 2017 200 South Tryon Street, Suite 200 Charlotte, North Carol:ns 28202 'itew.: 1704) 333-5 3, AN d— 0 (RAMJOM- CAD FILL PA III c z C) z 20 STREAM PLAN AND PROFILE Gin, Sh— S,t-C.... Ch,-tt, T,all L—t:27 NJM PKEPARLD BY ROCK CR rLEV=575.8 SS VANE &D APPRO�LD BY STREAm PLAN AND PROFILE 09/01/2016 DA I V A,,il 19. 2017 063:44— I—T-Ahl P1 MM -All RIFFLE ELE =575.7 .-30"MAX—] ROCK CR=S VANE SHEL 1 27 CROSS CHARLOTTE TRAIL 015016166 JOB NO, AS NOTED SCkl-!, SET NOT FOR CONSTRUCTION K:\CHL PRJ\015016 Clt� of Ch,,I,tt,\ Plans Prepared BY: Kimlep0orn NC LICENSE NO. F-0102 (D 2017 200 South Tryon Street, Suite 200 Charlotte, North Carol:ns 28202 'itew.: 1704) 333-5 3, AN d— 0 (RAMJOM- CAD FILL PA III ol 70 �-t,d B,Str,,,. STREAM PLAN AND PROFILE Gin, Sh— S,t-C.... Ch,-tt, T,all L—t:27 NJM PKEPARLD BY 'PROGRESS — GD CTILCKLO BY - &D APPRO�LD BY STREAm PLAN AND PROFILE 09/01/2016 DA I V A,,il 19. 2017 063:44— I—T-Ahl P1 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg I \04-CADD\02-PLANS\44-Y4- GRADING PLAN.dwq 28 Apr 19, 2017 5:14p� by, Cina.St,cg�-- --- .. --I. t�Vwr w, �­, ., —. 1, ht— wly � - A-Ift W- Wd dWt I, — It M, VV -d R-. .1 - ­,­ -­ . 111, ft-- �­ ­­ -h-.- .1 ­(.- ly A—.-. - Id. 1� �11— -111Y t. CV Fn nI SHEE 1 28 CROSSCHARLOTTE TRAIL 01501816 1111-117-- AS 10T- PROGRESS SET NOT FOR CONSTRUCTION PN- Pr�pa,d B, KimlerMorn NC LICENSE NO. F -0102 C) 2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 0 CHARLOI'M or 70 Y4 -GRADING PLAN NJM — GO 77 1' —1 �� I -IJ: JLD /01/2016 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg I \04-CADD\C2 -PLAN S\4 5 CONSTRUCTION ACCESS PLAN.dwq CA -1 CROSS CHARLOTTE TRAIL —.1. t-Itt. --I. I It.— II.—d —M, I� M hl—t If -11, 11 —1.4 �Iy II, th, V-11 p ­I d dl- I� It p1-4 A- th,� -.t .-W-1. t1d -L.— ly—wt-H. NO OAIE BY DUKRIPHO, Mtn PtriIp—d By: Kimley*Horn Nc LICENSE NO. F-0102 (E) 2017 200 South 'I'ryon Street, Suite 200 ll,,I,lt,, North C .. 2111111 "Lf_, CHARLOYM > (�DHILP�Hl 0 OF 70 CONSTRUCTION ACCESS PLAN NJM 'PROGRESS I IIII(IL-1 — bon JLD IPPIWILLIBY 1 09 /01/2016 DAIL , I m 0 > 0 nI 0 .40,�,,ANN' 0 m '0 n 0 Z z F > z a 0 A to to m z m �z M, 0 z M I I > noz 0 0 2, z .0 0. ozon �g 0 0 > x z 0 > 0 tlo"�QAIGO 0 m z z N 'po I In > 0 z '). '00 0 z N z 0 0 z z z a _j mz > 0 0 z . P, c g , -I, � '01 ZO- no, 00 00 P rn .0. �z z, rri �m 0 z�z 1XI 0 x > x to n o ntmo m 'o . z ZO z z z to o � 8 A 71 z 0 A K I, R M > I r.1 0 z E: Im 0 C, _0 000 Moz 0 z 0 SHLL 1 CA -1 CROSS CHARLOTTE TRAIL 015016189 "M No AS 1401- I ',t - SET NOT FOR CONSTRUCTION NO OAIE BY DUKRIPHO, Mtn PtriIp—d By: Kimley*Horn Nc LICENSE NO. F-0102 (E) 2017 200 South 'I'ryon Street, Suite 200 ll,,I,lt,, North C .. 2111111 "Lf_, CHARLOYM (�DHILP�Hl OF 70 CONSTRUCTION ACCESS PLAN NJM 'PROGRESS I IIII(IL-1 — JLD IPPIWILLIBY 1 09 /01/2016 DAIL Z vlq ..... I-- p- - . ..... PAVEMENT MARKING SYMBOLS THERMOPLASTIC (LEFT TURN ARROW, 90 MILS) (SEE CDOT STANDARD ARROW SPACING DETAIL) THERMOPLASTIC (RIGHT TURN ARROW, 90 MILS) (SEE CDOT STANDARD ARROW SPACING DETAIL) THERMOP STIC (COMBO. STRAIGHT & RIGHT TURN ARROW, 90 MILS) THERMO STIC (COMBO. LEFT/RIGHT/STRAIGH ARROW, 90 MILS) THERMOPLASTIC (ALPHANUMERIC CHARACTER, 120 MILS) BIKE SYMBOL PER -MUTCD FIGURE 9C.3 BICYCLE PAVEMENT MARKING - HELMETED BICYCLIST SYMBOL MUTCD 9C-3 GRAPHIC SCALE IN FEET o la 20 40 cu u u E-4 z 0 Of 1-- z 0, Qf p 0 J:4 0 Z U cn 0 u 0 r EROSION CONTROL SEDIMENT AND EROSION CONTROL PROCEDURES STORM DRAINAGE NOTES CONSTRUCTION SEQUENCE I- THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WTNI THESE PLANS ON ACCORDANCE NTH APPLICABLE NCOEMUO EROSION AND SEDIMENT CONTROL REGULATIONS 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE NTH THE MM114 CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. U . S. DEPARTMENT OF AGRICULTURE. AND U.S. SOIL CONSERVATION SERVICE 6 REGULATIONS. 3. ALL CONSTRUCTION WORK SH BE IN COMPLIANCE NTH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE SANNAMON SYSTEM (NPDCS) STORM WATER GENERAL PERMIT 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL ER 04 CONTROL MWES AND STRUCTURES 0', TO MINIMIZE EROSION. THE CONTRACTOR SH MAINTAM CLOSE CONTACT NTH THE NCOEMLR EIMCN CONTROL INSPECTOR SO THAT PERIODIC 14SPEC71ONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5. APPROVAL OF MS PLAN IS NOT' AN AURMORGATION TO GRADE ADJACENT PROPERTIES MEN FIELD CONDITIONS WARRANT OFF-STE GRAC'mr, PERMISSION MUST 13E OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTACT PROJECT ENGINEER AND PROJECT OM13N CONTROL INSPECTOR TO ENSURE ADDITIONAL ERKISCIN CONTROL MEASURES ARE INSTALLED PRIOR TO Off-STE GRADING. 6. EROSION AND SEDIMENT CON MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RUJDCA70 MEN AND AS NECESSARY, AND SMALL BE 04EQCED AFTER EVERY RAINFALL SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED. RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A 004SE STAND OF GRASS. 7 STABIJUTIM IS THE BEST FORM OF EROSMI CONTROL ALL DISTURBED AREAS MICH ARE HOT OTHERWSE SrABIUZED SHALL BE TOP SOLED AND SEEDED. TEMPORARILY OR PEIN Y IN ACCORDANCE WTH THE NORTH CAROLINA SEDIMENT CON- REGUI A71ONS PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REOURED PRIM TO PROJECT COMPLETION AND ACCEPTANCE & CONTRACTOR SHALL PROVIDE GROUND CaVER ON EXPOSED SLOPES WTHIN 14 CALENDAR DAYS FOLLOW14C COMPLETION OF MY PHASE OF GRAONIG. PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WTHIN 14 CALENDAR DAYS FOLLOWING COMPLE" OF CONSTRUCTION. SOL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WTHIN 14 DAYS AFTER FINAL STE STAIWJZATIOM OR AFTER THE IEMPMARY MEASURES ARE NO LONGER NODDED. TRAPPED SEDIMENT AND THE DISTLREED SOL AREAS RESLLT94G FROM THE OtSPOSITION OF TEMPORARY MEASLIRES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSON AND SEDIMENTATION. 10. WHERE SMWE14T IS TRANSPORIED ONTO A PAVED OR PIJBUC: ROAD SURFACE. ACE SH THE ROAD SURF ALL BE CLEANED THOROUGHLY AT THE 00 Of EACH DAY. SEDIMENT SMALL BE REMOVED MOM THE ROADS By SNCVO� OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS ROWYED IN THIS MANNER. 11 WHEN A CRUSHED STOW CONSTRUCTION ENTRANCE HAS SEEM COVEIIED NTH SOIL M HAS BEEN PUSHED ONTO THE SOL By CONSTRUCTION TRAFFIC, IT SHALL BE FIEPLACED NTH A DEPTH OF STONE EQUAL TO THAT OF THE ORDINAL APPLICATION- 12- ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INITFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 1.1 DURING CONSTRUCTION OF THE PROJECT, SOL STOCKPILES SHALL. BE STABILIZED OR PROTECTED WTH SEDIMENT TRAPPING MEASURES. THE APPUCMT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABIOU TION OF ALL SOL STDCWILES ON STE AS WELL AS SOL INTENTIONALLY TRANSPORTED FROM THE PROJECT STE GRADING THE CONTRACTOR IS RESPONSIELE FOR THE LOCATIM AND PROTECTION OF ALL EXISTING UTILITIES MINING 5 CONSTRUCTION- AT LEAST 48 HOURS PRIOR 70 ANY DEMOLITION. GRADIMC� OR CONSTRUCTION AcnmTY THE E CON CTUR SHAUL- NOTIFY THE NORTH CAROUNA, ONE -CAUL UTILITIES AMON SERVICE AT 1-aOO-632-4949 . FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THIE PROJECT STE 7 % U - 2. CONTRACTOR RESPONSIBLE FOR THE REPAIR AND RFPLAMIENT OF MY UTILITIES. 01,16to * GUTTER. PAVEMENT. b IS lom a LANDSC�G. EYC. THAT MAY BE DAMAGED DURING CONSTRUCT . DAMAGED ITEMS SHALL BE REPAIRED TO AT a LEAST THE DUALITY OF WORKMANSHfP FOUND IN THE ORIGINAL ITEM. 3, ALL AREAS SMALL BE GRADED FOR POSITIVE MANAGE. 4. CONTRA IS RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES 940M Z, ON THE APPROVED PLANS FOR THE DURATION OF CONSTRUCTION OR UNTIL F14AL INSPECTION AND APPROVAL IN ORDER TO ENSURE PROPER DRAINAGE. MAINTAIN A MININUM 0.50% SLOPE ON THE CUREL 6 TO. S. BOULDERS IN THER 0 ALL MATERIALS USED FOR FILL OR BACK -FILL SHALL BE FREE O� WOW. ROOTS. ROCK My 0 NON-COMPACTAELE SOL TYPE MATERIAL UNSATISFACTORY MATERIALS ALSO INCLUDE MAN-MADE FILLS REFUSE DEBRIS DERIVED FROM MY SOURCE. 0 7. ALL CONTOURS AND SPOT ELEVATIONS REFLECT M94ED GRADES. REFER TO THE PAVEMENT CROSS-SECTION DETAILS TO ESTA13LJSH THE CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATION& 0 & ALL CONTOURS ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY T14E CONTRACTOR PRIOR TO 0 GROUND BREAKING. OIL CONTRACTOR SHALL SUM NEW EARTHWORM SMOGTHLY TO TRANSTICH BACK To EXISTING GRADE 10, THE LIMITS OF CLEARING SHORN ON THE GRADING AND EROSION CONTROL PLAN IS BASED ON THE APPROMATE CUT AND FILL- SLOPE LIMITS. OR 07HER GRADING REQUIREMENTS. 11. &OPES SHALL BE GRADED NO STEE!" THAN 2:1. 1Z INSPECTORS COMEINAIIE ALL CURB AND STREET GRADES AT INTERSECTIONS NTH THE CITY OF CHARLOTTE ta ALL oEms mom CLEARING oPENATxws SMALL BE DISPOSED OF OR A LEGAL MANNER. 14. SIDE TREAM TOP ANN HAUL ROADS USED DURING CONSTRUCTION SHALL BE our THE s OF B TO THE EXTENT -b POSSIBLE. HAUL SHALL FOLLOW THE NATURAL CONTOURS OF THE TERHM, IF POSSIBLE. A 6' COURSE OF u 1 15 STOOME SHALL BE SPREAD OVER HAUL ROADS IN AREAS THAT ARE SUBJECT 70 NET CONDITIMS PROVIDE SUBSURFACE MAINS IN SEEPAGE AREAS OR SEASONALLY WET < GROUND STABILIZATION t)RSQL STABILIZA ON SHALL BE ACHIEVED ON ANY AREA OF A STE MORE LANG-OMURGING ACTIVITIES HAVE TEMPORARILY T PERMANNTLY CEASED ACCORDING TO THE FOLLOWING SCHEOULE. 1) ALL PERIMETER DIKES. SWAUES. DITCHES. PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORUEORTAL TO I VERTICAL (3:1) SHALL BE PROVIDED TEWF�ORMY OR PERMANENT STABILIZATION NTH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 1) ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPaWY OR PERMANENT STABILIZATION WFH GROUND COVER AS -U SOON AS PRACTICABLE BUT ON MY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LANO-D[STUREWIG ACTIVITY. j4Z'�'.IIDITIONS - IN MEETING THE .... ..IS ABOVE 11. DR ..S 1) EXTENSORS OF TIME MAY BE APPROVED By THE PERMITTPIG AUTHORITY BASED ON WEATHER OR OTHER SIE -SPECIFIC CONDITONS THAT MAKE COMPUANCE IMIRR.ACTICIABLE. ALL SLOPES 50. ON LENGTH OR GREATER SHALL APPLY THE OINKING COVER "THIN 7 DAYS EXCEPT MEN THE SLOPE UNDCOVER IS FLATTER THAN 4--l- SLOPES LESS THAN 50 94ALL APPLY GAV VATHIM 14 DAYS EXCEPT MEN SLOPES ARE STEEPER THAN 11. THE 7 DAY -REQUIREMENT APPLIES. M) My SIWED AREA FLATTER THAN 4A SHALL BE EXEMPT FROM THE 7 -DAY GROUND COVER REQUIREMENT. 11) SLOPES 10' OR LESS ON LEN IN SMALL BE EXEMPT FRON THE 7 -DAY GROJMO COVER REQUIREMENT EXCEPT MEN THE SLOPE IS STEEPER THAN � I. ALTHOUGH STABILIZATION IS USUALLY SPECIFIED AS GROUND COVER. OTHER METHODS, SUCH AS CHEMICAL STABILIZATION, MAY BE ALLOWED ON A CASE-ETY-CASE BASS 10 FOR PORTIONS (IF PROJECTS W7HIM 7ME SEDIMENT CONTROL COMMMSSION-DEFINED 'HIGH QUAjJTY WATER ZOW (15A NCAC 0� 0105) , STABILIZATION NTH GROUND COVER SHALL BE ACHIEVED AS SCON AS MACTICABLE OUT ON My EVENT ON ALL AREAS, OF THE SITE WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACT. PORTIONS OF A STE THAT ME LOWER IN ELEVATION THAN ADJACENT DISCHARGE LOCATIONS AND ARE NOT EXPECTED TO DISCHARGE DURING CONSTRUCTION WAY BE EXEMPT FROM THE TEMpDRANY GROUND COVER BEGUIFtEMERTS IF IDENTIFIED ON THE APPROVED E&SC PLAN OR ADDED BY THE PERMITTING AUTHORITY. 1- MIOR TO CUEAINNG AND EARTHWORK ACTIVITIES. THE CONTRACTOR SHALL OBTAIN AN MPROVED GRADING PERMIT FROM THE NCOEMLR INSPECTOR AND THEN INSTALL ALL ERG" CONTROL DIVACES SPECIFIED AND AS INDICATED ON THE DRAY04M DURING EACH PHASE OF STE CONSTRUCTION THE CONTRACTOR SMALL ADJUST. RELOCATE ANO/M REINSTALL AS APPLICABLE ALL EROSION CONTROL DEVICES AND SEDIMENT DISCHARGE FROM THE SITE, - Z SLT FENCE AND TREE PROTECTION FENCE SMALL BE MAINTAINED MaND THE PERIMETER OF ALL EmTHWM,, AREAS TO PREVENT SIEDMINT TRANSPORT ONTO ADJACE14T PROPERTIES, AS APPUCABLE 3. SLT FENCE n BARRIERS SHALL BE INSTALLED AND MAINTAINED UNTIL CONSTRUCTION M COMPLETE AND LANDSCAPING IS INSTALLED. 4 THE CONTRACTOR SHALL IMMEDIATELY CLEM UP AND REPAIR ALL SRO" DAMAGE AFTER DISCOVERY AND REINSTALL ADEQUATE CONTROL MEASURES AS NECESSARY TO PREVENT REOCCURRENCE OF DAMAGE ALL SEDIMENT CONTROL MEASURES S14ALL BE INSPECTED AT LEAST MOE EVERY SEVEN CALMMAR DAYS AND AFTER ANY STOW EVENT OF GREATER THAN 0.5 WHES OF PRECIPITA11014 DURING ANY 24 HOUR PERIOD. ALL SEDIMENT CONTROL FEATURES SMALL BE MAINTAINED UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. S. STABILIZATION MEASURES SHALL HE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE STE HAS BEEN TEMPORARILY 13R PERMANENTLY CEASED. 7. CONSTRUCTION POINT OF ACCESS TO LIMIT DEPOSTS OF EARTH AND OTHER HAULED MATERIALS ONTO THIE ADJACENT LOT. THE CONTRACTOR SHALL ROUTINELY CLEM ALL SEDIMENT DEPOSITS AND DEEIRS FROM ROADWAY AS THEY OCCUR MAINTENANCE PLAN I ALL EROSION AND SEDIMENTATION CONTROL DEVICES WALL BE 04ECKED BY THE CONTRACTOR FOR STABILITY AND OPERATION FULLOV84C EVERY RUNOFF PRODUCING RAJNFALL BUT IN NO CASE LESS THAN ONCE EVERY WEE)L MY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2- MAINTAIN EROSION CONTROL DEVICES AS FOLLOW. TEMPORARY - T FENCE- REMOVE SEDIMENT QUIDS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. AVOID UNDERIMING THE FENCE. 110,11PORAFlY CHEM DM- REM SEDIMENT ACCUIMULARDN BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION. ADD STONE TO BANS AS NEEDED TO MAINTAIN DESIGN HEIGHT 0 CROSS SECTION. VM NIMAE PROTECTION- REM VE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR INSPECT TEMPORARY DIVEIISIONS ONCE A WEEK AND AFTER EVERY RAINFALL IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSON RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PR07ECTED IS PERMANENTLY STABILIZED. REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND. 3- ALL GRADED AREAS 401 BE SEEDED. FlDtTKJZED AND MUIJ0*3) ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A MGOROUS. DENSF VEGETATIVE COVER WITHIN FOURTEEN (14) DAYS OF COMPLETION 13F MY PHASE OF GRADING. IF WOW ON THE PROJECT CEASES FOR MORE TH THE AFOREMENTIONED LENGTH OF TW ALL DISTURBED AREAS SHALL HAVE TEMPORARY VEGETATIVE GROUND COVER ESTABLISHED AND EROSION CONTROL DEVICES MAINTAINED. �CCNTACT FOR MAINTENANCL JOE FREY (704) 33&-5776 (CITY PROJECT MANAGER) GA13E DOBBS (704) MlIL-7NOB (CONSULTANT) SEEDING SCHEDULE AND SEEDBED PREPARATION SEEDING SCHEDLX F I- SEED. MULCH. AND FERTILIZE AREAS ACCORDING TO THE CITY OF CHARLOTITE LAND DEVELOPMENT STANDARD 30-178 (SEE SHEET EC -2), z PROTECTIVE MUST BE MABUSHEO ON ALL DISTURBED AREAS, GRADED SLOPES. AND FILLS WTHIN 14 CALENDAR DAYS AFTER LAM DISTUREING ACTIVITY IS COMPLETED OR HAS TEMPORARILY CEASED. - PREPARADON I- GRADED SLOPE AND FILL - THE ANGLE FOR GRADED SLOPES AND FILLS SHALL 13E NO GREATER THAN IHE ANGLE MICH CAN BE RETMNED BY VEGETATIVE COVER OR OTHER ADEQUATE ERDSOIN CONTROL DEVICES OR STRUCTUItES. IN My EVENT. SLOPES LEFT EXPOSED SMALL WITHIN 14 WORKING DAYS OF COMPLETION OF MY PHASE OF CRADINGw BE PLANTED OR OTHERWISE PROVIDED VATH GROUND CDVER. DEVICES. OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 2- GROUND COVER - WHENEVER LAW OMMRSING ACTIVITY IS UNDERTAKEN ON A TRACT CONIMTSING MORE THAN ONE ACRE. IF MORE TH ONE CONTIGUOUS ACRE IS UNCOVERED. A GROUND COVER SUFFICENT TO RESTRAIN EROSION MU BE PLANTED OR OTHERWSE PROVIDED NIHON 14 WORNING DAYS ON THAT PORTION OF THE MACY UPON MICH FURTHER ACTIVE CONSTRUCTION 15 NOT BEING UNDERTAKEN. 3- SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO THE PLANS. 4. AREAS TO BE SEEDED SHALL BE RPM MID SPREAD WITH AVAILABLE TOPSOIL 3- DEEP. TOTAL SEEDBED, PREPARED DEPTH SMALL 13E e TO r DEEP. 5- LOOSE ROCKS, ROOTS. AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE 50 THAT YWY WILL NOT INTERFERE NTH ESTABUSHMENT AND MA14TENANCE OF VIEGETATION. SURFACE FOR FINAL SEEDBED PREPANATION. AT FNisH GRADES sHom. SMALL BE REASONABLY smaori AND UNIFORM. S. OF NO SOIL TEST IS TAKEN. FERTILIZER AND LINE SMALL BE ACCORDING TO SEEDING SPECIFICATIONS. 7. IF SOL TEST IS TAKEN, PROVIDE UME AND FERTIUZER ACCORDING TO THE SOL TEST REF"T. 8. LANE AND FERILM SMALL 13E APPLIED UNIFORMLY AND MIXED NTH THE SOIL DURING SEEDBED PREPARATION. 1. ALL STORM MANAGE PIPE WTHIN PUBLIC ROAD RIGHT-OF-WAYS TO BE CLAM 9 RIONFOIRCED COINCRETE PIPE PER NCIDOT STANDARDS. UNLESS OTHERWISE NOTED. FLARED END SECTION INVERTS ARE SET AT OR SLIGHTLY BELOW EXSTINC GRADE. VERIFY ELEVATIONS IN FIELD PRIOR TO CONSTRUCTING PIPE SYSTEMS. A MINIMUM GRADE OF G -W% SHAL- BE MAINTAINED ON ALL PPES. 4. PIPE LENGTHS INDICATED ON PLANS ARE APPROXIMATE MLy. & ALL INLETS MUST BE PROTECTED AT THE CLOSE OF BUSINM EACH DAY. B. NO PIPES ARE TO BE INSTALLED AM LEFT OPEN OVER NIGHT ALL PIPE WORK MUST BE CLOSED AND PROTECTED AT THE CLOSE OF BUSINESS EACH DAY. 7. SUBSURFACE DRAINAGE FACILITIES MAY BE REGUIRED IN THE STREET fN;HY-.OF-WAy IF DEEMED NECESSARY gy THE INSPECTOR. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY 13E OP84ED AT ONE TIMIE. 2. EXCAVATED MATERIAL 94ALL BE PLACED ON THE UPHILL ODE OF TRENCHES IOL EFFLUENT FROM DENATURING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVIM ON BO . AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS M OFF-STE PROPERTY 11. MATERAL USED FOR BACK-FILUNQ TRENCHES SHALL BE PROPEFLY COMPACTED IN ORDER TO MINIMIZE EROSION AND FIM01E STABlU7ATKN. IZ RESTABOUZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL MEDULATIONS. 11 APPLICABLE SAFETY REGULATIONS SHALL. BE COMPUED NTH. 14.1CONTRACTOR SHALL. BE RESPONSIBLE FOR OBTAINING AN EROSION AND SEDIMENTATION POUT FROM THE MONTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NA71JRAL RESOURCES FUR MY NEW Off-STE BORROW AREA. THE CONTRACTOR MAY USE AN EXISTING 8ONR(DW AREA PROOl THAT IT 15 CURRENTLY PERMITTED UNIXER THE SEDIMENTATION POLLUTION CONTROL ACT OR THE MINING ACT. GENERAL EROSION CONTROL NOTES I. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT MAST ONCE A WEEK OR AFTER EACH RAINFALL EVENT. AND RETAUR IF NECESSARY, TO ENSURE THAT ALL DODSON CONTROL MEASURES ARE FUNCTIONING PROPERLY Z STABILIZATION OF DISTURBED AREAS SMALL PROGRESS VAIN PIPE INSTALLATION. AT NO TIME SHALL PIPE INSTALLATION PROGRESS MORE THAN WO FEET AHEAD OF FINE GRAOING� SEDONG. AMID MULCHING OPERATIONS. 3. THE CONTRACTOR SMALL MAINTAIN STORM DRAINAGE DURING PIPE INSTALLATION. 4. DISTURBED AREAS "THIN THE UNITS OF CONSTRUCTION 94ALL BE GRADED DAILY TO PREVENT PONDING OF STORM WATER FIUNCFF AND UNNECESSARY SOL ER�. 5. THE ROADWAY CUT SHALL BE BACKFILUED AND STABILIZED AT THE END W EACH WORK DAY NTH STONE MATERIAL, AND GRADED TO MATCH NORMAL GUTTER LIVE ELEVATIONS AND SLOPES 90 THAT NORMAL DRAINAGE WILL BE PROVIDED. THE CONTRACTOR SMALL BE SOLELY RESPONSIBLE FOR LOCATKNI AND PROTECTION OF EXISTING ABOVE AND BELOW GROUND UTILITIES AND STRUCTURES. MY AND ALL MAINS OR INDIVIDUAl. SIERVICES DAMAGED DURING CONSTRUCTION SMALL 13E REPAIRED AT NO ADDITIONAL COST TO THE OWNER, 7. SECLXtE EXISTING SANITARY SEWER DURING TRENCHING AND BACKFILLING OPERATION. B. SEEDING AM MULCHING IS REQUIRED FOR ALL DISTURBED AREAS. 9. THE CONTRACTOR SHALL NOTIFY CHARLOTTE-MECKLENBURG UTOUTY DEPARTMENT AND PIEDMONT NATURAL GAS COMPANY, INC. PRIM TO EXCAVATING AT OR NEAR SEVIER MMN% WATER MAINS. AND GAS MAINS. IO_ WHEN EXISTING FIENCIES ARE MOVED DURING CONSTRUCTION. THE CONTRACTOR SHALL. SECURE Pm WITH TEMPORARY FENCING UNTIL PERMANENT FB40NG IS RESET. 11. THE CONTRACTOR IS TO MAINTAIN CONTONUOUS SANITMY SEWER FLOW AT ALL EXISTING SANITARY SEV43M IZ THE CONTRACTOR IS TO MAINTAIN CONTINUOUS WATER SERVICE TO ALL RESIDENCES. :-� ANY STOCKPILING OF SOIL ON PAVED SURFACE SHALL HAW SAND AND OR ROM SCREENING UNDERNEATH MWA 4. CON'TRACTOR IS RESPONSIBLE FOR AMENDMENTS TO PLAN FOR ADDITIONAL AREAS FOR STAGING PUWOSE. SUCH AREAS WILL BE STABU2ED 15. THE OMTR SHALL HOT BEGIN WORK THAT CANNOT BE STABILIZED BY THE END OF THE NORIO DAY AND SH HOT LEAVE ANY STORM DRA04AGE PIPES OPEN OVERNIGHT PIPES MUST BE CLOSED AND PROTECTED BY THE ENID OF THE NORIO( DAY. 16- ALL EARTH MI)VING EQUIPMENT SHALL BE SERVICED PRIOR WOW COMMENCING EACH DAY. EQUIPMENT 94ALL BE MAINTAINED TO PREVENT FUEL OIL AND LLARCAKY 15PILLS IN THE VICINITY OF A STREAM. 17. PERMANENT VEGETATION SHALL BE INSTALLED IN CQHFJN NTH TEMPORARY SEEDING IF CONSTRUCTION OCQURS DURING THE SPECIFIED W -45M IN THE VEGETATION PLANS AND SPECIFICATIONS. IF NOT. PERMANENT VEGETATION SHALL BE PLANTED DURING THE SPECIFIED SEASON. I& CON ACTOR IS TO USE NO. 57 STOW VIM STONE IS REFER84CM FOR ALL SEDIMENTATOM AND EROSION CONTROL DETAILS 19. ADDITIONAL EROSION CONTROL ME.ASURES AND CONSTRUCTION ENTRANCES/lENOTS MAY BE REQUIRED BASED ON FIELD CONDITIONS. 20. INLET PROTECTION IS REOUIRED FOR ALL PHASES OF THE PROJECT AND UNTIL THE DISTURBED AREA IS FULLY STABILIZED. CONSTRUCTION SEQUENCE: THE FOLLOWING CONSTRUCTION SEQUENCE IS FURNISHED AS A GENERAL GUIDE FOR PREPARATION A SEQUENCE OF CONSTRUCTION EVENTS ADDITIONS. DELEVONS. AND M0OWXATK)MS SHOULD BE MADE AS APPROPRIATE. PHASE t I 1. CONTRACTOR TO OBTAIN GRADINGMICSION CONTROL PLAN APPROVAL MOM NCDENIUL z THE CON SHALL SET UP AN M-STE PRE-CONSTORICTION CONFERENCE NTH MCOEMLR EROSION CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO My LAND DISTURBING ACTIVITY IS A VIOLATION AND IS SU3JECT TO FIRE. I CONTRACTOR TO MMNTMhI ALL EXISTING EROSION CONTROL FEATURES AND INSTALL SILT FENCE. INLET PROTECTION. SEDIMENT BASINS. DIVERSION DITCHES. AND OTHER MEASURES AS 940M M PLANS. CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 1� c 4. SCHEDULE AN ON-STE WSPEC71ON BY NCOEMLA INSPECTOR. MEN APPROVED. INSPECTOR ISSUES THE GRADING PERMIT AND CLEAF04C AND GRUBBING MAY BEGIN. 5, THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL ON" CONTROL DEVICES AND STRUCTURM w z a. THE CONTRACTOR SHALL Nor BEGIN WORK THAT CANNOT BE sTA9uzED ey THE ENO OF u THE WORK DAY. u 7. ALL EARTH MONA EQUIPMENT SHALL BE SEIVACIED PRIOR TO WORK COMMENCING EACH DA . EQUIPMENT SHALL BE MAINTAINED TO PREVENT FUEL M. 00 LUBRICANT SPILLS IN THE VICINITY OF A STREAM. B. I'M PH EROSION CONTROL PLANS. CONTRACTOR 34ALL MEET "TH UNISON CONTROL IN CTOR PRIOR TO COMMENCING NTH EACH PHASE OF EROSION CONTROL MEASURES. PHASE � 1. BEGIN EARTHWORK/GRADING ACTIVITIES. BEGIN GRADING OF FILL SLOI-ESL MAINTAIN AND VER CALLY ACOAUST ALL ROCK CHECK DAMS. INLET PROTECTION DEVICES. OITCHE& AND SLT FIENCIE THROUGHOUT GRAOING ACTIVITIES TO MAINTAIN DRAINAGE PATTERNS. CONTRACTOR TO ENSURE ALL EROSION CONTROL MEASURES DO NOT ADVERSELY AFFECT CONSTRUCTABLITY OF PROJECT PER TRAFFIC CONTROL PLANS. 2. AS EARTHWORK ALLOVIS� BEGIN INSTALLING STORN MANAGE STRUCTURES AND PROPOSED DITCHES. AS STORM DRAINAGE IS INSTALLED. CONTRACTOR SHALL PLACE INLET PROTECTION ON ALL STORM STRUCTURES AND REMOVE INLET PROTEC ON WHERE ENISOING STORM DRAINAGE IS REMOVED. NO PIPES SHALL BE LEFT EXPOSED AT THE CLOSE OF BUSINESS EACH DAY. 3. AS WORK PROGRE IN THE AREA MICH CONTRIBUTES STORM RUNOFF TO SEDIMENT BASIN 1. CONTRACTOR SHALL INSTALL MEASURES TO ENSURE THAT SUCH RUNOFF IS STILL ROUTED TO SEDIMENT BASH 1. 4. INUGENTLY AND CONTI OUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MININGE END". THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT VA THE CITY INSPECTOR 50 THAT PERIGOIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5. AS CONSTRUCTION PROGRESSES. INSTALL PERMANENT ERX)SKIN CONTROL MEASURES SUCH AS Rip RAP AMON& VELOCITY DISSIPATORS, CHANNEL UNIERS� GRAVEL BASE C5 COURSE. ETC. E - 6. GRADED SLOPES AND FILLS ARE TO BE PLANTED OR PROVA)ED NTH PROTECTIVE COVER SUFFICIENT RESTRAIN EROSON WITHIN 14 CALENDAR DAYS AFTER E COMPLETION OF MY PHASE OF GRADING. ALL AREAS UPON MICH NO FLNIZER o LAND DISTUREN G ACTIVITY WILL BE UNDERTAKEN ARE TO BE PLANTED OR PROVIDED NTH PROTECTIVE COVER WITHIN 21 CALENDAR DAYS. 6. ALL EROSION CON MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL U.S. DEPT. (IF AGRICUL RE. CITY OF CHARLOTTE EIMSIM CONTROL ORDNANCE. AND THE 'U CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL EHAW-T- F - cn cf) z 1. AS AREAS ARE BROUGHT TO FINISHED GRADE. CONTRACTOR TO INSTALL FINAL pq 0 GRASSING AND STABILIZE ALL SLOPES PER THE EROSION CONTROL NOTES AND C) DETAILS- 1:4 Z CONTRACTOR SHALL COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO o REMOVAL OF EROSION CONTROL MEASLIRIES. 0 z C, w C) 0.4 z CJ u cl) w co� 0 9 u U .. . .. ......... CITY OF CHARLOTTE I LAND Dn"ELOPMENT STMARDS1 TEMPORARY SILT FENCE MlZbOl"t' I INCLUDES CHARLM71 ETJ SECTION NOTES - 1 . $NLEY M,MNTENMYCE SHALL E DOC-NIENICO IN I -ECT LOG ECON. 2. FILTER TYPES � BE APPRONIED BY THE CITY INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMCNIED WEN SITE 15 STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER � SHALL BE REMOVED MON TO STREET ACCEPTANCE AND/OR CLOSE OUT OF GRADING PERMIT. FILTER RINGS SHAUL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6, ALI WS MAY BE INSTALLED IN E,11STING CITY OR NC -T ROADS AS LONG AS S�.. DRA,NA.E 6 NOT K"WED. A -- .MP L: -4_ INSTALLATION SCALE I NOT TO SCALE CITY OF CHARLOTTE LkND D91IMPMENT STANDARDS CATCH BASIN INLET PROTECTION INCLUDES CHARIam ou �;n is I i c 8 A NOTES A STABIUZED ENTRANCE PAD OF 0 WASHED STONE AND RAILROAD BALLAST SHALL BE LOCATED WERE TRAFF1 WILL ENTER M LEA� THE CONSTRUCTION SITE ONTO A FtBUC STNEEE M11ER FABRIC OP COMPACTED CRUSHER RUN STONE SHALL 8 USED AS A BASE FOR THE CONSTRUCTION ENTRANCE_ THE E TFIANCE - BE MAINT�O IN A CONDITION WICH - PR- NT TRACKING OR FLO�G OF �NMENT ONAD BUC STREETS ON EMSTINCI PA�EMENT. NIS MAY REWIRE i;jRIODIC TOP DRESSING MTH ADDITIONAL S AS CONDITIONS �RANT AND REPAIR OR CI-EANWT OF ANY MEASURES USED TO MAP SEDIMENT ANY SEDIMENT -ULEU. DROPPED. WASHED. ON TRACKM ONTO PUSUC STItEETS MUST BE REM- IMMEDIATELY. AMY ACCREGAIIE TRACKED INTO THE RO-Y MUST BE SINEI'T BACK ONSI� ON A HIGH- BASIS. WIN �-RIAT, WEELS MUST BE �ANFD TO REEMOIAE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET MEN ANISHING IS RE RED. IT SHAIJL BE DOME IN AN ARE,I, STABtUZED AN CRUSHED STONE MICH MAINS INTO AN AFPRO� SEDIMENT BASIN SEE SM. I,K, .IUL CDOT MAY REWIRE A STANDARD -ER- I,— ISM 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE Mi -Y 11 ON A TH-CHFARE. -c -11- -C CITY OF CHARLOTTE I 1AND DEVELOPMENT STANDARDS1 STABILIZED CONSTRUCTION ENTRANCE 14fluym (01b I INCLUDES CHARLDWE KIN FOR LATE WINTER AND 5QL_AmLmDmEm: EARLY SPRING: ADLU� R COMMENDA-S OF - TESTS OR APPY 2,00D -B/-E CROUND M-JLTURAL UMESTCHE AND 7SO UB/ACRE 10-10-10 FERTIUZER 120 UP/ACRE 4.DDIII UB/ -E - ANCHOR STRAW BY -'IN. -H ASINALT. NMINC. OR A MU- -NLAL �EZA (KME) - 50 LII/�RE (OMIT ANNUAL - WHEN DURATION ANCHORING TOOL A DISK WN BILADES SU NEARYY SN -NT CAIN BE USED AS A MUWH ANCHORIIG TOO, .1 TEMPORARY �R S NOT 1. BE,DKO 'UNE) M6aT12kMkCE. 1 - MAY 1 REAEW1U E If - IS NOT RESEED, AERTIUZE AND MUUCH IMMEDIATIDLY FO -G FROSIGN UP OTHER DAMAGE FOR SUMMER: F -Ow R -MEN NS OF ML TESTS OR APPLY 2.000 LB/IkCRE "OUNO A-CUILTURAL LIMESTONE AND 750 W/ACRE 10-10-10 FERTILIZER GERMAN MILLET - . ./ACR1 M1210 (A .�l MAY BE - - US RE STRAIII. ANCHOR - BY -K- - -HALT. N -NG. OR A IJUIN SUBSTITUTED AT A RATE OF SO UB/ACRE) A -M..", TOO A DISK WIN BLADES SET NEARLY STRAIGHT CAIN BE USED AS A MUILCH ANCHOR - TOOL MAY I - AUO, 15 II -ENT -E MCNITH 6 NOT AUUY ADEQUATE. RESEW. AVITILDE AND M -H IMMEDIATELY A-IING EROSION OR OTHER DAMAGE FOR FALL: FOLL REODUMENDATIONS OF SOIL - OR APPLY 2.D00 LB/AME MOLND AM-T.JRN- UMESTONE AND LOOD LB/IkONE 10-10-10 AER1HUZER RYE (MAN) - 12. /ACRE hLLak± APPLY 4.0011 -8/AME - ANCHOR � BY TACKINO WN ASP T. NOTTING. OR A MUILDH 5EUXE6-061M IS - DEC ANKNO NO I -L- A DISK - BIADES SET NEARLY STRUKHT CAN HE USED AS A MULCH ANCHORNO MOIL REPAIR AND ­UZ DAMAGED MEAS I -D-1, TOPMESII WITH � W/ACRE OF HITHOCON IN MARCH� IF IT IS NECUEARY TO EKTEHD TEMPORARY CDVtN BEYOND JUNE 15. OVERSCED WITH -8/I,CNE NOBE LESPEOM IN LATE �BRUANY OR -1 MAN - AM AWITONAL 1--� REAL MODANN ­ A-- .. SEDIMENT C- -HO .0 DES- MANUAL I-), I, .,a. AM PERMANI�. -M.O INCLUNNO SEED BED 'HE'. SEASONAL LIMITATIONS AM S�W, OFERAPIGHS. THE KIN C� OF -E, OF FENTLIZEItS. THE KINDS OF SEED, AND THE INUES OF API'UCATION 01` LIMESTONE. FERTU-. AND -D. KIER M NODEM MCPOM MOTION AND E CHARLOAT LANDSCAPE -STRUCTION SDMIDANDS SECTION 0- aIDDIKKI AND --D OF -FMA.. CITY OF CRARIATTE LOD DUELOPMENT S7ANDARDS TEMPORARY SEEDING SCHEDULE ��JJZ, INCLUDES CRARIOM 171 f1m-:711:::71 I Vji 1: �i NO . �21 ID 1-T A A 5, .11, D 0. TM - N. 0 0 11.1 0 M. MN. - 0 o-, Cr'y OF CrLM CONSTRUCTION ENTRANCE LID IEILOPI I STANDARDS I INCLUDES CHIRLD"K Ui TIRE WASH NOTES: D7 ST��BN,CREE — BE PLANNED TO MINIM- NE NUMBER � DAYS OF N.. 2. NE COATRACTOR IS TO OBSURW THE WCAIL MEATHER 1ORCIA—HO NOT 1. THE CHECK ... AT —T THREE — AITHOUT N.6 A.P.1—D. AU NSIU CREEK RED AND BANKS ARE TO BE STABU�A) MON TO THE END OF E ON —K OAI k AM � DER CREEKS. —RUCTON SHOULD OCCUR ON ME OF THE CREEK AT A TIME. NE MST SIDE SHOULD BE S—LIZAI BEFORE BEGINNINO CONSTRUCTION ON THE WPOSITE SIDE. 5. A TUM MARY PIPE OR PUMP MAY BE INSTALLED TO CONTROL CREEK A-- OURN. CU.TNUCTM CONSTRUCT THREE ROCK CHECK DAMS (SM. Mfo) AT 100 FOOT SRAONG UO STREAM FROM THE coa-u-m ZONE W CONOII� AHG PROPERTY RIOHTS ALLOW. CONSTRUCION ZONE , ANK A`x TOP BANK Do, 1w N -ILL E OR COFFERDAM IMMEDIATELY UP - OF THE CONS�.ITON -1 IF GREEK HAS BASE FLOW Crry OF CONSTRUCTION WITHIN CREEK BANK LkND DEVELOPrNTWST%ARDS (FOR USE WITH ROAD CROSSINGS lob 1" 1 INCLUDES CHAP10M ETJ UTILITY CROSSINGS & CULVERT CONSTRIUCTION) TO 0— uF- z D, s E-4 z o C) :D V) z 0 C) Of 0 U- 0 P4 0 z U u rA CC) 0 Zli z I f, 0 1 u Ei E % V 'c 41 TOBY R SEEN I CER PIW 1,75-151-05 0, DB 29906 PIS "I E GRIFFIN v/ DB 24592 PIS 395 5 :-DB19184PG605 _151-04 MO 5 PC 187 D11 4 -41 LOT, OCK 2 MB 5 PG 187 L T 14 BLOCK LIMITS 01� DISTURBANCE (TYP� 7: 'A 0 0 "A _jl - Sl' 04+oo x -LI - STA:99.73-21 MECKLENBURG COUNTY BEGIN ALIGNMENT PIN: 175�173-02 DS 11684 PG 220 MB 5 PIS 215 MECKLENBURG COUNTY LOT 7 BLOCK E PIW175-173-03 D8,11744PIG2055 MBS PG 215 LOT 8 BLOCK E FPROPOSED EROSION CONTROL INFO > TEMPORARY DIVERSION DITCH - — — — — — — - DISTURBED AREA 644 PROPOSED CONTOURS EXISTING CONTOURS "�oo _PF— GREENWAY CONSTRUCTED UNDE SILT FENCE CHARLOTTE TRAIL -CONNECTION TO SEPARATE PROJECT -CROSS CHARLOTTET L�D MOM CONSTRUCTION ENTRANCE MECKLENBURG COUNTY 175 PIN .173-D4 CONNECTION TO PAI tn 0 SHOPPING CENTER ISEE .7 . FILTER BAG INLET PROTECTION CLDSM 30.15 DS 12026 PG 348 RLOTTEPROJECTS12-l" . ..... > ROCK CHECK DAM. TYPE A MB 5 PIS 215 LOT 9 BLOCK E ROCK CHECK DAM, TYPE B BEGIN CONSTRUCTION TIE TO EXIST GREENYVAY s �l �Ll- STA:102-96.41 SO 6outA 0, G 1,3 0", �r 5 MECKLENBURG C 'It, ll"�PG IB 5 B�Oy� BID 13�. OCK gt PIN IT5-IT 06 1229A PG .15, _O tA 8 26531 PG 26 MBS PQ21 02937 PG 177 LOT 6 BLOCK P D DB FPROPOSED EROSION CONTROL INFO > TEMPORARY DIVERSION DITCH - — — — — — — - DISTURBED AREA 644 PROPOSED CONTOURS EXISTING CONTOURS "�oo _PF— TREE PROTECTION FENCE SILT FENCE CHARLOTTE TRAIL -CONNECTION TO SPECIAL SEDIMENT CONTROL FENCE MOM CONSTRUCTION ENTRANCE RIP RAP APRON GREENWAY (-LI-) FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > ROCK CHECK DAM. TYPE A > ROCK CHECK DAM, TYPE B 5LF SHEETS EG -1 THRU EC -2 FOR NOTES AND DETAILS CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. ROPOSED CONTOURS SHOV44 AS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL El EVATIONS P IDO NOT INSTALL FILTER BAG INLETI PROJECTION LIN nL GRADING BEGINS� THAT "LL REQUIRE THE PROTECTION I STABIUZE ALL SLOPES 3:1 AND GREATER WTH MULCH AND SEED AS NOTED IN EROSION CONTROL DETAILS STABILIZE AS SHOVM (UNLESS OTHERMSE NOTED) ON THIS PLAN VATHIN 14 DAYS OF -R EROSION CONTROL NOTES ACREAGE SUMMAiK� PROJECT DISTURBED AREA ±1 0.69 ACRES GRAPHIC SCALE IN FEET 0 10 20 40 0 I 0 U 0 P4 u R. z E z E_ PQ o cf) C) :w) cf) cn U) z 0 0 0 F_ u P4 0 �2 z .1 z 0 z 0 u z 0 rn 0 LCONCRETE PAVING WORK ONLY THROUGH STA 104-50 AS PART OF THIS PROJECT� ALL OTHER WORK SHALL BE "�oo PERFO"ED UNDER CROSS CHARLOTTE TRAIL -CONNECTION TO PROPOSED12 PARKROAD SHOPPING CENTER (SEE CHARLOTTE PROJECT 512_1"15) GREENWAY (-LI-) s �l K, 0, HOLDINGS. NC IN 175-181-01 8 26531 PG 26 02937 PG 177 I 0 U 0 P4 u R. z E z E_ PQ o cf) C) :w) cf) cn U) z 0 0 0 F_ u P4 0 �2 z .1 z 0 z 0 u z 0 rn 0 as 9 GRAPHIC SCALE '. FEET 0 10 20 40 PROPOSED EROSION CONTROL INFO —> —>' — TEMPORARY DIVERSION DITCH - — — — — — — - DISTURBED ARE -644— PROPOSED CONTOURS EXISTING CONTOURS . . .... . ..... _PF— TREE PROTECTION FENCE //— //— SILT FENCE ZZSPECIAL SEDIMENT CONTROL FENCE 9290= CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > — ROCK C.ECK DAM. TYPE A > > — ROCK CHECK DAM, TYPE B SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS -Ali jco�ls 5 u u Z at E- Z: o U :D U) 0 c) Lo� 0 d_5 ILI CONTRACTOR To INSTALL IMPERVIOUS DIKES ALONG THE 0 STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3: 1 AND GREATER WTH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOYM As EROSION CONTROL DETAILS U u ILLUSTRATE z APPROXIMATE ONLY TO SEE CROSS STABILIZE AS SHO_ (UNLESS OTHERVASE 0 GENERAL FLOW PATHS. NOTED) ON THIS P ISECTIONS FOR ACTUAI El EVATIONS LAN WTHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES C 99 9% DO NOT INSTALL FILTER BAG INLET u PROJECTION UN L GRADING BEGINS ACREAGE SUMMARY THAT WILL REQUIRE THE PROJECT DISTURBED AREA PROTECTION *10.69 ACRES U o z -1 5 E PROPOSED EROSION CONTROL INFO > —> ' — TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED AREA 644 — PROPOSED CONTOURS ... . . ........ . ...... . . ........ .. . ........ . ....... . ........... EXISTING CONTOURS —PF— TREE PROTECTION FENCE SILT FENCE 7T SPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > — ROCK CHECK DAM. TYPE A > > — ROCK CHECK DAM, TYP 6 SEE SHEETS EC -1 THRU EC -2 FOR NODES AND DETAILS co 7: 0 -Z DIXON REAL PROPERTIES LP PIN 175-144-02 DO 26944 PG 796 DO 23909 PG 372 DO 23229 PG 224 DO 3963 PG 158 OANAD H JUNG PIN. 175-14403 DO 181 T7 PG 272 E DB 1 6651 PG 806 CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR GEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER WTH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHO EROSION CONTROL DETAILS A USTR APPROXIMATE ONLY TO ILL W7 ASE z GENERAL FLOW PATHS. SEE CROS STABILIZE AS SHOWN (UNLESS OTHERWISE 0 S SECTIONS FOR ACTUAL ELEVATIONS NOTED) ON THIS PLAN VATHIN 14 DAYS OF COMPLETION PER EROSION rA CONTROL NOTES C) 0 DO NOT INSTALL FILTER BAG INLET PROJECTION UNTIL GRADING BEGINS A CREAGE SUMMARY THAT WILL REQUIRE THE PROJECT DISTURBED AREA PROTECTION ±10.69 ACRES , I j i U) n m T A n m C-) PROPOSEDW CONNECTION (-Y3-) SEE SHEET 7 GRAPH FEET IC SCALE IN 0 10 20 40 LITT'LE SUGAR CREEK PROPOSED EROSION CONTROL INFO —> —> — TEMPORARY DIVERSION DITCH - — — — — — — - DISTURBED AREA 644- PROPOSED CONTOURS U EXISTING CONTOURS IAPR PP= TOURS R MATE% , TO ILLUSTRATE STABIUZE AS SHOWN (UNLESS OTHERWISE GENERAL FLOW PATHS. SEE CROSS --p.. COMPLETION PER EROSIDN CONTROL NOTES - SECTIONS FOR ACTUAL ELEVATIONS NOTED) ON THIS PLAN THIN 1 4 DAYS OF ID T IN -ALL nLZ BAG INLET P OX ( U L R CTI )N N 11 NG BEGINS ACREAGE SUMMARY PF— TREE PROTECTION FENCE AT WILL REQUIRE THE PROJECT DISTURBED AREA PROTECT10N *10.69 ACRES SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON U -F- — ILTER EIAG, INLET PROTECTION CILDSM 30.15 ROCK INLET SEDIMENT TRAP > ROCK CHECK DAM. TYPE A ROCK CHECK DAM. TYPE B — -=Ib tU-1 IHNU LC -2 FUR NOTES AND DETAILS co x Lu Lu Go L4 z o 0 Of co U) z pzq 0 0 Of 0 P4 0 z CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL SnU-ING BASINS FOR DIEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER C) I -A z 0 9 E. z NTH MULCH AND SEED AS NOTED IN 0 ED SHOWN AS EROSION CONTROL DETAILS U IAPR PP= TOURS R MATE% , TO ILLUSTRATE STABIUZE AS SHOWN (UNLESS OTHERWISE GENERAL FLOW PATHS. SEE CROSS --p.. COMPLETION PER EROSIDN CONTROL NOTES - SECTIONS FOR ACTUAL ELEVATIONS NOTED) ON THIS PLAN THIN 1 4 DAYS OF ID T IN -ALL nLZ BAG INLET P OX ( U L R CTI )N N 11 NG BEGINS ACREAGE SUMMARY CIO 0 94 u z AT WILL REQUIRE THE PROJECT DISTURBED AREA PROTECT10N *10.69 ACRES U E o I I d.. E � PROPOSED EROSION CONTROL INFO > TEMPORARY DIVERSON DITCH - — — — — — — - DISTURBED AREA PROPOSED CONTOURS EXISTING CONTOURS STABILIZE ALL SLOPES 3:1 AND GREATER PF— TREE PROTECTION FENCE PROPOSED CONTOURS SHOWN AS SILT FENCE zz SPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE NOT INST;.j��Fla� RIP RAP APRON IDO PROJECTION I FILTER BAG INLET PROTECTION CLDSM 30.1 5 THAT WILL REQUIRE THE PROTECTION I - ROCK INLET SEDIMENT TRAP > > _ ROCK CHECK DAM. TYPE A -10— > — ROCK CHECK DAM. TYPE B � Wll�lb L(;-1 INNU LC -2 FOR NOTES AND DETAILS CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL S LLING BASINS FOR DETWATERINC. STABILIZE ALL SLOPES 3:1 AND GREATER WITH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS m—m STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES NOT INST;.j��Fla� IDO PROJECTION I THAT WILL REQUIRE THE PROTECTION I OJECT DISTURBED TREA I - ±10.69 ACRES �4f -4;,r-,Cy4 C-. 0 GRAPHIC SCALE IN FEET 0 10 20 4 =!!!� 0 . ...... .. . ...... . ...... ... -Z, 121 +bd 1221,+00 + m Y PLAC F APARMENTS LL C PIN I T,� 112 12 D6 29369 PG591 D la B 108 PG 296 D13 1 b0 'a PG o GREGORY J FINNICAN 05F DB 10375 PG 736 PIN 175-14�210 DB 9249 PG IT5 4 t z .0 Z, z o U) cn V) z 0 0 0 z zi if i I PROPOSED EROSION CONTROL INFO L-@ TEMPORARY DIVERSION DITCH - — — — — — — - DISTURBED AREA 644 PROPOSED CONTOURS EXISTING CONTOURS z —PF TREE PROTErTIO FENCE SILT FENCE ZZSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS FILTER BAG INLET PROTECTION CLDSM 30.15 STABILIZE AS SHOVM (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF ROCK INLET SEDIMENT TRAP ROCK CHECK DAM. TYPE A > ROCK CHECK DAM, TYPE B — -�Ib LL -1 IHKU LU -2 FUR NOTES AND DETAILS 'IL 294 4" RCP PARKPLACETOW�HOUSESL !7,01F.DIS. R5ANCE,(TYPj DB 5799 PC, 667 CONTRACTOR TO INSTALL L-@ IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. z STABILIZE ALL SLOPES 3: 1 AND GREATER NTH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOVIIN AS U6 EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS STABILIZE AS SHOVM (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF T10N PER EROSION CONTROL NOTES 00 NOT INSTALL FILTER BAG INLET iPROJECTION UNTIL GRADING BEGINS THAT MLL REQUIRE THE PROJECT DISTURBED AREA PROTECTION *10.69 ACRES GRA SCALE IN FEET PHIC 0 10 20 40 E-4 z o PZ U D U) z 0 C) Z 'o 0 z 0 0 U u 0 rA 0 0 9 % u U L-@ z P" U6 Z�m E-4 z o PZ U D U) z 0 C) Z 'o 0 z 0 0 U u 0 rA 0 0 9 % u U 0 E; d E PROPOSED EROSION CONTRO�IN�FO] TE.PORARI DIVERSION DITCH - — — — — — — - DISTURBED AREA e PROPOSED CONTOURS DEWATERING. EXISTING CONTOURS STABILIZE ALL SLOPES 3:1 AND GREATER —PF— TREE PROTECTION FENCE //— //— SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE gogKM CONSTRUCTION ENTRANCE &.1 RIP RAP APRON STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF FILTER BAG INLET PROTECTION CLDSM 30.15 PHILL11PS IN LILC' PIN: 175-131-37 DB 22826 PG 39' DB 22368 PG 415 ROCK INLET SEDIMENT TRAP > — ROCK CHECK DAM, TYPE A DS 22368 PG 4TO DB 9486 PG 235 PROPOSED EROSION CONTRO�IN�FO] TE.PORARI DIVERSION DITCH - — — — — — — - DISTURBED AREA 644 PROPOSED CONTOURS DEWATERING. EXISTING CONTOURS STABILIZE ALL SLOPES 3:1 AND GREATER —PF— TREE PROTECTION FENCE //— //— SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE gogKM CONSTRUCTION ENTRANCE RIP RAP APRON STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > — ROCK CHECK DAM, TYPE A > > — ROCK CHECK DAM. TYPE 8 SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS . CONTRACTOR TO INSTALL IMPER\AOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER NTH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES 00 NOT INSTALL FILTER BAG INLET PROJECTION UNnL GRADING BEGINS THAT WILL REQUIRE THE PROJECT DISTURBED PROTECT10N :� 1 0.69 ACRES CRAP EET HI SCALE IN F 0 IOC 20 40 u Z 11 E- z cl o U U) 0, 00 0 0 0 0 0 z p rA 0 FIR /L PHILLPS SELWYN LLC 017S, OF DISTURBANCE (TYP) PIN 17EV31-37 D6 22826 PG 39 013 22368 PG 4� 5 DB22WPG4 0 D13 9486 PG 235 DD 9426 PG 363 e PHILIPS SELWYN LIC PIN: 175-131-12 GIB 22M PG 393 08 22368 PG 41 � 0822368PG410 DB 9486 PG 235 DI3 9426 PG 363 US 8123PGWa DB 7M PG 726 MS 3 PG 302 LOT 16 (D I *77-�' ".. - "�' – - '_1 .— I 1 -1 - I I I I - .- - - mo rn x i 100 r . . ..... l3c� !�: — m cn x z rn M rn u) ----------- LITTLE SUGAR CREEK PROPOSED EROSION CONTRO INFO FUCHARD Y PACELLA. COLBY — — — — — — — PIN: 17 91951 MCKN 'HT PROPOSED CONTOURS OB ZT776 PG 122 NICHOLSON —PF 0827425 PG 1 88 & SAMUEL D SILT FENCE DO 25603 PG293 NICHOLSON ..Do ?5368 PG 8W PIN:.,175.431-M APPROXIMATE ONLY TO ILLUSTRATEI GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS1 OB 21957 PG 728 DB 16273 PG STABILIZE AS SHO (UNLESS OTHERWISE NOTED) ON THIS PLAN WTHIN 14 DAYS OF 1ON PER EROSION CONTROL NOTES DS 3920 PO 264 571 CLDSM 30.15 M84PG427 'OB,8758 PG 248 > — LOT 1 MB4PG4 7 ROCK CHECK DAM, TYPE B THAT WILL REQUIRE THE LOT 2 PROPOSED12' I PROTECTION GREEN WA Y (-L 1 *10.69 ACRES (D I *77-�' ".. - "�' – - '_1 .— I 1 -1 - I I I I - .- - - mo rn x i 100 r . . ..... l3c� !�: — m cn x z rn M rn u) ----------- LITTLE SUGAR CREEK PROPOSED EROSION CONTRO INFO ��r TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED AREA 644 — PROPOSED CONTOURS :D Elf cf) EXISTING CONTOURS —PF TREE PROTECTION FENCE (o SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATEI GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS1 RIP RAP APRON STABILIZE AS SHO (UNLESS OTHERWISE NOTED) ON THIS PLAN WTHIN 14 DAYS OF 1ON PER EROSION CONTROL NOTES FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > — ROCK CHECK DAM, TYPE A > > — ROCK CHECK DAM, TYPE B SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS CONTRACTOR TO INSTALL ��r IMPERVIOUS DIKES ALONG THE E- z STREAM AS NEEDED AND UTILIZE cn 0 SPECIAL STILLING BASINS FOR :D Elf cf) DEWATERING. z STABILIZE ALL SLOPES 3:1 AND GREATER (o WTH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATEI GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS1 STABILIZE AS SHO (UNLESS OTHERWISE NOTED) ON THIS PLAN WTHIN 14 DAYS OF 1ON PER EROSION CONTROL NOTES DO NOT INSTALL FILTER BAG INLETJ PROJECTION UNTIL GRADING BEGINSI ACREAGE SUMMARY THAT WILL REQUIRE THE PROJECT DISTURBED AREA 1 I PROTECTION 1 *10.69 ACRES DEI 758TPGO, GRAF4iIC SCALE IN FEET 0 10 20 40 e z 's Z czt .9 u �lle c� n w ��r E- z ju cn 0 Lu 1111 z x :] U) :D Elf cf) X Lu L) w II- U) z (o 0 z �Vl I ["PIT, 0 GRAPHIC SCALE IN FEET all 0 10 20 40 PROPOSED EROSION CONTROL INFO > -> - TEMPORARY DIVERSION DITCH - - - - - - - - DISTUR13ED AREA 644 - PROPOSED CONTOURS ............. ... . ................ ...... . . . . ........... EXISTING CONTOURS -PF- TREE PROTECTION FENCE 00 //- //- SILT FENCE SPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP > - ROCK CHECK DAM, TYPE A > > - ROCK CHECK DAM, TYPE B SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS CONTRACTOR To INSTALL IMPER'AOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DIEWATERING. PROPOSED CONTOURS SHOWN AS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS DO NOT INSTALL FILTER BAG INLET� PROJECTION UNTIL GRADING BEGINSI THAT WILL REQUIRE THE PROTECTION I (FRANCISCAN TERRACE CONDOMINIUMS) DO 4383 PG 815 STABILIZE ALL SLOPES 3:1 AND GREATER NTH MULCH AND SEED AS NOTED IN EROSION CONTROL DETAILS STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES ACREAGE SUMMARY PROJECT DISTURBED AREA ± 1 0.69 ACRES I z I - o' 0 + 0 cf) i,— U LU D u) F - LU LLI z x �3 U) cn X LU (o 00 0 z I - o' 0 11 PROPOSED EROSION CONTROL INFO —> —> — TEMPORARY DIVERF40N DITCH — — — — — — — — DAV40 MISENHEIMER & JENNIFER 644 STEVE TAYLOR MISCNHEIMER EXISTING CONTOURS JILL BAINBRIDGE PINW 175-121-35 TREE PROTECTION FENCE PIN # 175-131-M. DB 2TMPG 214 SILT FENCE OB 29089 PG 499 DS 276G9 PG 20 9 08 24679 PG 898� EROSION CONTROL DETAILS 0 , B 22466 PG 443 DB 4451 PG aI0 MB 7 PG 813 RIP RAP APRON �DB 20081 PG357 LOT 4 DB 19628 PG 691 COMPLETION PER EROSION CONTROL NOTES ROCK CHECK DAM, TYPE A PROPOSED EROSION CONTROL INFO —> —> — TEMPORARY DIVERF40N DITCH — — — — — — — — DISTURBED AREA 644 PROPOSED CONTOURS EXISTING CONTOURS —PF TREE PROTECTION FENCE WTH MULCH AND SEED As NOTED IN SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE EROSION CONTROL DETAILS CONSTRUCTION ENTRANCE RIP RAP APRON STABILIZE AS SHOWN (UNLESS OTHERVASE NOTED) ON THIS PLAN WITHIN 14 DAYS OF FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP COMPLETION PER EROSION CONTROL NOTES ROCK CHECK DAM, TYPE A > . ROCK CHECK DAM. TYPE B � —� L— — LU -Z tUK NUTL5 AND DETAILS CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER WTH MULCH AND SEED As NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ONLY To 'LL% GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS STABILIZE AS SHOWN (UNLESS OTHERVASE NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES 00 NOT INSTALL FILTER BAG INLET PROJECTION UNTIL GRADING BEGINS THAT VALE REQUIRE THE ACREAGE SUMMARY PROJECT DISTURBED AREA PROTECTION_ ±10.69 ACRES GRAP EET HIC SCALE IN F 0 10 4p U E - z o cn pq 0 0 C i :;� I 0 0 \1.'TS .1 ..STUR.A.E (Typ)� PROPOSED EROSION CONTROL INFO TEMPORARY DIVERSION DITCH – — — — — — — – DISTUR13ED AREA 544 PROPOSED CONTOURS EXISTING CONTOURS _PF TREE PROTECTION FENCE SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE HELEN H M(OLIAID RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 JU, STIN L GEREN *> — PIN# 17642t�30. — ROCK CHECK DAM. TYPE 8 PIN# 175-121-31 MB 4 PG 4Z7,' THAT WILL REQUIRE THE PROJECT DISTURBED AREA 1 DO 26302 PG 709 PROTECTION 1 LOT 11 AND PART OF *10.69 ACRES D 36 B 2 16 PG 90 LOT 19 08 12041 PG 510 DO 7759 PG 569 DAVID AILENFYSON M84PG 42 7 & SUSAN INGRAM, LOT 1 0 'PINN 175-12T-29 DO 5514 PG 622 MO 3 PG 431 LOTI! & P�IT OF LOT - G? CHARLOTTE PARK ROAD 0 0 \1.'TS .1 ..STUR.A.E (Typ)� PROPOSED EROSION CONTROL INFO TEMPORARY DIVERSION DITCH – — — — — — — – DISTUR13ED AREA 544 PROPOSED CONTOURS EXISTING CONTOURS _PF TREE PROTECTION FENCE SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE APPROXIMATE ON LY To ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVA11ONSI RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP *> — ROCK CHECK DA., TYPE A — ROCK CHECK DAM. TYPE 8 � -Ittib LU -1 INKU LC—Z FOR NOTES AND DETAILS CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER WITH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ON LY To ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVA11ONSI STABILIZE AS SHOWN (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES IDO NOT INSTALL FILTER BAG INLET ROJECTION UNTIL GRADING BEGINS 6rREAGE SUMMARY THAT WILL REQUIRE THE PROJECT DISTURBED AREA 1 PROTECTION 1 *10.69 ACRES PROPOSED 121 GREENWAY (-Ll-) A. STRATFORD VENTURE U -C PINO 175-121.05 DO 29019 PG 89 DO 902 PG 105 DB2266723 PG 47 D: 26 149 1"=;G G 345 MB 4742 PG 190 LOT 2 - 8 BLOCK I A, eel GRAPHIC SCALE IN FEET 0 10 20 40 o v t E'S 'u u 7ff u E- z o C) co z 0 0 0 Z z 0 04 0 04 z 0 U u V) 4 0 u E .9 It. HEATHER MARIE AMIER - > — > — TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED ARE 644 — & JARDINE WILLIAM GEORGE JR . ....... . . . ... . ... . .......... . ... . .. . ..... . ........... EXISTING CONTOURS —PF— TREE PROTECTION FENCE . ........ PIN# 175-121-26 SAM BRAKE JOHN PETERMAN CONSTRUCTION ENTRANCE DB 28896 PG 851 DO 226 7 PG 729 &HUL AEB KF Y RA PtN# 175-121-25 JENNIFER REESE ROCK INLET SEDIMENT TRAP *> — DO 12160 PG 884 DB PG 506 OB 29353 PG 580 PIN# 175-121�24 DO 12503 PG 268 10946 DB 0094 PG 292 OB 25967 PG 404 DO 8469 PG 608 WILL" L WALL] 08- 0059 PG 997 08 254 3 PG 988 MS 3 PG 431 N, D&B32S PG 245 D5 22977 PG 533 DB 2W8 PG 137 LOT 12 a LOT 13 BLOCK 1 PIN# 175-121-23 DB 20423 PG 408 ELIZABETH HICKS PILYtEf;� Z,4f b,'f OB 6197 PG 168 MB PG431 DO 1 8290 PG 242 k JEFFREY..REID PLYLER PIN# 175-Ul-22 MB3PG43l LOT W BLOCK 1 Do 1 '944 PG "6 IDS 12788 PG 735 LOT 15 &PARf OF LOTI 6 BLOCK 1 ..16625 PG 259 DO 9150 PG 384 DB 11 852 PG 536 06 8385 PG 826 DO Ill 86 PC 45 MB 3 PG 431 DO 6467 PG 927 LOT 9 a P RT OF LOT IQ MB3PGA31 BLOCK I LOT t I & PART OF LOT 10 LVrTLE SUGAR CREEK BLOCK 1 `7 + L) Lu w z x w F- to) PROPOSED EROSION CONTROL INFO - > — > — TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED ARE 644 — PROPOSED CONTOURS . ....... . . . ... . ... . .......... . ... . .. . ..... . ........... EXISTING CONTOURS —PF— TREE PROTECTION FENCE SILT FENCE SPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP *> — ROCK CHECK DAM. TYPE A > — ROCK CHECK DAM, TYPE B SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS Al STRATFORD,VENTURE LLC PIN# 175-12-105 DO 29019 PG 89 DO 26Q02 PG 105 DO 26723 PG 47 DO 265M PG 849 MB 14256 PG 345 M 4742 PG 190 .LOT 2 - 8 BLOCK I ITS OF DISTURBANCE [TYP) 'PROP GREENWAY(-Ll-) GRAP EET HIC SCALE IN F 0 10 20 40 p' - L ui- 4. T ff LLJ Lu z x 0 ui L) W < to Cf) co U) z 'o, Of 0 0 Z-- 0 11ge z z A CONTRACTOR To INSTALL IMPERNAOUS DIKES ALONG T14E STREAM AS NEEDED AND UTILIZE SPECIAL STIWNG BASINS FOR DEWATERING. TER z AND SEED AS NOTED IN WTH MULCH STABILIZE ALL SLOPES 3:1 AND GREA PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS U u APPROXIMATE ONLY To ILL EUSTRATE STABI TH R z GENERAL FLOW PATHS. SE CROSS UZE AS SHOWN (UNLESS 0 E VASE cn SECTIONS FOR ACTUAL ELEVATIONS! NOTED) ON THIS PLAN WITHIN 1 4 DAYS OF COMPLETION PER EROSION CONTROL NOTES 0 0 DO NOT INSTALL FILTER BAG INLETI PROJECTION UNTIL GRADING BEGINS ACREAGE SUMMA u THAT WILL REOUIRE THE PROJECT DISTURBED PROTECTION ±10.69 ACRES o r t PROPOSED EROSION CONTROL INFO TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED AREA PROPOSED CONTOURS .. ........ . . ...................................... . ........ . . ......... . .... EXISTING CONTOURS PF— TREE PROTECTION FENCE SILT FENCE c nk v, SPECIAL SEDIMENT CONTROL FENCE STRAT R VENTURE��C PI 5-121-05 CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 DO 2901 Pq a9 lq5 DB2266723 PG 41", ROCK INLET SEDIMENT TRAP > — ROCK CHECK DAM, TYPE A > — ROCK CHECK DAM. TYPE a CONTRACTOR TOANSTALL IMPERVIOUS DIKES LONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. ALL TER STABILIZE SLOPES 3:1 AND GREA WITH MULCH AND SEED AS NOTED IN PROPOSED C OSION CONTROL DETAILS ll!M ONTOURS SHOWN ER APPROXIMATE ONLY TO STA131UZE AS SHOWN (UNLESS OTHERWISE "A FLOW PATHS t ACnIAI' NOTED) ON THIS PLAN WITHIN 14 DAYS OF COMPLETION PER EROSION CONTROL NOTES ]DO NOT INSTALL FILTER BAG INLET OJECTION UNTIL GRADING BEGINS THE PROJECT DISTURBED LJEA THAT WILL REQUIRE ACEEAGE SUMMARY PRO TECTIGN ±10.69 ACRES DI D I m SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS Q 'U 0 0 7��, 1§1 A. LINDA B..HUNNICUTT & STANLEY P. HUNNICUTT Ds A7 (;3 (FORMERLY LINDA 8 PAAR) _4� PIN# 175-121.-w 69—S& e Do 1731t PG 300 24� 06 5326 PG 932 M Oq4 Fl 4- M2 LOT 5 PART OF t 01 6 & Lwo BLOCK I SL WILLIAM FSAMPLE JR & BETTY I SAMPL 5-121-20 D13 2530 PIS 242 STA HWAY & y' MB'3,PG431 RKS LOT 7 &MT OF LOT 6 N ni-I x 'DR olgf3 pl� �m 12' GREEN E WA Y 7 ---------- _ At 7, 1MITS OF DISTURBANCE (TYP) z z - JGL I LLC PIN# 71-181-44 D810193PG110 DS 9904 PG 325 7 A� . . . . . . . . PROPOSEDqELOW 12'GR,,&IVWA y GRADE GRAPHIC SCALE IN FEET 0 10 20 40 z u P u z E- o C) z 0 0 Z 0 1.4 im C U u un z u 0 c nk v, STRAT R VENTURE��C PI 5-121-05 t ,cc, DO 2901 Pq a9 lq5 DB2266723 PG 41", N 60 0 0 OB 261. PG .9 MB 14256 PG 345 MB 4742 PG 190 7 C1�3 LOT 2 - 8 BLOCK 1 70 Q� SEUrN FAIR PIN# 171-1�1�V 0 'M8 5 PG 428 MB 5 PG 408 LOTS I -5&LOTS64-71 46 co 4� 4el 4� co GRAPHIC SCALE IN FEET 0 10 20 40 z u P u z E- o C) z 0 0 Z 0 1.4 im C U u un z u 0 011 Al JGL!LLC ZL '0 JGL � LLC PONN 17 -181- 06101 93PG 110 DIB 9904 PG 325 LIMITS OF DISTURBANCE (TYP PIN# 17 -181-44 D310193PG110 DB 9904 PG 325 A - ROBERT brJAGER PIN# 171-181-10 D8 20972 PG 437 OB 6997 PG119 MB 5 PIG 428 LOT 78 & 79 !�ROPOSED 12', GREENWAY(-LI-) =PROPOSED EROSION CONTROL INFO TEMPORARY DIVE SION DITCH - — — — — — — - DISTURBED AREA —644— PROPOSED CONTOURS EXISTING CONTOURS —PF— TREE PROTECTION FENCE SILT FENCE zzSPECIAL SEDIMENT CONTROL FENCE 0�� CONSTRUCTION ENTRANCE EROSION CONTROL DETAILS RIP RAP APRON FILTER BAG INLET PROTECTION CLOW 30A5 STAaUZE AS SHOW (UNLESS OTHERVASE NOTED) ON THIS PLAN VATHIN 14 DAYS OF -nON PER EROSION CONTROL NOTES ROCK INLET SEDIMENT TRAP > > ROCK CHECK DAM, TYPE A > -10—> ROCK CHECK DAM, TYPE B SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS CONTRACTOR TD INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER VATH MUL04 AND SEED AS NOTED IN PROPOSED CONTOURS SHOVIN AS EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL ELEVATIONS STAaUZE AS SHOW (UNLESS OTHERVASE NOTED) ON THIS PLAN VATHIN 14 DAYS OF -nON PER EROSION CONTROL NOTES FDO NOT INSTALL FILTER BA PROJECTION UNTIl �RADING THAT VALL REQUIRE THE I PROJECT DISTURBED AREA 1 ] PROTECTION 1 *10.69 ACRES GRA FEET PHIC SCALE IN 0 10 20 40 U u ,3 E- z o :D Lf) z of 0 Z 0 z z C) U u CIO z CIO 0 CAI 0 0 04 u I I j cn 8 Elf GRAPHIC SCALE IN FEET 0 10 20 40 MECKIL ENBLI RG COUNTY LITTLE SUGAR CREEK JUDY ,GREATHOUSE MARIAN GRACE PINIP 171-181-08 WARREN DO 6673 PG 716 PIN4 171-181-07 Me 5 PC 428 DB 7307 PIS 480 LOT81 Me 5 PG 428 MICHAEL S WARREN & Al LOT82 TABITHA D CARNES THOMAS GOUDELOCKSR PIN# 171-181-06 PIN# 17t-181-09 DO 25254 PG 39 PB 1"55 PC JANE WITTEN ADAMS & Me 5 DO 6365 PIG 196 796 PAUL TRAIN JAMES J BREWSTER All PIS 408 & Me 5 Pq 428 DO 4181 RG 166 PIN# 171-181 -05 OB 3CPIN# 171 181 04 LOT'8D Me 5 PIS 428 LOT W 08 5627,PG 66a 264 PG 751 06 25782 PROPOSED EROSION CONTROL INFO > TEMPORARY DIVERSION DITCH — — — — — — — — DISTURBED AREA — 644 — PROPOSED CONTOURS . .. ....... ................... . ... — EXISTING CONTOURS —PF— TREE PROTECTION FENCE SILT FENCE ZZSPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL—ELEVA71ONS RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP DO NOT INSTALL FILTER BAG INLE ROCK CHECK DAM, TYPE A ROCK CHECK DAM, TYPE 8 SEE 5FILET5 EC -1 THRU EC -2 FOR NOTES AND DETAILS CONTRACTOR TO INSTALL IMPERVIOUS DIKES ALONG THE STREAM AS NEEDED AND UTILIZE SPECIAL STILLING BASINS FOR DEWATERING. STABILIZE ALL SLOPES 3:1 AND GREATER WITH MULCH AND SEED AS NOTED IN PROPOSED CONTOURS SHOWN AS EROSION CONTROL DETAILS APPROXIMATE ONLY TO ILLUSTRATE GENERAL FLOW PATHS. SEE CROSS SECTIONS FOR ACTUAL—ELEVA71ONS STABILIZE AS SHOVO4 (UNLESS OTHERWISE NOTED) ON THIS PLAN WITHIN 14 DAYS OF nON PER EROSION CONTROL NOTES DO NOT INSTALL FILTER BAG INLE :PROJECTION UNTIL GRADING BE N THAT WILL REGUIRE THE SUMMARY PROJECT DISTURBED AREA PROTECTION ±10.69 ACRES PAS 6 PIS 428 PG a36 LOT 84 08 21259 PG 577 DO 19133 PG 619 06 7053 PG 738 Me 5 PC 428 LOT 85 31 Q IN U u U E- z pc� o C) z o C) cti 0 0 Z 0 z 0 z z 0 u z 0 00 CD 0 MECKLENBURG COUNTY PIN# 171-181-39 DO 11020 PG 3 8 M6 4 PG 345 LL 5 PROPOSED EROSION CONTROL INFO TEMPORARY DIVERSION DITCH - - - - - - - - DISTURBED AREA 644 - PROPOSED CONTOURS .............. EXISTING CONTOURS -PF- TREE PROTECTION FENCE SILT FENCE SPECIAL SEDIMENT CONTROL FENCE CONSTRUCTION ENTRANCE RIP RAP APRON FILTER BAG INLET PROTECTION CLDSM 30.15 ROCK INLET SEDIMENT TRAP ROCK CHECK DAM. TYPE A > > ROCK CHECK DAM, TYPE B SEE SHEETS EC -1 THRU EC -2 FOR NOTES AND DETAILS Crowing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT —1-1 -W -.7-7 .1 m Z :2 0 m a C) m m < ;00 > G U) z C) to m (n m P 0 0 C) M 0 -1 z '0 U) 0 , M Z :< M� 11111111�01111 CD 1111111 mrow. TIONS.dwg XS -01 Apr 19. 2017 5:23pm by GI—Strago — I—— �.. .1 - ...... I.. . 01. —.1 —.1 —1. --.— — .1 K-1— d A.—W. .1 1. LF1 0 8 0 0 8 0 cn 0 8 rQ cn 0 r SHEL 1 xS-01 CROSS CHARLOTTE TRAIL 015010166 j()8 No AS NO— KILF 1PROGRESS SETI NOT FOR CONSTRUCTION NO OATE By DESCRI PI ION PI... Pmard By: I Kimlevo Horn Nc LICENSE NO. F-0102 02017 200 South Tryon Street, Suite 200 Charlotte, Nort=:nl 28202 rhone: (7 3. CMABIffrM CAD FILL PA I H OF 70 %I CROSS SECTIONS I NJA 00 CIALMD81 PREPARLD 8Y JLD I APPROftD BY 09/01/2016 DA 11, Drawing name: K:\CHL-PRJ\015016 City of Charotte\1156 X -CLT Seq 1 \04-CADD\02-PLAN 5\80- CROSS SECTIONS.dwq XS -02 Apr I 0' --d h-. --t & ­., 1, bt—d ly I, .1ft P- - 11 .1 W. —.1 —t ­­ .­­­ d by- ­S. .1 A.—t- -1 b� Mr -k WHIty I. d M. -U.. co > M Z m z M C 0 m C) e) I -M '0 w 0 MW `0 m - " - C) M_ 0 z cn M, 8 0 0 0 0 0 Ln 0 8 o cn U1 0 a 1111111111111111111 EM 0 cn 0 0 1111111 WNW 41 E; 0) cp 0 SHLE I CROSS CHARLOTTE Moitsise JOBNO AS NOM) K11.1% NO, PAI E I B, DESCRIMON I'l-Ii P'� ... �d By: 0 XS -02 TRAIL PROGRESS SET- NOT FOR CONSTRUCTION KimlerMorn NC LICENSE NO. F-0102 (0 2017 (AD FILL PA III OF M&A IM CROSS SECTIONS MiLPAHILD BY CHILUL0 BY 200 Sao h I'ryon Street, Suite 200 CHARLOTTE LD 09/01/2016 70 Cha,lot't " North Carolina 28202 I I �PPROVLD BY DA I IF .. : (704) 333-5131 Lll..,,g -e: K:\CHL-PRJ\015016 City of Ch.rlotte\166 X -CLT Seq 1 \04 -CADD \02-PLANS\80- CROSS SECTIONS.d,g XS -03 Apr I P --d h—. f -A- 1. hi-d .1Y d -�l 11 p­r.d. .1 1—— -o—., -11 b� �Ith- 1-111y B, Ks—, -H. A—W4, in > M Z m z 0 m C) 0 -M G) 0 > < > >< '0 " U) 0 Imn m _0 m z 0 r_ z m z i 8 0 0 LU E i cn 0 15 8 8 CID cn 0 6 g m 00 CD 0 0 0 Ul C) Cil 0 SHLE I XS -03 CROSS CHARLOTTE TRAIL cu5cullifla J.B 10 T --m-1-F. PROGRESS SET NOT FOR CONSTRUCTION NO, DITE BY DISCRIMON I Plans Pretured It, Kimley)))Horn NC LICENSE NO. F-0102 (E) 2017 200 South 'rryon Street, Suite 200 Charlotte, Norlit C arol:sia 11111 'h_. " ", " 04 _' I (HARLOM CAD-LPAIM — OF 70 CROSS SECTIONS NJM GO 0' (hLDUY PREVAHLI) BY xPPROYLD fi� 09/01/2016 DA I L Drawing name: K:\CHL—PRJ\015016 City of Charlotte\166 X—CLT Seg I \04—CADD \02 —PLAN S\80— CROSS SECTIONS.dwg XS -04 Apr I 0' --11 .1. -1- PI -1.1 h—Ir. .1 1,-- .1 111 Mt-ttl .1y I, th, P,Wlt, d 0- 111, —1, It PItP­,F Rt— r thl. --Y �Ith­ rd d.pt.n. by -1-1F- A-1-tt. -11 b� At— 1-11ty I. KI.I­H­ r,, cy m Z 'n z 0 0 m ;0 :� :9 -M G) 0 < c') '0 2 P C) C) 0 m (n (1) z Or cn 0 Or 0 z z i -Wo U) M Z ID) 0 L4 0 CD 0 Lq 0 0 0 Ui 0 0 SHLE1 CROSSICHARLOTTE I 015016168 JOB 10 F; AS NOMD �� 11.1, ]PROGRESS NO, DATE By DESLRIPTION Plans Prepared H, I 1 0 XS -04 TRAIL SETE NOT FOR CONSTRUCTION Kimley))) Horn (E) 2017 CA FILL PA 1 It NJA GD VIRLPARLD BY or CHLINLO BY NC LICENSE NO. F-0102 70 CROSS SECTIONS 200 South Tryon Street, Suite 200 CHARWYM AD 09/01/2016 Charlotte, North Carolina 28202 �PPIFO� LD BY [A I Phn,: (704) 333-5131 Crowing name: K:\CHL-PRJ\015C)16 City_o_f Charlotta\166 X -CLT Seg 1 \04 -CADD \02 -PLAN 5\80- CROSS SECTIONS.dwg XS -05 Apr 19. 2017 5:25pm b), si",.St",ga —-t,, —W. -—d hItl— f 1. .1-1 �I' III. t,." ­ .1- 1. 1. It -1 1-.. 1., —1 --1 -t, -h—ti. d �,,eWtl. by— ­K. .4 A—l—, k,. —.1 11 1. -d A.—I... > m z m z C) m C) F) m G) C) C3) U) 0 Imn w m -- - 0 Im, 'o z J) Ln 0 0 0 Ln (-n 0 Ln 0 0) 0 0 co cn 0 co cn 0 r SHEE I CROSS CHARLOTTE Moisiod 0, - "' (" I AS NOTED NO, DATE By DEKIMMON Plans Prepared By: XS -05 TRAIL PROGRESS SET NOT FOR CONSTRUCTION I KimletylMorni NC LICENSE NO. F-0102 (E) 2017 (M F T" (AD FILL `� I H or NJA GD CROSS SECTIONS VRLPARLD BY CHLCKLU BY EH 200 Sou h 'rryon Street, Suite 200 CHARLOITE J-0 09/01/2016 70 Charlotte, Nrlh Ci,olin. 2112I)l IPPROI I.D BY I I I I 1 "04) 333-51 't Drawing name: K:\CHL—PRJ\015016 City of Charlotte\166 X—CLT Seg I \04—CADD\02—PLAN S\80— CROSS SECTIONS.d,g XS -06 Apr 19. 2017 5: 25pm by-. Gina III—t. t'"O. IKI t—pt, W P-- -th, I. t� h --t If 1101t, 1. —d" wly fI, th� Wt— P- d al- I, It t d Il— thil Wthwt 0 m Z m z 0 0 m 0 � m T :2 -M > I < > 0 z m z 0 wom t 0 0 z z AMC) -" M Z co �j 9 9 § . 0 . . 9 T T . 9 9 § �g . . . 0 T T . to to 0 10 10 to N t 0 0 0 0 �D Ln 0 cyl 0 �j CD 0 0 N) 0 i� 0 0 SHLL 1 CROSS CHARLOTTE 015018188 AIB N. AS NOTED S( ILI NO, QATZ BY DESCRIPHON Pla-, ]`,,wed BY: XS -06 TRAIL SET--- NOT FOR CONSTRUCTION Kimlev*Horn (E) 2017 C,, HILPAIII NJA 'PROGRESS GD t-HL1`,,R1,D BI, OF — CHL(rLD BY NC LICENSE NO. F-0102 70 CROSS SECTIONS 1 200 South Tryou Street, Suite 200 CHAPJjOYM F --7, 09/01/2016 I Charlotte, Nor," Carolina 28202 I . I, I I 1 "04) 333-51 3, 1 U—Ing name: K:\CHL-PRJ\015016 CIty of Charlotta\166 X -CLT Seg I \04-CADD\02 -PLAN S\80- CROSS SECTIONS.dwq XS -07 Apr 19. 2017 5: 25pm ch m 0 m z `0 0 015016166 JOB NO 0 m NO VA FF DES1,R1 P1 tON I BY C) C) XS -07 U) m UY 000 0 C) 2017 m 0 Z. WOM 0 z 0,0 z , I (n 0 NJA rn z � (n �n i� C,4 0 0 + CD 0 T7 CA + i� Ln CP 0 1111111 So 9 ; i + 0 0 0 0 cn 0 S11LL1 CROSS CHARLOTTE 015016166 JOB NO AS NOTM IK ILE. NO VA FF DES1,R1 P1 tON I BY XS -07 TRAIL PROGRESS SET NOT FOR CONSTRUCTION C) 2017 (ADFILLPAM _-AimlerMorn OF NJA GD PK�PABLLI BY (KLO BY NC LICENSE NO. F-0102 70 CROSS SECTIONS - 200 South Tryon Street, Suite 200 CHARIDIW- J -D t— 0 Charlotte, rt It Carolina 28202 kPPROVLD BY I I .. Ph (704) 333-5131 D­i�g K:\CHL-PRJ\015016 City of Ch.rlotte\166 X -CLT Seq I \04-CADD\02 -PLAN S\80 -CROSS SECTJONS.dwq XS -08 Apr 19. 2017 5:26pm by-, G—Strago W. ­­ I -M. M. —.1, W.—I.d I,—. b, W .­ 1. ­­ bbly fb, M. -I, ­ d -1 1b, .1. 11 --d, bf b,d �p­ ­. MI. —t -wt .11- wth-1w db,1I,­ by K--- A—U, vMI b. —.1 1.101Y 1. d 0 U) m Z "r' 0 m '0 cm, .0 0 w M Z" 0 U) 0 m _j 0 , q (n 0z z =01 I M U) 7< c) 0 111111111 MEOW in 0 0 I. In 0 0 i:� to N) 0 0 9 9 i� 00 Ln 0 0 Cil 0 r SHLL I CROSS CHARLOTTE On 50i at 66 10610 AS NOTED SCILL NO, DIESRIPTJON 11",, 1r,oared Bv: XS -08 TRAIL PROGRESS SET NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (D 2017 CAD HLL PA I A OF NJA GO 70 CROSS SECTIONS VftlARLD81 CFILCKLI) 3� — 200 South 'rryon Street, Suite 200 .(HARWYM ,L) 09/01/2016 Charlotte North Carolina 28202 �ppfio'w BY DAII Ph'unc: (704)333-5111 1 Dro,ing rome: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seq 1\04-CADD\02-PLANS cn m Z ""t z M 0 er 0 1 ;o M -M ;0 < 0 Z > m 0 - mu, oOM z wz p- W 0 U) M Z Be 0 0 8 0 I I by-, Gina.Strago It — p-— R.— bf bOd OpOtp. MI- . Mi. -t Othwt Ott. b-11bilbe tOd WWt�t$. by bed A-1- — Idl b. Mth- WbIthy I. KW.,—Hb,, - A—i-, I.. 0 0 CD i� C4 Ln CD o 0 0 0 0 I Nj 0 01 (D SHLL 1 XS -09 CROSS CHARLOTTE TRAIL 015018106 JOB NO AS NO- SCILL PROGRESS SET NOT FOR CONSTRUCTION 1 1 NO. WE By DISCRI�, Me, Phirr; P,,,p—d B�: Kimley)))Horn NC LICENSE NO. F-0102 (C) 2017 200 Sou'h Tryon S"ree", Salle 200 Charlotte, North C. rallits 28202 P�_'. 1 . (7041 333_5 131 1 CHARL07"M CADHLLPAM OF 70 CROSS SECTIONS NJM GD CHLLKLD BY PIRLPAKL08Y JLD 1PIR0111) 31 09/01/2016 A 1. 1 1 1 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADC\02-PLANS\80-CROSS SECTIONS.d,g_XS-10 Ap_r_ _I 9, 2 017 5: 27pm by, Gi—St,.g. — --t. t-— �Ith - —Ptl Ild dl.Irl p1 --d h—h. .1 1� -- .1 1. --. .1, 1. 1'. -p- ­ 11- 1, �— It . . . ­—d� R— f - �11W. 1-- . ,,, ."t- — Ln (D 0 z'" 0 0 i i =iilllir� cp Ln 0 cp 0 0 0 00 CD CD 11111111 IFIFIF-M an 0 cy) 00 cn C) SHLL I xS-10 0 > M Z Moilsise .108 NOL 1 m 0 m z 0 I N1. DATr By DIESCRIP-110N d By: Kimie"" yP ... )')')' H o r n (E) 2017 NC LICENSE NO. F-0102 T > '0 < > >< 0 NJA z I G') . 1 5 M 0 .0 1 1 m 0 z U) 0 m -, 1, zj 0 z C) z cn 5 I (n M AD 01 /01/2016 Ln (D 0 z'" 0 0 i i =iilllir� cp Ln 0 cp 0 0 0 00 CD CD 11111111 IFIFIF-M an 0 cy) 00 cn C) SHLL I xS-10 CROSS CHARLOTTE I TRAIL Moilsise .108 NOL 1 AS 401- ]PROGRESS SETE NOT FOR CONSTRUCTION N1. DATr By DIESCRIP-110N d By: Kimie"" yP ... )')')' H o r n (E) 2017 NC LICENSE NO. F-0102 -0 FILL PA 111 OF NJA OD BY PKEPAALD 81 70 CROSS SECTIONS 200 South Tryon Street, Suite 200 Charlott , North Carolina 28202 CHAPJDTM AD 01 /01/2016 VPROILD 31 DAIL Pehone: (704)333-5131 1 Drawing name: K:\CHL—PRJ\015016 City of Charlotte\166 X—CLT Seq I \04—CADD\02—PLANS\80— CROSS SECTiONS.dwg XS -11 Apr 19, 2017 5 27pm__ by Gino.Strago ril. dl --L bQ-1 Ah th, .—Pt. 1--d I,—, --�t .1 .-1. 1. �1­d �Iy I, th, v.— P."', wd '11"t w tt R— f dt— m thl, -- wd dbpbtI. by Kftll�— --b, rb —I bb —wt I—Ity b KI,bI­H.b A—I-� 0 m z I m Z T 0 0 m 0 ;0 :� m 'a :2 � In � § '0 29 =I 0 w U) 0 m U) m z Sn , 0 U) 0 m j O'n '0 z , . z c) 0 On Z ON ob 0 0 0 ab WWI 0 ob ob cn 0 + CD 0 0 0 0 cn 0 �HLL 1 xs_1 I CROSS CHARLOTTE T P -A, I L . . . . . . . . . . . . . . . . . . . PROGRESS SET- NOT FOR CONSTRUCTION NO. DATE 1 .1 DISCRtMON Mo. P .... red BY: KimleylMorn NC LICENSE NO. F-0102 0 2017 C�D F ILL PA I H OF N1JM GO (HILCKLI) BY VRI,MBLIJBY 70 CROSS SECTIONS 200 South -rryon Street, Suite 200 Charlotte , N"rth Carolina 28202 CHARURM &D 09/01/2016 APPROV0 BY OAIE — — — — — — — — — - — - Ph._ (704)333-51,f 1 WWI 0 ob ob cn 0 + CD 0 0 0 0 cn 0 �HLL 1 xs_1 I CROSS CHARLOTTE T P -A, I L 015018106 JOB NO AS NOTM ( 'LL PROGRESS SET- NOT FOR CONSTRUCTION NO. DATE 1 .1 DISCRtMON Mo. P .... red BY: KimleylMorn NC LICENSE NO. F-0102 0 2017 C�D F ILL PA I H OF N1JM GO (HILCKLI) BY VRI,MBLIJBY 70 CROSS SECTIONS 200 South -rryon Street, Suite 200 Charlotte , N"rth Carolina 28202 CHARURM &D 09/01/2016 APPROV0 BY OAIE — — — — — — — — — - — - Ph._ (704)333-51,f 1 Drawing name: K: \CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg I \04-CADD\02 -PLAN 5\80- CROSS SECTIONS cwq XS -12 Apr 19, 2017 5:28pm by Gina.strog. U) > m Z m z­ao 0 m 0 F) � ;a , � 71 a -M G) 0 § � om z > 00 m 0 to M Z_ 11 In 0 M ,0 0 z z W_ , M, Z. U4 0 0 cn 0 0 Ln 0 cyl Ln 0 0 0 0 0 LP 0 rSHLE 1 CROSS CHARLOTTE 015016186 jOB No AS NO- ILL NO DATE By orscmPrION I?Wu P,Ip.rI,d Ily; XS -12 TRAIL Kimley))) Horn PROGRESS SET NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 (D 2017 (AD I ILL `A:II OF N&A Q0 CROSS SECTIONS VRLPARLI) BY CHUKLO BY 200 South 1'ryon Street, Suite 200 CHARLOYM AD 09/01/20ill 70 Chm,lotte,.North Caroli.. 28202 kPPROvt.D BY D111, Ph : (704) 333-5131 Orawing name: K:\CHL—PRJ\015C)16 City of Charlatte\166 X—CLT Seg 1 \04 —CADD\02—PLAN S\80— CROSS SECTICNS.dwg XS -13 Apr 19. 2,017 5: Mann by: Gin..St,.g. It", n,. 1.— .1, Il. .dfl, dl.�t It, It R— f wd �,bbb, b—b b, thl� db -1 �thwt -tb, d bdbbtbt1w by K—, -P. A-- b. d A.—Itt.. m Z m m 0 0 m 0 ;a m m C) C) NX 0 W (7) (j) 0 Imn 'a m _ _ to to m 0 z m Z 11, CD CD 0 0 (D Ul CD D D 0 0 0 00 61 CD Cn 0 r SHLL 1 XS -1 3 CROSS CHARLOTTE TRAIL 015016166 JOB No AS 1401- KILL PROGRESS SET NOT FOR CONSTRUCTION 10, D4T1 11 DIESCIUMION Plans P --d 13, KimlerMorn NC LICENSE NO. F-0102 (E) 2017 200 South Tryon Str"t, Suite 200 Charlotte, North Carolina 28202 Ph.—� 704) 333-5131 _ _ I CHARIMM CAD[ ILL PAIN OF 70 CROSS SECTIONS NJA GD CHUALD13Y PREPAINLIJ BY JLD APPROVLD �BY 09/01/2010 DAII, Drawing name: K:\CHL-PRJ\015016 C(ty at Charlotte\166 X -CLT Sag I \04-CADD \02 -PLAN 5\80- CROSS SECTIONS.dwg XS -14 Apr 19. 2017 5:28pm by: Gin..St,.g. MI. _.- loolne, .10 .. __'. - _­ ­­ I,— .. - ­­­ �' ­'. 1. ­­ -1. - - ­­ - _... - __ . _. .. - - '_ '__­ _1-1 ------ --- cn a 3� m Z 015016158 jOHNO M 0 m z 'Do C, 5 � NO DATC BY DES(RI `1 [ON x M �Fl 01 m C) 0 0 Ln 9 en 0 NJM M 0 m w �n M 0 I- M , (b 0 m � 0, 01 0 z �wo M Z 0 0 61 0 0 cn 0 Cil 0 r SHLE1 XS -14 CROSS CHARLOTTE TRAIL 015016158 jOHNO AS NOM) KILL PROGRESS SET--- NOT FOR CONSTRUCTION NO DATC BY DES(RI `1 [ON Plans Preoured By: Kimley)))Horn NC LICENSE NO. F-0102 (D 2017 200 South 'rryon Street, Suite 200 Charlotte, North Carolina 28202 Phone: (704) 333-5131 CHARL01M CA [ILLPAIII 0 Ln 9 en 0 NJM 0 PIREPARLDBY 0 JLD APPROVICID By . � 0, an I I it I I I I OF;- I I 12. 10 0, 59, _F 11 0 :5, of -1.0) 1 L!04 ll 0 )FF .01 E 11' 5 14. 21 1 1 7 14 ff - oc 51 3A 11 LA LA 41, + 0 Ln CD 0 7:1 1 1114 0 Y :6 EL 59t3r A en cn 0 Cil 0 r SHLE1 XS -14 CROSS CHARLOTTE TRAIL 015016158 jOHNO AS NOM) KILL PROGRESS SET--- NOT FOR CONSTRUCTION NO DATC BY DES(RI `1 [ON Plans Preoured By: Kimley)))Horn NC LICENSE NO. F-0102 (D 2017 200 South 'rryon Street, Suite 200 Charlotte, North Carolina 28202 Phone: (704) 333-5131 CHARL01M CA [ILLPAIII 01' 70 \I. CROSS SECTIONS NJM GD Ci11C'K1D,,Y PIREPARLDBY JLD APPROVICID By 09/01/2016 DAII Drawing name: K:\CHL-PRJ\015016 City of Chariotte\166 X -CLT Seg I \04-CADD\02 -PLAN S\80- CROSS SECTtONS.dw tt,i. —t. toot- �Ith Its -,I -I p1t.— -a, p ­s .4 di- I� It .1 P-1- Rt- .1 —t -.t .1n, 1— s.6 -pt.ti. 1, ­­­ A.—I b� -.t -afty W -III d A-1- 0 to > m Z m z 0 0 m C) ;a :� m :2 -m G) c) >< 0 m 1� 0 0 to 0 m 5 Ln 0 0 61 cp cn 0 cp 0 JBM 0 0 5 co 0 0 6 !�' cn 0 SI ILL I XS -15 CROSISCHARLOTTE TRAIL (H50illies JOB "I 777�7 PROGRESS SET NOT FOR CONSTRUCTION I NO. DA FE By DES(:RWTIQN Plans Prepared By: Kimley)))Horn NC LICENSE NO. F-0102 (D 2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 ph ... : (704) 333-5131 0 CHARLOM 1 ( AD , ILL PA 111 OF 70 1-1 CROSS SECTIONS 1 1 NW GO I PHLI'AHILU UY 1 111WILD BY 09/01/2018 DAII Drawing name: K:\CHL—PRJ\015()16 City of Chorlotte\166 X—CLT Seg 1 \04—CADD \02—PLAN S\80— CROSS SECTIONS.d.g XS -16 Ap, 19, 2017 5- 29pm by. Cln..Str.V B,1. --, t-— �Ith th. —at. rd —1- pr --d h—h, �, � --- f --, 1. --d ty f" th. -Iv, N'p— d 61- f� hl�h 1, ... ­- B.— w d rr,p­ rl— . 11A --M .0.� rn. 0 0 > m Z 0150iW88 JOB NO M m Z:p 0 0 n NO. PATE By DIEK-RIPTION � M XS -16 :2 Q -M < Kimley)))Horn NC LICENSE NO. F-0102 (0 2017 > CA D � I LL PA I H C, so U) OF I m —0 z MO (,)0, GD 0 z 0 0 70 CROSS SECTIONS M Z CHLCKLD bY 11 M 0 0 0 0 � 1 9 � � . 0 0 . . T ni �q T 9 9 9 — 5 (0 cp 0 CROSSCHARLOTTE 0150iW88 JOB NO AS NOTED K I LL NO. PATE By DIEK-RIPTION Pl— Piro—d By: 0 XS -16 11111MI PROGRESS SET NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (0 2017 . CA D � I LL PA I H OF N&A GD 70 CROSS SECTIONS FREPARW d Y CHLCKLD bY 200 South Tryon Street, Suite 200 CHARLOM JLD 09/01/2016 Charlotte , North Carolina 28202 4 �-VIA 0PROV0 BY 41F. 04 Ph—: (104) 333-5131 r Ln CD 5 (0 cp 0 2 cp 0 r SHEE I CROSSCHARLOTTE 0150iW88 JOB NO AS NOTED K I LL NO. PATE By DIEK-RIPTION Pl— Piro—d By: 0 XS -16 TRAIL PROGRESS SET NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (0 2017 . CA D � I LL PA I H OF N&A GD 70 CROSS SECTIONS FREPARW d Y CHLCKLD bY 200 South Tryon Street, Suite 200 CHARLOM JLD 09/01/2016 Charlotte , North Carolina 28202 4 �-VIA 0PROV0 BY 41F. 04 Ph—: (104) 333-5131 r Ln CD IFF 8.10 T (D 8 LEH �ill i 1 2 cp 0 r SHEE I CROSSCHARLOTTE 0150iW88 JOB NO AS NOTED K I LL NO. PATE By DIEK-RIPTION Pl— Piro—d By: 0 XS -16 TRAIL PROGRESS SET NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (0 2017 . CA D � I LL PA I H OF N&A GD 70 CROSS SECTIONS FREPARW d Y CHLCKLD bY 200 South Tryon Street, Suite 200 CHARLOM JLD 09/01/2016 Charlotte , North Carolina 28202 0PROV0 BY OA I L Ph—: (104) 333-5131 Drawing name: K: I—— .1ft a m Z m z �q 0 m 0 n I M -1 T G) 0 m 0 > 0 Cn I 0 cn omw 0 M Z - In C) rn 0 cn cn I m ZO cn �015016 City of Charlotte\166 X -CLT Seg 1 \04-CADD\02-PLAN S\80- CROSS SECTIONSA�g XS -17 AD, 19. 2017 5 30prn by GI—St,.g. — —'. ­—� 1,—. .. . --t .1 —t, 1. .1— �Iy 1, th� ­ufl, .4 d— � — It .. p, ­td R— .1 .. .­ '.1— It, .1. —, —.t —1. .­­ - 61' C,4 0 0 �D- 0 0 3) 0 (D 0 Cy) 0 0 6 g m 011 0 ;3) cy) cn CD r SFILE 1 XS -17 CROSS CHARLOTTE TRAIL 01501 Gi 66 JOB No AS NOTED PROGRESS SET--- NOT FOR CONSTRUCTION NO. DA rE OY DESCRI PI ION Pl—,i P—tired By; Kimley)))Horn Nc LICENSE NO. F-0102 (D 2017 200 South Tryon Street, Suite 200 ch, the, North Carolina 28202 rio 704)333 -513, (BARLOYM CAD FILL PA I H OF 70 CROSS SECTIONS NJA GO (1,11-ChLD BY PIRLPARLD BY 7- 09/01/2016 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Sag 1\04-CADD\02-PLANS\8()-CROSS SECTIONS.dwg XS -18 Ap, 19, 2017 5: 30pnn by. Gin..St,.gc --t. t�— �Ith th� d -I- p,—B,d h—h. , m h-- f —­ 1. --d mly � th. 'p.. ­— .1 d- I� .1. 11 .1 d 1-- . thl, —It lo- -- --,B. — -ptltf 71 0 m Z 015011111"s JOB NO m 0 m z 'a C) 0 5 - NO, DATE DESCRIPTION 1 11 M:� M —4 T XS -18 TRAIL G) () � KimleylMorn NC LICENSE NO. F-0102 02017 om C) (n Cl) 0 m cn U) I OF m 0 z (D 0 D z 0 z -00 70 cn LZ 7< Z I C, CILLC!D By t9 19 9 CY) 0 0 el . . . o U` 9 . . 0 . g -0 -1 - g f g - - - 0 n 9 8 8 19 t CY) 01 (D Ul 0 0) 00 0 0 0 0 0 CY) 00 cn 0 0 cn 0 r SHU I CROSS CHARLOTTE 015011111"s JOB NO AS NOTED �CILL NO, DATE DESCRIPTION 1 11 Piinn P—ur'd li�; 0 XS -18 TRAIL PROGRESS SET NOT FOR CONSTRUCTION KimleylMorn NC LICENSE NO. F-0102 02017 CAD FILL PAIH OF NJM D 70 CROSS SECTIONS PRIEPARLD B Y CILLC!D By 200 South Tryon Street, Suite 200 CHARLOrM &D ag/01 /2016 Cho rl oll'e,.No 11 C 2132151 kPPRO�� DAIL . .... �'_ 't I ___0 Drawing name: K:\CHL—PRJ\015016 City of Charlotte\166 X—CLT Sag I \04—CADD\02—PLAN S\80— CROSS SECTIONS.dwg XS -19 A,, 19. 2017 5:31prr by. Gin.�St,.g. -1. —.1, 1-- .1. - --I. d —,. ­- 1—. .. � -- .1 —.. 11 —d �1, . - .—I ­.. d �1- 1� .1. 11 .. ­— �.. .1 — .­ -.- . IN. -1 -.1 win. --,t1w md dl.tl U) � m 0 m z m 0 — 015016166 10B 10 0 rn in NO. DATE BY DEWRIPTION Plans Preonred BY: lKimlerMorn (E) 2017 NC LICENSE NO. F-0102 t 200 Sao It Tryon Street, Suite 200 Charlotte, North Carolina 28202 Phanti (704) 333-5131 '0 < C) cn m co U) 0 01 NN m 0 z m 0 -j C) fn z 0 z —00 M Z OWN CA 0 0 crl 0 CA Ln 0 IQ 0 0 cn 0 41 cn 0 SHEL 1 XS -19 CROSS CHARLOTTE TRAIL 015016166 10B 10 AS NOM) S( 11.1. PROGRESS SET NOT FOR CONSTRUCTION NO. DATE BY DEWRIPTION Plans Preonred BY: lKimlerMorn (E) 2017 NC LICENSE NO. F-0102 t 200 Sao It Tryon Street, Suite 200 Charlotte, North Carolina 28202 Phanti (704) 333-5131 0 M W11W111111 CEARLOYM (AD I iLL ?A I H or 70 % CROSS SECTIONS NN GO (hLLKLU BY "KhVAftJ 81 JLD IPPROILD BY 09/01/2016 DA I L Drawing name: K:\CHL_PRJ\0I5016 City of Charlotte\166 X -CLT Sag 1\04-CADD\02-PLANS\80-CROSS SECFONS.d�q XS -20 Apr 19. 2017 5: 31 prn by. Gin..St,.g. "' N. _­' '­­ .0 - ­t"I' - —.1. ­.. .. � .­­ .1 ­... i, .­. ..' . ". ...ft ­. — dit't ft� — It — V­ld R- f — �P­ 1�1­ . — ­­ 1— -1. — — ­­� - — �. — -1 t. ­­.— — — Ln 0 0 0 0 __j Ln u 0 at 0 4 0 0 00 0 CD 8 r_T_ 111111111 !"R -0 21 11111 M.M.M.07M IN 1111111111 rLIF—M.M.W.. 0 co Ln 0 SHEL I XS -20 CROSS CHARLOTTE TRAIL 0i 50i 6i as 108 No T 777111�17__ PROGRESS SET— NOT FOR CONSTRUCTION NO. IWE DEKRIPTION 1.11 Plans Preaered ll�: y (D 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Suite 200 Charlotte , North Carolina 28202 CHARUNYM CAD v ILL PA I H —KimialmMorn — OF 70 CROSS SECTIONS NJA GO CHLCKLU BY PKEPARED BY 02/01/2016 kPPROV13) BY DA 1 L Ph ... : (704) 333-5131 1 Drcwlng name: K: \CHL–PRJ\015016 City of Charlotte\166 X–CLT Si,g 1 \04–CADD\02 –PLAN S\80–CRCSS SECTIONS,dwg _ _ XS -21 Apr 19, 2017 _5.31pm by, Gina.Straga t-- .11� ­.tl -1- 1--d —in. 11 --t -f 11 M -d" WIY t�� V-11 ­­ W4 di- f� It WV—d. R- .1 wd �pl­ 1—. thl. -t VOWt �Ifu. IdWt— by- ­H. d A—d-, b. —t Witildy W 0 m Z z M 0 C, , 5 m Jo . . C) 0 < '0 En 0 m c) m z S4 0 0 o m 0 cn z _00 7< M Z C, �n -- 1.j C) 0 cn 0 00 0 0 0 00 0 U1 0 SHLL I XS -21 CROSS CHARLOTTE TRAIL (n5chailld AS NOTED �'U PROGRESS SET- NOT FOR CONSTRUCTION No, DATE 1 .1 EME-1-1.1 Pl­ P,..r,d BY: Kimley)))Horn (0 2017 NC LICENSE NO. F-0102 —XIB10 CADIILLPAIH or NM GD CHUNID iJI 81 70 CROSS SECTIONS 200 South Tryon Street, Suite 200 Charlotte, Nor h Carolina 28202 CILMUJDTM 09/01/2016 IPPROILDBY D'11� —Ph.n,: ('704)333-5131 1 Drawing name: K:\CHL-PRJ\015016 City of Charfotte\166 X -CLT Seg 1 \04 -C ADD \02 -PLAN S\80- CROSS SECTIONS.d.9 XS -22 APr 19, 2017 5:31pm by. Gira.Straq. 1-1- 1.11pl, w,d —1- VI—Id h-1. .1 J� --d .1y f, th� .1— ­ n".t d A—MI, ft 0 U) > M Z M Z�o 0 M C) F) � X M �M 0 < § z > > 0 0 , Mr, CO 5.0 Mu, z- - c) oom 0 z 0 0 z M Z Acn -p- 0 CD C) -P, 0 CTI C-) 41 0 0 0 -p� 0 0 CD -P, c—) C) 41 (D CD SFILI, 1 XS -22 CROSS CHARLOTTE TRAIL 015018168 JOB N" AS NOTED PROGRESS SET NOT FOR CONSTRUCTION NO. DATE By DIESCRIPHON Pl— P,a—d 11, Kimley*Horn (C) 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Suite 200 Charlotte, North Carolina 28202 (HARLOM CAD HLIC VA III 70 Y2 - CROSS SECTIONS NJJW GO CHLC�LD BY PREPAIRW fly :EE]A.]E� JLD 09/01/2016 �PPROvLD BY D�IL Ph -c; (7041 113-5131 1 Drawing name: K:\CHL-PRJ\015016 City of Charlotta\166 X -CLT Seg I \04-CADD\02-PLAN S\80- CROSS SECTIONS.dwg XS -23 Apr 19. 2017 5: 32pm by: Gina.Strago I�­ th. --i. d -1- --4 --t W ft Y-- .'y '.Y. 0- -1 -1. wd ��Jl­ by ­­­ md A.—J., b� ­11fty J. .4 1-- ft 0 In Z Im z -0 0 0 m I m C) 0 * '0 z " 0 U) 0 om 0 m Z - 0- C) 0 0 z z U) m cll CD CD 0 i I cn CD Ln 0 0 + 0 0 0 cil 0 cil 0 (_Fl 0 0 (D r SHILL 1 CROSS CHARLOTTE 015018166 JOB NO AS NOTED SC ILE NO DATE BY DIESCRIPI JON PI... Pr�oB,Ld By: XS -23 TRAIL PROGRESS SET--- NOT FOR CONSTRUCTION Kimley)))Horn NC LICENSE NO. F-0102 (0 2017 C�I) FILL PA III OF Wild — GD Clil,tft!)LY PKILPARLD Ll 70 Y3 - CROSS SECTIONS 200 South Tryon Street, Suite 200 CILMUJOTM LD 09/01/2016 Charlotte, North Cgrolina 28202 kPPROVLD BY DA 1 Pho—(704) 333-5131 Iwing name: K:\CHL-PRJ\015C)16 City of Charlotte\166 X -CLT Seg I \04 -CADD\C2 -PLAN S\80- CROSS SECTONS.c.q XS -24 Apr 19. 2017 5: 32pYYY by. Gin..St,.g. obeo-t. tbge- �fn, - -bet, d 4e.1r. ­­ h..h. 11 b, elt—t of ­o.e. 1, et.- .1y 1b, - veofle p- wd di- I, - It - -bred, R- ef d n,plon. Idle- . Ole doeo- -.t -ten -ol -1. - beop-1. by K-,-- ono A.bbebt., b� ­­ Ibelety I. --H. bod C) 0 > M Z m z 0 M 0 M M ­ G) 0 C3) M. X. z > >00 I -, m cn G') D, 0 w m 0 V) 0 m 0 z z U) 0 M Z _Ij 0 c.n 0 __j 0 0 0 0 On 0 -j 0 0 0 Ir SHEL 1 XS -24 CROSS CHARLOTTE TRAIL 015015166 JOB NO AS NO- �( Ilk PROGRESS SET-- NOT FOR CONSTRUCTION NO, DATE B M 1prj()N I'l- P,,..,ed He: KimllepMorn NC LICENSE NO. F-0102 (C) 2017 200 south 'rryon Street, Suite 200 Charlotte, North Carolina 28202 Phone; (704) 333-5131 CHARLOM (AD I ILL PA 111 OF 70 Y5 - CROSS SECTIONS NAA — GD CHL"ID BY PHIEPARLO BY APPROvLD BY 09/01/2016 3111, Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADO\02-PLANS\50 - RETAINING WALL.d.g RW -02 Apr 19, 2017 5:34pm by Gino.Strago tt-1 0 -... 1. kttw� .11 � 1�. Wk .40 It, .1. It -o" z c 0 on 0, Zr M W 7< LM C) x r" 0 > 0 In z 0 , M U) G) 0 Z: -0 �01 a . ;0 P m 1, c 0. 'c), .,, 0 , cn > 0M cn ;0 L M I a -1 0 = M = 0 M M M Z X T M M X m ;a x 0 > -0 0 0 z 0 M 7 -1 > C, x ;0 M M M > M In > r - T 0 z M M G) (n > M Mo -V 0 ;a ;a > -i Ln Lj a 000, to + + M M In Ln 0 Ln CROSSCHARLOTTE TRAIL 015018168 NO AS 1107D -11 PROGRESS SET-- NOT FOR CONSTRUCTION 11) )AII: b� Plan, pt-�'-'d If,: Kimley*Horn (D 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Sulte 200 Charlotte, North Carol a 28202 Ph— �n : (704) 333-5 3, 0 GRARLOM. + 01 70 RETAINING NVALL N&A GO H-�LO L11 MILPA - RED BY M M M 0 00 0 - 09/01/2016 r z 0 m 0 ;a rn 7, M z 0 C) ;D M ;a 0 > 0 m > M In 0 a z M -z cn > + In 0 > 0 M 0 1 1� 0 1 0 Ln CROSSCHARLOTTE TRAIL 015018168 NO AS 1107D -11 PROGRESS SET-- NOT FOR CONSTRUCTION 11) )AII: b� Plan, pt-�'-'d If,: Kimley*Horn (D 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Sulte 200 Charlotte, North Carol a 28202 Ph— �n : (704) 333-5 3, 0 GRARLOM. 0 + 01 70 RETAINING NVALL N&A GO H-�LO L11 MILPA - RED BY M M M 0 00 0 - 09/01/2016 r z 0 m 0 ;a rn 7, M z 0 C) ;D M ;a 0 m > M In a z M -z cn > + In 0 > C) cy) Ln 0 ,+ L L—L —1 C, M 0 0 0 -4 0,Mz ZQ C: (j) 0 0 M 0 MA8 0 M Em M M L m c ;0 , 0 T M M Ln M 1 0 0, M 0 m 0 ;0 M ;K M z 0 ;a M ;a 0 M > m 0 z M + 0 0 C) 0 W-ld-M-OVA N-0.11 r HLI, J RW -02 CROSSCHARLOTTE TRAIL 015018168 NO AS 1107D -11 PROGRESS SET-- NOT FOR CONSTRUCTION 11) )AII: b� Plan, pt-�'-'d If,: Kimley*Horn (D 2017 NC LICENSE NO. F-0102 200 South Tryon Street, Sulte 200 Charlotte, North Carol a 28202 Ph— �n : (704) 333-5 3, 0 GRARLOM. 01 70 RETAINING NVALL N&A GO H-�LO L11 MILPA - RED BY XD B, 09/01/2016 ,CRAPHIC SCALE IN FEET 10 20 40 604 600 604 O� 995 SF (APPROX FAC 600 PROPOSED -Ll- GRADE A r TOP OF WALL RETAINING WALL 8 596-- RETAINING WALL 9 --5.6 SEE SHEET 2B FOR MORE DETAIL 592 END LARGE BLOCK PROPOSED -1 GRADE AT TOP C F WALL r-GRAVtTY WALL 588-- 596 592 4.1-STA:127+97.02 OFF:6.WLT 588 PROPOS.TEDTT.M OF WALL - FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF 584- ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE OR EXCEED THE SUBMIT SIGNED AND J -584 ELEVATIONS SHOWN IN THE SEALED SHOP DRAWINGS. EXISTING GROUND DAIGRAM ........... 580' EL -V:584.08 RETAINING WALL 8 BEGIN LARGE BLOCK GRAVITY WALL _Ll- STA -.126. 0.74 OFF:11.50'RT ,CRAPHIC SCALE IN FEET 10 20 40 1+50 2+00 RETAINING WALL 9 BEGIN LARGE BLOCK GRAVrrY WALL ,Ll,STA:114 21,14 OFF:6.00'LT c 0 C RETAINING WALL 9 END LARGE BLOCK GRAVITY WALL -LI-STA:135+ 2.61 OFF 1.50'RT 604 600 604 O� 995 SF (APPROX FAC 600 PROPOSED -Ll- GRADE A r TOP OF WALL RETAINING WALL 8 596-- PRECAST GRAVITY RETAINING WALL --5.6 SEE SHEET 2B FOR MORE DETAIL 592 - PROPOSED -1 GRADE AT TOP C F WALL 592 588-- 596 592 588 588 PROPOS.TEDTT.M OF WALL - FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF 584- ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE OR EXCEED THE SUBMIT SIGNED AND J -584 ELEVATIONS SHOWN IN THE SEALED SHOP DRAWINGS. EXISTING GROUND DAIGRAM \-S7 k:l 38.93 - 580' EL -V:584.08 1+50 2+00 RETAINING WALL 9 BEGIN LARGE BLOCK GRAVrrY WALL ,Ll,STA:114 21,14 OFF:6.00'LT c 0 C RETAINING WALL 9 END LARGE BLOCK GRAVITY WALL -LI-STA:135+ 2.61 OFF 1.50'RT u+uU 0+50 1+00 608 604 O� RETAINING WALL 8 `BW PRECAST GRAVITY RETAINING WALL �o SEE SHEET 2B FOR MORE DETAIL 600 PROPOSED -1 GRADE AT TOP C F WALL 592----- 0 596 592 588 NOTE: WALL PRO ILES ARE 588 FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF EXISTING GROI NDJ 1 ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE OR EXCEED THE SUBMIT SIGNED AND DEEPER THAN THE BORINGS IN CASE ELEVATIONS SHOWN IN THE SEALED SHOP DRAWINGS. THERE IS ROCK DEEPER IN THE PROFILE 1+50 2+00 RETAINING WALL 9 BEGIN LARGE BLOCK GRAVrrY WALL ,Ll,STA:114 21,14 OFF:6.00'LT c 0 C RETAINING WALL 9 END LARGE BLOCK GRAVITY WALL -LI-STA:135+ 2.61 OFF 1.50'RT 0+00 0+50 1+00 RETAINING WALL 9 PRECAST GRAVITY RETAINING WALL SEE SHEET 213 FOR MORE DETAIL g 02 z 3 u :1 u Z OGRAPHIC SCALE IN FEET 10 20 to E- z pc� o U) z ou 608 604 O� 6G4 `BW Z �o 630 IF(APPROXFACI) 600 PROPOSED -1 GRADE AT TOP C F WALL 592----- 0 596 592 588 588 -..E. B. I I WALL 141 EXISTING GROI NDJ 1 0+00 0+50 1+00 RETAINING WALL 9 PRECAST GRAVITY RETAINING WALL SEE SHEET 213 FOR MORE DETAIL g 02 z 3 u :1 u Z OGRAPHIC SCALE IN FEET 10 20 to E- z pc� o U) z 1+50 2+00 ou C) O� 0 Z �o 0 CONTRACTOR SHALL CONSTRUCT WALL TO MEET 1+50 2+00 C) �o C) CONTRACTOR SHALL CONSTRUCT WALL TO MEET OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM I V GRAPHIC SCALE IN FEET 0 10 20 40 u+uU U+bU 1+00 1+50 2+00 RETAINING WALL 10 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL 600 600 596— 596 —596 NOTE WALL PROFILES ARE EXISTING 3ROUND-\ F- 592 55a FOR:BIDDING PURPOSES 1815 �F (APPROX FACE I—\ CONTRACTOR SHALL DRILL MORE IF 580 592 580 THE PILE TIPS ARE ANTICIPATED TO BE SED 01 ALL SUBMITSIGNEDAND \ —592 588-- THERE IS ROCK DEEPER IN THE PROFILE 588 PROPOSED A. GRADE AT BC TTOM OF WALL — 554 584 580— 580 PR )POSED BOTTOM OF WALL 576 OR EXCEED THE u+uU U+bU 1+00 1+50 2+00 RETAINING WALL 10 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL R AJNINGWALLIl BEGIN SOLDIER PILE RETAINING WALL -1-1-STA: 41-46.27 RETAINING WALL I I j! OFF:9.00'RT END SOLDIER LE RETAINING WALL -LI-STA:143+15.73 OFF:B.DO'RT I -STA '43+'S 7T3 OFF 143+0 z 1+00 GRAPHIC SCALE IN FEET 0 10 20 40 L E z P4 o C/) F— z — 600 596 0 596 NOTE WALL PROFILES ARE 592 588 592 55a FOR:BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF 580 ONLY. CONTRACTOR TO 580 THE PILE TIPS ARE ANTICIPATED TO BE SED 01 ALL SUBMITSIGNEDAND — DEEPER THAN THE BORINGS IN CASE SEALED SHOP DRAWINGS. THERE IS ROCK DEEPER IN THE PROFILE R AJNINGWALLIl BEGIN SOLDIER PILE RETAINING WALL -1-1-STA: 41-46.27 RETAINING WALL I I j! OFF:9.00'RT END SOLDIER LE RETAINING WALL -LI-STA:143+15.73 OFF:B.DO'RT I -STA '43+'S 7T3 OFF 143+0 z 1+00 GRAPHIC SCALE IN FEET 0 10 20 40 L E z P4 o C/) F— z — 600 596 0 596 1470 SF %PPROX FACE) EXISTIP G GROUND 592 588 592 55a 584 584 580 780�OM �TPR 580 SED 01 ALL — DPOSED 4-1- GRAM AT BOTTOM IF WALL 1 --J576 2+50 3+00 0+00 0+50 1+00 RETAINING WALL I I SOLDIER P LIE RETAINING WALL it SEE SHEET 2C FOR MORE DETAIL �X4 Z5 P4 of 00 C P4 0 Z 0 +50 2+00 0 cn (A CONTRACTOR SHALL CONSTRUCT WALL TO MEET OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM E .1 -rE,G-,N,-,, EGIR-E-N'T'A'L�RIETAINING WALL -U-STA141-61.34 OFF:12.50'LT 2+00 143+0--L, 00 -1-+00 1+81 o') �;RAPHIC SCALE IN FEET 0 1�0 20 40 . .. . . ........ .. RIETAJNING W LL 12 END SEGMENTAL RETAININ WALL/ -Ll- STA 144+92 63 OFF 6.00'RT RETAIN NG WALL 13 END LARGE BLOCK GRAVITY WALL ,Ll * STA:141+21,11 OFF:11.50*LT -Ll - STA -145-41.63 OFF 6-0WRT PROPOMD -LI-GRADE F OF W LL 596 596 592 592 ROPOSE -Ll- GRADE AT I OF OF WALL ---592 --- 5aa I SF (APPROX FACE) 584 VPR0P 11! —R. STA:0-5 L69 584 Sao 576 ELEV:58 U PROPOSEC BOTTOM OF WAL L LFx,,�T,NG m[ND_ Ism 5" 572 ... 57' 5" 5150 7FP, -BOTTOM 576 D-POSE04-1- GRP DE AT C F WALL EXISTING GR ).N. PROPC SED BOTTOM OF WALL Fl F S T -OR M 2-37.66 ELF 578.60 576 572 RETAIN NG WALL 13 END LARGE BLOCK GRAVITY WALL ,Ll * STA:141+21,11 OFF:11.50*LT -Ll - STA -145-41.63 OFF 6-0WRT m a�w ll u os Z MR u E- z W o U) I -- GRAPHIC SCALE IN FEET 0 10 20 40 :D x cf) V) z pq 0 -) Qf 0 I +UU 1+50 2+00 2+50 3+00 3+50 0+00 0+50 1+00 RETAINING WALL 12 RETAINING WALL 13 PRECAST GRAVITY RETAINING WALL PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL SEE SHEET 2B FOR MORE DETAIL C) NOTE: WALL PROFILES ARE FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF CONTRACTOR SHALL ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE CONSTRUCT WALL TO MEET r - SUBMIT SIGNED AND DEEPER THAN THE BORINGS IN CASE OR EXCEED THE SEALED SHOP DRAWINGS. THERE IS ROCK DEEPER IN THE PROFILE ELEVATIONS SHOWN IN THE DAIGRAM PROPOMD -LI-GRADE F OF W LL 596 592 47SSF(APPR0.lACE)- 592 588 588 584 VPR0P 11! —R. STA:0-5 L69 584 Sao 576 ELEV:58 U PROPOSEC BOTTOM OF WAL L LFx,,�T,NG m[ND_ 550 572 ... 57' m a�w ll u os Z MR u E- z W o U) I -- GRAPHIC SCALE IN FEET 0 10 20 40 :D x cf) V) z pq 0 -) Qf 0 I +UU 1+50 2+00 2+50 3+00 3+50 0+00 0+50 1+00 RETAINING WALL 12 RETAINING WALL 13 PRECAST GRAVITY RETAINING WALL PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL SEE SHEET 2B FOR MORE DETAIL C) NOTE: WALL PROFILES ARE FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF CONTRACTOR SHALL ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE CONSTRUCT WALL TO MEET r - SUBMIT SIGNED AND DEEPER THAN THE BORINGS IN CASE OR EXCEED THE SEALED SHOP DRAWINGS. THERE IS ROCK DEEPER IN THE PROFILE ELEVATIONS SHOWN IN THE DAIGRAM RETAINING WALL 14 END LARGE BLOCK GRAVITY WALL -Ll-�TA:151. 7.84 OFF .12.MT I Ji GRAPHIC SCALE IN FEET C 1 0 2 0 40 — IL 60a FOR BIDDING PURPOSES I CONTRACTOR S14ALL DRILL MORE IF 604 — 604 500— 625 SF (APPROX FACI 60C SEALED SHOP DRAWINGS- THERE IS ROCK DEEPER IN THE PROFILE 592— 608 'o, Of 592 588— PROPOSI D BOTTOM OF WA LL 5w 604 5a4 4 saol x 0+00 0+50 1+00 J+ RETAINING WALL 14 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL NOTE: WALL PROFILES ARE IL I FOR BIDDING PURPOSES I CONTRACTOR S14ALL DRILL MORE IF ONLY. CONTRACTOR TO THE PILE TIPS ARE ANTICIPATED TO BE SUBMIT SIGNED AND F- DEEPER THAN THE BORINGS IN CASE SEALED SHOP DRAWINGS- THERE IS ROCK DEEPER IN THE PROFILE RETAINING WALL 15 0+00 1+00 1+50 2+00 RETAIINIING WALL 15 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL eel t t cu u Z IL I I I E- Z: LD GRAPHIC SCALE IN FEET G 1 F- Of U) z 608 'o, Of 0 604 0 'o x -600 592 5w 5" 580 2+50 2+75 Z cn tt CONTRACTOR SHALL CONSTRUCT WALL TO MEET 00 OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM Drawing name: K:\CHL—PRJ\015016 City of Charlatte\166 X—CLT Seg 1\04—CADD\02—PLANS\50 RETAINING WALL.d.g RW -09 Ap, 19. 2017 5.,36pm by. Giro.St,.g. 0. " —'. '-.. ... �� --1. .1 —­ ­— .... .. . 0 —... 1. —1 -11 � .. .ft -. — 1. — � .1 —... �.. . - A—— (n z T . 0, '0 jo� , C F M M .-< co C-) c) > 4100, X0 . z 2 - as . C) -0 z -0 ;' . C) c 0 0 8 ;6 -n > Zzm I, I > 0 En ;0 m -4 x m m 0 m m m X 'a -, M M Fa in 0� '(On > a mx;0 � C) m M + m 0 z C) XMEM03 coom m ). -4 M 0 (A 0 -.fi Jimm F* rn m c c C m ME, 0 G) 0 + m '2 1 �� 9 m 0 g g r CD z z 5: rSIIJ,Li RW -09 Cil CD m 0 0 M 0 � 0 'Z' z PROGRESS SET NOT FOR CONSTRUCTION 01 0 z W C P, + - 0 in M m -4 Ln 0 c; m CADVILLPAIII z 70 zmC) K m m L m -q NdW z z 5: rSIIJ,Li RW -09 CROSS CHARLOTTE TRAIL 015016186 AS NO I 1U PROGRESS SET NOT FOR CONSTRUCTION NO. DAIL BY Pl.- P—.red B,: Kimley)))Hom (D 2017 NC LICENSE NO. F-0102 200 South Tryon Stree`t� Suite 200 Charlotte, North Carolina 28202 ph.c.. (704) 333-5131 0 CADVILLPAIII — 70 RETAINING WALL NdW GO CHECKLDOY PREVAKLUSY 111.0 APPROVED 8Y 09/01/2010 DAII 0 L—IJ 4 z z 5: rSIIJ,Li RW -09 CROSS CHARLOTTE TRAIL 015016186 AS NO I 1U PROGRESS SET NOT FOR CONSTRUCTION NO. DAIL BY Pl.- P—.red B,: Kimley)))Hom (D 2017 NC LICENSE NO. F-0102 200 South Tryon Stree`t� Suite 200 Charlotte, North Carolina 28202 ph.c.. (704) 333-5131 0 CADVILLPAIII — 70 RETAINING WALL NdW GO CHECKLDOY PREVAKLUSY 111.0 APPROVED 8Y 09/01/2010 DAII D,..Irg r.rne: K:\CHL-PRJ\015016 City of Cho,lotte\166 X -CLT Sag 1\04-CADD\02-PLANS\50 - RETAINING WALL.d.g RW -10 Apr III, ibb, bbbb..'L. Ib,Ib- .1b, __I. M -1- P'- ­d b, b- ­t W .-1. 1, -4d wly th, tbbdft b,,,b, d- f, It -d. Abb., f .4 ow. by --H. M�bkt.. W�. M01 b. Al -k I-Ity tl KW,�H� A-4,. W 0 z T- - 0 rn r - co 7< C) 0 0 , 0 _0 C) , z -0 T, , c 0 8 ;o > ;a 0 Z 0, c) > m c) m mmmo MMM4m 'a .0 1 I'll, I " In in In m x :1 R, 0 > -0 0 z fA m -4 > (.0 x M In M M M to > P 0 0 z IT m -4 X M Z In 0 0 a ;D -4 In 0 0 + m m 'n 0 r In 0 In I_ j Ln 0 + In M 0 w r X!2 M In X M M q:s c) in M;u Z 0 0 > M Ir + CD 0 Ln 0 ob 0 0 F/ F1 z c 0 I to S Ar cp " X1. Lt,� E.E'A 0. L) b SHELI - RW -10 CROSSCHARLOTTE— TWAIL Moiailsa 7777�7 SET-- NOT FOR CONSTRUCTION NO. VAIL By DESCRIPTION 1I Prepared BY: Kimley*Horn Nc LICENSE NO. F-0102 C) 2017 200 South Tryon Street, Suite 200 ch, rlotte, North Carolina 28202 Ph.n,: (704)333-5131 0 - CADFILLPAIH ----------PROGRESS 01 70 RETAINING WALL NJA GD CHLCKLO BY PRbPAKEDBY APPROVED BY /01/2016 DAIE Drawing name: K:\CHL-PRJ\015016 City of Chorlotte\166 X -CLT Sag 1\04-CADD\02-PLANS\50 RETAINING WALL.dwg RW -11 Apr 19. 2017 5: 36pm by G.— St -g. 0. --1 t' —1. h, --,J -11 1� '-ft —'-H. Al—t1l 11 —J bl I—Al 1. —1-- 0 , Z 0 0 m ;0 m 00 n > 0 z M M C) z � x MO 0 C) -1 > 0 z z M OM C) m > to x I'm m 0 M M M Z ;o M , -4 M M F= 0 > M 0 0 z U) M X > M M M C) M ED > r- 6 'a - Z ` + M , =1 0 0 2 , C) :5 ILI) > M MO , 0 a ;a X > � M 0 M 0 -n to I m m I c c 4 li c M M 0 M M m M;, m z z + C) 0 > Z m 0 0 Gj 0 0 m M m 0 V > C) CD < -ri Z 0 a M M :* K M 0 > ;a M C, 2. m 0 )> + c -4 0 c PROGRESS SET NOT FOR CONSTRUCTION 1 )IIE 61 DI-RIPHU, Han, P ....... It It, Kimley*Horn (D 2617 NC LICENSE NO. F-0102 M CADFIUPAIII .8 0 M> CHLCKILI)BY 70 RETAINING WALL . I 0 (JURLOM. L 09/01/2016 APPROVED BY 0,,Ii, llh..- 1104) 333-5131 0- > In z o r o 0 I =1 o C' C, c 0 3 L r 0 o x m M m 0 V > C) CD < -ri Z 0 a M M :* K M 0 > ;a M C, 2. m 0 )> + c -4 1 N 911 LIKE F, 0 ,W-1 I 0 c PROGRESS SET NOT FOR CONSTRUCTION 1 )IIE 61 DI-RIPHU, Han, P ....... It It, Kimley*Horn (D 2617 NC LICENSE NO. F-0102 M CADFIUPAIII M> CHLCKILI)BY 70 RETAINING WALL 200 South 'rryon Street, Suite 200 Charlotte, "arlh Carolina 28202 (JURLOM. L 09/01/2016 APPROVED BY 0,,Ii, llh..- 1104) 333-5131 z r 0 0 3 0 1 N 911 LIKE F, 0 ,W-1 I CROSS CHARLOTTE TRAIL MOM88 PROGRESS SET NOT FOR CONSTRUCTION 1 )IIE 61 DI-RIPHU, Han, P ....... It It, Kimley*Horn (D 2617 NC LICENSE NO. F-0102 M CADFIUPAIII NJA PREPAIRLI) BY CHLCKILI)BY 70 RETAINING WALL 200 South 'rryon Street, Suite 200 Charlotte, "arlh Carolina 28202 (JURLOM. JLD 09/01/2016 APPROVED BY 0,,Ii, llh..- 1104) 333-5131 Drawing name: K:\CHL-PRJ\015016 City of Charlotte\166 X -CLT Seg 1\04-CADD\02-PLANS\50 RETAINING WALL.dwg--RW-13 Apr 19, 2017 5: 37pm by Gina.Strago 0' �. —.1. �-- .. - .1 -Io. h..., .. . ­- . -.. % .— .1, . .. .— ­ .1 . . 11 .. —.. �.. .1 - o.. "-. . I.. —­ .­ -,. ­­ - 000pt— o, O,z 0 z SET NOT FOR CONSTRUCTION 51 R m m a) 0 01ARMTM 1 :< C To C) CAD FILL PA I H U) z z 0 NJA NEFARIE08Y 0 JLD APPROVEDBY m 0 C 0 -1 11 > 0 -0 M 0 z M . cr, C) m > �o U) Do m x M x M M M Z M 'a , M M F: m 313 x :1 IN > .0 0 z 14) X X -1 > U) a x ;13 MMM M M > o0z M , =1 > -1 rn M ,.0 X M M (a 0 O,m r If 'cc 1P 0 + M M M M 0 MM -n 5 2 0 0 M M r29 . 0 r - M z 17 + m cn a 0 M 0 -40 CD ,13 ch M M M M 0 CA X I z 0 0 M M "Y Mo r + M Ul 02. 0 mo v g 0 -4 cyl CROSS CHARLOTTE TRAIL 015016M J06 NO AS NOTED SCALE SET NOT FOR CONSTRUCTION Plans Prepared By: KidepMorn Nc LICENSE NO. F-0102 (C) 2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 29202 Phone: (704)333-5131 0 01ARMTM 1 CAD FILL PA I H OF 70 0 NJA NEFARIE08Y 'PROGRESS GD CFJLcKLDBY JLD APPROVEDBY 09/01/2016 DAIE > z z 0 0 it 0 r z -40 CD ,13 ch M M M M 0 CA X I z 0 0 M M "Y Mo r + M Ul 02. 0 mo v g 0 -4 cyl -af`� 7,75— m 0 , 0 M z "00 �0-i, 0 0 c Z 0 C) 0 M M a > 0 F, z MM' 2 r SHLEJ RW -13 CROSS CHARLOTTE TRAIL 015016M J06 NO AS NOTED SCALE SET NOT FOR CONSTRUCTION Plans Prepared By: KidepMorn Nc LICENSE NO. F-0102 (C) 2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 29202 Phone: (704)333-5131 0 01ARMTM 1 CAD FILL PA I H OF 70 RETAINING WALL NJA NEFARIE08Y 'PROGRESS GD CFJLcKLDBY JLD APPROVEDBY 09/01/2016 DAIE > z 0 0 r z -af`� 7,75— m 0 , 0 M z "00 �0-i, 0 0 c Z 0 C) 0 M M a > 0 F, z MM' 2 r SHLEJ RW -13 CROSS CHARLOTTE TRAIL 015016M J06 NO AS NOTED SCALE SET NOT FOR CONSTRUCTION Plans Prepared By: KidepMorn Nc LICENSE NO. F-0102 (C) 2017 200 South Tryon Street, Suite 200 Charlotte, North Carolina 29202 Phone: (704)333-5131 0 01ARMTM 1 CAD FILL PA I H OF 70 RETAINING WALL NJA NEFARIE08Y 'PROGRESS GD CFJLcKLDBY JLD APPROVEDBY 09/01/2016 DAIE Ei .1 NOTE: WALL PROFILES ARE blJ4 600— iXISTING GROUNE 90 � SF (APPROX FAC E) 60c CONTRACTOR SHALL DRILL MORE IF 596 —596 THE PILE TIPS ARE ANTICIPATED TO BE 592 SUBMIT SIGNED AND DEEPER THAN THE BORINGS IN CASE SEALED SHOP DRAWINGS. 588- IOPOSED BOTTO F WALL 5M 584- L PROPOSED -Y4, GRADE AT BOTTOM OF, WALL -584 592 RRni 0+00 0+50 1+00 1+39 RETAINING WALL 24 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL 00 0+50 RETAINING WALL 25 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL GRAPHIC SCALE IN FEET 0 10 20 40 CONTRACTOR SHALL CONSTRUCT WALL TO MEET OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM W, - t, u z 7ff u E--4 Z 0 In z 0 Of 0 0 �- 0 E4 z c� w C cl) C 04 u NOTE: WALL PROFILES ARE 500 EMSTING GRC UND FOR BIDDING PURPOSES CONTRACTOR SHALL DRILL MORE IF ONLY. CONTRACTOR TO —596 THE PILE TIPS ARE ANTICIPATED TO BE SUBMIT SIGNED AND DEEPER THAN THE BORINGS IN CASE SEALED SHOP DRAWINGS. THERE IS ROCK DEEPER IN THE PROFILE 00 0+50 RETAINING WALL 25 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL GRAPHIC SCALE IN FEET 0 10 20 40 CONTRACTOR SHALL CONSTRUCT WALL TO MEET OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM W, - t, u z 7ff u E--4 Z 0 In z 0 Of 0 0 �- 0 E4 z c� w C cl) C 04 u 500 EMSTING GRC UND Goo -5 SF (APPR DX FACE) 596 —596 592 V 592 588 588 LfROPOSED -Y4-GRADE 5114 AT BOTTOM OF � VALL P.OPOS, :0 BOTTOM Of WALL 00 0+50 RETAINING WALL 25 PRECAST GRAVITY RETAINING WALL SEE SHEET 2B FOR MORE DETAIL GRAPHIC SCALE IN FEET 0 10 20 40 CONTRACTOR SHALL CONSTRUCT WALL TO MEET OR EXCEED THE ELEVATIONS SHOWN IN THE DAIGRAM W, - t, u z 7ff u E--4 Z 0 In z 0 Of 0 0 �- 0 E4 z c� w C cl) C 04 u I Ilf t —L1— HORIZONTAI CURVE DATA CURVE 10 PI STA = 109+35.78 A= 8-03'-19' L 14.06' T 7.04' R 100.00' —LI— HORI MT, EVE DATA PI STA = 110+16.87 A = 50* -05'-31" L = 52.46' T = 28.04' R = 60.00' CURVE 11 RETAINING WALL —Ll— HORIZONTAI CURVE DATA CURVE 12 P1 STA = I t2+19.16 A = 19'-23'�23' L = 67.68', T = 34.17' R = 200.00' OWALK. W.P. 3 CUR 12 END BOARDWALK. W.P. 2 BEGIN BOAR 01 STA:'1IO+41.&,­Lj_ STA:111+67.50 —Ll— a! ETAINING WALL 5 WOODLAWN CULVERT + ETAINING WALL 7 R 111+001 112+0,1 CL L9o--"0'0­Oo- (TYP.) RETAINING WALL 3 �49 w 113 351,'L -3q' -55.14"E CURVE 10 ovx WOOD LA W N CULV ER T 6'-0. 6'-0" ANGLE SUPPORT WITH ANCHOR 0 BOLTS DOWELED LINTO CULVERT 0 WALL (TYP.) I /—PER4ATRAK TREAP MICAL CULVMT SECTION SCALE: Y4"=1'—O" 4__8EGIN BOARDWAL I K. W.P. I CL LITTLE SUGAR CREEK STA: 109+76,28 —Ll— END BOARDWALK, W.P. 4 STA: 112+52.50 —Ll— RETAINNG WALL 6 LITTLE SUGAR CREEA WALL 2 PLAN ALONG BOARDWALK SCALE: 1"=20'—O" 65'-0" (BEGIN BOARDWALK : I 0 TO END BOARDWALK) +1.63% _+0.40% 00—Ll — VERTICAL CURVE OAT c� 00 PM STA: 109+83.57 + PVI ELEV: 591.61 620 VC 30.00' 610 uj w m 600 w 580 > Ln w 126'—Z%" (WOODLAWN CULVERT) �FINISHED GRADE 85'-0" (BEGIN BOARDWALK TO END BOARDWALK) +0.40% _+2_67% In —LI— VERTICAL CURVE DATA ul PVI STA: 111+97.92 PM ELEV: 592.47 VC = 40.00' uj 54" PEDESTRIAN )FRAIL (TYP.) 580 SPACING AND L 1ION OF OCAT MICROPILE FOUNDATIONS TO BE APPROX. EXIST'ING GROUND LINEV DETERMINED BY CONTRACTOR (ALONG � SURVEY —Ll—) 1 011_nN ri gAp ITICAL BOARDWALX SECTION SCALE: %"=1'—O" ALUMINUM RAILING (TYP-) oogs A u, momms +2 _67%+O 50% —L1 — VERTICAL CURVE DATA + PVI STA: 112+81.15 Ln PVI ELEV: 594.69 620 5 VC 50.00' w 610 v)w 600 590 D oo� cn z 0 o 0 580 NOTES, DESIGN IS IN ACCORDANCE NTH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES. z 2ND EDITION. 2009 NTH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT u h 9, k- I URVE 23 BEGIN BOARDWALK, W.P.''l — —Ll— —Ll— HORIZONTAL CURVE DATA STA: 127+9,5�00 —Ll— C RVE 22 U CURVE 24 10 S36* —27.93"E PI STA = 129+99.77 '4- + A = 14* -10'-43" CURVE 24 L = 74.24' T = 37.31' STA, 131+00.00 —Ll— R 300.00' co 4� 129+00 S51" -09'-11.11'E a- MA' 130+63 TCHUNE, SEE 80 S 6j:Z.07'-3EL._5YE--, + CURVE 25 STRUCTURAL PLAN 3 8+ ix 90--00--00- (TYP.) —Ll— HORIZONTAL CURVE DATA LITTLE SUGAR CREEK CURVE 25 PI STA = 131+53.59 A = 9 1�06'-37' L = 159.02' RETAINING WALL 8 T = 101.96' R = 100.00' mom cr —Ll— VERTICAL CURVE DATA —LI— HORIZONTAL CURVE DATA CURVE 22 PVI STA: 131+17.05 m PI STA = 127+89.37 -1 A = 13'-19'-37' -1 ;e El' L = 69.78' UJ T = 35.05' STA: 131+00.00 —Ll— R 300.00' w 590 E —Ll— HORIZONTAL C RVE DATA U CURVE 23 (ALONG q SURVEY —Ll—) PI STA 129+03.57 A L 26.05' T T 13.03' R 300.00' URVE 23 BEGIN BOARDWALK, W.P.''l — —Ll— —Ll— HORIZONTAL CURVE DATA STA: 127+9,5�00 —Ll— C RVE 22 U CURVE 24 10 S36* —27.93"E PI STA = 129+99.77 '4- + A = 14* -10'-43" CURVE 24 L = 74.24' T = 37.31' STA, 131+00.00 —Ll— R 300.00' co 4� 129+00 S51" -09'-11.11'E a- MA' 130+63 TCHUNE, SEE 80 S 6j:Z.07'-3EL._5YE--, + CURVE 25 STRUCTURAL PLAN 3 8+ ix 90--00--00- (TYP.) —Ll— HORIZONTAL CURVE DATA LITTLE SUGAR CREEK CURVE 25 PI STA = 131+53.59 A = 9 1�06'-37' L = 159.02' RETAINING WALL 8 T = 101.96' R = 100.00' mom cr —Ll— VERTICAL CURVE DATA 620 < O�m PVI STA: 131+17.05 m ��l 'o -1 610 K 0 -1 ;e El' 600 UJ � � STA: 131+00.00 —Ll— 600 mcn w 590 APPROX. EXISTING GROUID LIIIE (ALONG q SURVEY —Ll—) 1 g'—n" ri FAR ryp.) PLAN ALONG BOARDWALX SCALE: 1"=20'—O" 625'-0" (BEGIN BOARDWALK TO END BOARDWALK) +0.507 +5.00% —LI— VERTICAL CURVE DATA PVI STA: 129+04.50 PVI ELEV: 595.24 VC = 100.00' 54" PEDESTRIAN FINISHED GRADE RAIL (TYP.) ,-SPACING AND LOCATION OF MICROPILE FOUNDATIONS TO BE DETERMINED BY CONTRACTOR PROFILE ALONG BOARDWALK SCALE: 1"=20'—O- +5-00% - —3-31% —Ll— VERTICAL CURVE DATA PVI STA: 131+17.05 P\A ELEV: 605-86 VC = 170.00' 620 -1 610 =F-- =:F=F t-tT171-- I I I I 1 A 600 590 580 STA: 131+00.00 —Ll— MATCHLINE. SEE STRUCTURAL PLAN 3 NOTE56 OESGN IS IN ACCORDANCE WITH THE AASHTO URFD BRIDGE DESIGN SPECIFICATIONS, TTH EDITION. 2014 WITH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO URFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION. 2009 WITH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT '00 E- z o C) u� 00 0 P4 0 Z U u u ';� I —Ll— HORIE&�RVE DATA PI STA 131+53.59 A = gl*-06'-37" L 159.02' T 101.96' R 1 00.00' END BOARDWALK. W.P. 2 STA:134+20.00 —Ll - 04 CURVE 26 .00 RETAINING WALL 9 04 —Ll— I i -z . . - S54�08'-09-27"W STA: 131+00.00 —Ll— UATrWl Wr �rC PC: 130+51.63 S36' -58' -27.93"E ---- PT. 130# +36.70 620 610 590 580 12'-0" Cl FAR 90 00-00 kTYP.j --Q — ---1 33+00 —LI— HORIZONTAL CURVE DATA CURVE 26 P1 STA = 133+33.10 A — 23'-32'-26" L = 82 ' 17 T = 41 67' q LITTLE SUGAR CREEK R = 200'.00' PLAN ALONG BOARDWAI K SCALE: 1"=20'—O" 625'-0" (BEGIN E30ARDWALK TO END BOARDWALK) '(�4 +5�.00%-3-31% —Ll— VERTICAL CURVE DATA PA STA: 131+17�05 PM ELEV: 605.86 VC 170.00' 54" PEDESTRIAN FINISHED GRADE RAIL (TYP.)l 6. I T FYP.) STA: 131+00.00 —Ll— SPACING AND LOCAT10N OF APPROX. EXISTING ROU D LI E G N N MATCHLINE. SEE MICROPILE FOUNDATIONS TO BE STRUCTURAL PLAN 2 DETERMINED BY CONTRACTOR (ALONG q SURVEY —Ll—) PROF11-E ALONG BOARDWALX SCALE: 1"=20'—O" rl) aq Ln cn 620 uj 610 w �0-0 590 580 NOTES, DESIGN IS IN ACCORDANCE NTH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION. 2014 NTH 2015 AND 2016 INTERIM REMSIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION. 2009 NTH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT. L—o IT, E- z 0 cf) cn U) z PQ 0 C-) Of c) 0 P4 0 z C IJ U CA u C4 0 u al -Ll- HORIE��RVE DATA RETAINING 0 BEGIN BRIDGE, W.P. 1 WALL 12 "0\ op 00\ PI STA = 140+63.27 STA: 140+83.80 -Ll A = 45�11'-15" L = 23.66' CURVE 30 LITTLE N T = 12. SUGAR CREEK r- r� 48' c� RETAINING WALL 10 R = 30.00' + 141+00'. S70"-36 -34.67"W 19 BENT 1, CU W.P. 2 'LEND BRIDGE. W.P. 3 45'-00'-00- (Typ.)7r STA:141+53.80 -Ll- X /rpv F.F. END BENT 1- _Z-5.00---0-537 600 - _Ll- VERTICAL CURVE DATA PVI STA: 140+39.12 Wjn amw PIA ELEV: 520.87 0 +6 VC 80.00' =a M-t� 03 590 z W�w M�w ,,Rn 570 14'-0" CLEAR 7'-0' 7'-0* ---FLl- . --TL.,'-� METAL TUBE LOW RAIL (TYP.) CONCRETE DECK �!Xsj Magillei". 0:1v I lie] Wwo i: I -Ll- HORIZONTAL CURVE DATA Pf STA = 141+75.71 �7RETAINING A = 29* -07'-26" 31 WALL 11 L = 25.42' T = 12.99' R = 50.00' tL8N 8LUNU OmWUL SCALE: 1"=10'-O' 70'-0" FILL FACE END BENT I TO FILL FACE END BENT 2 F.F. END BENT 2 35'-0" 35'-0" -0.537 +4.59%_ 5PAN A SPAN 8 100 YR FLOOD 0 -Ll- VERTICAL CURVE DATA 600 03 PM STA: 142+09.16 - ELEV: 595.84 'i � ui � " PVI ELEV: 579.96 C., 10 w VC 87.23' ji'l m 590 oz I (-FINISHED GRADE [METAL TUBE w(nw -0.53% LOW RAIL 580 IVICAL BENT FLFVA-nON SCALE: %'=l' -O* 570 NOTES: DENN IS IN ACCORDANCE WITH THE AASHTO URFD BRIDGE CRETE CAP DESGN SPECIFICATIONS, 7TH EDITION, 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION. 2009 NTH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD WITH NO IMPACT H -PILE (TYP.) E- z pr� o cn cn pq 0 C) 0 0 U u E; RETAINING WALL 13 RETAINING (i LITTLE SUGAR CRJ 4,00 WALL 12 �60'0 cp am OD 77 ' 71 , . - : –Ll – A –14 -35-W 145+00 S54' -55'-48.60"W — -------------------- -LI– HOR17ONTAL CURVE DATA CURVE 34 CURVE 33 END BRIDGE. W.P. 2 \-90--oo'-00" CURVE 33 (TYP-) STA:145+42.13 –Ll– PI STA = 1744+75.11 A= 7* -20'-26" L 12.81' BEGIN BRIDGE W.P. 1 –Ll– HORIZONTAL CURVE DATA T 6.41' STA: 144+82.13 –Ll– CURVE 34 R 100.00' PI STA = 145+55.59 A= 14�05'-04" L = 24.58' T = 12.35' R 100.00' PLAN ALONG BRIDGE SCALE: 1"=10'–O" F.F. END BENT 1— 60'-0" FILL FACE END BENT 1 TO FILL FACE END BENT 2 --F.F. END BENT 2 SPAN A +4.59% +0.92% n n w C'i �Ll– VERTICAL CURVE DATA 0.0– 0 + 9 + -� PREFABRICATE w PM STA: 144+44.62 Q:,t m PEDESTRIAN TRUSS BRIDGE 600 m -* PVI ELEV; 590 ; 76 z 600 VC = 50.00 al-�e 5: FINISHED GRADE w uj -Z ;e lulw 580 570 6'-0" 6'-0" TOP 0 SAFETY RAIL –Ll– 2� CONCRETE DECK \–VERTICAL "– FLOOR BEAM DESIGN IS IN ACCORDANCE WITH THE AASHTO LRFO BRIDGE DESIGN SPECIFICATIONS. 7TH EDInON. 2014 WITH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO URFO GUIDE ORD FLOOR BRACE DIAGONAL–/ �–BOTTOM CHORD SECTION THROUGH BRIDGE SPAN SCALE: %"=l'–O* 580 AL ��APPROX. EXISTING GROUND LINE (ALONG SURVEY –Ll–) 570 PROFILE ALONG BRIDGE SCALE: 1"=10'–O" Im4w E- z �4 o C) :D cf) z 0 C-) 00 0 NOTES: DESIGN IS IN ACCORDANCE WITH THE AASHTO LRFO BRIDGE DESIGN SPECIFICATIONS. 7TH EDInON. 2014 WITH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO URFO GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDMON. 2009 WITH 2015 INTERIM REVISIONS. LIVE LOAD – 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD WITH NO IMPACT. 0 w -Ll- HORIE�RVE DATA PI STA = 162+10.82 A = 73* -23'-04" L 140.89' T 81.97' R 110.00' 10'-0" CLEAR 5--0' 5* -0' --Y4- METAL TUBE CONCRETE ILOW RAIL (Typ-)--� DECK X"I lk, z a I: I kq*luF?mz:j;4 I lilt 2WIVIO z I OwIrluim", U TTLE SUGAR CREEK go,-Oo,-Oo" (TYP.) -Y4- \\r + BENT 1. W.P. 2 0 SEE PLAN AND PROFILE, SHEET 21 FOR -Y4- NORIZONTAL CURVE DATA F.F. END BENT 600 4111-4 ICY _rl S9--56 -321q:d 0-�t- 0-1 �OL-- VIEGIN BRIDGE, W.P. 1 GE, W.P. 3 P , 600+95.77 STA:600+23.63 -Y6- STA::: 0 73.63 -Y6- 0. 32 68"E _29 -56'- 'q Wp END BR0 E 3 T 0 C, PC: 601 +60,35 �c 601+60r -.501+17.54 PLAN ALONG BRIDQE SCALE: 1"=10'-O' 590 + mo, z 580 m U-1 570 T 50* -0* FILL FACE END BENT 1 TO FILL FACE END BENT 2 F.F. END BENT 2 25-0" 25'-0" SPAN A SPAN B 600 -Y4= DATA 100 YR. FLOOD P, W�CURVE TA.. 1+24.24 593.35 0 PVI ELEV., 577.50 _szz-ELEV: W fln VC 80.00' 590 a + r-.: — FINISHED GRADE METAL TUBE cz' �-�e >w LOW RAIL wwuj 580 0.00% BENT 1 �APPROX. EXISTING GROUND LINE (ALONG q SURVEY -Y4-) PRORLE ALONG BRIDGE SCALE: 1"=10'-O" TYPICAL BENT-ELEVAIM SCALE: %'=l' -O" 570 NOTES, DESIGN IS IN ACCORDANCE 'NTH THE AASHTO LRFD BRIDGE —CONCRETE CAP DESIGN SPECIFICATIONS, 7TH EDITION. 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES. 2ND EDITION, 2009 WITH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT STEEL H -PILE (TYP.) z z 7ff �le I I I F E- z o cl:� cr) 0 0 0 Z z u u '4D RETAINING WALL 18 q- LITTLE SUGAR CREEK 10. a- 167+00 -4 CURVE 51 RETAINING WALL 19—"" BEGIN BRIDGE, W.P. 1 STA: 166+82.83 —LI — —Ll— HORIZONTAL URVE DATA CURVE 51 PI STA = 166+60.69 A= 38 —16'-12" L 26.72' T 13.88' R 40.00' 14'-0" CLEAR 7'-0' 7'-0" �METLAlL TUBE LOW RAIL (TYP.) CONCRETE DECK �101—i [ti -Mi av aillm: 0:1 v I ojel mv.9 wo 21 rg"I �.,- � F.F. END BENT I-- 600 wc� 590 .0 SPAN A SPAN B /-100 YR. FLOOD 580 m 'i 570 q BENT 1, W.P. 2 40* -00'-00" (TYP.)—\ S44�42'-51.59-W END BRIDGL W.P. 31 STA:167+47.83 —Ll— PLAN ALONG BRIDGE SCALE: 1"=10'—O" —Ll— HORIZONTAL CURVE DATA CURVE 52 PI STA = 167+76.97 A = 23 —16'-00" L = 32.49' RETAINING WALL 20 T = 16.47' R = 80.00' CURVE 52 "g, u g 65'-0' FILL FACE END BENT 1 TO FILL FACE END BENT 2 32* -6" 32'-6" F.F. END SENT 2 600 +5.00% SPAN A SPAN B /-100 YR. FLOOD ELEV: 591.71 —Ll— VERTICAL CURVE DATA PVI STA: 167+63.39 590 c� PVI ELEV: 575.03 VC = 80.00' FINISHED GRADE m !2 Lo TUBE Z�w 580 rMETAL LOW RAIL WOW 0.33% BENT I �APPROX. EXIST'ING GROUND LINE (ALONG q SURVEY —LI—) PROFILE ALONG BRIDGE SCALE: 1"=10'—O" TYPICAL BENT ELEVAT10N SCALE: %"—l'—O' 570 NOTES, DESIGN IS IN ACCORDANCE NTH THE AASHTO URFD BRIDGE CAP DESIGN SPECIFICATIONS, 7TH EDITION, 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO URFO GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES. 2ND EDITION. 2009 NTH 2015 INTERIM REMSIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD WITH NO IMPACT E (TYP.) 6 E- z o U) z 0 CD C 0 z U cn u (In C u -5 0 S25�44' .68"W 170+00 CURVE 54 —Ll— HORIZONTAL CURVE DATA LITTLE CURVE 54 BEGIN BRIDGE. W.P. 1_/ SUGAR CREEK PI STA 170+59.56 STA:169+52.00 —Ll— F.F. END BENT 600 Z5 �� F, 6-0- 6'-0' cl +,� Fr m 0 03 To PVI STA: 171+36.53 — z 5 PERMATRAK W�w 590 m cn w ------- �580 TYPICAL BOARDWALK SECTION 570 o 12'-0" CLEAR '8 6-0- 6'-0' +5.00% -1.82% HANDRAIL (TYP.) PVI STA: 171+36.53 — A W PERMATRAK TREAD al TYPICAL BOARDWALK SECTION SCALE: %"=l' -O' RAILING (TYP.) A = 56 -1, -5 L = 35.57' T = 19.49' R = 35.00' PLAN ALONG BOARDWALK SCALE: 1"=10'-O" 155'-o" (BEGIN BOARDWALK TO END BOARDWALK) 54" PEDESTRIAN RAIL (TYP.) GRADE +5.00% SPACING AND LOCATION OF \�APPROX. EXISTING GROUND LINE MICROPILE FOUNDATIONS TO BE (ALONG (� SURVEY -Ll-) DETERMINED BY CONTRACTOR PROFILE ALONG BOARDWALE SCALE: 1"=10'-O' —F.F. END BENT 2 Z) +5.00% -1.82% _Ll - VERTICAL CURVE DATA 600 PVI STA: 171+36.53 — A W PVI ELEV: 591.94 VC = 50.00' 590 580 570 NOTES, DESIGN IS IN ACCORDANCE NTH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014 WITH 2015 AND 2016 INTERIM REMSIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITON, 2009 NTH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT L_@ g Z�o F U�- Z 7ff u E- z W o C/) �- u cn P4 0 -) 0 Z C u u 00 CD aN -Ll- HORIZONTAL CURVE DATA CURVE 60 PI STA = 176+59.98 A = 82* -58'-20" L = 43.44 T = 26 " 53' R = 30.00' CURVE BEGIN BRIDGE. W.P. 1 STA:176+95.91 -Li- 0� 13! w rt LITTLE SUGAR CREEK-\\\ q BENT 3, W.P. 3 —E Ll --4j78--16' 20.43- 55'-00'-00- (TYP.),/ BENT 2. W.P. 2 PLAN ALONG BRIDGE SCALE: 1"=10'-O" F.F. END BENT 1 80'-0" FILL FACE END BENT 1 TO FILL FACE END BENT 2 26'-.8. 26'-8' 26'-8" SPAN A SPANS 5PAN C 600 __74-04% -0.527 590 600 -Ll- VERTICAL CURVE DATA 03 -0.52% +5-00%- PM STA: 176+54.9,0 z YR. FLOOD 580 PVI ELEV. 574.65 Z5,> ,kw d — VC = 60.00' CD , w 570 7'-0- 7--0' METAL TUBE I LOW RAIL (TYP.) CONCRETE DECK I ml I zisillei a, 0 :1V I lie] QP wo z I I 8too 78+00 CURVE 61 'VEl 0 BRIDGE, W.P. 4 -Ll- HORI RVE DATA STA:177+75.91 -LI- TaT PI STA � 178+48"74 A = 93 * -29 1 -11" L 81.58: T 53.14 R 50.00' —F.F. END SENT 2 TYPICAL BENT ELEVAnm SCALE: %"=i' -o" NCRETE CAP H -PILE (TYP.) DESIGN IS IN ACCORDANCE NTH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION, 2009 V41TH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT all t E- z �4 o U) z 0 0 0 z �o c) u u 600 -0.52% +5-00%- YR. FLOOD -j - -Ll - VERTICAL CURVE DATA ELEV.* 590.42 ��o 590 -=Y-100 0+4 PM STA: 178+02.39 — rl rl rin PVI ELEV. 573.88 im VC 50.00' FINISHED C3 Z� < :5 �j GRADE (n w 580 METAL TUBE 1 LOW RAIL 570_ BENT 2 BENT 3 APPROX. EXISTING GROUND LINE (ALONG q- SURVEY -Y4-) PRORLE ALONG BRIDGE SCALE: 1'=10'-O" TYPICAL BENT ELEVAnm SCALE: %"=i' -o" NCRETE CAP H -PILE (TYP.) DESIGN IS IN ACCORDANCE NTH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION, 2014 NTH 2015 AND 2016 INTERIM REVISIONS AND THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION, 2009 V41TH 2015 INTERIM REVISIONS. LIVE LOAD = 90 PSF PEDESTRIAN LOAD OR AASHTO H-10 VEHICLE LOAD NTH NO IMPACT all t E- z �4 o U) z 0 0 0 z �o c) u u r SHLEI CROSS CHARLOTTE 015018188 job In AS NOTED I SCALE 2� �� �L Plans P,epn,ed By: ---- TRAIL PROGRESS SET-- Kimlley)))Horn CAD FILE PA r 1H NJM — GD NOT FOR CONSTRUCTION NC LICENSE NO. F-0102 (C) 2017 70 40 -PLAN AND PROFILE - OLD PHLVARLD by UIL11hLL' I 1 200 South Tryon Street, Suite 200 CMU"TTE JLD 09/01/2016 Charlotte, North Carolina 28202 APPROVED BY ­" .. 1- D, I F. ­_ I., — — .1 —.11. 1— -1 --11-1 — . - � — I — 1-4 — -111— 4 Phone: (704) 333-5131