Loading...
HomeMy WebLinkAbout20161069 Ver 1_401 Application_20161016OT-TTUT 7'1 ENGINEERING, INC. October 28, 2016 Ms. Sue Homewood NC DWQ, WBSCP Unit 512 North Salisbury Street Raleigh, North Carolina 27604 Subj: PAID VNL20 l PCN Application — Stormwater Plan Quality Drive Extension \0 Mocksville, Davie, Oconee County, North Carolina Shield Project #1150142-01 Dear Ms. Homewood: On behalf of the Town of Mocksville, NC, we hereby submit to your Department five (5) sets of this PCN Application package for your review and approval. Along with this package we have included a check for $240.00 to cover the required submission/review fee. A copy of the same Application (excluding the stormwater calculations) has been submitted to Mr. John Thomas with the US COE. We have included the following items and information for your approval: Five (5) PCN Applications consisting of: a. Project Summary b. Various Maps i. Vicinity Map ii. USGS Topographic Map iii. NRCS Soils Map iv. Overview Plan v. Plan View — North vi. Plan View — South vii. Stream Crossing Detail c. Stormwater Plan i. Drawings 1. Existing Conditions Plan 2. Proposed Stormwater Grading Plan 3. Stormwater Details 4. Design Calculations d. Development Plan showing possible future development Should you have any questions, please do not hesitate to call us at (704) 394-6913. Sincerely, SHIELD ENGINEERING, INC. 0-, I LL (Pincipal David Weikle, P.E. k C. Boland, P.E. Project Engineer Engineer N;\Project5\2015\1150142-01 Oualitq Prive Koad Eaten5ion\'ermit\01 Submittal Package\5u6mittal LAterdoc 4301 Taggart Creek Road Telephone 704.394.6913 Charlotte, NC 28208 www.shieldengineering.com Fax 704.394.6968 PCN APPLICATION - STORMWATER PLAN FOR STORMWATER CULVERT PLACEMENT QUALITY DRIVE EXTENSION MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA David Weikle, P.E. Project Engineer CAI/0 .� Q:•'E.S3j := S 64 3 477 ' '. NGINE��'�i /11111110 r0128 For: The Town of Mocksville Davie County, NC 27028 Shield Engineering, Inc. 4301 Taggart Creek Road Charlotte, NC 28208 October 28, 2016 C Boland, P.E. pal Engineer Manager, Engineering & Design Services &WIELD PCN Application Quality Drive Extension October 28, 2016 Mocksville, Davie County, North Carolina Page I TABLE OF CONTENTS Page ProjectDescription...........................................................................................................................2 MAPS / DRAWINGS VicinityMap....................................................................................................................................1 USGSTopo Map..............................................................................................................................2 NRCSSoils Map..............................................................................................................................3 OverviewPlan ..................................................................................................................................4 PlanView - North............................................................................................................................5 PlanView - South............................................................................................................................6 StreamCrossing Detail....................................................................................................................7 Stormwater Plan (24 x 36")......................................................................................................... 4-7 APPENDICES Appendix A: PCN Application Appendix B: Design Calculations & Specifications — Stream Culvert Appendix C: Design Calculations & Specifications — Street -Side Ditches Appendix D: Design Calculations & Specifications — Outfall Ditches Appendix E: Miscellaneous Hydrologic Data Appendix F: Development Plan Appendix G: Approved Permit H:\Frojecb\2015\1150142-01 Quality Dave road �xLcmloll\Documents\Froiect 5ummarq,Ax PCNApplication Quality Drive Extension October 28, 2016 Mocksville, Davie County, North Carolina Page 2 Project Description: The project, titled Quality Drive Extension, is being proposed and administered by the Town of Mocksville, North Carolina. A completed and signed PCN Application is included in Appendix A. The project entrance is located at the end of Quality Drive approximately 1.1 miles Northwest of Interstate 40 Exit 170 in Davie County, North Carolina. The property is bordered to the east by an existing warehouse development complex and to the west by a vacant field, some of which is wooded. The topography of the property is relatively flat, with elevations ranging from around 800' above MSL (Mean Sea Level) to around 840' above MSL. The project will involve the placement of a proposed 36" RCP culvert (and two headwalls) in an existing perennial stream as determined by the US Corps of Engineers. This stream was inspected and delineated by Mr. John Thomas (U.S. Corps of Engineers) and Ms. Sue Homewood (N.C. Department of Environmental Quality) on September 9, 1916 during a site visit. It was determined that this unnamed tributary, which eventually feeds Bear Creek to the south, is perennial at the location of the upstream headwall and intermittent farther to the north. The culvert will disturb/replace 149 linear feet of existing stream. At the upper end of the proposed culvert is approximately 0.020 acres of existing wetlands. This PCN proposes that 0.016 acres of the wetlands might be disturbed for purposes of building the storm headwall. This permit also lists the possible temporary disturbance of the intermittent stream in this same area. Any stream disturbance caused by construction activities will be restored to its original state. At the lower end of the proposed culvert, we are also proposing 25 linear feet of a rip rap dissipation channel to be located immediately below the culvert. The top of the rip rap will be placed in a way it is equal to the existing channel bottom so that the existing channel bottom elevation will remain the same. Approximately 20 feet of fill material will be placed above the culvert at its highest point for a new 2 -lane public road crossing. The new road will be an extension of Quality Drive in a westerly direction where it will end in a new cul-de-sac. The entire road extension will be approximately 500 feet long and will disturb approximately 2.6 acres. Farther downstream are two more areas of proposed temporary disturbance. A new sanitary sewer line is being proposed and its alignment will cross a perennial stream and an intermittent stream. Both of these disturbances will be temporary for the purposes of excavation activities and will be followed by the restoration of the streams and their banks. A detail for the restoration can be found on Drawing #7 (Maps and Drawings). Due to the uncommon scope of this project, it is being treated as a low-density development. Stormwater Controls are being provided by grassed-swales that will be constructed parallel to the proposed curb and gutter on both sides of the extended drive. Curb -cuts will be spaced at 100 foot intervals to allow for the storm runoff to enter these swales and maximize natural conveyance. PCN Application Quality Drive Extension October 28, 2016 Mocksville, Davie County, North Carolina Page 3 Completion of this project will allow public vehicular access to the other side of the stream. Possible future development is shown on the current Development Plan (Appendix F). Best Management Practices (BMP's) will be designed and provided for these future developed sites at the time they are submitted for approval to the appropriate agencies and/or municipalities. 4301 TAGGART SHIELD7043RD-6913 NC 28208 4-3-394-6913 -6968 fax ENGINEERING, INC. www. snieldengineering.com H,\PmiP.rYs\7n1S11fin147-M oi,niity flrivP R—rl Pxt—.sinn\P..mi \1150149111 VICINfN MAPAWn 10/9F/9n1R 19.59 PM nA id Wakle I 4301 TAGGART CREEK SHIELD704-3CHARLOTTE94-691 NC 2g2pgROAD 94-6968 fax FNGINFFRING INC w shieldengineering.com a�0 N _ V a O CHANCE. LN --N GRAPHIC SCALE 0 250 500 1,000 (IN FEET) 1 "=500' The drawings, specifications and other documents prepared by FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 USGS MAP.dwg Shield engineering for this project are instruments of Shield Engineering for use solely with respect to this project and, unless otherwise provided, Shield shall be deemed the author of these SCALE: 1"=500' DRAWN BY: DW documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10.25.2016 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: WILLIS ENG/NEERS QUALITY DRIVE EXTENSION 10 700 SIKES PLACE SOUTHPOINT BUSINESS PARK USGS TOPO MAP 2 CHARLOTTE, NC 28277 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA F1'1YTIP.lRC\/I n.•l\l l nl Il4/All Ul I.Inv 17nVp. K'nnn hxrP.nClnrl\PPnninl l Y714%a 7l [RI( -L%; MAP nWn 1075/7n1F 17'57 PM IlavM Wplklp 4301 SHIELD 704-39L�OTT�RNC 28208 704-39"913 704-,,.96, ENGINEERING, INC. W .shieldengineering.com n.Irw7euo�cv Ion I Ion I., -u I -my nn i IDU 14L -U 1 JVILJ IVINY.(]Wg� I WGO/Nl0 IC.5o rIVI, Jason l.ar0 v 4. M Tt a � u x 1` O N' M r. S � Map Unit Legend m Darla county. North Cwo*u (NCOW Yap Unit sMbW Yap Us* Name Acres in Ad Percent of AIQ CfIB2 Ciffard sandy clay !oats, 2 to 8 0.4 16.1% n percent slopes, moderately FaD Fairview sandy loam 15 to 45 1.0 39.9% percent slopes ll Fairview sandy clay barn. 8 .o 15 1.2 44.0% percent slopes, moderately Totals Tor Area of Interest 2.6 IODA% GRAPHIC SCALE Area of Interest (AOI) Water Features 0 75 150 300 1 Area of Interest (AOI) Streams and Canals Soils Soil Map Unit Polygons (IN FEET) 1 "=150' The drawings, specifications and other documents prepared by Shield engineering for this project are instruments of Shield FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 SOILS MAP.dwg Engineering for use solely with respect to this project and, unles SCALE: 1"=150' DRAWN BY: DW otherwise provided, Shield shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10.25.2016 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: ENGINEERSWILLIS QUALITY DRIVE 10700SIKESPLACE SOUTHPOINTBUSINESSPIARK NRCS SOILS MAP 3 CHARLOTTE, NC28277 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA n.Irw7euo�cv Ion I Ion I., -u I -my nn i IDU 14L -U 1 JVILJ IVINY.(]Wg� I WGO/Nl0 IC.5o rIVI, Jason l.ar0 4301 TAGGART CREEK SHIELD704-394-6%CHARLOTTE , 9"9113a INC 28208ROAD ENGINEERING, INC. www.shieldengineedng.wrn iI ' 1I ' I 820 V/ � I i I II ' :uP�a.$ y I I tA? a� I I ,ago I I I , •c•v � y101W OF IgCKSVQE ' I I H-\Pmiw.tc\701R11.r,n149-n10,,Ality nrivr: Rnart FxtPncinn\Px if\11Sn147.n1 Pr.NAwn 1fV)A/9MA 7-5AAM nniri WPikIP (IN FEET) I I"I I J05EPH A. HOLUNGS PN: -000- 07 1"=150' OaG3: 198 e. 97 rH I. � MAY The drawings, specifications and other documents prepared by FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 PCN.dwg Shield engineering for this project are instruments of Shield SCALE: 1" = 150' DRAWN BY: DW Engineering for use solely with respect to this project and, unles otherwise provided, Shield shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10-28-16 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: WILLIS ENGINEERS QUALITY DRIVE EXTENSION A 10700 SIKES PLACE SOUTHPOINT BUSINESS PARK OVERVIEW PLAN CHARLOTTE. NC 28177 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA H-\Pmiw.tc\701R11.r,n149-n10,,Ality nrivr: Rnart FxtPncinn\Px if\11Sn147.n1 Pr.NAwn 1fV)A/9MA 7-5AAM nniri WPikIP 4301 TAGGART CREEK 13 SHIELD704-394-6968� CHARLOTTE, NC 28208ROAD FN(31NFFRING 1NC w .shieldengineering.com uvrrn� i STREAM k IMPACT S2 EXISTING STREAM I - ��` WETLANDS IMPACT S6 + C4 POSSIBLE 3< WETLANDS DISTURBANCE I i I I - _ I I - GRAPHIC SCALE I I I o I(.00 o 0 20 40 80 M 001 + 0 I - (IN FEET) 3 1 "=40' DD i The drawings, specifications and other documents prepared by FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 PCN.dwg Shield engineering for this project are instruments of Shield Engineering for use solely with respect to this project and, unles otherwise provided, Shield shall be deemed the author of these SCALE: 1"=40' DRAWN BY: DW documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10-28-16 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: WILLIS QUALITY DEXTENSION 10700SIKESPLAECE RS SOUTHPONTIVE BUSINESS PARK PLAN VIEW - NORTH 5 CHARLOTTE, NC 28277 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA 1 TAGGART SHIELD704-394-69683ggENCR820KROAD ENGINEERING, INC. wnwshleldenglneenngcom N I W E / / ' S I STREAM IMPACT S3 -SE SSE SEWER EASEMENT _ 8. 7 PIG: 1 S I STREAM IMPACT S4 � O EXISTING WETLANDS / O GRAPHIC SCALE 0 20 ao 80 JQSEPH A. HOLLINGSWO / PN: G3-000-00-0 4- D - DB: 198 197 (IN FEET) EN RISE WAY _I-4fl _ _ Inr The drawings, specifications and other documents prepared by FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 PCN.dwg Shield engineering for this project are instruments of Shield Engineering for use solely with respect to this project and, un es otherwise provided, Shield shall be deemed the author of these SCALE: 1"=40' DRAWN BY: DW documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10-28-16 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: WILLIS ENGINEERS QUALITY DRIVE EXTENSION 10700 SIKES PLACE SOUTHPOINT BUSINESS PARK PLAN VIEW - NORTH 6 CHARLOTTE, NC 28277 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA Irl I nerl Mil i I -/I I I �I I I uiy I I \ �I lall\V I InvF? Knan rx\P.n�lnn\YPRilil\ I I.'11I 14/a 1 I Yt .IV llwfl I11//nl/i l i h / '�h HM I )A\/Ifl UVP.INIe 4301 TAGGART - SHIELD 0H3R�-6913 C R82 BROAD -6968 fax ENGINEERING, INC. wwwshieldengineenng.com MATCH EXISTING UPSTREAM AND DOWNSTREAM STREAMBANK -11 = ! I= I I_ �— 1Lli2 RR �b 2.0 (MIN) CLASS B EROSION 0 CONTROL STONE, MIN. 18" THICK NON—WOVEN FILTER FABRIC NEW SEWER NOTES: STONE SHALL NOT BE PLACEDI IN BOTTOM OF STREAM 1. PROVIDE STABILIZATION MIN. 10 FEET EACH SIDE OF SEWER OR DISTURBED STREAMBANK. STREAM STABILIZATION The drawings, specifications and other documents prepared by FILE NUMBER: 1150142-01 DRAWING NAME: 1150142-01 PCN.dwg Shield engineering for this project are instruments of Shield Engineering for use solely with respect to this project and, unles otherwise provided, Shield shall be deemed the author of these SCALE: N.T.S. DRAWN BY: DW documents and shall retain all common law, statutory and other reserved rights, including copyright. DATE: 10-28-16 CHECKED BY: KAA CLIENT NAME: PROJECT NAME: SHEET TITLE: WILLIS ENGINEERS QUALITY DRIVE EXTENSION 10700SIKESPLACE SOUTHPOINT BUSINESS PARK STREAM CROSSING DETAIL 7 CHARLOTTE, NC 28277 MOCKSVILLE, DAVIE COUNTY, NORTH CAROLINA n �rrniencv� nu ni i , rI u1 -I v I I— Hnan rvr ,—n rammnl N n4i4 n M :N nwn l 110MIA11h f-hh AM I )avid VV2ikle o Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 12&39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular N Non -404 Jurisdictional General Permit N 401 Water Quality Certification — Express N Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: XN Yes ❑ No For the record only for Corps Permit: ❑X Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes NX No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes NX No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: QUALITY DRIVE EXTENSION 2b. County: DAVIE 2c. Nearest municipality / town: TOWN OF MOCKSVILLE 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: MAJORITY OF PROJECT WITHIN TOWN OF MOCKSVILLE R/W (QUALITY DR.) 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): TOWN OF MOCKSVILLE 3d. Street address: 171 S. CLEMENT STREET 3e. City, state, zip: MOCKSVILLE, NC 27028 3f. Telephone no.: (336) 753-6700 3g. Fax no.: (336) 751-9187 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: DAVID WEIKLE 5b. Business name (if applicable): SHIELD ENGINEERING 5c. Street address: 4301 TAGGART CREEK ROAD 5d. City, state, zip: CHARLOTTE, NC 28208 5e. Telephone no.: (704) 394-6913 5f. Fax no.: (704) 394-6968 5g. Email address: DWEIKLE@SHIELDENGINEERING.COM Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): G30000008406, G30000008410 1 b. Site coordinates (in decimal degrees): Latitude: 35.934898 Longitude: -80.6036 1c. Property size: 15.26 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: BEAR CREEK 2b. Water Quality Classification of nearest receiving water. C 2c. River basin: YADKIN PEE-DEE 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: THE IMMEDIATE WORK AREA IS UNDEVELOPED, MOSTLY OPEN GRASS FIELD, IMMEDIATE AREA ADJACENT TO EXISTING PERENNIAL STREAM IS WOODED. 3b. List the total estimated acreage of all existing wetlands on the property: 0.1 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 885 3d. Explain the purpose of the proposed project: TO EXTEND QUALITY DRIVE APPROXIMATELY 500 LINEAR FEET. EXTENSION WILL INVOLVE CROSSING OVER A PERENNIAL STREAM. APPROXIMATELY 1,300 LF OF 8 -INCH SEWER AND 450 LF OF 12 -INCH WATER LINE WILL BE INSTALLED 3e. Describe the overall project in detail, including the type of equipment to be used: SEE ATTACHED. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? X❑ Yes ❑ No ❑ Unknown Comments: BOTH DEPARTMENTS HAVE BEEN TO THE SITE. 4b. If the Corps made the jurisdictional determination, what type of determination was made? PreliminaryX Final El ❑ 4c. If yes, who delineated the jurisdictional areas? Name (if known): JOHN THOMAS Agency/Consultant Company: US CORPS OF ENGINEERS Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. SEPTEMBER 9, 2016. MET WITH JOHN THOMAS (US CORPS OF ENGINEERS) AND SUE HOMEWOOD (NC DEQ). NO DOCUMENTATION WAS RECIEVED DURING THE SITE VISIT. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? X❑ Yes 11 No El unknown 5b. If yes, explain in detail according to "help file" instructions. A 151' LONG CULVERT WAS PERMITTED BACK IN 2010 (SEE ATTACHED PERMIT). HOWEVER, THIS CULVERT WAS NEVER INSTALLED. 6. Future Project Plans 6a. Is this a phased project?X❑ Yes ❑ No 6b. If yes, explain. THE PROPERTY ON THE WEST SIDE OF THE EXISTING STREAM WILL BE DEVELOPED IN THE FUTURE. THE NEW ROAD CROSSING IS TO ALLOW ACCESS TO THIS PORTION OF THE OVERALL WAREHOUSE PARK. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X WetlandsX❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 P Excavation Unknown Yes Corps 0.016 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.016 2h. Comments: PROPOSED DISTRUBANCE TO THE WETLANDS IS TO ALLOW FOR THE CONSTRUCTION OF A HEADWALL FOR THE NEW CULVERT. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert UNNAMED PER Corps 5 149 S2 T Excavation UNNAMED INT Corps 5 35 S3 T Excavation UNNAMED PER Corps 5 30 S4 T Excavation UNNAMED INT Corps 3 31 S5 Choose one _ S6 T Stabilization UNNAMED PER Corps 5 25 3h. Total stream and tributary impacts 270 3i. Comments: ONE HUNDRED AND FORTY NINE FEET (AS THE EXISTING STREAM FLOWS) IS BEING PROPOSED FOR DISTURBANCE FOR THE CONSTRUCTION OF A NEW CULVERT TO ALLOW FOR A PUBLIC ROAD CROSSING. IMPACT S2 IS LISTED TO ALLOW FOR POSSIBLE DISTURBANCE OF THE EXISTING CREEK IF NECESSARY TO ALLOW FOR CONSTRUCTION OF THE HEADWALL. MINIMAL DISTURBANCE MAY BE REQUIRED. IMPACT S6 IS FOR RIP RAP DISSIPATER TO BE GRADED TO MATCH EXISTING BOTTOM OF CHANNEL. IMPAC I AREAS 53 AND 54 ARE CONSIDERED TEMPORARY IMPACTS DUE TO THE EXCAVATION THAT IS REQUIRED TO INSTALL A NEW SEWER LINE. THESE AREAS WILL BE RESTORED TO THEIR ORIGINAL STATE AFTER ALL CONSTRUCTION ACTIVITIES ARE CONCLUDED. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: N/A 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse Tar -Pamlico Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. LARGE HEADWALLS (APPROXIMATELY 11 FEET IN HEIGHT) ARE BEING PROPOSED TO MINIMIZE OVERALL IMPACT LENGTH TO THE EXISTING PERENNIAL AND INTERMITTENT STREAM AS DETERMINED BY THE CORPS OF ENGINEERS. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. SPECIAL CARE WILL BE TAKEN DURING THE CONSTRUCTION OF THE HEADWALLS TO HELP MINIMIZE DISTURBANCE TO THE EXISTING STREAM. TEMPORARY DISTURBANCE OF THE STREAM JUST NORTH AND SOUTH OF THE TWO HEADWALLS MAY BE NECESSARY DURING CONSTRUCTION ACTIVITIES TO FACILITATE THE REQUIRED CONSTRUCTION. THE STREAM WILL BE RETURNED TO ITS NATURAL STATE AFTER ALL CONSTRUCTION HAS BEEN COMPLETED. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires E] Yes Q No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). N/A 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes Q No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 18% 2b. Does this project require a Stormwater Management Plan? ❑X Yes []No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: WE ARE PROPOSING THE USE OF GRASS DITCHES JUST OUTSIDE THE PROPOSED CURB AND GUTTER. CURB CUTS IN THE CURB AND GUTTER WILL ALLOW FOR THE PASSAGE OF STORMWATER RUNOFF TO THE NEW DITCHES TO HELP FACILITATE THE TREATMENT OF THE RUNOFF FROM THE STREET. THESE DITCHES WILL LEAD TO PERMANENTLY MATTED GRASS DITCHES TO CONVEY THE WATER ALONG THE 3:1 SLOPE AND TO THE CREEKBED BELOW. THIS HAS BEEN INITIALLY APPROVED BY CORY LARSEN WITH THE 401 & BUFFER PERMITTING BRANCH OF THE NC DEQ. 2e. Who will be responsible for the review of the Stormwater Management Plan? NC DEQ - SEE SECTION 2d ABOVE 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? TOWN OF MOCKSVILLE ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? X❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes X❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, El Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑YesX❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. PROPOSED DEVELOPMENT WILL INCLUDE BMP FACILITIES FOR EACH NEW CONSTRUCTION TO TREAT STORMWATER ON-SITE PRIOR TO THE RUNOFF GETS TO ANY DOWNSTREAM AREA. A PROPOSED DEVELOPMENT PLAN HAS BEEN INCLUDED WITH THIS PERMIT TO SHOW WHERE THE PROPOSED BMP FACILITIES MAY BE PLACED AT THE TIME OF CONSTRUCTION. 4. Sewage Disposal (DWQ Requirement) 4a. Cleady detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. THE PROJECT INVOLVES A SEWER EXTENSION CONSISTING OF APPROXIMATELY 1,300 FEET OF 8 -INCH SEWER. THE TOWN HAS SUBMITTED A SEWER SYSTEM EXTENSION APPLICATION IN ACCORDANCE WITH THE NON -DISCHARGE REQUIREMENTS OF 15A NCAC 02T. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS THREATENED & ENDANGERED SPECIES ENVIRONMENTAL CONSERVATION ONLINE SYSTEM. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat?T ❑ Yes Q No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA HABITAT CONSERVATON WEBSITE 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC STATE HISTORIC PRESERVATION OFFICE WEBSITE. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NORTH CAROLINA FLOOD RISK INFORMATION SYSTEM WEBSITE (NC FLOODMAPS) Ghristiwj 13wuy &44 OGt �,201k0 Applicant/Agent's ignature Applicant/Agent's Printed Name Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Hydraflow Table of Contents Hydraflow.gpw Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2016 by Autodesk, Inc. 00.5 Tuesday, 09 / 27 / 2016 HydrographReturn Period Recap............................................................................. 1 2 - Year SummaryReport ......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 1, Rational, CULVERT Tc.............................................................................. 3 TR -55 Tc Worksheet............................................................................................................ 4 10 - Year SummaryReport ......................................................................................................................... 5 HydrographReports................................................................................................................... 6 Hydrograph No. 1, Rational, CULVERT Tc.............................................................................. 6 25 - Year SummaryReport ......................................................................................................................... 7 HydrographReports................................................................................................................... 8 Hydrograph No. 1, Rational, CULVERT Tc.............................................................................. 8 50 - Year SummaryReport ......................................................................................................................... 9 HydrographReports................................................................................................................. 10 Hydrograph No. 1, Rational, CULVERT Tc............................................................................ 10 100 - Year SummaryReport ....................................................................................................................... 11 HydrographReports................................................................................................................. 12 Hydrograph No. 1, Rational, CULVERT Tc............................................................................ 12 OFReport.................................................................................................................. 13 Hydrograph Return Period Re,Pr.PN, Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 Rational -- ----- 54.18 -- 0.000 71.42 79.83 85.26 90.42 CULVERT Tc Proj. file: Hydraflow.gpw Tuesday, 09 / 27 / 2016 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 313@2016 by Autodesk, Inc. 00.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuff) Hydrograph Description 1 Rational 54.18 1 11 35,761 ---- ---- ---- CULVERT Tc Hydraflow.gpw Return Period: 2 Year Tuesday, 09 / 27 / 2016 Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 09 / 27 / 2016 Hyd. No. 1 CULVERT Tc Hydrograph type = Rational Peak discharge = 54.18 cfs Storm frequency = 2 yrs Time to peak = 11 min Time interval = 1 min Hyd. volume = 35,761 cuft Drainage area = 36.200 ac Runoff coeff. = 0.37* Intensity = 4.045 in/hr Tc by TR55 = 11.00 min OF Curve =IDF Curve.IDF Asc/Rec limb fact = 1/1 * Composite (Area/C) = [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)] / 36.200 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 CULVERT Tc Hyd. No. 1 -- 2 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Y1 1 1 1 1 1 1 1 1 1 " 0.00 0 2 4 6 8 10 12 14 16 18 20 22 Hyd No. 1 Time (min) TR55 Tc Worksheet Hyd. No. 1 CULVERT Tc 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. A 0.5 Description A B C Totals Sheet Flow Manning's n -value = 0.035 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.41 0.00 0.00 Land slope (%) = 2.70 0.00 0.00 Travel Time (min) = 6.33 + 0.00 + 0.00 = 6.33 Shallow Concentrated Flow Flow length (ft) = 830.00 0.00 0.00 Watercourse slope (%) = 6.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.15 0.00 0.00 Travel Time (min) = 3.34 + 0.00 + 0.00 = 3.34 Channel Flow X sectional flow area (sqft) = 10.63 0.00 0.00 Wetted perimeter (ft) = 12.78 0.00 0.00 Channel slope (%) = 3.10 0.00 0.00 Manning's n -value = 0.030 0.015 0.015 Velocity (ft/s) =7.73 0.00 0.00 Flow length (ft) ({0})680.0 0.0 0.0 Travel Time (min) = 1.47 + 0.00 + 0.00 = 1.47 Total Travel Time, Tc.............................................................................. 11.00 min Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D@2016 by Autodesk, Inc. 00.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 Rational 71.42 1 11 47,140 --- — --- -- CULVERT Tc Hydraflow.gpw Return Period: 10 Year Tuesday, 09 / 27 / 2016 Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. 00.5 Tuesday, 09 / 27 / 2016 Hyd. No. 1 CULVERT Tc Hydrograph type = Rational Peak discharge = 71.42 cfs Storm frequency = 10 yrs Time to peak = 11 min Time interval = 1 min Hyd. volume = 47,140 cuft Drainage area = 36.200 ac Runoff coeff. = 0.37* Intensity = 5.332 in/hr Tc by TR55 = 11.00 min OF Curve =IDF Curve.IDF Asc/Rec limb fact = 1/1 . Composite (Area/C) _ [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)1 / 36.200 CULVERT Tc Q (cfs) Hyd. No. 1 -- 10 Year Q (Cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 Hyd No. 1 Time (min) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2016 by Autodesk, Inc. v10.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 Rational 79.83 1 11 52,686 ---- --- -- CULVERT Tc Hydraflow.gpw Return Period: 25 Year Tuesday, 09 / 27 / 2016 Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. 00.5 Tuesday, 09 / 27 / 2016 Hyd. No. 1 CULVERT Tc Hydrograph type = Rational Peak discharge = 79.83 cfs Storm frequency = 25 yrs Time to peak = 11 min Time interval = 1 min Hyd. volume = 52,686 cuft Drainage area = 36.200 ac Runoff coeff. = 0.37* Intensity = 5.960 in/hr Tc by TR55 = 11.00 min OF Curve =IDF Curve.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) _ [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)] / 36.200 CULVERT Tc Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 Hyd No. 1 Time (min) Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31302016 by Autodesk, Inc. 00.5 Hyd. No. Hydrograph time (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 Rational 85.26 1 11 56,270 ----- ---- --- CULVERT Tc Hydraflow.gpw Return Period: 50 Year Tuesday, 09 / 27 / 2016 Composite (Area/C) = [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)1/ 36.200 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 CULVERT Tc Hyd. No. 1 -- 50 Year 0 2 4 6 8 10 12 14 16 18 20 Hyd No. 1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 22 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. v10.5 Tuesday, 09 / 27 / 2016 Hyd. No. 1 CULVERT Tc Hydrograph type = Rational Peak discharge = 85.26 cfs Storm frequency = 50 yrs Time to peak = 11 min Time interval = 1 min Hyd. volume = 56,270 cuft Drainage area = 36.200 ac Runoff coeff. = 0.37* Intensity = 6.365 in/hr Tc by TR55 = 11.00 min OF Curve =IDF Curve.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)1/ 36.200 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 CULVERT Tc Hyd. No. 1 -- 50 Year 0 2 4 6 8 10 12 14 16 18 20 Hyd No. 1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 22 Time (min) 11 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. 00.5 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 90.42 1 11 59,679 -- --- --- CULVERT Tc Hydraflow.gpw Return Period: 100 Year Tuesday, 09 / 27 / 2016 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2016 by Autodesk, Inc. 00.5 Tuesday, 09 / 27 / 2016 Hyd. No. 1 CULVERT Tc Hydrograph type = Rational Peak discharge = 90.42 cfs Storm frequency = 100 yrs Time to peak = 11 min Time interval = 1 min Hyd. volume = 59,679 cuft Drainage area = 36.200 ac Runoff coeff. = 0.37* Intensity = 6.751 in/hr Tc by TR55 = 11.00 min OF Curve =IDF Curve.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(8.780 x 0.95) + (13.090 x 0.15) + (13.080 x 0.20)] / 36.200 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 Hyd No. 1 CULVERT Tc Hyd. No. 1 -- 100 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 4 6 8 10 12 14 16 18 20 22 Time (min) O CO v N X N c C[1 E N 7 N C E N E 110 O O N Lq O O O O CD . O Cn CD � O . CO O O O N N N M Q CA O O O O N CSD O f0 x N O — O O N N N M LL O O � O O 7 W O M 13 Ln O — O O N N M M C H O W co O C CD O OD 0 N cn Uf m .O O '- O O N N M M N CD LO 0 0 0 N M W O O N M M Cl) _m .0 W O W O O � � (Op CCR CM O O O O O O O O O T O O O Co O O O O a O O O N -t O O O O M h O M > M O N O O M M 7 7 D - w 0 0 0 0 0 0 w O O O O co � r- co v N O N O O M 0 7 0 C N O O O O 7 CMD O M d O O O O O O O u7 7 N O WM O O N N WO d M O COD O O O (07 O O LL D O No O O N r O N e o — o6 m O F O O O � A -i� O ICY O O CO f-- CD 00 e-0 12 OE — N M 0 O— LO N LO CD —O as 7 O O O O k T O O O O O N y C O O O trr) co Cl) C O O CD O O CO CD O ll� m O ,t O O M O N CD S O co Cl O O co CA 't NG fn (Q 2 x 2 2 2 O y _ 3.2 — N M C:1 �N N cO O CO v N X N c C[1 E N 7 N C E N E 110 O O N Lq O O O O CD . O Cn CD � O . CO O O O N N N M CA O O O O N CSD O f0 N O — O O N N N M O O � O O 7 W O M Ln O — O O N N M M H O W co O C CD O OD 0 N cn Uf C O '- O O N N M M N O O O N O O 0 N M W O O N M M Cl) _m .0 M O O N O O cn O LO 7 LO h O -It CM N0 O M Cl) co T O O O Co O O O O 10 O O O N -t O O O O M h O M > M O N O O M M 7 7 •C Q' 0 0 0 0 0 0 w O O O O co � r- co m N O N O O M 0 7 0 IL N O O O O 7 CMD O M O Cl) O O I�r 7 I�r u7 N O WM O O N N WO C M o ri o Co v ui ui (c O N O O IN r [ � F O O O � -i� O ICY O O CO f-- CD 00 e-0 12 OE — N M 0 O— LO N LO CD —O as O O O O O CO v N X N c C[1 E N 7 N C E N E 110 O O O O . CO O O O O Cl r O O O O O O O �+ O O O O O O O O O O O O O O O O TCD O O O O C O O O O N O O O O O O O O _m .0 T O O O Co O O O O !d Q' 0 0 0 0 0 0 v 0 0 m o 0 0 0 0 0 0 0 IL (D 0 0 C. 0 0 0 0 C M O O O O O O O O O O O O O O O O N O O O O O O O O O O O O T O O O O C O O L cvx C -E L_ d N O N co C O S U U > NG fn (Q 2 x 2 2 2 U HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 71.42 cfs Design Flow: 79.83 cfs Maximum Flow: 85.26 cfs Table 1 - Summary of Culvert Flows at Crossing: Crossing 1 Headwater Elevation (ft) Total Discharge (cfs) 36 Discharge (cfs) Roadway Discharge (cfs) Iterations 804.23 71.42 71.42 0.00 1 804.29 72.80 72.80 0.00 1 804.36 74.19 74.19 0.00 1 804.42 75.57 75.57 0.00 1 804.49 76.96 76.96 0.00 1 804.56 78.34 78.34 0.00 1 804.62 79.72 79.72 0.00 1 804.63 79.83 79.83 0.00 1 807.25 82.49 82.49 0.00 1 807.36 83.88 83.88 0.00 1 807.61 85.26 85.26 0.00 1 821.80 152.98 152.98 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 1 824 822 �- 820 e 818 0 816 W 814 m 812 0 810 808 Total Rating Curve Crossa*g Crossing Total Discharge (cfs) - T" 0) N M (O .. O aD N O n (O (0 (0 i� pl� t` c0 a0 O) H 0) N N N O P- m '� aa) m cO0 ;> N M M M M M M M N N M 0 0 N N- N t0 n 3 _ p m d H O T O) �p N ^ M N N M 7L W m 0 100 0 O_ 10 (O (O � y N N N N N N N N N L 7 t 0 R �n Nu� U N N N N N N N N N N N N O N t` M O O) M N I, N o Q CR� Of m O m (00 O (0 O (P Z d N N N N N N ?+ � C N C N C N C N C Nr^ C N C N C N U N U N U N .2 M to to '! w N f LL o O U� 0 0 0 0 0 0 0 0 o� d C L T (O N 00) h N W 0) N O N C O Q M V (O N (7 t` f` pl� O) O O U m t] m OM O) (0 N 0) O N M LL7 O 4 A C N a N M C V V V h 00 O N t� M (D (0 d = W O a0 o O W O W O tb eD 0 dp cD a0 O tp O co O c0 o O co d C E) > F N O ap O (O (O W N M a0 W 7 a0 a0 (O N L N (nc U H r N N aND aMO aOD O N O OI r N N M O) aD O 7 a0 �O t- a0 V aD N O U t` n In w N t` m a0 oD co * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation (invert): 800.83 ft, Outlet Elevation (invert): 798.73 ft Culvert Length: 117.42 ft, Culvert Slope: 0.0179 Culvert Performance Curve Plot: 36 820 818 c 0 816 M 814 w 812 810 m = 808 :r. Performance Curve Cvh-em 36 w a7 - Inlet Control Elev Outlet Control Elev Total Discharge (cfs) Water Surface Profile Plot for Culvert: 36 825 F-Jlkljl —815 C 0 �o IV 810 w Crossing - Crossing 1, Design Discharge - 79.8 cfs Culvert - 36, Cui%, W Discharge - 79.8 cfs 50 Station (ft) Site Data - 36 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 800.50 ft Outlet Station: 117.40 ft Outlet Elevation: 798.40 ft Number of Barrels: 1 Culvert Data Summary - 36 Barrel Shape: Circular Barrel Diameter: 3.00 ft Barrel Material: Concrete Embedment: 4.00 in Barrel Manning's n: 0.0130 (top and sides) Manning's n: 0.0130 (bottom) Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None 150 Table 3 - Downstream Channel Rating Curve (Crossing: Crossing 1) Flow (cfs) water Surface Elev (ft) Depth (ft) Velocity (ft/s) Shear (psf) Froude Number 71.42 799.49 1.09 7.52 2.11 1.45 72.80 799.50 1.10 7.56 2.13 1.46 74.19 799.51 1.11 7.60 2.15 1.46 75.57 799.52 1.12 7.64 2.17 1.46 76.96 799.53 1.13 7.69 2.19 1.46 78.34 799.54 1.14 7.73 2.21 1.46 79.72 799.56 1.16 7.76 2.23 1.47 79.83 799.56 1.16 7.77 2.24 1.47 82.49 799.58 1.18 7.84 2.28 1.47 83.88 799.59 1.19 7.88 2.30 1.47 85.26 799.60 1.20 7.92 2.32 1.47 Tailwater Channel Data - Crossing 1 Tailwater Channel Option: Trapezoidal Channel Bottom Width: 6.00 ft Side Slope (H:V): 2.50 (_:1) Channel Slope: 0.0310 Channel Manning's n: 0.0300 Channel Invert Elevation: 798.40 ft Roadway Data for Crossing: Crossing 1 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross -Section: Coord No. Station (ft) Elevation (ft) 0 0.00 825.30 1 150.00 822.20 2 200.00 821.80 3 250.00 822.00 4 300.00 823.30 5 342.00 825.10 Roadway Surface: Paved Roadway Top Width: 28.00 ft (—?T=rr. ENERGY DISSIPATION intersection point, move vertically to the upper curves until intersecting the curve for the correct flow depth, d. Find the minimum apron length, La, from the scale on the left. c. For box culverts: Use the depth of flow, d, in feet, and velocity, v, in feet/second. On the lower portion of the appropriate figure, find the intersection of the d and v curves, then find the riprap median diameter, d50i from the scale on the right. From the lower d and v intersection point, move vertically to the upper curve until intersecting the curve equal to the flow depth, d. Find the minimum apron length, La, using the scale on the left. 3. If tailwater conditions are uncertain, the median riprap diameter should be the larger of the values for minimum and maximum conditions. The dimensions of the apron will be as shown in Figure 7-3. This will provide protection under either of the tailwater conditions. 30 Outlet N 1 00 '` =a pipe T— diameter tRo) ►a —.l T i w ter < 0.500 o\ PQ 60 (« 50 ...... i,: CLASS II (12" 5 10 20 5-1 100 200 500 Discharge (ft3/sec) Figure 7-1 Design of Riprap Apron Under Minimum Tailwater Conditions LO 100 7-3 Quality Drive Stormwater Ditch Calculations Street Side Ditch #1 (North Side of Quality Drive) Q - ciA (Rational Method) where: Q = Total Flow (cfs) c = Rational Runoff coefficient I = Rainfall Intensity (in/hr) A = Drainage Area (acres) Q = 0.5 cfs C = 0.75 (assume future build -out) i = 6.78 in/hr (10 -Yr. Storm) A = 0.1 acres Street Side Ditch #2 (South Side of Quality Drive) Q - ciA (Rational Method) where: Q = Total Flow (cfs) c = Rational Runoff coefficient I = Rainfall Intensity (in/hr) A = Drainage Area (acres) Q = 1.4 cfs C = 0.75 (assume future build -out) i = 6.78 in/hr (10 -Yr. Storm) A = 0.27 acres Worksheet for V Channel - 1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.055 Channel Slope 0.05000 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 0.50 ft3/s ��S�I�.,�r �' � � �s � �' �*., �� � � r .� � ��" �• 'mac Normal Depth Flow Area Wetted Perimeter Hydraulic Radius Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Downstream Depth Length Number Of Steps Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope Subcritical 0.31 ft 0.29 ftz 1.98 ft 0.15 ft 1.88 ft 0.28 ft 0.09106 ft/ft 1.70 f/s 0.04 ft 0.36 ft 0.76 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity ft/s Infinity ft/s 0.31 ft 0.28 ft 0.05000 ft/ft 0.09106 ft/ft Bentley Systems, Inc. Haestad Methods Sol Bdoticryei'nvMaster V8i (SELECTseries 1) [08.11.01.03] 10/25/2016 8:25:56 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for V Channel - 2 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data, Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Discharge Normal Depth Flow Area Wetted Perimeter Hydraulic Radius Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Subcritical 0.055 0.05000 ft/ft 3.00 ft/ft (H:V) 3.00 ft/ft (H:V) 1.40 ft3/s 0.46 ft 0.64 ftz 2.92 ft 0.22 ft 2.77 ft 0.42 ft 0.07937 ft/ft 2.19 ft/s 0.07 ft 0.54 ft 0.81 Downstream Depth 0.00 0.00 ft Length ft/s 0.00 ft Number Of Steps Normal Depth 0 ft GVF pytput Data `,�: ft Channel Slope 0.05000 . t . Critical Slope 0.07937 Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.46 ft Critical Depth 0.42 ft Channel Slope 0.05000 ft/ft Critical Slope 0.07937 ft/ft Bentley Systems, Inc. Haestad Methods SolBtialicg4* vMaster V8i (SELECTseries 1) [08.11.01.03] 10/25/2016 8:26:19 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Quality Drive Stormwater Ditch Calculations Slope Ditch #1 (North Side of Quality Drive) Q- ciA (Rational Method) where: Q = Total Flow (cfs) c = Rational Runoff coefficient I = Rainfall Intensity (in/hr) A = Drainage Area (acres) Q = 4.3 cfs C = 0.75 (assume future build -out) i = 6.78 in/hr (10 -Yr. Storm) A = 0.85 acres Slope Ditch #2 (South Side of Quality Drive) Q - ciA (Rational Method) where: Q = Total Flow (cfs) c = Rational Runoff coefficient I = Rainfall Intensity (in/hr) A = Drainage Area (acres) Q = 2.6 cfs C = 0.75 (assume future build -out) i = 6.78 in/hr (10 -Yr. Storm) A = 0.52 acres x, SLOPED] # DRAT A AREA = C too,/ 1 �� I }' S_Op� ITCH 2 DRAINAGE AREA - 0.52 ACI. - - - - - - ('100 -- M Is -�4 Results Normal Depth Worksheet for Trapezoidal Channel - 1 Project Description Flow Area 0.62 Friction Method Manning Formula 3.11 Solve For Normal Depth 0.20 Input Data Top Width 2.99 Roughness Coefficient 0.040 0.45 Channel Slope 0.30000 ft/ft Left Side Slope 2.00 ft/ft (H:V) Right Side Slope 2.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 4.30 ft3/s Results Normal Depth 0.25 ft Flow Area 0.62 ftz Wetted Perimeter 3.11 ft Hydraulic Radius 0.20 ft Top Width 2.99 ft Critical Depth 0.45 ft Critical Slope 0.03584 ft/ft Velocity 6.95 ft/s Velocity Head 0.75 ft Specific Energy 1.00 ft Froude Number 2.69 Flow Type Supercritical fit♦ ys' 4{-.,� ¢:r f�.. Input Datc'1p k �S k `� �v l di�.Ys.� �*M �P ^�i 7�„ �v9rY 5+ �iu - dry, ltty, ',�.t`+�Z + Kst�}S�k.4`' $ ri .�d. '^ff+'.x�#<'E� ,,,.�,�5„?.d „ . Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data h. . Upstream Depth 0.00 ft Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope 10/25/2016 8:26:32 AM 0.00 ft Infinity ft/s Infinity ft/s 0.25 ft 0.45 ft 0.30000 ft/ft Bentley Systems, Inc. Haestad Methods SolBtiotldyeli*wMaster V8i (SELECTseries 1) (08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for Trapezoidal Channel - 1 GVF Output Data Critical Slope 0.03584 ft/ft Bentley Systems, Inc. Haestad Methods SoIBf3otlA4vilFfwMaster V8i (SELECTseries 1) [08.11.01.03] 10/25/2016 8:26:32 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Worksheet for Trapezoidal Channel --2 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.040 Channel Slope 0.30000 ft/ft Left Side Slope 2.00 ft/ft (H:V) Right Side Slope 2.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 2.60 ft3/s jq r . Normal Depth 0.19 ft Flow Area 0.44 ftz Wetted Perimeter 2.83 ft Hydraulic Radius 0.16 ft Top Width 2.74 ft Critical Depth 0.33 ft Critical Slope 0.03853 ft/ft Velocity 5.89 ft/s Velocity Head 0.54 ft Specific Energy 0.73 ft Froude Number 2.59 Flow Type Supercritical k. hR xT =y,, $;"J+'t^" 1l`'^vv e "S "'°m' pG°N ' �r+ "� �-y #' x >} Cid S r .r i i.. $, a,» % s *'" °D . { Vi Ef 1�it E.JtC�... V s�`.yy,1'7,. Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 CVF Output DataMIT Upstream Depth 0.00 ft Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope 10/25/2016 8:26:44 AM 0.00 ft Infinity ft/s Infinity ft/s 0.19 ft 0.33 ft 0.30000 ft/ft Bentley Systems, Inc. Haestad Methods SolBkiatiCycli tewMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for Trapezoidal Channel - 2 GVF Output Data Critical Slope 10/25/2016 8:26:44 AM 0.03853 ft/ft Bentley Systems, Inc. Haestad Methods S0113f ndcry awMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 9/27/2016 Precipitation Frequency Data Server 6.77 NOAA Atlas 14, Volume 2, Version 3 7.46 4 Location name: Mocksville, North Carolina, USA'WI- p Latitude:35.9349', Longitude: -80.6029' Elevation: 825.97 W- i =LQ ' source: ESRI Maps `ti•.. ' source: USGS (4.91-5.88) ! POINT PRECIPITATION FREQUENCY ESTIMATES (5.33-6.53) 4.64 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley 1 � (5.61-7.14) 522 NOAA, National Weather Service, Silver Spring, Maryland (3.70-4.43) 1 PF tabularI PF graphical I Maps & aerials (4.15-5.08) PF tabular 1 (4.54.5.78) 1 PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/h)) Duratiorr'� L Average recurrence interval (years) 1 2 � 10 25F 5 0-1 F 100 F 200 500 1000 4.425.22 6.13 6.78 7.54 I 8.04 8.52 8.95 9.43 9.78 5trlin (4.08-4.79) (4.84-5.69) i (5.66-6.68) 1 (6.24-7.37) (6.89-8.18) 1 (7.31-8.76) (7.68-9.29) 1 (7.99-9.79) 11 (8.32-10.4) I1 (8.51-10.8) 3.52 I 4.18 4.91 5.42 6.00 ' (3.26-3.82) 1 (3.86-4.55) I (4.54-5.35) (4.99-5.89) 1 (5.48-6.52) 15 -min 2.94 T 3.50 F 4.14 4.57 5.07 (2.72-3.19) ! (3.24-3.81) 1 (3.82-4.51) (4.20-4.97) (4.64-5.51) 30-m i n 2.01 2.42 2.94 F 3.31 F 3.76 (1.86-2.18) (2.24-2.63) (2.72-3.20) 1 (3.05-3.60) 1 (3.43-4.08) 60 -min 125 1.52 1.89 F 2.1-6F--2-.50--71 (1.16-1.36) (1.40 1.65) ! (1.74-2.05) 1 (1.98-2.34) 1 (2.29-2.72) 1 0.737 0.894 1.12 F 129 F 1.51 2 -hr (0.680-0.800)1(0.824-0.973)! (1.03-1.22) 1 (1.18-1.40) 1 (1.38-1.64) 0.526 0.638 0.801 0.925 1.09 �3r 1(0.486-0.573)1(0.589-0.697)1(0.738-0.873)11(0.849-1.01) (0.9 (0.849-1.01) 94-1.19)1 0.323 F 0.391 0.4901 0.567 0.672 6 -hr (0.298-0.352)'(0.361-0.427)x(0.451-0.535)(0.520-0.618) (0.611-0.730) 12 -hr ! 0.193 0.233 i 0.293 0.340 0.405 (0.178-0.211); (0.215-0.255){ (0.270-0.320){ (0.312-0.371), (0.367-0.440) 6.41 6.77 7.09 7.46 7.70 (5.82-6.97) 1 (6.10-7.38) 5.70 (6.34-7.76) !1 5.96 (6.58-8.21) 626 1 (6.70.8.53) 6.44 5.41 (4.91-5.88) ! (5.14-6.22) I 4.37 (5.33-6.53) 4.64 (5.52-6.90) 4.98 1 � (5.61-7.14) 522 4.07 (3.70-4.43) 1 1 (3.94-4.76) (4.15-5.08) 1 (4.39-5.49) 1 (4.54.5.78) 2.763.01 F 3.26 F 3.57 3.81 (2.51-3.00) ( 2.71-3.28) (2.91-3.56) (3.15-3.94) 1 (3.31-4.22) 1.69 1.86 F 2.03 226 2.43 (1.52-1.83) 1 (1.66-2.03) 1 (1.80-2.22) 11 (1.97-2.49) (2.09-2.69) 122 C��� 1.35 1.49 1.67 1.81 (1.11-1.33) (1.21-148) � (132-1.63) i (1.46-1.84) (1.55-2.01 i ) 0.755 F 0.839 F 0.925 1.04 1 F-1-.13 (0.682-0.821)'[(0.750-0.913)11(0.817-1.01)11(0.905-1.14) (0.971-1.25) 0.456 F 0.509 0.563 F 0.639 7F 0.698 (0.411-0.494) (0.454-0.552)r (0.496-0.611)] (0.553-0.694) (0.595-0.760) 0.118 F 0.142 F 0.179 F 0208 F 0248 If 0.280 F 0.312 F 0.345 1 0.391 F 0.428 24a1r (0.109-0.127)1(0.132-0.154)(0.166-0.194) (0.193-0.225) (0.228-0.268) (0.257-0.302) (0.286-0.337)j(0.315-0.374):(0.355-0.424) (0.387-0.464) 0.069 0.083 0.104 0.120 0.141 0.158 i 0.176 0.193 0218 0237 22-day(0.064-0.074)(,(0.077-0.089)((0.096-0.112) (0.111-0.129),(0.131-0.152) (0.146-0.170) (0.161-0.189)!(0.177-0.209) (0.198-0.235) (0.215-0.256). 3 -day 0.049 0.059 0.073 0.084 0.099 0.111 0.123 0.135 0.152 0.165 7--F (0.046 -0.052)j(0.055 -0.063)!(0.068-0.078)j(0.078-0.090) (0.092-0.106) (0.102-0.119)x(0.113-0.132)(0.124-0.146) (0.139-0.164) (0.150-0.179)1 0.039 0.047 0.058 i 0.066 0.078 0.087 0.096 0.106 1F---- 0.119 0.129 4 -lay (0.036-0.042) (0.044-0.050) 1)' (0.054-0.062)!(0.062-0.07(0.072-0.084)'(0.081-0.094) (0.089-0.104)1(0.097-0.114)1(0.109-0.129) (0.118-0.140) 7 -day 0.025 0.030 0.037 0.042 0.049 0.054 0.060 0.065 0.073 0.079 (0.024-0.027) (0.028 0.032){(0.035-0.039)!(0.039-0.(145) (0.046-0.052)(0.051-0.058) (0.056-0.064)j(0.061-0.070)!(0.067-0.079) (0.072-0.085)1 0.020 0.024 10 -day 0.029 0.033 0.038 0.042 1 0.046 0.050 0.055 0.059 -1 (0.019-0.022)1(0.023-0.026)x(0.027-0.031)(0.031-0.035) (0.036-0.040)',(0.039-0.044) (0.043-0.049) (0.046-0.053)1(0.051-0.059)1(0.055-0.063)' 0.014 0.016 0.019 0.021 0.024 0.027 0.029 0.032 0.035 0.037 20-day(0.013-0.014)! (0.015-0.017) (0.018-0.020) (0.020-0.023); (0.023-0.026): (0.025-0.028) (0.027-0.031)] (0.030-0.033); (0.032-0.037)) (0.035-0.040)1 0.011 F 0.013 T 0.015 0.017 0.019 0.021 F 0.022 T 0.024 0.025 I0.027 30 (0.011-0.012) (0.013 -0.014){(0.015-0.016);(0.016-0.018)j(0.018-0.020)1(0.019-0.022) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.025-0.029); 0.009 0.011 0.013 0.014 0.015 0.016 0.017 .018 0 0.020 0.021 45-day'(0.009-0.010)1(0.011-0.012)',(0.012-0.013) 1(0.013-0.014) (0.015-0.016)!1(0.016-0.017)1(0.017-0.018) 1(0.018-0.019)1(0.019-0.021)1(0.020-0.022)1 60 -day 0.008 1 0.010 0.011 0.012 0.013 ) ( 0.014 0.015 0.016 0.017 0.018 (0.008 0.009) (0.009-0.010);(0.011-0.012) (0.012 0.013)!(0.013 0.014 0.014-0.015) (0.014-0.016),(0.015 0.017)1(0.016-0.018) (0.017-0.019) t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top hftp://hdsc.nws.noaa.gov/hdsctpfds/pfdsjxintpage.html?lat=35.9349&lon=-80.6029&data=intensity&units=english&series=pds 1/4 9/27/2016 10 000 L 1.000 Precipitation Frequency Data Server PF graphical PDS -based intensity -duration -frequency (IDF) curves Latitude: 35 9349', Longitude: -80.6029' 0.001 — 2 -day — t0 -min — 3 -day t5 -ran — 4 -day — 30 -min — 7 -day — 60 -min — t0 -day 2 -hr — 20 -day — 3-rrr = — 6-nr — 45 -day — t 2 -hr — 60 -day E E E = m m m a m m -0 ro -0 o ro -.0-0 U1 o an rn %o �v ^' v N N rh a n o v o o Duration N R �O 1.000 C 0.100 O M N o_ v 0.010 I- CL A 0.001 1 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2. Version 3 Created (GIAT't: Tue Sep 27 12-09 47 2016 Back to Too Maps & aerials Small scale terrain lam http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_pri ntpage.htm I?lat= 35.9349&Ion=-80.6029&data=intensity&units=engl ish&series=pds Average recurrence rnte" iy9ar9) — 1 2 5 10 — 25 50 100 — 200 — 500 — 1000 IDuration 5 -mon — 2 -day — t0 -min — 3 -day t5 -ran — 4 -day — 30 -min — 7 -day — 60 -min — t0 -day 2 -hr — 20 -day — 3-rrr — 30 -day — 6-nr — 45 -day — t 2 -hr — 60 -day — 24 -hr v4 9/27/2016 Precipitation Frequency Data Server 3krn 2mi Large scale terrain 0 - Blad burg Ort* Sri stal • '311 City Wiwxon-SA ern • Durham =..Irareensl�oro •Rafe Asheville NORTH C AROL INA •Charlotte Fayettevilk i Large scale map , .,�Pport UA Johnson r,,V City Winston- ' Salern Durham Ralt Asheville Nortb Charlotte .00km 60rni Back to Top hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat--35.93498don=-80.6029&data=intensity&units=english&series=pds 314 9/27/2016 Precipitation Frequency Data Server US Deoartment of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center So, n . V'D %C9' Qoesr(o s' HDSC.QuestionsCc).noaa.aov Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_jxintpage.htmI?I at= 35.9349&lon= -80.6029&data= i ntensity&units=engl i sh&seri es= pds 4/4 NCAA Atlas 14, Volume 2, Version 3 Location name: Mocksville, North Carolina, US* AltLatitude: 35.9348', Longitude: -80.6040° Elevation: 813 ft* ' source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular Back to Too PF graphical PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration. Average recurrence interval (years) 10 25 50 100 F 200 500 1000 0.368 0.435 0.511 0.565 0.628 0.670 0.746 0.786' 0.815 5 -min 0710 I(-0786 , (0.340-0.399 0 403-0.474)' (0.472-0.557) (0.520-0.614) (0.574-0.682) (0.609-0.730 ( 0.640-0.774) (0.666-0.816 10.693-0.866)] (0.709-0.902 i K.��� ) �__ �L-�I ) 10 0.587 0.696 0.819 7, F 0.904 1.00 1.07 1.13 1.18 1.24 1.28 -min (0 .543-0.637) (0.644-0.758)1 (0.756-0.891) (0.831-0.982)1 (0,914 1.09) ! (0.970-1.16)(1.02-1.23) (1.06-1.29) 1 (1.10-1.37) (1.12-1.42) 15-f111n 0.734 0.875 1.03 I. I -47F 1.27 IF 1.35 1.431.4' 1.56 1.61 (0.679-0.797)1 (0.810-0.953) (0.956-1.13) (1.05-1.24) (1.16-1.38) ! (1.23-1.47) ! (1.28-1.55) (1.33 1.63) (1.38-1.72) 30 -rain 1.01 1.21 1.47 1.66 1.88 ! 2.04 2.18 2.32 2.49 2.61 � �' �� 11(0.930-1.09) 1.12-1.32) (1.36-1.60 ) ( ) ', (1.52-1.80 1.72-2.04) (1.97-2.38) (2.07-2.54) (2.19-2.74) 1 (2.27-2.89) ' (1.85-2.225-z.z2))---- 1.25 1.52 F 1.89 F 2.16 2.50 F 2.76 F 3.01 T 3.26 3.57 3.81 60�rrin (1.16-1.36) 1 (1.40-1.65) 1 (1.74-2.05) 11 (1.98-2.34) 1 (2.29-2.72) 1 (2.51-3.00) 1 (2.71-3.28) 1 (2.91-3.56) i1 (3.15-3.94) 1 (3.31-4.22) 1.47 F 1.79 2.24 2 58 3.03 3.37 3.71 4.06 4.51 4 86 2 -hr (2.36-2.80) (2.76-3.29) I (3.05-3.67) (3.33-4.05) (3.60-(3.60-4.44) (3.94-4.97) I��4��.97)��I (4.19-5.38) (1.36-1.60) (1.65-1.95) (2.06-2.44 I������� f 1.58 1.92 2.41 2.78 3.28 3.68 4.07 4.47 5.02 544 3 -hr (1.46-1.72); (1.77-2.09) 1 (2.22-2.62) 1 (2.55-3.02) (2.98-3.57) (3.32-4.00) 1 (3.64-4.44) 1 (3.96-4.90) 1 (4.37-5.54) 1 (4.67-6.04) 1 1.94 2.34 2.93 3.40 4.02 4.52 5.02 5.54 6.24 6.79 6 -hr I (1.79-2.11) (2.16-2.55) (2.70-3.20) (3.11-3.70) (3.66-4.37) y (4.08-4.92) 1 (4.49-5.47) 1(4.89-6.04 (5.42-6.85) (5.82-7.48) 2.33 2.81 3.53 4.10 4.87 5.49 6.13 6.79 7.69 12 -hr 8.40 (2 15.2 54) (2.59-3.08) j (3.25-3.86) (3.76-4.47) ! (4.43-5.30) 1 (4.95-5.96) 1 (5.47-6.65) (5.98-7.37) (6.66-8.36) (7.16-9.15) 2.82 3.41 4.30 5.00 5.95-'F-6 71 7.49 F 8.29 9-39-71 2"r 10.3 1 (2.62-3.05) ; (3.17-3.69) 1 (3.99-4.65) 11 (4.62-5.40) 1 (5.48-6.42) 1 (6.17-7.25) (6.86-8.09) 1 (7.57-8.96) 1 (8.53-10.2) 1 (9.28-11.1) 2�ay 3.31 3.98 4.97 5.74 6.78 7.60 F 8.449.29 10.5 11.4 (3.07-3.56) (3.71-4.29) 1 (4.63-5.36) 1 (5.33-6.18) 1 (6.27-7.30) I (7.01-8.18) (7.75-9.08) (8.51-10.0) (9.52-11.3) 1 (10.3-12.3) 3.52 4.23 11 F-5--25-7F-6--0-5---',F-7--1-3-7F7.98 8.85 9.73 10.9 3 -day 11.9 (3.28-3.78) 1 (3.94-4.55) 1 (4.89-5.65) 11 (5.62-6.50) 1 (6.60-7.66) !1 (7.37-8.58) 1 (8.14-9.52) (8.93-10.5) 1 (9.99-11.8) 1 (10.8-12.9) 3.73 4.47 I 5.53 6.36 7.47 8.36 9.26 I 10.2 4 -day 11.4 (3.48-4.00) (4.18-4.81) (5.16-5.94) ! (5.92-6.82) (6.93-8.02) (7.73-8.98) (8.54-9.96) (9.35-11.0) (10.5-12.3) ! (11.8- 3.4) 8.22 4.27 5.10 6.20 7.06 9.13 10.1 11.0 play 12.313.3 (4.00-4.57) (4.78-5.46) (5.81-6.63) (6.61-7.55) (7.67-8.79) (8.50-9.77) j (9.32-10.8) (10.2-11.8) (11.3-13.2) ! (12.2-14.3) 10�fay 4.88 5.82 6.99 -7-89-7F-9.09 10.0 11.0 11.9 13.2 14.2 (4.61-5.20) (5.49-6.19) (6.59-7.43) (7.43-8.39) ! (8.53-9.66) ! (9.39-10.7) ! (10.2-11.7) (11.1-12.7) (12.2-14.1) 1 (13.1-15.2) 6.56 r 7.76 F 9.16 F 10.3 11.7 12.9 14.0 15 2 20 -day 16.7 17.9 ! I (6.22-6.93) (7.35-8.19) (8.66-9.67) (9.69-10.8) (11.0-12.4) (12.1-13.6) (13.1-14.8) (14.2-16.1) (15.517.7) (16.6-19.1) [30-da� 8.13 9.56 11.1 12.2 13.7 14.8 15.9 16.9 r 18.4 19.4 (7.75-8.53) (9.12 10.0) (10.5-11.6) (11.6-12.8) (13.0-14.3) (14.0-15.5) (15.0-16.7) (16.0-17.8) (17.3-19.4) (18.3-20.5) 77 0120 136 149 16.5 17.7 18.820.8.80 21.4 22.5 F45-day (9.81-10.7) (11.5-12.5) 1 (13.0-14.2) (14.2-15.5) i (15.7-17.2) 1 (16.8-18.5) 1 (17.9-19.7) 1 (18.9-20.9) 1 (20.3-22.5) (21.3-23.7) j i 12.2 14.2 F 16.0 17A 19.1 20.4 21.6 22.8 24.3 60�Jay 25.5 (11.7-12.7) (13.7-14.8) (15.4-16.7 16.7 18.1) (18.3-19.9) i (19.5 21.3) (20.6-22.6) (21.7-23.9) (23.1-25.5) (24.2 26.7) ) ( 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Too PF graphical Precipitation depth rO depth(in) Precipitation depth (in) O N N NUO v JUt O O llO,u� Ut N Lr 10 -min 15 -min 30-tnin 60 -min 2 -hr 3 -hr g 6 -hr 12 -hr 24 -hr 2 -day 3 -day 4 -day 7 -day 10 -day 20 -day 30 -day 45 -day 60-dav z 0 w D a �� 0 o u N s a d C D C m C� o `L r A O C 3 M< ac C m Y d (� rD 3 v °' y w N 90 0 n fD W —i— cD o a o a F V N Gs r W N / M C 0 Ln N D i z Ln of • n 03 Precipitation depth rO depth(in) Precipitation depth (in) O N N NUO v JUt O O llO,u� Ut N Lr 10 -min 15 -min 30-tnin 60 -min 2 -hr 3 -hr g 6 -hr 12 -hr 24 -hr 2 -day 3 -day 4 -day 7 -day 10 -day 20 -day 30 -day 45 -day 60-dav v 0 Or r Ot a (^ rt ro CL C 4 aro .fD� L, rr to ? joa u) t o 9 �. ro c � a� �ro n co o� 00 00 on w IIIIIiII I �� 0 o u N s a d C cNii 0 0 0 0 C� o `L v 0 Or r Ot a (^ rt ro CL C 4 aro .fD� L, rr to ? joa u) t o 9 �. ro c � a� �ro n co o� 00 00 on 70 :. ;Johnson C�;t' ,.ria,, i 600ne Greensboro Mile Winston-Salemo o Durhamj� n o Rocky Mount ,Pisgah Ma io ror`'es ► Hicko Raleigh F h Hickory m NORTH o rt p a� '� C A 8 0 L I N'h Green Charlotte Hnrannp ede7k• „' ` ' _s1 aia . a SO km Map Repeutamaperron Large scale terrain 7373'�j� qiq i 7374 q: �I 519.. W+/ 73121 7408 r 1306- 7310'. 1405' 7307 ' Walmart Supercenter Q ,3 ea ✓r .. +'L'02- 17400 2km Map Reponamapenor Large scale map 731-3 1474' - I 1314 1414 4 A 1312 rx� 1408 M _ 7306 1310 .i 1405 1405 1307 t Walmart Supercenter a . 64 - . 601 1400 2 km Map Reporta map error Lar a scale aerial • 2 Km .. =imagery',, Report amap eru Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service Office of Hvdroloaic Development 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(a)noaa.00v Disclaimer Table A-1: Manning Equation Coefficients of Roughness Table A-1: Manning Equation Coefficients of Roughness Manning's n range I. Closed Conduits: A. Concrete Pipe............................................................................................... 0.011 - 0.013 B. Corrugated -metal pipe or pipe arch: 1. 2-2/3 by 1/2 in corrugation (riveted pipe): a. Plain or fully coated.................................................................................. 0.024 b. Paved invert (ranged values are for 25% and 50% of circumference paved): (1) Flow full depth..................................................................... 0.021 - 0.018 (2) Flow 08 depth...................................................................... 0.021 - 0.016 (3) Flow 06 depth...................................................................... 0.019 - 0.013 2. 6 by 2 -in corrugation (field bolted)................................................................. 0.030 C. Cast-iron pipe, uncoated.......................................................................................... 0.013 D. Steel pipe............................................................................................... 0.009 - 0.011 E. Monolithic concrete: 1. Wood forms, rough............................................................................. 0.015 - 0.017 2. Wood forms, smooth........................................................................... 0.012 - 0.014 3. Steel forms............................................................................................ 0.012 - 0.025 F. Cemented rubble masonry walls: 1. Concrete floor and top....................................................................... 0.017 - 0.022 2. Natural floor........................................................................................ 0.019 - 0.025 11. Open Channels, Lined (straight alignment): A. Concrete with surfaces as indicated: 1. Formed, no finish................................................................................. 0.013 - 0.017 2. Trowel finish......................................................................................... 0.012 - 0.014 3. Float finish............................................................................................ 0.013 - 0.015 4. Float finish, some gravel on bottom ................................................... 0.015 - 0.017 5. Gunite, good section............................................................................ 0.016 - 0.019 6. Gunite, wavy section............................................................................. 0.018 - 0.022 B. Concrete, bottom float finished, sides as indicated: 1. Dressed stone in mortar...................................................................... 0.015 - 0.017 2 Random stone in mortar.................................................................... 0.017 - 0.020 Page 1 of 4 http://harris.centreconnect.org/Table%20A- l .htm 5/16/2006 Table A-1: Manning Equation Coefficients of Roughness Page 2 of 4 http://harris.centreconnect.org/Table%20A- l .htm 5/16/2006 3. Cement rubble masonry .................................................................... 0.020 - 0.025 4. Cement rubble masonry, plastered..................................................... 0.016 - 0.020 5. Dry rubble(riprab)............................................................................_ 0.020 - 0.030 C. Gravel bottom, sides as indicated: 1. Formed concrete.................................................................................. 0.017 - 0.020 2. Random stone in mortar.................................................................... 0.020 - 0.023 3. Dry rubble(riprap).............................................................................. 0.023 - 0.033 D. Asphalt 1. Smooth ............................................................................................................. 0.013 2. Rough........................................................................ ..0.016 E. Concrete -lined excavated rock: 1. Good section........................................................................................ 0.017 - 0.020 2. Irregular section.................................................................................... 0.022 - 0.027 M. Open Channels, Excavated (straight alignment, natural lining): A. Earth, uniform section: 1. Clean, recently completed.................................................................... 0.016 - 0.018 2. Clean, after weathering........................................................................ 0.018 - 0.020 3. With short grass, few weeds................................................................. 0.022 - 0.027 4. In gravelly soil, uniform section, clean ................................................ 0.022 - 0.025 B. Earth, fairly uniform section: 1. No vegetation........................................................................................ 0.022 - 0.025 2. Grass, some weeds ....................................................... ............. - ...... ... 0.025 - 0.030 3. Dense weeds or aquatic plants in deep channels ............................... 0.030 - 0.035 4. Sides clean, gravel bottom.................................................................. 0.025 - 0.030 5. Sides clean, cobble bottom.................................................................. 0.030 - 0.040 C. Dragline excavated or dredged: 1. No vegetation........................................................................................ 0.028 - 0.033 2. Light brush on banks.......................................................................... 0.035 - 0.050 D. Rock: 1. Based on design section.................................................................................. 0.035 2. Based on actual mean section: a. Smooth and uniform.................................................................. 0.035 - 0.040 b. Jagged and irregular.................................................................. 0.040 - 0.045 E. Channels not maintained, weeds and brush uncut: 1. Dense weeks, high as flow depth .................................... .................. 0.080 - 0.120 Page 2 of 4 http://harris.centreconnect.org/Table%20A- l .htm 5/16/2006 Table A -l: Manning Equation Coefficients of Roughness Page 3 of 4 http://harris.centreconnect.org/Table%20A- I .htm 5/16/2006 2. Clean bottom, brush on sides............................................................. 0.050 - 0.080 3. Clean bottom, brush on sides, highest stage of flow ......................... 0.070 - 0.110 4. Dense crush, high stage........................................................................ 0.100 - 0.140 IV. Channels & Swales w/Maintained Vegetation (Values shown are for velocities of 2 & 6 fp.s.): A. Depth of flow up to 0.7 foot: 1. Bermudagrass, Kentucky bluegrass, buffalograss a. Mowed to 2 inches....................................................................... 0.045 - 0.070 b. Length 4-6 inches.......................................................................... 0.050 - 0.090 2. Good stand, any grass: a. Length about 12 inches............................................................... 0.090 - 0.180 b. Length about 24 inches............................................................... 0.150 - 0.300 3. Fair stand, any grass: a. Length about 12 inches............................................................. 0.0800 - 0.140 b. Length about 24 inches............................................................. 0.1300 - 0.250 B. Depth of flow 0.7 - 1.5 feet: 1. Bermudagrass, Kentucky bluegrass, buffalograss a. Mowed to 2 inches....................................................................... 0.030 - 0.050 b. Length 4-6 inches.......................................................................... 0.040 - 0.060 2. Good stand, any grass: a. Length about 12 inches.............................................................. 0.070 - 0.120 b. Length about 24 inches............................................................... 0.100 - 0.200 3. Fair stand, any grass: a. Length about 12 inches............................................................... 0.060 - 0.100 b. Length about 24 inches .......... ......... -....... ................................... 0.090 - 0.170 V. Street and Expressway Gutters: A. Concrete gutter, troweled finish............................................................................... 0.012 B. Asphalt pavement: 1. Smooth texture.................................................................................................. 0.013 2. Rough texture.................................................................................................... 0.016 C. Concrete gutter with asphalt pavement 1. Smooth.............................................................................................................0.013 2. Rough.............................................................................................................0.015 D. Concrete pavement: 1. Float finish ............................ ......... ..... ................ ... .--....... ........ ...... --......... 0.014 2. Broom finish...................................................................................................... 0.016 E. For gutters with small slope, where sediment may accumulate, increase above values of x by ........... ... .... ....... ........ ............ ........... ...... ..... ....... 0.002 VI. Natural Stream Channels: A. Minor streams (surface width at flood stage less than 100 feet): Page 3 of 4 http://harris.centreconnect.org/Table%20A- I .htm 5/16/2006 Table A-1: Manning Equation Coefficients of Roughness 1. Fairly regular section: a. Some grass & weeds, little or no brush ...................................... 0.030 - 0.035 b. Dense growth of weeks, depth of flow materially greater than weed height.............................................................. 0.035 - 0.050 c. Some weeks, light brush on banks ............................................. 0.035 - 0.050 d. Some weeks, heavy brush on banks ............................................ 0.050 - 0.070 e. Some weeks, dense willows on banks .......................................... 0.060 - 0.080 f For trees within channel with branches submerged at highstage, increase all above values by ....................................... 0.010 - 0.020 2. Irregular sections, with pools, slight channel meander; increase values given in 1 a -e about................................................................ 0.010 - 0.020 3. Mountain streams, no vegetation in channel, banks usually steep, trees and brush along banks submerged at high stage: a. Bottom of gravel, cobbles and few boulders .............................. 0.040 - 0.050 b. Bottom of cobbles, with large boulders ..................................... 0.050 - 0.070 B. Flood plains (adjacent to natural streams): 1. Pasture, no brush: a. Short grass.................................................................................... 0.030 - 0.035 b. High grass...................................................................................... 0.035 - 0.050 2. Cultivated areas: a. No crop......................................................................................... 0.030 - 0.040 b. Mature row crops......................................................................... 0.035 - 0.045 c. Mature field crops........................................................................ 0.040 - 0.050 3. Heavy weeds, scattered brush.............................................................. 0.050 - 0.070 Page 4 of 4 http://harris.centreconnect.org/Table%20A-1.htm 5/16/2006 SOMPOINT NORTN CAROLINA HE l,d«ar«I rw:la.t r.oe..n. —1 FUTURE POEXISTING PARK \ 2� ETAL SALE GESIPA 82,000SF 75,000SF FUTURE ' 130,0005F QUALITY ` IVE �+ I AVAILABLE r I 1 90,0005F FUTURE CARSON 1 COMFORTBIL t 108,0005F 1 216,000SF v ►. �� yapy / r a� 'Al 1 FUTURE 195'000SF DAVIE J WAREHOUS + i / ` 130,000SF DUNLOP / AIRCRAFT 1 108,0 SF 1 _ \ 1 SENEGA AMARR f I 72,500SF ' tl 108,000SF J� � f 1 I I I f I i � I I � L 1 SITE PLAN N.T.S. 10.27.15