Loading...
HomeMy WebLinkAbout20160979 Ver 1_Mitigation-Plan_DRAFT_20180703fires June 29, 2018 Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Ms. Dailey: 302 Jefferson St. Suite 110 Raleigh, NC 27605 Corporate Headquarters 5020 Montrose Blvd. Suite 650 Houston, TX 77006 Main: 713.520.5400 RES is pleased to submit the Draft Mitigation Plan for the Poplar Creek Stream Mitigation Site. The attached plan includes several important modifications from the Instrument Modification. In total the Draft Mitigation Plan presents 4,224 stream credits (versus 9,206 in the Instrument Modification). The alterations are detailed below: • All stream origins in the project have been verified by NCDWR and accurately mapped. • Reaches F1, F2,F4, F5, F6, F7, F8, YB1-D, YB1-E, and YB2-C have been removed from the project. • YB1-C Restoration reach is now 678 If. • Y132 -A now contains 863 If of P1 Restoration and 350 If of P2 Restoration. • YB2-B now contains 1,350 If of P1 restoration and 272 If of Enhancement II. • YB3 now contains 760 If of Enhancement II. We look forward to discussing this project with you in more detail as your review progresses. Thank you, Sincerely, RES Bob White, Project Manager cc: North Carolina IRT DRAFT MITIGATION PLAN Poplar Creek Stream Mitigation Site Johnston County, North Carolina USACE SAW ID: 2016-01985 Neuse River Basin HUC 03020201 Prepared by: fires Bank Sponsor: Environmental Banc & Exchange, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 919-209-1052 June 2018 "This mitigation plan has been written in conformance with the requirements of the following: • Federal rule for compensatory mitigation project sites as described in the Federal Register Title 33 Navigation and Navigable Waters Volume 3 Chapter 2 Section § 332.8 paragraphs (c)(2) through (c)(14). EXECUTIVE SUMMARY The Poplar Creek Project ("the Project") is located in Johnston County, approximately three miles north of Smithfield and contains approximately 32 acres of conservation easement (Figure 1). Water quality stressors currently affecting the Project include livestock production, agricultural production, closed drainage system, and an impoundment. The Project presents 4,273 linear feet (LF) of stream restoration, enhancement, and preservation, generating 4,224 Stream Mitigation Units (SMU) along three unnamed tributaries that drain into Poplar Creek. The Project is located in the Neuse River Basin within Cataloging Unit 03020201, TLW 03020201100040, and NCDWR sub -basin 03-04-02. The portion of the Neuse River Basin that includes Poplar Creek and the four project tributaries has been assigned as Water Supply IV (WS -IV) and Nutrient Sensitive Waters (NSW), (NCDWQ 2011). Consisting of wooded riparian areas that livestock have complete access to and one pond, the Project's total easement area is approximately 32 acres within the overall drainage area of 190 acres. The Project is broken up into five portions that are divided by Lee Youngblood Loop. Grazing livestock have historically had access to all stream reaches within the Project and the impoundment, leading to unstable channel characteristics and the over degradation of the stream banks throughout the project area. Goals for the Project include an increase to hydrologic function and restoration to ecological function within the existing stream and riparian corridor, and the protection of these features in perpetuity. These will be accomplished by removing an agricultural impoundment and returning the existing streams to stable conditions by constructing an E/C type stream with appropriate dimensions and pattern and reconnecting the channel to the floodplain (when possible). In -stream structures will be utilized for vertical stability and to improve habitat. Buffer improvements will filter runoff from agricultural fields, thereby reducing nutrient and sediment loads to the channel. Livestock exclusion fence will be installed along the easement boundary. The widening and restoration of the riparian areas will also provide wildlife corridors throughout the Project area. Benefits to be accrued from these activities include improved water quality, and terrestrial and aquatic habitat. The stream design approach for the Project is to combine the analog method of natural channel design with analytical methods to evaluate stream flows and hydraulic performance of the channel and floodplain. The analog method involves the use of a reference reach, or "template" stream, adjacent to, nearby, or previously in the same location as the design reach. The template parameters of the analog reach are replicated to create the features of the design reach. The analog approach is useful when watershed and boundary conditions are similar between the design and analog reaches (Skidmore et al., 2001). Hydraulic geometry is developed using analytical methods to identify the design discharge. After completion of all construction and planting activities, the Project will be monitored on a regular basis throughout the seven-year post -construction monitoring period, or until performance standards are met. Upon approval for closeout by the Interagency Review Team (IRT), the site will be transferred to North Carolina Wildlife Habitat Foundation. This party shall serve as the conservation easement holder and long-term steward for the property and will conduct periodic inspection of the site to ensure that restrictions required in the conservation easement are upheld. Endowment funds required to uphold easement and deed restrictions will be finalized prior to site transfer to the responsible party. This site will be co -located with a DWR Buffer Nutrient Bank. The width of the riparian restoration and preservation areas where buffer or nutrient offset credits are generated will begin at the most landward limit of the top of bank and extend landward to a distance of at least 50 feet perpendicular to the streams and out to a maximum of 200 feet. There will be no overlapping stream credit areas beyond 50 feet. Poplar Creek Mitigation Plan ii June 2018 TABLE OF CONTENTS 1 PROJECT INTRODUCTION........................................................................................................ 4 1.1 Site Components..................................................................................................................... 4 1.2 Project Outcomes.................................................................................................................... 4 2 WATERSHED APPROACH AND SITE SELECTION............................................................... 5 2.1 Site Selection.......................................................................................................................... 5 3 BASELINE AND EXISTING CONDITIONS.............................................................................. 7 3.1 Watershed Summary Information.......................................................................................... 7 Drainage Area and Land Use......................................................................................................... 7 SurfaceWater Classification.......................................................................................................... 7 3.2 Landscape Characteristics...................................................................................................... 7 Vegetation...................................................................................................................................... 7 ExistingWetlands........................................................................................................................... 8 Geology.......................................................................................................................................... 9 SoilSurvey..................................................................................................................................... 9 3.3 Land Use - Historic, Current, and Future............................................................................. 11 3.4 Regulatory Considerations and Potential Constraints.......................................................... 12 Property Ownership, Boundary, and Utilities..............................................................................12 FEMA/ Hydrologic Trespass........................................................................................................12 Threatened and Endangered Species............................................................................................12 CulturalResources........................................................................................................................12 3.5 Reach Summary Information............................................................................................... 14 ChannelClassification..................................................................................................................14 Discharge......................................................................................................................................14 ChannelMorphology....................................................................................................................15 Channel Stability Assessment......................................................................................................16 BankfullVerification....................................................................................................................17 3.6 Site Photographs................................................................................................................... 18 4 FUNCTIONAL UPLIFT POTENTIAL....................................................................................... 20 4.1 Anticipated Functional Benefits and Improvements............................................................ 21 Hydrology..................................................................................................................................... 21 Hydraulic...................................................................................................................................... 21 Geomorphology............................................................................................................................ 21 Physiochemical............................................................................................................................. 22 Biology......................................................................................................................................... 22 5 MITIGATION PROJECT GOALS AND OBJECTIVES............................................................ 23 Best Management Practices (BMPs)............................................................................................ 24 6 MITIGATION WORK PLAN..................................................................................................... 26 6.1 Reference Stream Studies..................................................................................................... 26 Target Reference Conditions........................................................................................................ 26 Reference Site Search Methodology............................................................................................ 26 Reference Watershed Characterization........................................................................................ 26 ReferenceDischarge..................................................................................................................... 27 Reference Channel Morphology................................................................................................... 27 Reference Channel Stability Assessment..................................................................................... 27 Reference Bankfull Verification................................................................................................... 27 Reference Riparian Vegetation..................................................................................................... 28 6.2 Design Parameters................................................................................................................ 28 Stream Restoration Approach....................................................................................................... 28 StreamData Analysis................................................................................................................... 33 Poplar Creek 1 June 2018 6.3 Vegetation and Planting Plan............................................................................................... 35 PlantCommunity Restoration...................................................................................................... 35 On -Site Invasive Species Management........................................................................................36 Table5. Mapped Soil Series................................................................................................................. SoilRestoration............................................................................................................................ 37 6.4 Mitigation Summary............................................................................................................. 37 6.5 Determination of Credits...................................................................................................... 37 6.6 Credit Calculations for Non -Standard Buffer Widths.......................................................... 38 6.7 Credit Calculations for Macroinvertebrate and Water Quality Monitoring ......................... 39 7 PERFORMANCE STANDARDS................................................................................................ 40 7.1 Stream Restoration Success Criteria..................................................................................... 40 BankfullEvents............................................................................................................................ 40 SurfaceFlow.................................................................................................................................40 Table14. Proposed Plant List............................................................................................................... Bank Height Ratio and Entrenchment Ratio................................................................................ 40 SurfaceFlow.................................................................................................................................40 7.2 Vegetation Success Criteria.................................................................................................. 40 8 MONITORING PLAN................................................................................................................. 41 8.1 As -Built Survey.................................................................................................................... 41 8.2 Visual Monitoring................................................................................................................ 41 8.3 Gauges.................................................................................................................................. 41 8.4 Cross Sections...................................................................................................................... 41 8.5 Vegetation Monitoring......................................................................................................... 42 8.6 Water Quality and Macroinvertebrate Monitoring............................................................... 42 WaterQuality............................................................................................................................... 42 Macroinvertebrate......................................................................................................................... 42 8.7 Scheduling/Reporting...........................................................................................................45 9 ADAPTIVE MANAGEMENT PLAN......................................................................................... 46 10 LONG-TERM MANAGEMENT PLAN..................................................................................... 47 11 CREDIT RELEASE SCHEDULE............................................................................................... 48 11.1 Initial Allocation of Released Credits.................................................................................. 48 11.2 Subsequent Credit Releases.................................................................................................. 48 12 MAINTENANCE PLAN............................................................................................................. 50 13 FINANCIAL ASSURANCES...................................................................................................... 51 14 REFERENCES............................................................................................................................. 52 List of Tables Table 1. Poplar Creek Site Project Components — Stream Mitigation ................................................... 4 Table 2. Project Parcel and Landowner Information.............................................................................. 6 Table 3. Project Watershed Summary Information................................................................................7 Table 4. Poplar Creek Vegetation Plot Summary................................................................................... 8 Table5. Mapped Soil Series................................................................................................................. l l Table 6. Regulatory Considerations.....................................................................................................13 Table 7. Summary of Existing Channel Characteristics.......................................................................14 Table 8. Channel Stability Assessment Results....................................................................................17 Table 9. Functional Benefits and Improvements.................................................................................. 25 Table 10. Scaling Factors for Sizing Planform Design Parameters...................................................... 32 Table11. Peak Flow Comparison........................................................................................................ 34 Table 12. Comparison of Allowable and Proposed Shear Stresses...................................................... 35 Table 13. Comparison of Allowable and Proposed Velocities............................................................. 35 Table14. Proposed Plant List............................................................................................................... 36 Poplar Creek 2 June 2018 Table 15. Mitigation Credits.................................................................................................................38 Table 16. Stream Mitigation Credit Adjustments for Non-standard Buffer Widths ............................ 39 Table17. Monitoring Plan.................................................................................................................... 44 Table 18. Stream Credit Release Schedule........................................................................................... 49 Table19. Maintenance Plan................................................................................................................. 50 List of Charts Chart 1. Stream Functions Pyramid...................................................................................................... 20 List of Figures Figure 1 — Vicinity Map Figure 2 — USGS Map Figure 3 — Landowner Map Figure 4 — Land -use Map Figure 5 — Existing Conditions Map Figure 6 — National Wetlands Inventory Map Figure 7 — Soils Map Figure 8 — Historical Conditions Map Figure 9 — FEMA Map Figure 10 —Planting Plan Map Figure 11 — Conceptual Plan Map Figure 12a — Ideal Buffer Width Zones Figure 12b —Actual Buffer Width Zones Figure 13 — Monitoring Plan Appendices Appendix A - Plan Sheets Appendix B - Data, Analysis, and Supplementary Information Appendix C - Site Protection Instrument Appendix D - DWR Stream Identification Forms Appendix E - Wetland JD Forms and Maps Appendix F - Invasive Species Plan Appendix G - Regulatory Agency Scoping Letters Poplar Creek 3 June 2018 I PROJECT INTRODUCTION 1.1 Site Components The Poplar Creek Mitigation Site Project (the "Project") is located within a rural watershed with limited residential and concentrated animal feed operation (CAFO) development, in Johnston County, North Carolina. The Project proposes to restore 3,241 linear feet (LF), enhance 1,032 LF, and provide water quality benefit for approximately 32 acres of conservation easement. The Project lies within the Neuse River Basin, North Carolina Division of Water Resources (NCDWR) sub -basin 03-04-02 and USGS 14 -digit f1UC 03020201100040 (Figure 1). The project is accessible from Lee Youngblood Road. Coordinates for the Project are as follows: 35.5521'N, -78.3568'W. The project area is comprised of four unnamed tributaries to Poplar Creek that flow north to south to their confluence with Poplar Creek, totaling 3,456 linear feet, which flows to the Neuse River approximately two river -miles downstream. 1.2 Project Outcomes The project streams have been significantly impacted by livestock production, agricultural production, and lack of riparian buffer. Due to its location and proposed improvements, the Project will provide numerous ecological and water quality benefits within the Neuse River Basin. Additionally, water quality stressors currently affecting the Project include impoundment, forestry activities, CAFO, and impervious surfaces. Proposed improvements to the Project will meet the water quality improvement needs expressed in the 2010 Neuse River Basin Restoration Priorities (RBRP) as well as ecological improvements to riparian corridor within the easement. Through stream restoration, and enhancement, the Project presents 4,273 LF of proposed stream mitigation generating 4,224 Stream Mitigation Units (SMUs) (Table 1). Table 1. Poplar Creek Site Project Components — Stream Mitigation Mitigation Approach Linear Feet Ratio Base SMU Fater Quality Adjusted SMUse Restorationt 3,241 1 3,241 3,306 Enhancement I 272 1.5 181 185 Enhancement II 760 2.5 304 310 Total 4,273 3,726 3,801 Non -Standard Buffer Width Adjustment" 423 Total Adjusted SMUs 4,224 tRestoration will consist of 2,891 linear feet of Priority One Restoration, and 350 linear feet of Priority Two Restoration BAdditional two percent credit on reaches conducting restoration and enhancement in accordance with the protocols specified in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update. . Calculated using GIS analysis and the Non -Standard Buffer Width Calculator Poplar Creek 4 June 2018 2 WATERSHED APPROACH AND SITE SELECTION The 2010 Neuse River Basin Restoration Priorities (RBRP) identified several restoration needs for the entire Neuse River Basin, as well as for HUC 03020201, specifically. The Project watershed (HUC 03020201100040) was identified as a Targeted Local Watershed (TLW), in the 2015 Neuse 01 CU Update, a watershed that exhibits both the need and opportunity for wetland, stream, and riparian buffer restoration. More specifically, goals outlined in the 2010 Neuse RBRP for the watershed include: Promote nutrient reduction in municipal areas through the implementation ofstormwater best management practices; 2. Promote nutrient and sediment reduction in agricultural areas by restoring and preserving wetlands, streams, and riparian buffers; and 3. Continue targeted implementation ofprojects under the Nutrient Offset and Buffer programs, as well as focusing DOT sponsored restoration in areas where they will provide the most functional improvement to the ecosystem. Catalog Unit Specific Goals: Support the Falls Lake Watershed Management Plan; a separate prioritization process for EEP will be developed in next 1-2 years; 2. Continue to implement planning initiatives including the NCEEP Phase IV LWP for the Upper Neuse (incorporates updated plans for Ellerbe Creek, Lake Rogers/Ledge Creek, Lick Creek, Little Lick Creek, and Upper Swift Creek) and the Upper Neuse River Basin Association's Upper Neuse Watershed Management Plan; and 3. Protect, augment and connect Natural Heritage Areas and other conservation lands. 2.1 Site Selection The Project was identified as a stream and buffer restoration opportunity to improve water quality, habitat, and hydrology within the Neuse River Basin. The Project's watershed is primarily forest and mixed agricultural land; it has historically served this purpose. Many of the Project design goals and objectives, including restoration of riparian buffers to filter runoff from agricultural operations, improve terrestrial habitat, and construction of in -stream structures to improve habitat diversity, will address the degraded water quality and nutrient input from farming that were identified as major watershed stressors in the 2010 Neuse RBRP. Project -specific goals and objectives will be addressed further in Section 5. A project watershed map with the Project's drainage areas is shown on Figure 2 and watershed planning priority boundaries is shown on Figure 1. The Project will address one of the three goals outlined in the 2010 Neuse RBRP, and will address one of three catalog unit specific goals. By establishing riparian buffers, instream structures, and increasing bedform diversity, nutrient and sediment reduction will be promoted (RBRP Goal 2). By establishing a conservation easement, the area will be protected in perpetuity, and is in close vicinity to the RES Meadow Spring Mitigation Bank (RBRP Catalog Unit Specific Goal 3). Poplar Creek 5 June 2018 The land required for the construction, management, and stewardship of this Site includes several parcels in Johnston County with the following ownership: (Table 2 & Figure 3). Once finalized, a copy of the land protection instrument(s) will be included in Appendix C. Table 2. Project Parcel and Landowner Information Owner of Record PIN Or Tax Parcel ID# Stream Reach 169500-27-6486; 169500-16-5546; 169500-25-0748; Dwight Youngblood Jr. 169500-25-9195; YB 1, YB2, YB3 169500-36-5192; 169500-36-8766; 169500-47-2720 Johnston Count 169500-34-9404 Terry M Keen (Johnston County) YB3 The Wilmington District Conservation Easement model template will be utilized to draft the site protection instrument. Once finalized, a copy of the final recorded easement will be provided in Appendix C. Poplar Creek 6 June 2018 3 BASELINE AND EXISTING CONDITIONS 3.1 Watershed Summary Information Drainage Area and Land Use The easement totals approximately 32 acres and the project area is comprised of four unnamed tributaries that flow south into Poplar Creek, which drains into the Neuse River. The total drainage area for the four project streams is 190 acres (0.3 mi2); YB 1(0.1 mi.2, 69.0 acres), YB2 (0.2 mi.2, 104.0 acres), Y133 (0.02 mi.2, 17.0 acres). Primary land use within the drainage area consists of approximately 36% forest and 55% agricultural land. Impervious area covers less than 2% of the total watershed. (Table 3. Project Watershed Summary Information & Figure 4). Table 3. Project Watershed Summary Information Level IV Ecoregion 65m — Rolling Coastal Plain River Basin Neuse USGS Hydrologic Unit 8 -digit 03020201 USGS Hydrologic Unit 14 -digit 03020201100040 DWR Sub -basin 03-04-02 Project Drainage Area (acres) 190.0 ac Percent Impervious Area <2% Surface Water Classification The portion of the Neuse River that includes Poplar Creek and the four project tributaries drain to, has been assigned as Water Supply IV (WS -IV) and Nutrient Sensitive Waters (NSW) (NCDWQ 2011). Water Supply IV (WS -IV) waters are used as sources of water supply for drinking, culinary, or food processing purposes where a WS -I, 11 or III classification is not feasible. These waters are also protected for Class C uses. WS -IV waters are generally in moderately to highly developed watersheds or Protected Areas (NCDWQ 2011). Nutrient Sensitive Waters (NSW) is a supplemental classification intended for waters needing additional nutrient management due to being subject to excessive growth of microscopic or macroscopic vegetation (NCDWQ 2011). 3.2 Landscape Characteristics The Project is located in the Rolling Coastal Plain IV ecoregion. Relief, elevation, and stream gradients are generally greater than in Ecoregion Middle Atlantic Coastal Plain to the east, and soils tend to be better drained. It has a slightly cooler and shorter growing season than the Atlantic Southern Loam Plains, but is a productive agricultural region with typical crops of corn, soybeans, tobacco, cotton, sweet potatoes, peanuts, and wheat. The region appears to be biologically less diverse than the coastal plain regions, the Atlantic Southern Loam Plains and the Carolina Flatwoods, to the south. Vegetation Vegetation around the project reaches are primarily composed of hardwoods. In general, these riparian zones are disturbed due to regular land management activities. On April 10, 2018 two 100 meter squared plots were surveyed along two project reaches, to categorize the existing vegetation communities. Forested riparian areas along the project reaches have been intermittently cattle -grazed and lack a well-developed understory and shrub strata. For this reason, representative plots were Poplar Creek 7 June 2018 surveyed along reach YB1 and YB3 (Appendix B). Within each vegetation plot, all trees greater than or equal to five inches (12.7 centimeters) diameter at breast height (DBH) were identified, measured, and used to calculate both basal area and stems per acre. Trees greater than or equal to 54 inches (137 centimeters) in height were used to quantify tree species diversity. Canopy species data was calculated to quantify the existing natural community (Schafale, 2012) (Table 4). Shrub species and herbaceous species were also identified and the percent cover was estimated. Table 4. Poplar Creek Vegetation Plot Summary Basal Area Plot ,_2i _� Avg. DBH (cm) Trees per Acre Total Tree Species Natural Community 1 36.50 20.82 323 5 Disturbed Piedmont Alluvial Forest 2 37.82 15.20 121 2 Disturbed Piedmont Alluvial Forest AVG 37.16 18.01 222 3 Dominant canopy species across the Project included tulip -poplar (Liriodendron tulipifera), white oak (Quercus alba), American holly (Ilex Opaca), elm (Ulmus alata), sweet gum (Liquidambar styraciva), river birch (Betula nigra), red maple (Acer rubrum), American hornbeam (Carpinus caroliniana). Sub -canopy species included sweetbay (Magnolia virginiana), blackberry (Rubus argutus), highbush blueberry (Vaccinium corybosum), black elderberry (Sambucus canadensis), and roundleaf greenbrier (Smilax rotundifolia). Herbaceous species included, pokeweed (Phytolacca americana), dewberry (Rubus trivialis), sensitive fern (Onoclea sensibilis), rattlesnake fern (Botrypus virginianus), trumpet creeper (Campsis radicans), wood -sorrel (Oxalis violacea), cane (Arundinaria gigantium, and sedges (Carex spp.). Invasive species were also found within the vegetation survey plots, and in the vicinity of the site: Chinese privet (Ligustrum sinense), multiflora rose (Rosa multiflora), and Japanese honeysuckle (Lonicera japonica). Non-native species included wavy bittercress (Cardamine flexuosa), common speedwell (Veronica persica), Nepalese browntop (Microstegium vimineum), wintercreeper (Euonymous fortune), and annual meadow grass (Poa annua), Existing Wetlands A survey of existing wetlands was performed on January 17, 2017 and January 31, 2017. A routine Level II wetland determination was performed (Environmental Laboratory 1987). wetland data forms are present in Appendix E. Within the boundaries of the proposed project, six Jurisdictional Wetlands are present (Figure 5). One Jurisdictional Wetland occurs on reach YB3, WA (Wetland A), and is approximately 1.82 acres. One Jurisdictional Wetland occurs on reach YB2-A, WB (Wetland B), and is approximately 0.49 acres. One Jurisdictional Wetland occurs on reach YB2-B, WC (Wetland C), and is approximately 0.35 acres. Two Jurisdictional Wetlands occur on reach YB1-B, WD (Wetland D), and WE (Wetland E). WD is approximate 3.07 acres, and WE is approximately 0. 11 acres in size. One Jurisdictional Wetland occurs on YB 1-C, WF (Wetland F), and is approximately 0.74 acres in size. Four wetlands are not entirely restricted to the easement boundary; WA, WB, WE, and WF. The Understory vegetation within the wetland areas was made up of Japenese Honeysuckle (Lonicera japonica), green brier (Smilax laurifolia), muscadine (Vitis rotundifolia), posion ivy (Toxicodendron radicans), giant cane (Arundinaria gigantean), nepalease browtop (Microstegium vimineum), and common rush (Juncus effuses), Midstory vegetation consisted of Chinese privet (Ligustrum sinense), Sawtooth blackberry, American holly (Ilex opaca). The overstory vegetation consisted of red maple (Acer rubrum), sweetgum (Liquidambar styraciflua), tulip poplar, and laurel oak. Poplar Creek 8 June 2018 Outside of the easement and wetland areas, cattle are actively managed for, and fescue is the dominant forage. A jurisdictional determination request was sent to the United States Army Corps of Engineers on March 28, 2017 (Appendix E). The United States Fish and Wildlife Service (USFWS) National Wetland Inventory Map (NWI) depicts two potential wetland areas within the project, located along Reach F6, YB1-E and Y132 (Figure 6). Geology According to geology data from the North Carolina Geologic Survey, published in 1985, the Project is located at the boundary two different map units, Tpy and Tt, both occurring within the Coastal Plain. Tpy. This map unit is associated with sedimentary rocks of the Yorktown Formation and Duplin Formation, undivided that formed in the Cenozoic between 1-66 million years ago. The Yorktown Formation contains fossiliferous clay with varying amounts of fine-grained sand, bluish gray, shell material commonly concentrated in lenses; mainly in area north of Neuse River. The Duplin Formation contains shelly, medium- to coarse-grained sand, sandy marl, and limestone, bluish gray; mainly in area south of Neuse River. Tt. This map unit is associated sedimentary rocks of the Terrace Deposits and Upland Sediment formation that formed in Cenozoic between 1-66 million years ago. This formation contains gravel, clayey sand, and sand, minor iron -oxide cemented sandstone. Soil Survey Existing soil information from the Natural Resource Conservation Service (NRCS) shows the property is located within the Norfolk -Goldsboro -Rains soil association. The association is uplands of the coastal plain. It is made up of nearly level and gently sloping, well drained, moderately well drained, and poorly drained soils that have a sandy or loam surface layer and a predominantly loamy subsoil. This soil association is at the edge of broad interstream areas or on moderately broad or broad ridges in the uplands. The largest areas of this map unit are in the west -central and northeastern parts of the county. Most of the map unit is used as cropland; small scattered areas are used as woodland or pasture. The Johnston County Soil Survey shows several mapping units across the project. Map units include seven soil series. The soil series found on the Project are described below and summarized in Table 5. Project soils are mapped by the NRCS as Goldsboro sandy loam, Marlboro sandy loam, Marlboro -Cecil complex, Nason silt loam, Norfolk loamy sand (A -slope and B -slope), Rains, and Wehadkee within the easement (Figure 7). All soils except for Wehadkee are not frequently flooded. Wehadkee soils are frequently flooded. Marlboro, Marlboro -Cecil complex, Nason silt loam, Norfolk loamy sand, are all well drained soils. Goldsboro sandy loam is a moderate well drained soil. Rains and Wehadkee loam are both poorly drained soils. Goldsboro sandy loam. This map unit consists of nearly level Goldsboro soils on upland flats. Goldsboro soils are very deep and moderately well drained. They have a loamy surface layer and a loamy subsoil. They formed in loamy marine deposits, and generally occur on slopes between zero and two percent slopes. Seasonal high-water table is within a depth of two to three feet. This soil does not meet hydric criteria. Soil occurs on less than one percent of the easement. Marlboro sandy loam. This map unit consists of gently sloping Marlboro soils on uplands. Marlboro soils are very deep and well drained. They have a loamy surface layer layer and a clayey subsoil. They Poplar Creek 9 June 2018 formed in clayey marine deposits, and generally occur on slopes between two and eight percent slopes. Seasonal high-water table is within a depth of four to six feet. This soil does not meet hydric criteria. Soil occurs on approximately one percent of the easement. Marlboro -Cecil complex. This map unit consists of gently sloping Marlboro and Cecil soils on uplands. Marlboro soils are very deep and well drained. They have a loamy surface layer layer and a clayey subsoil. They formed in clayey marine deposits, and generally occur on slopes between two to eight percent slopes. Seasonal high-water table is within a depth of four to six feet. Cecil soils are very deep and well drained. They have a loamy surface layer layer with a significant amount of gravel and a clayey subsoil. This soil does not meet hydric criteria. Soil occurs on less than one percent of the easement. Nason silt loam. This map unit consists of strongly sloping Nason soils on uplands. Nason soils are well drained and have soft (rippable) bedrock within a depth of 40 to 60 inches. They formed in residuum weathered from metavolcanics and/or residuum weathered from argillite, and generally occur on slopes between eight to fifteen percent slopes. This soil does not meet hydric criteria. Soil occurs on 32 percent of the easement. Norfolk loamy sand. This component is on coastal plains, marine terraces. The parent material consists of loamy marine deposits. The natural drainage class is well drained. Water movement in the most restrictive layer is moderately high. They formed in loamy marine deposits, and generally occur on slopes between zero and six percent slopes. Seasonal high-water table is within a depth of four feet. This soil does not meet hydric criteria. Soil occurs on 21 percent of the easement. Rains. This map unit consists of nearly level Rains soils on marine terraces on coastal plains. The parent material consists of loamy marine deposits. They formed in loamy marine deposits, and generally occur on slopes between 0-2% slopes. The natural drainage class is poorly drained. Water movement in the most restrictive layer is moderately high. This soil meets hydric criteria. Soil occurs on 12 percent of the easement. Wehadkee loam. This map unit consists of nearly level Wehadkee soils on flood plains. Wehadkee soils are very deep and poorly drained. They have a loamy surface layer and subsoil. They formed in loamy alluvium derived from igneous and metamorphic rock, and generally occur on slopes between 0-2% slopes. Seasonal high-water table is within a depth of one foot. This map unit is subject to frequent flooding for long duration. This soil meets hydric criteria. Soil occurs on five percent of the easement. Poplar Creek 10 June 2018 Table 5. Mapped Soil Series Map Unit Map Unit Name Percent Drainage Hydrologic Landscape Symbol Hydric Class Soil Group Setting GoA Goldsboro sandy 2 Moderately B Flats and Marine loam, 0-2 % slopes Well Drained Terraces MaB Marlboro sandy loam, 0 Well Drained B Low Ridges and 2-8 % slopes Marine Terraces Marlboro -Cecil Coastal Plain, Low McB complex, 2-8 % slopes 0 Well Drained B Ridges on Marine Terraces Nason silt loam 8-15 Hillslopes on NnD % 0 Well Drained B Ridges and slopes Uplands NoA Norfolk loamy sand, 0 Well Drained A Coastal Plains and 0-2 % slopes Marine Terraces NoB Norfolk loamy sand, 0 Well Drained A Coastal Plains and 2-6 % slopes Marine Terraces Ra Rains sandy loam, 0-2 90 Poorly A/D Marine Terraces on % slopes Drained Coastal Plains Wehadkee loam, 0-2 Poorly Depressions on Wt % slopes, frequently 90 Drained B/D flood Plains and flooded Valleys 3.3 Land Use - Historic, Current, and Future Historic aerial imagery indicates that the subject Project has remained primarily forested for the past 50 years (Figure 8). It is unclear if cattle have had access to the project area the entire time, since the historical images show the land as forested. Agricultural operations around the Project have remained the same and primarily have been row crops. Between 1949 and 1965 a pond was installed above reach Y131 -C. Between 1965 and 1993 a pond was installed along reach YB2. The Project area is currently still forested, aside from the ponds that had been installed along the project reaches. Livestock have full access to the Project reaches, and these reaches remain heavily impacted. The Project area in the future will be an established 31.89 -acre conservation easement, that will be protected in perpetuity. The Project easement will have 4,273 linear feet of high functioning streams, an approximate 125 -foot riparian buffer, and will be protected with fencing. Outside of the Project, the Poplar Creek 11 June 2018 area will likely remain in agricultural use. Much of the forested area in the immediate vicinity of the Project has very gentle slopes, and if it is cleared will likely be used for cropland (due to the erosive properties of the soils in the area). 3.4 Regulatory Considerations and Potential Constraints Property Ownership, Boundary, and Utilities There are a few potential constraints present on the proposed Poplar Creek Site. Lee Youngblood Loop Road (NCDOT) crosses Reach YB2. The existing culvert will be utilized and the proposed stream design will tie-in with that elevation in a stable manner. The Project is located within five miles of Johnston County Airport; a General Aviation airport. The Project is not located on the extended runway centerline (approach) and will not interfere with any airspace exclusion zones. RES will coordinate with Johnston County Airport Authority to ensure potential conflicts are eliminated or minimized. Two gas pipeline easements cross the project area. RES will coordinate with pipeline representatives and regulatory staff to determine the appropriate actions to minimize impacts to the mitigation project. FEMA/ Hydrologic Trespass No project reaches are located within FEMA regulated floodplains (Figure 9). Approximately 0.01 acres of the easement are within the FEMA Zone AE. Furthermore, hydrologic trespass is not a concern for this project. While designing the Poplar Creek project, appropriate measures were taken to eliminate hydrologic trespass of the adjacent agricultural fields. The adjacent land use will not be affected by the proposed design, and no detrimental impacts are expected beyond the easement limits. Threatened and Endangered Species Plants and animals with a federal classification of endangered or threatened are protected under provisions of Sections 7 and 9 of the Endangered Species Act of 1973, as amended. The US Fish and Wildlife Service (USFWS) database (2018) lists four Federally listed species that may occur in Johnston County: Red -cockaded woodpecker (Picoides borealis), dwarf wedgemussel (Alasmidonta heterodon), Tar River spinymussel (Parvaspina steinstansana), and Michaux's sumac (Rhus michauxii). No protected species or potential habitat for protected species was observed during preliminary project evaluations. Species and species habitat listed in the USFWS database were inspected during the field investigation to determine whether they occur at the Project. No individual species or habitats were identified on site. Potential impacts to species and species habitat off site, downstream, and within the vicinity of the project were also considered. A letter address to Mr. John Thomas with the U.S. Army Corps of Engineers, was sent by the USFWS on November 3, 2016 commenting on possible issues with respect to threatened and endangered species on the Project. This USFWS correspondence states the USFWS has reviewed the information concerning the above referenced project and "we do not any major concerns with the Poplar Creek Mitigation site plan as currently proposed, and think this project could greatly the downstream water quality". Additionally, the USFWS encourages the catching and removal of any non-native fish that currently reside in the ponds prior to draining; to reduce impacts to native aquatic species that occur downstream. Documentation of this correspondence can be found in Appendix G. Cultural Resources A letter dated November 28, 2016 from Ms. Rene Gledhill -Early with the North Carolina Department of Cultural Resources was addressed to Mr. John Thomas of the USACE Raleigh Regulatory Field Office concerning potential cultural resource affected by the proposed project. Ms. Gledhill -Early reported that "we have conducted a review of the project and are aware of no historic resources which would be affected by the project". Refer to Appendix G to view the referenced response letter. Poplar Creek 12 June 2018 Table 6. Regulatory Considerations Regulation Applicable? Resolved? Supporting Documentation Waters of the United States - Yes No Appendix B Section 404 Waters of the United States - Yes No Appendix E Section 401 Endangered Species Act Yes Yes Appendix G National Historic Preservation Act Yes Yes Appendix G Coastal Zone Management Act (CZMA)/Coastal Area No N/A N/A Management Act CAMA FEMA Floodplain Compliance Yes N/A N/A Magnuson -Stevens Act - Essential No N/A N/A Fisheries Habitat Poplar Creek 13 June 2018 3.5 Reach Summary Information The project area is comprised of three parallel conservation easements along tributaries to Poplar Creek. The project is divided into northern and southern portions by Lee Youngblood Road. The northern portion of the project includes Reach Y132 -A; the southern portion of the project includes Reach YB1- C, Y132-13 and Reach Y133 (Figure 5). Stream Classification Forms were completed at representative locations throughout the project area and stream determinations were confirmed by NCDWR staff on August 191}i, 2016 (Appendix D). Results of the preliminary data collection are presented in Table 7 and Table 8. The Stream Morphology Table is included in Appendix B. In general, all or portions of Y131 -C, Y132 -A, Y132-13 and Y133 do not function to their full potential (Section 4 and Section 5). Current conditions demonstrate significant habitat degradation as a result of impacts from agriculture, historic land uses, and water diversion. Some of the streams do not access their floodplains as frequently as they naturally would due to channel degradation caused by agricultural activities. In most cases, the riparian buffer is in good condition with a mixture of trees and various plants. Erosion and sediment deposition is present within the majority of the project. Invasive species, livestock and row crops are negatively affecting water quality and the surrounding habitat. Site photographs are location in Section 3.6 and morphological parameters are located in Appendix B. Table 7. Summary of Existing Channel Characteristics IABKF= cross-sectional area (measured at approximate bankfull stage as estimated using existing conditions data and NC Regional Curve equations where field indicators were not present) Channel Classification The streams have been classified as intermittent and perennial streams using the NCDWR Stream Identification Form version 4.11 (Appendix D) and are E-, and G- stream types as classified using the Rosgen stream classification system (Rosgen, 1996). The design reaches are described in Section 6.2. Channel characteristics are summarized in Table 7, and Appendix B. Stream determinations have been verified by NCDWR staff (Appendix D). Discharge Estimating flows (discharge) for the Poplar Creek Project is difficult due to the channelization and agricultural impacts of the existing streams. Several models, regression equations, and Regional curves were used to estimate existing bankfull discharges. Land use and slope were considered when the discharge calculations were developed. All hydraulic and hydrologic analyses are discussed in Section 6.2. Poplar Creek 14 June 2018 Drainage AsxF 1 Width Mean Width:Depth Bank Reach Area Depth Height Sinuosity Slope (ft/ft) (ft') (ft) Ratio (ac) (ft) Ratio YB1-C 66 2.4 5.2 0.5 11.3 3.6 1.18 0.0058 Y132 -B 102 2.5 6.2 0.4 15.5 5.7 1.14 0.013 Y133 29 2.4 3.9 0.6 6.5 1.3 1.16 0.021 IABKF= cross-sectional area (measured at approximate bankfull stage as estimated using existing conditions data and NC Regional Curve equations where field indicators were not present) Channel Classification The streams have been classified as intermittent and perennial streams using the NCDWR Stream Identification Form version 4.11 (Appendix D) and are E-, and G- stream types as classified using the Rosgen stream classification system (Rosgen, 1996). The design reaches are described in Section 6.2. Channel characteristics are summarized in Table 7, and Appendix B. Stream determinations have been verified by NCDWR staff (Appendix D). Discharge Estimating flows (discharge) for the Poplar Creek Project is difficult due to the channelization and agricultural impacts of the existing streams. Several models, regression equations, and Regional curves were used to estimate existing bankfull discharges. Land use and slope were considered when the discharge calculations were developed. All hydraulic and hydrologic analyses are discussed in Section 6.2. Poplar Creek 14 June 2018 Channel Morphology Reach YB1 Reach YB 1-C has a drainage area of 0.10 square miles (66 acres) and begins at the outfall of an existing pond flowing southwest through the project limits toward its confluence with Little Poplar Creek. The primary spillway of the upstream pond is not currently functional, and the pond currently utilizes its emergency spillway for all outflow. Due to a lack of flow through the primary spillway no well-defined channel exists downstream of the pond for approximately 200 feet. The defined channel is a mildly sinuous (K=1.18) G -type channel. The approximate bankfull cross-sectional area is 2.4 square feet with approximate dimensions of 5.2 feet width and 0.5 feet deep, while the cross-sectional area of the channel at top of bank is 16.0 square feet. The existing length of YB1-C is 1,066 linear feet, and the dominate bed material is coarse sand. The gradient of the reach is approximately 0.0058 ft/ft. Erosion is present and bank stability increases as the reach approaches the existing gas line easement. The banks are irregularly shaped due to cattle access and hoof shear. The riparian buffer is in good condition and is a mix of hardwoods and disturbed understory. Reach YB2 Reach Y132 -A has a drainage area of 0.08 square miles (51 acres). Reach Y132 -A begins downstream of an existing gas easement and flows south through an existing impoundment to a 24 -inch pipe under Lee Youngblood Road. Active pasture and livestock waste lagoons surround this reach. The existing length of Y132 -A is zero linear feet, because it is currently an impoundment, and drains underground in a closed system to Y132-13. Reach YB2-B has a drainage area of 0.16 square miles (102 acres) and begins downstream of Y132 -A and the 24 -inch pipe under Lee Youngblood Road. It flows south through active pasture past the project limits toward its confluence point with Poplar Creek. The planform of this G -type channel is mildly sinuous (K) of 1.14. The approximate bankfull cross-sectional area is 2.5 square feet with approximate dimensions of 6.2 feet width and 0.4 feet deep, while the cross-sectional area of the channel at top of bank is 25 square feet. The existing length of YB2-B is 1,721 feet, and the dominate bed material is fine gravel. The gradient of the reach is approximately 0.0130 ft/ft. Bank erosion is moderate to severe throughout the Reach. The riparian buffer is in good condition with widths averaging over 50 feet and is comprised of hardwoods with a few localized areas of privet. Reach YB3 Reach YB3 has a drainage area of 0.05 square miles (29 acres), and begins downstream of Lee Youngblood Road flowing south through active pasture until reaching its confluence point with Poplar Creek. The planform of this E -type channel is mildly sinuous (K) of 1.16. The approximate bankfull cross-sectional area is 2.4 square feet with approximate dimensions of 3.9 feet width and 0.6 feet deep. The existing length of Y133 is 760 feet, and the dominate bed material is course sand. The gradient of the reach is approximately 0.021 ft/ft. The channel bed is relatively stable, has low banks and easy access to the adjacent flood plain. Bank erosion and sediment deposition are present. The riparian buffer is in good condition and is a mix of hardwoods and disturbed understory with widths averaging over 100 feet along the entire reach. Poplar Creek 15 June 2018 Channel Stability Assessment A modified version of the Channel Stability Assessment Method provided in "Assessing Stream Channel Stability at Bridges in Physiographic Regions" by Johnson (2006) was used to assess channel stability for the Poplar Creek existing channels and reference reaches. This method may be rapidly applied on a variety of stream types in different physiographic regions having a range of bed and bank materials. The original Channel Stability Assessment method was designed to evaluate thirteen stability indicators in the field. These parameters are: watershed characteristics (frequency of watershed disturbances such as agricultural activities, urbanization, etc), flow habit, channel pattern, entrenchment/channel confinement, bed material, bar development, presence of obstructions/debris jams, bank soil texture and coherence, average bank angle, bank vegetation/protection, bank cutting, mass wasting/bank failure, and upstream distance to bridge. See Appendix B for a detailed description of the stability indicators. As this method was initially developed to assess stability at bridges, a few minor adjustments were made to remove indicators that contradict stability characteristics of natural channels in favor of providing hydraulic efficiency at bridges. First, the "channel pattern" indicator was altered such that naturally meandering channels scored low as opposed to straightened/engineered channels that are favorable for stability near bridges. Secondly, the last indicator, "upstream distance to bridge," was removed from the assessment as bridges are not a focus of channel stability for this project. The twelve indicators were then scored in the field, and a rating of excellent, good, fair, or poor was assigned to each project reach based on the total score. The Channel Stability Assessment results (scores and ratings) for the Poplar Creek project are provided in Table 8. Two project stream reaches received "Fair" ratings and one received a "Poor" rating. Reach YB3 had the best score followed by YB1-C and then YB2-B. The reach results reflect the differences in the channel characteristics throughout the project. Entrenchment and lack of bank protection is more prominent within Reach YB 1-B and YB2-B. YB3 has minor erosion and a good buffer which increases the Reach's score. These characteristics are reflected in the fair CSA scores throughout the project. The reference reach's scores are also shown below, both reference reaches received a good CSA score. (Table 8). Poplar Creek 16 June 2018 Table 8. Channel Stability Assessment Results Bankfull Verification Bankfull is difficult and often impossible to accurately identify on degraded channels and agricultural ditches. The usual and preferred indicators rarely exist, and other factors may be taken into consideration in order to approximate a bankfull stage. Other factors that may be used are wrack lines, vegetation lines, scour lines, or top of a bankfull bench; however, complete confidence should not be placed on these indicators. Along the proposed restoration reaches, the channel is generally entrenched and actively impacted by cattle, which means bankfull indicators were very limited or non-existent. Therefore, bankfull stage was estimated by using Regional Curves and other hydrologic analyses, existing cross-sections, and in-house spreadsheets to estimate bankfull area and bankfull discharge. Poplar Creek 17 June 2018 UT to Buffalo Creek (Ref.) YB1-C Watery Fork (Ref.) YB2-B YB3 1 Watershed characteristics 8 10 2 10 8 2 Flow habit 4 11 2 7 5 3 Channel pattern 3 6 2 6 4 4 Entrenchment/channel confinement 3 9 3 12 3 5 Bed material 5 8 4 5 7 6 Bar development 5 5 2 7 10 7 Obstructions/debris jams 3 4 2 8 4 8 Bank soil texture and coherence 4 9 4 8 10 9 Average bankangle 4 10 4 12 9 10 Bank vegetation/protection 3 6 5 8 3 11 Bank cutting 4 7 4 10 4 12 Mass wasting/bank failure 2 7 4 12 1 13 Upstream distance to bridge NA NA NA NA NA Score 48 92 38 105 68 Rating Good Fair Good Poor Fair Bankfull Verification Bankfull is difficult and often impossible to accurately identify on degraded channels and agricultural ditches. The usual and preferred indicators rarely exist, and other factors may be taken into consideration in order to approximate a bankfull stage. Other factors that may be used are wrack lines, vegetation lines, scour lines, or top of a bankfull bench; however, complete confidence should not be placed on these indicators. Along the proposed restoration reaches, the channel is generally entrenched and actively impacted by cattle, which means bankfull indicators were very limited or non-existent. Therefore, bankfull stage was estimated by using Regional Curves and other hydrologic analyses, existing cross-sections, and in-house spreadsheets to estimate bankfull area and bankfull discharge. Poplar Creek 17 June 2018 3.6 Site Photographs Reach YB 1-C — Looking Upstream 04/10/2018 Reach YB2-A — Looking Upstream at Pond 04/10/2018 Reach YB2-B — Looking Upstream 04/10/2018 Reach YB1-C — Looking Downstream 04/10/2018 z Reach YB2-A — Looking downstream at culvert 04/10/2018 Reach YB2-B — Looking Downstream 04/10/2018 Poplar Creek 18 June 2018 Poplar Creek 19 June 2018 4 FUNCTIONAL UPLIFT POTENTIAL The Stream Functions Pyramid Framework (Harman et. al. 2012) uses stream functions to describe project objectives, existing condition assessments and monitoring, performance metrics, and design criteria. The Framework separates stream functions into five categories, ordered into a hierarchy, which communicate the interrelations among functions and illustrate the dependence of higher level functions (biology, physiochemical and geomorpholgy) on lower level functions (hydrology and hydraulics). Functions that affect the greatest number of other functions are illustrated at the base of the pyramid, while functions that have the least effect on other functions are illustrated at the top of the pyramid. The Pyramid is illustrated below Chart 1. Stream Functions Pyramid A Guide for Assessing & Restoring Stream Functions » nVERV iew 1 HYDROLOGY;, Transport of water from the watershed to the channel 19 Chart 1. Stream Functions Pyramid wharman�stream-mechanicscom StreamMechanizs Fischenich (2006) found that the most critical functions include those that address hydrodynamic processes, sediment transport processes, stream stability and riparian buffer restoration. By addressing these fundamental functions and processes, a restored stream and riparian system are capable of supporting more dependent functions that typically require time to establish, such as diverse biological communities, chemical and nutrient processes, diverse habitats and improved water and soil quality. The objectives of this project will address the most critical functional objectives that will allow for a more restored stream and riparian buffer over time. Poplar Creek 20 June 2018 While traditional mitigation approaches have generally relied on surrogate measures of success (i.e. linear feet of restoration) for determining SMU credit yields, a function -based approach provides a more objective and flexible approach to quantify the expected ecological benefits of a mitigation design. Additionally, a functional based approach broadens the reach -scale goals of a restoration project by contextualizing the functional uplift to the watershed scale. The proposed Poplar Creek Stream Mitigation Project will provide numerous ecological and water quality benefits within the Neuse River Basin by applying an ecosystem restoration approach. The restoration approach at the reach scale of this project will have the greatest effect on the hydraulic and geomorphology function of the system but will benefit the upper-level functions (physiochemical and biology) over time and in combination with other projects within the watershed. Anticipated functional benefits and improvements within the project area, as based on the Function -Based Framework are outlined in Table 9 in Section 5. 4.1 Anticipated Functional Benefits and Improvements Hydrology According to the Stream Functions Pyramid Framework, hydrology is defined as the transport of water from the watershed to the channel. Therefore, this project intends to make significant improvements to the already functioning hydrology, making it high functioning. Much of the improvement will come from altering land use within these reaches' small catchment areas, by establishing a permanent conservation easement and removing an impoundment. By converting land -use for a significant percentage of the catchment area from pasture to riparian forest and a pond to a stream and functioning floodplain, curve numbers will decrease and reach runoff will improve. Hydraulic The hydraulic function of the Pyramid is defined as transport of water in the channel, on the floodplain, and through sediments. Perhaps the greatest potential uplift of the Project will be achieved through establishing healthy floodplain connectivity. Reaches in the Project do not have functioning floodplain connectivity or stable flow dynamics. Reaches where floodplain connectivity is not functioning or functioning at risk will be improved to functioning by reducing bank height ratios and increasing entrenchment ratios. Reaches in which stable flow dynamics are not functioning or functioning at risk will be improved to functioning by constructing a new channel that is geometrically stable based on the Project's hydrology inputs. Additionally, stream banks will be stabilized using a combination of grading, erosion control matting, bare -root plantings, native material revetment techniques (i.e., bioengineering), structure placement, and sod transplants where possible. In stream structure that will further improve hydraulic function will include log sills, log j -hooks, valley sills, and riffle grade control structures. Additionally, the removal of the agricultural impoundment will provide functional uplift, by establishing a stable stream and restoring the active flood plain. Geomorphology Geomorphology as defined within the Pyramid Framework, is the transport of wood and sediment to create bed forms and dynamic equilibrium. Sediment Transport will be improved in reaches that are currently function -at -risk or not functioning by designing channels that transport sediment until it reaches an appropriate place to settle like a point bar. Large Woody Debris Transport and Storage will be improved through the use of woody debris such as log vanes, root wads, log weirs, and log toes for in -stream structures on Restoration and Enhancement II reaches. The Restoration reaches are also designed to accumulate woody debris by having defined shallow riffles where cobble catches and holds woody debris and leaf packs. Riparian vegetation is functioning in some areas but is either functioning at risk or not functioning on most reaches. Therefore, riparian buffers will be planted out to a minimum of 50 feet to improve the riparian vegetation to functioning levels. Bed form diversity will be improved in restoration areas by using a natural riffle pool sequence from the reference reach to inform design of Poplar Creek 21 June 2018 functioning riffle pool sequences in constructed channels based on reference reach conditions. This bed form diversity will also further improve aquatic habitat. All of these functional parameters are interconnected and ultimately depend on each other in order to function properly. Therefore, by focusing improvements to these parameters, the restored channels will achieve dynamic equilibrium and provide maximum geomorphic functional uplift. Physiochemical The Pyramid Framework defines the physicochemical category as temperature and oxygen regulation and the processing of organic matter and nutrients. Although this project would support the overarching goal in the Neuse River Basin Priorities to promote nutrient and sediment reduction in agricultural areas, it is difficult to measure nutrient and sediment reduction in this restoration because they can be affected by so many variables. However, several restoration actions are known to help reduce nutrients and sediment even though they may not be measurable at the project level. These activities include cattle exclusion and direct removal of fecal inputs, filtering of runoff through buffer areas, the conversion of active farm fields to forested buffers, and improved denitrification and nutrient uptake through buffer zones. It is anticipated that temperature regulation will also be improved through the restoration of canopy tree species in the stream buffer areas and the agricultural impoundment. Additional benefits may also come from functional uplift of the lower level stream functions (hydraulics and geomorphology), which will reduce sediment and nutrients in the system through bank stabilization and reforesting. Temperature regulation will also be improved through the restoration of canopy tree species to the stream buffer areas. Oxygen regulation will occur through two actions: first, the temperature of the water directly impacts the amount of gas held by the water. Therefore, through planting the buffer to shade the channel the temperature is decreased dissolved oxygen is increased. Second, the log structures placed in the stream create mixing zones where oxygen dissolves much faster than the standard exchange rate of oxygen to dissolved oxygen. The processing of organic matter will be improved once healthy riffles are shallow enough to catch twigs and branches that then retain leaves. Many of these physiochemical benefits occur slowly over time and are dependent on multiple variables within the stream ecosystem. Therefore, it is not practical or feasible to directly measure these parameters within the monitoring time -frame of this project. With that said, it is logical to use existing riparian buffer and visual performance standards to demonstrate the positive correlation between geomorphic parameters and physicochemical parameters. For example, as riparian buffer trees grow, as represented in annual monitoring reports, it is anticipated that canopy cover is actively shading the stream channel and reducing water temperature. To determine whether there is any detectable benefit to the water quality from this Project, monitoring of these variables will be conducted with the understanding that these indicators are inherently sensitive to changes that occur anywhere within the watershed draining to the mitigation project or detection of benefit could take longer than the required monitoring period of the project. Biology The highest category of the Pyramid is biology and is defined as the biodiversity and life histories of aquatic and terrestrial life, specifically referring to animals. As mentioned for the physiochemical stream function, it will be difficult to measure the functional uplift of the biological functions at this site within the monitoring time period of the project. However, since the life histories of many species likely to benefit from stream and wetland restoration are depending on all the lower -level functions, the functional uplift from the hydraulic and geomorphic levels would have a positive effect to the biology over time and in combination with other projects within the watershed is anticipated.. In order to determine whether there is any detectable benefit to the macroinvertebrates from this Project, monitoring of the macroinvertebrates will be conducted with the understanding that these indicators are inherently sensitive to changes that occur anywhere within the watershed draining to the mitigation project or detection of benefit could take longer than the required monitoring period of the project. Poplar Creek 22 June 2018 5 MITIGATION PROJECT GOALS AND OBJECTIVES Through the comprehensive analysis of the Project's maximum functional uplift using the Stream Functions Pyramid Framework, specific attainable goals and objectives will be realized by the Site. These goals clearly address the excess nutrient input, streambank erosion, and sedimentation that were identified as major watershed stressors in the 2010 Neuse RBRP. The Project will address RBRP goal two and RBRP Catalog Unit Specific Goal three (listed in Section 2). The Site Goals are: • Improve water transport from watershed to the channel in a non-erosive manner in a stable channel; • Improve water quality within the restored channel reaches and downstream water sources by reducing sediment and nutrient loads, and increasing dissolved oxygen levels; • Improve flood flow attenuation on-site and downstream by allowing for overbank flows and connection to the active floodplain; and • Improve ecological processes by reducing water temperature, improving terrestrial and aquatic habitat, and restoring a native plant community. The Site objectives to address the goals are: • Design and construct stable stream channels with appropriate pattern, dimension, and profile based on reference reach conditions; • Permanently exclude livestock from stream channels and their associated buffers; • Add in -stream structures and bank stabilization measures to protect restored and enhanced streams; • Reduce bank height ratios and increase entrenchment ratios to reference reach conditions; • Increase forested riparian buffers to at least 50 feet on both sides of the channel along all reaches with a coastal plain hardwood riparian community; • Treat exotic invasive species; and • Establish a permanent conservation easement on the Site. Anticipated functional benefits and improvements within the Project area, as based on the Function - Based Framework are outlined in Table 9. Limitations to achieving these watershed goals arise by remaining constrained to our Project boundaries. While we are restoring the habitat and streams to stable and effective conditions that achieve our goals within the Site parcels, we are unable to influence the effect of poor riparian buffers and livestock impact in other areas within the watershed. However, through this Site's connectivity with other projects in the watershed and responsible stewardship of current restoration projects, overall watershed functionality and health will improve to meet the RBRP goals. Poplar Creek 23 June 2018 Best Management Practices (BMPs) A suite of agricultural BMPs will be utilized for the Project to reduce direct effluent inputs, pollutant contamination, and sediment loading. The combination of the following agricultural BMPs: riparian buffer planting, bank stabilization, stream restoration and livestock exclusion, ultimately lead to the functional uplift of the site, while still allowing livestock production to persist through the installation of alternative water sources. The riparian buffer will be restored along all project reaches. Restored riparian buffers are established adjacent to and up -gradient from watercourses of water bodies to improve water quality. The main advantages of the restored riparian buffer will be to provide water quality treatment, erosion control, and water temperature benefits. Moreover, there will be significant reductions in sedimentation, nutrient input, and fecal coliform input. Approximately 5,600 linear feet of livestock exclusion fencing will be installed along the easement boundary; therefore, livestock will no longer have stream access. The type of exclusion fence installed will be based on landowner preference. The main advantages of exclusion fence are that there will be significant reductions in sediment, nutrients, and fecal coliform. To account for eliminating livestock water access, landowners will be provided an alternate water source. A total of one well and two watering facilities will be installed to provide high quality drinking water to livestock. Poplar Creek 24 June 2018 Table 9. Functional Benefits and Improvements Not Measured (NM); Not Functioning (NF); Functioning -at -risk (FAR); Functioning (F); Highly Functioning (HF) Poplar Creek 25 June 2018 Existing Level Function Goal Functional Parameter Rating/Projected Rating Objective Measurement Method Reach Channel -Forming Discharge Precipitation/Runoff Relationship FAR/F Hydrology to transport water from the Flow Duration (YB1-C, YB2-A, Convert land -use of Percent Project drainage 4 Transport of water from the watershed to the channel in YB2-B) streams and their area converted to riparian watershed to the channel a non-erosive manner Flood Frequency F/HF headwaters from pasture to riparian forest forest (indirect measurement) Catchment Hydrology (YB3) Reach Runoff Baseflow Alteration Flood Bank FAR/F Cross sections Hydraulic Connectivity YB1-C YB- ( 2Aconnectivity Improve flood bank by reducing Crest gauges 2 Transport of water in the to transport water in a Flow Dynamics YB2-B) bank height ratios and channel, on the floodplain, stable non-erosive manner yn increase entrenchment Bank Height Ratio and through the sediments Groundwater/Surface F/HF ratios water exchange (YI33) Entrenchment Ratio Sediment Transport Large Woody Debris (LWD) Transport and Storage Reduce erosion rates and channel stability to As -built stream profile Channel Evolution FAR/F reference reach Geomorphology (� 1-C, YB2-A, conditions Cross sections Transport of wood and to create a diverse bedform Lateral Stability YB2-B) 3 sediment to create diverse to achieve dynamic Improve bedform Visual monitoring bedforms and dynamic equilibrium Riparian Vegetation F/HF diversity (pool spacing, equilibrium percent riffles, etc Stream walks Bedform Diversity Increase buffer width to Vegetation plots 50 feet Bed Material Characterization Sinuosity Improve stream temperature regulation through introduction of canopy to achieve appropriate Water Quality levels for water FAR/F Increase dissolved Continuous water quality Physiochemical temperature, dissolved Water Temperature (YB1-C, YB2-A, oxygen by installing in- monitoring device Temperature and oxygen oxygen concentration, and YB2-B) stream structures to regulation; processing of other important nutrients Nutrient Load created aeration zones Vegetation Plots organic matter and nutrients including but not limited to F/HF Nitrogen and Phosphorus Organic Carbon (YB3) Decrease nutrient Visual monitoring loading through Bacteria filtration of planted riparian buffer, and removing livestock from the riparian areas Microbial Communities Macrophyte Improve aquatic habitat Macroinvertebrate Communities FAR/F through the installation sampling in years 3, 5 and Biology to achieve functionality in (YB1-C, YB2-A, habitat features, 7 5 Biodiversity and life levels 1-4 to support the Benthic YB2-B) construction of pools at histories of aquatic life life histories of aquatic and Macroinvertebrate varying depths, and Vegetation plots histories and riparian life riparian plants and animals Communities F/HF planting the riparian (�3) buffer Visual monitoring of in - Fish Communities stream habitat features Landscape Connectivity Not Measured (NM); Not Functioning (NF); Functioning -at -risk (FAR); Functioning (F); Highly Functioning (HF) Poplar Creek 25 June 2018 6 MITIGATION WORK PLAN 6.1 Reference Stream Studies Target Reference Conditions The restoration portions of the project site are characterized by agricultural and livestock practices. Several ditches exist in the watershed and contribute to the project site. Physical parameters of the site were used, as well as other reference materials, to determine the target stream type. An iterative process was used to develop the final information for the site design. To develop the target reference conditions, physical site parameters were reviewed. This included the drainage area, land use, soils mapping units from the Johnston County Soil Survey for the watershed and Site, typical woody debris and habitat available for the area, as well as general topography. The "Classification of the Natural Communities of North Carolina" was also used to narrow the potential community types that would have existed at the site (Schafale and Weakley, 2003). Targeted reference conditions included the following: • Located within the Physiographic Region —Coastal Plain / Piedmont • Similar land use onsite and in the watershed, • Similar watershed soil types, • Similar site soil types, • Ideal, undisturbed habitat — several types of woody debris present, • Similar topography, • Similar slope, • Pattern common among regional streams, and • Minimal presence of invasive species. Reference Site Search Methodology All the parameters used in Section 2were used to find appropriate reference stream sites. Obtaining property owner information and owner authorization for access was another factor in locating suitable reference sites for the project. For this project, there was no predetermined amount of reference sites needed as long as the site was suitable and met the parameters. Several potential reference sites were assessed, and their characteristics were noted. It is difficult to find reference sites in Johnston County because many have been disturbed by farming or urban development. Most streams tend to be modified ditches and may have some of the characteristics that are sought in a reference, but too few to make it an ideal reference for the project site. The project area is in the transition between the Piedmont and Coastal Plan Physiographic Regions and the reaches in the project area were found to show common characteristics of both Regions; therefore, two reference streams were chosen for this project. The first reference stream site is a Coastal Plain stream in Johnston County that proves to be ideal in both geomorphology and habitat for YB1-C. The second reference stream site is a Piedmont stream in Orange County that proves to be ideal in both geomorphology and habitat for Y132 -A and B. Reference Watershed Characterization The YB1-C reference stream flows west to east and is the most downstream portion of an unnamed tributary that drains to Buffalo Creek. The reach that was surveyed and analyzed is approximately 375 feet long. The drainage area for the unnamed tributary is 0.84 square miles (540 acres). The land use in the watershed is characterized by mostly mixed pines and hardwoods (40 percent), cultivated row crops (29 percent), residential (18 percent), and managed herbaceous cover/pasture land (8 percent), pine Poplar Creek Mitigation Plan June 2018 26 plantations (four percent), and open water (one percent). Site photographs of the reference stream are located in Appendix B. The current State classification for this reference reach is undefined, but the tributary runs into Buffalo Creek. Buffalo Creek is defined as Class C NSW (NCDWQ 2012a). Class C waters are suitable for aquatic life, secondary recreation, and agricultural usage. Buffalo Creek is listed on the 2012 303d list for impaired waters (NCDWQ 2012b). It is impaired for aquatic use, receiving a Fair Bioclassification rating for benthic ecological/biological integrity. The YB2-A and B reference stream, Watery Fork, is located north of Dairyland Road in Orange County, NC and flows north to south. The reach that was surveyed and analyzed is approximately 1,559 feet long. The drainage area for this segment of Watery Fork is 0.98 square miles (624 acres). The land use in the watershed is characterized by mostly mixed pines and hardwoods (78 percent), cultivated row crops (five percent), residential (eight percent), managed herbaceous cover/pasture land (nine percent) and open water (less than one percent). Site photographs of the reference stream are located in Appendix B. The current State classification for this restoration reach is WS -II, HQW, and NSW. (NCDWQ 2012a). WS -II waters are used as sources of water supply for drinking, culinary, or food processing purposes. Reference Discharge Several hydrologic models/methods were used to develop a bankfull discharge for the reference site. Existing drainage area, land use, slope, roughness, and cross-sectional area were all factors considered when performing the calculations. Using a combination of Piedmont and Coastal Plain Regional Curves, in-house spreadsheet tools, and a project specific regional flood frequency analysis, the existing discharges for the design reaches were found to be between three and five cubic feet per second (ft3/s). See Appendix B for a more detailed description of the hydrologic analyses performed for this project. Reference Channel Morphology In comparison to the restoration reaches, the reference reaches are larger than Reaches YB1-C, YB2- A, and YB2-B when comparing pattern, dimension and profile, which is the reason for using scaling factors for the design. The scaling factor is based on the difference in bankfull width between the restoration and reference reaches. The YB1-C reference reach was typically eight to ten feet wide and two feet deep with an approximate cross-sectional area of 11 square feet with a width to depth ratio around eight. The YB2-A and B reference reach was typically 15 feet wide and two feet deep with an approximate cross-sectional area of 24 square feet with a width to depth ratio around 9.8. Reference Channel Stability Assessment The reference reaches were stable and showed no evidence of incision or erosion in the portion that was surveyed and analyzed. The streams appeared to maintain their slope and had sufficient amounts of vegetation to secure the banks. Riparian buffer widths exceeded fifty feet on each side of both channels. The CSA results (scores and ratings) for the reference reaches are provided above in Table 8. The reference reach received a "Good" rating as the channel demonstrates a stable meandering pattern and a well vegetated riparian buffer. Reference Bankfull Verification Typical indicators of bankfull include vegetation at the bankfull elevation, scour lines, wrack lines, vegetation lines, benches/inner berm, and point bars. Throughout the entire length of the reference reach, bankfull is located at the top of bank elevation. The accuracy of this bankfull stage is verified by Poplar Creek Mitigation Plan June 2018 27 Regional Curves and hydrologic analyses using existing cross sections to calculate area and discharge. Evidence that can further support the location of bankfull is the lack of any bench or berm features within the channel, and wrack lines present within the floodplain. Reference Riparian Vegetation The reference riparian vegetation was assessed on reach YB3 on site. On April 10, 2018, one 100 meter squared plot was surveyed along YB3 to categorize the existing vegetation community (vegetation plot two, Appendix B). This community was determined to have had past disturbance altering the species composition, and that the reference vegetation community is a disturbed Piedmont Alluvial Forest (Schafale, 2012). Canopy species within the vegetation plot and the adjacent area included elm (Ulmus alata), white oak (Quercus alba), and sweet gum, tulip, red maple, and American holly. The average basal area was approximately 37.82 meter squared per hectare, and the average stems per -acre was 121 stems/ac. Sub -canopy species within the vegetation plot and adjacent area included roundleaf greenbrier, highbush blueberry, and blackberry. Herbaceous species included, pokeweed (Phytolacca americana), dewberry (Rubus trivialis), sensitive fern (Onoclea sensibilis), rattlesnake fern (Botrypus virginianus), and sedges (Carex spp. ). Invasive species were also found within the reference vegetation survey plot, and in the adjacent area, most notably Chinese privet (Ligustrum sinense), multiflora rose (Rosa multiflora), and Japanese honeysuckle (Lonicera japonica). Non-native species included wavy bittercress (Cardamine flexuosa), common speedwell (Veronica persica), Nepalese browntop (Microstegium vimineum), wintercreeper (Euonymous fortune), and annual meadow grass (Poa annua). It is anticipated that a local seed source for high dispersal species is present at the Poplar Creek site and will disperse across much of the project. These species are often found in early successional communities and quickly fill disturbance gaps. Because many of these high dispersal species often become aggressive in these sites, they are not included in the Restoration Planting List (Section 6.3). Hardwood species typical of the target community were observed in adjacent and nearby communities, and were judged to be more appropriate for this site. 6.2 Design Parameters Stream Restoration Approach Stream restoration and enhancement efforts along the tributaries at the Poplar Creek Stream Mitigation site will be accomplished through analyses of geomorphic conditions and watershed characteristics. The design approach applies a combination of analytical and reference reach based design methods that meet objectives commensurate with both ecological and geomorphic improvements. Proposed treatment activities may range from minor bank grading and planting to re-establishing a stable planform and hydraulic geometry. For reaches requiring full restoration, natural design concepts have been applied and verified through rigorous engineering analyses and modeling. The objective of this approach is to design a geomorphically stable channel that provides habitat improvements and ties into the existing landscape. The Poplar Creek Site will include Priority I Restoration, Priority II Restoration, Enhancement I and Enhancement Level II. Priority I and II Restoration reaches will incorporate the design of a single - thread meandering channel, with parameters based on data taken from the reference site described above, published empirical relationships, Regional Curves, and hydrologic and hydraulic analyses. As a result of the restoration of planform and dimension, frequent overbank flows and a restored riparian buffer will provide the appropriate hydrology and sediment transport throughout this watershed. A conceptual plan set is provided in Appendix A. Poplar Creek Mitigation Plan June 2018 28 Current stream conditions along the proposed restoration reaches exhibit habitat degradation as a result of impacts from impoundment, bank erosion, channel degradation, and cattle encroachment. Additionally, and adequate riparian buffer is not present in most portions of the project and where present, the buffer has a high density of invasive species. The Poplar Creek Site design approach began with a thorough study of existing conditions, including the on-site streams, valleys, and watershed. Design parameters, including active channel, habitat and floodplain features were developed from analyses performed on the reference site data. Analytical design techniques were used to determine the design discharge and to verify the design as a whole. Engineering analyses were performed using various hydrologic and hydraulic models to verify the reference reach based design. A combination of methods (including Hydraflow Hydrographs, regional curves and flood frequency analysis) were used to calculate flows received by the channel for bankfull and other significant storm events. Through this hydrologic analysis, the design discharge (typically referenced as bankfull or dominant discharge) was determined, and the subsequent design was based on this calculated discharge. Design parameters developed through the analyses of reference reach data and hydrologic and hydraulic modeling were confirmed using spreadsheet tools. Engineering analyses were performed concurrently to geomorphic and habitat studies. While the stream design was verified by simulations of hydrology and fluvial processes, analogs of desirable habitat features were derived from reference sites and integrated into the project design. Both riparian habitat features, excavated floodplains, and in -stream structures such as rock a -vanes, log sills, brush toes, log j -hooks, log toes, and log drops are proposed to be used throughout the project to act as grade control and for bank stabilization by dissipating and redirecting the stream's energy. Bank stability will also be enhanced through the installation of live stakes that include native species (e.g. black willow (Salix nigra) and silky dogwood (Cornus amomum)). Sections of abandoned stream channel will be backfilled to the elevation of the floodplain in areas adjacent to the new channel with material excavated onsite and by installing channel plugs where necessary. The floodplain will be planted with native species creating a vegetated buffer, which will provide numerous water quality and ecological benefits. Stream banks will be stabilized using a combination of grading, erosion control matting, bare -root plantings, native material revetment techniques (i.e. bioengineering), structure placement, and sod transplants where possible. The stream and adjacent riparian areas will be protected by a permanent conservation easement. The Poplar Creek Site has been broken into the following design reaches: Reach YB1-C Reach beginning at the outfall of an existing pond flowing southwest beyond the project limits toward its confluence with Little Poplar Creek totaling 678 linear feet of Priority I Restoration. Row crops and active pasture are located adjacent to the reach. Priority I Restoration is proposed to address existing impairments including hydrologic dislocation, floodplain dislocation, bank erosion, nutrient input, livestock access and buffer degradation. The watershed that drains to this reach is approximately 66 acres and the land use is primarily agricultural. The design approach will include meandering the proposed channel within the natural valley, backfilling the existing streams, and reconnecting the channel to its floodplain. A minimum 50 -foot buffer will be established and planted with native riparian vegetation and any invasive species located within the conservation easement will be removed. Woody Poplar Creek Mitigation Plan June 2018 29 debris and log grade control structures will be installed along the bed and banks to improve in -stream habitat and stability. Reach YB2 YB2-A begins downstream of an existing gas easement and flows south through an existing impoundment to a 24 -inch pipe under Lee Youngblood Road. Restoration is proposed along this reach to address existing impairments including impoundment, floodplain dislocation, bank erosion, nutrient input, livestock access and buffer degradation. YB2-A totals 863 linear feet of Priority I Restoration and 350 linear feet of Priority II Restoration. Active pasture and livestock waste lagoons surround this reach.The watershed that drains to this reach is approximately 51 acres and the land use is primarily agricultural. The design approach will include breaching the existing dam and meandering the proposed channel within the natural valley. A minimum 50 -foot buffer will be established and planted with native riparian vegetation and any invasive species located within the conservation easement will be removed. Woody debris and log grade control structures will be installed along the bed and banks to improve in - stream habitat and stability. Priority I Restoration is proposed along YB2-B to address existing impairments including floodplain dislocation, bank erosion, sediment loading, nutrient input, livestock access and buffer degradation. The watershed at the upstream end of this reach is approximately 78 acres and the watershed at the downstream end is approximately 102 acres. The primary land use for the watershed is agricultural. The design approach will include meandering the proposed channel within the natural valley, backfilling the existing stream, reconnecting the channel to its floodplain. A minimum 50 -foot buffer will be established and planted with native riparian vegetation and any invasive species located within the conservation easement will be removed. Woody debris and log grade control structures will be installed along the bed and banks to improve in -stream habitat and stability. Enhancement I is proposed along the southern portion of YB2-B. Minor bank stabilization will take place along this channel. The riparian buffer is currently accessed by livestock and contains a significant invasive population. The Project will involve revegetating the buffer with native vegetation for a minimum 50 -foot width and fencing out livestock. Reach YB3 Reach begins downstream of Lee Youngblood Road and flows south through active pasture toward its confluence with Poplar Creek. Reach YB3 totals 760 linear feet of Enhancement II. Enhancement begins at the northern portion of the proposed conservation easement. The drainage area for this reach is approximately 29 acres. The channel is stable throughout and provides a variety of aquatic habitats. The riparian buffer is currently accessed by livestock and contains a significant invasive population. The Project will involve revegetating the buffer with native vegetation for a minimum 50 -foot width and fencing out livestock. Design Discharge Based upon the hydrologic analyses described below, design discharges were selected that fall near model results for the 1.5 -year flood frequency analysis for each reach. The selected flows for the restoration reaches are 3 ft'/s, 3 ft'/s, 4 ft'/s, and 5 ft3/s for Reaches YBI-C, YB2-A, YB2-B (Upstream Station 21+30) and, YB2-B (Downstream Station 21+30) respectively. These discharges will provide frequent inundation of the adjacent floodplain. The design discharges were selected based on the following rationale: • The calculated bankfull discharge for the analog/reference reach and existing reaches fall near the results of the 1.1 -year flood frequency analysis, Poplar Creek Mitigation Plan June 2018 30 The results of the 1.0 -year Hydraflow Hydrographs analysis are equivalent to the flood frequency 1.1 -year storm (Doll et al., 2003), and Selecting design discharges around the 1.1 -year storm events allows frequent inundation of the adjacent floodplain. Design Methods There are three primary methods that have demonstrated success in stream restoration: analog, empirical, and analytical. All three methods have advantages and limitations, and it is often best to utilize more than one method to address site-specific conditions or to verify the applicability of design elements. This is particularly true in developed watersheds where existing conditions do not always reflect current inputs and events, and sediment and hydrologic inputs may remain unstable for some time. Combinations of analytical and analog methods were used to develop the stream designs for the Poplar Creek site. Analytical Approach Analytical design is based on principles and processes considered universal to all streams, and can entail many traditional engineering techniques. The analytical approach utilizes continuity, roughness equations, hydrologic and hydraulic models, and sediment transport functions to derive equilibrium conditions. Since the project is located within a rural watershed, restoration designs are based on hydrologic and hydraulic analyses, including rainfall -runoff models to determine design discharges coupled with reference reach techniques. Analog Approach The analog method of natural channel design involves the use of a "template" or reference stream located near the design reach, and is particularly useful when watershed and boundary conditions are similar between the design and analog reaches (Skidmore et al., 2001). In an analog approach, the planform pattern, cross-sectional shape, longitudinal profile, and frequency and locations of woody debris along the analog reaches are mimicked when developing the design parameters for the subject stream. 1. The appropriate bankfull cross-sectional area (CSA) of each design reach was calculated using an in-house spreadsheet based on Manning's Equation. The input parameters included the design discharge as determined by the hydrologic analysis described above, and proposed slope based on site conditions, and the sinuosity measured for the analog reach. 2. The cross-sectional shape was adjusted within the spreadsheet to replicate the width -depth ratios and side slopes surveyed along the analog reach, while also maintaining the CSA necessary to convey the design discharge. 3. The scaling factor is determined from the ratio of the design top width to the analog top width (Table 10). 4. Pool cross-sectional areas were calculated using both typical reference reach techniques and the analog approach. Design CSA areas were determined using the measured analog ratios of shallow/riffle CSA to pool CSA as applied to the design CSAs. The pool cross-sectional shape was adjusted within the in-house spreadsheet as described above in step 2. Poplar Creek Mitigation Plan June 2018 31 Table 10. Scaling Factors for Sizing Planform Design Parameters Drainage Proposed Bankfull Design Analog Reach Scaling Reach Area (ac) CSA (ft2) Top Width (ft) Top Width (ft) Factor YB1-C 66 2.6 4.9 10 0.49 Y132 -A 51 2.6 5.0 15 0.33 Y132-13 (Upstream) 78 2.6 5.0 15 0.33 Y132-13 (Downstream) 102 2.7 5.3 15 0.35 Typical Design Sections Typical cross-sections for shallows and pools are shown on the design plan sheets in Appendix A. The cross-section dimensions were developed for the two design reaches by using a WK Dickson in-house spreadsheet. The cross-sections were altered slightly to facilitate constructability; however, the cross- sectional area, width to depth ratio, and side slopes were preserved. Typical pool sections include pools located on straight reaches and pools on meander bends. Meander Pattern The design plans showing the proposed channel alignment are provided in Appendix A. The meander pattern was derived directly from the analog reach and was altered in some locations to provide variability in pattern, to avoid onsite constraints, to follow the valley pattern, and to make the channel more constructible. The morphologic parameters summarized in the Appendix B were applied wherever these deviations occurred. Longitudinal Profiles The design profiles are presented in Appendix A. These profiles extend throughout the entire project for the proposed channel alignment. The profiles were designed using the analog reach bed features that were sized with the scaling factors. The bed slopes and bankfull energy gradients were determined for each design reach based on the existing valley slope and the sinuosity of the design reach. A mix of rock and log structures will be utilized in the design to control grade, divert flows, and provide additional habitat diversity and stability. In -Stream Structures Structures will be incorporated into the channel design to provide additional stability and improve aquatic habitat. Native materials and vegetation will be used for revetments and grade control structures where applicable. Additionally, rock structures will be utilized intermittently along Reach YB 1-C and YB2-B to provide increased stability and habitat. Typical rock structures that will protect the channel bed and/or banks will include a -vanes, riffle grade controls, rock cross vane, and j -hooks. Woody debris will be placed throughout the channel at locations and at a frequency that is similar to those observed in the analog reaches. Woody habitat features installed will include dead brush, root wads, brush toes, and log vanes. To provide additional bank stability, sod mats harvested onsite will be installed along stream banks during construction if and when feasible. Sod mats will only be harvested and used if comprised of appropriate vegetation. The use of sod mats that include aggressive turf grasses will be avoided. Sod mats are natural sections of vegetation taken from the banks when they were cut during construction, and are about nine inches thick. Before installation, proposed banks are graded lower than specified to accommodate the thickness of the mat. The mats are placed on top of the bank to act as a natural stabilizer of native species, and they grow much faster than the combination of coir fiber matting and seeding. Other bank stability measures include the installation of live stakes, log sills, brush toes, log vanes, and log toes. Typical details for proposed in -stream structures and revetments are in Appendix A. Poplar Creek Mitigation Plan June 2018 32 Stream Data Analysis Stream Hydrologic Analysis Hydrologic evaluations were performed for the design reaches using multiple methods to determine and validate the design bankfull discharge and channel geometry required to provide regular floodplain inundation. The use of various methods allows for comparison of results and eliminates reliance on a single model. Peak flows (Table 11) and corresponding channel cross-sectional areas were determined for comparison to design parameters using the following methods: • Regional Flood Frequency Analysis, • AutoCAD's Hydraflow Hydrographs, • NC Regional Curves for the Coastal Plain, and Piedmont • USGS regional regression equations for rural conditions in the Coastal Plain and Piedmon. Regional Flood Frequency Analysis A flood frequency analysis was completed for the study region using historic gauge data on all nearby USGS gauges with drainage areas less than 6,400 acres (10 mit) which passed the Dalrymple homogeneity test (Dalrymple, 1960). This is a subset of gauges used for USGS regression equations. Regional flood frequency equations were developed for the 1.1-, 1.5-, and 2 -year peak discharges based on the gauge data. Discharges were then computed for the design reach. These discharges were compared to those predicted by the discharge regional curve and USGS regional regression 2 -year discharge equations. AutoCAD's Hydraflow Express Hydraflow Express was used to simulate the rainfall -runoff process and establish peak flows for the watersheds. This model was chosen over the U.S. Army Corps of Engineers model HEC -HMS because it allows the user to adjust the peak shape factor for the watershed conditions. Rainfall data reflecting 100, 284 and 484 peak shape factors were used along with a standard Type II distribution, and NRCS hydrology (time of concentrations and runoff curve numbers), to simulate the rainfall -runoff process. A 284 peak shape factor was determined to be the most representative for this watershed. Regional Curve Regression Equations The North Carolina Coastal Plain and Piedmont regional curves by Doll et al. (2003) and Sweet and Geratz (2003), and the Virginia/Maryland (Krstolic and Chaplin, 2007) Coastal Plain regional curves for discharge were used to predict the bankfull discharge for the site. The NC regional curves predicted flows that are similar to those predicted by the 1.1 -year flood frequency, while the VA/MD curves are comparable to flows predicted by the 1.5 -year flood frequency equation. The regional curve equations for NC discharges by Doll et al. (2003) (1), Sweet and Geratz (2003) (2), and VA/MD (3) discharges are: (1) Qbkj=16.56*(DA)0_72 (Doll et al., 2003) (2) Qbkr-8.79*(DA)0.76 (Sweet and Geratz, 2003) (3) Qbkj;:= 28.3076*(DA)°.59834 (Krstolic and Chaplin, 2007) Where Qbkf=bankfull discharge (ft3/s) and DA=drainage area (mi'). USGS Regional Regression Equations USGS regression equations estimate the magnitude and frequency of flood -peak discharges (Weaver, et al., 2009). The regression equations were developed from gauge data in different physiographic Poplar Creek Mitigation Plan June 2018 33 regions of the Southeastern United States. For this analysis, there was only concern for the 2 -year return interval. The equation for the rural Coastal Plain (Hydrologic Region 4) is: (4) Q2=60.3 *(DA)0.649 Table 11. Peak Flow Comparison Reach Drainage Area (Ac) Hydraflow Qi FFQ Qi'i FFQ QA's NC Regional Curve Q (1) NC Regional Curve Q (2) VA/MD Regional Curve Q (3) Regional Regression Eqns. Q2 Design/ Calculated Q YB1-C 66 3.4 3.2 11.1 3.2 1.6 7.3 14 3 Y132 -A 51 2.5 2.6 9.4 2.7 1.3 6.3 12 3 Y132 -B 78 4.6 3.7 12.4 3.6 1.8 8.0 15 4 (Upstream) Y132 -B 102 4.2 4.6 14.8 4.4 2.2 9.4 18 5 (Downstream) YB3 29 0.6 1.6 6.5 1.8 0.8 4.4 8 - Sediment Transport Analysis An erosion and sedimentation analysis was performed to confirm that the restoration design creates a stable sand bed channel that neither aggrades nor degrades over time. Typically, sediment transport is assessed to determine a stream's ability to move a specific grain size at specified flows. Various sediment transport equations may be easily applied when estimating entrainment for gravel bed streams; however, these equations are not as effectively applied to sand bed channels where the entire bed becomes mobile during geomorphically significant flows. Therefore, more sophisticated modeling techniques were used to analyze the stream design for this project. The following methods and functions were utilized during the sediment transport analysis: • Permissible Shear Stress Approach • Permissible Velocity Approach Shear Stress Approach Shear stress is a commonly used tool for assessing channel stability. Allowable channel shear stresses are a function of bed slope, channel shape, flows, bed material (shape, size, and gradation), cohesiveness of bank materials, and vegetative cover. The shear stress approach compares calculated shear stresses to those found in the literature. Shear stress is the force exerted on a boundary during the resistance of motion as calculated using the following formula: (5) i = yRS i = shear stress (lb/ft') y = specific gravity of water (62.4 lb/ft') R = hydraulic radius (ft) S = average channel slope (ft/ft) Poplar Creek Mitigation Plan June 2018 34 Table 12. Comparison of Allowable and Proposed Shear Stresses Reach Proposed Shear Stress at Bankfull z Stage (lbs/ft) Critical Shear Stress (lbs/ftZ) Allowable Shear Stress' Sand/Silt/Clay Gravel (lbs/ft') (lbs/ft') Vegetation (lbs/ft2) YB1-C 0.11 >0.06 0.03 to 0.26 0.33 to 0.67 0.2 to 1.7 YB2-A 0.11 >0.06 0.03 to 0.26 0.33 to 0.67 0.2 to 1.7 YB2-13 0.045 1.8 2.0 4.0 6.0 0.24 >0.06 0.03 to 0.26 0.33 to 0.67 0.2 to 1.7 (Upstream) YB2 B YB2-13 0.045 1.8 2.0 4.0 6.0 0.24 >0.06 0.03 to 0.26 0.33 to 0.67 0.2 to 1.7 (Downstream) '(Fischenich, 2001 Review of the above table shows that the proposed shear stresses for the Poplar Creek design reaches fall between the critical shear stress (shear stress required to initiate motion) and the allowable limits. Therefore, the proposed channel should remain stable. Velocity Approach Published data is readily available that provides entrainment velocities for different bed and bank materials. A comparison of calculated velocities to these permissible velocities is a simple method to aid in the verification of channel stability. Table 13 compares the proposed velocities calculated using Manning's equation with the permissible velocities presented in the Stream Restoration Design Handbook (MRCS, 2007). Table 13. Comparison of Allowable and Proposed Velocities Reach Manning's "n" Design Velocity (ft/s) Allowable Velocity' (ft/s) value Fine Sand Coarse Sand Fine Gravel YB1-C 0.045 1.2 2.0 4.0 6.0 YB2-A 0.045 1.2 2.0 4.0 6.0 YB2 B 0.045 1.8 2.0 4.0 6.0 (Upstream) YB2 B 0.045 1.8 2.0 4.0 6.0 (Downstream) 1(NRCS, 2007) 6.3 Vegetation and Planting Plan Plant Community Restoration The restoration of the plant communities is an important aspect of the restoration project. The selection of plant species is based on what was observed at the reference reach, species present in the forest surrounding the restoration site, and what is typically native to the area. Several sources of information were used to determine the most appropriate species for the restoration project. The reference stream is located within a disturbed Piedmont Alluvial Forest. Dominant species included sweetgum, red maple, tulip poplar, and various oak species (Quercus sp.) in the canopy. Shrubs included Black elderberry (Sambucus canadensis), green briar, and American holly. The reference site was chosen due to the stability of the channel, the physical structure of the forest community, and to evaluate stream habitat. The species present are indicative of early successional species that have high dispersal rates. The mitigation site also supports many species typical of this community type due to its past disturbance history. Typically, Piedmont Alluvial Forest would occur along the stream banks and adjacent floodplain of the proposed Project. Poplar Creek Mitigation Plan June 2018 35 Piedmont Alluvial Forest will be the target community type and will be used for all planting areas within the project. The plant species list has been developed and can be found in Table 14. Species with high dispersal rates are not included because of local occurrence, adjacent seed sources, and the high potential for natural regeneration. The high dispersal species include red maple, tulip poplar, and sweetgum. The restoration of plant communities along the Project will provide stabilization and diversity. For rapid stabilization of the stream banks (primarily outside meanders), silky dogwood (Cornus ammomum) and black willow (Salix nigra) were chosen for live stakes along the restored channel because of their rapid growth patterns and high success rates. Willows grow at a faster rate than the species planted around them, and they stabilize the stream banks. Willows will also be quicker to contribute organic matter to the channel. When the other species are bigger, the black willows and silky dogwoods will slowly stop growing or die out because the other species would outgrow them and create shade that the willows do not tolerate. The live stake species will be planted along the outside of the meander bends three feet from the top of bank, creating a three-foot section along the top of bank. The live stakes will be spaced one per linear foot with alternate spacing vertically. See Figure 10 for a detailed planting plan. After construction activities, the subsoil will be scarified and any compaction will be deep tilled/ripped before the topsoil is placed back over the Project. Any topsoil that is removed during construction will be stockpiled and placed over the Project during final soil preparation. This process should provide favorable soil conditions for plant growth. Rapid establishment of vegetation will provide natural stabilization for the Project. Table 14. Proposed Plant List Live Staking and Live Cuttings Bundle Tree Species Species Common Name % of Total Species Composition Salix nigra Black willow 60 Cornus ammomum Silky dogwood 40 On -Site Invasive Species Management Treatment for invasive species will be required within all grading limits associated with stream restoration. Invasive species will require different and multiple treatment methods, depending on plant Poplar Creek Mitigation Plan June 2018 36 Piedmont Alluvial Forest Spacing % of Total Species Common Name (ft) Unit Type Species Composition Platanus occidentalis American sycamore 9x6 Bare root 20 Betula nigra River birch 9x6 Bare root 20 Quercus phellos Willow oak 9x6 Bare root 15 Nyssa biflora Black gum 9x6 Bare root 15 Quercus michauxii Swamp chestnut oak 9x6 Bare root 10 Quercus lyrata Overcup oak 9x6 Bare root 10 Asimina triloba Paw Paw 9x6 Bare root 10 Live Staking and Live Cuttings Bundle Tree Species Species Common Name % of Total Species Composition Salix nigra Black willow 60 Cornus ammomum Silky dogwood 40 On -Site Invasive Species Management Treatment for invasive species will be required within all grading limits associated with stream restoration. Invasive species will require different and multiple treatment methods, depending on plant Poplar Creek Mitigation Plan June 2018 36 phenology and the location of the species being treated. All treatment will be conducted so as to maximize its effectiveness and reduce chances of detriment to surrounding native vegetation. Treatment methods will include mechanical (cutting with loppers, clippers, or chain saw) and chemical (foliar spray, cut stump, and hack and squirt techniques). Plants containing mature, viable seeds will be removed from the Project and properly disposed. All herbicide applicators will be supervised by a certified ground pesticide applicator with a North Carolina Department of Agriculture and Consumer Services (NCDA&CS) license and adhere to all legal and safety requirements according to herbicide labels and NC and Federal laws. Management records will be kept on the plant species treated, type of treatment employed, type of herbicide used, application technique, and herbicide concentration and quantities used. These records will be included in all reporting documents. Soil Restoration After construction activities, the subsoil will be scarified and any compaction will be deep tilled before the topsoil is placed back over the site. Any topsoil that is removed during construction will be stockpiled and placed over the site during final soil preparation. This process should provide favorable soil conditions for plant growth. Rapid establishment of vegetation will provide natural stabilization for the site. 6.4 Mitigation Summary Natural channel design techniques have been used to develop the restoration designs described in this document. The combination of the analog and analytical design methods was determined to be appropriate for this project because the watershed is rural, the causes of disturbance are known and have been abated, and there are minimal infrastructure constraints. The original design parameters were developed from the measured analog/reference reach data and applied to the subject stream. The parameters were then analyzed and adjusted through an iterative process using analytical tools and numerical simulations of fluvial processes. The designs presented in this report provide for the restoration of natural fine gravel and sand -bed channel features and stream bed diversity to improve benthic habitat. The proposed design will allow flows that exceed the design bankfull stage to spread out over the floodplain, restoring wetland hydrology to the overbank areas and reducing instream forces. A large portion of the existing stream will be filled using material excavated from the restoration channel. However, many segments will be left partially filled to provide habitat diversity and flood storage. Native woody material will be installed throughout the restored reach to reduce bank stress, provide grade control, and increase habitat diversity. Forested riparian buffers of at least fifty feet on both sides of the channel will be established along the project reach. An appropriate riparian plant community will be established to include a diverse mix of species. Replanting of native species will occur where the existing buffer is impacted during construction. 6.5 Determination of Credits Mitigation credits presented in Table 15 are projections based upon site design (Figure 11). Upon completion of site construction, the project components and credits data will be verified to be consistent with the mitigation plan. Any discrepancies between the Mitigation Plan credits and the as -built credits will be explained and the final project credits will be based on the Mitigation Plan. This will be approved by the USACE. Poplar Creek Mitigation Plan June 2018 37 Table 15. Mitigation Credits +These reaches have an existing length ofzero; YB2-A with PI Restoration is where the current impoundment resides; YB2-A with P2 Restoration is currently an underground culvert from the pond that flows under the road to YB2-B. "Additional two percent credit on reaches conducting restoration and enhancement in accordance with the protocols specified in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update. Calculated using GIS analysis and the Non -Standard Buffer Width Calculator 6.6 Credit Calculations for Non -Standard Buffer Widths Buffer measurements for additional credit were made horizontally, beginning from the edge of the wetted perimeter and extending to easement boundary. Due to the minimum required widths, additional credit was not generated until a stream is at least 30 feet inside the edge of the buffer. Table 16 describes the adjustments in stream credit based on buffer widths. Areas within the project that are being used to generate additional credit are solely being used for the generation of stream mitigation credits, and will not be used for the generation of any other credit type (i.e., the same square foot of buffer cannot be used to generate wetland credit, nutrient offset credits or state buffer credits). Area within a buffer may only be used to provide credit for one stream (i.e., where buffers exist between two project streams, these areas may only be counted toward credit for only one of the streams, and areas within the minimum required buffer of any creditable stream may not be used for additional credit for any other stream). Poplar Creek Mitigation Plan June 2018 38 The Poplar Creek Site Mitigation Credits Mitigation Credits Stream Riparian Wetland Non -Riparian Wetland Totals 4,224 NA NA Proposed Reach Mitigation Type Proposed Stationing Existing Length (LF) Proposed Length Mitigation Ratio SMUs YB1-C P1 Restoration 0+25 to 7+03 1,066 678 1 : 1.0 678 Y132 -A P1 Restoration 0+17 to 8+80 0+ 863 1 : 1.0 863 Y132 -A P2 Restoration 8+80 to 12+30 0+ 350 1 : 1.0 350 YB2-B P1 Restoration 13+20 to 26+70 1,358 1,350 1 : 1.0 1,350 Y132-13 Enhancement I 26+70 to 29+42 272 272 1 : 1.5 181 Y133 Enhancement II 4+22 to 11+82 760 760 1 :2.5 310 Totals 3,456 4,273 3,801 Water Quality Adjusted SMUse 75 Non -Standard Buffer Width Adjustment* 423 Total SMUs 4,224 +These reaches have an existing length ofzero; YB2-A with PI Restoration is where the current impoundment resides; YB2-A with P2 Restoration is currently an underground culvert from the pond that flows under the road to YB2-B. "Additional two percent credit on reaches conducting restoration and enhancement in accordance with the protocols specified in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update. Calculated using GIS analysis and the Non -Standard Buffer Width Calculator 6.6 Credit Calculations for Non -Standard Buffer Widths Buffer measurements for additional credit were made horizontally, beginning from the edge of the wetted perimeter and extending to easement boundary. Due to the minimum required widths, additional credit was not generated until a stream is at least 30 feet inside the edge of the buffer. Table 16 describes the adjustments in stream credit based on buffer widths. Areas within the project that are being used to generate additional credit are solely being used for the generation of stream mitigation credits, and will not be used for the generation of any other credit type (i.e., the same square foot of buffer cannot be used to generate wetland credit, nutrient offset credits or state buffer credits). Area within a buffer may only be used to provide credit for one stream (i.e., where buffers exist between two project streams, these areas may only be counted toward credit for only one of the streams, and areas within the minimum required buffer of any creditable stream may not be used for additional credit for any other stream). Poplar Creek Mitigation Plan June 2018 38 Table 16. Stream Mitigation Credit Adjustments for Non-standard Buffer Widths Mountain Counties Piedmont and Coastal Plain Counties Buffer Width Adjustment to Stream Credit Buffer Width Adjustment to Stream Credit Less than 15 feet -100% Less than 15 feet -100% 15 to < 20 feet -50% 15 to < 20 feet -50% 20 to < 25 feet -30% 20 to < 25 feet -40% 25 to < 30 feet -15% 25 to < 30 feet -30% 30 to < 50 feet 0% 30 to <35 feet -20% 50 to < 75 feet 9% 35 to < 40 feet -15% 75 to < 100 feet 16% 40 to < 45 feet -10% 100 to < 125 feet 22% 45 to < 50 feet -5% 125 to < 150 feet 27% 50 to < 75 feet 0% 125 feet or Greater 30% 75 to < 100 feet 7% 100 to < 125 feet 12% 125 to < 150 feet 16% 150 feet or greater 20% In order to calculate credit adjustments, the Wilmington District Stream Buffer Credit Calculator (USACE, 2018) was utilized. To perform this calculation GIS analysis was performed to determine the area (in square feet) of ideal buffer zones and actual buffer zones around all streams within the project. Minimum standard buffer widths are measured from the top of bank (50 feet in Piedmont and Coastal Plain counties or 30 feet in mountain counties) and are not included in the ideal and actual buffer calculations. The ideal buffers are the maximum potential size (in square feet) of each buffer zone measured around all creditable stream reaches, calculated using GIS, including areas outside of the easement. The actual buffer is the square feet in each buffer zone, as measured by GIS, excluding non - forested areas, all other credit type (e.g., wetland, nutrient offset, buffer), easement exceptions, open water, areas failing to meet the vegetation performance standard, etc. Additional credit is given to 150 feet in buffer width, so areas within the easement that are more than 150 feet from creditable streams should not be included in this measurement. Non -creditable stream reaches within the easement are removed prior to calculating this area with GIS (for both ideal and actual). The stream lengths, mitigation type, ideal buffer, and actual buffer are all entered into the calculator. This is data is processed, and the resulting credit amounts are totaled for the whole project (Table 15, Figure 12a and 12b). 6.7 Credit Calculations for Macroinvertebrate and Water Quality Monitoring Although water quality and macroinvertebrate monitoring is not required, this project will be monitor both in accordance with the protocols specified in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update in order to generate an additional two percent credit. Credit will be generated on all reaches since they are expected to have habitat uplift and beneficially impacted from the restoration and enhancement treatments occurring upstream. Poplar Creek Mitigation Plan June 2018 39 7 PERFORMANCE STANDARDS The success criteria for the Project will follow accepted and approved success criteria presented in the 2016 USACE Wilmington District Stream and Wetland Compensatory Mitigation Update and subsequent agency guidance. Specific success criteria components are presented below. Table 17 shows how these performance standards are related to the goals and objectives of the project and the monitoring method used to determine success. 7.1 Stream Restoration Success Criteria Bankfull Events Four bankfull flow events must be documented within the seven-year monitoring period to demonstrate channel stability. The bankfull events must occur in separate years. Otherwise, the stream monitoring will continue until four bankfull events have been documented in separate years. One crest gauge will be installed on reach Y132 -A. Surface Flow Stream restoration reaches will be monitored to document intermittent or seasonal surface flow. This will be accomplished through direct observation and the use of stream crest gauge transducers with data loggers. Reaches must demonstrate a minimum of 30 consecutive days of flow. Bank Height Ratio and Entrenchment Ratio At any measured riffle cross-section, bank height ratio shall not exceed 1.2, and the entrenchment ratio shall be no less than 1.4 within restored reaches. These standards will only apply to reaches of the channel where bank height ratio and entrenchment ratio is adjusted to reference condition through design and construction. Surface Flow Stream restoration reaches will be monitored to document intermittent or seasonal surface flow. This will be accomplished through direct observation and the use of stream gauge transducers with data loggers. Reaches must demonstrate a minimum of 30 consecutive days of flow. Flow gauges will be installed on YB1-C and Y132 -A. 7.2 Vegetation Success Criteria Specific and measurable success criteria for plant density within the riparian buffers on the Project will follow Interagency Review Team (IRT) Guidance. The interim measures of vegetative success for the Project will be the survival of at least 320 planted three-year old trees per acre at the end of Year 3, five-year old trees at seven feet in height at the end of Year 5, and the final vegetative success criteria will be 210 trees per acre with an average height of ten feet at the end of Year 7. Volunteer trees will be counted, identified to species, and included in the yearly monitoring reports, but will not be counted towards the success criteria of total planted stems. Moreover, any single species can only account for up to 50% of the required number of stems within any vegetation plot. Any stems in excess of 50% will be shown in the monitoring table, but will not be used to demonstrate success. Poplar Creek Mitigation Plan June 2018 40 8 MONITORING PLAN Annual monitoring data will be reported using the IRT monitoring template. The monitoring report shall provide a project data chronology that will facilitate an understanding of project status and trends, research purposes, and assist in decision making regarding project close-out. Monitoring reports will be prepared annually and submitted to the IRT. Monitoring plan overview is presented in Table 17, and Figure 13. Table 17 below outlines the links between project goals, objectives, and treatments and their associated monitoring metrics and performance standards within the context of functional uplift based on the Stream Functions Pyramid Framework. 8.1 As -Built Survey An as -built survey will be conducted following construction to document channel size, condition, and location. The survey will include a complete profile of thalweg, water surface, bankfull, and top of bank to compare with future geomorphic data. Longitudinal profiles will not be required in annual monitoring reports unless requested by USACE. Stream channel stationing will be marked with stakes placed near the top of bank every 200 feet. 8.2 Visual Monitoring Visual monitoring of all mitigation areas will be conducted a minimum of twice per monitoring year by qualified individuals. The visual assessments will include vegetation density, vigor, invasive species, and easement encroachments. Visual assessments of stream stability will include a complete streamwalk and structure inspection. Digital images will be taken at fixed representative locations to record each monitoring event, as well as any noted problem areas or areas of concern. Results of visual monitoring will be presented in a plan view exhibit with a brief description of problem areas and digital images. Photographs will be used to subjectively evaluate channel aggradation or degradation, bank erosion, success of riparian vegetation, and effectiveness of erosion control measures. Longitudinal photos should indicate the absence of developing bars within the channel or an excessive increase in channel depth. Lateral photos should not indicate excessive erosion or continuing degradation of the banks over time. A series of photos over time should indicate successional maturation of riparian vegetation. 8.3 Gauges Crest gauges will be installed to document to occurrence of bankfull events. A minimum of one gauge will be installed on each tributary that is greater than 1,000 feet in length, with on gauge required for every 5,000 feet of length on each tributary and a maximum of 5 gauges per tributary. Where restoration or enhancement activities are proposed for intermittent streams, monitoring gauges should be installed to track the frequency and duration of stream flow events. 8.4 Cross Sections Permanent cross-sections will be installed at a minimum of one per 20 bankfull widths with half in pools and half in riffle on all Restoration and Enhancement I reaches. All cross-section measurements will include bank height ratio and entrenchment ratio. Cross-sections will be monitored in years 1, 2, 3, 5, and 7. There should be little change in as -built cross-sections. If changes do take place, they should be evaluated to determine if they represent movement toward a less stable condition (for example down - cutting or erosion), or are minor changes that represent an increase in stability (for example settling, vegetative changes, deposition along the banks, or decrease in width/depth ratio). Poplar Creek Mitigation Plan June 2018 41 8.5 Vegetation Monitoring Vegetation monitoring plots will be a minimum of 0.02 acres in size, and cover a minimum of two percent of the planted area. There will be 10 plots within the planted area (11.93 acres) (Figure 13). Plots will be a mixture of fixed and random plots, with eight fixed plots and two random plots. Planted area indicates all area in the easement that will be planted with trees. Existing wooded areas are not included in the planted area. The following data will be recorded for all trees in the fixed plots: species, height, planting date (or volunteer), and grid location. For random plots, species and height will be recorded for all woody stems. The location (GPS coordinates and orientation) of the random plots will be identified in the annual monitoring reports. Vegetation will be planted and plots established at least 180 days prior to the initiation of the first year of monitoring. Monitoring will occur in years 1, 2, 3, 5, and 7 between July l" and leaf drop. Invasive and noxious species will be monitored and so that none become dominant or alter the desired community structure of the Project. If necessary, RES will develop a species-specific treatment plan. 8.6 Water Quality and Macroinvertebrate Monitoring Water quality and macroinvertebrate indicators will be monitored to document and measure any changes to physical, chemical, and biological metrics within the project area. These metrics are sensitive to changes in the project watershed (e.g. land use change and pollutant inputs) and more localized modifications, such as in -stream habitat improvements and riparian buffer restoration. However, because results might not demonstrate a measurable improvement over pre -construction conditions, or measurable improvements may occur slowly, the success of the project will not be tied to these metrics. This data will be provided to the NCIRT so that it may be used to support future guidance and aid in linking stream mitigation to improvements in ecological function. While the success of the Site is not tied to water quality and macroinvertebrate monitoring, the goals of the project are intended to improve water quality and the biologic function of the project's stream channels. Objectives such as the permanent exclusion of livestock and the restoration of stable stream channels, are intended to directly improve water quality through the reduction of sediment and nutrient inputs to receiving waters. Objectives such as the installation of habitat features and the constructing pools of varying depth are intended to improve aquatic habitat. Planting the buffer with native tree and understory species will not only improve riparian and wetland habitats, but will also shade project streams and reduce thermal loadings. Water Quality Sampling will be conducted prior to construction and for the duration of the monitoring period using a continuous recording sampling device, and will include measurements of acidity (pH), temperature, dissolved oxygen, and conductivity. Sampling points will be located as close as possible to the upper and lower end of tributaries in order to detect any changes. Points will be located where water is freely flowing and with sufficient depth to be conducted without disturbance to streambed sediments. Macroinvertebrate Sampling will be conducted prior to construction and once a year during monitoring years 3, 5, and 7. Sampling points will be located on riffles, with the first sampling point located on the most downstream riffle on the tributary. Appropriate sampling locations will be based on riffle condition and best professional judgement. Pre -construction sampling may occur in different locations than those outlined in the monitoring period, but sampling conducted during the monitoring period will occur within the same riffle year-to-year, when possible. A reference location will also be sampled for comparison Poplar Creek Mitigation Plan June 2018 42 purposes, located on a relatively stable reach in an undisturbed setting, located as close to the mitigation site as possible, and within the same watershed. The sampling will be conducted in accordance with the NCDWR Qual 4 macroinvertebrate sampling protocol, which is described in the most current version of the Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates, February 2016 (Version 5.0). If the stream is large (greater than a 3 -square mile watershed), a mix of Qual 4 and the Standard Qualitative (Full Scale) methods may be appropriate. Sampling will be conducted during the same time of year to minimize seasonal differences in the data from year-to-year. Additionally, sampling will be conducted at the same time as water quality monitoring, and within the index period referenced in the North Carolina Division of Water Resources (NCDWR) document entitled Small Streams Biocriteria Development, dated May 29, 2009. Macroinvertebrate samples will be identified to the lowest practical taxonomic level (usually Genus) by a qualified taxonomist (this qualification can be demonstrated by being a NCDWR certified laboratory for macroinvertebrates). Results presented will include a list of taxa collected at each site for each sampling event, as well as an enumeration of the Ephemeroptera, Plecoptera, and Trichoptera (EPT) taxa and a Biotic Index (see the NCDWR Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates). Each report should include a summary of the current results and all past monitoring events in tabular format. Poplar Creek Mitigation Plan June 2018 43 Table 17. Monitoring Plan Level Goal Treatment Outcome Monitoring Method Performance Standard To transport Convert land -use Improve the cwater from the of Project reaches transport of water 1 z watershed to the from disturbed from the watershed N/A N/A channel in a non- riparian forest to to the Project x protected riparian reaches in a non - erosive manner forest erosive way Reduce bank Crest gauges and/or Four bankfull events documented in the seven - height ratios and Improve flood bank pressure transducers: year monitoringperiod At least 30 days of continuous flow each year T2 To transport increase entrenchment connectivity by Inspected semiannually 2 water in a stable ratios by reducing bank height ratios and Cross Sections: Entrenchment ratio shall be no less than 1.4 manner reconstructing channels to mimic increase Surveyed in years 1, within restored reach reference reach entrenchment ratios 2, 3, 5 and 7 Bank height ratio shall not exceed 1.2 on riffles conditions Reduce erosion As -built stream Perform stream profile survey post -construction Establish a riparian rates and channel profile buffer to reduce instability to Entrenchment ratio shall be no less than erosion and reference reach Cross sections: 1.4 within restored reach y I create a diverse bedform sediment transport conditions surveyed in years 1, 2, 3, 5 and 7 Bank height ratio shall not exceed c _t into Project 1.2 on riffles 3 astreams. c To achieve Establish Improve bedform Visual monitoring: Identify and document significant stream Z d auric stable banks with diversity (pool Performed at least problem areas; i.e. erosion, degradation, m C� equilibrium livestakes, erosion spacing, percent semiannual) a adation, etc. control matting, riffles, etc. and other in -stream Vegetation plots: MY 1-3: 320 trees/acre structures Increase buffer Surveyed in years 1, MY 4-5: 260 trees/acre (7ft. tall) width to >50 feet 2, 3, 5 and 7 MY 6-7: 210trees/acre (1 Oft. tall) Vegetation plots: To achieve Decrease stream Surveyed in years 1, MY 1-3: 320 trees/acre appropriate temperature 2, 3, 5 and 7 MY 4-5: 260 trees/acre (7ft. tall) levels for water regulation through (indirect MY 6-7: 210 trees/acre (I Oft. tall) introduction of temperature, measurement c ti dissolved Exclude livestock canopy Visual assessment of � oxygen from riparian areas Increase DO by established fencing 4 concentration, with exclusion installing in -stream and conservation Inspect fencing and signage. Identify and o y and other fence, and plant a structures to create signage: Performed document any damaged or missing fencing �? important riparian buffer aeration zones at least semiannually and/or signs. a nutrients (indirect including but not Decrease nutrient measurement Acidity (pH), limited to loading through Nitrogen and buffer filtration and Temperature, NA Phosphorus livestock removal Dissolved O2, Conductivity Vegetation plots: Surveyed in years 1, MY 1-3: 320 trees/acre 29 3, 5 and 7 MY 4-5: 260 trees/acre (7ft. tall) To achieve (indirect MY 6-7: 210 trees/acre (I Oft. tall) functionality in Provided more measurement levels 1-4 to Plant a riparian suitable aquatic Visual monitoring of 5 'It support the life buffer, install habitat features, habitat that can support biodiversity in -stream habitat document 3 histories of features: Performed Identify and significant stream 2q aquatic and and construct pools and life histories of at least semiannually problem areas; i.e. degradation, aggradation, riparian plants p p of varying depths aquatic and (indirect stressed or failed structures, etc. and animals terrestrial animals measurement Macroinvertebrate sampling performed NA in years 3, 5 and 7 ° These categories are measured indirectly; *These categories are not quantifiably measured Little Sebastian Mitigation Plan June 2018 44 8.7 Scheduling/Reporting A baseline monitoring report and as -built drawings documenting stream restoration activities will be developed within 60 days of the planting completion on the Project. The report will include all information required by IRT mitigation plan guidelines, including elevations, photographs and sampling plot locations, gauge locations, and a description of initial species composition by community type. The report will also include a list of the species planted and the associated densities. Baseline vegetation monitoring will include species, height, date of planting, and grid location of each stem. The baseline report will follow USACE guidelines. The monitoring program will be implemented to document system development and progress toward achieving the success criteria. The restored stream morphology will be assessed to determine the success of the mitigation. The monitoring program will be undertaken for seven years or until the final success criteria are achieved, whichever is longer. Monitoring reports will be prepared in the fall of each year of monitoring and submitted to the IRT. The monitoring reports will include all information, and be in the format required by USACE. Poplar Creek Mitigation Plan June 2018 45 9 ADAPTIVE MANAGEMENT PLAN Upon completion of project construction, RES will implement the post -construction monitoring protocols previously defined in this document. Project maintenance will be performed as described previously in this document. In the event the mitigation site or a specific component of the mitigation site fails to achieve the necessary performance standards as specified in the mitigation plan, the sponsor shall notify the members of the IRT and work with the IRT to develop contingency plans and remedial actions. Once the Corrective Action Plan is prepared and finalized RES will: 1. Notify the USACE as required by the Nationwide 27 permit general conditions. 2. Revise performance standards, maintenance requirements, and monitoring requirements as necessary and/or required by the USACE. 3. Obtain other permits as necessary. 4. Implement the Corrective Action Plan. 5. Provide the USACE a Record Drawing of Corrective Actions. This document shall depict the extent and nature of the work performed. Poplar Creek Mitigation Plan June 2018 46 10 LONG-TERM MANAGEMENT PLAN Upon approval of the Site by the IRT, the Site will be transferred to the NCWHF: North Carolina Wildlife Habitat Foundation (336) 375-4994 PO Box 29187 Greensboro, NC 27429 www.ncwh£or� The NCWHF will be responsible for periodic inspection of the Site to ensure that restrictions required in the Conservation Easement or the deed restriction document(s) are upheld. Easements held by the NCWHF are stewarded in general accordance with the guidelines published by the National Land Trust Alliance. These guidelines include annual monitoring visits to easements and related communication with the landowner(s). During the visit, a standard report is completed and pictures taken for the record. If the Site is found to be in violation of the easement terms NCWHF works with the landowner to see the problem rectified. When appropriate NCWHF pursues legal action to enforce the easement terms. NCWHF typically requires the site developer to install standard NCWHF signage as part of the easement transfer package. This includes well marked corners of the easement boundary, as well as plastic or metal signs identifying the easement. The current sign standard is a six-inch by six-inch aluminum sign with contact information. Signs are refreshed on an as needed basis. Typically, a sign will last five to ten years before it is no longer legible due to sun fading. An overview of the NCWHF Easement Stewardship program will be included in Appendix C upon execution of the final easement agreement. NCWHF requires and endowment for each easement it agrees to hold. All endowments are held together in an investment fund. Endowments are sized so that the interest from the principal will pay the expected monitoring costs for that easement. This assumes a seven-year monitoring period for the site during which NCWHF will not incur any expenses. It also assumes a 5% annual return. Currently NCWHF employs a contractor to handle annual monitoring visits and basic easement stewardship. This flat fee includes a property walkthrough, report, pictures, sign installation, etc. The endowment fee has not yet been confirmed for the easement transfer of the Poplar Creek Site, and it will be updated once finalized. Poplar Creek Mitigation Plan June 2018 47 11 CREDIT RELEASE SCHEDULE All credit releases will be based on the total credit generated as reported in the approved mitigation plan of the Site. Under no circumstances shall any mitigation project be debited until the necessary DA authorization has been received for its construction or the District Engineer (DE) has otherwise provided written approval for the project in the case where no DA authorization is required for construction of the mitigation project. The DE, in consultation with the IRT, will determine if performance standards have been satisfied sufficiently to meet the requirements of the release schedules below. In cases where some performance standards have not been met, credits may still be released depending on the specifics of the case. Monitoring may be required to restart or be extended, depending on the extent to which the site fails to meet the specified performance standard. The release of project credits will be subject to the criteria described in Table 18. 11.1 Initial Allocation of Released Credits The initial allocation of released credits, as specified in the mitigation plan can be released by the IRT with written approval of the DE upon satisfactory completion of the following activities: a) Execution of the UMBI by the Sponsor and the USACE b) Approval of the final mitigation plan c) Mitigation site must be secured d) Delivery of financial assurances. e) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE f) Issuance of the 404 permit verification for construction of the site, if required. 11.2 Subsequent Credit Releases The second credit release will occur after the completion of implementation of the Mitigation Plan and IRT approval of the Baseline Monitoring Report and As -built Survey. All subsequent credit releases must be approved by the DE, in consultation with the IRT, based on a determination that required performance standards have been achieved. As projects approach milestones associated with credit release, the Sponsor will submit a request for credit release to the DE along with documentation substantiating achievement of criteria required for release to occur. This documentation will be included with the annual monitoring report. Poplar Creek Mitigation Plan June 2018 48 Table 18. Stream Credit Release Schedule Release Credit Release Activity Interim Total Released Milestone Release 1 Site Establishment (includes all required criteria 15% 15% stated above 2 Baseline Monitoring Report and As -built Survey 15% 30% 3 First year monitoring report demonstrates 10% 40% performance standards are being met. 4 Second year monitoring report demonstrates 10% 50% performance standards are being met. 5 Third year monitoring report demonstrates 10% 60% performance standards are being met. 6 Fourth year monitoring report demonstrates 5% 65% performance standards are being met. (75%**) Fifth year monitoring report demonstrates o 10% 75% performance standards are beingmet. 85%** 8 Sixth year monitoring report demonstrates 5% 80% performance standards are being met. (90%**) 9 Seventh year monitoring report demonstrates 90% performance standards are being met, and project 10% (100%**) has received close-out approval. **10% reserve of credits to be held back until the bankfull event performance standard has been met. Poplar Creek Mitigation Plan June 2018 49 12 MAINTENANCE PLAN The Site will be monitored on a regular basis and a physical inspection will be conducted a minimum of once per year throughout the post construction monitoring period until performance standards are met. These site inspections may identify site components and features that require routine maintenance. Routine maintenance should be expected most often in the first two years following site construction and may include the following: Table 19. Maintenance Plan Component/Feature Maintenance through project close-out Stream Routine channel maintenance and repair activities may include chinking of in -stream structures to prevent piping, securing of loose coir matting, and supplemental installations of live stakes and other target vegetation along the channel. Areas where stormwater and floodplain flows intercept the channel may also require maintenance to prevent bank failures and head - cutting. Stream maintenance activities will be documented and reported in annual monitoring reports. Stream maintenance will continue through the monitoring eriod. Vegetation Vegetation shall be maintained to ensure the health and vigor of the targeted plant community. Routine vegetation maintenance and repair activities may include supplemental planting, pruning, mulching, and fertilizing. Exotic invasive plant species shall be treated by mechanical and/or chemical methods. Any vegetation control requiring herbicide application will be performed in accordance with NC Department of Agriculture (NCDA) rules and regulations. Vegetation maintenance activities will be documented and reported in annual monitoring reports. Vegetation maintenance will continue through the monitoring period. Site Boundary Site boundaries shall be identified in the field to ensure clear distinction between the mitigation site and adjacent properties. Boundaries will be marked with signs identifying the property as a mitigation site, and will include the name of the long-term steward and a contact number. Boundaries may be identified by fence, marker, bollard, post, tree -blazing, or other means as allowed by site conditions and/or conservation easement. Boundary markers disturbed, damaged, or destroyed will be repaired and/or replaced on an as -needed basis. Easement monitoring and staking/signage maintenance will continue in perpetuity as a stewardship activity. Road Crossing Road crossings within the site may be maintained only as allowed by Conservation Easement or existing easement, deed restrictions, rights of way, or corridor agreements. Crossings in easement breaks are the res onsibilit of the landowner to maintain. Livestock Fencing Livestock Fencing is to be placed outside the easement limits. Maintenance of fencing is the responsibility of the landowner. Beaver Routine site visits and monitoring will be used to determine if beaver management is needed. If beaver activity poses a threat to project stability or vegetative success, RES will trap beavers and remove impoundments as needed. All beaver management activities will be documented and included in annual monitoring reports. Beaver monitoring and management will continue through the monitoring period. Poplar Creek Mitigation Plan June 2018 50 13 FINANCIAL ASSURANCES CONFIDENTIAL The Sponsor will provide financial assurances in the form of a $358,000 Construction Performance Bond to the USACE to assure completion of mitigation construction and planting. Construction and planting costs are estimated to be at or below $358,000 based on the Engineer's construction materials estimate and recent bid tabulation unit costs for construction materials. Following completion of construction and planting the Construction Performance Bond will be retired and a $135,000 Monitoring Performance Bond will be provided to assure completion of seven years of monitoring and reporting, and any remedial work required during the monitoring period. The $135,000 amount includes contingency and estimated monitoring costs from the Engineer. The Monitoring Performance Bond will be reduced by $19,300 following approval of each annual monitoring report. The Monitoring Performance Bond will be retired in total following official notice of site close-out from the IRT. Financial assurances shall be payable to a standby trust or other designee at the direction of the obligee. Financial assurances structured to provide funds to the USACE in the event of default by the Bank Sponsor are not acceptable. A financial assurance must be in the form that ensures that the USACE receives notification at least 120 days in advance of any termination or revocation. The Performance Bonds will be provided by a surety listed with the U.S. Treasury and has an A.M. Best Rating of B or above. All Performance Bonds will be submitted to the USACE in draft form for approval prior to execution. In the event of Sponsor default, NCWHF has agreed to receive the funds and ensure the work is successfully completed. Construction Costs General (e.g. mobilization, erosion control, etc $ 57,000 Sitework $ 70,000 Structures (e.. ditch plugs, logs, rocks, coir, etc) $ 147,000 Crossings $ 7,000 Vegetation $ 57,000 Miscellaneous $ 20,000 Total $ 358,000 Monitoring Costs Annual Monitoring and Reports $ 80,000 Equipment e. au es, markers, etc $ 3,000 Miscellaneous $ 3,000 Contingency 8% $ 49,000 Total $ 135,000 Poplar Creek Mitigation Plan June 22, 2017 51 14 REFERENCES Chow, Ven Te. 1959. Open -Channel Hydraulics, McGraw-Hill, New York. Cowardin, L.M., V. Carter, F.C. Golet and E.T. LaRoe. 1979. Classification of Wetlands and Deepwater Habitats of the United States. U.S. Fish and Wildlife Service, Office of Biological Services, FWS/OBS-79/31. U.S. Department of the Interior, Washington, DC. Dalrymple, T. 1960. Flood Frequency Analyses. U.S. Geological Survey Water Supply Paper 1543- A. Doll, Barbara A., A.D. Dobbins, J. Spooner, D.R. Clinton and D.A. Bidelspach. 2003. Hydraulic Geometry Relationships for Rural North Carolina Coastal Plain Streams. NC Stream Restoration Institute, Report to N.C. Division of Water Quality for 319 Grant Project No. EW20011. Environmental Laboratory. 1987. U.S. Army Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1. U.S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi. Federal Emergency Management Agency (FEMA). FEMA Flood Map Service Center. North Carolina Panel 1695; map number 3720169500J, revised 12/2/2005. https://mapl.msc.fema.gov/idms/IntraList.cgi?displ=wsp/item-3720169500J.txt; accessed March 2018. Fischenich, C. 2001. "Stability thresholds for stream restoration materials." ERDC Technical Note No. EMRRP-SR-29, U.S. Army Engineer Research and Development Center, Vicksburg, Miss. Fischenich, J.C., 2006. Functional Objectives for Stream Restoration, EMRRP Technical Notes Collection (ERDC TN-EMRRP-SR-52), US Army Engineer Research and Development Center, Vicksburg, Mississippi. (available online at http://el.erdc.usace.army.mil/elpubs/pdf/sr52.pdf) Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller. 2012. A Function - Based Framework for Stream Assessment and Restoration Projects. US Environmental Protection Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843- K-12-006. Johnson PA. 2006. Assessing stream channel stability at bridges in physiographic regions. U.S. Department of Transportation. Federal Highway Administration. Report Number FHWA- HRT-05-072. Krstolic, J.L., and Chaplin, J.J. 2007. Bankfull regional curves for streams in the non -urban, non -tidal Coastal Plain Physiographic Province, Virginia and Maryland: U.S. Geological Survey Scientific Investigations Report 2007-5162, 48 p. (available online at http://pubs.water.usgs.gov/sir2007-5162) Poplar Creek Mitigation Plan June 22, 2017 52 NCDENR 2018. "Water Quality Stream Classifications for Streams in North Carolina." Water Quality http://portal.ncdenr.ora/web/wq/home. (April 2018). North Carolina Ecosystem Enhancement Program (NCEEP). "Neuse River Basin Restoration Priorities 2010.". NCEEP. 2013. Wake -Johnston Collaborative Local Watershed Plan: Phase I Preliminary Findings and Recommendations. North Carolina Department of Environmental Quality. https://ncdenr. s3.amazonaws.com/s3 fspublic/Mitigation%20Services/ Watershed _Plannin /Neuse_River_Basin/Wake_Johnston_ Collaborative/WJC%20LWP%20 Preliminary%20Findings%20Report%20FINAL.pdf. (February 2018). North Carolina Geological Survey, 1985, Geologic map of North Carolina: North Carolina Geological Survey, General Geologic Map , scale 1:500000. Rosgen, D. (1996), Applied River Morphology, 2nd edition, Wildland Hydrology, Pagosa Springs, CO Schafale, M.P. and A.S. Weakley. 2012. Classification of the Natural Communities of North Carolina, Fourth Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, NCDENR, Raleigh, NC. Sweet, W. V. and Geratz, J. W. 2003. Bankfull Hydraulic Geometry Relationships and Recurrence Intervals For North Carolina's Coastal Plain. JAWRA Journal of the American Water Resources Association, 39: 861-871. Tweedy, K. A Methodology for Predicting Channel Form in Coastal Plain Headwater Systems. Stream Restoration in the Southeast: Advancing the Science and Practice, November 2008, Asheville, NC. Unpublished Conference Paper, 2008. http://www.bae.ncsu.edu/programs/extension/wgg/srp/2008conference/tweedy paper.pdf US Army Corps of Engineers (USACE), 2002. Regulatory Guidance Letter. RGL No. 02-2, December 24, 2002. USACE, 2003. April 2003 NC Stream Mitigation Guidelines. USACE, 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR -10-20. Vicksburg, MS: U.S. Army Engineer Research and Development Center. USACE, 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. United States Department of Agriculture (USDA), Natural Resources Conservation Service (MRCS). 1986. Urban Hydrology for Small Watersheds. Technical Release 55. NRCS, 1994. Soil Survey of Johnston County, North Carolina. NRCS, 2007. Stream Restoration Design Handbook (NEH 654). Poplar Creek Mitigation Plan June 22, 2017 53 NRCS. 20 10. Field Indicators of Hydric Soils in the United States, Version 7.0. L.M. Vasilas, G.W. Hurt, and C.V. Noble (eds.). USDA, NRCS, in cooperation with the National Technical Committee for Hydric Soils. NRCS, Web Soil Survey; http://websoilsurvey.nres.usda.gov (September 2014). United States Environmental Protection Agency, (USEPA, 1999) 1999. EPA Manual. Quantifying Physical Habitat in Wadeable Streams. United States Fish and Wildlife Service. "Threatened and Endangered Species in North Carolina." North Carolina Ecological Services. http://www.fws.,gov/raleigh/. (September 2014). Weaver, J.C., Feaster, T.D., and Gotvald, A.J., 2009, Magnitude and frequency of rural floods in the Southeastern United States, through 2006—Volume 2, North Carolina: U.S. Geological Survey Scientific Investigations Report 2009-5158, 111 p. Poplar Creek Mitigation Plan 54 June 22, 2017 List of Figures Figure 1 — Vicinity Map Figure 2 — USGS Map Figure 3 — Landowner Map Figure 4 — Land -use Map Figure 5 — Existing Conditions Map Figure 6 — National Wetlands Inventory Map Figure 7 — Soils Map Figure 8 — Historical Conditions Map Figure 9 — FEMA Map Figure 10 —Planting Plan Map Figure 11 — Conceptual Plan Map Figure 12a — Ideal Buffer Width Zones Figure 12b —Actual Buffer Width Zones Figure 13 — Monitoring Plan as e 0 O \ nP SC I -� Cafrssa -_ I 6° Jade St O SO of O Q.a i e c'0 o 3 a 5 � n PP Wea < U SPS 4° n Mon estead Ln Pb cv rlsOns U o�F .. 5e`' J s pn c o Marlin Ln °,�a� 43 G�c U Mitch r Dr s 01. 41 s N 6 F° Ota 0 3 G n S � J l0� `orna9c Ra Lee yo a O � 0 Poplar Creek Site Lauret Or �b \�9 Ota a o°y Durham --phenson Or m� Ralei h Mobile Or y Lane Dr W m n Sonrtse p 6%, h. 0 4 Sonset 4 ve S n D Sanford �-� Proposed Easement 14 -Digit HUC - 03020201100040 Dr 3 West Castle Dr Service Area - 03020201 Smithfield JLFigure 1 - Vicinity Map Date: 6/29/2018 wE Drawn by: MDE Poplar Creek Mitigation Bank p Checked by: RMW res 0 1,000 2,000 Johnston County, North Carolina Feet I L S.. 0M /CC CD /I. � •�• you ,.. • `', .. j % ecru' ~� �'n��� � �'°°� .`� • �__ o s YB^ 1 YB2 ,N. 69 104 ac ♦ y f rrSon- not / I 1 YB3 ' QaI• — ice` ♦ 17 acpit ,� 1 i _ I I 'IV 1; �� •�• �, a � _ _ _•i tl - c t51 / r � e�• o\on Q !a L. , - c9• � s 00 �,• •. r ........... Park � / //�_.. __ �• �-+ jT Le-gen `-_ �� •� - .'_ L �� Proposed Easement Drainage Areas W. Drainage Smito ield •� _ 1 Figure 2 - USGS Map Date: 6/19/2015 w Selma (1976) Drawn by: MDE Poplar Creek Mitigation Site Checked by:RMW res 0 1,000 2,000 i Feet Johnston County, North Carolina DWIGHT BENJAMIN =169500-17-7883' YOUNGBLOOD,' i DWIGHT B�JR 1 Legend Proposed Easement Parcels of Interest w�E 0 300 600 DWIGHT B JR DWIGHT B�JR DWIGHT B�JR Figure 3 - Landowner Map Poplar Creek Mitigation Site Johnston County, North Carolina I DWIGHT B`JRI 169500-47-2720 'OUNGBLOOI DWIGHT B"JF DWIGHT B JRj 169500-36-5192 Date: 5/22/2018 Drawn by: MDE Checked by: RMW pres 4 1965 ri i A. t Johnston County Historical Photography Le end Proposed Easement w�E 6 0 500 1,000 Feet s Figure 8 - Historical Aerial Photography Poplar Creek Mitigation Site Johnston County, North Carolina Date: 6/29/2018 Drawn by: MDE Le end's'' Proposed Easement FEMA Zone AE FEMA Regulatory Floodway `; f - .2% Chance Annual Flood Figure 9 - FEMA Map Panel: 3720169500J Effectiev Date: 12/2/2005 300 60o Poplar Creek Mitigation Site x Feet Johnston County, North Carolina M Date: 5/22/2018 Drawn by: MDE Checked by: RMW — pres Species Salix nigra Cornus ammomum Live Staking and Live Cuttings Bundle Tree Common Name Black willow Silky dogwood %of Total Species Composition 60 40 fires N W E S 0 200 400 Feet Figure 10 Planting Plan Poplar Creek Mitigation Site Johnston County, North Carolina (Date: 5/24/2018 1 Drawn by: MDE by: RMW Legend Proposed Easement Planting Area (11.93 ac) Mitigation Type P1 Restoration P2 Restoration Enhancement I Enhancement II REFERENCE 1) Horizontal Datum is NAD83 UTM Z15N 2) Map Projection is NAD_1983_StatePlai North Carolina FIPS 3200 Feet Bare Root Tree Speices Species Common Name Spacing (ft) Unit Type %of Total Species Composition Platanus occidentalis American sycamore 9x6 Bare root 20 Betula nigra River birch 9x6 Bare root 20 Quercus phellos Willow oak 9x6 Bare root 15 Nyssa bitlora Black Gum 9x6 Bare root 15 Quercus michauxii Swamp chestnut oak 9x6 Bare root 10 Quercus lyrata Overcup oak 9x6 Bare root 10 Asimina triloba Paw Paw 9x6 Bare root 10 Species Salix nigra Cornus ammomum Live Staking and Live Cuttings Bundle Tree Common Name Black willow Silky dogwood %of Total Species Composition 60 40 fires N W E S 0 200 400 Feet Figure 10 Planting Plan Poplar Creek Mitigation Site Johnston County, North Carolina (Date: 5/24/2018 1 Drawn by: MDE by: RMW Legend Proposed Easement Planting Area (11.93 ac) Mitigation Type P1 Restoration P2 Restoration Enhancement I Enhancement II REFERENCE 1) Horizontal Datum is NAD83 UTM Z15N 2) Map Projection is NAD_1983_StatePlai North Carolina FIPS 3200 Feet 1 DWR Nutrient Bank 1 _ -AU: Remove Pond Legend Proposed Easement Reach Mitigation Type LengthRatio SMUs Water Quality Adjusted SMUs Parcels of Interest Y131 -C P1 Restoration 678 1:1 678 692 Mitigation Type YB2-A P1 Restoration 863 1:1 863 880 Y132 -A P2 Restoration 350 1:1 350 357 P1 Restoration Y132-13 P1 Restoration 1,350 1:1 1,350 1,377 P2 Restoration Y62 -B Enhancement 1 272 1.5:1 181 185 Y133 Enhancement II 760 2.5:1 304 310 Enhancement I Totals 4,273 3,726 3,801 Enhancement II Non -Standard Buffer Width Adjustment 423 Total SMUs 1 4,224 Figure 11 -Conceptual Map Date: 5/24/2018 w E Drawn by: MDE Poplar Creek Mitigation Site res 0 300 600 Checked by: RMW Johnston County, North Carolina Feet Legend Proposed Easement Proposed Streams Ideal Buffers = 50'-75'247,323 sqft - 75'-100'256,802 sqft - 100'-125' 266,698 sfgt - 125'-150 276,830 sqft Figure 12a - Ideal Buffer Width Zones Date: 5/22/2018 w�E Drawn by: MDE Poplar Creek Mitigation Site res 0 300 600 Checked by: RMW Johnston County, North Carolina Fccf 0 Legend Proposed Easement Proposed Streams Actual Buffers - 50'-75' 197,205 sgft - 75-100' 181,274 sqft 100'-125' 125,889 sfqt - 125'-150 25981.4 sgft Buffer Width Zone (feet from Ordinary High Water Mark) Buffer Zones >50 to 75 feet >75 to 100 feet >100 to 125 feet >125 to 150 feet Max Possible Buffer (square feet) 213,650 213,650 213,650 213,650 Ideal Buffer (square feet) 247,323 256,802 266,698 276,830 Actual Buffer (square feet) 197,205 181,274 125,889 25,981 Zone Multiplier 7% 5% 4% 4% Buffer Credit Equivalent 261 186 149 149 Pe rce nt of Ideal Buffer 80% 71% 47% 9% Credit Adjustment 208 132 70 14 Total Baseline Credit Credit Loss in Credit Gain for Net Change in Total Credit Required Buffer Additional Buffer Credit from Buffers 3,726 0 424 424 4,150 Water Quality Adjustmement 423 Total Adjusted SM Us 4,224 Figure 12b - Actual Buffer Width Zones w�E Poplar Creek Mitigation Site 0 300 600 Johnston County, North Carolina Feet Date: 5/24/2018 res Drawn by: MDE Checked by: RMW Note: There will be eight fixed vegetation plots, and two will be randomly placed each monitoring year. Flow guage, crest gauge, cross section, and vegetation plot locations are all proposed locations. fires N W E S 0 200 400 Feet Figure 13 Monitoring Plan Poplar Creek Mitigation Site Johnston County, North Carolina (Date: 5/24/2018 1 Drawn by: MDE by: RMW Legend Proposed Easement Planting Area REFERENCE 1) Horizontal Datum is NAD83 UTM Z15N 2) Map Projection is NAD_1983; North Carolina FIPS 3200 Feet Proposed Streams Proposed Cross Section ® Proposed Crest Gauge O Proposed Flow Gauge ■ Proposed Vegetation Plot REFERENCE 1) Horizontal Datum is NAD83 UTM Z15N 2) Map Projection is NAD_1983; North Carolina FIPS 3200 Feet Appendix A -Plan Sheets Om Zaw oOUO OJU pZw ¢O� zc~ wwo UO=w pxm .ap FN p Ozw w o. F UO �U uzOm wYJ mu, w O N OY< yew D_ ,w¢ o., zx ?OQ pzz w Y Q �3z 0 w.z w�¢ �Q� xap �x, ¢w� r Z O w Oz� U -U O Zzp 2_ �w w pp0 Y�Q �2Z H� 'wo 0 FFF aw O Owp� POPLAR CREEK MM. . MITIGATION SITE Q .1 Lbu fk-+ [7f © 2018 Microsoft Corporation © 2018 HERE bpr Lq�.nq VICINITY MAP NTS "8111 Know what's below. Call before you dig N•11c• : •z•10• • -�� • • PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL "811"A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE ` CONTRACTOR REV RECORD: REV RECORD: BY DATE DESCRIPTION BY DATE DESCRIPTION POPLAR CREEK MITIGATION SITE JOHNSTON COUNTY, NORTH CAROLINA NEUSE RIVER BASIN: HUC 03020201 APRIL 2018 RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 302 JEFFERSON ST, SUITE 110 RALEIGH, NC 27605 Resource Environmental Solutions r m 300 0 150 300 600 HORIZ. 1 inch = 300ft. Sheet List Table Sheet Number Sheet Title 1 COVER Al OVERALL AERIAL E1 EXISTING CONDITIONS INDEX E2 EXISTING CONDITIONS E3 EXISTING CONDITIONS S1 REACH Y131 S2 REACH Y131 S3 REACH Y132 S4 REACH Y132 S5 REACH Y132 S6 REACH Y132 S7 REACH Y132 S8 REACH Y132 S9 REACH Y132 S10 REACH Y133 S 11 REACH Y133 S12 REACH Y133 F1 FENCING PLAN F2 FENCING PLAN D1 DETAILS D2 DETAILS D3 DETAILS D4 DETAILS D5 DETAILS D6 DETAILS D7 DETAILS D8 DETAILS PROFESSIONAL SEAL W LUH U Z U w U o z W� o O Z o rn p 0 (D co U w w Z C�' qJ rn rn U zM C 00 O ♦^ U v ♦ � d U �cU i �— E it3 O U 00 0 N Co Q LLI M Q W � U Q mo 0 U U add a z_ W J ~o zv O= Q� CD O �z LLJ LU � U cr �U Irz O �Cl) O z O Iii Q z U W a W O U w J Z 00 C) W N D Z U Q Z � 0 O D a_ WKD PROJ. NO.: 20170243.00.RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300RA - T01 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT COVER.dwg - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants 7 Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 * AM � � R 0 200 400 2" FULL = FULL SCALE - ®®® 7• H CL cc n N '% J '4 Z O _ :w v I z O 0 O (L ILL L F— C) O LU \' . '. •\ y W LL z 0 l z I p LLJ i O U) 2i t J U) Q Q :� y LU J O ~O U) J Cr Q O Q F- c,�° ZU zLu C\j 2 O_j z O O MEMO Q U oC Y J C:) LU Z o/ LU LLI w J 11� O LU °C cn p U U > O Qz Qo Q XI J Z C/) aO o Luo U LL � Via= w Ww = N N H N o L. Uj i 0)LU w U Z_ Z 0zm s� z r PROJ. DATE: APR 2018 00 Q.C. DATE: 318 �r DRAWING NUMBER: Al PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300RA - T01 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT COVER.dwg - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1"= 200' 0 200 400 2" FULL = FULL SCALE I` HALF SCALE 11J cc 0 N O� J '4 Z O z O 0 O (L ILL L F— C) O LU O W LL z 0 Q Z I p LLJ i O U) 2i Y C) W a J U) Q Q Z i= LU J O ~O U) J Cr Q O Q F- c,�° ZU zLu C\j 2 O_j z O O Lu �z LU wQ Q U oC Y J C:) LU Z o/ LU LLI w J 11� O LU °C cn p U U > O Qz Qo Q J Z C/) aO o Luo U LL � Via= w Ww = N N H N o r` Uj i 0)LU w U Z_ Z 0zm OQ= 0 PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 318 DRAWING NUMBER: Al PROJ. NO.: 20170243.00. RA MATCHLINE SEE DWG i' 0� / / 150- �,'_ '� .145' %i SEE DWG E3 /i(b Nom\ ///�// r • r' ' /'// \ \ ,/ i CO l I00 — — L0 i • T3 J lir 14" GUM TREE T5 20" POPLAR TREE T6 \\\ T7 \ � _I`�--��/•••• �� 1 / Ali T8 12" TREE T9 18" POPLAR TREE • I }� REACH YI31 /� ��/ 1 �� j� • //// / / 12"TREE T13 16" GUM TREE T14 \ T15 12" GUM TREE T16 12"TREE T17 12"TREE T18 i' 0� / / 150- �,'_ '� .145' %i SEE DWG E3 /i(b Nom\ ///�// r • r' ' /'// \ \ ,/ i CO l I00 — — FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll YB2-A 1, a� , INC., L0 i 18"T T3 J lir 14" GUM TREE T5 20" POPLAR TREE T6 18" POPLAR TREE T7 18" POPLAR TREE T8 12" TREE T9 18" POPLAR TREE T10 12"TREE T11 18" TREE T12 12"TREE T13 16" GUM TREE T14 16" GUM TREE T15 12" GUM TREE T16 12"TREE T17 12"TREE T18 12"TREE T19 18"TREE T20 16"TREE T21 16" GUM TREE T22 20" GUM TREE T23 14" GUM TREE T24 N C05 \\r T25 FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll YB2-A 1, a� , INC., MATCHLINE T1 24" TREE i 18"T T3 J MATCHLINE T1 24" TREE T2 18"T T3 20" GUM TREE T4 14" GUM TREE T5 20" POPLAR TREE T6 18" POPLAR TREE T7 18" POPLAR TREE T8 12" TREE T9 18" POPLAR TREE T10 12"TREE T11 18" TREE T12 12"TREE T13 16" GUM TREE T14 16" GUM TREE T15 12" GUM TREE T16 12"TREE T17 12"TREE T18 12"TREE T19 18"TREE T20 16"TREE T21 16" GUM TREE T22 20" GUM TREE T23 14" GUM TREE T24 16"TREE T25 12"TREE T26 20" POPLAR TREE T27 16" GUM TREE T28 12" GUM TREE T29 18" POPLAR TREE T30 22" GUM TREE T31 16"TREE T32 12"TREE T33 20" OAK TREE T34 12"TREE T35 14" GUM TREE T36 14"TREE T37 12"TREE T38 12" TREE T39 12"TREE T40 12" GUM TREE T41 12" GUM TREE T42 14" TREE T43 14"TREE T44 16" POPLAR TREE T45 14" OAK TREE T46 16" POPLAR TREE T47 16" GUM TREE T48 22" TREE T49 18" TREE T50 12" GUM TREE T51 16" TREE T52 12" TREE T53 14" GUM TREE T54 18"TREE T55 12" GUM TREE T56 12"TREE T57 12" GUM TREE T58 18" OAK TREE T59 16"TREE T60 14" TREE T61 16" GUM TREE T62 12" GUM TREE T63 12" GUM TREE T64 12" GUM TREE T65 16" GUM TREE T66 18" GUM TREE T67 18" OAK TREE T68 20" GUM TREE T69 18" GUM TREE T70 16" GUM TREE T71 18" GUM TREE T72 22" GUM TREE T73 12" GUM TREE T74 18" POPLAR TREE T75 20" POPLAR TREE T76 16" POPLAR TREE T77 16" POPLAR TREE T78 14" POPLAR TREE T79 16" POPLAR TREE T80 16" POPLAR TREE T81 16" POPLAR TREE T82 16" POPLAR TREE T83 18" POPLAR TREE T84 14" GUM TREE T85 24" POPLAR TREE T86 16" POPLAR TREE T87 20"TREE T88 12" POPLAR TREE T89 18"TREE T90 14" TREE T91 12" TREE T92 28" POPLAR TREE T93 14"TREE T94 20"TREE T95 16"TREE T96 14"TREE T97 16" GUM TREE T98 14" OAK TREE T9916" POPLAR TREE T100 14" OAK TREE T101 12" TREE T102 30" OAK TREE T103 24" GUM TREE T104 14" TREE T105 12" OAK TREE T106 14" OAK TREE T107 18" GUM TREE T108 1 24" GUM TREE T109 14" GUM TREE 7110 16" GUM TREE -111 12" OAK TREE T112 14" TREE T113 14" POPLAR TREE T114 24" OAK TREE T115 14" POPLAR TREE T116 12" GUM TREE T117 12" TREE T118 12" OAK TREE 7119 12" TREE T120 14" POPLAR TREE T121 14" OAK TREE T122 16" POPLAR TREE T123 20" OAK TREE T124 14" OAK TREE T125 16" TREE T126 12" TREE T127 14" POPLAR TREE T128 12" TREE T129 12" POPLAR TREE T130 12" TREE T131 12" OAK TREE T132 14" OAK TREE 7133 16" POPLAR TREE T134 12" POPLAR TREE T135 12" POPLAR TREE T136 16" GUM TREE T137 12" OAK TREE T138 12" OAK TREE T139 12" OAK TREE T140 16" TREE T141 16" OAK TREE T142 16" OAK TREE T143 18" OAK TREE T144 24" GUM TREE T145 14" OAK TREE T146 20" GUM TREE T147 14" TREE T148 14" OAK TREE T149 16" POPLAR TREE T150 12" OAK TREE T151 12" OAK TREE T152 20" POPLAR TREE T153 20" POPLAR TREE T154 12" POPLAR TREE T155 14" OAK TREE T156 16" POPLAR TREE T157 14" POPLAR TREE T158 12" TREE T159 12" POPLAR TREE T160 18" TREE T161 24" OAK TREE T162 16" TREE T163 16" TREE T164 18" TREE T165 14" OAK TREE T166 16" TREE T167 18" POPLAR TREE T168 18" OAK TREE T169 12" POPLAR TREE T170 16" POPLAR TREE T171 16" TREE T172 12" POPLAR TREE T173 14" POPLAR TREE T174 12" TREE T175 12" TREE T176 12" POPLAR TREE T177 14" TREE T178 12" POPLAR TREE T179 18" POPLAR TREE T180 12" POPLAR TREE T181 12" OAK TREE T182 14" TREE T183 12" POPLAR TREE T184 16" TREE T185 16" TREE T186 18" POPLAR TREE T187 12" POPLAR TREE T188 16" POPLAR TREE T189 14" POPLAR TREE T190 12" POPLAR TREE T191 12" POPLAR TREE T192 12" POPLAR TREE T193 12" GUM TREE T194 16" TREE T195 12" POPLAR TREE T196 12" POPLAR TREE T197 14" POPLAR TREE T198 12" POPLAR TREE T19914" POPLAR TREE T200 16" TREE LEGEND EXISTING CONTOUR MAJOR — — — — 50 — — — — — EXISTING CONTOUR MINOR -------------------- APPROXIMATE BOUNDARY LINE — — — — — — — — BOUNDARY LINE EXISTING TOP OF BANK ---TB ----- TB ----- TB --- EXISTING BOTTOM OF BANK---BB-----BB-----BB--- EXISTING TREELINE EXISTING OVERHEAD ELECTRICAL LINE EXISTING GASLINE EXISTING FENCE LINE EXISTING TREE EXISTING WETLAND T718 12" TREE T719 20" TREE T720 12" TREE T721 12" TREE T722 20" TREE T723 18" TREE T724 12" TREE T725 14" TREE T726 18" TREE T727 12" TREE T728 12" TREE T729 22" TREE T730 18" GUM TREE T731 12" TREE T732 18" TREE T733 30" POPLAR TREE T734 20" GUM TREE T735 22" GUM TREE T736 36" POPLAR TREE T737 16" MAPLE TREE T738 36" MAPLE TREE T739 14" TREE T740 16" POPLAR TREE T741 14" POPLAR TREE T742 20" POPLAR TREE T743 12" POPLAR TREE T744 16" POPLAR TREE T745 16" TREE T746 12" POPLAR TREE T747 12" POPLAR TREE T748 18" POPLAR TREE T749 16" POPLAR TREE T750 20" TREE T751 20" TREE T752 12" POPLAR TREE T753 16"POPLAR TREE T754 14" POPLAR TREE T755 14" POPLAR TREE T756 14" POPLAR TREE T757 16" POPLAR TREE T758 18" TREE T759 30" POPLAR TREE T760 16" TREE T761 18" TREE T762 12" TREE T763 16" TREE T764 14" TREE T765 12" TREE T766 16" GUM TREE T767 20" GUM TREE T768 12" POPLAR TREE T769 18" GUM TREE T770 14" TREE T771 14" TREE T772 12" TREE T773 20" POPLAR TREE T774 16" TREE T775 20" POPLAR TREE T776 18" POPLAR TREE T777 18" POPLAR TREE T778 14" TREE T779 14" POPLAR TREE T780 16" TREE T781 16" POPLAR TREE -782 20" OAK TREE T783 12" MAPLE TREE T784 12" MAPLE TREE T785 20" POPLAR TREE T786 12" TREE T787 18" POPLAR TREE T788 14" POPLAR TREE T789 20" POPLAR TREE T790 18" POPLAR TREE T791 18" POPLAR TREE T792 20" MAPLE TREE T793 24" POPLAR TREE T794 14" GUM TREE T795 12" GUM TREE T796 14" GUM TREE T797 12" TREE T798 20" GUM TREE T799 34" POPLAR TREE T800 30" OAK TREE T801 20" POPLAR TREE T802 14" POPLAR TREE T803 16" POPLAR TREE T804 14" POPLAR TREE T805 14"POPLAR TREE T806 12" POPLAR TREE T807 12" TREE T808 12"POPLAR TREE T809 14" GUM TREE T810 18" POPLAR TREE T811 20" POPLAR TREE T812 14" GUM TREE T813 14" GUM TREE T814 16" MAPLE TREE T815 18" POPLAR TREE T816 16" POPLAR TREE T817 12" POPLAR TREE - - - - OHP----- OHP GAS GAS GAS - - - - WLR---- WLB I I T818 18" POPLAR TREE T819 12" POPLAR TREE T820 14" GUM TREE T821 12" POPLAR TREE T822 16" POPLAR TREE T823 14" TREE 7824 18" POPLAR TREE T825 12" POPLAR TREE T826 24" POPLAR TREE T827 16" POPLAR TREE T828 24" POPLAR TREE T829 20" GUM TREE T830 18" POPLAR TREE T831 14" TREE T832 18" POPLAR TREE T833 18" POPLAR TREE T834 20" POPLAR TREE T835 14" POPLAR TREE T836 18" POPLAR TREE T837 30" POPLAR TREE T838 18" POLAR TREE T839 20" TREE T840 18" POPLAR TREE T841 20" OAK TREE T842 12" OAK TREE T843 14" POPLAR TREE T844 16" TREE T845 16" OAK TREE T846 16" POPLAR TREE T847 20" TREE T848 12" OAK TREE T849 16" POPLAR TREE T850 14" POPLAR TREE T851 12" POPLAR TREE T852 28" OAK TREE T853 12" POPLAR TREE T854 16" OAK TREE T855 16" OAK TREE T856 14" OAK TREE T857 18" OAK TREE T858 16" TREE T859 16" TREE T860 18"TREE T861 12" POPLAR TREE T862 18" OAK TREE T863 12" POPLAR TREE T864 14" POPLAR TREE T865 12" OAK TREE T866 12" GUM TREE T867 12" POPLAR TREE T868 14" POPLAR TREE T869 12" POPLAR TREE T870 20" TREE T871 20" POPLAR TREE T872 20" TREE T873 20" TREE T874 20" POPLAR TREE T875 36" OAK TREE T876 32" OAK TREE T877 30"T T878 30" OAK TREE T879 18" OAK TREE T880 18" OAK TREE T881 24" OAK TREE T882 12" POPLAR TREE T883 14" OAK TREE T884 16" OAK TREE T885 30" OAK TREE T886 14" TREE T887 18" OAK TREE T888 16" OAK TREE T889 12" OAK TREE T890 20" OAK TREE T891 20" OAK TREE T892 20" OAK TREE T893 14" POPLAR TREE T894 14" TREE T895 24" OAK TREE T896 18" GUM TREE T897 20" OAK TREE T898 26" OAK TREE T899 22" OAK TREE T900 16" TREE T901 36" POPLAR TREE T902 14" TREE T903 18" POPLAR TREE T904 18" OAK TREE T905 14" HOLLY TREE T906 16" OAK TREE T907 12" TREE T908 18" OAK TREE T909 32" POPLAR TREE T910 20" POPLAR TREE T911 18" TREE T912 28" POPLAR TREE T913 16" OAK TREE T914 14" OAK TREE 1915 20" GUM TREE T915 14" TREE T917 30" OAK TREE T918 18" OAK TREE T919 18" OAK TREE T920 12" OAK TREE T921 12" OAK TREE T922 12" OAK TREE T923 12" HOLLY TREE 7924 12" TREE T925 14" TREE T926 12" TREE T927 14" TREE T928 32" OAK TREE T929 14" TREE T930 12" TREE T931 24" TREE T932 12" TREE T933 12" TREE T934 12" POPLAR TREE T935 18" TREE T936 14" TREE T937 12" TREE T938 12" TREE T939 20" OAK TREE T940 12" TREE T941 14" TREE T942 12" POPLAR TREE T943 20" POPLAR TREE T944 22" OAK TREE T945 30" OAK TREE T946 14" GUM TREE T947 14" GUM TREE T948 28" GUM TREE T949 14" GUM TREE T950 16" TREE T951 14" GUM TREE T952 16" GUM TREE T953 20" OAK TREE T954 20" GUM TREE T955 16" TREE T956 14" OAK TREE T957 14" TREE T958 16" GUM TREE T959 16" TREE T960 16" TREE T961 20" GUM TREE T962 22" TREE T963 24" MAPLE TREE T964 18" TREE T965 12" TREE T966 16" GUM TREE T967 12" TREE T968 16" TREE T969 16" TREE T970 12" TREE T971 16" POPLAR TREE T972 12" POPLAR TREE T973 16" TREE T974 14" POPLAR TREE T975 16" TREE T976 12" TREE T977 14" POPLAR TREE T978 12" POPLAR TREE T979 14" POPLAR TREE T980 12" POPLAR TREE T981 16" POPLAR TREE T982 14" POPLAR TREE T983 14" POPLAR TREE T984 12" TREE T985 16" GUM TREE T986 24" OAK TREE T987 24" TREE T988 12" GUM TREE T989 12" TREE T990 16" GUM TREE T991 24" OAK TREE T992 34" OAK TREE T993 22" OAK TREE T994 22" GUM TREE T995 34" GUM TREE T996 16" GUM TREE T997 18" TREE T998 16" TREE T999 16" TREE T1171 20" TREE T1172 16" TREE T1173 12" TREE T1174 1 14" TREE T1175 16" TREE T1176 16" GUM TREE T1177 14'TREE T1178 18" GUM TREE T1179 14" TREE T1180 18" TREE T1181 12" TREE T1182 14" TREE T1183 12" POPLAR TREE T1184 14" TREE T1185 16" TREE T1186 18" TREE T1187 12" POPLAR TREE T1188 12" POPLAR TREE VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 200' 0 200 400 2" = FULL SCALE 1" = HALF SCALE I` W 00 QC) Q O co z O N� z O 0 O H LL (L_ O w z i � � I O W LL Q I z LU U) 2i _O W J i 07 Q 0 Z LL] J �O 0 0. X Q W < o Z U w CO O= z � U Z Z z >LD z O z Lu Z 111 Q C) Y 5 o W Zo/ 0O w U � o U U (D Z_ U `"o Qp �0 J F—(n Z M 0 — O W o Wa Z Ww W w 00 �_ Z --j H = CV CD N CV 0) W Z > I LLj W z Z m O Qo PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: El PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0 100 200 2” = FULL SCALE 1" = HALF SCALE I` LLI I— 00 C) I— \ co j .• .. -4 \ Z 1 I \ \ E & F PROPERTIES, INC. . / \ DB 4377, PG 880 \ I Z 0 O ' , rC 1 ill'/ L O i phi � O W LL (n Q CO I O(n �_ •. J cp i �''•' •• •. � U) t�oj �/ // Q O \. / ��/�i/ii' /''fir• QL /���/� O Ln �i� '4VJ/J/�/// Ur- `- Z •/I//JJ If. lam' A�v (� ~ > ('3 I ' I I I H O W Ir - DWIGHT B. YOUNGBLOOD, JR. i j%i lil / lil /m /• ,� Z �i,// //// @, I ly �1 t Z Q rr 0 5 o DB 721, PG 582 DB 854, PG 705 DB 1399, PG 222 82 E 207 o �/i w J 0 Z °C n p U U Z U U) 0 X Q z Q O Q co 0 O 11, 0Lij^ Z U LL o o LL Or' ��/% I DWIGHT B. YOUNGBLOOD, JR. Ijl� I DB 721, PG 582 DB 854, PG Q O O N M z --j F— r` 0) 705 DB 1399, PG 222 82 E 207 O z o0m Q O Q�� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: •. • •• •• •. GAS GAS c GAS GAS _ -,AS _ \ GAS �— GAS GAS GAS GAS — — — AS GAS \ /GASGAS GASGAS\� \\ � GR GASGAS E2 aFP ' j ,'•, — GAS �� GAS — G6S GAS 50' WIDE PIPE LINE EASEMENT �_ GAS— c�AS� GAS __ GAS ANY) GAS EAPPROXIMATE) 9AS/ GAS— GAS GASI_1—/ /-'GA!S�_I- GAS GAS GAS __ GAS �I' / / ' ' GAS = /, �N\ .•I i� (r�', j J \i \\ (\\--/J I� 20170243.00. RA I $'M -_—J (COLONIAL PIP/E�IT AND 1 r%' (LOCATION CID \• : ,�_ _--'"'�• ./y ��-- '_ ------ /p`e—' �'/ _•'/i � /— \\ J 1 _----��____�/ \- / / /moi' �/ �� 11\ '•/ �/ ////,viy'' i ri ---- /�i� ///'��/�� ------ i ►� / I POND TOP OF WATER�� IJ `^7 DWIGHT B. YOUNGBLOOD, JR. 179.68' DB 1908, PG 697 PB 55, PG 230-235 DWIGHT B. YOUNGBLOOD, JR. DB 721, PG 582 DB 854, PG JR. ' DWIGHT B. YOUNGB 705 DB 1399, PG 222 82 E 207 I I I I h I , 1 DB 721, PG 582 DB 854, PG 854 ��%�� /��� , 705 DB 1399, PG 222 82 E 207 ' I 1 \ -- r\'1 �� , � \ \ 1 1 I \\ \ \ \ —' / \ /,�/ / gyp• POND TOP OF WATER \\\ 168.66' �O DWIGHT B. YOUNGBLOOD, JR. DB 1908, PG 697 PB 55, PG •\ @: --' �\ , \\\\\\\� \\\ �'� �9iG,yG\� \�`�\ /''\\ `�\�� `\ \� I 230-235 I, i x\ \�\ 1, �E\�, `\ LEGEND ell\\ 1,��' @ :\ REACH \�• \\ YB2-A EXISTING CONTOUR MAJOR — — — — 50 — — — — — \Q w /, __ I — -- @@@ EXISTING CONTOUR MINOR -------------------- APPROXIMATE BOUNDARY LINE --- -- --- BOUNDARY LINE /'@ /, �\ \\ /' � EXISTING TOP OF BANK ---TB-----re-----re--- EXISTING BOTTOM OF BANK ---Be-----Be-----ee--- X \ @ �, I , \ / m L �"J REACH YB1 � ^ �� / it @i % _ ��j \\\\ r\ \ \ EXISTING TREELINE EXISTING OVERHEAD ELECTRICAL LINE —____ OHP _____ OHP — 1N� ' !/; l ' DWIGHT B. YOUNGB/COD, JR. EXISTING GASLINE GAS GAS- GAS 1 1 \ /� /� ���@— / '� \i 1 DWIGHT B. YOUNGBLOOD, JR. DB 1908, PG 697 PB 55, PG DB 1908, PG 697 P 55, PG 230-235 ///y_�' •' \• I EXISTING FENCE LINE /'/^ l i INr A 230-235 i t/„/ •• ii I ^ 1 r// �//�I,pi' ' �• /XDwIGNT60, EXISTING TREE a`>; /90yG9N8, PGgt00 69? p& Il(/ II(//•F/� /r�l� 1 W2LR-- EXISTING WETLAND ---� 235 55 O'A �®, ' 1� -WLp8 — I F \�LQ G -o�l\ 1 / MATCH LINE SEE DWG NO. E3 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0 100 200 2” = FULL SCALE 1" = HALF SCALE I` LLI I— 00 C) I— \ co IZ -4 Z O Z 0 O O LL L O i phi � O W LL (n Q Q I O(n �_ 7 W J i U) Q O Z LL] J O Ln Ur- `- Z w o� 0 oz (� ~ > ('3 H O W Z Q rr 0 5 o V LL] Z 'Un 0 w w J 0 Z °C n p U U Z U U) 0 X Q z Q O Q w z O 0 O 11, 0Lij^ Z U LL o o LL = N Q O O N M z --j F— r` 0) LU Z LU LU LILI W O z o0m Q O Q�� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: E2 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources MATCH LINE SEE DWG NO. E2 Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com W � NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' o 200 2" = FULL SCALE \\ \\ rI I �2 w \ \ i'/%I�t/ J16(/ v O \ \ // I +� I 1 \\\\� \ 41i l I I l\\ r- O O C) coco I �\\ \ \ \ \\ DWIGHT B. YOUNGBLOOD, JR. /r/i// to I it////// X a -4 \ \ DB 1908, PG 697 PB 55, PG \ \ 230-235 %55'/ jz/ O ,i �j%/,� / i •– \ \\ \ rel/,/�,, \ DWIGHT B. YOUNGBLOOD, JR. DB 1232, PG 766 z 0 O O LL L O O W LL (n Q Q AIP 2i _O Fn W J i C/) Q O Z uJ J �0� o L I_ J LO �CD REACH YB2-B W o 0 o z j (D LD 1--O zw 7 o LL] Z 'Un 0 W V H w J 0 Z cn O U C I— � � U U U) �Z 0 Q D X az Q w z o 0 C/) O W 0Lij^ Z U � o o LL --3 Cl DWIGHT B. YOUNGBLOOD, JR. A_ i/i'' / i/'/� �G� DB 1232, PG 766 67 I rn >Z_ (� W LU z Q� Z m Q O Q�� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: xx PROJ. NO.: G4- \�(P pNNn400 LQ cam kp 41 1. \ \ DDD711 \ \\ \\ \\ \ DWIGHT B. YOUNGBLOOD, JR.JV \ \ DB 1232, PG 766 -/1000 –�\ @ \ \ /r .\ • _ ;" ,p �i \ \ \ \ �''�,� , / �•' TERRY M. KEEN PAMELA R. EN / 1' B 4652, PG 109 LEGEND \ \ /'/ @V • %� @ EXISTING CONTOUR MAJOR EXISTING CONTOUR MINOR APPROXIMATE BOUNDARY LINE — – – – – \ \\ \ \\ \ ��// •- '�/�'�•• a yam/ / BOUNDARY LINE EXISTING TOP OF BANK --- TB ----- TB ----- TB --- REACH YB3 EXISTING BOTTOM OF BANK ---BB-----BB-----BB--- "00, EXISTING TREELINE 7° J EXISTING OVERHEAD ELECTRICAL LINE----o„P----- \ @_� GAS—GAS EXISTING GASLINE —GAS—GAS—GAS— GAS— EXISTING EXISTING FENCE LINE \ \ \ EXISTING TREE `—t•''tL \ \ \ EXISTING WETLAND ---- WWF .I I I COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT EX COND.dwq - April 13, 2018 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0 100 200 2" = FULL SCALE 1" = HALF SCALE I` w 00 C) coco a -4 z O z 0 O O LL L O O W LL (n Q Q 1 U) 2i _O Fn W J i C/) Q O Z uJ J �0� o L I_ J LO �CD `0 Z (n U N W o 0 o z j (D LD 1--O zw Z W Q 0 Er tr o LL] Z 'Un 0 W V H w J 0 Z cn O U C I— � � U U U) �Z 0 Q D X az Q w z o 0 C/) O W 0Lij^ Z U � o o LL --3 Cl Q O = NM 67 I rn >Z_ (� W LU z Q� Z m Q O Q�� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: E3 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 NOTES: (f) 919.782.9672 30-1 30-1 �'1DWIGHT B. YOUNGBLOOD, JR. DB NC. LICENSE NO. F-0374 4.9 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO 0 30 60 1908, PG 697 PB 55, PG 230-235 1.6 0.85 DOWNSTREAM DIRECTION. w H - REMOVE QC) � o 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. \ c _ - - - - - STOCKPILED SEDIMENT BANKFULL STAGE 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. \ _ / _ _ - / 2 150 0;49 q - - - Y Y Y FILL EXISTING CHANNEL X996 d SEE DWG D2 0.8 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. ROOTS OR TREES TO REMAIN, AND EXCAVATED OR OTHER MATERIAL z 995 994 T993 _ / � O SHALL NOT BE PLACED, PILED OR STORED WITHIN THE TREES TO BE SAVED. THE CRITICAL ROOT ZONE AREA OF \ / \ \\\\\\ \ \\\\ 998 / ^ 1 2\7-991 / / - - FL 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION \\ \ �/r 4,23 �q } DWIGHT B. YOUNGBL'60D, JR. DB T� 7-191908, PG 697 �5, PG 230-235 7-21 / FILL T9�T961 _ - - T959 - - - _ - EXISTING CHANNEL T95 Q TYPICAL SHALLOW CROSS SECTION AND STABILIZATION SHALL BE PLACED INSIDE ABANDONED AT AN ELEVATION THAT PROVIDES THE EXISTING CHANNEL TO BE POSITIVE DRAINAGE TOWARDS THE ` J ZEN A T18 / / / SEE 7-955 DWG D2 �\I\ PROPOSED CHANNEL. Z_ ------ T 63 r \ \ - - ( 5.0 1.6 1.8 1.6 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL J LO Q O 999 � �_ f / \ _ 7-990 \\IJ ``� O w N _ U SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS \ \ \ 111 I III I / //� / j/� A /ZI � /�/ �� / 6� T 7-957 - �� _O I- Z } w Q BANKFULL STAGE NOT AVAILABLE, THEN AN EQUAL MAX OF #5 MATERIALS IS TO BE USED. / # 57 GRAVEL, SURGE STONE, AND NATIVE U `��� �/ \�\ � \ J \ \\ \ \ \ I I I � T35 �+' T/ 2+00 \ \ \ x0 r _ \ \ 81 \ O / \\ I 1O\\ \ Q \ \ - 989 \\\ \ \ 1 IIII T967 \ \ /;►►'' VIII \\\ 0 Q o Z 7. IN -STREAM STRUCTURES PROPOSED ALONG (BRUSH TOES, LOG VANES, ROOT WADS, AND INTERCHANGEABLY THROUGHOUT THE PROJECT THE OUTSIDE OF MEANDER BENDS LOG TOES) MAY BE USED PER APPROVAL FROM DESIGNER. 1 IIII 1 '���I IIII\ IIII 1111 IIII ,00 \\\-s0 ) � C) 3 7-987 / 00Ir Q O F_ = O Z F N M r` (i) rn III I IIII IIII 0+001�� 1 `\\\\\\ 0 DO \ r Qat PROJ. DATE: APR 2018 \ �/ T34 ,0, III \ 1 IIII IIII I 1 � / �, i \ \ \11111 \I\� `� T941 \ q T9 T985 \ �W �s ? T,984\ -1 CIV 0.2 TYPICAL POOL CROSS SECTION LEGEND III �T32 I EXISTING \\ \---_-_ \\ \ = T969\ V EXISTING CONTOUR MAJOR - 50 -- III I / I 6 INCH DIP „�` ; \_� \�-_ I I / 011 II 1 I I I vim\ ^ � \ \\ REACH YB1-C - � _ � = 150- - P1 RESTORATION \ WQx \ \ � � �O 5.0 --------- PROPOSED CONTOUR MAJOR �1 / � _ (STA. 00+25 TO 07+03) T33 \ - T12'i 81 \ - - _ \ \ \ - \` /l�j 3.0 0.9 PROPOSED CONTOUR MINOR \ \ \ \ \ \ � / \ -= WL r` I ) I \ I / ) / � \ � \ \ � \ � � J � � \ \ � \ / � \ \ BANKFULL STAGE EXISTING WETLAND �6 Y I - / \ \ \ \ \ EXISTING TOP OF BANK --- - TB FILL EXISTING CHANNEL T90 \ \ `e T939 \ 1.2 EXISTING BOTTOM OF BANK PROPOSED CENTERLINE OF CHANNEL - - - - BB SEE DWG D2 r14 \\ \ I 1 I938 lT \ EXISTING FENCELINE n 7-48 t / \ \ \ 7-13 I- 1 \ \ 98I I EXISTING TREELINE EXISTING OUTFALL TO BE - _ - WLB- WL // 1 REPLACED WITH SIPHON I T56 I (DESIGNED BY OTHERS) W '' _ _%4 - B, I �' I I I I T4 TYPICAL RIGHT MEANDER CROSS SECTION PROPOSED TOP OF BANK - - - - TB / / / / I I X55 ///7 \ YYY \/\\ 1 r� T 6 \ zINN T977 I� / 5.0 LIMITS OF PROPOSED CONSERVATION EASEMENT LCE /� ///I/ I 7-� �\ 17 4 /J79/ / l 7� 0.9 3.0 \ \ ��� /'10 7-57 T42\ \ / a T38 I\\ �- �/ l / � \ �' BANKFULL STAGE PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) i�.S c' / T46 /�� 7-4 e� 7-40 \ A 7-39 \\ \ I i =- / � �/ � � � ��� �4 �' I /i ` / AREA PROPOSED FILL 1.2 DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSH TOE (SEE DETAIL DWG D3) 156 156 TYPICAL LEFT MEANDER CROSS DOUBLE LOG DROP (SEE DETAIL SHEET D4) SECTION 1 RO K CROSS VAN LOG TOE PROTECTION (SEE DETAIL DWG D2) ST O+7 FELEV114.17 153 1 EXISTING GRADE A_ONG 153 LOG SILL (SEE DETAIL DWG D4) - EXISTING 6 INCH DIP /STREAM C EN ERLI qE VALLEY SILL (APPROXIMATE LOCATION) PROPOSED (SEE DETAIL DWG D2) CH NNEL BOTTOM OU LE LOG DROP LOG VANE 150 OG ILL OG ILL TA 1+30 LEV 147.8 ELEV 146.8 LO SIL STA3+08 ST 2+4 LE . 145.36 ROP SE FELEV 140.09 OP F B NK 150 (SEE DETAIL DWG D3) LOG J -HOOK (SEE DETAIL DWG D6) -0.35 o DOUBLE LOG)ROP LOG SILL STA 3+12 STA +01 RIFFLE GRADE CONTROL ' U-0.35%1 147 ELE 144.84 FELEV144102 147 (SEE DETAIL DWG D6) T -VD.35o LOG SILL 0.35 o S A 4+28 ROCK A -VANE (SEE DETAIL DWG D7) EL.EV 143.4 PRO OS D SIPHON PLUNGE (TO E D SIG ED Y OTHERS) POCL 0.3 % ROCK A -VANE 144 144 (SEE DETAIL DWG D8) ROCK CROSS -VANE (SEE DETAIL DWG D5) U 141 141 FLOODPLAIN SILL LOG SIL (SEE DETAIL DWG D4) _ ST 4+8CJ-- E1.EV 142.7E VALLEY /LOG SILL (PROFILE) 138 138 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 135 135 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 132 132 RIFFLE GRADE CONTROL (PROFILE) 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 4+80 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1" = HALF SCALE I` w H 00 QC) � o H co co Z O IL' z O O O LLL L � O U) I z p11i O ' w LL Z p Q 1 u2i _O w J U) Q O Z_ LJ J I- O O J LO Q O Z U z `° O w N _ U '`D _O I- Z } w Q Lu Oc 5 o Y U o Lur LLI =)W w ~ J U U c� Z U U) 0 Q o Z Q 0 0 w U � 0Lij^ o Z LL o N Q O F_ = O Z F N M r` (i) rn _ LU w L�j W LL] Z ?j z Zm 0 DO o o Qat PROJ. DATE: APR 2018 Q. C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S1 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics \ \ Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NOTES: NC. LICENSE NO. F-0374 \ FULL SCALE: 1 "= 30 4'9 030 60 2 = FULL SCALE m wo 1" = HALF SCALE I` 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. H \ ��00 \ 1.6 0.85 H co co \�mm o NOZ'` m 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. �W Z7 BANKFULL STAGE \4 9' \ w 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. � \ Z O �< 0 O 0.8 LLL L � 0 -7 \ 6'�u' i 10 0 U) I w Z 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL w LL. z p SIPm / \ 1 u2i _O W SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF 7 _V40-77 D T9 48 l l \ U) Q O THE TREES TO BE SAVED. �,� Q T952T951 `�4�' -----��� / // \ uJ J GL 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE /-ei5 T85�3 / / / � Z U z `,l° TYPICAL SHALLOW CROSS SECTION O w N _ 2i U ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE - - � >(D 5.0 _O HZ } LUQ PROPOSED CHANNEL. - - T946 T9 / U 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. - - / �� / U U F_ 1.6 1.8 1.6 U U) THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS AND SHALL BE AT LEAST 6 INCHES GRAVEL SUBSTRATE T947 / C/) w 0^ U � BANKFULL STAGE Z W Lu LijQ LL DEEP. IF NATIVE IS NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE � � / / I REACH YB1-C � _ C7 LLI W Z ?LLj j Z � Z - FILL EXISTING CHANNEL - / / � - J P1 RESTORATION / \ \ Qac PROJ. DATE: APR 2018 MATERIALS IS TO BE USED. SEE DWG D2 - 3 - / (STA. 00+25 TO 07+03) Q.C. DATE: 3/18 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS S2 (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED PROJ. NO.: T�� / / // \ 20170243.00. RA 1.1 INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. T92 T933 % %/ / DWIGHT B. YOUNGBLOOD, JR. DB 1908, PG 697 PB 55, PG 230-235 6+00 o \ / ocp94 _�(+oo - �1 �_�� /opo ^ 0.2 LEGEND - �QO TYPICAL POOL CROSS SECTION EXISTING CONTOUR MAJOR --50- 50-_ T_ / 1�� -jam--B 1 �iil / d \� EXISTING CONTOUR MINOR - - - - - - - - - \ I \/ I - )T\ / / // A //�/� T92,6 / / / / / f / / 5.0 PROPOSED CONTOUR MAJOR �v D, 3.0 0.9 FILL EXISTING r e929 '� ► PROPOSED CONTOUR MINOR r--- -� WL \/ CHANNEL \��` I/�!/ J� / // \/// .145 �� SEE DWG D2 / � BANKFULL STAGE EXISTING WETLAND 1M - Y J // ' ./ � PROPOSED 3.2' BASE DITCH -4 T� / Q / / / / // EXISTING TOP OF BANK - - - - TB � � SIDE SLOPES = 2.5:1 MIN DEPTH - 0.6' / 31 �/ / r927 � / � / - - - EXISTING BOTTOM OF BANK - BB / I�i � SLOPE = 2.36% r / / J \ PROPOSED CENTERLINE OF / / / CHANNEL �cL3' T932 EXISTING FENCELINE n LOG SILL \ h TOP ELEV = 141.51 \ EXISTING TREELINE A BED ELEV. = 0.6' \ TYPICAL RIGHT MEANDER CROSS SECTION PROPOSED TOP OF BANK - - - - TB LOG SILL \ \ \ 5.o LIMITS OF PROPOSED TOP ELEV = 143.57 CONSERVATION EASEMENT LCE - A BED ELEV. = 0.6' \ \ 0.9 3.0 T93E \ PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) - = LOG SILL - TOP ELEV = 144.43 \ A BED ELEV. = 0.6' \ \ \ BANKFULL STAGE PROPOSED FILL AREA -CE \ \ r, f- C \ 1.2 DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSH TOE (SEE DETAIL DWG D3) 156 156 TYPICAL LEFT MEANDER CROSS DOUBLE LOG DROP SECTION (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) 153 153 LOG SILL (SEE DETAIL DWG D4) VALLEY SILL (SEE DETAIL DWG D2) LOG VANE 150 LOG SILL 150 (SEE DETAIL DWG D3) TA 'I ELEV51410 43 LOG J -HOOK (SEE DETAIL DWG D6) ' D UBL LO DR P PROPOS ED ST 5+ 9 RIFFLE GRADE CONTROL /__TOF OF BANK EL V 14 0.83 (SEE DETAIL DWG D6) 147 147 OUB_E LOG DROP OG ILL dTA 6+03 ROCK A -VANE TA +16 LEV. 140.6 DOU13LE LOG ROS (SEE DETAIL DWG D7) ELEV 142.2 TA +68 LE 139.)8 144 OG ISILL 144 ROCKA-VANE :roe 0 LI TA +38 DOUBLE LO DROP (SEE DETAIL DWG D8) ELEV 139.5 + ELEV. 1 8.64 ROCK CROSS -VANE (SEE DETAIL DWG D5) 141 141- - FLOODPLAIN SILL J (SEE DETAIL DWG D4) - P OP SE CH NNE BO TO VALLEY /LOG SILL (PROFILE) 138 138 DOUBLE LOG DROP (PROFILE) E ISTI G G D ALONG LOG VANE / J HOOK O (PROFILE) 135 STR EAM CEN FERL INE 135 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) RIFFLE GRADE CONTROL 132132 (PROFILE) 4+80 5+00 5+50 6+00 6+50 7+00 7+29 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 030 60 2 = FULL SCALE 1" = HALF SCALE I` W H 00 C) H co co Z O Z O O O LLL L � 0 O U) I w Z i phi ' w LL. z p Q 1 u2i _O W LijJ U) Q O Z_ uJ J I- O O J LO Q O Z U z `,l° O w N _ 2i U z z >(D _O HZ } LUQ Lu rr 5 o Y U o LLJr W D w w H 0 �O °`U) o U U F_ 0 U U) 0 Q 0 o Z Q 0 C/) w 0^ U � o Z W Lu LijQ LL o Cl) F O O = Z N M _ C7 LLI W Z ?LLj j Z � Z m o o Qac PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S2 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 NOTES: (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 030 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 1" = HALF SCALE I` W H DWIGHT B.5 2 D13 85 , PG 7 5 B � ( / \ \ � 721, PG 582 DB 854, PG 705 DB QC) � o 5.0 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. � 1399, PG 222 82 E 207 \ \ I 1.3 1.2 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE \ \ \ END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF ` z I O THE TREES TO BE SAVED. 18 8 \ 0 1 \\ \,��p O 0.7 � 0 \0, U) I w Z i phi O 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION Q I U) 2i _O 07 < W J AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE / `C �/ / \ U) Q o PROPOSED CHANNEL. / uJ J \ \ CL J LO Q O Z U Zr-- TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL \ \ -\�� CD 2+00 �\ _ \ - �g \\ OD / 175 �� �� \\ \\ j/ / -- C� \ \ \�\ \\ \\ 5.0 SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE MATERIALS IS TO BE USED. __- Y 5!�! U 1.3 2.4 1.3 J 0 °C ) C6� \/ / / / / )j / / / �� _ ` \ - J / - - / - - - \ \ \ BANKFULL STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED \ \ / // // \ � 3+00 \\ \\�''-_.�-- / \ - \ \ o Cl) Z LL Lu INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. / \\ \\ \/ \s CY) \ \ _ C7 L�j LL] w Z ?j z � Z 0 DOm O� ���' O Qat 0.9 Q.C.: BC 00_ DRAWING NUMBER: LEGEND 91, S3 PROJ. NO.: /� / REACH Y132 -ACL /-)&180 P1 RESTORATION I \ 20170243.00. RA 0.2 EXISTING CONTOUR MAJOR - -50- - 7 -\ \ (STA. 00+17 TO 08+80) - \ \ TYPICAL OL CROSS SECTION C O C SS EXISTING CONTOUR MINOR - - - - - - - - - PROPOSED CONTOUR MAJOR / 4;# /� \ \\\gg \ \ \ \ \ �� \ \�k�� 5.1 PROPOSED CONTOUR MINOR NIL" sb 3 1.2 EXISTING WETLAND - JI 1M \ \ \ \ \ \ \ \ S EXISTING TOP OF BANK - TB // /� \\\ \ \ S / /180 � - � / / / - - ` \ \ \� \ \ \ \ ��� / \ \ \ \ BANKFULL STAGE EXISTING BOTTOM OF BANK ---- BB PROPOSED CENTERLINE OF T1 172 /ice _� \\ \\ \\\ \ \ \ CHANNEL 6", \ 6 J / \ \ \ 1.1 EXISTING FENCELINE EXISTING TREELINE T1176 ��- , I& \� CL TYPICAL RIGHT MEANDER CROSS SECTION PROPOSED TOP OF BANK - - - - TB LIMITS OF PROPOSED CONSERVATION EASEMENT LCE -- 185 \ \ PROPOSED CHANNEL PLUG ---- --- ` /-----yw -T1f75 meq- \ s� \\ \\ 5.1 1.2 3 (SEE DETAIL DWG D2) PROPOSED FILL AREA BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) DOUBLE LOG DROP I 1.1 BRUSH TOE I �ST O+1 (SEE DETAIL DWG D3) ELEV17E.81 DOUBLE LOG DROP DOUBLE LOG DROP (SEE DETAIL SHEET D4)E 183 183 r LEV. 177.7ou 3G TYPICAL LEFT MEANDER CROSS P L(OSEEDETARLODWGID2) LE ROPTOE TA +44 SECTION LOG SILL ELEV 1177.22 (SEE DETAIL DWG D4) DOUBLE LO DROP 180S A 0+62 180 VALLEY SILL (SEE DETAIL DWG D2) E EV 176.6 DOUBLE LOG DROP _EX STIN G GRADE ALONG LOG VANE o TA 0+66 STREAM CE TE LINE- - (SEE DETAIL DWG D3) ELEV. 176.3 PROPOSED �I 177 TA +50 '___T0P O BANK 177 O (SEE DETAIL DWG D6) \ � � VA LLE SIL - U-51% L V 113.70 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) 0.34 /o 174 DOUB E L G DROP 174 ROCK A -VANE (SEE DETAIL DWG D7) TA +85 EL V. 175.56 DOUBLE L G DROP P OP SED ROCKA-VANE :roe (SEE DETAIL DWG D8) STA +9 HA NEL BOTTOM 171 171 ELEV 175.12 ROCK CROSS -VANE DOU 3LE LOG DROP (SEE DETAIL DWG D5) STA +20 ELEV. 17E.30 FLOODPLAIN SILL 168 168 (SEE DETAIL DWG D4) _ VALLEY / LOG SILL (PROFILE) 165 165 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 162 162 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 160 160 RIFFLE GRADE CONTROL (PROFILE) 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 030 60 2 = FULL SCALE 1" = HALF SCALE I` W H 00 QC) � o H co co z O z O O O LLL L � 0 O U) I w Z i phi O ' w LL (n p Q I U) 2i _O 07 < W J U) Q o uJ J l ­_O � J LO Q O Z U Zr-- O w N _ U z z 0 N z w Z � W Q C) Y 5!�! U W w H J 0 °C ) 0 U U 0 Z U U) 0 Q o Z Q 0 O w U LL 0Lij^ o Cl) Z LL Lu Cl) Q O F = O Z __j F_ N M CY) _ C7 L�j LL] w Z ?j z � Z 0 DOm O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S3 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NOTES: NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO I` W H 00 QC) � o H DOWNSTREAM DIRECTION. z 5.0 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. ----3�=--�_ IL' L7 z - - - - __ 1.3 1.2 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE O LLL L � 0 O U) I W z i phi END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. W LL (n p Q I U) - - - - - - - - - - J BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND U) Q o - uJ J o SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL LO Qo ZU z`r-- O W N _ 2i U 0 z SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF w Z C0 Lu Q - - Y _5!�! U 0.7 LL] D w o ~ THE TREES TO BE SAVED. 0 Of °C U) 0 \ \ \ \ Z U U) 0 Q 00 Z M 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION o Cl) Z Lu LL / Q O = O Z N M \ _ C7 W Z Z ?j z � LU AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE / PROJ. DATE: APR 2018 _-7 Q.C.: BC Q.C. DATE: 3/18 ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE DRAWING NUMBER: \ S4 GL PROPOSED CHANNEL. 20170243.00. RA DWIGHT B. YOUNGBLOOD, JR. DB 721, PG 582 DB 854, PG 705 DB / TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. \ \1399, PG 222 82 E 207 n 4/_ '9% THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS 8+00 Oy 5 0 NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE �X4Q I I 1.3 2.4 1.3 MATERIALS IS TO BE USED. / -1 �cS I �� G, l,V / / X BANKFULL STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED / 00 INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. POND TOP OF WATER = \ / 179.68' / /REACH 0.9 YB2-A \ \ \ ��> P1 RESTORATION (STA. 00+17 TO 08+80) LEGEND 7 J/LO \ \ _ CL 0.2 EXISTING CONTOUR MAJOR - —50— — \ TYPICAL POOL CROSS SECTION EXISTING CONTOUR MINOR - - - - — - - - - \ \ \ / PROPOSED CONTOUR MAJOR 0, 5.1 PROPOSED CONTOUR MINOR -� WL \\ r- \\ \ \ \ \ \ \ \ ^ / / ��'b/ 3 1 2 EXISTING WETLAND Y EXISTING TOP OF BANK - - - - TB \ BANKFULL STAGE EXISTING BOTTOM OF BANK - - - - BB PROPOSED CENTERLINE OF \ \ \\j \ \ \ \ - _ - _ _ / // / CHANNEL \ aEXISTING EXISTING FENCELINE n TREELINE ------------ 0 n PROPOSED TOP OF BANK ----TB LIMITS OF PROPOSED CONSERVATION EASEMENT LCE TYPICAL RIGHT MEANDER CROSS SECTION 5.1 PROPOSED SE HAILDWGANNEL PLUG 1.2 3 e- PROPOSED FILL AREA BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) 1 1 BRUSH TOE (SEE DETAIL DWG D3) DOUBLE LOG DROP 183 183 GL (SEE DETAIL SHEET D4 TYPICAL LEFT MEANDER CROSS LOG TOE PROTECTION (SEE DETAIL DWG D2) SECTION LOG SILL (SEE DETAIL DWG D4) 180 180 VALLEY SILL (SEE DETAIL DWG D2) VAL EY ILL LOG VANE - — (SEE DETAIL DWG D3) LOG SIL EXI TINGGWLDE ALONG -STA 7+0 ' 177 STR AM EN ERL NE ELE 172.60 177 LOG J -HOOK PROPOSED (SEE DETAIL DWG D6) ' ELEV 17 .30 T P O BANK LOG JHO K STA 7+76 RIFFLE GRADE CONTROL ELEV 172139 (SEE DETAIL DWG D6) 174 -0.340A 174 ROCK A VANE (SEE DETAIL DWG D7) ROCK A -VANE (SEE DETAIL DWG D8) 0 LI 171 PROPOSED 171 CHA NEL BOTTOM ROCK CROSS -VANE (SEE DETAIL DWG D5) OG HOO — - LAIN SILL 168 ST 5+ 3 168 (SEE DETTFLOOAIL DWG D4) _ LEV 173. 0 VALLEY / LOG SILL (PROFILE) 165 165 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 162 162 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 160 160 RIFFLE GRADE CONTROL (PROFILE) + 4+50 500 5+50 6+00 6+50 7+00 7+50 8+00 8+40 SCALE: HOR 1"=30`1 VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1" = HALF SCALE I` W H 00 QC) � o H co co z O IL' L7 z O O O LLL L � 0 O U) I W z i phi ' W LL (n p Q I U) 2i _O U1 < W J U) Q o Z_ uJ J o LO Qo ZU z`r-- O W N _ 2i U 0 z N z w Z C0 Lu Q Lu C) Y _5!�! U LL] D w o ~ J 0 Of °C U) 0 U U 0 Z U U) 0 Q 00 Z M Q 0 U LL 0Lij^ o Cl) Z Lu LL Cl) Q O = O Z N M _ C7 W Z Z ?j z � LU m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S4 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 / CE (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 NOTES: 030 60 2 = FULL SCALE 1" = HALF SCALE I` W H 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO C) \`80\\ \ / \ \ ( / z DOWNSTREAM DIRECTION. 5.0 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. z O O O LLL L � 0 O U) I w z i phi ' w LL (n p Q 1.3 1.2 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. _J co IX Q o Z uJ J l-_ 0 J In Q O ZU z(.0 O w N _ U BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL CD0 N zw Z WQ Lu C) Y 5!�! U W D w o J SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF O —175— / / / / / / a EXISTING 15 INCH RCP � p Lu U � 0Lij^ 0.7 Z LL THE TREES TO BE SAVED. Q O F = O Z N M �\ \ / / 0 DOm O Q1� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 — / 01 CLEANOUT 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION PROJ. NO.: / 20170243.00. RA O AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE GL ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL 5.0 SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE 9 MATERIALS IS TO BE USED. 1.3 2.4 1.3 O 1 + / / / / — w BANKFULL STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED / / / / CO1 / / / / / / INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 11+00 O /00 21143 i ^N Z / 9 U / / / / / / / / / / / f Z� 0.9 -_-_ J�_ LEGEND EXISTI G 8.0 INCH PVC PPEI — V GL 0.2 EXISTING CONTOUR MAJOR —-50— 50—TYPICAL TYPICALPOOL CROSS SECTION EXISTING CONTOUR MINOR - — — — — — — — — / PROPOSED CONTOUR MAJOR v, CID \ \ /// / 5.1 5 1 PROPOSED CONTOUR MINOR \ \� / �" T WLJ 180 _ _ / / 3 1.2 EXISTING WETLAND I J = BANKFULL STAGE EXISTING TOP OF BANK — — — — TB EXISTING TM OF BANK— — — — BB OCETNOTER REACH \ PROPOSED INE OF CHANNEL YB2-A ///// 1 1 REACH YB2-A P1 RESTORATION DWIGHT B. JR. P2 RESTORATION (STA. 08+80 TO 12+30) / �/ / / / /�/ EXISTING FENCELINE n 2 DB 85 ,PIG 7 B / 721, PG 582 DB 854, PG 705 DB EXISTING TREELINE (STA. 00+17 TO 08+80) 1399, PG 222 82 E 207 y / PROPOSED TOP OF BANK — — — — TB / \ / LIMITS OF PROPOSED LCE ��, �� �I / mQ? TYPICAL RIGHT MEANDER CROSS SECTION CONSERVATION EASEMENT 7^ J `J � /// 5.1 PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) / I / \ 1.2 3 PROPOSED FILL AREA BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) I I I A 1.1 BRUSH TOE (SEE DETAIL DWG D3) DOUBLE LOG DROP 183 183 (L (SEE DETAIL SHEET D4) TYPICAL LEFT MEANDER CROSS LOG TOE PROTECTION SECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) 180 180 VALLEY SILL (SEE DETAIL DWG D2) E ISTING RAD ALONG S TRE41M C NTE RLIN LOG VANE — — (SEE DETAIL DWG D3) 177 177 LOG J -HOOK I (SEE DETAIL DWG D6) P OP SED' $T 9+ 2 FTCIP O BANK / RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) 174 � EXI TIN LOG JHOOK 174 — A PRO IMA LO ATIO PE STA 11--48 ROCK A -VANE DETAIL DWG D7) — E EV 1 1.15 (SEE 4% ROCK A -VANE (SEE DETAIL DWG D8) 171 171 ROCK CROSS -VANE PROPOSED (SEE DETAIL DWG D5) CHAN14EL BOTTDM FLOODPLAIN SILL 168 168 (SEE DETAIL DWG D4) _ VALLEY / LOG SILL (PROFILE) 165 165 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 162 162 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 160 160 RIFFLE GRADE CONTROL (PROFILE) 8+30 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 12+70 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 030 60 2 = FULL SCALE 1" = HALF SCALE I` W H 00 C) co co z O z O O O LLL L � 0 O U) I w z i phi ' w LL (n p Q 1 U) 2i _O w _J Q o Z uJ J l-_ 0 J In Q O ZU z(.0 O w N _ U z z CD0 N zw Z WQ Lu C) Y 5!�! U W D w o J 0 Of°C U) O U U 0 Z U 2 Q o z 0 � p Lu U � 0Lij^ o Z LL o N Q O F = O Z N M 0) _ LU W LU Z cn ?j z � Z 0 DOm O Q1� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S5 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 Ill / I FULL SCALE: 1 "= 30 030 NOTES: 2 = FULL SCALE 1" = HALF SCALE R LLI H 00 C:) 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO 0 ' - Z O 5.0 DOWNSTREAM DIRECTION. /1.3 L7 1.2 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. O O LLL L � 0 O U) I w Z i phi ' w LL c/J p Q u r - - - = J 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. uJ J O Fn 0� Ln Q C' Z U z `,1° BANKFULL STAGE O w N _ 2i U z z CD0 N zw _ - Z C0 Lu Q Lu C) o 0.7 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF J 0 °C cq H RCP i i ' i \ \ / 0 Q o Q 0 o THE TREES TO BE SAVED. o Cl) Q O F = O Z N M I` i - i / o o Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 \O - -- RT\6 - - _ � �OU�SIL�_ - i �- T_O BEV = 4644'00 bai - - S6 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE PROJ. NO.: / / _ \ / - �0 T 55�' EXISTING 15 INCH RCP / / / j / / i / �� / rT74s� BE _a ESV.'/ 1 ' T757 ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. CLEANOUT / / / v \ 74� _ , / TYPICAL SHALLOW CROSS SECTION 4 /747 4 / \� c - 4 _\� 4„p,� // // 52 -- / , 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. \ _ PROPOSED 'V' DITCH 5.0 THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL / 4 / 4 / 4 SIDE SLOPES = 3:1 SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS 4 / 4 4 \ / 4 \ ( MIN DEPTH = 0.6' 1.3 2.4 1.3 NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE MATERIALS IS TO BE USED. I// / 4 a _ a 76, 4 4 \�S - \ T/ SLOPE = 1.5% - / 1\ BANKFULL STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS ,76' - J = \ (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED /� / / I I 9 �_ / `S - � 4 �-% / �r � - 4 ���\ 1 INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 1� / 15+ � 4 0p 4 / ��5 CD 0.9 Nc73x�� T 39 1 4 i 4 i T720 / x + 17 W �� / �- - \4\ 1 I _' c LEGEND - - 0.2 CL -\ -eI = _ _` _ _ _�_- _ _ - - _ 4 TYPICAL POOL CROSS SECTION - EXISTING CONTOUR MAJOR - 5Q - / // l �� / --- - ------ -- -� Q EXISTING CONTOUR MINOR --------- -_! /iii // iii a / _ j �,nf�7��- - �� - � �----- - - - - - - - �1 PROPOSED CONTOUR MAJOR 51 W3-\ �T72c FILL EXISTING CHANNEL �\ I � 3.0 1.2 PROPOSED CONTOUR MINOR WL '� ---�---- � SEE DWG D2 � � �� EXISTING WETLAND _ -rz26_ � I � \ I 8�M - _ - XVN T72 BANKFULL STAGE = EXISTING TOP OF BANK TB EXISTING BOTTOM OF BANK - - - - BB a � REACH T730 T�32- P1 RESTORATION �J PROPOSED CENTERLINE OF (STA. 13+20 TO 26+70) 1.1 CHANNEL EXISTING FENCELINE EXISTING TREELINE / r PROPOSED TOP OF BANK - - - - TB MTYPICAL RIGHT MEANDER CROSS SECTION LIMITS OF PROPOSED LCE CONSERVATION EASEMENT w 5.1 PROPOSED CHANNEL PLUG DWIGHT B. YOUNGBLOOD, JR. DB 1.2 3.0 (SEE DETAIL DWG D2) 1908, PG 697 PB 55, PG 230-235 / BANKFULL STAGE PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) 1.1 BRUSH TOE RO K A- ANE (SEE DETAIL DWG D3) KVVVV 174 STA 13+49 174 ELE 168.90 (L DOUBLE LOG DROP T�NC R CK -VA E TYPICAL LEFT MEANDER CROSS (SEE DETAIL SHEET D4) 4 �N STA 13+55 OLILEL G DROP SECTION LOG TOE PROTECTION P E EV. 68.3F3TA',3+8qROCK A-VANE (SEE DETAIL DWG D2) 171 LE 167.00 171 I IDOJBLE LOG DR PE EV 66.0 (SEE DETAIL WG D4) STA 13+94 VALLEY SILL -0' oO/0 EL V. 1 7.06 OC A-V NE (SEE DETAIL DWG D2) TA 4+5 LEV. 165.53 EXI STING G DE LCIG- LOG VANE - 168 STREAIMI CENTERLINE I I 1 168 (SEE DETAIL DWG D3) OG ILL'I LOG J -HOOK 0 80 0 TA 15+30 LOG S LL (SEE DETAIL DWG D6) _ LEV 164.6 S A 1 +08 ELEV'63.32 PRO OSED RIFFLE GRADE CONTROL 165n ILI onm \I,- TOP OF BANK 165 (SEE DETAIL DWG D6) t - 0 ROCK A VANE (SEE DETAIL DWG D7) 162 PR P ED CHANNEL OT OM - 162 ROCK A -VANE (SEE DETAIL DWG D8) f�� _O 9% ROCK CROSS -VANE __R0C ANE (SEE DETAIL DWG D5) TA 16+57- 159 159 - _ FLOODPLAIN SILL (SEE DETAIL DWG D4) _ OC A-V NE L GSI L S A 16+61. STA 16+)6-/ ELE . 161.90 LE 161.0 VALLEY / LOG SILL (PROFILE) 156 156 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 153 153 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 150 150 RIFFLE GRADE CONTROL (PROFILE) 12+70 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 030 60 2 = FULL SCALE 1" = HALF SCALE I` LLI H 00 C:) H co co 0 Z O L7 Z O O O LLL L � 0 O U) I w Z i phi ' w LL c/J p Q u 2i _O W J U) Q O uJ J O Fn 0� Ln Q C' Z U z `,1° O w N _ 2i U z z CD0 N zw Z C0 Lu Q Lu C) o U LL] D w o ~ J 0 °C cq O U U 0 Z U U) 0 Q o Q 0 � OZ w U � o Lij0^ Z LL o Cl) Q O F = O Z N M I` rn _ w Z Z �zm w o o Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S6 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive 30-1 �� (v) 919.782.0495 NOTES: www.wkdickson.com 0/ �J FULL SCALE: 1 "= 30 0 30 60 NI 2" = FULL SCALE 1" = HALF SCALE I` LLI 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO 00 30-1 H \ co UPSTREAM UPSTREAM STA. 21+30 = 5.0 DOWNSTREAM DIRECTION. z / O DOWNSTREAM STA. 21+30 = 5.3 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 1.3 1.2 z O 1.4 1.25 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE O L L LL I-_0 O U) w z END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. w LL. U) p DWIGHT B. YOUNGBLOOD, JR. DB 1232, PG 766 U) l / BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL U) Q o 0.7 SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF O 0 J LO Q O 0.7 THE TREES TO BE SAVED. z z 0N z w Z Q 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION U /� 4 LOG SILL J 0 °C cq 0 AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE (D U U) Z z0 - - - - T813 TOP ELEV = 153.70PROPOSED Q 0 � 0 U � 0Lij^ o ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE o Q O F- = O N z N M r` 4BEDELEV.=0.6' of C7 LLI LU Z LU ?j � z z m 0 DO CHANNEL. O Qat - - - - /UPSTREAM _---------- �- Q.C.: BC TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. DRAWING NUMBER: / / J ' / -160 4'BASE DITCH STA. 21+30 = 5.0 THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL PROJ. NO.: i�ez- - - - - FILL EXISTING CHANNEL 12 - - _ _ _ - PROPOSED SIDE SLOPES = 4:1 DOWNSTREAM STA. 21+30 = 5.4 1.3 2.4 1.3 SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE SEE DWG - i // / / / 1/84 T77 \\ f / / / D2 / / \ \ / /�\ --�\ \- /SLOPE /I � MIN DEPTH = 1.6' l0776- - - 5.6%BANKFULL 1.3 2.8 1.3 MATERIALS IS TO BE USED. �,\// 165 J/ - \ J / / / / / / - - - - - STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS \ X83-- ,/ T806 -� 17� -��/ �� _ `4,t� 1 / ( 7 ' 781 BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. /\ \ - / 118+00 \0.9 IV -kp0.9 2 _ -�5 \�� �I I J __-\., T7 ,T \� \\ ► -- i - 'ss\�= LEGEND 817 \ \ \ CL 0.2 r ` 0.2 EXISTING CONTOUR MAJOR - -50- - O 78� 16 TYPICAL POOL CROSS SECTION EXISTING CONTOUR MINOR --------- - - - - \ \ \ \TS ' 2_ \ \ \ k�Q PROPOSED CONTOUR MAJOR v, Z N - - \\ - \`\ \ ¢/� /�� - 791- - m / - \ =` - \ - \ \ \ l 21 v UPSTREAM STA. 21+30 = 5.1 PROPOSED CONTOUR MINOR T789= _ _ \ - - - - - - - - - - - \ \ \ 1 �.�� ` DOWNSTREAM STA. 21+30 = 5.4 T WL iTr95 _-' \_ / f ' --- _ - 31\ �\ �\ \ �GC �� �P 3.2 � 2 EXISTING WETLAND I- - - - - T80 �' _ \- -T834---\�_� \\�� \\\ =796 \ BANKFULL STAGE EXISTING TOP OF BANK - - - - TB - - - 165 -__ ' I REACH YB2-B - - \ �� - \ \ � � P1 RESTORATION - - - EXISTING BOTTOM OF BANK - BB _ 165- _ _ -T9� - - TtmF_ (STA. 13+20 TO 26+70) �\ \\ \\ \ PROPOSED CENTERLINE OF CHANNEL _ j T797 --- ----_--- EXISTING FENCELINE n T798 EXISTING TREELINE rL PROPOSED TOP OF BANK - - - - TB LIMITS OF PROPOSED LCE TYPICAL RIGHT MEANDER CROSS SECTION CONSERVATION EASEMENT GE UPSTREAM STA. 21+30 = 5.1 DOWNSTREAM STA. 21+30 = 5.4 PROPOSED CHANNEL PLUG 1.2 3.0 (SEE DETAIL DWG D2) 1.2 3.2 PROPOSED FILL AREA BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) 1.1 165 Do BLE LOG DRO 165 1 1 BRUSH TOE ST 17+ 8 (SEE DETAIL DWG D3) ELE V. 16 .37 DOIJBLELOGDROP OC A-V NE DOUBLE LOG DROP (SEE DETAIL SHEET D4) TA 17+66 162 - ELEV 15 .84 LEV 159.5 Ro K A -VANE 162 TYPICAL LEFT MEANDER CROSS LOG TOE PROTECTION ST 18+52 SECTION (SEE DETAIL DWG D2) CK -V NE EL V 15 .33 STA 17+72 XISING GRADE ALONG TTRE'AM LOG SILL - (SEE DETAIL DWG D4) E V. 158.1 OCK A-V NE CENTERLINE A 1 +56 VALLEY SILL _0p ELEV. 155.3 DO BLE LOG DR P (SEE DETAIL DWG D2) 159 159 ROC A- ANE ST 19+ 3 K LOG VANE ��'Q.aou STA 8+6 ELEV 15 .25- - (SEE DETAIL DWG D3) ELEV. 15E.29 DOUBLE LO DROP LOG S LL 'I LOG 0.8)%\/ S A 19 27 $ A 2 +25 ROC A -ANE (SEE DETAIL DWG D6) WG D6) 156 ELEV. 53.7 E EV 52.4 156 ROP SE ELE 151 85 RIFFLE GRADE CONTROL DOUBLE LOG DROP OP F B NK(SEE DETAIL DWG D6) STA 18+16- 0°C R CK -VA E ELEV 157.66 STA 21405 ELEV. 1 1.3 ROCK A -VANE OUBLE L D OP(SEE G I DETAIL DWG 7 153 - A 18+20 ° 153 ELEV. 1 7.13 I ROCK A -VANE (SEE DETAIL DWG D8) 0 LI PROPOIEED 80 0 150 HAN EL OT M 150 CROSS -VANE (SEEDCK DETAIL DWG D5) FLOODPLAIN SILL (SEE DETAIL DWG D4) _ 147 147 VALLEY /LOG SILL (PROFILE) DOUBLE LOG DROP (PROFILE) 144 144 LOG VANE / J -HOOK (PROFILE) O ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 141 - 141 140 140 RIFFLE GRADE CONTROL (PROFILE) 17+10 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 21+80 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 NI 2" = FULL SCALE 1" = HALF SCALE I` LLI H 00 C:) H \ co z O z O O O L L LL I-_0 O U) w z O w LL. U) p Q U) 2i _O wJ U) Q o Z uJ J O 0 J LO Q O Z U z `,-° O w N _ 2i U z z 0N z w Z Q Lu C) 2 Ccg U W D w o J 0 °C cq 0 U U (D U U) Z z0 0 Q z w Q 0 � 0 U � 0Lij^ o Z LL o Q O F- = O N z N M r` of C7 LLI LU Z LU ?j � z z m 0 DO O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S7 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 J NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0- 30 NOTES: 2 - FULL SCALE 1" = HALF SCALE I` W H 00 C) H co co O J � z O_ I- 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO L7 Z O DOWNSTREAM DIRECTION. O O LLL L � 0 O U) I W Z 5.3 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. Q I U) _O w DWIGHT B. YOUNGBLOOD, JR. DB 1.4 1.25 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE Z_ uJ J 1232, PG 766 Ln Q o ZU z(.0 END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. z z N z Z C0 W w Q Lu LC) _ cco BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND J 0 °C U) 0 U U 0 Z U U) 0 Q o Z Q 0 C/) w U LL o Cl) SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF Cl Q O F = Z __j F_ N M r` CY) 66 i _ LU I LLj W LU Z ?j z Z m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 ?5q DRAWING NUMBER: 0.7 THE TREES TO BE SAVED. PROJ. NO.: 20170243.00. RA / 5 /� '_ / .15 -- _ X62 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE §° T861 - -T8�4 GL PROPOSED CHANNEL. _ T855° TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. �/ _ - THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL 864--'- 64 - - FILL EXISTING CHANNEL - _ \ 1{c T853 5.4 SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS SEE DWG D2 NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE MATERIALS IS TO BE USED. T863 �/ - \ / 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS BANKFULL STAGE TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED (BRUSH 25+00 ` / INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 7-8e 14s _T883 X24+00^ ° 65h �_� / 0.9 r ��\� TS J 84 / T 42- �� \ 40 ��% + LEGEND T843/ N V ^ 22�' (/ / / T844 \ 1S\ \\ L - \\ ° T8701 ° -_ W FL EXISTING CONTOUR MAJOR --50-- � 0p �O / // \ \\\ / 0 \ \ \\ �� �� \ \ ( ° 7;71 T8 3 ° 26+00 Z_ rn J 0.2 EXISTING CONTOUR MINOR --------- Az 1 \ \ - �� �� \\ �� - ��\_T8UB T�37-_ ` T872 T874 TYPICAL POOL CROSS SECTION /�/ / �\ PROPOSED CONTOUR MAJOR 50 T650 (� /J' 48° _/ Q PROPOSED CONTOUR MINOR 7-949 T836\ \ -�\ _ 5.4 wlT'828 T826 -� T826 \ - - - ��� / / / ° 855 \\ , \ \ \ \ \ \ \\ \ \ \ \ \ 3.2 1.2 EXISTING WETLAND J \ T8ZT---------�� T825 / / � ° REACH YB2-B T846 �`\ \835 \\ ��� ��\ \\� \\ \ ° \ 3� 1M - EXISTING TOP OF BANK ---TB -� _ -155- �__--_�-�� P1 RESTORATION -T85�2 \� \ -- \ BANKFULL STAGE ___ (STA. 13+20T026+70) ' \ \ \� ---- EXISTING BOTTOM OF BANK - BB \ \ PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE n - - - _ EXISTING TREELINE DWIGHT B. YOUNGBLOOD, JR. DB PROPOSED TOP OF BANK - - - - TB 1908, PG 697 PB 55, PG 230-235 LIMITS OF PROPOSED LCE TYPICAL RIGHT MEANDER CROSS SECTION CONSERVATION EASEMENT PROPOSED CHANNEL PLUG 5.4 (SEE DETAIL DWG D2) 1.2 3.2 LCEPROPOSED FILL AREA BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) 1.1 BRUSH TOE (SEE DETAIL DWG D3) D S UBLE LO DROP 21 84 TA 2+5 DOUBLE LOG DROP 153 EL V. 150.1 153 CL (SEE DETAIL SHEET D4) DOUBLE LOG DROP I TYPICAL LEFT MEANDER CROSS LOG TOE PROTECTION STA 21+88 ROC A- NE SECTION (SEE DETAIL DWG D2) E EV 149.65 BL DO LO DROP TA 4+3 LOG SILL -� ST 22+ 5 LE 143.13 (SEE DETAIL DWG D4) � 150 FELEV 147.08 ZCK A-\/150 VALLEY SILL -0.8 % TA 2 +91 D UBL LO DROP SO 24 2AN (SEE DETAIL DWG D2) ROCKA-VANE STA 23475 EL V. 142.58 LOG VANE ST 22+b6 EL V. 144.62 OCK A-V NE - - (SEE DETAIL DWG D3) ° EL V. 14-5.75 TA 24+46 �I 147 D UBL LO DROP ELEV.142.4 147 LOG _ OC A-V NE 0.78 ° STA 23 79 (SEE DETAIL DWG D6) WG D6 J' STA 22 24 J fEL EV 114.081 DO BL LOG DROP ELEr 148.85 STA 24+ 2 RIFFLE GRADE CONTROL -0. °/ EL V. 1 1.26 R CK -VA E (SEE DETAIL DWG D6) R CK -VA E S A 25+75 144 STA 22+28 I D UBL LO DROP E EV 138.51 1 144 LE . 148,31 -0. 0% ST A 24+8 ROCK A -VANE EL V 140.72 OC A-V NE (SEE DETAIL DWG D7) RO OS D TA 5+8 OP F BANK LE .137 96 ROCK A -VANE EXI TIN G DE LONG 0.801 °L (SEE DETAIL DWG D8) LI 1410 TRE M C NT RLI E RO OS D ROCK A- AN 141 CHANNEL B TTOM STA 2585 1 _0. 0% EL V. 1+ 7.42 ROCK CROSS -VANE (SEE DETAIL DWG D5) ° FLOODPLAIN SILL 138 138- SEE DETAIL DWG D4 DOUBLE OG DROP ° VALLEY / LOG SILL TA 5+32 (PROFILE) EL V. 139.85 135 135 DOUBLE (ORDROP DOUBLE LO DROP SIA 25+37 ELE 13E.30 LOG VANE / J -HOOK (PROFILE) O 132 132 ROCK ROSS -VANE / ROCK A -VANE (PROFILE) 130 130 RIFFLE GRADE CONTROL (PROFILE) 21+80 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+30 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0- 30 60 2 - FULL SCALE 1" = HALF SCALE I` W H 00 C) H co co O J � z O_ I- L7 Z O O O LLL L � 0 O U) I W Z i phi O ' W LL (n p Q I U) _O w U) Q o Z_ uJ J O Ln Q o ZU z(.0 O W N _ 2i U z z N z Z C0 W w Q Lu LC) _ cco U W D w J 0 °C U) 0 U U 0 Z U U) 0 Q o Z Q 0 C/) w U LL o Cl) Lij0^ Z LL __3 Cl Q O F = Z __j F_ N M r` CY) _ LU I LLj W LU Z ?j z Z m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S8 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 30 i i i 7 Raleigh, NC 27607 NOTES: (v) 919.782.0495 II I (f) 919.782.9672 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO NC. LICENSE NO. F-0374 I 30 I FULL SCALE: 1 "= 30 0 30 DOWNSTREAM DIRECTION. NI 2" = FULL SCALE I 1" = HALF SCALE 5.3 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. H DWIGHT B. YOUNGBLOOD, JR. DB C) co co I1232, PG 766 I 1.4 1.25 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE I END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. II I BANKFULL STAGE 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND z SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL I O O L L SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF I I0.7 U) I W z i phi THE TREES TO BE SAVED. W LL (n p I I I U) 2i 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION y U) Q O AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE Z_ — -J I uJ J �O O ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. J LO QO --- --- Z U z `,-° O W N _ 2i U z z __ X145— _ _ — T� 145- — s9r_ / — — _—I— —140 CD O N z TYPICAL SHALLOW CROSS SECTION 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL LLu Lu C) T888 — — — — — — T1_ — — _ — — — = _ — — — — — _ _ — — — ,�, �� — — — = — — _ _ — — — — — _Zg17� — Y 5!�! U 5 4 LLI D w w ~ SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS Q °C U) _ _ _ _ — — _ I T 18� i— �� U U 0 Z U U) NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE Q o Z mo---_ __ -----_ ��— _— — �__ i I- "I— --- __ _i � j� _� � —140— C/) p w U � 1.3 2.8 1.3 Lij^0^ Z LL MATERIALS IS TO BE USED. Q O F- = O Z N M — — — — — —_ BANKFULL STAGE 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS o o �_ T — _ _ _ _ __ ��� GRADE POINT BAR-- -27+00- — — — — — _ —2J+OO _ — — — — — — — Qat PROJ. DATE: APR 2018 (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. _— ��------(MAX SLOPE I 30+20.34 DRAWING NUMBER: 06 S9 PROJ. NO.: CV) {°894 CID 0.9 Ill ��� \�\� +00 q �\ %�T905���--- — X30\ LEGEND T915_ �� ` i fio� �� \_�_ f 04__� ���� -- --__ X T901�9� _ _ _ _ \ — GRADE POINT BAR \-_ —_ �� i _ EXISTING CONTOUR MAJOR —-50—— _ F► — (MAX SLOPE 3:1),,_ - _ r� — � 2� _ ` \ \ \ I 140- — , \ ,\ _ — _ _ _ — _ _ � T�13 \ \ 0 2 TYPICAL POOL CROSS SECTION EXISTING CONTOUR MINOR - — — — — — — — — / 1 o835—/���_---� /�— —\ �\ 1\\ �� \ \� \ PROPOSED CONTOUR MAJORT901 ` \ ------� —� T �� \ �\ PROPOSED CONTOUR MINOR \ \ —� ,-- ---- — s -- ��� 878 \� \ \ \�-- T90s� — -- -- \� \ \ / `orf 5.4 -� wl r- \ —140, � \ � 3.2 1.2 EXISTING WETLAND � � BANKFULL STAGE EXISTING TOP OF BANK — TB T-907, — \ 18 I o EXISTING BOTTOM OF BANK — — — — BB T8 I REACH YB2-B REACH YB2-B I L�.� P1 RESTORATION ENHANCEMENT I (u PROPOSED CENTERLINE OF CHANNEL (STA. 13+20 TO 26+70) (STA. 26+70 TO 29+42) I I 1.1 EXISTING FENCELINE DWIGHT B. YOUNGBLOOD, JR. DB I EXISTING TREELINE 1908, PG 697 PB 55, PG 230-235 I I — — — PROPOSED TOP OF BANK — TB I II CL LIMITS OF PROPOSED LCE I TYPICAL RIGHT MEANDER CROSS SECTION CONSERVATION EASEMENT II PROPOSED CHANNEL PLUG LCELCE LCE I I 5.4 (SEE DETAIL DWG D2) 3.2 I1.2 I I I PROPOSED FILL AREA I BANKFULL STAGE DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) 1.1 BRUSH TOE (SEE DETAIL DWG D3) 144 DO IUBLE:DROP ST 26 37 144 DOUBLE LOG DROP (SEE DETAIL SHEET D4) ELEV. 1 6.50 TYPICAL LEFT MEANDER CROSS LOG TOE PROTECTION D UBL LO DR P (SEE DETAIL DWG D2) 141 S A 26 42 141 SECTION LOG SILL E EV 1 5.9 (SEE DETAIL DWG D4) ROP SE VALLEY ILL OP F B NK I I I I I I I (SEE DETAIL DWG D2) LOG VANE 138 PROOS D 138 (SEE DETAIL DWG D3) �i CHA NE BOTTOM LOG J -HOOK (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL 135 135 (SEE DETAIL DWG D6) R ROCK A -VANE (SEE DETAIL DWG D7) 132 \� TRE M C NT RLI E 132 ( ROCK A -VAN j SEE DETAIL DWG D8 0 LI \/ i 1 T ROCK CROSS -VANE (SEE DETAIL DWG D5) 129 \, 129 FLOODPLAIN SILL IT (SEE DETAIL DWG D4) _ VALLEY / LOG SILL (PROFILE) 126 126 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 123 123 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 120 120 RIFFLE GRADE CONTROL (PROFILE) 26+30 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 30+97 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 NI 2" = FULL SCALE 1" = HALF SCALE I` W H 00 C) co co z O z O O O L L LL I-_0 O U) I W z i phi ' W LL (n p Q I U) 2i _O U1 < W J U) Q O Z_ uJ J �O O J LO QO Z U z `,-° O W N _ 2i U z z CD O N z w Z Q LLu Lu C) Y 5!�! U LLI D w w ~ w Q °C U) O U U 0 Z U U) 0 Q o Z Q 0 C/) p w U � o Lij^0^ Z LL o N Q O F- = O Z N M r` _ LU U) Lu?j w Z � Z z m 0 DO o o Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S9 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics I LCE (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 NOTES: I 60 I 1" = HALF SCALE 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO H CE QC) � o I- DOWNSTREAM DIRECTION. I L CE 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. O 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. Z 0 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND H L LL � O U) I w Z SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL ' TERRY M. KEEN Q u 2i _O w SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF PAMELA R. KEEN DB U) Q O THE TREES TO BE SAVED. 4652, PG 109 I 0 o J LO Q O �z REACH YB3 z z 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION Z Q ENHANCEMENT II Lu Ir Y 5!�! U AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE LLID w oLL1~ T77 (STA. 4+22 TO 11 +82) O U U 0 ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE 0 Q o Z Q 0 C/)O w U LL 0Lij^ o Cl) Z Lu LL PROPOSED CHANNEL. Q O F = O Z __j F_ N M V7 o T78 - - - w Z _ C7 LL' ?j Z � Z 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL 11 WLB- 81 —170OT2-� T79- LB- T83/ Q.C.: BC SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE 8 \ � \ _�� T97 / T93 Ak0'�` q fff��� DRAWING NUMBER: MATERIALS IS TO BE USED. S10 I 1 > m s c PROJ. NO.: 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED \ INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 1 1 / / T911 08 ✓ 1�///'/�'� /� T,109 Y 0+00I 1 / fi91 --elm_ — �\ ` ¢ 4\\\ T96 t1 W9 LEGEND I� ` / 1 / I 3+00'*� ° 10IT1 //� �1� J It (� EXISTING CONTOUR MAJOR --50- 50- - EXISTING CONTOUR MINOR - - - - - - - - - 1 ¢{ �L3T181 T 185 11 I \�� �T104� � / TOT101 �/ ~ \ / _�, / 111 L WLB- / PROPOSED CONTOUR MAJOR v, EXISTING 18 INCH RCP - / I I 1 �1 ��_� / I T98 / _ � 111 \ 1 ,{{ *' T111 / / 1 T18�\\/ / zE�951\ PROPOSED CONTOUR MINOR r` —` WL� EXISTING WETLAND I �T1�980 T177 Tln1 Y Y J EXISTING TOP OF BANK - - - - TB 1i % EXISTING BOTTOM OF BANK - - - - BB T18e T178 \ —_—\_ _�sS \ Q / / r 1 1 �s T174 er PROPOSED CENTERLINE OF CHANNEL EXISTING FENCELINE n 73 / EXISTING TREELINE _ --- PROPOSED TOP OF BANK - TB LIMITS OF PROPOSED LCE CONSERVATION EASEMENT s � PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) DWIGHT B. YOUNGBLOOD, JR. DB 1232, PG 766 ^ PROPOSED FILL AREA \\ 30- J DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSH TOE (SEE DETAIL DWG D3) 174 174DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION (SEE DETAIL DWG D2) 171 171 LOG SILL � (SEE DETAIL DWG D4) VALLEY SILL (SEE DETAIL DWG D2) EXISTING 18 1 INCH RCP LOG VANE — — (SEE DETAIL DWG D3) 168 168 �I �T LOG J -HOOK _ (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) 165 EXISTING GRAI )E ALONC STREAM CENTERLINE 165 L (SEE DETAIL DWG D7) 162 162 ROCK A -VANE (SEE DETAIL DWG D8) 0 LI NL ROCK CROSS -VANE (SEE DETAIL DWG D5) 159 159- - FLOODPLAIN SILL (SEE DETAIL DWG D4) _ VALLEY / LOG SILL (PROFILE) 156 156 DOUBLE LOG DROP (PROFILE) LOG VANE / J -HOOK (PROFILE) O 153 153 ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 150 150 RIFFLE GRADE CONTROL PROF 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1" = HALF SCALE I` w H 00 QC) � o I- co co Z O Z 0 O O H L LL � O U) I w Z i phi ' w LL c/J p Q u 2i _O w J U) Q O Z � uJ J 0 o J LO Q O Z U z `,-° O w N _ U z z LD p M Z Q Lu Ir Y 5!�! U LLID w oLL1~ J 0 °C cq O U U 0 Z U U) 0 Q o Z Q 0 C/)O w U LL 0Lij^ o Cl) Z Lu LL Cl) Q O F = O Z __j F_ N M r` w Z _ C7 LL' ?j Z � Z m o o Qac PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S10 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 L CE (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 NOTES: 2" = FULL SCALE 1" = HALF SCALE I` W LCE H 00 C) I- co SCE 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO Z O LCEDOWNSTREAM DIRECTION. SCE2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. Z O O O H L LL � 0 O U) w Z O 3. ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE Q U) L L�C _O WJ END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. Cn Q o TERRY M. KEEN LIJ J 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND LO Q O PAMELA R. KEEN DB O W N _ U SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL U' p c) 4652, PG 109 L Lu rr SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF W w o J 0 °C U) O U U F_ 0 THE TREES TO BE SAVED. 0 Q o z w Q 0 C/)O U � o Lij0^ Z LL __3 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION r` 0) LU _ �zw W z Z m AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE PROJ. DATE: APR 2018 Q.C.: BC REACH YB3 Q.C. DATE: 3/18 ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE ENHANCEMENT11 PROJ. NO.: PROPOSED CHANNEL. 20170243.00. RA (STA. 4+22 TO 11+82) 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS \ / NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE MATERIALS IS TO BE USED. \T125 { T127 T136 / / / T13W g \.� WLR WL W 8�o d T _ �r O 126 ��� \ ` \ �- .� k0 � �� ^ _ , ^ �`< � -rz6 LB� i� /� �\ \ \ \\\ Cgs 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. T13i / — _ _ r-- — �r1 / / i T107 „{ "2, 13`1 / / �i� — \ / 7144 T142' -i Z �- "vi T14� /' T12T141 l J T 1 T105 134 i„�'�f 6+00130 f f '� o #� \ -- % l ��— _Ije"O_L \ _�\ --81M -_ __ ) / T1l13, Q T�46 C / _ o+oo ,, $�T133 \�\ � -� �, �,�, ,; T140 LEGEND + �� /� Jr T124 'WT122 � Q5 \ EXISTING CONTOUR MAJOR - —50— — W Z O -�..// 160` \\ B CJS/ //\\��\Yi �, Qjx I EXISTING CONTOUR MINOR --------- \T121 B- \ o B,IV 18\ - -- \ \ �� C') PROPOSED CONTOUR MAJOR 50 U %1 o '$ F \66 G T115 16T PROPOSED CONTOUR MINOR T119 wL-B EXISTING WETLAND 6 J — EXISTING TOP OF BANK - - - - TB EXISTING BOTTOM OF BANK - - - - BB PROPOSED CENTERLINE OF CHANNEL DWIGHT B. YOUNGBLOOD, JR. DB EXISTING FENCELINE jj 1232, PG 766 EXISTING TREELINE PROPOSED TOP OF BANK - - - - TB LIMITS OF PROPOSED LCE CONSERVATION EASEMENT 30-1 PROPOSED CHANNEL PLUG � 30-1 (SEE DETAIL DWG D2) PROPOSED FILL AREA DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSH TOE 165 165 (SEE DETAIL DWG D3) DOUBLE LOG DROP (SEE DETAIL SHEET D4) LOG TOE PROTECTION 162 162 (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) VALLEY SILL (SEE DETAIL DWG D2) 159 159 LOG VANE (SEE DETAIL DWG D3) �I LOG J -HOOK (SEE DETAIL DWG D6) \ 156 156 RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) ROCK A -VANE (SEE DETAIL DWG D7) 153 153 ROCK A -VANE (SEE DETAIL DWG D8) 0 LI ROCK CROSS -VANE (SEE DETAIL DWG D5) 150 150 EXISTING GRADE LON � STREAM C NTE LIN - - FLOODPLAIN SILL (SEE DETAIL DWG D4) _ 147 ^ 147 VALLEY / LOG SILL \ (PROFILE) DOUBLE LOG DROP (PROFILE) 144 144 LOG VANE / J -HOOK O (PROFILE) ROCK CROSS -VANE / ROCK A -VANE (PROFILE) 141 141 RIFFLE GRADE CONTROL (PROFILE) 140 140 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1" = HALF SCALE I` W H 00 C) I- co O Z O Z O O O H L LL � 0 O U) w Z O W LL (n p Q U) 2i _O WJ Cn Q o Z LIJ J 0 o CnJ LO Q O Z U z `,-° O W N _ U z z a� t� U' p c) zw Z Q L Lu rr U W w o J 0 °C U) O U U F_ 0 Z U U) 0 Q o z w Q 0 C/)O U � o Lij0^ Z LL __3 o Cl Q O F = Z __j F_ N M r` 0) LU _ �zw W z Z m O Q=� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: Sil PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll VMC DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 E► (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE NOTES: W H LCE I I I H co co 0 Z O 1. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO II IL' DOWNSTREAM DIRECTION. Z 0 2. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. H L LL � 0 O I3. Z i phi O ' ALL IMPERVIOUS DIKES AND BYPASS PUMPING EQUIPMENT SHALL BE MODIFIED AT THE Q Z LLI 1 U) _O W J Lij END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. U) Q O Z uJ J O 4. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND Z U z `,-° O W N _ U z z U' p c) SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL zw Z Q C) ' I Y 5!�! U LLI D w o LLI~ J SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF O U U 0 U Z ZO 2 Q Z 0 � p w U � THE TREES TO BE SAVED. Lij0^ Z LL o N Q O F = O Z N M II Z _> C7 LU LU Z 5. UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE DRAWING NUMBER: TERRY M. KEEN I I I PROJ. NO.: ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE 20170243.00. RA PAMELA R. KEEN DB PROPOSED CHANNEL. 4652, PG 109 I 6. REMOVE AND STOCKPILE GRAVEL SUBSTRATE LOCATED WITHIN EXISTING CHANNELS. REACH YB3 THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOW CHANNEL SECTIONS AND SHALL BE AT LEAST 6 INCHES DEEP. IF NATIVE GRAVEL SUBSTRATE IS ENHANCEMENT II I I NOT AVAILABLE, THEN AN EQUAL MAX OF #5 / # 57 GRAVEL, SURGE STONE, AND NATIVE (STA. 4+22 TO 11+82) W�-e MATERIALS IS TO BE USED. / I I I 7. IN -STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS `i� T148 W ` T170 I� I I (BRUSH TOES, LOG VANES, ROOT WADS, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. O — — — WLB— — — — WLB—� xQ, 4 T150 / £C�, / Q 11 t15 k ZQ T168 LEGEND T10f-� - ° ��\ �a T16 T16i1� T156 T 9 EXISTING CONTOUR MAJOR — —50— — ;M — i\ L \ \ \ T163 6\ ` \ — T159 T158 T157 I EXISTING CONTOUR MINOR - — — — — — — — — T164 \ F' i \ I I PROPOSED CONTOUR MAJOR v, \ I II PROPOSED CONTOUR MINOR Wl WETLAND IEXISTING EXISTING TOP OF BANK — TB = _ _ EXISTING BOTTOM OF BANK — BB DWIGHT B. YOUNGBLOOD, JR. DB 1232, PG 766 PROPOSED CENTERLINE OF CHANNEL II I EXISTING FENCELINE n II EXISTING TREELINE PROPOSED TOP OF BANK — — — — TB LIMITS OF PROPOSED LCE CONSERVATION EASEMENT PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) II I PROPOSED FILL AREA I � I DIFFUSE FLOW STRUCTURE (SEE DETAIL DWG D4) BRUSH TOE (SEE DETAIL DWG D3) DOUBLE LOG DROP (SEE DETAIL SHEET D4) 153 153 LOG TOE PROTECTION (SEE DETAIL DWG D2) LOG SILL (SEE DETAIL DWG D4) VALLEY SILL 150 150 (SEE DETAIL DWG D2) LOG VANE (SEE DETAIL DWG D3) �I LOG J -HOOK 147 147 (SEE DETAIL DWG D6) RIFFLE GRADE CONTROL (SEE DETAIL DWG D6) 144 144 ROCK A -VANE (SEE DETAIL DWG D7) ROCK A -VANE (SEE DETAIL DWG D8) 0 LI 141 EXI TIN G DE LON �T 141 ROCK CROSS -VANE STREAM C1 NT RLIN (SEE DETAIL DWG D5) L FLOODPLAIN SILL (SEE DETAIL DWG D4) _ 138 138 VALLEY /LOG SILL (PROFILE) DOUBLE LOG DROP 135 135 (PROFILE) LOG VANE / J -HOOK (PROFILE) O ROCK CROSS -VANE / 132 132 ROCK A -VANE (PROFILE) RIFFLE GRADE CONTROL 130 130 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 SCALE: HOR 1"=30'; VERT 1"=3' COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT ALL.dwq - April 13, 2018 - Ben Carroll VMC DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 30 0 30 60 2" = FULL SCALE 1" = HALF SCALE I` W H 00 C) H co co 0 Z O IL' Z 0 O O H L LL � 0 O U) I W Z i phi O ' W LL p Q Z LLI 1 U) _O W J Lij U) Q O Z uJ J O LO Q o Z U z `,-° O W N _ U z z U' p c) zw Z Q C) Y 5!�! U LLI D w o LLI~ J 0 °C U) O U U 0 U Z ZO 2 Q Z 0 � p w U � o Lij0^ Z LL o N Q O F = O Z N M Z _> C7 LU LU Z 0� m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: S12 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT FENCING.dwq - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0 100 200 2" -_ FULL SCALE 1" = HALF SCALE I` LLI j .• .. 00 \ C) ('7 Z O \ I 'I'/ 1 ,II Z 0 O O H LL L J//N 7 \ U) Z o Ir 'O �� w IL Q LL Q Z LLJ O U)2i W LdJ J \�/ U) Q p Ij�\ f prwT1 .ti 11 l I 1\� I / Z LJ J �0� o I I_ J LO QO Z U z `,Z° O w N _ U Z Z QZ o;= �.J Q0 Q C3 HZ JwJ Q Cc rr GAS GAS 0 '=) o w Z U O/ GAS GP.S GAS GPS GAS GAS GAS GAS GAS 0 LU °Cu o U U L F_ GAS GAS GAS /GAS GAS GAS GAS GAS PAS AS G U U) Z ZO ! ,', •, GAS GAS r� GAS GAS GAS GAS GAS GPS GAS _� GASGAS GASAS GAS GASG GAS �_ GAS GAS - GAS GAS �l / ' \ •• / �/ / l \\ ' - r/ (... p w r 0^ Z U LL o LijQ LL N O = O NM ex t CD rn INSTALL 1070 LF OF Z Z m / \• _--'"�• WOVEN WIRE FENCE SEE DETAIL DWG D5 �- /'_-------_�@�'>// ,ter// / \; I rt' ,/i%i� '�0y .,�e-•- .ry __ Q.C. DATE: 3/18 DRAWING NUMBER: ------------- F1 PROJ. NO.: --- 20170243.00. RA RETAIN 1756 LF FENCE / REACH Y62 -A lie g' •• \\µms`- �� � �\ \\\\\\y��� \\\ �� �� /' \ \\\\\\ \\ \� I X,,\_'�--_�%/® REMOVE AND REPLACE 440 �,\\���\�j`\ LF OF WOVEN WIRE FENCE \ SEE DETAIL DWG D5 :4 REACH YB1 REACH YB2-B 7, , \� , , �I • LEGEND INSTALL1590 LF OF WOVEN WIRE FENCE I \ \ \ SEE DETAIL DWG D5 �j l/' j� ,\y j II / j//�i/ • j; 1 EXISTING FENCE LINE PROPOSED FENCE LINE — — — — — X — \ INSTALL 3311 LF OF I I ei I WOVEN WIRE FENCE SEE DETAIL DWG D5 MATCH LINE SEE DWG NO. F2 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT FENCING.dwq - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0 100 200 2" -_ FULL SCALE 1" = HALF SCALE I` LLI I— 00 C) ('7 Z O Z 0 O O H LL L � O U) Z o Ir 'O �� w IL Q LL Q Z LLJ O U)2i W LdJ U) Q p Z LJ J �0� o I I_ J LO QO Z U z `,Z° O w N _ U Z Z QZ o;= �.J Q0 Q C3 HZ JwJ Q Cc rr 0 '=) o w Z U O/ w 0 LU °Cu o U U L F_ 0 U U) Z ZO 0 Q Z Q 0 p w o 0^ Z U LL o LijQ LL N O = O NM r` 67 rn W Z U)IiLLj i ?j � Z Z m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: F1 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT FENCING.dwq - April 13, 2018 - Ben Carroll VVK DICKSON MATCH LINE SEE DWG NO. F1 Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive YY/ (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 A/1 \ V/ FULL SCALE: 1 "= 100' \ \ \ ' 1r 40 11�\��� /✓4/ // 200 2 - - FULL SCALE 1- = HALF SCALE I` LLI W Q O Ila coco 11 -4 Z O z O 0 O \ G /' INSTALL 3333 LF OF LL a_ /�i�'�� WOVEN WIRE FENCE SEE DETAIL DWG D5 U) z i phi ' O W LL Q Q Z LLJ I U) 2i _O WJ /./ \ REACHYB2-B /BSc '/010 U) Q O Z LJ J �O� o L I- J LO Q O Z U z `,-° O W N _ U Z Z O(D H Z J w w a- Q rr 0 5 o wZ U 00� W W w J 7 O Z Ir Cn O U U LL c� Z U U Q 00 Z Q 0 0 w o Z U LL o Lij0^ LL NO FQ O --j F- N M � z rn _ LU Ij j W Z ?j z Z m Q O Q�� PROJ. DATE: APR 2018 3 Q.C. DATE: 3/18 DRAWING NUMBER: F2 PROJ. NO.: 20170243.00. RA 49 .5 I . -- . to INSTALL 2530 LF OF WOVEN WIRE FENCE SEE DETAIL DWG D5 LEGEND \ \ >/ REACH YB3 EXISTING FENCE LINE PROPOSED FENCE LINE — — — — COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitiqation Site\CADD\Plan Set\2017024300RA SHT FENCING.dwq - April 13, 2018 - Ben Carroll VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 100' 0100 200 2 - - FULL SCALE 1- = HALF SCALE I` LLI W Q O coco 11 -4 Z O z O 0 O L LL a_ � O U) z i phi ' O W LL Q Q Z LLJ I U) 2i _O WJ U) Q O Z LJ J �O� o L I- J LO Q O Z U z `,-° O W N _ U Z Z O(D H Z J w w a- Q rr 0 5 o wZ U 00� W W w J 7 O Z Ir Cn O U U LL c� Z U U Q 00 Z Q 0 0 w o Z U LL o Lij0^ LL NO FQ O --j F- N M � z rn _ LU Ij j W Z ?j z Z m Q O Q�� PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: F2 PROJ. NO.: 20170243.00. RA WHEN AND WHERE TO USE IT DICKSON community infrastructure consultants Transportation + Water Resources SILT FENCE IS APPLICABLE IN AREAS: 1.25 LB./LINEAR FT. STEEL POSTS FLOW Raleigh, NC 27607 WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100 -FEET. WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V. EXTRA STRENGTH 6 gMIDDLE LAYER www.wkdickson.com TOP LAYER THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS. FILTER FABRIC 4f BOTTOM LAYER I- 00 ` *N' oC:) EARTH SURFACESp DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP. O d ` gNOgQ A A O CONSTRUCTION SPECIFICATIONS: \ , :� ` • . D\"i1 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, W z WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS O g TRENCH 0.25' DEEP ONLY WHEN IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND 11 O . \ A"' � ` HEAVY DUTY PLASTIC TIE PLAN VIEW ENDS OF BAGS IN ADJACENT 0- _O Of PLACED ON EARTH SURFACE STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT BACKFILL TRENCH WITH FOR STEEL POSTS \ ROWS BUTTED SLIGHTLY w A TEMPERATURE RANGE OF 0° TO 120' F. COMPACTED EARTH \ \` SEE NOTE TOGETHER 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM O U) ` �' SEE NOTE LULU i LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATEF FASTENING THE FABRIC. \ �O\� LOWEST POINT GROUND /LEVEL SECTION B -B Z LU J O CONSTRUCTION: JL, �� Z U 2E N O= ozz Q i 0 CO Z Lu W J 1. CONSTRUCT THE SEDIMENT BARRIER OF EXTRA STRENGTH SYNTHETIC FILTER FABRICS. O J BURY FABRIC �. -\ rr CD 0 O >- 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE USE EITHER FLAT -BOTTOM - ---- -- - -- - -- - °C rn p 10� 0 � 0 GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE OR V -BOTTOM TRENCH % �� ` `i �� EARTH SURFACE FAILURE OF THE STRUCTURE.) SHOWN BELOW Q z ~ SECTION A -A J CO w 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER 0 U � SILT FENCE INSTALLATION LLL O z LU Z Lu NOTES: TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT = N N z N C) U Z_ A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. rn LL, LLI NOTE: END OF DIKE AT GROUND LEVEL TO BE 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR 4. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH PROJ. DATE: APR 2018 HIGHER THAN THE LOWEST POINT OF FLOW ISOLATED SECTIONS OF CHANNEL. SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC CHECK. SUFFICIENT SANDBAGS ARE TO BE ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. D1 PLACED TO PREVENT SCOURING. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED FILTER FABRIC FILTER FABRIC FROM STREAM FLOW. LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. COMPACTED COMPACED SANDBAG BARRIERS SHALL BE CONSTRUCTED OF THREE LAYERS OF 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH EARTH p p EARTH4'OFF SANDBAGS. THE BOTTOM LAYER SHALL CONSIST OF 3 ROWS OF BAGS, THE BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 200 FEET COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 0 MIDDLE LAYER SHALL CONSIST OF 2 ROWS OF BAGS AND THE TOP LAYER SHALL MAY BE DISTURBED AT ANY ONE TIME. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. RUNOFF 2 RU02 CONSIST OF 1 ROW OF BAGS. THE RECOMMENDED DIMENSION OF A FILLED 11 SANDBAG SHALL BE APPROXIMATELY 0.5 FT X 0.5 FT X 1.5 FT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING MAINTENANCE: �o \ J PUMP SIZE SUFFICIENT TO PUMP BASE FLOW. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED 111111 miSHOULD N N 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS AS SANDBAGS. REPAIRS IMMEDIATELY. J� SANDBAG IMPERVIOUS DIKESUCH � NTS SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. FILTER 4" FILTER FABRIC 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS FABRIC A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT PROJECT WORKING AREA. RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE V -SHAPED TRENCH DETAIL DURING CLEANOUT. FLAT -BOTTOM TRENCH DETAIL 2. THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING TEMPORARY SILT FENCE OPO COARSE AGGREGATE - OPERATIONS FOR STREAM DIVERSION. (\�G STONE SIZE = 2"-3" 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING NTS PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED 0 0 0 o AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER 0 0 0 0 2t WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 2"X1" OR 2"X2" - 5. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT WOODEN STAKE MINIMUM 9" EROSION `° o 0 0 0 AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. CONTROL STRAW WATTLE NOTE: EXISTING WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED OR COIR WATTLE/LOG EROSION CONTROL WATTLES OR COIR LOGS/WATTLES MAY BE USED IN THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND PLACE OF SILT FENCE. T TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE 6 0 ,,y7N DOWNSTREAM DIKE FIRST. SLOPE ' S 6. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP �� �� �,\\�\ j /\\/\\/\\/ \/�/-��r\� �/ / / / / / / / / / / /,. EROSION CONTROL WATTLE \P SPS\cue AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. IN 1\NTS 7. ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING INSTALL WATTLE IN 3" IMPERVIOUS DIKE. TO 5" TRENCH PURPOSE: STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD. INSTALLATION NOTES: KEY -IN MATTING PER CONSTRUCTION SPECIFICATIONS: 2.0' FIG. 1 OR FIG. 2 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE FLOW SITE PREPARATION MIN. MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE DETAIL, AND GRADE AND COMPACT AREA. SMOOTH IT. INTAKE HOSE - 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. CLASS A REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE ` - ' '-••-•' 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS STONE DIRECT CONTACT WITH THE SOIL. N. SUBJECT TO SEEPAGE OR HIGH WATER TABLE. PUMP AROUND PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. KEY -IN AND/OR PUMP STAKE MATTING MAINTENANCE:JUST TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE ABOVE WORK ENGINEER. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. CHANNEL TOE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE DE -WATERING AREA CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2 -INCH STONE. AFTER EACH PUMP SEEDING RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC SEE SHEETS P1 AND P2 FOR SEEDING REQUIREMENTS. ROADWAYS, OR AIRFIELD PAVEMENTS. IMPERVIOUS APPLY SEED TO SOIL BEFORE PLACING MATTING. DIKE IMPERVIOUS DIKE INSTALLATION -STREAM BANK TRENCH APPROX. TRENCH APPROX. SOIL PILE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SEE GRADING NOTES ON PLAN AND PROFILE SHEETS AND DETAIL SHEETS FOR INFORMATION SOIL PILE 8" WIDE X 8" DEEP 8" WIDE x 8" DEEP FROM TRENCH REGARDING WHAT AREAS ARE TO RECEIVE COIR MATTING. FROM TRENCH FLOW NTS 18 -� OVERLAP ADJACENT MATS 3" (IN DIRECTION PARALLEL TO FLOW) AND ANCHOR EVERY 12" ...I ,� - FLOW DISCHARGE HOSE ACROSS THE OVERLAP. THE UPSTREAM MAT SHOULD BE PLACED OVER THE DOWNSTREAM FLOW GENERAL NOTES: CLASS A MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. �� \/\\r\\�//\//\//\\/// � / // //% /\ ' \ \ / '/ 1. CONSTRUCT DAM ACCORDING TO NCDENR EROSION CONTROL MANUAL. B� # 5 WASHED STONE /\/\/\//\/ \/\/\/\/\/\ \/� STONE 2. ROCK DAM RIPRAP SHALL BE 50/50 MIX OF CLASS I AND NOTE: HOSE SHOULD BE LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT. ///////////////// ////� < \�\�\ A KEPT OUTSIDE OF WORK /\\��` II. A SILT BAG AREA \ \ 1 ROW OF STAPLES 3. PLACE ROCK DAM AS SHOWN ON PLANS. EXTEND CLASS LOCATION ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. \ \/���' ,\/� OR STAKES, MIN. OF B RIP RAP ROCK APRON 5 FEET DOWNSTREAM FROM TOE /\ 1 ROW OF STAPLES OR STAKES, MIN. OF 24" O.0 OF ROCK DAM. CUT 8" x 8" TRENCH ALONG TOP OF BANK FOR MAT TERMINATION AS SHOWN IN FIGURES 1 & 2. \�///\/ ; EXTEND MAT 2 TO 3 FEET PAST TOP OF BANK. 24" O.0 STEP 1 STABILIZED OUTFALL PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 4" OVERLAP. SECURE STEP 1CLASS A STONE FILTER FABRIC WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. 1.5' THICK 5'-0" MIN. CLASS B B STAPLE AT 12" INTERVALS ALONG OVERLAP. 1 ROW OF STAPLES 1 ROW OF STAPLES ROCK APRON FLS OR STAKES, MIN. OF OR STAKES, MIN. OF PLAN DISCHARGE STREAM BANK MATTING TO BE INSTALLED FROM TOE OF BANK TO A MINIMUM OF 2.0' PAST 18" O.0 12' O.0 EXISTING HOSE TOP OF BANK. SEE FIGURE 3 FOR TERMINATION AT TOP OF BANK. ff� SPILLWAY 2:1 CREST GROUND � FLOW W (SPILLWAY) ' IF MORE THAN ROLL IS REQUIRED TO COVER THE CHANNEL FROM THE TOP OF BANK DOWN TO `%/\�%/\\//\//\\//\\//\ /\///\ \/\/�\/` \//\\//� _ 1 MIN 0 F 5 # MIN 2 3 STREAM WIDTH 3:1 / STABILIZED THE TOE, THEN OVERLAP MATTING BY A MINIMUM OF 1'. \\\\\ `,._`..`r�ry�I��y%�; WASHED STONE CLASS I AND OUTFALL CLASS 15' TO 20' SOIL FILLED �;\tj j\\/\\/\\ \ \\j\\\ 11 RIP RAP aFLO W A STONE FROM SOIL PILE, \\ 1.5' THICK COMPACT WITH FOOT %/�// SOIL FILLED 2' CLASS B \ EROSION CONTROL MATTING MUST MEET OR EXCEED THE // // //\//� FROM SOIL PILE, \/\/ \�� COMPACT WITH FOOT 2'� -2' MIN. ROCK APRON i BELOW FOLLOWING REQUIREMENTS: STEP 2//j�//j \ ,LOWEST ............................. BANK • 100 % COCONUT FIBER (COIR) TWINE WOVEN INTO A ' LEVEL (MIN) �r""""". CLASS I AND --7 HIGH STRENGTH MATRIX. • THICKNESS - 0.35 IN. MINIMUM. STEP 2 CUTOFF II RIP RAP FILTER TRENCH FILTER SECTION A -A FABRIC FILTER FABRIC 8" OF CLASS A STONE • SHEAR STRESS -5 LBS/SQFT FIGURE 1 FIGURE 2�_EXISTINGC SECTION 13-13 FABRIC • FLOW VELOCITY- OBSERVED 16 FT/SEC • WEIGHT - 29 OZ/SY SILT BAG PROFILE • OPEN AREA - 38% • SLOPES - UP TO A MAXIMUM OF 1:1 COIR MATTING TEMPORARY ROCK CHECK DAM PUMP AROUND & DEWATERING DETAIL NTS NTS NTS COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA_SHT DETAILS.dwg - April 13, 2018 - Ben Carroll DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI I- 00 oC:) I- O d z O I- W z O o 11 O H LL_ 0- _O Of O U) z w w O L � Q a oLU O U) g_ Y LULU i EDJ U) z Q 0 Z LU J O �O cnQ JL, �� Z U 2E N O= ozz Q C3 0 CO Z Lu W J O J U < rr CD 0 O >- W W Z w CO ~ w J W °C rn p 10� 0 � 0 U U 0 C0 0 Z Q z ~ Q J CO w 11~ 0 U � o � LLL O z LU Z Lu Q �_ O H = N N z N C) U Z_ 07 coLLi rn LL, LLI LU Z � Z J 00 m O D < 2E PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D1 PROJ. NO.: 20170243.00. RA W _ DICKSON & CO_ INC_ ALI DUCTION OR USE OF THE CONTENTS OF THIS DOCIJMENT- ADD THIS DOCUMENT_ IN WHOLE OR IN PART_ WITHOUT WRITTEN CONSENT OF W FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll INC__ IS PROHIBITED_ ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT_ MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL 6E CONSIDERED TO RE VALID_ TRUE COPi FLOW VVK DICKSON community infrastructure consultants NOTES: Urban Development + Geomatics 720 Corporate Drive COIR FIBER 1. LOGS SHOULD BE AT LEAST 10 INCHES IN DIAMETER, 5-8 FEET LONG, RELATIVELY STRAIGHT, AND HARDWOOD. PROPOSED STREAM BED REBAR OR DUCKBILL ANCHOR MATTING 0.75" TO 2" 2. CABLE ANCHORS SHOULD BE PLACED V TO T FROM EACH END OF LOG. REBAR (5/8" MINIMUM DIAMETER I I NC. LICENSE NO. F-0374 FLAT TOP END o T MIN. LENGTH TYPICAL) MAY BE USED AS A SUBSTITUTION FOR CABLE ANCHORS PER DIRECTION OF CHANNEL I I FLOW MIN 6.0' 00 ENGINEER. BOTTOM OF BANK M MIN 4.0' - 3. IF REBAR IS USED, PRE -DRILL HOLES WITH 5/8" DRILL BIT. Z 0.5' TO 1.5' LATERAL DETAIL 0 A I �a� �Da�)�� ���T BUD LIVE STAKES SHOULD BE LONG ENOUGH TO REACH BELOW THE GROUNDWATER COARSE BACKFILL CO j TABLE. (GENERALLY, A LENGTH OF 2 TO BACKFILL (1 TO 4') �� 0 / cv� 3 FEET IS SUFFICIENT.) ADDITIONALLY, HTAKES SHOULD HAVE A DIAMETER O NTHE 5 TO 2 INCHES. RANGE OF 0.7 SIDE BRANCH O F_ \ REMOVED AT SLIGHT BANKFULL ELEVATION �\ ANGLE MIN 18 w L o 6� 0 B \\ j\ N B j\ 1/4 TO 1/3 OF LOG /\\/\\/�\/ \\,\\,�\/\\ DIAMETER CAN BE EXPOSED N M N n n n H n n NON WOVEN GEOTEXTILE /\/� COARSE AGGREGATE WATER TABLE \/ PRIOR TO FINAL GRADING \ FABRIC (NCDOT TYPE I I) 1 TO 4") - o TACK FABRIC TO LOG �O _jn U Z r- Q CHANNEL TOP N Z O= 0Z PROPOSED BED \\/ OF BANK I 18.0' SECTION A -A M I N U' O (%) w J COIR FIBER \ \j\\j\�\\�\\%\\\�\%\\%\\% A 45 DEGREE MATTING TAPERED BUTT END W J LU D Cr cn p 0� O F- /\\i > PROPOSED STREAM BANK o 4 \\/\i\\/\\\\/\\/\\/\\i \\/\ TYPICAL PLAN VIEW o M LLI O^ U)Iii w o0 N O Z H N Cl) o) U Z w I %MINIMUM OF 2/3 OF LOG DIAMETER BEDDED BELOW W 3 Z W Z m HEADER LOG D- O Q0-2 PROJ. DATE: APR 2018 EXISTING CHANNEL INVERT 10" MINIMUM LOG NOTES: - Q.C. DATE: 3/18 DIAMETER (TYP.) 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND SECTION VIEW D2 RECENTLY HARVESTED. PROJ. NO.: LIVE STAKES SHALL BE INSTALL CABLE ANCHOR AS SHOWN. DRILL (OR SAW CUT) PILOT HOLE THROUGH LOG Y3 TO Ya THE WAY 2. LOG DIMENSIONS: MIN DIAM. = 10", MIN LENGTH = 40' 3. NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL FOOTER LO G SPACED 3 FEET APART, ALTERNATE SPACING. DOWN SO THAT ANCHOR CABLE IS NOT EXPOSED. EVERY 1.5' ALONG THE LOG MIN 3' 4. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. SECTION B -B REBAR (5/8" MIN. DIAMETER, 4' MIN. LENGTH) OR DUCKBILL ANCHORS LOG TOE PROTECTION INSTALLED PER MANUFACTURERS VALLEY SILL INSTRUCTIONS (TYP.) NOTE: NTS NTS 1. ACCEPTABLE SPECIES INCLUDE BLACK WILLOW (SALIX NIGRA), SILKY WILLOW (SALIX SERICEA) AND SILKY DOGWOOD (CORNUS AMMOMUM). 2. LIVE STAKES SHALL BE PLANTED IN AN AREA EXTENDING 3 FEET OUT FROM TOP OF BANK TO JUST BELOW BANKFULL. BANKFULL ELEVATION BACKFILL AREA BETWEEN BANK AND COIR FIBER \\ \\/\�\\/ \\ ROLL (APPLY PERMANENT SEED MIX & COIR MATING) LIVE STAKE EXISTING NTS 1 /4 TO 1 /3 OF LOG 0 DIAMETER CAN BE EXPOSED PLANTED COIR FIBER ROLL BANK \,\\,\/\/\\j�\\I \j\ j\\j \\1-1 = PRIOR TO FINAL GRADING \\% NORMAL WATER LEVEL PLANTED COIR FLOW FIBER ROLL PROPOSED BED WOOD STAKES 0.5'T01.25' \\i \\X,\\ \/\\\/ \\/% DENSE COIR MATTING DIBBLE PLANTING METHOD w\/\� (ROLANKA BioD-Mat®90 OR EQUIVALENT) USING THE KBC PLANTING BAR TO 3.0' MINIMUM OF2 TO 3 OF LOG DIAMETER WOOD STAKE BEDDED BELOW CHANNEL INVERT WOOD KEY IN UPSTREAM 4M STAKES PLAN VIEW END OF ROLL APPROX inch 12" LOG DIAMETER (TYP.) NOTES: 2-4 FT INTO BANK �2 SECTION VIEW 1. DESIGNER TO MARK LOCATIONS AND DIMENSIONS OF NOTES: SILLS IN THE FIELD PRIOR TO CONSTRUCTION. 1. INSTALL STAKES ON T CENTERS ON EACH SIDE OF ROLL. TOP OF STAKE 2. INSTALL STAKES ON T CENTERS ON EACH SIDE OF ROLL. SHOULD NOT EXTEND ABOVE ROLL. 2. EXCAVATE A SMALL TRENCH (DEPTH APPROX z TO 3 OF LOG DIAM) FOR TOP OF STAKE SHOULD NOT EXTEND ABOVE ROLL. PLACEMENT OF ROLL. 3. EXCAVATE A SMALL TRENCH (APPROX 2in DEEP) FOR 1. INSERT 2. REMOVE 3. INSERT PLANTING BAR AS PLANTING BAR PLANTING BAR 2 3. COIR LOGS SHALL BE 10 FT LONG AND HAVE A DIAMETER OF 12 IN. PLACEMENT OF ROLL. SHOWN AND PULL AND PLACE INCHES TOWARD HANDLE TOWARD SEEDING AT PLANTER FROM PLANTER. CORRECT DEPTH. SEEDING. COIR LOG (TOE PROTECTION) NTS VEGETATED SILL DEFLECTOR NTS r` 'ft* NEW CHANNEL TO BE OJT CONSTRUCTED 4. PULL LE OF 5. PUSH 6. LEAVE BAR TOWARDHANDLE COMPACTION MIN. 25' PLANTER, FIRMING FORWARD HOLE OPEN. SOIL AT BOTTOM. FIRMING SOIL WATER AT TOP. THOROUGHLY. OLD CHANNEL TO CHANNEL PLUG MAX. 75' BE DIVERTED OR ABANDONED TOP OF BANK PLANTING NOTES: NOTES: PLAN VIEW 0 EXISTING �j�/ / /\\ //\\/�\ CHANNEL \\� % /\\ /\�\\% \\� i\ \ \/ / / \\/\- BOTTOM\ \\�\%\\ I BARE ROOTS SHALL BE PLANTED 6 PLANTING BAG FT. TO 10 FT. ON CENTER, RANDOM DURING PLANTING, SEEDLINGS SPACING, AVERAGING 8 FT. ON SHALL\\\�\\!\\\/\%\%\\%\�\�\\/\\\�\�\� IST AS Z i\\\�/\\/�\/��\%� j\,\ /\�j\\jj\� BAG OR SIMILAR CONTOAINER TO CENTER, APPROXIMATELY 680 PREVENT THE ROOT SYSTEMS FROM PLANTS PER ACRE. DRYING. UNCOMPACTED BACKFILL 1.5' MINIMUM COMPACTED BACKFILL KBC PLANTING BAR BANKFULL ELEVATION (12" TO 18" LIFTS) PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS SECTION, AND SHALL BE 12 INCHES 30' LONG, 4 INCHES WIDE AND 1 INCH X L THICK AT CENTER. FINISHED GRADE NEW CHANNEL BANK SHALL NOTES: ROOT PRUNING COMPACTED BACKFILL 1 \ \ \ \ \ \� BE TREATED AS SPECIFIED IN PLANS 1. FILL EXISTING CHANNEL TO BANKFULL ELEVATION WHEN POSSIBLE. ALL SEEDLINGS SHALL BE ROOT PRUNED, IF NECESSARY, SO THAT NO (12" LIFTS) 1 - ,- 2. CHANNEL MUST BE FILLED IN 12" TO 18" LIFTS, II „ ROOTS EXTEND MORE THAN 10 10' MIN 3. IF CHANNEL CANNOT BE COMPLETELY FILLED TO TOP OF BANK, FILL INCHES BELOW THE ROOT COLLAR. TO TOP OF BANK FOR 25' OUT OF EVERY 100' SEGMENT. �N�.A r� PROPOSED CHANNEL INVERT IMPERVIOUS SELECT MATERIAL TYPICAL SECTION CHANNEL BACKFILL BARE ROOT PLANTING (PER DIRECTION OF ENGINEER) LOG TOE OR COIR LOG NTS NTS CHANNEL PLUG NTS W _ DICKSON & CO_ INC_ ALI DUCTION OR USE OF THE CONTENTS OF THIS DOCIJMENT- ADD THIS DOCUMENT_ IN WHOLE OR IN PART_ WITHOUT WRITTEN CONSENT OF W FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll INC__ IS PROHIBITED_ ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT_ MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL 6E CONSIDERED TO RE VALID_ TRUE COPi VVK DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 W H 00 N M O - Z 0 U) Z O 0 O F_ li O � I w Q O� w L o 6� 0 Q I LdZ I O U) Y F W J YLU I Q z 0 Q F_ Z o �O _jn U Z r- Q N Z O= 0Z U' O (%) w J I- Z Jw M LU w U) LU LU W J LU D Cr cn p 0� O F- U U z > Q Z o Q Z U J Ow ~ U LL o M LLI O^ U)Iii w o0 N O Z H N Cl) o) U Z w I rn W W 3 Z W Z m D- O Q0-2 PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D2 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive 1.5' THICK CLASS I RIP RAP (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 DISSIPATER PAD LLi 00 y O PROPOSED GRADING Z O i= � CD CLASS I RIP RAP U) Z O -�� _rte 0 #5 WASHED STONE 6" MIN. THICK I—III LL 0 O ROOT WAD ✓� �J�- I w Q O� lake l II-III=III=11 I LU I O U)2i BOULDER J lY Q_j LLJI i \ -1 I= _ _ _ 1 O Q F_ �� (AS DIRECTED / BY ENGINEER) Z INSTALL COIR MATTING PER \ \ Q Z Z U N O = o z DETAIL DWG D1 Q > 0 / U' p (%) w J I— Z Jw < Er C1 Ow 5:7,J LLI U) ° w LU D W FLOW 0� O 0 U U z Q > Z o Q z U J Ow ~ U LL o M LLI O* U)LLi w ROOT WAD Q O z N Cl) 0) EXCAVATE / GRADE UPPER BANK U Z w i _ U) -71-11 lEd I PEI W 3 Z W Z m Q 0- O Q�2 BOULDER Q.C.: BC Q.C. DATE: 3/18 `�I I MI DRAWING NUMBER: AS DIRECTED INSTALL LIVE STAKES (SEE PLANTING PLAN) _ __ I -I I I -I I I -I I I-IFOOTER 20170243.00. RA BY ENGINEER) LOG EXISTING CHANNEL BANK / — PLAN VIEW -TRENCHING METHOD PLAN VIEW - DRIVE POINT METHOD TIE TO EXISTING GRADE MIN SLOPE 2.5HAV SEE DWG ## (DESIGNER TO MARK IN FIELD PERSPECTIVE VIEW PRIOR TO CONSTRUCTION) IF ROOT WAD DOES NOT COVER ENTIRE BANK & CONSTRUCTION CLASS I RIP RAP IS BETWEEN MID OCTOBER TO MID MARCH, PROTECT BANK DRIVE POINT METHOD: #5 WASHED STONE SOD MATS WITH BRUSH LAYER. SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE 3' PROPOSED TOP OF BANK "DRIVING" IT INTO THE BANK. ORIENT ROOT WADS UPSTREAM SO SEDIMENT STORAGE ZONE 6" GRADING FLOOD PLAIN THAT THE STREAM FLOW MEETS THE ROOT WAD AT A 90 -DEGREE EXISTING MIN. ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK. A CHANNELBED STORMWATER STORAGE ZONE BOULDER BANKFULL STAGE TRANSPLANT OR BOULDER SHOULD BE PLACED ON THE 10' TO 15' (AS DIRECTED BY DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMED NOTES: 1. TREES NOT INDICATED TO BE REMOVED BENCH SHALL BE ENGINEER) BASEFLOW BY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY 3' X F�Ow _ 3' X 2'. PROTECTED DURING CONSTRUCTION IN ACCORDANCE WITH PLANS. 2.5'MIN 2.0' TRENCHING METHOD: 2. SEED AND MULCH ALL BANKS PRIOR TO INSTALLING PROP CHANNEL BOULDER 24" MIN. IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE COIR MATTING. """""""""""""""""""' DIAMETER FOOTER LOG > 12" DIAMETER BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD `-•-••-••• ( MINIMUM OF 1/2 OF DIAMETER SHOULD BE USED. THIS METHOD REQUIRES THAT A TRENCH BE MAX. SEDIMENT DEPTH •••-•-•••-••-••----•••••••'' (CLEAN OUT POINT) SECTION 1.5' THICK CLASS I INSTALLED BELOW STREAM BED 10-15 FEET LONG >10' DIAMETER EXCAVATED FOR THE LOG PORTION OF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE ROOT WAD IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND RIP RAP DISSIPATER PAD WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. GENERAL NOTES: FILTER FABRIC CROSS SECTION VIEW 1. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTED UNLESS OTHERWISE NOTED. TYPICAL BANK GRADING RIPRAP FILTER BERM NTS NTS ROOTWAD NTS TOE OF BANK NOTES: 1. LOG VANES SHALL BE CONSTRUCTED OF ONE OR MORE LOGS HELD IN PLACE BY EITHER BALLAST BOULDERS, DUCKBILL INSTALL COIR MATTING PER ANCHORS, OR REBAR. LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE RELATIVELY DETAIL DWG D1 NON -WOVEN GEOTEXTILE �' STREAM BANK STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH SHALL BE SUCH THAT THE LOG IS BURIED INTO THE SOIL OF THE STREAM BANK (ON ONE END) AND STREAM BED (ON THE OTHER END) A MINIMUM DISTANCE OF 4.0'. FLAT -SIDED BALLAST FABRIC (NCDOT TYPE II) 0� BOULDERS SHALL BE OF SIZE ZX 2'X 1.5' OR AS SPECIFIED BY THE DESIGNER. MIN 2.0' COMPACTED SOIL �2 VV/1) v / M BANK AT A HEIGHT UAL TO EN BANKFULL GE AND 2. THE VANE SHALL INTERCEPT THE AN ELEVATION CONTROL POINT MAY BEA ESTABLISHED AT THE LQEFT OR RIGHT STREAM BANK/VANE IA TERCEPT POINT. LTHE GE LIVE STAKES TOP OF BANK VANE INTERCEPT LOCATION MAY BE OTHERWISE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THE LENGTH / LIVE CUTTINGS / AND SLOPE OF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE. ' 20° TO 30° BALLAST BOULDER OR DUCK BILL ANCHORS 3. FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOGS AND UNDER THE COARSE BACKFILL MATERIAL OF THE VANE. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED TUCKED, OR TRIMMED ASAND SMALL BRANCHES \` ---__-__-___ BRUSH W NOTES: 1. OVER EXCAVATE THE OUTSIDE BEND OF THE CHANNEL. PLACE /! f NEEDED.\\ \ \ _ _ - - - - - - \ !" =" _ LARGER BRANCHES AND LOGS IN A CRISS-CROSS PATTERN. LOCK IN PLACE WITH FILL COVERING 6 IN TO 18 IN OF THE ! i 4. LOG VANES SHALL BE BUILT TYPICALLY AS FOLLOWS: A. OVER -EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER (AND FOOTER IF \\ / / / / \\ LARGER ES/SMALL LOGS. 2. PLACE SMALLER BRANCHES AND BRUSH OVER THE LARGER f' COARSE SPECIFIED) LOGS. B. PLACE FOOTER LOG OF THE VANE ARM IF SPECIFIED. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THE VANE T BRANCHES/SMALL LOGS (HARDWOOD SPECIES ONLY AND AGGREGATE !! f BACKFILL � ARM WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE.// \ \\� \\TT\7T\TT�/ COMPACT LIGHTLY TOGETHER. BACKFILL AND COMPACT TO (1" TO 5") i BANKFULL C. INSTALL HEADER LOG OF THE VANE ARM ON TOP OF AND SLIGHTLY FORWARD OR BACK FROM THE FOOTER LOG. D. NAIL FILTER FABRIC TO THE HEADER LOG USING A GALVANIZED NAIL WITH A PLASTIC CAP. THE SIZE AND GAGE OF NAIL /, / ��/� � \ \ LOCK IN PLACE. 3. ACCEPTABLE LIVE CUTTINGS SPECIES A INCLUDE BLACK \\�\\ \\� ` IL WILLOW (SALIX NIGRA) AND SILKY WILLOW (SALIX CaC AND NAIL SPACING SHALL BE SPECIFIED BY THE DESIGNER. SMALL LOGS AND/OR WILLOW CUTTINGS SHOULD G POINA). RINSED AT CUTTING POINT TO - E. PLACE BALLAST BOULDERS OR DUCKBILL ANCHOR ON THE VANE. F. PLACE COARSE BACKFILL BEHIND LOGS ENSURING THAT ANY VOIDS BETWEEN THE LOGS ARE FILLED. LARGE BRANCHES WITH SECTION A ALLOW BETTER ROOTING. �a LOG VANE G. BACKFILL REMAINDER OF VANE WITH PREVIOUSLY EXCAVATED MATERIAL. A MIN DIAMETER OF 4". -A 4. INSTALL EROSION CONTROL (COIR) MATTING OVER a� ! I COMPACTED SOIL PER DIRECTION OF ENGINEER. ! J 5. IF ANY EROSION CONTROL MATTING IS SPECIFIED FOR USE IN THE VICINITY OF THE STREAM BANK/VANE INTERCEPT POINT THE 5. INSTALL 1 TO 3 ROWS OF LIVE STAKES ABOVE THE LIVE o MATTING EDGES SHALL BE NEATLY SECURED AROUND THE LOGS. CUTTINGS LAYER PER DIRECTION OF ENGINEER. 2 ! POOL LEFT OR RIGHT VANE ARM BANK INTERCEPT CONTROL POINT FL O`N '\ BANKFULL BALLAST BOULDER OR DUCKBILL ANCHORS COIR MATTING 1 �\ LEFT OR RIGHT VANE ARM BANK INTERCEPT CONTROL POINT PLAN VIEW FLOW VARIES �\ ------ 0' TO 0.8' %j��T 30/ o % BANKFULL STREAM BANK \ \\\ \\\ _` ` - -- =--5 CHANNEL TOP OF BANK - - /\ �j\\j COARSE AGGREGATE BACKFILL (1" TO 5") TFLOW - _ �' ~` /\ \\ 7 \ \ \ FOOTER LOG HEADER LOG SPOOL \\/ \ �� �7 HEADER LOG TOE OF BANK / FOOTER LOG -� STREAM BED PROFILE VIEW A IN POOL CHANNEL BOTTOM OF BANK i NON -WOVEN GEOTEXTILE /\ �\ FABRIC (NCDOT TYPE II) `� VARIES %\LOG VANE TYPICAL PLAN VIEW BRUSH TOE .00 UTO -WIDTH \� r\� ` NTS NTS SECTION A -A COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLi 00 N O Z O i= U) Z O 0 O H LL 0 O U) Z I w Q O� w LL 0 o Q Z I LU I O U)2i Y aL.I L J lY Q_j LLJI i Z O Q F_ Z � O _j LD Q Z Z U N O = o z Q > 0 U' p (%) w J I— Z Jw < Er C1 Ow 5:7,J LLI U) ° w LU D W o 0� O 0 U U z Q > Z o Q z U J Ow ~ U LL o M LLI O* U)LLi w °° N Q O z N Cl) 0) U Z w i _ U) 0.) w W 3 Z W Z m Q 0- O Q�2 PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D3 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 NOTE: REBAR (1/2" MINIMUM DIAMETER 3' MIN. LENGTH EXISTING DITCH p � I I www.wkdickson.com LOG SILL EXISTING GRADE A TYPICAL) SHOULD BE PLACED V TO T FROM END OF LOG. ADDITIONAL REBAR TO BE PLACED AT 6' BANK I CONSERVATION D o N LOG STRUCTURE EXISTING DITCH TOP OF BANK SEE DETAIL ( ) PROPOSED GRADE -4 MINIMUM DIAMETER 12" OFFSETS. LAST REBAR SHOULD BE PLACED V TO 3' FROM FROM END OF LOG. DUCK BILL ANCHORS MAY BE PROPOSED EASEMENT LIMITS O (SEE DETAIL) -_-------- --------------- ------ -_____ USED AS A SUBSTITUTION FOR REBAR, 2 PER LOG. L. � < <� �� `� LCE —LCE —LCE —LCE '--------------- z g' 0 O aILL TO 0.5% SLOPE --------- ---------------- O Lu I 0 0 O } � Lu LL Q co ---- ___-_-__ (MAX)TIE-IN EXISTING J LOGS U) z C:) PROPOSED\/\\/\\/ \ \ \ \ y /�j FILL DITCH SUCH THAT THE DOWNSTREAM ELEVATION TIES INTO EXISTING DITCH INVERT -L�-�G���� / /,,,� \ \ \ FLOODPLAIN - L�� / L� j� /\ ELEVATION �- REBAR Z U LU N LIMITS O \\\ \ti CONSTRUCT FLOW FILL DITCH AND — -� PROPOSED FLOODPLAIN SURFACE OF GRADING/\\/\\/ 0 g /\ \ jj \ j/ �I g EXISTING GRADE OF THE FLOODPLAIN POOL INSTALL MATTING COIR 0 0 o az ON Z o Q 0 w O aU � o SECTION A -A w Q d = = o z F- N c� � O U z� cn w W W WLU J Z �zm O o0 a O Q Q0- PROJ. DATE: APR 2018 Q.C.: BC A' Q.C. DATE: 3/18 DOWN VALLEY U DRAWING NUMBER: GRADE AREA SUCH THAT EXISTING D4 LENGTH VARIES\//\// PROJ. NO.: O/\\/\ / a MAX SLOPE BELOW LOG STRUCTURE IS 1% GROUND NOTES: 6" (TYP.) ILLIY//\\//\\ Q /\� \//�CUT ` ---- - ---------- - 1. NO FLOODPLAIN GRADING IS ALLOWED WITHIN 10 FT OF THE PROPOSED CHANNEL TOP OF BANK. ` 2. LOGS SHOULD BE AT LEAST 10'-20' LONG AND AT BANKFULL LIMITS OF 5.0 I ✓ LEAST 8 INCHES IN DIAMETER, AND HARDWOOD. 3:1 MAX PROPOSED CHANNEL D 3:1 MAX/\\/\\/\\/ /\\� SLOPE l�f//\//\//\ \ ; SLOPE PLAN VIEW 518" REBAR VARIES (TYPICALLY 20' TO 40') INSTALL COIR MATTING '� PER MAN UFACTURERSECTION B -B FILL DITCH SECTIONAL VIEW A - A' INSTRUCTIONS PLAN VIEW FLOODPLAIN SILL NTS DIFFUSE FLOW STRUCTURE NTS FLOW PROPOSED STEAM FEAR OR DUCIBI LL CHANNEL BOTTOM OF g® ANCHOR BANK COARSEACGREGNTE I I FLOWBACKRLL(1" TO 5") MIN. 5.0' COARE.EAGGFUGATE BACKFILL(2" TO 6") \ HEADERLOG INVERT ELEVATION OOAFSE BACKFILL NON-WOVENI GEOTEXTILE FABRIC (NCDOT TYPE I I) I I I A I _ POOLAPPROX 0.75' TO 1.5' '\/�� - DDEEP,c /\/ a° a° < I COARSE: AGGREGATE B HEADER LOG 4' TO 8' I NVERT ELEVATI ON/! I I BACKS LL (1 " TO 5")D�� aAir, a gAN�ULL POINTRE=�ICEOIN MIN ° / \/ OOAR�EAGGREGATE BACKFLL(2" TO 6") DFOPOF n � �E FT OR BRll9-TOE T03ROOTWAD NON -WOVEN FOOTER LOG HEADER ,3„.0_' MAXDEPTH2'tOFLOG DIAMETHZ(T1P) - - - �'����0 / I �1 I GEOTEXTILE FABRIC TACKFABRICTO (NCDOT TYPE II) LOG LOG ------ COARSEAGGREGATE ,� /1> Z OOAFSEAC�GATE BACKFILL (2" TO 6")MC FOOTS � �� BACKHLL(2" TO 5.0 SECTION A—A 6") LOG I MIN I I �I OOIRMATTING LOG BURIED IN iv ° ° �j`, C I B' ° BANK MIN 5FT ° ° NON -WOVEN O IANN�TOPOF I A I POOL G LOG BURIED IN GEOTEXTILE FABRIC (NCDOT BANK HEADERLOG 1%T03% POINT I��ICEDIN BANK TYPE II) PROFILE A -A' STRJCTURETABtE MIN 5FT TYPICAL PLAN VIEW (OPT 1)_ ti A' FOOTER LOG FLOW PLAN VIEW MIN 5FT MIN 5FT REBAR 5 8"MIN. DIAM ETH 4' M I N. LENGTH) DUCKBILL ANCHORS INSTALLED PERMANUFACTUFS;S CHANNEL BOTTOM OF INSTRUCIIONS(TYP.) \ \\/\� \//\\/� OVER AP OF BANK UPSTREAM LOG00AFEBAO¢1LL I SECTION B—B (OPT 1) 4%TO 6 /o / //\\�\\ (�� \\//\\// Fl LTB FABf�I C I A MIN 5FT MIN 5FT PROPOS STREAM BANK \\ MIN.. 2.5' OF/ /// / X\\N // /�\/// ///\/` \//\/\\\\//\\\\\\/�\/�\/ / /� /\ /\ ✓ . r RDOTWAD OR n 'o� HEADER LOG TO 3� �� 1%T03% \ \ 4%�— \\\\\\\ \\\ \\ BFB 19 ffOE Y PROFILE C -C' FOOTHRLOG 5.0' FEAR(5/ 8" MIN. DIAM ETH 4' M I N. LENGTH)OR OVERLAP OF MINDUCTBILLANCHORSINSTALLED PERMANUFAC:T JF�S DOWNSTREAM LOG �d OVAPOF INSTRJCTIONS(TYP.) PROFILE B -B' NOTES: I I I DOWNSTREAM LOG 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. I I I L� SECTION B -B (OPT 2) 2. LOG DIMENSIONS: CHANNELTOPOF I A I POOL MIN DIAM. = 10", MIN LENGTH = 12' BANK 3. NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG TYPICAL PLAN VIEW (OPT 2) NOTES: 1. LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. 2. LOG DIMENSIONS: DOUBLE LOG DROP MIN DIAM. = 10", MIN LENGTH = 12' NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' NTS ALONG THE LOG LOG SILL 3. DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR. NTS COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\2017024300 RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 W F- 00 a 0 o N H O � J d -4 z O U) z 0 0 O aILL C) O Lu I 0 0 O } � Lu LL Q co g _O Y LO w J U) z Q O z O ILLJ L0 0 Q o Z U LU N O= OZz C7 p (n W J H z —� 0 Cr C) LU 0 W LU Z 0 LU LU o LU U) O p 0 0 o az ON Z o Q 0 w O aU � o 07 Lij w Q d = = o z F- N c� � O U z� cn w W W WLU J Z �zm O o0 a O Q Q0- PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D4 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants BANKFULL STREAM BANK NOTES: Transportation + Water Resources FLOW 16 FT MAX 720 Corporate Drive ODAFUEAGGFEGATE 1. LOGS3-WLLBEOFAMINIMUM OF 12' IN LENGTH AND 10" IN DIAM ETERAND LINE POST BARBED OR LINE WOVEN WIRE ELECTRIC POST TOEOFBANK, TYRCAL STRIEAM BANKS BACKFILL(2" TO 6") TWICAL \ \ �\ RB_ATIVELYSTRAIGHTHARDWOOD, RECENTLY HARVESTED. 2. ASINGLE LOG MAYBE USED INUEUOFA HEADB:?lFOOTEZLOGCOM BINATION,PER WIRE (f) 919.782.9672 /� HEADBR LOG DIREC110NOFDESIGNER NC. LICENSE NO. F-0374 f Emma fi fE Q o 0 CV co \j\\ CROSS VANE INVERT FOOTER LOG, IF 3. RLTERFABRCSHALLBEUca)TOSFALTHE GAPS BETWEEN THE LOG(S)AND THE STREAM BED, UNDER THE COARSE BACKFI LL MATERIAL THERE SHALL BE NO R LTER Z O 1 W \\/\ SPEO R ® 's4. / FABF� C VI S BLE INHTHE R N I SHED WORK EDGES SHALL BE FOLDED, TUC}tED, OR TRIMMED ASN®®. U) D BANKFULL COARSE BACKR LL SdALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE o O LL C) O HEADER (AND ANY FOOTER) LOGSAND SHALL EXTEND OUT FROM THEVANEARMS TO THE STF AM BANK AN D U PSTREAM O Lu L Q W p \ STREAM B® IN POOL . LINE PANEL 0OAF S<AGGREGATE BACI41 LL (2" TO 6") \\\ \ \\ \\\ \ RLTERFABRIC /� D 5. AS AN OFTION, FLAT -9 DBD BOULDBZS MAYBE PLACID AS BALLAST CNV TOP OF THE STREAM BANK SIDE OFTHEEVIBBDDBDVANEARMS DUCKBILLANCHORSMAYBE LLJ o O LO C7 0 Q z I- 0' TO, W USS I N LIEU OF BALLAST BOULDBRS a� >0 CD O (n w J 5 H Z J 0 Cr QX Da D /I KC 6. DUCKBILLANCHORSWITHGALVANIZ®CABLEATTACHEDMAYBEUS�TOS aJF;E I THE STREAMI BED AND/ IL BANKS FLAT 9 DED BOULDERS CAN BE USSBARBED OR 11� p F_ 0 � ° n,_ -C N LI OFTHE LOG INVBRT/ DUCKBTO ORSYSTHVI ELECTRIC WIRE LINE POST ? "ii n � Lu A - INVERTLOG (SFNOTE 6& 11) •D /�� //ji z — &j I 0')U Of C/) L ui 4" TO 6 WOVEN WIRE: ° D D SECTION A -A' ;°� � �' Da , RLTBRFABR IC �\ Q.C.: BC ASTM CLASS 3 GALVANIZED. T DRAWING NUMBER: TOP AND BOTTOM WIRES MIN. 12 GAUGE. PROD. NO.: \� WOVEN WIRE o z INTERMEDIATE AND STAY WIRES MIN+H I. '�°O D� % w� ° GROUND LINE Zv 12 1/2 GAUGE. �20e30 ~ i/ A� \� D MIN 5' CO o D II D INVERT LOG LL_ Z � �CJD I BANKFULL POOL VANEARVI LOG, TYPICAL BACKR LL(2TO 6") ----- � COAF�AGGREGATE -------- ----- - i OPTIONAL BALLAST BOULDER - ----- -- --- ----- '-� HEADBRLOG- FLOW WOVEN WIRE WITH ONE BARB DETAIL 3%TO 8% �— HEADER LOG STREAM B® LINE POSTS (WOODEN): MIN. 4 IN. DIAM. OR 4 IN. SQUARE. \/\\/\\ F`VV LINE POSTS (STEEL): STUDDED OR PUNCHED T, U, OR Y SHAPED, WITH ANCHOR PLATES.POOL MIN. WEIGHT 1.3 LBS./FT. (EXCLUDING ANCHOR PLATE). POSTS SHALL BE DRIVEN A MINIMUM OF 18" DEEP AND MUST BE AT LEAST 5.5 FT IN LENGTH RLTERFABR C FOOTER LOG SPECIES AND TREATMENT FOR ALL WOOD: USE UNTREATED DURABLE POSTS OF SPECIES SUCH AS RED CEDAR, FOOTER LOG BLACK LOCUST OR OSAGE-ORANGE WITH BARK REMOVED, OR NON -DURABLE WOOD THAT IS PRESERVATIVE PRESSURE TREATED (0.40 LBS./CUBIC FOOT CCA, OR EQUIVALENT NON -CCA TREATMENT). DO NOT USE RED PINE. DUCKBILL ANCHOR PLAN VIEW WOVEN WIRE FENCE (NRCS DETAIL 382A) PROFILE VIEW NTS LOG CROSS VANE NTS TCN' OF BANK TOE OF BANK RIP RAP APPROACH [TIMBER (5' MIN) MAT CROSSING TIMBER MAT APPROACH II M BER MAT I NSTALLED FLOW PARALLEL WING CROSS WING I OF OF OF CLASSBRIPRAP I I I CHANNEL CHANNEL CHANNEL I 1 I 1 I I WIDTH WIDTH WIDTH BANKFULL WING CROSS WING // �_!�— / OF CHANNE OF CHANNEL OF CHANNEL BOTTOM a / \/ WIDTH WIDTH WIDTH I ���\���\�� BOTTOM A OF BANK I ����� a a I I ��/�� 20* TO 30 DEGREE \����� OF BANK j�\�,\\��/ \ \ f (AS DIRECTED I /�\\�� �\\\ ���� "FROM" ELEVATION IN a STREAM BED _ — .---- ---, /�/��/� �• ELEVATION •'���� BY ENGINEER IN� ' ' ��� D ij'----'��j�THE FIELD) !/j �\ - -- ----- �\�j�\�j� UPSTREAM BED STRUCTURE TABLE ELEVATION TO" ELEVATION IN VANE BOULDER STRUCTURE TABLE Yea Yea � Z � Z � / •: � � � r .� �����/` ., _ \4 /. �� �� I ` --- - _ WATER = -------------- -_BANKFULL FLOW ° Yea Yea CARRIAGE BOLT \\ \\ \\ \\ �� �\ .1 \ \ \ \' \ �:: . • • , �� \ F TER BOULDERS \�\� ;;! -. '�;. I\�\� �\�\\\\��\\��\\� 5 \\�j\\�j\ / �j��� ��\\��\\ \ / ;, •. `\ . J .. I\\��\\�� ADER BOULDERS \ \ i :• \ �\ \ ___ELEVATI N --------- 2' MIN 10' \� - 11 ��VA VVA V\%VVA/�V\�V �VA�VA/ :. �. �VA�VA - _.;- o o� D I I TI M BER AT, TYPICALI FOOTER ROCKS CROSS SECTION ,.. 5' MIN. 5' MIN. CLASS 'A' STONE FOOTER BOULDER FILTER FABRIC TO EXTEND #5 STONE PLAN VIEW 1' BELOW BOTTOM FOOTER I BOULDER SECTION - A -A VIEW II M BER M AT I NSTALLED I PERPENDICULAR I I I NOTES: PLAN VIEW 1. TIMBER MATS SHALL BE USED FOR TEMPORARY CONSTRUCTION ACCESS TO TRAVERSE WET AND/OR MUDDY ARES ADJACENT TO THE STREAM AND TO CROSS THE STREAM AND OTHER CONCENTRATED FLOW AREAS. Tl M BER M AT I NSTALL® CARPoAGEBOLT, 2. PERPENDICULAR THE STREAM CROSSING SHALL BE INSTALLED WHEN FLOW IS NOTES: CLASSBRRIPRAP I FALLE AT TOP CN BANK INSSTALL® PPRALLD LOW. THERE SHALL BE MINIMAL TO NO DISTURBANCE OF THE CHANNEL BED AND BANKS AS A RESULT OF INSTALLING 1. HEADER AND FOOTER BOULDERS SHALL BE APPROXIMATELY 24" X 24" X 18" AS A MINIMUM SIZE. THE THE APPROACHES OR CROSSING. UPPER LIMIT FOR BOULDERS SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION OF THE 0 0 0 0 3. "IV,:�/\ THE LENGTH OF TIMBER MAT REQUIRED TO CROSS THE STREAM OR CONCENTRATED FLOW AREAS SHALL BE SUCH STRUCTURE. 2. CROSS VANES SHALL BE CONSTRUCTED SO THAT ADJOINING BOULDERS TAPER IN AN UPSTREAM DIRECTION, FROM THE BANKFULL ELEVATION TO THE STREAM INVERT. THE UPSTREAM END OF THE CROSS \\ \ � BANK EACH SID ETOF THE CROSSING A SUFFICIENT DISTTHAT MAT EXTENDS PAST THE TOPOANC TON VANE IS SET AT AN ANGLE OF 20 TO 30 DEGREES TANGENT TO THE PROJECTED STREAM BANK DIRECTION. BANKFULL VANE BOULDERS— //\/\� j\� j\� j\� j\ SUPPORT SUPPORT THE MAXIMUM EQUIPMENT SIZE USING THE THE TOP ELEVATION OF BOTH VANES WILL DECREASE TOWARD THE CENTER OF THE CHANNEL. FLOW / / /\\/\\/\\/\\/\\\\\ CROSSING. 3. THE DOWNSTREAM END OF THE CROSS VANE SHALL BE KEYED INTO THE STREAMBANK AT THE BANKFULL 5, ELEVATION. THE CROSS VANE SHALL BE KEYED A MINIMUM OF FIVE FEET INTO THE STREAMBANK. THE c _ ------------------------------------------ --- 4. RLTERFABPoC TOE OFBANIC STREAM CROSSINGS SHALL BE INSTALLED WITH THE TIMBER MAT LENGTHS ORIENTED PERPENDICULAR TO THE TOPS OF UPSTREAM END OF CROSS VANE SHALL BE KEYED INTO THE STREAMBANK AT THE DESIGNED STREAMBED STREAM BED INVERT ELEVATION. ELEVATION 3° TO 5° N TYPICAL APPROXI M ATE BAS= FLOW WATBRSURFACE THE STREAM BANKS. TIMBER MAT STREAM APPROACHES SHALL BE INSTALLED WITH THE TIMBER MAT LENGTHS ORIENTED PARALLEL TO THE TOPS OF THE STREAM BANKS. 4. VANE BOULDERS SHALL BE PLACED IN A LINEAR FASHION SO AS TO PRODUCE THE SLOPING CROSS VANE, AND SHALL BE PLACED WITH TIGHT, CONTINUOUS SURFACE CONTACT BETWEEN ADJOINING BOULDER. - --- - ---- T ---------- \\Tf\\, 5. STREAM CROSSING APPROACHES FROM DRY AREAS SHALL BOULDER SHALL BE PLACE SO AS TO HAVE NO SIGNIFICANT GAPS BETWEEN ADJOINING BOULDER. 5. VANE BOULDERS SHALL BE PLACED SO AS TO HAVE A FINAL SMOOTH SURFACE ALONG THE TOP PLANE OF BE CONSTRUCTED USING CLASS B RIP RAP PLACED OVER THE CROSS VANE. NO VANE BOULDER SHALL PROTRUDE HIGHER THAN THE OTHER BOULDER IN THE SECTION VIEW FILTER FABRIC. BOULDER VANE. A COMPLETED CROSS VANE HAS A SMOOTH, CONTINUOUS FINISH GRADE FROM THE BANKFULL ELEVATION TO THE STREAMBED. 6. ALL TIMBER MATS, FILTER FABRIC, AND RIP RAP SHALL BE 6. AS THE CROSS VANE IS CONSTRUCTED, THE CONTRACTOR SHALL CHINK ALL VOIDS BETWEEN THE FOOTER COMPLETELY REMOVED FROM THE SITE WHEN THE CROSSING IS REMOVED. BOULDERS, AND BETWEEN THE FOOTER BOULDERS AND VANE BOULDERS. VOIDS SHALL BE CHINKED WITH FOOTER BOULDERS SMALLER ROCK SUCH THAT NO VOIDS GREATER THAN FOUR INCHES IN SIZE WILL BE PRESENT. PROFILE VIEW - B -B VIEW TIMBER MAT TEMPORARY CROSSING ROCK CROSS VANE NTS NTS COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI H 00 Q o 0 CV co 0 Z O U U) Z O o O LL C) O U) Z O Lu L Q W p U) _O Y � LQj,J J I Q U) z _O Z J LLJ o O LO C7 0 Q z I- U O z z a� >0 CD O (n w J 5 H Z J 0 Cr CE CD 0 LU LU LULU Z Lu o Cr W O 11� p F_ 0 U U v Cl) 0 Z Ow Q Z O CE J O w o aa U "ii n � Lu = Q o tZ-3 z — &j I 0')U Of C/) L ui LU LLJ Z � Z m O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D5 PROD. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll S3ECT BAOKF1 LL MATERIAL (MIX OF ODAFEE community infrastructure consultants AGGREGATE AND #5 STONE) A Urban Development + Geomatics LOG BURIED Raleigh, NC 27607 IN STREAM (v) 919.782.0495 BANK VANELENGTH www.wkdickson.com NC. LICENSE NO. F-0374 BANKFULL OFFSET FROM 00 Q � TOP FB KSTREAM LOG BURIED ; � o o �o� BANKFULL CHANNEL 3' MAXIMUM BANK HEIGHT IN STREAM IANK I IIII - MAX DEPTH OF NEAREST BANK STRIEAVI BED o 0 0 RIFFLE MIN.5FT FOOTERLOG 0 - INT SURFACE c�_BAR HEADERFLOWINVERT \DIVERSION2%TOS I- BOULDERS o o ° IIII w i o m o 0 0 o o o ° cr o°C) o� °° ° -� o0 o"/ �- o BOULDERS � O°FOCITER/� ��/°°�°o°o go°° lulls \ o // e o 0 0 0 0 o 0 0 0_� ° °00 ° \�\ // \ /\/ /\ W i O o O o ° W�' AI II i iW 1111' 11 53EC7 BA04�LL MATERIAL \\\\\ \ \/�%/\�/\\/� \%/�\% (M IX OF ODAF�EAGGREGATE OUTSIDE, O -z K//,\� AND #5 STONE) M EAND�2 BEfVD o HEADER LOG I y B c H a l STONE APPROACH X / SECTION A -A' O SLOPIEO ONSROAD z I N Q ' o 50/50 MIX OF CLASS A W LL Q AND B RIPRAP OVER B Y L LLJ FILTER FABRIC NON -WOVEN GEOTEXTILE FABRIC SURFACE FLOW NOTES: (NCDOT TYPE II) SGOU O_ Q DIVERSION �- 1. LOGS SHALL HAVE MINIMUM DIMENSIONS AS FOLLOWS: / POOL LLJ _j oL0 MIN DIAM = 10" �� `/ MIN LENGTH = 25' 0 U) coo EXISTING STREAMBANK 2. ALL LOGS SHALL BE RELATIVELY STRAIGHT, HARDWOOD, AND LIMBS SHALL BE TRIMMED FLUSH. O= 00z 3. FOOTER LOGS/BOULDERS ARE LOGS/BOULDER PLACED TO PROVIDE A FOUNDATION AND SCOUR PROTECTION FOR THE HEADER Q LOGS/BOULDERS. SLLLOGOR H Z J 0 or 4. HEADER LOGS/BOULDERS SHALL BE UNDERLAIN BY FOOTER LOGS/BOULDERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. ROOTWAD A jo 0 0w 50/50 MIX OF 5. HEADER LOGS ARE THE TOP MOST LOGS USED IN EACH LOG STRUCTURE. ALL HEADER LOGS CAN BE SEEN PROTRUDING FROM THE W J CLASS A AND B WATER SURFACE DURING EXTREMELY LOW FLOWS. Q� 0 RIPRAP - - - 6. HEADER LOGS SHALL BE OFFSET SLIGHTLY DOWNSTREAM OF THE FOOTING LOGS WHERE SCOUR POOLS ARE ANTICIPATED TO FORM o Z 1.-0 CO AS SHOWN IN THE DETAIL. Q 0 p ,°„ ~ FILTER FABRIC 7. SILL LOGS SHALL BE PLACED PERPENDICULAR TO THE BANKFULL FLOW DIRECTION. c`o �_ = N Q 8. THE FOOTER LOGS SHALL EXTEND FROM THE SILL LOG TO THE END OF THE HEADER LOG TOWARD THE BANK. UVESTAI4NG z 0 N oM NOTES: 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW. 9. HOOK BOULDERS SHALL EXTEND FROM THE HEADER LOG TO BEYOND BANKFULL WIDTH. rn W 2. HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE 10. SET INVERTS AT ELEVATION SHOWN ON THE PLAN AND PROFILE SHEETS. O Qat WORK BEGINS. 11. HEADER LOG SHALL TIE INTO THE STREAM BANK AT A MAXIMUM ELEVATION OF a DMAX (MEASURED AT THE NEXT DOWNSTREAM Q.C.: BC 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT RIFFLE) BELOW BANKFULL ELEVATION AND A MINIMUM ELEVATION OF 2 DMAX (MEASURE AT THE NEXT DOWNSTREAM RIFFLE) BELOW PLANVIEW EXCAVATE CHANNEL BOTTOM. COMPLETE ONE SIDE BEFORE STARTING BANKFULL ELEVATION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. N THE OTHER SIDE. I 4. NSTALL STREAM CROSSING PERPENDICULAR TO FLOW. 12. CUTTING OF THE SILL LOG ROOTWAD BAY BE REQUIRED TO PREVENT THE ROOTWAD FROM PROTRUDING ABOVE THE BANKFULL D6 5. GRADE SLOPES TO A MAXIMUM 5:1. ELEVATION. PROJ. NO.: 6. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD 13. ALL GAPS/VOIDS LARGER THAN 1 INCH BETWEEN THE HEADER AND FOOTING LOGS SHALL BE CHINKED WITH LIMBS AND/OR BRUSH ON DOES NOT ENTER EXISTING CHANNEL. THE UPSTREAM SIDE PRIOR TO PLACEMENT OF THE GEOTEXTILE. 7. A STABILIZED PAD OF NATURAL CLASS A STONE, 18 INCHES THICK, 14. ALL GAPS/VOIDS LARGER THAN 1 INCH BETWEEN THE HEADER AND FOOTING BOULDERS SHALL BE CHINKED WITH GRAVEL AND LINED WITH FILTER FABRIC SHALL BE USED OVER THE BERM AND COBBLES. LIVE STAKES (TYP.) ACCESS SLOPES. 8. FILTER FABRIC USED SHALL BE NCDOT TYPE 2 ENGINEERING FABRIC 15. ON THE UPSTREAM SIDE OF THE LOGS AND/OR BOULDERS, NON WOVEN GEOTEXTILE FABRIC SHALL BE PLACED AS SHOWN IN BANKFULL OR EQUIVALENT. PLANVIEW AND IN SECTION B -B'. PLACE SELECT BACKFILL FOR THE ENTIRE LENGTH OF THE LOG AND BOULDER HOOK. 9. WIDTH OF THE CROSSING SHALL BE SUFFICIENT (8' MIN.) TO 16. BACKFILL STRUCTURE WITH SELECT BACKFILL MATERIAL AS SHOWN SHOWN IN PLANVIEW AND IN SECTION B -B'. ACCOMMODATE THE LARGEST VEHICLE CROSSING THE CHANNEL. 17. SELECT BACKFILL AND SOIL BACKFILL MATERIAL SHALL BE COMPACTED SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT 10. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE TO A MINIMUM. 901LBAO¢1LL - ACCORDING TO EQUIPMENT UTILIZED. 18. NAIL NON -WOVEN GEOTEXTILE USING 3" 10D GALVANIZED COMMON NAIL TO EDGE OF HEADER LOG AND BACKFILL AS SHOWN IN THE HEADER LOG LOG 11. TEMPORARY CROSSINGS ARE TO BE ABANDONED IN PLACE. -q= GEOTEXTILE PLACEMENT AND SELECT BACKFILL DETAIL. BA0KFILLMATERAL lJ�/ \ \ FORD CROSSING NON -WOVEN GEOTEXTILE FABRICNTS (NCDOT TYPE II) FOOTHZLOG SMB® SECTION B -B' LOG J -HOOK NTS SMALL POOL, TYP LARGE COBBLE/ SMALL BOULDE:S TYP FLOW TOP OF BANK NOTES: 4.0' CHANNEL 4.0' 1 BEGIN RIFFLE TYP BOTTOM WIDTH TYP 1. CONSTRUCTED RIFFLES SHALL BE INSTALLED IN NEWLY GRADED CHANNEL SECTIONS, AS SPECIFIED BY 4.0' CHANNEL 4.0' / Z/ /, /." j TYPBOTTOM WIDTH THE DESIGNER. TYP \ 2. ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE BEGINNING AND END OF RIFFLE POINTS RIFFLEMATEPoAL TOP OF BAN K / �� TO ESTABLISH PART OF THE PROFILE OF THE CHANNEL. SURVEY OF CONTROL POINTS SHALL BE I \ \'_ 0.5' MIN cX z--- PROPOSED TOE OF BANK REQUIRED TO ESTABLISH ACCURATE RIFFLE INSTALLATION WITHIN A TOLERANCE OF ±0.2'. " GLI�E � 1.0'MIN 4' MIN � O�O O O � �O\ \ 3. GRADE CONTROL ROCK SHALL BE COMPRISED OFA 50/50 MIX OF CLASS A AND B RIPRAP. GRADE o o CONTROL ROCK SHALL BE PLACED SUCH THAT THE ADDITION OF THE SPECIFIED THICKNESS OF RIFFLE MATERIAL SHALL ACHIEVE THE DESIGNATED GRADES. /\\ RIFFLE M AT�AL, EQUAL M I X \N \�/�\/ \� \� \� \�� OF#5/#57 STONE SJRGE 4. STONEAND NATIVE RIFFLE MATERIAL SHALL BE COMPRISED OF ROCKS AND WOOD. THE ROCK MATERIAL SHALL CONSIST OF AN EQUAL MIX OF #5 / #57 STONE, SURGE STONE AND NATIVE SUBSTRATE MATERIAL. RIFFLE GJBS'1RATEMATHRIAL SMALL FOOL' t LOGS WOODY DEBRI MATERIAL SHALL BE EXCAVATED, STOCKPILED, AND RE -USED FROM ABANDONED CHANNEL RIF E o o c VARIES GRADE CONTROL F< 50/50 MIX OFCASSAAND B SECTIONS. OTHERWISE ROCK RIFFLE MATERIAL SHALL BE SLIGHTLY "RIVER CROSS SECTION A ROUNDED, -TYPE" ROCK, UNLESS OTHER ROCK CHARACTERISTICS ARE APPROPRIATE FOR THE _ o o -A' RIPRAP OCIBBLE CHANNEL. IN ADDITION, LOGS AND WOODY DEBRIS SHALL BE INCLUDED WITH THE ROCK MATERIAL AS 3VlALL BOU �o �'� o - SPECIFIED BY THE DESIGNER. oU RI FFLE M ATERIAL 5. THE PLACEMENT OF GRADE CONTROL ROCK AND/OR RIFFLE MATERIAL SHALL BE DONE IN A MANNER LOGS' WOODY Y Po FFLE MATERIAL EQUAL M IX OF (TRANSITION) TO CREATE A SMOOTH PROFILE, WITH NO ABRUPT "JUMP" TRANSITION BETWEEN THE UPSTREAM DEBRIS #5/#57 STONF, SJRGESTONEAND POOL -GLIDE AND THE RIFFLE, AND LIKEWISE NO ABRUPT "DROP" (TRANSITION) BETWEEN THE RIFFLE 4' MIN NATIVESJBS'TPATEMATE IAL AND THE DOWNSTREAM RUN -POOL. THE FINISHED CROSS SECTION OF THE RIFFLE MATERIAL SHALL ��L GENERALLY MATCH THE SHAPE AND DIMENSIONS SHOWN ON THE RIFFLE TYPICAL SECTION WITH SOME �­Z 'w 4' 4' TOP OF BANK-----IMIN VARIES VARIABILITY OF THE THALWEG LOCATION AS A RESULT OF THE SMALL POOLS AND LOGS. MIN BEGIN WFFLE PROPCISED TOP 6. OF BANK THE END OF RIFFLE CONTROL POINT MAY TIE IN TO ANOTHER IN -STREAM STRUCTURE (LOG SILL OR RI F BVD FLE CONTROL POI NT J -H 00 K). TOE OF BANK 7. FLOW BVD FFLEOONTROLPOINT THE CONSTRUCTED RIFFLE SHALL BE KEYED IN TO THE STREAM BANKS AND/OR BED AS DESIGNATED PLAN VIEW FLOW BY THE DESIGNER. THE "KEY" SHALL EXTEND BEYOND THE TOP OF BANK AT THE BEGINNING (CREST) OF THE RIFFLE. WHERE PRESERVATION OF EXISTING STREAM BANK VEGETATION IS A PRIORITY A "KEY" THALWEG-.\,\ MAY NOT BE USED (OR THE DIMENSIONS MAY BE ADJUSTED) TO LIMIT DISTURBANCE. o" _ THALWEG LOGS/WOODY GRADE CONTROL ROCK RIFFLE GRADE CONTROL DEBRIS 50/ 50 I X OF CLASSA AN D B NTS PROFILE COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI F- 00 Q � o N Or z O I- W z O O O H a 11 � O U) I w z I N Q ' o ' W LL Q O Q Y L LLJ J ell U) z O_ Q Z LLJ _j oL0 0 U) coo Q Z U � N O= 00z Q U' 0 (n w Q H Z J 0 or jo 0 0w r LLI (n W J LuD m cn 0 Q� 0 0 U U Q z o Z 1.-0 CO o Q 0 p ,°„ ~ o a_ 0 � O z w � w c`o �_ = N Q N r` z 0 N oM 0') U Z_ &j rn W LLI>U LLI Z � Z J DO M d O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D6 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources CENTERLINE OF Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 STREAMBED (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 - _ TOP OF BANK VARIES 00 CONSTRUCTION NOTES: Q � o N BANKFULL ELEVATIOq - - - � - - - - - O� - - - - - - - -- - - - z 1. CONSTRUCTION OBSERVATION OF MODIFIED A -VANE SHOULD INCLUDE ENGINEER OR DESIGNER WITH STREAM O - - 2% (INCLINE SLOPE OF VANE ARM) RESTORATION EXPERIENCE. FLOWS 0.5% TO _ - __ --------------------- - - \\ 2. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF DROP STRUCTURE O \ \ 0 ARM, BETWEEN THE ARM AND STREAM BANK H a LL � O 3. INSTALL GEOTEXTILE FABRIC THE FULL LENGTH OF THE STRUCTURE STARTING AT THE UPSTREAM END, AND THEN z I 0- HEADER ROCK } � -----�� �`� \`\ LL Q DOWNSTREAM PAST THE LAST DROP STRUCTURE POOL TO A MINIMUM OF THREE FEET U) (TYP) _O LO W J ell U) z Q O 4. PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. FOOTER ROCKS SHALL BE FIRMLY KEYED INTO THE FOOTER ROCK H 0 ~ �O STREAMBED. TOP OF HEADER CROSS ROCK(S) SHALL BE PLACED 0.2' ABOVE PROPOSED STREAM BED ELEVATION N (TYP) z oz Q LD WITH THE WEIR HEADER ROCK PLACED AT PROPOSED STREAMBED ELEVATION U' 0 (n w Q H Z J CONSTRUCTED POOL JUST DOWNSTREAM 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS r LLI W (n SECTION C -C OF A -VANE ARM °C v o 0� 0 0 U U Q z o Z 6. ROCKS SHALL BE PLACED IN A LINEAR FASHION, AND SHALL BE PLACED WITH TIGHT, CONTINUOUS SURFACE Q 0 F_ Z O IM o 0 z iu U � W 'L'))LLI o0 Q �_ CONTACT BETWEEN ADJOINING ROCKS. ROCK SHALL BE PLACED SO AS TO HAVE NO SIGNIFICANT GAP (NO MORE N Z 0 N oM 0') BANKFULL ELEVATION &jrn U) Iii THAN 2 INCHES) BETWEEN ADJOINING ROCKS. A COMPLETED ROCK VANE ARM HAS A SMOOTH, CONTINUOUS FINISH FOR PROPOSED HB -2 A -VANES: A FOR PROPOSED UT -2 A -VANES: DO M O Qat PROJ. DATE: APR 2018 GRADE RUNNING IN AN UPSTREAM DIRECTION FROM THE BANKFULL ELEVATION TO THE STREAMBED DIMENSION A = 10.9' C B C DIMENSION A = 9.0' Q.C. DATE: 3/18 N HEADER 7. KEY SILL ROCKS INTO THE BANK A MINIMUM OF 5' DIMENSION B = 3.0' DIMENSION B = 2.0' o ROCK PROJ. NO.: DIMENSION C = 3.95' DIMENSION C = 3.5' HEADER ROCK 8. USE COBBLE SUBSTRATE MATERIAL EXCAVATED FROM CHANNEL BED TO FILL GAPS BETWEEN AND ON THE (VANE ARM) WEIR HEADER ELEVATION UPSTREAM SIDE OF ROCKS AND TO LINE POOL BEDS. IF ADEQUATE SUBSTRATE MATERIAL IS NOT AVAILABLE, USE A ' 50/50 MIXTURE OF CLASS A AND CLASS B STONE. SEALING WEIR ROCK(S) IS CRITICAL TO SUCCESS OF STRUCTURE. G - (BANKFULL AS SPECIFIED ON PROFILE �' ELEVATION) AND TABLE THIS SHEET. 9. AFTER ALL HEADER AND FOOTER ROCKS HAVE BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH FOOTER ROCK MIX OF CLASS A, B RIP -RAP, NO. 57 STONE, AND SUBSTRATE MATERIAL TO THE ELEVATION OF THE TOP OF THE (VANE ARM) HEADER ROCK. COMPACT IN 6 INCH LIFTS. BENTONITE CLAY MAY BE USED AT FACE OF HEADER BOULDERS IF N WEIR HEADER ELEVATION VOIDS EXIST WITH HEADER BOULDERS AND THE CLASS A AND B RIP -RAP C5 AS SPECIFIED ON PROFILE AND TABLE THIS SHEET. 10. AFTER INSTALLATION OF ALL ROCK IS COMPLETE, CONTRACTOR SHALL RESHAPE THE BANK SLOPES AND STREAM FOOTER ROCK SEE MATERIAL NOTES BED TO THE SPECIFIED ELEVATIONS. ALL UNSUITABLE AND SURPLUS ROCK WILL BE REMOVED FROM THE SITE SEE MATERIAL NOTES FOR ROCK SIZES 11. UPON COMPLETION OF THE ROCK A -VANE, THE CONTRACTOR SHALL PLACE STABILIZING VEGETATION AS SHOWN IN HEADER ROCK FOR ROCK SIZES FIVE BOULDERS MAY NOT BE NECESSARY TO SPAN CHANNEL THE PLANTING PLAN (TYP) DEPENDING ON SIZE OF BOULDERS SELECTED. FLANKING NON WOVEN BOULDERS TO CENTER BOULDER SHOULD HAVE A TOP GEOTEXTILE FABRIC FOOTER ROCK NON WOVEN TYPE II ELEVATION 0.3 FEET HIGHER THAN CENTER BOULDER. (NCDOT TYPE II) MATERIALS NOTES (SEE ABOVE ROCK DIMENSIONS DETAIL (TYP) SECTION A -A GEOTEXTILE FABRIC (TYP.) SECTION D -D 1. ROCKS MUST HAVE AN INTERMEDIATE DIMENSION (Z) OF AT LEAST 18" FOR HEADERS AND 20-26" FOR FOOTERS. SILL ROCKS SHALL HAVE AN INTERMEDIATE DIAMETER OF AT LEAST 18". ALL ROCKS SHALL BE APPROVED BY ENGINEER PRIOR TO INSTALLATION 2. LENGTH OF HEADER AND FOOTER ROCKS (LONGEST DIMENSION), (X) MUST BE AT LEAST 24". DEPTH OF HEADER AND FOOTER ROCKS (SHORTEST DIMENSION), (Y) MUST BE AT LEAST 18". WIDTH AND DEPTH OF SILL ROCKS MUST BE AT LEAST 12" 3. ROCKS SHALL BE COMPRISED OF ANGULAR, FLAT OR CUBED ROCK OBTAINED FROM A SOURCE THAT IS APPROVED FLOW BY THE ENGINEER PRIOR TO CONSTRUCTION DIRECTION FOR PROPOSED HB -2 A -VANES: FOR PROPOSED UT -2 A -VANES: 4. ROCK SHALL BE OF SUFFICIENT HARDNESS TO RESIST WEATHERING AND SHALL BE FREE OF CRACKS AND OTHER DIMENSION A = 10.9' DIMENSION A = 9.0' STRUCTURAL FAULTS. IN NO INSTANCE SHALL CONCRETE BE ALLOWED A DIMENSION B = 3.0' DIMENSION B = 2.0' 5. GEOTEXTILE FABRIC SHALL MEET SPECIFICATIONS FOR TYPE 2 NCDOT GEOTEXTILE FABRIC ACCORDING TO NCDOT C B C DIMENSION C = 3.95' DIMENSION C = 3.5' STANDARD SPECIFICATION 1056 WEIR HEADER ELEVATION AS SPECIFIED ON PROFILE AND B NON WOVEN TABLE 1. (TYP) C GEOTEXTILE FABRIC FILL POOL BED WITH 18" OF EVEN MIXTURE OF SC I (NCDOT TYPE ll) CLASS A AND CLASS B RIP -RAP, NO. 57 / NO. 5 I A A I STONE, AND NATIVE MATERIAL ON TOP OF TYPE II I I HEADER ROCK GEOTEXTILE FABRIC. COMPACT IN 6 INCH LIFTS. (TYP) BENTONITE CLAY MAY BE USED IF VOIDS EXIST WITH I I SECTION B -B INSET CLASS A RIP -RAP AND HEADER BOULDERS CENTERLINE OF (SEE ABOVE) STREAMBED I FOR PROPOSED: I I I I TOP OF BANK HB -2 = 5.5' NON WOVEN GEOTEXTILEI I o I I I o ELEVATION) UT -2 = 5.0' FABRIC (NCDOT TYPE II) o -(BANKFULL D I I ------ __ 0 0 0 0 0 _ HEADER ROCK I I I (VANE ARM) (TYP) I I 1777 NON WOVEN GEOTEXTILE FOOTER ROCK �` %/���!��`� FABRIC (NCDOT TYPE II) I o (TYP) 24" OF EVEN MIXTURE OF CLASS A, B D o SILL ROCK 0 D UNDISTURBED SOIL AND CLASS CRIP-RAP, N0. 57 STONE, ROW OF CLASS B o o(TYP) AND NATIVE MATERIAL ON TOP OF RIPRAP NCDOT TYPE II GEOTEXTILE FABRIC I I I c 5.0' FOOTER ROCK Z (TYP) I I I w ���TOP Y O;of _j o OF BANK (G) (BANKFULL ELEVATION) (TYP) FILL DOWNSTREAM POOL BED AND 3 PRIMARY ROCK DIMENSIONS: ADJACENT AREAS WITH 24" OF EVEN X. LONGEST DIMENSION THIS SYMBOL DENOTES CRITICAL BOTTOM OF BANK o MIXTURE OF CLASS A, B AND CLASS (STREAMBED ELEVATION) C RIP -RAP, NO. 57 / NO. 5 STONE, Y. SHORTEST DIMENSION ELEVATION ON STRUCTURE. AND NATIVE MATERIAL ON TOP OF Z. INTERMEDIATE DIMENSION IC CHECK DIMENSION AND CRITICAL TYPE II GEOTEXTILE FABRIC. COMPACT ELEVATION TABLE 1 BELOW IN 6 INCH LIFTS. PROFILE FOR EXACT ELEVATION CONSTRUCTED POOL CALLOUT DESIGNATIONS: ROW OF CLASS B RIPRAP, A. BANKFULL WIDTH SET 2" ABOVE GRADE B. STREAMBED WIDTH C. DISTANCE FROM BOTTOM OF BANK TO TOP OF BANK ROCK A -VANE DETAIL NTS COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI 00 Q � o N � M O� z O z O 0 O H a LL � O U) I W z I 0- 0 O } � Lu LL Q I U) Y _O LO W J ell U) z Q O Z H 0 ~ �O v! i Z U N 0 z oz Q LD U' 0 (n w Q H Z J v CC jo O r LLI W (n W J LLl °C v o 0� 0 0 U U Q z o Z O C Q Q 0 F_ Z O IM o 0 z iu U � W 'L'))LLI o0 Q �_ = N N Z 0 N oM 0') U� Z_ &jrn U) Iii LLI> LLI Z � Z J d DO M O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D7 PROJ. NO.: 20170243.00. RA COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources CENTERLINE OF Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 STREAMBED (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com - _ TOP OF BANK VARIES NC. LICENSE NO. F-0374 CONSTRUCTION NOTES: LLI BANKFULL ELEVATIOq - - - - - - - - Q � o N � M - - - - - - - -- - - - 1. CONSTRUCTION OBSERVATION OF MODIFIED A -VANE SHOULD INCLUDE ENGINEER OR DESIGNER WITH STREAM - - 2% (INCLINE SLOPE OF VANE ARM) RESTORATION EXPERIENCE. FLOWS 0.5% TO _ - __ --------------------- - - \\ 2. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF DROP STRUCTURE \ \ ARM, BETWEEN THE ARM AND STREAM BANK O 3. INSTALL GEOTEXTILE FABRIC THE FULL LENGTH OF THE STRUCTURE STARTING AT THE UPSTREAM END, AND THEN O HEADER ROCK -----�� �`� \`\ LL � DOWNSTREAM PAST THE LAST DROP STRUCTURE POOL TO A MINIMUM OF THREE FEET O U) I W (TYP) z i p O ' Lu LL Q I LU U) 4. PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. FOOTER ROCKS SHALL BE FIRMLY KEYED INTO THE _O W J FOOTER ROCK STREAMBED. TOP OF HEADER CROSS ROCK(S) SHALL BE PLACED 0.2' ABOVE PROPOSED STREAM BED ELEVATION Q (TYP) Z WITH THE WEIR HEADER ROCK PLACED AT PROPOSED STREAMBED ELEVATION CONSTRUCTED POOL JUST DOWNSTREAM F- �O 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS LU N O= SECTION C -C OF A -VANE ARM Q (D UI O (n w Q H Z J 6. ROCKS SHALL BE PLACED IN A LINEAR FASHION, AND SHALL BE PLACED WITH TIGHT, CONTINUOUS SURFACE jo 0 r LLI W W (n W J CONTACT BETWEEN ADJOINING ROCKS. ROCK SHALL BE PLACED SO AS TO HAVE NO SIGNIFICANT GAP (NO MORE °C cn 0 Q� O BANKFULL ELEVATION 0 0 THAN 2 INCHES) BETWEEN ADJOINING ROCKS. A COMPLETED ROCK VANE ARM HAS A SMOOTH, CONTINUOUS FINISH A FOR PROPOSED HB -2 A -VANES: FOR PROPOSED UT -2 A -VANES: 0 CO Q Q 0 ~ Z O IM GRADE RUNNING IN AN UPSTREAM DIRECTION FROM THE BANKFULL ELEVATION TO THE STREAMBED DIMENSION A = 10.9' C B C DIMENSION A = 9.0' 'L'))LLI CP N HEADER = N 7. KEY SILL ROCKS INTO THE BANK A MINIMUM OF 5' DIMENSION B = 3.0' DIMENSION B = 2.0' U � Z_ o ROCK Iii W > W Z 0� Z m DIMENSION C = 3.95' DIMENSION C = 3.5' HEADER ROCK O Qat PROJ. DATE: APR 2018 8. USE COBBLE SUBSTRATE MATERIAL EXCAVATED FROM CHANNEL BED TO FILL GAPS BETWEEN AND ON THE (VANE ARM) WEIR HEADER ELEVATION UPSTREAM SIDE OF ROCKS AND TO LINE POOL BEDS. IF ADEQUATE SUBSTRATE MATERIAL IS NOT AVAILABLE, USE A ' D8 50/50 MIXTURE OF CLASS A AND CLASS B STONE. SEALING WEIR ROCK(S) IS CRITICAL TO SUCCESS OF STRUCTURE. G - (BANKFULL AS SPECIFIED ON PROFILE 20170243.00. RA �' ELEVATION) AND TABLE THIS SHEET. 9. AFTER ALL HEADER AND FOOTER ROCKS HAVE BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH FOOTER ROCK MIX OF CLASS A, B RIP -RAP, NO. 57 STONE, AND SUBSTRATE MATERIAL TO THE ELEVATION OF THE TOP OF THE (VANE ARM) HEADER ROCK. COMPACT IN 6 INCH LIFTS. BENTONITE CLAY MAY BE USED AT FACE OF HEADER BOULDERS IF N WEIR HEADER ELEVATION VOIDS EXIST WITH HEADER BOULDERS AND THE CLASS A AND B RIP -RAP C5 AS SPECIFIED ON PROFILE AND TABLE THIS SHEET. 10. AFTER INSTALLATION OF ALL ROCK IS COMPLETE, CONTRACTOR SHALL RESHAPE THE BANK SLOPES AND STREAM FOOTER ROCK SEE MATERIAL NOTES BED TO THE SPECIFIED ELEVATIONS. ALL UNSUITABLE AND SURPLUS ROCK WILL BE REMOVED FROM THE SITE SEE MATERIAL NOTES FOR ROCK SIZES 11. UPON COMPLETION OF THE ROCK A -VANE, THE CONTRACTOR SHALL PLACE STABILIZING VEGETATION AS SHOWN IN HEADER ROCK FOR ROCK SIZES FIVE BOULDERS MAY NOT BE NECESSARY TO SPAN CHANNEL THE PLANTING PLAN (TYP) DEPENDING ON SIZE OF BOULDERS SELECTED. FLANKING NON WOVEN BOULDERS TO CENTER BOULDER SHOULD HAVE A TOP GEOTEXTILE FABRIC FOOTER ROCK NON WOVEN TYPE II ELEVATION 0.3 FEET HIGHER THAN CENTER BOULDER. (NCDOT TYPE II) MATERIALS NOTES (SEE ABOVE ROCK DIMENSIONS DETAIL (TYP) SECTION A -A GEOTEXTILE FABRIC (TYP.) SECTION D -D 1. ROCKS MUST HAVE AN INTERMEDIATE DIMENSION (Z) OF AT LEAST 18" FOR HEADERS AND 20-26" FOR FOOTERS. SILL ROCKS SHALL HAVE AN INTERMEDIATE DIAMETER OF AT LEAST 18". ALL ROCKS SHALL BE APPROVED BY ENGINEER PRIOR TO INSTALLATION 2. LENGTH OF HEADER AND FOOTER ROCKS (LONGEST DIMENSION), (X) MUST BE AT LEAST 24". DEPTH OF HEADER AND FOOTER ROCKS (SHORTEST DIMENSION), (Y) MUST BE AT LEAST 18". WIDTH AND DEPTH OF SILL ROCKS MUST BE AT LEAST 12" 3. ROCKS SHALL BE COMPRISED OF ANGULAR, FLAT OR CUBED ROCK OBTAINED FROM A SOURCE THAT IS APPROVED FLOW BY THE ENGINEER PRIOR TO CONSTRUCTION DIRECTION FOR PROPOSED HB -2 A -VANES: FOR PROPOSED UT -2 A -VANES: 4. ROCK SHALL BE OF SUFFICIENT HARDNESS TO RESIST WEATHERING AND SHALL BE FREE OF CRACKS AND OTHER DIMENSION A = 10.9' DIMENSION A = 9.0' STRUCTURAL FAULTS. IN NO INSTANCE SHALL CONCRETE BE ALLOWED A DIMENSION B = 3.0' DIMENSION B = 2.0' 5. GEOTEXTILE FABRIC SHALL MEET SPECIFICATIONS FOR TYPE 2 NCDOT GEOTEXTILE FABRIC ACCORDING TO NCDOT C B C DIMENSION C = 3.95' DIMENSION C = 3.5' STANDARD SPECIFICATION 1056 WEIR HEADER ELEVATION AS SPECIFIED ON PROFILE AND B NON WOVEN TABLE 1. (TYP) C GEOTEXTILE FABRIC FILL POOL BED WITH 18" OF EVEN MIXTURE OF SC I (NCDOT TYPE ll) CLASS A AND CLASS B RIP -RAP, NO. 57 / NO. 5 I A A I STONE, AND NATIVE MATERIAL ON TOP OF TYPE II I I HEADER ROCK GEOTEXTILE FABRIC. COMPACT IN 6 INCH LIFTS. (TYP) BENTONITE CLAY MAY BE USED IF VOIDS EXIST WITH I I CLASS A RIP -RAP AND HEADER BOULDERS CENTERLINE OF I I STREAMBED FOR PROPOSED: I I I I HB -2 = 5.5' I o I TOP OF BANK UT -2 = 5.0' NON WOVEN GEOTEXTILE I I I o (BANKFULL ELEVATION) FABRIC (NCDOT TYPE II) o - p I I --------- FLOW --- ----------------- I I HEADER ROCK I (VANE ARM) (TYP) NON WOVEN GEOTEXTILE I o 0 0 I FOOTER ROCK FABRIC (NCDOT TYPE II) I 0 0 0 o (TYP) 0 0 o 0 0 SECTION B -B INSET ASS B -j ROW OF CRIPRAP SILL ROCK o 3, o 0 (SEE ABOVE) (TYP) W UNDISTURBED SOIL 24" OF EVEN MIXTURE OF CLASS A, B o 0 0 0 0 0 0 0 0 0 0 0 0 0 AND CLASS C RIP -RAP, NO. 57 STONE, AND NATIVE MATERIAL ON TOP OF NCDOT TYPE II GEOTEXTILE FABRIC 5.0' FOOTER ROCK o o (TYP) I I� Z Y � I I TOP OF BANK (G) _ (BANKFULL ELEVATION) (TYP) CONSTRUCTED POOL FILL DOWNSTREAM POOL BED AND ADJACENT AREAS WITH 24" OF EVEN B MIXTURE OF CLASS A, B AND CLASS 3 PRIMARY ROCK DIMENSIONS: C RIP -RAP, NO. 57 / NO. 5 STONE, X. T DIMENSION THIS SYMBOL DENOTES CRITICAL BOTTOM OF BANK AND NATIVE MATERIAL ON TOP OF TYPE II GEOTEXTILE FABRIC. COMPACT ELEVATION ON STRUCTURE. (STREAMBED ELEVATION) Y. SHORTEST SHORTEST DIMENSION IN 6 INCH LIFTS. Z. INTERMEDIATE DIMENSION CHECK DIMENSION AND CRITICAL ELEVATION TABLE 1 BELOW OR ROW OF CLASS B RIPRAP, PROFILE FOR EXACT ELEVATION SET 2" ABOVE GRADE CALLOUT DESIGNATIONS: A. BANKFULL WIDTH B. STREAMBED WIDTH C. DISTANCE FROM BOTTOM OF BANK TO TOP OF BANK ROCK A -VANE DETAIL NTS COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Solutions\2017024300RA - T013 Poplar Creek Mitigation Site\CADD\Plan Set\2017024300RA SHT DETAILS.dwg - April 13, 2018 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI 00 Q � o N � M O� z O z O 0 O H a LL � O U) I W z i p O ' Lu LL Q I LU U) Y _O W J U) z Q O Z O U) F- �O i Z U LU N O= 00z Q (D UI O (n w Q H Z J 0 or jo 0 r LLI W W (n W J Lu °C cn 0 Q� O 0z 0 0 o Z 0 CO Q Q 0 ~ Z O IM o 0- O z w U � w 'L'))LLI CP Q �_ = N N Z O N �_ U � Z_ of 0 Iii W > W Z 0� Z m d 0 O Qat PROJ. DATE: APR 2018 Q.C.: BC Q.C. DATE: 3/18 DRAWING NUMBER: D8 PROJ. NO.: 20170243.00. RA Appendix B —Data, Analysis, and Supplementary Information a Cw §fix. � m �•'r:�k�a ' ..r ✓' 8 '. Ak A`� a ir+i+ of P 8 '. Ak NOTES: ExistingConditions Vegetation Survey Date: Latitude: 5Wcvcl 11o,(�d Basal=36.50mi Site:.'��� Plot: Longitude: Stems/acre=32 fcyo, Sam us sp. um vara me tie uosa *List unidentified species starting with UNK-1; Take pics and/or pressings for later ID / /—N,/, Multiflora p Multiflora Rose <1% V TREE - DBH >10cm = Meas (>5in) 5.CT '2/ha 3.76 Est. % Cover .ire Size Record 5% to 100% in increments of 5; c5% for anything below Personnel: ���<� " �`1 Azimuth: For SEEDLINGS -Height Classes SAPLINGS - DBH �6 Species S H 0-9cm 10-50cm 51 101-137cm 0-1cm 1-2.5cm 2.5-5cm 5-12.7cm (19.8 (19.8- (0-3.5in) i3.6 19.7inj 39 din (39.5-54in) (0-0.4in) (0.5 -lin) (1-2in) (2-5in) r"f l ° o e m fcyo, Sam us sp. um vara me tie uosa *List unidentified species starting with UNK-1; Take pics and/or pressings for later ID / /—N,/, Multiflora p Multiflora Rose <1% V TREE - DBH >10cm = Meas (>5in) 5.CT '2/ha 3.76 Est. % Cover .ire Size Record 5% to 100% in increments of 5; c5% for anything below �6 TC a nn to Camp X1041 , r� �i Carpi Gi% `r,1LQ Magno. fcyo, Sam us sp. um vara me tie uosa *List unidentified species starting with UNK-1; Take pics and/or pressings for later ID / /—N,/, Multiflora p Multiflora Rose <1% V TREE - DBH >10cm = Meas (>5in) 5.CT '2/ha 3.76 Est. % Cover .ire Size Record 5% to 100% in increments of 5; c5% for anything below r� �i Gi% V C)O A caoYk1 z V/ Oxalis violacea 1'0Ae5t/Ve`L y: �`!; Botrypus virginianus Ophioglossum pycnostichum Southern adder's-tongue Existing Conditions Vegetation Survey date: Latitude: ]NOTES:y Longitude: �""` ' —�, op -x, Basal=37.82m^2/ha -pop Site: Plat: I � � i y�v�; _ Stems/acre=121.4 Personnel: -11 Azimuth:�, 0 ! 1 0 — •• For SEEDLINGS - Height Classes SAPLINGS - DBH TREE - DBH Est. % Cover Species T S H 0-9cm 10-50cm 51 108- (19.8- 101-137cm 0-1cm 1-2.5cm 2.5-5cm 5-12.7cm >10cm Measure Size Record 5% to lOOq in cm (0-3.5in) (3-6-19.7in) 39.4in (39.5-54in) increments of 5; for (0-0.4in) (0.5-lin) (1 -tin) (2 -sin} � ( sin) anything below n. nr �� Vaccini m co ry osum ro i, r'o C-1 1 V V1 Il I J Y ►�`�. ,�1 Onoclet sensibil s t7J' S Y'1 / j1.,�bas J AT -r\&- SHofof f e. Botryp us virgin anus % !1, G4D i Phytol acca amE ricana z Rubus trivialis Stellari media 0 �c%` *List unidentified species starting with UNK-1; Take pics and/or pressings for later ID L G I f Cardamine flexuosa I- i "'. Poa annua UT to Buffalo Creek (Ref.) YBl-C Watery Fork (Ref.) YB2-B YB3 1 Watershed characteristics 8 10 2 10 8 2 Flow habit 4 11 2 7 5 3 Channel pattern 3 6 2 6 4 4 Entrenchment/channel confinement 3 9 3 12 3 5 Bed material 5 8 4 5 7 6 Bar development 5 5 2 7 10 7 Obstructions/debris jams 3 4 2 8 4 8 Bank soil texture and coherence 4 9 4 8 10 9 Average bankangle 4 10 4 12 9 10 Bank vegetation/protection 3 6 5 8 3 11 Bank cutting 4 7 4 10 4 12 Mass wasting/bank failure 2 7 4 12 1 13 Upstream distance to bridge NA NA NA NA NA Score 48 92 38 105 68 Rating Good Fair Good Poor Fair Stream: Reach: Date: Weather: Location: Stability Indicator Excellent (1 -3 ) Good (4 - 6) Observers: Project: Drainage Area: Stream Type: Fair (7 - 9) Poor (10 -12) Score 1. Watershed and flood plain activity Stable, forested, undisturbed Occasional minor disturbances in the Frequent disturbances in the Continual disturbances in the watershed. and characteristics watershed watershed, including cattle activity watershed, including cattle activity, Significant cattle activity, landslides, (grazing and/or access to stream), landslides, channel sand or gravel channel sand or gravel mining, logging, construction, logging, or other minor mining, logging, farming, or farming, or construction of buildings, deforestation. Limited agricultural construction of buildings, roads, or roads, or other infrastructure. Highly activities other infrastructure. Urbanization over urbanized or rapidly urbanizing significant portion of watershed watershed 2. Flow habit Perennial stream with no flashy Perennial stream or ephemeral first- Perennial or intermittent stream with Extremely flashy; flash floods prevalent behavior order stream with slightly increased flashy behavior mode of discharge; ephemeral stream rate of flooding other than first -order stream 3. Channel pattern Straight to meandering with low radius Meandering, moderate radius of Meandering with some braiding; Braided; primarily bed load; engineered of curvature; primarily suspended load curvature; mix of suspended and bed tortuous meandering; primarily bed channel that is maintained loads; well-maintained engineered load; poorly maintained engineered channel channel 3. Channel pattern (revised) No evidence of channelization. Appears to have previously been Appears to have previously been Appears to have previously been Meandering, stable channel or straighi channelized. Stream is relatively channelized. Stream is actively channelized. Stream is actively (step -pool system, narrow valley), stable. Channel has some meanders adjusting (meandering); localized areas adjusting (laterally and/or vertically) with stable channel. due to previous channel adjustment. of instability and/or erosion around few bends. Straight, unstable reach. bends. Straightened, stable channel. 4. Entrenchment/ channel confinement Active flood plain exists at top of Active flood plain abandoned, but is Moderate confinement in valley or Knickpoints visible downstream; banks; no sign of undercutting currently rebuilding; minimal channel channel walls; some exposure of exposed water lines or other infrastructure; no levees confinement; infrastructure not infrastructure; terraces exist; flood plain infrastructure; channel -width -to -top -of - exposed; levees are low and set well abandoned; levees are moderate in banks ration small; deeply confined; no back from the river size and have minimal setback from the active flood plain; levees are high and river along the channel edge 5. Bed material Assorted sized tightly packed, Moderately packed with some Loose assortment with no apparent Very loose assortment with no packing. Fs = approximate portion of sand in the overlapping, and possibly imbricated. overlapping. Very small amounts of overlap. Small to medium amounts of Large amounts of material < 4 mm. Fs bed Most material > 4 mm. Fs < 20% material < 4 mm. 20 < Fs < 50% material < 4 mm. 50 < Fs < 70% > 70 6. Bar development For S < 0.02 and w/y > 12, bars are For S < 0.02 and w/y > 12, bars For S < 0.02 and w/y > 12, bar widths Bar widths are generally greater than 1/2 mature, narrow relative to stream may have vegetation and/or be tend to be wide and composed of newly the stream width at low flow. Bars are width at low flow, well -vegetated, composed of coarse gravel to deposited coarse sand to small cobbles composed of extensive deposits of fine and composed of coarse gravel to cobbles, but minimal recent growth of and/or may be sparsely vegetated. particles up to coarse gravel with little to cobbles. For S > 0.02 and w/y are < bar evident by lack of vegetation on Bars forming for S > 0.02 and w/y < 12 no vegetation. No bars for S < 0.02 and 12, no bars are evident portions of the bar. For S > 0.02 and w/y > 12 w/y <12, no bars are evident 7. Obstructions, including bedrock Rare or not present Occasional, causing cross currents Moderately frequent and occasionally Frequent and often unstable, causing a outcrops, armor layer, LWD jams, grade and minor bank and bottom erosion unstable obstructions, cause noticeable continual shift of sediment and flow. control, bridge bed paving, revetments, erosion of the channel. Considerable Traps are easily filled, causing channel dikes or vanes, riprap sediment accumulation behind to migrate and/or widen obstructions Stabilitv Indicator Excellent 0 -3 ) Good R - 6) Fair (7 - 9) Poor 00 -12) Score 8. Bank soil texture and coherence Clay and silty clay; cohesive material Clay loam to sandy clay loam; minor Sandy clay to sandy loam; Loamy sand to sand; noncohesive amounts of noncohesive or unconsolidated mixtures of glacial or material; unconsolidated mixtures of unconsolidated mixtures; layers may other materials; small layers and lenses glacial or other materials; layers of exist, but are cohesive materials of noncohesive or unconsolidated lenses that include noncohesive sands mixtures and gravels 9. Average bank slope angle (where Bank slopes < 3H:1V (18°) for Bank slopes up to 2H:1 V (27°) in Bank slopes to 1 HAV (45°) in Bank slopes over 45° in noncohesive or 90° is a vertical bank) noncohesive or unconsolidated noncohesive or unconsolidated noncohesive or unconsolidated unconsolidated materials or over 60° in materials to < 1:1 (45°) in clays on materials to 0.8:1 (50°) in clays on materials to 0.6:1 (60°) in clays clays common on one or both banks both sides one or occasionally both banks common on one or both banks 10. Vegetative or engineered bank Wide band of woody vegetation with Medium band of woody vegetation Small band of woody vegetation with 50 Woody vegetation band may vary protection at least 90% density and cover. with 70-90% plant density and cover. 70% plant density and cover. A depending on age and health with less Primarily hard wood, leafy, deciduous A majority of hard wood, leafy, majority of soft wood, piney, coniferous than 50% plant density and cover. trees with mature, healthy, and deciduous trees with maturing, trees with young or old vegetation Primarily soft wood, piney, coniferous diverse vegetation located on the diverse vegetation located on the lacking in diversity located on or near trees with very young, old and dying, bank. Woody vegetation oriented bank. Wood vegetation oriented 80- the top of bank. Woody vegetation and/or monostand vegetation located off vertically. In absence of vegetation, 90% from horizontal with minimal root oriented at 70-80% from horizontal, of the bank. Woody vegetation oriented both banks are lined or heavily exposure. Partial lining or armoring of often with evident root exposure. No at less than 70% from horizontal with armored one or both banks lining of banks, but some armoring may extensive root exposure. No lining or be in place on one bank armoring of banks 11. Bank cutting Little or none evident. Infrequent raw Some intermittently along channel Significant and frequent on both banks. Almost continuous cuts on both banks, banks, insignificant percentage of total bends and at prominent constrictions. Raw banks comprise large portion of some extending over most of the banks. bank Raw banks comprise minor portion of bank in vertical direction. Root mat Undercutting and sod -root overhangs bank in vertical direction overhangs 12. Mass wasting or bank failure No or little evidence of potential or Evidence of infrequent and/or minor Evidence of frequent and/or significant Frequent and extensive mass wasting. very small amounts of mass wasting. mass wasting. Mostly healed over occurrences of mass wasting that can The potential for bank failure, as Uniform channel width over the entire with vegetation. Relatively constant be aggravated by higher flows, which evidenced by tension cracks, massive reach channel width and minimal scalloping may cause undercutting and mass undercuttings, and bank slumping is of banks wasting of unstable banks. Channel considerable. Channel width is highly width quite irregular, and scalloping of irregular, and banks are scalloped banks is evident 13. Upstream distance to bridge from More than 35 m; bridge is well -aligned 20-35 m; bridge is aligned with flow 10-20 m; bridge is skewed to flow, or Less than 10 m; bridge is poorly aligned meander impact point and alignment with river flow flow alignment is otherwise not centerec with flow beneath bridge H = horizontal, V = vertical, Fs = fraction of sand, S = slope, w/y = width -to -depth ratio Total Score Stream: Reach: Date: Weather: Location: Stability Indicator Excellent (1 -3 ) Good (4 - 6) Observers: Project: Drainage Area: Stream Type: Fair (7 - 9) Poor (10 - 12) Score 1. Watershed and flood plain activity Stable, forested, undisturbed Occasional minor disturbances in the Frequent disturbances in the Continual disturbances in the watershed. and characteristics watershed watershed, including cattle activity watershed, including cattle activity, Significant cattle activity, landslides, (grazing and/or access to stream), landslides, channel sand or gravel channel sand or gravel mining, logging, construction, logging, or other minor mining, logging, farming, or farming, or construction of buildings, deforestation. Limited agricultural construction of buildings, roads, or roads, or other infrastructure. Highly activities other infrastructure. Urbanization over urbanized or rapidly urbanizing significant portion of watershed watershed 2. Flow habit Perennial stream with no flashy Perennial stream or ephemeral first- Perennial or intermittent stream with Extremely flashy; flash floods prevalent behavior order stream with slightly increased flashy behavior mode of discharge; ephemeral stream rate of flooding other than first -order stream 3. Channel pattern Straight to meandering with low radius Meandering, moderate radius of Meandering with some braiding; Braided; primarily bed load; engineered of curvature; primarily suspended load curvature; mix of suspended and bed tortuous meandering; primarily bed channel that is maintained loads; well-maintained engineered load; poorly maintained engineered channel channel 3. Channel pattern (revised) No evidence of channelization. Appears to have previously been Appears to have previously been Appears to have previously been Meandering, stable channel or straighrl channelized. Stream is relatively channelized. Stream is actively channelized. Stream is actively (step -pool system, narrow valley), stable. Channel has some meanders adjusting (meandering); localized areas adjusting (laterally and/or vertically) with stable channel. due to previous channel adjustment. of instability and/or erosion around few bends. Straight, unstable reach. bends. Straightened, stable channel. 4. Entrenchment/ channel confinement Active flood plain exists at top of Active flood plain abandoned, but is Moderate confinement in valley or Knickpoints visible downstream; banks; no sign of undercutting currently rebuilding; minimal channel channel walls; some exposure of exposed water lines or other infrastructure; no levees confinement; infrastructure not infrastructure; terraces exist; flood plain infrastructure; channel -width -to -top -of - exposed; levees are low and set well abandoned; levees are moderate in banks ration small; deeply confined; no back from the river size and have minimal setback from the active flood plain; levees are high and river along the channel edge 5. Bed material Assorted sized tightly packed, Moderately packed with some Loose assortment with no apparent Very loose assortment with no packing. Fs = approximate portion of sand in the overlapping, and possibly imbricated. overlapping. Very small amounts of overlap. Small to medium amounts of Large amounts of material < 4 mm. Fs bed Most material > 4 mm. Fs < 20% material < 4 mm. 20 < Fs < 50% material < 4 mm. 50 < Fs < 70% > 70 6. Bar development For S < 0.02 and w/y > 12, bars are For S < 0.02 and w/y > 12, bars For S < 0.02 and w/y > 12, bar widths Bar widths are generally greater than 1/2 mature, narrow relative to stream may have vegetation and/or be tend to be wide and composed of newly the stream width at low flow. Bars are width at low flow, well -vegetated, composed of coarse gravel to deposited coarse sand to small cobbles composed of extensive deposits of fine and composed of coarse gravel to cobbles, but minimal recent growth of and/or may be sparsely vegetated. particles up to coarse gravel with little to cobbles. For S > 0.02 and w/y are < bar evident by lack of vegetation on Bars forming for S > 0.02 and w/y < 12 no vegetation. No bars for S < 0.02 and 12, no bars are evident portions of the bar. For S > 0.02 and w/y > 12 w/y <12, no bars are evident 7. Obstructions, including bedrock Rare or not present Occasional, causing cross currents Moderately frequent and occasionally Frequent and often unstable, causing a outcrops, armor layer, LWD jams, grade and minor bank and bottom erosion unstable obstructions, cause noticeable continual shift of sediment and flow. control, bridge bed paving, revetments, erosion of the channel. Considerable Traps are easily filled, causing channel dikes or vanes, riprap sediment accumulation behind to migrate and/or widen obstructions Stabilitv Indicator Excellent 0 -3 ) Good R - 6) Fair (7 - 9) Poor 00 -12) Score 8. Bank soil texture and coherence Clay and silty clay; cohesive material Clay loam to sandy clay loam; minor Sandy clay to sandy loam; Loamy sand to sand; noncohesive amounts of noncohesive or unconsolidated mixtures of glacial or material; unconsolidated mixtures of unconsolidated mixtures; layers may other materials; small layers and lenses glacial or other materials; layers of exist, but are cohesive materials of noncohesive or unconsolidated lenses that include noncohesive sands mixtures and gravels 9. Average bank slope angle (where Bank slopes < 3H:1V (18°) for Bank slopes up to 2H:1 V (27°) in Bank slopes to 1 HAV (45°) in Bank slopes over 45° in noncohesive or 90° is a vertical bank) noncohesive or unconsolidated noncohesive or unconsolidated noncohesive or unconsolidated unconsolidated materials or over 60° in materials to < 1:1 (45°) in clays on materials to 0.8:1 (50°) in clays on materials to 0.6:1 (60°) in clays clays common on one or both banks both sides one or occasionally both banks common on one or both banks 10. Vegetative or engineered bank Wide band of woody vegetation with Medium band of woody vegetation Small band of woody vegetation with 50 Woody vegetation band may vary protection at least 90% density and cover. with 70-90% plant density and cover. 70% plant density and cover. A depending on age and health with less Primarily hard wood, leafy, deciduous A majority of hard wood, leafy, majority of soft wood, piney, coniferous than 50% plant density and cover. trees with mature, healthy, and deciduous trees with maturing, trees with young or old vegetation Primarily soft wood, piney, coniferous diverse vegetation located on the diverse vegetation located on the lacking in diversity located on or near trees with very young, old and dying, bank. Woody vegetation oriented bank. Wood vegetation oriented 80- the top of bank. Woody vegetation and/or monostand vegetation located off vertically. In absence of vegetation, 90% from horizontal with minimal root oriented at 70-80% from horizontal, of the bank. Woody vegetation oriented both banks are lined or heavily exposure. Partial lining or armoring of often with evident root exposure. No at less than 70% from horizontal with armored one or both banks lining of banks, but some armoring may extensive root exposure. No lining or be in place on one bank armoring of banks 11. Bank cutting Little or none evident. Infrequent raw Some intermittently along channel Significant and frequent on both banks. Almost continuous cuts on both banks, banks, insignificant percentage of total bends and at prominent constrictions. Raw banks comprise large portion of some extending over most of the banks. bank Raw banks comprise minor portion of bank in vertical direction. Root mat Undercutting and sod -root overhangs bank in vertical direction overhangs 12. Mass wasting or bank failure No or little evidence of potential or Evidence of infrequent and/or minor Evidence of frequent and/or significant Frequent and extensive mass wasting. very small amounts of mass wasting. mass wasting. Mostly healed over occurrences of mass wasting that can The potential for bank failure, as Uniform channel width over the entire with vegetation. Relatively constant be aggravated by higher flows, which evidenced by tension cracks, massive reach channel width and minimal scalloping may cause undercutting and mass undercuttings, and bank slumping is of banks wasting of unstable banks. Channel considerable. Channel width is highly width quite irregular, and scalloping of irregular, and banks are scalloped banks is evident 13. Upstream distance to bridge from More than 35 m; bridge is well -aligned 20-35 m; bridge is aligned with flow 10-20 m; bridge is skewed to flow, or Less than 10 m; bridge is poorly aligned meander impact point and alignment with river flow flow alignment is otherwise not centerec with flow beneath bridge H = horizontal, V = vertical, Fs = fraction of sand, S = slope, w/y = width -to -depth ratio Total Score Poplar Creek Morphological Parameters Bankfull stage was estimated using NC Regional Curve equations and existing conditions data 2 NC Regional Curve equations source: Doll et al. (2003) 3 NC Regional Curve equations source: Sweet and Geratz (2003) UT to Buffalo Branch Reference Watery Fork Reference YB1-C YB1-C Existing' YB2-B YB2-B YB3 YB1-C YB2-A Design YB2-B (Upstream) YB2-B (Downstream) Feature Pool I Riffle Pool Riffle Riffle Pool Riffle Pool Riffle Riffle I Pool Riffle I Pool Riffle I Pool Riffle I Pool Drainage Area (ac) 540 624 66 66 102 102 29 102 51 78 102 Drainage Area mit 0.84 0.84 0.10 0.10 0.16 0.16 0.05 0.16 0.08 0.12 0.16 NC Regional Curve Discharge cfs 2 14.7 78 3.2 3.2 4.4 4.4 1.9 4.4 2.7 3.6 4.4 NC Regional Curve Discharge (cfs)3 7.7 81 37.9 37.9 2.2 2.2 0.9 2.2 1.3 1.8 2.2 Design/Calculated Discharge cfs 17 87 --- --- --- --- --- 3 3 4 5 Dimension BF Width ft 8.5 9.9 13.5 15.3 5.2 4.5 6.2 7.6 3.9 4.9 5 5 5 5 5 5.3 5.4 Floodprone Width (ft) 36 50 >30 >30 6 6 7 10 >17 >11 >11 >11 >11 >11 >11 >12 >12 BF Cross Sectional Area (ft) 11.8 11.2 25.7 23.9 2.4 5.3 2.5 6.3 2.4 2.6 3.9 2.6 3.6 2.6 3.6 2.7 4 BF Mean Depth (ft) 1.4 1.1 1.9 1.6 0.5 1.2 0.4 0.8 0.6 0.5 0.8 0.5 0.7 0.5 0.7 0.5 0.7 BF Max Depth (ft) 2.2 1.7 2.5 2.0 0.7 1.4 0.6 1.2 0.8 0.8 1.3 0.7 1.1 0.7 1.1 0.7 1.1 Width/Depth Ratio 6.2 8.7 7.1 9.8 11.3 3.8 15.5 9.3 6.5 9.1 6.4 9.7 7.0 9.7 7.0 10.3 7.3 Entrenchment Ratio >2.2 >2.2 >2.2 2.0 1.2 1.3 1.1 1.3 >4.3 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 >2.2 Wetted Perimeter (ft) 10.2 10.7 16.6 19.0 5.7 6.3 6.5 8.3 4.6 5.3 5.7 5.4 5.6 5.4 5.6 5.6 6.0 Hydraulic Radius (ft)l 1.2 1 1.0 1 1.5 1 1.3 1 0.4 1 0.8 1 0.4 1 0.8 1 0.5 0.5 1 0.7 0.5 1 0.6 1 0.5 1 0.6 1 0.5 1 0.7 Bank Height Ratiol 1.2 1 1.3 1 1.4 1 1.8 1 3.6 1 2.1 1 5.7 1 3.9 1 1.3 1.0 1 1.0 1.0 1 1.0 1 1.0 1 1.0 1 1.0 1 1.0 Substrate Coarse Sand Very Coarse Gravel Coarse Sand Fine Gravel Course Sand Course Sand Course Sand Fine Gravel Fine Gravel Pattern Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Channel Beltwidth (ft) 41.2 43.5 36 114 20 35 16 44 13 22 13 27 13 28 9 22 11 25 Radius of Curvature (ft) 13.11 24.6 14 73 10 62 7 57 4 30 10 15 11 32 13 33 12 24 Radius of Curvature Ratio 1.2 2.3 0.9 4.8 1.9 11.9 1.1 9.2 1.03 7.69 2.0 3.1 2.2 6.4 2.6 6.6 2.3 4.5 Meander Wavelength (ft) 49.5 64.9 112 345 45.0 109.0 27 139 20 61 36 77 43 80 36 70 40 72 Meander Width Ratio 3.8 4.0 2.4 7.5 3.8 6.7 2.6 7.1 3.33 5.64 2.7 5.5 2.6 5.6 1.8 4.4 2.1 4.7 Profile Shallow Length (ft) 4 19.9 12 35 2.5 15 3 13 --- 1.2 17.2 4.1 12.0 4.1 12.0 4.4 12.7 Run Length (ft) 7.8 23 2 10 3 6 3 18 --- 1.0 9.8 1 3.4 1 3.4 1 3.6 Pool Length (ft) 6.9 21.6 3 18 5 22 6 14 --- 3.9 16.2 1.1 6.2 1.1 6.2 1.2 6.5 Pool -to-Pool Spacing (ft) 40.3 109.8 29 62 22 39 23 63 --- 9.8 27.9 9.8 21.2 9.8 21.2 10.4 22.5 Additional Reach Parameters Valley Length ft 285 1238 611 1512 1068 611 1068 750 762 Channel Length ft 375 1500 720 1721 1238 797 1246 840 871 Sinuosity 1.32 1.21 1.18 1.14 1.16 1.30 1.17 1.12 1.14 Water Surface Slope ft/ft 0.0023 0.011 - 0.012 - --- --- --- --- Channel Slope(ft/ft),0.0025 0.0100 0.0058 0.013 0.021 0.0035 0.0035 0.0080 0.0080 Rosgen Classificationi E5 I E4 I G5 I G4 I E5 E5 E5 E4 E4 Bankfull stage was estimated using NC Regional Curve equations and existing conditions data 2 NC Regional Curve equations source: Doll et al. (2003) 3 NC Regional Curve equations source: Sweet and Geratz (2003) Morphological Parameters Dimension BB Reference Y1131 -C WF Reference Y1132A YB2B (US) YB2B (DS) BF Width ft 10 4.9 14.6 5 5 5.3 Floodprone Width ft BF Cross Sectional Area(ft) BF Mean Depth ft BF Max Depth ft Width/Depth Ratio Entrenchment Ratio Wetted Perimeter ft Hydraulic Radius ft Substrate Description D50 D16 mm D50 mm D84 mm Pattern Channel Beltwidth ft Radius of Curvature ft Radius of Curvature Ratio Meander Wavelength ft Meander Width Ratio Profile Min Max Min Max Min Max Min Max Min Max Min Max Shallow Length ft 2.4 35 1.176 17.15 12 35 4.1 12.0 4.1 12.0 4.4 12.7 Shallow Length Ratio 0.24 3.50 0.82 2.40 Shallow Sloe 0.20% 6.30% 0.3% 9.6% 1.10% 2.70% 0.35% 0.86% 0.80% 1.96% 0.80% 1.96% Shallow Sloe Ratio 0.87 27.39 1.00 2.45 Run Length ft 2 20 0.98 9.8 2 10 0.7 3.4 0.7 3.4 0.7 3.6 Run Length Ratio 0.20 2.00 0.14 0.68 Run Sloe 0.20% 8.70% 0.3% 13.2% 1.20% 7.90% 0.38% 2.51% 0.87% 5.75% 0.87% 5.75% Run Sloe Ratio 0.87 37.83 1.09 7.18 Glide Length ft 5 26 2.45 12.74 5 8.5 1.7 2.9 1.7 2.9 1.8 3.1 Glide Length Ratio 0.50 2.60 0.34 0.58 Glide Sloe 0.20% 8.70% 0.3% 13.2% 3.20% 6.11% 1.02% 1.94% 2.33% 4.44% 2.33% 4.44% Glide Slope Ratio 0.87 37.83 2.91 5.55 Pool Length ft 8 33 3.92 16.17 3.2 18 1.1 6.2 1.1 6.2 1.2 6.5 Pool Length Ratio 0.80 3.30 0.22 1.23 Pool -to-Pool Spacing ft 20 57 9.8 27.93 28.7 62 9.8 21.2 9.8 21.2 10.4 22.5 Pool -to-Pool Ratio 2.00 5.70 1.97 4.25 Additional Reach Parameters Valley Length ft Channel Length ft Sinuosity Water Surface Slope ft/ft Channel Slope ft/ft 0.23% 0.35% 1.10% 0.35% 0.80% 0.80% Ros en Classification UT to Buffalo Creek Cross Section 1 - Riffle 189 188 c ° 187 .6 aa) w 186 185 0 5 10 15 20 25 30 35 Distance (ft) --*--Reference Reach Approx. Bankfull Floodprone Area pstream UT to Buffalo Creek Cross Section 2 - Pool 192 191 190 189 C: ° 188 187 LU 186 185 184 0 5 10 15 20 25 30 35 40 Distance (ft) --*--Reference Reach Approx. Bankfull Floodprone Area t%ze" UT to Buffalo Creek CrossSection 4 - Riffle 190 189 188 C: ° 187 m LU 186 185 184 0 5 10 15 20 25 30 35 40 Distance (ft) —40-- Reference Reach Approx. Bankfull Floodprone Area �`_�:' • .. - � r-� _ -moi Ci Upstream Downstream Watery Fork Cross Section 2 - Riffle 100 99 .00 98 0 97 R > 96 w 95 94 0 5 10 15 20 25 30 35 Distance (ft) —a—Ground Approx. Bankfull Floodprone Area Appendix C —Site Protection Instrument SITE PROTECTION INSTRUMENT The land required for the construction, management, and stewardship of this Site includes portions of the following parcels (Table 1). Table 1. Project Parcel and Landowner Information The Wilmington District Conservation Easement model template was utilized to draft the site protection instrument. Once finalized, a copy of the final recorded easement will be provided in Appendix A. EBX-Neuse I, LLC, acting as the Bank Sponsor, will establish a Conservation Easement, and will monitor the Site for a minimum of seven years. This Mitigation Plan provides detailed information regarding bank operation, including long term management and annual monitoring activities, for review and approval by the Interagency Review Team (IRT). Upon approval of the Site by the IRT, the Site will be transferred to the North Carolina Wildlife Habitat Foundation (NCWHF). The NCWHF will be responsible for periodic inspection of the Site to ensure that restrictions required in the Conservation Easement or the deed restriction document(s) are upheld. Endowment funds required to uphold easement and deed restrictions will be negotiated prior to site transfer to the responsible party. The Bank Sponsor will ensure that the Conservation Easement will allow for the implementation of an initial monitoring phase, which will be developed during the design phase and conducted by the Bank Sponsor. The Conservation Easement will allow for yearly monitoring and, if necessary, maintenance of the Site during the initial monitoring phase. These activities will be conducted in accordance with the terms and conditions of the approved Mitigation Plan for the Poplar Creek Mitigation Site. The Poplar Creek Site will be authorized under the Neu -Con Wetland and Stream Umbrella Mitigation Bank made and entered into by EBX-Neuse I, LLC, US Army Corps of Engineers, and NC Division of Water Resources. PIN Owner of Record Or Stream Reach Tax Parcel ID# 169500-47-2720 169500-36-8766 YB 1-C 169500-36-5192 YB2-A Dwight B Youngblood JR. 169500-27-6486 YB2-B 169500-25-9195 Y133 169500-25-0748 169500-16-5546 Dwight Benjamin Youngblood No reach, but Conservation 169500-17-7883 Jr. Easement on the parcel Terry M Keen 169500-34-9404 YB3 The Wilmington District Conservation Easement model template was utilized to draft the site protection instrument. Once finalized, a copy of the final recorded easement will be provided in Appendix A. EBX-Neuse I, LLC, acting as the Bank Sponsor, will establish a Conservation Easement, and will monitor the Site for a minimum of seven years. This Mitigation Plan provides detailed information regarding bank operation, including long term management and annual monitoring activities, for review and approval by the Interagency Review Team (IRT). Upon approval of the Site by the IRT, the Site will be transferred to the North Carolina Wildlife Habitat Foundation (NCWHF). The NCWHF will be responsible for periodic inspection of the Site to ensure that restrictions required in the Conservation Easement or the deed restriction document(s) are upheld. Endowment funds required to uphold easement and deed restrictions will be negotiated prior to site transfer to the responsible party. The Bank Sponsor will ensure that the Conservation Easement will allow for the implementation of an initial monitoring phase, which will be developed during the design phase and conducted by the Bank Sponsor. The Conservation Easement will allow for yearly monitoring and, if necessary, maintenance of the Site during the initial monitoring phase. These activities will be conducted in accordance with the terms and conditions of the approved Mitigation Plan for the Poplar Creek Mitigation Site. The Poplar Creek Site will be authorized under the Neu -Con Wetland and Stream Umbrella Mitigation Bank made and entered into by EBX-Neuse I, LLC, US Army Corps of Engineers, and NC Division of Water Resources. Appendix D — DWR Stream Identification Forms m N N N N N N O Im ry- C Im m O C O C- C Olh C C C O C O O C C C 10 --co. 'C O C O .... N -,-Ill -- O I------ IN m O O O C O O Ifl ----------- NNNNNN---O IN N - -- O IM m 0 0 0 0, O C O O O C C O C O C O O IO O O C O C IO 0 0 0 0 0 0 0 0 O Cy C m G NC E M $O•: O V O G L CCI O V E C.0 'J 9 V'� O L J R E G uy=o.�.c4<s4uzumLO°='�cmmLL�i<4:u<< M1 I% -? 10`! N N N N Yh G - N N cn E 0 LL c 0 ZZ cu E cu CD � v`�AJ' — I CY U Z NC DWQ Stream Identification Form Version 4.11 Date: Project/Site: Latitude: Evaluator. County: Longitude: Total Points: Stream Determination (circle one) Other Stream is at laest/ntennirtent 9919or ial%930• Ephemeral Intermittent Pemnnlal e.p, Quad Neme; A. Geomorphology (Subtotal= Absent Weak Moderate Strong 1' Continuity of channel bed and bank 0 1 2 1 3 2. Sinuosity of channel along thalwell 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, r I sequence 0 1 2 3 4. Particle size of stream substrate 0 1 2 3 5. Act va(relict floodplain 0 1 2 3 6. Deposilional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headouts 0 1 2 3 9. Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No = 0 Yes = 3 Sketch. 'Nadel ditches are not rated; we discussions In manual B. Hvdroloov (Subtotal = ) 12, Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leat litter 1.5 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris fines or plies 0 0.5 1 1.5 17. Soil -based evidence of high water table7 0 No = 0 Yes = 3 1.5 C. Bioloov (Subtotal = 18. Fibrous roots in stmambed 3 2 1 0 19. Rooted upland plants in straambed 3 2 1 0 20. Macrobenthos (note dHersity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 L5 23. Crayfish 0 OS 1 1.5 24. Amphibians 0 0.5 1 1.5 25, Algae 0 0.5 1 1.5 26. Welland plants in streembed FACW = 0.75; OBL = 1.5 Other = 0 'perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch. SIN � M '7 M M m h y 7IMv CiIM O a b C M m h a '7 SIO O C O O C O O O Olz �IM O y 0 y, y� h h M co E U. E �cn _I /�w' co _/ �u �i 2 V Z p� Q7 1 ;0 33 C q W QCQ ao eo N N d d C > > C G O O co E U. E �cn _I /�w' co _/ �u �i 2 V Z p� Q7 i i ;0 33 C q W QCQ ao eo N N d d C > > C G O O O� Y OR fA 'L L g R A �p7 e eG010. pp `�Cd C >L > > > S 5 co E U. E �cn _I /�w' co _/ �u �i 2 V Z F<s'v Ant.- M= -- ._ e I� nen mD s _ r61 i E C FECC� $�8 E F � ESf Ant.- M= -- ._ e / . / / \ j Water Resources ENVIRONMENTAL QUALITY August 19, 2016 Brad Breslow, RES 302 Jefferson St., Suite 110 Raleigh, NC 27605 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Direcmr Subject: Buffer Determination Letter RRO #16-260 Johnston County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B.0233) Start@ Stop@ ❑ Intermittent/Perennial Determination (where local buffer ❑ Tar -Pamlico (15A NCAC 2B .0259) ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Poplar Creek Mitigation Site Address/Location: 2549 Wilson Mills Road Smithfield NC 27577 Stream(s): Poplar Creek Determination Date: 08/18/2016 Staff. Rick Trone Stream E/I/P* Not Subject Subject Start@ Stop@ Soil USGS To o 171-175 ------Survey I X DWR Flag DWR X X Flag/Pipeline Easement 177-178 I X DWR Flag Confluence X X w/Po lar Creek YB1 I X DWR Flag Confluence X X w/Polar Creek YB2B- P X DWR Flag at LeeConfluence X X Y132C Youngblood Rd w/Polar Creek YB3 I X DWR Flag DWR X Flag/Pipeline Easement "E/IIP = Ephemeral/Intermittent/Perennial Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Johnston County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject' has been determined to not be at least intermittent or is not present. Streams that are checked "Subject' have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins, DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins, DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you ave questions regarding this deterin ton, please feel free to contact Rick Trone at (919) 791-4248. S' cereI If y/ Danny Smith/ �v Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Popular Creek Mitigation Site I Johnston County, NC-DWR Project # 16-260 I Stream F1- — F5 A os, PP< Subject Stream F8 4 Stream YB1 Subject isml ftY_ _ tib i i e Pond \ — \\` ', X v y loMESTfAAD I SPA Stream YB2B- � YB2C — ',g�\ Subject I o "rJones g Cc -n USGS Topo Map •yTq cd Map provided by NCDEQ Selma Quandrangle ' " Division of Water Re- s sources Johnston Co., NC S •;ry �. :: Locations are approxi- 2016 pproxi- r•� n 2016�',� mate and are provided for IILJ,AV\'JII .�., reference only :: I It Appendix E —Wetland JD Forms and Maps fires March 28, 2017 The purpose of this project is the establishment of a mitigation site under the existing 10055 Red Run Blvd. Ms. Samantha Dailey Suite 130 U.S. Army Corps of Engineers Owings Mills, MD associated with Department of the Army permit authorizations pursuant to Section 404 of 117 3331 Heritage Trade Drive, Suite 105 1371/2 East Main St. Wake Forest, North Carolina 27587 412 N. 4th St. Delineation Information Suite 300 RES completed its delineation of potentially jurisdictional areas on this property on January 17, Baton Rouge, LA 2017 and January 31, 2017 in accordance with the 1987 Corps of Engineers Wetlands 70802 Dear Ms. Samantha Dailey, Suite 431 Supplement to the Corps of Engineers Delineation Wetland Delineation Manual: Atlantic and 100 Calhoun St. Resource Environmental Solutions RES is leased to resent this Request for a Preliminary (RES) p P q rY Suite 320 Charleston, SC Jurisdictional Determination for the Poplar Creek Mitigation Site in Smithfield, Johnston County, 29401 North Carolina. As part of this scope of work, RES is submitting this request to the U.S. Army Suite 110 Corps of Engineers (Corps) for a confirmation of the limits of Waters of the U.S. on the subject � gneers ( �) � 5020 Montrose Blvd. were located using Global Positioning System (GPS) technology with sub -meter accuracy and Suite 650 site. Houston, TX location of these areas are depicted on the attached Waters of the U.S. Delineation Map. p p 77006 The purpose of this project is the establishment of a mitigation site under the existing Neu -con Umbrella Banking Instrument to generate stream mitigation credits that may be 1200 Camellia Blvd. Suite 220 used to provide compensatory mitigation for unavoidable impacts to warm water streams Lafayette, LA associated with Department of the Army permit authorizations pursuant to Section 404 of 70508 the Clean Water Act. 1371/2 East Main St. Suite 210 Delineation Information Oak Hill, WV RES completed its delineation of potentially jurisdictional areas on this property on January 17, 25901 2017 and January 31, 2017 in accordance with the 1987 Corps of Engineers Wetlands 33 Terminal Way Delineation Manual methodology (Environmental Laboratory 1987), as well as the Regional Suite 431 Supplement to the Corps of Engineers Delineation Wetland Delineation Manual: Atlantic and Pittsburgh, PA Gulf Coastal Plain (Version 2.0). Stream buffer determinations were verified during a site visit 15219 on August 19, 2016 by a North Carolina Division of Water Resources representative. The Buffer 302 Jefferson St. Determinaton Letter can be found in the attachments. Flags were numbered and placed onsite to Suite 110 mark the limits of potentially jurisdictional wetlands and other waters of the U.S. Wetland flags Raleigh, NC 27605 were located using Global Positioning System (GPS) technology with sub -meter accuracy and the streams were professional surveyed at the top of their banks. The approximate size and 1521 W. Main location of these areas are depicted on the attached Waters of the U.S. Delineation Map. p p 2 Id Floor Richmond, VA Richmond, 23220 The current land use on-site is agricultural, light -residential, and forested land. The site contains three tributaries to Poplar Creek, two farm ponds, and six wetland areas. Attachments for Reference - Jurisdictional Determination Request Form - Preliminary Jurisdictional Determination Form - Landowner Authorization Forms - Project Vicinity Map - Project Location Map (with topography) - National Wetlands Inventory Map - Aerial Imagery - Soils Map - Wetland Delineation Data Sheets - NCDWR Buffer Determination - Waters of the U.S. Delineation Map fires RES respectfully requests that the Corps confirm this delineation of Waters of the U.S. on this property. I will contact you in the coming days to arrange a site visit for this purpose. Please contact me ((919) 345- 3034) if you have any additional questions regarding this matter. Sincerely, Jeremy Schmid, PWS Ecologist 1 Matthew DeAngelo Ecologist Jurisdictional Determination Request 0 US Amy Corps of Engineers. Wilmingbn Divw This force is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as described within each category, with your request. You may submit your request to the appropriate Corps Field Office (or project manager, if known) via mail, electronic mail, or facsimile. A current list of county assignments by Field Office and project manager can be found on-line at: hqp://www.saw.usace.anny.mil/Missions/RegulatoryPermitProgram.aspx , by telephoning: 910-251-4633, or by contacting any of the field offices listed below: ASHEVILLE REGULATORY FIELD OFFICE US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 General Number: (828) 271-7980 Fax Number: (828) 281-8120 RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 General Number: (919) 554-4884 Fax Number: (919) 562-0421 WASHINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 General Number: (910) 251-4610 Fax Number: (252) 975-1399 WILMINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 General Number: 910-251-4633 Fax Number: (910) 251-4025 Version: December 2013 Page 1 Jurisdictional Determination Request INSTRUCTIONS: All requestors must complete Parts A, B, C, D, E and F. NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a paying client or your agency, please note the specific submittal requirements in Part G. NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that all JD requests must include the current property owner authorization for the Corps to proceed with the determination, which may include inspection of the property when necessary. This form must be signed by the current property owner to be considered a complete request. NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for JD requests associated with North Carolina Department of Transportation (NCDOT) projects will be conducted according to the current NCDOT/USACE protocols. NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should also request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Version: December 2013 Page 2 Jurisdictional Determination Request A. PARCEL INFORMATION IN C. Street Address: City, State: County: Directions: See attached Site Ownership Information Parcel Index Number(s) (PIN): REQUESTOR INFORMATION Name: Mailing Address: Telephone Number: Electronic Mail Address f See attached Site Ownership Information Jeremy Schmid, PWS 302 Jefferson Street, Suite 110 919-345-3034 JSchmid@res.us Select one: ❑ I am the current property owner. ❑✓ I am an Authorized Agent or Environmental Consultantz ❑ Interested Buyer or Under Contract to Purchase ❑ Other, please explain. PROPERTY OWNER INFORMATION Name: Mailing Address: Telephone Number: Electronic Mail Address': See attached Site Ownership Information ❑ Proof of Ownership Attached (e.g. a copy of Deed, County GIS/Parcel/Tax Record data) 1 If available z Must attach completed Agent Authorization Form 3 If available Version: December 2013 Page 3 Jurisdictional Determination Request D. PROPERTY OWNER CERTIFICATION° I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. See attached Site Ownership Information Property Owner (please print) Property Owner Signature E. JURISDICTIONAL DETERMINATION TYPE Select One: Date ❑✓ I am requesting that the Corps provide a preliminary JD for the property identified herein. This request does include a delineation. ❑ I am requesting that the Corps provide a preliminary JD for the property identified herein. This request does NOT include a delineation. I am requesting that the Corps investigate the property/project area for the presence or absence of WoUS5 and provide an approved JD for the property identified herein. This request does NOT include a request for a verified delineation. 0 I am requesting that the Corps delineate the boundaries of all WoUS on a property/project area and provide an approved JD (this may or may not include a survey plat). I am requesting that the Corps evaluate and approve a delineation of WoUS (conducted by others) on a property/project area and provide an approved JD (may or may not include a survey plat). 4 For NCDOT requests following the current NCDOT/USACE protocols, skip to Part E. 5 Waters of the United States Version: December 2013 Page 4 Jurisdictional Determination Request F. ALL REQUESTS ✓0 Map of Property or Project Area (attached). This Map must clearly depict the boundaries of the area of evaluation. ✓0 Size of Property or Project Area 63 acres n✓ I verify that the property (or project) boundaries have recently been surveyed and marked by a licensed land surveyor OR are otherwise clearly marked or distinguishable. G. JD REQUESTS FROM CONSULTANTS OR AGENCIES (1) Preliminary JD Requests: ❑✓ Completed and signed Preliminary Jurisdictional Determination Form 6. Project Coordinates: 35.555200 Latitude 76.356735 Longitude Maps (no larger than 11 x 17) with Project Boundary Overlay ❑✓ Large and small scale maps that depict, at minimum: streets, intersections, towns ❑✓ Aerial Photography of the project area Z✓ USGS Topographic Map ✓0 Soil Survey Map ❑✓ Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps) s See Appendix A of this Form. From Regulatory Guidance Letter No. 08-02, dated lune 26, 2008 Version: December 2013 Page 5 Jurisdictional Determination Request Delineation Information (when applicable)7: Wetlands: ❑✓ Wetland Data Sheets8 Tributaries: ❑ USACE Assessment Forms ❑ Upland Data Sheets ❑ Other Assessment Forms (when appropriate) ❑ Landscape Photos, if taken ❑✓ Field Sketch overlain on legible Map that includes: ■ All aquatic resources (for sites with multiple resources, label and identify) ■ Locations of wetland data points and/or tributary assessment reaches ■ Locations of photo stations ■ Approximate acreage/linear footage of aquatic resources (2) Approved JDs including Verification of a Delineation: ❑ Project Coordinates: Latitude Longitude Maps (no larger than 11x17) with Project Boundary Overlay: ❑ Large and small scale maps that depict, at minimum: streets, intersections, towns ❑ Aerial Photography of the project area ❑ USGS Topographic Map ❑ Soil Survey Map ❑ Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps) ' 1987 Manual Regional Supplements and Data forms can be found at: http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/reg supp.aspx Wetland and Stream Assessment Methodologies can be found at: http://portal.ncdenr.org/c/document library/get file7uuid=76f3c58b-dab8-4960-ba43-45b7faf06f4c&groupld=38364 and, http://www.saw.usace.army.mil/Portals/59/docs/regulatory/publicnotices/2013/NCSAM Draft User Manual 130318.pdf B Delineation information must include, at minimum, one wetland data sheet for each wetland/community type. Version: December 2013 Page 6 Jurisdictional Determination Request Delineation Information (when applicable): lands: Wetland Data Sheets Tributaries: USACE Assessment Forms ❑ Upland Data Sheets ❑ Other Assessment Forms (when appropriate) ❑ Landscape Photos, if taken ❑ Field Sketch overlain on legible Map that includes: • All aquatic resources (for sites with multiple resources, label and identify) • Locations of wetland data points and/or tributary assessment reaches • Locations of photo stations • Approximate acreage/linear footage of aquatic resources Supporting Jurisdictional Information (for Approved JDs only) ❑ Approved Jurisdictional Determination Form(s) (also known as "Rapanos Form(s)") ❑ Map(s) depicting the potential (or lack of potential) hydrologic connection(s), adjacency, etc. to navigable waters. 9 Delineation information must include, at minimum, one wetland data sheet for each wetland/community type. Version: December 2013 Page 7 Jurisdictional Determination Request I. REQUESTS FOR CORPS APPROVAL OF SURVEY PLAT Prior to final production of a Plat, the Wilmington District recommends that the Land Surveyor electronically submit a draft of a Survey Plat to the Corps project manager for review. Due to storage limitations of our administrative records, the Corps requires that all hard- copy submittals include at least one original Plat (to scale) that is no larger than 11"x17' (the use of match lines for larger tracts acceptable). Additional copies of a plat, including those larger than 11 "x17', may also be submitted for Corps signature as needed. The Corps also accepts electronic submittals of plats, such as those transmitted as a Portable Document Format (PDF) file. Upon verification, the Corps can electronically sign these plats and return them via e-mail to the requestor. (1) PLATS SUBMITTED FOR APPROVAL EJMust be sealed and signed by a licensed professional land surveyor ElMust be to scale (all maps must include both a graphic scale and a verbal scale) ❑ Must be legible ❑ Must include a North Arrow, Scale(s), Title, Property Information 0 Must include a legible WoUS Delineation Table of distances and bearings/metes and bounds/GPS coordinates of all surveyed delineation points RMust clearly depict surveyed property or project boundaries Must clearly identify the known surveyed point(s) used as reference (e.g. property corner, USGS monument) ❑ When wetlands are depicted: • Must include acreage (or square footage) of wetland polygons • Must identify each wetland polygon using an alphanumeric system Version: December 2013 Page 8 Jurisdictional Determination Request FJWhen tributaries are depicted: • Must include either a surveyed, approximate centerline of tributary with approximate width of tributary OR surveyed Ordinary High Water Marks (OHWM) of tributary • Must identify each tributary using an alphanumeric system • Must include linear footage of tributaries and calculated area (using approximate widths or surveyed OHWM) • Must include name of tributary (based on the most recent USGS topographic map) or, when no USGS name exists, identify as "unnamed tributary" FJall depicted WoUS (wetland polygons and tributary lines) must intersect or tie -to surveyed project/property boundaries F] Must include the location of wetland data points and/or tributary assessment reaches ❑ Must include, label accordingly, and depict acreage of all waters not currently subject to the requirements of the CWA (e.g. "isolated wetlands", "non - jurisdictional waters"). NOTE: An approved JD must be conducted in order to make an official Corps determination that a particular waterbody or wetland is not jurisdictional. Must include and survey all existing conveyances (pipes, culverts, etc.) that transport WoUS Version: December 2013 Page 9 Jurisdictional Determination Request (2) CERTIFICATION LANGUAGE E]When the entire actual Jurisdictional Boundary is depicted: include the following Corps Certification language: "This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, the determination of Section 404 jurisdiction may be relied upon for a period not to exceed five (S) years from this date. The undersigned completed this determination utilizing the appropriate Regional Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual." Regulatory Official: Title: Date: USACE Action ID No.: ElWhen uplands may be present within a depicted Jurisdictional Boundary include the following Corps Certification language: "This certifies that this copy of this plat identifies all areas of waters of the United States regulated pursuant to Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is change in the law or our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to exceed five years from this date. The undersigned completed this determination utilizing the appropriate Regional Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual." Regulatory Official: Title: Date: USACE Action ID No.: Version: December 2013 Page 10 Jurisdictional Determination Request (3) GPS SURVEYS For Surveys prepared using a Global Positioning System (GPS), the Survey must include all of the above, as well as: ❑ be at sub -meter accuracy at each survey point. 0 include an accuracy verification: One or more known points (property corner, monument) shall be located with the GPS and cross-referenced with the existing traditional property survey (metes and bounds). Minclude a brief description of the GPS equipment utilized. Version: December 2013 Page 11 ATTACHMENT A PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Jeremy Schmid, PWS- Resource Environmental Solutions, 302 Jefferson Street, Suite 110, Raleigh, NC 27605 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Raleigh Regulatory Field Office D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: Johnston City: Smithtled Center coordinates of site (lat/long in degree decimal format): Lat. 35.555200 ON; Long. -78356735 Universal Transverse Mercator: NAD 1983 Name of nearest waterbody: Poplar Cook OLTIM Identify (estimate) amount of waters in the review area: Non -wetland waters: 3,724 linear feet: width (ft) and/or acres. Cowardin Class: R5 and R4 Stream Flow: Intermittent and Perennial Wetlands: 13.22 acres. Cowardin Class: Pro, POW Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ❑ Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ❑ Data sheets prepared/submitted by or on behalf of the appI c nt/consultant. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atla ❑ USGS NHD data ❑ USGS 8 and 12 digit HUC maps ❑ U.S. Geological Survey map(s). Cite scale & quad name: ❑ USDA Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. M This preliminary JD finds that there "maybe" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information.- IMPORTANT nformation: IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. G Signature and date of Regulatory Project Manager (REQUIRED) 4 Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) Waters Name State YB1-B NORTH CAROLINA YB1-C NORTH CAROLINA Y132 -A NORTH CAROLINA YB2-B NORTH CAROLINA Y133 NORTH CAROLINA Wetland A (WA) NORTH CAROLINA Wetland B (WB) NORTH CAROLINA Wetland C (WC) NORTH CAROLINA Wetland D (WD) NORTH CAROLINA Wetland E (WE) NORTH CAROLINA Wetland F (WF) NORTH CAROLINA Pond A (PA) NORTH CAROLINA Ponb B (PB) NORTH CAROLINA Cowardin_Code HGM_Code Meas -Type Amount R4 Linear R4 Linear R5 Linear R5 Linear R4 Linear PFO Area PFO Area PFO Area PFO Area PFO Area PFO Area POW Area POW Area Units Waters -Type Latitude 635 FOOT DELINEATE 35.5547 154 FOOT DELINEATE 35.5511 401 FOOT DELINEATE 35.5556 1426 FOOT DELINEATE 35.5504 1108 FOOT DELINEATE 35.5482 1.82 ACRE DELINEATE 35.5485 0.49 ACRE DELINEATE 35.5556 0.35 ACRE DELINEATE 35.5519 3.07 ACRE DELINEATE 35.5555 0.11 ACRE DELINEATE 35.5536 0.74 ACRE DELINEATE 35.5519 3.3 ACRE DELINEATE 35.5541 3.34 ACRE DELINEATE 35.5527 Longitude Local -Waterway -78.3537 Poplar Creek -78.356 Poplar Creek -78.3498 Poplar Creek -78.3517 Poplar Creek -78.3489 Poplar Creek -78.3487 Poplar Creek -78.3498 Poplar Creek -78.3512 Poplar Creek -78.3538 Poplar Creek -78.3543 Poplar Creek -78.3558 Poplar Creek -78.3506 Poplar Creek -78.3546 Poplar Creek "c b N � N �d d ra x � cin rpi�r�m.n =a�mnwa yJ�aC2 b a tia �wNAo LL VILL O.x+Cc R U z F V' zLU OW 0 F W, ZD ZDLU cd Q� AG ¢ S LU a .0 0. `c b AW uW7 m m cn E L U- O N Q 6 U) E W L Q ^L W C O J U) E L O U- O co N Q 6 VJ N L a L co J 7 ? Y O Z u G C. o O a � n•E .❑• .c .• �o a F o q m 10 o a oL�dz 3 m d i fl❑^, ice- � � G � N G a 5� 52 a 94 q Uz _ 4 V u F -1 R C d r a, q -e R 2. K L, C,ti Rte.. 4 � Q• •-• AW uW7 m m cn E L U- O N Q 6 U) E W L Q ^L W C O J U) E L O U- O co N Q 6 VJ N L a L co J \ 0 / § 2 § § \ 2 u 2 § \ / -24% m / O � � .0 m & 0 � � Q 06 m � m E 3 3 � Q 3 � J _0 c n J \ �\\ ° 6 k 7Q \§\§Ic ) $5 _ �2 / \ \ ° \ \ k 40| ] m \ ] Jz = 2 ƒ v m / O � � .0 m & 0 � � Q 06 m � m E 3 3 � Q 3 � J _0 c n J 0 C w w lu5r- N 7 V m `' Iu Awa u6 ❑ C ❑ 00 3 C v 41 {R u .c yl 7 9 U) M 4 w �1 •eu W!b W -%1 -. V m • 1 in C P SI D la U +-I •• V d L % tin c 006 C G 6 a mA p u N N co R X w P 06 v w N +, X C C d U Im+ C C u 17. M3 H d� 1tl y m [I1 N m .0 6 N H C 7 RbF C7 a N V N a P N G G C +d u V N -mi W i u u v eR6 w R 4 O z IV G Iii Y C D UWM H U C}P4 H r1 F G 6 r In V Q k •ri W u co E O m a--1 Q 06 cn E W L Q L c J E L O m N .�r y �I Q 6 ' V/ E Q% L c J H m q m �! m O u ui 4 m m a a m;--9zW o m a c L w Li c w •m T x as m p �m rn r y Q a m - p m d u d y r u p N y uxwc rvy a. ^Y0• W r mm L4L6 0 m mLOQ 3. a am oam �NC N0LQ0 o oo ¢ws 0 1..• rn p 4] m m •. •+ m u L w m m -. C u -. ep x v a a v -e c r Y e_❑ u- n mF LI N L y' v 'm C •• rr .� x W O c v c G ^P F G m C d •-� m G Y N C W^ O u -+ i.+ m � i Y •-+ �c .S V Y m r 4 F E •-• 1w .% C m Y r x u v y f_ N d u G mm q ❑❑ OIm. 6 y 0D m m d m •. m p c Y rr u b m 3 b L p m � C W u�] y d• u ^' q aF, m O w 1m. m e 0 -- c m •a oma m �yl0 P � m O IO 0 p•r p� uaVu �.v w E � a•�-� @ .0 7 � L m G m b� P. d m L m m n L R O N -X w 00 C ^+ Y L L w ❑- W m CF yibpu Nd b m 5S , OCO F V] W S G u 4 O c px o �•- d r= ly } C E-• u MN Im+ Ca V c c m m d G V r C U W u ~ m w N L- H v •r L M u •.+ N m CV d w V m •+ [Qj m U ~ ,'� C d S d •• K' d p F x m C # e•'1 L Y •� r m m u Y F 0Wm p Y L Gr• -•w w FLS 3 mb 1•- m E ❑ V 6 9 D C 'j ] m om um d W fA C• O�+V•rF Q m a q V m os mo�a+�+ mr m�d am W vw o �pp C Z +� y m m� •- r nl o. N m O yC:] � � eY 6 m G� T L ❑ O• Ing r •-- ao vc�u ❑ a � R L v - a! •O a i m y 7 O d S ❑ A- Y ., sG. m •m .. d c m n� F p a w " en L V V� � N❑ n m� n di V O d im L.P m— .x d yA cx w9A�^n m.+••N•-+ Wle E u c T u V X m -• d Ld yea^Y G u C N d 0.� L m L m x 11 IND r M r m L � en a �ypjm c Q m E O aF.i m C W 4 'f O G d Cn rt N E N •� ?' w 4 y 2 m O N s+ 0 Y T I d ,y ._ c u ..-a .m. -V w V ... 'c] D •• V •r m'X G m n~ m m L m 16 R•� O N w w +. V O O T G# 3 u m F❑ y T ❑ 1 G m en F F ❑ 1 ❑ L°NNOJu Vd U- A�+ -�•�� mCUL u�L G 2 C T m❑ -•' T •^ D N L❑ •� d �n 3 1p ... o p � � my d �S .+a wl"clm.. u L•] ttl d 411x- •• 'n W L F 5 d m a a a•� r+ 1- x d u •-• a+ d w w. � r m m y i p C F U E A. 3- 0 C w w lu5r- N 7 V m `' Iu Awa u6 ❑ C ❑ 00 3 C v 41 {R u .c yl 7 9 U) M 4 w �1 •eu W!b W -%1 -. V m • 1 in C P SI D la U +-I •• V d L % tin c 006 C G 6 a mA p u N N co R X w P 06 v w N +, X C C d U Im+ C C u 17. M3 H d� 1tl y m [I1 N m .0 6 N H C 7 RbF C7 a N V N a P N G G C +d u V N -mi W i u u v eR6 w R 4 O z IV G Iii Y C D UWM H U C}P4 H r1 F G 6 r In V Q k •ri W u co E O m a--1 Q 06 cn E W L Q L c J E L O m N .�r y �I Q 6 ' V/ E Q% L c J 3 "R LEGEND 9�oe Smithfield n� f•Mark°tS, J APPROXIMATE PROJECT LIMITS ti .3it � H - Street Map Source: VICINITY MAP World Street Map ESKI ArcGIS Online re N POPLAR CREEK MITIGATION SITE 10 JOHN5TON COUNTY, NC I inch = 800 feet ea a Cam' - y i • .. `• 4 � • _ '1 �_/� � �19� '` j •9 163 CD ` ' I N •Ole t - Zao / , . . •• �• 1.T:- 169 N. ('') i rll:"•�'. /86� • 90 Grave!Pit 1 I u ti =o nes 70 '\ Pa:: VIP •• '.::�LEGEND est Smithfield to r C� ;, ••,• �•'-�•,6,_• "'`-- / L APPROXIMATE PROJECT LIMITS Map S PROJECT LOCATION MAP SUSA opo Mapse ESKI ArcGIS Online N POPLAR CREEK MITIGATION SITE JOHNSTON COUNTY, NC I Inch = 2,000 feet r k)l NoA� . LEGEND �NoB t l - 41 APPROXIMATE PROJECT LIMITS NON -HYDRIC SOIL © SOIL WITH HYDRIC INCLUSIONS HYDRIC SOIL aA� . WATER wr r � VrA 0-$ dr!!'o NB 7k df Ar + Ra NoB Bk 010 W" NoEr RWaB 00hL $ �Ave � Lys No irB ' " .V. I Earthstar Ge graphies _�1'Airbu#s� anrl�MPmmdinifi Source: 501 L5 MAP U.S. Department of Agriculture Natural Resources Conservation Service re lip POPLAR CREEK MITIGATION SITE Soil Survey Geographic N (SS U RGO) JOHNSTON COUNTY, NC I Inch = 500 feet Document Path: C:\Users\rmeJ—\Dropbm (RE5)\9RE5 GI5\,nroje is\NC\Poplar Creek (bank site)\MXDVD_Rgures\PoplarCreek_5als.mxa - Date Saved: 3/28/2017 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 17-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -1 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Floodplain Local relief (concave, convex, none): convex Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5488231 Long.: -78.3478915 Datum: NAD83 Soil Map Unit Name: Norfolk loamy sand NWI classification: PFO Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes C No O Is the Sampled Area Hydric Soil Present? Yes No C Yes `- No O Wetland Hydrology Present? Yes O' No O within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U) ❑ Drainage Patterns (B10) ❑ Saturation (A3) [ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0)❑ Geomorphic Position (D2) ❑ Iron Deposits (B5) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No O Depth (inches): Water Table Present? Yes O No OO Depth (inches): Yes O No O Saturation Present?Wetland Yes * No O Depth (inches): 2 Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -1 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: 8, Tree Stratum (Plot size: 30 ) % Cover ❑ Cover Status 50% of Total Cover: 40 20% of Total Cover: 16 80 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) Number of Dominant Species FACW species 20 x 2 = 40 1 . 1 , Liquidambar styraciflua 60d❑ ❑ 75.0% FAC That are OBL, FACW, or FAC: 5 (A) 2. Uriodendron tulipifera 20d❑ FACU species 20 x 4 = 80 25.0% FACU 0 ❑ 0.0% UPL species 0 x 5= 0 4. ❑ 0 ❑ Total Number of Dominant Column Totals: 130 (A) 390 (B) 5. 5. 3. 0 Ll 0.0% Species Across All Strata: 6 (B) 4. 0 ❑ 0.0% 0 Ll 0.0 5. 0 ❑ 0.0% ❑ Percent of dominant Species Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation That Are OBL, FACW, or FAC: 83.3% (A/B) 6. 0 0 2 - Dominance Test is > so% 0.0% )❑ 7. 0 ❑ 0.0% Prevalence Index worksheet: 8, 0 ❑ 0.o% Total % Cover of: Multiply by: 50% of Total Cover: 40 20% of Total Cover: 16 80 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) 5. FACW species 20 x 2 = 40 1 . Hydrophytic 0 ❑ 0.0% FAC species 90 x 3 = 270 2. 10 0 ❑ 0.0% FACU species 20 x 4 = 80 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.0% Column Totals: 130 (A) 390 (B) 5. 5. o Ll o.o 0.0% Prevalence Index = B/A = 3.000 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 )❑ 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 20d❑ 66.7% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. Rubus argutus 10d❑ 33.3% FAC 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ o.o°r° 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 15 20% of Total Cover: 6 30 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 Arundinaria gigantea 10d❑ 100.0% FACW Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. 0 ❑ 0.0% than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 Smilax laurifolia 10 d❑ 100.0% FACW 2. 0 ❑ 0.0% 3. o ❑ 0.0% 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover Present? Yes ` No Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -1 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Tvne 1 Locz Texture Remarks 0-12 10YR 4/1 90 10YR 4/6 10 C M Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: ❑ Histosol (Al) ❑ Histic Epipedon (A2) ❑ Black Histic (A3) ❑ Hydrogen Sulfide (A4) ❑ Stratified Layers (AS) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Muck Presence (A8) (LRR U) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Depleted Below Dark Surface (All) ❑ Thick Dark Surface (Al2) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Sandy Gleyed Matrix (S4) ❑ Sandy Redox (S5) ❑ Stripped Matrix (S6) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 Indicators for Problematic Hydric Soils3: ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) d❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 1538) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 17 -Jan -17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -2 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Hillslope Local relief (concave, convex, none): flat Slope: 5.0 % / 2.9 ° Subregion (LRR or MLRA): LRR P Lat.: 35.5487788 Long.: -78.3478663 Datum: NAD83 Soil Map Unit Name: Norfolk loamy sand NWI classification: Upland Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes (•% No n Is the Sampled Area Hydric Soil Present? Yes O No ' ` • Yes No Wetland Hydrology Present? Yes 0 No C within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U) ❑ Drainage Patterns (B10) ❑ Saturation (A3) ❑ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0) ❑ Geomorphic Position (D2) ❑ Iron Deposits (B5) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No 0 Depth (inches): Water Table Present? Yes O No Depth (inches): Yes O No Saturation Present?Wetland Yes O No Depth (inches): Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -2 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: 8, Tree Stratum (Plot size: 30 ) % Cover El Cover Status 50% of Total Cover: 25 20% of Total Cover: 10 50 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) Number of Dominant Species FACW species 10 x 2 = 20 1. Ilex opaca 1 , Liquidambar styraciflua 30d❑ - 60.0% FAC That are OBL, FACW, or FAC: 5 (A) 2. Uriodendron tulipifera 20d❑ FACU species 40 x 4 = 160 40.0% FACU 0 ❑ 0.0% UPL species 0 x 5= 0 4. ❑ 0 ❑ Total Number of Dominant Column Totals: 105 (A) 345 (B) 5. 5. 3. 0 Ll 0.0% Species Across All Strata: 7 (B) 4. o ❑ 0.0% 0 Ll 0.0 5. o ❑ 0.0% ❑ Percent of dominant Species Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation That Are OBL, FACW, or FAC: 71.4% (A/B) 6. 0 0 2 - Dominance Test is > so% 0.0% ) 7. 0 ❑ 0.0% Prevalence Index worksheet: 8, 0 El 0.o% Total % Cover of: Multiply by: 50% of Total Cover: 25 20% of Total Cover: 10 50 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) 5. FACW species 10 x 2 = 20 1. Ilex opaca Hydrophytic 5❑ - 100.0% FAC FAC species 55 x 3 = 165 2. 40 0 ❑ 0.0% FACU species 40 x 4 = 160 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.o% Column Totals: 105 (A) 345 (B) 5. 5. o Ll o.o 0.0% Prevalence Index = B/A = 3.286 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 2.5 20% of Total Cover: 1 5 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) ❑ 3 - Prevalence Index is <_3.0 1 1. 0 ❑ 0.0% ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. _ 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. _ o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 Arundinaria gigantea 10d❑ 100.0% FACW Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. 0 ❑ 0.0% than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including Ll herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 . Lonicera japonica 20❑ 50.0% FACU 2. Smilax rotundifolia 10d❑ 25.0% FAC 3. Vitis rotundifolia 10d❑ 25.0% FAC 4. o ❑ 0.0% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 20 20% of Total Cover: 8 40 = Total Cover Present? Yes ` No',J Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -2 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % _ Color (moist) % Tvoe t Locz Texture 0-6 10YR 3/3 100 Sandy Loam 6-12 2.5Y 4/4 100 Sandv Loam Remarks t Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: ❑ Histosol (Al) ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Histic Epipedon (A2) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Black Histic (A3) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) ❑ Stratified Layers (AS) ❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 153B) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Muck Presence (A8) (LRR U) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Marl (F30) (LRR U) ❑ Depleted Below Dark Surface (All) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Thick Dark Surface (Al2) ❑ Iron -Manganese Masses (F12) (LRR 0, P, T) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Sandy Gleyed Matrix (S4) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Sandy Redox (S5) ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Stripped Matrix (S6) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: Hydric Soil Present? Yes 0 NO O US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 17-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -3 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Floodplain Local relief (concave, convex, none): flat Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5560729 Long.: -78.3497293 Datum: NAD83 Soil Map Unit Name: Norfolk loamy sand NWI classification: PFO Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes C No O Is the Sampled Area Hydric Soil Present? Yes No C Yes `- No O Wetland Hydrology Present? Yes O' No O within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) O Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) O Marl Deposits (B15) (LRR U)d❑ Drainage Patterns (B10) ❑ Saturation (A3) [ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0)❑ Geomorphic Position (D2) d❑ Iron Deposits (BS) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No O Depth (inches): Water Table Present? Yes O No OO Depth (inches): Yes O No O Saturation Present?Wetland Yes O No Depth (inches): Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -3 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: 1. Prevalence Index worksheet: Tree Stratum (Plot size: 30 ) % Cover 0 Cover Status ❑ o.o% Total % Cover of: Multiply by: 50% of Total Cover: 30 20% of Total Cover: 12 60 = Total Cover OBL species 15 x 1 = 15 Number of Dominant Species ) ❑ o.o% 1 , Uriodendron tulipifera 30d❑ FACW species 0 x 2 = 0 50.0% FACU That are OBL, FACW, or FAC: 5 (A) 2. Liquidambar styraciflua 30d❑ 2. 50.0% FAC ❑ 0.0% FACU species 30 x 4 = 120 3. ❑ 0 ❑ Total Number of Dominant UPL species 0 x 5= 0 3. 0 0 0.0% 0.o% Species Across All Strata: 6 (B) 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Prevalence Index = B/A = 3.000 Percent of dominant Species 0 Ll 0.0 ❑ 7. That Are OBL, FACW, or FAC: 83.3% (A/B) 6. 0 Hydrophytic Vegetation Indicators: 0.0% 0 ❑ 0.0% 7. 0 ❑ 0.0% 1. Prevalence Index worksheet: 8, 0 Elo.o% 0 ❑ o.o% Total % Cover of: Multiply by: 50% of Total Cover: 30 20% of Total Cover: 12 60 = Total Cover OBL species 15 x 1 = 15 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) ❑ o.o% FACW species 0 x 2 = 0 1. Ilex opaca ❑ 0.0% 20❑ Hydrophytic 100.0% FAC FAC species 90 x 3 = 270 2. Vegetation 0 ❑ 0.0% FACU species 30 x 4 = 120 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.o% Column Totals: 135 (A) 405 (B) 5. 5. o Ll 0.0% o.o Prevalence Index = B/A = 3.000 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 10 20% of Total Cover: 4 20 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) 0 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 20 d❑ 100.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 10 20% of Total Cover: 4 20 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 Microstegium vimineum 20d❑ 57.1% FAC Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. ]uncus effusus 15d❑ 42.9% OBL than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 175 20% of Total Cover: 7 35 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1. 0 ❑ o.o% 2. 0 ❑ o.o% 3. o ❑ o.o% 4. 0 ❑ o.o% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover Present? Yes ` No',J Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -3 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Tvne 1 Locz Texture Remarks 0-12+ 10YR 4/1 85 10YR 5/8 15 C M Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: ❑ Histosol (Al) ❑ Histic Epipedon (A2) ❑ Black Histic (A3) ❑ Hydrogen Sulfide (A4) ❑ Stratified Layers (AS) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Muck Presence (A8) (LRR U) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Depleted Below Dark Surface (All) ❑ Thick Dark Surface (Al2) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Sandy Gleyed Matrix (S4) ❑ Sandy Redox (S5) ❑ Stripped Matrix (S6) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 Indicators for Problematic Hydric Soils3: ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) d❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 1538) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 17-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -4 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Floodplain Local relief (concave, convex, none): concave Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5521540 Long.: -78.3510778 Datum: NAD83 Soil Map Unit Name: Rains sandy loam NWI classification: PFO Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes C No O Is the Sampled Area Hydric Soil Present? Yes No C Yes `- No O Wetland Hydrology Present? Yes O' No O within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U)d❑ Drainage Patterns (B10) ❑ Saturation (A3) [ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0)❑ Geomorphic Position (D2) d❑ Iron Deposits (BS) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No O Depth (inches): Water Table Present? Yes O No OO Depth (inches): Yes O No O Saturation Present?Wetland Yes * No O Depth (inches): 0 Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -4 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: 15 Tree Stratum (Plot size: 30 ) % Cover 2. Cover Status 0.o% 3. Total % Cover of: Multiply by: 50% of Total Cover: 25 20% of Total Cover: 10 50 = Total Cover Number of Dominant Species OBL species 10 x 1 = 10 1 , Liquidambar styraciflua 30d❑ ❑ 0.0% 60.0% FAC That are OBL, FACW, or FAC: 7 (A) 2. Uriodendron tulipifera 20d❑ 15 40.0% FACU FAC species 90 x 3 = 270 2 • ❑ 0.0% Total Number of Dominant 3. 3. 0 ❑ 0.0% Species Across All Strata: 8 (B) 4. 0 ❑ 0.0% Column Totals: 135 (A) 390 (B) 5 5. 5. 0 ❑ 0.0% Percent of dominant Species • ❑ -0.0% That Are OBL, FACW, or FAC: 87.5% (A/B) 6. 0 Ll 0.0% 7. 7. 0 ❑ 0.0% 15 Prevalence Index worksheet: 8, 2. 0 El 0.o% 3. Total % Cover of: Multiply by: 50% of Total Cover: 25 20% of Total Cover: 10 50 = Total Cover ❑ 0.0% OBL species 10 x 1 = 10 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) ❑ 0.0% Hydrophytic FACW species 15 x 2 = 30 1. Ilex opaca Vegetation 20❑ 15 100.0% FAC FAC species 90 x 3 = 270 2 • ❑ 0.0% FACU species 20 x 4 = 80 3. ❑ 0.o% UPL species 0 x 5 = 0 4. 0 ❑ 0.0% Column Totals: 135 (A) 390 (B) 5 5. o Ll o.o • -0.0% Prevalence Index = B/A = 2.889 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8 • 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 10 20% of Total Cover: 4 20 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 )❑ 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 20d❑ 80.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. Rubus argutus 5d❑ 20.0% FAC 3 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must • be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 12.5 20% of Total Cover: 5 25 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 Microstegium vimineum 15d❑ 60.0% FAC Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. ]uncus effusus 10d❑ 40.0% OBL than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7• 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8 • 0 ❑ 0.0% 9 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including • ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 125 20% of Total Cover: 5 25 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 Smilax laurifolia 15 d❑ 100.0% FACW 2. 0 ❑ 0.0% 3. o ❑ 0.0% 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 7.5 20% of Total Cover: 3 15 = Total Cover Present? Yes ` No',J Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -4 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Tvne 1 Locz Texture Remarks 0-12+ 10YR 5/1 90 10YR 4/6 10 C M Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: ❑ Histosol (Al) ❑ Histic Epipedon (A2) ❑ Black Histic (A3) ❑ Hydrogen Sulfide (A4) ❑ Stratified Layers (AS) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Muck Presence (A8) (LRR U) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Depleted Below Dark Surface (All) ❑ Thick Dark Surface (Al2) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Sandy Gleyed Matrix (S4) ❑ Sandy Redox (S5) ❑ Stripped Matrix (S6) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 Indicators for Problematic Hydric Soils3: ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) d❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 1538) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 24-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -5 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Toeslope Local relief (concave, convex, none): concave Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5546987 Long.: -78.3538137 Datum: NAD83 Soil Map Unit Name: Rains sandy loam NWI classification: PFO Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes C No O Is the Sampled Area Hydric Soil Present? Yes No C Yes `- No O Wetland Hydrology Present? Yes O' No O within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U) ❑ Drainage Patterns (B10) ❑ Saturation (A3) [ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0) ❑ Geomorphic Position (D2) d❑ Iron Deposits (BS) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7)❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No O Depth (inches): Water Table Present? Yes O No OO Depth (inches): Yes O No O Saturation Present?Wetland Yes * No O Depth (inches): 0 Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -5 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: Tree Stratum (Plot size: 30 ) % Cover 0 Cover Status Total % Cover of: Multiply by: 50% of Total Cover: 7.5 20% of Total Cover: 3 15 = Total Cover OBL species 10 x 1 = 10 Sapling or Sapling/Shrub Stratum (Plot size: 30 Number of Dominant Species 1 , Acer rubrum 15 d❑ 100.0% FAC That are OBL, FACW, or FAC: 4 (A) 2. o ❑ o.o°ro ❑ 0.0% FACU species 0 x 4= 0 3. ❑ ❑ 0.0% Total Number of Dominant 4. 3. _ 0 ❑ 0.0% Column Totals: 105 (A) 275 (B) Species Across All Strata: 4 (B) 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Percent of dominant Species Ll 0.0 ❑ 0 That Are OBL, FACW, or FAC: 100.0% (A/B) 6. 0 0.0% ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 7. 0 ❑ 0.0% Prevalence Index worksheet: 8, 0 ❑ 0.o% Total % Cover of: Multiply by: 50% of Total Cover: 7.5 20% of Total Cover: 3 15 = Total Cover OBL species 10 x 1 = 10 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) 5. FACW species 20 x 2 = 40 1 . Hydrophytic 0 ❑ 0.0% FAC species 75 x 3 = 225 2. 20 0 ❑ 0.0% FACU species 0 x 4= 0 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.0% Column Totals: 105 (A) 275 (B) 5. 5. o Ll o.o 0.0% Prevalence Index = B/A = 2.619 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) 0 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 60d❑ 100.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 30 20% of Total Cover: 12 60 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 ]uncus effusus 10d❑ 100.0% OBL Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. 0 ❑ 0.0% than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 Smilax laurifolia 20 d❑ 100.0% FACW 2. 0 ❑ 0.0% 3. o ❑ 0.0% 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 10 20% of Total Cover: 4 20 = Total Cover Present? Yes ` No',J Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -5 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Tvne 1 Locz Texture Remarks 0-12 10YR 4/1 85 10YR 5/8 15 C M Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: ❑ Histosol (Al) ❑ Histic Epipedon (A2) ❑ Black Histic (A3) ❑ Hydrogen Sulfide (A4) ❑ Stratified Layers (AS) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Muck Presence (A8) (LRR U) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Depleted Below Dark Surface (All) ❑ Thick Dark Surface (Al2) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Sandy Gleyed Matrix (S4) ❑ Sandy Redox (S5) ❑ Stripped Matrix (S6) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 Indicators for Problematic Hydric Soils3: ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) d❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 1538) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ Marl (F30) (LRR U) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Iron -Manganese Masses (F12) (LRR O, P, T) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 24-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -6 Investigator(s): ]. Schmid, M. DeAngelo Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Backslope-NRCS Local relief (concave, convex, none): flat Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5546451 Long.: -78.3539534 Datum: NAD83 Soil Map Unit Name: Rains sandy loam NWI classification: Upland Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes (•% No n Is the Sampled Area Hydric Soil Present? Yes O No ' ` • Yes No Wetland Hydrology Present? Yes 0 No C within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U) ❑ Drainage Patterns (B10) ❑ Saturation (A3) ❑ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0) ❑ Geomorphic Position (D2) ❑ Iron Deposits (B5) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No 0 Depth (inches): Water Table Present? Yes O No Depth (inches): Yes O No Saturation Present?Wetland Yes O No Depth (inches): Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -6 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: 8, Tree Stratum (Plot size: 30 ) % Cover ❑ Cover Status 50% of Total Cover: 15 20% of Total Cover: 6 30 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) Number of Dominant Species FACW species 0 x 2 = 0 1. 1 , Uriodendron tulipifera 20d❑ ❑ 66.7% FACU That are OBL, FACW, or FAC: 4 (A) 2. Liquidambar styraciflua 10d❑ FACU species 20 x 4 = 80 33.3% FAC 0 ❑ 0.0% UPL species 0 x 5= 0 4. ❑ 0 ❑ Total Number of Dominant Column Totals: 125 (A) 395 (B) 5. 5. 3. 0 Ll 0.0% Species Across All Strata: 5 (B) 4. 0 ❑ 0.0% 0 Ll 0.0 5. 0 ❑ 0.0% ❑ Percent of dominant Species Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation That Are OBL, FACW, or FAC: 80.0% (A/B) 6. 0 0 2 - Dominance Test is > so% 0.0% ) 7. 0 ❑ 0.0% Prevalence Index worksheet: 8, 0 ❑ 0.o% Total % Cover of: Multiply by: 50% of Total Cover: 15 20% of Total Cover: 6 30 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) 5. FACW species 0 x 2 = 0 1. Hydrophytic 0 ❑ 0.0% FAC species 105 x 3 = 315 2. 25 0 ❑ 0.0% FACU species 20 x 4 = 80 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.0% Column Totals: 125 (A) 395 (B) 5. 5. o Ll o.o 0.0% Prevalence Index = B/A = 3.160 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) ❑ 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 70 d❑ 100.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 35 20% of Total Cover: 14 70 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 0 ❑ 0.0% Sapling - Woody plants, excluding woody vines, . approximately 20 ft (6 m) or more in height and less 2. 0 ❑ 0.0% than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 . Vitis rotundifolia 20❑ 80.0% FAC 2. Smilax rotundifolia 5d❑ 20.0% FAC 3. o ❑ o.o% 4. 0 ❑ o.o% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 12.5 20% of Total Cover: 5 25 = Total Cover Present? Yes ` No Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -6 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % _ Color (moist) % Tvoe t Locz Texture 0-3 2.5YR 3/3 100 Sandy Loam 3-12 2.5YR 5/4 100 Sandv Loam Remarks t Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: ❑ Histosol (Al) ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Histic Epipedon (A2) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Black Histic (A3) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) ❑ Stratified Layers (AS) ❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 153B) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Muck Presence (A8) (LRR U) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Marl (F30) (LRR U) ❑ Depleted Below Dark Surface (All) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Thick Dark Surface (Al2) ❑ Iron -Manganese Masses (F12) (LRR 0, P, T) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Sandy Gleyed Matrix (S4) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Sandy Redox (S5) ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Stripped Matrix (S6) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: Hydric Soil Present? Yes 0 NO O US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 31-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -7 Investigator(s): ]. Schmid, R. Medric Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Floodplain Local relief (concave, convex, none): flat Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5588335 Long.: -78.3589653 Datum: NAD83 Soil Map Unit Name: Nason silt loam NWI classification: PFO Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes C No O Is the Sampled Area Hydric Soil Present? Yes No C Yes `- No O Wetland Hydrology Present? Yes O' No O within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U)d❑ Drainage Patterns (B10) ❑ Saturation (A3) [ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0)❑ Geomorphic Position (D2) ❑ Iron Deposits (B5) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No O Depth (inches): Water Table Present? Yes O No OO Depth (inches): Yes O No O Saturation Present?Wetland Yes * No O Depth (inches): 8 Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -7 7. ❑ Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: Tree Stratum (Plot size: 30 ) % Cover 0 Cover Status 5 Total % Cover of: Multiply by: 50% of Total Cover: 37.5 20% of Total Cover: 15 75 = Total Cover OBL species 0 x 1 = 0 Number of Dominant Species ) 1 , Liquidambar styraciflua 30d❑ FACW species 35 x 2 = 70 40.0% FAC That are OBL, FACW, or FAC: 7 (A) 2. Acer rubrum 20d❑ 2. 26.7% FAC ❑ 0.0% 3. Uriodendron tulipifera 20 d❑ 26.7% FACU Total Number of Dominant UPL species 0 x 5= 0 - 0 ❑ 0.o% Species Across All Strata: 8 (B) 4. Quercus laurifolia 5 ❑ 6.7% FACW 5. 0 ❑ 0.0% Prevalence Index = B/A = 2.900 Percent of dominant Species o Ll 0.0 ❑ 7. That Are OBL, FACW, or FAC: 87.5% (A/B) 6. 0.0% 0 Hydrophytic Vegetation Indicators: 0.0% 0 ❑ 7. ❑ 0 ❑ 0.0% _ 0.0% Prevalence Index worksheet: 8, _ 0.0% _ 0 ❑ 0.o% 5 Total % Cover of: Multiply by: 50% of Total Cover: 37.5 20% of Total Cover: 15 75 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) FACW species 35 x 2 = 70 1. Ilex opaca 5❑ 100.0% FAC FAC species 95 x 3 = 285 2. 0 ❑ 0.0% FACU species 20 x 4 = 80 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.o% Column Totals: 150 (A) 435 (B) 5. 5. o Ll o.o 0.0% Prevalence Index = B/A = 2.900 o Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 2.5 20% of Total Cover: 1 5 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) 0 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 20 d❑ 100.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 10 20% of Total Cover: 4 20 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 Arundinaria gigantea 30d❑ 66.7% FACW Sapling - Woody plants, excluding woody vines, , approximately 20 ft (6 m) or more in height and less 2. Microstegium vimineum 15d❑ 33.3% FAC than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 22.5 20% of Total Cover: 9 45 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 Toxicodendron radicans 2- 50% 50% of Total Cover: 2.5 20% of Total Cover: 1 Remarks: (If observed, list morphological adaptations below). 5 d❑ 100.0% FAC 0 ❑ 0.0% 0 ❑ _ 0.0% 0 ❑ _ 0.0% _ 0 ❑ 0.0% 5 = Total Cover *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. Hydrophytic Vegetation Present? Yes `•' No US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -7 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Tvne 1 Locz Texture 0-12 10YR 4/2 90 10YR 5/6 10 C M Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Remarks Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: ❑ Histosol (Al) ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Histic Epipedon (A2) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Black Histic (A3) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) ❑ Stratified Layers (AS) d❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 153B) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Muck Presence (A8) (LRR U) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Marl (F30) (LRR U) ❑ Depleted Below Dark Surface (All) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Thick Dark Surface (Al2) ❑ Iron -Manganese Masses (F12) (LRR 0, P, T) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Sandy Gleyed Matrix (S4) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Sandy Redox (S5) ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Stripped Matrix (S6) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: Hydric Soil Present? Yes 0 No 0 US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 WETLAND DETERMINATION DATA FORM - Atlantic and Gulf Coastal Plain Region Project/Site: Poplar Creek Mitigation Site City/County: Johnston Sampling Date: 31-3an-17 Applicant/Owner: Resource Environmental Solutions State: NC Sampling Point: DP -8 Investigator(s): ]. Schmid, R. Medric Section, Township, Range: S T R Landform (hillslope, terrace, etc.): Backslope-NRCS Local relief (concave, convex, none): flat Slope: 0.0 % / 0.0 Subregion (LRR or MLRA): LRR P Lat.: 35.5590353 Long.: -78.3590192 Datum: NAD83 Soil Map Unit Name: Nason silt loam NWI classification: Upland Are climatic/hydrologic conditions on the site typical for this time of year? Yes 0 No O (If no, explain in Remarks.) Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ significantly disturbed? Are "Normal Circumstances" present? Yes O No O Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS - Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes (•% No O Is the Sampled Area Hydric Soil Present? Yes O No ' ` • Yes NoO Wetland Hydrology Present? Yes O No C within a Wetland? Remarks: HYDROLOGY wetland Hydrology Indicators: Secondary Indicators (minimum of 2 required) Primary Indicators (minimum of one required; check all that apply) ❑ Surface Soil Cracks (B6) ❑ Surface Water (Al) L Aquatic Fauna (B13) ❑ Sparsely Vegetated Concave Surface (B8) ❑ High Water Table (A2) L Marl Deposits (B15) (LRR U) ❑ Drainage Patterns (B10) ❑ Saturation (A3) ❑ Hydrogen Sulfide Odor (Cl) ❑ Moss Trim Lines (B16) ❑ Water Marks (Bl) ❑ Oxidized Rhizospheres along Living Roots (0) ❑ Dry Season Water Table (C2) ❑ Sediment Deposits (B2) ❑ Presence of Reduced Iron (C4) ❑ Crayfish Burrows (C8) ❑ Drift Deposits (B3) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Saturation Visible on Aerial Imagery (C9) ❑ Algal Mat or Crust (B4) ❑ Thin Muck Surface (0) ❑ Geomorphic Position (D2) ❑ Iron Deposits (B5) ❑ Other (Explain in Remarks) ❑ Shallow Aquitard (D3) ❑ Inundation Visible on Aerial Imagery (B7) ❑ FAC -Neutral Test (D5) ❑ Water -Stained Leaves (B9) ❑ Sphagnum moss (D8) (LRR T, U) Field Observations: Surface Water Present? Yes O No 0 Depth (inches): Water Table Present? Yes O No Depth (inches): Yes O No Saturation Present?Wetland Yes O No Depth (inches): Hydrology Present? (includes capillary frinqe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 VEGETATION (Five/Four Strata) - Use scientific names of plants. Dominant C .. .'i-7 Sampling Point: DP -8 7. Absolute Rel.Strat. Indicator Dominance Test worksheet: Prevalence Index worksheet: 8, Tree Stratum (Plot size: 30 ) % Cover ❑ Cover Status 50% of Total Cover: 40 20% of Total Cover: 16 80 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) Number of Dominant Species FACW species 0 x 2 = 0 1. Liquidambar styraciflua 1 , Pinus taeda 80 d❑ 100.0% FAC That are OBL, FACW, or FAC: 4 (A) 2. o ❑ o.o°ro 0 ❑ 0.0% UPL species 0 x 5= 0 4. ❑ 0 ❑ Total Number of Dominant Column Totals: 125 (A) 385 (B) 5. 5. 3. _ 0 Ll 0.0% Species Across All Strata: 5 (B) 4. 0 ❑ 0.0% 0 Ll 0.0 5. 0 ❑ 0.0% ❑ Percent of dominant Species Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation That Are OBL, FACW, or FAC: 80.0% (A/B) 6. 0 0 2 - Dominance Test is > so% 0.0% ) 7. 0 ❑ 0.0% Prevalence Index worksheet: 8, 0 ❑ o.o% Total % Cover of: Multiply by: 50% of Total Cover: 40 20% of Total Cover: 16 80 = Total Cover OBL species 0 x 1 = 0 Sapling or Sapling/Shrub Stratum (Plot size: 30 ) 5. FACW species 0 x 2 = 0 1. Liquidambar styraciflua Hydrophytic 20❑ - 80.0% FAC FAC species 115 x 3 = 345 2. Quercus nigra 10 5❑ Present? Yes ` No',J 20.0% FAC FACU species 10 x 4 = 40 3. 0 ❑ 0.0% UPL species 0 x 5= 0 4. 0 ❑ 0.0% Column Totals: 125 (A) 385 (B) 5. 5. o Ll o.o -0.0% Prevalence Index = B/A = 3.080 0 Ll 0.0 7. 0 ❑ 0.0% Hydrophytic Vegetation Indicators: 8. 0 ❑ 0.0% ❑ 1 -Rapid Test for Hydrophytic Vegetation 50% of Total Cover: 12.5 20% of Total Cover: 5 25 = Total Cover 0 2 - Dominance Test is > so% Shrub Stratum (Plot size: 30 ) ❑ 3 - Prevalence Index is <_3.0 1 1. Ligustrum sinense 10 d❑ 100.0% FAC ❑ Problematic Hydrophytic Vegetation 1 (Explain) 2. 0 ❑ 0.0% 3. 0 ❑ 0.0% 1 Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. 4. o ❑ 0.0% 5. 0 ❑ 0.0% Definition of Vegetation Strata: 6. 0 ❑ 0.0% Tree - Woody plants, excluding woody vines, 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover approximately 20 ft (6 m) or more in height and 3 in. (7.6 cm) or larger in diameter at breast height (DBH). Herb Stratum (Plot size: 30 ) 1 0 ❑ 0.0% Sapling - Woody plants, excluding woody vines, . approximately 20 ft (6 m) or more in height and less 2. 0 ❑ 0.0% than 3 in. (7.6 cm) DBH. 3. 0 ❑ 0.0% 4. 0 ❑ 0.0% Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than 3.28 ft (1 m) tall. 5. 0 ❑ 0.0% 6. 0 ❑ 0.0% Shrub - Woody plants, excluding woody vines, 7. 0 ❑ 0.0% approximately 3 to 20 ft (1 to 6 m) in height. 8. 0 ❑ 0.0% 9. 0 ❑ 0.0% Herb - All herbaceous (non -woody) plants, including ❑ herbaceous vines, regardless of size, and woody 1 Q. 0 0.0% plants, except woody vines, less than approximately 11. 0 ❑ 0.0% 3 ft (1 m) in height. 12. 0 ❑ 0.0% 50% of Total Cover: 0 20% of Total Cover: 0 0 = Total Cover Woody vine - All woody vines, regardless of height. Woody Vine Stratum (Plot size: 30 ) 1 . Lonicera japonica 10 d❑ 100.0% FACU 2. 0 ❑ 0.0% 3. o ❑ 0.0% 4. 0 ❑ 0.0% 5. 0 ❑ 0.0% Hydrophytic - Vegetation 50% of Total Cover: 5 20% of Total Cover: 2 10 = Total Cover Present? Yes ` No',J Remarks: (If observed, list morphological adaptations below). *Indicator suffix = National status or professional decision assigned because Regional status not defined by FWS. US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 SOIL Sampling Point: DP -8 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % _ Color (moist) % Tvoe 1 Locz Texture Remarks 0-6 2.5Y 4/4 100 Loam 6-12 2.5Y 6/3 100 Loam 1 Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: ❑ Histosol (Al) ❑ Polyvalue Below Surface (S8) (LRR S, T, U) ❑ 1 cm Muck (A9) (LRR O) ❑ Histic Epipedon (A2) ❑ Thin Dark Surface (S9) (LRR S, T, U) ❑ 2 cm Muck (A10) (LRR S) ❑ Black Histic (A3) ❑ Loamy Mucky Mineral (Fl) (LRR O) ❑ Reduced Vertic (F18) (outside MLRA 150A,B) ❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ Piedmont Floodplain Soils (F19) (LRR P, S, T) ❑ Stratified Layers (AS) ❑ Depleted Matrix (F3) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 153B) ❑ Organic Bodies (A6) (LRR P, T, U) ❑ Redox Dark Surface (F6) ❑ Red Parent Material (TF2) ❑ 5 cm Mucky Mineral (A7) (LRR P, T, U) ❑ Depleted Dark Surface (F7) ❑ Very Shallow Dark Surface (TF12) ❑ Muck Presence (A8) (LRR U) ❑ Redox Depressions (F8) ❑ Other (Explain in Remarks) ❑ 1 cm Muck (A9) (LRR P, T) ❑ Marl (F30) (LRR U) ❑ Depleted Below Dark Surface (All) ❑ Depleted Ochric (F31) (MLRA 151) ❑ Thick Dark Surface (Al2) ❑ Iron -Manganese Masses (F12) (LRR 0, P, T) ❑ Coast Prairie Redox (A16) (MLRA 150A) ❑ Umbric Surface (F33) (LRR P, T, U) ❑ Sandy Muck Mineral (Sl) (LRR 0, S) ❑ Delta Ochric (1`17) (MLRA 151) ❑ Sandy Gleyed Matrix (S4) ❑ Reduced Vertic (F18) (MLRA 150A, 150B) 3Indicators of hydrology mushydrophytic vegetation and wetland hydrology must be present, ❑ Sandy Redox (S5) ❑ Piedmont Floodplain Soils (F19) (MLRA 149A) unless disturbed or problematic. ❑ Stripped Matrix (S6) ❑ Anomalous Bright Loamy Soils (F20) (MLRA 149A, 153C, 153D) ❑ Dark Surface (S7) (LRR P, S, T, U) Restrictive Layer (if observed): Type: Depth (inches): Remarks: Hydric Soil Present? Yes 0 NO O US Army Corps of Engineers Atlantic and Gulf Coastal Plain Region - Version 2.0 Water Resources ENVIRONMENTAL QUALITY August 19, 2016 Brad Breslow, RES 302 Jefferson St., Suite 110 Raleigh, NC 27605 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Direcmr Subject: Buffer Determination Letter RRO #16-260 Johnston County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B.0233) Start@ Stop@ ❑ Intermittent/Perennial Determination (where local buffer ❑ Tar -Pamlico (15A NCAC 2B .0259) ordinances apply) ❑ Jordan (15A NCAC 2B .0267) (governmental and/or interjurisdictional projects) Project Name: Poplar Creek Mitigation Site Address/Location: 2549 Wilson Mills Road Smithfield NC 27577 Stream(s): Poplar Creek Determination Date: 08/18/2016 Staff. Rick Trone Stream E/I/P* Not Subject Subject Start@ Stop@ Soil USGS To o 171-175 ------Survey I X DWR Flag DWR X X Flag/Pipeline Easement 177-178 I X DWR Flag Confluence X X w/Po lar Creek YB1 I X DWR Flag Confluence X X w/Polar Creek YB2B- P X DWR Flag at LeeConfluence X X Y132C Youngblood Rd w/Polar Creek YB3 I X DWR Flag DWR X Flag/Pipeline Easement "E/IIP = Ephemeral/Intermittent/Perennial Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Johnston County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject' has been determined to not be at least intermittent or is not present. Streams that are checked "Subject' have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. If sending via US Postal Service: c/o Karen Higgins, DWR — 401 & Buffer Permitting Unit, 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins, DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street, Raleigh, NC 27604. This determination is final and binding unless, as detailed above, an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you ave questions regarding this deterin ton, please feel free to contact Rick Trone at (919) 791-4248. S' cereI If y/ Danny Smith/ �v Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy Popular Creek Mitigation Site I Johnston County, NC-DWR Project # 16-260 I Stream F1- — F5 A os, PP< Subject Stream F8 4 Stream YB1 Subject isml ftY_ _ tib i i e Pond \ — \\` ', X v y loMESTfAAD I SPA Stream YB2B- � YB2C — ',g�\ Subject I o "rJones g Cc -n USGS Topo Map •yTq cd Map provided by NCDEQ Selma Quandrangle ' " Division of Water Re- s sources Johnston Co., NC S •;ry �. :: Locations are approxi- 2016 pproxi- r•� n 2016�',� mate and are provided for IILJ,AV\'JII .�., reference only :: I It Appendix F —Invasive Species Plan INVASIVE SPECIES PLAN Annual monitoring and semi-annual site visits will be conducted to assess the condition of the finished project. These site inspections may identify the presence of invasive vegetation. RES will treat invasive species vegetation within the project area and provide remedial action on a case-by-case basis. Common invasive species vegetation, such as Chinese privet (Ligustrum sinense), multiflora rose (Rosa multiflora), tree -of -heaven (Ailanthus altissima), and Japanese honeysuckle (Lonicera japonica), will be treated to allow native plants to become established within the conservation easement. Invasive species vegetation will be treated by approved mechanical and/or chemical methods such that the percent composition of exotic/invasive species is less than 5% of the total riparian buffer area. Any control methods requiring herbicide application will be performed in accordance with NC Department of Agriculture (NCDA) rules and regulations. If areas of invasive species exist within the easement, they will be monitored yearly as part of the monitoring protocol, and treated if necessary. If required, problem areas will continue to be treated until the project easement shows overall trending towards meeting all monitoring requirements. Appendix G —Regulatory Agency Scoping Letters FISH AND WILDLIFE SERVICE Raleigh ES Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 November 3, 2016 Mr. John Thomas U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RECEIVED NOV 0 9 2016 RALEIGH REGULATORY Subject: Action ID # 2016-01985; Modification of the Neu -Con Umbrella Mitigation Banking Instrument associated with the addition of the Poplar Creek Mitigation Site Dear Mr. Thomas: The U.S. Fish and Wildlife Service (Service) has reviewed the information concerning the above referenced project. The project, based on the description in your letter to our office, the provided Instrument Modification, and other information is expected to have minimal adverse impacts to fish and wildlife resources. The proposed Poplar Creek Mitigation Site is approximately 60 -acres, and occurs west of Wilson's Mills Road, north of Smithfield,_adjacent.to Poplar Creek,,in Johnston County, North Carolina. The project proposes to restore 4,169 linear feet (LF) of stream channel and to enhance 9,255 LF of stream channel, all of which will be included within the conservation easement onsite. We do not have any major concerns with the Poplar Creek Mitigation site plan as currently proposed, and think this project could greatly benefit the downstream water quality. Downstream water quality in this watershed is greatly important to the Service since there have been records of the following aquatic federal species of concern (FSC) in the recent years: r Roanoke slabshell (Elliptio oanokensis) found in 2015, Triangle floater (Alasnaidonta undulate) found in 2012, and the State threatened Eastern lampmussel (Lampsillis radiata) found in 2005. There have also been records of the Neuse River Waterdog (Necturis levvisi), also a federal species of concern, found approximately 4.5 miles downstream. The Service encourages mitigation efforts in priority watersheds, or with work that drains to priority watersheds such as this one, that will benefit federal and state listed species. The Service would encourage catching and removing any non-native fish that currently reside in the ponds onsite that is proposed for removal, prior to breaching the dam and connecting this feature with the tributary system to reduce impacts to native aquatic species downstream. We will continue to be involved in this project through discussions with the IRT, and will provide additional comments in the future if d wan ante . The Service has reviewed available information on federally -threatened or endangered species known to occur in Johnson County, specifically within the proposed mitigation work area, 2 tributaries of Poplar Creek, and downstream in the Neuse River. Federally listed species in Johnston County, North Carolina include: Red -cockaded woodpecker (Picoides borealis), Tar River spinymussel (Eliptio steinstansana), dwarf wedgemussel (Alasnaidonta heterodon), and Michaux's sumac (Rhus n¢ichauxii), in addition to many other federal species of concern. We have also reviewed information from the North Carolina Natural Heritage Program (NCNI-IP) database which contains excellent data on the special status species, both federal and state, which can be found here: https://ncnhde.natureserve.org/. The federally listed species table on page 7 includes Kidney Sedge (State listed) and Virginia Least Trillium (federal species of concern), which are not federally listed at this time. Those two species should be removed from the federal species table, but should remain in the discussion of other listed species within the one -mile radius. Our review indicates that no federally listed species under Service jurisdiction are likely to occur in the project area due to lack of appropriate habitat. Therefore, the Service would concur with a determination that the action is not likely to adversely affect species designated as threatened, endangered, or their designated critical habitat. In accordance with the Endangered Species Act of 1973, as amended, (ESA) and based on the information provided, and other available information, it appears the actions described in the Mitigation Site plan for Poplar Creek are not likely to adversely affect federally listed species or their critical habitat as defined by the ESA. We believe that the requirements of Section 7 (a)(2) of the ESA have been satisfied for this project. Please remember that obligations under the ESA must be reconsidered if: (1) new information identifies impacts of this action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is modified in a manner that was not considered in this review; or, (3) a new species is listed or critical habitat determined that may be affected by the identified action. The Service appreciates the opportunity to comment on this Mitigation Site plan. If you have questions regarding these comments, please contact Emily Wells at 919-856-4520, ext. 25 or by e-mail at < emily_wells@fws.gov >. Sincerely, Peter gamin Field ffice Supervisor a North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Banos, Administrator Governor Pat McCrory Secretary Susan Kluttz November 28, 2016 John Thomas Raleigh Regulatory Field Office 3331 Heritage Trade Street, Suite 105 Wake Forest, NC 27587 Office of Archives and History Deputy Secretary Kevin Cherry Re: Add Poplar Creek Mitigation Site to the New -Con Umbrella Mitigation Bank, SAW 2016-01985, Johnston County, ER 16-2086 Dear Mr. Thomas: We have received a public notice concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or environmental.review cr,ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Banos Location: 109 East Jonas Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephonemax: (919) 807-6570/807-6599