HomeMy WebLinkAbout20160521 Ver 1_More Info Received (S&E and SW Report)_20171129TABLE OF CONTENTS
General Description…………………………………………………………………..….1
Predevelopment Conditions.…………………………………………..………….….…2
Post-development Conditions.…………………………………………..……….….….5
Erosion and Sediment Control….……………………………………..…..……….…..12
Figure 1 – Predevelopment Drainage Area…………………………..…..…………..17
Figure 2 – Post-development Drainage Area………………………..…..……………18
Figure 3 – EC Phase 1 Drainage Areas……………...………………..…..………....19
Figure 4 – EC Phase 2 Drainage Areas……………………………………………….20
Figure 5 – Diversion Drainage Areas………………..…………..…………………….21
Figure 6 – Pipe Drainage Areas…………………………………………………….….22
Figure 7 – Watershed Drainage Areas…………………………………………….…..23
Appendix A –Site Location Map, USGS topographic map, NRCS Soil Data, FEMA Firm
Map
Appendix B – NOAA Rainfall Data
Appendix C– Permit SAW-2016-00534 to fill riparian, non-riverine wetlands
Appendix D – Wet Pond Calculations
Appendix E – Hydraflow Hydrographs
Appendix F – Storm Sewer Calculations
Appendix G – Rip Rap Outlet Protection Calculations
Appendix H – Faircloth Skimmer Calculations
Appendix I – Ditch Stability Calculations
Appendix J – Watershed Calculations
- 1 -
WRENN FARM
HIGH POINT, NC
STORMWATER MANAGEMENT REPORT
GENERAL DESCRIPTION
This project involves the development of an approximate 65 acre site in High Point,
North Carolina. The existing conditions include a mass graded site that is partially
stabilized. The proposed development will include multiple commercial parcels along
Greensboro Road, attached single family units and single family homes. The
development will include the necessary infrastructure to support these developments
(roads, water, and sewer) and the necessary stormwater control measures. It will be
permitted by Jemsite Development, LLC.
The stormwater and storm drain calculations were based on the surveys provided by
EAS Professionals, Inc and Jamestown Engineering Group, Inc. The plans show
multiple parcels totaling approximately 65 acres that will be disturbed for construction.
Additional work will be performed within the DOT right-of-way. Therefore, the sediment
and erosion control devices will be designed accordingly.
In order to meet the City of High Point development standards the storm drain
measures will control and treat runoff from the first one inch of rain and provide 85%
TSS removal. Stormwater control measures must discharge the storage volume at a
rate equal to or less than the predevelopment discharge rate for the 10-year, 24-hour
storm. In order to meet the discharge design requirements three (3) wet detention
ponds will be installed on the site. One in the northwest corner of the site. One along
the northern side of the site and one on the northeast side of the site. All three wet
ponds have an appropriately sized forebay area. The second design requirement for
the City of High Point is the structural treatment system shall be designed to have a
minimum of 85% average annual removal for Total Suspended Solids (TSS). This
requirement is fulfilled by using the wet detention pond as the primary control measure.
In order to design the stormwater control measures, the post-development calculations
are compared to the predevelopment conditions. The existing conditions of the site
include 64.55 acres of fair condition grassed open space for stormwater calculations.
The post-development conditions include 6.51 acres of commercial area, 6.52 acres of
impervious area for roads, sidewalks, and townhomes, 32.55 acres of single family lots
and 19 acres of grassed area. Three wet ponds will be used to treat stormwater from
this development.
For sediment and erosion control purposes, three skimmer sediment basins, temporary
diversions with sediment tube check dams, double rows of silt fencing, inlet/outlet
protection, and stone construction exits, etc. will be installed according to their needs
within the perimeter of the property. All sediment and erosion control measures will be
designed to sufficiently comply to North Carolina and Town of High Point design
- 2 -
standards. The project will be split into four sediment and erosion control phases.
Phase 1 will be installation of construction entrance, perimeter controls, sediment
basins and diversions necessary to direct water to the sediment basins. Phase 2 will be
when the site is brought to proposed grades, the 3 sediment basins will remain in place
and development phase 1 will be built out. Phase 3 will include Development Phase 2
being built out, the sediment basins will remain in place. Phase 4 will be stabilization.
Once the entire site is stabilized, the remaining volume will be excavated from the
ponds and the wet ponds will be stabilized as designed.
Additionally, approval has been obtained from the US Army Corp of Engineers to
“discharge clean fill material into 0.018 acres of riparian, non-riverine wetlands
necessary to construct a stormwater management facility (wet pond) as part of a mixed
use development known as Wrenn Farm.” This work will be done in Phase 1 of the
Erosion Control phases and shall be completed by 3/18/2018. All appropriate
documentation will be submitted to the USACE following approval by the City of High
Point and following the completion of the construction. See Appendix C
PREDEVELOPMENT CONDITIONS
Based on the survey conducted on the site, the property of 65 acres will be observed for
this report. The predevelopment area was divided into 4 areas for the purpose of
drainage analysis.
The drainage areas were divided based on the runoff flow directions of the site under
consideration. The first is located in the northwest side of the site and drains to the
Greensboro Road right-of-way. The second is in the northeast portion of the site and
drains to the west towards the adjacent property owner. The third is located in the
south portion of the site and drains south towards the adjacent property owners. The
forth is the largest and drains towards the existing stream located on site in the
northeast corner. Drainage Area 1 drains to the City Lake Watershed, while the
remaining three drain to the Oakdale Watershed.
PREDEVELOPMENT AREAS
Area 1 11.45 acres
Area 2
Area 3
Area 4
6.43 acres
6.84 acres
39.8 acres
Total Area 64.52 acres
All of the drainage areas were delineated; see Figure 1. Hydraflow Hydrographs were
used to determine each area’s respective curve number, surface slope and total time of
concentration using the SCS method.
- 3 -
The first predevelopment area calculations are based on sheet and shallow
concentrated flow. Stormwater runoff is directed towards the northwest side of the site
to the Greensboro Road right-of-way.
PREDEVELOPMENT AREA 1 WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Open Space (Good) 0.18 73
Grassed Open Space (Fair) 6.05 79
Curve Number (CN) 79
PREDEVELOPMENT AREA 1 TIME OF CONCETRATION PATH
Flow Type Length (ft) Slope (%)
Sheet 100 1.5
Shallow Concentrated 681 1.5
Channel/Pipe NA NA
Curve Number (CN) 79
Time of Concentration (min) 16.4
The second predevelopment area calculations are based on sheet and shallow
concentrated flow. Stormwater runoff is directed towards the northeast side of the site
to the adjacent property owner
PREDEVELOPMENT AREA 2 WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Open Space (Fair) 6.43 79
Curve Number (CN) 79
PREDEVELOPMENT AREA 2 TIME OF CONCETRATION PATH
Flow Type Length (ft) Slope (%)
Sheet 100 6
Shallow Concentrated 296 6.1
Channel/Pipe NA NA
Curve Number (CN) 79
Time of Concentration (min) 7.3
The third predevelopment area calculations are based on sheet and shallow
concentrated flow. Stormwater runoff is directed towards the western side of the site to
the adjacent property owner
PREDEVELOPMENT AREA 3 WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Open Space (Fair) 6.84 79
Curve Number (CN) 79
- 4 -
PREDEVELOPMENT AREA 3 TIME OF CONCETRATION PATH
Flow Type Length (ft) Slope (%)
Sheet 100 2
Shallow Concentrated 474 2
Channel/Pipe NA NA
Curve Number (CN) 79
Time of Concentration (min) 12.9
The fourth predevelopment area calculations are based on sheet and shallow
concentrated flow. Stormwater runoff is directed towards the northeastern side of the
site to the existing stream near N. Scientific Road
PREDEVELOPMENT AREA 4 WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Open Space (Fair) 39.84 79
Curve Number (CN) 79
PREDEVELOPMENT AREA 4 TIME OF CONCETRATION PATH
Flow Type Length (ft) Slope (%)
Sheet 100 3
Shallow Concentrated 1668 3.6
Channel/Pipe NA NA
Curve Number (CN) 79
Time of Concentration (min) 12.9
After the time of concentration and curve numbers are computed for each area, the
peak flows are determined. See below for tabulation.
PREDEVELOPMENT RUNOFF (cfs), UNDETAINED
Storm Event Area 1 Area 2 Area 3 Area 4
2 year
10 year
11.99
21.88
16.23
29.16
14.50
26.32
72.04
131.54
25 year 28.03 37.19 33.66 168.59
50 year 32.94 43.58 39.50 198.12
100 year 37.94 50.09 45.45 228.25
- 5 -
POST-DEVELOPMENT CONDITIONS
In the post-development conditions the site will have seven drainage areas used for
analysis. The drainage areas were divided based on the runoff flow directions for the
proposed design. Drainage area 1 will be split into two areas (the portion to the pond
and the portion bypassing the pond) and continues to drain to the northwest towards
Greensboro Road. Drainage area 2 will be split into two areas (the portion to the pond
and the portion bypassing the pond) and continues to drain to the northeast towards the
adjacent property owner. Drainage area 4 will be split into two areas (the portion to the
pond and the portion bypassing the pond) and continues to drain to the northeast side
of the site into the existing stream draining towards N. Scientific Blvd.
POST-DEVELOPMENT AREAS
Area 1 to pond
Area 1 Bypass
10.94 acres
1.01 acres
Area 2 to pond
Area 2 Bypass
7.26 acres
0.55 acres
Area 3
Area 4 to pond
Area 4 Bypass
1.03 acres
39.37 acres
4.42 acres
Total Area 64.58 acres
Hydraflow Hydrographs is used to determine the curve number, surface slope, and total
time of concentration using the SCS method.
Post-development drainage area 1 to pond consists of commercial development area,
attached single family development and a small portion of detached single family
development. The commercial development is accounted for with a curve number of 94
since no particular layout is known at this time. All future commercial development
would have to be less than or equal to the 94 curve number proposed, this equals
83.3% impervious. The attached single family development is split into impervious and
grassed since the proposed layout is known. See Figure 2 for a visual representation of
the curve number breakdown.
POST-DEVELOPMENT AREA 1 TO POND WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Impervious 2.23 98
Grassed Area 3.22 74
Single Family (1/4 ac lots) 2.08 83
Commercial Development 3.41 94
Curve Number (CN) 10.94 87
- 6 -
POST-DEVELOPMENT AREA 1 TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 100 2
Shallow Concentrated 38 2
Channel
Pipe
350
418
3.1
0.75
Curve Number (CN) 87
Time of Concentration (min) 15.3
Post-development Area 1 bypass consist of the undeveloped portion of land along the
western property line and a portion of the right-of-way along Greensboro Road. It is all
considered grassed although a portion is wooded as well. To be conservative we are
considering the entire thing grassed.
POST-DEVELOPMENT AREA 1 BYPASS WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Area 1.01 74
Curve Number (CN) 74
POST-DEVELOPMENT AREA 1 BYPASS TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 100 1
Shallow Concentrated 187 4.1
Curve Number (CN) 74
Time of Concentration (min) 26
Post-development drainage area 2 to pond consists of commercial development area,
attached single family development and a small portion of detached single family
development. The commercial development is accounted for with a curve number of 94
since no particular layout is known at this time. All future commercial development
would have to be less than or equal to the 94 curve number proposed. The attached
single family development is split into impervious and grassed since the proposed
layout is known. See Figure 2 for a visual representation of the curve number
breakdown.
POST-DEVELOPMENT AREA 2 TO POND WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Impervious 0.99 98
Grassed Area 2.08 74
Single Family (1/4 ac lots) 1.09 83
Commercial Development 3.10 94
Curve Number (CN) 7.26 87
- 7 -
POST-DEVELOPMENT AREA 2 TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 31 33
Shallow Concentrated 170 3.33
Channel
Pipe
n/a
524
n/a
1.3
Curve Number (CN) 87
Time of Concentration (min) 5 (min)
Post-development Area 2 bypass consist of the portion of land along the eastern
property line that is unable to be directed into the detention pond and a small portion of
the future driveway into the outparcels. The majority of the area is grassed.
POST-DEVELOPMENT AREA 2 BYPASS WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Area
Impervious
0.50
0.05
74
98
Curve Number (CN) 76
POST-DEVELOPMENT AREA 2 BYPASS TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 45 33
Shallow Concentrated n/a n/a
Curve Number (CN) 76
Time of Concentration (min) 5 (min)
Post-development drainage area 3 consist of a small section of undeveloped portion of
land around the south and western boundaries. It is considered grassed and a
minimum time of concentration of 5 minutes is used.
POST-DEVELOPMENT AREA 3 WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Area 1.03 74
Curve Number (CN) 74
POST-DEVELOPMENT AREA 3 TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 30 2
Shallow Concentrated n/a n/a
Curve Number (CN) 74
Time of Concentration (min) 5 (min)
Post-development drainage area 4 to pond consists of attached single family
development and detached single family development. The attached single family
- 8 -
development is split into impervious and grassed since the proposed layout is known.
The detached single family development is accounted for with a curve number of 83 to
represent ¼ acre lots. See Figure 2 for a visual representation of the curve number
breakdown.
POST-DEVELOPMENT AREA 4 TO POND WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Impervious 3.25 98
Grassed Area 6.74 74
Single Family (1/4 ac lots) 29.38 83
Commercial Development n/a 94
Curve Number (CN) 39.37 83
POST-DEVELOPMENT AREA 4 TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 75 2
Shallow Concentrated n/a n/a
Channel
Pipe
688
1661
2.4
1.9
Curve Number (CN) 83
Time of Concentration (min) 19.9
Post-development Area 4 bypass consist of the portion of land along the northern and
western property line that is unable to be directed into the detention pond. The 1st order
stream and wetland are also in this section. Since this section of land is left undisturbed
it continues to drain offsite towards N. Scientific Street. The majority of the area is
grassed and will be considered grassed for calculations.
POST-DEVELOPMENT AREA 4 BYPASS WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Grassed Area 4.42 74
Curve Number (CN) 74
POST-DEVELOPMENT AREA 4 BYPASS TIME OF CONCENTRATION
Flow Type Length (ft) Slope (%)
Sheet 86 33
Shallow Concentrated 211 2
Curve Number (CN) 74
Time of Concentration (min) 5 (min)
- 9 -
POST-DEVELOPMENT RUNOFF (cfs), UNDETAINED
Storm
Event
Area 1 to
Pond
Area 1
Bypass
Area 2 to
Pond
Area 2
Bypass
Area 3 Area 4 to
Pond
Area 4
Bypass
2 year 29.63 1.12 27.78 1.34 2.265 81.95 9.719
10 year 48.10 2.25 44.75 2.51 4.39 140.94 18.85
25 year
50 year
59.16
67.84
2.99
3.58
54.88
62.83
3.24
3.83
5.74
6.83
176.92
205.34
24.65
29.30
100 year 76.61 4.20 70.86 4.43 7.94 234.19 34.08
Due to factors such as the re-grading of the property and the increase in impervious
areas the runoff produced by the post-development site conditions is greater than the
runoff during the predevelopment state. In order to accommodate the new site
conditions, three wet detention ponds will be built to meet water quantity and quality
standards. The wet detention ponds will detain the 1st inch of runoff and release it over
a 48 hour period. Additionally, the wet pond is designed to treat 85% TSS removal,
25% total nitrogen removal and 40% total phosphorus removal. Sediment forebays are
proposed as the pretreatment process prior to runoff entering the wet detention ponds.
The sediment forebays will also act to dissipate the energy of the water entering the
ponds. The forebays will act to collect the majority of sediment in a small area where it
can be cleaned out more easily. The forebays will be separated from the wet pond by a
rip-rap berm. The berm will allow water to escape from the forebay while removing
sediment and reducing the flow velocity.
See Appendix D for wet pond dimensions and calculations.
The following table shows post-development areas routed through their perspective
ponds.
WET POND 1
Storm Event Output (cfs) Elevation
2 year
10 year
1.368
8.168
849.63
850.42
25 year 12.08 851.05
50 year 22.68 851.38
100 year 28.26 851.72
There is 2.28’ of freeboard. Additionally, see below for the total Predevelopment Area 1
compared with the Total Post-development Area 1.
- 10 -
AREA 1 PRE VS POST, DETAINED (CFS)
Storm Event Pre Area 1 Post Area 1 (total) Difference
2 year
10 year
11.99
21.88
1.463
9.803
- 10.527
- 12.077
25 year 28.03 14.23 - 13.8
50 year 32.94 25.68 - 7.26
100 year 37.94 31.99 - 5.95
As shown above the post-development flows (which include the bypass flows and the
pond outlet flows) are less than or equal to the predevelopment for all storms up to the
100-year.
WET POND 2
Storm Event Output (cfs) Elevation
2 year
10 year
0.858
5.709
841.97
842.72
25 year 21.65 843.17
50 year 33.29 843.42
100 year 35.59 843.75
There is 1.25’ of freeboard. Additionally, see below for the total Predevelopment Area 2
compared with the Total Post-development Area 2.
AREA 2 PRE VS POST, DETAINED (CFS)
Storm Event Pre Area 2 Post Area 2 (total) Difference
2 year
10 year
16.23
29.16
1.48
6.271
- 14.75
- 22.89
25 year 37.19 23.07 - 14.12
50 year 43.58 35.63 - 7.95
100 year 50.09 38.83 - 11.26
As shown above the post-development flows (which include the bypass flows and the
pond outlet flows) are less than or equal to the predevelopment for all storms up to the
100-year.
WET POND 3
Storm Event Output (cfs) Elevation
2 year
10 year
1.17
5.606
805.79
807.54
25 year 13.27 808.13
50 year 18.89 808.85
100 year 39.91 809.41
There is 2.59 of freeboard. Additionally, see below for the total Predevelopment Area 4
compared with the Total Post-development Area 4.
- 11 -
AREA 4 PRE VS POST, DETAINED (CFS)
Storm Event Pre Area 4 Post Area 4 (total) Difference
2 year
10 year
72.04
131.54
10.24
19.62
- 61.8
- 111.92
25 year 168.59 25.54 - 143.05
50 year 198.12 30.28 - 167.84
100 year 228.25 42.92 - 185.33
As shown above the post-development flows (which include the bypass flows and the
pond outlet flows) are less than or equal to the predevelopment for all storms up to the
100-year.
Drainage area 3 does not have a proposed pond; therefore, the post-development is
compared to the predevelopment. The post-development is less than the
predevelopment for all storms up to the 100-year storm.
AREA 3 PRE VS POST, DETAINED (CFS)
Storm Event Pre Area 3 Post Area 3 (total) Difference
2 year
10 year
14.50
26.32
2.265
4.392
- 12.235
- 21.93
25 year 33.66 5.743 - 27.92
50 year 39.50 6.892 - 32.61
100 year 45.45 7.943 - 37.51
- 12 -
EROSION AND SEDIMENT CONTROL CALCULATIONS
Erosion and sediment control will be discussed separately for each of the 3 phases of
construction. Phase 1 will include installing perimeter silt fences, construction exits, and
phase 1 sediment basins with all associated temporary diversions.
Phase 2 will include mass grading, installing storm drain pipes and catch basins. Inlet
protection will be installed around the catch basins as they are installed. The Phase 1
sediment basins will be converted to Phase 2/3 sediment basins.
During Phase 3 of construction the entire site will be stabilized with vegetation or
paving. Once the entire drainage area is stabilized to each sediment basin, it will be
cleaned out and converted to permanent wet detention ponds. The wet ponds will then
be landscaped as shown on the design plans.
PHASE 1:
To accommodate phase 1 construction, three sediment basins will be used for sediment
and erosion control. See Figure 3 for the delineation of each of the sediment basin
areas. See below for the phase 1 calculation for each of the sediment basins and on
the civil sheets. See skimmer calculations for skimmer and orifice sizing.
Phase 1 Skimmer Sediment Basin #1
Area Draining to Skimmer Sediment Basin: 10 acres
Q10 for this area is 61.6 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
1,800 * 10 acres = 18,000 cf
Surface Area required is 325 sf * Q10
325 * 61.6 = 20,020 sf
Volume provided at 848: 18,310 cf
Surface Area provided at 848: 21,514 sf
Phase 1 Skimmer Sediment Basin #2
Area Draining to Skimmer Sediment Basin: 7.6 acres
Q10 for this area is 42.6 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
- 13 -
1,800 * 7.6 acres = 13,680 cf
Surface Area required is 325 sf * Q10
325 * 42.6 = 13,845 sf
Volume provided at 842: 29,003 cf
Surface Area provided at 841: 14,394 sf
Phase 1 Skimmer Sediment Basin #3
Area Draining to Skimmer Sediment Basin: 33 acres
Q10 for this area is 131.3 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
1,800 * 33 acres = 59,400 cf
Surface Area required is 325 sf * Q10
325 * 131.3 = 49,674 sf
Volume provided at 805: 100,229 cf
Surface Area provided at 805: 49,674 sf
PHASE 1 SKIMMER SEDIMENT BASIN #1
Pond Elevation (ft) Area (sf) Volume (cf)
847 15,287 0
848 21,514 18,310
849
850
23,511
25,752
40,813
65,434
PHASE 1 SKIMMER SEDIMENT BASIN #2
Pond Elevation (ft) Area (sf) Volume (cf)
840 12,811 0
841 14,394 13,593
842
843
844
845
16,452
18,552
20,868
23,202
29,003
46,493
66,190
88,212
- 14 -
PHASE 1 SKIMMER SEDIMENT BASIN #3
Pond Elevation (ft) Area (sf) Volume (cf)
802 15,650 0
803 26,551 20,860
804 41,605 54,654
805
806
807
808
809
810
811
812
49,674
53,211
56,820
60,494
64,225
68,012
71,857
75,758
100,229
151,656
206,657
265,298
327,642
393,745
463,664
537,455
PHASE 2/3:
During Phase 2 and 3 the three skimmer sediment basins will remain in place, as the
grades are brought up to proposed grades, the top of sediment basins 1 will be raised.
Sediment Basins 2 and 3 will remain the same.
Phase 2 Skimmer Sediment Basin #1
Area Draining to Skimmer Sediment Basin: 10.94 acres
Q10 for this area is 67.4 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
1,800 * 10.94 acres = 19,692 cf
Surface Area required is 325 sf * Q10
325 * 67.4 = 21,915 sf
Volume provided at 849: 40,813 cf
Surface Area provided at 849: 23,511 sf
Phase 2 Skimmer Sediment Basin #2
Area Draining to Skimmer Sediment Basin: 7.26 acres
Q10 for this area is 40.7 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
1,800 * 7.26 acres = 13,068 cf
- 15 -
Surface Area required is 325 sf * Q10
325 * 40.7 = 13,228 sf
Volume provided at 842: 29,003 cf
Surface Area provided at 841: 14,394 sf
Phase 2 Skimmer Sediment Basin #3
Area Draining to Skimmer Sediment Basin: 39.37 acres
Q10 for this area is 156.63 cfs
Per NCDENR and City of High Point Requirements:
Volume Required is 1,800 cf/acre
1,800 * 39.37 acres = 70,866 cf
Surface Area required is 325 sf * Q10
325 * 156.63 = 50,905 sf
Volume provided at 805: 100,229 cf
Surface Area provided at 806: 53,211 sf
PHASE 2/3 SKIMMER SEDIMENT BASIN #1
Pond Elevation (ft) Area (sf) Volume (cf)
847 15,287 0
848 21,514 18,310
849
850
851
852
853
854
23,511
25,754
27,703
29,901
32,167
34,501
40,813
65,346
91,975
120,767
151,791
185,115
PHASE 2/3 SKIMMER SEDIMENT BASIN #2
Pond Elevation (ft) Area (sf) Volume (cf)
840 12,811 0
841 14,394 13,593
842
843
844
845
16,452
18,552
20,868
23,202
29,003
46,493
66,190
88,212
- 16 -
PHASE 2/3 SKIMMER SEDIMENT BASIN #3
Pond Elevation (ft) Area (sf) Volume (cf)
802 15,650 0
803 26,551 20,860
804 41,605 54,654
805
806
807
808
809
810
811
812
49,674
53,211
56,820
60,494
64,225
68,012
71,857
75,758
100,229
151,656
206,657
265,298
327,642
393,745
463,664
537,455
PHASE 4:
During Phase 4 of construction the site will be stabilized. Once the entire drainage area
to each skimmer sediment basin is stabilized and construction is complete, the skimmer
basin will be converted to a wet pond. The sediment will be cleaned out and the
proposed wet pond contours will be graded. Once the wet pond is in place and
landscaped, the skimmer will be removed.
Appendix A
Site Location Map, USGS topographic map, NRCS Soil
Data, GIS Floodplain Map
Hydrologic Soil Group—Guilford County, North Carolina
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/24/2015
Page 1 of 439829003983000398310039832003983300398340039835003982900398300039831003983200398330039834003983500593600593700593800593900594000594100594200594300594400594500594600
593700 593800 593900 594000 594100 594200 594300 594400 594500 594600
35° 59' 29'' N 79° 57' 41'' W35° 59' 29'' N79° 56' 58'' W35° 59' 7'' N
79° 57' 41'' W35° 59' 7'' N
79° 56' 58'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
0 200 400 800 1200
Feet
0 50 100 200 300
Meters
Map Scale: 1:4,920 if printed on A landscape (11" x 8.5") sheet.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more accurate
calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Guilford County, North Carolina
Survey Area Data: Version 13, Sep 10, 2014
Soil map units are labeled (as space allows) for map scales 1:50,000
or larger.
Date(s) aerial images were photographed: Feb 11, 2011—Mar 3,
2011
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Hydrologic Soil Group—Guilford County, North Carolina
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/24/2015
Page 2 of 4
Hydrologic Soil Group
Hydrologic Soil Group— Summary by Map Unit — Guilford County, North Carolina (NC081)
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
EnB Enon fine sandy loam, 2
to 6 percent slopes
C 0.1 0.2%
MhB2 Mecklenburg sandy clay
loam, 2 to 6 percent
slopes, moderately
eroded
C 48.3 77.7%
MhC2 Mecklenburg sandy clay
loam, 6 to 10 percent
slopes, moderately
eroded
C 9.0 14.6%
MuB Mecklenburg-Urban land
complex, 2 to 10
percent slopes
C 4.7 7.6%
Totals for Area of Interest 62.2 100.0%
Hydrologic Soil Group—Guilford County, North Carolina
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/24/2015
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well drained
soils that have moderately fine texture to moderately coarse texture. These soils
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Guilford County, North Carolina
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/24/2015
Page 4 of 4
Appendix B
NOAA Rainfall Data
Appendix C
Permit SAW-2016-00534 to fill riparian, non-riverine
wetlands
Water Quality Certification No. 3890
GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE
FOR U.S. ARMY CORPS OF ENGINEERS NATIONWIDE PERMIT
NUMBERS 18 (MINOR DISCHARGES) 29 (RESIDENTIAL DEVELOPMENT),
39 (COMMERCIAL AND INSTITUTIONAL DEVELOPMENTSJ,
41 (RESHAPING EXISTING DRAINAGE DITCHES) 42 (RECREATIONAL FACILITIES),
44 (MINING ACTIVITIES) AND 46 (DISCHARGES IN DITCHES),
AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES)
Water Quality Certification Number 3890 is issued in conformity with the requirements of Section
401, Public Laws 92 -500 and 95 -217 of the United States and subject to the North Carolina
Division of Water Quality (DWQ) Regulations in 15A NCAC 02H .0500 and 15A NCAC 02B .0200
for the discharge of fill material to waters and adjacent wetland areas or to wetland areas that are
not a part of the surface tributary system to interstate waters or navigable waters of the United
States as described in 33 CFR 330 Appendix A (B) (18, 29, 39, 41, 42, 44, and 46) of the Corps
of Engineers regulations and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC
02B .0200.
The State of North Carolina certifies that the specified category of activity will not violate
applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92 -500 and 95 -217
if conducted in accordance with the conditions hereinafter set forth.
Activities meeting any one (1) of the following thresholds or circumstances require written
approval for a 401 Water Quality Certification from the Division of Water Quality (the
Division'T
a. Any impacts to streams involving excavation or dredging; or
b. Total stream impacts within the project boundaries equal to or greater than 150 linear feet
of stream, including temporary and /or permanent impacts; or
c. Any stream relocation; or
d. Any impact associated with a high density project (as defined in Item (A)(iv) of the 401
Stormwater Requirements) that is not subject to either a state stormwater program (such
as, but not limited to, Coastal Counties, HQW, ORW or state - implemented Phase II
NPDES) or a certified community's stormwater program; or
e. Temporary or permanent impacts equal to or greater than one -tenth (1/10) acre of wetlands
or open waters; or
f. Any impacts to wetlands adjacent to waters designated as: ORW, SA, WS -1, WS -11, or
Trout, or wetlands contiguous to waters designated as a North Carolina or National Wild
and Scenic River; or
g. Any impacts to coastal wetlands [15A NCAC 07H .0205)], or Unique Wetlands (UWL) [15A
NCAC 02H .0506]; or
h. Any impact associated with a Notice of Violation or an enforcement action for violation(s) of
DWQ Wetland Rules (15A NCAC 02H.0500), Isolated Wetland Rules (15A NCAC 02H
1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC
02B .0200); or
i. Any impacts to streams and /or buffers in the Neuse, Tar - Pamlico, or Catawba River Basins
or in the Randleman, Jordan or Goose Creek Watersheds (or any other basin or watershed
with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application)
unless the activities are listed as "EXEMPT" from these rules or a Buffer Authorization
Certificate is issued through N.C. Division of Coastal Management (DCM) delegation for
ALLOWABLE" activities.
In accordance with North Carolina General Statute 143- 215.3D(e), written approval for a 401
Water Quality General Certification must include the appropriate fee. If a project also requires a
CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the
two fees.
Water Quality Certification No. 3890
Water Quality Certification No. 3$90
Activities included in this General Certification that do not meet one of the thresholds
listed above do not require written approval from the Division as long as they comply with
the Conditions of Certification listed below. If any of these Conditions cannot be met, then
written approval from the Division is required.
Conditions of Certification:
1. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use
of this Certification
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre - Construction Notification, as
authorized in the written approval from the Division or beyond the thresholds established for
use of this Certification without written authorization, including incidental impacts. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices shall be performed so that no
violations of state water quality standards, statutes, or rules occur. Approved plans and
specifications for this project are incorporated by reference and are enforceable parts of this
permit.
2. Standard Erosion and Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices and if applicable, comply with the specific conditions and
requirements of the NPDES Construction Stormwater Permit issued to the site:
a. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal or exceed the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor -owned or leased borrow pits associated with the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
c. Reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act and the
Mining Act of 1971.
d. Sufficient materials required for stabilization and /or repair of erosion control measures
and stormwater routing and treatment shall be on site at all times.
e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs),
SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the
sedimentation and erosion control designs must comply with the requirements set forth
in 15A NCAC 04B.0124, Design Standards in Sensitive Watersheds.
Water Quality Certification No. 3890 2
Water Quality Certification No. 3890
3. No Sediment and Erosion Control Measures in Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters.
Exceptions to this condition require application submittal to and written approval by the
Division. If placement of sediment and erosion contro! devices in wetlands and waters is
unavoidable, then design and placement of temporary erosion control measures shall not be
conducted in a manner that may result in dis- equilibrium of wetlands, stream beds, or banks,
adjacent to or upstream and downstream of the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the
date that the Division of Land Resources (DLR) or locally delegated program has released
the specific area within the project.
4. Construction Stormwater Permit NCG010000
An NPDES Construction Stormwater Permit is required for construction projects that disturb
one (1) or more acres of land. This Permit allows stormwater to be discharged during land
disturbing construction activities as stipulated in the conditions of the permit. If your project
is covered by this permit, full compliance with permit conditions including the erosion &
sedimentation control plan, inspections and maintenance, self- monitoring, record keeping
and reporting requirements is required. A copy of the general permit (NCG010000),
inspection log sheets, and other information may be found at
http: / /portal.ncdenr crq /web /wq /ws /su /npdessw #tab -w .
The North Carolina Department of Transportation (NCDOT) shall be required to be in full
compliance with the conditions related to construction activities within the most recent version
of their individual NPDES (NCS000250) stormwater permit.
5. Construction Moratoriums and Coordination
If activities must occur during periods of high biological activity (i.e. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of other
state or federal agencies and coordinated with these activities.
All moratoriums on construction activities established by the NC Wildlife Resources
Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries
DMF), or National Marine Fisheries Service (NMFS) to lessen impacts on trout, anadromous
fish, larval /post - larval fishes and crustaceans, or other aquatic species of concern shall be
implemented. Exceptions to this condition require written approval by the resource agency
responsible for the given moratorium.
Work within the twenty -five (25) designated trout counties or identified state or federal
endangered or threatened species habitat shall be coordinated with the appropriate WRC,
USFWS, NMFS, and /or DMF personnel.
6. Work in the Dry
All work in or adjacent to stream waters shall be conducted so that the flowing stream does
not come in contact with the disturbed area. Approved best management practices from the
most current version of the NC Sediment and Erosion Control Manual, or the NC DOT
Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams,
and other diversion structures shall be used to minimize excavation in flowing water.
Exceptions to this condition require application submittal to and written approval by the
Division.
Water Quality Certification No. 3890
Water Quality Certification No. 8800
7. Riparian Area Protection (Buffer) Rules
Activities located in the protected riparian areas (whether jurisdictional wetlands or not),
within the Neuse, Tar - Pamlico, or Catawba River Basins or in the Randleman, Jordan, or
Goose Creek Watersheds (or any other basin or watershed with buffer rules) shall be limited
to "uses" identified within and constructed in accordance with 15A NCAC 02B.0233, .0259,
0243, .0250, .0267 and .0605, and shall be located, designed, constructed, and maintained
to have minimal disturbance to protect water quality to the maximum extent practicable
through the use of best management practices. All buffer rule requirements, including diffuse
flow requirements, must be met.
8. If concrete is used during the construction, then all necessary measures shall be taken to
prevent direct contact between uncured or curing concrete and waters of the state. Water
that inadvertently contacts uncured concrete shall not be discharged to waters of the state
due to the potential for elevated pH and possible aquatic life/ fish kills.
9. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed
across the bridge and pre- treated through site - appropriate means (grassed swales, pre-
formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the
most current version of Stormwater Best Management Practices. Exceptions to this condition
require written approval by the Division.
10. Compensatory Mitigation
In accordance with 15A NCAC 02H .0506 (h), compensatory mitigation may be required for
losses of equal to or greater than 150 linear feet of streams (intermittent and perennial)
and /or equal to or greater than one (1) acre of wetlands. For linear public transportation
projects, impacts equal to or exceeding 150 linear feet per stream shall require mitigation.
Buffer mitigation may be required for any project with Buffer Rules in effect at the time of
application for activities classified as "Allowable with Mitigation" or "Prohibited" within the
Table of Uses.
A determination of buffer, wetland, and stream mitigation requirements shall be made for any
General Water Quality Certification for this Nationwide and /or Regional General Permit.
Design and monitoring protocols shall follow the US Army Corps of Engineers Wilmington
District Stream Mitigation Guidelines (April 2003) or its subsequent updates. Compensatory
mitigation plans shall be submitted to the Division for written approval as required in those
protocols. The mitigation plan must be implemented and /or constructed before any impacts
occur on site. Alternatively, the Division will accept payment into an in -lieu fee program or a
mitigation bank. In these cases, proof of payment shall be provided to the Division before
any impacts occur on site.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
11. Relocated stream designs should include the same dimensions, patterns, and profiles as the
existing channel (or a stable reference reach if the existing channel is unstable), to the
maximum extent practical. The new channel should be constructed in the dry and water shall
not be turned into the new channel until the banks are stabilized. Vegetation used for bank
stabilization shall be limited to native woody species and should include establishment of a
30 -foot wide wooded and an adjacent 20 -foot wide vegetated buffer on both sides of the
relocated channel to the maximum extent practical. A transitional phase incorporating
appropriate erosion control matting materials and seedling establishment is allowable,
however matting that incorporates plastic mesh and /or plastic twine shall not be used in
wetlands, riparian buffers or floodplains as recommended by the North Carolina Sediment
and Erosion Control Manual. Rip -rap, A- Jacks, concrete, gabions or other hard structures
may be allowed if it is necessary to maintain the physical integrity of the stream; however, the
applicant must provide written justification and any calculations used to determine the extent
of rip -rap coverage. Please note that if the stream relocation is conducted as a stream
restoration as defined in the US Army Corps of Engineers Wilmington District, April 2003
Stream Mitigation Guidelines (or its subsequent updates), the restored length may be used
as compensatory mitigation for the impacts resulting from the relocation.
12. Stormwater Management Plan Requirements
All applications shall address stormwater management throughout the entire project area per
the 401 Stormwater Requirements, referenced herein as "Attachment A" at the end of this
Certification
13. Placement of Culverts and Other Structures in Waters and Wetlands
Culverts required for this project shall be designed and installed in such a manner that the
original stream profiles are not altered and allow for aquatic life movement during low flows.
Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal
profile) must be maintained above and below locations of each culvert.
Placement of culverts and other structures in waters and streams must be below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than or equal to 48
inches, to allow low flow passage of water and aquatic life.
When topographic constraints indicate culvert slopes of greater than 5 %, culvert burial is not
required, provided that all alternative options for flattening the slope have been investigated
and aquatic life movement/ connectivity has been provided when possible (rock ladders,
crossvanes, etc). Notification to the Division including supporting documentation to include a
location map of the culvert, culvert profile drawings, and slope calculations shall be provided
to the Division 60 days prior to the installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required provided that there
is sufficient documentation of the presence of bedrock. Notification to the Division including
supporting documentation such as, but not limited to, a location map of the culvert,
geotechnical reports, photographs, etc shall be provided to the Division a minimum of 60
days prior to the installation of the culvert. If bedrock is discovered during construction, then
the Division shall be notified by phone or email within 24 hours of discovery.
If other site- specific topographic constraints preclude the ability to bury the culverts as
described above and /or it can be demonstrated that burying the culvert would result in
destabilization of the channel, then exceptions to this condition require application submittal
to, and written approval by, the Division of Water Quality, regardless of the total impacts to
streams or wetlands from the project.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
Installation of culverts in wetlands must ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. Additionally, when
roadways, causeways, or other fill projects are constructed across FEMA- designated
floodways or wetlands, openings such as culverts or bridges must be provided to maintain
the natural hydrology of the system as well as prevent constriction of the floodway that may
result in destabilization of streams or wetlands.
The establishment of native, woody vegetation and other soft stream bank stabilization
techniques must be used where practicable instead of riprap or other bank hardening
methods.
14. All temporary fill and culverts shall be removed and the impacted area returned to natural
conditions within 60 days of the determination that the temporary impact is no longer
necessary. The impacted areas shall be restored to original grade, including each stream's
original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile,
and the various sites shall be stabilized with natural woody vegetation (except for the
approved maintenance areas) and restored to prevent erosion.
15. All temporary pipes/ culverts/ riprap pads etc, shall be installed in all streams as outlined in
the most recent edition of the North Carolina Sediment and Erosion Control Planning and
Design Manual or the North Carolina Surface Mining Manual so as not to restrict stream flow
or cause dis- equilibrium during use of this General Certification.
16. Any riprap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area directly impacted by the approved
construction activity. All rip -rap shall buried and /or "keyed in" such that the original stream
elevation and streambank contours are restored and maintained. Placement of rip -rap or
other approved materials shall not result in de- stabilization of the stream bed or banks
upstream or downstream of the area.
17. Any rip -rap used for stream stabilization shall be of a size and density so as not to be able to
be carried off by wave, current action, or stream flows and consist of clean rock or masonry
material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed
except in specific areas required for velocity control and to ensure structural integrity of bank
stabilization measures.
18. A one -time application of fertilizer to re- establish vegetation is allowed in disturbed areas
including riparian buffers, but is restricted to no closer than 10 feet from top of bank of
streams. Any fertilizer application must comply with all other Federal, State and Local
regulations.
19. If this Water Quality Certification is used to access building sites, then all lots owned by the
applicant must be buildable without additional impacts to streams or wetlands. The applicant
is required to provide evidence that the lots are buildable without requiring additional impacts
to wetlands, waters, or buffers if required to do so in writing by the Division. For road
construction purposes, this Certification shall only be utilized from natural high ground to
natural high ground.
20. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional
wetlands, waters, and protective buffers within the project boundaries in order to assure
compliance for future wetland, water, and buffer impact. These mechanisms shall be put in
place at the time of recording of the property or of individual lots whichever is appropriate. A
sample deed notification can be downloaded from the 401/Wetlands Unit web site at
http : /fportal.ncdenr.or /web /wg /sw_p /ws/ 401 /certsaDdpermits /apply /forms. The text of the
sample deed notification may be modified as appropriate to suit to a specific project.
Documentation of deed notifications shall be provided to the Division upon request.
Water Quality Certification No. 3890 6
Water Quality Certification Flo. 3390
21. If an environmental document is required under the National or State Environmental Policy
Act (NEPA or SEPA), then this General Certification is not valid until a Finding of No
Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State
Clearinghouse.
22. In the twenty (20) coastal counties, the appropriate DWQ Regional Office must be contacted
to determine if Coastal Stormwater Regulations will be required.
23. This General Certification does not relieve the applicant of the responsibility to obtain all other
required Federal, State, or Local approvals.
24. The applicant /permittee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of
State and Federal Law. If the Division determines that such standards or laws are not being
met, including failure to sustain a designated or achieved use, or that State or Federal law is
being violated, or that further conditions are necessary to assure compliance, then the
Division may reevaluate and modify this General Water Quality Certification.
25. When written authorization is required for use of this certification, upon completion of all
permitted impacts included within the approval and any subsequent modifications, the
applicant shall be required to return the certificate of completion attached to the approval.
One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail
Service Center, Raleigh, NC, 27699 -1650.
26. Additional site- specific conditions, including monitoring and /or modeling requirements, may
be added to the written approval letter for projects proposed under this Water Quality
Certification in order to ensure compliance with all applicable water quality and effluent
standards.
27. This certification grants permission to the director, an authorized representative of the
Director, or DENR staff, upon the presentation of proper credentials, to enter the property
during normal business hours.
This General Certification shall expire on the same day as the expiration date of the
corresponding Nationwide and /or Regional General Permit. The conditions in effect on the date
of issuance of Certification for a specific project shall remain in effect for the life of the project,
regardless of the expiration date of this Certification.
Non - compliance with or violation of the conditions herein set forth by a specific project may result
in revocation of this General Certification for the project and may also result in criminal and /or civil
penalties.
The Director of the North Carolina Division of Water Quality may require submission of a formal
application for Individual Certification for any project in this category of activity if it is determined
that the project is likely to have a significant adverse effect upon water quality, including state or
federally listed endangered or threatened aquatic species, or degrade the waters so that existing
uses of the wetland or downstream waters are precluded.
Water Quality Certification No. 3890
Water Quality Certification fro. 3390
Public hearings may be held for specific applications or group of applications prior to a
Certification decision if deemed in the public's best interest by the Director of the North Carolina
Division of Water Quality.
Effective date: March 19, 2012
DIVISION OF WATER QUALITY
FA
Charles Wakild, P. E.
Director
History Note: Water Quality Certification (WQC) Number 3890 issued March 19, 2012 replaces
WQC Number 3821 issued April 6, 2010; WQC Number 3631 issued March 19, 2007; WQC 3402
issued March, 2003; WQC Number 3362, issued March 18, 2002; WQC 3287, issued June 1,
2000; WQCs 3106 and 3108 issued February 11, 1997. This Water Quality Certification is
rescinded when the Corps of Engineers reauthorizes any of the corresponding Nationwide or
Regional General Permits and /or when deemed appropriate by the Director of the Division of
Water Quality.
Water Quality Certification No. 3890 8
Water Quality Certification No. 3899
Attachment A: 401 Stormwater Requirements
The requirements listed below shall be implemented in order to comply with Condition 12 of this
General Certification. For the North Carolina Department of Transportation, compliance with
NCDOT's Individual NPDES permit NCS000250 shall serve to satisfy the 401 and Isolated
Wetland Stormwater Requirements.'
A. Design and Implementation Requirements. All projects, regardless of project area,
amount of built -upon area or amount of jurisdictional impact, shall meet the following
stormwater design requirements:
Non - Erosive Discharge to Streams and Wetlands. Stormwater conveyances that
discharge to streams and wetlands must discharge at a non - erosive velocity prior to
entering the stream or wetland during the peak flow from the ten -year storm.
Vegetated Setbacks. A 30 -foot wide vegetated setback must be maintained adjacent to
streams, rivers and tidal waters in areas that are not subject to a state Riparian Area
Protection Rule or other more stringent vegetated setback requirements. The width of
the setback shall be measured horizontally from the normal pool elevation of impounded
structures, the top -of -bank of streams and rivers, and the mean high waterline of tidal
waters, perpendicular to shoreline. Vegetated setback and filters required by state rules
or local governments may be met concurrently with this requirement and may contain
coastal, isolated or 404 jurisdictional wetlands. Non - jurisdictional portions of the
vegetated setback may be cleared and graded, but must be planted with and maintained
in grass or other vegetative or plant materia1.3
iii. Construction and Operation. The stormwater management plan must be constructed
and operational before any permanent building or other structure is occupied or utilized at
the site. The stormwater management plan, including drainage patterns, must be
maintained in perpetuity.
4
iv. Coordination with Other Stormwater Programs. Projects that are subject to another
Division of Water Quality (DWQ) stormwater program, including (but not limited to) the 20
Coastal Counties, HQW, ORW or state - implemented Phase II NPDES, or a Certified
Community's stormwater management program, must be constructed and maintained in
compliance with the approved stormwater management plan.
5
Stormwater Design Requirements for Projects Not Covered Under Item (iv).
Projects that are not subject to another DWQ stormwater program or a Certified
Community's stormwater program shall meet all of the following requirements:
a. Low Density. A site is low density if all the following requirements are met:
The development has a built upon area of twenty -four percent (24 %) or less,
considering both current and future development. When determining the amount
of built upon area, coastal wetlands shall be included; however, ponds, lakes and
rivers as specified in North Carolina's Schedule of Classifications shall be
excluded. If a portion of project has a density greater than 24 %, the higher
density area must be located in an upland area and away from surface waters
and drainageways to the maximum extent practicable.s
2. All stormwater runoff from the built upon areas is transported primarily via
vegetated conveyances designed in accordance with the most recent version of
the NC DWQ Stormwater Best Management Practices Manual. Alternative
designs may be approved if the applicant can show that the design provides
Water Quality Certification No. 3890 9
Water Quality Certification No. 3890
equal or better water quality protection than the practices specified in the manual.
The project must not include a stormwater collection system (such as piped
conveyances) as defined in 15A NCAC 02B .0202(60).'
b. High Density. Projects that do not meet the Low Density requirements shall meet
the following requirements:
1. Stormwater runoff from the entire site must be treated by structural stormwater
controls (BMPs) that are designed to remove eighty -five percent (85 %) of the
average annual amount of Total Suspended Solids (TSS). Stormwater runoff
that drains directly to Nutrient Sensitive Waters (NSW) must also be treated to
remove thirty percent (30 %) of Total Nitrogen (TN) and Total Phosphorus (TP).
8
2. All BMPs must be designed in accordance with the version of the NC DWQ
Stormwater Best Management Practices Manual that is in place on the date of
stormwater management plan submittal. Alternative designs may be approved if
the applicant can show that the design provides equal or better water quality
protection than the practices specified in the manual.9
3. DWQ may add specific stormwater management requirements on a case -by-
case basis in order to ensure that a proposed activity will not violate water quality
standards.10
4. DWQ may approve Low Impact Developments (LIDs) that meet the guidance set
forth in the Low Impact Development: A Guidebook for North Carolina."
5. Proposed new development undertaken by a local government solely as a public
road project shall follow the requirements of the NC DOT BMP Toolbox rather
than Items (1) -(4) above. 12
B. Submittal Requirements. The submittal requirements listed below apply only to projects
that require written authorization as indicated in the applicable General Certification as well
as projects that require an Isolated Wetlands Permit. Any required documentation shall
be sent to the Wetlands, Buffers and Stormwater Compliance and Permitting Unit at
1650 Mail Service Center, Raleigh, NC 27699 -1650.
i. Projects that are Subject to Another DWQ Stormwater Program: If the project is
subject to another DWQ stormwater program, such as the 20 Coastal Counties, HQW,
ORW or state - implemented Phase II NPDES, then the applicant shall submit a copy of
the stormwater approval letter before any impacts occur on site.
t3
Projects that are Subject to a Certified Community's Stormwater Program. If the
project is subject to a certified local government's stormwater program, then the applicant
shall submit one set of approved stormwater management plan details and calculations
with documentation of the local government's approval before any impacts occur on site.5
iii. Projects Not Covered Under Items (i) or (ii). If the project is not subject to another
DWQ Stormwater Program or a Certified Community's stormwater program, then it shall
be reviewed and approved by the DWQ through the Water Quality Certification
authorization process.
a. Low Density. For low density projects, the applicant shall submit two copies of the
DWQ Low Density Supplement Form with all required items. 13
Water Quality Certification No. 3890 10
Water Quality Certification No. 3890
b. High Density. For high density projects, the applicant shall submit two copies of a
DWQ BMP Supplement Form and all required items at the specified scales for each
BMP that is proposed. 13
iv. Phasing. Stormwater management plans may be phased on a case -by -case basis, with
the submittal of a final stormwater management plan per Items (i) -(iii) above required for
the current phase and a conceptual stormwater management plan for the future phase(s).
The stormwater management plan for each future phase must be approved by the
appropriate entity before construction of that phase is commenced. The approved
stormwater management plan for each future phase must be constructed and operational
before any permanent building or other structure associated with that phase isoccupied. 4
Stormwater Management Plan Modifications. The stormwater management plan may
not be modified without prior written authorization from the entity that approved the plan.
If the project is within a Certified Community, then the applicant shall submit one set of
approved stormwater management plan details and calculations with documentation of
the local government's approval for record - keeping purposes. If the project is subject to
DWQ review, then the applicant shall submit two copies of the appropriate Supplement
Forms per Item (iii) above for any BMPs that have been modified for DWQ's review and
approval.15
1 The stormwater requirement for 401 applications is codified in 15A NCAC 02H .0506(b)(5) and
c)(5).
2 Non erosive discharge rates are required in SL 2008 - 211 §2(b)(1). The 10 -year design storm
standard is codified in 15A NCAC 02H .1008(f)(2) and .1008(g)(1).
3 30 -foot vegetated setbacks are required in SL 2006 - 246 §9(d), SL 2008 - 211 §2(b), 15A NCAC
02H .1006(2)(c) and .1007(1)(a).
4 Construction and maintenance of the stormwater plan is necessary to satisfy 15A NCAC 02H
0506(b)(5).
5 Conveys application procedure to streamline the permitting process and reduce any unnecessary
duplication in the review of stormwater management plans.
6 Low density built upon area thresholds are set in SL 2006 - 246 §9(c) and SL 2008 - 211 §2(b).
The requirement for low density development to use vegetated conveyances is codified in SL
2006 - 246 §9(c), SL 2008 - 211 §2(b), 15A NCAC 02H .1006(2)(b) and .1007(1)(a). The Stormwater
BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e).
8 85% TSS removal is required in SL 2006 - 246 §9(d), SL 2008 - 211 §2(b), 15A NCAC 02H
1006(2)(c), 15A NCAC 02H .1007(1)(a). The 30% TN and TP removal requirements for NSW
waters are set forth in 15A NCAC 02B .0232, 15A NCAC 02B .0257(a)(1), 15A NCAC 02B
0265(3)(a) and 15A NCAC 02B .0277(4).
9 The Stormwater BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e).
10 The requirement for DWQ to ensure that water quality standards are protected before issuing a
401 certification is codified in 15A NCAC 02H .0506.
11 The LID Toolbox is also referenced in 15A NCAC 02B .0277(4)(g).
12 The term "public road project" is defined in15A NCAC 02B .0265(3)(a).
13 Conveys application procedure to streamline the permitting process.
14 Phased development is addressed as a "common plan of development" in 15A NCAC 02H
1003(3).
15 Procedures for modifying stormwater plans are set forth in 15A NCAC 02H .1011.
Water Quality Certification No. 3890 11
Appendix D
Wet Pond Calculations
CALCULATION SHEET PAGE 1 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
Wet Pond 1 Calculations
Wet Pond 1 Dimension Calculations
TASK: Determine Wet Pond 1 Dimensions
CALCULATION:
WET POND 1
Elevation (ft) Area (sf) Volume (cf)
842 4,522 0
843 5,624 5,062
844 8,982 12,300
845
846
847
848
849
850
851
852
853
854
10,826
12,802
14,889
21,514
23,511
25,574
27,703
29,901
32,167
34,501
22,188
33,987
47,818
65,917
88,419
112952
139,581
168,373
199,397
232,721
The permanent water elevation is 847. The pond drains with a 24” RCP at elevation 847. It has a 4’x4’ riser at
elevation 851 and a 10’ wide emergency spillway at elevation 853. The riser has a 2.25” water quality orifice
at elevation 847 and a 8”x36” weir at elevation 849.4.
The wet pond volume is 47,818 cf and surface area is 14,889 sf.
Permanent pool average depth: 47818 cf / 14889 sf = 3.21 ft
Percent Impervious Cover: 87 = [x*98 + (10.94-x)*74] / 10.94 x=5.92 acres
5.92 acres / 10.94 acres = 54% - round up to 60% to be conservative
Using Table 1 Assume 60% cover since conditions are unknown for the commercial development.
CALCULATION SHEET PAGE 2 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
SA:DA Ratio = 2.09
0.0209= SA / DA = SA / 10.94 acres
Required SA = 0.23 acres = 9959 sf
Provided SA = 14889 sf; Therefore, the wet pond surface area is adequate.
TASK: Determine forebay dimensions.
FOREBAY DIMENSIONS FOR POND 1
Elevation (ft) Area (sf) Volume (cf)
844 2183 0
845 2783 2477
846
847
3447
4166
5585
9386
Forebay Volume = 9386 cf
Total wet pond volume = 47818 cf
Forebay Volume Percentage = 19.6%
CALCULATION SHEET PAGE 3 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
First Flush Runoff Calculations
TASK: Design the basin to catch and release the first inch of runoff from the area draining to the basin and
release it over a 2-5 day period.
CALCULATIONS:
Area: 10.94 acres = 476,546 sf
1” runoff on this area:
V = (Ac.) * (43,560 sf / ac) * (1.0 inch) * (1 ft/12 inches) = 39,712 cf
Based on pond sizes, 39,712 cf is provided at elevation 848.96 ft.
Elevation 848 – 65917 cf (total pond) – 47818 cf (wet pond) = 18099 cf (temp storage)
Elevation 849 – 88419 cf (total pond) – 47818 cf (wet pond) = 40601 cf (temp storage)
Bottom of Temporary Storage = 847 ft
To release this over a 48 hour period:
Q = (39,712 cf/ 48 hours) * (1 hour / 60 minutes) * (1 min / 60 sec) = 0.23 cfs
Q = (0.6)(A)(2gh)1/2
H = 849.33– 847 = 2.33’
0.23 cfs = (0.6)(A)[(2)(32.2)(2.33)]1/2
A = 0.0312 sq. ft. = 4.51 sq. in.
Therefore the required diameter 2.39 inches. Use a 2.25 inch orifice.
Therefore, the basin will drain in more than 48 hours.
CALCULATION SHEET PAGE 4 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
Wet Pond 2 Calculations
Wet Pond 2 Dimension Calculations
TASK: Determine Wet Pond 2 Dimensions
CALCULATION:
WET POND 2
Elevation (ft) Area (sf) Volume (cf)
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
1,360
1,686
2,046
2,440
2,868
4,179
4,992
5,877
6,833
7,875
12,811
14,334
15,920
17,571
19,285
21,064
0
1,520
3,383
5,623
8,274
11,776
16,355
21,783
28,132
35,479
45,721
59,285
74,404
91,141
109,560
129,726
The permanent water elevation is 839 The pond drains with a 24” RCP at elevation 837. It has a 4’x4’ riser at
elevation 842.75 and a 10’ wide emergency spillway at elevation 844. The riser has a 2” water quality orifice
at elevation 839 and (4) 8” orifices at elevation 841.75.
The wet pond volume is 35,479 cf and surface area is 7875 sf.
Permanent pool average depth: 35479 cf / 7875 sf = 4.51 ft
Percent Impervious Cover: 87 = [x*98 + (7.34-x)*74] / 7.26 x=3.93 acres
3.93 acres / 7.26 acres = 54% - round up to 60% to be conservative
Using Table 1 Assume 60% cover since conditions are unknown for the commercial development.
CALCULATION SHEET PAGE 5 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
SA:DA Ratio = 1.77
0.0177 = SA / DA = SA / 7.26 acres
Required SA = 0.129 acres = 5597 sf
Provided SA = 7875 sf; Therefore, the wet pond surface area is adequate.
TASK: Determine forebay dimensions.
FOREBAY DIMENSIONS FOR POND 2
Elevation (ft) Area (sf) Volume (cf)
835 850 0
836 1167 1004
837
838
839
1522
1915
2364
2345
4059
6195
Forebay Volume = 6195 cf
Total wet pond volume = 35479 cf
Forebay Volume Percentage = 17.5%
CALCULATION SHEET PAGE 6 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
First Flush Runoff Calculations
TASK: Design the basin to catch and release the first inch of runoff from the area draining to the basin and
release it over a 2-5 day period.
CALCULATIONS:
Area: 7.26 acres = 316,245 sf
1” runoff on this area:
V = (Ac.) * (43,560 sf / ac) * (1.0 inch) * (1 ft/12 inches) = 26,354 cf
Based on pond sizes, 26,354 cf is provided at elevation 841.5 ft.
Elevation 841 – 50,458 cf (total pond) – 26651 cf (wet pond) = 23807 cf (temp storage)
Elevation 842 – 65576 cf (total pond) – 26651 cf (wet pond) = 38925 cf (temp storage)
Bottom of Temporary Storage = 841.17 ft
To release this over a 48 hour period:
Q = (26,354 cf/ 48 hours) * (1 hour / 60 minutes) * (1 min / 60 sec) = 0.15 cfs
Q = (0.6)(A)(2gh)1/2
H = 841.17 – 839.0 = 2.17’
0.15 cfs = (0.6)(A)[(2)(32.2)(2.17)]1/2
A = 0.021 sq. ft. = 3.04 sq. in.
Therefore the required diameter 2.0 inches. Use a 2.0 inch orifice.
Therefore, the basin will drain in 48 hours.
CALCULATION SHEET PAGE 7 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
Wet Pond 3 Calculations
Wet Pond 3 Dimension Calculations
TASK: Determine Wet Pond 3 Dimensions
CALCULATION:
WET POND 3
Elevation (ft) Area (sf) Volume (cf)
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
6587
8490
10565
17785
21240
24746
28408
39461
42814
46208
49674
53211
56820
60494
64225
68012
71857
74758
0
7518
17025
31043
50528
73497
100050
133830
174952
219448
267373
318801
373801
432442
494786
560889
630808
704599
The permanent water elevation is 801. The pond drains with a 36” RCP at elevation 801. It has a 5’x5’ riser at
elevation 809 and a 15’ wide emergency spillway at elevation 811. The riser has a 4” water quality orifice at
elevation 801 and (4) 12” orifices at elevation 807.
The wet pond volume is 100050 cf and surface area is 28408 sf.
Permanent pool average depth: 10000 cf / 28408 sf = 3.52 ft
Percent Impervious Cover: 83 = [x*98 + (39.37-x)*74] / 39.37 x=14.76 acres
14.76 acres / 39.37 acres = 37.5% - round up to 40%
Using Table 10-1
CALCULATION SHEET PAGE 8 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
SA:DA Ratio = 1.51
0.0151 = SA / DA = SA / 39.37 acres
Required SA = 0.59 acres = 25895 sf
Provided SA = 28408 sf; Therefore, the wet pond surface area is adequate.
TASK: Determine forebay dimensions.
LARGE FOREBAY DIMENSIONS FOR POND 3
Elevation (ft) Area (sf) Volume (cf)
798 5033 0
799 6095 5555
800
801
7236
8431
12212
20037
Total Forebay Volume = 20037 cf
Total wet pond volume = 100050 cf
Forebay Volume Percentage = 20.0%
CALCULATION SHEET PAGE 9 OF 9
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/26/2017_
PROJECT: Wrenn Farms Wet Pond Calculations Reviewed By PMR Date 10/26/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\171026_Wet Pond Calculations.doc
First Flush Runoff Calculations
TASK: Design the basin to catch and release the first inch of runoff from the area draining to the basin and
release it over a 2-5 day period.
CALCULATIONS:
Area: 39.37 acres = 1,714,957 sf
1” runoff on this area:
V = (Ac.) * (43,560 sf / ac) * (1.0 inch) * (1 ft/12 inches) = 142,913 cf
Based on pond sizes, 142,913 cf is provided at elevation 804.5 ft.
Elevation 804 – 219448 cf (total pond) – 100050 cf (wet pond) = 119393 cf (temp storage)
Elevation 805 – 267373 cf (total pond) – 100050 cf (wet pond) = 167323 cf (temp storage)
Bottom of Temporary Storage = 801 ft
To release this over a 48 hour period:
Q = (142,913 cf/ 48 hours) * (1 hour / 60 minutes) * (1 min / 60 sec) = 0.83 cfs
Q = (0.6)(A)(2gh)1/2
H = 804.5– 801 = 3.5’
0.83 cfs = (0.6)(A)[(2)(32.2)(3.5)]1/2
A = 0.09 sq. ft. = 13.46 sq. in.
Therefore the required diameter 4.13 inches. Use a 4.5 inch orifice.
Therefore, the basin will drain in greater than 48 hours.
Wet Pond 1 Area CalculationsElevationForebay 1Main PondTotal area1' Sediment Excavation8413828 (Main Pond)Storage = (3828sf +4522sf)/2 * 1 ft = 4175 cf84245224,5228435,6245,6241819 (Forebay)Storage = (1819sf+2183sf)/2 * 1 ft = 2001 cf84421836,7998,9828452783804310,826Total Sediment Storage = 4175 + 2001 = 6176 cf8463447935512,80284741661072314,8896176 cf > 4964 cf therefore, acceptable8482151421,5148492351123,5118502557425,5748512770327,7038522990129,9018533216732,1678543450134,501
Wet Pond 2 Area CalculationsElevationForebay 1Main PondTotal area1' Sediment Excavation828809 (Main Pond)Storage = (809sf +1067sf)/2 * 1 ft = 938 cf8291067 (main Pond)Storage = (1067sf +1360sf)/2 * 1 ft = 1213 cf83013601,36083116861,68683220462,0468332,4402,440330 (forebay)Storage = (330sf+572sf)/2 * 1ft = 451 cf8342,8682,868572 (Forebay)Storage = (572sf+850sf)/2 * 1ft = 711 cf83585033294,179836116738254,992Total Permanent Sediment Storage = 938cf + 1213cf+451cf+711cf = 3313cf837152243555,877838191549186,8333313 cf > 3294 cf therefore, acceptable839236455157,8798401281112,8118411433414,3348421592015,9208431757117,5718441928519,2858452106421,064
Wet Pond 3 Area CalculationsElevationForebay 1Forebay 2Main PondTotal area1' Sediment Excavation7934227 (Main Pond)Storage = (4227sf +5385sf)/2 * 1 ft = 4806 cf7945385 (Main Pond)Storage = (5385sf +6587sf)/2 * 1 ft = 5986 cf79565876,5877968,4908,4903714 (Forebay)Storage = (3714sf+4358sf)/2 * 1ft = 4036 cf79710,56510,5654358 (Forebay)Storage = (5035sf+4358sf)/2 * 1 ft = 4697 cf79850331275217,785Total Sediment Storage = 4806cf + 5986cf+ 4036cf + 4697 cf = 19525 cf79960951514521,24080072361751024,74619525cf > 17864 cf therefore, acceptable80184311997728,4088023946139,4618034281442,8148044620846,2088054967449,6748065321153,2118075682056,8208086049460,4948096422564,2258106801268,0128117185771,8578127575875,758
Appendix E
Hydraflow Hydrographs
1 2 3 4
5 6 7 8 9 10
11
12 13 14
15 16 17
1819
2021 22 23
1
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Project: 171016_Wrenn Farms.gpw Thursday, 10 / 26 / 2017
Hyd.Origin Description
Legend
1 SCS Runoff Pre Area 1
2 SCS Runoff Pre Area 2
3 SCS Runoff Pre Area 3
4 SCS Runoff Pre Area 4
5 SCS Runoff Post Area 1 to Pond
6 SCS Runoff Post Area 1 Bypass Pond
7 SCS Runoff Post Area 2 to Pond
8 SCS Runoff Post Area 2 Bypass Pond
9 SCS Runoff Post Area 3
10 SCS Runoff Post Area 4 to Pond
11 SCS Runoff Post Area 4 Bypass Pond
12 Reservoir Wet Pond 1
13 Reservoir Wet Pond 2
14 Reservoir Wet Pond 3
15 Combine Post Area 1 Total
16 Combine Post Area 2 Total
17 Combine Post Area 4 Total
18 SCS Runoff Phase 1 Sediment Basin 1
19 SCS Runoff Phase 1 Sediment Basin 2
20 SCS Runoff Phase 1 Sediment Basin 3
21 SCS Runoff Phase 2 Sediment Basin 1
22 SCS Runoff Phase 2 Sediment Basin 2
23 SCS Runoff Phase 2 Sediment Basin 3
Hydrograph Return Period Recap
2
Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ ------- 11.99 ------- ------- 21.88 28.03 32.94 37.94 Pre Area 1
2 SCS Runoff ------ ------- 16.23 ------- ------- 29.16 37.19 43.58 50.09 Pre Area 2
3 SCS Runoff ------ ------- 14.50 ------- ------- 26.32 33.66 39.50 45.45 Pre Area 3
4 SCS Runoff ------ ------- 72.04 ------- ------- 131.54 168.59 198.12 228.25 Pre Area 4
5 SCS Runoff ------ ------- 29.63 ------- ------- 48.10 59.16 67.84 76.61 Post Area 1 to Pond
6 SCS Runoff ------ ------- 1.120 ------- ------- 2.254 2.989 3.584 4.197 Post Area 1 Bypass Pond
7 SCS Runoff ------ ------- 27.78 ------- ------- 44.75 54.88 62.83 70.86 Post Area 2 to Pond
8 SCS Runoff ------ ------- 1.340 ------- ------- 2.508 3.242 3.829 4.433 Post Area 2 Bypass Pond
9 SCS Runoff ------ ------- 2.265 ------- ------- 4.392 5.743 6.829 7.943 Post Area 3
10 SCS Runoff ------ ------- 81.95 ------- ------- 140.94 176.92 205.34 234.19 Post Area 4 to Pond
11 SCS Runoff ------ ------- 9.719 ------- ------- 18.85 24.65 29.30 34.08 Post Area 4 Bypass Pond
12 Reservoir 5 ------- 1.368 ------- ------- 8.168 12.08 22.68 28.26 Wet Pond 1
13 Reservoir 7 ------- 0.858 ------- ------- 5.709 21.65 33.29 35.59 Wet Pond 2
14 Reservoir 10 ------- 1.117 ------- ------- 5.606 13.27 18.89 39.91 Wet Pond 3
15 Combine 6, 12, ------- 1.463 ------- ------- 9.803 14.23 25.68 31.99 Post Area 1 Total
16 Combine 8, 13, ------- 1.480 ------- ------- 6.271 23.07 35.63 38.83 Post Area 2 Total
17 Combine 11, 14, ------- 10.24 ------- ------- 19.62 25.54 30.28 42.92 Post Area 4 Total
18 SCS Runoff ------ ------- 38.27 ------- ------- 61.64 75.60 86.54 97.60 Phase 1 Sediment Basin 1
19 SCS Runoff ------ ------- 26.43 ------- ------- 42.59 52.24 59.80 67.45 Phase 1 Sediment Basin 2
20 SCS Runoff ------ ------- 80.72 ------- ------- 131.29 161.59 185.38 209.48 Phase 1 Sediment Basin 3
21 SCS Runoff ------ ------- 41.86 ------- ------- 67.43 82.70 94.67 106.77 Phase 2 Sediment Basin 1
22 SCS Runoff ------ ------- 25.25 ------- ------- 40.68 49.90 57.12 64.43 Phase 2 Sediment Basin 2
23 SCS Runoff ------ ------- 96.31 ------- ------- 156.63 192.79 221.16 249.92 Phase 2 Sediment Basin 3
Proj. file: 171016_Wrenn Farms.gpw Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Summary Report
3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 11.99 1 723 34,440 ------ ------ ------ Pre Area 1
2 SCS Runoff 16.23 1 719 34,229 ------ ------ ------ Pre Area 2
3 SCS Runoff 14.50 1 721 36,762 ------ ------ ------ Pre Area 3
4 SCS Runoff 72.04 1 724 215,049 ------ ------ ------ Pre Area 4
5 SCS Runoff 29.63 1 723 84,867 ------ ------ ------ Post Area 1 to Pond
6 SCS Runoff 1.120 1 730 4,379 ------ ------ ------ Post Area 1 Bypass Pond
7 SCS Runoff 27.78 1 717 57,362 ------ ------ ------ Post Area 2 to Pond
8 SCS Runoff 1.340 1 718 2,692 ------ ------ ------ Post Area 2 Bypass Pond
9 SCS Runoff 2.265 1 718 4,569 ------ ------ ------ Post Area 3
10 SCS Runoff 81.95 1 725 256,025 ------ ------ ------ Post Area 4 to Pond
11 SCS Runoff 9.719 1 718 19,608 ------ ------ ------ Post Area 4 Bypass Pond
12 Reservoir 1.368 1 838 49,176 5 849.63 103,974 Wet Pond 1
13 Reservoir 0.858 1 839 34,935 7 841.97 73,996 Wet Pond 2
14 Reservoir 1.117 1 1446 133,702 10 805.79 307,788 Wet Pond 3
15 Combine 1.463 1 834 53,554 6, 12, ------ ------ Post Area 1 Total
16 Combine 1.480 1 718 37,627 8, 13, ------ ------ Post Area 2 Total
17 Combine 10.24 1 718 153,310 11, 14, ------ ------ Post Area 4 Total
18 SCS Runoff 38.27 1 717 79,012 ------ ------ ------ Phase 1 Sediment Basin 1
19 SCS Runoff 26.43 1 718 56,773 ------ ------ ------ Phase 1 Sediment Basin 2
20 SCS Runoff 80.72 1 725 252,837 ------ ------ ------ Phase 1 Sediment Basin 3
21 SCS Runoff 41.86 1 717 86,439 ------ ------ ------ Phase 2 Sediment Basin 1
22 SCS Runoff 25.25 1 718 54,233 ------ ------ ------ Phase 2 Sediment Basin 2
23 SCS Runoff 96.31 1 725 301,642 ------ ------ ------ Phase 2 Sediment Basin 3
171016_Wrenn Farms.gpw Return Period: 2 Year Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 1
Pre Area 1
Hydrograph type = SCS Runoff Peak discharge = 11.99 cfs
Storm frequency = 2 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 34,440 cuft
Drainage area = 6.230 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.40 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.180 x 73) + (6.050 x 79)] / 6.230
4
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
Pre Area 1
Hyd. No. 1 -- 2 Year
Hyd No. 1
TR55 Tc Worksheet
5
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 1
Pre Area 1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 1.50 0.00 0.00
Travel Time (min) = 10.63 + 0.00 + 0.00 = 10.63
Shallow Concentrated Flow
Flow length (ft) = 681.00 0.00 0.00
Watercourse slope (%) = 1.50 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.98 0.00 0.00
Travel Time (min) = 5.74 + 0.00 + 0.00 = 5.74
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 16.40 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 2
Pre Area 2
Hydrograph type = SCS Runoff Peak discharge = 16.23 cfs
Storm frequency = 2 yrs Time to peak = 719 min
Time interval = 1 min Hyd. volume = 34,229 cuft
Drainage area = 6.430 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.30 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
6
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Pre Area 2
Hyd. No. 2 -- 2 Year
Hyd No. 2
TR55 Tc Worksheet
7
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 2
Pre Area 2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 6.00 0.00 0.00
Travel Time (min) = 6.11 + 0.00 + 0.00 = 6.11
Shallow Concentrated Flow
Flow length (ft) = 296.00 0.00 0.00
Watercourse slope (%) = 6.10 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.98 0.00 0.00
Travel Time (min) = 1.24 + 0.00 + 0.00 = 1.24
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 7.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 3
Pre Area 3
Hydrograph type = SCS Runoff Peak discharge = 14.50 cfs
Storm frequency = 2 yrs Time to peak = 721 min
Time interval = 1 min Hyd. volume = 36,762 cuft
Drainage area = 6.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 12.90 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
8
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
Q (cfs)
Time (min)
Pre Area 3
Hyd. No. 3 -- 2 Year
Hyd No. 3
TR55 Tc Worksheet
9
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 3
Pre Area 3
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 9.48 + 0.00 + 0.00 = 9.48
Shallow Concentrated Flow
Flow length (ft) = 474.00 0.00 0.00
Watercourse slope (%) = 2.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =2.28 0.00 0.00
Travel Time (min) = 3.46 + 0.00 + 0.00 = 3.46
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 12.90 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 4
Pre Area 4
Hydrograph type = SCS Runoff Peak discharge = 72.04 cfs
Storm frequency = 2 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 215,049 cuft
Drainage area = 39.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 17.10 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
10
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Pre Area 4
Hyd. No. 4 -- 2 Year
Hyd No. 4
TR55 Tc Worksheet
11
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 4
Pre Area 4
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 3.00 0.00 0.00
Travel Time (min) = 8.06 + 0.00 + 0.00 = 8.06
Shallow Concentrated Flow
Flow length (ft) = 1668.00 0.00 0.00
Watercourse slope (%) = 3.60 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.06 0.00 0.00
Travel Time (min) = 9.08 + 0.00 + 0.00 = 9.08
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 17.10 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 5
Post Area 1 to Pond
Hydrograph type = SCS Runoff Peak discharge = 29.63 cfs
Storm frequency = 2 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 84,867 cuft
Drainage area = 10.940 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 15.30 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(2.080 x 83) + (3.410 x 94) + (2.230 x 98) + (3.220 x 74)] / 10.940
12
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Post Area 1 to Pond
Hyd. No. 5 -- 2 Year
Hyd No. 5
TR55 Tc Worksheet
13
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 5
Post Area 1 to Pond
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 9.48 + 0.00 + 0.00 = 9.48
Shallow Concentrated Flow
Flow length (ft) = 38.00 0.00 0.00
Watercourse slope (%) = 2.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =2.28 0.00 0.00
Travel Time (min) = 0.28 + 0.00 + 0.00 = 0.28
Channel Flow
X sectional flow area (sqft) = 4.00 4.90 0.00
Wetted perimeter (ft) = 6.47 7.85 0.00
Channel slope (%) = 3.10 0.75 0.00
Manning's n-value = 0.150 0.013 0.015
Velocity (ft/s) =1.27
7.24
0.00
Flow length (ft) ({0})350.0 418.0 0.0
Travel Time (min) = 4.60 + 0.96 + 0.00 = 5.57
Total Travel Time, Tc .............................................................................. 15.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 6
Post Area 1 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 1.120 cfs
Storm frequency = 2 yrs Time to peak = 730 min
Time interval = 1 min Hyd. volume = 4,379 cuft
Drainage area = 1.010 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.00 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
14
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post Area 1 Bypass Pond
Hyd. No. 6 -- 2 Year
Hyd No. 6
TR55 Tc Worksheet
15
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 6
Post Area 1 Bypass Pond
Description A B C Totals
Sheet Flow
Manning's n-value = 0.400 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 4.10 0.00 0.00
Land slope (%) = 1.00 0.00 0.00
Travel Time (min) = 25.03 + 0.00 + 0.00 = 25.03
Shallow Concentrated Flow
Flow length (ft) = 187.00 0.00 0.00
Watercourse slope (%) = 4.10 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.27 0.00 0.00
Travel Time (min) = 0.95 + 0.00 + 0.00 = 0.95
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 26.00 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 7
Post Area 2 to Pond
Hydrograph type = SCS Runoff Peak discharge = 27.78 cfs
Storm frequency = 2 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 57,362 cuft
Drainage area = 7.260 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(1.090 x 83) + (0.990 x 98) + (3.100 x 94) + (2.080 x 74)] / 7.260
16
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post Area 2 to Pond
Hyd. No. 7 -- 2 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 8
Post Area 2 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 1.340 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 2,692 cuft
Drainage area = 0.550 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.500 x 74)] / 0.550
17
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post Area 2 Bypass Pond
Hyd. No. 8 -- 2 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 9
Post Area 3
Hydrograph type = SCS Runoff Peak discharge = 2.265 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 4,569 cuft
Drainage area = 1.030 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
18
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post Area 3
Hyd. No. 9 -- 2 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 10
Post Area 4 to Pond
Hydrograph type = SCS Runoff Peak discharge = 81.95 cfs
Storm frequency = 2 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 256,025 cuft
Drainage area = 39.370 ac Curve number = 83*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.90 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.380 x 83) + (3.250 x 98) + (6.740 x 74)] / 39.370
19
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Post Area 4 to Pond
Hyd. No. 10 -- 2 Year
Hyd No. 10
TR55 Tc Worksheet
20
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 10
Post Area 4 to Pond
Description A B C Totals
Sheet Flow
Manning's n-value = 0.150 0.011 0.011
Flow length (ft) = 75.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 7.53 + 0.00 + 0.00 = 7.53
Shallow Concentrated Flow
Flow length (ft) = 0.00 0.00 0.00
Watercourse slope (%) = 0.00 0.00 0.00
Surface description = Paved Paved Paved
Average velocity (ft/s) =0.00 0.00 0.00
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Channel Flow
X sectional flow area (sqft) = 4.00 7.06 0.00
Wetted perimeter (ft) = 6.47 9.42 0.00
Channel slope (%) = 2.40 1.90 0.00
Manning's n-value = 0.150 0.013 0.015
Velocity (ft/s) =1.12
13.02
0.00
Flow length (ft) ({0})688.0 1661.0 0.0
Travel Time (min) = 10.28 + 2.13 + 0.00 = 12.41
Total Travel Time, Tc .............................................................................. 19.90 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 11
Post Area 4 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 9.719 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 19,608 cuft
Drainage area = 4.420 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
21
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
Q (cfs)
Time (min)
Post Area 4 Bypass Pond
Hyd. No. 11 -- 2 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 12
Wet Pond 1
Hydrograph type = Reservoir Peak discharge = 1.368 cfs
Storm frequency = 2 yrs Time to peak = 838 min
Time interval = 1 min Hyd. volume = 49,176 cuft
Inflow hyd. No. = 5 - Post Area 1 to Pond Max. Elevation = 849.63 ft
Reservoir name = Wet Pond 1 Max. Storage = 103,974 cuft
Storage Indication method used. Wet pond routing start elevation = 847.00 ft.
22
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Wet Pond 1
Hyd. No. 12 -- 2 Year
Hyd No. 12 Hyd No. 5 Total storage used = 103,974 cuft
Pond Report 23
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Pond No. 4 - Wet Pond 1
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 842.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 842.00 4,522 0 0
1.00 843.00 5,624 5,062 5,062
2.00 844.00 8,982 7,237 12,300
3.00 845.00 10,826 9,889 22,188
4.00 846.00 12,802 11,799 33,987
5.00 847.00 14,889 13,831 47,818
6.00 848.00 21,514 18,098 65,917
7.00 849.00 23,511 22,503 88,419
8.00 850.00 25,574 24,533 112,952
9.00 851.00 27,703 26,629 139,581
10.00 852.00 29,901 28,792 168,373
11.00 853.00 32,167 31,024 199,397
12.00 854.00 34,501 33,324 232,721
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 24.00 2.25 8.00 0.00
Span (in)= 24.00 2.25 36.00 0.00
No. Barrels = 1 1 1 0
Invert El. (ft)= 847.00 847.00 849.40 0.00
Length (ft)= 76.00 0.00 0.00 0.00
Slope (%)= 0.89 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes Yes No
Crest Len (ft)= 16.00 0.00 10.00 0.00
Crest El. (ft)= 851.00 0.00 853.00 0.00
Weir Coeff.= 3.33 3.33 2.60 3.33
Weir Type = 1 --- Broad ---
Multi-Stage = Yes No No No
Exfil.(in/hr)= 0.000 (by Wet area)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0 842.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
1.00 5,062 843.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
2.00 12,300 844.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
3.00 22,188 845.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
4.00 33,987 846.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
5.00 47,818 847.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
6.00 65,917 848.00 0.13 ic 0.12 ic 0.00 --- 0.00 --- 0.00 ------ --- 0.123
7.00 88,419 849.00 0.18 ic 0.18 ic 0.00 --- 0.00 --- 0.00 ------ --- 0.180
8.00 112,952 850.00 5.01 ic 0.19 ic 4.75 ic --- 0.00 --- 0.00 --- --- --- 4.937
9.00 139,581 851.00 11.05 ic 0.21 ic 10.84 ic --- 0.00 --- 0.00 --- --- --- 11.05
10.00 168,373 852.00 29.82 ic 0.04 ic 3.23 ic --- 26.54 s --- 0.00 --- --- --- 29.82
11.00 199,397 853.00 33.74 ic 0.02 ic 1.50 ic --- 32.19 s --- 0.00 --- --- --- 33.71
12.00 232,721 854.00 37.02 ic 0.01 ic 0.96 ic --- 36.02 s --- 26.00 --- --- --- 63.00
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 13
Wet Pond 2
Hydrograph type = Reservoir Peak discharge = 0.858 cfs
Storm frequency = 2 yrs Time to peak = 839 min
Time interval = 1 min Hyd. volume = 34,935 cuft
Inflow hyd. No. = 7 - Post Area 2 to Pond Max. Elevation = 841.97 ft
Reservoir name = Wet Pond 2 Max. Storage = 73,996 cuft
Storage Indication method used. Wet pond routing start elevation = 839.00 ft.
24
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Wet Pond 2
Hyd. No. 13 -- 2 Year
Hyd No. 13 Hyd No. 7 Total storage used = 73,996 cuft
Pond Report 25
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Pond No. 11 - Wet Pond 2
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 830.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 830.00 1,360 0 0
1.00 831.00 1,686 1,520 1,520
2.00 832.00 2,046 1,863 3,383
3.00 833.00 2,440 2,240 5,623
4.00 834.00 2,868 2,651 8,274
5.00 835.00 4,179 3,503 11,776
6.00 836.00 4,992 4,579 16,355
7.00 837.00 5,877 5,428 21,783
8.00 838.00 6,833 6,348 28,132
9.00 839.00 7,875 7,347 35,479
10.00 840.00 12,811 10,242 45,721
11.00 841.00 14,334 13,564 59,285
12.00 842.00 15,920 15,119 74,404
13.00 843.00 17,571 16,737 91,141
14.00 844.00 19,285 18,420 109,560
15.00 845.00 21,064 20,166 129,726
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 24.00 2.00 8.00 0.00
Span (in)= 24.00 2.00 8.00 0.00
No. Barrels = 1 1 4 0
Invert El. (ft)= 837.00 839.00 841.75 0.00
Length (ft)= 85.00 0.00 0.00 0.00
Slope (%)= 2.85 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes Yes No
Crest Len (ft)= 16.00 0.00 10.00 0.00
Crest El. (ft)= 842.75 0.00 844.00 0.00
Weir Coeff.= 3.33 3.33 2.60 3.33
Weir Type = 1 --- Broad ---
Multi-Stage = Yes No No No
Exfil.(in/hr)= 0.000 (by Wet area)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0 830.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
1.00 1,520 831.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
2.00 3,383 832.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
3.00 5,623 833.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
4.00 8,274 834.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
5.00 11,776 835.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
6.00 16,355 836.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
7.00 21,783 837.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
8.00 28,132 838.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
9.00 35,479 839.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
10.00 45,721 840.00 0.11 ic 0.10 ic 0.00 --- 0.00 --- 0.00 --- --- --- 0.101
11.00 59,285 841.00 0.15 ic 0.15 ic 0.00 --- 0.00 --- 0.00 --- --- --- 0.145
12.00 74,404 842.00 1.01 ic 0.18 ic 0.82 ic --- 0.00 --- 0.00 --- --- --- 0.995
13.00 91,141 843.00 13.30 ic 0.21 ic 6.44 ic --- 6.66 --- 0.00 --- --- --- 13.30
14.00 109,560 844.00 36.69 ic 0.04 ic 2.28 ic --- 34.38 s --- 0.00 --- --- --- 36.69
15.00 129,726 845.00 39.94 ic 0.02 ic 1.12 ic --- 38.77 s --- 26.00 --- --- --- 65.92
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 14
Wet Pond 3
Hydrograph type = Reservoir Peak discharge = 1.117 cfs
Storm frequency = 2 yrs Time to peak = 1446 min
Time interval = 1 min Hyd. volume = 133,702 cuft
Inflow hyd. No. = 10 - Post Area 4 to Pond Max. Elevation = 805.79 ft
Reservoir name = Wet Pond 3 Max. Storage = 307,788 cuft
Storage Indication method used. Wet pond routing start elevation = 801.00 ft.
26
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Wet Pond 3
Hyd. No. 14 -- 2 Year
Hyd No. 14 Hyd No. 10 Total storage used = 307,788 cuft
Pond Report 27
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Pond No. 5 - Wet Pond 3
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 795.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 795.00 6,587 0 0
1.00 796.00 8,490 7,518 7,518
2.00 797.00 10,565 9,508 17,025
3.00 798.00 17,785 14,018 31,043
4.00 799.00 21,240 19,485 50,528
5.00 800.00 24,746 22,968 73,497
6.00 801.00 28,408 26,553 100,050
7.00 802.00 39,461 33,780 133,830
8.00 803.00 42,814 41,122 174,952
9.00 804.00 46,208 44,496 219,448
10.00 805.00 49,674 47,926 267,374
11.00 806.00 53,211 51,427 318,801
12.00 807.00 56,820 55,000 373,801
13.00 808.00 60,494 58,642 432,442
14.00 809.00 64,225 62,344 494,786
15.00 810.00 68,012 66,103 560,889
16.00 811.00 71,857 69,919 630,808
17.00 812.00 75,758 73,792 704,599
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 36.00 4.50 12.00 0.00
Span (in)= 36.00 4.50 12.00 0.00
No. Barrels = 1 1 4 0
Invert El. (ft)= 801.00 801.00 807.00 0.00
Length (ft)= 127.00 0.00 0.00 0.00
Slope (%)= 0.83 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes Yes No
Crest Len (ft)= 20.00 0.00 15.00 0.00
Crest El. (ft)= 809.00 0.00 811.00 0.00
Weir Coeff.= 3.33 3.33 2.60 3.33
Weir Type = 1 --- Broad ---
Multi-Stage = Yes No No No
Exfil.(in/hr)= 0.000 (by Wet area)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0 795.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
1.00 7,518 796.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
2.00 17,025 797.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
3.00 31,043 798.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
4.00 50,528 799.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
5.00 73,497 800.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- ---0.000
6.00 100,050 801.00 0.00 0.00 0.00 --- 0.00 --- 0.00 --- --- --- 0.000
7.00 133,830 802.00 0.46 ic 0.46 ic 0.00 --- 0.00 --- 0.00 --- --- --- 0.462
8.00 174,952 803.00 0.74 ic 0.69 ic 0.00 --- 0.00 --- 0.00 --- --- --- 0.693
9.00 219,448 804.00 0.88 ic 0.87 ic 0.00 --- 0.00 --- 0.00 --- --- --- 0.869
10.00 267,374 805.00 1.04 ic 1.01 ic 0.00 --- 0.00 --- 0.00 --- --- --- 1.015
11.00 318,801 806.00 1.14 ic 1.14 ic 0.00 --- 0.00 --- 0.00 --- --- --- 1.142
12.00 373,801 807.00 1.32 ic 1.26 ic 0.00 --- 0.00 --- 0.00 --- --- --- 1.258
13.00 432,442 808.00 11.96 ic 1.27 ic 10.69 ic --- 0.00 ---0.00 --- --- --- 11.96
14.00 494,786 809.00 19.85 ic 1.33 ic 18.52 ic --- 0.00 ---0.00 --- --- --- 19.85
15.00 560,889 810.00 84.59 ic 0.61 ic 17.38 ic --- 66.60 --- 0.00 --- --- --- 84.59
16.00 630,808 811.00 98.00 ic 0.24 ic 6.87 ic --- 90.89 s --- 0.00 --- --- --- 98.00
17.00 704,599 812.00 104.45 ic 0.15 ic 4.28 ic --- 100.00 s --- 39.00 --- --- --- 143.43
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 15
Post Area 1 Total
Hydrograph type = Combine Peak discharge = 1.463 cfs
Storm frequency = 2 yrs Time to peak = 834 min
Time interval = 1 min Hyd. volume = 53,554 cuft
Inflow hyds. = 6, 12 Contrib. drain. area = 1.010 ac
28
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post Area 1 Total
Hyd. No. 15 -- 2 Year
Hyd No. 15 Hyd No. 6 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 16
Post Area 2 Total
Hydrograph type = Combine Peak discharge = 1.480 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 37,627 cuft
Inflow hyds. = 8, 13 Contrib. drain. area = 0.550 ac
29
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Post Area 2 Total
Hyd. No. 16 -- 2 Year
Hyd No. 16 Hyd No. 8 Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 17
Post Area 4 Total
Hydrograph type = Combine Peak discharge = 10.24 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 153,310 cuft
Inflow hyds. = 11, 14 Contrib. drain. area = 4.420 ac
30
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
Post Area 4 Total
Hyd. No. 17 -- 2 Year
Hyd No. 17 Hyd No. 11 Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 18
Phase 1 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 38.27 cfs
Storm frequency = 2 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 79,012 cuft
Drainage area = 10.000 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
31
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 1
Hyd. No. 18 -- 2 Year
Hyd No. 18
TR55 Tc Worksheet
32
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 18
Phase 1 Sediment Basin 1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.011 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 1.17 + 0.00 + 0.00 = 1.17
Shallow Concentrated Flow
Flow length (ft) = 500.00 0.00 0.00
Watercourse slope (%) = 1.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.61 0.00 0.00
Travel Time (min) = 5.16 + 0.00 + 0.00 = 5.16
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 6.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 19
Phase 1 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 26.43 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 56,773 cuft
Drainage area = 7.600 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
33
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 2
Hyd. No. 19 -- 2 Year
Hyd No. 19
TR55 Tc Worksheet
34
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 19
Phase 1 Sediment Basin 2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.011 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 1.00 0.00 0.00
Travel Time (min) = 1.55 + 0.00 + 0.00 = 1.55
Shallow Concentrated Flow
Flow length (ft) = 600.00 0.00 0.00
Watercourse slope (%) = 1.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.61 0.00 0.00
Travel Time (min) = 6.20 + 0.00 + 0.00 = 6.20
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 7.70 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 20
Phase 1 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 80.72 cfs
Storm frequency = 2 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 252,837 cuft
Drainage area = 33.000 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.70 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 33.000
35
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 3
Hyd. No. 20 -- 2 Year
Hyd No. 20
TR55 Tc Worksheet
36
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 20
Phase 1 Sediment Basin 3
Description A B C Totals
Sheet Flow
Manning's n-value = 0.011 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 3.66 0.00 0.00
Travel Time (min) = 0.92 + 0.00 + 0.00 = 0.92
Shallow Concentrated Flow
Flow length (ft) = 1182.00 0.00 0.00
Watercourse slope (%) = 3.66 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =3.09 0.00 0.00
Travel Time (min) = 6.38 + 0.00 + 0.00 = 6.38
Channel Flow
X sectional flow area (sqft) = 4.00 7.06 0.00
Wetted perimeter (ft) = 6.47 9.42 0.00
Channel slope (%) = 2.40 1.90 0.00
Manning's n-value = 0.150 0.013 0.015
Velocity (ft/s) =1.12
13.02
0.00
Flow length (ft) ({0})688.0 1661.0 0.0
Travel Time (min) = 10.28 + 2.13 + 0.00 = 12.41
Total Travel Time, Tc .............................................................................. 19.70 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 21
Phase 2 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 41.86 cfs
Storm frequency = 2 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 86,439 cuft
Drainage area = 10.940 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
37
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 1
Hyd. No. 21 -- 2 Year
Hyd No. 21
TR55 Tc Worksheet
38
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 21
Phase 2 Sediment Basin 1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.011 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 2.00 0.00 0.00
Travel Time (min) = 1.17 + 0.00 + 0.00 = 1.17
Shallow Concentrated Flow
Flow length (ft) = 500.00 0.00 0.00
Watercourse slope (%) = 1.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.61 0.00 0.00
Travel Time (min) = 5.16 + 0.00 + 0.00 = 5.16
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 6.30 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 22
Phase 2 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 25.25 cfs
Storm frequency = 2 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 54,233 cuft
Drainage area = 7.260 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
39
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 2
Hyd. No. 22 -- 2 Year
Hyd No. 22
TR55 Tc Worksheet
40
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hyd. No. 22
Phase 2 Sediment Basin 2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.011 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 3.42 0.00 0.00
Land slope (%) = 1.00 0.00 0.00
Travel Time (min) = 1.55 + 0.00 + 0.00 = 1.55
Shallow Concentrated Flow
Flow length (ft) = 600.00 0.00 0.00
Watercourse slope (%) = 1.00 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) =1.61 0.00 0.00
Travel Time (min) = 6.20 + 0.00 + 0.00 = 6.20
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) =0.00
0.00
0.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 7.70 min
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 23
Phase 2 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 96.31 cfs
Storm frequency = 2 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 301,642 cuft
Drainage area = 39.370 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 19.90 min
Total precip. = 3.42 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 39.370
41
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
100.00 100.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 3
Hyd. No. 23 -- 2 Year
Hyd No. 23
Hydrograph Summary Report
42
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 21.88 1 723 62,381 ------ ------ ------ Pre Area 1
2 SCS Runoff 29.16 1 718 61,999 ------ ------ ------ Pre Area 2
3 SCS Runoff 26.32 1 721 66,586 ------ ------ ------ Pre Area 3
4 SCS Runoff 131.54 1 724 389,513 ------ ------ ------ Pre Area 4
5 SCS Runoff 48.10 1 723 140,031 ------ ------ ------ Post Area 1 to Pond
6 SCS Runoff 2.254 1 729 8,471 ------ ------ ------ Post Area 1 Bypass Pond
7 SCS Runoff 44.75 1 717 94,648 ------ ------ ------ Post Area 2 to Pond
8 SCS Runoff 2.508 1 718 5,068 ------ ------ ------ Post Area 2 Bypass Pond
9 SCS Runoff 4.392 1 718 8,840 ------ ------ ------ Post Area 3
10 SCS Runoff 140.94 1 725 441,999 ------ ------ ------ Post Area 4 to Pond
11 SCS Runoff 18.85 1 718 37,935 ------ ------ ------ Post Area 4 Bypass Pond
12 Reservoir 8.168 1 743 103,958 5 850.42 124,125 Wet Pond 1
13 Reservoir 5.709 1 732 71,909 7 842.72 86,503 Wet Pond 2
14 Reservoir 5.606 1 889 257,621 10 807.54 405,427 Wet Pond 3
15 Combine 9.803 1 738 112,429 6, 12, ------ ------ Post Area 1 Total
16 Combine 6.271 1 723 76,977 8, 13, ------ ------ Post Area 2 Total
17 Combine 19.62 1 718 295,555 11, 14, ------ ------ Post Area 4 Total
18 SCS Runoff 61.64 1 717 130,369 ------ ------ ------ Phase 1 Sediment Basin 1
19 SCS Runoff 42.59 1 718 93,676 ------ ------ ------ Phase 1 Sediment Basin 2
20 SCS Runoff 131.29 1 725 417,181 ------ ------ ------ Phase 1 Sediment Basin 3
21 SCS Runoff 67.43 1 717 142,624 ------ ------ ------ Phase 2 Sediment Basin 1
22 SCS Runoff 40.68 1 718 89,485 ------ ------ ------ Phase 2 Sediment Basin 2
23 SCS Runoff 156.63 1 725 497,710 ------ ------ ------ Phase 2 Sediment Basin 3
171016_Wrenn Farms.gpw Return Period: 10 Year Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 1
Pre Area 1
Hydrograph type = SCS Runoff Peak discharge = 21.88 cfs
Storm frequency = 10 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 62,381 cuft
Drainage area = 6.230 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.40 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.180 x 73) + (6.050 x 79)] / 6.230
43
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
Q (cfs)
Time (min)
Pre Area 1
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 2
Pre Area 2
Hydrograph type = SCS Runoff Peak discharge = 29.16 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 61,999 cuft
Drainage area = 6.430 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.30 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
44
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Pre Area 2
Hyd. No. 2 -- 10 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 3
Pre Area 3
Hydrograph type = SCS Runoff Peak discharge = 26.32 cfs
Storm frequency = 10 yrs Time to peak = 721 min
Time interval = 1 min Hyd. volume = 66,586 cuft
Drainage area = 6.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 12.90 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
45
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Pre Area 3
Hyd. No. 3 -- 10 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 4
Pre Area 4
Hydrograph type = SCS Runoff Peak discharge = 131.54 cfs
Storm frequency = 10 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 389,513 cuft
Drainage area = 39.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 17.10 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
46
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
Q (cfs)
Time (min)
Pre Area 4
Hyd. No. 4 -- 10 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 5
Post Area 1 to Pond
Hydrograph type = SCS Runoff Peak discharge = 48.10 cfs
Storm frequency = 10 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 140,031 cuft
Drainage area = 10.940 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 15.30 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(2.080 x 83) + (3.410 x 94) + (2.230 x 98) + (3.220 x 74)] / 10.940
47
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Post Area 1 to Pond
Hyd. No. 5 -- 10 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 6
Post Area 1 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 2.254 cfs
Storm frequency = 10 yrs Time to peak = 729 min
Time interval = 1 min Hyd. volume = 8,471 cuft
Drainage area = 1.010 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
48
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post Area 1 Bypass Pond
Hyd. No. 6 -- 10 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 7
Post Area 2 to Pond
Hydrograph type = SCS Runoff Peak discharge = 44.75 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 94,648 cuft
Drainage area = 7.260 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(1.090 x 83) + (0.990 x 98) + (3.100 x 94) + (2.080 x 74)] / 7.260
49
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Post Area 2 to Pond
Hyd. No. 7 -- 10 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 8
Post Area 2 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 2.508 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 5,068 cuft
Drainage area = 0.550 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.500 x 74)] / 0.550
50
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post Area 2 Bypass Pond
Hyd. No. 8 -- 10 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 9
Post Area 3
Hydrograph type = SCS Runoff Peak discharge = 4.392 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 8,840 cuft
Drainage area = 1.030 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
51
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post Area 3
Hyd. No. 9 -- 10 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 10
Post Area 4 to Pond
Hydrograph type = SCS Runoff Peak discharge = 140.94 cfs
Storm frequency = 10 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 441,999 cuft
Drainage area = 39.370 ac Curve number = 83*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.90 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.380 x 83) + (3.250 x 98) + (6.740 x 74)] / 39.370
52
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
Q (cfs)
Time (min)
Post Area 4 to Pond
Hyd. No. 10 -- 10 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 11
Post Area 4 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 18.85 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 37,935 cuft
Drainage area = 4.420 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
53
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Post Area 4 Bypass Pond
Hyd. No. 11 -- 10 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 12
Wet Pond 1
Hydrograph type = Reservoir Peak discharge = 8.168 cfs
Storm frequency = 10 yrs Time to peak = 743 min
Time interval = 1 min Hyd. volume = 103,958 cuft
Inflow hyd. No. = 5 - Post Area 1 to Pond Max. Elevation = 850.42 ft
Reservoir name = Wet Pond 1 Max. Storage = 124,125 cuft
Storage Indication method used. Wet pond routing start elevation = 847.00 ft.
54
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Wet Pond 1
Hyd. No. 12 -- 10 Year
Hyd No. 12 Hyd No. 5 Total storage used = 124,125 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 13
Wet Pond 2
Hydrograph type = Reservoir Peak discharge = 5.709 cfs
Storm frequency = 10 yrs Time to peak = 732 min
Time interval = 1 min Hyd. volume = 71,909 cuft
Inflow hyd. No. = 7 - Post Area 2 to Pond Max. Elevation = 842.72 ft
Reservoir name = Wet Pond 2 Max. Storage = 86,503 cuft
Storage Indication method used. Wet pond routing start elevation = 839.00 ft.
55
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Wet Pond 2
Hyd. No. 13 -- 10 Year
Hyd No. 13 Hyd No. 7 Total storage used = 86,503 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 14
Wet Pond 3
Hydrograph type = Reservoir Peak discharge = 5.606 cfs
Storm frequency = 10 yrs Time to peak = 889 min
Time interval = 1 min Hyd. volume = 257,621 cuft
Inflow hyd. No. = 10 - Post Area 4 to Pond Max. Elevation = 807.54 ft
Reservoir name = Wet Pond 3 Max. Storage = 405,427 cuft
Storage Indication method used. Wet pond routing start elevation = 801.00 ft.
56
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
Q (cfs)
Time (min)
Wet Pond 3
Hyd. No. 14 -- 10 Year
Hyd No. 14 Hyd No. 10 Total storage used = 405,427 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 15
Post Area 1 Total
Hydrograph type = Combine Peak discharge = 9.803 cfs
Storm frequency = 10 yrs Time to peak = 738 min
Time interval = 1 min Hyd. volume = 112,429 cuft
Inflow hyds. = 6, 12 Contrib. drain. area = 1.010 ac
57
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
Q (cfs)
Time (min)
Post Area 1 Total
Hyd. No. 15 -- 10 Year
Hyd No. 15 Hyd No. 6 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 16
Post Area 2 Total
Hydrograph type = Combine Peak discharge = 6.271 cfs
Storm frequency = 10 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 76,977 cuft
Inflow hyds. = 8, 13 Contrib. drain. area = 0.550 ac
58
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
Post Area 2 Total
Hyd. No. 16 -- 10 Year
Hyd No. 16 Hyd No. 8 Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 17
Post Area 4 Total
Hydrograph type = Combine Peak discharge = 19.62 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 295,555 cuft
Inflow hyds. = 11, 14 Contrib. drain. area = 4.420 ac
59
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
21.00 21.00
Q (cfs)
Time (min)
Post Area 4 Total
Hyd. No. 17 -- 10 Year
Hyd No. 17 Hyd No. 11 Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 18
Phase 1 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 61.64 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 130,369 cuft
Drainage area = 10.000 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
60
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 1
Hyd. No. 18 -- 10 Year
Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 19
Phase 1 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 42.59 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 93,676 cuft
Drainage area = 7.600 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
61
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 2
Hyd. No. 19 -- 10 Year
Hyd No. 19
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 20
Phase 1 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 131.29 cfs
Storm frequency = 10 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 417,181 cuft
Drainage area = 33.000 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.70 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 33.000
62
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 3
Hyd. No. 20 -- 10 Year
Hyd No. 20
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 21
Phase 2 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 67.43 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 142,624 cuft
Drainage area = 10.940 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
63
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 1
Hyd. No. 21 -- 10 Year
Hyd No. 21
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 22
Phase 2 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 40.68 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 89,485 cuft
Drainage area = 7.260 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
64
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 2
Hyd. No. 22 -- 10 Year
Hyd No. 22
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 23
Phase 2 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 156.63 cfs
Storm frequency = 10 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 497,710 cuft
Drainage area = 39.370 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 19.90 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 39.370
65
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 3
Hyd. No. 23 -- 10 Year
Hyd No. 23
Hydrograph Summary Report
66
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 28.03 1 723 80,178 ------ ------ ------ Pre Area 1
2 SCS Runoff 37.19 1 718 79,687 ------ ------ ------ Pre Area 2
3 SCS Runoff 33.66 1 721 85,583 ------ ------ ------ Pre Area 3
4 SCS Runoff 168.59 1 724 500,641 ------ ------ ------ Pre Area 4
5 SCS Runoff 59.16 1 723 173,946 ------ ------ ------ Post Area 1 to Pond
6 SCS Runoff 2.989 1 729 11,149 ------ ------ ------ Post Area 1 Bypass Pond
7 SCS Runoff 54.88 1 717 117,571 ------ ------ ------ Post Area 2 to Pond
8 SCS Runoff 3.242 1 718 6,605 ------ ------ ------ Post Area 2 Bypass Pond
9 SCS Runoff 5.743 1 718 11,634 ------ ------ ------ Post Area 3
10 SCS Runoff 176.92 1 725 558,238 ------ ------ ------ Post Area 4 to Pond
11 SCS Runoff 24.65 1 718 49,926 ------ ------ ------ Post Area 4 Bypass Pond
12 Reservoir 12.08 1 741 137,744 5 851.05 141,000 Wet Pond 1
13 Reservoir 21.65 1 724 94,709 7 843.17 94,237 Wet Pond 2
14 Reservoir 13.27 1 790 372,480 10 808.13 440,567 Wet Pond 3
15 Combine 14.23 1 739 148,893 6, 12, ------ ------ Post Area 1 Total
16 Combine 23.07 1 723 101,315 8, 13, ------ ------ Post Area 2 Total
17 Combine 25.54 1 718 422,406 11, 14, ------ ------ Post Area 4 Total
18 SCS Runoff 75.60 1 717 161,944 ------ ------ ------ Phase 1 Sediment Basin 1
19 SCS Runoff 52.24 1 718 116,364 ------ ------ ------ Phase 1 Sediment Basin 2
20 SCS Runoff 161.59 1 725 518,221 ------ ------ ------ Phase 1 Sediment Basin 3
21 SCS Runoff 82.70 1 717 177,167 ------ ------ ------ Phase 2 Sediment Basin 1
22 SCS Runoff 49.90 1 718 111,158 ------ ------ ------ Phase 2 Sediment Basin 2
23 SCS Runoff 192.79 1 725 618,253 ------ ------ ------ Phase 2 Sediment Basin 3
171016_Wrenn Farms.gpw Return Period: 25 Year Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 1
Pre Area 1
Hydrograph type = SCS Runoff Peak discharge = 28.03 cfs
Storm frequency = 25 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 80,178 cuft
Drainage area = 6.230 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.40 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.180 x 73) + (6.050 x 79)] / 6.230
67
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Pre Area 1
Hyd. No. 1 -- 25 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 2
Pre Area 2
Hydrograph type = SCS Runoff Peak discharge = 37.19 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 79,687 cuft
Drainage area = 6.430 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.30 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
68
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Pre Area 2
Hyd. No. 2 -- 25 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 3
Pre Area 3
Hydrograph type = SCS Runoff Peak discharge = 33.66 cfs
Storm frequency = 25 yrs Time to peak = 721 min
Time interval = 1 min Hyd. volume = 85,583 cuft
Drainage area = 6.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 12.90 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
69
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Pre Area 3
Hyd. No. 3 -- 25 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 4
Pre Area 4
Hydrograph type = SCS Runoff Peak discharge = 168.59 cfs
Storm frequency = 25 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 500,641 cuft
Drainage area = 39.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 17.10 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
70
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
180.00 180.00
Q (cfs)
Time (min)
Pre Area 4
Hyd. No. 4 -- 25 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 5
Post Area 1 to Pond
Hydrograph type = SCS Runoff Peak discharge = 59.16 cfs
Storm frequency = 25 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 173,946 cuft
Drainage area = 10.940 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 15.30 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(2.080 x 83) + (3.410 x 94) + (2.230 x 98) + (3.220 x 74)] / 10.940
71
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Post Area 1 to Pond
Hyd. No. 5 -- 25 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 6
Post Area 1 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 2.989 cfs
Storm frequency = 25 yrs Time to peak = 729 min
Time interval = 1 min Hyd. volume = 11,149 cuft
Drainage area = 1.010 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.00 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
72
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Post Area 1 Bypass Pond
Hyd. No. 6 -- 25 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 7
Post Area 2 to Pond
Hydrograph type = SCS Runoff Peak discharge = 54.88 cfs
Storm frequency = 25 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 117,571 cuft
Drainage area = 7.260 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(1.090 x 83) + (0.990 x 98) + (3.100 x 94) + (2.080 x 74)] / 7.260
73
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Post Area 2 to Pond
Hyd. No. 7 -- 25 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 8
Post Area 2 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 3.242 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 6,605 cuft
Drainage area = 0.550 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.500 x 74)] / 0.550
74
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Post Area 2 Bypass Pond
Hyd. No. 8 -- 25 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 9
Post Area 3
Hydrograph type = SCS Runoff Peak discharge = 5.743 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 11,634 cuft
Drainage area = 1.030 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
75
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Post Area 3
Hyd. No. 9 -- 25 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 10
Post Area 4 to Pond
Hydrograph type = SCS Runoff Peak discharge = 176.92 cfs
Storm frequency = 25 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 558,238 cuft
Drainage area = 39.370 ac Curve number = 83*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.90 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.380 x 83) + (3.250 x 98) + (6.740 x 74)] / 39.370
76
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
Q (cfs)
Time (min)
Post Area 4 to Pond
Hyd. No. 10 -- 25 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 11
Post Area 4 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 24.65 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 49,926 cuft
Drainage area = 4.420 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
77
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post Area 4 Bypass Pond
Hyd. No. 11 -- 25 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 12
Wet Pond 1
Hydrograph type = Reservoir Peak discharge = 12.08 cfs
Storm frequency = 25 yrs Time to peak = 741 min
Time interval = 1 min Hyd. volume = 137,744 cuft
Inflow hyd. No. = 5 - Post Area 1 to Pond Max. Elevation = 851.05 ft
Reservoir name = Wet Pond 1 Max. Storage = 141,000 cuft
Storage Indication method used. Wet pond routing start elevation = 847.00 ft.
78
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Wet Pond 1
Hyd. No. 12 -- 25 Year
Hyd No. 12 Hyd No. 5 Total storage used = 141,000 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 13
Wet Pond 2
Hydrograph type = Reservoir Peak discharge = 21.65 cfs
Storm frequency = 25 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 94,709 cuft
Inflow hyd. No. = 7 - Post Area 2 to Pond Max. Elevation = 843.17 ft
Reservoir name = Wet Pond 2 Max. Storage = 94,237 cuft
Storage Indication method used. Wet pond routing start elevation = 839.00 ft.
79
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Wet Pond 2
Hyd. No. 13 -- 25 Year
Hyd No. 13 Hyd No. 7 Total storage used = 94,237 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 14
Wet Pond 3
Hydrograph type = Reservoir Peak discharge = 13.27 cfs
Storm frequency = 25 yrs Time to peak = 790 min
Time interval = 1 min Hyd. volume = 372,480 cuft
Inflow hyd. No. = 10 - Post Area 4 to Pond Max. Elevation = 808.13 ft
Reservoir name = Wet Pond 3 Max. Storage = 440,567 cuft
Storage Indication method used. Wet pond routing start elevation = 801.00 ft.
80
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
Q (cfs)
Time (min)
Wet Pond 3
Hyd. No. 14 -- 25 Year
Hyd No. 14 Hyd No. 10 Total storage used = 440,567 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 15
Post Area 1 Total
Hydrograph type = Combine Peak discharge = 14.23 cfs
Storm frequency = 25 yrs Time to peak = 739 min
Time interval = 1 min Hyd. volume = 148,893 cuft
Inflow hyds. = 6, 12 Contrib. drain. area = 1.010 ac
81
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
Q (cfs)
Time (min)
Post Area 1 Total
Hyd. No. 15 -- 25 Year
Hyd No. 15 Hyd No. 6 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 16
Post Area 2 Total
Hydrograph type = Combine Peak discharge = 23.07 cfs
Storm frequency = 25 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 101,315 cuft
Inflow hyds. = 8, 13 Contrib. drain. area = 0.550 ac
82
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
Q (cfs)
Time (min)
Post Area 2 Total
Hyd. No. 16 -- 25 Year
Hyd No. 16 Hyd No. 8 Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 17
Post Area 4 Total
Hydrograph type = Combine Peak discharge = 25.54 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 422,406 cuft
Inflow hyds. = 11, 14 Contrib. drain. area = 4.420 ac
83
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post Area 4 Total
Hyd. No. 17 -- 25 Year
Hyd No. 17 Hyd No. 11 Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 18
Phase 1 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 75.60 cfs
Storm frequency = 25 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 161,944 cuft
Drainage area = 10.000 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
84
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 1
Hyd. No. 18 -- 25 Year
Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 19
Phase 1 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 52.24 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 116,364 cuft
Drainage area = 7.600 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
85
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 2
Hyd. No. 19 -- 25 Year
Hyd No. 19
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 20
Phase 1 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 161.59 cfs
Storm frequency = 25 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 518,221 cuft
Drainage area = 33.000 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.70 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 33.000
86
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
140.00 140.00
160.00 160.00
180.00 180.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 3
Hyd. No. 20 -- 25 Year
Hyd No. 20
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 21
Phase 2 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 82.70 cfs
Storm frequency = 25 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 177,167 cuft
Drainage area = 10.940 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
87
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 1
Hyd. No. 21 -- 25 Year
Hyd No. 21
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 22
Phase 2 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 49.90 cfs
Storm frequency = 25 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 111,158 cuft
Drainage area = 7.260 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
88
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 2
Hyd. No. 22 -- 25 Year
Hyd No. 22
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 23
Phase 2 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 192.79 cfs
Storm frequency = 25 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 618,253 cuft
Drainage area = 39.370 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 19.90 min
Total precip. = 5.80 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 39.370
89
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 3
Hyd. No. 23 -- 25 Year
Hyd No. 23
Hydrograph Summary Report
90
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 32.94 1 723 94,550 ------ ------ ------ Pre Area 1
2 SCS Runoff 43.58 1 718 93,971 ------ ------ ------ Pre Area 2
3 SCS Runoff 39.50 1 721 100,924 ------ ------ ------ Pre Area 3
4 SCS Runoff 198.12 1 724 590,381 ------ ------ ------ Pre Area 4
5 SCS Runoff 67.84 1 723 200,924 ------ ------ ------ Post Area 1 to Pond
6 SCS Runoff 3.584 1 729 13,337 ------ ------ ------ Post Area 1 Bypass Pond
7 SCS Runoff 62.83 1 717 135,807 ------ ------ ------ Post Area 2 to Pond
8 SCS Runoff 3.829 1 718 7,855 ------ ------ ------ Post Area 2 Bypass Pond
9 SCS Runoff 6.829 1 718 13,918 ------ ------ ------ Post Area 3
10 SCS Runoff 205.34 1 725 651,345 ------ ------ ------ Post Area 4 to Pond
11 SCS Runoff 29.30 1 718 59,725 ------ ------ ------ Post Area 4 Bypass Pond
12 Reservoir 22.68 1 737 164,637 5 851.38 150,537 Wet Pond 1
13 Reservoir 33.29 1 722 112,891 7 843.42 98,844 Wet Pond 2
14 Reservoir 18.89 1 772 464,805 10 808.85 485,467 Wet Pond 3
15 Combine 25.68 1 736 177,974 6, 12, ------ ------ Post Area 1 Total
16 Combine 35.63 1 722 120,747 8, 13, ------ ------ Post Area 2 Total
17 Combine 30.28 1 718 524,530 11, 14, ------ ------ Post Area 4 Total
18 SCS Runoff 86.54 1 717 187,061 ------ ------ ------ Phase 1 Sediment Basin 1
19 SCS Runoff 59.80 1 718 134,412 ------ ------ ------ Phase 1 Sediment Basin 2
20 SCS Runoff 185.38 1 725 598,596 ------ ------ ------ Phase 1 Sediment Basin 3
21 SCS Runoff 94.67 1 717 204,645 ------ ------ ------ Phase 2 Sediment Basin 1
22 SCS Runoff 57.12 1 718 128,399 ------ ------ ------ Phase 2 Sediment Basin 2
23 SCS Runoff 221.16 1 725 714,142 ------ ------ ------ Phase 2 Sediment Basin 3
171016_Wrenn Farms.gpw Return Period: 50 Year Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 1
Pre Area 1
Hydrograph type = SCS Runoff Peak discharge = 32.94 cfs
Storm frequency = 50 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 94,550 cuft
Drainage area = 6.230 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.40 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.180 x 73) + (6.050 x 79)] / 6.230
91
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Pre Area 1
Hyd. No. 1 -- 50 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 2
Pre Area 2
Hydrograph type = SCS Runoff Peak discharge = 43.58 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 93,971 cuft
Drainage area = 6.430 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.30 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
92
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Pre Area 2
Hyd. No. 2 -- 50 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 3
Pre Area 3
Hydrograph type = SCS Runoff Peak discharge = 39.50 cfs
Storm frequency = 50 yrs Time to peak = 721 min
Time interval = 1 min Hyd. volume = 100,924 cuft
Drainage area = 6.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 12.90 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
93
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Pre Area 3
Hyd. No. 3 -- 50 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 4
Pre Area 4
Hydrograph type = SCS Runoff Peak discharge = 198.12 cfs
Storm frequency = 50 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 590,381 cuft
Drainage area = 39.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 17.10 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
94
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Pre Area 4
Hyd. No. 4 -- 50 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 5
Post Area 1 to Pond
Hydrograph type = SCS Runoff Peak discharge = 67.84 cfs
Storm frequency = 50 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 200,924 cuft
Drainage area = 10.940 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 15.30 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(2.080 x 83) + (3.410 x 94) + (2.230 x 98) + (3.220 x 74)] / 10.940
95
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Post Area 1 to Pond
Hyd. No. 5 -- 50 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 6
Post Area 1 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 3.584 cfs
Storm frequency = 50 yrs Time to peak = 729 min
Time interval = 1 min Hyd. volume = 13,337 cuft
Drainage area = 1.010 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.00 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
96
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Post Area 1 Bypass Pond
Hyd. No. 6 -- 50 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 7
Post Area 2 to Pond
Hydrograph type = SCS Runoff Peak discharge = 62.83 cfs
Storm frequency = 50 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 135,807 cuft
Drainage area = 7.260 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(1.090 x 83) + (0.990 x 98) + (3.100 x 94) + (2.080 x 74)] / 7.260
97
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Post Area 2 to Pond
Hyd. No. 7 -- 50 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 8
Post Area 2 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 3.829 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 7,855 cuft
Drainage area = 0.550 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.500 x 74)] / 0.550
98
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Post Area 2 Bypass Pond
Hyd. No. 8 -- 50 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 9
Post Area 3
Hydrograph type = SCS Runoff Peak discharge = 6.829 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 13,918 cuft
Drainage area = 1.030 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
99
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
Post Area 3
Hyd. No. 9 -- 50 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 10
Post Area 4 to Pond
Hydrograph type = SCS Runoff Peak discharge = 205.34 cfs
Storm frequency = 50 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 651,345 cuft
Drainage area = 39.370 ac Curve number = 83*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.90 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.380 x 83) + (3.250 x 98) + (6.740 x 74)] / 39.370
100
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Post Area 4 to Pond
Hyd. No. 10 -- 50 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 11
Post Area 4 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 29.30 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 59,725 cuft
Drainage area = 4.420 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
101
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
Q (cfs)
Time (min)
Post Area 4 Bypass Pond
Hyd. No. 11 -- 50 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 12
Wet Pond 1
Hydrograph type = Reservoir Peak discharge = 22.68 cfs
Storm frequency = 50 yrs Time to peak = 737 min
Time interval = 1 min Hyd. volume = 164,637 cuft
Inflow hyd. No. = 5 - Post Area 1 to Pond Max. Elevation = 851.38 ft
Reservoir name = Wet Pond 1 Max. Storage = 150,537 cuft
Storage Indication method used. Wet pond routing start elevation = 847.00 ft.
102
0 180 360 540 720 900 1080 1260 1440 1620
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Wet Pond 1
Hyd. No. 12 -- 50 Year
Hyd No. 12 Hyd No. 5 Total storage used = 150,537 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 13
Wet Pond 2
Hydrograph type = Reservoir Peak discharge = 33.29 cfs
Storm frequency = 50 yrs Time to peak = 722 min
Time interval = 1 min Hyd. volume = 112,891 cuft
Inflow hyd. No. = 7 - Post Area 2 to Pond Max. Elevation = 843.42 ft
Reservoir name = Wet Pond 2 Max. Storage = 98,844 cuft
Storage Indication method used. Wet pond routing start elevation = 839.00 ft.
103
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Wet Pond 2
Hyd. No. 13 -- 50 Year
Hyd No. 13 Hyd No. 7 Total storage used = 98,844 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 14
Wet Pond 3
Hydrograph type = Reservoir Peak discharge = 18.89 cfs
Storm frequency = 50 yrs Time to peak = 772 min
Time interval = 1 min Hyd. volume = 464,805 cuft
Inflow hyd. No. = 10 - Post Area 4 to Pond Max. Elevation = 808.85 ft
Reservoir name = Wet Pond 3 Max. Storage = 485,467 cuft
Storage Indication method used. Wet pond routing start elevation = 801.00 ft.
104
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Wet Pond 3
Hyd. No. 14 -- 50 Year
Hyd No. 14 Hyd No. 10 Total storage used = 485,467 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 15
Post Area 1 Total
Hydrograph type = Combine Peak discharge = 25.68 cfs
Storm frequency = 50 yrs Time to peak = 736 min
Time interval = 1 min Hyd. volume = 177,974 cuft
Inflow hyds. = 6, 12 Contrib. drain. area = 1.010 ac
105
0 180 360 540 720 900 1080 1260 1440 1620
Q (cfs)
0.00 0.00
4.00 4.00
8.00 8.00
12.00 12.00
16.00 16.00
20.00 20.00
24.00 24.00
28.00 28.00
Q (cfs)
Time (min)
Post Area 1 Total
Hyd. No. 15 -- 50 Year
Hyd No. 15 Hyd No. 6 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 16
Post Area 2 Total
Hydrograph type = Combine Peak discharge = 35.63 cfs
Storm frequency = 50 yrs Time to peak = 722 min
Time interval = 1 min Hyd. volume = 120,747 cuft
Inflow hyds. = 8, 13 Contrib. drain. area = 0.550 ac
106
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Post Area 2 Total
Hyd. No. 16 -- 50 Year
Hyd No. 16 Hyd No. 8 Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 17
Post Area 4 Total
Hydrograph type = Combine Peak discharge = 30.28 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 524,530 cuft
Inflow hyds. = 11, 14 Contrib. drain. area = 4.420 ac
107
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Post Area 4 Total
Hyd. No. 17 -- 50 Year
Hyd No. 17 Hyd No. 11 Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 18
Phase 1 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 86.54 cfs
Storm frequency = 50 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 187,061 cuft
Drainage area = 10.000 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
108
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 1
Hyd. No. 18 -- 50 Year
Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 19
Phase 1 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 59.80 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 134,412 cuft
Drainage area = 7.600 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
109
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 2
Hyd. No. 19 -- 50 Year
Hyd No. 19
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 20
Phase 1 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 185.38 cfs
Storm frequency = 50 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 598,596 cuft
Drainage area = 33.000 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.70 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 33.000
110
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 3
Hyd. No. 20 -- 50 Year
Hyd No. 20
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 21
Phase 2 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 94.67 cfs
Storm frequency = 50 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 204,645 cuft
Drainage area = 10.940 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
111
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
100.00 100.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 1
Hyd. No. 21 -- 50 Year
Hyd No. 21
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 22
Phase 2 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 57.12 cfs
Storm frequency = 50 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 128,399 cuft
Drainage area = 7.260 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
112
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 2
Hyd. No. 22 -- 50 Year
Hyd No. 22
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 23
Phase 2 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 221.16 cfs
Storm frequency = 50 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 714,142 cuft
Drainage area = 39.370 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 19.90 min
Total precip. = 6.50 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 39.370
113
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
240.00 240.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 3
Hyd. No. 23 -- 50 Year
Hyd No. 23
Hydrograph Summary Report
114
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 37.94 1 723 109,381 ------ ------ ------ Pre Area 1
2 SCS Runoff 50.09 1 718 108,711 ------ ------ ------ Pre Area 2
3 SCS Runoff 45.45 1 721 116,755 ------ ------ ------ Pre Area 3
4 SCS Runoff 228.25 1 724 682,988 ------ ------ ------ Pre Area 4
5 SCS Runoff 76.61 1 723 228,487 ------ ------ ------ Post Area 1 to Pond
6 SCS Runoff 4.197 1 729 15,614 ------ ------ ------ Post Area 1 Bypass Pond
7 SCS Runoff 70.86 1 717 154,436 ------ ------ ------ Post Area 2 to Pond
8 SCS Runoff 4.433 1 717 9,151 ------ ------ ------ Post Area 2 Bypass Pond
9 SCS Runoff 7.943 1 718 16,293 ------ ------ ------ Post Area 3
10 SCS Runoff 234.19 1 725 746,902 ------ ------ ------ Post Area 4 to Pond
11 SCS Runoff 34.08 1 718 69,918 ------ ------ ------ Post Area 4 Bypass Pond
12 Reservoir 28.26 1 736 192,121 5 851.72 160,330 Wet Pond 1
13 Reservoir 35.59 1 723 131,474 7 843.75 104,793 Wet Pond 2
14 Reservoir 39.91 1 748 559,718 10 809.41 522,137 Wet Pond 3
15 Combine 31.99 1 734 207,735 6, 12, ------ ------ Post Area 1 Total
16 Combine 38.83 1 720 140,626 8, 13, ------ ------ Post Area 2 Total
17 Combine 42.92 1 747 629,636 11, 14, ------ ------ Post Area 4 Total
18 SCS Runoff 97.60 1 717 212,722 ------ ------ ------ Phase 1 Sediment Basin 1
19 SCS Runoff 67.45 1 718 152,850 ------ ------ ------ Phase 1 Sediment Basin 2
20 SCS Runoff 209.48 1 724 680,710 ------ ------ ------ Phase 1 Sediment Basin 3
21 SCS Runoff 106.77 1 717 232,718 ------ ------ ------ Phase 2 Sediment Basin 1
22 SCS Runoff 64.43 1 718 146,012 ------ ------ ------ Phase 2 Sediment Basin 2
23 SCS Runoff 249.92 1 724 812,108 ------ ------ ------ Phase 2 Sediment Basin 3
171016_Wrenn Farms.gpw Return Period: 100 Year Thursday, 10 / 26 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 1
Pre Area 1
Hydrograph type = SCS Runoff Peak discharge = 37.94 cfs
Storm frequency = 100 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 109,381 cuft
Drainage area = 6.230 ac Curve number = 79*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 16.40 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.180 x 73) + (6.050 x 79)] / 6.230
115
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Pre Area 1
Hyd. No. 1 -- 100 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 2
Pre Area 2
Hydrograph type = SCS Runoff Peak discharge = 50.09 cfs
Storm frequency = 100 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 108,711 cuft
Drainage area = 6.430 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.30 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
116
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
Q (cfs)
Time (min)
Pre Area 2
Hyd. No. 2 -- 100 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 3
Pre Area 3
Hydrograph type = SCS Runoff Peak discharge = 45.45 cfs
Storm frequency = 100 yrs Time to peak = 721 min
Time interval = 1 min Hyd. volume = 116,755 cuft
Drainage area = 6.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 12.90 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
117
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Pre Area 3
Hyd. No. 3 -- 100 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 4
Pre Area 4
Hydrograph type = SCS Runoff Peak discharge = 228.25 cfs
Storm frequency = 100 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 682,988 cuft
Drainage area = 39.840 ac Curve number = 79
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 17.10 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
118
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
240.00 240.00
Q (cfs)
Time (min)
Pre Area 4
Hyd. No. 4 -- 100 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 5
Post Area 1 to Pond
Hydrograph type = SCS Runoff Peak discharge = 76.61 cfs
Storm frequency = 100 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 228,487 cuft
Drainage area = 10.940 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 15.30 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(2.080 x 83) + (3.410 x 94) + (2.230 x 98) + (3.220 x 74)] / 10.940
119
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Post Area 1 to Pond
Hyd. No. 5 -- 100 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 6
Post Area 1 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 4.197 cfs
Storm frequency = 100 yrs Time to peak = 729 min
Time interval = 1 min Hyd. volume = 15,614 cuft
Drainage area = 1.010 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 26.00 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
120
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post Area 1 Bypass Pond
Hyd. No. 6 -- 100 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 7
Post Area 2 to Pond
Hydrograph type = SCS Runoff Peak discharge = 70.86 cfs
Storm frequency = 100 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 154,436 cuft
Drainage area = 7.260 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(1.090 x 83) + (0.990 x 98) + (3.100 x 94) + (2.080 x 74)] / 7.260
121
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Post Area 2 to Pond
Hyd. No. 7 -- 100 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 8
Post Area 2 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 4.433 cfs
Storm frequency = 100 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 9,151 cuft
Drainage area = 0.550 ac Curve number = 76*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(0.050 x 98) + (0.500 x 74)] / 0.550
122
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Post Area 2 Bypass Pond
Hyd. No. 8 -- 100 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 9
Post Area 3
Hydrograph type = SCS Runoff Peak discharge = 7.943 cfs
Storm frequency = 100 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 16,293 cuft
Drainage area = 1.030 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
123
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Post Area 3
Hyd. No. 9 -- 100 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 10
Post Area 4 to Pond
Hydrograph type = SCS Runoff Peak discharge = 234.19 cfs
Storm frequency = 100 yrs Time to peak = 725 min
Time interval = 1 min Hyd. volume = 746,902 cuft
Drainage area = 39.370 ac Curve number = 83*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.90 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.380 x 83) + (3.250 x 98) + (6.740 x 74)] / 39.370
124
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
240.00 240.00
Q (cfs)
Time (min)
Post Area 4 to Pond
Hyd. No. 10 -- 100 Year
Hyd No. 10
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 11
Post Area 4 Bypass Pond
Hydrograph type = SCS Runoff Peak discharge = 34.08 cfs
Storm frequency = 100 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 69,918 cuft
Drainage area = 4.420 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
125
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Post Area 4 Bypass Pond
Hyd. No. 11 -- 100 Year
Hyd No. 11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 12
Wet Pond 1
Hydrograph type = Reservoir Peak discharge = 28.26 cfs
Storm frequency = 100 yrs Time to peak = 736 min
Time interval = 1 min Hyd. volume = 192,121 cuft
Inflow hyd. No. = 5 - Post Area 1 to Pond Max. Elevation = 851.72 ft
Reservoir name = Wet Pond 1 Max. Storage = 160,330 cuft
Storage Indication method used. Wet pond routing start elevation = 847.00 ft.
126
0 180 360 540 720 900 1080 1260 1440 1620
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Wet Pond 1
Hyd. No. 12 -- 100 Year
Hyd No. 12 Hyd No. 5 Total storage used = 160,330 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 13
Wet Pond 2
Hydrograph type = Reservoir Peak discharge = 35.59 cfs
Storm frequency = 100 yrs Time to peak = 723 min
Time interval = 1 min Hyd. volume = 131,474 cuft
Inflow hyd. No. = 7 - Post Area 2 to Pond Max. Elevation = 843.75 ft
Reservoir name = Wet Pond 2 Max. Storage = 104,793 cuft
Storage Indication method used. Wet pond routing start elevation = 839.00 ft.
127
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
Q (cfs)
Time (min)
Wet Pond 2
Hyd. No. 13 -- 100 Year
Hyd No. 13 Hyd No. 7 Total storage used = 104,793 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 14
Wet Pond 3
Hydrograph type = Reservoir Peak discharge = 39.91 cfs
Storm frequency = 100 yrs Time to peak = 748 min
Time interval = 1 min Hyd. volume = 559,718 cuft
Inflow hyd. No. = 10 - Post Area 4 to Pond Max. Elevation = 809.41 ft
Reservoir name = Wet Pond 3 Max. Storage = 522,137 cuft
Storage Indication method used. Wet pond routing start elevation = 801.00 ft.
128
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
240.00 240.00
Q (cfs)
Time (min)
Wet Pond 3
Hyd. No. 14 -- 100 Year
Hyd No. 14 Hyd No. 10 Total storage used = 522,137 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 15
Post Area 1 Total
Hydrograph type = Combine Peak discharge = 31.99 cfs
Storm frequency = 100 yrs Time to peak = 734 min
Time interval = 1 min Hyd. volume = 207,735 cuft
Inflow hyds. = 6, 12 Contrib. drain. area = 1.010 ac
129
0 180 360 540 720 900 1080 1260 1440 1620
Q (cfs)
0.00 0.00
5.00 5.00
10.00 10.00
15.00 15.00
20.00 20.00
25.00 25.00
30.00 30.00
35.00 35.00
Q (cfs)
Time (min)
Post Area 1 Total
Hyd. No. 15 -- 100 Year
Hyd No. 15 Hyd No. 6 Hyd No. 12
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 16
Post Area 2 Total
Hydrograph type = Combine Peak discharge = 38.83 cfs
Storm frequency = 100 yrs Time to peak = 720 min
Time interval = 1 min Hyd. volume = 140,626 cuft
Inflow hyds. = 8, 13 Contrib. drain. area = 0.550 ac
130
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
Q (cfs)
Time (min)
Post Area 2 Total
Hyd. No. 16 -- 100 Year
Hyd No. 16 Hyd No. 8 Hyd No. 13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 17
Post Area 4 Total
Hydrograph type = Combine Peak discharge = 42.92 cfs
Storm frequency = 100 yrs Time to peak = 747 min
Time interval = 1 min Hyd. volume = 629,636 cuft
Inflow hyds. = 11, 14 Contrib. drain. area = 4.420 ac
131
0 300 600 900 1200 1500 1800 2100 2400 2700 3000
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
Q (cfs)
Time (min)
Post Area 4 Total
Hyd. No. 17 -- 100 Year
Hyd No. 17 Hyd No. 11 Hyd No. 14
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 18
Phase 1 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 97.60 cfs
Storm frequency = 100 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 212,722 cuft
Drainage area = 10.000 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
132
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
80.00 80.00
90.00 90.00
100.00 100.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 1
Hyd. No. 18 -- 100 Year
Hyd No. 18
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 19
Phase 1 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 67.45 cfs
Storm frequency = 100 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 152,850 cuft
Drainage area = 7.600 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
133
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 2
Hyd. No. 19 -- 100 Year
Hyd No. 19
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 20
Phase 1 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 209.48 cfs
Storm frequency = 100 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 680,710 cuft
Drainage area = 33.000 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 19.70 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 33.000
134
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
30.00 30.00
60.00 60.00
90.00 90.00
120.00 120.00
150.00 150.00
180.00 180.00
210.00 210.00
Q (cfs)
Time (min)
Phase 1 Sediment Basin 3
Hyd. No. 20 -- 100 Year
Hyd No. 20
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 21
Phase 2 Sediment Basin 1
Hydrograph type = SCS Runoff Peak discharge = 106.77 cfs
Storm frequency = 100 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 232,718 cuft
Drainage area = 10.940 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 6.30 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
135
0 120 240 360 480 600 720 840 960 1080 1200
Q (cfs)
0.00 0.00
20.00 20.00
40.00 40.00
60.00 60.00
80.00 80.00
100.00 100.00
120.00 120.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 1
Hyd. No. 21 -- 100 Year
Hyd No. 21
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 22
Phase 2 Sediment Basin 2
Hydrograph type = SCS Runoff Peak discharge = 64.43 cfs
Storm frequency = 100 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 146,012 cuft
Drainage area = 7.260 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of conc. (Tc) = 7.70 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
136
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
10.00 10.00
20.00 20.00
30.00 30.00
40.00 40.00
50.00 50.00
60.00 60.00
70.00 70.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 2
Hyd. No. 22 -- 100 Year
Hyd No. 22
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Thursday, 10 / 26 / 2017
Hyd. No. 23
Phase 2 Sediment Basin 3
Hydrograph type = SCS Runoff Peak discharge = 249.92 cfs
Storm frequency = 100 yrs Time to peak = 724 min
Time interval = 1 min Hyd. volume = 812,108 cuft
Drainage area = 39.370 ac Curve number = 87*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 19.90 min
Total precip. = 7.21 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
* Composite (Area/CN) = [(29.630 x 83) + (3.020 x 98) + (6.950 x 74)] / 39.370
137
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
40.00 40.00
80.00 80.00
120.00 120.00
160.00 160.00
200.00 200.00
240.00 240.00
280.00 280.00
Q (cfs)
Time (min)
Phase 2 Sediment Basin 3
Hyd. No. 23 -- 100 Year
Hyd No. 23
Appendix F
Storm Sewer Calculations
Appendix G
Rip Rap Outlet Protection Calculations
CALCULATION SHEET PAGE 1 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
TASK: Design of rip rap outlet protection.
CALCULATIONS:
Pond Outlet A11.0
Q10 Year = 8.17 CFS (From Hydraflow Calcs)
Culvert Size = 24 inch = 2.0 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 8.17 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 6 feet
Length = 9 feet
Ending Width = Diameter + Length = 2 feet + 9 feet = 11 feet
Pond Inlet Y1.0
Q10 Year = 17.05 CFS (From Storm Sewer Calculations)
Culvert Size = 36 inch = 3 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
CALCULATION SHEET PAGE 2 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Riprap Sizes
Q= 17.05 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 9 feet
Length = 13 feet
Ending Width = Diameter + Length = 3 feet + 13 feet = 16 feet
Pond Inlet B1.0
Q10 Year = 13.95 CFS (From Storm Sewer Calculations)
Culvert Size = 36 inch = 3 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 13.95 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 9 feet
Length = 13 feet
Ending Width = Diameter + Length = 3 feet + 13 feet = 16 feet
CALCULATION SHEET PAGE 3 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Diversion to Pond 1
Q10 Year = 5 CFS
Diversion Size = 24 inch bottom width
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 25 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Bottom Width = 6 feet
Length = 9 feet
Ending Width = Beginning Width + Length = 6 feet + 9 feet = 15 feet
Pond Inlet C1.0
Q10 Year = 10.95 CFS (From Storm Sewer Calculations)
Culvert Size = 36 inch = 3 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 11.02 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
CALCULATION SHEET PAGE 4 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 9 feet
Length = 13 feet
Ending Width = Diameter + Length = 3 feet + 13 feet = 16 feet
Diversion to Pond 2
Q10 Year = 11.6 CFS
Diversion Size = 24 inch bottom width
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 11.6 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Bottom Width = 6 feet
Length = 9 feet
Ending Width = Beginning Width + Length = 6 feet + 9 feet = 15 feet
Pond Outlet C27.0
Q10 Year = 5.185 CFS (From Hydraflow Calcs)
Culvert Size = 24 inch = 2 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
CALCULATION SHEET PAGE 5 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Q= 5.185 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 6 feet
Length = 9 feet
Ending Width = Diameter + Length = 2 feet + 9 feet = 11 feet
Pond Inlet D1.0
Q10 Year = 15.87 CFS (From Storm Sewer Calcs)
Culvert Size = 24 inch = 2 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 15.87 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 6 feet
Length = 9 feet
Ending Width = Diameter + Length = 2 feet + 9 feet = 11 feet
Pond Inlet E1.0
CALCULATION SHEET PAGE 6 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Q10 Year = 72.44 CFS (From Storm Sewer Calcs)
Culvert Size = 36 inch = 3 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 72.44 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 9 feet
Length = 31 feet
Ending Width = Diameter + Length = 3 feet + 31 feet = 34 feet
Pond Outlet J1.0
Q10 Year = 5.61 CFS (From Hydraflow Calcs)
Culvert Size = 36 inch = 3 feet
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 5.61 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Diameter = 9 feet
CALCULATION SHEET PAGE 7 OF 7
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date10/2/17_
PROJECT: Wrenn Farms Rip Rap Outlet Protection Calculations Reviewed By PMR Date 10/2/17
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170705_Riprap Apron.doc
Length = 13 feet
Ending Width = Diameter + Length = 3 feet + 13 feet = 16 feet
Diversion to Pond 3
Q10 Year = 13.9 CFS
Diversion Size = 24 inch bottom width
Using Figure 8.06b (attached) the following sizes for the outlet apron are as follows:
Riprap Sizes
Q= 13.9 cfs
D50= Discharge is too small to read on the figure. Use minimum size of 6 inches
DMax = 1.5 x D50 = 9 inches
Thickness = 1.5 x DMax = 13.5 inches
Beginning Width = 3 x Bottom Width = 6 feet
Length = 9 feet
Ending Width = Beginning Width + Length = 6 feet + 9 feet = 15 feet
Appendix H
Faircloth Skimmer Calculations
Appendix I
Diversion Calculations
1 2 3 4 5 6 7
8 9 10
1
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Project: 170718_Diversion Hydrographs.gpw Tuesday, 07 / 18 / 2017
Hyd.Origin Description
Legend
1 SCS Runoff Pond 1 Diversion
2 SCS Runoff Pond 2 Diversion
3 SCS Runoff Pond 3 Diversion
4 SCS Runoff I4.0 Diversion A
5 SCS Runoff I4.0 Diversion B
6 SCS Runoff H2.1 Diversion
7 SCS Runoff E8.1 Diversion
8 SCS Runoff F7.3 Diversion A
9 SCS Runoff F7.3 Diversion B
10 SCS Runoff B3.3 Diversion
Post-Construction
Hydrograph Return Period Recap
2
Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ ------- ------- ------- ------- 4.989 ------- ------- ------- Pond 1 Diversion
2 SCS Runoff ------ ------- ------- ------- ------- 11.60 ------- ------- ------- Pond 2 Diversion
3 SCS Runoff ------ ------- ------- ------- ------- 13.86 ------- ------- ------- Pond 3 Diversion
4 SCS Runoff ------ ------- ------- ------- ------- 13.81 ------- ------- ------- I4.0 Diversion A
5 SCS Runoff ------ ------- ------- ------- ------- 4.586 ------- ------- ------- I4.0 Diversion B
6 SCS Runoff ------ ------- ------- ------- ------- 14.93 ------- ------- ------- H2.1 Diversion
7 SCS Runoff ------ ------- ------- ------- ------- 11.02 ------- ------- ------- E8.1 Diversion
8 SCS Runoff ------ ------- ------- ------- ------- 2.125 ------- ------- ------- F7.3 Diversion A
9 SCS Runoff ------ ------- ------- ------- ------- 9.115 ------- ------- ------- F7.3 Diversion B
10 SCS Runoff ------ ------- ------- ------- ------- 5.984 ------- ------- ------- B3.3 Diversion
Proj. file: 170718_Diversion Hydrographs.gpw Tuesday, 07 / 18 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Summary Report
3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 4.989 1 718 10,042 ------ ------ ------ Pond 1 Diversion
2 SCS Runoff 11.60 1 718 23,344 ------ ------ ------ Pond 2 Diversion
3 SCS Runoff 13.86 1 717 29,128 ------ ------ ------ Pond 3 Diversion
4 SCS Runoff 13.81 1 717 28,597 ------ ------ ------ I4.0 Diversion A
5 SCS Runoff 4.586 1 717 9,494 ------ ------ ------ I4.0 Diversion B
6 SCS Runoff 14.93 1 717 30,912 ------ ------ ------ H2.1 Diversion
7 SCS Runoff 11.02 1 717 22,808 ------ ------ ------ E8.1 Diversion
8 SCS Runoff 2.125 1 717 4,400 ------ ------ ------ F7.3 Diversion A
9 SCS Runoff 9.115 1 717 18,872 ------ ------ ------ F7.3 Diversion B
10 SCS Runoff 5.984 1 717 12,388 ------ ------ ------ B3.3 Diversion
170718_Diversion Hydrographs.gpw Return Period: 10 Year Tuesday, 07 / 18 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Tuesday, 07 / 18 / 2017
Hyd. No. 1
Pond 1 Diversion
Hydrograph type = SCS Runoff Peak discharge = 4.989 cfs
Storm frequency = 10 yrs Time to peak = 718 min
Time interval = 1 min Hyd. volume = 10,042 cuft
Drainage area = 1.170 ac Curve number = 74
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
4
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Pond 1 Diversion
Hyd. No. 1 -- 10 Year
Hyd No. 1
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
B3.3 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 4.00
Total Depth (ft) = 1.00
Invert Elev (ft) = 848.00
Slope (%) = 3.60
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 5.98
Highlighted
Depth (ft) = 0.96
Q (cfs) = 5.980
Area (sqft) = 4.68
Velocity (ft/s) = 1.28
Wetted Perim (ft) = 8.10
Crit Depth, Yc (ft) = 0.51
Top Width (ft) = 7.76
EGL (ft) = 0.99
0 1 2 3 4 5 6 7 8 9 10
Elev (ft)Depth (ft)Section
847.50 -0.50
848.00 0.00
848.50 0.50
849.00 1.00
849.50 1.50
850.00 2.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
E8.1 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 3.00, 6.00
Total Depth (ft) = 1.50
Invert Elev (ft) = 835.00
Slope (%) = 2.60
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 11.00
Highlighted
Depth (ft) = 1.21
Q (cfs) = 11.00
Area (sqft) = 9.01
Velocity (ft/s) = 1.22
Wetted Perim (ft) = 13.19
Crit Depth, Yc (ft) = 0.64
Top Width (ft) = 12.89
EGL (ft) = 1.23
0 2 4 6 8 10 12 14 16 18 20
Elev (ft)Depth (ft)Section
834.50 -0.50
835.00 0.00
835.50 0.50
836.00 1.00
836.50 1.50
837.00 2.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
F7.3 Diversion A
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 4.00
Total Depth (ft) = 1.50
Invert Elev (ft) = 843.00
Slope (%) = 2.90
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 1.30
Highlighted
Depth (ft) = 0.48
Q (cfs) = 1.300
Area (sqft) = 1.65
Velocity (ft/s) = 0.79
Wetted Perim (ft) = 5.05
Crit Depth, Yc (ft) = 0.22
Top Width (ft) = 4.88
EGL (ft) = 0.49
0 2 4 6 8 10 12 14 16
Elev (ft)Depth (ft)Section
842.50 -0.50
843.00 0.00
843.50 0.50
844.00 1.00
844.50 1.50
845.00 2.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
F7.3 Diversion B
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 4.00
Total Depth (ft) = 1.50
Invert Elev (ft) = 843.00
Slope (%) = 2.50
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 5.40
Highlighted
Depth (ft) = 0.99
Q (cfs) = 5.400
Area (sqft) = 4.92
Velocity (ft/s) = 1.10
Wetted Perim (ft) = 8.30
Crit Depth, Yc (ft) = 0.48
Top Width (ft) = 7.94
EGL (ft) = 1.01
0 2 4 6 8 10 12 14 16
Elev (ft)Depth (ft)Section
842.50 -0.50
843.00 0.00
843.50 0.50
844.00 1.00
844.50 1.50
845.00 2.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
H2.1 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 2.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 814.00
Slope (%) = 3.80
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 14.93
Highlighted
Depth (ft) = 1.60
Q (cfs) = 14.93
Area (sqft) = 8.32
Velocity (ft/s) = 1.79
Wetted Perim (ft) = 9.16
Crit Depth, Yc (ft) = 0.90
Top Width (ft) = 8.40
EGL (ft) = 1.65
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft)Depth (ft)Section
813.50 -0.50
814.00 0.00
814.50 0.50
815.00 1.00
815.50 1.50
816.00 2.00
816.50 2.50
817.00 3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
I4.0 Diversion A
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 2.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 812.00
Slope (%) = 2.60
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 13.81
Highlighted
Depth (ft) = 1.68
Q (cfs) = 13.81
Area (sqft) = 9.00
Velocity (ft/s) = 1.53
Wetted Perim (ft) = 9.51
Crit Depth, Yc (ft) = 0.86
Top Width (ft) = 8.72
EGL (ft) = 1.72
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft)Depth (ft)Section
811.50 -0.50
812.00 0.00
812.50 0.50
813.00 1.00
813.50 1.50
814.00 2.00
814.50 2.50
815.00 3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
I4.0 Diversion B
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 2.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 812.00
Slope (%) = 2.60
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 4.60
Highlighted
Depth (ft) = 1.00
Q (cfs) = 4.600
Area (sqft) = 4.00
Velocity (ft/s) = 1.15
Wetted Perim (ft) = 6.47
Crit Depth, Yc (ft) = 0.47
Top Width (ft) = 6.00
EGL (ft) = 1.02
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft)Depth (ft)Section
811.50 -0.50
812.00 0.00
812.50 0.50
813.00 1.00
813.50 1.50
814.00 2.00
814.50 2.50
815.00 3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
Pond 1 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 2.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 850.00
Slope (%) = 1.00
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 5.00
Highlighted
Depth (ft) = 1.31
Q (cfs) = 5.000
Area (sqft) = 6.05
Velocity (ft/s) = 0.83
Wetted Perim (ft) = 7.86
Crit Depth, Yc (ft) = 0.49
Top Width (ft) = 7.24
EGL (ft) = 1.32
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft)Depth (ft)Section
849.50 -0.50
850.00 0.00
850.50 0.50
851.00 1.00
851.50 1.50
852.00 2.00
852.50 2.50
853.00 3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
Pond 2 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 3.00, 3.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 840.00
Slope (%) = 1.25
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 11.60
Highlighted
Depth (ft) = 1.63
Q (cfs) = 11.60
Area (sqft) = 11.23
Velocity (ft/s) = 1.03
Wetted Perim (ft) = 12.31
Crit Depth, Yc (ft) = 0.72
Top Width (ft) = 11.78
EGL (ft) = 1.65
0 2 4 6 8 10 12 14 16 18
Elev (ft)Depth (ft)Section
839.50 -0.50
840.00 0.00
840.50 0.50
841.00 1.00
841.50 1.50
842.00 2.00
842.50 2.50
843.00 3.00
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jul 18 2017
Pond 3 Diversion
Trapezoidal
Bottom Width (ft) = 2.00
Side Slopes (z:1) = 2.00, 2.00
Total Depth (ft) = 2.00
Invert Elev (ft) = 812.00
Slope (%) = 2.87
N-Value = 0.150
Calculations
Compute by: Known Q
Known Q (cfs) = 13.86
Highlighted
Depth (ft) = 1.65
Q (cfs) = 13.86
Area (sqft) = 8.74
Velocity (ft/s) = 1.58
Wetted Perim (ft) = 9.38
Crit Depth, Yc (ft) = 0.86
Top Width (ft) = 8.60
EGL (ft) = 1.69
0 1 2 3 4 5 6 7 8 9 10 11 12
Elev (ft)Depth (ft)Section
811.50 -0.50
812.00 0.00
812.50 0.50
813.00 1.00
813.50 1.50
814.00 2.00
814.50 2.50
815.00 3.00
Reach (ft)
1 2 3 4 5 6 7
8 9 10
1
Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Project: P:\15.027 NC - Wrenn Farms Residential\Calculations\170718_Diversion During Construction Hydrographs.gpwWednesday, 07 / 19 / 2017
Hyd.Origin Description
Legend
1 SCS Runoff Pond 1 Diversion
2 SCS Runoff Pond 2 Diversion
3 SCS Runoff Pond 3 Diversion
4 SCS Runoff I4.0 Diversion A
5 SCS Runoff I4.0 Diversion B
6 SCS Runoff H2.1 Diversion
7 SCS Runoff E8.1 Diversion
8 SCS Runoff F7.3 Diversion A
9 SCS Runoff F7.3 Diversion B
10 SCS Runoff B3.3 Diversion
During Construction
Hydrograph Return Period Recap
2
Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ ------- ------- ------- ------- 7.212 ------- ------- ------- Pond 1 Diversion
2 SCS Runoff ------ ------- ------- ------- ------- 16.77 ------- ------- ------- Pond 2 Diversion
3 SCS Runoff ------ ------- ------- ------- ------- 14.18 ------- ------- ------- Pond 3 Diversion
4 SCS Runoff ------ ------- ------- ------- ------- 15.22 ------- ------- ------- I4.0 Diversion A
5 SCS Runoff ------ ------- ------- ------- ------- 5.054 ------- ------- ------- I4.0 Diversion B
6 SCS Runoff ------ ------- ------- ------- ------- 16.46 ------- ------- ------- H2.1 Diversion
7 SCS Runoff ------ ------- ------- ------- ------- 12.14 ------- ------- ------- E8.1 Diversion
8 SCS Runoff ------ ------- ------- ------- ------- 2.342 ------- ------- ------- F7.3 Diversion A
9 SCS Runoff ------ ------- ------- ------- ------- 10.05 ------- ------- ------- F7.3 Diversion B
10 SCS Runoff ------ ------- ------- ------- ------- 6.595 ------- ------- ------- B3.3 Diversion
Proj. file: P:\15.027 NC - Wrenn Farms Residential\Calculations\170718_Diversion During Construction Hydrographs.gpwWednesday, 07 / 19 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Summary Report
3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 7.212 1 717 15,253 ------ ------ ------ Pond 1 Diversion
2 SCS Runoff 16.77 1 717 35,460 ------ ------ ------ Pond 2 Diversion
3 SCS Runoff 14.18 1 717 29,985 ------ ------ ------ Pond 3 Diversion
4 SCS Runoff 15.22 1 717 32,201 ------ ------ ------ I4.0 Diversion A
5 SCS Runoff 5.054 1 717 10,690 ------ ------ ------ I4.0 Diversion B
6 SCS Runoff 16.46 1 717 34,809 ------ ------ ------ H2.1 Diversion
7 SCS Runoff 12.14 1 717 25,683 ------ ------ ------ E8.1 Diversion
8 SCS Runoff 2.342 1 717 4,954 ------ ------ ------ F7.3 Diversion A
9 SCS Runoff 10.05 1 717 21,250 ------ ------ ------ F7.3 Diversion B
10 SCS Runoff 6.595 1 717 13,950 ------ ------ ------ B3.3 Diversion
P:\15.027 NC - Wrenn Farms Residential\Calculations\170718_Diversion During Construction Hydrographs.gpwReturn Period: 10 Year Wednesday, 07 / 19 / 2017
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 1
Pond 1 Diversion
Hydrograph type = SCS Runoff Peak discharge = 7.212 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 15,253 cuft
Drainage area = 1.170 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
4
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Pond 1 Diversion
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 2
Pond 2 Diversion
Hydrograph type = SCS Runoff Peak discharge = 16.77 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 35,460 cuft
Drainage area = 2.720 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
5
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
Pond 2 Diversion
Hyd. No. 2 -- 10 Year
Hyd No. 2
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 3
Pond 3 Diversion
Hydrograph type = SCS Runoff Peak discharge = 14.18 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 29,985 cuft
Drainage area = 2.300 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
6
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
Q (cfs)
Time (min)
Pond 3 Diversion
Hyd. No. 3 -- 10 Year
Hyd No. 3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 4
I4.0 Diversion A
Hydrograph type = SCS Runoff Peak discharge = 15.22 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 32,201 cuft
Drainage area = 2.470 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
7
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
I4.0 Diversion A
Hyd. No. 4 -- 10 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 5
I4.0 Diversion B
Hydrograph type = SCS Runoff Peak discharge = 5.054 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 10,690 cuft
Drainage area = 0.820 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
8
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
I4.0 Diversion B
Hyd. No. 5 -- 10 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 6
H2.1 Diversion
Hydrograph type = SCS Runoff Peak discharge = 16.46 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 34,809 cuft
Drainage area = 2.670 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
9
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
3.00 3.00
6.00 6.00
9.00 9.00
12.00 12.00
15.00 15.00
18.00 18.00
Q (cfs)
Time (min)
H2.1 Diversion
Hyd. No. 6 -- 10 Year
Hyd No. 6
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 7
E8.1 Diversion
Hydrograph type = SCS Runoff Peak discharge = 12.14 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 25,683 cuft
Drainage area = 1.970 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
10
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
14.00 14.00
Q (cfs)
Time (min)
E8.1 Diversion
Hyd. No. 7 -- 10 Year
Hyd No. 7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 8
F7.3 Diversion A
Hydrograph type = SCS Runoff Peak discharge = 2.342 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 4,954 cuft
Drainage area = 0.380 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
11
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
F7.3 Diversion A
Hyd. No. 8 -- 10 Year
Hyd No. 8
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 9
F7.3 Diversion B
Hydrograph type = SCS Runoff Peak discharge = 10.05 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 21,250 cuft
Drainage area = 1.630 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
12
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
F7.3 Diversion B
Hyd. No. 9 -- 10 Year
Hyd No. 9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 07 / 19 / 2017
Hyd. No. 10
B3.3 Diversion
Hydrograph type = SCS Runoff Peak discharge = 6.595 cfs
Storm frequency = 10 yrs Time to peak = 717 min
Time interval = 1 min Hyd. volume = 13,950 cuft
Drainage area = 1.070 ac Curve number = 87
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
13
0 120 240 360 480 600 720 840 960 1080 1200 1320
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
7.00 7.00
Q (cfs)
Time (min)
B3.3 Diversion
Hyd. No. 10 -- 10 Year
Hyd No. 10
Appendix J
Watershed Calculations
CALCULATION SHEET PAGE 1 OF 2
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date7/17/2017_
PROJECT: Wrenn Farms Watershed Calculations Reviewed By PMR Date 7/17/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170717_Watershed Calculations.doc
City Lake Tier 4 Watershed Calculations
Allowable Built-upon Area
11.11 acres total
50% built upon area allowed = 5.56 acres impervious acres
Proposed Built-upon Area
Calculate the curve number based on curve numbers used for stormwater report. See below table. Also, see
Figure 7.
CITY LAKE TIER 4 WATERSHED AREA CURVE NUMBER, CN
Area Type Area (Acres) CN
Impervious 2.22 98
Grassed Area 3.91 74
Single Family (1/4 ac lots) 1.91 83
Commercial Development 3.07 94
Curve Number (CN) 11.11 85.87
Using the weighted curve number for the entire 11.11 acres, determine the amount of impervious and pervious
area that would equal that curve number. Assume impervious equals a curve number of 98 and
grassed/pervious is a curve number of 74.
85.87 = (X * 98 + (11.11 – X)*74 ) / 11.11
X = impervious area = 5.49 acres
5.49 acres < 5.56 acres which is allowed; therefore, the proposed site layout is acceptable.
5.49 acres / 11.11 acres = 49.4% built upon area
CALCULATION SHEET PAGE 2 OF 2
PROJECT NO. 15.027
CLIENT: Jemsite Development SUBJECT: SWM Report Prepared By WWC Date7/17/2017_
PROJECT: Wrenn Farms Watershed Calculations Reviewed By PMR Date 7/17/2017
Approved By Date
P:\15.027 NC - Wrenn Farms Residential\Calculations\170717_Watershed Calculations.doc
Oakdale Watershed Calculations
Allowable Built-upon Area
52.90 acres total
70% built upon area allowed = 37.03 acres impervious acres
Proposed Built-upon Area
Calculate the curve number based on curve numbers used for stormwater report. See below table. Also, see
Figure 7.
OAKDALE WATERSHED WEIGHTED CURVE NUMBER, CN
Area Type Area (Acres) CN
Impervious 4.14 98
Grassed Area 14.75 74
Single Family (1/4 ac lots) 30.69 83
Commercial Development 3.32 94
Curve Number (CN) 52.90 82.35
Using the weighted curve number for the entire 52.9 acres, determine the amount of impervious and pervious
area that would equal that curve number. Assume impervious equals a curve number of 98 and
grassed/pervious is a curve number of 74.
82.35 = (X * 98 + (52.90 – X)*74 ) / 52.90
X = impervious area = 18.40 acres
18.40 acres < 37.03 acres which is allowed; therefore, the proposed site layout is acceptable.
18.40 acres / 52.90 acres = 34.8% built-upon area