Loading...
HomeMy WebLinkAbout20160225 Ver 2_Revised version 2 BPDP_20180521Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/21/2018 11:43:52 AM (Message Start Event) Approve by Montalvo, Sheri A 5/21/2018 12:23:32 PM (Initial Review- Sheri Montalvo) • The task was assigned to Montalvo, Sheri A 5/21/2018 11:44 AM D# * 20160225 Version* v2 Select Reviewer:* Katie Merritt Mitigation Project Submittal - 5/21/2018 Type of Mitigation Project:* r Stream r Wetlands PF Buffer PF Nutrient Offset (Select all that apply) Is this a Prospectus, Technical Proposal or a f Yes r No New Site? * Project Contact Information ............................................................................................................................. Contact Name:* Andrea Eckardt Email Address:* aeckardt@Wldlandseng.com Project Information Existing (DWR) ID#:* 20160225 (nun-bers only... no dash) Existing Version:* v2 (nunbers only) Project Name:* South Fork Mitigation Bank Parcel County:* Chatham Document Information Mitigation Document Type:* Mitigation Plan File Upload: South Fork Final BPDP 5.21.2018.pdf 19.6MB Rease upload only one RDF of the conplete file that needs to be subrritted... Signature Print Name:* Andrea Eckardt Signature: 0�f1w, 6wwlf ,I- Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Haw River Subwatershed of the Jordan Lake Watershed  DWR #2016‐0225v2                  May 2018          PREPARED BY:  1430 South Mint Street, Suite 104  Charlotte, NC  28203  Phone: (704) 332‐7754  Fax: (704) 332‐3306 Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Haw River Subwatershed of the Jordan Lake Watershed  DWR #2016‐0225v2 TABLE OF CONTENTS  1.0  Project Location and Description ...................................................................................................... 1  1.1  Introduction .................................................................................................................................. 1  2.0  Project Area ‐ Existing Conditions ..................................................................................................... 2  2.1  Parcel Features .............................................................................................................................. 2  2.2  Parcel Soils .................................................................................................................................... 3  2.3  Existing Vegetative Communities ................................................................................................. 3  2.4  Threatened and Endangered Species ........................................................................................... 4  2.5  Cultural Resources ........................................................................................................................ 4  3.0  Riparian Restoration, Enhancement and Preservation Plan ............................................................. 4  3.1  Parcel Preparation ........................................................................................................................ 5  3.2  Riparian Area Restoration Activities ............................................................................................. 5  3.3  Riparian Area Enhancement Activities .......................................................................................... 6  3.4  Riparian Area Preservation Activities ............................................................................................ 6  4.0  Monitoring and Maintenance Plan ................................................................................................... 6  4.1  Monitoring Protocol ...................................................................................................................... 6  4.2  Parcel Maintenance ...................................................................................................................... 7  4.3  Easement Boundaries and Fencing ............................................................................................... 7  4.4  Ownership and Long‐Term Management ..................................................................................... 7  5.0  Financial Assurance ........................................................................................................................... 8  6.0  Mitigation Potential .......................................................................................................................... 8  7.0  References ...................................................................................................................................... 11  FIGURES  Figure 1  Service Area Map   Figure 2  Vicinity Map  Figure 3  Site Map  Figure 4  Soils Map  Figure 5  Buffer Mitigation Credit Determination Map   Figure 6  Riparian Zone Map  APPENDIX  NC Division of Water Resources Site Viability for Buffer Mitigation and Nutrient Offset Letter – August  16, 2017  NC Division of Water Resources On‐Site Determination for Applicability to the Jordan Buffer Rules and  Water Quality Standards – August 15, 2017  Historical Aerial Photographs  Parcel Photo Log  United States Fish and Wildlife Service Letter (USFWS)– July 22, 2016  State Historic Preservation Office (SHPO) – July 1, 2016  EDR Summary Report  Figures 3.0 and 3.1 from South Fork Site Stream Mitigation Plan Sheets (Planting Plan)     South Fork Mitigation Site   HUC 03030002 – BPDP 1  Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Jordan Lake Watershed in the Cape Fear River Basin  The South Fork Nutrient Offset and Buffer Mitigation Bank Parcel (“Parcel”) is proposed under the terms  and conditions of the Cane Creek Nutrient Offset and Buffer Umbrella Mitigation Banking Instrument  (UMBI), made and entered into by Wildlands Holdings IV, LLC, acting as Bank Sponsor (Sponsor), and the  North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources (DWR). The  Parcel shall be planned and designed according to the UMBI, 15A NCAC 02B .0240, and the Consolidated  Buffer Mitigation Rule 15A NCAC 02B.0295 which became effective on November 1, 2015.  The BPDP has  also been designed in concurrence with the Cane Creek Stream and Wetland Umbrella Mitigation Bank  (SAW# 2016‐00219).  The Mitigation Plan for the South Fork Stream and Wetland Mitigation Site has  been submitted to the Interagency Review Team.  The project encompasses land along unnamed tributaries to South Fork Cane Creek in Chatham County,  NC. The primary purpose of the Bank is to provide riparian buffer mitigation credits to compensate for  unavoidable buffer impacts in the 03030002 Hydrologic Unit Code (HUC) of the Cape Fear River Basin,  within the Haw River Sub‐watershed of the Jordan Lake Watershed. The Bank may also provide nutrient  offset credits for stormwater requirements with new and existing development requiring nutrient  offsets within the Haw River Sub‐watershed of the Jordan Lake Watershed. The bank service area is  depicted in Figure 1.  1.0  Project Location and Description  1.1  Introduction  This Parcel is being proposed to provide stream and wetland mitigation through the creation of a Stream  and Wetland Mitigation Bank Site on unnamed tributaries to South Fork Cane Creek as well as nutrient  offset and buffer mitigation through the creation of a Buffer & Nutrient Offset Bank.  Riparian  restoration activities deemed suitable for riparian buffer mitigation will generate 444,747.60 ft² riparian  buffer mitigation credits.  Riparian restoration activities deemed suitable for nutrient offsets on this  Parcel could generate 2,249.36 lbs.‐Nitrogen per acre and 143.81 lbs. ‐Phosphorus per acre (with a  delivery factor of 71% and 67% respectively) if converted from riparian buffer mitigation credits.    For purposes of the South Fork Buffer and Nutrient Offset Bank, the Parcel involves restoring riparian  buffers and other riparian areas adjacent to mitigated streams onsite in order to help reduce non‐point  source contaminant discharges to downstream waters in the Jordan Lake Watershed within the Cape  Fear River Basin. Approximately 18.13 acres will be protected with a permanent conservation easement.  Out of the 18.13 acres, 15.30 acres will be mitigated to generate Jordan Lake riparian buffer credit. Out  of the 15.30 acres, 5.48 acres qualify for either riparian buffer mitigation credit or nutrient offset credit,  but not both.  In general, riparian areas that are restored, enhanced or preserved for buffer or nutrient  offset credits, will be a minimum of 30 feet from the top of stream banks and out to a maximum of 100  feet.     The NC Division of Water Resources (DWR) performed an onsite Site Viability for Buffer Mitigation and  Nutrient Offset on August 9, 2017.  The correspondence related to the site visit is attached in the  Appendix and dated April 15 and 16, 2017.   South Fork Mitigation Site   HUC 03030002 – BPDP 2   1.2  Parcel Location  The Cane Creek Umbrella Mitigation Bank Sites are located in Chatham and Alamance County near the  Town of Snow Camp, NC. The site described in this bank parcel development plan is the South Fork Bank  Parcel (36° 10’ 9.48” N and 78° 55’ 49.44” W) which is located in Chatham County within the Cape Fear  River Basin Hydrologic Unit 03030002050050 (Cane Creek) and the North Carolina Division of Water  Resources (NCDWR) Subbasin 03‐06‐04 (Figure 2).  From Raleigh, take US‐64 West to the exit for NC‐87 N.  Continue north on NC‐87 for 1.8 miles and turn  left onto Silk Hope Gum Spring Road.  Continue on Silk Hope Gum Spring Road for 8.1 miles.  Turn right  onto Silk Hope‐Lindley Mill Road and continue for 2.9 miles.  Turn left onto Moon Lindley Road and  continue for 1.3 miles.  Turn left onto Johnny Lindley Road and continue for 0.7 miles to 1727 Johnny  Lindley Road, Snow Camp, NC (Figure 2).   2.0  Project Area ‐ Existing Conditions  2.1  Parcel Features  The project includes restoring riparian areas along four unnamed tributaries to South Fork Cane Creek,  as shown on Figure 3 and listed in Table 1.   Table 1. Project Features Descriptions – South Fork BPDP  Feature Name** Feature ID from  DWR Assessments Stream Type Buffer Credit  Viable  Nutrient Offset  Viable  SF4A SF Perennial Yes Yes* UT1 UT1 Intermittent Yes Yes UT2 UT2  Intermittent/Perennial  Yes Yes UT4 UT4 Perennial Yes Yes* * Nutrient Offset is viable in non‐forested pasture areas only ** No credits are being requested on UT3 and UT5 referenced in DWR correspondence.  Subjectivity calls for the features were determined by DWR in correspondence dated August 15, 2017  using the 1:24,000 scale quadrangle topographic map prepared by USGS and the most recent printed  version of the soil survey map prepared by NRCS.  SF4A, UT1 and UT2 were determined to be subject to  the Jordan Lake Buffer Protection Rule 15A NCAC 02B .0267. UT4 is not subject to the Jordan Lake Buffer  Protection Rules.    The results documented in the Site Viability Letter from DWR dated April 16, 2017 indicated that SF4A,  UT1, UT2 and UT4 are viable for riparian restoration and suitable for buffer mitigation.  SF4A, UT1, UT2,  and UT4 are also viable for nutrient offset credits in non‐forested pasture areas.  These areas are  currently being restored for riparian buffer credit, but may be converted to nutrient offset credit  pursuant to 15A NCAC 02B .0295 and the MBI. Written approval must be granted by DWR prior to any  conversion and transfer of credits.    Photos showing historic site conditions and current site conditions (as of August 2017) of the Parcel are  provided in the appendix.  Site conditions have not changed since the DWR 2017 viability letter and  August 2017 site photos.  South Fork Mitigation Site   HUC 03030002 – BPDP 3  2.2  Parcel Soils  The largely forested watersheds with low rolling topography result in relatively low sediment supply.  The bed material in the streams on this site is small to medium gravel and sand that is derived from  highly weathered parent material.   Soil mapping units are based on the U.S. Department of Agriculture (USDA) Natural Resources  Conservation Service (NRCS) Soil Survey for Chatham County. Soil types within the study area were  mapped with the NRCS Web Soil Survey and are described below in Table 2. The South Fork project area  is dominated by Chewacla loams. This soil frequently floods and is poorly drained, resulting in frequent  occurrence of wetlands.  The 1937 Soils Survey Map is provided in Figure 4.  Table 2:  Project Soil Types and Descriptions – South Fork BPDP  Soil Name Location Description  Chewacla and  Weehadkee soils,  ChA  Mapped along the floodplain of  SF4A, UT1, UT2, UT3, UT4, UT5,  EC1 and EC2.  Chewacla and Wehadkee soils consist of nearly level,  very deep, poorly and somewhat poorly drained soils.  These are typically floodplain areas. They have a loamy  surface layer and subsoil. Permeability is moderate and  shrink‐swell potential is low. These soils are subject to  frequent flooding.  Nanford‐Badin  complex, NaB  Mapped along the floodplain of  UT2.  Nanford‐Baldin complex soils are gently sloping to steep  uplands. They are moderately deep to deep, well‐ drained soils. The surface layer and subsoil are silt loam.  Permeability is moderate and shrink‐swell potential is  low to moderate.  Nanford‐Badin  complex, NaC  Mapped along the floodplain of  UT1, UT2, UT4, EC1, and EC2.  Nanford‐Baldin complex soils are gently sloping to steep  uplands. They are moderately deep to deep, well‐ drained soils. The surface layer and subsoil are silt loam.  Permeability is moderate and shrink‐swell potential is  low to moderate.  Cid‐Lignum  complex, CmB  Mapped at upstream extent of  UT2.  Cid and Lignum soils series are gently sloping,  moderately deep, moderately well‐drained soils. They  are often found in uplands. The surface layer and  subsoil are silt loam. Permeability is slow and shrink‐ swell potential is moderate.   Goldston‐Badin  complex, GoC  Mapped along right floodplain of  UT2.  Goldston‐badin soils are found on hillslopes and ridges.  They are shallow to moderately‐deep, well‐drained  soils. The surface layer and subsoil are silt loam.  Permeability is moderate to moderately rapid and  shrink‐swell potential is low to moderate.  Source: Chatham County Soil Survey, USDA‐NRCS, http://efotg.nrcs.usda.gov  2.3  Existing Vegetative Communities  The cattle pastures on the site are dominated by fescue grasses (Festuca spp.) and broomsedge  (Andropogon virginicus).  Much of the riparian areas on the site are wooded; however, cattle have  access to all of the streams except the downstream portion of SF4A, as noted in the DWR Site Viability  letter. Vegetation in the wooded areas is primarily hardwood species including white oak (Quercus alba),  red oak (Quercus rubra), willow oak (Quercus phellos), tulip poplar (Liriodendron tulipifera), sweetgum  (Liquidambar styraciflua), red maple (Acer rubrum), southern red oak (Quercus falcata), and American  elm (Ulmus americana).  Vegetation within the riparian areas along the right bank of SF4A, as noted in  South Fork Mitigation Site   HUC 03030002 – BPDP 4  the DWR Site Viability letter, lack a healthy divers understory and therefore require supplemental  plantings to be viable for generating buffer credits.  2.4  Threatened and Endangered Species  Wildlands utilized the US Fish and Wildlife Service (USFWS) and NC Natural Heritage Program (NHP)  databases to search for federally listed threatened and endangered plant and animal species in Chatham  County, NC. Two animal and one plant species identified as threatened or endangered are currently  listed in Chatham County (Table 3).   Table 3:  Listed Threatened and Endangered Species in Durham County, NC – South Fork BPDP  Species Federal Status Common Name Scientific Name  Red‐cockaded woodpecker Picoides borealis Endangered  Cape Fear shiner Notropis mekistocholas Endangered  Harperella Ptilimnium nodosum Endangered  A letter was sent to the USFWS on April 1, 2016, requesting a review of the project and comment on  potential effects on endangered species or other resources. The USFWS responded on July 22, 2016, and  stated the “proposed action is not likely to adversely affect any federally listed endangered or  threatened species, their formally designated critical habitat or species currently proposed for listing  under the Act...”  USFWS also stated a concern for potential sediment loss during the stream and  wetland mitigation construction period.  These concerns are addressed in Section 3.0 below.  All  correspondence with USFWS is included in Appendix 5. A pedestrian survey of the project area was  performed on November 7, 2016. No suitable habitat and/or individually federally listed species were  identified in the project area.   2.5  Cultural Resources  The site is not located near any sites listed on the National Register with the State Historic Preservation  Office (SHPO). A letter was sent to the SHPO on April 1, 2016, requesting a review of the project and  comment on potential effects on archeological and cultural resources. SHPO responded on July 1, 2016  stating that they are not aware of any historic resources that would be affected by the project.  2.6  Environmental Issues  An EDR Radius Map Report with Geocheck was ordered for the Parcel through Environmental Data  Resources, Inc. on April 7, 2016. The target property and the adjacent properties are not listed in any of  the Federal, State, or Tribal environmental databases searched by EDR. There were no known or  potential hazardous waste sites identified within one mile of the Parcel. The Executive Summary of the  EDR report is included in the Appendix.   3.0  Riparian Restoration, Enhancement and Preservation Plan  Developing the Parcel for mitigation will require converting existing agriculture land use practices  adjacent to streams into riparian forest.  The mitigated riparian areas, which includes the 50‐foot‐wide  Jordan Lake riparian buffers, will involve replanting appropriate native tree species along the project  corridors. Vegetation management and herbicide applications may be needed during the first year of  tree establishment in the restoration areas to prevent establishment of invasive species that could out  South Fork Mitigation Site   HUC 03030002 – BPDP 5  compete the planted native species. More detailed descriptions of the proposed restoration activity  follow in Sections 3.1 ‐3.4 and are shown on Figure 5.  This site is also being proposed as a stream and wetland mitigation bank; therefore, restoration of  riparian areas will be accomplished through the goals and methods outlined by the Cane Creek Umbrella  Mitigation Banking Instrument – South Fork Stream Mitigation Plan (USACE # 2016‐00219) and the  South Fork Riparian Buffer & Nutrient Offset Mitigation Banking Instrument.  All applicable federal,  state, and local documentation, permits, and/or authorizations will be acquired as part of implementing  the above‐mentioned mitigation plan and will be provided to DWR as part of the As Built Report  including Section 401, Section 404 and Sediment and Erosion Control permits.  All riparian restoration activities will commence in concurrence with the stream mitigation activities and  not before.  Therefore, the mitigation area where riparian restoration is being performed may be altered  slightly depending on the implementation of the South Fork Stream Mitigation Plan for the Cane Creek  Umbrella Mitigation Bank.   3.1  Parcel Preparation  The current land uses adjacent to the streams proposed for buffer restoration are primarily non‐ forested crops.  Areas slated for buffer restoration will require site preparation that will include select  herbicide treatments or limited mechanical clearing to remove undesirable underbrush or invasive  species. Diffuse flow will be maintained in the buffers.  3.2  Riparian Area Restoration Activities  The revegetation plan for the entire buffer restoration area will include permanent seeding, planting  bare root trees, live stakes, and herbaceous plugs and controlling invasive species growth. The specific  species composition to be planted was selected based on the community type, observation of  occurrence of species in riparian buffers adjacent to the Site, and best professional judgement on  species establishment and anticipated Site conditions in the early years following project  implementation. Species chosen for the planting plan are listed on Sheet 2.0 of the preliminary stream  mitigation design plans located in the Appendix and in Table 4. The plans also contain information on  planting zones on Sheets 2.1.  Table 4:  Selected Tree Species Appropriate for Buffer Restoration – South Fork BPDP  Species Common Name  Ulmus americana American Elm  Celtis occidentalis Hackberry  Quercus pagoda Cherrybark Oak  Liriodendron tulipifera Tulip Poplar  Quercus phellos Willow Oak  Plantus occidentalis Sycamore  Betula nigra River Birch  Quercus michauxii Swamp Chestnut Oak  Fraxinus pennsylvanica Green Ash  South Fork Mitigation Site   HUC 03030002 – BPDP 6  Trees will be planted at a density sufficient to meet the performance standards outlined in the Rule 15A  NCAC 02B .0295 of 260 trees per acre at the end of five years. No one tree species will be greater than  50% of the established stems.  An appropriate seed mix will also be applied to provide temporary  ground cover for soil stabilization and reduction of sediment loss during rain events in areas disturbed  by stream construction, as necessary. This will be followed by an appropriate permanent seed mixture.    3.3  Riparian Area Enhancement Activities  The revegetation plan for the buffer enhancement areas under NCAC 02B .0295(n) will include planting  supplemental bare root trees and controlling invasive species growth.  The tree species to be planted  are listed in Table 4.  For buffer enhancement areas under NCAC 02B .0295(o), cattle exclusion, planting isn’t anticipated to  be needed except where required in the stream mitigation plan.  A seed mix will be applied where cattle  have caused bare soils and removed all vegetation and cattle will be fenced out of the easement area.   The proposed fencing boundary is shown on Figure 5.  3.4  Riparian Area Preservation Activities  There will be no parcel preparation work done in the buffer preservation areas, as allowed under 15A  NCAC 02B .0295(o).  The preservation area will be protected in perpetuity under a conservation  easement.  Site preparation and planting on the restoration and enhancement areas is scheduled to begin in  January 2019.  4.0  Monitoring and Maintenance Plan  4.1  Monitoring Protocol   Permanent vegetation monitoring plots will be installed and evaluated within the buffer restoration  and/or nutrient offset areas to measure the survival of the planted trees. There may be additional plots  within the riparian buffer that are measuring the success of the riparian areas as part of the stream and  wetland mitigation bank, but only the plots measuring the success of the riparian buffer credit will be  provided in the monitoring reports.  The plots will be randomly placed throughout the planted riparian  areas and will be representative of the entire top of bank back one‐hundred feet, more or less.    A total of 5 plots will be established within the buffer restoration credit generation area. The number of  monitoring quadrants required is based on the USACE Wilmington District monitoring guidance  documents. The size of individual quadrants will be 100 square meters for woody tree species.  Vegetation assessments will be conducted following the Carolina Vegetation Survey (CVS) Level 2  Protocol for Recording Vegetation (2008). A reference photo will be taken from the southwestern corner  of each of the 5 plots. Photos will be taken from all photo points each monitoring year and provided in  the annual reports. All planted stems will be marked with flagging tape and recorded.   Planting is scheduled for January 2019. The first annual monitoring activities will commence at the end  of the first growing season, at least five months after planting has been completed and no earlier than  the fall season. Species composition, height, and survival rates will be evaluated on an annual basis by  plot. The total number of volunteer woody stems will also be documented and reported. The measures  of vegetative success for the Parcel will be the survival of at least 4 native hardwood tree species, where  no one species is greater than 50% of the established stems, established at a density of at least 260  South Fork Mitigation Site   HUC 03030002 – BPDP 7  planted trees per acre at the end of Year 5. Appropriate native volunteer species may be included to  meet the performance standards with DWR approval.   A visual assessment of the cattle exclusion and preservation areas within the conservation easement will  also be performed each year to confirm:  Fencing is in good condition throughout the site; no cattle access within the conservation easement area; no encroachment has occurred; diffuse flow is being maintained in the conservations easement area; and there has not been any cutting, clearing, filling, grading, or similar activities that would negatively affect the functioning of the buffer. Any issues identified during the visual assessment of the cattle exclusion and preservation areas will be  photographed and mapped as part of the annual monitoring report with remedial efforts proposed or  documented.  The Sponsor shall submit the annual monitoring report to DWR by December 31st of each  year for five consecutive years and will follow the terms and conditions of the MBI.  4.2  Parcel Maintenance  Adaptive measures will be developed, or appropriate remedial actions will be implemented in the event  that the Parcel or a specific component of the Parcel fails to achieve the success criteria outlined in  Section 4.1. Site maintenance will be performed to correct any identified problems on the Parcel that  have a high likelihood of affecting project success. Such items include, but are not limited to, excess tree  mortality caused by fire, flooding, drought, or insects. Any actions implemented will be designed to  achieve the success criteria and will include a work schedule and updated monitoring criteria. Any parcel  maintenance performed will be included in the monitoring report for that year. A rigorous herbicide  schedule will need to be implemented in the first few years of tree establishment in the restoration  areas to prevent establishment of invasive species that may attempt to out‐compete the planted native  vegetation. The only herbicides used on the Parcel will be aquatic approved herbicides that will be  applied in accordance with North Carolina Department of Agriculture rules and regulations. The  easement boundary will be checked annually as part of monitoring activities and the conditions as well  as any maintenance performed will be reported in the annual monitoring reports to NC DWR.  If mowing is deemed necessary by the Sponsor during the monitoring period, the Sponsor must receive  approval by the DWR prior to any mowing activities within Zone 1 and Zone 2 of the Jordan Lake buffers  to ensure that no buffer violations have occurred.    4.3  Easement Boundaries and Fencing  Easement boundaries will be identified in the field to ensure clear distinction between the Parcel and  adjacent properties. Boundaries may be identified by fence, marker, bollard, post, tree‐blazing, or other  means as allowed by site conditions  and/or  conservation  easement.  Boundary  markers  disturbed,  damaged, or destroyed will be repaired and/or replaced on an as needed basis. Contact information for  the long‐term steward will be provided on boundary markers throughout the site.  4.4  Ownership and Long‐Term Management  The Site will remain in private ownership, protected in its entirety, and managed under the terms  detailed in the conservation easement. Unique Places to Save (UP2Save) will serve as the Grantee and  long‐term manager and will be the party responsible for long‐term management.   South Fork Mitigation Site   HUC 03030002 – BPDP 8  UP2Save is a 501c3 non‐profit organization that is committed to land conservation through sustainable  planning and management. UP2Save has the ability, both logistically and financially, to monitor and  enforce the provisions of the conservation easement and long‐term management plan. The organization  operates in a sustainable manner to facilitate operations well into the future. UP2Save has been  approved to serve as the easement holder and long‐term manager on several mitigation banks in North  Carolina.  5.0  Financial Assurance  Following approval of the South Fork BPDP, the Sponsor shall provide a Performance Bond from a surety  that is rated no less than an “A‐“ as rated by A.M. Best. The Performance Bond amount shall be 100% of  the estimated cost for implementation of the project as described in the BPDP, but not less than  $150,000.00. In lieu of posting the performance bond, the Sponsor may elect to construct the project  prior to the first credit release. In that case no performance bond will be necessary.  After completion of the restoration/construction, a separate Performance/Maintenance Bond will be  secured for 100% of the estimated cost to implement the monitoring and maintenance plan but not less  than $100,000.00. The Performance/Maintenance Bond shall apply at the inception of the monitoring  period for a term of one year, to be extended annually for a minimum of five years. Upon DWR  approval, this may be lowered each year based on the adjusted cost to complete the monitoring.  Performance bonds for monitoring shall be renewed to cover the next years monitoring period, with  confirmation of renewal provided to DWR with each annual monitoring report when applicable.  DWR  reserves the right to alter the credit release schedule if monitoring reports are submitted without proof  of bond renewals when applicable.  Financial assurances provided in this section must be separate from the financial assurances provided as  part of the Stream and Wetland Mitigation Bank.  6.0  Mitigation Potential  Approximately 18.13 acres will be protected with a permanent conservation easement. Out of the 18.13  acres, a total of 15.30 acres of riparian areas will be mitigated to generate Jordan Lake riparian buffer  credit or nutrient offset credit.  Out of those 15.30 acres, 5.48 acres will be restored, 8.84 acres will be  enhanced by permanently excluding livestock and stabilizing soils, 0.52 acres will be enhanced through  supplemental plantings, and 0.46 acres will be preserved (Figure 5).  Of the 5.48 acres that are restored,  all 5.48 acres were deemed to be agriculture by DWR and are therefore suitable for either buffer credit  or nutrient offset credit by DWR. These areas may be used for either Jordan Lake buffer credits or  nutrient offset credits, but not both. Out of the 5.48 acres that are restored, the Sponsor is requesting  all 5.48 acres to be used to generate credit releases for riparian buffer credits.  Neither riparian buffer  nor nutrient offset credit will be generated on the remaining 2.83 acres (Figure 5).   Riparian zones are  depicted in Figure 6.  The Sponsor will maintain up to four (4) credit ledgers. One to account for buffer preservation and  enhancement (via cattle exclusion) credits, one to account for buffer restoration and enhancement  credits (under Rule 15 NCAC 2B .0295(n)) , one to account for Nitrogen nutrient offset credits, and one  to account for Phosphorus nutrient offset credits (if riparian buffer credits are ever converted to  nutrient credits).  All buffer ledgers will report credits in both square feet and acres and nutrient offsets  in both pounds and acres.  Nutrient offset ledgers must also show both generated credits and delivered  credits.  Overall credit generation by drainage feature is detailed in Table 5. The total credit generation  is summarized in Tables 6a and 6b and visually represented in Figure 5.  The Sponsor must request and  receive approval from DWR prior to any credit conversions and transfers to the credit ledgers. With each  South Fork Mitigation Site   HUC 03030002 – BPDP 9  conversion and transfer request submitted to the DWR, the Sponsor will provide all updated credit  ledgers showing all transactions that have occurred up to the date of the request. Buffer preservation  and enhancement credits (via cattle exclusion) from this Bank cannot be converted into Nutrient offset  credits.  The credit release schedule is shown in Table 7.  Table 5. Mitigation Activities by Drainage Feature – South Fork BPDP  Feature Name DWR Feature  Reference  Riparian  Restoration   (Acre)  Top of Bank ‐100’  Riparian  Enhancement   Cattle Exclusion  (Acre)  Top of Bank – 100’  Riparian  Enhancement  (Acre)   Top of Bank –  100’  Riparian  Preservation    (Acre)   Top of Bank – 100’  %  Total  Area  SF4A SF 2.73 6.1 0.52 0.46 64.1%  UT1  UT1 0.38 0.78 00 7.8%  UT2  UT2 2.37 0 00 15.4%  UT4  UT4 0 1.96 00 12.7%  Total acreage mitigated  5.48 8.84 0.52 0.46 15.40  % Total Area 35.8% 57.8% 3.4%3.0%100%  South Fork Mitigation Site   HUC 03030002 – BPDP 10  Table 6a: Riparian Buffer Credit Generation Summary – South Fork BPDP  Mitigation  Type* Feature  ID  Riparian  Widths**  Credit  Type  Total  Acreage  Credit  Ratio  % of Full  Credit  Credited  Acreage*  Mitigation  Credits Restoration SF4A, UT1,  & UT2  Zone A:  Top of  Bank – 50’  Riparian  Buffer 3.80  1:1  100%  3.80  165,528.00 ft²  Zone B:   51‐100’  Riparian  Buffer 1.68  1:1  100%  1.68  73,180.80 ft² Enhancement – Cattle Exclusion SF4A, UT1,  & UT4  Zone A:  Top of  Bank – 50’  Riparian  Buffer 7.39  2:1  100%  3.70  161,172.00 ft²  Zone B:   51‐100’  Riparian  Buffer 1.45  2:1  100%  0.73   31,798.80 ft² Enhancement SF4A  Zone A:  Top of  Bank – 50’  Riparian  Buffer 0.40  2:1  100%  0.20  8,712 ft²  Zone B:   51‐100’  Riparian  Buffer 0.12  2:1  100%  0.06  2,613.60 ft² Preservation SF4A  Zone A:  Top of  Bank – 50’  Riparian  Buffer 0.32  10:1  100%  0.03  1,306.80 ft²  Zone B:   51‐100’  Riparian  Buffer 0.14  10:1  100%  0.01  435.60 ft²  Total Riparian Buffer Restoration Credits  238,708.80 ft²  Total Riparian Buffer Enhancement – Cattle Exclusion Credits  192,970.80 ft²  Total Riparian Buffer Enhancement Credits  11,325.60 ft²  Total Riparian Buffer Preservation Credits  1742.40 ft²  Total Riparian Buffer Credits 444,747.60 ft²  *The area of preservation credit within a buffer mitigation site shall comprise of no more than 25% of the total area of buffer  mitigation per 15A NCAC 0295 (o)(5).  South Fork Mitigation Site   HUC 03030002 – BPDP 11  Table 6b. Nutrient Offset Credit Generation Summary** Riparian  Width from  TOB  Credit  Type  Mitigation  Type  Total  Acreage  Generated  Credits per  Acre  Generated  Credits  Delivery  Factor  Delivered  Credits  Zone A: Top  of Bank – 50’ Nitrogen Riparian  Restoration  3.80 2,249.36  lbs.  8547.57 lbs.  71%  6,068.77 lbs.  Zone B:   51‐100’ 1.68  3778.92 lbs.  2,683.03 lbs.  Zone A: Top  of Bank – 50’ Phosphor us  3.80  143.81 lbs.  546.48 lbs.  67%  366.14 lbs.  Zone B:   51‐100’ 1.68  241.60lbs  161.87 lbs.     Total Nitrogen Credits  8751.80 lbs.     Total Phosphorus Credits  528.01 lbs.  **Note: In the BPDP, WHIV is requesting buffer mitigation from the riparian restoration areas and is providing this information for supporting documentation in case a request is made to convert and transfer from buffer credit to nutrient offset credit. Any transfer of credit from buffer to nutrient must be reviewed and approved by the Division prior to transfer.  Table 7 ‐ Credit Release Schedule – South Fork BPDP  Task Project Milestone % Credit Available  for Sale  1 Instrument and BPDP Approved by DWR, Conservation Easement  Recorded and Financial Assurance Posted 20  2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices  Completed 20  3  Monitoring Financial Assurance Posted and Approval of As‐Built Report  10  4 Monitoring Report #1: Approved by the DWR & financial assurance  renewed 10  5 Monitoring Report #2: Approved by the DWR & financial assurance  renewed 10  6 Monitoring Report #3: Approved by the DWR & financial assurance  renewed 10  7 Item B(1) of Section X in this Instrument has been completed and  approved by DWR 5  No remaining credits will be released until the conservation easement has been assigned to an  approved land trust or stewardship  8 Monitoring Report #4: Approved by the DWR & financial assurance  renewed 5  9 Monitoring Report #5: Approved by the DWR and final site visit by DWR  has been conducted 10  Total 100% 7.0  References  USDA, Soil Conservation Service, 1937. Soil Survey of Chatham County.  USDA, Soil Conservation Service, 2015. Soil Survey of Chatham County.  &/'hZ^    ^_ 03030002 Haw River Arm Upper New Hope Lower New Hope ¹ County Boundaries HUC 03030002 Jordan Lake Sub-Watersheds Service Area - Riparian Buffer and Nutrient Offset Credits ^_South Fork Mitigation Bank Parcel Location Figure 1 Service Area MapSouth Fork Mitigation Bank ParcelBank Parcel Development PackageCape Fear River Bain 03030002 Chatham County, NC 0 105 Miles ^_ South Fork Bank Parcel Location Chatham County, NC Figure 2 Vicinity MapSouth Fork Mitigation Bank ParcelBank Parcel Development PackageCape Fear River Basin 03030002¹0 0.750.375 Miles SF 4 A UT2UT4UT1U T 3 UT5 SF4 ASF4A Chatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Project Streams Topographic Contours 5' Figure 3 Site MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography Chatham County, NC 0 750375 Feet ¹ Soil Survey of Chatham County, NC - 1937 Figure 4 Soils MapSouth FOrk Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 Conservation Easement (18.13 ac) 30' Internal Easement Crossing 35'80' 30' 50' 50' 50' 35' 50' SF 4 A UT2UT4UT1U T 3 UT5 SF4ASF4AChatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Stream Mitigation (1.85 ac) Buffer Restoration (5.48 ac) Cattle Exclusion (8.84 ac) Buffer Enhancement (0.52 ac) Buffer Preservation (0.46 ac) No Credit (0.98 ac) [ [Proposed Fencing Figure 5 Buffer Credit Determination MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography SF 4 A UT2UT4UT1U T 3 UT5 SF4 ASF4A Chatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Stream Mitigation (1.85 ac) Zone A: Top of Bank to 50' (11.91 ac) Zone B: 51'-100' (3.39 ac) No Credit (0.98 ac) Figure 6 Riparian Buffer Zones MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography WWE/y 4585422.5 2012 = 500' 4585422.5 2010 = 500' 4585422.5 2009 = 500' 4585422.5 2008 = 500' 4585422.5 2006 = 500' 4585422.5 2006 = 500' 4585422.5 2005 = 500' 4585422.5 1998 = 750' 4585422.5 1993 = 500' South Fork Mitigation Site    Existing Conditions Photographs     August 2017    SF4A    SF4A    UT1    UT2     UT4        North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Office of Archives and History Secretary Susan Kluttz Deputy Secretary Kevin Cherry Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 July 1, 2016 Ruby Davis Wildlands Engineering 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Re: Cane Creek Mitigation Bank, Alamance and Chatham Counties, ER 16-1133 Dear Ms. Davis: Thank you for your email of June 24, 2016, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-807-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Bartos SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Road, Ste 225Raleigh, NC 27609Tel: 919.851.9986Firm License No. F-0831Date:Revisions:F:\Projects\005-40045 Cane Creek\CADD\South Fork Site\Plans\40045-SF-Planting Plan.dwgApril 26, 2018Cane Creek Umbrella Mitigation Bank - South Fork SiteChatham County, North CarolinaPlanting Tables005-40045CLM/GATANAGAT3.004.26.2018Zone 1 - Streambank Planting Zone (See Detail 2, Sheet 6.6) Zone 2 - Buffer Planting Zone (See Detail 1, Sheet 6.6) Zones 1 and 2 0'100'200'300' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Road, Ste 225Raleigh, NC 27609Tel: 919.851.9986Firm License No. F-0831Date:Revisions:F:\Projects\005-40045 Cane Creek\CADD\South Fork Site\Plans\40045-SF-Planting Plan.dwgMay 17, 2018Cane Creek Umbrella Mitigation Bank - South Fork SiteChatham County, North CarolinaPlanting Plan005-40045CLM/GATANAGAT3.105.17.2018NNote: Non-hatched areas within easement are currently vegetated and will be planted as needed to achieve target density. Zone 1 - Streambank Planting Zone (See Detail 2, Sheet 6.6) Zone 2 - Buffer Planting Zone (See Detail 1, Sheet 6.6) Zone 3 - Understory Planting Zone (See Detail 1, Sheet 6.6)Revised Buffer Planting Zone,Added Understory PlantingZone - 05.17.2018CECECECECECECECECECECECECECE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECECEC E C E C E C E C E C E C E CE CE CE CE CE CECECECE CE CE CE CE CECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECECECECECECEC E C E C E C E C E CE CE CE CECECECECECECECECECECECECE CE CECECECE CE CECECECECECECECE CE CE CE CECECEUT 1 SF4AUT2UT3UT4 EC1EC2UT5JO H N N Y L I N D L E Y R O A D