Loading...
HomeMy WebLinkAbout20160225 Ver 2_Draft BPDP_20171220Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 12/20/2017 3:06:26 PM (Message Start Event) Approve by Montalvo, Sheri A 12/21/2017 8:34:08 AM (Initial Review- Sheri Montalvo) • The task was assigned to Montalvo, Sheri A 12/20/2017 3:06 PM ID# * 20160225 Version* 2 Select Reviewer:* Mac Haupt Mitigation Project Submittal -12/20/2017 Type of Mitigation Project:* V Stream r Wetlands fJ Buffer rJ Nutrient Offset (Select all that apply) Is this a Prospectus or Technical Proposal?* a Yes a No Project Contact Information Contact Name:* Andrea Eckardt Email Address:* aeckardt@Wldlandseng.com Project Information Existing (DWR) ID#:* 20160225 (numbers only... no dash) Existing Version:* 2 (nunbers only) Project Name:* South Fork Mitigation Bank Parcel County:* Chatham Document Information Mitigation Document Type:* Mitigation Plan File Upload: South Fork BPDP Draft 12.20.2017.pdf 23.56MB Rease upload only one RDF of the conplete file that needs to be subrritted... Signature Print Name:* Andrea Eckardt Signature:* Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Jordan Lake Watershed of the Cape Fear River Basin                  October 2017          PREPARED BY:  1430 South Mint Street, Suite 104  Charlotte, NC  28203  Phone: (704) 332‐7754  Fax: (704) 332‐3306   Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Jordan Lake Watershed of the Cape Fear River Basin    TABLE OF CONTENTS  1.0  Project Location and Description ...................................................................................................... 1  1.1  Introduction .................................................................................................................................. 1  2.0  Project Area ‐ Existing Conditions ..................................................................................................... 2  2.1  Parcel Features .............................................................................................................................. 2  2.2  Parcel Soils .................................................................................................................................... 2  2.3  Existing Vegetative Communities ................................................................................................. 3  2.4  Threatened and Endangered Species ........................................................................................... 3  2.5  Cultural Resources ........................................................................................................................ 4  3.0  Proposed Jordan Lake Buffer and Nutrient Offset Restoration Plan ................................................ 4  3.1  Parcel Preparation ........................................................................................................................ 4  3.2  Riparian Planting ........................................................................................................................... 5  4.0  Monitoring and Maintenance Plan ................................................................................................... 5  4.1  Monitoring Protocol ...................................................................................................................... 5  4.2  Parcel Maintenance ...................................................................................................................... 5  4.3  Easement Boundaries and Fencing ............................................................................................... 6  5.0  Financial Assurance ........................................................................................................................... 6  6.0  Mitigation Potential .......................................................................................................................... 7  7.0  References ........................................................................................................................................ 8    FIGURES  Figure 1  Service Area Map   Figure 2   Vicinity Map  Figure 3  Site Map  Figure 4  Soils Map  Figure 5  Buffer Mitigation Credit Determination Map   Figure 6  Riparian Zone Map  APPENDIX  NC Division of Water Resources Site Viability for Buffer Mitigation and Nutrient Offset Letter – August  16, 2017  NC Division of Water Resources On‐Site Determination for Applicability to the Jordan Buffer Rules and  Water Quality Standards – August 15, 2017  Historical Aerial Photographs  Parcel Photo Log  United States Fish and Wildlife Service Letter (USFWS)– July 22, 2016  State Historic Preservation Office (SHPO) – July 1, 2016  Figures 2.0 and 2.1 from South Fork Site Stream Mitigation Plan Sheets (Planting Plan)        South Fork Mitigation Site   HUC 03030002 – BPDP 1  Bank Parcel Development Package  South Fork Nutrient Offset and Buffer Mitigation Bank Parcel  Jordan Lake Watershed in the Cape Fear River Basin    The South Fork Nutrient Offset and Buffer Mitigation Bank Parcel (“Parcel”) is proposed under the terms  and conditions of the Cane Creek Nutrient Offset and Buffer Umbrella Mitigation Banking Instrument  (UMBI), made and entered into by Wildlands Holdings IV, LLC, acting as Bank Sponsor (Sponsor), and the  North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources (DWR). The  Parcel shall be planned and designed according to the UMBI, 15A NCAC 02B .0240, and the Consolidated  Buffer Mitigation Rule 15A NCAC 02B.0295 which became effective on November 1, 2015.  The BPDP has  also been designed in concurrence with the Cane Creek Stream and Wetland Umbrella Mitigation Bank  (SAW# 2016‐00219).  The Mitigation Plan for the South Fork Stream and Wetland Mitigation Site has  been submitted to the Interagency Review Team.  The project encompasses land along unnamed tributaries to South Fork Cane Creek in Chatham County,  NC. The primary purpose of the Bank is to provide riparian buffer mitigation credits to compensate for  unavoidable buffer impacts in the 03030002 Hydrologic Unit Code (HUC) of the Cape Fear River Basin,  within the Haw River Sub‐watershed of the Jordan Lake Watershed. The Bank may also provide nutrient  offset credits for stormwater requirements with new and existing development requiring nutrient  offsets within the Haw River Sub‐watershed of the Jordan Lake Watershed. The bank service area is  depicted in Figure 1.  1.0  Project Location and Description  1.1  Introduction  This Parcel is being proposed to provide stream and wetland mitigation through the creation of a Stream  and Wetland Mitigation Bank Site as well as nutrient offset and buffer mitigation through the creation of  a Buffer & Nutrient Offset Bank.  Riparian restoration activities deemed suitable for nutrient offsets on  this Parcel, will generate 2,249.36 lbs.‐Nitrogen per acre and 143.81 lbs. ‐Phosphorus per acre (with a  delivery factor of 71% and 67% respectively).    For purposes of the South Fork Buffer and Nutrient Offset Bank, the Parcel involves restoring riparian  buffers and other riparian areas adjacent to mitigated streams onsite in order to help reduce non‐point  source contaminant discharges to downstream waters in the Jordan Lake Watershed within the Cape  Fear River Basin. Approximately 18.13 acres will be protected with a permanent conservation easement.  Out of the 18.13 acres, 15.40 acres will be restored for either Jordan Lake riparian buffer credit or  nutrient offset credit. In general, riparian buffer restoration area widths on streams range from 50 feet  to 100 feet from the top of bank for Jordan Lake buffer credits and nutrient offset credit.     The NC Division of Water Resources (DWR) performed an onsite Site Viability for Buffer Mitigation and  Nutrient Offset on August 9, 2017.  The correspondence related to the site visit is attached in the  Appendix and dated April 15 and 16, 2017.      1.2  Parcel Location  The Cane Creek Umbrella Mitigation Bank Sites are located in Chatham and Alamance County near the  Town of Snow Camp, NC. The site described in this bank parcel development plan is the South Fork Bank  Parcel (36° 10’ 9.48” N and 78° 55’ 49.44” W) which is located in Chatham County within the Cape Fear      South Fork Mitigation Site   HUC 03030002 – BPDP 2  River Basin Hydrologic Unit 03030002050050 (Cane Creek) and the North Carolina Division of Water  Resources (NCDWR) Subbasin 03‐06‐04 (Figure 2).  From Raleigh, take US‐64 West to the exit for NC‐87 N.  Continue north on NC‐87 for 1.8 miles and turn  left onto Silk Hope Gum Spring Road.  Continue on Silk Hope Gum Spring Road for 8.1 miles.  Turn right  onto Silk Hope‐Lindley Mill Road and continue for 2.9 miles.  Turn left onto Moon Lindley Road and  continue for 1.3 miles.  Turn left onto Johnny Lindley Road and continue for 0.7 miles to 1727 Johnny  Lindley Road, Snow Camp, NC (Figure 2).   2.0  Project Area ‐ Existing Conditions  2.1  Parcel Features  The project includes restoring riparian areas along six unnamed tributaries to South Fork Cane Creek, as  shown on Figure 3 and listed in Table 1.   Table 1. Project Features Descriptions – South Fork BPDP  Feature Name Feature ID from  DWR Assessments Stream Type Buffer Credit  Viable  Nutrient Offset  Viable  SF4A  SF  Perennial  Yes  Yes* UT1  UT1  Intermittent  Yes  Yes UT2  UT2  Intermittent/Perennial  Yes  Yes UT3**  UT3  N/A  N/A  N/A UT4  UT4  Perennial  Yes  Yes* UT5  UT5  Ephemeral  Yes (left bank)  No * Nutrient Offset is viable in non‐forested pasture areas only  **DWR was unable to access the feature to complete the assessment.  No credits are being requested on that Feature.    Subjectivity calls for the features were determined by DWR in correspondence dated August 15, 2017  using the 1:24,000 scale quadrangle topographic map prepared by USGS and the most recent printed  version of the soil survey map prepared by NRCS.  SF4A, UT1 and UT2 were determined to be subject to  the Jordan Lake Buffer Protection Rule 15A NCAC 02B .0267. UT4 and UT5 are not subject to the Jordan  Lake Buffer Protection Rules.  UT3 was not assessed due to adverse site conditions.  No credits are being  requested on UT3.    The results documented in the Site Viability Letter from DWR dated April 16, 2017 indicated that SF4A,  UT1, UT2, UT4, and UT5 are viable for riparian restoration and suitable for buffer mitigation.  SF4A, UT1,  UT2, and UT4 are also viable for nutrient offset credits in non‐forested pasture areas (Appendix).  These  areas are currently being restored for riparian buffer credit, but may be converted to nutrient offset  credit pursuant to 15A NCAC 02B .0295 and the MBI. Written approval must be granted by DWR prior to  any conversion and transfer of credits.    Photos showing historic site conditions and current site conditions (as of February 2016) of the Parcel  are provided in the appendix.  2.2  Parcel Soils  The largely forested watersheds with low rolling topography result in relatively low sediment supply.  The bed material in the streams on this site is small to medium gravel and sand that is derived from  highly weathered parent material.         South Fork Mitigation Site   HUC 03030002 – BPDP 3      Soil mapping units are based on the U.S. Department of Agriculture (USDA) Natural Resources  Conservation Service (NRCS) Soil Survey for Chatham County. Soil types within the study area were  mapped with the NRCS Web Soil Survey and are described below in Table 2. The South Fork project area  is dominated by Chewacla loams. This soil frequently floods and is poorly drained, resulting in frequent  occurrence of wetlands.  The 1937 Soils Survey Map is provided in Figure 4.    Table 2:  Project Soil Types and Descriptions – South Fork BPDP  Soil Name Location Description  Chewacla and  Weehadkee soils,  ChA  Mapped along the floodplain of  SF4A, UT1, UT2, UT3, UT4, UT5,  EC1 and EC2.  Chewacla and Wehadkee soils consist of nearly level,  very deep, poorly and somewhat poorly drained soils.  These are typically floodplain areas. They have a loamy  surface layer and subsoil. Permeability is moderate and  shrink‐swell potential is low. These soils are subject to  frequent flooding.  Nanford‐Badin  complex, NaB  Mapped along the floodplain of  UT2.  Nanford‐Baldin complex soils are gently sloping to steep  uplands. They are moderately deep to deep, well‐ drained soils. The surface layer and subsoil are silt loam.  Permeability is moderate and shrink‐swell potential is  low to moderate.  Nanford‐Badin  complex, NaC  Mapped along the floodplain of  UT1, UT2, UT4, EC1, and EC2.  Nanford‐Baldin complex soils are gently sloping to steep  uplands. They are moderately deep to deep, well‐ drained soils. The surface layer and subsoil are silt loam.  Permeability is moderate and shrink‐swell potential is  low to moderate.  Cid‐Lignum  complex, CmB  Mapped at upstream extent of  UT2.  Cid and Lignum soils series are gently sloping,  moderately deep, moderately well‐drained soils. They  are often found in uplands. The surface layer and  subsoil are silt loam. Permeability is slow and shrink‐ swell potential is moderate.   Goldston‐Badin  complex, GoC  Mapped along right floodplain of  UT2.  Goldston‐badin soils are found on hillslopes and ridges.  They are shallow to moderately‐deep, well‐drained  soils. The surface layer and subsoil are silt loam.  Permeability is moderate to moderately rapid and  shrink‐swell potential is low to moderate.  Source: Chatham County Soil Survey, USDA‐NRCS, http://efotg.nrcs.usda.gov  2.3  Existing Vegetative Communities  The cattle pastures on the site are dominated by fescue grasses (Festuca spp.) and broomsedge  (Andropogon virginicus).  Much of the riparian areas on the site are wooded; however, cattle have  access to the streams. Vegetation in the wooded areas is primarily hardwood species including white  oak (Quercus alba), red oak (Quercus rubra), willow oak (Quercus phellos), tulip poplar (Liriodendron  tulipifera), sweetgum (Liquidambar styraciflua), red maple (Acer rubrum), southern red oak (Quercus  falcata), and American elm (Ulmus americana).  2.4  Threatened and Endangered Species  Wildlands utilized the US Fish and Wildlife Service (USFWS) and NC Natural Heritage Program (NHP)  databases to search for federally listed threatened and endangered plant and animal species in Chatham      South Fork Mitigation Site   HUC 03030002 – BPDP 4  County, NC. Two animal and one plant species identified as threatened or endangered are currently  listed in Chatham County (Table 3).     Table 3:  Listed Threatened and Endangered Species in Durham County, NC – South Fork BPDP  Species Federal Status  Common Name Scientific Name  Red‐cockaded woodpecker Picoides borealis Endangered  Cape Fear shiner Notropis mekistocholas Endangered  Harperella Ptilimnium nodosum Endangered    A letter was sent to the USFWS on April 1, 2016, requesting a review of the project and comment on  potential effects on endangered species or other resources. The USFWS responded on July 22, 2016, and  stated the “proposed action is not likely to adversely affect any federally listed endangered or  threatened species, their formally designated critical habitat or species currently proposed for listing  under the Act...”  All correspondence with USFWS is included in Appendix 5. A pedestrian survey of the  project area was performed on November 7, 2016. No suitable habitat and/or individually federally  listed species were identified in the project area.   2.5  Cultural Resources  The site is not located near any sites listed on the National Register with the State Historic Preservation  Office (SHPO). A letter was sent to the SHPO on April 1, 2016, requesting a review of the project and  comment on potential effects on archeological and cultural resources. SHPO responded on July 1, 2016  stating that they are not aware of any historic resources that would be affected by the project.    3.0  Proposed Jordan Lake Buffer and Nutrient Offset Restoration Plan  Developing the Parcel for mitigation will require converting existing agriculture land use practices  adjacent to streams into riparian forest.  The riparian areas, which includes the 50‐foot‐wide Jordan Lake  buffers, will involve replanting appropriate native tree species along the project corridors. Vegetation  management and herbicide applications may be needed during the first year of tree establishment in  the restoration areas to prevent establishment of invasive species that could out compete the planted  native species. More detailed descriptions of the proposed restoration activity follow in Sections 3.1 and  3.2.  All riparian restoration activities will commence in concurrence with the stream mitigation activities and  not before.  Therefore, the mitigation area where riparian restoration is being performed may be altered  slightly depending on the implementation of the South Fork Stream Mitigation Plan for the Cane Creek  Stream and Wetland Mitigation Bank.  The riparian restoration areas will be surveyed and information  provided in the As‐Built report.  3.1  Parcel Preparation  The current land uses adjacent to the streams proposed for buffer restoration are primarily non‐ forested crops.  Areas slated for buffer restoration will require site preparation that will include select  herbicide treatments or limited mechanical clearing to remove undesirable underbrush or invasive  species. Diffuse flow will be maintained in the buffers.      South Fork Mitigation Site   HUC 03030002 – BPDP 5  3.2  Riparian Planting  The revegetation plan for the entire buffer restoration area will include permanent seeding, planting  bare root trees, live stakes, and herbaceous plugs and controlling invasive species growth. The specific  species composition to be planted was selected based on the community type, observation of  occurrence of species in riparian buffers adjacent to the Site, and best professional judgement on  species establishment and anticipated Site conditions in the early years following project  implementation. Species chosen for the planting plan are listed on Sheet 2.0 of the preliminary design  plans located in the Appendix. The plans also contain information on planting zones on Sheets 2.1.  Trees will be planted at a density sufficient to meet the performance standards outlined in the Rule 15A  NCAC 02B .0295 of 260 trees per acre at the end of five years. No one tree species will be greater than  50% of the established stems.  An appropriate seed mix will also be applied to provide temporary  ground cover for soil stabilization and reduction of sediment loss during rain events in areas disturbed  by stream construction, as necessary. This will be followed by an appropriate permanent seed mixture.    While planting isn’t anticipated to be needed in the cattle exclusion areas, except where required in the  stream mitigation plan, a seed mix will be applied where cattle have caused bare soils and removed all  vegetation.  There will be no parcel preparation work done in the buffer preservation areas.  Site preparation and planting is scheduled to begin in January 2019.  4.0  Monitoring and Maintenance Plan  4.1  Monitoring Protocol   Permanent vegetation monitoring plots will be installed and evaluated within the buffer restoration  and/or nutrient offset areas to measure the survival of the planted trees. There may be additional plots  within the riparian buffer that are measuring the success of the riparian areas as part of the stream and  wetland mitigation bank, but only the plots measuring the success of the riparian buffer credit will be  provided in the monitoring reports.  The plots will be randomly placed throughout the planted riparian  areas and will be representative of the entire top of bank back two‐hundred feet, more or less.    A total of 5 plots will be established within the buffer restoration credit generation area. The number of  monitoring quadrants required is based on the USACE Wilmington District monitoring guidance  documents. The size of individual quadrants will be 100 square meters for woody tree species.  Vegetation assessments will be conducted following the Carolina Vegetation Survey (CVS) Level 2  Protocol for Recording Vegetation (2008). A reference photo will be taken from the southwestern corner  of each of the 5 plots. Photos will be taken from all photo points each monitoring year and provided in  the annual reports. All planted stems will be marked with flagging tape and recorded.   Planting is scheduled for January 2019. The first annual monitoring activities will commence at the end  of the first growing season, at least five months after planting has been completed and no earlier than  the fall season. Species composition, height, and survival rates will be evaluated on an annual basis by  plot. The total number of volunteer woody stems will also be documented and reported. The measures  of vegetative success for the Parcel will be the survival of at least 4 native hardwood tree species, where  no one species is greater than 50% of the established stems, established at a density of at least 260  planted trees per acre at the end of Year 5. Native volunteer species may be included to meet the  performance standards.   A visual assessment of the cattle exclusion and preservation areas within the conservation easement will  also be performed each year to confirm:      South Fork Mitigation Site   HUC 03030002 – BPDP 6   Fencing is in good condition throughout the site;   no cattle access within the conservation easement area;   no encroachment has occurred;   diffuse flow is being maintained in the conservations easement area; and   there has not been any cutting, clearing, filling, grading, or similar activities that would  negatively affect the functioning of the buffer.   Any issues identified during the visual assessment of the cattle exclusion and preservation areas will be  photographed and mapped as part of the annual monitoring report with remedial efforts proposed or  documented.  The Sponsor shall submit the annual monitoring report to DWR by December 31st of each  year for five consecutive years and will follow the terms and conditions of the MBI.  4.2  Parcel Maintenance  Adaptive measures will be developed or appropriate remedial actions will be implemented in the event  that the Parcel or a specific component of the Parcel fails to achieve the success criteria outlined in  Section 4.1. Site maintenance will be performed to correct any identified problems on the Parcel that  have a high likelihood of affecting project success. Such items include, but are not limited to, excess tree  mortality caused by fire, flooding, drought, or insects. Any actions implemented will be designed to  achieve the success criteria and will include a work schedule and updated monitoring criteria. Any parcel  maintenance performed will be included in the monitoring report for that year. A rigorous herbicide  schedule will need to be implemented in the first few years of tree establishment in the restoration  areas to prevent establishment of invasive species that may attempt to out‐compete the planted native  vegetation. The only herbicides used on the Parcel will be aquatic approved herbicides that will be  applied in accordance with North Carolina Department of Agriculture rules and regulations. The  easement boundary will be checked annually as part of monitoring activities and the conditions as well  as any maintenance performed will be reported in the annual monitoring reports to NC DWR.  If mowing is deemed necessary by the Sponsor during the monitoring period, the Sponsor must receive  approval by the DWR prior to any mowing activities within Zone 1 and Zone 2 of the Jordan Lake buffers  to ensure that no buffer violations have occurred.    4.3  Easement Boundaries and Fencing  Easement boundaries will be identified in the field to ensure clear distinction between the Parcel and  adjacent properties. Boundaries may be identified by fence, marker, bollard, post, tree‐blazing, or other  means as allowed by site conditions  and/or  conservation  easement.  Boundary  markers  disturbed,  damaged, or destroyed will be repaired and/or replaced on an as needed basis.   5.0  Financial Assurance  Following approval of the South Fork BPDP, the Sponsor shall provide a Performance Bond from a surety  that is rated no less than an “A‐“ as rated by A.M. Best. The Performance Bond amount shall be 100% of  the estimated cost for implementation of the project as described in the BPDP, but not less than  $150,000.00. In lieu of posting the performance bond, the Sponsor may elect to construct the project  prior to the first credit release. In that case no performance bond will be necessary.  After completion of the restoration/construction, a separate Performance/Maintenance Bond will be  secured for 100% of the estimated cost to implement the monitoring and maintenance plan but not less  than $100,000.00. The Performance/Maintenance Bond shall apply at the inception of the monitoring  period for a term of one year, to be extended annually for a minimum of five years. Upon DWR  approval, this may be lowered each year based on the adjusted cost to complete the monitoring.      South Fork Mitigation Site   HUC 03030002 – BPDP 7  Performance bonds for monitoring shall be renewed to cover the next years monitoring period, with  confirmation of renewal provided to DWR with each annual monitoring report when applicable.  DWR  reserves the right to alter the credit release schedule if monitoring reports are submitted without proof  of bond renewals when applicable.  Financial assurances provided in this section must be separate from the financial assurances provided as  part of the Stream and Wetland Mitigation Bank.  6.0  Mitigation Potential  Approximately 18.13 acres will be protected with a permanent conservation easement. Out of the 18.13  acres, a total of 15.40 acres of riparian areas will be mitigated to generate Jordan Lake riparian buffer  credit or nutrient offset credit.  Out of those 15.40 acres, 5.54 acres will be restored, 8.84 acres will be  enhanced by permanently excluding livestock and stabilizing soils, 0.56 acres will be enhanced through  supplemental plantings, and 0.46 acres will be preserved (Figure 5).  Of the 5.54 acres that are restored,  all 5.54 acres were deemed suitable for either buffer credit or nutrient offset credit by DWR. These  areas may be used for either Jordan Lake buffer credits or nutrient offset credits, but not both. Out of  the 5.54 acres that are restored, the Sponsor is requesting all 5.54 acres to be used to generate credit  releases for riparian buffer credits.  Neither riparian buffer nor nutrient offset credit will be generated  on the remaining 2.73 acres (Figure 5).   Riparian zones are depicted in Figure 6.  The Sponsor will maintain four (4) credit ledgers. One to account for buffer preservation credits, one to  account for buffer restoration credits, one to account for Nitrogen nutrient offset credits, and one to  account for Phosphorus nutrient offset credits.  Overall credit generation by drainage feature is detailed  in Table 4. The total credit generation is summarized in Table 5.  The Sponsor must request and receive  approval from DWR prior to any credit conversions and transfers to the credit ledgers. With each  conversion and transfer request submitted to the DWR, the Sponsor will provide all updated credit  ledgers showing all transactions that have occurred up to the date of the request. Buffer preservation  and enhancement credits from this Bank cannot be converted into Nutrient offset credits.  Table 4. Mitigation Activities by Drainage Feature – South Fork BPDP Feature Name DWR Feature Reference Riparian Buffer Restoration       (Acre)Top of Bank ‐100’ Riparian Buffer Enhancement – Cattle Exclusion (Acre) Top of Bank – 100’ Riparian Buffer Enhancement – (Acre) Top of Bank – 100’ Riparian Buffer Preservation–   (Acre) Top of Bank – 100’ % Total Area SF4A   SF  2.73  6.1  0.56 0.46 64.0%  UT1  UT1  0.44  0.78  007.9%  UT2  UT2  2.37  0  0015.4%  UT3  UT3  0  0  000%  UT4  UT4  0  1.96  0012.7%  UT5  UT5  0  0  000%  Total acreage mitigated  5.54  8.84  0.56 0.46 15.40   % Total Area 36.0% 57.4% 3.6%3.0%100%      South Fork Mitigation Site   HUC 03030002 – BPDP 8    Table 5: Credit Generation Summary – South Fork BPDP  Mitigation  Type Buffer Zone** Credit Type Total  Acreage  Credit  Ratio  Credited  Acreage*  Credit Per  Acre or Pound  Per Acre  Mitigation  Credit  Restoration  Zone A: Top of  Bank – 50’  Riparian  Buffer  Or  3.86  1:1  3.86  43,560 ft²/ac  168,141.60 ft²  Nutrient  Offset  Nitrogen  3.86  N/A  3.86  2,249.36  lb./ac* 6,164.60lbs.  Nutrient  Offset  Phosphorus  3.86  N/A  3.86  143.81  lb./ac** 371.92 lbs.  Zone B: 51’‐ 100’  Riparian  Buffer  Or  1.68  1:1  1.68  43,560 ft²/ac  73,180.80 ft²  Nutrient  Offset  Nitrogen  1.68  N/A  1.68  2,249.36  lb./ac* 2,683.04 lbs.  Nutrient  Offset  Phosphorus  1.68  N/A  1.68  143.81  lb./ac** 161.87 lbs.  Cattle  Exclusion  Zone A: Top of  Bank – 50’  Riparian  Buffer 7.39  2:1  3.70  43,560 ft²/ac  161,172.00ft²  Zone B: 51’‐ 100’  Riparian  Buffer 1.45  2:1  0.73  43,560 ft²/ac   31,798.80 ft²  Enhancement  Zone A: Top of  Bank – 50’  Riparian  Buffer 0.40  2:1  0.20  43,560 ft²/ac  8,712 ft²  Zone B: 51’‐ 100’  Riparian  Buffer 0.16  2:1  0.08  43,560 ft²/ac  3,484.80 ft²  Preservation  Zone A: Top of  Bank – 50’  Riparian  Buffer 0.32  10:1  0.03  43,560 ft²/ac  1,306.80 ft²  Zone B: 51’‐ 100’  Riparian  Buffer 0.14  10:1  0.01  43,560 ft²/ac  435.60 ft²   Total Buffer Credits (no Nutrient Offset Proposed)  448,232.40 ft²  Total Buffer Credits (with Nutrient Offset Proposed) 206,910 ft²  Total Nitrogen Offset Proposed 8,847.64 lbs.  Total Phosphorus Offset Proposed 533.79 Lbs. * Delivery Factor of 71%  ** Delivery Factor of 67%  7.0  References  USDA, Soil Conservation Service, 1937. Soil Survey of Chatham County.    USDA, Soil Conservation Service, 2015. Soil Survey of Chatham County.      FIGURES       ^_ 03030002 Haw River Arm Upper New Hope Lower New Hope ¹ County Boundaries HUC 03030002 Jordan Lake Sub-Watersheds Service Area - Riparian Buffer and Nutrient Offset Credits ^_South Fork Mitigation Bank Parcel Location Figure 1 Service Area MapSouth Fork Mitigation Bank ParcelBank Parcel Development PackageCape Fear River Bain 03030002 Chatham County, NC 0 105 Miles ^_ South Fork Bank Parcel Location Chatham County, NC Figure 2 Vicinity MapSouth Fork Mitigation Bank ParcelBank Parcel Development PackageCape Fear River Basin 03030002¹0 0.750.375 Miles SF4A UT2UT4UT1U T3 UT5 SF4ASF4A Chatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Project Streams Topographic Contours 5' Figure 3 Site MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography Chatham County, NC 0 750375 Feet ¹ Soil Survey of Chatham County, NC - 1937 Figure 4 Soils MapSouth FOrk Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 Conservation Easement (18.13 ac) 30' Internal Easement Crossing SF4A UT2UT4UT1U T3 UT5 SF4ASF4A Chatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Stream Mitigation (1.85 ac) Buffer Restoration (5.54 ac) Cattle Exclusion (8.84 ac) Buffer Enhancement (0.56 ac) Buffer Preservation (0.46 ac) No Credit (0.88 ac) Figure 5 Buffer Credit Determination MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography SF4A UT2UT4UT1U T3 UT5 SF4ASF4A Chatham County, NC 0 350175 Feet ¹ Chatham County Parcels Conservation Easement (18.13 ac) Stream Mitigation (1.85 ac) Zone A: Top of Bank to 50' (11.97 ac) Zone B: 51'-100' (3.43 ac) No Credit (0.88 ac) Figure 6 Riparian Buffer Zones MapSouth Fork Mitigation Bank ParcelBank Parcel Development PlanCape Fear River Basin 03030002 2013/2014 Aerial Photography APPENDIX        4585422.5 2012 = 500' 4585422.5 2010 = 500' 4585422.5 2009 = 500' 4585422.5 2008 = 500' 4585422.5 2006 = 500' 4585422.5 2006 = 500' 4585422.5 2005 = 500' 4585422.5 1998 = 750' 4585422.5 1993 = 500' South Fork Mitigation Site    Existing Conditions Photographs     February 2016      SF4A      SF4A    UT1    UT2    UT3    UT4  South Fork Mitigation Site    Existing Conditions Photographs     February 2016     UT5        North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Office of Archives and History Secretary Susan Kluttz Deputy Secretary Kevin Cherry Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 July 1, 2016 Ruby Davis Wildlands Engineering 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Re: Cane Creek Mitigation Bank, Alamance and Chatham Counties, ER 16-1133 Dear Ms. Davis: Thank you for your email of June 24, 2016, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-807-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Bartos SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Road, Ste 225Raleigh, NC 27609Tel: 919.851.9986Firm License No. F-0831Date:Revisions:PRELIMIN ARY DO NOTUSE F OR CONSTRUCTIONF:\Projects\005-40045 Cane Creek\CADD\South Fork Site\Plans\40045-SF-Planting Plan.dwgOctober 30, 2017Cane Creek Umbrella Mitigation Bank - South Fork SiteChatham County, North CarolinaPlanting Tables005-40045CLMANAGAT2.010.18.2017Zone 1 - Streambank Planting Zone (See Detail 2, Sheet 5.6) Zone 2 - Buffer Planting Zone (See Detail 1, Sheet 5.6) Zones 1 and 2 0'100'200'300' (HORIZONTAL)SheetChecked By:Job Number:Drawn By:Project Engineer:312 W. Millbrook Road, Ste 225Raleigh, NC 27609Tel: 919.851.9986Firm License No. F-0831Date:Revisions:PRELIMIN ARY DO NOTUSE F OR CONSTRUCTIONF:\Projects\005-40045 Cane Creek\CADD\South Fork Site\Plans\40045-SF-Planting Plan.dwgOctober 30, 2017Cane Creek Umbrella Mitigation Bank - South Fork SiteChatham County, North CarolinaPlanting Plan005-40045CLMANAGAT2.110.18.2017NNote: Non-hatched areas within easement are currently vegetated, and will be planted as needed to achieve target density. Zone 1 - Streambank Planting Zone (See Detail 2, Sheet 5.6) Zone 2 - Buffer Planting Zone (See Detail 1, Sheet 5.6) CE CECECECECECECE C E C E CECECECECECECECECECECECECECE CE CECECECE CE CECECECE CE CECECE CE CE CE CE CEC E CEC E C E CEC E C E C E CECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECE CE CE CE CECECECECECE CE CECECECE CE C E CE CECECECECECECECECECECECECECECECECECEC E C E C E C E CECECECECECECECECECECECECECECECECECECECECECECECEUT 1SF4A U T 2UT3UT4 JO H N N Y L I N D L E Y R O A D EC1EC2UT5