HomeMy WebLinkAbout20131200 Ver 5_Stormwater Calculations_20170818STORMWATER CALCULATIONS TRYON EQULSTRIAN PROPERTIES, LLC Polk County, North Carolina August 15, 2017 Odom Engineering PLL NC FIRM# R-0880 169 Oak Street Forest City, N.C. 28043 628-247-4495 Summary............................................................................... .................................................................>.,..............,........................ 1 US65 Map.......................................................... ..... ........................................ 2 BMP Calculations Summary.................................................................. Stablehouse Inn Site Drainage Areas............................................................ 3 7 Stablehouse Inn Site Drainage Area Map ............................... ......................................................................................................... StablehouseInn North....................................................................... ............................................................ 9 Stablehouse Inn North Calculations ....................................... StablehouseInn South ...................................................................................................... ... 17 Stablehouse Inn South Calculations ................................................................. 18 StablehouseInn East............................................................................. StablehouseInn East Calculations .................................................................................. ................................, ....... ...................... .. 26 Covered Arena .................................. 28 Covered Arena Calculations ..................................................................................................................................................... 29 VillageWest ........................................................................................................................................................................................ .......,.............................,........................................................................ 36 Village West Calculations............... .......................----.............................................................................................. Village East Drainage Areas.............................................................. 37 . 44 Village East North................................ .....................................,....,.........................................,...........,................. ...................................................................................................................... Village East North Calculations 45 ................................................................ .................46 VillageEast South..................................................................................................... ... 53 VillageEast South Calculations.................................................................................................................... ...................... 54 VillageEast Middle..................................................................................................... ......... 61 Village East Middle Calculations ....................................................................................... ................. Salamander Drainage Areas...................................................................... 62 .......,...,...........................,.......................,...................... 68 Salamander North.................. ......................................................................................••,............................................................... 69 SalamanderNorth Calculations .................................................................................................. ................. 70 SalamanderSouth ........................................................................... ................. SalamanderSouth Calculations 77 ........................................................................................................ .......... .................................... O & M Agreement 78 SUMMARY The purpose of the enclosed calculations is to determine the necessity of a detention system for each drainage area located at the Tryon International Equestrian Center by examining the pre -construction and post -construction runoff velocity. A BMP is required for any drainage areas where the post -construction velocity exceeds that of pre -construction. Each required BMP has been designed to discharge stormwater flow at a rate equal to or less than the pre -construction velocity for that drainage area. The following drainage areas have been identified for the enclosed calculations and BMP determinations: 1. Stablehouse Inn • Stablehouse Inn North • Stablehouse Inn South • Stablehouse Inn East 2. Covered Arena 3. Village West 4. Village East ■ Village East North ■ Village East Middle ■ Village East South S. Salamander North 6. Salamander South ** * Stablehouse Inn East is the only drainage area that does not require detention. Based on the enclosed calculations, the post - construction runoff velocity is less than the pre -construction runoff velocity. ** A wet detention pond is proposed for Salamander South to replace a prior approved wet detention pond being removed. The calculations included with this report determined that the following BMPs will be required: 1. Wet Detention Pond 2. Dry Detention Pond (2) 3. ADS Stormtech Pipe System Nr4Ydi4 67ATO STAT4 ar MrTM GSwxll� } , PWATRIMIT of Til[ INTEMQR asPamatenx oc MA -URA PIy91RPl'M MA MIE OIIALRkWLE �441iJi4 $I/RY�j' Aitl WI•.�w7T !wrf�M4oILYi J•MTM ::Nc�luA ,� >U •.'mar �_........ . .�...r 9lSnCll i+iglu r.5 w W �iR.e[s �4reea}w'sr Y' �i � rr•. "� w•+'r ',k I ; ` ,' f l � arm �;5 '_ _ -_ ,1 + ,•Y`.-• err.. _ rG�: r r� ""'N - , •y Iv • A-tl _ 77. - ��,� `;3' -- —��.-- --- -- � �- - � " IAS • R � - L + � I i�lIY I � ' � R I + � M • ' S •Y+'I I � � ' i; r S1• � 0 _.—. • ` I l i f el�it. r. W/Arca MMOdlarnm�uMaxlru s.� _ ••�wiry „ a--' . r—_ A: rn:!l.IIPa'ruu w:w� .. �:c•I�rrr�w - �� I �u en® •nsl�r►r�.�rL :.�.�... r•+nrrt '� qW ^•'=-rirlb. r+lka aw a.,r: i.lx '4�7 �� '.t `���'N' r.f�..r:T'1ti la♦IOq�N... 4 +�.�Lueo-r.I r+Lu�r.. �t ��� " -' + e P"..r.y,.y t•`i FEE' 1'I� __�.rrh xn l7 , wr.i wllne �°:wairned.ue [_y,:w.u.le.. [J.14•-�`f�.r nn .. •wxrl.4 rr Iw ;. .i." r P1 -A NMI!. N. L- •w!•�a; u�nmcs+�...w 'OLwn rrw�.s. •� u�i�..'.iuera.r •�.• Basin Mader RrctNarm; Hydrology Studio v 2,0A48 09-16-2017 1x147+ E h. xKn 9lodelnu� f E P+f Vllags FAN �pyhr C—d arena Prt wlloe � Pex naln J 'm4peC".2.N wuuewP. Selem��trSehr 1411ae€lb�lafdm e VPiU.L VW.W HN Vlore E =1-9, 94blhdae E Mea - VI`rpo-1 9•ANd09 ' v"" %Y Pae ` • r vAa7ow Roma, Ox"HWHN {ee hftml . N Pod _..— Wlan dtrmylyyp soaxnouoe g 1'aj Sledenourr N Pm Nbr— N 9Fonpa 3W nuKarx Fe .•ll.hlmmea$ Pml - ' Stedenw�p g'lofep MI—dor 9 Pad 91lVnpeder97aoraae 4;4v 7h -For. '�wx+CPlFY 9huv Hydrograph 25 -yr Summary Hydrology Studio v 2.0.0.48 Project Name: 08-16-2017 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cult) 1 Rational Village E Pre North 14.70 0.08 4,411 ---- 2 Rational Village E post north 38.84 0.08 11,653 ---- 3 Rational Village E post south 38.62 0.08 11,587 --- 4 Pond Route Village E storage N 13.00 0.17 11,646 2 103.09 6,676 5 Pond Route Village E Storage S 12.81 0.17 11,561 3 103.03 7,001 6 Rational Village EPost Middle 30.41 0.08 9,122 ---- 7 Pond Route VillageE Storage Mld 6.147 0.17 9,115 6 103.60 6,814 8 Rational Village E Pre South 17.54 0.08 5,263 ---- 9 Rational Village W Pre 39.51 0.08 11,853 ---- 10 Rational Village W Post 58.48 0.08 17,543 ---- 11 Pond Route Village W Storage 12.67 0.17 17,510 10 103.44 12,959 12 Rational Salamander N Pre 15.13 0.08 4,539 ---- 13 Rational Salamander N Post 48.94 0.08 14,682 ---- 14 Rational Stablehouse N pre 13.45 0.08 4,036 ---- is Rational Stablehouse S Pre 7.871 0.08 2,361 ---- 16 Rational Stablehouse E Pre 6.377 0.08 1,913 ---- 17 Rational Stablehouse N Post 33.48 0.08 10,045 ---- 18 Rational Stablehouse S Post 9.566 0.08 2,870 ---- 19 Rational Stablehouse E Post 5.912 0,08 1,773 ---- 20 Pond Route Salamander N Storage 7.117 0.17 14,674 13 872.27 12,223 21 Pond Route Stablhouse N Storage 5.745 0.17 10,039 17 905.61 7,910 22 Pond Route Stablehouse S Storag 7.252 0.08 3,204 18 102.41 347 23 Rational Salamander S Pre 6.782 0.08 2,035 ---- 24 Rational Salamander S Post 29.53 0.08 8,859 ---- 25 Pond Route Salamander S Storage 0.085 0.17 8,763 24 906.74 8,829 26 Rational Covered Arena Pre 101.0 0.08 30,315 ---- 27 Rational Covered Arena Post 162.1 0.08 48,630 ---- 28 Pond Route Covered Arena Storag 61.79 0.17 48,624 27 105,84 26,014 OF Report (infi'lr) Tc `:-yr IN filename:7RYQN.idf lorology 5rudic v 2.0.4.48 bO-yr (min) 1.00 1.00 1.00 08.16-2017 Equation 0 7.47 Intensity = S! (Tc + D),, (inMr) 0 2 yr 3 -yr Coefficietr#s 1 -yr 3 -yr 3 -yr 6 -YF 10 -yr 2&yr 50 -yr 100 -yr 8 50,4258 72.3721 n1000 0-00DO 71-33M 65.&673 0.40130 63.21 Bi D 12.50{30 13.1 ODD 0 00DO U•0000 12.1 DOC 14.8000 0.DD00 9.6000 E 0.8853 0,8838 0.0000 0.0000 0,7948 0.7378 4.0000 4.5622 WrWrnum 7� = 5nviwres (infi'lr) Tc `:-yr 10 -yr 26 -yr bO-yr (min) 1.00 1.00 1.00 1.13D 1 -OD 0 7.47 1 -yr 0 2 yr 3 -yr Cf 6.99 1-60 8.28 1.00 1.00 5 4 4.72 0 5.5D 0 10 6-30 3,78 4.04 4.51 0 16 4 3.16 4.25 3.79 0 20 3.34 2.73 6 3.28 0 25 3-E2 2.40 4.47 2.90 0 30 0 2.15 D 2,60 0 35 3.96 1.95 2.52 2.36 4 40 8 1.78 2.83 2.16 0 45 1.65 2.00 0 60 1.53 1.86 0 66 1.43 1.74 0 s0 1,34 1,03 4 Gf r CdrfEti.h'bn FjPUw v0rad to Ro t=&( MB1fJ�[Y rLratlffa49fip97Ji. I i I j I 9- 4- 2 2 1 0 5 10 15 20 Intensity Values (infi'lr) `:-yr 10 -yr 26 -yr bO-yr 100 -yr 1.00 1.00 1.00 1.13D 1 -OD 0 7.47 8.56 0 10.46 .0 8.09 6.99 0 8.28 0 5.18 B96 4 7-12 0 4.53 5.23 0 6-30 0 4.04 4.68 0 5-68 4 3,05 4.25 0 5.18 9 3.34 3.90 6 4.80 4 3.08 3-E2 0 4.47 d 2.66 3.37 0 4.19 D 2.68 3.17 0 3.96 0 2.52 2. GG 0 3,75 8 2.38 2.83 0 3.57 Tryon OF Curves 25 3I) 35 40 45 50 55 61) time (min) - 100yr 25yr -- 10yr 2yr lyr Precipitation Report Precipitation filenamepolkpcp Hydrology Studio v 2.0.0.48 08-16-2017 Active 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr .. 100 -yr Active NRCS/SCS Storms > SCS Dimensionless Storms SCS 6hr 1.20 1.50 0 1.86 2.18 2.64 3.01 3.41 Type 1, 24 -hr 0 0 0 0 0 0 0 0 Type 1A, 24 -hr 0 0 0 0 0 0 0 0 Type 11, 24 -hr 2.62 3.17 0 4.00 4.66 5.56 6.28 7.02 Type II FL, 24 -hr 0 0 0 0 0 0 0 0 Type III, 24 -hr 0 0 0 0 0 0 0 0 Synthetic Storms > IDF-Based Synthetic Storms 1 -hr 1.34 1.63 0 0 2.38 2.83 0 3.57 2 -hr 1.57 1.92 0 0 2.94 3.60 0 4.73 3 -hr 1.69 2.07 0 0 3.28 4.09 0 5.51 6 -hr 1.89 2.32 0 0 3.87 5.00 0 7.08 12 -hr 2.08 2.55 0 0 4.53 6.07 0 9.03 24 hr V 2.26 2.79 0 0 5.25 7.32 0 11.46 Huff Distribution > 1st Quartile (0 to 6 hrs) 1 -hr 0.76 0.98 0 1.33 1.61 2.01 2.34 2.69 2 -hr 0.89 1.14 0 1.50 1.80 2.24 2.60 2.99 3 -hr 0.98 1.24 0 1.59 1.90 2.33 2.68 3.07 6 -hr 1.20 1.50 0 1.86 2.18 2.64 3.01 3.41 Huff Distribution > 2nd Quartile (>6 to 12 hrs) 8 -hr 0 0 0 0 0 0 0 0 12 -hr 0 0 0 0 0 0 0 0 Huff Distribution > 3rd Quartile (>12 to 24 hrs) 18 -hr 0 0 0 0 0 0 0 0 24 -hr 0 0 0 0 0 0 0 i 0 Custom Storms 5fi > Custom Storm Distributions i ` `My Custom Storm 1 p: 0 0 0 0 0 p 0 0 My Custom Storm 2 0 0 0 0 0 0 0 0 My Custom Storm 3 0 0 0 0 0 0 0 0 t My Custom Storm 4 0 0 0 0 0 0 0 0 iMy Custom Storm. 0 0 0 0 0 0 0 p { i rr My Custom Stortn & 0 0 0 0 0 0 0 0 My Custom Storm 7 0 0 0 0 0 0 0 0 My Custom Storm 8 0 0 0 0 0 0 0 0 My Custom Storm 9 0 0 0 0 0 0 0 0 My Custom Storm, 10 0 0 0 0 0 0 0 0 Gn STABEENOUSE INN SITE DRAINAGE AREAS The pre -development Stablehouse Inn site drainage area is divided into three areas: North, South, and East. Stablehouse Inn North and South drainage areas are a result of an existing hill causing water in flow in both directions. Calculations were derived using Hydrology Studio software for all three drainage areas. Stablehouse Inn North discharges to an existing Swale located northwest of the Stablehouse Inn site. Stablehouse Inn South flows to an existing 24" culvert under John Shehan Road and follows the roadside ditch along Moore Road until discharging to White Oak Creek. The Stablehouse Inn East collects water discharged by an existing culvert that crosses under Hwy 74. ,Sol w w %. 40 4f LL PRO '4. .01 Ncy 10 li X -M 442 7i� T A M I" STABLEHO EAST DIS4 T4 STABLLHOUSE SOUTH RUNOFF To' WHITE OAK CREEK GREEN RIVER e't ea Af, er, .-- - - -------- . . ...... .. New Zion CM STABLEHOUSE INN NORTH: The pre -construction runoff, post -construction runoff, and BMP discharge rates for Stablehouse Inn North are as follows: Pre: 13.45 cfs Post: 33.48 cfs BMP outlet flow: 5.75 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Stablehouse Inn North hydrograph. Post -construction runoff values for Stablehouse Inn North are greater than the pre -construction values, therefore, itwas determined that a detention system is required. Stablehouse Inn North runoff results have changed due to modifications in the design. This area is now accepting additional flows from the Stablehouse Inn South area. The post -construction runoff values for the Stable North were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up asa detention pond that is 8 ft. deep with dimension of 100'x50' and utilizes a 3' x 3' riser basin with a trash rack and 12" orifice discharging through a 24" pipe. Hydrograph Report Hydrology Studio v 240,48 tablehouse N pare Hydrograph Type = Rational Storm Frequency - 25 -yr Time interval r 5 min Drainage Area = 2,62 ac Tc Method = user IDF Curve = TRYON,idf Freq, Corr. Factor = 1.00 Composite C Worksheet AREA�ac) C DESCRIPTION 0.s0 u.95 A9phak 0.44 0 a0 84crniq Roof 1.19 0.20 Grass 2AZ 8.60 VVai0teaAvarape Cf Project Name: M-16-201} Hyd. No. 14 Peals NOW = 13.45 cls Time to Peak = 0.08 hrs Runoff VoJome = 4,038 tuft Runoff Coeff. = 0.6* Time of Conc. (Tc) _ 5.0 min Intensity - 8.5578 In/hr Asc/Rec Limb Factors = ill QP = 13.45 ofs Time {min} I Il H drop raph Report Hydrology Studio v x,0.0.48 Stablehouse N Post Hydrogmph Type = Rational Storm Ffequency - 25 -yr Time Interval = 5 min Drainage Area = 5.36 ac Tc Method = User IDF Curve = TRYON.idt Freq, Corr. Factor = 1.00 Carnposite C Worksheet AREAtec) C ❑ESCROPTrON 2.a2 0.95 A.spha9 1.06 0.94 Builoiv Roof 1.4B Q.20 Grass 5,36 C73 LVBighroeAwAftUA 38 36 34 32 30 28 26 24 22 20 a' 18 16 14 12 10 8 6 4 2 0 V Project N3rne: f)5.1b�ZOW Hyd. No. 17 Peak Flow - 33,48 cfs Time to Peak = 0.08 hrs Runoff Volume = 10,045 cuft Runoff Coefi. = 0.73* Tare of Conc. (7c) = 5.0 min Intensity 5.5576 in/hr ASORec Limb Factors 111 [!p c 33.48 efs 1 2 3 4 5 6 7 6 9 10 Time (min) Hydrograph Report Hydrology Studio v ?,D.OAS tablbouse N Storage Hydrograph Type - Pond Route Storm Frequency = 25 -yr Time Interval = 5 min iriftw Hydrograph = 17 - Stablehouse N Past Pond Name = Stablehouse N Storage Pard RMIMP by Storage Indreabon McMod 38 M) 34 32 30 28 26 24 22 20 � 7$ 16 14 12 10 8 6 4 2 Qp 5.75 cfs I 1 I Project Name; 68-16-2017 Hyd. No. 21 Peak Flow = 5,745 cfs Time to peak = 0.1�hrs Hydrugfaph Volume = 10,039 cuff Max. Elevation = 905.61 ft Max. Storage = 7,910 tuft Center*} mass detention time = 17 min 0 10 20 30 40 50 60 70 80 90 Yim,o (min) - Req`d Star Stablehouse N Rost — Stablhouw N Storage 100 110 120 130 Pond Deport Hyrirolagy Studio v 2.0.6.4$ Stahlehouse N Storage 908 907 gas w 904 403 402 u User Defined Contours Description Input Sottorn Elevatlon, ft 902,E Voids (%) 100,00 Volume Calc Conic Prnjerr Namp, 08.16-2017 Stage -Storage Stage f Storage Table Stage Ott} Elevation lftj ContburAma {sgit� incr. Storage (tuft) Total Storage (cuit) 9.00 9�-OQ t,b36 x.401} d-800 1,00 904.dd 2,000 1.763 1.763 2.06 944.40 2.496 2.243 4,006 3.00 905.00 3.024 2,756 6,781 4,00 9N.DO 3.583 3.799 16.001 5,40 907.00 4,768 3471 13,932 6.04 908.44 4,779 4,470 18.402 Stage -Storage zulxO 4000 5000 8000 1Q0g4 12000 14000 16000 1 M Total Storage (cutt) -- Cantoors • Top of Pond 14 Pond Report Hydrology Studio v 2.0048 Stablehouse N Storage Culvert 1 Orifices Rise„ in Span, in No Barrels Invert Elevation, it Orifice Cneft-eient, Co Length, ft Barrel Slope, % N -Value, n Weirs Shape /Type Crest Elevntion, ft Crest Length, ft Angle, deg Weir Coefficient, Cw 'Rouros YrFq t? GunmF2. Culvert 24 24 1 902 .6 36 16.6 0.013 Riser Box 906 12 Project Name: M-16.1417 Stage -Discharge Orifices Orifice Plate 1` a � 12 Orifice Hise,in 12 Orifice Span.irt 1 No. Orrhmi 902.01 Invert Qlevat9on, ft .6 Height, ft Orifice Coufflaent, Co Weirs 1 2 3 Cipoletfi Rectangular Reclangular 907 910 10 16 3.3 3.3 3.3 Stacie-Disichar e Ancillary Exfiltration. !Or Tailwater Elevation, 4 U IG 15 20 25 30 35 40 45 50 55 60 65 pischarge (cfs) Top of Pond Culvert — Riser — Orifice Cipin IPtti Total Q 4A m `Aj Hydrology Studio v 2.0.0.48 Stablehouse N Storage Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (cuft) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) (c (cfs} (cfs) User {cfs) Total {cfs) 1 2 3 1 2 3 0.00 902.00 0.000 0.00 0.00 0.00 0.00 0.00 0.00 1.00 903.00 1,763 2.300 is 2.300 0.00 0.00 0.00 2.300 2.00 904.00 4,006 4.053 is 4.052 0.00 0.00 0.00 4.052 3.00 905.00 6,761 5.348 is 5.348 0.00 0.00 0.00 5.348 4.00 906.00 10,061 6.531 is 6.428 0.00 0.00 0.00 6.428 5.00 907.00 13,932 29.21 is 1_970 27.23s 0.00 0.00 29.20 6.00 908.00 18,402 33.63 is 0.887 32.74 s 33.00 0.00 66.63 ourux Key: !c = infer conrrol, oc = outlet control, s = Submerged weir Pond Report ilydro[Qgy Stadia v 2-0.0.48 Stablehouse N Storage Stage (ft) Prq*t Name: 08-i6-2017 Pond Drawdown I STABLEHOUSL INN SOUTH: The pre -construction runoff, post -construction runoff, and BMP rates for Stablehouse Inn South are as follows: Pre: 7.87 cfs Post: 9.57 cfs BMP outlet flow: 7.25 cfs The Runoff Coefficient was calculated for the abovementioned runoff area and is shown on the Stablehouse Inn South hydrograph. Post -construction runoff values for Stablehouse Inn South are greater than the pre -construction values, therefore, it was determined that a detention system is required. Stablehouse Inn South runoff results have changed due to modifications in the design. Most of the runoff from Stablehouse Inn South now flows to the Stablehouse Inn North drainage area. The post -construction runoff values for the Stablehouse Inn South were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up using a 2' x 30' underground piping detention system using a 24" header and 24" pipe. i wl Hydregraph Deport fydr41o9Y 5tt4o w 2.0.0.48 Stablehoue S Pre Hydrograph Type = Rational Storm Frequency = 25 -yr Time intorvsi = 5 mire Drainage Area = 4.38 ac Tc Method = User OF Curve = TRYON.idf Freq. Carr. Factor 71,00 Cbmposiie C Warksheet = 8.5576 in/hr AREp(wQ C DESCRIPTION 4.Oa 0,95 A9pnsn 4.3 8.38 Grass 4.39 a2i Wek, Ndkverape Qp`7.87ds n Project Name: 08.15.2017 Hyd. No, 15 Peak Flow = 7.871 cfs T1me to Peak = 0.08 hrs Runoff Volume = 2,361 cuff Runoff Coeff. = 0.21 * Time of Conc_ QTc) = 5.0 min Intensity = 8.5576 in/hr AsclRec Limb Tractors = V1 V I t i 4 5 6 7 erne (min) I Ih Hydrograph Report Hydrology Studio 2.10.0.48 Stablehouse S Post Hydrograph Type = Rational Storm Frequency = 25 -yr Time Interval = 5 gun arainageArea = 2.07 ac Tc Method - User OF Curve = TRYONJdf Fret{. Carr. Factor -1.00 Composits C Worksheet = 50 min AREA(aa) C DESCRIPTION 0.$4 0.95 ASOOIC Asc/Rec Limb Factors Ma 0.20 Grass 2.07 054 WOigMed Average S 7 6 C1 5 4 3 1 0 c Project Name: 08-16-W7 QP = 9.57 cfs 3 4 5 5 7 8 9 10 Time (min) Hyd. No. 18 Peak Flew = 9.556 cfS Time to Peak = C.08 hrs Runoff Volume = 2,870 cuff Runoff Coeff. = Time of Conc. (Tc) = 50 min Intensity = 8.5576 in/hr Asc/Rec Limb Factors = 111 QP = 9.57 cfs 3 4 5 5 7 8 9 10 Time (min) Hydrograph Report Hydrology.SWC a v 2.0.0A8 Stablehouse S Storag Hydrugraph Type m Pond Route Storm Frequency 25 -yr Time Interval = 5 mire Inflow Hydrograph = 18 - Stablehouse S Past Pond Mame = Stablehouse S storage Pond RnOng by ,Storage tndicabw Method 11 10 9 E 7 6 u Cy 5 4 3 2 1 QP = 7.25 cfs Project Ptame' 08-16-2017 Hyd. No. 22 Peak Flow = 7.252 cis Time to Peak = 4,08 hrs Hydrograph Volume = 3,284 tuft Max. Elevation = 102.41 ft Max. Storage = 347 cuft Center 01 mass [6erWm time = 2 rmn 0 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 Time (min) Req'd Stor Stablehouse 5 Post ^ 5tabIchcuse S S#arag n Pond Report Hydrology Studio v 2 0_n_o 5tablebouse S storage Underground Chambers Description Input Invert Elev down, it 100,00 Chamber Rise, ft 24,00 Chernber Shape Circular Chamber Span. ft 24.00 Barrel Length, ft 30.00 No Berrels 1 Barrel Slope, % 0.25 Headers, yln No Stone Enaasemem, ylrl No Encasement Bottartl Elevation, ft OM Encasemenl Width per Chamber, ft ().Co 1.294 i Encasement Depth. $ 1 0,00 Encasement Voids, % 40.00 Project Name; 08-16-2017 Stage -Storage Stage f Storage Table stage ttl} Flevatton A CnntaurArea (50) ln4:r- storage �auftj Total Storage {coif) 0.00 100.100 rola 0,o�a o.a0o 1.24 101.20 nla 244 244 2.41 102.41 wa 450 a94 3,61 143.61 nil 570 1.294 4.82 104.82 nla 656 1,921 6.02 1 D5,02 nla 723 2,643 7.22 167-22 rva 773 3.416 $_43 108.43 n!a 812 4,229 9.63 109.63 nla 838 5,067 115-0 110-83 nla 857 5,823 1 Z.44 112.04 ala 866 6389 13.24 113.24 nra 8613 7,555 14.45 114,45 nra 856 B1511 15.55 115.65 nig 838 9,349 16.85 116,85 nta 813 10,162 98.06 118.6 nla 773 10,934 19.26 119.26 Fla 722 11.557 20.46 120.46 nfa 665 12,312 21.67 121.87 nra 570 12.862 22-87 122.87 Ne 454 13.332 2.4.08 124.08 nla 243 19,574 Mage -Storage 1 1 U iuuu 2uu9 z3UUU 40aa 5940 6000 70OU 8000 90 Total Storage (tuft) - UG Chambers ---- Tap of Pond 24 22 20 is 16 14 12 10 8 4 2 0 00 10000 11000 12400 13040 14040 Pond Deport Hydrology Studio v 2.0.0.48 Stablehouse S storage Project Name 4B -TG -2017 Stage -Discharge Culvert 1 Orifices culvert Orifices Perforated Riser 1 2 3 Rise, in 18 Peri. Rise, n Span, in 18 Peri. Span, n No- Barrels t No. Perforations Invert Elevation, ft 100.01 Invert Elevation fl Orifice C❑etLlebent, Ga Height,tt Length. It Orifice Coefficient, Ca Barrel Slope, % N -Value, n 4.400 Weirs Riser" Weirs Ancillary 1 2 3 Shape { Type Exfiiltfatlorl, 10r Crest Elevation, ft Tapwater Elevation, fl Crest Length, I Angle, deg Weir Coefficient, C 'routesb)r Luh CWvcft. Stage -Discharge 124 - 24 22 20 118- 18„...— 116 ...... —•- m.. i v 16 11q -: -- - — - ' -- --- 14 Ln 12 rp 110.-.._ — — - 10 .s 100 - -- -• - —� _. f I 1067 4 102 2 1w 0 0 2 4 6 5 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 discharge (ds) — Tap of Pond —Orifice Total Q Hydrology Studio v 2..0.0.48 Stablehouse S storage Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (cuft) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 100.00 0.000 0.00 0.00 1.20 101.20 244 5.614 5.614 2.41 102.41 694 10.92 10.92 3.61 103.61 1,264 14.37 14.37 4.82 104.82 1,921 17.13 17.13 6.02 106.02 2,643 19.51 19.51 7.22 107.22 3,416 21.63 21.63 8.43 108.43 4,229 23.56 23.56 9.63 109.63 5,067 25.34 25.34 10.83 110.83 5,923 27.00 27.00 12.04 112.04 6,789 28.57 28.57 13.24 113.24 7,655 30.06 30.06 14.45 114.45 8,511 31.47 31.47 15.65 115.65 9,349 32.83 32.83 16.85 116.85 10,162 34.13 34.13 18.06 118.06 10,934 35.38 35.38 1926 119.26 11,657 36.59 36.59 20.46 120.46 12,312 37.76 37.76 21.67 121.67 12,882 38.90 38.90 22.87 122.87 13,332 40.01 40.01 24.08 124.08 13,574 41.08 41.08 Suffix key. is = inlet control, oc - outlet control, s = submerged weir Pond Report Hydrology Studio u 2.0.0.48 Stablehouse S storage Project Name. 08�t6.2017 Pond Drawdown STABLEHOUSE INN EAST: The pre -construction and post -construction runoff rates for Stablehouse Inn East are as follows: Pre: 6.38 cfs Post: 5.91 cfs The Runoff Coefficient was calculated for the abovementioned runoff area and is shown on the Stablehouse Inn East hydrograph. Post -construction runoff values for Stablehouse Inn East are less than the pre -construction values, therefore, it was determined that a detention system is not required. H drograph Report Hydroingy Studio v Z,O.U.48 tablehouse E Pre Project Name: Q6-16-2037 Hyd. No. 16 Hydropraph Type Rational Peak Flow = 6.377 cfs Storm Frequency = 25 -yr Time to Peak = 0.48 hrs Time Interval = 5 min Runoff Volume = 1,913 cuff Drainage Area = 3.24 ac Runoff Coeff. = 023* Te Method = User Time of Conc. (Tc) = 5-0 min EDF Curve = TRYON,Idf Intensity = 8.5576 inthr Freq. Corr. Factor = 1. DO AscNec Limb Factors = III Composite C Warksheet AREA(ac) C OESCRIPTjpN 0.15 Q95 Asphed 3.1 0.20 Grass 3.24 0.23 Wei"dAvarage 6 5 d N 4 CY K 1 QP = 6.38 cfs U 1 2 3 4 S 6 7 8 1D Tame (min) Hydrograph Report Hydrology Studio v 2.0.0.46 Stahlehousc E Post Hydrograph Type = Rational Storm Frequency = 25 -yr Time Interval = 6 min Drainage Area = 3.14 ac Tc Method = User 1DF Curve = TRYON.idf Freq. Carr. Factor = 1.00 Composite C Worksheet = 8.5576 inlhr AREA(ac) C DESCRIPTION U. t 0.95 Asphah &D4 4.20 Grass 5A4 6.22 45fai"cl!Average 7 = 5,97 &Z Project Name.- 013-115-2017 ame. 4a-T15-2017 Hyd. Na. 19 Peak Flow = 5.912 cfs Tune to Peak = 0,D8 hrs Runoff Volume = 1,773 cult Runoff Cceff. = 0.22* Time of Conic. (Tc) = �.O min Intensity = 8.5576 inlhr AWRec Limb Factors = 111 U 3 4 5 6 7 $ 9 1p Time (min) COVERED ARENA The pre -construction runoff, post -construction runoff, and BMP discharge rates for the Covered Arena are as follows: Pre: 101.0 cfs Post: 162.1 cfs BMP outlet flow: 33.02 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Covered Arena hydrograph. Post -construction runoff values for the Covered Arena are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Stablehouse Inn South were routedthrough a detention system scenario within the Hydrology Studio software. The scenario was set up using a 112' x 48' underground piping detention system using 8 rows of 100 linear feet 6' diameter pipe with a 6' header and a 36" orifice. Hydrograph Report Hydrolpgy Studio v 2.4.0.48 Covered Arena Pre Hydrograph Type = Rational Storm Frequency 25 -yr Time Interval - 5 rein Drainage Area = 24.6 ac Tc Method = User IDF Curvs = TRYONAt Freq. Corr. Factor 1.00 Cnrr POrdte C waftheet = 5.0 min AREA(ac) C DE3GRIPTON 9.9 0.50 Rsphall Asc[Rec Limb Factors 143 4.20 Grans 24A OAS WelphtedAveraga 1 1 Cr Project Name, 08-16-2017 QP = 101.05 cfs V 3 4 5 6 7 8 9 10 Time (min) I Hyd. No. 26 Peak Flow = 101.0 cfs Time tD Peak = 08 hrs Runoff Voluble = 30,315 cuft Runoff Coeff_ = 0.48' Time of Conc. (Tc) = 5.0 min Intensity = 8,5576 in/hi Asc[Rec Limb Factors - 1f9 QP = 101.05 cfs V 3 4 5 6 7 8 9 10 Time (min) I H drograph Report Hyd(adogy Studio v 2.4.0.48 Covered Arena Past Hydrograph Type = Rational Storm Frequency = 2t -yr Time Interval = 5 min Drainage Area = 24.6 ac Tc Method = User IDF Curve = TRYON.Of Freq. Carr. Factor = 1.00 Composite C Worksheet = 8.5576 in/hr ARWar) G DM'RrPtr0N t$.Ba 10 Aapham 5-77 a.20 Gress 24A 0.77 WaWtedAvwrapa Qp = 162.10 cfs Project Mame: 48.16.2017 Hyd. No. 27 Peak Flow = 152.1 ds Time to Peak = 0.08 hrs Runoff Volume = 48,630 cult Runoff Coeff. = 0.77* Time of Cone. (TQ = 5.0 min intensity = 8.5576 in/hr Asc/Rec Limb Factors = IN U 7 2 3 4 5 6 7 8 4 14 Time (main) Hydrograph Report Hydrology Studio v 2.O.OAS Covered Arena Storag Hydrograph Type = Pond Route Storm Frequency = 25 -yr Time Interval = 5 min Inflow Hydrograph = 27 - Covered Arena Post Pond Name = Covered Arena Storage P-+ d Rorging by S *"0 frrcfx@4cn Method 180 170 160 150 140 1io 120 110 100 90 80 70 50 54 i 10 20 Op = 33.02 Cis Project Name, 0$-16-2017 Hyd. No. 2B Peak Flow = 33 02 cfs Time to Peak = 0.17 hrs Hydrograph Volurne - 4626 cult Max. Elevation = 890,77 ft Max. Storage - 36,618 cuft Centarolmass d&Wftan time = 17 mrfr 30 40 50 60 70 80 9D 100 Time (min) Req'd Star Covered Arena Post — Covered Arena SWrag Pard Report Kydm]oW Studia v2,4 -4,A8 Covered Arena Storage Underground Chambers Stege Description Input Invert Elev Cvwn. S 885.00 Chamber Rise, ft 6.00 Chamber Shape Circular Chamber Span, It 6.00 Barrel Length, ft 150,04 No. Barrels 8 Barrel Slope, °Io- 0.25 Headers, yln Yes Stone Encasement, y1n No EncasemeM ac%om Elevation, ft 0.00 Encasement Width per Chamber, ft 0.00 Encasement Depth, tt 0,00 Encasement Voids, % 40.00 699 891 890 Project Name - W -16-2017 Stage -Storage Stage 1 Storage Table Stege Elevation Gantou? Area Ihcr. Storage TOUT storage (n) (ft) c-Sgft) (cufti (cutt) 000 885.00 nla 0.000 0.000 0.32 $65,32 nfa 278 279 0.64 885.64 Na 1.442 1,322 0.96 8$5.96 Na 1,833 2,855 1.25 888.28 nfa 1.644 4.699 1-89 886.59 nfa 2,070 6.769 1.91 886.91 Wa 2,243 9.012 2.23 887.23 nee 2,312 11,384 2.55 887.55 nla 2,467 13,85+6 2.87 887.67 n(a 2,522 15,372 3.19 888_10 Na 2.552 15,924 151 858.51 n/a 2,554 21.478 3.83 856_63 Ma 2.519 23,997 4.14 589.14 nfa 2,456 26,463 4.46 $39.46 nfa 2,373 23,836 4.78 588.78 rva 2.242 31,078 5-10 890.10 Ma 2,072 33,149 5.42 890.42 nfa 1,839 34.908 5.74 890.74 rVA 1,531 36.524) 6.06 891.06 nla 1,040 37.559 6.37 891.38 nla 279 37,838 Stage -Storage 886 885 0 5000 10000 15000 20000 25000 30000 35000 Total Storage (tuft) - UG Chambers -- Top of Pond Pored Report Hydrology Studio v 2-0 am Covered Arena Storage Culvert I Orifices Rise. in Span, in No- Barrels Invert Elevation, ft Orifioe Coefficient, Co Length, ft Barrel Slope. % N -Value, fi Weirs Shape I Type Crest Elevation- ft Crest Length, ft Angle, dreg Weir Coefficient, Cw '�❑ides 2hrrwg9 GUlwar!. 841 690 Project Name; M-1 6-2017 Stage -Discharge Mage -Discharge r I Orifices culvert Perforated Riser i i r 1* 2 3 i 24 48 Per(. Rise,in 24 46 Perf. Span,irr 1 1 No. Perforatirns 886 100.01 Invert Elevation, ft ,6 •6 Height,ft 8 OriSue Coefficient. Co 1 6- 613 Weirs Kiser` Ancillary 1 2 3 Exfiltration, Mr Tailwater Elevalion.ft Mage -Discharge r I r f i i r i 6 a J 885 ! 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 2$ 30 32 34 36 Discharge (cfs) — Top of Pond—Culvert Total Q Hydrology Studio v 2.0.0.48 Covered Arena Storage Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (tuft) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 885.00 0.000 0.00 0.00 0.00 0.32 885.32 279 0.562 oc 0.00 0.562 0.64 885.64 1,322 1.553 oc 0.00 1.553 0.96 885.96 2,855 2.705 oc 0.00 2.705 1.28 886.28 4,699 3.828 oc 0.00 3.828 1.59 886.59 6,769 4.873 oc 0.00 4.873 1.91 886.91 9,012 5.588 oc 0.00 5,588 2.23 887.23 11,384 11.12 oc 0.00 11.12 2.55 887.55 13,850 15.82 oc 0.00 15.82 2.87 887.87 16,372 19.42 oc 0.00 19.42 3.19 888.19 18,924 22.37 is 0.00 22.37 3,51 888.51 21,478 23.94 is 0.00 23.94 3.83 888.83 23,997 25.42 is 0.00 25.42 4.14 889.14 26,463 26.82 is 0.00 26,82 4.46 889.46 28,836 28.14 is 0.00 28.14 4.78 889.78 31,078 29.41 is 0.00 29.41 5.10 890.10 33,149 30.63 is 0.00 30.63 5.42 890.42 34,988 31.79 is 0.00 31.79 5.74 890.74 36,520 32.92 is 0.00 32.92 6.06 891.06 37,559 34.01 is 0.00 34.01 6.37 891.38 37,838 35.07 is 0.00 35.07 aumx Key: is = imet control, oc ; outlet control, s = submerged weir Fond Report Hydrology Studio 2.0.0,46 Covered Arena Storage Siege (ft) Rr jvu Name_ 08-16-2017 Pond Drawdown VILLAGE WEST The pre -construction runoff, post -construction runoff, and BMP discharge rates for Village West are as follows: Pre: 39,5 cfs Post: 58.5 cfs BMP outlet flow: 12.7 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Village West hydrograph. Post -construction runoff values for Village West are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Village West were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up using a 158' x 32' underground piping detention system using 8 rows of 48" diameter pipe with a 48" header and an 18" orifice. Hydrograph Report Hydrology Stadia v 2.0.4,48 Tillage VIS Pre Hydrogreph Type = Rational Storm Frequency = 25 -yr Time Interval = 5 min Drainage Area = 15.92 ac Tc Method User OF Curve = TRYONJdf Freq. Corr. Factor = 1.00 Composke C Worksheet RREA(aC) C DEgCR PT10N 1.97 0.9$ asphalt 13,9.5 0.20 grass 15.92 0,29 AtIghtwAVeraOB u CY Project Name; Q8-16 2017 Hyd. No. 9 Peak Flow = 39.51 Cfs Time to Peak = US hrs Runoff Volume = 11,853 tuft Runoff Coeff. = 0.29= Time of Conc. {Tc} 5.0 mint Intensity = 8.6578 inthr Asc/Rec Limb Factors = 1J1 Qp = 39.61 cfs U 1 2 3 4 5 7 8 9 10 Time (min) H dro raph Report Hydrology Studio v n.0.48 Village W Post Hydrograph Type = National Storm Frequency = 25 -yr Time Interval = 5 min Drainage Area = 18.27 ac Tc Method = User OF Curve = TRYON,!& Freq. Corr. Factor = 1.00 Composite C Worksheet AREAlac} C OESCRYTIOhd 3.59 0.95 Asphalt 0.91 0.95 Concrete 0.37 0.90 Bldg kwf 11.5 6.29 Gr99s 15.27 4DA2 W9ighWAY app Qp=88.48 da Project Name; 06-16.2017 Hyd. No. 10 Peak Flow = 68.48 cls Time to Peak = 0.08 hrs Runoff Volurne - 11'W cuff Runoff Coeff. 0.42* Time of Cone. (Tc) _ 5.0 min Intensity = 8-557$ in/hr Asc/Ren Hmh factors = 111 U 1 2 3 d S b 1 8 9 1Q Time (ruin) Hydrograph Report Hydrology Studio 2.0.0,48 Village 111! Storage Hydrograph Type = Pond Relate Storm Frequency = 25 -yr Time Interval - 5 min Inflow Hydrograph = 10 - Village W Post Pond Name = Village West Storage Pond Routing by Storage indication r1+lelhod 6s 64 fit 60 58 56 C547 - rJ/C�� J4l AS 46- - 44 42--- 4p 38 - -- _ 35 34 CY 32 — 30-- - 24-- 22-- 20-- 18 1fi 14 12 1d 8 f 2 0 0 Project Mame: 08.16-2017 Hyd. No. f l Peals Flow - 12.67 cts Time to Peak = 0.17 hrs Hydrograph Volume = 17,510 cult Max. Elevation = 103.44 ft Max. Stofage = 12,959 Cuft Centef of mass detee.1km lime = 14 min Qp = 12.67 cfs Om 80 90 100 I + 20 30 40 50 by 70 Time (min) Peq'd 5tor -- - Village W Past — Village W Storage 80 90 100 Pond Report Hydrology 5tudia v 2, UAS EleVati0h (It) Village West Storage Incr. Storage (cult) Total Storage teurtl 0.44 Underground Chambers nla Description Input Invert Elev Dpwn. fl 100.00 Chamber Rise, K 4.00 Chamber Shape Circular Chamber Span, ft 4.00 Barrel Length, ft 150.00 Nn Barrels 8 Barrel Slope, % a_aa Headers, yin Yes Stone Encasement, yin No Encasement Bottom Elevation, ft 0,00 Encasemerli Mdth per Chamber, ft 0.00 Encasement Depth, ft 0.00 F_nCasement Voids, % 40-66 oil 103 Z > 102 101 100 0 Project Name'. 08-16-2017 Stage -Storage Stage 0 Storage Table Stage (11) EleVati0h (It) Contour Area (sgft) Incr. Storage (cult) Total Storage teurtl 0.44 100.00 nla 0.000 0.000 0.20 100.20 n1a 344 304 0.40 900.40 Ala 543 847 0160 100.60 nha 681 1,528 0.80 ion 84 Ala 785 2,313 1.00 101,00 n!a 884 3,177 1.20 10120 Mtn 922 4.499 1.40 101.40 nfa 970 5.089 1,68 101.60 nta 997 6,056 1-$Q 101.80 nla 1,425 7,091 2.00 102,84 Ala 1,030 6,121 2.20 10220 Na 1.03U 9,152 2.40 102.40 Ala 11025 16.177 2.04 102.6{] tea 997 11,174 2.80 102-80 Afa H9 12,143 3.00 1010U nfa n22 13,065 3.20 103.20 nfa 863 13,925 3.40 103.40 nfa 785 14,713 3.60 103,60 nla 682 15,395 3,Sfl 103.84 nla 541 15,936 4.00 1 x4.00 nla 303 16.239 Stage -Storage 2000 4000 6000 8000 10000 12000 14000 16COO Total Storage (cu#t) - UG Chambers Top of Pond 9 m a A n Pond Deport Hydrology Studio v 2.0.0.4$ Village West Storage Project Name: D8-16.2017 Stage -Discharge Pond Report Hydrology Studio v 2.0.0.48 Village West Storage Project Name - 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (tuft) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 100.00 0.000 0.00 0.00 0.20 100.20 304 0.194 0.194 0.40 100.40 847 0.778 0.778 0.60 100.60 1,528 1.692 1.692 0.80 100.80 2,313 2.855 2-855 1.00 101.00 3,177 4.195 4.195 1.20 101.20 4,099 5.588 5.588 1.40 101.40 5,069 6.860 6.860 1.60 101.60 6,066 7.797 7.797 1.80 101.80 7,091 8.676 8.676 2.00 102.00 8,121 9.474 9.474 2.20 102.20 9,152 10.21 10.21 2.40 102.40 10,177 10.90 10.90 2.60 102.60 11,174 11.54 11.54 2.80 102.80 12,143 12.15 12.15 3.00 103.00 13,065 12.73 12.73 3.20 103.20 13,928 13.29 13.29 3.40 103.40 14,713 13.82 13,82 3.60 103.60 15,395 14.34 14.34 3.80 103.80 15,936 14.83 14.83 4.00 104.00 16,239 15.31 15.31 "5umx key: le = inlet control, oc = outlet control, s = submerged weir Pored Report Hydrology Studio 2AO.A8 Village West Storage Stage 0t) Project flame: 0�-16.2917 Pond Drawdown W) ^a13 m kn i I i i I i E ~ Q] � I a 0 W a) I I 4} i i I I � m W) ^a13 VILLAGE EAST DRAINAGE AREAS The pre -development Village East site drainage area was divided into two areas: North, and South. Once the civil design was completed for the site, the drainage area for the Village East was divided into three drainage areas: Village East North, Village East Middle, and Village East South. Calculations were derived using Hydrology Studio software for all three drainage areas. Village East drainage area currently drains into two existing NCDOT culverts. The proposed detention system for all three areasconnects to the existing NCDOT stormwater system. r•i A VILLAGE EAST NORTH The pre -construction runoff, post -construction runoff, and BMP discharge rates for Village East North are as follows; Pre: 14.7 cfs Post: 38.84 cfs BMP outlet flow: 13.00 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Village East North hydrograph. Post -construction runoff values for Village East North are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Village West were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up using a 24' x 108' underground piping detention system using 6 rows of 48" diameter pipe with a 48" header and an 18" orifice. Hdrograph Report I t4rology Studio v 2.0.0.48 Tillage E Pre North Hydrograph Type = Rational Storm Frequency = 25 -yr Time Interval = 5 miry Drainage Area = 7.47 ac Tc Method = TR55 IDF Curve = TRYCNAdf Fret}. Corr_ Factor = 1.00 Camp alta C Worksheet = 8,5576 in/hr AREA (aa) C DESCRIPTION asa 0.80 acre lot 1.94 0.2s Grass 5.4 0.24 woods 7.A7 0.23 Wai�pted Aw raWe h a Project Name - 46.15 -2017 Hyd. No. I Peak Flow = 14.70 cfs Time to Peak = 0.08 hrs Runoff Volume 4,4'1 tuft Runoff Coeff. = 0.23* Time of Conc. (Tc) _ 5.0 min intensity = 8,5576 in/hr AsC/Rec Limb Factors = if1 QP = 14.70 cfs f 3 4 5 6 7 8 9 1a Time (min) Hydrograph Report Hydrology Studio v 2.0,0.46 Village E past north Hydrograph Type = Rational Storm Frequency = 25 -yr Time I nterva I = 5 min Drainage Area = 5.34 ac Tc Method = TR55 IaF Curve = TRYON.idf Freq Corr. Factor = 1,00 44- 42- 4G- 34- 32- 30- 26- 24- 22- 20- 18- 16- 14 44i}3432302624220181614 12- 10- 8- 4- 2- 0 21b8420 Project Name - 08.16.2017 Wyd. No. 2 Peak Flow = 38.8.4 ds Time to Peak = 0.08 hrs Runoff Volume = 11,653 cuff Runoff Coeff. = 085 Time of Conc. {Tc} = 5.0 min Intensity = 8.5576 irdhr AsclRec Limb Factors = 111 QP = 38.84 cfs • I i i i i i I ; D 1 3 4 5 6 7 8 9 10 Time (min) Hydrograph Report aIydrology Studio V 2.0.0.48 Village E storage N Hydrograph Type = Pond Route Storm Frequency = 25 -yr Time Interval = 5 min Inflow Hydrograph 2 - Village E post north Pond Name = North Pond Pofrd Flouting by Storage Indication Method 44 42 40 38 36 34 32 3D 28 26 24 22 20 18 16 14 12 10 8 5 4 fl U Project Name - 08 -16-n H Hyde No. 4 Peak Flow = 13.00 cfs Time to Peak = 0.17 hrs Hydrograph Volume = 11,646 cult Max. Elevation =103.09 ft Max. storago = 6,676 cult Ceorer o/ mass 01�ntron time = T min Gtp = 13,00 Cfs. 1U 20 30 40 Time (rein) Req'd Stor Village E post north — Village E storage N Pond Report Project Name: Hydrology Studio v 2-0.0.48 08.16.2017 North Pond Stage --Storage Underground Chambers Stage Description Input Invert E leo Downr ft 100,00 Chamber Rise. ft 4.00 Chamber Shape Circular Chamber Span, ft 4-00 Farrel Length, ft MOD No. Barrels 6 Barrel Slope, % 0.25 Headers, y/n Yes Stone Encasement, yin No Encasement E3attom Elevalion, ft 0 -OD Encasement Nfidth per Chamber, ft 0-00 Encasement Depth, ft 0-00 Encasement Voids, % 40.00 w 104 101 100- 0 Stage 1 Storage Table Stage rlevatloo Contour Area Inc r. Stn rage Total Storage {ftp tftj {s#tta [tuft) jcuftj 0.00 10{140 wa 0.004 0-000 0.21 100.21 nra 62.0 62.0 OA3 100-43 "la 331 293 0.64 100.64 Na 344 633 0,85 140.85 n1a 409 1.043 1.06 101.06 rva 459 M02 1,28 101.28 ora *8 2.000 1-49 301.49 nla 526 2,526 1.70 IM -70 nra 547 3.073 1-91 101.91 nta 550 3x533 2,13 102.13 ria 565 4,199 2.34 102,34 rata 567 4,766 2.55 102.55 nta 558 5,325 2.76 102.76 nta $47 5,672 2.98 102.98 nla 577 6,398 3.19 103.19 0a 497 6,x96 3.40 103,40 nla 464 7.356 3.61 103.61 Na 408 7.764 3.83 163.$3 Na 340 8,703 4.04 144.04 Na 231 8,334 4.25 104-25 nta 61,8 8,396 Stage -Storage ------------ a J 0000 i logo 1 2000 3000 4000 5040 Total Stcrage (cuft) - UG Chambers - - - Top of Pond 6400 7000 5 4 Pored Deport Hydrology Studio v 2.0.OAB North Pond Culvert! Orifices Rise, in Span, in No. Barrels Invert Elevation, ft Orifice Coefficient, CQ Length. ft Barrel Slope, % N -Value, in Weirs Shape / Type Crest Elevation, ft Crest Length, ft Angle, deg Weir Coefficient, Cw morass rrh C;d�h. 104 103 °F 1 02 Ur 101 Culvert O. D130 Riser I OrifGes 7 Weirs 2 Stage -Discharge Project Name 08-16-2017 Stage -Discharge Perforated Riser 3 Peri. Rise, in Perf. Span. in No. Perforations Inve, t Elevation, ft Height, A Orifice Coefficient, Co 3 Ancillary Exfiltraticn. iruhr Tailwater Elevation, fl 4 I 2 1 100 ' I 0 a 1 2 3 4 5 5 7 B 9 10 11 12 13 14 15 16 Discharge (tfs) — Top of Pond --Orifice Total Q Hydrology Studio v 2.0.0.48 North Pond Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev, (ft) Storage (tuft) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 100.00 0.000 0.00 0.00 0.21 10021 62.0 0.220 0.220 0.43 100.43 293 0.876 0.876 0.64 100.64 633 1.892 1.892 0.85 100.85 1,043 3.180 3.180 1.06 101.06 1,502 4.631 4.631 1,28 101.28 2,000 6.090 6.090 1.49 101.49 2,526 7.291 7.291 1.70 101.70 3,073 8.249 8.249 1.91 101.91 3,633 9.133 9.133 2.13 102.13 4,199 9.940 9.940 2.34 102.34 4,766 10.69 10.69 2.55 102.55 5,325 11.38 1138 2.76 102.76 5,872 12.04 12.04 2.98 102.98 61398 12.66 12.66 3.19 10319 6,896 13.26 13.26 3.40 103.40 7,356 13.82 13.82 3.61 103.61 7,764 14.37 14.37 3.83 103.83 8,103 14,89 14.89 4.04 104.04 8,334 15.40 15.40 425 104.25 8,396 15.89 15.89 ouuix rcey.- rc = Mier control, oc = outlet control, s = submerged Weir Pond Report Hydi,Nu,gy Studio v 2-0.0,4a North Pond Stage (fl) 40 en CO VD t - Project Narm, 08-16-2017 Pond Drawdown VILLAGE EAST SOUTH The pre -construction runoff, post -construction runoff, and BMP discharge rates for Village East South are as follows: Pre: 17.54 cfs Post: 38.62 cfs BMP outlet flow: 12.81 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Village East South hydrograph. Post -construction runoff values for Village East South are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Village West were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up using a 24' x 108' underground piping detention system using 6 rows of 48" diameter pipe with a 48" header and an 18" orifice. Hydrograph Report H draiogy Studio v2•QOA8 Village E Pre South Hydrograpb Type = Rational Storm Frequency = 25 -yr Time Jnterval = 5 min Drainage Area = 10.25 ac Tc Method = User OF Curve = TRYDN.idf Freq. Corr_ Factor = 1.00 Cnmpmb C Worksheet RRER(jpC} C DESCRIPTION 10.2$ 020 grpm 10.25 0.20 Mighbod AweraW 20 19 18 17 16 15 1.4 13 12 11 �' 10 9 8 7 4 3 2 1 0 Project Name: 08-16-2017 Myd. No. 8 Peak Flow = 17.54 cfs Time to Peak = 4.O8 hrs Runoff Volume = 5,263 euft Runoff Coeff, = 0•2' Tirne of Conc. (Tc) = 5.0 min Intensity = 8.5576 in/hr AsclRec Limb Factors = 1!1 Op = 17.54 cfs Time (mirk) •1 J i h -- — i� r 0 1 2 3 4 5 6 7 S 4 ii Time (mirk) H drogr ph Report Hydrology Studio v 2.0.0.48 Village E post south Project Name; 06-16-2017 Hyd. No. 3 Hydrographr Type = Rational Peak Flow = 38.62 cfs Storm Frequency = 25 -yr Time to Peak 0.08 hrs Time Interval = 5 mirk Runoff Volume = 11,587 cult Drainage Area = 5.31 ac Runoff Coeff. 70.65 Tc Method = TR55 Time of Conc. (Tc) = 5.D min IAF Curve = TRYON.idf Intensity = 8.5576 in/hr Freq. Corr. Factor = 9.0 Ase/Rec Limb Factnrs � ift (gyp = 38.62 cfs z 3 4 5 6 7 8 9 Time (min) 10 1 Hydrograph Report Hydw kl g Studio Y 2.0.0.49 Village E Storage S I lydrograph Type = Pond Route Storm Frequency = 25 -yr Time Interval = 5 rein Inflow Hydrograph = 3 - Village E post south Pond Flame = South pond Pond f3xImLg by Slwage rndFcahan Moved QP = 12-81 cfs 44 42 Project Name: 08-16-2017 Hyd. No. 5 Peals Flaw 7:12.81 cfs Time to Peak = 0,11 hrs Hydrograph Volume = 11,561 cult Max. Elevation = 103.03 #t Max. Storage = 7,001 cult Center of mass deferigan trine r 9 min 40 - E 34 32 -- 30 28— I 26- 24 2U- 14 -- U — -- — — — 22- N W i V '-77 RR - - 1 — - — — -- - - ---,.. - - - 12-- � I 0 10 20 30 40 5o 1tlrne (miry) keg'd Star Village E post south — Village E Storage 5 I . , , , r—) 60 ?0 Pond Report PjImtNamc Hydrology Studio v 2.0.0.4.8 08-16-2017 South pond Stagy -,storage Underground Chambers Stage f Storage Table Description Input Stage Elevation ContourArea Incr. Storags Total Sturage (11) iftl lsgft� (cuft) (tuft) Invert Eiev Dawn, ft 100.0 4,Uo 100.00 t3la 4,000 0.900 Chamber Rise, ft 4.000.24 140.21 nla 254 254 Chamber Shape Arch 0.43 10041 nla 547 801 0.64 100.64 nfa 585 1,386 Chamber Span, A 4.00 4.85 100.85 nla 561 1,927 Barrel Length. ft 110.00 1-M 101.06 nla 555 2,02 1.28 101.28 nM 548 3,030 4, Barrels 6 1.49 101.49 fila 539 3.569 Barrel Slope. % 0.25 1.70 101.74 Ila $26 4,087 1.91 101.91 Ela 515 4,61Q Headers, y1n Yes 2.15 102.13 Ma 500 8,112 Slone Encasernent, yln No 2.34 102.34 nfa 483 5,594 Erica ernerll Bottom Elevation, ft O. � x.55 102.55 nf& 482 6,057 2.76 102.76 nfa 439 6.496 Encasement Width per Chamber. ft 0.00 2.9a 162.98 nla 41$ 6.949 Encasement Depth. ft (00 3.19 143.19 nla 382 7.291 3,40 1t}5.46 nla 346 7,637 Encasement Voids, % 40.00 3.61 103.61 We 3w 7.939 3.83 145.83 Na 247 8.1 B6 4.04 104.04 rVa 166 8,352 4.25 10425 nfa 44.0 8.396 1 Stage -Storage 1000 2000 3000 4000 5000 WOU 7000 goo Total Storage (tuft) - M Chambers - Top of Pgrld 6 v� Pond Report Hydra logy Studio v 2.0.DAR South pond Culvert / Orifices Rise, irl Span, in No_ Barrels Invert Elcvntion, h Orifice Coefficient, Co ✓.ength, ft Barrel Slope, % N-Value,n Weirs Shape � Type Crest Clevation, ft Crest Length. fl Angle, deg Weir CoethiGienj, Cw Wm#ar'through C&VP-d, 1 LU 1 1 Culvert 0.000 R issr* 1 18 18 100.01 .6 1 Orifices 2 Weirs 2 Mage -Discharge Project Name: 08-15-2017 Stage -Discharge Perforated Riser 3 Pert_ Rise, In Parf, SPan,ln No. Perforations Invert Elevation, it Height. t Orifice Coefficient, Co Ancillary 3 Exfl#ration, inter Teilwaler Elevation, N 4 3 0 20 40 b0 80 100 120 140 166 180 200 224 240 Discharge (cis) — Top of Pond —Orifice Total Q V1 t�'�i Hydrology Studio v 2.0.0.48 South pond Project Name: 08 16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage {cuff} Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Tata) (cfs) 1 2 3 1 2 3 0.00 100.00 0.000 0.00 0.00 0.21 10021 254 0.220 0.220 0.43 100.43 801 0.876 0.876 0.64 100.64 1,366 1.892 1.892 0.85 100.85 1,927 3.180 3.180 1.06 101.06 2,482 4.631 4.631 1.28 101.28 3,030 6.090 6.090 1.49 101.49 3,569 7.291 7.291 1.70 101.70 4,097 8.249 8.249 1.91 101.91 4,612 9.133 9.133 2.13 102.13 5,112 9.940 9.940 2.34 102.34 5,594 10.69 10.69 2.55 102.55 6,057 11.38 1138 2.76 102.76 6,496 12.04 12.04 2.98 102.98 6,909 12.66 12.66 3.19 103.19 7,291 13.26 13.26 3.40 103.40 7,637 13.82 13.82 3.61 103.61 7,939 14.37 14.37 3.83 103.83 8,186 14.89 14.89 4.04 104.04 8,352 15.40 15.40 4.25 104.25 8,396 235.8 235,8 0.00 0.00 0.000 236.0 236,0 0.00 0.00 0.000 236.1 2361 0.00 0.00 0.000 236.3 236.3 Suffix key: is = inlet control, oc = outlet control, s = submerged weir _ ,� Pond Report HydrMouy Studio v 2.G -4A6 South pond Stage (ft) PrajKt Name: OB -16-2017 Ponce Drawdown O r CO GAO 0o i I � � r i I I 1 i I L y L i I I 1 r q} ~ I G ui to+�- � CD w (ai) A913 r a VILLAGE EAST MIDDLE The post -construction runoff and BMP discharge rates for Village East Middle are as follows: Post M: 30.41 cfs BMP outlet flow M: 6.15 cfs Pre & BMP totals: Pre N: 14.7 cfs Pre S: 17.5 cfs TOTAL: 32.2 cfs BMP outlet flow M: 6.15 cfs BMP outlet flow N: 13.00 cfs BMP outlet flow S: 1281 cfs TOTAL: 31.96 cfs The BMP outlet flow total of all three Village East drainage areas is less than the total of the pre -construction runoff rate. The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Village East Middle hydrograph_ The post -construction runoff values for the Village East Middle were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up using a 24' x 108' underground piping detention system using 6 rows of 48" diameter pipe with a 48" header and an 12" orifice. Hydrograph Report Hydrology Studio v 2,4,4,4$ Village EPost Middle Hydrograph Type = Rational Storm Frequency = 25 -yr Time Interval = 5 min Drainage Area = 4.18 ac Tc Method = User IDF Curve = TRYQN.idf Freq, Corr. Factor = 1.00 34- 33- 32- 31- 30- Z9- 27 d33323130z927 26- 25- 24- 23- 22: 2s242322 21 2a 1 cr 1& 15 14- 13- 112- 10- 9- 8- 7-- 6- 5- 4- 3- 21 d131210sa7-32 1 0 [gyp 30.41 cfs Project Name-' 48.16.2417 5 6 7 8 9 10 Time (min) Hyd. No. G Peak Flow = 30.41 cfs Time to Peak = 0.48 hrs Runoff Volume = 9,122 cult Runoff Cue#t. = 0.85 Time of Cone_ (Tc) = 5,0 min Intensity = 6,5576 inthr ASC/Rec Limb Factors = 111 5 6 7 8 9 10 Time (min) Hydrograph Report Hydrology Dudiov 2,0.4.48 i IlageE Storage Mid Project Narr1- 08-16-2 97 Hyd. No. 7 Hydrograph Type = Puna Route Peak Flow = 6.147 uts Storm Frequency � 2!> --yr Time to Peak = 0-17 hrs Time Interval = 5 min Hydrograph Volurne = 9.115 uuft Inflow Hydrograph = 6 -Village Epost Middle Max. Elevation = 103-60 R Pond Nage = Middle Porro Max- Storage = 6.814 tuft Pend Rautir�g by Storage rnftaNm mumod Cenfer of moss detari on lime= 73 miry QP 6.16 ct5 34- 31- 32- 30 4333234 - - 29 27-- 2 7 25 �.. J 24 -- - 23 20 17 — _..... T— C7 16 _ 14 — -- 72___ i 10 — - �;---- f — — I.. a J p I r o 10 20 30 40 so 0 70 Time (mirt) Rieq'd Stor Village Post Middle — VillageP Storage Mid . �r Pond Report Project Name- t 4rology Studio v 2.0.0AS 08-16-2017 Middle Pond Stage -Storage Underground Chambers aescripUan InputSt[rt1age Stage I Storage Table i r i Etevativn Contour Area incr. %torage Total Storage (ft) 00) (cuftt {Cuftj Invert 1=1ev Down, ft 100.40 0.00 100.00 nra 0.000 0.000 Chamber Rise, ft 4.00 0.21 100.21 nfs 62,0 62.0 Chamber Shape Circular 0.43 100.43 nfa 231 293 0.64 100.64 nfa 344 633 Chamber Span, ft 4.00 0.85 1D0,86 nfa 409 1,043 Barrel Length, ft 100-00 1.06 101,46 Wa 459 1,502 1.28 101.28 rJa 498 2,000 No Barrels 6 1.49 101.4€} wa 526 2.526 Barrel Slum % 0.25 1.74 101.74 Na 547 3,473 1.91 101.91 rkfa 560 3.63$ Headers, yin Yes 2.13 102.13 nfa ma 4,199 Stone Encasement, yfn No 234 142.34 n1a 567 4,766 Encasement BottomE1eva#lort, ft 4.40 2.55 142.55 nfa 559 5.325 2.36 102.75 n1a 547 d,E72 Encasement Width per Chamber, fit 0.40 2-98 102.98 nfa 527 6,395 Ent asernent Depth, ft 0.00 3.19 143.19 wa 497 8,896 3.40 143,40 nra 46G 7,3% Encasement Voids. % 40.00 3-61 103.51 rti a 448 7,75E 3,63 103.83 n!a 340 6.103 4 04 144.04 nfa 231 8.334 4.25 104.25 No 61.8 0.396 105 104 103 102 101 1000 0 Stage -Storage 1000 ZOt}0 3000 4000 5000 6000 Total Storage {cuft} -• UG Chambers - - Tap of Pond 7000 5 4 3 ei n: 2� 0 8004 I i r i � I 1000 ZOt}0 3000 4000 5000 6000 Total Storage {cuft} -• UG Chambers - - Tap of Pond 7000 5 4 3 ei n: 2� 0 8004 Pond Report Hydr4plQgy Studio v 2AGAS Middle Pond Project Name: 06-15-2017 Stage -Discharge 0 r Hydrology Studio v 2.0.0.48 �� Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (cult) Culvert (cfs)1 Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) Exfil (cfs) User (cfs) Total (cfs) 2 3 1 2 3 0.00 100.00 O.00O 0.00 0.00 0,21 100.21 62.0 0.175 0.175 0.43 100.43 293 0.677 0.677 0.64 100.64 633 1,401 1.401 0.85 100.85 1,043 2.199 2,199 1.06 101.06 1,502 2.811 2.811 1.28 101.28 2,000 3.307 3.307 1.49 101.49 2,526 3.738 3.738 1.70 101.70 3,073 4.125 4.125 1.91 101.91 3,633 4.478 4.478 2.13 102.13 4,199 4.805 4,805 2.34 102.34 4,766 5.112 5.112 2.55 102.55 5,325 5.401 5.401 2,76 102.76 5,872 5.675 5.675 2.98 102,98 6,398 5.937 5.937 3.19 103.19 6,896 6.187 6.187 3.40 103.40 7,356 6.428 6.428 3.61 103.61 7,764 6.660 6.660 3.83 103.83 8,103 6.884 6.884 4.04 104.04 8,334 7.102 7.102 4.25 104.25 8,396 7.312 7,312 sutrix Key. is = inlet control, oc = outlet control, s = submerged weir f . Pond Report Ky+dMIOgy Studio Y 2.4.4.48 Middle Pored Stage {#t} Project NamV.- 98-16-2017 Pond Drawdown SALAMANDER DRAINAGE AREAS The pre -development Salamander site drainage consisted and wood and grass areas. Calculations were derived using Hydrology Studio software for both drainage areas. The site layout, based on hotel roof drainage, dictates that two BMPs be used for drainage for post development areas. One cry detention and once wet detention pond were used. These are labeled Salamander North for the Dry Detention and Salamander South for the Wet Detention. SALAMANDER NORTH The pre -construction runoff, post -construction runoff, and BMP discharge rates for Salamander North are as follows: Pre: 15.1 cfs Post: 48.9 cfs BMP outlet flow: 7.12 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Salamander North hydrograph. Post -construction runoff values for Salamander North are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Salamander North were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up as a detention pond that is 4 ft. deepwith dimension of 100'x50' and utilizes a 3' x 3' riser basin with a trash rack and 12" orifice discharging through a 24" pipe. /nn Hydro ra h Report Hydrology Studio V Z.O.OA6 Salamander N Pre Hydrograph Type = Rational Storm Frequency = 25 -yr lime Interval = 5 min Drainage Area = 8.84 ac Tc Method = User IDF Curve TRYCNAdf Freq. Corr. Factor = 1.DO CornpwOW C Worksheet = 111 AREA{ec} C 6ESCRiPTIOH 8.64 0-20 Grass &84 0.20 Welghled Average 1I 1� 15 14 13 12 11 10 9 {y 8 7 6 5 4 3 2 1 0 6 Project Name; OB -16-2017 Hyd. No. 12 Peak Flow = 15.13 cfs Time to Peak = 0.08 hrs Runoff Volume y 4,539 cuft Runoff Coeff. = 0.2* 1-ime of Conc. (Tc) = 5.D rain Intensity 8.5576 in/hr Asc/Rec Limb Factors = 111 Qp = 15.13 ds Time (min) -4 — Hydrograph Report Hydrology Studio Y 2.0.0,46 Salamander N Post Hydrogyaph Type = Raticnal Storm Frequency = 25 -yr Time Interval = 5 min drainage Area = 10.79 ac Tc Method = User OF Curve = TRYONAdf Freq, Corr. Factor = 1.00 COMPOSHe ic WorXimeet AREA 00 C OEscprpTim 399 0,9fi Asphs H 0.84 0.90 Pluil&ro RWF 5.0 0.20 Grass 10,72 0,53 WaightGdAyarage 54--- 52 48- 46- 44- 42- 38- 36-- 32- 30- 28- 24- 22- 20 18 - 14-- J, 12 4- 2 Project Name: Q = 48.94 ofs 3 4 5 6 7 Time {rmn} -i I Hyd. No. 13 Peak Flow = 48.94 cfs Tinne to Peak = 0.08 hrs Runoff Volume = 14,682 cult Runoff Coeff, = 0.53* Time of Conc. (Tc) = 5,0 min Intensity = 8.5576 Whir AscJRee Limb Factors V1 Q = 48.94 ofs 3 4 5 6 7 Time {rmn} -i I Hydrograph Report Hydrolvgy Studio v 2.0.0.18 Salamander N Storage Hydrograph Type = Pond Route Storm Frequency = 25 -yr Time Interval - 5 rain Inflow Hydrograph = 13 - Salamander N Post Pond Name = $alamander N Storage Pond Routrrrg by anmge 1n#lcation Method 56 54 52 50 48 46 44 42 40 38 36 34 32 34 28 26 24 22 1$ 61412 16- U- 12 10- 6- 4- 2 0642 a D Qp = 7.12 cfs Project Name: 08-15-2017 Hyd. No. 20 Peak Row = 7.117 cfs Time to Peak 0.17 hrs Hydrograph Volume = f4,674 cuff: Max. Elevation = $72.27 ft Max. Storage = 12,223 tuft Cerner of mass delmhbn lime = 2a min 10 20 30 40 50 6Q 70 80 94 140 114 120 130 140 150 160 Time (min) aeq'd YOU Salamander N Post Salamander N Storage Pond Report Hydrology Studio v 2.0.0.48 Salamander N Storage 873 872 User Defined Contours Description Bottom Elevation, ft Voids (%) Volume Calc Input 868.00 100.00 Conic Project Nimes 08-16-2017 Stage -Storage S#age! Storage Table Slags Ift) Elevation (ft) Contour Area (Sgft) Incr Storage (tuft) Total Storage (curt) 0,40 $68.{74 2.292 C.DCO ().Ow 1.40 870.40 3.280 2,771 2,771 2.00 871.40 4,362 3,807 6,57a 3.130 872.00 5703 5,017 11,695 4.04 873.013 7.011 fi.345 17,940 Stage -Storage 870 869 U 11104 400 6000 8040 1ODOO 12004 14000 15000 18000 Total Storage (tuft) — Contours — Top of Pond Pond Report Flydrology Studio v 2,0.4.48 Salamander N Storage Prqject Name-- 02-16-2017 ame:02-16-2017 Stage -Discharge Culvert 1 Orifices Culvert orifices 0riflee Plate i, i i 1 2 3 Rise, in 24 12 Orifice Rise, its Span. in 24 12 Orifice Spars, in I- No. Barrels 1 1 Na OfifiCRs Invert Elevation, ft 859.5 669.01 Invert Elevation, ft Orifice Coefficient, C❑ 6 .6 Height, fl Length, ft 50 0rifiee Coefficient, Co Barrel Slope, % t N -Value, n 4.013 Weirs We I rs Riser' A nO l lary 1" 2 3 Shape l Type Box Rectangular Extiltration, iruhr Crest Elevation, ft 873 871 Tailwater Elevation, h Crest Length. ft 12 1fl Angle, deg Weir Coefficient, Cw 4,3 3.3 -Routes through CUA," Stage -Discharge 873- 4 I 872 - 3 871 2 W � 1 877 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Discharge (cfs) -- Top of Pond - Culvert—Orifice IwoI Q I i, i i i i i I I- Hydrology Studio v 2.0.0.48 Salamander N Storage Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (cult) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) FAI (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 869.00 0.000 0.00 0.00 0.00 0.00 0.00 1.00 870.00 2,771 44.10 is 2.656 0.00 0.00 2.656 2.00 871.00 6,578 44.10 is 4.616 0.00 0.00 4.616 3.00 872.00 11,595 44.10 is 5.967 0.00 0.00 5.967 4.00 873.00 17,940 44.10 is 7.064 0.00 0.00 7.064 Suffix key: is = inlet control, oc = outlet control, s = submerged weir r r- Pond Report Hydrology Stutfio v 2. D.0 48 Salamander N Storage Stage (ft) en Ln r Project Name; D8-15-2011 Pond Drawdown r r- ko Ln f; (4) A613 N O LT cm SALAMANDER SOUTH The pre -construction runoff, post -construction runoff, and BMP discharge rates for Salamander North are as follows: Pre: 6.78 cfs Post: 29.5 cfs BMP outlet flow: 0.08 cfs The Runoff Coefficient was calculated for the abovementioned drainage area and is shown on the Salamander North hydrograph. Post -construction runoff values for Salamander North are greater than the pre -construction values, therefore, it was determined that a detention system is required. The post -construction runoff values for the Salamander North were routed through a detention system scenario within the Hydrology Studio software. The scenario was set up as a detention pond that is 4 ft. deep with dimension of 100'xS0' and utilizes a 3' x 3' riser basin with a trash rack and 2" orifice discharging through a 36" pipe. Hdrograph Deport Hydrology Studio v 2.6.0.46 Salamander S Pre Hydrograph Type = Rational Storm Frequency = 25 -yr Time Interval R 5 mire Drainage Area - 3.17 ac Tc MethDd = User lDF Curve = TRYON.idf Freq. Corr. Factor = 5.0 min Composite C Wo "hoot = 8.5576 inlhr AREA (A4) C DESCRIPTION 3.17 4.25 YJopds 3.17 6.25 YMOtadkwmage 7 2 5 A cr CY 3 2 1 Project Narn►e 08.15-2017 Hyd, No. 23 Peak Flow = 6.782 ds Time to Peak = 0.08 hr's Runoff Volume = 2,035 tuft Runoff Coeff. = 0.25" 'rime of Cone, (Tc) = 5.0 min Intensity = 8.5576 inlhr Asc/Rea Limb Factors o if1 QP = 6.78 da U 1 3 4 5 6 7 8 9 10 Time (min) Hydrograph Report Hydro[ogy Studio Y 2.0.0.48 Salamander S Post Project Mame: Wlb 2 17 Hyd. No. 24 Flydragraph Type - Rational Peak Flow = 29.53 cfs Storm Frequency = 25 -yr Time to Peak = 0.08 his Time Interval = 5 min Runoff Volume = 8,859 cuff Drainage Area = 6,39 ac Runoff Coeff. = 0.54* To Method = User Time of Conc. (Tc) = 5.0 min IUF Curve = TRYON_idf Intensity = 8.5576 in/hr Freq. Gorr. Factor = 1.00 AWRec Limb Factors = 111 COMPosfte C Worksheet AREA(mcl C 4E-BrArY10W 1.Z2 0.95 A20h& 1.76 0.90 Buildng Roof M1 9.20 Grass Ut O -r4 Mightsd Average 32 30 28 26 24 22 200 18 N W 16 14 12 10 8 6 4 2 0 0 QP = 29.53 Cf5 7 2 3 4 5 6 7 $ 9 10 Time (miri) Hydrograph R a po rt Project Nam, Hydrology Studio v 2.D.Q-4B 08-15-2017 Salamander S Storage Hyd. No. 25 Hydrograph Type = Pond Rcute Peak Flow = 0,085 cf% Storm Frequency = 25 -yr Time to Peak = 0.17 hrs Time Interval = 5 mire Hydrograph Volume = 8,763 cult Inflow Hydrograph = 24 - Salamander 8 Post Max. Elevation = 906.74 ft Pond Name = Salamander S Storage Max. Storage r 8,829 cuff Pond ,4ougmg by Storage 1ndx4?tcn Method Center of mass detenw ffine = 22.85 Hrs Op = 0.08 cfs 33 32 31- - r29 -- - 28- 2---.1__.- 26 2 - - --- - I 23 22 I — •; — -- - - - --- - -. _ .. 4 21 i T11I 20- 19 T -- 16 14 _ I - - 0 2 4 6 8 10 12 14 16 18 20 22 24 25 28 30 32 34 35 38 40 42 44 46 48 5D Time (hrs) Salamander S Post — Salamander 5 Storage Pond Deport Hydrology %idin v 2,0.0.48 Salamander 5 Storage Project Name: 05 16-2017 Stage -Storage User Defined Contours Stage 1 Storage Table Description Input Stage Elevation ContaurArea Incr, Storage Total Storage #0 M) 100) jeukl (cult! Bottom Elevalian, it 906.00 0.00 906.00 9,709 a aoo a.aao Voids %) 100.00 1-00 807.00 14,2101 11,883 11,583 Volume Calle Conic 2.00 908 01) 15,855 15.019 26,901 0.00 909,44 17,598 16,717 43,619 4.00 910.00 I 19,500 18,539 62,158 I I Stag.—Storage �1 t1 - 4 I - 909 ~ I 908 I 07 907- 906 906 D 10000 20004 30000 4400fl 500Q4 60000 Total Storage (tuft) — Contours Top of Pani Pond Report Hydrology Studio v 2,x,0,4$ Salamander S Storage Culvert 10 rifices Culvert 1" Rise, kn 36 2 Span, 'rn 36 2 No. Barrels 1 1 Invert Elevation, ft 901 906.01 Orifice Coefficient, Ce .6 .6 Length, fl 78 Barrel S[ope, % N -Value, n 0.013 Weirs Risen V Shape f Type Hux Rectangular Crest Elevation, ft 909 908 Crest Length, ft 4 8 Angle, deg Weir Coefficient, Cw 3.3 3.3 'Rou!es f nxah Cufvrnt 910 � I , r I I I I , I i I I I 909 IIIIIIIIIII ll.Y1 Orifices 2 Weirs 2 Stage -Discharge j Project Name: 68-16-2017 Stage -Discharge Orifice Plate 3 Orifice Rise, in Orifice Span, in No. Orifices Invert Elevation, ft Height, It Orifice Cc ITident, Co s Ancfilary EAltration. whr Tailwater Elevation fl I 4 9060 0 2 4 6 8 10 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 Discharge (cfs) — Top of Pond --Culvert— Kiser— Orifice Rectangular Total 0 2! I no IM.i• I Hydrology Studio v 2.0.0.48 Salamander S Storage Project Name: 08-16-2017 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (cult) Culvert (cfs) Orifices, cfs Riser (cfs) Weirs, cfs Pf Riser (cfs) (c (cfs) (cfs) User (cfs) Total (cfs) 1 2 3 1 2 3 0.00 906.00 0.000 0.00 0.00 0.00 0.00 0.00 1.00 907.00 11,883 55.88 oc 0.100 0.00 0.00 0.100 2.00 908.00 26,901 55.88 oc 0.145 0.00 0.00 0.145 3.00 909.00 43,619 55.88 oc 0.179 0.00 26.40 26.58 4.00 910.00 62,158 79.91 oc 0.145 5.377 is 74,39s 79.91 Suffix keys is 7 inlet control, oc = outlet control, s = submerged weir Pond Report Hydraln�jy Studio v 2.0.0.48 Salamander S Storage Stage (ft) Projed Name: 08-16-7017 Pond Drawdown r I i F o r q) - - - ..... CP -_ ---- - --- - c z + E � I Ci3 � ❑ Q + i - - -- C5 M i 4 LZ Oq r6 LZ V1 (4j) A913 1