HomeMy WebLinkAbout20130667 Ver 1_401 Application_2013061320130667 Joint 4011404 Pre - Construction Notification and Riparian Buffer Authorization Request Crowne at Alexander Place Apartments 7651 ACC Boulevard Raleigh, Wake County, North Carolina Prepared by: Irerracan Consulting Engineers & Scientists JUN � g 2013 On Behalf of: Crowne Partners, Inc. 505 North 20th Street, Suite 1015 Birmingham, Alabama 35203 20130667 Irerracan June 27, 2013 North Carolina Division of Water Quality Webscape Unit 512 North Salisbury Street Raleigh, North Carolina 28801 Re: Request for Water Quality Certification and Riparian Buffer Authorization Crowns at Alexander Place 7651 ACC Boulevard Raleigh, Wake County, North Carolina Terracon Project: 71127767 Terracon Consultants, Inc. (Terracon), on behalf of Crowne Partners, Inc., is please to submit the enclosed Pre - Construction Notification (PCN) to obtain a Water Quality Certification and Riparian Buffer Authorization for the referenced project. Supporting documentation is included as an appendix. Our payment by check in the amount of $240.00 is included as well. A copy of this PCN documentation is being submitted to Mr. David Shaeffer in the Raleigh Field Office of the USACE with whom we have been in contact with during the development phase of the project. If you have any questions regarding this submittal, please contact us at 704 -509- 1777. Your timely response is greatly appreciated. Sincerely, Terracon Consultants, Inc. Stephen C. Brown Project Geologist ��r�aee� JUN 2 & 2013 c�n Terracon Consultants, Inc. 2020 -E Starita Road Charlotte, North Carolina 28206 \]C/ P [7041509 1777 F [7041509 1888 terracon.com of WATFq G 0 o < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 09 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Crowne at Alexander Place Apartments 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: SLF Ruby Jones, LLC 3b. Deed Book and Page No. Book 9526, Page 1888 3c. Responsible Party (for LLC if applicable): 3d. Street address: Post Office Box 56607 3e. City, state, zip: Atlanta, Georgia 30343 -6607 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: 4b. Name: Christina Nawrocki 4c. Business name (if applicable): Crowne Partners, Inc. 4d. Street address: 505 North 20th Street, Suite 1015 4e. City, state, zip: Birmingham, Alabama 35203 4f. Telephone no.: 205- 328 -3120 4g. Fax no.: 205 -326 -0528 4h. Email address: chdstinan @crownepartners.com 5. AgentlConsultant Information (if applicable) A copy of the Authorized Agent letter included in Appendix 1. 5a. Name: Stephen C. Brown 5b. Business name (if applicable): Terracon Consultants, Inc. 5c. Street address: 2020 -E Starita Road 5d. City, state, zip: Charlotte, North Carolina 28206 5e. Telephone no.: 704 -509 -1777 5f. Fax no.: 704 -509 -1888 5g. Email address: scbrown @terracon.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification Site location/USGS topographic map included in Appendix 2. 1a. Property identification no. (tax PIN or parcel ID): 1 0768.02 -66 -5694 and 0768.02 -66 -1345 1b. Site coordinates (in decimal degrees): Latitude: 35.9110 Longitude: - 78.7762 1c. Property size: 14.4602 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Little Brier Creek (approx. 3,200 feet W -SW) 2b. Water Quality Classification of nearest receiving water: C, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Please see "Responses to Narrative Questions" included in Appendix 3. 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: approx.1,955 feet 3d. Explain the purpose of the proposed project: The purpose of the stream crossing is to provide access to the northern portion of the site which is otherwise, inaccessible. inaccessible. The second minor stream impact is for storrnwater discharge. 3e. Describe the overall project in detail, including the type of equipment to be used: Please see "Responses to Narrative Questions" included in Appendix 3. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments: JD data currently under review with USACE. 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams — tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - P Culvert unnamed PER - Corps 6 143 S2 - Choose one S3 - Choose one - S4 - Choose one S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 143 3i. Comments: The stream impact is depicted on the Overall Impact Map is included in Appendix 4. Profile views of the stream crossing are shown on the Impact Details plan also included in Appendix 4. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Og Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman []Other: 6b. Buffer Impact number - Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet B1 P UT of Little Brier Creek No 454 302 B2 P UT of Uttle Brier Creek No 367 300 B3 - P UT of Little Brier Creek No 7,745 4,368 B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 8,566 4,970 6i. Comments: The buffer impacts are depicted on the Overall Impact Ma included in p p p p ' Appendix 4. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Please see "Responses to Narrative Questions" included in Appendix 3. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Please see "Responses to Narrative Questions" included in Appendix 3. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? [] Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (Stage Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. A copy of the Stormwater Management Plan is included in Appendix 5. ® Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 41.5 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: A copy of the Stormwater Management Plan Is included in Appendix 5. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Raleigh 3. Certified Local Government Stormwater Review City of Raleigh 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW USMP apply (check all that apply): ® Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ®Yes ❑ No attached ?City of Raleigh will not approve plan until 401/404 permits are revolved. 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): H Session Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /stateAocal) funds or the ❑ Yes ® No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ag No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Domestic wastewater generated at the site will be discharged into the municipal sanitary sewer system. Page 9 of 10 PCN Form — Version 1.4 January 2009 S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US FWS Critical Habitat Mapper via the Internet and inquiry with FWS Raleigh field office. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? National Maries Fisheries Service website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Review of SHPO GIS Web Service and review of files at the SHPO office in Raleigh, North Carolina. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Map No. 3720076800J, dated May 2, 2006 Stephen C. Brown June 27, 2013 Applicant/Agent's Printed Name ApplicanUAgent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 aAVERY° READY INDEX' 600083 WROWNE PARTNERS October 25, 2012 Mr. Stephen C. Brown Terracon Consultants, Inc. 2020 -E Starita Road Charlotte, North Carolina 28206 Re: Authorized Agent Approximate 14.47 -Acre Site 7651 ACC Boulevard Raleigh, Wake County, North Carolina Terracon Project No. 71127764 Dear Mr. Brown, As part of site development activities, we the undersigned hereby grant permission for Terracon Consultants, Inc. ( Terracon) to act as our agent for the purpose of conducting wetlandsfjudsdictional waters assessment of the referenced property. We further grant permission for Terracon to access the property and to schedule site visits by Federal and State regulatory personnel, as necessary, for assessment and/or permitting purposes. Terracon will provide client prior notification of impending regulatory visits scheduled by us. Applicant Name: Firm: Crown Partners, Inc. Address: 505 North 20th Street, Suite 1015 Birmingham, bama 35203 Signature: Date: to Z!r �-- 1205) 328,3120 • FAx (205) 326.0528 •505 NORTH 20tH STREET • SUITE 1015 * BIRMINGHAM, Am" 35203 WWW.CROWNEPARTNERS.COM thm'-, SITE MAI N' — ` SITE LOCATION MAP Irerracon ir CROWNE AT ALEXANDER PLACE PROJECT NO.: 71127767 7651 ACC BOULEVARD DATE: June 2013 DRAWN BY: SCB RALEIGH, NORTH CAROLINA REFERENCE: USGS Topographic Map; Southeast Durham, North Carolina Quadrangle; dated 1993. Crowne at Alexander Place 7651 ACC Boulevard Raleigh, Wake County, North Carolina Responses to Narrative Questions B. Project Information and Prior Project History 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently undeveloped, wooded acreage. Areas to the north of the site across ACC Boulevard are a mixture of multi - family residential complexes and wooded areas. Areas to the south of the site across Glenwood Avenue contain office buildings and a retail shopping center to the southwest of the site. The adjoining property to the east is under construction as a residential apartment complex. Areas farther to the east contain a cemetery and office buildings. The adjoining property to the west contains a retail development that includes various stores and restaurants. 3e. Describe the overall project in detail, including the type of equipment to be used: See the attached plan showing the proposed culvert stream crossing and buffer. impact to access the southwestern portion of the site and two smaller buffer impacts that are necessary to implement the proposed stormwater management plan for the site. Typical heavy equipment will be used in the land clearing and grading phase and also during the construction /development of the roads and other ancillary features. D. Impact Justification and Mitigation 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The site layout was design in a manner to reduce impacts to wetlands. Other preliminary site designs would have required separate stream crossings for the roadway and utilities. The current design allows for a single crossing. The roadway crossing was designed to cross the stream as close to 900 as possible. The stream crossing was designed with retaining walls to further minimize impacts to jurisdictional areas. Buffer Impacts 1 and 2 for the stormwater management were designed to cross the buffer as close to 900 as possible. Page 1 of 2 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion control measures will be implemented to protect jurisdictional areas. The erosion control devices will be inspected daily during construction of the impacts and immediately repaired if necessary. The general contractor and subcontractor will be instructed on the principal of "avoidance and minimization ", erosion control maintenance practices and the Nationwide Permit Conditions. The contractors will be provided with a copy of the permit general conditions. Page 2 of 2 Stormwater Calculations Project: Crowne at Alexander Place Date: 4.11.2013 By: Jon Callahan, PE John A. Edwards & Co. 333 Wade Avenue Raleigh, NC 27605 (919) 828 -4428 Stormwater Narrative The existing site consists of two vacant wooded lots located between Acc Boulevard and US Hwy 70 (Glenwood Avenue). The parcel fronting on US Hwy 70 is essentially landlocked since US Hwy 70 is controlled access by NCDOT and no driveway access will be allowed. The proposed development will re- combine the 2 lots into 1 lot to allow access to Acc Blvd for the entire parcel. The recombined parcel will be approximately 14.45 Ac. Proposed site development will consist of 4 multi -story apartment buildings with associated parking and amenities. For stormwater management, the site is divided into 2 separate sub - basins by a natural buffered stream that separates the 2 areas of the property. We have designated these areas as the North side and South side for purposes of the analysis. As mentioned above, the south side property has frontage along US Hwy 70, however, no access to the public street. There is a cross access driveway located on the adjacent development to the east, however, the adjacent property is a gated community and the cross access will be limited to emergency vehicles and exit only. Therefore, the proposed site plan shows a driveway crossing the buffered stream that separates the property into the North and South areas. In addition to the driveway crossing, public sewer exists on the South side of the buffered stream. The proposed project will run a sewer line in the driveway crossing to limit the total impact to the stream. The driveway crossing is located at the lower (downstream) end of the property in order to get sewer across and able the serve the North side with a gravity collection system. The runoff resulting from the proposed improvements will be collected by a storm drain network of pipes and then discharged into a dry pond for retention on each of the North and South sides to control the post development run -off rates. The detention ponds will then discharge to a level spreader and natural wooded filter strip prior to entering the Neuse Riparian buffer along the sites western boundary. The dry pond BMPs were selected rather than wet ponds since the contributing drainage areas are relatively small and there was no SHWT (seasonal high water table) present to meet the design requirements for a wet pond. The dry ponds, level spreaders, and natural filter strip will reduce the nitrogen export below 10.0 lbs /Ac., and a buydown for nitrogen will be utilized to satisfy the remaining nitrogen requirements. The post development run-off rates are less than the pre- development and therefore the site complies with the City of Raleigh Part 10 Chapter 9 code, satisfying both the quantity and quality components of the stormwater ordinance. Stormwater Runoff Calculations Pre - Development: Total site area = 15.28 Ac. (Includes public r/w on Acc Blvd) Total Existing Impervious Area = 0.00 Ac. (c =0.95) Total woods = 14.46 Ac. (c =0.25) Total grassed = 0.82 Ac. (c =0.5) Composite C = 0.26 Q2 = 23.2 cfs Q10= 29.1 cfs Post - Development: Total project area = 15.28Ac. Area not collected in either Dry Detention Pond = 7.23 ac Total Wooded and Landscaped = 7.23 ac (c =0.4) Q2 =16.66 cfs Q 10 =20.88 cfs Inflow to North Pond 3.11 ac impervious (C= 0.95), 1.03 ac grass (c =0.4) Outflow from North Pond Q2 =0.03 cfs Q 10 =0.04 cfs Inflow to South Pond 3.24 ac impervious (c= 0.95), 0.67 ac grass (c =0.4) Outflow from South Pond Q2 =0.031 cfs Q10= 0.034 cfs TOTAL Q2 =16.72 cfs Q10= 20.96 cfs POST DEVELOPMENT RUN -OFF FOR THE 2 AND 10 YEAR STORM IS LESS THAN PRE - DEVELOPMENT TO SATISFY THE CITY OF RALEIGH STORMWATER ORDINANCE. iy U lljS N vl w ,v VW %DIM �j �J 7 I� 1 I 1 1 1 4 � ellM 1 nw 1 r 1 qe, V J i / G1EVW NwY101 tU5 mpual" wW �V ��RI �glk W tD� J �r -r2 1 Dry Pond Routing Calculations The dry ponds were modeled using Hydroflow Hydrographs modeling software. The storage is based on the WQV for each sub - basin. The routing shows that the ponds are designed to retain the 2, 10, and 100 year storms such that the pre- development run -off rates are not exceeded. Dry Pond North Design 2/6/2013 Pro*ect: Crowne at Alexander Place la = 0.75 (Impervious fraction, unitless) Rv = 0.73 (Runoff Coefficient, unitless) Rd = 1.00 (Design storm depth, inches) A = 4.14 (Watershed Area, Acres) WQv = 10,895 (Volume to be controlled in pond, cf Dry Pond dimensions = variable Volume provided @ 3.0' depth = 12,795 cf Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 / 2013 Pond No.1 - DRY POND Pond Data Contours - User - defined contour areas. Average end area method used for volume calculation Begining Elevation = 356.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 000 356.00 2,502 0 0 1.00 357.00 3,604 3,053 3,053 2.00 358.00 4,783 4,194 7,247 3.00 359.00 6,028 5,406 12,652 4.00 36000 7,340 6,684 19,336 500 361.00 8,030 7,685 27,021 Culvert / Orifice Structures Weir Structures [Al [B] [C] [PrfRsr] [A] IBl [C] ID] Rise (in) = 24.00 100 0.00 0.00 Crest Len (ft) = 20.00 25.00 0.00 0.00 Span (in) = 24.00 1.00 0.00 0.00 Crest El. (ft) = 358.67 359.50 0.00 0.00 No. Barrels = 1 4 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 354.30 356.00 0.00 0.00 Weir Type = 1 Broad - - Length (ft) = 60.00 1.00 0.00 0.00 Multistage = Yes No No No Slope ( %) = 0.50 0.10 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 060 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multistage = n/a Yes No No TW Elev. (ft) = 0.00 Note cuwwortfice outilows are analyzed under mist (w) and outlet (oe) control Weir risers checked for orNice conditions (tc) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Ch► A Civ B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cis cfs cfs cfs cis cis cis cis cis cis cis 0.00 0 356.00 0.00 000 - - 0.00 000 - - - - 0.000 1.00 3,053 357.00 8.72 oc 0.10 is - - 0.00 0.00 - - - - 0.103 2.00 7,247 35800 8.72 oc 0.15 is - - 0.00 0.00 - - - - 0.147 3.00 12,652 35900 12.79 oc 0.16 is - - 12.62 0.00 - - - - 12.79 4.00 19,336 360.00 32.63 is 0.02 is - - 32.60s 22.98 - - - - 55.61 5.00 27,021 361.00 36 07 is 0.01 is - - 35.97s 119.41 - - - - 155.39 MoRkM'VA \I.. A P1E2V IDf1A1r% I vIIw I'm v. 1 — Nor I% ■ ■ v I'm v -6.00 -6.00 -4.00 -3.00 -2.00 -1.00 1-0.00 Stage (ft) Extension for AUtOGAI)V UV11 3i IV ZUf Z oy AutooeSK, inc. vto Top of pond EIev.381.00 100-yr 10-yr 2-yr 1 -yr Inflow hydrograph = 1. Rational - <no description> Project: dry pond north.gpw Monday, 05 / 20 / 2013 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 / 2013 Hyd. No. 2 NORTH POND Hydrograph type = Reservoir Peak discharge = 0.135 cfs Storm frequency = 2 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 5,992 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 357.69 ft Reservoir name = DRY POND Max. Storage = 5,953 cuft Storage Indication method used. Q (Cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 000 NORTH POND Hyd. No. 2 — 2 Year Q (Cfs) 0 10 20 — Hyd No. 2 Hyd No. 1 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 30 40 50 60 Time (min) 1 1 1 1 1 1 1 Total storage used = 5,953 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc v9 Monday, 05 / 20 / 2013 Hyd. No. 2 NORTH POND Hydrograph type = Reservoir Peak discharge = 0.149 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 7,517 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 358.04 ft Reservoir name = DRY POND Max. Storage = 7,472 cuft Storage Indication method used. NORTH POND Q (cft) Hyd. No. 2 —10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 10 20 -- Hyd No. 2 Hyd No. 1 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 30 40 50 60 Time (min) I f I I I L Total storage used = 7,472 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 / 2013 Hyd. No. 2 NORTH POND Hydrograph type = Reservoir Peak discharge = 0.165 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 10,113 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 358.52 ft Reservoir name = DRY POND Max. Storage = 10,060 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ` 0 10 --- Hyd No. 2 NORTH POND Hyd. No. 2 —100 Year 20 Hyd No. 1 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 30 40 50 60 Time (min) ! I I I I I I Total storage used = 10,060 cult Dry Pond South Design 2/6/2013 Project: Crowne at Alexander Place la = 0.83 (Impervious fraction, unitless) Rv = 0.80 (Runoff Coefficient, unitless) Rd = 1.00 (Design storm depth, inches) A = 3.91 (Watershed Area, Acres) WQv = 11,312 (Volume to be controlled in pond, cf) Dry Pond dimensions = variable Volume provided G 3.0' depth = 14,709 cf VGPii4 2 .5 1 > 1)131-L Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139 2012 by Autodesk, Inc. v9 Monday, 05 1 20 12013 Pond No.1 - DRY POND Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Beginmg Elevation = 354 00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 354.00 3,246 0 0 1.00 355.00 4,281 3,764 3,764 2.00 356.00 5,386 4,834 8,597 3.00 357.00 6,561 5,974 14,571 4.00 358.00 7,772 7,167 21,737 5.00 359.00 8,030 7,901 29,638 Culvert/ Orifice Structures Note: culvertlo f= Weir Structures Stage / Storage / Discharge Table [A] JB] IC] [PrfRsr] Elevation [A] [B] [C] [D] Rise (in) = 24.00 1.00 0.00 Inactive Crest Len (ft) = 20.00 25.00 0.00 0.00 Span (in) = 24.00 1.00 0.00 000 Crest El. (ft) = 356.50 357.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 350.55 354.00 0.00 0.00 Weir Type = 1 Broad - - Length (ft) = 55.00 1.00 000 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.10 0.00 n/a 119.41 - - - - 160.64 N -Value = 013 013 013 We Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: culvertlo f= ow lows are analyzed wider irHet (ic) and outlet (oo) control Weir risers checked for anfioe cortdibws (IC) and submergence (s) Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft cuff ft cfs cfs cis cis cis cfs cfs cis cfs cis cis 0.00 0 354.00 0.00 0.00 - - 000 0.00 - - - - 0.000 1.00 3,764 355.00 23.67 is 0.03 is - - 0.00 0.00 - - - - 0.026 2.00 8,597 356.00 23.67 is 0.04 is - - 0.00 000 - - - - 0.037 3.00 14,571 357.00 23.67 is 0.05 is - - 23.55 0.00 - - - - 23.59 400 21,737 35800 38.27 is 0.01 is - - 38.26s 22.98 - - - - 61.24 5.00 29,638 35900 41.25 is 0.00 is - - 41.22s 119.41 - - - - 160.64 m _ — -A u _ A 11 P9 V Pf /1 r I r% r%JJJ .1 MV. I ' f1LR I rvI'Iv 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Stage (ft) Hydraflow Hydrographs Extension for AutOCAD® clvu ULM zuiz oy AuroaesK, inc. vv Top of pond --\ EIev.359.00 10-yr 2 -yr 1-yr Inflow hydrograph = 1. Rational - <no descnption> Project: dry pond south.gpw Monday, 05 / 20 / 2013 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31)® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 / 2013 Hyd. No. 2 <no description> Hydrograph type = Reservoir Peak discharge = 0.031 cfs Storm frequency = 2 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 4,223 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 355.45 ft Reservoir name = DRY POND Max. Storage = 5,929 cuft Storage Indication method used. <no description> Q (mss) Hyd. No. 2 — 2 Year Q (c�) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 10 20 — Hyd No. 2 — Hyd No. 1 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 30 40 50 60 _ Time (min) ill _ l 1_ I f Total storage used = 5,929 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 / 2013 Hyd. No. 2 <no description> Hydrograph type = Reservoir Peak discharge = 0.034 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 4,857 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 355.76 ft Reservoir name = DRY POND Max. Storage = 7,437 tuft Storage Indication method used. 0 10 — Hyd No. 2 <no description> Hyd. No. 2 —10 Year 20 30 40 50 Hyd No. 1 1 1 1 1 -11, f Total storage used = 7,437 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 60 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAO® Civil 3D® 2012 by Autodesk, Inc. v9 Monday, 05 / 20 12013 Hyd. No. 2 <no description> Hydrograph type = Reservoir Peak discharge = 0.039 cfs Storm frequency = 100 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 5,733 cuft Inflow hyd. No. = 1 - <no description> Max. Elevation = 356.24 ft Reservoir name = DRY POND Max. Storage = 10,003 cult Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 10 Hyd No. 2 <no description> Hyd. No. 2 —100 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 I I I - - -- ' ' 0.00 20 30 40 50 60 Time (min) Hyd No. 1 1 1 1 1 1 1 1 Total storage used = 10,003 cult Level Spreader Calculations The supplemental spreadsheet and maintenance manual from the NCDWQ BMP manual are attached that show the level spreader calculations. The area below the level spreader will remain naturally wooded for a minimum of 35' prior to entering the Neuse Riparian Buffer. The storage capacity of each dry pond exceeds the WQV (Water Quality Volume) and the 2, 10, and 100 year storms are retained for a drawdown over 2 to 5 days. Each level spreader is designed with a flow splitter and bypass channel. The outflow rates are very low due to the slow drawdown of the WQV. The bypass channel should only receive flow during very intense storms exceeding the 100 yr storm amount. It Stormwater Enters the LS-VFS from a BMP Type of BMP Other. Explained below Peak discharge from the BMP during the design storm 0.037 cis Peak discharge from the BMP during the 10 -rear storm 0.037 cis Maximum rapacity of a 100 -foot long LS-VFS 2 cis Peak flow directed to the LS-VFS 0.037 cis Is a flow bypass system going to be used? y (Y or N) Explanation of any "Other, responses above Dry Pond due to no SHWT present and small drainage areas that would make it difficult to maintain a healthy normal pool elevation Forth SW401 - LS-VFS - Mune2012 - Rev 10 page 1 of 3 ,'0�y.Wi,1,11 ,410 T NC ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION Project name Crowne at Alexander Place Contact name Jon Callahan Phone number 919.8284428 Date May 16, 2013 Drainage area number North Level Spreader/Filter Strip II. DESIGN INFORMATION The purpose of the LS-VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS-VFS from A BMP Type of VFS Wooded stormwater setback (slope < 5 %) Explanation of any "Other responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area ft Do not complete this section of the forth. Impervious surface area fe Do not complete this section of the form Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form Peak flow From the 1 kAr storm cis Do not complete this section of the form Time of concentration min Do not complete this section of the form Rainfall intensity,10•yr storm infhr Do not complete this section of the form Peak flow from the 10-yr storm cis Do not complete this section of the forth. Design storm Pick one: Maximum amount of flow directed to the LS-VFS cis Do not complete this section of the form. Is a flaw bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other responses above It Stormwater Enters the LS-VFS from a BMP Type of BMP Other. Explained below Peak discharge from the BMP during the design storm 0.037 cis Peak discharge from the BMP during the 10 -rear storm 0.037 cis Maximum rapacity of a 100 -foot long LS-VFS 2 cis Peak flow directed to the LS-VFS 0.037 cis Is a flow bypass system going to be used? y (Y or N) Explanation of any "Other, responses above Dry Pond due to no SHWT present and small drainage areas that would make it difficult to maintain a healthy normal pool elevation Forth SW401 - LS-VFS - Mune2012 - Rev 10 page 1 of 3 LS-VFS Design Forebay surface area Depth of forebay at stom water entry point Depth of forebay at stormwater exit point Feet of level Up needed per ds Computed minimum length of the level rip needed Length of level rip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level rip to the end of the VFS) Are any draws present in the VFS? Is there a collector Swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram blow): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10-yr storm Channel fining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any 'Other' responses above y (Y or N) Y (Y or N) 3.00 sq It 2.00 in 15.00 in 50 Fdds 2 ft 15 It 35 ft 354.80 fmsl 354.00 fmsl 2.29 % n (Y or N) n (Y or N) y (Y or N) Y (Y or N) 3.00 It 2.00 It 15.00 It 0.00 It 2.00 ft 0.00 fUsec Rip-rap A (Y or N) y (Y or N) w Ten feet is the minimum level spreader length. OK Please provide plan details of flaw splitter & supporting caics. ♦ B + Form SW401 - LS-VFS - Mune2012 - Rev 10 page 2 of 3 JUL REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project Initial in the space promded to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - W or larger) of the entire site showing- - Design at ultimate build -out Offer drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, Maintenance access, Pmposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1' = N or larger) for the level spreader showing: - Fombay (if applicable), High flow bypass system, One foot topo Ones between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out 3. Section view of the level spreader (1' = 20' or larger) showing: - Underdram system (d applicable), Level lip, Upslope ehannet and Downslope filter fabric. 4. Plan details of the flow splflting device and supporting calculations (if applicable). 5. A Construction sequenoe that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6 If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement Page or plan sheet number and any notes: Au-- PeT41i:,Q�,j CAL,c,c44� s jAJCL-4 -b44-> 1 &.1 57X01-t"-AfM P k"f,C gG Aopaz5e'J r-✓l r* CAb,,,t Pez,,,r t f ; ! ynwd t Nolen 1115 P"-"' "' Form SW401 - LS-VFS - Mune2012 - Rev 10 page 3 of 3 Form SW401 - LS-VFS - 29June2012 - Rev 10 page 1 of 3 IlotVO'iAAZF, HME A` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled ou4 printed, initialed, and submitted. I. PROJECT INFORMATION Prolect name Crowne at Alexander Place Contact name Jon Callahan Phone number 919.828.4428 Date May 16, 2013 Drainage area number South Level Spreader/Filter SOO II. DESIGN INFORMATION The purpose of the LS-VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stomtwater enters LS-VFS from A BMP Type of VFS Wooded stormwater setback (slope < 5 %) Explanation of any "Other' responses above It Stormwater Enters the LS-VFS from the Drainage Area Drainage area fe Do not complete this section of the form Impervious surface area fe Do not complete this section of the form Percent impervious % Do not complete this section of the form Rational C coefficient Do not complete this section of the form Peak flow from the 1 in/hr storm cis Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10-yrstorm Whir Do not complete this section of the form Peak flow from the 10-yr storm cis Do not complete this section of the form Design storm Pick one: Maximum amount of flour directed to the LS-VFS ds Do not complete this section of the form. Is a flow bypass system gang to be used? (Y or N) Do not complete this section of the form. Explanation of any 'Other" responses above N Stormwater Enters the LS-VFS from a BMP Type of BMP Other Explained below Peak discharge from the BMP during the design storm 0 034 cis Peak discharge from the BMP during the 10 -year storm 0.034 cis Maximum capacity of a 100 -foot tong LS-VFS 2 cis Peak flow directed to the LS-VFS 0.034 cis Is a flow bypass system gang to be used? y (Y or N) Dry Pond due to no SMWT present and small drainage areas that would make it difficult to Explanation of any 'Other responses above maintain a healthy normal pool elevation Form SW401 - LS-VFS - 29June2012 - Rev 10 page 1 of 3 LS-VFS Design Forebay surface area Depth of forebay at stomrwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per ds Computed minimum length of the level Up needed Length of level lip provided Width of VFS Elevation at dowrmbpe base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10 -year stone) freeboard (during the 10 -year storm) Peak vebcdy in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any -OW responses above y (Y or N) y (Y or N) 300 sq ft 2.00 In 15.00 in 50 fticfs 2 it 15 it 35 it 350.80 fnrsl 349.80 hsl 2.86 % n (Y or N) n (Y or N) y (Y or N) y (Y or N) 300 ft 2.00 it 15.00 it 0.00 it 2.00 it 0.00 Nsec Rip -rap n (Y or N) y (Y or N) W Ten feet is the minimum level spreader length. OK Please provide plan details of flow splitter & supporting cafes. j B � Form SW401 - LS-VFS - Mune2012 - Rev.10 page 2 of 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentabon can be found. M incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requrled Item: InZ Page or plan sheet number and any notes: 1. Plans (1' - 50' or larger) of the entire site growing: AL,- D eEM C-0 - Design at ultimate build -out, Off -site drainage (ff applicable), Delineated drainage basins (include Rational C coefficient per basin), Fofebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and pubic right of way (ROW), and Boundaries of drainage easement 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo Ones between the level Op and top of stream bank, Proposed drainage easement and Design at ultimate build -out Section view of the level spreader (1' = 20' or larger) showing: Underdrain system (if applicable), Level Op, Upslope channel, and Dowmlope fitter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows Crow the level spreader will be protected from sediment until the entire drainage area is stabilized. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present 7. The supporting calculations. 8 A copy of the signed and notarized operation and maintenance (O&M) agreement Form SW401 - LS-VFS - 29June2012 - Rev.10 page 3 of 3 Permit Number: (to be provided by DW Drainage Area Number: oX ?I) Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/ debris is present. Remove the trash /debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SVX401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it water until it is established. Provide lime and a one -time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or lust downslope of the level lip. The bypass channel Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). a roximate three to six inches. Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -tune fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Wafter damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919- 733 -1786. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Crowne at Alexander Place BMP drainage area number:North Level Spreader and Filter Strip I Print name: Title: M � r Signature: Date: L_, Ir-I ` OR Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, NH G:b 1I ga lV2Fw y-p d== , a Notary Public for the State of a kzt�. , County of �C �Ct erz, , do hereby certify that l21 personally appeared before me this f; day of I "lam 20L 3, and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, QP ,..::'STEAL My commission expires q. b_. I 1 4 Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev3 Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: Sou 2i Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash /debris is present. Remove the trash /debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the roblem: The Swale and the level The Swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one -time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslope of the level lip. The bypass channel Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). a roximatel three to six inches. Areas of bare soil and /or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919- 733 -1786. Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 2 of 3 C. Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Crowne at Alexander Place BMP drainage area number: South Level Spreader and Filter Strip CZ-i Print name: tM Title: H "a Address: So Phone: Signature: Date: � Ito = Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 3 SZa � I, 0 (10 \V c--_)wW �-� , a Notary Public for the State of ,County of ®-r , do hereby certify that 2z � v aA personally appeared before me this day of �" , a.Dl 3 and acknowledge the due execution of the forgoing filters 'p, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, t A ! SEAL My commission expires `T 12! I T Form SWU401 -Level Spreader, Filter Strip, Restored Riparian Buffer O &M -Rev.3 Page 3 of 3 Culvert Calculations The culvert crossing the buffered stream at the driveway location was modeled with Hydroflow Express Extension software. The 100 year flow was determined using the TR -55 segmented flow and SCS method as a more conservative approach to larger drainage areas. The minor flood study and culvert analysis is attached. The culvert was designed with a buried invert. MIAJOC r-,tvoy) JTvpy DA ��}�±Jr -S� ����. 4�v -�!� l5 GAS /��► is z&ceviax� ln� 0&7*,-j /(7qo cjt*jN"ue?- r-,-Oz a n o.ay Pv -7 = 23.2 w�EAJ C. CAL a� 1 41c, G — 1 (Q� � f S, (Zj,'7)(-7Li) TR55 Tc Worksheet Hyd. No. 1 Creek Crossing Description Sheet Flow Manning's n -value Flow length (ft) Two -year 24 -hr precip. (in) Land slope ( %) Travel Time (min) Shallow Concentrated Flow Flow length (ft) Watercourse slope ( %) Surface description Average velocity (ft/s) Travel Time (min) Channel Flow X sectional flow area (sgft) Wetted perimeter (ft) Channel slope ( %) Manning's n -value Velocity (ft/s) Hydraflow Hydrographs Extension forAutoCADD Civil 3D® 2012 by Autodesk, Inc. v9 A B = 0.150 0.011 = 250.0 0.0 = 3.60 0.00 = 3.20 0.00 = 15.93 + 0.00 = 0.00 = 0.00 = Paved =0.00 = 0.00 = 10.00 = 9.00 = 4.00 = 0.080 =4.00 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 Willa C 0.011 0.0 0.00 0.00 + 0.00 = 15.93 0.00 0.00 Paved 0.00 + 0.00 0.00 0.00 0.00 0.015 0.00 Flow length (ft) ( {0 })1740.0 0.0 0.0 Travel Time (min) = 7.25 + 0.00 + 0.00 TotalTravel Time, Tc ............................................... ............................... = 0.00 7.25 23.19 min Hydrograph Report Hydrafkow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk. Inc. v9 Wednesday, 05 / 15 / 2013 Hyd. No. 1 Creek Crossing Hydrograph type = SCS Runoff Peak discharge = 73.42 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 255,582 cuft Drainage area = 28.300 ac Curve number = 74 Basin Slope = 4.0% Hydraulic length = 1990 ft Tc method = TR55 Time of conc. (Tc) = 23.20 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Creek Crossing Q (off) Hyd. No. 1 —10 Year () 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. v9 Wednesday, 05 / 15 / 2013 Hyd. No. 1 Creek Crossing Hydrograph type = SCS Runoff Peak discharge = 133.03 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 459,324 cuft Drainage area = 28.300 ac Curve number = 74 Basin Slope = 4.0% Hydraulic length = 1990 ft Tc method = TR55 Time of conc. (Tc) = 23.20 min Total precip. = 7.40 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Creek Crossing Q () Hyd. No. 1 —100 Year Q (off) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Thursday, May 9 2013 Circular Culvert Invert Elev Dn (ft) = 356.00 Calculations Pipe Length (ft) = 94.00 Qmin (cfs) = 73.00 Slope ( %) = 1.10 Qmax (cfs) = 133.00 Invert Elev Up (ft) = 357.03 Tailwater Elev (ft) = (dc +D) /2 Rise (in) = 60.0 Shape = Circular Highlighted Span (in) = 60.0 Qtotal (cfs) = 73.00 (p '(g Q No. Barrels = 1 Qpipe (cfs) = 73.00 n -Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.68 Culvert Entrance = Square edge w /headwall (C) Veloc Up (ft/s) = 7.79 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 359.71 HGL Up (ft) = 359.44 Embankment Hw Elev (ft) = 360.49 Top Elevation (ft) = 374.00 Hw /D (ft) = 0.69 Top Width (ft) = 45.00 Flow Regime = Inlet Control Crest Width (ft) = 100.00 Elev (ft) 377 00 37400 37100 36800 36500 36200 359.00 35600 35300 <Name> My Depth (a) 1997 1697 1397 1097 797 497 197 -103 403 Gra3ar Cuhren HGL Embank - Reach (H) Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Thursday, May 9 2013 Circular Culvert Invert Elev Dn (ft) = 356.00 Calculations Pipe Length (ft) = 94.00 Qmin (cfs) = 73.00 Slope ( %) = 1.10 Qmax (cfs) = 133.00 Invert Elev Up (ft) = 357.03 Tailwater Elev (ft) = (dc +D) /2 Rise (in) = 60.0 Shape = Circular Highlighted Span (in) = 60.0 Qtotal (cfs) = 133.00 IooYRt? No. Barrels = 1 Qpipe (cfs) = 133.00 n -Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 7.64 Culvert Entrance = Square edge w /headwall (C) Veloc Up (ft/s) = 9.68 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 360.15 HGL Up (ft) = 360.33 Embankment Hw Elev (ft) = 362.21 Top Elevation (ft) = 374.00 Hw /D (ft) = 1.04 Top Width (ft) = 45.00 Flow Regime = Inlet Control Crest Width (ft) = 100.00 Elev (ft) 377 00 37400 37100 368 00 36500 36200 35900 35600 35300 <Namea Hw Depth (ft) 1997 1697 1397 1097 797 497 197 -1.03 403 Qrtvlar CuIven HGL Embank Reath (ft) Nitrogen Export Calculations Proposed Lot with R/W on Acc Blvd (15.28 total acres) Area draining to Dry Pond - Retention/Level Spreader/Filter Strip LAND TYPE SITE AREA TN EXPORT COEFFICIENT TN EXPORT BY LAND USE TN EXPORT FROM SITE PRESERVED UNDISTURBED 0.0 ac 0.6 lb /ac /yr 0.0 lb /yr PRESERVED MANAGED 1.7 ac 1.21b /ac /yr 2.04 lb/ IMPERVIOUS 6.35 ac 21.2 lb/ac/yr 134.62 lb/yr TOTAL 8.05 ac 136.661b/ r AVERAGE F 1 16.97 lb /a r Nitrogen is reduced by 10% by use of dry pond and then 20% by use of filter strip, thus: 136.66 lb /yr * 10% (reduction) = 122.991b/yr 122.99 lb /yr * 20% (reduction) = 98.39 lb /yr Remaining area - no treatment LAND TYPE SITE AREA TN EXPORT COEFFICIENT TN EXPORT BY LAND USE TN EXPORT FROM SITE PRESERVED UNDISTURBED 0.0 ac 0.6 lb /ac /yr 0.0 lb /yr PRESERVED MANAGED 7.23 ac 1.2 lb/ac/Tr 8.67 lb/yr IMPERVIOUS 0.0 ac 21.2 lb/ac/yr 0.0 lb /yr TOTAL 7.23 ac 8.67 lb/ r AVERAGE 1.191b/a r Thus total site nitrogen export post development: 98.39 + 8.67 = 107.07 lb /yr Average total site nitrogen export: 107.07 / 1 5.28 Ac. = 7.00 lb /Ac /yr Developer to buy down to 3.61b /Ac /yr. SHWT Evaluation May 16, 2013 Crowne Partners, Inc 505 N. 20"' St. Ste. 1015 Birmingham, Alabama 35203 Attn: Christina Nawrocki Re: Report of Supplemental Services Seasonal High Water Table Evaluation Crowne at Alexander Place ACC Boulevard Raleigh, North Carolina Terracon Project No: 70125143 Dear Ms. Nawrocki, Irerracan Terracon Consultants, Inc. ( Terracon) has completed services for the Crowne at Alexander Place project in accordance with our supplemental agreement dated May 7, 2013. We previously issued a preliminary geotechnical engineering report for the project dated October 18, 2012. The services authorized in the current scope of work include evaluation of the presence and /or level of a seasonal high water table within the range of the elevations of the proposed dry ponds. PROJECT INFORMATION General project information is based on our on -site observations and the provided site plans dated January 30, 2013. The Crowne at Alexander Place is a proposed residential apartment complex planned for Parcel Nos. 51 and 53 within the T. W. Alexander Place mixed -use community. The attachments to this letter include a site plan with further details regarding the project location. A stream running from southeast to northwest roughly bisects the site before joining a creek that runs along the northwest boundary of the site. Two dry ponds are planned to manage stormwater that accumulates and flows northwest from the development on the north and south banks of the stream. The provided grading plans indicate proposed cuts in portions of the ponds. Terracon Consultants, Inc. 5240 Green's Dairy Road Raleigh, NC 27616 P [9191 873 2211 F [9191 873 9555 terracon corn Report of Supplemental Services Irerracon Crowne at Alexander Boulevard ■ Raleigh, North Carolina May 16, 2013 • Terracon Project No. 70125143 FIELD EXPLORATION Two borings were performed within each of the proposed ponds for a total of four borings. The boring locations were established in the field with the help of hand -held GPS technology and by estimating relative elevation based on the contours in the provided topographic plans. A figure showing the approximate location of the borings with respect to the proposed ponds is attached to this report. The borings were performed with a track- mounted Diedrich D -50 rotary drill rig using hollow stem techniques and split - barrel sampling procedures to advance the boreholes. A drill rig was utilized to facilitate excavation in the anticipated very hard/dense subsurface materials. Auger refusal was encountered at a depth of approximately seven feet below the existing surface in Boring No. 1-4. The remaining borings were advanced to depths of two to five feet below the proposed pond elevation at the locations tested. The following table contains further details regarding the depths of the borings relative to the existing and proposed pond elevations: Proposed Pond Boring No. The samples obtained were placed in appropriate containers for transport to our laboratory. The samples were observed by Fred D. Smith, a licensed soil scientist in the State of North Carolina, for physical properties that include texture, color, structure, and consistency. Mr. Smith did not encounter any evidence of a seasonal high water table based on his observation of the samples from the borings. A detailed report of his findings is attached to this letter. Responsive a Resourceful a Reliable 2 Existing ftjevation Elevation Depth of Boring (ft) 1 -1 356 354 4.2 1 -2 359 354 10 1 -3 363 356 10.2 1-4 369 356 7.2 The samples obtained were placed in appropriate containers for transport to our laboratory. The samples were observed by Fred D. Smith, a licensed soil scientist in the State of North Carolina, for physical properties that include texture, color, structure, and consistency. Mr. Smith did not encounter any evidence of a seasonal high water table based on his observation of the samples from the borings. A detailed report of his findings is attached to this letter. Responsive a Resourceful a Reliable 2 Report of Supplemental Services Irerracon Crowne at Alexander Boulevard , Raleigh, North Carolina May 16, 2013 Terracon Project No. 70125143 CLOSURE We appreciate the opportunity to work with you on this project. Please contact us if you have any questions concerning the information or comments contained in this letter. %% f%A,,If Sincerely, Terracon Consultants, Inc. Thomas R. Bartlett, El Staff Professional 0 O FESZ, 'Q V. SEAL 034749 i R. L. Levi Denton, 11, P Senior Associate / Geotechnical Manager Registered, NC 034749 Attachments: Report of a Soil Evaluation for Stormwater Treatment Fred D. Smith Consulting, Inc. Exhibit A -1 Site Location Plan Exhibit A -2 Boring Location Plan 1 -1 through 1 -4 Boring Logs Responsive Resmircoful Reliable 3 ' FRED D. SMITH SOIL CONSULTING May 15, 2013 Mr. Levi Denton Terracon Consulting Engineers and Scientists 5240 Green's Dairy Rd Raleigh, NC 27616 Subject: Report of a Soil Evaluation for Stormwater Treatment Crown at Alexander Place US 70 Raleigh, NC Dear W. Denton, This letter concerns the soil evaluation we performed at the above mentioned site. You authorized me to evaluate the soil samples obtained by a mechanical drill to determine the depth to the `seasonal high water table (SHWT)' at two proposed stormwater pond locations. My work consisted of classifying soil samples obtained by a Terracon drill rig into the USDA classification system and determining the depth to a seasonal high or perched water table. Continuous sampling split spoon samples were evaluated in your laboratory. The USDA soil descriptions are presented in Table 1. The drawing that shows boring locations is shown in Tenacon's report. Soil Evaluation The soils are formed in the Triassic Basin from sedimentary rocks. The soils have thin layers of topsoil over about 3 to 5 feet of very firm, very sticky, very plastic clay or silty clay that has reddish brown and brown colors. Below about 5 feet is very dense brown silty clay that resembles silt stone. Partially weathered rock is present below this layer. These soils are shallow to parent material and sedimentary rock They are probably not permeable and show no evidence of iron reductions or concentrations. Any water that falls on the surface probably runs off the surface or penetrates the topsoil and moves laterally down slope along the topsoil — B horizon interface without any downward movement through the soil. Groundwater Groundwater was not found in the borings. Based on soil color patterns, a seasonal or perched water table is not present in these two proposed pond lowdons. Ofiiee/WhMe (252) 908-4389 Post Moe Box f f75 — Nasbvi/!e, North Carolina 27856 I appreciate the opportunity to work with you on this project. Please contact me if you have questions or need additional information. C rally, ,44-b 4 -1-1- Fred A Smith Licensed Soil Scientist OffvWMobAe (252) 9084MO Post OMae Box If75- Mashvi//e, Mor& Cara i7a 27855 Table 1 USDA Soil Descriptions Crown at Alexander Place Raleigh, NC I1 HORIMN/DEPTH DESCRIPTION feet !moil A/ 0-.5 topsoil B2 /.5-3 Strong brown (7.5YR 5/4 and 518) clay with few gray streaks (Mochromic) that have pwr fragments; very film; sticky, slightly BC / 5.5 -10 plastic. Clay is expansive. CR / 3-4.2 Partially weathered rock 12 HORIW"EPTH DESCRIPTION feet !moil A/ 0-.5 topsoil B2 /.5-5.5 Brown (7.5YR 5/6 and 4/4) clay; very firm; sticky, plastic. Expansive clay. BC / 5.5 -10 Brown (7.5YR 514 and 3/2 and M 516); silty clay; very firm, very sticky, very plastic. I -3 HORIWN/DEPTH feet DESCRIPTION A / 0-.5 !moil B/3 - 8 Brown (7.5YR 5/6 and 10YR 7 11) silty clay; very firm; very sticky, very plastic; expansive, CR/ 8 -10 Partially weathered rock I-4 HORIMN/DEPTH feet DESCRIPTION A/0 -.5 topsoil B 1.5- 5 Brown 7.5YR 6/4 sandy clay-, yery firm; very sticky, very plastic. CR / 5- 7 pqWy weathered rock Of FCWM"I& (252) 9A04M Past Offee Box -1175 - Nashville, North Carvfta 27056 Project Mngr. 143 lrerracon SITE LOCATION PLAN EXHIBIT REPORT OF SUPPLEMENTAL SERVICES raven y: NTS Consulting Frigineers & ScicnrisLs CROWNE AT ALEXANDER PLACE n Checked By: 1211 RILE) 143 ACC BOULEVARD / l Approved By: 12/9 -d.r awa 111100 Rene C-1— 11611 RALEIGH, NORTH CAROLINA 2013 nH.(919(6rs2211 PAX, (919)ern -9555 ,< I � - .. �t .... t1 1 �•t Vii, �•� j � � 1 i (���. iii � + � �`.r.. -T�,.�•. "i••i '•i � � s '�J t �.. „". j f I ��r, /•, J- .. r r '' y \�•� + � � j �•� I•� r ��r'�r.� s �� �� Py�4y���n, p� r r�r•- �,•'•• I t fi.. t' I jJ �r/t ' � i t � 1 � ! t.o .,,'r, 0. AE SO OA6�. �011r : iil1etrf� / TI' i'/ ¢P'��,�'p�r��, t! i r Jrr, f rAJ 0J Q 04 �, � -+�; Jtr� 9 !{ Ii ' � P {QG'! I•� ?1� ' - ' a� ✓.i��' jv IF 'loll 3'$ V .S �r %- °- • � � „r,ti '.t, � /Ji V � -fir • i : i !rr '+ /' S � ✓ ��r - +,''� - r ��� ' ' t .I ' .'w+ \� • ' . ter/ ' ' , *'' � I �.. �`` �, -1 ,, � 1 \ !! fri r � ! 'j ,- e`a't • ;, r_j,e i'�` t`;` t 4 �\ ; 1 t� . , �♦ U� Ji''� r,'' ! ♦ ~� i Fes.,, i `•- . low t I, � it � / / t � ! ' ,- , S; �`,� ,♦�~. � ., 1i4 S1 � \♦ • ; ; G,� ` r !/ ! - 10X � ' / .• - ' . y �' 1 ♦ ♦. � '�,, d e '. „ 1`•.`♦♦4i+0.r'f'3'r —'" �+'i to i I to if tr !. t /,/ -�� / ♦� '• r•` ✓ ?.,'.� - , ,, ♦ `emu.` ^�\,� \`�"� IL r r/ r Jr r ! r r r ♦ . f' i r -•_� , Approximate Boring LOCatIOn ! r lr rr f1C /)y f r T ♦ l L ��a '♦ ♦♦ t r f� "!- , r LOCATION' _D BE CONSIDE w a a 0 2 O O m O F- 2 r- a. w J 0 IN BORING LOG NO. 1-1 Page 1 of 1 PROJECT: Crowns at Alexander Place CLIENT: Crowns Partners, Inc. Birmingham, Alabama SITE: ACC Boulevard Raleigh, North Carolina a LOCATION J T Q w "-f2 U Latitude- 35.91087° Longitude -78.7773T 009 a �W d tl Surface Elev.: 358 TO 0 3 m U. DEPTH ELEVATION L O 0 5 TDPSOIL 355. ELASTIC SILT (�1. with sand, red- brown, very stiff 11113.0 10-12 -13-15 N =25 3 _ X PARTIALLY VEATHERED ROCK OME red -bmwn, Triassic .2 352 14-47 -50/2" N =50/2" Boring Temrinated at 4.2 Feet 5 1 1 2 2 StratlBcation lines are appropmate. In -situ, the tramutron may be gradual. Hammer Type: Automatic Advancement Method: Notes- Borehole advanced with 31/4 inch hollow stem augers AbarMonment Method: Borings baddlled with sal cuttings upon completion. WATER LEVEL OBSERVATIONS Irerracon Boring Started: 05/07/13 Boring Completed. 05!07113 No free water observed Drill Rig D£0 Driller WTD 5240 Green's Dairy Road Raleioh North Carolina Project No.* 70125143 BORING LOG NO. 1-2 Page 1 of 1 PROJECT: Crowne at Alexander Place CLIENT: Crown Partners, Inc. Birmingham, Alabama SITE: ACC Boulevard Raleigh, North Carolina 00 LOCATION z w0- 9 Latitude: 35.91086° LongftWe: -78.77713' v W0 � ie p �+ as a o a c a oW : Cr Surface Elev.: 359 (FL) 30 DEPTH ON FL � — 0,5 jOPSOfL 3585 FT CLAY (CHI, with sand, red- brown, stiff 4-6-8 N =14 5 - - ss 363.5 ELASTIC SILT MOO with sand, red -brown, stiff to very stiff 4- 6-8-18 N =14 10-10-9 -20 N =19 10.0 346 1 Boring Terminated at 10 Feet 1 2 2 Stratification lines are apprwdmate. In -situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: Notes. Borehole advanced with 3-114 inch hollow stem augers Abandonment Melhod' Borings bacidilled with sob cuttings upon completion. WATER LEVEL OBSERVATIONS Irerracon Boring Started: 05107/13 Boring Completed: 05107/13 No free water observed Drill Rig: D-50 Driller WTD 5240 Green's Dairy Road —T Raleiah North Carolina Proled No.. 70125143 t L f BORING LOG NO. 1-3 Page 1 of 1 PROJECT: Crowne at Alexander Place CUENT: Crowne Partners, Inc. Birmingham, Alabama SITE: ACC Boulevard Raleigh, North Carolina a LOCATION -. wo a N 78.77611' G Q Latitude: 35.91121' Longitude - r � a N w 0 W cc Surface Elev.: 363 (FL) 3 DEPTH ELEVATION FL = ` 0.5 MPSOIL 362 ELASTIC SILT (W), with sand, red- brown, very stiff to hard 5-9-12 N =21 5 &13 -30-35 N=43 8.0 355 ' PARTIALLY WEATHERED ROCK IP11YItl, red -brown, Triassic 1.2 1 N ==50150/ 2" i i 50/2" N =5012" Boring Terminated at 10.2 Feet i i 1 C u 2 7 C J u c S r J :e e 2 Strabtication lines are approAmate. In -situ, the transition may be gradual. Hammer Type: Automatic a Advancement Method Notes. `- Borehole advanced with 31/4 mch hollow stem augers 7 2 D Abandonment Method: N Borings badddted with sal cuttings upon completion. I WATER LEVEL OBSERVATIONS Irerracon Boring Started: 05107/13 Boring Competed. 05/07/13 = No free water observed 6 Drill Rig. Dso Dollar wro W _ 5240 Green's Dairy Road Raleiah North Carolina Project No.. 70125143 R W a a 0 2 0 K 0 m 0 x a w 0 0 O J 0 Q BORING LOG NO. 1-4 Page 1 of 1 PROJECT: Crowne at Alexander Place CLIENT: Crowne Partners, Inc. Birmingham, Alabama SITE: ACC Boulevard Raleigh, North Carolina J Q x LOCATION Latitude: 35.91131' Longitude: - 78.77584° surface Bev., 369 (Ft.) DEPTH ELEVATION (ILl o w o Q a m 'y 0 a W rn Lu .5 368.5 5 1 1 2 2 - 40-75 N= .0 with sand, red -brown 366 PARTIALLY WEATHERED ROCK (PWR) , red -brown, Triassic 362 Auger Refusal at 7.2 Feet 17.2 69- 100/2' N= 10012° 50/2° N =50/2° 50/0' N =50/0° Strat6ceton lines are apprmilmate. In -situ, the transition may be gradual. Hammer Type- Automatic Advancement Method: Borehole advanced with 3-1/4 inch hollow stem augers Notes* Abandonment Method Borings bacWdled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS Irerracon 5240 Green's Dairy Road Rateich. North Carolina Boring started: 05107/1 3 Borng Completed: 05107/13 No flee wafer observed Drill Rig. DSO Driller. WTD Proiect No. 70125143 A� 24' pjpE L RISER TO BE DESIGNED WITH GATE TO DRAIN POND GATE CONTROL INVERT OUT 354.00' WITH LOCK AND KEY TRASH RACK 100YR STORM — 356,2 TOP OF RISER 356.5' 1, 10YR STORM 355.76 7 2YR STORM 355.45 V it li 4'X8'X6" FOREBAY IS NOT REQUIRE' � SINCE VOLUME 5' X 5' 7 :7, ;;000',40 SEED DAM AND SLOPES WITH TURF GRASS SUC-*r AS FESCUE TOP OF DAM 0 358.00' 10' MIN 10' EMERGENCY SPI__LWAY 0 357.00' RIP RAP LINED W GEOTEXTII E FABRIC ON FILL SLOPE EMBANKMENT Ti BE COMPACTED TO 98% xl� STD. PROCTOR DENSITY. Er Mir MAP PAD CONC. BOX "57 L"=, 4' PVC TEE WITH IS LESS THAN 10 ACRE h',<:HES RISER CAP ON END 1" SEED BOTTOM WITH A QIET MEADOW MIX ORIFICE IN BOTTOM CAP Q�QM OF POND 354.00' \7 I I I I T INVERT OUT 350.55' u 7fTiL7 WATER TIGHT GASKETS ON PIPE AREA AT BASE OF RISER TO REMAIN WET —ilII NOTE: 55 LF 24'" ATTACH SKIMMER TO BOTTOM OF RISER CULVERT @ 1.4% —III DURING CONSTRUCTION PHASE WHILE POND IS BEING USED AS A SEDIMENT BASIN. DO NOT INSTALL 3/4- DRAW DOWN TUBE DURING 7'X7*X2' CONCRETE AN-n–FLOATAInlON PAD SEDIMENT BASIN PHASE. ALL SEDIMENT TO BE ANCHORED WITH "L" SHAPE #4 ANCHORS REMOVED PRIOR TO FINAL CONSTRUCTION OF ONNECTED TO RISER POND. ANTISEEP COLLARS 30' O.C. DRY POND SOUTH CROSS SECTION NOT TO SCALE DRY PONDS TO BE UTILIZED AS SEDIMENT BASINS DURING CONSTRUCTION. FINAL DESIGN OF THE SEDIMENT BASIN AN[.,, CONSTRUCTION SEQUENCE TO BE INCLUDED WITH GRADING PERMIT APPLICATION; HOWEVER, THE LEVEL SPREADER AND FILTER STRIP SHALL NOT BE INSTALLED UNTIL ALL UPSTREAM AREAS ARE STABILIZED AND DRY POND IS NO LONGER ACTING AS A SEDIMENT BASIN. THE SKIMMER FOR THE SEDIMENT BASIN WILL DISCHARGE DIRECTLY TO THE BYPASS CHANNEL DURING CONSTRUCTION. ANY DISTURBED SLOPES TO BE SEEDED AND STABILIZED FLOW SPUTTER JUNCTION -'Jy MH 'ACCESS TOP SEE DETAIL FS INV=350.00 24' PIPE OUT TO RIP RAP BYPASS CHANNEL SEE DETAILS INVERT 6" ABOVE BOTTOM ELEVATION TO HIGH FLOW BYPASS CHANNEL 24" PIPE FROM POND SPREADER WITH GEO'TEXTILE FABRIC LINER SECTION VIEW FLOW SPLITTER NOT TO SCALE iL INVERT OUT 356-00' 100YR STORM _:j�.53 Q 10YR STORM 358.05 V 7- 2YR STORM 357,70 �7 RISER TO BE DESIGNED WITH GATE TO DRAIN POND GATE CONTROL WITH LOCK AND KEY [,TRASH RACK ' _ TOP OF RISE R 358.8' SEED DAM AND SLOPES WI s-1 TURF GRASS SUCH AS FESCUE TOP OF DAM 0 360.50' 10' MIN 10' EMERGENCY SPILLWAY 0 359.50' RIP RAP LINED WITH GECTEXTII E FABRIC ON FILL SLOPE EMBANKMENT TO BE COMPACTED TO 98% STD. PROCTOR DENSITY. - wl 4'X8'X6" RIP RAP PAD FOREBAY IS NOT REQUIRED SINCE VOLUME 5' X 5' 24" pipe IS LESS THAN 10 ACRE INCHES CONIC. BOX "5" 4" PVC TEE WITH RISER CAP ON END 1" SEED BOTTOM WITH A WET MEADOW MIX - I ORIFICE IN BOTTOM =1 CAP -I E u OUT 354.30' NOTE: ATTACH SKIMMER TO BOTTOM OF RISER DURING CONSTRUCTION PHASE WHILE POND IS BEING USED AS A SEDIMENT BASIN. DO NOT INSTALL 3/4" DRAW DOWN TUBE DURING SEDIMENT BASIN PHASE. ALL SEDIMENT TO BE REMOVED PRIOR TO FINAL CONSTRUCTION OF POND. 6" PVC PIPE OUTLET FA "ATER 77GHT CASKETS ON AREA AT BASE OF RISER TO REMAIN WET 60 LF 24' RcP CULVERT @ 7'X7'X2' CONCRETE ANTI—FLOATATION PAD ANCHORED WITH "L" SHAPE #4 ANCHORS CONNECTED TO RISER ANTISEEF COLLARS 30, 0. C. DRY POND NORTH CROSS SECTION NOT TO SCALE 15' MIN 30" CURB AND GUTTER PLAN VIEW CONSTRUCT FLAT ELEV 354.8 (NORTH POND) CONSTRUCT FLAT ELEV 350.8 (SOUTH POND 5X15 RIP RAP PAD 3' WIDE 3" LAYER OF #57 STONE ;6r WITH GEOTEXTILE FABRIC LINER SECTION A-A LEVEL SPREADER NOT TO SCALE LINE WITH RIP RAP D:50=12" 2' MIN =71LI I— BYPASS CHANNEL NOT TO SCALD` ANY DISTURBED SLOPES TO BE SEEDED AND STABILIZED FLOW SPUTTER JUNCTION BO) MH ACCESS TOP SEE DETAIL FS INV=354.00 24" PIPE OUT TO RIP RAP BYPASS CHANNEL SEE DETAILS co z 0 LU ry LU 0 �pe® 9 w , 1/1 5X15 RIP RAP PAD 0 ry 30" CURB AND GUTTER z 3' WIDE 3" LAYER OF #57 STONE "ATER 77GHT CASKETS ON AREA AT BASE OF RISER TO REMAIN WET 60 LF 24' RcP CULVERT @ 7'X7'X2' CONCRETE ANTI—FLOATATION PAD ANCHORED WITH "L" SHAPE #4 ANCHORS CONNECTED TO RISER ANTISEEF COLLARS 30, 0. C. DRY POND NORTH CROSS SECTION NOT TO SCALE 15' MIN 30" CURB AND GUTTER PLAN VIEW CONSTRUCT FLAT ELEV 354.8 (NORTH POND) CONSTRUCT FLAT ELEV 350.8 (SOUTH POND 5X15 RIP RAP PAD 3' WIDE 3" LAYER OF #57 STONE ;6r WITH GEOTEXTILE FABRIC LINER SECTION A-A LEVEL SPREADER NOT TO SCALE LINE WITH RIP RAP D:50=12" 2' MIN =71LI I— BYPASS CHANNEL NOT TO SCALD` ANY DISTURBED SLOPES TO BE SEEDED AND STABILIZED FLOW SPUTTER JUNCTION BO) MH ACCESS TOP SEE DETAIL FS INV=354.00 24" PIPE OUT TO RIP RAP BYPASS CHANNEL SEE DETAILS co z 0 LU ry LU 0 �pe® 9 w , 1/1 SHEET z 0 ry z < min cr_ 0 z 11 co E m < cy COIL 0 co 00 co co 6 c1l co cm co w cr. O cl FTC ul co CL Lb 4 3:: z co (D X2 omll SHEET z 0 ry _j 0 < min cr_ 0 z 11 0 m < cy COIL w x 0 91 LJ _j v> z zo CJ c w O FTC (D Lli SHEET LAJ 0 ry tL min o 11 0 m < cy COIL w x 0 91 SHEET LAJ tL 11 iJ m z < u 91 LJ _j v> c SHEET IMPACT 1 ZONE 2 NRI3 302 SF ZONE 1 NRI3 454 SF IMPACT 2 NRB ZONE I ZONE 2 NRI3 300 SF 367 SF ZONE 1 NRI3 ... . .... . . . TAINING!��WAFI L -7 –7 777 Fo 382 .584 IIV A II. . . ... ... �� 7 . . . . . . . . . . IIA' 396 IA: . . . . . . . . . . . . . . III.. .. ...... . LEGEND I-& EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED WATER VALVE > EXISTING WATER REDUCER DO, PROPOSED WATER REDUCER 0 EXISTING MANHOLE 0 PROPOSED MANHOLE = EXISTING CATCH BASIN MM PROPOSED CATCH BASIN 13 EXISTING DROP INLET PROPOSED DROP INLET EXISTING FLARED END SECTION -44 PROPOSED FLARED END SECTION CO CLEANOUT FDC FIRE DEPARTMENT CONNECTION ADA ACCESSIBLE ROUTE TREE CONSERVATION AREA — I GRAPHIC SCAUS 50 25 A IN FEET 1 inch = 50 ft. 9 z 0 w w I I SHEET C-2 . 0 z z Cj < n. IL Lr) o z 0 04 o OD C4 E 0 not z 4 &t 0. ov% m 9 ()D C4 00 C4 ci 4) w co - ca I 0 o C4 > > u Lu i U. I Lb Z co ui ry I SHEET C-2 . 0 z _j 0 Cj < n. Lr) o z z O ry z ci w 0 V) _j cc C4 > L) ui ry I SHEET C-2 . 0 < n. Lr) O ry I SHEET C-2 . 0 < n. Lr) ci w 0 V) _j cc I SHEET C-2 . 0 IIVIrHI.. I I ZONE 2 NRE 302 SF ZONE 1 NRE 454 SF IMPACT 2 ZONE 2 NRB 300 SF ZONE 1 NRB 367 SF i� 370 IMPACT 3 ZONE 2 NRB 4,368 SF ZONE 1 NRB 7,745 SF CHANNEL 143 LF 528 SF PRI'VA- CREST 350 1 0+00 HEADWALL INV =357.0 - 374.0' 0 z Q t ___.L, PIPE CULVERT NIEL HEADWAL _INV =356. 0 +50 1+00 IMPACT 3 CROSS SECTION 1 +50 RIP RAP ENERGY I DISSAPATOR 2+00 •i z 0 w limlill erl, � I SHEET z W ° (L r U N s m i � I� a jLn a •e i r erg � w'+ o• o• s W V) o w .r � W L) w a � .r a C) r w d ry SHEET z W ° (L r U N s m 0 0 z � I� a jLn a cQ w v ry erg C3 �O O W V) o w Q � W L) w a � W a C) w d ry SHEET r C] (L r N m o � I� a jLn a 0- v ry SHEET C] (L N � I� C3 W V) ti W SHEET