Loading...
HomeMy WebLinkAbout20130101 Ver 1_More Info Received_20130123 (2)41 r6111 Piedmont Natural Gas 4720 Piedmont Row Drive Charlotte, NC 28210 a Town of Kenty , Tovim_of, Ison's Mills 4r • "` f f.x,P 13 -0 xo I Town of Micro "Town of Fremont Y Town of Selma NG� Town of Eureka '>r44 ^° 104 rt / Town of Pine-Level Jr p d a Town of Pikeville Town of Smithfield b q �► ` 40000 i w/ JOl -I NS TON Town of Princeton p 1, Oak9 � v .� n COUNTY � .m '2V Q ID ' n� O f `) City,of Gold" oldsboro 0 4 �. ° US-1 9 _ Village of Walnut Creek Q S \ ° ° WAYNE M - A COUNTY 0 N A N.T.S. NORTH CAROLINA ♦� *�a.�■ Iii �L. KEY MAP 1. bwn B�Snc GRIT NE COUNTY �2 im AV J �t Town of kerton i ^� t ,19®7H13j � e FJWHUM FEB 0 4 2013 NC DENR LENOIR COUNTY 5113 LOOP - WEST M C D E N R UM EROSION CONTROL COVER > ; 12' NATURAL GAS PIPELINE, NORTH CAROLINA, PROJECT NUMBER: 39911024 10550 Richmond, Suite 155 5020 Ritter Road, Suite 206 PLOT SCALE AT 22' x 34' Houston, TX 77042 Mechanicsburg, PA 17055 DRAWING NUMBER: 56LW- SEC -"01 SHEET 1 OF S2 EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST The following items shall be incorporated with respect to specific site conditions, in an erosion & sedimentation control plan: NPDES Construction Stomtwater General Permit NGG010000 Designation on the plans where the 7 or 14 day ground stabilization requirements apply per Section 11.6.2 of the permit. Design of basins with one acre or more of drainage area for surface withdrawal as per Section 11.6.4 of the permit. LOCATION INFORMATION X Project location & labeled vicinity map (roads, streets, landmarks) �— North arrow and scale Identify River Basin. X Provide a copy of site located on applicable USGS quadrangle and NRCS Soils maps ff it is in a River Basin with Riparian Buffer requirements. GENERAL SITE FEATURES (Plan elements) X Property lines & ownership ID for adjoining properties �— Existing contours (topographic lines) NTA Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label). Be sure to include all access to measures, lots that will be disturbed, and utilities that may extend offsite. N/A Planned and existing building locations and elevations Planned & existing road locations & elevations, including temporary access roads X Lot and/or building numbers X Hydrogeologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes, ponds, dams, etc. (include all required local or state buffer zones and any DWQ Riparian Buffer determinations) X Easements and drainageways, particularly required for offske affected areas. Include copies of any recorded easements and /or agreements with adjoining property owners. A Profiles of streets, utilities, ditch lines, etc. Stockpiled topsoil or subsoil locations X If the same person conducts the land- disturbing activity & any related borrow or waste activity, the related borrow or waste activity shall constitute part of the land -disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, or is a landfill regulated by the Division of Waste Management. If the land- disturbing activity and any related borrow or waste activity are not conducted by the same person, they shall be considered separate land- disturbing activities and must be permitted either through the Sedimentation Pollution Control Act as a one -use borrow site or through the Mining Act. N/A Location and details associated with any onsite stone crushing or other processing of material excavated. If the affected area associated with excavation, processing, stockpiles and transport of such materials will comprise 1 or more acres, and materials will be leaving the development tract, a mining permit will be required. X Required Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbances over 150 linear feet) EROSION & SEDIMENT CONTROL MEASURES (on plan) X Legend (provide appropriate symbols for all measures and reference them to the construction details) X Location of temporary measures —� Location of permanent measures Construction drawings and details for temporary and permanent measures. Show measures to scale on plan and include proposed contours where necessary. Ensure design storage requirements are maintained through all phases of construction. X Maintenance requirements for measures X Contact person responsible for maintenance SITE DRAINAGE FEATURES X Existing and planned drainage patterns (include off -site areas that drain through project and address temporary and permanent conveyance of stormwater over graded slopes) _ X Method used to determine acreage of land being disturbed and drainage areas to all proposed measures (e.g. delineation map) N/A Size, pipe material and location of culverts and sewers Soil information: type, special characteristics =A Soil information below culvert storm outlets X Name and classification of receiving water course or name of municipal operator (only where stormwater discharges are to occur) STORMWATER CALCULATIONS N/A Pre - construction runoff calculations for each outlet from the site (at peak discharge points). Be sure to provide all supporting data for the computation methods used (rainfall data for required storm events, time of concentration/storm duration, and runoff coefficients). N/A Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients for the site) N/A Design calcs for culverts and storm sewers (include HW, TW and outlet velocities) N/A Discharge and velocity calculations for open channel and ditch flows (easement & rights -of -way) N/A Design calks for cross sections and method of stabilization for existing and planned channels (include temporary linings). Include appropriate permissible velocity and /or shear stress data. N/A Design talcs and construction details for energy dissipaters below culvert and storm sewer outlets (include stone /material specs & apron dimensions). Avoid discharges on fill slopes. N/A Design calcs and dimension of sediment basins (note current surface area and dewatering standards as well as diversion of runoff to the basins). Be sure that all surface drains, including ditches and berths, will have positive drainage to the basins. VEGETATIVE STABILIZATION X Area & acreage to be stabilized with vegetation Method of soil preparation Seed type & rates (temporary & permanent) X Fertilizer type and rates X Mulch type and rates (include mulch anchoring methods to be used) NOTE: Plan should include provisions for groundcover in accordance with NPDES Construction Stormwater General Permit NCG010000 and permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITY /OWNERSHIP FORM X Completed, signed & notarized FR/O Form X Accurate application fee payable to NCDENR ($65.00 per acre rounded up the next acre with no ceiling amount) Certificate of assumed name, if the owner is a partnership Name of Registered Agent (if applicable) Copy of the most current Deed for the site Please make sure the deed(s) and ownership information are consistent between the plan sheets, local records and this form. X Provide latitude & longitude (in decimal degrees) at the project entrance. NOTE: For the Express Permitting Option, inquire at the local Regional Office for availability. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature & purpose of the construction activity Construction sequence related to erosion and sediment control (including installation of critical measures prior to the Initiation of the land- disturbing activity & removal of measures after areas they serve are permanently stabilized). Address all phases of construction and necessary practices associated with temporary stream bypasses and/or crossings. Bid specifications related only to erosion control rev. 12182012 FINANCIAL RESPONSIBILITY /OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land- disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name Line 5B Looping West 2. Location of land- disturbing activity: County Johnston & wayneCity or Township various Highway /Street Various Latitude 35.329816 N Longitude 78.265026 W 3. Approximate date land-disturbing activity will commence: March 1, 2013 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Natural Gas Pipeline 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 203 6. Amount of fee enclosed: $ 13, 195 . The application fee of $65.00 per acre (rounded up to the next acre) is assessed without a ceiling amount (Example: a 9 -acre application fee is $585). 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land- disturbing activity: Name Robert Baker E -mail Address baker9568 ®sbcglobal.net Telephone Cell# 361- 827 -5279 Fax# 9. Landowner(s) of Record (attach accompanied page to list additional owners): See Attached Project Line List Name Telephone Fax Number Current Mailing Address Current Street Address "='= City State Zip City State 10. Deed Book No. Page No. Provide a copy th most current_dec I WFT� j Bra Part B. w - nCh 1. Person(s) or firm(s) who are financially responsible for the land- disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Piedmont Natural Gas c/o Dave Vena David.Vena@piedmontng.com Name E -mail Address 4720 Piedmont Row Drive Current Mailing Address Current Street Address Charlotte NC 28201 City State Zip City State Zip Telephone 704- 731 -4496 Fax Number 704 -731 -4098 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent Name Current Mailing Address City Telephone State Zip E -mail Address Current Street Address City State Zip Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address City State Zip E -mail Address Current Street Address City Telephone Fax Number State Zip The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This. form must be signed by the Financially Responsible Person if an individual or his attomey -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Dave Vena j � I l pw m T or i e Title or Authority OL- Z3�Z®1.� Signature Date I,`- �. ID�iJ1(9 �i�. , a Notary Public of the County of L�h� VINO State of North Carolina, hereby certify that 5AYID M, Vl�: \/A appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, thisZday of 20 Notary Seal My commission expires 2 ®1 FINANCIAL RESPONSIBILITY /OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land- disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name Line 5B Looping East 2. Location of land- disturbing activity: County Wayne & Greene City or Township various Highway /Street Various Latitude 35.496219 N Longitude 77.757180 W 3. Approximate date land- disturbing activity will commence: March 1, 2013 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Natural Gas Pipeline 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 163 6. Amount of fee enclosed: $ 10,595 . The application fee of $65.00 per acre (rounded up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $585). 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land - disturbing activity: Name Robert Baker E -mail Address baker9568@sbcglobal.net C 361 - 827 -5279 Telephone Cell # Fax # �,•� -� 9. Landowner(s) of Record (attach accompanied page to list additional o @ See Attached Project Line List C�,3 Name Telephone r ax Number ; D9 If . WF.TB V� Inch Current Mailing Address Current Street Address City State Zip City State Zip 10. Deed Book No. Page No. Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land- disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Piedmont Natural Gas C/o Dave Vena david.vena@piedmontng.bom Name E -mail Address 4720 Piedmont Row Drive Current Mailing Address Current Street Address C Charlotte NC 28210 City State Zip City State Zip Telephone 704 - 731 -4496 Fax Number 704- 731 -4098 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name E -mail Address Current Mailing Address Current Street Address City State Zip City State Zip Telephone Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent E -mail Address Current Mailing Address Current Street Address City State Zip City State Zip Telephone Fax Number C The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attomey -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Dave Vena, PE Ty r print name wm Signature O &ORIECG ?Mb__q N &&MAGeR Title or Authority ot_2s_WR e Date ki qV _1� a Notary Public of the County ofO L _:Wer • � State of North Carolina, hereby certify that DAV) P /yl. V151VA appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, this,Z day of --S`� , 20 1.�2 Seal Not My commission expires'M_ ?-,o I ^..G• -.x ,✓ _ -_ -_ -_ -_- - -: �yi-�=. -n ..�. -- ^ r -y - . ''u•'�.tr,'`i' �,tfiWr` eY _`- _ - + r' eft +ibt r�tl,•�' �h%',7 71 {.I�Ir_ __ '�•�;� ,ti ___[EDMON� NAT,,URALGA COMP NY _ _ :_ _ `�_ AD±KOIzA_MER9617 y `� 1113%90 Box 3 068t-, ;.y r'� yTI �.•�a r ry W _ _ -I Bt[fl►]SB 0 ' exaS. N. 1 3_i k C 11 tte N' +'N' S',{ i� ",_ ' -_ _ _ 4 5+ ti" , + %It! (� +• j;t - - =_ 4 28;L3 -306 , {y' _ _ _== _f#iq_r n t=cIdC 2823,; . , 1'��, � lV,:�.� � ---•_ 1(110 =- - +Etr; + 4 yy'.,� �• ' }'• �f�':r {~,mot:_,- _ -==4 1_' ,.�f�ti /t�°,r,. - _ -== _s' _ = _ =_ �eW "Dater��� !.{4/2Q.I __ = _a�molfnt�.ja�QD _ _ _ _ r y9'r y 1 Sti�1'k� - = .�'�' +�"li „, ,n- �',, +a5;t'i,pJ', '7 Pay �r" *'�FIFTEENj )=)i ©USAION71INRED NINETFIVFr�AIVD7i / IOd DOLLAR « **' - °- - '•� �=" {, 1 +.- 'r'+r iT+'�d_ ";L- '•iT," ` _ f =: _ _ __ -_- -'- -_ "-- t_ I r k lu � ) •y iI.A > -A __ _ - _ -- -- __ _ -- , i•__•'i` �'ti J.Lr >" _h, � -,-ti ni _ __ _ __— _ — _ _ F.-r`• �"t,, 1Y' L� - -` __ c = fi^Tw ��:. �. �rJ• ^.���" = - _ -_ - c - c _ . - TWIK�. .l�iV -��/' •iy�: 1 S'i -`� __ 30)03,e £i,C_DEPT OF EPI�=IRONMEP� & PiAT[JRAL RESO�t, = _ _ ?`ordgrlN"'rt ,n 43`WASHIN&bkk; AI I [#.T=`_ :a c� ' ^?�; �/�SjICNGTOItf_ 2 $4 —K- 11'1X13990112 li`� = _ =_� = fn ,r�,y _ atilurizedS9etoi_� y I: L L 10000 L 21: 375000961711' Check Date: 01/242013 Vendor Number: 0000944332 Check 111o. 1113990 Invoice Number Invoice Date Vodcher ID Gross Amount Discount Taken Late Charge\ Paid Amount EROSION012313 01/23 /2013 01255737 15,195.00 0.00 0.00 r 15,195l!.00-- J I I , ' 1 I > � 1 1. Check Number Date Total Total Total Total Gross Amount Discounts Late Charges Paid Amount 1113990 - _. 01/24 /2013 $15,195.00 $0.00 _ $0.00 $15,195.00 QUESTIONS REGARDING THIS (CHECK PLEASE CALL (704) 364 -3120 \ , I - _ r_- _ _=`__ "d!r ` 'rrr `' }•'�:7; i -'��r �'r`1: (t! _-_ s* � - -_ -� - ��___ %.�'i '':} tt' }': �iZ r"tt ��'?�'J!r _ _ __ t- _ I', ._ r•y ` v'l' 1� �1�:,llu ___ =�=- _ e -_ t-tr= _— - _ _c_ :3_` _ _ -_ _ _ _ / � y= �. (• _ �\�.. .�f�rJ yam=_~ _> -�- i�'rc_� -__ _ - -_ � it � ,I! ,1b The N, C QEPT OF ENVIRONMENT& NATURAL RESOR , _ x 1+ASHIN(iGTO'41Q t'; VWAS NGTONt NG 2E78W - _ __ -= _ �r-� ' ' 's ; + h� jAu`zed Nroris' y to VOID AFTER SOC"MOPfHS N., _ _= N St l,r} {'Y °••r<I i�� +l IIi�Jr 'I uILLL3989o■ 1 :LLLOOOOL21: 375000960ua 1 y61' Check,Date: 01/24/2013 Vendor Number: 0000944332 �-R 1113989 Invoice Number Invoice Date Youcher ID Gross Amount _ 1 pIEDMO14TNATURALGAS�COMPANY = BANIC_O!?AbiER9617,, % ,,- 0123/2013 01255738 ==_ �. Box 3306Q� - }', = _ _' _= _ _ _ °- _ = "- Tdatio` B_ —k € =_exav N. I "t r,+:-^ ,` -' 12,595.00 N Charlotte, NC 28233=3'06>3 �, +; 't :_ =_ _ == 01i,4R �c NC 28234 ' r S •I r `1 I'I l',y' ' ��' -� ' —__ -2 __ _ ?_P}_ tl __ =° .�: • =ice =_ {' )atel���l `c � !Q, �r rPa_y�tmount_ =�1 - -, __= -- -= =-- _ _�� -_ tr fiS L EA/ b v —**TWELV ! 1 - _ r_- _ _=`__ "d!r ` 'rrr `' }•'�:7; i -'��r �'r`1: (t! _-_ s* � - -_ -� - ��___ %.�'i '':} tt' }': �iZ r"tt ��'?�'J!r _ _ __ t- _ I', ._ r•y ` v'l' 1� �1�:,llu ___ =�=- _ e -_ t-tr= _— - _ _c_ :3_` _ _ -_ _ _ _ / � y= �. (• _ �\�.. .�f�rJ yam=_~ _> -�- i�'rc_� -__ _ - -_ � it � ,I! ,1b The N, C QEPT OF ENVIRONMENT& NATURAL RESOR , _ x 1+ASHIN(iGTO'41Q t'; VWAS NGTONt NG 2E78W - _ __ -= _ �r-� ' ' 's ; + h� jAu`zed Nroris' y to VOID AFTER SOC"MOPfHS N., _ _= N St l,r} {'Y °••r<I i�� +l IIi�Jr 'I uILLL3989o■ 1 :LLLOOOOL21: 375000960ua 1 y61' Check,Date: 01/24/2013 Vendor Number: 0000944332 �-R 1113989 Invoice Number Invoice Date Youcher ID Gross Amount _ 1 Late Charge Paid Amount EXPRESS012313 0123/2013 01255738 12,595.00 — 0.00 0.00 - _ r_- _ _=`__ "d!r ` 'rrr `' }•'�:7; i -'��r �'r`1: (t! _-_ s* � - -_ -� - ��___ %.�'i '':} tt' }': �iZ r"tt ��'?�'J!r _ _ __ t- _ I', ._ r•y ` v'l' 1� �1�:,llu ___ =�=- _ e -_ t-tr= _— - _ _c_ :3_` _ _ -_ _ _ _ / � y= �. (• _ �\�.. .�f�rJ yam=_~ _> -�- i�'rc_� -__ _ - -_ � it � ,I! ,1b The N, C QEPT OF ENVIRONMENT& NATURAL RESOR , _ x 1+ASHIN(iGTO'41Q t'; VWAS NGTONt NG 2E78W - _ __ -= _ �r-� ' ' 's ; + h� jAu`zed Nroris' y to VOID AFTER SOC"MOPfHS N., _ _= N St l,r} {'Y °••r<I i�� +l IIi�Jr 'I uILLL3989o■ 1 :LLLOOOOL21: 375000960ua 1 y61' Check,Date: 01/24/2013 Vendor Number: 0000944332 Check Na 1113989 Invoice Number Invoice Date Youcher ID Gross Amount Discount Taken Late Charge Paid Amount EXPRESS012313 0123/2013 01255738 12,595.00 — 0.00 0.00 12,595.00 1 ' 1 I ' � I l e \ Check Number Date Total Totai, Total Total ( Gross Amount Discounts Late Charges Paid-Amount 1113989 01242013 $12,595.00 ( $0.00 $0.00 _ $12,595.00 QUESTIONS REGARDING THIS CHECK PLEASE CALL (704) 364 -3120 I Acquisition Line List Bentonville to Junction B Bentonville to Junction B Totals '► rowAP1S 149 Tracts NC40-0001.00000 Nodh Carolina Natural Gas CMr11 Private Landowner - 700.00000000% 2256 Harper Hausa Rd IC1110-111n Four Oaks NO 27524 C- (919)901 -2928 Agent Action- NC—JO—O002,00000 George H 6 Betty F Levels Garrison Bob 1011812012 Tract Acquired 10/24/2012 Choc No: , $553.00 P' to Landow 2102 HARPER HOUSE ROAD D:k eCheckr FOUR OAKS NO 27524 Tote1:553.0000000000 H- 919 648 -2690 NC40-0003.00000 Lester Langston Dietz Jahn 10/18/2012 Tract Acquired 11105/2012 Check No: ,Check $1,116.00 Private Landowner Harper House Road Date:,Check Four Oak. NO 27524 Total:1116.0000000000 FF 919 689 -2635 NC40- (x703.00100 Gary Langston.".? Do".1' Dietz John 10/30/2012 Tract Acquired 11105/2012 Check No ,Check $746.63 Private Landowner 6269 Harper Hausa Rd Date:,Check Newton Grove NO Tole1:746.6300000000 Jonathan Langston - 5D.D0000000% NCJO-0004.000DO Eldridge T Westbrook Gammon Bob 10/1812012 Tract Acquired 11127/2012 Check No: ,Check $2.17125 P' to Landowner 799 Scout Rtl Data:,Chock Four Oaks NO 2]5 24 Total 2171.2500000000 H4(919) 934 -7194 C- 919 915-0174 NCJ0-0005A0000 Larry A. Person Dietz John 10/18/2012 Tract Acquired 10124/2D12 Check No' $1,040.17 Private Landowner 1944 Harper House Rd ,Check Date :,Check Four Oaks NO 27524 Total: 1040.17D000DODD H- 919 689 -2839 NCJO -0DDEDDODO pan L Jernigan Gammon Bob 101182012 Tract Acquired 11105/2012 Check No: ,Check $7606.25 Private Landowner 1820 Harper H Rd Dete:,Chock Four Oaks NO 275 27524 Tata1:1620.001XNll100W,Ch Hk (919) 689-3736 act, No ,Check C- 919 631.6753 Dete:,Chock NCJO- 0007.00000 John RCos Cavelier Albert 10/18/2012 Tract Acquired 01111/2013 Cheek NO: ,Check §116]6.07 Private Landowner 780 Ha Harper Rd Date:,Check Four Oaks NC 27524 NO Tota1:11678.0700000000 FF (919) 689 -3736 1125/2013 Page 1 of 22 10:28:15 AM NCJte John R COx - 110.00000000 % Cavalier Albert 1 011 82 01 2 Tract Acquired 01/112013 Check No ,Check $4,123.57 Landow— Private Landowner 780 Harper House Date',Check Four Oaks NO 27524 4 Total 4123,5700000000 11- 919 689 -2702 7 NCJO -0009.00000 Nonna W Lee Garrison Bob 10/1812012 Tract Acquired 1212012012 Check No. ,Check $43,663.00 Private Landowner 1764 Harper house Rd Date.,Check Four Oaka NO 27524 Total 43663.0000000000 H- 919 689 -2781 NCJD -0009.00100 Norman C Denning - 100.00000000% Garrison Bob 12/1012012 Tract Acquiretl 0111612013 1 Check No $7647.00 Pr—te Landowner ,Check Date',Check Scout Rd Total 7647.0000000000 Four Oaks NC 27524 NCJO4)OO9.D020O Norma W Lee- 100.0000OD00% Garrison Bob 12/10/2012 Traci Acquired 0111112013 Cheek No $6,915.75 Private Landowner 1764 HARPER HOUSE ROAD ,Check Dale:,Check Four Oak, NC 27524 Total 6915.7500000000 NCJ04)009.00300 Sleepy Cree k Farms- Dietz John 12/102012 lot Otter Private Landowner 100.000000110Y. W- 919 778-3130 ext 1217 NCJO -0009.004W John R Goa Covets, Albert 1 2/1 012 0 1 2 Tract Acquired 01/11/2013 Check No ,Check $4269.07 Private Landowner 780 Harper House Rd Detek - ',Chec Four Oaks NC 27524 Toter. 4269.0700000000 Fl- (919)6 89 -2702 NC J 0-0011ODOOO JLM Farms LLC Dietz John 12103/2012 let Offer Private Landowner PO Box 1DOD9 Goldsboro NC27532 H- 919 778J130 NC40-0012000OD John Cox Cavalier Albed 1011812012 Tract Acquired 01/1112013 Check No ,Check $4,716.07 Private Landowner 780 HARPER HOUSE RD Dete:,CMck FOUR OAKS NO 27524 Total: 4716.0700000000 11- 919 689 -2702 NCJO -0013.00000 John R Cox Cavelier Albert 1O/182012 Tract Acquired 01111/2013 Check No. $7,210.07 Private Lantlowner 780 Harper House Rd ,Check Dale: Check Four our Oaks NC 27524 Total T210.0700000000 W H• 919 689 -2702 NC J O -0014.DDD00 John R Cox Cavalier Albert 10ilB2012 Tract Acquired 01/112073 Check No $1,048.00 Private Lantlowner 780 Harper House Rd ,Check Date :,Check Four Oaks NC 27524 Total: 1048.00D0000000 /4 919 689 -2702 NCJO -0015.00000 John RCOx - 100.00000000% Cavalier Alberl 10/182012 Tract Acquired 01/112013 Check No. $1,457.15 Private Landowner 780 Harper use Rd ,Check Date',Check Four Oaka NC 27542 Tota1:1457.15000.70000 K. 919 689 -2702 NCJ'- D016.00W0 Lane Farms Inc Dietz Jahn 1011812012 Tract Acquired 10/2412012 Check No $2,070.00 Private Lantlowner PO Box 1179 ,Check Date :,Check Goldsboro NC 27530 Tota1:2070.0000000.700 W- (919) 734 -1245 C- 919 738 -9150 NCJO-0017.000W Cox Dairies In, Cavalier Albert 1011812D12 isl Offer Private Landowner 284 Dobbiisvills Rd Goldsboro NC 27530 H- (9191 689 -9581 NCJ0-0018.00000 Daniel F. d Paula S. Kornegay Guereschi Tina 10/1812012 Tract Acquired 11/0912012 Check No $35,559.25 Private Landowner 610 Worley Road ,Check Date Check Princeton NO 27569 "11109/2012 Tola135559.2500000000 NDJ' -0018. DO100 Daniel F.6 Paula S. Komegay Guereschi Tina 12/03/2012 Tract Acquired Private Landowner 610 Worley Road Princeton NC 27569 NCJO-0019.OW00 Private I nndnwner Brent Beasley- 18.81700000 %. Cavalier Albert 1=12012 1st Offer 1/25/2013 Page 2 of 22 10:28:15 AM 1/25/2013 Page 3 of 22 10:28:15 AM 2447 Lees Union cnumn Ra. Faur Oeks NC 21524 C i S "OPO"les Aft: Larry Cox - 15.666D00007. 110 WAS— Mills Rd. Smithfield NO 27577 Larry Cox - 16.66700000% 110 Wilson, Nib Rd. SMITHFIELD NO 27577 Fi- (919) 664-0220 G (9191915-0658 Lloyd Cox .16.66600000% 2447 Lees Unon Church Rd Four Oaks NC 27524 Mike Beasley- 16.66700000% 2447 Lees Unbn Church Rd Four Oaks NC 27524 Raymond Cochran .16.63700000% 2447 Lees Union Church Rd Four Oaks NC 27524 Phoned to speak to Larry Cox today. He is out or [own but I was told that the partners have not gotten _._T„.,_._... together yet to disctea w offer. I will follow .__ up. ..._... ._ ...._.. " NCJO-0o2o.000D0 Daniel L Heavner Hughes Phyllis 1011B/2012 Referred to 1012720 Private Landowner PO Be. 2346 Condemnation Smithfield NC 27577 H.1919) 934 -2039 NCJO-0021.00000 Bradley SU-11 - 50.00000000% Hughes Phyllis 1 0/1 820 1 2 Tract Acquired 10/29/2012 Check No ,Check $3,067.75 Private Landowner 466 Stancil Road Date:,Cheok Angier NO 27501 Total: 3067.7500000000 H- 1919)639 -20]3 G (919)538 -5845 bradleystancil @embargmaiLcom Krlstl Stanclt- 30.00000000% 466 Stancil Road An ier NC 27501 NCJO-0022.DDDDO Bradley L Stancil Hughes Phyllis 1011812012 Tact Acquired 10/2912012 Check No ,Check $3,06].]5 10124/2012 Private Landowner 1415 Jackson King Rd ,ate:, Check Willow Springs NO 27592 Total.3D67.7590000000 E2 fi395429 NC-JO-0023.00000 Bradky L9tancll Hughes Phyllis 1011812012 Tract Acquired 10/292012 Check No Check $3,114.00 Private Landowner 1415 Jackson King Date:,Check Willow Springs NC 277 592 Tota1:3114.0000000000 FF 919 639 -&i29 NCJO-0024.DDOOD Durwood McRln • 100.00000000% Guereschi Tine 1011812012 Tact Acquired 11/092012 Check No. ,Check $4,862.38 Private landowner Dale:,Check 1 DODS Almond Ct Tota1:4862.38000000W Raleigh NC 27615 FL (919) 846 -7007 W- 1919)870.8295 9)m349 -1172 G uwtl n m en NCJ2.00OO Gurney MCBrytle Guereschi Tina 17JON2012 Tract Acquired 0124/2013 Check No: ,Check $11.654.00 Private Landowner 3015 Fax Run Circle Date:,Check Kieston NC 28504 Total: 1 D22B.250000000DC Thressa Mcbdde heck No: ,Check Date:, Ch" 3612 St. Paul Read TOts1:1425.7500000000 Raeford NC 28376 G 919 4175542 NCJO-0D26.00000 D 6 P Land LLC Guereschi Tina 10/182012 Tract Acquired 11/0912012 CMCk No: ,Check 813 719.50 Privates I erdnwnwr net. C—k 1/25/2013 Page 3 of 22 10:28:15 AM 1/25/2013 Page 4 of 22 g 10.28:15 AM 610 Worley Road Princeton NC 27569 Total i f 19.5000000000,0 14 (919) 9361201 C- 919 920-7865 heck No ,Clack Dale:,Check 041o27.00000 Davld E Myers Guereachi Tire 10/182012 let Offer :NC-JO-OD28.DOODD te Landowner 7034 Br.gden Road Smithfakl NC 27577 FI- 919) 934J322 Frank L Baumgartner Guereachi Tina 10/18/2012 T2ot Acquired 11/07/2012 Clack No. Check $9941 87 to Landowner 4115 Massey Holt Roatl : Data Check Princeton NC 27569 7.1.1:9941 8700000000 14 (919) 936-8441 C- 919 33042]7 -' NCJO-0o29.00D00 Medeon G Creech Norman Ron 10/18/2012 Rel. —cl to P' to Landowner PC Boz 39 Condemnation Pine Level NC 27568 NC -WA- 0001.00000 Davld E My.. - 100.00000000% Guereachi Tina 12/032012 tat Offer Private Landowner 7034 Brogden Road Smithf M NC 27577 !4 919 934322 NC- WA41001.DO100 Kan n Merll.y lMA....DO. Guereachi Tina 1al Offer Private Landowner La..9.r Rd NC NC- WA- 0002.00000 Karen 8 Jesse Hartley - Guereachi Tlna 12/03/2012 let Offer Prints Land —er 10D.00000000% 3692 MasseyF ft Roatl Princeton NC 27569 r (919) 936 -9651 C- (919)920 4494 NC -WA 4003.00000 TC81 Timber Company, LLC - Dietz John 12/03/2012 Assigned Private Landowner 1D0.00000000•/. 1 SW CoWmbia Street Suds 1700 P. Marc! OR 9]353 W- 910 815 -0320 NC•WA4JODI.ODDDD Ann .,its- 33.33]33333% Gueresch, Tina 12115/2012 1.1 Offer Private Landowrar Peggy Watson .33.33333333% 103 S Douglas St Goldsboro NC 27534 H-(919) 778 -2171 Roe. Hinton- 33.33333330% NC- WA-0005.00000 Gwendolyn Peedln- t00.D0000000Y. Dietz John 111162111 Tract Acquiretl 01/25/2013 Check No: ,Check $12,150.00 Private Lsntlownar Dsh:,Clrek 1672 Old NC 27 3Rd Goldsboro NC 2]530 Total: 12150.00000OOOOD H- 919)734-5299 NC- WA-0006. DDDOO Lane Farms Inc - 10D.D000000D % Dietz John 121032012 Tract Acquired 01/17/2013 Clack No ,Check $35,42225 1/14/2013 Private Landowner Data:,Cheek PO Boz 1179 Gokfaboro NC 27533 TotaL354222500000000 11- 919 734 -1245 NC -WA 0006.00100 Of Wayne County - 100.ODD00000 Cavalier Albed 12/03/2012 1al Oiler Privet. Landowner NCO NC- WA-0007. 00000 Billy Hill -10 D.000000Dg% Dietz John 12/0312012 Tract Acquired 01/1112013 Clack No. ,Check $1,675.60 Private Landowner 555 Braswell Rd Date:,Check Goldsboro NC 27530 Gol Tota1:1675.6000000000 14 (919) 734 -0619 1/25/2013 Page 4 of 22 g 10.28:15 AM 1/2512013 Page 5 of 22 10:28:15 AM NC- WA-001I,003W Danny H-4 Dietz John 12103/2012 Tract Acquired 01/072013 Check No: ,Check $7,367.50 Prwate Landowner 313 Lasader Road Cate.,Check Princeton NC 27569 Total: 7367.5000000000 f4 (919) 736 -1851 G (9 19) 735-0212 NC- WA-001200000 Margfe Fell .50.00000000% Dietz John 1 1 /1 62 01 2 Tract Acquired 11262012 Check NO: ,Check $1023.15 P' M1 landowner Rd 2127 DM SMC Dete:,Ct,k Gold sboro NC 27530 275d ToIa1:1023.1500000000 Walter Fall- $0.00000000% 2127 Old Smihfield Rd Goldsboro NC 27530 H- 919 734 -E481 NCA A-0014.DD000 Clytle Fall-1D0.00000000% Oletz John 11/162012 Tract Acquired 11/27/2012 Check No ,Check $1,38960 Private landowner 1510 Cm W S Foot Roed Data: Chalk Mount Olive INC 28365 Tofe1:1389.6000000000 - -(919) 689 -3406 G (9 19) 922J440 NC- WA-0 014.00100 George Rains - 5D.D0000000% Garrison Bob 12/032012 1st Offer Private Landowner 1698 Old Smthfield Rd Goldsboro NC 27530 Jennifer K. Worre9 - 50.0000DOOD% 1898 Old Smthfield Rd Goldsboro NC 27530 NC -WA -0015.00000 Paula Waters •50.00000000% Dietz John 01102/2013 Tract Acquired 0112112013 Check No. ,Check $] X62.50 Private Landowner 165 Perkin Mill Road Dete:,Chack Goldsboro NC 27530 Total. 7362.5000000000 Ronald Waters- 50.00000000% 165 Perkin, Mill Road Goldsboro NC 27530 H- 919 734 -7341 NC- WA-0016.00000 Anthony8M- 100.D0000000% Gamson Bob 01/022013 Tract ACgwred 01/2312013 Check No. ,CMCk $3.000.00 Pdvete Landowner Date.,Check 2032 Old Smithfield Rd Goldsboro NC 27530 Total ZWO.0D00000000 C- 919 394 -1659 NC- WA-0017.00000 Patsy Pearce •100.00000000% -ugM, Phyllis 01102(2013 Tract Acquiretl 0111712013 Check No: ,Check $7.48725 Private L.endowner 2306 Rosewood Rd Date:,Check Goldsboro NC 27530 Total 7487.2500000000 14 919 735 -7]39 NGWA-0022.00000 Etlna Reins -life Estate - Gamson Bob 11/032012 tat Offer Privet, Landowner 100.00D00000% 1998 Old SmdMeld Rd Goldsboro NC 27530 H- 1919)735-5836 George Rains - R- 1,derman Jennifer Reins - R— Inderman NC- WA-0128.00000 Madge King - 1DO.00000000% Cavalier Albed 12/1012012 It Offer P' to Landowner 1726 NC Hwy 111 N Goldsbom NC 27530 NC- WA-0129.000W Margaret RowNl Dietz John 1 2/1 0 2 01 2 Tract Acquired 01/032013 Check No. ,Check $2.00 Private Landowner 171 Lane Rose 1NC Date:,Check G.l Goldsboro NC 27534 2 Tole1:2.ODD0000000 Sue Nowell . Reminds- 182 Rosa 11-11 Lena Goldsboro NC 27534 1/2512013 Page 5 of 22 10:28:15 AM 1/25/2013 Page 6 of 22 10:28:15 AM Tknothy Hawed! - Rertlalnderman - 100.00000000% 182 Rasa Howell Lana Godsboro NC 27534 "'.J., 734.2277 NC -WA -0130.00000 Betty Daw. 25.00000000% Dietz JOhn 12/102012 Traci Acquired 01/092013 Check No . Check $1.08800 Ph"te landowner Date Check NC Total: 1008.0000000000 W -(919) 734 -7171 Brandon Howell, Heir of Adrian G_ Howell NC David Dow Deborah Howell NC Jeanette Howell Jeffrey Howell, Heir of Add— Gray Howell NC J lmmy Howell- 25.00000000% NC C- (919) 920 -1551 Lynda Howell, Heir of Adrian Gray Howell - 2S.00D00000% 139 Z.W. Lane Gold. or. NC 27534 K (919) 2425228 Stephen Howell, Heir of Adrian Gray Howell NC William Howell . 25.0000D000% NC C -""" '22-1 822 NC -WA -0131.00000 AMC -* S., Guereachi Tire 12/102012 1st Offer Private Landowner 1032 Stoney Creak Church Road Goldsboro NC 27534 Linwood Smith - 100.00000000% 1032 Staroy Creak Church Road GDoaboro NC 27534 K 919 7346482 NC -WA 4)132.00000 "ce, Smith- 50.00000000% Guereschi Tina 12It0/2012 1st Offer Private Landowner 1032 Stoney Creek Ch Road Gold. or. NC 27534 Linwood Smith - 50.00000000% 1032 Stony Creek Ch Road Goldsboro NC 27534 K 919 7356462 NC- WA-0 133.00000 Private Landowner HL Lancaster - 34.00000000% Dietz John 12/04/2012 Assigned 409 Lochskla Drive Cary NC 27518 K(919)233 -1348 Lynn Gorges - 33.00000000% 1/25/2013 Page 6 of 22 10:28:15 AM 1/25/2013 Page 7 of 22 10:28:15 AM 409 Lochsde Drive Cary NC 27518 Nan Dews - 33.00000000% 409Laehede DO- C., ND 27516 NC- WA-0134.00000 Helen Radford . 100.00000000% Guereach, T'ma 1210312012 1st Offer Private Landowner 1039 Stony Creek Ch Rd Golden— NC 27534 K 919 7346535 NC- WA-0135.00000 Private Landowner HMe-In Lancaster- 33.33330000% Date John 1204/2012 Aaalpart 409 Lachsida Drive Cary NC 27518 K (919) 233 -1346 Lynn Gorges . 33.33330000% c/o H, Martin Lerxaster 409 Lochslda Drive Cary NC 27518 Nan Davis • 33.33330000 % c/o H. Martin Lancaster 409 Lochalde Drive C.ry NC 27518 N1WA-0 136.00000 Leroy Jones. 100.00000000% Hughes Phyllis 12110/2012 tat One, Private Lardowner 1051 Stony Creek Ch Rd Goldsboro NC 27534 NC- WA -0137.D0000 Lillie Jones Hughes Phyllis 12/1012012 Tract Acquired 01/142013 No: Check $3.009.00 private vete Landowner 3406 NC Hwy 111 N Data C1a,k :, Goldsboro NC 27534 Tota1:3009.0000000000 K 919 736.1617 NC- WA-0138.00000 Clifton Grant - 1DO.00000000% Hughes Phyllis 11/16/2012 Tract Acquired 0 111 4/201 3 Check NO: $747775 Private Landowner 114 Kelly Dr ,Check Dats:,Check Godenoro NC 275311 Total: 7477.7500000007 K 919 7364)533 NC -WA -0141.00000 Private Landowner EBIE, LLC - 100.00000000% Dietz John 12/03/2012 Tract Acquired 01/112013 2815 N Wiliam Street Goldsboro NC 27532 W- 919 SB3 -9'DO NC-WA-0142.00000 EBIE,LLC Diets John 12/03/2012 Tract Acquired 01111/2013 Private Landowner PO Box 11360 Goldsboro NC 27532 K 919 779-0801 NC -WA -0143.00000 Private Landowner ERIE, LLC • 100.00000000% Dietz John 12/03/2012 Tract Acquired 0111112013 PO Box 11350 Golsboro NC 27532 K 919 739-0601 NC- WA-0144.00000 ERIE, LLC •100.00000000% Dietz John 12/03/2012 Tract Acquired 01/11/2013 Private Landowner PO Box 11360 Goldsboro NC 27532 K (919) 739-0601 G 919 58}9290 NGWA -0145.00000 Mangle Dew I)OD0000 % Dietz JOhn 11/16/2012 Tract Acquired 3111712013 Check No: ,CMCk $3,545.00 1/1612013 Private Landowner 1433 Sloney Greek Church Daa:,Cheek God$ orc NC 27534 Total: 3545.0000000000 K (91 9)734-1953 Murray Dew - 50.00000000% 1433 Storoy Crank Church Goldsboro NC 27534 K (91 g) 7341953 G 919 738 -0737 NC4NA-0116.00000 IMrgle DM- 1111100000% Dietz John 11/1612512 Tract Acquired 01/17/2013 Check NO:,Check $3.545.00 111WM13 Privets Landowner rite' Check 1/25/2013 Page 7 of 22 10:28:15 AM 1/25/2013 Page 8 of 22 10:28:15 AM 1433 Stoney Creek Church Goldsboro NC 27534 Total: 3545.D00D000000 H- (919' 734-1953 Murray Dam - 50.00000000% 1433 Stoney Creek Church Goldabom NC 27534 K 919 73d -1953 NC- WA-0147.00000 Margie Daw - 60.000OD000% Dietz John 11116/2012 Tract Acquired 0111712013 Check No. ,Check $3548.M 1116/2013 Private Landowner 1433 Stormy Creek Church Date:, Check Goldsboro NC 27534 Total 3548.0000000000 H. (919) 734 -1953 Murray Daw - 50.00000000% 1433 Stoney Creek Church Goldsboro NC 27534 K 919 734 -1953 NC -WA -0146.00000 Chaste Hayes - 50.0000DO00% Hughes Phylhs 11/1&2D12 Tract Acquiretl 11129/2012 Check No Check $147100 Private Landowner Data Check 209 Braneyoine Drive Goldsboro NC 27534 Tata11471.0000000000 K (919) 7314800 Davie Hayes - 50.000DOOOD% 2D9 Boindywine Drive Goldsboro NC 27534 H-1919) 7314800 NC -WA -0149.00000 Bradley Bowen Hughes Phyllis 1111612012 Tract Acquired 0110212013 Check No:,Check $1,413.00 Private Landowner 91 N Woodcrast Or N Date:,CMCk Fargo NO 58102 Tote1:7D6.5000000000, Che amnel Bowen - so.ogSDOgoD % c: , k No Check Date Check Two1:7D6.5000000000 91 North Woodcreat Drive North Fargo ND 58102 C- (919) 520 -2638 Wry Smbh - 50.00000000% 2515 Anendell Hodges Lane Kinston NC 28504 K 919 223 -0039 NC -WA -0150.00000 Johnny Beal Hughes Phyllis 11/1512012 lit Offer 1117/2013 Private Landowner 42D Coley Rootl Goldsboro NC 27534 K (919) 778-0075 LJllle Best - 100.00000000% 795 Saulston Road GoMsbom NC 27534 K (91 D) 778 -0075 Myra Copenhaver 795 Saulston Road Goldsboro NC 27534 NC- WA- 0151.00010 Private Landowner Marshall Coy Jr.- 50.00000000% Hughes Phyllis 11116/2012 tat Offer 1/15/2013 808 Crestwood Drive Nashville TN 37204 K (615) 292 -3024 Michael Cox. 50.00000000% 808 Crestwcoe Drive Nashville TN 37204 NC- WA-0152D0000 Johnny Beat- 11,10010000% Hughes Phyllis 12/10/2012 lot Offer 1117/2DI3 Private Landowner 420 Coley Road Goldsboro NC 27534 K (91 9) 735-0929 C- (919) 580 -6282 sue Beet . 50.00000000% 1/25/2013 Page 8 of 22 10:28:15 AM 1/25/2013 Page 9 of 22 10:28:15 AM 420 Coky Roatl Goldsboro NC 27534 N- 919 7353929 NC.WA-0153.DD000 Private Landowner David Frailer - 50.00000000% 1000 Sor, NC Road GoMaboro NC 27534 Hughes Phyllis 12/10/2012 Tract Acquired Check No ,Check Date:,Check Tola1:3.0000000000 $3.00 H -(919) 736 -2966 Sarah Frazier - 50.00000000% 1000 Saulston Road Goldsboro NC 27534 H4 919 736.2966 NC -WA 0154.00000 Frederick Bibby Guereschi Tina 11/16/2012 let One, - Private Landowner 1048 Sedston Road Goldsboro NC 27534 Hilda Altlee .50.00000D00% 1048 Saulaton Road Goldsboro NC 27534 H. (919) 735 -7279 Jansce Bibby - 50.00000000% 1045 Saulston Road Goldsboro NC 27534 N- 155.00000 David Frszler 50.00000000% Hughes Phyllis 11/15/2012 Tract Acquired 11129/2012 Check No. ,Check $3092.50 Private Landowner 1000 Saulaton Road Dete'. Check Goldsboro NC 27534 7ata1:3092.5000000000 H. (919) 736 -2966 Sarah Frazier - 50.00000000% 1000 Sar/ston Road Goldsboro NC 27534 K. 919 736 -2956 NC -WA -0156.00000 Brands Bryant. 20.0000000D% Guereschi T'ma 11116/2012 let Offer Private Landowner P. 0. Box 681 Selma NC 27576 Bruce Coley. 20.00000000% 2D5 Winslow Circle Goldsboro NC 27530 1+(919) 7364046 Estella Boseman- 20.00000000% 11502 Homest,,d Drive Upper Marlboro MD 20774 H- (301) 499 -1017 Helen Washington . 20.00000000% 410 Gulley Sheet Goldsboro NC 27530 Reginald Slrrarro r; - S.acc000m 608 W. Chestrut Street Goldsboro NC 27530 Roy Slmmons .5,00000000 % East Orange NJ 07017 Sharon Simmons - 5.00000000% 608 W. ChestnN Street Goltlsboro NC 27530 Sharelene Braswell - 3.00000000% 295 Perkins Roatl Goldsboro NC 27530 fF 919 739 -0208 NC- WA-0157.000D0 Helen COley. 10.00000000% Guereschi Tina 11/1612712 let Offer Prhrste 'end. —r 1/25/2013 Page 9 of 22 10:28:15 AM 1749 Tommys Road Goldsboro NC 27534 F (91 9) 734 -1061 Annette Smith Atlanta GA Carolyn Yelwdon - 10.00000000 1223 S. Andrews Goldsboro NC 27534 Dewon Forte Goldsboro NC 27534 Dods Sampson - 1D.D000000o , Bronx NY Heir of Irene Mofdsey 101 Neil street Goldsboro NC 27530 2548 Big Daddy. Road Pikeville NC 27863 26205 Dartmouth Street Inkster MI 4S 141 2904 Bridle Creek Drive SW Coryere GA 808 Slaughter Street Goldsboro NC 27530 Hell. of Geraldine C. Spmlll - 1D.00000000 1749 Tommy's Road Goldsboro NC 27534 Heirs of Irene C. Moml.ey - 1D.DDDD0000x 806 Slaught.r Street Goldsboro NC 27534 Helm of James M. Coley - 10.0000Dg00'b Unknovm 1125/2013 Page 10 of 22 10:28:15 AM Heirs of Oecle S. Fade 10.009DD000% Unknown Johnny Forte, Jr. Wilmington NC Leads- Coley - 10.00000000%. 159 Carnegie Place Vauxhall WOMBS Leona Thomas - 10.00000000 1749 T.—, Road Goldsboro NC 27534 Shelia Forte 1759 Tommy's Road Goldsboro NC 27534 % lvlan JODes • 10.00000000% 1504 S. SI.-.b Gold.boro NC 27534 00100 Cedric Dickemo n- 100.00000000%. Cavalier Albers 1210 3/2012 Assigned Landowner CNC-WA-1117- 356 Harandale Drive Wilmin ton NC 28411 -0158.01XIM Cedric Dickerson- 50.0000000D% Cavalier Albers 11/162012 Assigned Land. —, 1125/2013 Page 10 of 22 10:28:15 AM 1/25/2013 Page 11 of 22 10:28:15 AM 356 Harhmdale Drrve Wilmington NC 28411 C- (910)395-0064 Mary Dickerson - 50.00000000 356 Hedandale Drrve Wilmington NC 28411 H- 910 395-0064 NC -WA -0159.00000 Johnny Best- 50.00000000% Cavalier Albert 11116/2012 1st Otter 111712013 Private Landowner 420 Coley Road Goldsboro NC 27534 H- (9191735 -3929 C -(9191 580 -6282 Sue Best - 50.00000000% 420 Coley Road Goldsboro NC 27534 Fk 919 735x929 NC -WA -0160.00000 Annette Smith Guereschi Tlna 12110/2D12 is1 Oft, Private Landowner Atlanta GA Carolyn YeIwrt,n - 10.00000000% 1223 S. Andrews Goldsboro NC 27534 D.— Forte 1749 Tommy's Roetl Goldsboro NC 27534 Dods Sampson - 10.00000000% Bronx NY Heir of Irene Nlorrlsey 101 Neil Street Goldsboro NC 27530 2548 Big Daddya R Pikeville NC 27863 26205 Dartmouth Street Inkster MI 48141 2904 Bridle Creek Drive, S. W. Conyers GA BOB Slaughter Street Goldsboro NC 27530 Heirs of Geradine C. Spruill - 10.00000000 i 1749 Tommy's Road Goldsboro NC 27534 Heirs of Irene C. Mordsey- 10.00000000 i 608 Slaughter Street Goldsboro NC 27534 Heirs n/ James M. Coley - 10.00000000% Heirs of 0—le B. Fode - 10.000o0D 0% 314 Ryan Blvd No Devon Forte Goldsboro NC 27530 Helen Coley - 10.00000000% 1749 Tommy's Road Goldsboro NC 27534 H-(919)734 -1061 Johnny Forte 1/25/2013 Page 11 of 22 10:28:15 AM 1/25/2013 Page 12 of 22 10:26:15 AM r,. 1 Wilmington NC Lesmon Coley - 10.00DOOD00% 159 Carnegie Place Vauxhall NJ 07088 Leona Thomas - 10.0000000D% 1749 Tammy's Road Goldsbo r0 NC 27534 Shelia Forte 1759 Tommy, Real Goldsboro NC 27534 VWlen Jones - 10.00000000 1504 S. Sloc,mb Goldsboro NC 27534 NC.WA0160.00000- AST- FretlMeM Bibby Gueresch, Tina 12/10/2012 1st Offer W Private Landowner 940 5 Ryan Rcad Henrico VA 23228 -2330 Hilda Attlee . 50.00000000% 1048 SB,Iston Road GoldsboroNC 27534 Janece Bibby - 50.00000000% 9406 Ryan Read Henrico VA 23228 -2330 H- 804 262 -6045 NC -WA -016100000 Chrlstine Hamilton- 10.OD000O(10% Cavalier Albert 12/10/2012 1st Offer Private Landowner Cleveland Hamilton, Jr. - 10.000O0o0ov. 1420, 1Road Goltlsboro NC 27534 Dawn Hamilton - 10.00000000•/. Edward Hamilton. 10.00000000% Ethel Battle - 10.00000000% John Hernia- Heirs - 10.000ODDOm. 1106 Devera,x Street Goldsboro NC 27530 untan Isae - 1n.D0000000=i Linwood Hammon - 10.00000000 Mable Bola, - 10.000DO000 Ross Thompson - 10.0000001)0% 206 S. Oleander Ave Goltlsborc NC 27530 H- N' 34545 NC -WA -0162.00000 Benton Family Fa(nts,LLC- Cavalier Albert 12/03/2012 Assigned Pdvate Landowner 100.DDDObooar 1/25/2013 Page 12 of 22 10:26:15 AM 1/25/2013 Page 13 of 22 10:28:15AM 723 Airport Road, NE Pikeville NO 27863 G 919 738 -SD32 NC -WA -0163.00000 Naney St al ling,- 100.00000000% Garrison Bob 11/2612012 1st Offer Private Landowner 1413 Hunters Point Way Cary NO 27511 H- (919) 467 -5786 Robert Stallings 1413 Hunters Point Way Ca NO 27511 NC.WA-0163.DD10D Nancy Stalling- 100.00000000% Garrison Bob 11126/2012 1st Offer Private Land - 1413 Hunters Point Way Cary NO 27511 Robert Staling, 1413 Huners Paint Way Cary NC 27511 NC -WA -0166.00000 George Herring, CO -Executor- Garrison Bob 11/2612012 1st Offer Private Landowner 50.00000000% P. 0 B.. 396 212 W. Harper Street Snow Hill NC 2858D Nancy Stalling,, Co-Executor - SO.D000(i 1413 Hura— Point Way Cary NO 27511 F4 919 778 -5245 NC- WA-0167.00000 Nancy Stalling, • 50.00000000% Garrison Bob 1112512012 1s1 Offer Pnvale Landowner 1413 Hunters Paint Way Cary NO 27511 K (9191467 -5786 Robert Stallinga - 50.0000000D% 1413 Hunters Point Way Cary NO 27511 NC -WA -0168.00000 Maxwell Foods LLC • Dietz Jahn 12103/2012 Assigned Privets Landowner 1g0.00000Dit /. 938 Millers Chapel R..d Chapel Hill NO 27534 F4 919 778 -3130 NC -WA -0169.00000 Maxwell FOOds LLC- Dietz J.hn 12/03/2012 Assigned Private Landowner 1ll.DODOD000K PO Box 10009 Goldsboro NO 27532 K 19 7783130 NC -WA-0170.00000 Halle Evans . 100.00000000% Hughes Phyllis 12/1012012 1st Offer 1/14/2013 Private Ural.— 251 Lemley Road Pikeville NC 27863 NC- WA-0171.00000 Ellen Smith. 10D.00000000% Gano—Bob 11/16/2012 Ist Offer Private Landowner 5627 Wayne Memorial Drive Pikeville NO 27863 K (919) 7386516 W Illlarn SmOh 5627 Way- Memorial Drive Pikeville NO 27863 Fp 919 738.5516 NC -WA -0172.00000 William Smlh- 100.00000000% Garrison Bab 11116/2012 1st Offer Private Landowner 5627 Wayne Memorial Drive Pikeville NC 27863 C- 919 7386516 NC- WA-0174.00000 ' Linda HamkH Hughes Phyllis 12110/2012 Tract Acquired Check No: ,Check $1,678.40 Private Landowner 2129 NC 111 Hwy N Data:,Check Goldsboro NC 27534 11111711011 ToteC167B.400D00D000 K (919) 7355102 1/25/2013 Page 13 of 22 10:28:15AM 1/25/2013 Page 14 of 22 10:28:15 AM 1/25/2013 Page 15 of 22 10:26:15 AM 1/25/2013 Page 16 of 22 10:28:15 AM Theodore Spruill, Heir of Isaac SDMIII Thomas SnOh, bus band of Shirley Hamm Willie Spruill, Heir of Leonard Odell Somdl Zebedee Spruill, Heir of Leonard Odell saran, NC -WA 0174.00400 Anne Johnson Heirs, Heir of Hughes Phyllis 12/10/2012 1st OHer Private Landowner Geomla Anna Hamm Bleak. Pope 1621 E. Elm Simet GoMeboro NC 27534 14 (919) 7355762 Canaria Spring, Heir of Leonard Od.n Somin 3302 Wayne Memorial Dr— Goldsboro NC 27534 14 (919) 734 -1673 Carolyn Jones, Heir of Georgia Anna Hamm Cults Hamm, Heir of Georgia Anna Hamm Deloda Price, Heir of Leonard Odell Sorulll Donna Hamm, Heir of Georgia Ann Hamm Elizabeth Best, Heir of Isaac Spruill and Mamin Sorulll 74 Hawkins late San Francisco CA 94124 -2482 H -(415) 643.5605 Eva Cox, Heir of Georgla Anna Hamm Georgia Hamm Heirs - 11.DObg0000x Its Hamm, Heir of Georgia Ann Hamm 606 Eleventh Street Goldsboro NC 27534 Isaac Spruill heirs - 11.0DDDD00D% Jimmie Ford, husband of Priscilla Sorulll Ford 1/25/2013 Page 16 of 22 10:28:15 AM 1/25/2013 Page 17 of 22 10:28:15 AM 1/25/2013 Page 18 of 22 10:28:15 AM 2'ebedee Spru81, Helr M Led n. - Odell SOrvNI NC- WA-0174.OD500 Helen Gurley- 50.00000000% Hughes Phyllis 0110 3 /2 01 3 Olher Private Lend- - 802 Bartlett Rd. Pikeville NO 27863 Raeford Gurley - 50.00000000% 802 Bartlett Rd Pikeville NO 27863 NC- WA-0175.00DDD Frances Wade HugMa Phyllis 12/10/2012 Tract Acquired 01/1412013 Check No: ,Check $500.00 Private Landowner 3580 U6 HwY 13N Date:,Check Goldsboro NC 27534 Totac5M.0000000000 G 919 922 -0950 NC- WA-0176.00000 Annette Pate Hughes Phyllis 1 211 02 01 2 Tract Acquired 01222013 Check No: ,Check $3,141 38 Private Landowner 5915 Wayne Memorial Dr'rva Date:,Chack Pikeville NC 27863 Total 3141.3800000000 H- 919 778-3444 NC- WA-0177.00000 Connie Dail - 50.00000000% Garrison Bob 1111612012 Tract Acquired 17292012 Check No: ,Check $2,877.18 Private Landowner 713 Badlett Rd. Deta:,Check Pikeville NO 27863 Tota1:2877.180OD00000 Gene Dail - 50.00000000% 713 Bartlett Rd Pikeville NO 27863 C- 919 778-0365 NC.WA-0178.00000 Cathy Lancaster- 100.00000000% Guereachi Tina 11116/2012 let Offer Private Landowner 6171 Wayne Memorial Drive Pikeville NO 27863 K(919)581 -1339 -2023 Z�19)731 .19 7383198 NC -WA -0179.00000 Thlanda Howell- 100.00000000% Guereschi Tina 11116/2012 let Offer Private Landowner 241 Howep Road Goldsboro NC 27530 -I 'Mi 736-0888 NC -WA -0180.00000 North Carollna State Hwy Cavalier Albert 121032012 1st Offer Private Landowner Commission- 100.00000000% Bartlett Rd NO 0 W- 252 2378164 NC- WA-0187.00000 Cathy Lanca star - 100.0D00DD00% Guereec hi Tina 12103/2012 let Otter Private Landowner 5171 Wayne Memorial Dr Pikeville NO 27863 h41919)581 -1339 W- (919)731 -2023 C- (919 7383193 NC -WA -0182.00000 Edward Lancaster, 11- Guereschi Tina 121032012 1st Offer Private Landowner 7D0.00000000% 194 True Vino Road Pikeville NC 27683 NC -WA -0183.00000 Thlande Howell Guereachi Tine 1 2 /0 32 01 2 let Offer Private Landowner 241 HoweA Road Goldsboro NO 27530 W- 919 73643888 NC -WA -0184.00000 City of Wllson- 100.00000000% Cavelier Albert 12103/2012 iet Offer Privale 1 aryl -, 1/25/2013 Page 18 of 22 10:28:15 AM 1/25/2013 Page 19 of 22 10:28:15 AM P. O. Box 10 WOson NC 27894 W- 252 399 -2461 NC -WA -0185.00000 Cathy Lancaster Guereschi Ti- 12/0312012 let Offer Private Landowner 6171 Wayne Memorial Drive Pikeville NC 27863 FL (919) 581 -1339 W- (919)731 -2023 C- 919 738 -3198 NC -WA -0185.00100 City Of Wilson Cavalier Albert 12/D3/2D12 1st Offer Private Landowner Po Box 10 Wilson NC 27894 - NC -WA -0187.00000 CRY of Wilson - 100.00000000% Cevelier Albert 12/D32012 1st Offer Private Landowner P. 0. Box 10 Wilson NC 27894 W- 252 399.2461 NC -WA -0188.00000 city Of Wilson- 100.00000000% Cavelier Albert 11/1612012 let Offer Private Landowner p 0. Box 1D Wilson NC 27894 w- (252) 3942461 NC -WA 0189.00000 CRY Of Wilson- 100.00000000% Cavalier Albert 11/16/2012 1st Offer Private Landowner PO Box 10 Wilson NC 27894 W- 252 399 -2461 NC -WA -0190.00000 City Of Wihon- 100.00000000% Cavalier Albert 11/162012 let Offer Private Landowner P. 0. Box 1D Wilson NC 27894 W- 252 399 -2461 NC -WA -0191.00000 City Of Wilson- 100.00000000% Cavalier Albert 121032012 let Offer Private Landowner p0 Box 10 Wilson NC 27894 W- 252 399 -2461 NC-GR-0WI.000DO Private Landowner Batty Kearney- 50.00000000% Cavalier Albert 11 M812012 Assigned 5991 Wayne Memorial Drive PikeNlle NC 27863 Kenneth Kearney - 50.0000000a% 5991 Wayne Memorial Drive Pikeville NC 27863 H- 919 778 -2711 NC- GR-0002.OD0D0 Vemell Kearney. 100.00000000% Cavalier Albert 121032012 Assigned Private Landowner 7594 Flwy 13 5 LaGrarge NC 28551 Fk (2521747-2217 NC- GR-0003,OOW0 William Mewbom- 100.00000000% Cavalier Alban 1110812012 iel Offer Private to Landoner 3943 U6 Mvy 13 N. Goldsboro NC 27537 F4 919 778 -2082 NC- GR-0W3.00100 Noah Bugg Cavelier Albert I V032012 Assigned P' to Landowner 5775 Fort Run Rd NC 0- NC-GR-0004.00W0 Noah Sugg - 100.00000000% Cavalier Albert 1M32012 Assigned Private Landowner 402 N Cornentnea St Farmvilh NC 27028 H- 252 7534395 NC- GR-0007.WW0 Ann Caslaell- 100.00000000% Cavalier Albert 11/0812012 Tract Acquired 01/15/2013 Check No Check $14.032.45 Private Landowner 5337 Fort Run Rd Date.,Check Pikeviih NC 27B63 H- (252) 747 -0114 Total - .14032.4500000000 1/25/2013 Page 19 of 22 10:28:15 AM 1/25/2013 Page 20 of 22 10:28:15 AM NC- GR-000B.00WC Alice Baker Hughes Phyllis 11/0812012 2nd Offer 1/1512013 Private Landowner 7707 Del Monte Or Raleigh NC 27613 H- 919 449 -0780 NC- GR-0009.00000 P-- Landowner Kelvin Mooring - 100.00000000% Garrison Bob I1ID812012 lot Offer 1/17/2013 203 Hill Loop Rd Goldsboro NC 27534 F4 919 738 -2988 NC- GR-0010.OWW Private Landowner Tersle Yates Garrison Bob 11/0812012 Offer Accepted 3222 10th Plaee SE Washington DC 20032 H- 910 449 -0708 NC-GR OW0 Albin Cal son. 100.00000000% Dietz John 11/082012 Tract Acquired 12/05/2012 Check No: $469.00 Private Lantlowner ando 443 Davis Grove Church Rd ,Check Date:,Check Snow Hill NC 28580 Total 300.0000000000.Che H- 252 7474171 ck No: ,Check Date. Check NC- GR-0012.00000 Wesley Moore- 100.00000000% Dietz JOhn 1110812012 1st Offer Private Landowner 133 North Irving Rd Starting VA 20164 H-(703)43 288 NC -GR-0013.D0000 Sylvia Mahoney . 100.00000000% Dietz John 11/D8/2012 Assigned Pmrsts Landowner 106 Dog Wood Dr Greenville NC 27834 H- 2S2 756-0373 NC- GR-0014.ODDDO Private Landowner Scott Willoughby Hughes Phyllis 1110812012 1st Offer 1/8/2013 219 Chad—d Rd Irmo SC 29053 H- 803 781-0617 NC- GR-0015.00000 Makivell Footla LLG • Dietz John 1110812012 Assigned Private landowner 100-DOD PO B. 10OD9 938 Millers Chapel Road Goldsboro NC 27534 H- 919 778-3730 NC- GR-0016.0000D Maxwell Foods LLC • Dietz John 11/082012 Assigned Private Landowner too .OD000000% PO Boz 10009 Goldsboro NC 27532 H- 919 778 -3130 NC-GR-0016.00000-ABT- William Leroy Bass, Jr Pending N Private Lantlowner 4287 BELCHER ST Farmvile NC 27828. NC•GR-0017.00000 Helena Aldridge • 100.00000000% Hughes Phyllis 11/082012 Assigned Private Lantlowner 411 West Brownrigg 51 Goldsboro NC 27534 H- (9191734-5415 NC- GR-0018.00000 David Yelverton - 33.33000000% Hughes Phyllis 11/08/2012 Tract Acquired 0124/2013 Check No. $3 006.25 111712013 Private Landowner 9516 Whitehuiat Drive ,Check Date.,Ch,,0 Zing. Mill MD 21117 Total. 3006.2500000000 H-(410) 9022580 C- (410)935 -9661 Roger Yelverton. 33.33000000% 2510 Buckingham Drive Wilson NC 27893 FL (252) 9915478 Thurman Velverton • 33.34000000% 5104 Ell Court Wake Forest NC 27587 __... ..,.... 14- (919). 556 -1727 .... 1/25/2013 Page 20 of 22 10:28:15 AM 1/25/2013 Page 21 of 22 10:28:15 AM NC- GR.0019.00000 Emma Kearney- 100.00000OOD% Cavalier Albert 11/08/2012 Assigned Private Landowner 7594 Hwy 13 S LaGrange NC 20551 H- 252 747 -2217 NC- GR-0020.00000 Robert Edmundson Guereschi Tina 11108/2012 1st Offer Private Landowner 100.00000000". 374 Ednr -de-Rd Snowhil INC 28580 C- 919 738 -5822 NC -GR. 0021.00000 Linda Edmundson- 1DD.D000000D% Guereschi Tina 1110812012 1st Offer Prrvate Landowner 233 Edmundson Rd Snowhil NC 20560 C. 919 738-5812 NC- GR-0022.00000 Loulse Swinson - Life Estate - Guereschi Tina I lIDB12012 Tract Acquired 1203/2012 Check No: ,Check $1,820.00 Private Landowner 100.00000000: Data Check 106 Hunters Creek Drive Total 1190.000D00000OCh Goldsboro NC 27534-8324 eck No ,Check Mallle Smith Date Check 106 Hunters Creek Drive Total.630.DODD0000f10 Golds or, NC 27534 Mercle Edwards 106 Hunters Cask Or Goldsboro NC 27534 K (919 759-0916 NC- GR-0023.0J.. Elizabeth Ann Smith - Guereschi Tina 11108/2012 Assigned Private Landowner 100.00000000". 163 SmOh Farm Road Goldsboro NC 27534-7955 H- 919 778 -0922 NC- GR-0024.00100 Kirby Letchworth Jr. - Garrison Bob 120312012 2nd Offer Private Landowner 100.00000DOOK NC- GR-0025.00000 Mary Letchworth- 100.00000ODD% Garrison Bob 2nd Offer Private Landowner 3626 Shine Rd Snow Hill NC 28580 H- 252 747 -3582 NC- GR-0025.00100 Britt Farm Partnership Garrison Bob 121 D/2012 1st Offer 1117/2013 Private Landowner PO Box 1421 Wilson NC 27893 NC- GR-0025.00200 Mildred Mew born Hines Heirs - Garrison Bob 12JD312D12 1st Offer Pd'ate landowner 100.0oeeeob0a. c/o David V. Jones 2495 Pine Knoll Dr Kinston NC 26504 NC- GR-003DDDD00 Ann Joyner- 4.00000000% Garrison Bob 11108/2012 let Offer Private Landowner Arleta Harper- 20.00000000% Deborah Joiner- 4.DDDOD000% Mollie Joyner - 64.00000000% 1785 Gruen Rd. snow Hill NC 28580 C -(252) 747 -2142 Robert Jayoer.4.000D0000% 1/25/2013 Page 21 of 22 10:28:15 AM 1/25/2013 Page 22 of 22 10:28:15 AM Rudolph Joyner • 4.00000000% NC- GR.0030.D0100 Br1H Farm Partnershlp Garrison Bob 12J03/2D12 1st Offer Private Landowner p0 Box 1427 Wilson NC 27893 NC -GR-0 31.00000 GIIMn & Griffin Hog Farm Garrison Bob 1110812012 1st Offer 1/1'!12013 Private Landowner 7610 Grin Rd Srow Hill NC 28580 H- 252 747 -2142 NC-G R-0031.00700 Isaac Hal" i H.me Saab Garrison Bob 12/0312012 Assigned Private Landowner 3850 FNVY 58 N Snow Hill NC 28580- 1/25/2013 Page 22 of 22 10:28:15 AM EROSION AND SEDIMENTATION CONTROL NARRATIVE for Piedmont Natural Gas Line 5B Looping Project Johnston, Wayne, and Greene Counties, North Carolina Prepared By: AK Environmental, LLC 5020 Ritter Road, Suite 206 Mechanicsburg, PA, 17055 January 2013 Erosion and Sediment Control Narrative Piedmont Natural Gas — Line SB Looping Project 1.0 Introduction This Erosion and Sediment Control Plan (ESCP) has been prepared for Piedmont Natural Gas (PNG) as a requirement for the Line 56 Looping West and East ( "Project "). The information contained herein outlines the general requirements for earth disturbing activities associated with construction activities and was prepared in accordance to the North Carolina Sedimentation Pollution Control Act of 1973 (as amended) and the NC Erosion and Sediment Control Planning and Design Manual. 1.1 Project Location and Description The Project consists of approximately 24 miles of 12 -inch diameter natural gas pipeline from Piedmont's Bentonville LNG Plant in Johnston County (35.328916 0N, 78.264026 °W) continuing cross country through Wayne County, and ending at Piedmont's Junction B interconnect ( 35.496219 0N, 77.757180 °W) in Greene County. United State Geological Service (USGS) 7.5 Minute Quadrangle Topography Maps overlain with the Project Location is depicted on Figure 1 and 2, as well as on the cover of the Erosion and Sediment Control Plan Drawings. The Project will loop PNG's existing 10 -inch Line 5B Pipeline to provide additional capacity to the growing area of Goldsboro, NC. Although being permitted as one project, in an effort to minimize construction /operational impacts on the local community, the project has been divided into two segments; Line 58 Loop West and Line 58 Loop East. The "West" segment (discussed herewith in) will begin at the Bentonville LNG Plant and will parallel PNG's existing Line 5B Right -of -Way (ROW) where feasible for approximately 11 miles where it will tie back into the existing Line SB at PNG's Junction E site (35.385795 °N, 78.099343 °W), located at the intersection of Old Smith Field Road and Rosewood Road in Wayne County. At this Junction PNG will use the existing Line 5B Pipeline to transport natural gas through the greater Goldsboro area. The "East" segment will begin at a new pipeline "Junction" to be located along NC Highway 111(35.433066 °N, 77.962990 °W), approximately 670 -feet North of the intersection of Cotton Wood Drive. The Project then continues cross country paralleling the existing Line SB ROW where feasible in an easterly direction for approximately 13 miles into Greene County, terminating at PNG's Junction B Compressor Station in Snow Hill, NC. — i q J- _ f M L t °ti t ? , - f i i ! ' v � P r} as La e , Y R p.. t' r t R t' .{ R } min � r 1 6 "fit Wayne' Al A" (� R t ' s F r i OH WV Project Location Map N Line 5B Looping Project - Southwest Portion Figure 1 KY VA Johnston and Wayne Counties, North Carolina aR a; ' 0 125 TN 2.5 5 Miles 1 inch = 8,000 feet Legend SC Prepared For AK Environmental, LLC CenteHine " 5020 Ritter Road L� Counties h GA u./,' }. Piedmont Suite 206 rL Wit% 111 Ncatur[a' l Ga$ ,. Mechanicsburg, PA 17055 S t � 6 � r 3 Elmwiga '. St -age i s Eurrita J f to J, :z. f- r asy ° } 35 40 AI 41 kw i ,y1a 1 { :� Greene; Patel a Wayne f Go+dsboYO� 'ayne� } New w ii Cfe61F ✓ '' fra+dttUn.. =.....,..., , f / 4Yd N r 1 t f 1 Sxamp -'' r - ..."'- takers s i LJj b � • , ra , t P9new --� C M t �^ r° �• nom,\ � � ""7°- (� � , F1vpc > S ta✓ IENOI C"O 1 OH �VV Project Location Map N KY Line 58 Looping Project - Northeast Segment VA Wayne and Greene Counties, Figure 2 North Carolina TN 0 1.25 2.5 5 Miles 1 inch = 9,000 feet Legend Prepared For. Centerline $C AK Environmental, LLC 5020 Ritter Road ® Counties GA u Piedmont suite 205 L MAI Natural Gas AK Mechanicsburg, PA 17055 1.2 Approach and Overview The primary soil disturbing activities will include the clearing and grubbing of the pipeline easement, the segregation of topsoil, the excavation and re- compaction of the trench, and the restoration of the disturbed areas. The topography along the pipeline corridor will be restored to the original grades as near as possible so that any changes in land surface elevation will be temporary. 1.2.1 Planning Site topography, soil types, and potential effects of construction - related activities on erosion and sediment migration have been considered in developing this ESCP. Areas of steep, erodible slopes and erodible soils, if encountered, will not be disturbed without instituting proper engineering controls to minimize erosion and off -site transport of sediments. 1.2.2 Minimize Land Disturbance To the extent practical, disturbed areas and the duration of exposure to erosion elements will be minimized. Clearing of vegetation will be limited to only those areas of the site to be disturbed at a given time. To the extent possible and practical, existing vegetation will be retained and protected. 1.2.3 Installation of Erosion and Sediment Controls Erosion and sediment control Best Management Practices (BMPs) will be constructed, installed, stabilized and functional immediately following any earth disturbing activities in a given area 1.2.4 Maintenance of Erosion and Sediment Controls Erosion and sedimentation controls will be maintained during construction activities and until the disturbed area is stable. Maintenance will include weekly inspection of all erosion and sedimentation control devices and after any precipitation event that is greater than 0.5 inches. Preventive and corrective maintenance activities such as cleanout, repair, replacement, re- grading, reseeding, and re- mulching will be done as soon as possible and practical. 1.2.5 Stabilization Temporary stabilization will occur on a daily basis immediately after soil disturbance. Temporary waterbars will be installed at the end of the day, sediment barriers will be installed across bridge entrances, and silt fence is maintained. During pipeline construction, all areas are considered active until back fill and final grade take place, at which time final stabilization measures will be implemented. Permanent stabilization methods including seeding and mulching shall occur within 15 working day or 30 calendar days, whichever is less. Typical pipeline construction follows the Federal Energy Regulatory Commissions (FERC) recommendation of permanent stabilization within 20 days (10 days in residential areas) upon completion of final grade. 1.2.6 Supervision and Inspection Inspection of land- disturbing activities for sediment control is required. The inspector's job is to determine that the approved ESCP is installed as approved, that erosion is being controlled, and off -site sedimentation is prevented. If the inspector finds deficiencies, he or she must take appropriate actions to secure compliance. • Erosion and sedimentation control devices will be in -place and inspected at the end of each work day during active construction and after each precipitation greater than 0.5 inches. Upon inspection the contractor shall repair or replace any failed device, immediately or as practical. • Maintenance and inspection of sediment control facilities shall conform to NCDLQ rules and regulations. • Sediment must be removed when it has reached % the aboveground height of the filter fabric fence. Repair all undercutting of erosion of the toe anchor immediately with compacted backfill materials. Adhere to the manufacturer's recommendations for replacing filter fabric due to weathering. • Re- vegetated areas shall be inspected for bare spots, washouts, and healthy growth during construction. Identified bare spots and washouts shall be repaired immediately or as practical. • All spoils piles shall be stabilized as appropriate with either silt fence or temporary seedings. • It is the responsibility of the contractor to ensure that all runoff is directed to sedimentation control devices. • All sedimentation control devices shall remain in -place until the disturbed area has achieved a minimum of 80% total re- vegetation. Any area not achieving 80% re- vegetation shall be re- seeded and mulched. 2.0 Site Description 2.1 Topography The pipeline traverses rolling agricultural land with an average slope of 1% or less. Localized slopes of up to 10% may be encountered for short distances. The majority of the pipeline is located in cultivated land; however, portions of the route contain forested areas that will require clearing. Portions of the route may encounter wetlands requiring special mitigation techniques. 2.2 Site Hydrology Due to the nature of linear project, there are multiple surface waters within the Neuse River Basin that are associated with the Project. The major receiving waters include associated with the West segment include; Mill Creek, Neuse River, Raccoon Swamp (WS- IV;NSW), Moccasin Creek, Half -Mile Branch (WS- IV;NSW), Stoney Creek (C;NSW), Exum Mill Branch (C;Sw,NSW), and Cow Branch (C;Sw.NSW). 2.3 Soils Due to the long, narrow nature of the disturbed area, no single soil type exists along the project. Along the route, areas of coarse soils such as sand and gravel as well as fine soils such as silt and clay are expected. Appropriate erosion control measures for each type will be provided. Soil types and symbols area provided on the ESCP drawings. 2.3.1 Topsoil Segregation Topsoil is required to be segregated in wetlands along the ditch line only as part of the ditching procedure, unless the soil is saturated, there is standing water present, or in freezing conditions. Unless approved otherwise by the landowner or land management agency, topsoil is segregated prior to ditching in all residential areas in actively cultivated or rotated croplands and pastures, hayfields and other areas at the landowners or land managing agency's request. Topsoil and subsoil will be segregated within wetlands during ditching and stockpiled separately. The Contractor shall strip and segregate a minimum of 12 inches of the topsoil layer. In soils where the actual topsoil depth is less than the specified depth of salvage, the Contractor shall strip and segregate the topsoil layer by stripping the topsoil to a depth where the topsoil color changes to the color of a distinct underlying soil horizon. Topsoil shall not be used for padding, backfill or trench breakers, under any circumstances 3.0 Erosion and Sediment Control Practices 3.1 Standard Pipeline Construction Sequence Typical pipeline construction in completed as an "assembly" line, with dedicated crews for each phase described below. A graphical representation of typical pipeline construction sequence in included as Figure 3. Figure 3 Typical Pipeline Construction Sequence r- I . Survey and Staking 11. X -Ray Inspecti on, Weld Repair 2. Clearing 12. Coating Field Welds 3. Frord -End Grading 13a. Trenching (wheel ditcher) a. ROW Topsoil Stripping 13b. Trenching (backhoe) 5. Restaking Centerline of Trench 13c. Trenching (rock) 6. Stringing Pipe 14. Inspection & Repair of Coating 7. Field Bending Pipe 15. Lowering Pipe into Trench 8. Line -Up, Initial Weld 16. As -Built Survey 9. Fill & Cap, Final Weld 17. Pad, Backfill, Rough Grade 10. As -Built Footage 18. Hydrostatic Testing, Final Tte-n 19. Replace Topsoil, Final Clean- Up, Full Restoration Figure 3 Typical Pipeline Construction Sequence r- 3.1.1 Clearing The following are standard procedures that PNG will follow during the clearing phase of construction: • ROW boundaries (e.g., workspace limits) will be clearly delineated and that no clearing occurs beyond these boundaries. • Wetland boundaries shall be clearly marked prior to clearing. • Trees to be saved shall be marked (flagging, construction fencing, etc.) before clearing begins. • The construction corridor will be cleared and graded to remove brush, trees, roots and other obstructions such as large rocks and stumps. Non -woody vegetation may be mowed to ground level. • Trees shall be felled into the ROW. • Trees that have fallen into waterbodies or beyond the ROW shall be removed immediately. • Trees located outside of the ROW will not be cut to obtain timber for use along the ROW. • Timber shall not be stacked in drainage ways or left within wetlands. Access within the ROW across wetlands will only be permitted with timber mats where soils are saturated and not able to support construction equipment without rutting of the wetland soil at the time of crossing or during frozen soil conditions. A stable crossing should be provided at all times within the wetlands 3.1.2 Grading When existing topography and /or terrain does not permit crews and equipment to operate safely and does not provide access or an efficient work area, grading shall be required. Rock construction entrances shall be installed where required prior to or in association with grading. Erosion control devices must also be installed at all stream, wetland, and road crossings prior to grading. Only the minimal clearing and grading necessary to install the devices shall be allowed. The following general construction methods will be employed during grading: Removal of Tree Stumps • In upland areas, stumps can be removed across the entire width of the construction ROW if required for pipeline safety reasons or for worker safety concerns. • In wetlands, stumps shall be removed only in the trenchline; except where construction constraints or safety concerns require their removal. Disposal of Tree Stumps Tree stumps shall be disposed of by one of the following methods, pending approval of the landowner, the lead environmental inspector, and in accordance with permit and regulatory requirements: • Stumps may be removed from the site and disposed of in an approved landfill or other site which traditionally accepts construction /timber debris. • Stumps may be burned in upland areas provided that the residual ash is removed from the ROW. 3.1.3 Trenching and Stringing Trenching will be done utilizing track -hoe excavators and /or specialized trenching machines. Top soils and underling soils are typically segregated and stored in rows along the trench line. In general, approximately 80 -foot lengths of pipe will be trucked to the site from a temporary storage yard, strung along the easement, and placed on skids (wooden pedestals). Specialized machines will be used to bend individual segments of the pipe to fit the contours of the trench where necessary. The pipe segments will be welded together, x- rayed, inspected for structural integrity. 3.1.4 Lowering/ Backfilling Once the pipe is welded into selected lengths, the pipe is then lowered in to the trench using side boom excavators. Permanent trench breaks will be installed where necessary and at the appropriate spacing based on FERC recommendations: Slope % FERC Snacin < 5 None 5-15 300 feet apart >15 — 30 200 feet apart > 30. 100 feet apart Upon lowering, backfilling will commence with excavated subsoil and topsoil. In certain areas, such as residential, wetlands, and agricultural crops, efforts will be made to segregate topsoil from the subsoil and backfilled using the following guidelines: • Backfill material and methods will be approved by the assigned inspector. • Subsoil shall be placed directly onto the padding material. • Heavy equipment may be used to compact the backfilled ditch to minimize settling, or a crown of soil will be put over the pipeline to compensate for future soil settling. Openings shall be left in the crown to allow for lateral surface drainage. • Subsoil excavated as part of the project and sediment removed from BMPs will be combined and used to backfill the trench. Typically, excess soil is minimal and will either be used to create a crown over the trench to counteract settling or will be spread evenly across the ROW, which will have a negligible effect of the overall grade. • Any excess excavated materials or materials unsuitable for backfill will be handled, as approved by landowner or land management agency, or disposed of in accordance with applicable regulations. Depth of cover Is as follows: Agricultural fields — minimum 4 feet Wetlands — minimum 4 feet Waterbodies - 5 feet Upland forested — minimum 4 feet 3.1.5 Restoration Restoration and revegetation of the ROW incorporates permanent erosion and sediment control measures. However, in the event that final restoration cannot occur in a timely manner due to weather or soil conditions, temporary erosion and sediment control measures will be maintained until the weather is suitable for final cleanup and revegetation. In no case shall final cleanup be delayed beyond the end of the next recommended seeding season. Temporary Restoration Measures • Stabilization measures shall be initiated as soon as practical on upland portions of the ROW where activities have temporarily or permanently ceased except when the initiation of stabilization measures by the seventh day is precluded by weather. Stabilization measures shall be initiated as soon as machinery is able to obtain access to the ROW. • Stabilization of waterbodies and wetlands shall be initiated immediately after backfilling, weather permitting. • Per the E &SC Plan as soon as slopes, channels, ditches and other disturbed areas reach final grade, they will be stabilized. Upon completion or temporary cessation of the earth disturbance activity, the project site shall be immediately stabilized. • Temporary seeding for ROW and topsoil stabilization will be provided within 7 days on slopes greater than 3:1 or 14 days on flat terrain or slopes less than 3:1. • All temporary sediment barriers will be removed when an area is successfully revegetated (i.e., when a minimum uniform 80% perennial vegetative cover with a density capable of resisting accelerated erosion and sedimentation has been achieved.), or when permanent erosion controls are installed. Permanent Restoration Measures • Permanent restoration of waterbodies and wetlands shall be initiated immediately after backfilling, weather permitting. • Final grading shall be completed, including topsoil replacement and permanent erosion control measures, within 20 days after backfilling the trench (10 day in residential areas), weather permitting. • Construction debris shall be removed from the ROW and the ROW shall be graded so that the soil is left in the proper condition for planting. • Where trench compaction has not been done, the ROW shall be graded to pre - construction contours, as practical, with a small crown of soil left over the ditch (except in waterbodies) to compensate for settling, but not to interfere with natural drainage. • Where topsoil has been segregated, the topsoil shall be spread back along the ROW in an even layer. • All fences which were cut and replaced by gaps during construction shall be repaired to at least the equivalent preconstruction conditions. • Permanent water bars shall be constructed to the same specifications as temporary water bars after final grading and prior to seeding. • Permanent water bars will be constructed to replace temporary erosion control barriers upslope of road and railroad crossings, and on both sides of all wetland and waterbody crossings, where appropriate. 3.2 Site Access 3.2.1 Rock Construction Entrance Temporary crushed stone construction entrances will be installed at construction entrances adjacent to existing public and private roadways, where construction traffic will be entering and exiting the site. The use of these access routes will help confine truck and equipment traffic to specific corridors, thus reducing land disturbances, protecting vegetation, and reducing the amount of sediment transported off -site and into the existing local stormwater system. In applicable, inlets to storm drainage facilities shall be protected for 300 feet to either side of the entrances. 3.2.2 Temporary Access Road Where temporary roads are needed to provide access to the pipeline right -of -way, road stabilization may be required in order to control sedimentation. Where temporary roads are expected to remain in use for an extended period of time or are located in areas of excessive moisture, gravel will be required to stabilize the surface. At a minimum, drainage from the roads should be controlled using water bars or turnouts to divert the water through vegetated buffer areas or other sediment control devices. Parking and staging areas should be maintained using clean gravel to minimize sediment transport. 3.3 Travel Lanes 3.3.1 Upland Areas A travel lane, typically along the working side of the ROW may be left open temporarily to allow access by construction traffic if the temporary erosion control structures are installed, inspected and maintained as specified. When access is no longer required, the travel lane shall be removed, decompaction of the travel lane will occur, and the travel lane restored. The contactor wii not use dirt, rock, pulled tree stumps or brush, or rip -rap to stabilize the travel lane. 3.3.2 Temporary Bridges Stream will be temporary bridged by using bolted timber mats, modified railcars, or similar devices that will limit temporary bank impacts and will be underlined with geotextile fabric to prevent sediment and tracked materials from falling between the timbers. In addition, sideboards will be attached to the temporary bridges to prevent accumulated soils from entering the waterbody. 3.4 Sediment Barriers and Filters 3.4.1 Silt Fence Also referred to as filter fence or sediment barrier, this temporary sedimentation control device consists of metal posts with filter fabric stretched across the posts. Silt fencing will be installed as needed on slope -side and down -slope boundaries of disturbed areas. Silt fencing shall be constructed and installed in accordance with the construction standard. 3.4.2 Reinforced Sediment Barrier Reinforced Sediment Barrier or "Super Silt Fence" is similar to standard silt, but is typically reinforced with chain link fence, welded wire fence, or hogwire. Reinforced Sediment Barriers are used in areas where additional support is required due to the slope of the site or volume of stormwater runoff. 3.4.3 Temporary Waterbars Waterbars may be used to direct runoff to well- vegetated areas or sediment removal facilities (e.g., sediment traps or sediment basins). They should discharge to the downslope side of the access road or ROW so that runoff will flow away from, not back onto the roadway or ROW. A 2% maximum gradient is recommended to ensure proper discharge of water entering the waterbar. Steeper gradients should be avoided to prevent erosion of the waterbar. Wherever erodible soils are present, or where there is not a sufficient vegetative filter strip between the waterbar and receiving surface water, the waterbar should be provided with a temporary protective liner or be outfitted with waterbar outlet protection to promote sheetflow. Obstructions, (e.g., straw bales, silt fence, rock filters, etc.) should not be placed in or across waterbars. 3.5 Temporary Stabilization 3.5.1 Temporary Seeding Temporary seeding will be used to stabilize disturbed areas before final grading or when in a season that is not suitable for permanent seeding. At a minimum, lime and fertilizer shall be incorporated in the top 4 -6 inches of soil if possible, follow the recommendations of soil tests or apply 2000lb /acre ground agricultural linestone and 700 -1000 lb/acre 10 -10 -10 fertilizer. Use temporary species that are appropriate for the season and region, as outlined on the ESCP. Within 6 weeks of planting, inspect to verify growth, fertilize re -seed, and mulch as necessary. 3.5.2 Mulching Mulching is used to provide temporary erosion protection and to promote growth of vegetation. Use material equivalent to that show below. On steep slopes and in channels, install and anchor matting, geofabric, or netting over straw 3.6 Maintenance and Inspection Until the site is stabilized, erosion and sediment control BMPs must be maintained properly. Preventative and corrective maintenance work, including clean -out, repair, replacement, re- grading, Re- seeding, re- mulching, and re- netting must be performed immediately. If erosion and sedimentation control BMPs fail to perform as expected, replacement BMPs, or modifications to those installed will be required. The following inspection and maintenance practices will be used to maintain erosion and sediment controls on -site during activities. • Erosion and sedimentation control devices will be in -place and inspected at the end of each work day during active construction and after each precipitation event greater than 0.5 inches. Upon inspection the contractor will immediately repair or replace any failed device. • Sediment must be removed when it has reached Y2 the aboveground height of the filter fabric fence. Repair all undercutting of erosion of the toe anchor immediately with compacted backfill materials. Adhere to the manufacturer's recommendations for replacing filter fabric due to weathering. • Re- vegetated areas shall be inspected for bare spots, washouts, and healthy growth during construction. Identified bare spots and washouts shall be repaired immediately. • All soil stockpiles that are to remain onsite for more than 1 week shall be seeded with temporary grass, as noted in Tables 4 and 5 above and the construction details. • It is the responsibility of the contractor to ensure that all runoff is directed to sedimentation control devices. All sedimentation control devices shall remain in -place until the disturbed area has achieved a minimum of 80% total re- vegetation. Any area not achieving 80% re- vegetation shall be re- seeded and mulched within 24 hours of detection. 4.0 Specialized Construction Methods 4.1 Wetland and Waterbody Crossings Wetland and waterbody crossing techniques shall be conducted in according with the applicable construction detail provided in the ESCP. Method I: Horizontal Direction Drilling (HDD), or bored crossings will involve aboveground removal of vegetation by hand to provide a "line of site ". Of the 50 -foot wide clearing, the 30 -foot temporary work space will be seeded with a native restoration seed mix and allowed to return to its pre - construction condition. The remaining 20 -foot permanent easement will be routinely mowed and brush hogged. During HDD activities, the risk of releasing drilling fluids to the surface (aka "frac out ") is always present. Should this situation arise during drilling activities, the contractor shall follow the Frac Out procedures outlined in Section 7.0 Method II: Pipeline installation through wetlands and streams utilizing the traditional open cut or "dry crossing" methods. Aboveground vegetation will be removed by hand and generally no grubbing or belowground vegetation removal will occur, with the exception of the area directly over the trench line. Prior to trench line excavation within a steam body, a 10 -foot vegetative buffer will be left in place until the time of crossing, only then will grubbing of below ground vegetation take place, any logging debris introduced into streams or wetlands will be avoided to the maximum extent practical and removed promptly Following preparation of the easement timber mats will be placed alongside the trench line to provide a safe space for equipment to work and travel, and prevent excessive rutting and ground disturbances. Streams will be temporary bridged by using bolted timber mats, modified railcars, or similar devices that will limit temporary bank impacts and will be underlined with geotextile fabric to prevent sediment and tracked materials from falling between the timbers. In addition, sideboards will be attached to the temporary bridges to prevent accumulated soils from entering the waterbody. Silt fence will be installed along the boundaries of streams and across the boundaries between uplands and wetlands. Since stream flow during construction may vary, streams crossing will be completed by utilizing "dry crossing" methods described below. The dry crossing method required that waterbody flow be maintained at all times. Continuous flow will be maintained by: o Flume Crossing: This crossing technique is not proposed for the Project, however it is being included in case the contractor decides this is the best method due to site conditions at the time of crossing. During mainline construction the streambed will not be excavated and the banks will be left in place as hard plugs until the pipe is ready to be installed. The size and number of flumes over the trench line will be sufficient for maximum anticipated flows during the construction time frame. Flume pipe(s) will be installed over the trench line and maintained until restoration is compete. At the time of crossing, the pipe will be threaded under the flume pipe(s) and the ditch will be backfilled while waterbody flows are maintained. Flume pipe(s) will be permanently removed as part of restoration. o Dam and Pump: This method will maintain upstream and downstream flows during in -steam activities. Grubbing or removal of belowground vegetation within the trench line will not take place until all materials required to compete crossing are onsite and pipe is ready to be installed. Street plates or sand bags will be used to dam the flow during the pump around; Pumps will be used only when direct access to the trench or streambed is required, and not for extended period of time. During pumping operations, a construction representative will "man" the pump and generator to ensure aquatic resources are protected in the event of a spill. Energy dissipation devices will be used at the downstream outlet to prevent excessive scour or erosion of the streambed. When an intermittent or ephemeral stream is to be crossed during construction and a "dry- ditch" crossing is not required, the use of an open cut method may be used, providing no flow is present during the time of crossing and flow is not anticipated during the crossing procedure (typically within 48 hours). Bank disturbance shall not take place until all materials to complete the crossing area onsite and the pipe is ready to be installed. During an open cut crossing, the use of equipment shall be limited to that needed to construct the crossing; all other construction equipment must cross on a temporary equipment bridge, and remain in place until the bridge is no longer need for the Project. All delineated streams, regardless of category will be bridged during construction. Wetlands and waterbodies are commonly found together as one system. The crossing methods used will be based on field conditions to protect both resources equally. It is essential to recognize that individual construction methods will be assigned to both the wetland(s) and the waterbody(ies) to protect the resources. Areas within wetlands that are disturbed will be seeded with a native wetland seed mix. Disturbed wetland areas outside the permanently maintained easement will be allowed to re- vegetate naturally. Stream banks temporarily affected by trenching or placement of the equipment bridge will be stabilized with a native riparian seed mix, and protected using curlex matting. 4.2 Trenching 4.2.1 Trench Plugs Soft plugs consist of compacted subsoil or sandbags placed in the ditch following excavation. Topsoil will not be used for plugs. Hard plugs consist of unexcavated portions of the ditch and also typically provide access across the ditch for wildlife and livestock. Trench breakers will be installed at both sides of all waterbody and wetland crossings. Soft plugs constructed to hold water will be longer along the trenchline than they are tall, constructed in compacted layers, and inspected regularly by the Contractor to prevent breaching. Installation of trench breakers and soft plugs will be coordinated with installation of temporary water bars in order to effectively divert water off the ROW (see table below). Slope % FERC Spacin < 5 None 5-15 300 feet apart >15 — 30 200 feet apart >30 100 feet apart Water accumulated behind the plugs will be pumped out onto a well- vegetated area or filtered before the plug is removed. Sediment shall be removed and redistributed within the trench upslope of the trench breaker when accumulations reach 1/2 the height of the barrier. 4.2.2 Trench Dewatering Hose intakes will be elevated off of the ditch bottom. The Contractor will be trained on exclusion areas for dewatering locations. The environmental inspector will assist in choosing dewatering locations when needed and has the authority to stop work and relocate the structure if the structure is not placed correctly or is causing sedimentation. Discharges shall be directed through a filter bag and /or into areas contained by erosion control barriers. Filter bags will be used in accordance with manufacturers' specifications. Filter bags shall not be placed on slopes greater than 5 %. Intake hoses will be screened and the of clamps or tie wire will be used to attach filter bag to hose. String or cord should not be used. Under no circumstonces will trench water or other forms of turbid water be directly discharged onto exposed soil or into any wetland or waterbody, known cultural resource sites, or locations of sensitive species. 5.0 Site Housekeeping and Material Management The spill prevention and control methods listed in this section are based on approved spill control plans. The ECP is comprehensive in that it addresses actions used to prevent spills in addition to specifying actions that will be taken should any spills occur, including emergency notification procedures. The Project's on -site El are responsible for ensuring that Contractors implement and maintain spill control measures. 5.1 Preventative Measures 5.1.1 Training The Contractor will instruct personnel on the operation and maintenance of equipment to prevent the accidental discharge or spill of fuel, oil, and lubricants. Personnel will also be made aware of the pollution control laws, rules, and regulations applicable to their work. Spill prevention briefings with the construction crew will be scheduled and conducted by the El to insure adequate understanding of spill prevention measures. These briefings will highlight: • precautionary measures to prevent spills; • sources of spills, such as equipment failure or malfunction; • standard operating procedures in case of a spill; • equipment, materials, and supplies available for clean -up of a spill; and • a list of known spill events. 5.1.2 Equipment Inspection / Maintenance The Contractor will inspect and maintain equipment that must be fueled and /or lubricated according to a strict schedule. Ensure that all construction equipment has on hand sufficient supplies of absorbent and barrier materials to allow the containment and recovery of spilled materials. The Contractor will submit to PNG for approval written documentation of the methods used, which includes: work performed, fueling and grease truck locations, as part of the daily work plan. All containers, valves, pipelines, and hoses will be examined regularly to assess their general condition. The examination will identify any signs of deterioration that could cause a spill and signs of leaks, such as accumulated fluids. All leaks will be promptly corrected and or repaired. 5.1.3 Refueling Operations The Contractor will insure that equipment is refueled and lubricated within the ROW and at least 100 feet away from all waterbodies and wetlands with the following exceptions: • Areas such as rugged terrain or steep slopes where movement of equipment to refueling stations would cause excessive disturbance to the ROW. • Areas where removing equipment from a wetland for servicing would increase adverse impacts to the wetland. • Sites where moving equipment to refueling stations from pre- fabricated equipment pads is impracticable or where there is a barrier from the waterbody /wetland (i.e., road or railroad). • Locations where the waterbody or wetland is located adjacent to a road crossing (from which the equipment can be serviced). • Refueling of immobile equipment including, but not limited to, bending and boring machines, air compressors, padding machines, and hydro -test fill pumps. In these areas, auxiliary fuel tanks will be used to reduce the frequency of refueling operations and in no case will refueling take place within 100 feet of any known potable water wells. The Contractor will assure that all refueling is done pursuant to the following conditions: • Impact minimization measures and equipment will be sufficient to prevent discharged fluids from leaving the ROW or reaching wetlands or waterbodies, and be readily available for use. These will include some combination of the following: a. Dikes, berms or retaining walls sufficiently impervious to contain spilled oil. b. Sorbent and barrier materials in quantities determined by the Contractor to be sufficient to capture the largest reasonably foreseeable spill. c. Drums or containers suitable for holding and transporting contaminated materials. d. Curbing. e. Culverts, gutters, or other drainage systems. f. Weirs, booms, or other barriers. g. Spill diversion or retention ponds. h. Sumps and collection systems. • The Contractor will prepare for approval by PNG a list of the type, quantity, and the storage location of containment and clean up equipment to be used during construction. • All spills will be cleaned up immediately. Containment equipment will not be used for storing contaminated material. 5.1.4 Storage Storage containment areas will not have drains, unless such drains lead to a containment area or vessel where the entire spill can be recovered. Hazardous materials shall not be stored within 100 feet of any wetland or waterbody. 5.1.5 Personnel Support Prior to construction, the ROW inspector or agent shall identify and prepare a written inventory of water wells within 150 feet of the construction work area. The Construction ROW Agent will notify the authorities of all potable water supply intakes located within three miles downstream of any crossings a minimum of one week prior to construction. 5.1.6 Impact Minimization Measures Containment is the immediate priority in the case of a spill. A spill will be contained on PNG property or ROW, if possible. Clean up procedures will begin immediately after a spill is contained. In no case will containment equipment be used to store contaminated material. 5.2 Waste Management 5.2.1 Before Work Commences and Before Generating Waste Company shall inspect all secondary containment provided by the Contractor. Company shall provide the EPA generator number if necessary for all hazardous waste generated as a result of the performance of the Scope of Work and provide a hazardous waste contingency plan if necessary. 5.2.2 During Waste Generation For unanticipated wastes generated during the performance of the Scope of Work, Company and Contractor shall confer on classification responsibilities as soon as possible after the waste is generated. Company shall obtain a temporary hazardous waste EPA ID number if necessary. 5.2.3 After Waste Generation Company shall arrange for transportation and disposal of all hazardous and special wastes generated during the performance of the Scope of Work. 5.3 Waste Management — Contractor Responsibilities 5.3.1 Before Work Commences Contractor shall develop a Waste Management Plan for all wastes anticipated during the project and submit to Company for approval. At the discretion of the Company, multiple similar projects may be covered under one Waste Management Plan. The work shall not commence prior to obtaining Company's approval of Waste Management Plan. If the Waste Management Plan addresses potentially hazardous waste or asbestos, the Contractor shall have training in accordance with Contractor's own training program. Contractor shall minimize the waste generated during a project by purchasing and using only the amount of material needed. All excess materials purchased by a Contractor shall be removed by the Contractor at the end of the project. Contractor shall furnish to the Company copies of any permits, clearances or authorizations obtained by Contractor. 5.3.2 Before Generating Waste Contractor shall be familiar with the state and local environmental requirements as necessary for the performance of the Scope of Work. Contractor shall provide all drums (DOT Spec. 1A1 or IA2), rolloff boxes, or other containers necessary to contain wastes generated during the performance of work, including wastes generated in response to spill response and cleanup activities, unless otherwise specified in the Scope of Work. All containers shall be approved by the Company. Contractor shall provide containment areas for liquids, hazardous waste and special waste as required by the Spill Management section of this specification. The containment shall be impervious to the materials being stored. Temporary storage on the right -of -way does not require protection from weather; temporary storage shall not exceed one week. Contractor shall collect all waste near the close of each workday and shall place the waste in a Company- approved location. 5.3.3 During Waste Generation Contractor shall be responsible for housekeeping activities in the work area. Contractor shall notify the Company prior to placing any potentially hazardous or special waste in storage so that Company may conduct sampling and analysis as necessary. Contractor shall be responsible for proper packaging, labeling, marking and storing of waste. Contractor shall keep hazardous, non - hazardous, special, and general trash wastes separate and shall not mix waste streams. Contractor shall keep a waste log identifying the Company facility at which the waste was generated, the volume and type of waste generated, the date generated and, where applicable, the Company - approved location to which the waste was transported or stored. Contractor shall provide the waste log to the Authorized Company Representative weekly. Any waste shipped to a Company facility shall be accompanied by a log. For unanticipated wastes generated during the Scope of Work, Company and Contractor shall confer on classification responsibilities as soon as possible after the waste is generated. If classification of a waste is unknown, all waste shall be assumed to be hazardous until final classification is received from the Company. Contractor shall label and store waste accordingly. In accordance with the Contractor's approved Waste Management Plan, the Contractor shall be responsible for the handling, storing and transporting of non - hazardous and special wastes generated by Contractor during the performance of the contract. Any proposed changes to the approved Waste Management Plan regarding the methods established for the handling, collecting, transporting, and storing of any waste shall be submitted in writing and agreed to by both the Contractor and Company prior to instituting the change. 5.3.4 After Waste Generation Contractor shall notify Company personnel prior to moving any waste off -site to another location. Contractor shall be responsible for ensuring that non - hazardous and special wastes are transported by Company- authorized transporters only, and all waste is accompanied by the appropriate shipping papers, complete with required information and signatures. Contractor is prohibited from transporting hazardous waste unless specifically authorized. Contractor shall submit all waste shipping papers to the Company. • Contractor shall supply disposal containers for the general trash waste generated by the Contractor and its subcontractor; it shall be transported to a disposal facility in accordance with the Waste Management Plan. 5.4 Spill Management — Company Responsibilities Company shall review spill prevention and response as part of the pre job meetings as discussed above. In the event of a reportable spill or release which involve Company - processed products /materials (e.g. pipeline liquids, used oil, etc.), Company shall make notifications to the appropriate agency. Company shall provide a copy of release reports required by Federal or State agencies to any jurisdictional land- managing agency, concurrent with the filing of reports to the involved Federal and State agencies. 5.5 Spill Management — Contractor Responsibilities The Contractor shall comply with the spill prevention, control, and containment procedures set forth below and in the Scope of Work for all work undertaken during performance of the contract. Contractor shall ensure that their personnel and subcontractors involved in the work area are aware of the spill prevention and containment responsibilities. Contractor shall develop a list of all emergency contacts within the Contractor's and subcontractors' organization, and a description of emergency response equipment that will be provided by the Contractor for use by their employees. Emergency equipment may include but is not limited to shovels, backhoes, dozers, front end loader, etc. Contractor shall have a copy of the Material Safety Data Sheet (MSDS) of each chemical to be used during the job and it shall be available for review if requested by the Company. 5.6 Spill Prevention — Contractor Responsibilities Contractor shall install lined secondary containment impervious to the material being stored (e.g. diking and /or earthen berms with liner) around liquids materials handling and storage areas to prevent spilled material from reaching the waters of the state. Areas which require containment structures include: (i) liquid and hazardous waste drum storage areas, (ii) bulk storage tanks, (iii) tanker trucks if parked at one location for more than two days, (iv) liquids handling and operations areas on offshore facilities. All equipment staging areas shall be located at least 50 feet away from all water sources and wetland areas. No storage areas shall be located within 100 feet of a perennial stream. No chemicals or fuel shall be transferred within 100 feet of stream banks. The contractor shall install drip pans or other suitable containment devices to collect all vehicle fluids when performing on -site maintenance. All waste fluids shall be removed from the site by Contractor and disposed of properly. Contractor shall inspect equipment for integrity including, but not limited to, valves, hoses and fittings. Contractor shall monitor all loading and unloading operations of chemicals and fuels to ensure proper response to prevent spills. All hose connections shall be inspected for leaks and if leakage should occur, the operation should cease until the leak is repaired or a containment pan is placed under the leaking connection. 5.7 Spill Response - Contractor Responsibilities Contractor shall provide immediate notice to the Company's Authorized Representative in the event of a spill or other emergency. All spills occurring on land or in watercourses (including intermittent and ephemeral streams), regardless of quantity, shall be cleaned up immediately. If a release or spill occurs, Contractor shall stop operations and take immediate measures to control the release and prevent dispersal of the spilled material. For spills to land (e.g. spills in drum storage areas, spills at bulk storage tank areas, spill at truck staging areas, equipment failure or leaks, etc.), Contractor shall initiate cleanup of the area affected by the spill by removing the soil and placing it into new or reconditioned DOT Spec. IA2/Z150 /S drums, or other suitable containers, as determined appropriate by Company. The Contractor shall be deemed the generator of the waste resulting from the spill. The Contractor shall excavate and remediate the area of the spilled material. For spills that enter water, Contractor shall contain the spill and remove the spilled material to the extent practicable using pumps or absorbent materials. With the exception of spills /releases which involve Company - processed products /materials (e.g. pipeline liquids, used oil, etc.), Contractor shall be responsible for making any necessary notifications to the appropriate Federal or State agencies for any release or spill of hazardous substances in excess of reportable quantities established by 40 CFR 117, 40 CFR 302, and 40 CFR 355 or releases of oil as defined by 40 CFR 110, which occurs as a result of Contractor's or its subcontractors' activities. Contractor shall document and record all spills. Copies of the documentation shall be provided to the Company's Authorized Representative. 6.0 Post - Construction 6.1 Permanent Site Stabilization 6.1.1 Permanent Seeding Use permanent seeding techniques to stabilize areas for periods longer than 12 months. At a minimum, slopes greater that 3:1 should be roughened by tracking, grooving, or furrowing. Add lime and fertilizer in the upper 4 -6 inches where practical, use appropriate seed for region and season as indicated on the ESCP, and mulch 75% of the ground surface with approved material. Following installation, inspect seeded areas within 4 -6 weeks, repair and re -seed as necessary. 6.1.2 Mulching Mulching is used to provide temporary erosion protection and to promote growth of vegetation. Use material equivalent to that show in the table below. On steep slopes and in channels, install and anchor matting, geofabric, or netting over straw. Material Rate Per Acre Requirements Notes Organk Mulches Straw Dry, un- chopped, un- Spread by hand or 1 -2 tons weathered; avoid weeds machine; must be tacked or tied down. Wood fiber or wood Use with hydroseeder; cellulose 'r4 ton may be used to tack straw. Do not use in hot Straw or hay mulch should be anchored by applying tackifier, stapling netting over the top, or crimping with a mulch crimping tool. Materials that are heavy enough to stay in place do not need anchoring. Inspections should be done after rainstorms to check for movement of mulch or erosion. If washout, breakage, or erosion occurs, repair surface, re -seed, re- mulch, and install netting. Continue inspections until vegetation is firmly established. 6.1.3 Permanent Waterbars Following final grading, install permanent right -of -way diversions (aka waterbars) to prevent erosion on long, sloping right -of -ways to divert run -off at specific intervals based on slope. Following construction and Right -of -way has reached final grading, correct any erosion problems, stabilize outlets, and apply permanent seeding, as specified. Slope % FERC Spacing < 5 Nom? dry weather Wood Chips Air dry. Add fertilizer N. Apply with blower, chip 5 -6 Tons 12 lb/ton handler, or by hand. Not for fine turn areas Bark Air dry, shredded or Apply with mulch blower, 35 cu -yds hammermilled, or chips chip handler, or by hand. Do not use asphalt tack Nets and Mats Jute net Heavy, uniform; woven of Withstands water flow Cover area single jute yard. Used with organic mulch Excelsior (wood fiber) mat Cover area Fiberglass roving Continuous fibers of Apply with compressed air X -1 ton drawn glass bound ejector. Tack with together with a non -toxic emulsified asphalt at rate agent of 25 -35 gal /1000 sq -ft Chemical Stabilizers Aquatain Aerospray Not beneficial to plant Curasol AK Follow manufacturer's specifications growth. Do not attempt to seed /mulch over the Petroset SB soil binder. Krete Crust 500 Straw or hay mulch should be anchored by applying tackifier, stapling netting over the top, or crimping with a mulch crimping tool. Materials that are heavy enough to stay in place do not need anchoring. Inspections should be done after rainstorms to check for movement of mulch or erosion. If washout, breakage, or erosion occurs, repair surface, re -seed, re- mulch, and install netting. Continue inspections until vegetation is firmly established. 6.1.3 Permanent Waterbars Following final grading, install permanent right -of -way diversions (aka waterbars) to prevent erosion on long, sloping right -of -ways to divert run -off at specific intervals based on slope. Following construction and Right -of -way has reached final grading, correct any erosion problems, stabilize outlets, and apply permanent seeding, as specified. Slope % FERC Spacing < 5 Nom? 5-15 300 feet apart >15 — 30 200 feet apart > 30 100 feet apart 6.2 Inspection and Maintenance Until the site is stabilized, erosion and sediment control BMPs must be maintained properly. Preventative and corrective maintenance work, including clean -out, repair, replacement, re- grading, Re- seeding, re- mulching, and re- netting must be performed immediately. If erosion and sedimentation control BMPs fail to perform as expected, replacement BMPs, or modifications to those installed will be required. The following inspection and maintenance practices will be used to maintain erosion and sediment controls on -site during activities. • Erosion and sedimentation control devices will be in -place and inspected at the end of each work day during active construction and after each precipitation event greater than 0.5 inches. Upon inspection the contractor will immediately repair or replace any failed device. • Sediment must be removed when it has reached % the aboveground height of the filter fabric fence. Repair all undercutting of erosion of the toe anchor immediately with compacted backfill materials. Adhere to the manufacturer's recommendations for replacing filter fabric due to weathering. • Re- vegetated areas shall be inspected for bare spots, washouts, and healthy growth during construction. Identified bare spots and washouts shall be repaired immediately. • All soil stockpiles that are to remain onsite for more than 1 week shall be seeded with temporary grass, as noted in Tables 4 and 5 above and the construction details. • It is the responsibility of the contractor to ensure that all runoff is directed to sedimentation control devices. All sedimentation control devices shall remain in -place until the disturbed area has achieved a minimum of 80% total re- vegetation. Any area not achieving 80% re- vegetation shall be re- seeded and mulched. 7.0 HDD "Frac -out" Cleanup Contingency Plan This Horizontal Directional Drilling (HDD) Fluid Release Contingency Plan is a supplement to the SPCC Plan and provides specific preventative and mitigative measures to be use by PNG and its contractors during HDD activities. HDD operations pose a potential risk to wetlands and waterbodies through a release of drilling fluids. This may occur when the drilling fluid is released through fractured bedrock and sands. Drilling fluids typically consist of a mixture of bentonite, water, and soil cuttings. This mixture is not hazardous or toxic. A release can occur at any place along any point of an HDD installation, although releases are more likely to be observed at the entry and exit points. If a release occurs and no control measures are in place, the drilling fluid could potentially reach the surface of water or wetland that is above the HDD installation. The contingency plan discussed below outlines the measures to minimize the potential for a release. This plan also addresses the methodology that will be used in order to detect a release, as well as countermeasures to be taken if a release should occur. 7.1 Planning and Prevention HDD crossings will be conducted only during recommended construction timeframes to minimize the impacts from potential releases. PNG and its contractors will use nontoxic bentonite -clay mixtures of drilling mud to ensure that, if a release occurred, it would not result in toxicity to an aquatic habitat. The contractor performing the HDD must have personnel onsite who are familiar and experienced with the procedures of this type of installation. Before drilling activities begin, the contractor must submit any certifications and documentation of at least 2 years of experience for all personnel who will be performing drilling work. The Environmental Inspector (EI) must be present for all HDD activities. Before any HDD occurs, the release contingency plan will be discussed, and any questions will be answered. Prior to drilling, the work area(s) will be flagged and the limits defined. Erosion and sedimentation controls such as silt fence, stake hay bales, etc., shall be installed at the entrance and exit pits and properly maintained before, during and after drilling activities. Additionally materials will be kept onsite at a designated location, and the presence of these materials will be verified prior to any drilling activities. These materials will be placed in a designated area and denoted as the "drilling mud containment response kit." The kit will include the following: • Silt Fence • Straw bales • Silt curtain • Compost filter sock • Submersible pumps • Specialized filters • Generator • Appropriate hand tools • Vacuum truck (available on -call) • Light towers for night work • Heavy equipment, such as backhoe or dozer, for containment and cleanup of drilling mud • Boat for major waterbody crossings to allow for monitoring of releases to water 7.2 Release Monitoring Once HDD begins, specific monitoring will be required to determine whether a release occurs. The bentonite mixture will be adjusted to match the conditions of the subsurface. The pressure levels will be set as low as possible, and they will be closely monitored to ensure that the pressure on the drilling fluid is set to match the formation. The pressure should not exceed what is needed to penetrate the formation. During drilling, the pressure will be closely watched and randomly checked by the environmental inpsector. As the boring progresses, the pressures will be inspected and documented. Any drop in the pressure could indicate a potential release, at which point all drilling activities shall be discontinued immediately. The drill mud will also be monitored, inspected, and documented. If there is a noticeable drop in the return of the drill mud, all drilling activities shall be discontinued immediately. 7.3 Release Response Should the results of the monitoring indicate that a release has occurred, the drilling is to be stopped immediately, and the following procedures will be implemented: • Slowly pull the stem back to relieve pressure on the potential fluid release location. • Wait for the drill mud to settle. • Assess the situation to determine whether the fluid has reached the surface. — If the release has reached the surface, immediately implement containment and notifications, as described below. — If the release has NOT reached the surface and it is NOT threatening a sensitive area, use a leak- stopping compound to correct the release. • If the leak- stopping compound has been successful, continue with drilling. • If the leak- stopping compound has NOT been successful, redirect the boring to an area where a release has not occurred. • If the release cannot be contained, abandon the borehole, as discussed below. 7.4 Surface Release Containment and Response Should a release occur and result in a release to the surface, drilling will be discontinued immediately and the severity of the release will be determined. If the release to the surface is minor, the following procedures will be implemented: • Identify the extent of the release. • Create a containment area with the use of a silt curtain, compost filter sock, fiber roll, and /or constructed earthen berm /dike. — If the release is to the surface is in an upland or riparian area, allow the material to dry prior to excavation. — If the release is to an area that is in a waterbody or wetland, immediately remove the material. • For minor releases that are not widespread, remove bentonite- contaminated material using hand tools to a depth of 2 feet. • For larger releases that are, or have the potential to be, widespread, mobilize the vacuum truck to remove the material. Place the submersible pumps within the release area to capture material until the vacuum truck arrives. • Place excavated material in an appropriate container. • Backfill with clean sand. • Dispose of material at an approved facility and as required by regulations. After successful containment and removal of the released material, operations will be able to continue (subject to the appropriate agencies' approval). All the activities associated with the release response will be documented, and measures to prevent another release will be discussed. Before resuming drilling operations, the boring will be redirected to an area that has not had a release, or the borehole will be abandoned. 7.S Release Notifications In the event of an HDD drilling fluid release to a waterbody, sensitive areas, or riparian areas, it is the responsibility of the contractor to report the release to the NCDENR Department of Water Quality Washington Regional Office at 252 - 946 -6481 and the USACE Washington Regulatory Field Office at 910 -251 -4567. 7.6 Borehole Abandonment A borehole will need to be abandoned if a drilling fluid release cannot be avoided, or if a release has occurred that cannot be controlled. The borehole will be completely abandoned and new location determined. Any borehole abandonment locations will be documented and shown on any as -built documents. The following steps will be implemented during abandonment of the borehole: • Determine the new location for the HDD crossing. • Insert casing, as necessary to remove the pilot string. • Pump a thick grout plug into the borehole to securely seal the abandoned borehole. o EROSION CONTROL MAMTENANCE PLAN I. ILL SETWENT AND EROSION CONTROL WVICES SHALL BE Nsr4CTFD EVERY SEVEN (7) DAYS OR AFTER EACH RAINFALL OC WDa THAT EXCEEDS ONE -HALF (05) INCH. 2. ALL ERMCM CONTROL OWES SNMLL BE PROPERLY NANTALNED TARING MR ALL PHASES OF CMXTION WE THE COMPLETION OF ILL COFSNICDON ACTIVITIES AND ALL OSTRUIM AREAS PAVE BEEN STABILIZED. ADWIOWL CCAIRROL DEVICES M UR Y BE REQED DURING CONSTRUCTION N ORDER TO CONTROL EROSION 40101 OFFSRE SEUBACIO UION, ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION 6 COMPLETE AND THE SITE 6 STABUZED. 154DMENT WD` BE REMOVED FROM BEHIND THE SET FENCE WHEN F BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL WE PREPARED OR REPLACED AS NECESSARY TO MAINTAIN A DINNER. C ALL AREAS WILL BE FEMU2EA RESEEDED AS NECESSARY AM MULCHED ACCORDING TOSPECdMATNN S N THE VEXTATNE PLAN TO ABANDON A VIGOROUS. DENSE VEOCTATM: COVER. 5. STONE CONSTRUCTION ENTRANCE TO BE CLEANED WHEN gCDENF ACUYUATIOS ARE VISIBLE ON SEDIMENT 6 TRACKED ON TO THE MOMENT. STONE ALL SE PERIODICALLY TOP DRESSED WITH 2 LACES OF 14 STONE To MMNTMI 1 NOI DEOTK. TIE CONTRACTOR SHALL DAILY REMOVE MRD /SOL FROM PAMEENI. AS MAY E SOURED. 6, CONTRACTOR WALL TAKE ADDITIONAL STEP AS NEEDED ED ENSURE REFSLABLOWNT OF VEGETATION 6 ACNEVED N WETLAND AREAS ON A CASE BY CASE BILi CONSTRUC71I011 SEQUENCE 1. OBTAIN GRAORNO/IIIOLON CONTROL PLAN APPR(NL FROM NCDENR. 2. SCIEXILE MANDATORY PRE - CONSTRUCTION MEETING MTN LAND CHARY (PHONE / 252- 949 -14313 48 HODS PRIOR TO CONSTRUCTION TO DISCUSS DID" CONTROL MEASURES, 3. INSTALL TEMPORARY SILT PENDING ON DOWNHILL SIDE OF D,SDENT. 4. NSV1L 7DPORMY DIVERSION DITCHES AND WATTLES ON THE DOWNHILL SIDE OF EASEIEM. INSTALL BERM ON UPHILL SINE OF EASE] ENT. OMNI ALL OTTER LCk'R TEES AS SHOWN! ON THE APPROVED PLANS. 5. INSTALL TEMPORARY ORMAL CONSIRUCTION ENTRANCES PER NCDOT ORAEWAT PERMITS. INSTAL INET PROTECTION FOR STORM DRAIN IN ET LOCATED N FIELD, . L CALL FOR ONSIIE INSPECTION IN NCOENR INSPECTOR AND OBTAIN CERTIFICATION OF N1f1EflO1, PRIOR TO CONSTRUCTION IN EACH AEA 7. MOA TAN 50 FOOT (BUFFER AROUND AL WETLANDS AND STREAMS. NO CUAIRN0 DR Dow WILL E PERFORMED IN THE 50 FOOT N1FFFER UNTIL TIE FRIES OUTLINED BELOW ARE MET. RAREST ACCESS ACROSS THE WETLAND 6 NEEDED. F ACCESS 6 NEEDED. AN ACCESS PATH FOR EQAPMENT ONLY WILL BE CLEARED. SET FENCE MY BE PLACED N 50 FOOT BUYER AROUND STREW AN S D WETIANDT BUT TEIPORW DIVERSION NTCKS ALL NOT E NSTALED IN THE BUFFER LN7l THE THE FRAMES MUVED BELOW. 6, NO CLEARING OF TREES N THE WEI LA D BUFFER OR SMLL WETIA D AREAS (LESS THAN ADO IN LENGTH) UNTIL THREE TO FARE DANE BEFORE START OF CONSTRUCTION. NO ClE//I1G OF TREES N THE WERAWO REFER OR URGE WETLAND AREAS (06" 400 N LENGTH) UNTIL SEVEN TO FOURTEEN DANE BEFORE THE START OF COSSTRUCTOL LREFSS ACCESS 6 NEEDED ACROSS THE WETLAND. F ACCESS 6 NEEDED, AN ACCESS PATH FOR 2DUPADO DAILY WILL BE CLEARED, 9. WITHIN WETLAND IMPACT Aff.AS. REMOVAL OF STUDS 6 ALLOWED TO THAT AEA DIRECTLY OVER THE TRENCH LINE REMOVAL OF STUMPS 6 NOT ALLOWED N TEMPORARY IMPACT AREAS. 1D.NTIATE CIFARING AND ORNBNG WITHIN DENUDED LIMITS, INSTALL TEMPORARY EROSION CONTROL MEASURES NEAR STREAM AND WEILA D CROSSINGS, TEMPORARY SEEDING L141 BE PERFORMED WITHN THEE TO FIVE DANE AFTER GRLSOM 11.1"" THE AREA OF CTNA NTcNAL PrEL E CONSTRUCTION TO NO MORE THN 10 LINEAR ARLES IN FRONT OF THIS 10 10.E SECTION ALL OSTRUND EARTH WILL NAME (ROAD COVERT AS DAMNED ABOVE RPE MY BE MOVED TO THE RIGHT OF THE ROIT -OF -WAY AND LAO OUT TO EXPEDITE THE OPEN INNER TIME TRUE FOR COMSTRUCT10M. INSTRIED AREAS EHNO THE AO MILE SECTION WILL RECENT PERMANENT (ADUCT PIER WITHIN THREE TO FINE CALENDAR DAYS AVER THE PIPELINE TRENCH 6 FILLED. 12.FOLOWING PREPARATION OF THE ROW AND INSTALLATION OF THE NECESSARY SEDIMENT AND EROSION CONTROL MELSURM THE TENCH WILL E EXCAVATED AND SPOS WILL E ARID OA THE NON- WOVIOW SIDE OF THE ROW. F NECESSARY. TRENCH 3REAERS WTLL E INSTALLED WITHIN THE TRENCH TO SLOW THE FLOW OF THE SUSLFPICE WATER. WHEN WATER 6 PUMPED OUT OF THE TRENCH FOLLOWING A RALNFALL EVEN, OSCVACE MIA E PUMPED THROUGH AT SAW PRIM TO LEAVING SITE 119RSUR1'ACE DSTNSWX OR STIMP REMOVAL WILL ONLY E CONDUCM WITHIN THE TENCiXNE WITHIN WETLANDS. STUD ROAWL 01 LIGHT GRADING MY OCCUR ON DE WORKIG SIDE OF THE ROW ONLY F REQUIRED FOR SAFETY REASONS WITHIN WERµpS.THE WON RILL E PERFORMED FROM THE OWNER MIS LACED AUM THE WMNG SEE OF THE ROW. IN CERTAIN AREAS, SUCH AS WETLANDS AND FLLDS SUPPORTING CROPS. EFFORTS WILL E ME TO SEGREGATE TOPSOIL FROM THE $URS01. 14.111 ,AREAS WHERE SEGREGATION OF THE SURSOL AND TOPSOIL 6 NECESSARY, THE TOPSOIL WLL E REPLACED LAST. AFFECTED AREAS WILL TWIN E 'CLEANED UP' IN ROUR1 -OGONO AND TEMPORARY 5E7DMG IF NECESSAK FOLLOWED BY FINAL CRDNG. PERMANENT SEEDING AND MULTCHNNG TO RESTORE THE R.O.W. AS CLOSELY AS POSSIBLE TO PE- DISTRAMMl CONTOURS AND CONDITIONS. MANY CONSTRUCDW ACTMIIES REOA" N ROD OR JACK AND BORE WILL E PERFORMED N ADDITION TO THE 10 MILE SECTION DESCRIBED ARM. IESTABUZED SITE AS TENCH S RESTORED TO ORCINAL GRADE MTN VEGETATIC L PAYING, DITCH LMN' ETC. 17ARfAS DEMOTED AS'CUL7NATED LAND* AS HATCHED ON THE PLANS DO NOT REWIRE PERIA ENT GROJND COVERTO E ESTASUSED AT THE END OF CONSTRUCTION. IE.WIEN VEGETATION HAS BECOME ESTABLISHED. CALL FOR FINAL SfTENSPECRON BY ROOM INSPECTOR. ISEMD,E SLT FENCING, OKRSDN OUCHES, WRAP. AND OTHER EROSION CONTROL MEASURES AVER ANAL APPROVAL. FROM ANON INSPECTORARFAS OSWUB6 DURING THIS PROCESS SHALL E RESEEDED WH PERMANENT SOD. 20AL EROSIONS CONTROL MEASURES LNL E CONSTRUCTED N ACCORDANCE NTH THE NCCENR REGULATORS AD /OR WOOT SECONDARY ROADS METNOD4 21.THE CONTRACTOR SHALL 110ENTLY AND CONTINUOUSLY "MN 919DSON CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WTH THE NCENR INSPECTOR SO THAT PERCAN ODIC INSPECTIONS C E PERFORMED AT APPROPRAIE STAGES OF CONSTRUCTION. 22ACRML RCTR -DF -WAY MVNTINARM PIPELINE HYDROTESTNG AND PIPELINE REPAIRS WILL TAKE PACE N THE 'WEEKS AND MONTHS AFTER THE OSTRUBED ROE -OF -WAY HAS BEEN PERMANENTLY SEEDED. EROSION CONTROL NOTES I. ANY OWING BEYOND THE DENUDED LAMBS SHOWN ON TIE PUN S A VIOLATION OF THE MODENA PERMIT AND MY BE SUBJECT TO A FINE UNITS OF LONSMUCTODOE .1533 mt THIS INCLUDES 6, FAQ /S\ THAT ARE SET ASIDE FOR OFTSDE UYDOWN AREAS FOR CONSTRUCTION MATFAVlS. THESE LAYWA MFRS ELL BE DETERMINED DURING THE CONSTRUCTION PROCESS AND WILL BE COORDINATED WITH THE NCDENR EROSION CONTRA INSPECTOR. 2. GRIONG MARE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN 6 A VIOLATION Of THE WINDOW REGULATIONS. 3. A GROUND COVER MUST BE PROVIDED ON EXPOSED SLOPES WOkN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. AND, A PERMANENT GROIN COVER FOR ALL DSTRUND AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER 6 SNORTER) FOLLOXNG COMPLETION OF CONSTRUCTION OR DEVELOPMENT. t. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED Or A REPRESENTATIVE OF 5. SLOPES SPA LL E GRADED NO STEEPER THAN 3:1. S. ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON MTN FIELD INSPECTOR, ENGINEER AND OWNER. 7. F ACTIVE CONSTRUCTION CEASES IN ANY AREA FOR MORE THAN 15 WORKING DAYS OR D CNFtOMt DAYS (WNICHEYER 6 SHOWVR), ALL 06TRUBED AIDS MIST RE SEEDED, MLLCNED AND TACKED UNLESS WRITTEN APPROAA 6 GRANTED BY THE MEDIA NSPECTOR B. FOLLOWIG EVERY RAINFALL EVENT GREATER THAN 0.5 INCHES, CONTRACTOR SHALL INSPECT AND REPAIR, AS NECESSARY, ALL DAMAGED EROSION CONTROAIEASOES. THIS INCLUDES BUT 6 NOT LIMITED TO SILT FENCE, DECK DAMS. CONSTRUCTION ENTRANCES, WETLWD CROSSINGS AND STREAM CROSSINGS. TYPICAL MNTDA M INCLUDES "GOING FOR STRUCTURAL DEIODNCES SUCH AS UNECON OMIC AND DEERS BUILDUP AROUND SILT FENCE CNECKl1WSSTRW AND WETLAND CROSSINGS SMALL E CHECKED FOR SRRUCTURIL DFRCOICES SUCH AS EXCESSIVE RLMNG WASHOUTS AND SEDIMENT DISCHARGE. 9. CONTRACTOR SHALL TAKE ALL PRACTICAL MEASURES TO MINIMIZE THE LINEN FOOTAGE OF DISTURBED AREA AND TO ENSURE THAT THE OSTIADED ARMS ARE STABILIZED WITH VEGETATION AS SOON AS POSSIBLE. tO.CONTRACTOR LIMO TAKE ALL PRACTICAL MEASURES POSSIBLE TO LMT THE AMOUNT OF STREW AND WEILAND DISTURBANCE AND TO REDUCE THE AMOUNT OF SILT DUE16NG THE ADJACENT WATER BOOKS ILALL DUSTING AND PROPOSED DITCHES SHALL BE STABILIZED USED STRAW WITH NET OR ANOTHER FORM OF SLOP STABILIZATION MPROED BY THE ENGINEER IMMEDIATELY FCLOWRW SEEDED) PREPARADDIN AND SEEDING. SLOPE STABUZATRN SHOULD BE INSTALLED PER THE MANUFACTURER'S IECOYMENOITIdt 12ACRAL LOCATIONS OF SILT FENCE OUTLET DEVICES SHOIAD E FIELD ADASIED TO ALLOW DEVICE TO BE LOCATED AT LOW POINTS. 13SNLT FENCE SHOWN ACROSS PROPOSED GASLWE WILL BE INSTALLED IMMEDIATELY AFTER THE CLEARING PHASE AND THEN TEMPORARILY REMOVED DIEING PPEUNE INSTALLATION FOR EACH INDIVIDUAL AREA SEEDED PREPARATION I. CHISEL COMPACTED AREAS AND SPREAD TOPAM 1 ACHES DEEP OVER ADVERSE SOL CONDITIONS, F AVAILABLE. 2. RP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. APPLY AGRICULTURAL LIME. FERTILIZER. AND SUPER PHOSPHATE LINFORMLY AND MIX WITH SOX (SEE SEED SCIEDLXQ. DO NOT USE LOWE OR FERTNIZER NL STREW BAH KS OR N IMEMAND AREAS MATCH DOB NOT NEED TO USED IN WER AND AREAS, 4. SEED ON A INSHLY PREPARED SEEDED AND COVER SEED LIGHTLY WITH SEEDING EQAPUM OR CLLTPACK AFTER SEEDING. S M LTCH IMMEDIATELY AFTER SEEDING AND ANCHOR AILTCH. L INSPECT ALL SEEDED AREAS AND MINE NECSSNFY REPAIRS OR RSEIDNG WITHIN THE PLANTING SEASON, F POSSIBLE. F STAND "" BE OVER 60% OMMAGID. ]REESTABLISHMENT FOLLOMNG ORIGINAL U.E. FERTILIZER AND SEEDING RATES 7. CONSULT CONSERVATION INSPECTOR ON MMNIENNCE TREATMENT AND FERTIUZATON AFTER PERMANENT COVER 6 ESTABLISHED. STREAM AND WETLAND PERMANENT SEEDiNQ SCMEDUIE I TART P i' Wit AND tttD M O SPECIES COMMON NAME pERCENTACE OF MIX i1YmYW! 'FtNAS 0.WerbmTk sAIO ryq 2O AVWIASTvbWera Crmirgbemgras$ 15 CaPC wufpNTOldca fo,,wdge 12 '. INV* nYM aux. SYMl4 au 1s Pay pattmos FoW4 blue ass is DRhanthditAm dNldestfom Oely eu•.& _ _ '. Bidem WEStOTia R �.._._.__..., I Mem . _._. �iD4 i trmcAUetfusns, NCecatyPE __,_ SDR tusk __ Aster latenNOeas __ Ca)ka aster 03 5ortria IytAtoFia Duchy ata 02 e SauruFUE CemNSl •VSYFTI ANVCf SFFfT MFY TGS FA�AF+i'Sr LNards t.A 5:91 ArNll 41 -it4 Are " -- 02 AEik EY'cl.MJMr;- FIVE FEET LANDWARD FCL.LOW IAX'i CGM:STR UCTHDII4 " RECO12MENVEQ AMLICATtON RATE '10-25 LEIS PER ACRE_ TABLE 2: RIPARIAN SEED MIX PAnk- RMdbetkQ NOT,), NC ecolype , WiKk -eyed SASan ( IQ Careopsl$IynXHwWta LDI+Xe kNtNkseed 10 SPPghyMtum [NKAr1A "AAn glass EXT F.NOITA, FIVE FEFT LAkOWARO AND WITHIN H IGH GRCXN1D PERT IONS OF THEZCINE T SLFFER, FOLLLOWING CONSTTRIJ T_ (ON "RE'GGMAI @ypEO APPC,ICJATfCON RATE 202SLDS PERACRE PERMANENT SECOM SPEGIQNSATIOFS 31 MOPES OR RATTER TYPE. I APPLY AORICULTTIRAL LIME AT THE RATE OF °15:DSF'OW SF 2 APPLY COA&MCRCGL FERTUZLTR AT THE ROTC CF A8161SVt007 GF. "OR $.10.10 rCRr)tGZ[R 240", OWSF FCx1N tfN2030 FER71L2ER, OR :KYE$5/4600 Bf_ FOR 11L,A.8 FERTILIZER 3 SEED IN ACCORGMNC-E WITH THE Pa_LOVVFNEG SCHNECUk E AND APPLFCATGON RATES DATE'. TYPE: PUUNTR%G RATE: AUG IS, NOV E TALE FOOD 3001BS /AC OR 7IOSAOCO SF. ONE GRAIN 120IBS/AC OR 3 ULVDADO S I INOV 1 -MAR 1• TALL FESCUE AND 30C LSS /ACOK 2 E1114W10DO S.F. A6RU221 RYE ZS LWAC Oft IJ2 CSy1CD011'. MAR 1 - APR 15 TALL FESCUE 30C LOSVAC OF 7 UPS/SCCOS F_ APR 15 AE 30 HERLEO COMMON - /20 LOS/AC OR 21/2 LIAOM ERMUCAGRASS 2S LBS/AC OR L'2 1,01511OW S.F. HR 1- AUG 15 TALL FESCUE AM 30D "WAC OR )/2 LB/204D S1 BROW'NTOPMRLET 34 ES$ /AC OR V. isllow S. F. OR SORGHUM HYBRIDS SIRAAN HYBRIDS 3C IRS/AC OR VA I K/10OG SF. 4 MULCH V217 H STRAW APPLIEC AT THE RATE Ci 95 LSSA' OCC S € '4£AV,LY MULCHED C,AfNG _&WARY -MARCH PE4i0D "C•ONTRACTOR MAY GRTArN SOH. TEST TO TIFTFR IINF WOLI NT OF tIMF RFOORFa TO OBTAIN A PH �ugW 0 6 5 8 10 "• SEED TYPE, RATES ANDOR SOIL AMIENJMENTS SPECIFIED ABOVE MAY BE MODIFIED ANDJOR EL,M. NAT ED ,F FLUOUIRED BY OF HER LOCAL, W ATE OR FEDERAL AGENCIES MG. rl rCS, NC COOPERATIVE EXTENSION OFF:CE, ETC L PRIOR TO MODIFICATIONS OR CLINIVIATIOtNS COHTRAC70R Si ALL SUBMIT WRFTTEN DK C; IAErITATION SUPPORTING THE REQUEST FOR APPROVAL PRIOR TO MAKING MONPCATIOY 1. APPLY AGR:CLATU RAL UME AT RA-E OF "BO LEI&I000 S 2 APPLY COMMERC(AL FERTILA2ERAT TNERATE0F48L85M000SF FOR 5.10.10FER71tZER, 24 L8SH000 3 F F(1R ty2D -XI FERTILIZER. CALF c" Yl LBSriD00 S F. FCR T3.2A -L FERT412ER. 3. -SEED IN ACCOROANLE W11H THE FOLLCAATNG SCHEGJLE AND APPLICADON RATES: DATE' TYPE. PLANTRPGRAlE' MAR.RUNS HFCIALESPEDEZA SO U(JAC lMS2/2 tMS,A1002 u MIA 1 EN LAKES. S'Ah4ES.. FXTCAES AND SLOPES RYE GRAS/ S.f CSCARIFFD)AM 75 L SVAC OR 314 ILS,V-if= Sf, MAR APSI ADD TALL FESCUE ISO L6S/AC OR 31/2 LSS/iew za.'IES %1, AfN -SEPT I "• TALE FESCUE AND - /20 LOS/AC OR 21/2 LIAOM SROWRTOPMELET 5,F1 w+a4CN+Pr OR SORGHt"'I SUDAN 35 IBS/AC OR 3/4 t! /10M SF. SLOPES 8:1 OR FLATTER HYBRIDS LENGTH AND ARE NOT STEEPER MNHIRLID - UNSCARWWDI TALL FESCUE 120 VIVAC OR 2 0 LVIDDO ELARLET OR SUDAN SF, Tn AAee:.r nc t n o11mn e e A, MULCH APPLIED AT THE RATE Of 95 IDS/2000 $,r, AND AEKHOR Will, ASPRNMS (MANSION TACK CCAT APPLIED AT THE RA'F OF 10 1S GM13COO S.F. OR ASO GAIJAC, ' TEMPORARY RESEED SEPT. 1 AT RECOMMENDED RATES. " CONTRAC -CAA MAY CBTAHN SOIL TEST TO OfTEAMONE AMCUN' OF LIME NOUNUD, TO ORTAIPA A ph RANGE CUTE 5'.T 0 •" SEED TYPE, RATES AHDI+RR SOW AMENDMENT. S SPECIFIED ABOVE MAY E MODIFIED ANDVOR EAAAAB EO IF INOUIED SY OTHER LCAL STATE (M FEDERAL AGENCIES (EG. MRCS, NO COOFERA'AE EXTENMON OFFK:E, FTC.N PRIM TO MODIFICAMNS OR Ft WNATIONS, (CAWRAC'C RSHALL SUBMIT WIN TTEN DOCUMENTATION SUWCATM S IFIE REQUEST FOR APPROVAL PNMOR TIC MANNA MODIFICATION. TABLE f 1ft TEMPORARY SEEOINO RECOMMENDATIONS PONE SUMMER - 5EEWFKiMIXTURE RATE ILB /AC) GERMANMRLfT Y-O AN THE PIEDMONT AND MOUNTAINS. A SMALL STEMAIFD SUOANGRASS MAV Of $UF$!fTU "E0 AT A RATE Of W LBIACRIE SEEONGDATES MOU TANNS- MAY 1$ - AUG 1$ PIEDMONT- MAY 1- AUG 1S COASTAL PLAIN - APR 15 - AUG +$ SOE AMENDMENTS FOLOW RECOMMENDATIONS Of SOIL TESTS OR AMY LOW ED /ACRE GROUND AGRICEWTURAL LIMESTONE AND 750 LWACRE 10.10-10 IBM M12ER- NR LTCH APPLY 4,000 LB /ACRE STRAW. ANCHOR STRAVV OY TACKING WITH ASFNM', NtTTING, CR A MULCH ANCHORING IDOL. A OISK WITH BLADES SET NEARLY $1 RAIGHT CAN Bt USED M A MULCH 44CHOPNG TOOL MAINTENANCE NAHRTIIIZE F GROWIHH ISNOT FULLY ANOUATE. RESEED. REFERTIZE AND MULCH IMMEDIATELY fOLMA NG EROSION OR OTHER DAMAGE. FAALES.105 TEMPORARY SEEDING RECO/®IWDELTIOM FOR SAABNOBBE. SEEDNNGMIATURE RATEMWJAC) "GOAN 120 SIEDNNGOA?fs A701NITA06 -AUG 1S -DEC 15 COASTAL PLAIN AND FROMM -AUG 1S - DEC 3O SCE AMENDMENTS FDUOW RECOMMENDATIONS OF $01 TESTS OR AFFIT LOW ERIACRF GROUND AGRICLRTURAL LMAESTCWE AND 750 U/ACRE LO- ;0.12FEATAULTA, MULCH APFEY 4,060 M ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASP VIAA • NFITIN i, OR A MIN CH ANCHORING tOIX- A DESK MTN BLADES SFT NFARLY STRAIGHT CAN N 11540 AS A MULCH AWHOMG TOOL MANTENANCE RLPAW AND RERRTILLTE DAMAGED AFEAS MMELNAT[LY, TCiDEESS WITH 50 LWACRE OF tETAIOGEN IN MACH, N IT BE NECESSARY TO EX'ETD iEMPOPAmY COVER BEM'OND ARE 15, CRRSEfo WITH SO LIVACE KOSf CREDW40W AND COASTAL FLA" OF KOREAN (MOUNTAINS) UsPEOEIA NF LATE FEBRUARY OA EARLY MARDI. c =fOGM1G S'X81;PA7tdl'IMfFRAME5 _ SITE ARFA DESCRIPTION STANI7ATION TIMFFRAAIF u MIA 1 EN LAKES. S'Ah4ES.. FXTCAES AND SLOPES i DAYS Weed -: drw ee weaA � tIME4 RAMS HIC>H CxlAL.TY VJ4TER (HCWVj 7LAYS ( za.'IES Nars� SLOPES STEEPEIR THAN 31 7 CNAYS NONE ( IF S -ODES ARE 1O OR LESS w+a4CN+Pr :N SLOPES 8:1 OR FLATTER 14 DAYS LENGTH AND ARE NOT STEEPER 4:l INtAa» r ww ,rWFuld Mar THAN 2:1, 14 CAY$ ARE i t ALtCY,YE1? ALL OTC-ER AREAS 'NTH SLOPES % DAYS FOR SLOPES FLATTER THAN A.1 TO DAYS GREATER ettrnxiNd,wG�=a W N dtir oA hr tAYd T�A7:5a N LL UTH iAS.ft sr>E?,ne A N�a wETtnno ww,ecl sw.olAny i TVPE Gf IMPACT .�AMOUNTAPPFIOVED _� a40A1Aa,wi LAND 2S 33 AC TEMPOR", IMPACT i tp4(m vniLAlN 2) s2 AC EFMM�FNI IMPACT , �ACtMO' STREAM _.. ... i.1 ._.3.1 u IF TfMKMIARY biACT I -ACC/ -STREAM _ ...._ -05 LFFIRMAFENT IMPACT e TABLE 6,10. TpVORARY BECOME) RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRNO SeECANO MWATURE RATE LLILAC) NYE LGALMN U 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAIN,) so OMIT ANNUAL LESPEC EZA WHEN DURATION Of TEMPORARY COVER IS NOT TO EXTEND BEYOND JUTE. SEEDING DATES MOUNTAINS- ABOVE'SOO PEST, FEB 15 - MAY 1S BELOW 2500 FEET, FES I - MAY T P190MONT -JAN 1 -APR 1S COASTAL PLAIN -DEC I -APRS 15 SOAMAENOMENTS FOLLOW RlCOMAEIODATIONS CAR SOIL TESTS OR APPLY 2000 LWACRE GROUND AGRICULTURAL LIMSTONE AND 750 LIVACRE 10.10.10 FERTILIZER, MULCH APPLY 4.000 L&ACRE STRAW, ANCHOR STRAW BY TACKOG WITH ASPHALT. NETYMNO, OR A MULCH ANCHORING TOOL A DISK WFTH BLADES SET NEARLY S1RA10147 CAN Of USED AS A MULCH ANCHORING TOOL, MAINTENANCE REfERTLIZE If GROWTH IS NOT FULLY ADEC LIATE. RESEED. REFERTiUZE AND MULCH IMAEOIATELY FOLLOWING EROSION DR OTHER DAMAGE, Cnw•..A 1 sxp!AURA V+rl. tlleA ., vuffiarFA +..c xeUkP F.nkAtrhWe4AM.l -M ? tow.:uea `. Nbn4A„s;•MR :CC ^crvTwaf�Exasd appy wsnr«vw�mm as E i -1 FnH araWaAIAS.S h.cAd is ;k WA`. (w HAW ( Fdw *m,vtuwr j AhN trmM ImPL.M ArpwAi. On m AeSAmW ': D.Y,Nev+Awaa,,x- 9F• allo- as I I 1 -S CnT 1MnatNtlW:AwA w+aas OacM<sa:. nalT WtACh4f1 wtyA auww. Weed -: drw ee weaA � ____-_ --- -- - lA. nhYAre.Keva now- Im ( my Ea leaa ic:zk Y• ( RSA. Da ntt.irin ent ( :Cry w- eaU+sr - w+a4CN+Pr 5-F r,>„E 4:l INtAa» r ww ,rWFuld Mar i t M t a.w 6X1 A r arti. ­44",H • .PDN f vkY NGKA, 15- ettrnxiNd,wG�=a W N dtir oA hr tAYd i�� IM anT UU,Agn4tr 1 Cnw•..A 1 sxp!AURA V+rl. tlleA ., vuffiarFA +..c xeUkP F.nkAtrhWe4AM.l -M ? tow.:uea `. Nbn4A„s;•MR :CC ^crvTwaf�Exasd appy wsnr«vw�mm as E i -1 FnH araWaAIAS.S h.cAd is ;k WA`. (w HAW ( Fdw *m,vtuwr j AhN trmM ImPL.M ArpwAi. On m AeSAmW ----- - .- . � rpaellkaRRrvs I PH+PACt 56 - E m @lnw6', mvV try I I w:ta,gAv tvq•,R $ NOTES REFERENCE DRAWINGS MATERIAL SUMMARY REVISIONS o DRAWING NO. TITLE NO. DESCRIPTION OTY (ACTUAL) NO. DATE BY DESCRIPTION � 0111 Piedmont c A 11/23/13 BT ISSUE FOR APPROVAL URSCorp Or M- NOBI Car06MI Natural Gas NOWT CWofrd License W C-2243 SB LOOP - WEST SOIL EROSION R AK NORTH CAROLINA DRAWN BY: CHECKED BY: APPROVED BY: SCALE: DHW SR DC NAS. DATE: DRAWING NO: SHEET 02 OF 52 JOB NO. 39971024 01 23 13 - 1 3 8 U m� O 3 8 cS / H 9 9 x SHEET DRAWING NO. DESCRIPTION ENRET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION 1 5BLW- SEC -C-001 COVER 12 5BLW- SEC -E0007 STA 185+00- 192.OD 23 5BLW- SEC -EC -018 STA 461.00- 488.00 34 5BLW - SEC -EC-M ACCESS ROAD -(M ;8) 45 58LW- SEC -DTL -002 DETALS 2 581W- SEC- GEN -DD1 GENERAL NOTES 13 5BLW- SEC -EC -008 ST&192.00- 21&.Op 24 5BLW- SEC -EC -019 STA 488.00. 510.00 35 SBLWSEC- EC-030 ACCESS ROAD - (AR #8) 46 5B1-W- SEC- DTL -D03 DETAILS 3 5BLW- SEC -4001 NDEX SHEET 14 5BLW- SEC -EC -009 STA219+00 -24&00 25 5BLW -SECEC -020 STA 51 D.00 536+00 36 5BLW - SEC -EC-031 ACCESS ROAD- (AR; 8) 47 58LW- SEGDTL -W4 DETALS 4 5BLW -SEC1-002 NDEX SHEET 15 5BLW.SEC£C -010 STA 246+00- 274+OD 26 58LW- SEC -EC -021 STA 536.00- 560.27 37 5BLW - SEC -EC-M ACCESS ROAD - (AR ;9) 48 5BLW- SEC- DTL-OD5 DETALS 5 5BLW- SEC -4003 NDEXSHEET3 18 S8LW- SECEC-0II STA 274+00- 30&00 27 58LW- SEC-EC-022 ACCESS ROAD - ARf 1, AR 12) 38 5BLW -SEC£C -033 ACCESSROAD -(AR 810) 49 5BLW- SEC -DTL -006 DETAILS 6 5BLW- SEC- EC -0D1 STA 0.00 -27.00 17 5BLW- SEC -EC -012 STA 300.00- 327 +00 28 58LW- SEC -EC -023 ACCESS ROAD - (AR ;3) 39 5BLW- SEC -EC-034 ACCESS ROAD - (AR ;ID) 50 5BLW - SEC -DTL -007 DETAILS 7 5BLW- SECEC-OD2 STA 27 +00 -54.00 18 5BLW- SEC -EC -013 STA 327.00 -%4.00 29 58LW- SEC -EC -024 ACCESS ROAD -(AR; 3, AR 84) 40 5BLW- SEC -EC-M ACCESS ROAD -(ARM 11) 51 5BLW- SEC -OTL -008 DETAILS 8 5BLW- SEC -EC -003 STA 54.00.81.00 18 SBLW- SEC-EC -014 STA 351.00.38&00 30 5B -SEC-EC-025 ACCESS ROAD -(AR; 5. AR L6) 41 5BLW- SEC -EC-038 ACCESS ROAD (AR 011, AR 12) 52 5BLW- SEC- Ch4D.0D1 CONSTRUCTION AETHODS 9 58LWSECEC -OD4 8TA81.00-110.OD 20 58LW - SEC -EC -015 STA 380+00- 407 +00 31 5BLW- SEC -EC -026 ACCESS ROAD - (AR R7) 42 58LW- SEC£C-037 ACCESS ROAD - (AR 813) 10 5BLW- SEC -EC-005 STA 110 +00- 138+00 21 58LWSEC -EC -016 STA 407.00. 434.00 32 5BLW- SEC -EC -027 ACCESS ROAD - (AR ;BA) 43 5BLW - SEC -EC -W8 LAYDOWN YARD 11 5BLW- SEC -EC406 STA 138 +D0 - 165+00 22 1 5BLWSEC -EC -017 I STA 434 +00- 461 +00 33 SBLW- SEC -EC-028 ACCESS ROAD - (AR ;8A) W 5BLW- 6EC- DTL-001 DETAA -S N 4 1" = 1,500' 0 0.125 025 Miles 0.5 '7Qr 1 JOHNSTON COUNTY EC -006 m EC.005 (BEGIN STA. 138 +00, 007 (BEGIN STA. 110 +00 END STA 165 +00) (BEG N ST EC-001 EC -002 Ob 0 END STA. 138 +00) END STA A 92 S,00 ° (BEGIN ST - - - - - -- . END 2 0 +00, BEGIN STA. 27 +00, EC. G 8� }0 - +00) STA. 27 +00 ( (B So 003 { P• p01 - - -- END STA. 54 +00) Fjy N 4- ST �N CL - -- -- - D STA. By +QO0Q l �Np I I \ ` t O N Harper House Rd vcc 0. ti W` VQ p N "T C1• ory � A • 90 4w WAYNE COUNTY Sre�e ns 4111 Richard Smith Rd NOTES LEGEND PROPOSED CENTERLINE +-F- RAILROADS - ACCESS ROADS --- -- ROADS SHEETS ,LAKES °- RIVERS COUNTY BOUNDARIES FOR REVISIONS DESCRIPTION REFERENCE DRAWINGS DRAWING NO. TITLE ti�URS CarpW mfha North Carolina License; C -2243 AK JOB NO. _ 39911024 0111 Piedmont Natural Gas 58 LOOP - WEST INDEX SHEET 1 OF 3 JOHNSTOH,NC Y: CHECKED BY: I APPROVED BY: SC TP SR DC DRAWING NO: 01232013 SBLW -SEC-I -001 SHEET 1" -- 1,500' OF REV A ,� JOHNSTON GREENE COUNTY. COUNTY WAYNE�- Cj COUNTY LENOIR COUNTY KEY MAP '7Qr 1 JOHNSTON COUNTY EC -006 m EC.005 (BEGIN STA. 138 +00, 007 (BEGIN STA. 110 +00 END STA 165 +00) (BEG N ST EC-001 EC -002 Ob 0 END STA. 138 +00) END STA A 92 S,00 ° (BEGIN ST - - - - - -- . END 2 0 +00, BEGIN STA. 27 +00, EC. G 8� }0 - +00) STA. 27 +00 ( (B So 003 { P• p01 - - -- END STA. 54 +00) Fjy N 4- ST �N CL - -- -- - D STA. By +QO0Q l �Np I I \ ` t O N Harper House Rd vcc 0. ti W` VQ p N "T C1• ory � A • 90 4w WAYNE COUNTY Sre�e ns 4111 Richard Smith Rd NOTES LEGEND PROPOSED CENTERLINE +-F- RAILROADS - ACCESS ROADS --- -- ROADS SHEETS ,LAKES °- RIVERS COUNTY BOUNDARIES FOR REVISIONS DESCRIPTION REFERENCE DRAWINGS DRAWING NO. TITLE ti�URS CarpW mfha North Carolina License; C -2243 AK JOB NO. _ 39911024 0111 Piedmont Natural Gas 58 LOOP - WEST INDEX SHEET 1 OF 3 JOHNSTOH,NC Y: CHECKED BY: I APPROVED BY: SC TP SR DC DRAWING NO: 01232013 SBLW -SEC-I -001 SHEET 1" -- 1,500' OF REV A ,� SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION 1 SBLW- SEC -C-001 COVER 12 SBLW- SEC-EC-07 STA 165+00- 192.00 23 5BLW- SEC-EC -018 STA 461 +0- 488 +0 34 58LW- SEC -EC-M ACCESS ROAD - (AR 08) 45 58LW- SEC- DTL-D02 DETALS 2 58LW SEC- GEN -DDi GENERAL NOTES 13 SBLW- SEC -EC -008 STA 192 +00 -219.0 24 5BLWSEC -EC -019 STA 488.000- 510.00 35 5BLW- SEC -EC -030 ACCESS ROAD - (AR C8) 46 SBLW- SEC- DTL-003 DETALS 3 5BLW SEC-H)01 NDEX SHEET 14 58L -SEC-EC-009 STA219.00 -246.0 25 5BLW- SEC -EC -020 STA 510.0 -536.0 36 58LW- SEC -EC-031 ACCESS ROAD - (ARf 8) 47 5BLW- SEC - DTL -0D4 DETALS 4 5BLWSEC +02 NDEX SHEET 15 5BLW- SEC -EC -010 STA 246+0.274+0 26 5BLW- SEC -EC -021 STA 536.00- 560 +27 37 58LW- SEC -EC-M ACCESS ROAD - (ARf 9) 48 SBLW- SEC -DTL -005 DETALS 5 58LW- SEC +03 NDEX SHEET 3 16 5BLW- SEC -EC -011 STA 274+0.3D0.0 27 5BLW- SEGEC -022 ACCESS ROAD - (AR f 1. AR f 2) 38 SBLW- SEC -EC-033 ACCESS ROAD - (AR N 10) 49 SBLW - SEC. DTL -06 DETALS B 58LW SEC.M00I STA 0+0 -27.0 17 5BLW- SEC -EC -012 STA 30.0 -327 +0 28 5BLW- SEC -EC -023 ACCESS ROAD - (AR 13) 39 58LW- SEC -EC434 ACCESS ROAD - (AR #10) 50 SBLW- SEC - DTL -007 DETALS 7 5BLWSEC -EC -002 STA 27.0.54 +0 16 581W- SEC-EC -013 STA 327 +0 -354+0 29 513LW- SEC -EC -024 ACCESS ROAD - (AR f3, AR f 4) 40 58LW- SEC -EC-M ACCESS ROAD - (ARf 11) 51 SBLW -SEC -DTL -008 DETALS 8 SBLW - SEC -MOD3 STA 54 +00 -81 +0 19 5BLWSEC -EC -014 STA 35/+0D -38p+0 3D SBLW- SEC -EC -025 ACCESS ROAD - (AR f5, ARf 6) 41 5BLW- SEC -EC-M ACCESS ROAD - (ARf 11, ARf/2) 52 5BLW- SEC- CNU -01 CONSTRUCTIONMTHDDS 9 5BLWSEC -EC -004 STA 81.00- 110.0 20 5BLW- SEC -EC -015 STA 380.0.407 +0 31 5BLW- SEC- EC-026 ACCESS ROAD - (AR f 7) 42 58LW- SEC -EC-037 ACCESS ROAD - (AR M 13) 10 5BLWSEC -EC -05 STA 110.0 -135.0 21 5BLWSEC -EC -018 STA 407 +0- 434+00 32 58LW- SEC -EC-027 ACCESS ROAD - (AA f8A) 43 5BLW- SEC -EC -038 LAYDOWNYARD 11 I 58LW SEC- EC-006 STA138+00 -,65+0 22 5BLWSEC- EC-017 STA434 +0- 461 +0 33 58LW - SEC -EC-M ACCESS ROAD - (AR I8A) 44 58LW- SEC- DTL-001 I DETAILS Al -4 1" = 1,500' 0 0.125 0.25 Miles 0.5 'O�c�ea `bJ4 er�d9e C1 Rd � P,crardsc� bw JOHNSTON 4 o r COUNTY w . IeEGIEC -007 ba 9v (BEG NC.015 EC -01 E`4 AT � 920p�0, EC- '� ,O�Q� J� �' , G S AT 4078 00)0' (BEGIN STAA43 (BEG END S7-A. 8 h x' ..11 Q _ - - - -- AND STq' ?T9±2o*+00 Oly � ryy� 9 T►� i EC -02 (AR #7)�� (BEG 0'9 �09 EC'�1246 +00, (ENS gT% EC -012 (BEGIN STA. 300 +00, END STA. 327 +00) (BEGIN STA. 327 +00, END STA. 354+00) E s��4a +oo, l END sTA. 3g0 +0001 WAYNE COUNTY •�iiiga a 0 Ferry Bridge Rd NOTES LEGEND REVISIONS NO. DATE DESCRIPTION PROPOSED CENTERLINE �� RAILROADS A 01/23/13 ISSUED FOR APPROVAL ACCESS ROADS --- --W- -- ROADS SHEETS LAKES ---- RIVERS COUNTY BOUNDARIES I I REFERENCE DRAWINGS DRAWING NO. I TTLE URS Corporati� olina North Caroline Lkense f C -2243 AK JOB NO. 39911024 tool r6,11 Piedmont i Natural Gas SE LOOP - WEST INDEX SHEET 2 OF 3 JOHNSTON, WAYNE, NC CHECKED BY: APPROVED BY: SCALE: SR DC 1'.1,500' DRAWING NO: REV. A 58LW- SEC -I -002 SHEET QAOF,53 JOHNSTON GREENE COUNTY ... COUNTY WAYNE - - /� COUNTY LENOIR COUNTY KEY MAP 'O�c�ea `bJ4 er�d9e C1 Rd � P,crardsc� bw JOHNSTON 4 o r COUNTY w . IeEGIEC -007 ba 9v (BEG NC.015 EC -01 E`4 AT � 920p�0, EC- '� ,O�Q� J� �' , G S AT 4078 00)0' (BEGIN STAA43 (BEG END S7-A. 8 h x' ..11 Q _ - - - -- AND STq' ?T9±2o*+00 Oly � ryy� 9 T►� i EC -02 (AR #7)�� (BEG 0'9 �09 EC'�1246 +00, (ENS gT% EC -012 (BEGIN STA. 300 +00, END STA. 327 +00) (BEGIN STA. 327 +00, END STA. 354+00) E s��4a +oo, l END sTA. 3g0 +0001 WAYNE COUNTY •�iiiga a 0 Ferry Bridge Rd NOTES LEGEND REVISIONS NO. DATE DESCRIPTION PROPOSED CENTERLINE �� RAILROADS A 01/23/13 ISSUED FOR APPROVAL ACCESS ROADS --- --W- -- ROADS SHEETS LAKES ---- RIVERS COUNTY BOUNDARIES I I REFERENCE DRAWINGS DRAWING NO. I TTLE URS Corporati� olina North Caroline Lkense f C -2243 AK JOB NO. 39911024 tool r6,11 Piedmont i Natural Gas SE LOOP - WEST INDEX SHEET 2 OF 3 JOHNSTON, WAYNE, NC CHECKED BY: APPROVED BY: SCALE: SR DC 1'.1,500' DRAWING NO: REV. A 58LW- SEC -I -002 SHEET QAOF,53 i 3 8 3 3 S 8 9 9 t S� i x SHEET DRAWING NO. DESCRIPTION SNORT DRAWING NO. DESCRI►TNIM SHEET DRAWING NO. DESCRIPTION SHOOT DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION I 5BLW- SEC -C-001 COVER 12 SBLW,SEC- EC-007 STA 165 +00 - 192+00 23 58LW- SEC -EC -018 STA, 461.00- 488.00 34 SBLW- SEC -EC-M ACCESS ROAD - (AR V8) 45 58LW- SEC- DTL-002 DETAILS 2 5BLW.SECGEN -OD1 GENERAL NOTES 13 58LW- SEC -EC -008 STA 192 +00 -219.00 24 58LW - SEC -EC -019 STA 488 +00. 510+00 35 SBLWSEC -EC -030 ACCESS ROM - OR 88) 46 5BLW- SEC - DTL -003 DETAILS 3 5BLW- SEC +001 INDEX SHEET 14 5BLW,SEC -EC -009 STA 219+00, 246+00 25 5BLW -SECEC -020 STA 510+00. 536.00 36 SBLW- SEC -ECo3i ACCESS ROM - (AR 0B) 47 5BLW- SEC -DTL -004 DETAILS 4 58LW SEC -4002 INDEX SHEET 15 5BLW- SEC-EC -010 STA 246+00. 274+00 26 58LW- SEC -EC -021 STA 536 +00. 560 +27 37 5BLW- SEC -EC-= ACCESS ROM- (AR V9) 46 5BLW- SEC - DTL -0D5 DETAILS 5 5BLW- SEC+003 INDEX SHEET 18 58LW - SEC -EC -011 STA 274.00- 300+00 27 5BLW- SEC -EC -022 ACCESS ROM- (AR t 1, AS 12) 38 5BLW- SEC -EC-033 ACCESS ROAD • (AR 010) 49 5BLW- SEC - DTL -D06 DETAILS 8 SBLW-SEC -EC -001 STA 0.00 -27+00 17 5BLW- SEC-EC -012 STA 300+00- 327 +00 28 5BLW- SEC -EC -023 ACCESS ROAD - (ARt3) 39 58LW- SEC -EC -034 ACCESS ROAD - (Mt 10) 50 58LW- SEC - DTL -007 DETAILS 7 5BLW- SEC -EC -002 STA 27.00 -54 +00 18 5BLW-SEC -EC -013 STA 327 +00 - 354+00 29 5BLWSEC -EC -024 ACCESS ROM - (AR V3. AR 14) 40 5BLW- SEC -ECAY ACCESS ROM - (AR 0 11) 51 5BLW -SEC -DTL -006 DETAILS 8 58LW- SEC -EC -003 STA 54+00 -81 +00 19 581-W- SEC -EC -014 STA 354+-00- 380+00 30 5BLW- SEC -EC -025 ACCESS ROM - (AR t5, AR t6) 41 58LW- SEC -EC-OW ACCESS ROM - (AR It 11, ARV 12) 52 5BLW- SEC -CAC -001 CONSTRUCTIONMETHODS 9 SBLW SEC- EC -OD4 STA 81.00- 110.00 20 58LW- SEC -EC -015 STA 380+00. 407 +OD 31 5BLW- SEC -EC -026 ACCESS ROM - (AR t7) 42 5BLW- SEC -EC-037 ACCESS ROM - (ARV 13) 10 581W SEC -EC -005 I STA110+00- 136.00 21 5BLW- SEC -EC -018 STA 407+00- 434+00 32 5BLW - SEC -EC -027 ACCESS ROM - (AR SBA) 43 5BLW- SEC -EC -038 LAYDOWN YARD 1f 5BLW- SEC -EC-006 STA 138+00- I65+OD 22 1 5BLWSEC -EC -017 STA 434.00. 461 +00 33 5BLW- SEC -EC -028 ACCESS ROM - (AR 08A) 44 58LW- SEC- OTL-001 I DETAILS N 1" = 1,500' 0 0.125 0.25 Miles 0.5 l JOHNSTON �'` GREENE COUNTY ` COUNTY �J WAYNE COUNTY j LENOIR COUNTY KEY MAP o y � v U. m Neuse Islands Ln WN EC-p19 EC-020 (BEGIN STA. 485 +00, END S q S 0 �' E(',- pSi +00, END STA. 510 +001 EC -021 �� ) (BEGIN ST BEGIN TA 488 +00) jJ ` A 536 +OQ 1Fw +00, END 1 _ END STq, g60 +27) (eE -01 -- ._ G N S A S EC -016 (END TA• 461 +00) _ — _��— END SM. 4 0��00, END I STA 434 00) 9AC-0 j —� (AR #1' — Old Smithfield Rd ot Sc'0 +001 EGN ST 80 00) gTA• 3 � END 6raswe / /9a NOTES LEGEND REVISIONS REFERENCE DRAWINGS I NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE r6111 Natural G a s P i ed m o n t �� PROPOSED CENTERLINE 1-•!- RAILROADS A 01123113 ISSUED FOR APPROVAL TP SR UPS Corporafon - North Carolina North Carolina License 9 C-2243 - ACCESS ROADS ROADS _ -_ S 56 LOOP - WEST HEETS LAKES INDEX SHEET 3 OF 3 WAYNE,NC -•—°- RIVERS COUNTY BOUNDARIES .r K DRAWN BY: CHECKED BV: APPROVED BY: SCALE: ,.- TP SR DC 1'.1.500' JOB NO. 39911024 DATE: DRAWING NO: REY A 0123/2013 _ - SBLW- SEC -I -003 SHEET Qj OFD i` WETLAND DELINEATgM { 'w 1111N1 EASE -1 OtgnMO OAS ME IM.1 PROPOSED OAS EASEMENT TM'°""'*«++s�..u.,«�: _Y'°"_ ___- -_ _ - -- L 1 __ _ ._ __. __ ______. - u _. _.___ _ ___._ __ _.__ _- __ _____- - T FENCE ITYP _.__. _ - _ - - -- � -.. -.. _.— ..— •.: := °COREFO OUTLET UTLE -O - ___ _ - l 1+W 2+00 5+00 6400 —GAS — G +00 — AS — G 9 +� 10+00 11+00 °t /9 0+00 GA9 — GC 4 — G�c — GAg —GAS — GpS 3 GAS GAS -µGAS —GAS — GpS . -..G — G — PS — G 8+00 AS —GAS — AS ._ G{Lq — uee 12+OSAS — GA Z 3+00 14+00 15+00 16 5 -- �, J GAS —GAS — GpS — GpS — GAS — GAS — G THE PLUG TREN PLUG — — _ `'CORE FILTER OUTLET - Q — �. — — — — — !J + CORE FlLjEl1 OUTLET c __ SOIL DELINEATgNIM.)+•• TMMAT ^_ �� — _ TEMPORARY WORK SM (TYP.I _... d • — PROPOSED GAS LINE (TYP.) I} .. o N r } s'� axETO,ND oEUUEwn e = • e _ y1!j .•` t�` '+c...ro.:,u SILT FENCE (TYP.) VAANEA C SILT FENCE(M.) - IM CORE FILTER OUTLE O ARE F$W LE T GORE FILTER OU_E_ �.�•�_ ..___ ..__.____ - _ - - -._ _.. —. —._ _.__ —__ ___._.._ .. _..____ .__._- _ __ c 0r00 11 +00 X12 +00 W 3 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 - 22 +00 23 +00 24 +00 25 +00 26 +00 27 W 28 +00 '29 +00 GAS — + — GAS — GAS•J — GAS — GAS — GAS — GAS — GAS — GAS<— GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — GAS — Gp4 —GAS —GAS —GAS —GAS —GAS —GAS — CJ — GAS — GAS — GAS — GAS'- GAS - T RERCRPW O TRENCH PLUG '•,•' ' TRENCH PLUG txi 1.i r F F FL OUTLET 6x ere CORE FILTER OUTLET CORE FILTER O UfLET ANO Nit (i ii t�'PF �•� -- 5� - - - --- - - - -- ------------ - - - - -- — — — — — — — — — — --- - - - - -- -- TIMBf.R 1MT ' ACCESSROADS, I I FOR OEIIIJE/' -T10N (TYFI �• T ppp J � /V 4 0 60 120 Feet NOTES LEGEND�w— REVISIONS REFERENCE DRAWINGS Ulm URS covo.non - North Carolina North Carolirs License E C -2243 Piedmont 0111 Natural G a s U,TEREAR N Rr urae —SF~ PER saT vE -E �aA}f PR �w solLncE EasEO EASENE �T O RDOEr,TRY,E.I., 11 i:- _ - - - --� w RR P, E O TRE„c P uG C f R RLT R N,r oRE PT FOR AcR AUo ® o RoRE _.- _.._. - STI- COmC —A—) TeNPeR -7-GE ..,_.�w =rREAM ®N ucr�oN ENTRARCE NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 012313 ISSUED FOR APPROVAL NF SR - ., .. _. 58 LOOP -WEST EROSION CONTROL PLAN FROM STATION 0+00 TO STATION 27 +00 JOHNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: REV 1 SBLW- SEC -EC -001 SHEET 6 OF 52 l �e `.i W LAND DEUNEATION YI10S � qy }gf SILT PENCE (TYP) { WATER ROS C NO 3 CORFPyx� R ) EXISTING GAS LINE (TYP.) xo EA SEME NT OIRE f _ _ - - -. - TV _ GAS — _ 25+00 C _ _- PROPOSED GAi EASEMENT -" — - - _ -. - - ----------- - S 41 +00 42 G;S P 43 GAS GAS —,c p5 -_ 26+00 271E . I CORE PIL R ovrLEr _ - - ---- -- — -- - -- --- 39 +00 r 0 G p — p GAS — GAS _ Z 28+00 a ­ t - - - - -- 37 +� 38+00 GP5 ,_,,, p —GP5 ._._. p m � PS GP5 .�. -- GAS --- GA5 — GAS -29+00 - , GAS —GAS GpS31+00 b 32+00 35+09 GP5 — P —GPS — P' A 0o P o — -- — _ TREN nuD n;E S _ GA5 _ G g G S 33GPS GAS — p P GP`' — — — — _ — — TREN PLUG i CORE F= RTER =UTLET CON. I g O E{ _• •— F - i_— _• -- -_ —_ �— -- ACCESS ROAD e1 SOL DELINEATION ITYPI� rna�yruT WET AN W]02 TM7Q NAT 9�L V Typ PF TEMPo_YiRIOGFIJ TEMIOMRY WORN SPACE )TYP.) tt PROPOSED GAS LINE (TYP.) Y � 4 N m QPR - -- W_. �._ .r_,.. -- - — — � - - - -- ; � �� Goy 7+00 38+00 -- -- - - ---- _ _ _ - - GPS —GS— - - -° - -__ Gp5 39 +00 — W 0 G 4 GP5 J G G +� GP5 +� 43 +00 44+00 -- - - - - - - -- - - - - - - +OQ GPS GPy GPg a —GP5 — P — GPS GPS — 45+00 GR34 GP8 G 47+00 48 +Op 49+00 52.00 -CEPS G PS —GP5 — GPg GP5 —GPS — — — p5 —GP5 —GP5 — GP5 — G Gp5 —5GOW0 51 +00 �- GP`s + _ PS — GP5 — GP5 — 01-S o — SOE DELINEATION (TYR.) 1 ACCESS ROAD N 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS 1� URSCorporation -North Carolina Nor CMra License i C -2243 Piedmont ON Natural G a s c r ~� IAT' 'R —iF —a a - Rr urE _ PLKSILrFLN`E OLTYK - _ > :1 -SAS 9 E s IL Llr� .OH w K_-E TRENOHPL G POT "'ENT ENPOR,Pr _ WETLAND fA ORE F LTER L TLE n N NAT e E PST EoR SACK nHO eoRE - Exin�NC CCHrcuR INUCRI r..PeR•m""'E ��.r SIREAN c un�oN ENrE E ®H NO. DATE DESCRIPTION ENO. DRAWN CHK, DRAWING NO. TITLE 1 01123/13 ISSUED FOR APPROVAL NF SR AK . . -, 56 LOOP - WEST EROSION CONTROL PLAN FROM STATION 27+00 TO STATION 54 +00 JOHNSTON NC. DRAWN BY: NF CHECKED BY: APPROVED BY SCALE: SR DC 1 "�60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: REv SBLW- SEC -EC -002 SHEET 7 OF 52 i INSET A E%ISTINC Cea uxE lrn.1 ��, 61+01) 62 +00 7 +00 58480_ �� `\ EXISTING EASEMENT ! j 2403'0 0 +00 5 � — �. a• _. -. vPS 6040 GAS PROPOSED GAS EASEMENT - -" 59+006P5 GPg viC woo GP`r \\ \GAS \Ge 67+00 GP`s PROPOSED GASLINERYRI Woo Cpb woo CVgq, GAS - r 00 C+PS ° o CAPS \ \ \ CIA Ae � g GPy lG� � ..�.:, TEMPORARY WORN SPACE (TYP.) GAS v° \ 52+00 GP W1 G s0 51 +00 �GPS GP ° \ \ \ AV \ \\ \ AS \ \ /� � Gp� E Y •PS GPS GAS GAS GAS \ \\ SEE INSETAI \\ \ NOTES LEGEND � ' H ' Q REVISIONS REFERENCE DRAWINGS uRS Corporation - NDM Carolina North Carolina License P C -2243 0111 P i ed m o n t Natural G a s \J w..- ,PATERPAa RR. C RIAO Rv uNE _ _ suPER sl�T FEncE - -Des -s -STING sII�I �In ATI_N PROPOSED EMEI IDDERTR+�E:ITPOINT S EW ";N „oE O TRENC —SIG - - - -- � FILTER OUTLET .... wETLANO DIREF ERGO E ® TIMBER MAT BORE PT FIR 1ACK AnO BORE NTOaR`MUORI �.O. BT. r1CT111 ENT—CF RM NO DATE DESCRIPTION ENp, DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR 74+00 GAS ° n +oo �_ _ _ _ _. _ _ _. 71M0 GAS 72a s ._. GAS -- 6AS --- GAS --- GJ1S -- GAS --- GAS _ GAS GAS ` 78+00 — _ — _ _ 2 — 6g+00�S — GAS L r:AS — GAS GAS — ` GJ13 — G43 — G43 —GAS +� C:!! GAS GAS _ _. _. _ _. _ .� r_ — -ro — GAS —GAS 80+'00 C ­GAS — Gas 1� n ° GAS GAS —GAS GAS -- GA m .� . —G 2 ..— �. — + S \O •�'W p _ .� �. ! \ \ N \�� \ a \ I I 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS uRS Corporation - NDM Carolina North Carolina License P C -2243 0111 P i ed m o n t Natural G a s w..- ,PATERPAa RR. C RIAO Rv uNE _ _ suPER sl�T FEncE - -Des -s -STING sII�I �In ATI_N PROPOSED EMEI IDDERTR+�E:ITPOINT S EW ";N „oE O TRENC —SIG - - - -- � FILTER OUTLET .... wETLANO DIREF ERGO E ® TIMBER MAT BORE PT FIR 1ACK AnO BORE NTOaR`MUORI �.O. BT. r1CT111 ENT—CF RM NO DATE DESCRIPTION ENp, DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR K ... .. -. 58 LOOP -WEST EROSION CONTROL PLAN FROM STATION 54 +00 TO STATION 81+00 JOHNSTON, NC. DRAWN BV: CHECKED BY: APPROVED BY: SCALE: NF SR DC 1' = 60' JOB NO. 39911024 DATE: DRAWING NO: REv 0123/2013 SBLW- 5EC -EC -003 SHEET 8 of s2 \ \ A Al TEMPORARY PROPOSED GAS EASEMENT G \ EMT FOR JACK �\ A D FORE ITYPJ \ II �� II 1 1 PROPOSED GAS LINE (TYP.) / O TE�EFaR IMi CD J neEyLX FLUa _O -- 91+00 94+ -- „( _ _ — oo 95+p0 to 90+00 91+00 92+00�� -- UQ5 ._.. — �J :._ 97+00 98+00 89+00 —����G- 3 C4Q9 _" - (2Qy -- �� � �•� �.� � vrti -�' TREr1GX RUV,•. L. ', .. 99+00 . TEMPOMRYwORKSPACE(TYP.) SOIL DELINEATION (TYP.) O I •�—y--$-1 I �I�w SILT fgNOE (TYP.) w 1 l pC ` / / SR O+pp ~' 0 5 111 +00 �_ �• ,: S �bbf�bbe�bbe j4L i ... /• + +t tom. -' •. '.. .' -'. .... , ,...., ... ....,..'..... ..•.,',• •_.`.. .. � -,"aa�" k�44 :•a ... r , . , , « ... . , ... . WETLAND DELINEATION �,Ie11eRa !' • .. - - ...... ; . ... .:.. - .. , , . - '. .? `. , IMn�ulwRl�raMUU'�O . y, a ' 12Feet NOTES LEGEND O PROPOSED GAS LINE(TYP.) O ' l — J 1810+ —• �..._ _ _ 100 Cite op. OP G� 1 _ _ G 10 _ URS Corporation -North Caror�na C North Cemli- License ! C -2243 r. — .00 9 106+00 G ('Qc' 0- J 3 93 +0o Qy r GQy ENO. 0107+ O 97 cqc* �`G am•^ LAY"' O '^ DRAWING NO. _bbt'bbt�'s�f bbf��bbt bbf•�bbf.�bbf - b9f— .44f��bbfi�bbf��4bf�� 61,9108+00 _ .,, •..��. QJ rr@ —t - rOi _y +t_bbt- I —c c: « ✓ �#pQ -�„ l:r �( �' +, W • I,113rp��0 O —_ 44t_ bbt C y+t SUPER SLT a.Q PENCE . �. •` `. ..• . ETLAND W2 _ - ► -.tyf __ �t _ i �. ME 4� bbt��bb i ;P��.. .. -.... bbf�f l pC ` / / SR O+pp ~' 0 5 111 +00 �_ �• ,: S �bbf�bbe�bbe j4L i ... /• + +t tom. -' •. '.. .' -'. .... , ,...., ... ....,..'..... ..•.,',• •_.`.. .. � -,"aa�" k�44 :•a ... r , . , , « ... . , ... . WETLAND DELINEATION �,Ie11eRa !' • .. - - ...... ; . ... .:.. - .. , , . - '. .? `. , IMn�ulwRl�raMUU'�O . y, a ' 12Feet NOTES LEGEND REVISIONS t REFERENCE DRAWINGS URS Corporation -North Caror�na C North Cemli- License ! C -2243 r6111 Piedmont Natural G a s �--Y�- —RSOR - ERrr uRE —eP " s Rv unE _ s�RER NIT r—E RUeUL oq0 LISA ►N► c - 11TVRE _M = r�CL 111L LINEI0" O_ DoE "TRYE ITROIr,T R� _ "� a E NO S CORE FLTEROUTLET t TKRD+NAT -RE R FOR1 *CAAUOaORE - - - - -- onsrn+c wNTOOR muJeRt reuvoR.RY aRIDCE �' °�""� =rRe.N c cn�oN El.nRnRCE 0- DATE DESCRIPTION ENO. DRAWN CNK. DRAWING NO. TITLE 1~ i - ISSUED FOR APPROVAL I SR -- -. l pC ` / / SR O+pp ~' 0 5 111 +00 �_ �• ,: S �bbf�bbe�bbe j4L i ... /• + +t tom. -' •. '.. .' -'. .... , ,...., ... ....,..'..... ..•.,',• •_.`.. .. � -,"aa�" k�44 :•a ... r , . , , « ... . , ... . WETLAND DELINEATION �,Ie11eRa !' • .. - - ...... ; . ... .:.. - .. , , . - '. .? `. , IMn�ulwRl�raMUU'�O . y, a ' 12Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation -North Caror�na C North Cemli- License ! C -2243 r6111 Piedmont Natural G a s �--Y�- —RSOR - ERrr uRE —eP " s Rv unE _ s�RER NIT r—E RUeUL oq0 LISA ►N► c - 11TVRE _M = r�CL 111L LINEI0" O_ DoE "TRYE ITROIr,T R� _ "� a E NO S CORE FLTEROUTLET t TKRD+NAT -RE R FOR1 *CAAUOaORE - - - - -- onsrn+c wNTOOR muJeRt reuvoR.RY aRIDCE �' °�""� =rRe.N c cn�oN El.nRnRCE NO. DATE DESCRIPTION ENO. DRAWN CNK. DRAWING NO. TITLE i 012113 ISSUED FOR APPROVAL NF SR AK -° - - 50 LOOP - WEST EROSION CONTROL PLAN FROM STATION i1 +00 TO STATION 110 +00 JOHNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR OC 1 " =60' JOB NO. 39911024 DATE: 01232013 NO: W SHEET 9 OF 52 REv SBL- SEC -EC -004 i ' � wFTLAND DELINEATNJN MITfO �P'1 TRENCH PLUG � O M 2GP9.4 laj!5 _4u�A9,�= - C" 40& — GPS SILT FOE P��72GP5 --.-. 126 +00 t L) p� , REVISION! I REFERENCE /)� IOI ORWIaTgNtrY►i ■ # ■IIF���LLL it _ `�1'i ' URS Corporation - Norfl Carlin! North C--h- Uu E C -2243 � 32atER CROSSING - PROPERtt UxE —aF—y Nir EExcE PuaLlc Roao ��' �R uxo %RV Ure — wPEa RILT rEaacE PR `J 301LTVPE - --GASa E% wEA 7 O EMEw G NDDENTRVIE% 111 TRw U. — ♦v WORNSMCE axD =o REfLERO nE TMFER wT ® eoREPTEOR.u,GC Axo BORE ..._ - ...... ETlsimG CONTOUR MAIORi TEMPOR4R•/eRRWE ...rr arREnM —cox murnoN ENranxce 1°D3 NO, O f _ W204 DRAWN CNN. DRAWING NO. TTIE _L 0123/13 ISSUEDFORAPPROVAL TQI INSa SR 114+00 � � if f —bf —lf �bf —sf -11 WarER CROSSrNV s3o2 SILTPIInR .� !3 4' LL •'• . Ex+TNO WI3 LNltTYR) E %13TING EASEMENT �`., y' / If ♦ wr + �ZS� lJ .- _.._Q_ ._ -.___ ______ -- _— _ _ - _.._. -_- ...- l..- •1 ' __ -- _ - _.._. -_ ._..___ _ .._ - 107 +Op �,. '�1 — — — / ' SM1F«urrENC! + + ~�::' .." .. .`. + -� . -', •, :. — O -••a• p 120+90. 121480 - - -- •o . •-- — -- �' _ , .. �• '.. 108 +00 P9 Gp+s ,'.. ....... ',, 1r:.... , . , .. 4 ih 9 00 Gpy — GP9 — Z GINS 111 +0o N +'J —GPS —, Gpg �.ry "— - +� a 23 +OD x Gp+ -- GP9 ,,., Ea7S . •. -, `. •- • -. s ra 1 `f ,�; - :J', t�,'.. ,' Q ... • rlMFOMRY aRlOOa © 38 +D0 — GP3 pg u .'- TyPefTFQ -r•-2` .T .;Ni � ,. ,. Yibf�T+4f�_TS3f�g�,__ � / .. CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' `• -fir �.+ �t�. wT / YlwP�b(1f,1.,a�]ida .•.•` TlgpE WT Gin_ ! W ! a' • l PROPOSED Ga3 LINE (TYP) x*" Q JOB NO. 3!7911024 DATE: 01232013 _ Ap ... „„..w , ,a t ' , • • MITfO �P'1 TRENCH PLUG � O M 2GP9.4 laj!5 _4u�A9,�= - C" 40& — GPS SILT FOE P��72GP5 --.-. 126 +00 t L) p� — — — — — — — — — — 4a 4� —. r• f. 4 �r �+• — — — — — — — — — — — — — — — — — — — — — 4 ".: • "• PROPOSED GAS G EMENT _� `4.5 3 '1*' _ "• • .•• ^ TEMPORART WORK SPADE (TYP.) O`• ACCESS kOAOp 0 M IL sILr O�(rn.t I I I--- - - - - -- 0 30 60 120 Feet NOTES LEGEND REVISION! I REFERENCE WETLANDDELINEATION ■ # ■IIF���LLL it _ `�1'i ' URS Corporation - Norfl Carlin! North C--h- Uu E C -2243 Piedmont Natural G a s -•.. - PROPERtt UxE —aF—y Nir EExcE PuaLlc Roao ��' �R uxo %RV Ure — wPEa RILT rEaacE PR `J 301LTVPE - --GASa E% wEA 7 O EMEw G NDDENTRVIE% 111 TRw U. — ♦v WORNSMCE axD =o REfLERO nE TMFER wT ® eoREPTEOR.u,GC Axo BORE ..._ - ...... ETlsimG CONTOUR MAIORi TEMPOR4R•/eRRWE ...rr arREnM —cox murnoN ENranxce 1°D3 NO, O DESCRIPTION W204 DRAWN CNN. DRAWING NO. TTIE _L 0123/13 ISSUEDFORAPPROVAL NF SR � � f —bf —lf �bf —sf -11 WarER CROSSrNV s3o2 SILTPIInR .� !3 4' LL •'• . Ex+TNO WI3 LNltTYR) E %13TING EASEMENT �`., y' / If ♦ NODT(T I POINT (Typ t .- _.._Q_ ._ -.___ ______ -- _— _ _ - _.._. -_- ...- l..- Al - JE7LAt D 204^• ,._ __ _.._.._. __ -- _ - _.._. -_ ._..___ _ .._ - ------ -_ - • 00 v tw - { X�2289+00 126+00 +00 • : — GPs -- GPs ° GPs —GP5 ° GPS ° G 7+00 t2¢ip0 '•130 +�0�� A — y+ G r G R ' 131+ Q 132 +pp0 PS — FiF$ °GPs — GpS 133 +0p —GPS — GPS 184+D0 35 +00 GP5 —W — C" — �P5 — GPS -- X35 +00 17 +00 W GP5 —GPS —GPS —asp 5 — Z 38 +D0 — GP3 pg TREN PLUG; .•'' • r ?R ...(• " TR PLUG DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' wT / YlwP�b(1f,1.,a�]ida .•.•` TlgpE WT Gin_ ! W ! a' • l PROPOSED Ga3 LINE (TYP) x*" Q — — — — — — — — — — 4a 4� —. r• f. 4 �r �+• — — — — — — — — — — — — — — — — — — — — — 4 ".: • "• PROPOSED GAS G EMENT _� `4.5 3 '1*' _ "• • .•• ^ TEMPORART WORK SPADE (TYP.) O`• ACCESS kOAOp 0 M IL sILr O�(rn.t I I I--- - - - - -- 0 30 60 120 Feet NOTES LEGEND REVISION! I REFERENCE DRAWINGS ■ # ■IIF���LLL it _ `�1'i ' URS Corporation - Norfl Carlin! North C--h- Uu E C -2243 Piedmont Natural G a s - PROPERtt UxE —aF—y Nir EExcE PuaLlc Roao ��' �R uxo %RV Ure — wPEa RILT rEaacE PR `J 301LTVPE - --GASa E% wEA 7 O EMEw G NDDENTRVIE% 111 TRw U. — ♦v WORNSMCE axD =o REfLERO nE TMFER wT ® eoREPTEOR.u,GC Axo BORE ..._ - ...... ETlsimG CONTOUR MAIORi TEMPOR4R•/eRRWE ...rr arREnM —cox murnoN ENranxce 1°D3 NO, pAT! DESCRIPTION ENO. DRAWN CNN. DRAWING NO. TTIE _L 0123/13 ISSUEDFORAPPROVAL NF SR A-K 5S LOOP -WEST EROSION CONTROL PLAN FROM STATION 110 +00 TO STATION 138 +00 JOHNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' JOB NO. 3!7911024 DATE: 01232013 DRAIMNG NO: rtfv SBLW- SEC -EC -005 I SHEET i0 OF 52 1 O LEGEND I �f— �1t� —sf sf� —st -11 �I .I roSIT'TYR.) II .I REFERENCE DRAWINGS UM N.rlt, lwritwn - NOrN C -224 E North CS.h- Lianas E C -2243 3{+Op 135+00 GP`+ GPS GAS 737 GAg ,.._. GpS M GAS GAS _ w G.4 i'RDP�ED GAS ADEMEMt i I • SILT fENC1(TNR.) I KO[Sf ROAD WETLAND W205 I• {— l{� ► {� TYP PFO coRE Ra�ourLET tM WATEII CROSSING - IODEMRY �- TlMROIS►(T EbOp! IIj� uw . -. x. L) �R�3`✓w+ #z'x- s"ra«��. _..— - -_ . ell . I I roWIMI 153 +00 GAS — GAS O T{7!!R MAT - aLi Al O r,- SILT !T (TYRI EDR[ rli rdl L1CII O AND EORE MM) MOROSEDGASLI •. -SIT 1 I USING EASEMENT / • -' I HOD ENTRY \ / TYR. G - EtMnND wf LME (TYR.) -- --- _ - ---- _ , {J_ ------- - - - - -- -- -- - - - -- - - - -- - -- - - - -- - - - - - - - -- -- - - -- - -- - - -- - - - -- 1 .. 153+00 154+00 155 +00 156 +00 157+00 158 +00 159+00 160+00 161+00 182 +00 _rT Z z - Gp5 - GA5 -GAS - Gp5 -GAS - G -GAS -GAS -GAS - GAS - GAS - GAS - GAS - GAS - GAS - GAS - GAS - GAS - GAS - GAS e TM NAT TFMROMRY COMETIIUCTION ENTIGMLl ITrRI � T _ ., �a.::.cr:ra._'wl.�i�z:. -"•- •, SM..r r`•- r-.... I`y11 ---� . II AOROSED GAS EASEMENT {F {f TlMRORARY WORKfMCE ITYR) SILT RETMR) �* \,p\ SILT ReNC[(TYR) • iACCESSROADS4 --------- - - - - -- -r— — — — — — — — — — — — v V"a / AND lOR[1TYR.) m - � TEAS \\ At 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS UM N.rlt, lwritwn - NOrN C -224 E North CS.h- Lianas E C -2243 V1' Piedmont Natural Gas LI.E ROAD fTM� wyTEa BAR z rzr uRE - — suRER SILT rsacE �11►� as PosED CL case. Ex T o, O RR • DOERTR ERnRDIaT ----- `E PORD w RKS„IE O TP...1- ETLARD -RE ERTEII -TAE TM.-T ® SORE PITRORJACxAaDROaE -IG C-0-IR cN—) TENPDa+m aaIDDE �+�.. BREAM c urn DR ENraAacE ® ,D NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR A K . 50 LOOP - WEST EROSION CONTROL PLAN FROM STATION 135 +00 TO STATION 165+00 JONNSTON, NC. DRAWN BV: NF CHECKED BY: APPROVED BY: SCALE: SR OC 1" 60' JOB NO. 39911021 DATE: 01232013 DRAWING NO: SHEET 11 OF 52 n[v 1 5BLW- SEC -EC -006 !%IfTIND GAS LINE ITYR -1 " •,4 -'"'k .ORE PR FDR��K //A Ey �' w+D.oRECMt 0 v SX— ..SIIAS T 60l D[LINGTIONIM.) O p J +r PROROfED OAS LINK ITVA ) .. - . - - -. - _.._ -. + .. _.. O / ` t0 + Go MlOROlEO GAf GlEM[XT h 66 +00 18 00 1 d +00 68+00 170 +00 171 +0 772 +po 173 +pp 17 +pp 1 +00 178 +02— 7 *00 W 6 +00 78 +00 180 +0 08 61 ,W 162+GAS ` —" 's"" 4+ +AS —GAS J GAS —GAS — AS — GAS — Gp5 —GAS — Gp5 —GAS — Gp� —GAS —GAS —GAS —GAS —GAS —GAS — Gp5 —GAS — GA.S — G —GAS — GAS — JAS -±�- GAS — GAS GAS Gp.S —GAS — Z —GAS — GA� — GAS ^GAS — GpS r° V J Z - - - -- ----- - - - - -- ----------------- - - - - -- ------ - - - --- — ILT FEMDE ITYP.)� 1 / TEMPOGRY WORK SMD[ (TYP.1 7 O � / ♦ T/ j O O �I NOTES LEGEND REVISIONS REFERENCE DRAWINGS � URS (Carolina aoLi -Nse (`i -224f North License [ C -2213 031 Piedmont Natural Gas L =AD wA�Ea BAR s nr urE — wPEa MLT f EacE .._4G5 -9 Ex R u � A icX Q DEA�EMEXT G — EXTRI —P011T -__- T EwsP,_E REX=XP TE � SoaE .,�+.. —E— _ c �cnoa ENraAXCE M,rrmTm NO. DATE DESCRIPTION o DRAWN CXK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR T O ITYR� - - -- -- - - -- -- -- -- ._. _ - c4 ♦ 75 +00 171+00 177 +00 T W 76 +00 178+00 180rOp T)T GAS —GAS —GAS —GAS .- GAS —GAS - Z p5 —GAS —GAS —GAS —GAS —GAS 61 r00 182+00 id3 +00 7d4 +pppp 165 +00 188 +00 1 7 +00 64+00 �8 +00 — GA� —GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS — GA —GAS — GAS — GAS — GAS — GAS — J'8 — GAS — GAS — GAS 180 +00 197 +00 19 W — GAS —GAS — GAS — GAS —"d Z ��+ 94r — GAS J � :. Q S U TRENOX RLW y 1 -------- - - - - -- ----- - - - - -- — —. _. — — — — — — — — — — — — — — — .. — — — — — — — — — — — — — — — w wD'wtaa A 1 pe PFO- 1 V DRAWN BV: NF CHECKED BY: APPROVED BV: SCALE: SR DC 1-.60' TINS[R MAT G�1 s O JOB NO. 3991102/ DATE: 01/23/2013 DRAWING NO: SHEET 12 OF 52 REv 5BLW- SEC -EC -007 1 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS � URS (Carolina aoLi -Nse (`i -224f North License [ C -2213 031 Piedmont Natural Gas L =AD wA�Ea BAR s nr urE — wPEa MLT f EacE .._4G5 -9 Ex R u � A icX Q DEA�EMEXT G — EXTRI —P011T -__- T EwsP,_E REX=XP TE � SoaE .,�+.. —E— _ c �cnoa ENraAXCE M,rrmTm NO. DATE DESCRIPTION ENO. DRAWN CXK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK- SB LOOP -WEST EROSION CONTROL PLAN FROM STATION 165 +00 TO STATION 182 +00 JONNSTON, NC. DRAWN BV: NF CHECKED BY: APPROVED BV: SCALE: SR DC 1-.60' JOB NO. 3991102/ DATE: 01/23/2013 DRAWING NO: SHEET 12 OF 52 REv 5BLW- SEC -EC -007 1 O -0 �y � � W[TIAM ppJ,111TIOM . , kAl— RENC[ITYP) `: ",• °.. � w n , a D f VirE, }CARt3'tNTd4' , - _ _ T� -,_- ____ + _ - ♦ ;: .. - 1 w- -,. - ... � TYPe PEM` � b IP 8GO 19 + 1 + 0 Gat 'z' a 9 +DO ' - • 4 4 +00 ` . " •, •' 93+00 - - •198 +0 ' - • �19P.. 0 . ` . ` , 198 '0 19 + _ '* ,0` Ot 0. 20 +00 3 +00 04 +00 W OS +00 Dn '+W AS U-I-'!;WS — U pp g� p - M y� p C GAS GAS —GAS —GAS —GAS —GAS '-2 S r '- `.'R.'n^' reh`+�5' — .��« .-. ..,..A c�PI GAS G�S — GAS —GAS — GAS — GAS — (2 — Gpg -- GAS GAS . S YPO � REN�I KIw \ T o P EM ... + • � y^'. ' . `' •' • . 4 WETU D OELINEATI , y / J A� N p` TE4Ea wr e £+•' . fg OLAND+N104 PFO C4 "pp •` 20 +00 204 +00 W s ,4•Q9 ` _ 2,08w AS -1•�- GAS ^GAS —GAS ^GAS — GAS - 2 OpS00 GpS — ORS G W[TlALO D[LAEUTION •""�� ~ ACCEESROADNI O "•rc - - ' i WETUND DELINEATION W1. -• WETCRNO Wf08 � . Type 'yU—NG GAS LINE (TYP.) E STING EASEMENT `• - WETLAND W106 /7 7YP PENT ______ . �sf�3F`�SF�fF�lF�fF F N sou-.I 211 +0o 21 +00 213 +00 y1 +00 15 +00 y15+00... "' 277 +00 218 +00 W 19 +0 220+00 y21 +0� GAS ° 09s — GAS —GAS — GAS — GAS — GAS.. G� GAS — GAS 0— GAS G S —GAS —GAS —GAS —GAS — G 2 —GAS —GAS —GAS —GAS — M 2 4 �- 41 = T FFjM�E (T•�P= — J��',`„»�: -^-,, — — — — ^ -------- 0PO3EDGA3 LI E(TYP.) .� � � .L) � ^ � �• � � � � � � ^ — NLT qE mR) PROPOSED GAS EASEMENT ` TEMPORARY WORK SPACE ITYRI N 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corpor.— - North Carollm NOM Carolina Llc_ naa E C -2243 Piedmont 0111 Natural G a s wnTER A,.R - —sr-a z ENCE - _ LIME — swER saT rENCE �ly..� PR soiLTrPE e SOiIDELINF TIC EASEMENT Q DPOSEOL ooE ".R.E ITVOirn - - - - -� oo G .E.TP, E p TE _ Aao.PL o —IND Cy oREPILTEROOTLE< ® nMeER MAT eoRE Pn POR SAC. N +o SORE Exen ", CONTOUR..... : TE.IPOR_ERIOOE Co"sTRUCnoN-110E NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWINGE TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK , _.- SB LOOP -WEST EROSION CONTROL PLAN FROM STATION 192 +00 TO STATION 219 +00 JOHNSTON, NC. DRAWN BY NF CHECKED !=APPROVED BY: SCALE: SR DC 1 " -60' JOB NO. 39911024 DATE: 0123/2013 DRAWING NO: REV. SBLWSEC -EC -008 SHEET 13 OF 52 1 0 WEZLANQ W101i - PFD. WETLAND WI'104 o TYPe PE1d o SE:.° -1f F� N 15 +00 216 +00 217 +00 216 +U0 W GAS —GAS — GAS — GAS — GA ? I — — — -} — — — LTZ;5EI =YP.- — — — — ACCESS R D" WETLAND DEuNEATION WETLAND OlLIItAT1DN . 1_ W1aS 7 soL DELMEwraNlnFl -, EslanNC DAs uNE 1rvr I - - •WE7LA Q vviD,S ,µ.w+"*' x�+^!". �EAIETIND EAEEMENi PNMOSED OA {LMEITYPJ ..,....,- _.._. _ -_. _ _ -._. _ ..___ . "_.. _.. .._ ._ "._.._ .. _.. ._. -_.._. .._.._. "_ "_.._ _ ------ -------- _ _ _ _ _ _. TYP PF c-�dEF[Alllb'WT07 � - '+ 19 +00 22 *0 2 1+ 0 2 +00 2 +00 4 +00 25 +00 226 +00 227+ \° ?2E +0 ??9 +.. .. •ty a PEM `23 +�Qq +OQ * /- W 0 0 22 pp 22 Z3 �y pp - y� qqQQ P - - GAS —GAS —GAS ° GAS ° GA$ — GAS — Gp5 — GAS -- GAS — GAS — GAS — GAS — G —GAS — GAS —GAS — GAS —GAS — G .._. _s_QA4 GPS itAS�_z+�. _^ GAS °GAS i%S -? !►1 TRENC��LLI�LUO J IROPoSED GAS GSEMENT /l T. OAS EASEMENT J , L -_ —• SILT FEyCE1nP.) TEMPoMRY WORN SMC! ITV►1 � , 10 GAS ° G23J +00 GAS — 1 234 +00 GAS ""'Rw.. mew- .- v+w«�.+v..�. •-•" WATE0. C0.0aE \NO %i c ' / / 'p G i © i -------- .._ -. - - -- 233+00 234 +00 235 +00 236+00 237+00 , , - .. S`S � - 'L .00 6� xpG / 241+00 243+00 214+00 Gp$ "� ED ^N n o OY� K — GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS —GAS +pp GAS —GAS GAS —GAS 240 GAS —GAS —GAS —GAS 242+ 8 —GAS — 0 —GAS — AS — GAS D E 0 — — — — — — _ — — — — — — / ` \ IN 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS IMS URS Corporation - NoM Carolina NoM CarO11rIS Liwnsa / C -2243 Piedmont 0111 Natural Gas •- r FENCE FO7'D LIZ AD - Rr uNE _ suPEa slLr rENCE °E DE INEA O DDE „rRrE nPOa,T - - - - -� EA w,aa P, E O TRENC „o, °° .LAND ET C E °* aERRAT REPrFDR A «A ° ao BORE -- - - - -- Ex�snND ccNre°a m.uoai TENroaAar ea,DDE .+I+.. sraEAN c �rnDNEMRaNCE 0� XO NO. DATE DESCRIPTION ENO. DRAwT1 CHK. DRAVNNO NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR ” �' 58 LOOP - WEST EROSION CONTROL PLAN FROM STATION 219 +00 TO STATION 246 +00 JOHNSTON, NC. DRAWN BY; NF CHECKED BY., BY: SCALE: SR DC 1 " =60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: REv SBLW- SEC -EC -009 SHEET 14 OF 52 1 - - -- 262+Uv GP`s _ - - - fOL DELINEATION ITYI.1 PROPOSED GAS LINE ITYII "- - f' -'� ._.. EXISTING GAS ueE an.l --- _ _ _._ - - - r - '— - g / d", %MTNG EASEMENT - - 253400 -- - __ . _ -_. - - _ -- - � 252+00 / \ieRCnofslNG , %-- - 251+00 04 � G� _.. -g sT02 250+00 GPy S \ .. / / Ok / 2 — 49+ 0 G 5 GP X +d0� \ / S \ ^S 247a 00 IROIOSED GAS EASEMENT \ _ q \ \ / M1�/ v A ►� OA S / 3 \ / CIA 243.0 -.-- ----- ----- r �.. G -- ... / A ,�` Gu�� / \ 1 TEMPORARY WORN SMCE (TVI.1 \ \ GAS ^+rte C9e / . '"- GA 245 +00 Ot !� ?F IO YCTION ENTRANOE (TVI SORE ND ■ORE N �K \iR\i •� sf-- �i� \ \ \ \ / \ MLT fEIiCE (TYP.) / Av Vb w A.A O O WETLAND DELINEATION /� S -- .__ - -. 1M1 O) , - -- - -- r - -- I I - - - -- - --------------- ►-- �,----- �._._.MR -�, D POINT TY 262+00 264+00 I� - --- -- -/. G� "- P5 �G� 263 — L1, <1 WA'EA CRO851 0 9 / 6�AA0 GP9 — C. — � 266+00 267+00 k i ,� '.. .1 / / ` � -- Gpy — Gpr� Gp9 268 +00 269 ". y ,, , `4 I - i2 7y5�"' r N� MLT I E a o ACCESS .1 / C? " d9%5 GaFj _' OpS +'00 G 270+Op h?r'S'_'^ '✓,C'r t, r S' a y — — — — TO / rJ / / — — — �. — — �. ,— — •� — TREO— ° / ��..� —.. � M. ,r"`r '�4 " r:`rx. SS i •}SG?� l.�j � �.,�}"`':t.T . fi�= -, � r, ti r 1 / MLT PENC! MR) `C- Y 0 -" 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS 1� URS COrporntion -North Carolina N.r Carolina Ll— E C -7243 o Piedmont Natural G a s —fib —TER � R N - Rv uNe s PER sar FE E IsrWB CL so LOE E. --cA eK ur, rlcr, r— I �DPOSEDE,RENENr DDEN,R „E,,,D,r PnR,RYW RR�P,�E O rRENDN P,DD ND OREF rERa T Er r NBER Nrr BoREPr FOR a,cN ANO BORE -- - - -- -ITING OONTOOR ­0R) TE-0 ,RV BR�DOE ..�» IRE,N c ucnoN ENTRANCE ® N NO DATE DESCRIPTION ENO, DRAWN ONK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK- ” 56 LOOP -WEST EROSION CONTROL PLAN FROM STATION 248 +00 TO STATION 274 +00 JOHNSTON, NC. DRAWN BY: NF CHECKED BY: I APPROVED BY: SCALE: SR DC 1". 60' JOB NO. 39911024 DATE: 0123/2013 DRAWING NO REV SHEET 15 OF 52 SBLW- SEC -EC -010 1 OSOL DELINEATION (T- ) �R[.I.AMD DgFEA/10N '{ Cxanra GAS LINT (TYPJ S6 ACCESS ROAD aM {---ft alt alt alt � /t� : • '.' ,', �. wA� CR0831x0 I I WET' ND DEUNEAT*N -371W EASEMENT ... , nN • ✓� tez? a ' ` . _,� #.. • SILT !IT �O + ,rr���� @ t , ` t : r ri I - 1�_� ".— .--- �_�.� -�.. - - -_ -._ -- - .._. PR._O- P_O._ SE-D _ _OA_ i LINE IT-- - ) _ ..- .. -.._ - _.__- _ --- _- T -- - - - - --- --- - -- - - - --- ° -- - - ---- - -- 1MT x,� �. `., P ;:. ���x� tFwn ii*FJ'. �T , " �% � r�'' =ds `..*, -e' wC'-�.V T•. - �i ��st� + - - - 9 W 280.� CsPh GP'S OPy — (aP'S 6 F=3' +00 ' — O!5 -� — fiPy — f40'9 — 60h — GO'S -- GO �- { {:hr�� §„t ti.l. r�rJ� � � �, a'fiHtLs a rry.�xr,_� S ••. * ,� G� � �� l f.� THE nuo = V` ^_. �2P ,. EW V PD.T (TYP I ,� PLUG A#F,T' i{ .Yii4 LTF •�"�', s'k'i"`-'' I 1 PROroSED OAi EASEMENT — — — — — — r v t� '` TEMPOMRY WORNiMCE 1TVP.1 '.. , - • SILT fE(TVP.) LT v IT FENCE (TYP.1 +t �St •tom -17 �1t M SILTgE(TVR) 0 }B f 3 Sh wnuxD DFUxFATNTx .. s M14 TRFN Pwo TFFMORARY snow y �1 4 TLA N)D W113 ) IF • V :# YP@ PSS' { "ROCESS ROADSSA "I. .� #( •' � � Doluxun sole DEu wFTUN oN PROPOSEDGAS LINE mP7 T AaT T 1xgFy , w .. - - -- - -- rwFER� �� TE/�MAT N . 290 +00 ^, 291 +00 292 +0d', 293+00 294 00 295 +00 296 +00 2 M — G — GPS -"' 4$ — t Z GPg — GPS — CiPra °'- P5 — CoP — P5 — GP -- p5 — GP 297 +00 ,. 298+00 99 +00 + , - W 00 +Op . 301+0,0' - - GPS Py g -•- Cspg GPS — GP'g — 6PAS -" C*" — -GYPS — P5 — CapS — G 2 ..... 2,}00 303 Py 6P5 C* - [ !! h PLUG S PLUG I YUL'[iA Nq s?.7~rp,y, •.' u..] TREn PLUG T11F Pi z H ,vr4'U V T t. F YP , SILT FITYPJ Q -� / I a SILT I�ES�F mR I > � — — _ — — — — — — — — WETLAND W 1 — 7 PFO., wATFR CRGStRNo 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URSCorporaton- North CarornaW``■ NorN Carolim LlGnsa / C -2243 C�� P i e d m o n t Natural Gas - PROPERTVU "E �Fy SLT_AR —.1 Rv LiIR suPER saT FEry E �sraiw.rr ROM IL SOIL TYPE --- cas-s Era O 0 DoE "TRY7,POP,T EoSr_ - - - - -� TE» w a� PAIE 0 TLS «D C� TRpc "�uG xaERNAT oR,A «A o 7. ® 4o BORE - Exinwc ccHrouR IxucRl -1— BR-E .•+aw sraeAN c uCTIO "ENrRA "ce ®" NO, DATE DESCRIPTION ENO. DRAWN OHK, DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR - - DRAWN 513 LOOP - WEST EROSION CONTROL PLAN FROM STATION 274 +00 TO STATION 300 +00 JOHNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' JOB NO. 39971024 DATE: 0723/2013 DRAWING NO: SHEET 16 OF 52 REV. SBLW- SEC-EC -011 1 OA.A & TEMPoYSRIODE d O TRENCH MR D uD D O g O ExSTING cNa LINE ITn.I , �WETLAND SOL DELTION(TYP.1 - pELINFATION . • • �' WG PROPOSED DNS EASEMENT IXISTNO EASEMENT o o wWEI N D DELINEATION - --..-- - ' ---- - -- -- --- - - -- — *'^ - - - ---- -- ------------ -TERSER MAT _ - - ,\ Type PE7A +00 .- ---- 97+00 M • 305 -308+00 • . - • 310+00 311 +00 312+00 313+00 M - - - - - -- -- 198+00 299 +00 • W 00+00. 301+00 2+00 a 304+00 G45 —GPS —GP5 — Gp5 y J —' �' (iQ�b GP5 303+OOCapr PS G!g —GP5 — ^GP5. GP5 —GP5 =GP5 — Gp5 =GPS G►�a Gp�a Gp5 GP5 n oPg —GP5 —GP5 Gp� _GI's Gp� ° 5 ° �+N Z 315+00 GP$ --- GP5 31 U x. mE nuD = GP5 Gp 5 GpS SILTP EIttPIn Q i :.711 Plllb t �. — — — — — — — — — — — — — — ✓ NRTER DRO>T41MB PFO SILTt�GE1ttP.1 PROPOSED GAS LINE(TYP.) jlyr b]S4 `J �• � .�. I - •'- TEMPoMRY WORN SMCE ITYP.) J } EXISTING OAS LINE (TYP.) -GEE. ROAD SS W111ANS) DELE{ATIOII WMT TM ER IAAT \i ` O •`�•ll TREI1fN nW ` P _.. _. _ _- - -__._ - - - -- - _.._. 100 31 +00 3 3 +00 314 W 315 +00 318 +ppgg 317 +9D0 318 +00 319 +00 320 +00 y1�+00 2y+00 3 J +00 24 +00 325 +0o J28 0 W " 32g +0p Jj9 ±40 P5 °GP5 —GP5 —GPS ° G� —GPS —GPS —GP5 —GP5 —GP5 °GP5 —GP5 — CiPS ° GP9 —GP5 —GP5 —GP5 —GPS — CaPS —GPS °-P5 —GP5 — G5 — GW3 —GP5 — GN3 — GP °GP5 —GP5 —09" -GP5 — M 4sP CsP3 YaP5 C9P9 I'S, S J (,% • f .YX ...<u«..z.? / (� ........._4..«.'� T ' mss, N �1 TAE _ fILT IITYP) �71�/ 44 WETLAND DELINEATION �w — — — — — — — — — — — — — — — — — — — ; - - - - - -- - W30) *4 - .'OP.FF [l. WP,07 �J .'OP. PFD r 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation -Norm Carolina Nor C—fim U—se E C -2243 Piedmont 0111 Natural Gas �--M� WATER E - —EPA - $IIPER SILT FEN E I�TICN O G - .ERTRY PoRIT = R «so,_E O TRE.C.P— TL"D NEERNAT BORE PIT - -A-„ -1ORE ETING crlrc�R rtllucRl _EAN „E urnoR E—A. CE NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK - " SB LOOP - WEST EROSION CONTROL PLAN FROM STATION 300 +00 TO STATION 327 +00 JOHNSTON, NC. DRAWN BY. NF CHECKED BY: APPROVED BY: SCALE: : IAP SR DC JOB NO. 39911024 DATE: 01/23/2013 DRAWING NO; REV 1 1 58LW- SEC -EC -012 SHEET 17 OF 52 TMS ;MAT — GPS323 +0GP5 — 4+5 +00 ❑^J' 0 WE ND DELINEATION ... •' - '. • .r . WMT TPEN NPLUD ••4- PROPOSED OAS •EASEMENT EJ(ISTING EASEMENT - - --- + '- -- -- -- "" -' - - -- - - -- - — -- ---- - - - -- -- -- -- - - - -- -- �7rr 34E +qQ 32;3g�pp 3gop+00 331 +00 gg3��+00 333 +00 �T 3 +00 335+ 336+ �GM ? .'.Caps � Gp'+5 - Un Gp5.' Gp+i.- Aps - GpS - Gp5 0 - Gp5 - Gp5 - Gp5 -Gp5 c�g�3� . G1'!?_.a...�►.�n �..�_. SOLD EATION(M.) PROPOSED GAS LNIE (TYP.) O WETLAND DELINEATIO WMS SILT FPJ{CE (IYP.I 6 p..u..,� --nom GPG 33G +PS - GPS -3GP�0 - GP5 - GPES� GP5 - Z 4 +00 Gp3 - Gp93 +00 GPs - C SILTF l(TYP) — 11"!- - I I 11 — — 'r — t~< TM MAT sb WETLANa TRlyGILFLUG - - - -- -' �rn�Fa..•. -, _: - ��i -- ---- -- - - -_ - - --- - -" - -- — — — — ---------- - - ---- -mac ------ - - -V -- MMA • , . , . SILT ! (TYP.) TEMPO ORK SPACE SILT .,:. E d! r • y` L.S r .. .^'"`„ "°ar� •• W �e, P FO n2 f O 80S. DELINEATION (TYPJ SILTFEMDEITYPI .•i +00 339 +00 340+00 W 1+ 0 342 +00 -Gp5 —Gp5 —Gp5 — 6p5 — GI ? OGps — GP5 —Gp5 — Gp5 [FISTING GAS LNE (M.) TR/y(11 RLM 1- ��+D8 48 _ — Gp5 — Gp9 +00 I Ss MSSdM T / rR PLuo J. V i J rREyGIyPLUO EI Fur — — — — — — — — — — — — — — — �. — ` TM� IAAT < rase ti. "WETLAND,W217 -� Typ `PF0• . t - -- - ------- - +p�8 N6 }- C." - OWL 0p3 -- OM PLC Y R/P.1 a� �OPK SPADE T1%tFPO O , V\ 0 30`:. 60 120 Feet NOTES REVISIONS REFERENCE DRAWINGS UM URS Corporation - Nora, Carolina North CerolinE License E C -2243 0111 Piedmont Natural Gas ptiYeOU1oARyLII�LEOEND � -1f � w�iEn BAR s — BVRER:T rE "cE - ...,cns -s E:c s,v ceooc 11 a Aeon O R "npENTRY-T _ MRORARY - _ .RE "�" RL�o L - - - - -1 w�v PA I[ Np C� - REELEROUnE ® MBEB NAT RE '=—E roR �ACR ANO BORE - - -- -- - - - -.- Ex�BTiNC eeRTeuR mrA�eRI TENroRARr aRiocE se... +^•� srREAK c ucrioN ENrRA "cE " NO. DATE YATLAND W209' .`. END. DRAWN CNK. DRAWINONO. TITLE 1 0123113 ISSUED FOR APPROVAL - NF SR U�Q� 461vF;....• - GP+�i pp - Gft.�• °'-.Y` *oo B +ob*' [FISTING GAS LNE (M.) TR/y(11 RLM 1- ��+D8 48 _ — Gp5 — Gp9 +00 I Ss MSSdM T / rR PLuo J. V i J rREyGIyPLUO EI Fur — — — — — — — — — — — — — — — �. — ` TM� IAAT < rase ti. "WETLAND,W217 -� Typ `PF0• . t - -- - ------- - +p�8 N6 }- C." - OWL 0p3 -- OM PLC Y R/P.1 a� �OPK SPADE T1%tFPO O , V\ 0 30`:. 60 120 Feet NOTES REVISIONS REFERENCE DRAWINGS UM URS Corporation - Nora, Carolina North CerolinE License E C -2243 0111 Piedmont Natural Gas ptiYeOU1oARyLII�LEOEND � -1f � w�iEn BAR s — BVRER:T rE "cE - ...,cns -s E:c s,v ceooc 11 a Aeon O R "npENTRY-T _ MRORARY - _ .RE "�" RL�o L - - - - -1 w�v PA I[ Np C� - REELEROUnE ® MBEB NAT RE '=—E roR �ACR ANO BORE - - -- -- - - - -.- Ex�BTiNC eeRTeuR mrA�eRI TENroRARr aRiocE se... +^•� srREAK c ucrioN ENrRA "cE " NO. DATE DESCRIPTION END. DRAWN CNK. DRAWINONO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR - - ' 56 LOOP -WEST EROSION CONTROL PLAN FROM STATION 327 +00 TO STATION 354 +00 JOHNSTON, NC. BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1— 60' JOB NO. 39911 024 DATE: D7232013 DRAWING NO: SHEET 16 O2 REv fiBLW- SEC -EC -013 F 6 i 371 \ 3s1+ .b ' . ,, , - T -.'.v • - O .. ` s' ' jAjE7 LARD Witt / WET W[nAND DEuNEATION •Type P66 + - O -9� / / T ep ' �_ • � r aLr PENCEIm.I I / C' S ~ 3 v \ \ O \ \ at/ ACCES —A-10 / / 36 4 / sf�s ✓ ~`/ —POSED `3 NJ (�?e,E_�•n. - DGAS { I \ TRENCH PLUO \ _aS"o W dt) / •'G6 #O� / I PROPOSED OAS LINE (TYP) cops 5"-ft ovs 8 p \ \ \ \ \ _•'•7 \ #.. f��� E% MTINGEASEMENT 3V W / TEMPoMRY WORN SPAC[(TYI.) \ / / //- GI's 336pr00 ` \ �'�+ / / �Qy / g / / / • _ l vv p5 361 \\ \G I / ! ExuTING GAS UNE ITYP.I DELINEATION ITYP.) s . Z" _ 315 +00c*'b \ \ 373 + - 3 C�Pg v9g G. \ \ / 371 +� CiQS . A l000 // Ile o � 0— ell 01 P G \ 0 30 60 120 / f R Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS M� URS Corporation - Norm Carolina Norm Carolina License E C -2213 Piedmont 0111 Natural G a s fPS� VIA �N v TER eAR uris — — suvER sLT EENCE �M.r♦ w = sol�TrvE -eas s E �` PP ENT 0 aPOSE�EASEN Noo E ",R.E.R roan -- PoRAR.w_RNEPACE TPENCNP�No v.NO "REE TERa T L eER NAT ® eo —E PE VT roR �ACN AUO - ........ -STING CONTOUR nAIOPI rern"R"'R"'E c uc I.. ENTRANCE Lam'+ N NO. DATE DESCRIPTION ENO. DRAWN CNN. pRAYJINO NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR - ' " 5B LOOP -WEST EROSION CONTROL PLAN FROM STATION 354 +00 TO STATION 3E0+00 WAYNE, NC. DRAWN BV: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1" - 60' JOB NO, 3991102{ DATE: 01232013 DRAWING NO: REv SHEET 19 OF 62 SBLW- SEC- EC -01{ 1 ?, 9 378+88 ` „ 1tNea / -. � Y v✓ !� ;-, :' �,� 0p � GAS 37 +00 p an s Do `GAS GAS z en 80 +00 TC�Y� iND w111 _ —GAS 381+ MOPOSED GAS LINE ITYP.) SOIL DELINEATION 1TYP.) / / , p\ TYPe PFO 8p / O it U GAS �•- ^• +.y. �• �� \ MOPOSED GAS EASEMENT NOTES TEMPORARY WORK SMCE (TM.) co REFERENCE DRAWINGS 0111 Piedmont Natural Gas ww� wA —aF� SIiT FENCE ar uNF ER SILT FEN E �Rl� FROF ^sm c� soR TVFE Q F 0 mEASENE„ R nDEN.RTE i_.- --- -] E,NS<xGEAFENENT O ENFOaNty w:aaSanCE TaENC „ nND ttaEFIER11T� ® aFa Nnr NOR. FT FOR 1Atau +D eo1E - -- - -- -STING CONTOIR (MA.IOa) TExata Aav Sa,tGE c I-1 ENrRn „cE „ NO. PEM. DESCRIPTION ENO. TEMPORARYSRIDG! \ `� ?e_ / ype E%IfTN6 GAf LINE (TYRI �� EXISTNOEASEMENT 1 0123/13 ISSUED FOR APPROVAL NF , WjitANO DELINEATION OPP TREN e r H SILT PEOITYPI\ - '_ -- •' 5B LOOP -WEST EROSION CONTROL PLAN FROM STATION 380 +00 TO STATION 407 +00 WAYNE, NC. - �•..K^^'°. ', ,.'. .:. ,. Typ,LAND`W1 TFO • v , nM r- NOTES LEGEND REVISIONS REFERENCE DRAWINGS M� URb COrpora,ion-NoM Carolina NorM Carolina LkenN / C -2213 0111 Piedmont Natural Gas ww� wA —aF� SIiT FENCE ar uNF ER SILT FEN E �Rl� FROF ^sm c� soR TVFE Q F 0 mEASENE„ R nDEN.RTE i_.- --- -] E,NS<xGEAFENENT O ENFOaNty w:aaSanCE TaENC „ nND ttaEFIER11T� ® aFa Nnr NOR. FT FOR 1Atau +D eo1E - -- - -- -STING CONTOIR (MA.IOa) TExata Aav Sa,tGE c I-1 ENrRn „cE „ NO. GATE DESCRIPTION ENO. DRAWN CMK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR - '_ -- •' 5B LOOP -WEST EROSION CONTROL PLAN FROM STATION 380 +00 TO STATION 407 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC JOB NO. 39911021 DATE: 01232013 DRAWING NO: SHEET 20 OF 52 REV 1 SBLW- SEC -EC -015 W313 SOLDELINEATION(TYP.) TEMPORARY WORK SPACE (TYP.) SILT FENDE,TYP ) (J TIIENON PLUG PROPOSED GAS EASEMENT _ O — — — — — — — — — — — — — — — — — — — ❑© -- t — — — — — — — — — — — — — — I 104+ 405 pp�0� 1 40 +�0p W + 0 �p +00 - qqppgg+00 "4�0 +00 "411 +00 412�pg. 417+ ty}�'sg�. _. -_.. `c, :, y" ,.c„ r� x �' - GPs — apps — GP6 — &PS — c+e 2 iVaP� — GPs — R — Gps c" — GPs — 0 — GPs — Gps — Gp5 — G — �aPS — C" — �aps — C." —GPs — :e 5 420 2 U aE\a E rnEPwG s . . WETLANQW 21 PROPOSED GAS LINE (TYP.) E%ISTIND GAS LINE (TVIJ ""STING EASEMENT m❑ O Cm7 O ? YYEIYAND DELtM[ATN1M rRENCN PLUG O Q 9 TRENCN PLUG 8 , �•;:- — — — — — — — — — — — — — — — — �J) /Ire ? — — — — — — — — — — �. O I O cD < — } t TREriSM RUO 3 .. i TREjrb PLUG , � . - •' `' ,. —, GPs — 015 +00 GPs — 4 Exlan� y 0 - 422+00 GPS — G P5 2J —dOG 4 +0 '. 425 +pQ PS WETLAND W213 .. —��-- ACCE83ROAD S LINE IT-) WETUND DELINEATION wxt[ — C4, 1 `c'" — GP f � 6 — VJETLAND W2 1' Type PEI —� ACCESS RO UN[(TYP.) NOTES REVISIONS 2 REFERENCE DRAWINGS `WEPLANDW212'_J. 0111 Types PFb o�ryAOU „O^RYLIELEGEND —[r-3 z,rEp aAR — — suPER sILr,ERCE NBLIC ROM - —��►� moRCSEO CL �� sOILTVPE __rne- Ex r s u IN I N Q HOOEHTa �nPOINT rKE „� „PL G TL�HD cORErLTEROITLET ® eER Nr,T EOREPTROR 1n11 U +o ROBE _.. .':T HO CONTOUR INr..R1 TENROR.m RRIOCE .�.. IDD �rnoH ErrtRnNCE NO. DATE DESCRIPTION ENO. DRAWN GPs — 015 +00 GPs — 4 Exlan� y 0 - 422+00 GPS — G P5 2J —dOG 4 +0 '. 425 +pQ PS WETLAND W213 .. —��-- ACCE83ROAD S LINE IT-) WETUND DELINEATION wxt[ — C4, 1 `c'" — GP f � 6 — VJETLAND W2 1' Type PEI —� ACCESS RO UN[(TYP.) NOTES REVISIONS REFERENCE DRAWINGS UPS Corpo,,b- -Norm C—lina Norm Carolina LicenE. E C -22.3 0111 Piedmont Natural G a s o�ryAOU „O^RYLIELEGEND —[r-3 z,rEp aAR — — suPER sILr,ERCE NBLIC ROM - —��►� moRCSEO CL �� sOILTVPE __rne- Ex r s u IN I N Q HOOEHTa �nPOINT rKE „� „PL G TL�HD cORErLTEROITLET ® eER Nr,T EOREPTROR 1n11 U +o ROBE _.. .':T HO CONTOUR INr..R1 TENROR.m RRIOCE .�.. IDD �rnoH ErrtRnNCE NO. DATE DESCRIPTION ENO. DRAWN CHK. DRANANG NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR ;... -- AK- .. 5B LOOP - WEST EROSION CONTROL PLAN FROM STATION 407 +00 TO STATION 434 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1” = 60' JOB NO. 3991102! DATE: 0123/2013 DRAWING NO: REV. 5BLW- SEC -EC -016 1 SHEET 21 OF 52 1 (TYRI —J 78 C PROPOSED GAS LINE RYP) 1 _ 1 — c WO C" ,a1 +oo f �g --- ----- _ BORE PIT FOR JACK AND BORE (TYP.) TRENCH PLVG ; \ MLT PENCE(TYR) 7 1 O G i 1 TEM- -- WORK : ------ - - - - -- as�i +oo u6 Z 0 S— uag� — e r,h_ P_ Y S I s TBdroRAM WORK SPACE RYP.) PROPOSED GAS EASEMENT _.._--------- - - - - -- __._------- 4----------- - - - - -- -- -- x" TEMPORARY WORK SPA" ITYP. _ 449+00 +00 451+00 �PPg — C," — Gp5 -- 42 +00 43 }00 — GK 454+00 t" 0 tg — G — 6" E %ISTING GAS LINE (TYP) — — — — cO — — — — — — — — — — — — + 459+00 460 +00 LU 61 +00 462 +00 463 +00 J HH 2 ,. 0 30 60 120 Feet NOTES LEGENDw..� REVISIONS REFERENCE DRAWINGS EMS URS Corporation -NOM Carolina North Carollrs U—SS E C -2243 Piedmont Natural G a s N � ATERBAR LINE — suveR sLT EEXCE -- -sA3°9 Ex� I uN TI N O oDERTR. xnPpP NEORARY RER XPL - - -- w R.sP E 0 TLAXp Ey oRErLTERO�TLE NBER AT ®BORE RT FOR 1—Ar.o BORE EzISTluc ccNTOCR CNAIORI „.,�.. TEUV0— BRIoGE „ ucTIOX ENrRAnw NO. DATE DESCRIPTION ENO. DRAWN CXK. pRAWINO NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK -- `. 50 LOOP -WEST EROSION CONTROL PLAN FROM STATION 434 +00 TO STATION 461 +00 WAYNE, NC. DRAWN BY NF CHECKED BY: APPROVED BY: SCALE: SR DC 1" 60' JOB NO. 3991102{ DATE: 0123/2013 DRAWING NO: REV. 68LW- SEC -EC -017 SHEET 22 OF 52 1 O SOL DELINEATgN ITTP.) TEMPOMRV WORK SPACE (TVR) U PROPOSED GAS EASEMENT PROPOSED GAS LINE (T"T C o— — — — — — — — — — — — — — — — — — — v !+00 +( 459 +pp 460 +0 W 61+ 46 + 46aroy 4Lt+ p 465 +00, 468 +00 467 +00 466 +00 469 +04 _ 470 +1 471x00 47p +0 4i3 +U0 W 74x00 47 *00 ��1Z6 +00 d)� +p GP a — Gp5 GP' ? vPS — GPg — G!5 — Cs4S ° Cs45 °GP's — Ca — GPS — ca S -- GP�o ° Gp5 ° Cs 5 — vPA� — CaPh — G 5 — GP°+ — G y — csp� — G 5 —cap -° G45 G 5 ° GPS — V — GP5 ° V 9 ° GPS - ? — G S — e — G — op +L 9 —CAPS J J S EXISTING EASEMENT - EXISTING GAS LINE (TVP.) 10 \! -.. ..- PROPOSED GAS qraGPh G GPS Gpr3 +� _ 1+00 „ G 483+ D 478+00 4 GPS GPg "' GP5 Gp5 V GP9 GPS G 485 +pp _ _ _ _ o° _ 'i -- -- �' 477+00 GpA3 P9 Gp5 486 ` — — �� — — — — — — — — — — — _ _ 2 475+00 _ X476 G Gpy (�p�j . ,: A G pg Dp 473+00 — Z G py G _ L'+P5 GPR 2 _ G G 487 71+00 GQ.y -- GP`S GOS A — — — — — — — — _ Gp� G� GP9 — GPS - GPg — G v f - ACCESS ROAD PI3 EXISTING GAD'LW! (TVP.1 s EASEMENT 0 30 60 120 7eet NOTES LEGEND REVISIONS REFERENCE DRAWINGS ll� URS CorporaDOn -NOM Carorna No M Cuofiru L—w E C -2243 Piedmont Natural G a s 0111 fA� w,TEa BAR Rr u,IE — suvEa mLr EE"cE soILTVPE _cas s E Bnl ul TIN Po :EL EAEENERT - PORoRABENEaT p aE" RPL B PoR,a.w�aK =P,�E TLA,rD f5 CoaEPLTEROUTLEr O IMBE S • "DREPnPOa .PoA LB aE DODf� Bo ceNTCUR nucRl TENP. BRLOE ��.�w SraEAK c ucnoNENTaAaw ®" O DATE DESL0.IPTION ENG DRANM CNK DRAW NG NO TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR -:. - AKI 515 LOOP -WEST EROSION CONTROL PLAN FROM STATION 461+00 TO STATION 488 +00 WAYNE, NC. DRAWN BY. NF CHECKED BY: APPROVED BY. SCALE: SR DC 1 " =60' JOB NO. 39911024 DATE: 0123/2013 DRAWING NO: SHEET 23 OF 52 REV 1 SBLW- SEC -EC -016 S 1f / CO / / w 1'^.'1 RROPOSED GAS LINE (TYR.) ' TENRORANY WORN SPACE V SOL 1- 5+0 0 DELINEATION IYP I / _ � r C y,Estb+dS14ao0 Gg — ' 51 r MtOPOSED GAS EASEMENT �' -�• �� �� II4 6 f =' /! /! MA7C141-INE 522 +00 o EMOO UO ` - -- A/ s e X yI - Y T1IEMCH}LUG n � S/ Ilk � E�f / 3 cli's \ 9d, \ \ ✓ fyR PKO W 115 _ . - / ►�/ E RTFOIT Y►4-.-- wATUC osslµG )))• :r .. 'a00 GP •� „ 3 OR[MT ROII SACK / / I/ WET L(cNDWIJ7 wenAND DELMRATKNI /5_2. / ANDe�(TV I TY( TM" MAT _ �( ((f LS / --�CINS O \ 7a \ SILTRENGE(TYR) . 0aO0 I ,:.. •11 s• I s1 EE, : / WETLAND DELINEATION -V TRENCH PLUOO �� TREMCX •L1IO // ' W11T` \ \ MR \ \ TMEER SAT \ \ \ S2f _- J TE—RA. UCTION ENTRANCE(TYR) TR."CCl �GpS CM }t Lr jW E - .... d °" li - J P'� i FERRY 9W / .. / i e 0 30 60 120 i y :..._ Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS dM URrt Corporation - Im, Carolina North North CAroNna Liunaa / C -2243 Piedmont (V` J\ N a t u ra I Gas ~� —. T e R -SR s Rr urE —SS suPEASiLTTErvcE u a �u O G ooErvTFYAxiTPOirn nN, EASENEN, - - ] W RNSV4iE O T— C.:'„° TNEER NAT ® °°aEPTGOR UCx AI�o EOSE -- Exisrwo ccNrc °a cNUCe) s- W TENP0. —.="' ucnory ENTNArv<E � ry NO. DATE DESCRIPTION ENO. DRAWN CHK. DRAWING NO. TITLE 1 0123 13 ISSUED FOR APPROVAL NF SR AK _ - 5B LOOP - WEST EROSION CONTROL PLAN FROM STATION S10 +00 TO STATION 536 +00 WAYNE NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 ".60' REv JOB NO. 39911024 DATE: 01/23/2013 DRAWING NO: SHEET 25 OF 52 SBLW- SEC -EC -020 1 'WETLAND )Mt15 TYPe PFO y � 4 _ --_ - -- AND SORB (TYR) %. 544+00 GP+`+ � pps., GpoS �� iNj ,.EL/ _ -.__+ TMD UEl1lMT unTNO OAE ( - •QO ` ^-- .,. cs4 +pQ ,.. , . � _- •- _ sEn LINe rn � � . ,.,° °""`"°`..w�- w;,,, ""�s, ..+* S3 S +QQ PRGroSED aAE GQS• ~ � REiry+ck r•NRE ,_ -,.. Gpg �, Gpg _ 33!+00 *i __ _/ � x / � ag '�O \� IN � q TENPDRARY < ONSTRUCTION ENTRANCE IttP.) N, SILTF CE IO / •` TEMPORARY WORK SPACE (TYP.) THE PLUG$ H /L1�1 .. ..: \ IN `J • / / '4.t, ^�' \ .,' ��� \-V \`` �\` r� SOiL pfu iIp G . Tb N. G GAs \ G,pS +00 _ SOL DELINEATION (TYP.) PERMANENT ACCESS ROAD YI3A -� -1 GAS C'aS ,y 4w1j MORE nT FOR JACN AND MORE (IYP.) j •��Dp GPs I 2 W qS j l� \ tiV %SSt +QQ �.� I o _ - ' - 5W!! -. GPg , \ \ CAS ` _ _ ' - SSTh00 GPg GAS S GP S i � I TEMPORARY CONSTRUCTION ENTRANCE MA) 31LT PEEITYRI O r NOTES N , REVISIONS REFERENC■ DRAWINGS U NT U COTPDED- NOE C Nw Gmlr Ur S C -2243 jjfJd T 0 30 60 120 NO, DATE Feet ENO. DRAW NOTES LEGEND REVISIONS REFERENC■ DRAWINGS U NT U COTPDED- NOE C Nw Gmlr Ur S C -2243 011 P ' e d m o n t Natura I Gas _ APRCOm UN 1 -R s wR si—CE PR V SOILTrPE - -CA9 -A Exi8TwG0.` RDELINEnriON r DPOSEDEASE woEN - - - -? TE W,RKSPA E O� TREr,�NPL- rPOM CORE FILTER OUTLET RE P,T Pon JA« AuD ® - —E - -- - - - -- ExiETxo coNrOUR ryAJOR) TEMPO — ERiDCE STREAM SSSISSI CONSTRUCTION ENTRANCE ® �DSm NO, DATE DESCRIPTK ENO. DRAW C.K . DRAWNG NO. TITLE 1 01/2Y13 ISSUEOFOR APPROVAL NF SR .. AK - ss LooF - MOSSY EROSION CONTROL PLAN FROM STATION 536 +00 TO STATION 560 +00 WAYNE NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' � 60' JOB NO. 39911024 DATE: 01/23/2013 DRAWING NO: REV. SHEET 20 OF 52 58LWSEC -EC -021 1 _- _. _ -._ _.._- t— SO E DELERATION ITL) EX I1nNa axl UNE ITrP.I S PROPOSED GAS EASEMENT _ EXISTING EASENItlIT _ ---- - RA RY WORN SPACE ITY, I _/ .�._ - – – _ D l .� — — — — — — — — — — — — -- -- GPS = Spy +00 505+00 I, o+ _ —,, 00 GP`�49J:06Pg - -`.�r��.� Gg6+00 — 497+00 OpL r00 GPS —GI's 99±OOGPS — GPS GPS —GPS m +GPS —GPS — GP$ — _ m *� 490! 493 — — — — — — — — — v 46lWO GP`s GP`s 99 MS+00 —GPS 5 5 +00 486+00 487 +� _ Z 188+00 6P5 OPS — 6p5 C{� 493 +00 —GPS — GPg •—GPS .— OP5 — GPS — P9 —GPS J� o GPS — GPS — GPS — GPS — GPS — GPS P'P' - L/ + J PROPOSED GAS LINE ITYP.1 + _— — O E1Ei1EL9 I D72 +p 314+00 \ \ \OOx \ \ O ��., /` G, �.y_+. j \ \ � V� \ � \ \ \ \ .. -, `` 1 ``•`\ ` TRENCH LUG / PgoP Oo TEMPORARYWORKSCE RP ,1 \ LM (Tw4 d ✓' \ \ \ JOJx \ ` ` \ !1a \ \ \ TRFj{CH PLUG {f•.�T �3L ``` 95x00 \ \ / �KoO / TLAt4D w139 �...`` Type P55 \ ACCESSROADRI3S�Bx0 4�. / W[STLIIND DELINEATION ik ..g��.•........,- _,..,W ``�.- 0 30 60'.\ 120 NOTES LEOEND ACCESa ROAD LINE �� srER �A -- -. -_ -- co7,1ACUNDAAr LINE LT FENCE _ - -- wN.IC ROAD _r ►� aPER SILT FENCE --GA* movcsEDU doETrPE —cnsa I— CL SoILDELINEA,IG r___73 MOPOS EDEASS.— HODENTRV.EXRPOIN y,_. -_ -� Eu1 wGEA1ENENT TREHCHPLUG -- ENPORUrvWGRKW,tE xE AND CORE FATER OUTUT MMMOM TINaw NAT ® SORE PIT FOR —AND ACRE -._. ExlrrwG CaNrauR auoR1 !r rEMPORARr eRIDOE ��� SrREAN CONSTFUCT,GNENTNANCE ®ro NO. DATE REVISIONS DESCRIPTION ENO. DMNM CNK. REFERENCE DRAWIINO NO. DRAWINGS TITLE _ HIM URS CoroCn -North C—ilr North CAmIirr Liwnr /C•7243 N �' P i e d m o n t Natural Gas 1 01/23113 _ _ ISSUED FOR APPROVAL NF SR AK SE LOOP -WEST EROSION CONTROL PLAN FROM STATION 488 +00 TO STATION 510 +00 WAYNE, NC. DRAM BY: NF CHECKED BY: APPROVED BY: SCALE SR DC 1 • = 60' REV. JOB NO. 39911024 DATE: 0123/2013 DRAWNG NO: SHEET 24 OF 52 SBLW- SEC-EC -019 1 AO\ \ u \ TEMPORARY CONfT11VCTK)N ENTIGNCF ITYP.I O ' O a \\ ACCESS ROAD # 2 \ z \ \ 0 30 60 120 S Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS " URS Co North C roliaruoLl— E C -2243 Piedmont 0121 Natural Gas .CCESSaO.p ---1— - - -- RRCP.n uuE �Ey s�L. EE „cE wPER sut cEr+cE A�, E Sp,Ltt „ pPOaEp E.EENERT O Pa „ppEMRrExrtPpi „. — 0 "E G „PLUG TENPGR.R.woRRSP.ce �a RL,ER OU,LET coR... RCRDRAWN RER R., aE PI �p - Ex ETIN G CONTOUR INNORI TENPOR.Rr 6a,pOE s.RE.N c 1- 11—INCE ® "p NO. DATE DESCRIPTION ENO. DRAWN CNK. DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR A K, SB LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON� NC. BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 "�60' JOB NO. 39911024 DATE: 0123113 DRAWING NO: REV 1 58LW- SEC -EC -022 SHEET 27 OF 52 WETLAN f+ Type PFO f f U1 ! W Z o J x v M ACCESS ROAD # 3 r PIS *a� \ c \ 1b# DR. \ 5 \ O S OT / �• ' r� x �P f� R ACCESS ROAD # 3 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation -North Ca 1m, North C-1 ----0 C -2243 Piedmont M �' Natural Gas sccESS RD50 rER B,R �ai� VM uNE —arm 10 Pue cROno "D R.LINE AtoeoseocL soi�rrpE cA p e s „. L a „„ Q PRDPD�EDE, ENET oDE„ R ,a,rPO, „, 1 — TI— SENEHT O ENPCR- 1110 -1110 TREN-KI,D TL, „D ( co REPLTERO LET ® """'T IIS�I B01—ITvoR �.CR.NO —C - T.1—CNT- Ran+oRl TEMPOaner 1Rl E srRE�IN — C U— NENTR. „CE ® H NO. DATE DESCRIPTION ENO. DRAWN CHK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR _. -•? 511 LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, NC. DRAWN BV: NF CHECKED BV: APPROVED BY: SCALE: SR DC 1 "><60' JOB NO. 399110241 DATE: 0123/13 DRAWING N0 :5BLW-SEC -EC -023 SHEET 2E OF 52 REv 1 r •. WB RD`yyZQ6 � Type•FFO, TEMPONARY CONS TION ENTR EITYP.1 ty 1 t_ ACCESS ROAD # 3 0. �f Gpg / / Gp +"dO yf °a f9 °� � � � as —ss —• —af —sf j— +f— sF-- ss— sr— ss— ae— ss— ss— a♦ —aF� s �S Ile dP op r.--- --- - - - - -- — — — - / / s ds ACCESS ROAD # 4 t / c 0 a t a N LEGEND 0 30 60 120 Feet DRAWINGS MI URSCorporation- NormCamlina Norm Camhr La nsa E C -2243 NOTES LEGEND REVISIONS REFERENCE DRAWINGS MI URSCorporation- NormCamlina Norm Camhr La nsa E C -2243 Piedmont 0111 Natural Gas ROAD fEY� Yb.TER enR ILT, _Py Tv oOUO ­1 LINE — — avEa III ­CE E � , O E­­ G ADEN R,EKnaoINT — - - - -! E< NE »T 0 woa.a E RENO »xUC � E TL.NO RE ,EROUr ET MNAT aoaEanEOR,A «, -RE - - - - - -- ­7 Gco "TOUR INndOR) TE_N_,BRIOOE .+.+�+. IRE.. c U-0N ErrrRANCC � " 'NO- DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR AK'" 56 LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, NC. DRAWN BV: NF CHECKED BY: APPROVED BY: SCALE: SR 1' 60' JOB NO. 39911024 DATE: 0123!13 DRAWING NO: REv ET 681W- SEC -EC -024 SHEET 29 OF 52 1 G1 � 1 1 O 1 E OSILT fLNGl (TYR) � 1 '•1. p , Y 1 t TEMaG RARY CONSTRUOTbNEMTRA lITYII � � �• 1 1• 1 '. SOR. peura:A x 0—a (Y TIAND plllxlaTlON —� . .1 U ( Wl IN't— WETLAND W128f �t 1' 6 TVVeroW T" o iy 6 MATCtW®r- �9 1 CCESS ROAD # 5 1 1 Z I k r p1'AND - l i VEm 1 1 - W�TLANn w,iQ: 1 • {i TEMPORARY COfISTRUCTION lNT11AN0! IM.) IS i I rI ACCESS ROAD # 6 I 0 30 60 ,2U Fa i €€ Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation - Norm Carolina Norm Carotin! License E C -2243 Piedmont 0111 Natural G a s fwd wi a -11R sILI 1-11 LTMPE Q EoE.sENEr DDE R.E,.POi „, RREr „LVERn *L * L,RD � D E eER N.* AnD B� a eoRE -- Exls *Na co,v.ouR,N,.,oR> .ENP.._R,DoE CO IL—N Elar 1— NO. PATE DESCRIPTION ENO. DflAVJN CNK, pRANANO NO. TITLE 1 O V23113 ISSUED FOR APPROVAL NF SR - 5B LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' = 60' JOB NO. 39911024 DATE: 0123113 DRAWING NO REV. 5BLW -SEGEC -025 SHEET 30 OF 52 1 CONX,E TION ENTRANCEI-) ACCESS ROAD # 7 O 2 f 4Rtr °,^a � ,cJ• r F A N ACCESS ROAD # 7 _ - - , GPg' 0 30 60 120 o GO`a / Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS GorPoraean NoM Carolina North CSmGnE LiunEeEC -2243 Piedmont 0111 Natural Gas VNTBRBAR & weuc ROx°r oARV LNE _ aPER Srr FEMCE ,PE CL fUSfM� SO OEL EAT 0 Q ....EOEABEMENT G ...NT:-1-INT Ex,.TING EASEMENT O TREK° „P.GD - EMP—R.rNGRRSPACE Ae L"D —RE—ER—LET t .—MAT BORE P-11 Arm BORE ExISTMa coNrouR lN.�oRI TEMPORARY BRIDGE STREAM c 1-0 1—ANCE I� "D NO. DATE pESCRIPTION ENO. DRAWN CNK. DRAWINONO TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK .... -'- ` SO LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, NC. DRAWN BY: NF CHECKED BV: APPROVED BY: SCALE: SR DC J..60. JOB NO. 39911024 DATE: 0123/13 DRAWING NO: REV. 6BLW- SEC -EC -026 SHEET 31 OF 52 1 1 I I i i WETUM DEUNEAMN a O !1 fOII DEUNEATpN (T-) MM14 )) ND plLg1 O \ �+ NIERU•E,DE)N - � G / ` -� I ERNTNO OASU ( PI _sue e 1 r :..�" � `,\ ..— st— st— •r —st� WETLAND DEUNFATIDN ' �' - WATER CROffINq W11S j ' • .113 \ t '/ '�f / 11 \\ + I EAIfTNO EASEMENT T..-P UO PROPOSED GAS LINT ITYP.1 TM[ER MAT .G fL•n •,t a 1zs L ;',. -J slLr xc[(Tr.r - - --- -- ---- - -' - -- ----- --- -'11M[ERAWY-'--- 3- / ---- -._ --- -' -- -------------- -- ---- --- -- -n -- - -- - -- -- '- f' Z N 11 :.s I �SS�Sf7 co Z GP — _69 0" C46 G K G G5 = Pg Gp5 Zi, ^v n' rrS� 1 ""*• r 'vwv X>r ,� 'r �, V :'"r '-iai S� — GP5 OQ'S E.__r ) rRENg1 nuD THE xuD a O � �. Q rodTITYP.) +I SILT PFyCF(T`I►) I «. ' .' r w f • ,s L � PROPOSEDGAi EASEMENT SRT g. (M.) WETLAND WII - S 1 'P I TEMPORARY WORN SML! ITYP., \ 1t -1t !l— bt —lt� Z MT FENDS ITYP.) - •!. \ , I /w.`+_ _.I ..- 1 1 S0.T Ff.ItOI RrPI �l ACCESS ROAD # 8A C 0 4 .1 ' 1 1 MJktc 1NE28T 1't 1 1 0 30 60 120 mOM Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS UR6 Corp°nEDn -NOM Carolina North Camkm Lianas 4 C -2243 0111 P i e d m o n t Natural G a s —ar—+ :u�T rFNCF Rr uNE —..r— suPER sar rvicF wB4o Roi.D �A�a► `� - so "ry'• A N .S,N�a Fro RROno :FO Fr sFNEnr G RDoFmR.ExnPO11T �+DFns[u[Rr Q ENPORARrw�RKSwcE TRENLRODa ND —ER 0—ET aER— —E-- =R ,DaDRF - -- - - -- F,usrND cor,rouR WAioR1 rernORear aR�DOE- +. srRE.N coNSrRUCr,oR ErnRAncF ® H°° NO. DATE DESCRIPTION ENO. DRAWN CNK. DRAW1Np NO. TITLE 1 012L73 ISSUED FOR APPROVAL NF SR - AKI w 56 LOOP - WEST EROSION CONTROL PLAN JOHNSTON NC. DRAWN BY: NIF CHECKED BY: APPROVED BY: SCALE: SR 60' JOB NO. 39911024 DATE: 0123113 REV^ DRAWING NO: SHEET 32 OF 52 7 5BLW-SEC -EC -027 a {' " r w z W .oL p61NE111AN m..l to z D D AcCEss ROAD #8 ERM AR r ACCESS ROAD # 8A } a w 2 OO ACCESS ROAD # 8A 30 60 120 �� Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation Carolina North Camlir. Liunse A C -2243 V1 Piedmont Natural Gas ssTViNE v.TER E wl.Nty couxosRVUxE --...� is RDM sDVSR SRT TEUCt SDLn� O „„ G DDErvTR.�TRD „, »cWOQS CE O RErvc „c uD �f- E. .rvD DDREF.reROUr�ET R"T aDxEPTFOR,A« roaDRC Ncc TOUR(NaDR) reuroa.Rr RRiDCE ® uc.�ox ErrrR�rvcs NO. DATE DESCRIPTION ENO. DRAWN CNK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK ., -- SB LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, N DRAWN BV: NF CHECKED BY: APPROVED BY: SCALE: SR DC JOB NO. 39911024 DATE: 0123/73 DRAWING NO: SHEET 33 OF 52 REv 7 SBLW- SEC -EC -026 /0000 Ex1S 94 wks Law M", M / .',<�/ETL15ND•W11S .` .� rtf WETLAND DELIN"—N W114 \_ 1 � TYP V Y �y PERMANENT ACCESS ROAD # 8 q� e d i --:.» WETLRN6YVV-3 r� 0 30 60 0 � S � T \ 1 A � i NOTES LEGEND REVISIONS I REFERENCE DRAWINGS ■ T ■ 1M URSCopo n C NoM CAro% - Lun- t C -2243 Piedmont 0111 N a t u ra I Gas ACCESS ROAD -- -TER BAR NLFRE -I UUE -- SUPER u FwcE w �1 sDiLTrRE �� Ew uEA " DEL G MDDERTR.Rxn"" 1 -= WOR—CE u` CORE — ERDUILET BORE -FOR .NCR AND BORE coRTDUR IMaIOR) TENPORARV ERIDOE co urnoN ErnRARCE ® "D NO. DATE DESCRIPTION ENO. DRAWN CHK. Dft MNO NO. TITLE 1 D12Y1 ISSUED FOR APPROVAL N SR A . -. ",.. �-..' 56 LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, NC. DRAWN BV: NF CHECKED BV: APPROVED BV: SCALE: SR EC 1' ° 60' JO! NO. 3g11D21 DATE: 012Y13 DRAWN3 NO: REv 68LW- SEC -EC -029 SHEET 34 OF 52 1 O i EOL DELMG— ITYR.I PERMANENT ACCESS ROAD # 8 O PERMANENT ACCESS ROAD # 8 C ©7 4V 2 ,re� 0 m co 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS NOM CEro1- L-O i C -2243 Piedmont 0111 Natural G a s � fA� N4TER BtP - ♦RV uNE —.EI— suPER 'ICE PUBLIC ROAD �6AM PR _ soiLncE PDBEDE.BENENT O G DDEMR. R—T - - -- l T 2 D2T—E O TREHC „PLOD P,RaR. ,HD (9 CDREPLTERDDTLET DER 'AT ®BORE a..cK wo BORE ® 11101 _... _. Exi6Twc C.NT -1.1 -1 TENPDReRV aRiDDE sRENoN ErnRNw ® „ NO. DATE DESCRIPTION E.G . DRAWN CHK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR .. - — SB LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS JONNSTON, NC. DRAWN BY: NF CHECKED BY: APPROVED BV: SCALE: SR DC 1 ". 60' JOB NO. 39911024 DATE: 0123/13 DRAWING NO: 68LW- SEC -EC -030 I SHEET 33 OF 62 REV 1 k� . eOL DELINEATgNIiYR.I "+, O w a A' Ul 3• s" f PERMANENT ACCESS ROAD # 8 O u ❑m PERMANENT ACCESS ROAD # 8 "RYACWER 0 w Ae�EU Rwo w /" N 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation - P- Carolina North Carolina License t C -2243 011 Piedmont Natural Gas ♦c<ESS ao,D ��� verEa ana PaoPER,.uNE —ee� v eounD,RV ur+e cao,o _wE_ suvea saT RENCE �Rw a —PE -_-GAS E _ iN i� N DaoSED E,SENEt„ O G RDDEN,a.E ,PORT - - --- -i T— C- P,SENF , aE aPL a — I.G E—DR SP,DE ' A- RE R LTER our ET eEa",T BDREPI-ROMCau,D —E - -- - - -- Ex srmc con.oua INaoRI ,ENROaeRV eaiDCE —E.N c urnox Etrra,r,ce f� "D NO. DATE DESCRIPTION ENO, DRAWN CHK, DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR _ AK - - — 58 LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS JOHNSTON, DRAWN BV: NF CHECKED BY: APPROVED BY: SCALE: APPROVED DC JOB NO. 39911024 DATE: 0123113 DRAWING NO: SHEET ] OF 52 REv 1 W_ SBLW- SEC -EC -031 $ I ccI ,IP, PFO -Y 1 ' 1 V 1 1 16(C ' V 1 I I V Ea ; I a, ACCESS ROAD # 9 1 / ; O tiv r ACCESS ROAD # 9 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URSC B�firoon -NmhC -2243 NorN C R Li • C -223 0121 Piedmont Natural Gas -° N A1111111A1 __ — Pusuc `Taco ;oLR.E suPER Sat FENCE ----- c;ns -s- a Q — .— .— .—. — s EDE —NErn O DDENTR.E iT T IN. TaEN11 PLID EcE —AND CDIE F11E1 D ET ­_R R EPRF0a,,c.N,DEDRE - - - -- E.1—c NT R 1.10R� .ENP _.,.aDDE �.�.. -TRE.N ® c� 1-11 11NCe NO. DATE DESCRIPTION ENO. DRAWN CHK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR - - 58 LOOP - WEST EROSION CONTROL P LAN ACCESS ROADS JOHNSTON NC. DRAWN BY: NF CHECKED Sr. APPROVED BY, SR DC 1' - 60' JOB NO. 39911024 GATE: 0123/13 DRAW NG NO: REV. SBLW- SEC-EC-032 SHEET 31 OF 52 1 1 r 1 W I ??4 !IJ � � 1 o c �41 • fype p NDi^izn ,.•�..�,•...�.,.,.,,,..�.....-. I I ACCESS ROAD'`# 10� l t �41 - ,. •� ' v� i a� \ �a G \ WE TLA711D WG211 f TYPO PFD AR #10 z. Ca F DApTCHLINE . :�� WffIAIO DRIN�ATIOM JD O vPe P�'. ' 'tie,, �..��'° .�'°"'�� \ • t s MATCHLINE AR #10 WErLaNO�v�jD "• PFO" A F ACCESS ROAD #_10 F s i .. D 30 60' � 120. . Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS �� URS CorpomboD -Norm Carolina North C..h- Liana t C -2243 0111 Piedmont Natural G a s fA� Mr a -- - ry —..� B ER C — —ER Gal FEIICE �® A ... ROnO �A*-* PR _. sa�TVaE ,RoP_ -L so LOE01E/. o Q RROROBEDE,sENE1r1 � -T NT - " "" Qi _ p RE" Ro,DG -- R.R.woRRSa.cE .NO CORE FI-TERODnET ® aNA. GORE PIT FOR j_ ..RE - - Exs GCO "TOUR INn�ow .ENaOR.RV Ba DGE .�.. sTRE "N ®N U_Err ANCe O. DATE DEBC0.IPTION ENG, DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK- SB LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN BY: NF CHECKED BY: SR APPROVED BY: SCALE: 1' 60' JOB NO. 3991102/ DATE: 0123/13 DRAWING NO: SHEET 3t OF 52 REV 1 5BLW- SEC -EC -033 0 0 0 I:3 551 m MT FENS[JTTR) O 0 ._ INETLANO DELINEATION •/ - ,WE TLANDw x101 TYPe tRLr FEru�rR.) � R i ACCESS ROAD # 10 IS YYITLAND DEUNEATION na WE,Tt'AND waI� NRORARY CONSTRUCTION ENTMNOe (TYR.) Ys yp pF0 •�s �� O Y / 1 i f • -" W IMD waT�3 s ACCESS ROAD # 10 ;,: '�jNETLANL1.a ;10r . • rypaPFO: !.. Yf�Yf• 7W Nh wa P2 Type ),FO .. A 0 O 0 30 60 i. 120 f NOTES LEGEND 3 REVISIONS .. .... YJE LAND.i o2 r -ype�PFO DRAWINGS URS CorpouGOn - NorEt cumina North GrolinE Lieens• E C -2243 r6111 Piedmont Natural Gas f_Yf EWETLAND [.102 e PFO _ .. PRROO— 'I- � —A� vrr[R exc �Fy s Go- RvuNE Fueuc Row ^ — w >ER slit FeTrcE — 4DIL .� SAS -� --t+.— FR a - ail N I,TwBRYMR T O 'RE .C. -- ENPCPnRV wORxBPxDE Q FMOFOGEAGENNEI G BOnBa F NDBDBE 1— FAT R T RE E oDTte �« E o - - - - - -- ews.m, cox.OUR ;N.,IORI TENFORIN, BRIDGE —E- — c ucTloR 111—ce ® H NO. DATE 551 m MT FENS[JTTR) O 0 ._ INETLANO DELINEATION •/ - ,WE TLANDw x101 TYPe tRLr FEru�rR.) � R i ACCESS ROAD # 10 IS YYITLAND DEUNEATION na WE,Tt'AND waI� NRORARY CONSTRUCTION ENTMNOe (TYR.) Ys yp pF0 •�s �� O Y / 1 i f • -" W IMD waT�3 s ACCESS ROAD # 10 ;,: '�jNETLANL1.a ;10r . • rypaPFO: !.. Yf�Yf• 7W Nh wa P2 Type ),FO .. A 0 O 0 30 60 i. 120 f NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS CorpouGOn - NorEt cumina North GrolinE Lieens• E C -2243 r6111 Piedmont Natural Gas .. PRROO— 'I- � —A� vrr[R exc �Fy s Go- RvuNE Fueuc Row ^ — w >ER slit FeTrcE — 4DIL .� SAS -� --t+.— FR a - ail N I,TwBRYMR T O 'RE .C. -- ENPCPnRV wORxBPxDE Q FMOFOGEAGENNEI G BOnBa F NDBDBE 1— FAT R T RE E oDTte �« E o - - - - - -- ews.m, cox.OUR ;N.,IORI TENFORIN, BRIDGE —E- — c ucTloR 111—ce ® H NO. DATE DESCRIPTION ENO. DRAWN CNK. DRAWING NO. TITLE 1 0123/tJ ISSUED FOR APPROVAL NF SR AK- - SB LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. I DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE. SR DC 1• 60' JOB NO. 39911024 DATE: 0123/13 DRAWING NO REv 5BLW- SEC -EC -034 SHEET 39 OF 52 , I TAR D'.W213 � ✓ � < .^ .., WET lq D wa 201 I I 31 Peer O ) i 8 •I O I � E MATCHLINE 420 I' f ACCESS ROAD # 11 W.F -T LA�N k W21 2 P. 111 Nv- � narR,' D V U ePrO. t�to«w�it201 i TENIOIRARY CON! OON ENTRANCE IM.1� KaE uLr �e 1rrR1 "" A n C, O ACCESS ROAD # 11 N #/ 30 so 120 m" Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS DROBC orporation - NorE+ Carolina N rN CErogna Licenaa 4 C -2243 0111 P i e d m o n t Natural Gas �—,.� WrEga^q RT. ^qv „,-. s Nca LINE _ euvea s�T cE ++cE PUBLIC ROM sOILTVPE case so�OEUIE ^now oPOSEO E,SENEI,T O NOD ENrRV, —IT POINT _ - - -_ IX wORKaq^ E 4 P,q ^R n ^NO aERN.T aoREPTTOR� NINoa�RE - -- - - -- EziIT— CONTOUR (N OR) TENPORZRr eq�OCE + sqE ^N c ucTloNErrrR ^Nw ®� NO. DATE DESCRIPTION ENO. DRAMR+ CNK. DRAYJINO NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR - ' , . -- - - 5B LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' JOB NO. 39911024 OATE: 0123/13 DRAWING NO: 5BLW- SEC -EC -035 SHEET 40 OF 52 REV 1 QOS / $ t / 7 /OPg / / `"'"'°»„.�.„,m,w -• ' "� / S GPS GPS I /I^ /GPS / I /GPS / S /c CIO k G/ � i .�...m«,•e�, ""' ��,..+._ �.., �..+. m..-. n,..„.. �.,.,. ...�..._.r.w.«.....w»,+,w+ >m`°" ...w ",+ems. ACCESS ROAD # 12 TEMPORARY CONSTRUCTION ENTMNCE IWA) O O 1 !C \ \\ 1 1 I1 -n \ q =' p- V 14 iNETiAPID'VJ10" 3f I \ \ \ Q i1•TYPk P SIS' TEMW MRY CONf1A�UCTION ENTRANCE ITYP.1 fi �j it z 1 ( e ACCESS ROAD # 13 I f I 0 30 60 120 Y Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation - NoM Carolina North Carolina L-nm t C -2243 0121 Piedmont Natural Gas ACCE65 aoA0 — w'EaBxR uNE Co DNTreounoARr LINE tiP� LT RENCE CAD —aar— .1ER sic* ­ICE M000sE CL _ —L-RE — •- cAS -rE E E ILD .N o EL E RROROEDEAEEMENT „a:,OD,NT O DD T TEMP CE,� R- TaEND „RLDO EMPDaA EASE. -SaACE YE AND C=RERLTEROUTLET MBER MAT BORE RT EOa JACAND BORE ECONTOUR,Me RI TEMaoRARV Ba DcB .PR..�.. STREAM c UcT'ON E ANCE ® "D NO. DATE DESCRIPTION ENO. DRAWN CHK. DRAWNONO. TITLE 1 0123717 ISSUED FOR APPROVAL NF SR AK 5B LOOP -WEST EROSION CONTROL PLAN ACCESS ROADS WAYNE NC a DRAWN BY: NIF CHECKED BY: APPROVED BY: SCALE: SR DC 1' a 60' JOB NO. 3991102! DATE: 01/23!13 DRAWING NO: SHEET 41 OF 62 REV 1 6BLW- SEC -EC -036 v `GAS `Gat \ `\`' ` - \ r— 3CL DELOIEATION aw) � z GAS` \ �.\ BORE PR FOR. K — t AND BORE RM..) 0 AS \ w GPg 0 r \ AS ' ------ \ V G i PS ., GPS GP`s GIs PERMANENT ACCESS ROAD # 13A OI TEYPORARr asnfrh �' � °"" � ���J CONO TRUCKN ENTRANCE RP) ` „,1_ 0 30 60 120 Feet NOTES LEGEND REVISIONS I REFERENCE DRAWINGS L VRS Go,mkf L,,nmN C -2243 North C=mYry Lb®ns� i C -2213 Piedmont Natural Gas weLic ROSO mow' —TE"" ARV uHe —71— suRER su cEHce --- GM� _ soanvE A�� = sal I, noH I no EN R.�ITPOIH - - -- T __ O REH "R n EN R EIr RounET BORE T., "o � E E r,EER N,T oRE R T EoR,.o.,No EX-3c Nu rNA-1 re.woReR —o' a _T_AM c o—o" Ern_r ®" NO. DATE DES RrPTION ENG, DRAWN CHK DRAWING NO TITLE 1 01123/13 ISSUED FOR APPROVAL NF SR AK_ 5S LOOP - WEST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN 8V: NF CHECKED BY: APPROVED BV: SCALE: SR DC 1" = 60' JOB NO. 39911024 DATE: 0123!13 DRAWING NO: REv 66LW- SEC -EC -037 SHEET 42 OF 62 1 BALES Cl. A.R— �E 81M1'IFE NC CEP4RT'1EI�T OF �.AN6P0R -A.JO d . J CFO ER ER75 - -'- DEED : 6 158 ' d PA CE b�1'SJd IS ER E L. PA W1 IA - L COUNTY 111, -111 GEED 1 E7. 2 7R SYKES FRah'B -EG PARCELS- 95794 L - D^_669L]5 F CEL 3601495]52 " 5`�KES FRANK /E G - Ta _ FA�EL a601 j99]50 _- HOYJE.LLEDNAL-CC DEED -4 -,. 35 a v ES FRANKIEG FAICEL? �..._- ' b'�.3 EAR 3 E906 1 COJNY OF -:AYN �b� VVC RLEYMCLVNALAN GE 916.02.0 r - -DEED 24 0 �a l.- -'I P - -. FI. FCEL!LCI -09.5'24 / � _ AR OEL 350 5 - r ' TILC!^R sif. 6 WIL IANI IRRS SALL5 DONP DGSLY ALTA C DEED 1 ' VAr J:E ]EER.O .,a C ED 0.934 4E DEED 1E .. .]6 PA C L3 0 ,_6 «. PARCEL 3001 „]n5,T - PARCEL 3 J »4B6 PARCEL 3501 JO5M5 l; E'WI LIAM 56, t'Td_ I CEEp 3520 4Pvv o_ - � J !PARCEL 360'4fa45rEE lI.LLIPM ERF'.NK +� i DEED 26 456 RE'NER BO BEY 8'4 - r RAIC 6� 19 ?-9 _ DEED JL92- N C_ RY 9R AVT JR - PA RCEL_6,._., + -'•' ' Y DEED 05'2 Cr4 _ _ �"LL AV PFAAN A'iJ -A RCEL 361149 3U "024 -456 d _ FAR— E111 B. ! ^JR i , AIL. ANM FRAKF CC— NRy ERYAN R... a C Cx 11 1 £DEEC 26_4 -655 DE D 912 -09^ IPA.R 1114562 -i - PAIDE- 0 -a 256 X26 - D$ NATHAN IELP -. PkR _1360'I594Z`9 d __ 1DE ED '6E2032 'EE - N'LLIAM 9, DOSSGNSPTHJRLB�t FE - �AROEL 360149 Y C D26 4 -6l'. DA. L_N OHNNY E i DEED 1 083 _ rd PARCEL 36DI499 }10 DI- D1,6224f1 JPAICE 36.:,69212$ 'Y+ -A RCEL ­1 LEE 1V "_LIAA9 FRANK L__ Jr'ILLIA f ERA' 131E '4. IP.I ER All d - PPC CED 2624p DEED 2'o2445n _D 2624.iG'c, i. _ ..6_,j1., Cad EP... 360'55.4. <�. _L 1160 1 '93 :5.= '... - NOTES LEGEND REVISIONS REFERENCE DRAWINGS � 0111 wnTER R,a NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE Piedmont - --sa —� a 1 01f23/13 ISSUED FOR APPROVAL NF SR Prune N. C ..I,DSOn - se V C- 243 Natural Gas s.1PER sLT FENCE NoM Carolina Litensa � C -2743 — GAIII.0 MOECSED CL saLTIPE cns F E, ,N m, of ,n T,on 5B LOOP - WEST D RR G HDDENTRI— TP -INT EROSION CONTROL PLAN IX w«Rm, E ® COREF 01OOLET Ga R LAYDOWN YARD AETL D � WAYNE, NC. N6EPN,T REPTF. «,wK N .. E - D.noaP INUOPI IN, - DRAWN BY CHECKED BY: APPROVED BY: SCALE: ....�.. IRE- c _ - TI— ETk,NCe NF SR DC 1' = 100' ® H00 SHEET 43 OF 52 JOB NO. 39911024 DATE: DRAWING NO: REv 01/23/2013 SBLW- SEC- EC -03E 1 - 6 600D11EAa BOBBY G _ DEED 14-]]6 - EH11EL96C_ C C - MCC:$, E`I CONALD'.hl iAM58'S^:M G ' .RCEL 36024053:oy 36'-,4 7 - FO JE "C 1-T COI. -'LP 48 W KIP.•BEF i it y - -- _ _. F KRN C CER6ETTYk •IC : :d - -_ A P v P K C DO 6�39 - s LEEC v5 v , ,d sd BF �. VEe DF RP , E F.TrJvt ,.E H R 8 tN/FE GOOD ".R B G L Jr RGSE^ B EED �?1 d DEED 16 J3ofi p p ICE 6.._ J�115I PCEL3A0 4C166'6 PARCEL 1 - -� LARK GERALD B B':J;'� _ CV✓IGFT .: 4+ . _ I I'EFRYLr -fiRI C Z Z • '� ' L .PADRE CD 1 Y14-1, KE; N O 8 V" �-o7O7- 1 ................ .. d P DEE \ 1 P PARCEL 3302- ^5596 ". PERRY ­00C C B':h4 FEAY' r � DEED j932 2G3 GOODEEAR BOBBY G - - _ a ^ _E[360 91 i : ED 2LEA DEED OITD 611 E _D 6 ! ! f•.E,M84EEP L -� CAMPaE'LSA C C LB 5�DCRQTFY Dc D2Ji1 155 rL D DEED 2114-557 q• F F4. N. G N JCACE L a a - _ _aM ? ?BELL R '.JEL€ W —THY H HC',VE D'79 RE ?R? R TJl1.G a HO'f.E LL EDNA -EE S R DE a' nr DF VJP:='JE DEED 16]_2]6 PA RCEL S6C'456523 LAYDOWN YARD D WEL_S GEkE A . B GARY B-, J - t.{4 ACRES P PARCEL 3601 3396]3 C CI - - DEED : 6 158 ' d PA CE b�1'SJd IS ER E L. PA W1 IA - L COUNTY 111, -111 GEED 1 E7. 2 7R SYKES FRah'B -EG PARCELS- 95794 L - D^_669L]5 F CEL 3601495]52 " 5`�KES FRANK /E G - Ta _ FA�EL a601 j99]50 _- HOYJE.LLEDNAL-CC DEED -4 -,. 35 a v ES FRANKIEG FAICEL? �..._- ' b'�.3 EAR 3 E906 1 COJNY OF -:AYN �b� VVC RLEYMCLVNALAN GE 916.02.0 r - -DEED 24 0 �a l.- -'I P - -. FI. FCEL!LCI -09.5'24 / � _ AR OEL 350 5 - r ' TILC!^R sif. 6 WIL IANI IRRS SALL5 DONP DGSLY ALTA C DEED 1 ' VAr J:E ]EER.O .,a C ED 0.934 4E DEED 1E .. .]6 PA C L3 0 ,_6 «. PARCEL 3001 „]n5,T - PARCEL 3 J »4B6 PARCEL 3501 JO5M5 l; E'WI LIAM 56, t'Td_ I CEEp 3520 4Pvv o_ - � J !PARCEL 360'4fa45rEE lI.LLIPM ERF'.NK +� i DEED 26 456 RE'NER BO BEY 8'4 - r RAIC 6� 19 ?-9 _ DEED JL92- N C_ RY 9R AVT JR - PA RCEL_6,._., + -'•' ' Y DEED 05'2 Cr4 _ _ �"LL AV PFAAN A'iJ -A RCEL 361149 3U "024 -456 d _ FAR— E111 B. ! ^JR i , AIL. ANM FRAKF CC— NRy ERYAN R... a C Cx 11 1 £DEEC 26_4 -655 DE D 912 -09^ IPA.R 1114562 -i - PAIDE- 0 -a 256 X26 - D$ NATHAN IELP -. PkR _1360'I594Z`9 d __ 1DE ED '6E2032 'EE - N'LLIAM 9, DOSSGNSPTHJRLB�t FE - �AROEL 360149 Y C D26 4 -6l'. DA. L_N OHNNY E i DEED 1 083 _ rd PARCEL 36DI499 }10 DI- D1,6224f1 JPAICE 36.:,69212$ 'Y+ -A RCEL ­1 LEE 1V "_LIAA9 FRANK L__ Jr'ILLIA f ERA' 131E '4. IP.I ER All d - PPC CED 2624p DEED 2'o2445n _D 2624.iG'c, i. _ ..6_,j1., Cad EP... 360'55.4. <�. _L 1160 1 '93 :5.= '... - NOTES LEGEND REVISIONS REFERENCE DRAWINGS � 0111 wnTER R,a NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE Piedmont - --sa —� a 1 01f23/13 ISSUED FOR APPROVAL NF SR Prune N. C ..I,DSOn - se V C- 243 Natural Gas s.1PER sLT FENCE NoM Carolina Litensa � C -2743 — GAIII.0 MOECSED CL saLTIPE cns F E, ,N m, of ,n T,on 5B LOOP - WEST D RR G HDDENTRI— TP -INT EROSION CONTROL PLAN IX w«Rm, E ® COREF 01OOLET Ga R LAYDOWN YARD AETL D � WAYNE, NC. N6EPN,T REPTF. «,wK N .. E - D.noaP INUOPI IN, - DRAWN BY CHECKED BY: APPROVED BY: SCALE: ....�.. IRE- c _ - TI— ETk,NCe NF SR DC 1' = 100' ® H00 SHEET 43 OF 52 JOB NO. 39911024 DATE: DRAWING NO: REv 01/23/2013 SBLW- SEC- EC -03E 1 STEP 1 ARRANGE HAY BALES OVER GEOTEXTILE FABRIC ON LEVEL LAND TIGHTLY PACKED AS SHOWN TO COVER AN AREA APPROXIMATELY 12' . 12' INSTALL ON THE NOTES: I- WHERE POSSIBLE STRUCTURE SHALL BE PLACED ON A LEVEL. HELL VEGETA SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WON 2. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF DEWAT STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN b HOURS AFTER DEWATIL-n OPERATIONS ARE COMPLETE. }, STRUCTURE SHOULD BE POSITIONED SUCH THAT WATER WILL NOT FLOW INTO ANY WETLANDS OR WATERBODIES. 5TEP 3 INSTALL SEDIMENT BARRIER, IF REWIRED BY COMPANY REPRESENTATIVE. AROUND ENTIRE HAY BALE STRUCTURE AS SHOWN. DEWATERING STRUCTURE Ds.� TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. j STEP 4 INSTALL ANOTHER LAYER OF HAY BALES ON THE OUTSIDE OF THE SEDIMENT BARRIER AND SECURE IN PLACE BY DRIVING REBAR OR WOODEN STAKE THROUGH EACH OF THE OUTER HAY BALES. (STAKES NOT SHOWN FOR CLARITY PURPOSES) NOTES DISCHARGE NOSE SEDIMENT BARRIER 1. SEDIMENT BARRIRS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES SPOIL PILE IBM (D SLOPE SIDE) (�') OF WORN AREAS MID STAGING AREAS SUCH THAT NO HEAVY SILT LADEN WATER ENTERS THE SPOIL PILE WATERBODY ON LEAVES THE CONSTRUCTION RIGHT -OF -WAY _WATERBOOY BALK (TYP) 2 HARD DITCH PLUGS MUST REMAIN N PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE - 3 DITCH FROM THE WATERBDOY CROSSING UNTIL THE .111 1 CROSSING 11 INSTALLED AND BACKFIUED. EQUIPMENT OPERATING N DE WATERBODY SHALL BE DOTED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSNNG (BEC). PUMP (SEE NOTE S) 4. STAGING AREA(S) FOR WAIERIMY aMSNG(% MEN REQUIRED. 94ALL BE LOCATED AT LEAST 1fEN01 PLUG (1P) ROD RID (� 5D FEET FROM WATER'S EDGE AND SHALL BE (SEA HIDE e) (� NOTE 0 OF A MINIMUM 9S NEEDED FOR CONVENIENT PREPARATION. S. IMPLEMENTATION OF TIE DAN - AND -HAP CROSSING METED MUST MEET THE FOLLOWING PERFORMANCE CRNERM: (A) USE SUFTICENT PUMPS, INCLUDING ON -SITE BACKUP PUMPS, TO MAINTAIN DOWNSTREAM FLOWS. DIVISION (B) CONSTRUCT DAMS WITH MATERIALS THAT PREVENT SEDIMENT AND OTHER POLLUTANTS FROM E14TERM THE WATERBODY (E.G.. SANDBAGS OR CLEAN GRAVEL WIN MASTIC LINER). (4[ NOTE / I) (C) SCREEN PUP NTAKEk ERSIOII (E) MOMTORT STREAMBED SCOUR AT PUMP DISCHARGE. (SEE HIDE / THE D AND ION A PUMPS TO ENSURE PROPER OPERATION THROUGHOUT THE ,6 (S >! V I I I FILTER/SCREEN WATERBODY CROSSING S I 8. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DALY AND SANDBAGS WITH REPAIRED IF NECESSARY. MASTIC LINER TO I INSTALL REMOVABLE EA SEDIMENT 7, INSTALL DIVERSION TRENCHES AT THE BASE O ALL SLOPES ADJACENT TO FORM UPSTREAM E BARBER O pWIVEABLE BERM DOWNSTREAM DAYS ACROSS ROADWAY THE WATERBODY. (SEE NOTE 5) 8. CHEMICALS, FUELS AND LUBRICATING OLS SHALL NOT BE STORED AND EQUIPMENT WATERBODY 1EIPORAR SIREN SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. Y QOCSSK (DEC) PER DETAIL 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DRER90d (SEE TOE E 3) OF WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ------- ACCUMULATED TRENCH WATER OUT OF THE WATERBODY. M 10. CONTRACTOR SHALL POSTPONE GRADING O RIGHT -CF -WAY ADJACENT TO WA09MY PLAN UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. SCALE: N.T.S. DAM AND PUMP CROSSING DPx TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. NOTES REFERENCE DRAWINGS DRAWING NO. TITLE 9 PIPE SMALL BE WELDED M A T E R I AL S U M M A R Y 1 R E V I S I O N S DESCRIPTION I CITY (ACTUAL) NO. I DATE I BY I DESCRIPTION INSTALL GEOTEXTILE FABRIC COMPLETELY 2 LAYERS EE 2 . 2 . 1 BENEATH ENTIRE DEWATERING SECURELY TIED BALES OF STRUCTURE AS SHOWN TO HAY OR STRAW PREVENT SCOURING INSTALL A LAYER OF 'HIGH ETRCENCY IRS AR FILTER MEDIA' BEPIEEN ROWS O NAY OR STRAW BALES. SECTO Y . 2' WOODEN STAKE (TYP.) NOTE STAKES SECURING -HIGH EFFICIENCY 865 AIR FILTER MEDIA- AND CHICKEN WARE FENCE ARE NOT SHOWN FOR CLARITY PURPOSES. NOTES 1. STRUCTURE SHALL BE PLACED ON A LEVEL WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY YORK AREAS. 2. FLOW RATES THROUGH DISCHARGE AND DVERTOR PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW. 3. WHERE CONDITIONS WARRANT A 30 . 30' RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY BE VARIED DEPENDING UPON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 48 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE e. -HIGH EFFICIENCY 865 AIR FILTER MEDIA- CAN BE PURCHASED FROM THE FOLLOWING: UNITED AIR FILTER COMPANY 1000 WEST PALMER STREET CHARLOTTE, NORTH CAROLINA 28234 (704) 334 -5311 HYDROSTATIC DEWATERING STRUCTURE tAaa TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. UR.S Piedmont URS CpPam N111 Natural Gas NOM CarafnR Lilsms Y G2243 UONDAIG 43 56 LOOP - WEST SOIL EROSION AK: CONTROL DETAILS NORTH CAROLINA DRAWN ITT: CHECKED W: APPROVED M: SCAT OHW SR DC NO. 39411024 ��'01 /23/13 58LW- No SHEET 44 OF 52 SEC-DTI _M, W y CONSIR D I R.O.W. e rt Ne A A REMOVABLE SEDIMENT smIMDHT BARRI =_ %xEn,no BARRU (SEE NOTE 1) - � WRWD MFffR Wr u SEDIMENT BARItER ,I, SEdA9NT `z (SEE NOTE {) ] REMOVABLE SEDIMENT SEDIMENT 51YCUT tcPSOa s BuDRIn • -1M1L ,, RA"MR — S BARRIER (SEE NOTE i) I R —_ S� 1p. ,�. .JI, 10' MH SoDNENr 4 BARRIER WOOING SIDE ] TOR SOa INNER EWPIENT MATS YaIL Ytt �F CONSTRUCTION sPaa - - — PROPOSED PPEUNE WORK CORRIDOR NBtAWRICAtFD E - - SLIDER CROSS SECTION D SCALE: N.T.S. WETUxc sECIUENr —RER EVERSION TERRACE (SEE NOTE 2) CROSS SECTION — — SCALE: N.T.S. AL ro) —_ — sruL TRENCH PLUG vA�FK (SEE NOTE J) 311 uATs DIVERSION TERRACE.- PLAN VIEW (3E NOTE 2) SCALE: N.T.S. > EgnvuDNT enc%HOE CONSTRUCTION PROCEDURE NOTES TS PLAN WETLAND BOUNDARY (BNONE S) 1, FLAG WETLAND BOUNDARIES AND INSTALL BOUNDARY SIGNS PRIOR TO CLCARING PLAN VIEW 2. NO OVERNIGHT PARKING OR REFUELING OF MOBILE EQUIPMENT IS ALLOWED WITHIN 100 FEET OF WETLAND. PLACE 'NO FUELING CONSTRUCTION PROCEDURE NOTES SCALE: N.T.S. SIGN POSTS 100 MT BACK FROM WETLAND BOUNDARY. REFUEL STATIONARY EQUIPMENT AS PER SPCC PLAN. 'IU9FR KAT EMTIS_N RAMP 1. MG WETLAND BOUNDARIES AND INSTALL WETLAND BOUNDARY SIGNS PRIOR TO CLEARING. G INSTALL TEMPORARY SLOPE BREAKERS UPSLOPE OF WETLAND BOUNDARIES AS SHOWN ON DRAWINGS AND SPECIFlCATONS 2. NO OVERNIGHT PARKING OR REFUELING OF NOBLE EQUIPMENT IS ALLOWED WTHBN 100 FEET OF NOTES INSTALL PRFFABNCAMD EQUIPMENT MATS THROUGN ENTIRE WETLAND AREA ON THE WU16(NG SIDE OF THE CONSTRUCTION {' — WETLAND. PLACE -ND FUELING' SIGN POSTS 100 FEET BACK FROM WETLAND CORRIDOR. BOUNDARY. REFUEL STATIONARY EQUIPMENT AS PER SPCC PLAN. 1. INSTALL REMOVABLE SEDIMENT BARRIERS OR DRIVEABLE BERMS ACROSS THE TRAVEL LANE AT BOTH 5. AVOID ADJACENT WETLANDS. INSTALL SEDIMENT BARRIERS AT OUTER BOUNDARIES OF THE WETLAND. INSTALL SEDIMENT 1. INSTALL TEMPORARY SLOPE BREAKERS UIPSLOPE OF WETLAND BOUNDARIES AS SHORN ON DRAWNGS AND SPECIFICATIONS. WETLAND BOUNDARIES. THE REMOVABLE SEDIMENT BARRIERS CAN BE REMOVED DURING THE CONSTRUCTION DAY, BARRIERS ALONG THE EDGE OF THE SPOIL SIDE OF THE CONSTRUCTION CORRIDOR THROUGH THE WETLAND AND ALONG BUT MUST BE RE- INSTALLED AFTER CONSTRUCTION HAS STOPPED FOR THE DAY AND /OR WHEN HEAVY THE DOWNSLOPE EDGE OF THE WETLAND. F THE DOWNSLOPE EDGE OF THE WETLAND IS TIE SPELL SIDE. THEN SEDIMENT PROPLE 4. AVOID ADJACENT WETLANDS. INSTALL SEDIMENT BARRIERS AT OUTER BOUNDARIES OF WETLAND AND ALONG BOTH WETLAND EDGES. PRECIPITATION IS IMMINENT. BARRIERS ARE NOT REQUIRED ON THE WOOING SIDE OF THE CORRID UNLESS EQUIPMENT TRAVERSING THROUGH THE WERAND CAUSES SPOIL AND SEDIMENT TO EMT THE CONSIRUCTCN CORRIDOR. 5. UNIT PUUJNG OF TREE STUMPS AND GRADING ACTIVITIES TO DIRECTLY OVER TRENCNUNE. DO NOT GRADE OR REMOVE 2. NSTALL DIVERSION TERRACES IMMEDIATELY UPSLOPE OF BOTH WETLAND BOUNDARIES TO PREVENT SEDIMENT FROM 6. UNIT PULLING OF TREE STUMPS AND GRADING ACTIVITIES TO DIRECTLY OVER THE TRENCHLNE. DO NOT GRADE OR STAMPS OR ROOT SYSTEMS FROM THE REST OF THE RIGHT -OF -WAY IN WETLANDS UNLESS THE Guff INSPECTOR AND ENTERING THE WETLAND. REMOTE STUMPS OR ROOT SYSTEMS FROM THE REST OF THE RIGHT -OF -WAY IN WETLANDS UNLESS THE CHIEF INSPECTOR COMPANY ENVIRONMENTAL INSPECTOR DETERMINE THAT SAFTY- RELATED CONSTRUCTION CONSTRAINTS REQUIRE REMOVAL OF COMPANY ENVIRONMENTAL NSPECTOR DETERMINE THAT SAFTY RELATED CONSTRUCTION CONSTRAINTS REQUIRE REMOVAL OF TREE STUMPS FROM UNDER THE WORKING SIDE OF THE RIGHT -OF-WAY. 3, INSTALL TRENCH PLUGS AT BOTH V£TLAND BOUNDARIES TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS AND TREE STUMPS FROM UNDER THE WORKING SIDE Of THE RIGHT -OF -WAY. NOTES 1, PERIODICALLY CHECK INSTALLATION AND REMOVE BULD -UP OF SEDIMENT OR 6. TOPSOIL STRIPPING SHALL NOT BE REQUIRED IN SATURATED SOIL CONDITIONS. OF THE PIPELINE TRENCH AMD TO KEEP ANY ACCUMULATED UPLAND TRENCH WATER OUT OF WETLAND. CONDUCT TRENCH UK TOPSOIL STOPPING (If TOPSOIL IS NOT SATURATED). SALVAGE TOPSOIL TO ACTUAL DEPTH 7. OR A MAXIMUM DEPTH a 12 IN TRIP A$ DETERMINED BY THE COMPANY ENVIRONMENTAL INSPECTOR. SEGREGATED TOPSOIL OEBRNS. 2. MATERIALS PLACED N WETLANDS SHALL BE COMPLETELY REMOVED DURING T. UTILIZE AMPHIBIOUS EXCAVATORS (PONTOON MOUNTED BAO(XOES) OR TRACKED BACKHOES SUPPORTED BY PREFABRICATED 4. FOR TYPE 11 (- SATURATED -) AND TYPE IN (- FLOODED -) WETLANDS, INSTALL SEDIMENT BARRIERS AT WETLAND PRE MAY BE LOCATED ON SPOIL SIDE. AS REQUIRED. FINAL CLEAN -UP. REMOVAL OF THIS STRUCTURE IS NOT CONTINGENT UPON EQUIPMENT MATS OR FLOAM TO EKCAVATE TRENCH. F PREFABRICATED EQUIPMENT MATS ARE USED FOR STABILIZATION, BOUNDARIES AND ALONG BOTH WETLAND EDGES FOR TYPE 1 DRY WETLANDS, INSTALL SEDIMENT BARRIERS )THE d LEAVE HARD PLUGS AT 111E EDGES di WETLAND UNTIL RUST PRIOR TO TRENCHING, ESTABLISHMENT OF PERMANENT VEGETATION. ME BACKHOE SHALL GRADUALLY MOVE ACROSS THE WETLAND BY MOVING THE MATS FROM IMMEDIATELY BEHIND TO IN N FRONT OF THE BAOKHOFS PAM. AT METLANO BOUNDARIES, ALpJC THE EDGE OF ONE SPOIL SIDE OF CONSTRUCTION CORRIDOR AND ALONG THE DOWNSLOPE EDGE OF THE WETLAND. IF THE DOWNSLOPE EDGE OF THE WETLAND IS THE SPOIL SIDE, THEN S. TRENCHING THRQNGH WETLANDS MAY PROCEDE WHEN THE PIPE SECTI ON IS FABRICATED AND READY TO LAY. ONCE TRENCHING 1 li A WAIERBODV IS LOCATED WTHM A WETLAND SYSTEM, EXTEND TIMBER EQUIPMENT MATS TO THE BRIDGE EQUIPMENT CROSSING (KC) USED TO CROSS ME 8. FABRICATE PPE IN A STAGING AREA OUTSIDE THE TYPE IN WETLAND AS INDICATED ON TIE CONSTRWIICN DRAWINGS SEDIMENT BARRIERS ARE NOT REWIRED ON THE WORKING SIDE OF THE CORRIDOR UNLESS EQUIPMENT COMMENCES. CONSTRUCTION THROUGH THE WETLAND IS TO PROCEOE CONTINUOUSLY UNTIL THE CROSSING IS COMPLETED. NMTERBCDY IN ORDER TO ALLOW FOR CONTINUOUS TIMBER EQUIPNENT MAT COVERAGE NO CONCRETE COATING ACTIVITY WITHIN 1DO FEET OF WETLAND BOUNDARY, UNLESS APPROVED BY COMPANY TRAVERSING THROUGH THE WETLAND CAUSES SPOIL AND SEDIMENT TO EXIT THE CONSTRUCTION CORRIDOR. BACKFLLED AND RESTORED IN ORDER TO MINIMIZE THE LENGTH Of TIME THE TRENCH IS OPEN. THROWN THE WETLAND AND WATERSODY AREA. ENVIRONMENTAL INSPECTOR. 1O PIPE SECTION MAY BE FABRICATED WITHIN THE WETLAND ADJACENT TO NPE TRENCH. OR IN STAGING AREA OUTSIDE THE 4. USE POORtLAL AT LAYERS 1a RAISE CROSSING ABOVE GRADE WHERE POOR SOIL CONDITIONS C %UST. S. LEAVE HARD PUGS AT THE EDGE OF TYPE NI WETLAND UNTIL JUST PRIOR TO PIPE PLACEMENT. INE 1_ 0 AND WALKED IN. NO CONCRETE COATING ACTIVITY WITHIN ROD FEET OF WETLAND BOUNDARY UNLESS APPROVED BY COMPANY ENVIRONMENTAL INSPECTOR. .CON 5 TUBER EQUIPMENT MATS SHALL EXTEND A ANNUM OF 10 FEET OUTSIDE 10. GLOAT PIPE IN PACE, LOWER -IN, INSTALL IAENOI PLUGS N ACCORDANCE WITH DRAWINGS AND SPECFICATOHS, 11' LOWER -IN PIPE. PRIOR TO BACK ILLNG TRENCH. INSTALL TRENCH PUGS IN ACCORDANCE WITH DRAWINGS AND OF THE WETLAND BOUNDARIES. AND BACKFLL 11. RESTORE GRADE TO NEAR PRE - CONSTRUCTION TOPOGRAPHY AND INSTALL PERMANENT EROSION CONTROL. SPEGFICATIONS. RESTORE GRADE TO NEAR PRE- CCNSTRWTON TOPOGRAPHY, REPLACE TOPSOIL AND INSTALL PERMANENT 6. NSTALL EARTHEN RAMP APPROACHES TO TIMBER EQUIPMENT MATS. EARTHEN RAMPS TO BE CONSTRUCTED OF UPL AND MATERIAL TOP SO4 SHAH NOT BE USED TO CONSTRUCT EARTHEN RAMPS. 12. REMOVE ANY MATS Ut1UZE0 TO SUPPORT AMPHIBIOUS EQUIPMENT FROM WETLANDS UPON COMPLETION 12' EROSION CONTROL. it WETLANDS CROSSED USING PUSH/PULL METHOD TEND TO BE TOO NET FOR EFFECTIVE SEEDING. HOWEVER. IF THE SITE /J' REMOVE PPABNCATED MATS FROM WETLANDS UPON COMPlF110N. , DRY ENOUGH AND F DIRECTED By THE ENVIRONMENTAL INSPECTOR, THE RIGHT -OF -WAY SHALL BE SEEDED IN ACCORDANCE WITH DRAWINGS. 14. SEED DISTURBED WETLANDS AREA AS OETERMNEO BY THE ENVIRONMENTAL INSPECTOR AND AS SHOWN ON DRAWINGS. WETLAND CROSSING CONFIGURATION WETLAND EQUIPMENT CROSSING TYPE III "FLOODED WETLAND" TYPE I "DRY WETLAND'' TEMPORARY EROSION CONTROL MEASURE (TYPE I, II AND III WETLANDS) INSTALLATION PROCEDURE INSTALLATION PROCEDURE SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. SIDE RAIL (M. BOTH SIDES t ll(�I �lll( �BR EOUPNENT UAT INDIES GEDTE %TIRE 1. TIMBER BRIDGES SHALL BE ADEQUATELY ANCHORED AT BOTH ENDS. FABNC 2 PERIODICALLY CHECK BRIDGE INSTALLATION AND REMOVE BUILD —UP OF SEDIMENT OR DEBRIS ON BRIDGE. I 1 BRDGE APPROACHES SHALL BE TIMBER EQUIPMENT MATS, SUREAU 4. MATERIALS PLACED ALONG STREAM CHANNEL SHALL BE COMPLETELY REMOVED DURING ` FINAL CLEAN—UP. REMOVAL OF THIS STRUCTURE IS NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION. USE CULVERT � �'' `1` S CULVERTS SHALL BE USED TO SUPPORT THE TUBER BRIDGE TO PREVENT US SCULVET "N'S" RRN101' SETTLEMENT OF THE BRIDGE. F THE GEOMETRY OF THE STREAM ALLOWS CULVERTS TO FOR SUCH INSTALLATION. THE TIMBER BRIDGE AND GEOTE %TILE FABRIC SHALL CONSIST OF REMAIN ABOVE THE WATER SURFACE ELEVATION AT ALL TIMES CLEAN USED PPE 6. SIDE RALS SHALL BE INSTALLED ON BOTH SIDES OF THE BRIDGE EQUIPMENT N 1 Y DINTS CROSSING IN ORDER TD PREVENT SEDIMENT FROM ENTERING THE WATERBODY. nQES AND RUST. SIDE RALS TO BE CONSTRUCTED OF PLVWDCO NAILED TO THE OUTER EDGES OF THE TIMBER EOUPNENT MATS SIE RALS T. TIMBER EQUIPMENT MATS SHALL EXTEND A MINIMUM OF 10 FEET OUTSIDE OF THE WATERBODY OR WETLAND BOUNDARIES. ilNER BA02 GEOIE%TILE FABRIC 10 BE PROfIL PLACED MEAT" °R'ID`E —� APPROACHES AND EXTEND MINDER TIMBER -- BRIDGE EQUIPMENT CROSSING E TEMPORARY EROSION CONTROL MEASURE UNLESS OTHERWISE INDICATED ON PLAN, CROSSING SHALL SNHL BE REMOVED AFTER COWRUCTION IS COMPLETED. SCALE: N.T.S. NOTES E F E R E N C E D RT I N C S MAT U M M A R Y R E V I S 1 0 UM Piedmont DRAWING NOR E ND DESCIRIPTIONS QTY (��) NO DATE BY IE5SCRIPTKNN URSCGWb.- W*Ceraw NO Natural Gas A 1/23/1 ST ISSUE FOR APPROVAL Nar1D CEMM Liron68 Y G2243 513 LOOP - WEST SOIL EROSION AK CONTROL DETAILS NORTH CAROLINA DRAWN Y. DHW CHECKED BY: APPROVED BY: SCALE: SR DC N.T.S. DATE: DRAWING NO: SHEET 45 OF 52 A JOB NO. 39911024 01/23/13 — — T — — — SEDWI BE OR ^ /— 133 L6./U6R FOOT SIM POST (TYPJ SEDIMENT BARKER (ASTM D 6161) -!law UNDISTURBED GROUND B. A END OF SEM09 BARBER E WDS OF Rte, $mMDil BAFFIER CpPACTED NM iOaTHER BAOLFRL FLOW POS1 TRENCH DETAIL (TYP HA>— BEGINNING OF SEDIMENT BARRIER OVERLAP DETAIL NOTES 1. SEDIMENT BARRIER SHALL BE INSTALLED TO FILTER SEDIMENT FROM SURFACE RUNOFF. 2. INSTALLATIONS SHALL BE PERIODICALLY CHECKED. THE SEDIMENT SHALL BE REMOVED WHEN IT REACHES 0.5 FEET IN HEIGHT AT SEDIMENT BARRIER. .1 SEDIMENT BARRIER SHALL BE LEFT IN PLACE UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. 4. SEDIMENT BARRIER SHALL BE REPLACED WHENEVER IT HAS DETERIORATED TO SUCH AN EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SEDIMENT BARRIER. 5. AREA DISTURBED AS A RESULT OF REMOVING THE SEDIMENT BARRIER SHALL BE RESTABIUZED BY BACKFLLING, COMPACTING, AND SEEDING IN ACCORDANCE WT14 THE REVECETATION PUN. S. SEDIMENT BARRIER SHALL BE PLACED TO FOLLOW (RUN PARALLEL TO) THE CONTOURS. 7. ON UPSLOPE INSTALLATIONS, BOTH ENDS OF THE SEDIMENT BARRIER SHALL BE TURNED AND EXTENDED UPSLOPE. & SEDIMENT BARRIER SHALL BE CONSTRUCTED A SYNTHETIC FILTER FABRIC OF A LEAST 95X BY WEIGHT OF POLYOLEFNS OR POLYESTER. WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USEABLE CONSTRUCTION UFE AT A TEMPERATURE RANGE OF 0 TO 120'F. SEDIMENT BARRIER TEMPORARY EROSIOM CONTROL MEASURE SCALE: N.T.S. NOTES dl PLAN CA" r FOLD BACK F -S* [ROBOn SEDRELY STAPLE CONTRA N RACE ONE FOOT BLAN(ET APMi SECTION A -A BLANLET WA ENAL ANT -WASH / GEO.OTE ' NORM AMERICAN GREW C122H • BELTON INDUSTRIES t TOP OF BANK i ANCHOR N ACCORDANCE I I EROSON CONTROL NM MANOFACIUMS ISTRUCTIO& ONE STARE i i BIAWET PER FOOT LENGTH FOLD RA 6" NABRAL GRgID FOLD BACK 1 " -r I SECURELY STAPLE N RACE EROSION INSTALL STAPLES D — BLANKET lr TO N" APART I ' BJN6Rl BLAWT)NA . I I T STARES SHALL Y I 14-GAUGE CIXD DRAIN �.,:J AS FO 3ors SPACED SECTION B —B IN A ` S IA FIRMED HO AS FOIEOMY LEA TH SHAPE NOT PUN HESS THAN It LENGTH Irs sD EMBANKMENT INSTALLATION '3R zs EB SHALL WIER WNNEL ANCHOR N ACCORDANCE F 80n0Y MIX RMG[TA70 WIN MAMFACTMIEII'S III M CHANNEL BOTTOM B NSIAIICRONS STAPLE PATTE x r x �a�. NAIUGL GROUND F1 0W TYPE O� 1 X LOW fL R t��X MED. HIGH O VELOCITY X X X D SECTION C -C IxST ALLABDx - x x X dMNxEL SS AN CHNEL INSTALLATION ADE n4M PATS/ OQ EROSION NOTES BIMRQT EROSION CONTROL BLANKETS SHALL EXTEND COMPLETELY ACROSS DISTURBED AREA TO BEAN TO PROTECT ERODIBLE SURFACES. THE SOIL SHALL BE PROPERLY PREPARED, SEEDED AND 6' f� 6' Ov" r MULCHED PRIOR TO INSTALLATION. NATURAL IPSLOP SCDNENi 6ARAE71 GROUND 14 � LIES INSTALL EROSION CONTROL BLANKETS ON FRESHLY GRADED EMBANKMENTS ON SLOPES IN a0 AND SECURELY EXCESS OF 3:1 (H: V) TO SUPPORT VEGETATION. STARE N RACE ! ALONG CHECK SLOE INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. ONE FOOT APART BLANKET SHALL BE LOOSELY INSTALLED AND TAMPED OR ROLLED IN PLACE AFTER INSTALLATION. STAPLES SHALL BE DRIVEN FLUSH WITH THE GROUND. SECTION D -D REFERENCE DRAWINGS DRAWING NO TITLE EROSION CONTROL BLANKET ECB PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. MATERIAL SUMMARY DESCRIPTION R E V I S I -iT TEMP. (IF Ri EXISTING DRAINAGE DITCH �I 01 BEAN TO RINfiF IFSLO E Of IPSLOP SCDNENi 6ARAE71 ACGREGAk a0 x ! A PLAN FABRIC [tlSlw SIM F-BN. MIN. ROADWAY 1 GRADE + LEDTEYIEE FABPoC SEE NOTE 5 SECTION 'A -A' NOTES 1. STABILIZED ENTRANCE SHALL BE INSTALLED WHERE EOWPMENT ENTERS AND EXITS CONSTRUCTION SITES ONTO PAVED ROADWAY OR OTHER IMPROVED SURFACE. 2. LOCATE ALL ROADWAY CROSSINGS AND ENTRANCES TO ENSURE SAFE AND ACCESSIBLE CONDITIONS THROUGHOUT THE CONSTRUCTION PHASE. 3. THE ENTRANCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION IN A CONDITION WHICH WILL MINIMIZE TRACKING OF SEDIMENT ONTO A PUBLIC ROADWAY. 4. ALL SEDIMENT TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING OR SCRAPING. 5. TOP SOIL SHALL BE REMOVED TO A MINIMUM DEPTH OF 6 INCHES PRIOR TO PLACEMENT OF GEOTEXTN.E FABRIC AND STONE. 6. WHERE DRAINAGE DITCH EXISTS, CONTRACTOR SHALL PROVIDE AND INSTALL A FLUME PIPE IN ORDER TO PREVENT IMPEDEMENT OF WATER FLOW. 7. THE CONSTRUCTION ENTRANCE SHALL BE REMOVED AND AREA RESTORED AS PART OF FINAL GRADING AND CLEAN UP. REMOVAL IS NOT CONTINGENT UPON ESTABUSHMENT OF PERMANENT VEGETATION. URS Cmpmbon - NOM Cs *w NOT C6r6w LNWrxIa F 0.2243 m JOB NO. 39911024 CONSTRUCTION ENTRANCE ��� VC TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. N111 Piedmont Natural Gas 56 LOOP - WEST SOIL EROSION CONTROL DETAILS NORTH CAROLINA SHEET 46 OF 52 I A dtuaArt dTtx SEDMENT BARRIER —T ��C�QQ�lFYR�EE���R`QwG� n �iIBW ®.3LIM11r n u �� ® ® ®Wl! u �� •• � H LRAIIROAD OR PAVDAENT NOTES L. SEDIMENT BARRIER SHALL BE INSTALLED AT THE BASE OF SLOPES ADJACENT TO ROAD CROSSINGS WHERE VEGETATION IS DISTURBED, TO INTERCEPT SURFACE RUNOFF. 2 PROTECTION FOR SPOIL PILES SHALL BE INSTALLED ONLY WHERE SEDIMENT BARRIERS ACROSS THE ENTIRE DISTURBED AREA ARE NOT REQUIRED. 3. SEDIMENT BARRIERS SMALL REMAIN IN PLACE UNTIL PERMANENT REVEGETATION IS ESTABLISHED. 4. WATER REMOVED FROM BORE PIT AND RECEIVING PIT SHALL BE FILTERED THROUGH A DEWATERING STRUCTURE OR FILTER BAG. 5. IF WELL POINTING IS REWIRED PRIOR TO EXCAVATING BORE PITS, CONTRACTOR SHALL CONSULT WITH COMPANYS ENVIRONMENTAL INSPECTOR PRIOR TO COMMENCEMENT OF WORK IN ORDER TO DETERMINE PROPER DEWATERING LOCATION. S. CONTRACTOR SMALL BE REWIRED TO KEEP THE ROAD CLEAN OF DEBRIS AT ALL TIMES. 7. CONTRACTOR MAY ELECT TO UTILIZE SHEET PILING IN ORDER TO STABILIZE BORE PITS. 8. DEPENDING ON TOPOGRAPHY AND STATE REQUIREMENTS, SEDIMENT BARRIER MAY BE REOUIRED ACROSS THE ENTIRE CONSTRUCTION RIGHT OF WAY AT THE EDGE OF ROAD. IN ADDITION TO THIS DETAIL, REFER TO THE ENVIRONMENTAL ALIGNMENT DRAWINGS FOR PLACEMENT OF SEDIMENT BARRIERS. BORED ROAD /RAILROAD CROSSING TENPORARY EROSION CONTROL IF-A&IRE RX.2 SCALE: N.T.S. NOTES SURFACE RUNOFF I SPOIL FILE > OLERSION TERRACE (TIT.) / J SEE CORE Flrol OUTLET DETAIL DIVERSION TERRACE I I T I 1 1 0 17 i EMARM SEIMERT BARRIER TO BE :) NS74LED FLUSH 10 'T SEDWENT BARRIER SHALL Top RSION TERRACE PE OF BE TRENCHED INTO CP OF BERN RR SOIL (SEE DETAIL) 3 -r— T ELEVATION SED 1" BARER (AAOCD CEF -2019) OR CO IANY APPROAED EQUAL ACTED &1CRFLL RUNOFF POST--,, OST T. ANDHOR 7Rf11O1 NOTES TRENCH DETAIL 1. SEDIMENT BARRIER HOOKS SMALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PLAN. 2. ONCE THE DISTURBED AREA IS STABILIZED, THE SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED 3. SEDIMENT SHALL BE REMOVED WHEN R REACHES 0.5 FEET IN HEIGHT AT SEDIMENT BARRIER. SEDIMENT BARRIER HOOK SCALE: N.T.S. REFERENCE DRAWINGS DRAWING NO. TITLE S RFA1Z RUNOFF I � 1 > DBERSOI TERRA�CE1l 111 ADO LOGS AS 11 NECESSALY OW:RBBL IMAM 1 1 1 1 1 1 1( 11 1 SEDMEHI BARRIER TD BE INSTALLED MI15H TO SEDWENT BARBER SNAL DP,ERSAYA TERRACE BE TRENCHED INTO TOP OF BUR/ SDL (SEE DETAIL) STANDARD STDMENT BARRIER S FENNOIS CORE LOG$ ELEVATION SED1fN11 BARRER (AM0 CEE -2O9) OR COWANY APPRM EQUAL COPACTED BAODRL RMIDFT 4, POST 70E ANDHOR VD I NOTES TRENCH DETAIL 1. CORE LOG FILTER OUTLETS SMALL BE PLACED ALONG SEDIMENT BARRIERS AS INDICATED ON THE PLAN. AS WELL AS WHERE DEEMED NECESSARY BASED ON FIELD OBSERVATIONS. 2. THE FIBROUS CORE LOG SHALL BE REPLACED NTH A NEW CORE LOG WHEN THE ACCUMULATION OF SEDIMENT IS SUCH THAT THE CORE FILTER OUTLET CANNOT EFFECTIVELY FILTER DISCHARGE WATER. 3. ONCE THE DISTURBED AREA IS STABILIZED, THE CORE FILTER OUTLET SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY THE REMOVAL SMALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED . CORE FILTER OUTLET �� A.r v SCALE: N.T.S. MATERIAL SUMMARY _ _.. REYI SI0NS DESCRIPTION l OTY (ACTUAL) NO. I DATE I BY I DESCRIPTION URS Cremation - No* Crd1U Nom CAra9n9 L"m E G2243 JOB NO. 39911024 MA'Piedmont Natural Gas 5B LOOP - WEST SOIL EROSION CONTROL DETAILS NORTH CAROLINA CHECKED BY APPRGIEM BY. SCALE. CR N T �,,�, „r, ,,,.,I SHEET 47 OF 52 SEDIMENT BARRIER (DOWN SLOPE SIDE) (TV.) SPOIL PILE MM. SEDAENT 1 ' �ORABIACF dTCN (TYR WATERBODY BANK j 1 1 I' 9t P� BARRIER II ��+1— IAN m - u OPEN PIPE TRENCH a 11DI ENI BARRIER (DOWN SLOPE SIDE) (TYR.) SPOIL PIE IN r (TYR) WAIERBWY LOA ----M 11 1 11 W /-SPOIL ' (".) �1�/ lili� \,I ►1. III/ liI'' \�I ►I. r SPOIL PILE 1 a / I, I tl TRENCH RUG (TIP) I TRENCH RUC (TIP) W i iRENCN RING (TIP) I I TRF1N:11 PLUG (TIP) i (SEE NOTE 11) I I I 1 (SEE NOTE 11) S (gE NOTE it) I I I I (SEE NOTE 17) - 1 I I I I 0N (SEE (S RN07E P 9) I I I I I SEE NE N (SEE f 9) z= �NOT II I IJ S (OTE (SEE II iI IFJ VIE �MCRE REWIRED) / 1=0UPM TO 10""T IMIRIER STMUCTION ENTRANCE �SEE DETAIL CE) NOTES 1. SEDIMENT BARRIER SHALL BE INSTALLED AT THE BASE OF SLOPES ADJACENT TO ROAD CROSSINGS WHERE VEGETATION IS DISTURBED, TO INTERCEPT SURFACE RUNOFF. 2. PROTECTION FOR SPOIL PILES SHALL BE INSTALLED ONLY WHERE SEDIMENT BARRIERS ACROSS THE ENTIRE DISTURBED AREA ARE NOT REQUIRED. y SEDIMENT BARRIERS SHALL REMAIN IN PUCE UNTIL PERMANENT REVEGETATION IS ESTABLISHED. 4, CULVERTS TO BE SIZED AND PLACED WHERE REWIRED TO MAINTAIN WATER FLOW- 5. CONTRACTOR SHALL BE REQUIRED TO KEEP THE ROAD CLEAN OF DEBRIS AT ALL TIMES- 5, CONTRACTOR MAY ELECT TO UTILIZE SHEET PILING IN ORDER TO STABILIZE PIPE TRENCH. 7 CONTRACTOR MAY ELECT TO UTILIZE WELL -POINTS IN ORDER TO REDUCE THE WATER TABLE 3 PRIOR TO COMMENCING EXCAVATION. DEPENDING ON TOPOGRAPHY AND STATE REQUIREMENTS. SEDIMENT BARRIER MAY BE �I 8. REWIRED ACROSS THE ENTIRE CONSTRUCTION RIGHT -OF -WAY AT THE EDGE OF ROAD. IN ADDITION TO THIS DETAIL- REFER TO THE ENVIRONMENTAL ALIGNMENT DRAWINGS FOR PLACEMENT OF SEDIMENT BARRIERS, TRENCHED ROAD CROSSING TEMPORARY EROSION CONTROL MEASURE Rx.1 SCALE: N.T.S. NOTES TEMPORARY STREAM CROSSING. (BEC) PER DETAIL (SEE NOT; IF 6) INSTALL REMOVABLE SEDIMENT Jl 1 I p 11 BARRIER OR DM%CABLE BERM ACCROSS ROADWAY NOTES 1. THIS METHOD APPLIES TO MINOR WATERBODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME OF CROSSING 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFILLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EOLAPMENT MUST CROSS THE WATERBODY. CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S), WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATERS EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. B. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPEUNE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER OUT OF THE WATERODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY IMMEDIATELY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11. EXCEPT FOR BLASTING AND OTHER ROCK BREAKING MEASURES. COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (INCLUDING TRENCHING, PIPE INSTALLATION, BACKFILL, AND RESTORATION OF THE STREAM BED CONTOURS) WTHRN 24 HOURS. STREAM BANKS AND UNCONSOLIDATED STREAM BEDS MAY REWIRE ADDITIONAL RESTORATION AFTER THIS PERIOD. WET MINOR WATERBODY CROSSING TEMPORARY EROSION CONTROL MEASURE M� (APPLIES TO WATERBODIES 10' WIDE OR LESS AT WATERS EDDE AT TEE OF CROSSI14) SCALE: N.T.S. REFERENCE DRAWINGS DRAWING NO. TITLE WATERBODY --� I TEMPORARY STREAM CROSSING. (BEC) PER OETAL (SEE NOTE f 6) INSTALL REMOVABLE SEDIMENT BARRIER DR DRNEABLE BERM ACCROSS ROADWAY NOTES 1. THIS METHOD APPLIES TO INTERMEDIATE WATER BODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE GREATER THAN 10 FEET WIDE BUT LESS THAN OR EQUAL TO 1DO FEET WIDE AT THE WATERS EDGE AT THE TIME OF CONSTRUCTION. 2, SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 1 HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFILLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S), WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED HE NECESSARY. 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON 60TH SIDES OF THE WATERBDDY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER OUT OF THE WATERODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11, COMPLETE MSTREAM CONSTRUCTION ACTIVITIES (NOT INCLUDING BUSTING AND OTHER ROCK BREAKING MEASURES) WITRN 48 HOURS, UNLESS SITE SPECIFIC CONDITIONS MAKE COMPLETION WITHIN 48 HOURS INFEASIBLE. M A T E R I AL S U M M A R Y DESCRIPTION WET INTERMEDIATE WATERBODY CROSSING AV TEMPORARY EROSION CONTROL MEASURE WIDE (APPLIES TO WATERE110MT EDGE HMI E0 OF CROW9NCESS THAN 100' MIDE SCALE: N.T.S. DESGRDTTON SSUE FOR APFROYAL URB cowww - w M Cw&w NO`* cwolW Li INAMN #t c-M3 AK N0. 39911024 0111 Piedmont Natural Gas 50 LOOP - WEST SOIL EROSION CONTROL DETAILS NORTH CAROLINA CNE.CRm M: APPROVED M: SCAM SR OC i3 DRAWN4SEC— DTL_DDS SHEET 4e OF 52 ■ T % -K LABARSR FOOT oovM ADPE soE) (TW.) W_o' uex. sTEn PMT (1 ».) S�PI��N(;;pj WRE FENCE SIOL PLE SPOT PLE CREEK BANG SAND BAC (TYa —) - -- - -WATERBOOr BANK - - - -- ti1 l I I-) - - - --- - (TVP.) DAYS — — _ -- — — WATER LEVEL RUDE PPE I I "AA" l I I I I WA7ER FLOW ASSRISR5 ` \ I / / I ( CREEK BOT7DII BACKFIE ((� NOTTE 10)(IP) TRENCH PLUG (iP) ---• —•—•— •- .. . (SEE NOTE 10) EXCAVATED TRENCH Ts" "BB" SECTI N "A —A" W NOTE I B) QI4flRSpl CREEK BAN( SAND RAG DAY1 FFHCE MAIM (SEE NOTE / 8) 1/ GAUGE WIN 6 6' OPENNGS E^ I \ ROVE PPE (FREE OF DENTS WATER LEVEL SANDBAGS NTH ICES AND RUST} —_ .v. — -_ /— —_ •>f VK' BARRIER TO Y lE0 PLLAASITIC LIN R TT f •\ FLUME PPE 5• IeL i wi 1WE FFNEE AT IOM ! ms SECTION REAR \ / WM 'IRE Ai 3 MOO( INTEM/ALI %"` NOIi[ 010NK —•\ _— _ —. - -- _-s! .- \ 1. REKIWCD SEGMENT BARREN SHALL BE NSTNIED TO FLIER SEGMENT M AREAS WERE E %CESSVE fT0 6 SFWOIT BARRIER WATFRBOOY (BEC PER GETAL TRENCH PLUG — PPEIIIE .— TRENCH PLUG �� TIE ENDS Cf SEGMENT SLOPE RENDERS STANDARD SEDIMENT BARRIER NEFFECDVE. A (W NODE 3) 2 NSTALLA110NS SHALL BE PERIODICALLY CECKED, THE SEDIMENT SMALL BE REWM WDN IT RARRER TOGETHER SEC11ON "B —B" INSTIL REMOVABLE SEDIMENT — _ —_ . N .1 F —_ —_ _ _ _ _ READIES RS FFEf N NENxMT AT $EDNENT BARf6ER. WIN. R BARRIER Q C ROSS RO BEAN I I REKORCED SEDIMENT BANNER SHALL BE LEFT N PLACE UNTIE PERMANENT WGETAME COVER IS A GRIME ROADWAY ESTABUSNE0. A REKORCED SEDIMENT BARRIER SHALL BE REPLACED WElEVER IT HAS DETERIORATED TO SUCH AN EXTENT POST 1. SEDIMENT AREA A SHALL GE NSIALS SAS THAT EO AND ALONG DOWN WA ER E IDES 6. THE FLUE PIPE MST BE SIZED TO PREVENT RIPEDEYEJT OF TIE jTREAM ROW AND TO MAINTAIN THAT 1T DEDUCES THE EFFECTIVENESS OF THE REINFORCED SEDIMENT BANNER. ( m' ) WA WON( AREAS AiD STA(wNG AREAS SIGN 1HAi NO NEAW SLIM LADEN WATER ENTERS 7HE ADEWATE ROW RATES 10 PROTECT ACIATIC LRT. AND PREVENT iIHE NTENMTION CC EXISTNG WATEilBDDY 0R LEAVES TIE CONSTRUCTION RIGHT -OF -WAY. DOWNSTREAM USES S. AREA DISTURBED AS A RESULT OF REMOVING THE RFNffaRCED SEDIMENT BARRER SIIALL BE 2 HARD DITCH RIXS MUST REMAW M PLACE Al CONVENENi LOCAil0115 TO SEPARATE YAIMNE 7. ER�ON AND SEDIMENT CCNIROL YEASUES SHALL BE INSPECTED DAEY Alp RESTABNZED BY SEEDING M ACCORDANCE NTH THE REVEGETATDN PLAN. DITCH FROM THE WATERBODY CROSSING UNR THE WATERKIDY C G0K IS INSTALLED AND REPI7ED IF NECESSARY. BE(]NNNIG OR 4DRMLiNT BARRIER BACKFILED. S CORAI'IOAT OFF.RA7NG M RE WATERBMY SHAH BE W1FD TD 7HAi NEEDED IL NNST V MDR TRENCHES AT THE BASE OF ALL SUPES ADJACENT TO 6. REKORCED SEMNENT BARRIER SHALL BE PLACED TO FOLLOW (RUN PARALLEL TO) THE CONTOURS. OVERLAP DETAIL TO PERFORM CONSTR CTION. P OTHER TYPES OF EOJIPENT MUST CROSS 7. OI UP9.OPE NSTALU7DNS BDM ENDS Of 1K REKONCED SEDIMENT BARKER SHALL BE 1URNF.O THE WAIERSODY, CONTRACTOR SHALL PROVDE AND USE A TEPORARY STREAM CROSSNG (BEC) 9. CHEYICNS. FUELS AND LUBLNCATING OLS SHALL NOT BE STORED AND EOJPYENT 1. STA(wIC AFEA(S) FCR WATERIMY CRGSyNG($ IIMNiMMM, � T ARATION. �� NOT BF REFIELID W7NN 100 FEET 6 iFE wAIERBODY. AND EXTENDED GPYOPL 50 FEET F7MCY WATER'S EDGE ANTED SMALL BBEE 1➢ NSTALL TRENCH PLUGS CN BOTH SIDES OF THE WATERBWY TO PREVENT DIYER50N CC 5. RUE LROSSNG uET1MOD PEGUREYFNTS INCL7pE: WATER NTO UPLAND PORTIONS VE TIE PPEIIIE TRENCH AND TO KEEP ANY ACCU%U.ATED ((A MS1ALL RUYE PIPE($ LEVIER BUSiNO ((P NECESSARY), BUT BEFORE ANY TRENCHING. TRENCH WRIER OUT OF THE WATERBODY. (B� USE SAND BAG CR SAND BAG L A PLASID 07 STR AMFLO N HR UGH T OR EOIAVAIFNi 11. CONTRACTOR SHALL POSTPONE CRACK OF NW -OF -WAY NEEIDA7ELY ADJACENT TO WATERBOOY (()) ( N$ 1 [CIPEE7lVELLYODETCADONSCTOPPDEE( STREW TBOTTTTOM MAY BE RK UIRED TTOO ACHE f AN EFFECTIVE SEAL). UNM STAONG AREA IS PREPARED AND WORK N THE WATERADDY IS READY TO COMMENCE (D) DD NOT REMOVE FLUME PIPE SD)UR%TRTRENCKNG, PIPE LAYNW, OR BACCFALNG ACIMTES, CN NTIAL STREAM BED RESTCRAINN EFFORTS (E) RFMDVE ALL FLUME PKS AND GAYS THAT ARE NOT ALSO PART OF TIE EOOPINFNT MOM AS SOON AS FINAL CLEANUP OF DARE STREAM BED AND BAN( 6 COP ETE. FLUME CROSSING Fx REINFORCED SEDIMENT BARRIER o TEMPORARY EROSION CONTROL MEASURE TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. SCALE: N.T.S. A R Nt e a 8 S 'e a 0 4 gN D i E S DRAWING NOR E F E R E N C E D RILE I N G S NO MAT DESCRIPTIONS U AI AN A R Y 07Y (ACTUAL) NO DATY BY R E Y I S 1 0 N UR.S ��� Piedmont A l 23 1 BT ISSUE FOR APPROVAL URS ClryaWron _ Hari Cpa6N ' N a t u ra I G a s NOrri CRrdnW LInMe W C -7110 SB LOOP - WEST SOIL EROSION CONTROL DETAILS NORTH CAROLINA DRAWN BY: CHMM BY: APPROVED EY: SCALE: DHW SR DC N.T.S. a x JOB NO. 39911024 TIE 01 23 13 ONAWWIO N0: — SHEET 49 OF 52 A $F— FABRIC I I ►1111 I l l +I\j� LAN GEOTXRE FARM 10 BE PLACED BDEAIH STOVE 12' 0 0.50 MIN. p COARSE AIXREOAT 3 C SEE NOTE 1 pp � WHERE: PROF�ILE D — PIPE DIAMETER (SEE ALIGNMENT SHT) NOTES C COVER DEPTH (12" MIN) 1, PERIODICALLY CHECK BRIDGE INSTALLATION AND REMOVE BUILD —UP OF SEDIMENT OR DEBRIS ON BRIDGE. 2- CULVERTS SHALL BE PLACED AT LEAST ONE —HALF (1/2) THEIR DIAMETER APART. 3. MATERIALS PLACED IN STREAM CHANNEL SHALL BE COMPLETELY REMOVED DURING FINAL CLEAN —UP. REMOVAL OF THIS ITEM IS NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION. 4- RIPRAP (OR ROCK) TO 10' AVERAGE DIAMETER CAN BE USED FOR ALL BUT THE TOP 5" OF STONE FILL THE TOP 6' MUST CONSIST OF NSA R -2 (1.5' — 3.5') COARSE AGGREGATE. CULVERT EQUIPMENT CROSSING cEc SCALE: N.T.S. NOTES YANER P05T W E FUCED IN FENCE DECRY 00 PIPDX N I= st TP SCALE: N.T.S. NOTES 1. CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL TO RESTORE FENCE TO ORIGNAL CONDHT3M. 2 POSTS. WRE AND OTHER MATERIAL SHALL BE SAME AS OR EQUIVALENT MATERIAL TO MATCH EKHSTHHG FENCE 1 BRACE SPAN TO BE CONSTRUCTED ON EACH SIDE OF PIPELINE RICHT —OF —WAY, PRIOR TO INITIAL DISMANTU NG OF FENCE 4. ACTUAL DEPTH REQUIRED TO BE SET BY WHAT IS REWIRED TO ACHIEVE A STABLE SUPPORT PDST. 5. UNDER NO I:IRCUMSTANCES SHALL FENCE POSTS E PLACED DIRECTLY OVER COMPANYS MPD_INES. CONSULT COMPANY AUIHOMZED REPRESENTATIVE FOR LOCATMS OF FENCE POSTS ADJACENT TO CCHHPANY PIPELNdES. FENCE RESTORATION SCALE: N.T.S. R E F E R E N C E D R A W I N G S DRAWING NO. I TITLE SURFACE RUNOFF SPOIL PILE SOFT PLUG —I y 13 (SEE NOT 191 [J ¢ DIVERSION TERRACE l 11( IIN EO O DRY WATRBCOY SEDIMENT BARRIER TO BE O O 16TALED FLUSH TO 0 E3 17 O O EVERSION TERRACE INSTALL REMOVABLE SEDIMENT BARRIER OR DFNEABIE BER11 ACCROSS ROADWAY SEDIMENT BARRIER SHALL BE TRENCHED HIM SOIL (SEE DETAIL) 3 SWMENT BARBER (AMMDCO CEF -2019) T ON COMPANY 9 I APPROWD EOM, 4 ELEVATION NAYBALE carAETm 'ILL BAtl F RIMOFT POST TOE ANCHOR 7EN0H TRENCH DETAIL NOTES 1. REINFORCED SEDIMENT BARRIER HOOKS SHALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PUN. 2, ONCE THE DISTURBED AREA IS STABILIZED, THE REINFORCED SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED. 3. SEDIMENT SHALL BE REMOVED WHEN IT REACHES LICE —THIRD THE HEIGHT OF THE SEDIMENT BARRIER. RE)NFORCED SEDIMENT BARRIER HOOK os2 SCALE: N.T.S. PATE RIAL SUMMARY I REVISIONS DESCRIPTION OTY (ACTUAL) NO. I DATE I BY I DESCRIPTION � I A 11/23/131 BT I ISSUE FOR APPROVAL SEDIMENT BARBER NO SLOPE SON) (TIP.) SPOIL PILE 1 { I I I SOFT r. (Ski NOk-7 FABMCAIEO FyE SiRNG ISM NOTE 19) `E111PAENT LIMPID (YE NOT If I) BSfltSIDN NOTES 1. THIS METHOD APPLIES TO WATERBODIES THAT ARE DRY AT THE TIME OF CROSSING - 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. SOFT PLUGS SHALL BE INSTALLED FOLLOWING EXCAVATION OF MAINLINE DITCH THROUGH THE WATERBODY. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY. CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (BEC). 5. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED DAILY AND REPAIRED IF NECESSARY. 6. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EOUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF WATERBODY. 7, INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. MAINLINE FABRICATED PIPE STRING MAY SPAN DRY WATERBODY CROSSING IN PREPARATION FOR LOWER IN PHASE OF CONSTRUCTION. 9. DRY WATERBODY MAY BE TRENCHED IN SEQUENCE WITH NORMAL TRENCHING OPERATIONS AND PIPE INSTALLED THROUGH DRY WATERBODY CROSSING MAY BE INSTALLED IN CONJUCTON WTH UPSTREAM AND DOWN STREAM PIPE. DRY WATERBODY CROSSING �� TEMPORARY EROSION CONTROL MEASURE Vey (APPLIES TO WATERBODIES -DRf AT TOE OF CROSSW) SCALE: N.T.S. um 11 YIN CLEARANCE Piedmont PIPELINE BRACE SPAN DETAIL Natural Gas (SEE NOW 3) 84OIG ME TO E 9 CA M1E c(AN[CTD N FENCE POST WIN f . C HordMTX I EXIM ABE B ICE EYE BITS ( V) TOP A 80170E (TP3 EACH NIOCHAL YE TO NAY A AK W. RA86JDflE FOR TWHTENNG • NORTH CAROLINA DRAWN M: DHW 18! �u � DRAWING NO SHEET 50 OF 52 A FITL_ TltllUFXUS N I= st TP SCALE: N.T.S. NOTES 1. CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL TO RESTORE FENCE TO ORIGNAL CONDHT3M. 2 POSTS. WRE AND OTHER MATERIAL SHALL BE SAME AS OR EQUIVALENT MATERIAL TO MATCH EKHSTHHG FENCE 1 BRACE SPAN TO BE CONSTRUCTED ON EACH SIDE OF PIPELINE RICHT —OF —WAY, PRIOR TO INITIAL DISMANTU NG OF FENCE 4. ACTUAL DEPTH REQUIRED TO BE SET BY WHAT IS REWIRED TO ACHIEVE A STABLE SUPPORT PDST. 5. UNDER NO I:IRCUMSTANCES SHALL FENCE POSTS E PLACED DIRECTLY OVER COMPANYS MPD_INES. CONSULT COMPANY AUIHOMZED REPRESENTATIVE FOR LOCATMS OF FENCE POSTS ADJACENT TO CCHHPANY PIPELNdES. FENCE RESTORATION SCALE: N.T.S. R E F E R E N C E D R A W I N G S DRAWING NO. I TITLE SURFACE RUNOFF SPOIL PILE SOFT PLUG —I y 13 (SEE NOT 191 [J ¢ DIVERSION TERRACE l 11( IIN EO O DRY WATRBCOY SEDIMENT BARRIER TO BE O O 16TALED FLUSH TO 0 E3 17 O O EVERSION TERRACE INSTALL REMOVABLE SEDIMENT BARRIER OR DFNEABIE BER11 ACCROSS ROADWAY SEDIMENT BARRIER SHALL BE TRENCHED HIM SOIL (SEE DETAIL) 3 SWMENT BARBER (AMMDCO CEF -2019) T ON COMPANY 9 I APPROWD EOM, 4 ELEVATION NAYBALE carAETm 'ILL BAtl F RIMOFT POST TOE ANCHOR 7EN0H TRENCH DETAIL NOTES 1. REINFORCED SEDIMENT BARRIER HOOKS SHALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PUN. 2, ONCE THE DISTURBED AREA IS STABILIZED, THE REINFORCED SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED. 3. SEDIMENT SHALL BE REMOVED WHEN IT REACHES LICE —THIRD THE HEIGHT OF THE SEDIMENT BARRIER. RE)NFORCED SEDIMENT BARRIER HOOK os2 SCALE: N.T.S. PATE RIAL SUMMARY I REVISIONS DESCRIPTION OTY (ACTUAL) NO. I DATE I BY I DESCRIPTION � I A 11/23/131 BT I ISSUE FOR APPROVAL SEDIMENT BARBER NO SLOPE SON) (TIP.) SPOIL PILE 1 { I I I SOFT r. (Ski NOk-7 FABMCAIEO FyE SiRNG ISM NOTE 19) `E111PAENT LIMPID (YE NOT If I) BSfltSIDN NOTES 1. THIS METHOD APPLIES TO WATERBODIES THAT ARE DRY AT THE TIME OF CROSSING - 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. SOFT PLUGS SHALL BE INSTALLED FOLLOWING EXCAVATION OF MAINLINE DITCH THROUGH THE WATERBODY. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY. CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (BEC). 5. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED DAILY AND REPAIRED IF NECESSARY. 6. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EOUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF WATERBODY. 7, INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. MAINLINE FABRICATED PIPE STRING MAY SPAN DRY WATERBODY CROSSING IN PREPARATION FOR LOWER IN PHASE OF CONSTRUCTION. 9. DRY WATERBODY MAY BE TRENCHED IN SEQUENCE WITH NORMAL TRENCHING OPERATIONS AND PIPE INSTALLED THROUGH DRY WATERBODY CROSSING MAY BE INSTALLED IN CONJUCTON WTH UPSTREAM AND DOWN STREAM PIPE. DRY WATERBODY CROSSING �� TEMPORARY EROSION CONTROL MEASURE Vey (APPLIES TO WATERBODIES -DRf AT TOE OF CROSSW) SCALE: N.T.S. um Piedmont N� °Ucew, D A 111 Natural Gas NtxY1 CNKORIN LKen9e III C-2243 50 LOOP - WEST SOIL EROSION AK CONTROL DETAILS NORTH CAROLINA DRAWN M: DHW CHECKED BY: APPROVED BY: SCALE: SR DC N.T.S- OATE:01/23/13 DRAWING NO SHEET 50 OF 52 A FITL_ NO. 3991 }024 SIRFACf RUNOFF I t I OL DrfRSON 1RENC1 �� i _.nnA a �:dn�n PLAN MIN. MIN. t01ffACTO EARTH RWOE ,FADED 5:1 OR RATRR SLOPE 31 OR FUTTER SLOPES SECTION A - A TEMPORARY AND PERMANENT DIVERSION TERRACES PERCENT OF LAND SLOPE 5 ACING (IN FEET) 15 - 252 50 to - 15X BO B - 10% 125 3 -eR 2 -4 PCF UREIHA 6I 300 NOTES 1. DURING CONSTRUCTION, DIVERSION TERRACES SHALL BE PREPARED AT THE END OF EACH WORK DAY. 2. WHERE SLOPE OF CONSTRUCTION AREA EXCEEDS THAT FOR SAFE INSTALLATION, TERRACES SHALL BE INSTALLED AT BASE OF SLOPE ONLY. 3. AFTER EARTH DISTURBING WORK HAS BEGUN, DIVERSION TERRACES SHALL BE INSTALLED AS SOON AS IS PRACTICABLE AT THE SPACING SHOWN N THE ABOVE TABLE OR AS SHOWN ON THE DRAWINGS. 4. TEMPORARY AND PERMANENT DIVERSION TERRACES ARE REWIRED AT ALL WATERBODY CROSSINGS AND UPSLOPE FROM ALL WETLAND BOUNDARIES. S. THE DIVERSION TERRACE OUTLET SHALL BE LOCATED WHERE RUNOFF WILL BE RELEASED ONTO AN EXISTING WELL - VEGETATED AREA IN THE ABSENCE OF A WELL- VEGETATED AREA, AN OUTLET STRUCTURE (OS) MUST BE INSTALLED AT THE DIVERSION TERRACE OUTLET. 6. PERMANENT DIVERSION TERRACES SHALL BE REVEGETATED WITH THE RIGHT OF WAY STABILIZATION. CHANNEL LINERS MAY BE REWIRED FOR VELOCITIES GRATER THAN 2.5 GPS. DIVERSION TERRACE (WATERBAR) TEMPORARY AND PERMANENT ov EROSION CONTROL MEASURE SCALE: N.T.S. IaalIIIIIIB ISEE NOR 21 TRENCH PLUG TO BE KEYED INTO BOTTOM OF TRENCH. (SEE NOR 2) > I SPACIIIO AS SHOW ON RAX I PROFILF TRENCH RUG CROSS- SECTION 'LUG FOAM NOTES 1. TOP SOIL SHALL NOT BE USED IN TRENCH PLUGS 2. TRENCH PLUG SHALL BE KEYED TO SIDES AND BOTTOM OF TRENCH S TRENCH PLUGS SHALL BE INSTALLED AT THE BANKS OF ALL WATERBODIES AND AT THE BOUNDARIES OF ALL WETLANO CROSSINGS AND AS INDICATED ON THE CONSTRUCTION DRAWINGS IMMEDIATELY AFTER TRENCH EXCAVATION. THE PLUGS MAY BE TEMPORARILY REMOVED DURING PIPE PLACEMENT, BUT THEN REPLACED. 4. TRENCH PLUGS SHALL BE LEFT IN PLACE WIZEN THE TRENCH IS BACKFILLED TRENCH PLUG /BREAKER �� Ir TEMPORARY AND PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. REFERENCE DRAWINGS DRAWING NO TITLE STNS 1HRO161 CONSTRUCTION Ma To RESTRAIN, F SLOPE IS OKA" THAN 5 PERCENT r.2' STINKS SEE NOTES FOR CONNECTION OF HOSE TO FILTER BAG (NOTE 4) T, ZZ SECTION NOTES 1, FILTER BAG SHALL BE PLACED ON A SLOPING OR LEVEL. WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM DEVICE AND ANY WORK AREAS. 2. THE FILTER BAG MUST BE STAKED IN PLACE IF THE FILTER BAG IS PLACED ON A SLOPE GREATER THAN 5 PERCENT. 3. FILTER BAG SHALL NOT BE USED FOR DISCHARGE FLOWS GREATER THAN 300 GPM. 4. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF USED FILTER BAGS IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED FILTER BAGS BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 46 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE. 5. SEDIMENT FROM BAG SHALL BE SPREAD IN AN UPLAND AREA WITHIN THE CONSTRUCTION CORRIDOR AND THE AREA SHALL BE STABILIZED AND REVEGETATED. S. TO ATTACH HOSE, CUT OPEN CORNER OF FILTER BAG, GATHER UP MATERIAL AND CLAMP TO A SHORT SECTION OF STEEL PIPE. CLAMP HOSE TO OTHER END OF PIPE. BOTH CONNECTIONS SHALL BE WATERTIGHT. 7. CONTRACTOR SHALL ONLY INSTALL ONE DEWATERING HOSE PER FILTER BAG. d RUNOFF SHALL NOT CHANNEL OR CREATE EROSIONAL ISSUES MATERIAL SUMMARY DESCRIPTION FILTER BAG TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. REVISIONS DESCRIPTION it" h N TWO TO OEWWTFRNG PLUG DESCRPItdw RUG MATERIAL SiROCiURE (OS7) SACK 1/2 CU. FT. SACKS OF Kill SIFTED SOL OR SAND OR FLIER BAG (FB} F04V 2 -4 PCF UREIHA JWF SOIL EROSION FOAMED N RAC( TRENCH RUG CROSS- SECTION 'LUG FOAM NOTES 1. TOP SOIL SHALL NOT BE USED IN TRENCH PLUGS 2. TRENCH PLUG SHALL BE KEYED TO SIDES AND BOTTOM OF TRENCH S TRENCH PLUGS SHALL BE INSTALLED AT THE BANKS OF ALL WATERBODIES AND AT THE BOUNDARIES OF ALL WETLANO CROSSINGS AND AS INDICATED ON THE CONSTRUCTION DRAWINGS IMMEDIATELY AFTER TRENCH EXCAVATION. THE PLUGS MAY BE TEMPORARILY REMOVED DURING PIPE PLACEMENT, BUT THEN REPLACED. 4. TRENCH PLUGS SHALL BE LEFT IN PLACE WIZEN THE TRENCH IS BACKFILLED TRENCH PLUG /BREAKER �� Ir TEMPORARY AND PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. REFERENCE DRAWINGS DRAWING NO TITLE STNS 1HRO161 CONSTRUCTION Ma To RESTRAIN, F SLOPE IS OKA" THAN 5 PERCENT r.2' STINKS SEE NOTES FOR CONNECTION OF HOSE TO FILTER BAG (NOTE 4) T, ZZ SECTION NOTES 1, FILTER BAG SHALL BE PLACED ON A SLOPING OR LEVEL. WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM DEVICE AND ANY WORK AREAS. 2. THE FILTER BAG MUST BE STAKED IN PLACE IF THE FILTER BAG IS PLACED ON A SLOPE GREATER THAN 5 PERCENT. 3. FILTER BAG SHALL NOT BE USED FOR DISCHARGE FLOWS GREATER THAN 300 GPM. 4. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF USED FILTER BAGS IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED FILTER BAGS BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 46 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE. 5. SEDIMENT FROM BAG SHALL BE SPREAD IN AN UPLAND AREA WITHIN THE CONSTRUCTION CORRIDOR AND THE AREA SHALL BE STABILIZED AND REVEGETATED. S. TO ATTACH HOSE, CUT OPEN CORNER OF FILTER BAG, GATHER UP MATERIAL AND CLAMP TO A SHORT SECTION OF STEEL PIPE. CLAMP HOSE TO OTHER END OF PIPE. BOTH CONNECTIONS SHALL BE WATERTIGHT. 7. CONTRACTOR SHALL ONLY INSTALL ONE DEWATERING HOSE PER FILTER BAG. d RUNOFF SHALL NOT CHANNEL OR CREATE EROSIONAL ISSUES MATERIAL SUMMARY DESCRIPTION FILTER BAG TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. REVISIONS DESCRIPTION PPOLNE TRENCH FLOATNG INTAKE NOTES 1. WATER PUMPED OUT OF TRENCH SHALL NOT BE DISCHARGED INTO WATERWAYS. WATER SHALL BE DISCHARGED INTO A FILTER BAG OR DEWATERING STRUCTURE. 2. PUMP SHALL BE CONTROLLED SO THAT DISCHARGE DOES NOT OVERPLOW DEWATERING STRUCTURE. 3. PUMP SUCTION HOSE MUST NOT BE ALLOWED TO COME IN CONTACT WITH TRENCH BOTTOM. PRO"SIONS MUST BE MADE TO ELEVATE THE SUCTION HOSE TO AT LEAST ONE FOOT ABOVE THE BOTTOM OF THE PIPE TRENCH UNTIL BOTTOM DEWATERING IS NECESSARY. 4. DEWATERINO SHALL NOT OCCUR DURING TIMES OF HEAVY RMNFALL EXCEPT AS REWIRED TO PREVENT FLOODING OF CONSTRUCTION EQUIPMENT LOCATED IN BORE PITS AND TRENCHES. 5, PUMPS UTILIZED WRING DEWATERING SHALL BE PLACED WITHIN SECONDARY CONTAINMENT IF POSTIONEO WITHIN 100 FEET OF A WETLAND OR WATERBODY. TRENCH DEWATERING �-, TEMPORARY EROSION CONTROL MEASURE I" SCALE: N.T.S. UM TO OEWWTFRNG URSCoryorawL- -2rZ 0111 SiROCiURE (OS7) ,,IC2 NorBI Carolina License R G2247 OR FLIER BAG (FB} SRX PILE SB LOOP - WEST JWF SOIL EROSION AKI CONTROL DETAILS SUCTION lWE IL DRAWN BY: CH UXED p: APPROVED K: Sl:M ^S MITER FABRIC PPOLNE TRENCH FLOATNG INTAKE NOTES 1. WATER PUMPED OUT OF TRENCH SHALL NOT BE DISCHARGED INTO WATERWAYS. WATER SHALL BE DISCHARGED INTO A FILTER BAG OR DEWATERING STRUCTURE. 2. PUMP SHALL BE CONTROLLED SO THAT DISCHARGE DOES NOT OVERPLOW DEWATERING STRUCTURE. 3. PUMP SUCTION HOSE MUST NOT BE ALLOWED TO COME IN CONTACT WITH TRENCH BOTTOM. PRO"SIONS MUST BE MADE TO ELEVATE THE SUCTION HOSE TO AT LEAST ONE FOOT ABOVE THE BOTTOM OF THE PIPE TRENCH UNTIL BOTTOM DEWATERING IS NECESSARY. 4. DEWATERINO SHALL NOT OCCUR DURING TIMES OF HEAVY RMNFALL EXCEPT AS REWIRED TO PREVENT FLOODING OF CONSTRUCTION EQUIPMENT LOCATED IN BORE PITS AND TRENCHES. 5, PUMPS UTILIZED WRING DEWATERING SHALL BE PLACED WITHIN SECONDARY CONTAINMENT IF POSTIONEO WITHIN 100 FEET OF A WETLAND OR WATERBODY. TRENCH DEWATERING �-, TEMPORARY EROSION CONTROL MEASURE I" SCALE: N.T.S. UM Piedmont URSCoryorawL- -2rZ 0111 Natural Gas ,,IC2 NorBI Carolina License R G2247 SB LOOP - WEST SOIL EROSION AKI CONTROL DETAILS NORTH CAROLINA DRAWN BY: CH UXED p: APPROVED K: Sl:M DHW SIR OC NO. 39911024 ' :01/23/13 55aLw sEc- DTL -DDg SHEET 51 OF 52 A s V OTYPICAL CONVENTIONAL PIPELINE CONSTRUCTION PROPOSED 20' EASE W PROPOSED 30' Tws WiIAIL GK t2' TREK. VARIES S y TOPSOIL SL9S(x a' S' S f' L PROPOSED t2• 11R f W IMTURAL PrQDA IE SLOPE b' EXSTP,O 10- GPtPEUN NED aMmDADYoUw Y IC—OV.E) MnVN R ) O RIGHT PARALLEL LAY WITH EXISTING PIPELINE ON NON - WORKING SIDE 02 TIE IN (BELL HOLE) EXCAVATION PROFILE EYtf1NO eD' N O T E S 1. ALL EXCAVATION SHALL MEET THE REQUIREMENTS OF OHSA 29 CFR 1926. 2. ONLY AUTHORIZED PERSONNEL ARE PERMITTED IN EXCAVATED AREA. 3. CAVE –IN PROTECTION BY SLOPING: D. IF THE SOIL IS ANALYZED, CATEGORIZED AND DOCUMENTED BY A QUALIFIED AND COMPETENT PERSON AS TYPE A. B, OR C SOIL, THE SLOPE WILL BE AS FOLLOWS: TYPE A – 3/4 (H) TO I (V), TYPE B – 1 TO 1, TYPE C – I% TO 1. b. IF THE SOIL IS NOT ANALYZED AND CATEGORIZED BY A QUALIFIED AND COMPETENT PERSON, THE SOIL SLOPE WILL BE CONSIDERED TYPE "C" & SLOPED ACCORDING TO OSHA STANDARDS CFR 1926 SUPPORT 'P'. THE SLOPE WILL BE FROM THE TOE OF THE TRENCH AND WILL BE CONSISTENT THROUGHOUT THE TRENCH WALL. 4. VERTICAL WALL (DOES NOT INCLUDE BENCHES) AND VERTICAL CUTS ARE ALLOWED ONLY AS LISTED BELOW: TYPE A – VERTICAL CUT CAN BE A MAX. OF 3% FT. IN HEIGHT WITH A 3/4 (H) TO 1 (V) SLOPE BUT CAN NOT BE MORE THAN 6 FT. DEEP. VERTICAL CUT CAN BE A MAXIMUM OF 3% Fr. IN HEIGHT BETWEEN B TO 12 FT. IN DEPTH BUT THE SLOPE INCREASES TO 1 TO 1 ABOVE THE VERTICAL CUT. TYPE B – VERTICAL CUT NOT ALLOWED, EXCEPT FOR A BENCH CUT IN COHESIVE B SOIL. TYPE C – VERTICAL CUT NOT ALLOWED. SLOPE TO TOE. SLOPE H V� VERTICAL WALL 6' BEDDI REQUIRED SLOPE OF UNSHORED EXCAVATION WALLS PIpPp2[D t2• P[dgMf ~• SLOPE N4TUML fiAS Pw ER (a. � CGIR) � b• TRCHCHED CSCAVATION ERISTNO t0-. PPRDIE I- SEDD1.0 ("; I 2s' I 35' ® LEFT PARALLEL LAY WITH EXISTING PIPELINE ON NON - WORKING SIDE NOTES REFFRENCE DRAWINGS MATERIAL SUMMARY REVISIONS DRAWING NO, TITLE NO. DESCRIPTION QTY (ACTUAL) NO. DATE By I DESCRIPTION um 0111 Piedmont A 1/23/1 BT ISSUE FOR APPROVAL URSCorporr�on•NDr(hCarDlata Natural Gas NoM CaIDFa Uc*nw %C -2243 513 LOOP - WEST SOIL EROSION AK TYPICAL WORKSPACE CONSTRUCTION METHOD OPEN CUT-CONVENTIONAL -' DRAWN BY: CHECKED 8'f: APPROVED BY. SCALE: DHW SR DC N.T.S. J08 NO. DATE:Oi 23 13 DRAWING NO: SHEET 52 OF 52 1 A 5BLW–SFC–CMD-0011 — — j YARKS tY TRENCH S'T "a 4ii N O T E S 1. ALL EXCAVATION SHALL MEET THE REQUIREMENTS OF OHSA 29 CFR 1926. 2. ONLY AUTHORIZED PERSONNEL ARE PERMITTED IN EXCAVATED AREA. 3. CAVE –IN PROTECTION BY SLOPING: D. IF THE SOIL IS ANALYZED, CATEGORIZED AND DOCUMENTED BY A QUALIFIED AND COMPETENT PERSON AS TYPE A. B, OR C SOIL, THE SLOPE WILL BE AS FOLLOWS: TYPE A – 3/4 (H) TO I (V), TYPE B – 1 TO 1, TYPE C – I% TO 1. b. IF THE SOIL IS NOT ANALYZED AND CATEGORIZED BY A QUALIFIED AND COMPETENT PERSON, THE SOIL SLOPE WILL BE CONSIDERED TYPE "C" & SLOPED ACCORDING TO OSHA STANDARDS CFR 1926 SUPPORT 'P'. THE SLOPE WILL BE FROM THE TOE OF THE TRENCH AND WILL BE CONSISTENT THROUGHOUT THE TRENCH WALL. 4. VERTICAL WALL (DOES NOT INCLUDE BENCHES) AND VERTICAL CUTS ARE ALLOWED ONLY AS LISTED BELOW: TYPE A – VERTICAL CUT CAN BE A MAX. OF 3% FT. IN HEIGHT WITH A 3/4 (H) TO 1 (V) SLOPE BUT CAN NOT BE MORE THAN 6 FT. DEEP. VERTICAL CUT CAN BE A MAXIMUM OF 3% Fr. IN HEIGHT BETWEEN B TO 12 FT. IN DEPTH BUT THE SLOPE INCREASES TO 1 TO 1 ABOVE THE VERTICAL CUT. TYPE B – VERTICAL CUT NOT ALLOWED, EXCEPT FOR A BENCH CUT IN COHESIVE B SOIL. TYPE C – VERTICAL CUT NOT ALLOWED. SLOPE TO TOE. SLOPE H V� VERTICAL WALL 6' BEDDI REQUIRED SLOPE OF UNSHORED EXCAVATION WALLS PIpPp2[D t2• P[dgMf ~• SLOPE N4TUML fiAS Pw ER (a. � CGIR) � b• TRCHCHED CSCAVATION ERISTNO t0-. PPRDIE I- SEDD1.0 ("; I 2s' I 35' ® LEFT PARALLEL LAY WITH EXISTING PIPELINE ON NON - WORKING SIDE NOTES REFFRENCE DRAWINGS MATERIAL SUMMARY REVISIONS DRAWING NO, TITLE NO. DESCRIPTION QTY (ACTUAL) NO. DATE By I DESCRIPTION um 0111 Piedmont A 1/23/1 BT ISSUE FOR APPROVAL URSCorporr�on•NDr(hCarDlata Natural Gas NoM CaIDFa Uc*nw %C -2243 513 LOOP - WEST SOIL EROSION AK TYPICAL WORKSPACE CONSTRUCTION METHOD OPEN CUT-CONVENTIONAL -' DRAWN BY: CHECKED 8'f: APPROVED BY. SCALE: DHW SR DC N.T.S. J08 NO. DATE:Oi 23 13 DRAWING NO: SHEET 52 OF 52 1 A 5BLW–SFC–CMD-0011 — — j x a s a s S 3 9 cgs_ 5� Piedmont Natural Gass 4720 Piedmont Row Drive Charlotte, NC 28210 U&S 10550 Richmond, Suite 155 Houston, TX 77042 AK, 5020 Ritter Road, Suite 206 Mechanicsburg, PA 17055 5B LOOP - EAST N C D E N R EROSION CONTROL COVER 12" NATURAL GAS PIPELINE, NORTH CAROLINA, PROJECT NUMBER: 39911024 PLOT SCALE AT 22" x 34" DRAWING NUMBER: 5BLE- SEC -C -001 SHEET 1 OF 48 EROSION CONTROL MAINTENANCE PWV 1. ALL SEDIMENT NO EROSION CONTROL DEMCES %ALL E INSPECTED EMERY WHEN (7) DAYS OR AFTER EACH OWAtL OCCURRENCE rTW EK(7[IDS OW -HWF (0.5) 1101. 2. ALL EROSION CONTROL DEUCES UVLL E NRTPUEY NAMMIED DOW ALL RKRS Or CONSTRUCTION U1t THE COMPLETION Of ILL CONSTITUTION ACTNTIES AND ALL OMMU WD AQSS HAVE DEEM STAKM. ADDnIONAL CONTROL DEUCES MY E REGARD) DURING WNSTRUCION N ORDER TO CONTROL EROSION AND/OR OFFSITE SEDWWATON. ALL TEMPORARY CONTRA DEVICES SHALL E REMOVED ONCE CONMPUDON 6 COMPLETE AND THE SITE 5 STABOZED. 3 SEW" WILL E IEW94D FROM BEHIND INC SILT FENCE WHEN R ECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEGMENT FEET WILL E PREPARED OR REPLACED AS NECESSARY 70 MAINTAIN A WEER. 4, ALL ALAS BILL E FERTILIZED. RESEEDED AS NECESSARY ND MULCHED ACCpIONG TOSPECFIGTIOS N PC VEGETATIVE PLAN TO MAINTAIN A VWWUS, DENSE IERTATE COVER S STONE CONSTRUCTION ENTRANCE TO E CLEANED WHEN SEDIMENT ACU AATONS ARE VTSKU OR SEDIMENT 6 TRACKED ON l0 THE PAVEMENT . STOW WILL E PERIODICALLY TO` OESSED NN 2 LACES O 14 STOW TO MANTA 1 NCH DEOTH. THE CONTRACTOR SMALL ONLY REMOVE MLO /SOIL FROM PAVEMENT. AS MY E REQUIRED. 6. CONTRACTOR SHALL TAE ADDITIONAL STEP AS NEEDED TO ENSUE REESGBIDIMENT O VEGETATION 6 ACHIEVED N WETLAND AREAS ON A CASE N CASE MESS. CONSTRUCTION SEQUENCE 1. OBTAIN GMDIC /ERCSON CONTROL PUMP APPROVAL FROM NCDEMI. 2, SCHEDULE MANDATORY NE- COr6IR1IC7ION MEETING WIN LAND OLWTT (RHONE 1 252 -919 -6481) 4a HORS PRIOR 70 C016IRUCI1ON TO DISCUSS EROSION CONTROL MEASURES. A INSTALL TEMPORARY $ILT FENCING ON DOWNHILL SIDE OF EASEMENT. 4. INSTALL TEMPORARY DIVERSION DITCHES AND BATTLES ON IRE DMRU SOX O EASEMENT. COSTAL ERM ON UPHILL SIDE OF EASEMENT. INSTALL ALL OTHER MEASURES AS SOWN ON THE APPROVED RIMS. 5. INSTALL TEMPORARY GRAIL CONSTRICTION ENTRANCES PER NCDOT OR SWAY PERSIL INSTALL INLET PROTECTION FOR SIM LRA NLEI LOCATED N FIELD, 6, CALL FOR ONSIE NSKCTION N ILEA INSPECTOR OM MAW CERTWAT04 O COMPLETION. PRIOR TC CONSTRU DON N EACH AREA 7. MANTA 50 FOOT BUFFER MOM AL WETLANDS AND STREAMS. NO CLEATING OR GRDW WILL E PERFORMED N THE 50 FOOT PAM ARIL THE FRANCS )RUED BELOW NE NET, LWUS& ACCESS ACROSS THE WEILAND 6 NEEDED. F ACCESS 6 NEEDED, AN ACCESS PATH FOR TOUPENT ONLY WILL E CLEANED, SILT FENCE WAY E ARCED N 50 FOG BUFFER AROUND STPEAS NO WETLANDS. BUT TEMPORARY DIVERSION DIM BILL NOT E ISIAUT) IN Tit BUFFER UNTIL THE TIME FORKS OVTLNED INDO . 8. NO CLEARING O TREES N THE WERAND BUFFER OR SMALL WEILAND CALK (LESS THAN 400' M LENGTH) UNTIL TWEE 70 FIVE DAYS BEFORE STMT O CONSTRUCTION. ND ITIAa1N: O TREES N THE IRTLAND BUFFER OR UiCE WEILAND PLEAS (OVER 400' N LENGTH) UNTIL SEVEN TO FOURTEEN DAYS BEFORE THE STMT OF CONSTRUCTION. DEER ACCESS 6 NEEDED CROSS THE WEILAND. F ACCESS 6 NEEDED. AN ACCESS PATH FOR VEOPMENI GWT WILL E CLEARED_ 9 CORN WEILAND IMPACT ALAS. REMOVAL OF VUWPS 6 ALLOWED TO THAT AREA DIRECTLY OVER THE TRENCH LINE. REMOVAL O STUDS 6 ND ALLOTTED N TEMPORARY IMPACT ALAS. IO.NRTATE CLEARING AND GRU98NG WIN" DENUDED LIMITS. INSTALL TEMPORARY EROSION CONTROL MEASURES WAR STREAM AND REMAND CROSSINGS. TEMPORARY SEEDING SWIM K PERFORMED WITHIN TWEE TO FIVE DAYS AFTER CRUMM. I IIIIT M AREA OF CW4WM L PPEuK CONSTRUCTION TO NO AGE THAN 10 LNfM MILES, N FRONT OF THIS 10 MILE SECTION ALL OS IRRIED EARTH SILL HAVE OROU D COVER AS OUTLINED MME, PPE MAY BE MOVED TO THE RIGHT O THE RIOT -O -IIAY AND LAID OUT TO MORE THE OPEN TRENCH IRE FINE FOR CONSTRUCTION. DISTRUED MFRS BEANO THE 10 WE SECTION TALL RECENT PERMANENT GROUND COVER MITI TWEE TO FIVE CALENDAR DAYS AFTER THE PPEURE TRENCH 6 FILLED. 12FWCW JG PEP/WOON O Tit NOW AND e6TALATIM O THE NECESSARY SEDIMENT AND EROSION CONTROL MEASURES. THE FRENCH BILL E EXCAVATED AID SPOILS WILL BE PEED ON THE TON- WORONO RE OF TNE ROE. F NECESSW, TRENCH BREAKERS BILL E INSTALLED WHIN THE TRENCH 70 SLOW THE ROW O THE SUBSURFACE HOER. WHEN HATER 6 RAPED OUT OF THE TRENCH FOLLOWING A PAWALL EMT, DEDH ADE MUST E RAPED THROUGH SILT SACKS PRIOR TO LEAVING SITE 13 SUBSURFACE 061ROVOCE OR STUD REMOVAL WALL ONLY BE CONDUCTED WIDE M TEN DICK KIM WEIVAID& SOUP REMOVAL OR UGHT GAINING ARMY OCCUR ON THE AMONG SIDE OF RE ROW OWT F EWM FOR SAFETY REASONS WITHIN I ERIMOS.DIF WAIN WILL K KWORED FROM THE 7MKR WS RACED ALONG THE WORKING S10C O THE ROW. N CERTAIN ARRAS, SUCH AS WETLANDS AND FIELDS SUPPORTING CROPS. EFFORTS WILL E MADE 10 SEGREGATE TOPSOIL FROM THE SUBSOIL 14A AREAS WHERE SEOIEGAION OF lE SUBSOL AD TOPSOL 6 NECESSM', THE TOPSOIL Bill BE REPLACED LAST. AFFECTED AREAS WILL TWIN E "CLEANED UP BY ROUGH-GWONG APO TEMPORARY SEEDING (F NECESSARY), FOLLOWED BY FINAL GRUIC, PERMANENT SEEDING AND WATCHING TO RESTORE TNE I,O.W. AS CLOSELY AS POSSIBLE TO P E- DISINUBACE CONTOURS NO CONMONS. IS ANY CONSTRUCTION ACTIVITIES REQUITING AN ROD OR JACK AND BORE WLL BE PERFORMED N ADDITION TO THE 10 COLE SECTION DESCRIED ABOVE. t6.SIAKM SITE AS TRENCH 6 RESTORED TO ORIGINAL GRACE WITH VEGETA". PAYING, DITCH LAMM. ETC. 17AEAS DEMOTED AS'GOLTNATED LAND AS HATCHED ON THE PUNS M NOT REQUIRE PERMANENT GROUND COENO E ESTABLISHED AT THE END O CONSTRUCTION IEWHEN VEGEUTON HAS ECLME ESTABLISHED, CAL FOR FINE SITErrKCMN By Kom NSPECTOL 19NBOVE SILT FUNDING. DIVERSION DTCHES, RAW. NOD OTHER EROSION CONIROL MEASURES AER FINAL APPROVAL FROM WCDENR NSPECIONREAS DISTRUSTED DURING THIS PROCESS SHALL E RESEEDED NTH PERMANENT SEED. 20ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED N CMRDVCE ON THE NCDENR REGULATIONS AID /OR MCDG SECONDARY RODS METHODS. 21.IE CONTRACTOR SHALL DLOENTLY AID CONTINUOUSLY MAINTAIN ALLEROSON CONTROL DDOM AND STRUCTURES TO MINMtU EROSION. THE CONTRACTOR SHALL MANTA CLOSE CONTACT WITH THE MEDENR INSPECTOR 50 THAT PERIODIC INSPECTIONS CAN E PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 22NOIIML ROM -OF -WAY MWMNNCE. PPELK HYDR)IESTNO NO PPEUNE AEPARS BILL TAE PLOT N THE WEEKS AND MONTHS AFTER TE DISTRIED RICH-OF-WAY HAS EDEN PERMANENTLY SEEDED. EROSION CONTROL NOTES 1. ANY CRACK BEYOND THE DENUDED UMn SHOWN DO THE PLAN 6 A VIOLATION OF THE NCOENR PEW AD NIT E SUBJECT 70 A FIE. LIMOS OF CONSTRUCTION .7071 ACRES THIS NCILOES A w.y THAT ARE SET ASIDE FOR CFFSDE LAMM AREAS FOR CONSTRUCTION MATERIALS. RAISE LAYMAN A" ALL E DETERMINED DURING THE CONSTRICTION PROCESS AD WILL E C001DMTED WITH THE NCOENH UOSd CONTROL INSPECTOR 2. GWM RARE TINE ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN 6 A VIOLATION OF THE WDENL REGULATIONS. 3. A GROUND COVER MUST E PROVIDED ON EXPOSED SLOPES NMN 21 OKEND R DAYS FOLLOWING CDWLrMN O AT PEASE O CRACK; AND. A PERMANENT GROUMID COYER FOR ALL DWMMD AREAS WITHIN 15 BORING DAYS OR 90 CALENDAR DAYS (WKW4ER 6 SHOT FOLDING COMFlVON OF CONSTRUCTION OR DEVELOPMENT. 4 ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY E REQUIRED BY A REPRESENTATIVE OF NCOENIL 5. SLOES 9-MILL E GILDED NO STEEPER THAN 11. C ADDITIONAL DEVICES MAY E EOMED AS AGREED AWN WITH FIELD INSPECTOR. ENGINEER APO OWNER, 7. F ACTS CONSTRUCTION CEASES N ANY AREA FOR MORE THAN 15 WORKING DAYS OR 90 CALENDAR DAYS (AICNEWR 6 SHOWER). ILL DSTRIIED AREAS COST E SEEDED, MULCHED NO TALKED UALESS ROTTEN APPROWN. 6 GREED BY THE MCDENK INSPECTOR L. POILOWIC RANT ►AREAL EVENT OUTER THAN 05 NOES. CONNACTOR SCOWL INSPECT AND EPA. AS ECESSAT, ALL DAMMED EROSION CONTROLWASlRES INS NCLUOES " 6 NOT UNITED TO R7 FENCE. CHECK DAIS, CONSTRUCTION ENTRANCES. WETIAVED CROSSINGS AND STREW CROSSINGS TYPICAL INNIENVICE MUCKS DECKING FOR STRUCTURAL DEFILMOMM SUCH AS URDERMW AD DECORS BUILDUP AROUND 5117 FENCE C ECKMMS.STEM AO WEILAND CAOSSM SHALL E CHECKED FOR STRUCTURAL DEFICIENCIES SUCH AS EXCESSIVE RUTTING. WASHOUTS AND SEDIMENT DISCHARGE. L. CONTRACTOR $HALL TNT ALL PRkWA MEASURES TO MINIMIZE THE UEA FOOTAGE OF PSTUtED AREA AND TO ENSURE THAT THE DISTURBED AREAS ARE SDABLIZED WITH VEGETATION $6 SOON AS POSSIBLE. IO.CON11MCTOR SMALL TAE ALL PRACTICAL MEASURES POS581 TO WT THE AMOUNT OF STREAM NO WEILAND DISTRBMIOE I/O TO REDUCE THE AMOUNT O R7 ENTERING THE AWCENT HOER SCONES. 11.AOL EXISTING AND PROPOSED O KS SMALL E STABILIZED USING STRAW WITH NET OR A40TKR FONT O SOP STABILIZATION APPROVED BY THE ENGINEER IMMEDIATELY FOLLOWING SEEDBED PREPARATION AD SEEDING. SLOPE STABILIZATION SEOULD E INSTALLED PER THE NCMFAC7LRTR'S RECOMMENDATION. 12AC UAL LOCATIONS OF SILT FENCE OtELET DEVICES SHOULD E FIELD ADAWED To ALLOW DEVICE TC E LOCATED AT LOW POINTS 13SLT FENCE S1O1N ACROSS PROPOSED GASLNE WILL E INSTATED WEELNTELY AFTER THE CLEARING PRAY AND THEN TEEOPARILT REMOVED DLRNIC PPELPE INSTALLATION FOR EACH Fg1A GUL AREA SEEDED PREPARATION T. CHISEL COMPACTED AREAS NO SPREAD IMAGE 3 WOWS DEEP OVER ADVERSE WL DIAMETER& F AVAIABLL. 2. ARP THE ENTIRE AREA TO 6 NOES DEPTH. 3. PRY AGRICULTURAL LAW. FERTILIZER, AND SUPER "C'SPHWE UNIFO4ILY AND MX WITH SOIL (SEE SEED 4. SEED ON A FRESHLY PREPARED SEEDED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CUTPCK AFTER SITTING. 5. MATCH OW(YATELT AFTER SEEDING AND ANCHOR MOLTCH. 6. INSPECT ALL PEED AREAS AND WAKE NECSSW SPARS OR EYEDW IKDAN THE PIAHW SEASON F POSSIBLE. F STAND SHOULD E OVER 609 DAMAGED. REESTABLISHMENT FOLLOWING ORCWAL LIME. FERTILIZER AND SEEDING RATES. 7. COMSAT CONSERVATION INSPECTOR ON MA FiENAJCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER 5 ESCAB-ISED, STREAM AND WETLAND PERMANENT SEEDING SCHEDULE SPECIES I COMMON NAME I PFRCENTAGE OF MIX Agrostbs stobWera Cirmirg bentgrau IS - Care. Y Ipi kki : FOP Sadg! 1 12 aNerM alikon Sidero 1 04 s*1wYL Iffn MS, Nc aENPtN SPrt N DATE' TYPE. 04 Aster latefKaus Catko aster RYE GRAIL 01 Saot.'ia meet a {Durk patato ABRUZZI NYE 02 Sau cernuss___...__, UearostaH APR 15 AK 30 NUMMEO COMMON • VVE TLAND SEED MX 10 BE K 41PED _- _.__ -_ 10 ALL ----------- LAND AREAS EX' ENDING -•- F(VE FEET LAHWYARDFOLLOWENCTCCNSTRUCT IONI. 35 051A OR 314 UI1W0 SF •• RECOMMENDED APPLICATION RATE 20-25 LOS. PER ACRE NONE ANIAOMMStourera_ .._ - -:. veelw�g xnt4!?'_'._�.- _ 10 ---- -- - -- RudbedW hMta, NC f1rJ5type . Mack-eyed s4ASan 10 0 ca'- is lanceolata Lane leaf tkks"d 10 Iunfus S- Ifia. -_IM :IOdwngrass I OS OMEN OINIG FIVE FEET LANDWARD AND WITH N HIGH CACUND PORTIONS OF TNE ZONE 1 BUFFER. FOLLOWOJG CONSTRLUCTbCX'1 "RECGVME'NdLK MI'Ut.ICA.flCNd RATE 20t15LBS PERACRE 31 SLOPES OR FLA -TER TYCO -: 1 APPLY AGRICULTURAL L:ME AT TNCS RATS OF ­75 LSVIDDO SF APPLY COMA MC1AL rCR''LtZCR AT IOIC RA7E Cr 46 LO&IDW S F FOR S -to iorCRTRIZER 'ALP SAOOOSP FOR i ?x•20 FERTILIZER, OR 20 LBSH000 SF FOR1874AVERTIUZER 3 SEED 04 ACCORCAW -C WITH THE FO.LOANNG SCHECULE AND APPLICATION RATES DATE' TYPE. PLANTING RATE AUG 15 NOV 1 TALL r1s(U 30C I WAC OR 7 LRSr1000 S F. RYE GRAIL 12C USIAC OR 3 UIVICCO S.IF NOV 1 • MAR 1• TALL FESCUE AND 300 LRSIAAC OR 7 US11000 S.F. ABRUZZI NYE 25 LSVAC Oft 212 Los/x000 S.F. MAR L - APR IS TALL FESCUE )W LBS!AC OR 7 18 5110 00 S F APR 15 AK 30 NUMMEO COMMON TALL FESCUE AW BERMUDA GRASS 2S tWAC OR 112 ISS/lOOD S.F. ILR 1 -AUG 35 7ALL fESC'UE AND SOD LBS/AC OR 112 LAV300) S. V BRONIN TOP MILLIT 35 051A OR 314 UI1W0 SF OR SOR"t"A NONE SUDAN HYRRMK 3C USJAC 00314 to/10011 SF A MULCH VVITH STRAW APPLIED AT THE RATE OF 95 LBS:OCC S F HEAG:LV MULCHED D:RWG JANUARY - MARCH PERIOD "CONTRACTOR MAY OR'AIN SOI; TEST TO DFTFRM ME AMOUNT OF I IMF R -QLARFO TO OBTAIN A PH w9e of 6 5 N, 7 D "• SEED TYPE RATES MIO'OR SOIL AI&INCI AEA4TS SPECIFIED ABOVE MAY SE MODIFIED A -401OR ELAN RATED 1F REWIRE) BY OS HER LOCAL. STATE OR FEDERAL AGENCIES (EGA NRCS, NC COOPERATIVE EXTENSION OFF C£. ETC 1 PRIOR TO MODIFICATIONS OR ELMMINATO`JS CONTRACTOR S ALL SUBMIT WRITTEN DOCJMEMATON SUPPORTING THE REQUEST FOR APPROVAL PR30R 70 MAKING MODIFRCATHON 1 APPLY AGR'CL)LTLJRAL UME AT RA-E OF - W tBMCCO S F 2 APPLY COMMERGAL FERTILIZER AT THE RATE Of 46 LBVIOOD SF. FO25.10- 10PERTWIZER. 24 LWIOM S F FOR 1'}20.20 FER%IZETR, C R 20 LBSV11700 S F. FOR /6-245 FERTILIZER. 3 "SEEDINACCOFDANCEWSIH I EFOLLOWIN,u SC7HeDJLE AND APPLICATIONRAIES DATE:' TYCO -: PLAMINGRATU MAR -JUN I SERNI A LESPEQEZA SD US/AC OR t III twloW STAN17AT!f!N F RYE BRAIN Sr (SCMNIFD) 92 M LRS/AC OA V4 AS /LCOC S,F, MM - APR 1 ADDTAALFfSCUE ISO LRS/AC OR 1112 LWIwC I IVkY RAVE W-,. WAL TY WATER Ii dW,L.... 7 5.E, RUN SEPT 1••' TALL FESCUE AW :N LOS/AC OR 2112 ILB13OW BROWNTOPWIET S.F. SLCPES STEEPER THAI. 31 I OR SORGMIM SUDAN 35 LRS/AC OR 314 L8 /IOOD&f. NONE NYRRDS IF C C&Ieg ARE 101 rR LM 30 ttl /AC UM 3/d U/1 WOLF. 70lESJAC OR 131110/7000 S1. SLOPES 31 OR FLA'TER 1 (URN UML D - UNSCAFIII R Dj 14 DAYS L LEN OTH AND ARE NOT STEEPER TALL FESCUE 120 LIS/AC OR 11/2 totIwo MRLET OR SUTCU N Sr, 2O tSS/AC OR 12 U/I000 SF.. 4. MULCH APPLIED AT THE RATE Or 95ISVIOM S.T. AND ANCHOR WITH ASPHALT EMULSION TACK COAT APPLIED A7 THE MR O 10.15GM /EOM S.F. OR 4SC GAAW • TEMf CdtApY RESEED S4Pi, 1 At pECOMMfND[D RATES •• COMRAC-OR A4AY OBTAIN SOIL TEST TO DEIERJ64M AMCUN- Of t" RE WREDIO ORTMN A ph AANGi1 OF 6.S TP TO. SEED _YPE. RATES COLD /OR SOL AMEEIMEN -S SPECIFIED ABOVE MAY BE MODEFED AND/OR EEPANATED N EQURFD BY OTHER LOCAL, STATE OR FEDERAL AGENCIES (f G. MRCS, NC fCXNERATAE FXIfN{ON OFIE'F, FTC I PRIOR TO MQDIFKATNINS OR FEtMNATONS, CONTRACTOR SHALL SUBMIT WRITTEN DOCUMENIAI ION SUPPORTING IHE REQUEST FOR APPROVAL PRIOR TO MINING MODIFICATION TEMPORARY SEEDING SPECIFICATIONS TALLE 6.101, TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER. SEEDING MIOURE WE IIb/. GERMANMILLET 40 N SHE NEDMON7 AND MOUNTAINS A SMALL STEMMED HDAAKNASS MAY BF VASTITU7f D AT A RATE OF 50l BRACE, SEEDING DATES MOUNTAINS - MAY 15 - AUG 15 FEEDMONT -MAY 1 -AUG 15 COASTAL PLAIN - APR 15 - AUG 15 SOLI AMENOIA[N[S FOLLOW ECOMA4ENDATNINS Of SO% TCSTSOR APPLY 2.000 U /ACRE GRCVND AGRhZR TURIN. LMKSTOW AND 750 ES/ACE 14:0.30 fERTLiZER MUtTCH APPLY 4,000 LS /ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHAI NETTING. OR A MULCH ANKHCN TOOL, A DISK WITH OLAMS M I NEARLY STRAEiHT CM! IN, USED AS A MULCH ANCHORINKI III L MANTENANCE EFERTRIIE IF GROW704 IS NOT FULLY ADEQUATE RESEED, NEFERTITI AND MULCH IMMEDIATELY FOLLOWING EROSION OR OIHEA DAMAGE, TABLE 6.10M TEMPORARY SEEDING MCOABEIUMBONS FOR SUMMER. SEEDING MIK ME RATE SUVAt, RYE GRAN 170 SFFUMG DATES MOUNT 406 - AUG 15 - DEC 15 COASTAL PLAN AND PIEDMONT -AUG 15 - DEC 3C SOHMAENDUKRIi FOLLOW ECOMA4NDATNONS OF SOW TESTSOR APPLY 2,000 U!ACRE GRCVND AGRICULTURAL UMSTCNE AND 750 46 /ACE 14:tr1O HRTLDER.. MULCH APLYADODIS /ALAI STRAW. ANCHOR STRAW BY TACKING WITH ASPHAI NETTING, ON A MULCH ANCHORNG TOOL A DISK WITH NAOFS SET NEARLY STRAIGHT CAIN BE USED AS A MULCH ANCHORNG IDEA. MAIN'tNAIEE REPAIR AND MFERTILUM DAMAGED AREAS IMMEDIATELY. TCPDRESS WIII SC tITIACRE O/ NTROGEII N MARCH. W f KNfCESSARY TO EX'END TfMMRMV COVER EVOW LINE 15.OYERYED VMTH SD MACK KOBE (PIEDMONT AND COASTAL PIANO OR KOREAN (MOUNTAINS) I ISPEDEIA N LATE FEBRUARY OR EARLY MARCIV. .S.PED1 N NG STAR47AT01Y " "MPFRAMF4 SITE AREA (IFSCRIPrION S STAN17AT!f!N F Fit�F:RM4F PLRRdEtEROIKES. SWA:ES, 7 7DA.YS .... I IVkY RAVE W-,. WAL TY WATER Ii dW,L.... 7 7 DAYS Z ZO'IES N NONE SLCPES STEEPER THAI. 31 I IDAYS N NONE IF C C&Ieg ARE 101 rR LM IN SLOPES 31 OR FLA'TER 1 14 DAYS L LEN OTH AND ARE NOT STEEPER 7HAN2t 14DAYSARE ALLO.S'M ALL OTER AREAS W TH SLOPES 7 7 DAYS FOR S.CPES FLATTER THAN 41 1 14 DAYS , , -Pti AMOUNT MPROhD 4C-14C. WEILAND 2533 AC TFAPORARY IMPACT 14WAC2 WEILAND 12 . S2 AE PE1044NENT IMPACT ... _.. --- ._..._.- ._....__--- 4L'414015TEAM 3,1351E TEMPORARY IMPACT � AC4V4C. STREAM 105 IF HRMANFNT MIPAR TABU 4.11. TEIEPMARY REEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE RATE (LGAC) RYE (GRAIN) I= ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND SO COASTAL PLAIN, KOREAN IN MOVNTAINSj OMIT ANYLAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND SEYONDJUNE SEEDING DATES MO+JNTAINS -ABOVE :500 FEET, FEB IS- MAY 13 BELOW 25CO PEET. FEB I -MAY t PIEDMONT - JAN 1 -APR IS COASTAL PLAIN - DEC 1 -APRs 16 SOIL AMENDMENTS FOLLOW M RECOLIMENCIATFONS OF SOIL TESTS OR APPLY 2 O LB'ACRE GROUND AGRICULTURAL LIMESTONE AND 760 LBACRE 10 -1410 FERTILIZER. MULCH APPLY 4.000 Ld'ACRE STRAW. ANCHOR STRAW BY TACKNO WITH ASPHALT. MATTING. OR A MULCH ANCHORING TOOL A DISK WITH BLAOIS SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REP ERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED. REPERTILJZE ANO MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SIrK« ' ^M.un2hePwd. ,,n.. St e.d Hryh•r]d j 1 -2 tdM NYnker4d. AwHd •ee0t PYKnw, mMfr xtxkAd ! -d- Z WpM •1,r d VVxrM _--- .-'-.___ : .. Xldrn,JwLnr; tRNubu yum nuvbwdxe;sN - -� -_ NriW 114 Rgt,r}e W nN !. ' ervwr+tlur Wppd CXApt _ AAr dry AddlMJ,1YrM WPYY.Kf GUM«, UrJ i5•W rSrt �:. :1NRoy 1-db, P, NNed hot E Tor tMNNWAAr.y Bask tl Ardw..iNRddrdb Aeptl.- -ilh. Ift-, i 35 a w> 1 hPr.nx, OhnI d Thin 'u. N'9 Rr I, n.•id Ot nR:uv JKJ.M1 tat GdveAU,a e}APY pNe Y+ri VW `. WVPK.APtmkl'N C.tekVw l+AUnd XbrT mat ! tpvM rF. FN«I,Nf }POM:hK I nu:W} -R«}d Wl rxr. (4'niPWS}Sq JK j k h I mn d TV1n k nd ett Tkk Arai ' IryPlrrer aiM,non4.+.X i.�,h +ad,lon.n Atrq N«Vt W8d5 pi`lOHO S9h ApriIAJ+ CAN47W At Nd wnsRSm w PN,t FCpcvr TinuV,xurKt : N4Nn DAtrq JRrmPT PHrpA4 U_... .....E ApJ[IM1tJN4n1 : bVerN /nvC ewrtne kmf 1 NOTES REFERENCE DRAWINGS MA T RIAL SUMMARY RE VISIONS DRAINING NO TITLE NO DESCRIPTION DIY (ACTUAL) N0. DATE I BY DESCRIPTION C41' Natural Gas Piedmont A 123/1 BT ISSUE FOR APPROVAL UPS Corporation - WMCW*Q I North CaTLiR License E C-2243 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA DRAM BY: I CHECKED BY APPROVED BY SCALE: DHW SR DC N.T.S. ,MOB NO. .3991102Z ah01 /2.3/13 DNA'"_ � N- 1 SHEET 02 OF ae A GdveAU,a e}APY pNe Y+ri VW `. WVPK.APtmkl'N C.tekVw l+AUnd XbrT mat ! tpvM rF. FN«I,Nf }POM:hK I nu:W} -R«}d Wl rxr. (4'niPWS}Sq JK j k h I mn d TV1n k nd ett Tkk Arai ' IryPlrrer aiM,non4.+.X i.�,h +ad,lon.n Atrq N«Vt W8d5 pi`lOHO S9h ApriIAJ+ CAN47W At Nd wnsRSm w PN,t FCpcvr TinuV,xurKt : N4Nn DAtrq JRrmPT PHrpA4 U_... .....E ApJ[IM1tJN4n1 : bVerN /nvC ewrtne kmf 1 NOTES REFERENCE DRAWINGS MA T RIAL SUMMARY RE VISIONS DRAINING NO TITLE NO DESCRIPTION DIY (ACTUAL) N0. DATE I BY DESCRIPTION C41' Natural Gas Piedmont A 123/1 BT ISSUE FOR APPROVAL UPS Corporation - WMCW*Q I North CaTLiR License E C-2243 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA DRAM BY: I CHECKED BY APPROVED BY SCALE: DHW SR DC N.T.S. ,MOB NO. .3991102Z ah01 /2.3/13 DNA'"_ � N- 1 SHEET 02 OF ae A NOTES REFERENCE DRAWINGS MA T RIAL SUMMARY RE VISIONS DRAINING NO TITLE NO DESCRIPTION DIY (ACTUAL) N0. DATE I BY DESCRIPTION C41' Natural Gas Piedmont A 123/1 BT ISSUE FOR APPROVAL UPS Corporation - WMCW*Q I North CaTLiR License E C-2243 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA DRAM BY: I CHECKED BY APPROVED BY SCALE: DHW SR DC N.T.S. ,MOB NO. .3991102Z ah01 /2.3/13 DNA'"_ � N- 1 SHEET 02 OF ae A ENE" 18"Itme NO. "ScaII►ION mon RRANING M0. OESGRPTION ENE" D"11 MG NO. OEEGRVTION COUNTY ORAIIIN{ NO. ORECRBTNBN EVER DRAWING NO. OEEGIR►T10N I 5BLE- SEC -C -001 COVER 12 5BLE- SEC -EC-007 STA. 102.00- 189.00 23 5BLE- SEC -EC -018 STA. 461.00 488.00 34 5BLE- SEC -EC-M ACCESS ROAD - (AR816) 45 SSLE- SEC -DTL 006 DETAILS 2 5BLE- SECCFN -001 GENERAL NOTES 13 581-E- SEC -EC -008 STA 189+00 - 218.00 24 5BLE- SEC -EC -019 STA 488.00 - 517.00 35 5BLE- SEC -EC-030 ACCESS ROAD - (AR 110. AR 117) 46 5BLESEC- DTL-007 DETAILS 3 5BLE- SEC -wI INDEX SHEET 14 5BLESEC- EC-009 STA 218.00. 243.00 25 58LE- SEC -EC-020 STA 517,00- 545.00 36 5BLE- SEC -EC-031 ACCESS ROAD - (AR i17,AR If 18) 47 SBLE- SEC -DTL -008 DETALS 4 SBLE- SEC -&002 INDEXSIEET2 15 SBLESEC -EC -010 STA 243.00- 270.00 26 5BLE- SEC -EC-021 STA 545+00. 572.00 37 5BLE- SEC- EC-032 ACCESS ROAD- JAR 819) 48 5131E- SEC -CMD -001 CONSTRUCTION METHODS 5 5BLE- SEC -&003 INDEX SHEET 3 16 5BLESEC -EC -011 STA 270.00 - 297.00 V 5BLE- SEC -EC-M STA 572 +00 - 598 +00 38 5BLE- SEC -EC-033 ACCESS ROAD - (AR 820, AR 121) 6 SBLE- SEC -EC -001 STA 0.00 -27.00 17 SSLE- SEC -EC -012 STA 297.00.325.00 28 5BLE- SEC -EC-= STA 599+00.626.00 39 5BLE- SEC -EC-034 LAYDOWNYARD 7 58LE- SEC -EC-DW STA 27 +00 -54.00 16 5BLE- SEC -EC -013 STA 325.00 -352+00 29 SBLE- SEC -EC-024 STA 826.00 .651.00 40 5BLESEC- SEC-001 DETAILS 6 SOLE- SEC- EC-003 STA 54.00 -81.00 19 SSLESEC -EC -014 STA 352.00- 378+00 30 5BLE- SEC -EC-M STA 551.00 -679.00 41 5BLE- SECOTL -OM DETAILS 9 5BLE- SEC -EC -004 STA 81.00 . 106.00 20 SBLESEC•EC -015 STA 378.00.408+00 31 5BLE- SEC -EC-026 STA 679+00 - 688+89 42 SBLESEC- DTL-OW OETAILS 10 58LESEC -EC-005 STA 106.00 - 135+00 21 SBLE- SEC -EC -016 STA 406+00. 433.00 32 5BLESEC- EC-027 ACCESS ROAD - (AA 114, AA a 15) 43 5BLESEC-DTL -004 DETAIS 11 5BLE- SEC -EC-006 STA 135.00 - 162+00 22 58LE- SEC -EC -017 STA 433+00 - 461+00 1 33 1 5BLE- SEC -EC -028 ACCESS ROAD - (AR 115. AA 11B) 44 SBLE- SEC -0TL -= I DETAILS N -4 1" = 1,500' 0 0.125 0.25 0.5 Miles N NC -111 HWY Gh�1O� Ot God Rd �yC, ��9a EC -001 J EC -006 EC -007 gEG N s 0089+ou, � (BEGIN STA. 0 +00, EC -002 EC -003 EC -004 EC -005 ( 216 +00) cp END STA. 27 +00) (BEGIN STA. 27 +00, (BEGIN STA. 54 +00, BEGIN STA. 81 +00, (BEGIN STA. 108+00, (BEGIN STA. 135 +00, (BEGIN STA. END STA. END STA. 54 +00) END STA. 81 +00) (END STA. 108 +00) END STA. 135+00) END STA. 162+00) END STA. 189+00) - r- - -- - - _ -- - - -- (BEGIN STOO9 �4. �GNO END STA, 2 oo�p, Qa �r �c r��ys WAYNE COUNTY 3S NOTES LEGEND S - PROPOSED CENTERLINE RAILROADS 3 > - ACCESS ROADS - -- ROADS .SHEETS LAKES - -- - ° °° RIVERS COUNTY BOUNDARIES REVISIONS DESCRIPTION ISSUED FOR APPROVAL REFERENCE DRAWINGS DRAWING NO TITLE Tjj N URS Caaroraeo" - North C C41' Natural G a s 22Q North Cam /n Lkarue 1 C-2243 J T \ � CREENE COU NTY \✓/ COU COUNTY WAYNE COUNTY WAYNE. INC _.. LENOIR DRAWN BY: COUNTY KEY MAP TP N NC -111 HWY Gh�1O� Ot God Rd �yC, ��9a EC -001 J EC -006 EC -007 gEG N s 0089+ou, � (BEGIN STA. 0 +00, EC -002 EC -003 EC -004 EC -005 ( 216 +00) cp END STA. 27 +00) (BEGIN STA. 27 +00, (BEGIN STA. 54 +00, BEGIN STA. 81 +00, (BEGIN STA. 108+00, (BEGIN STA. 135 +00, (BEGIN STA. END STA. END STA. 54 +00) END STA. 81 +00) (END STA. 108 +00) END STA. 135+00) END STA. 162+00) END STA. 189+00) - r- - -- - - _ -- - - -- (BEGIN STOO9 �4. �GNO END STA, 2 oo�p, Qa �r �c r��ys WAYNE COUNTY 3S NOTES LEGEND S - PROPOSED CENTERLINE RAILROADS 3 > - ACCESS ROADS - -- ROADS .SHEETS LAKES - -- - ° °° RIVERS COUNTY BOUNDARIES REVISIONS DESCRIPTION ISSUED FOR APPROVAL REFERENCE DRAWINGS DRAWING NO TITLE Tjj Piedmont URS Caaroraeo" - North C C41' Natural G a s 22Q North Cam /n Lkarue 1 C-2243 58 LOOP - EAST INDEX SHEET 7 OF WAYNE. INC _.. .. - -.- DRAWN BY: CHECKED BY: APPROVED BY: SC. _... TP SR DC DATE: DRAWING NO: JOB NO. 39911024 0123/2013 5BLESEC -I -001 SHEET REV A OF �Q g 5 gy8 ci 8 9 !MEET D"U"NG NO. DESCRIPTION SHE" DMWN/G NO. DESCRPTION SHE" DRAr1111G NO. DESCRVTION SWEET OMWINO NO. O ISIMPTNIN SHEET DRAWING NO. DESCRVTION 1 56LE- SEC -C -001 COVER 12 SBLE- SEC -EC-007 STA 162,00- 188.00 23 5BLE- SEC -EC -018 STA. 461.00- 488+00 34 SBLE- SEC -EC -029 ACCESS ROAD - (AR #16) 45 SBLESEC-DTL -006 DETAILS 2 5BLE- SEC -C£µ001 GENERAL NOTES 13 SBLE- SEC- EC-008 STA 189+00- 216,00 24 5BLE- SEC -EC -019 STA 4813,00 - 51740 35 5BLE- SEC- EC-030 ACCESS ROAD - (AR #16, M#17) 46 5BLE- SEC- DTL-007 DETAILS 3 5BLE- SEC -I-0D1 INDEX SHEET 14 5BLE- SEC -EC -009 STA 216+00- 243.00 25 5BLE- SEC -EC -020 STA 517,01) - 545+00 36 5BLE- SEC- EC-D31 ACCESS ROAD - (AR # 17, AR # 18) 47 5BLE- SEC-DTL -008 DETAILS 4 58LE- SEC -4002 NDEX SHEET 15 SBLESEC -EC -010 STA 243+00.270+00 26 5BLE- SEC -EC -021 STA 545,00. 572+00 37 58LE- SEC- EC-032 ACCESS ROAD - (AR #19) 48 SBLE- SEC -CNN -001 CONSTRUCTION RETHODS 5 58LE -SEC -4003 INDEX SHEET 16 SBLESEC -EC -011 STA 270.00. 297+00 27 5BLE- SEC -EC -022 STA 572,00 - 599+00 38 SBLE- SEC -EC-M ACCESS ROAD - (AR #20, AR X21) 6 SBLE- SEC -EC -001 STA 0.00 -27+00 17 5BLESEC -EC -012 STA 297+00- 325.00 28 5BLE- SEC -EC -023 STA 599+00 . 626 +00 39 5BLE- SEC -EC -004 LAYDOWN YARD 7 5BLE- SEC -EC -002 STA 27 +00 -54,00 16 5BU- SEC -EC -013 STA 325,00 - 352,00 29 5BLE- SEC -EC -024 STA 626+00 . 651+00 40 5BLE- SEC- DTL-001 DETAILS 8 5BLE- SEC -EC -003 STA 54+00 -81,00 18 SBLE - SEC -EC -014 570.$2 +00 - 379,90 30 5BLE- SEC -EC -025 STA 651+00 -679,00 41 SOLE- SEC- OTL-002 DETAILS 9 5BLE- SEC- EC-004 STA 81 +00.106+00 20 5BLESEC -EC -015 STA 379+00 . 408+00 31 SBLE- SEC -EC-025 STA 679,00 - 696+89 42 5BLE- SEC-DTL-003 DETAILS 10 5BLE- SEC- EC -DO5 STA 106.00 . 135+00 21 SBLE- SEC -EC -016 STA 406+00 .433+00 32 SBLE- SEC -EC -007 ACCESS ROAD - (AR # 14, AR # 15) 43 5BLESEC-OTL -004 DETAILS 11 581-E- SEC -EC -006 STA 135,00 - 162+00 22 SBLE- SEC-EC -017 STA 433+00 . 461+00 1 33 513LE- SEC -EC -028 ACCESS ROAD - (AR # 15. AR # 16) 44 5BLE - BED- DTL-005 DETAILS pip G SAO g90 ' o1 ND STA• _ _ EC -009 (BEGIN STA. 216 +00, END STA. 243 +00) 4? EC -010 (BEGIN STA. 243 +00, END STA. 270 +00) N A 1" = 1,500' 0 0.125 0.25 Miles 0.5 WAYNE �%nRd COUNTY EC -015 EC -016 EC -017 (BEGIN STA. 379+00, (BEGIN STA. 406 +00, (BEGIN STA. 433 +00, EC -011 EC -013 E S01a2+00, END STA. 406 +00) END STA. 433 +00) END STA. 461 +00) (BEGIN STA. 270+00, 0 (BEGIN STA. 297 +00 END STA• END STA. 297 +00) END _ STA. 325 +00) (BEGIN STA. 325 +00, l 379+ END STA. 352 +00) 1- f I III � — — 1!11 GREENE ZI rn COUNTY CA j Wayne Memorial Dr(r t- f P NOTES LEGEND PROPOSED CENTERLINE -++ RAILROADS ACCESS ROADS -- --- --- ROADS SHEETS LAKES °- RIVERS COUNTY BOUNDARIES REVISIONS DESCRIPTION APPROVAL REFERENCE DRAWINGS DRAWING NO. I TITLE URS Corporav� olna North Carolina U—se # C -2243 AK- JOB NO. 39911024 011 Piedmont Natural Gas SIS LOOP - EAST INDEX SHEET 2 OF 3 WAYNE, GREENE, NC V: CHECKED BY: APPROVED BY: SCALE: TP SR DC 11.1,500' DRAWING NO: REV A 0123/2013 5BLE- SEC -I -002 SHEET QjOF M N.. JOHNSTON / GREENE COUNTY COUNTY WAYNE - COUNTY LENOIR COUNTY KEY MAP WAYNE �%nRd COUNTY EC -015 EC -016 EC -017 (BEGIN STA. 379+00, (BEGIN STA. 406 +00, (BEGIN STA. 433 +00, EC -011 EC -013 E S01a2+00, END STA. 406 +00) END STA. 433 +00) END STA. 461 +00) (BEGIN STA. 270+00, 0 (BEGIN STA. 297 +00 END STA• END STA. 297 +00) END _ STA. 325 +00) (BEGIN STA. 325 +00, l 379+ END STA. 352 +00) 1- f I III � — — 1!11 GREENE ZI rn COUNTY CA j Wayne Memorial Dr(r t- f P NOTES LEGEND PROPOSED CENTERLINE -++ RAILROADS ACCESS ROADS -- --- --- ROADS SHEETS LAKES °- RIVERS COUNTY BOUNDARIES REVISIONS DESCRIPTION APPROVAL REFERENCE DRAWINGS DRAWING NO. I TITLE URS Corporav� olna North Carolina U—se # C -2243 AK- JOB NO. 39911024 011 Piedmont Natural Gas SIS LOOP - EAST INDEX SHEET 2 OF 3 WAYNE, GREENE, NC V: CHECKED BY: APPROVED BY: SCALE: TP SR DC 11.1,500' DRAWING NO: REV A 0123/2013 5BLE- SEC -I -002 SHEET QjOF M g s a 8 s 4 3 SHEET DNANINO NO. I ESCRVTION SHEET GNAWING NO. GESCRI -TION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DESCRIPTION SHEET DRAWING NO. DEECNIITION 1 513LE SEC -C -001 COVER 12 6BLESEC -EC-007 STA 162,00- 189+00 23 5BLE- SEC -EC -018 STA. 461+00. 488 +00 34 6BLE- SEC -EC -029 ACCESS ROAD -(AR Y76) 45 5BLE- SEC.DTL -OW DETALS 2 5BLE- SEC- GEN-001 GENERAL NOTES 13 5BLE- SEOEC-008 STA 189.00- 216+00 24 5BLE- SEC -EC -019 STA 488,00- 517.00 35 5BLE- SEC -EC -030 ACCESS ROAD (AR i 16, AR 117) 46 5BLE- SEC- DTL-007 DETALS 3 5BLESEC -1001 NDEX SHEET 14 SSLE- SEC -EC-009 STA 216.00- 243+00 25 5BLE- SEC -EC -020 STA 517 +00- 545.00 36 5BLE- SEC -EC-031 ACCESS ROAD (AR S 17, AR 118) 47 SBLE- SEC- DTLDDS DETALS 4 5BLE -SEC 14M NOEXSHEET2 15 SBLESEC -EC -010 STA 243.00.270.00 26 5BLE- SEC -EC-021 STA 545+00. 572 +00 37 58LE- SEC- EC-032 FCCESSROAD- (ARl19) 48 SBLE- SEC -Ck0 -001 CONSTRUCTION LETHODS 5 1 SBLE -SEC -1-OW INDEX SHEET 16 SBLESEC-EC-011 STA 270.00 - 297.00 27 I 5BLESEC-EC-022 STA 572 +00- 599 +00 38 5BLE- SEC- EC-033 ACCESS ROAD - (AR N20. AR 1`21) (BEGIN STA. 545 +00, STA. 572 +00) END STA. 599 +00) ec y 6 5BLE- SEC -EC -001 STA O.00 -27.00 17 5BLESEC-EC-012 STA 297.00- 325+00 28 5BLE- SEC -EC-M STA 599.00. 626.00 39 5BLE- SEC- EC-034 LAYDOWNYARD 7 5BLE- SEC-EC -002 STA 27 +00.5400 18 5BLE- SEC -EC -013 STA 325,00.352.00 29 SBLE- SEC -EC -024 STA 626+00.651.00 40 5BLESEC-DTL-001 DETAILS 8 5BLE- SEC -EC -003 STA 5100-81.DO 19 SBLESEC-EC-014 STA 352 +00- 379+10 30 5BLE- SEC -EC-025 STA 651 +00- 679.00 41 5BLE- SEC- DTL-002 DETAILS 9 5BLE- SEC- EC -CD4 STA8I.OD. 106.00 20 5BLESEC-EC-015 STA 379,00- 406+00 31 5BLE- SEC -EC -026 STA 679+00- 696 +89 42 SBLESEC-DTL-003 DETAILS 10 5BLE- SEC -EC -005 STA 106.00. 135+00 21 SBLE- SEC-EC -016 STA 406+00 -433+00 32 SBLE- SEC -EC -027 ACCESS ROAD, (AR a 14, AR X 15) 43 SBLE- SEC -OTL-004 DETAILS 11 5BLE- SEC -EC -W6 STA 135.00 - 162.OD 22 SKESEC -EC -017 STA433+00. 461+00 33 5BLE- SEC -EC -028 ACCESS ROAD - (AR N 1S, AR K 16) 44 5BLE- SEC-0TL-0OS DETAILS P-p a9 a N A 1" = 1,500' 0 0.125 0.25 0.5 Miles N JOHNSTON / GREENE COUNTY COUNTY WAYNE - .. ,.. COUNTY LENOIR COUNTY KEY MAP WAYNE COUNTY Fort Run Rd V C � EC -023 (BEGIN STA. 599 +00, EC -024 (BEGIN 0 END STA. 626 +00) �._- STA. 626 +00, END STA.. 626 0) mop m c EC -017 C.02 ( gE E S�p545 a° — - - Own Own (BEGIN STA. 433 +00, -) END STA. 461 +00) EC -018 EC -019 END STA (BEGIN STA. 461 +00, (BEGIN STA. 488 +00, 488 STA. 517 +00) END STA. +00) END m+ F -- _ _. - -- t --- EC -021 EC -022 (BEGIN STA. 572 +00, _. - 02S _ Zi - (BEGIN STA. 545 +00, STA. 572 +00) END STA. 599 +00) ec y (BEG TA. 51 +0p END STA. END rc 679,00) GREENE COUNTY ev co" Branch Ra NOTES LEGEND PROPOSED CENTERLINE -F--F- RAILROADS ACCESS ROADS -- -- - -•- ROADS SHEETS LAKES -- RIVERS COUNTY BOUNDARIES REVISIONS DESCRIPTION REFERENCE DRAWINGS DRAWING NO. I TITLE IjRl$ ��� Natural G a s Piedmont DRS Corporation - Nonh Carolina North Cvolina License I C -2243 5E LOOP - EAST AK , INDEX SHEET 3 OF 3 GREENE,NC . DRAWN BY: CHECKED BY: APPROVED BY: SC -- TP SR DC DATE: DRAWING NO: JOB NO. 39911024 0123/2013 5BLE SEC -1 -003 SHEE1 1;7. 1,500' REV OF 4� A — —• _- -- -- •— ' TEMrOMRY WORKFMC[(TYP.) /* TEMPoMRY CONSTRUCTKIH ENTRANCE ITYPI -_ _- PROPOSED GAS LIN= jiYP.) — — O PROPOSED GAS EASEMENT £ / �� �- �• �. — -� — — — — — — — — — — — — — — — — — — — — \ \ \ • . 10 11+90_ —GPs — caps \ GP GPS GPS = 4 GP�iGP� GPS — \ .�+o° -- +pp 3�pp ,�+ppg0 ----- - E. IS 0+00 1 +00 2 OP5 — GP$ — C, — GP5 -GPS _ Gp5 —GPg — G� _ Gps —GPS — FaPS -- GPS ' v r W GAS - J pg+� GPS - \ _ SILT E(I..) -- \ \ -._. -- – [ %IITNO IAlEMENT ""t- SOIL DELINEATION (TYP.) O O 0— NO "a rG «r (T",) N ` TEMPOMRY WORK 0 30 60 120 Feet NOTES 3 - •.. ..... „. } [xMTNO OAE LWFITW.) � f FR.T PFMCF ITYR) © I �w OPOSED OAS LINE MP.) REFERENCE DRAWINGS f� 0111 Piedmont Natural G a s - .–.,.t vuiERRnR ARY LINE suveR:T FENCE _`0 PR (;j Eo��rrRE bTNa "'L OL Q rl E .EOEN -ENT L --- NO :EOMR EN!T E O TRENC« RL�a ,7-.--- W CORE FILTER OUTLET NM loRE Rn Ru. m eoRE EX-INO CONTOUR V—R) jai" TENPOR"Rr FRD" r»w.� _E "N uCTno ®« NErrruNw NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL 12+00 GPg_GPS \ \\ o ` ° - - -- - -- - - -- - - - -- °: - - - °- - - -- - - - - -- - - -- - -- - -- - - - - - - - -- -... _. .... o - - - -- - - -- ----------------- - -- - --------------------------- - -- -- - ° - GAS GP`. J 4+ 15 +00 �5 ° GP S 18 +0 — GP + 0 00 +00 1 +00 22 +0 ° GP — ^ GPS — C — G" — Gai+ — GI's — GP� — GP5 — GPb2 —GPS —GPS — Q9p5 —GPS 23+ 24 2 Z —PPS —GPS — +(�P+S — GP5 — i — Gp5 — a —0" -3 ♦ 0 �LgO — Gp5 - -- -------- - -- - -- — x x \ DRAWN BY NF CHECK APPROVED BY: SCALE: SR DC 1'•60' FOIL DEl1NEATMJNIMJ O -0 JOB NO, 39911024 DATE: 01/232013 DRAWING NO: 5BLESEC- EC-001 BEET 6 OF 46 REv 1 0— NO "a rG «r (T",) N ` TEMPOMRY WORK 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS LIRS corPOrarion - North CwIi North C[roErm Lkense i C -2263 0111 Piedmont Natural G a s - .–.,.t vuiERRnR ARY LINE suveR:T FENCE _`0 PR (;j Eo��rrRE bTNa "'L OL Q rl E .EOEN -ENT L --- NO :EOMR EN!T E O TRENC« RL�a ,7-.--- W CORE FILTER OUTLET NM loRE Rn Ru. m eoRE EX-INO CONTOUR V—R) jai" TENPOR"Rr FRD" r»w.� _E "N uCTno ®« NErrruNw NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR -., .. _ SB LOOP -EAST LAN EROSION CONTROL P FROM STATION 0 +00 T + WAYNE, NC. DRAWN BY NF CHECK APPROVED BY: SCALE: SR DC 1'•60' JOB NO, 39911024 DATE: 01/232013 DRAWING NO: 5BLESEC- EC-001 BEET 6 OF 46 REv 1 LLT rENCEjTYRI �� ' O \ \yl II 4 +&s — Gir00 G" — c A +00 GA9 —1 z 7 +00 G" Z a — — — — — — — — — — — — —' x NOD EXIT PONT(TYr.I TEMPORARY WORK SMCE (TYR) O CARE Fl R OUTLAY''^e �„_ . ,♦ • > < eY b., e i . WETLAND DELINEATK)N IN— e.. bPo •1 § Y� EPKT ROUT 1 II I.I FROPOSED OAS LINE ITVP.) i ENE F • , l roNENTRY • 1 p �`.,�'�'' .'��" rr`'r�.z�` i ,, yl t ,,, 4 �Y.tt., -z � ".. t',�•b' r ,wa h'x "' £,: — ,_-- - -.._. p - - -- - - - --- - - - ° -- ��}}�� T nrl I t . C'" . — GP6 40+a — G" J — C" —va 0 �' �r ".t�ti ^A`�° -. � � ;�z�N ,�,�c. •`•. t ,,* r ` 7 °w ," At s ��;' `'+ �7#. x�' `'� k: 4 �1�+x- t�•�"'r'�:L�'`�a�r2''�� *rtx zt ha -;s — SILTPy1FE1nR) PROPOSEDOASEASEMENT 's CORE FILTER OUTIAT O ,y} wLL DELNEA YMTER CROENNO we LJLI .0 CORE PISjf,�t OUTLET !`f � TEMPORARY WORK 3MCE (nR) t� 4 LY SO MT FlT POR JACK II II ANO wee (fYP.I • $F — — — — — �. — — —. —. PROPOSED OAS LgIl RYP.1 EXISTING OAS UiE (TYP.) -• __.. EXISTING EASEMENT `_ • » -- ._____ ` \ _.. '��n 1 y \ ./ - / — - / PROPOSE_D _ O_A_ S _ L INE (TY.P_._) w ENTRY POINTITYPI _ _..._..__._. __._ _.___._ _.___.._. ___._ . _ _.._ p — _ _..___.._ ___ r .,I \ w of 51+�Q� 5 Q0 — SO 39 +00 40 +0 2 1+ 42+ 4 0 00 +00 + r' 4 0 T s ®Qy GAS — a� —GAS —ZaP $ `S W + 0 00 6 +00 4�l43►1 . —GAS — Gp5 — GPS ° —"K M s — Gp6 -- — GAS — �a+ — C." — -- GPS — � — GA5 — G*s+ — G" — GPg — GPS — Gpda L P6 w 'GP+g ' t o — G 5 - J — G 5 — 0% — 5 — RS — es- -j 7� -------------------- _ _ — — — — — — — — — — — — — -- �..— — — — — — — - -�� MPORARV C... O xExTMN ( 1 \ TE TRUCTIO CE nR. +49+00 47 +00 4 9+-00 50 +00— 1„ +0 54 +0 0 58 +00 7 +00 S ` \ R a L PROPOSED GAS EASEMEM _ D 1 — \ f TEMPORARY WORK SPACE(TYR) Al v , ( TEMPOMRY WORK !PACE (TYP.) jF '• f 1NSETA `, ---------IS EE INS =ETA \\ mss D 3D 6D 120 NOTES LEGEND REVISIONS REFERENCE DRAWINGS I= U R S Corporation - NOM Carolina NoM Caroh'na Linnse t C -22 43 0111 Piedmont Natural Gas �nvlourvoARV ur+E _ PuaucR AAO �� wATERaAR — suPER slLr EErvcE —YAI� l,j soil rvPE n�LOELIrvEAr�ory O A O Ko — RY,EXIT —T �- - - - - -� TE "`ASEMEE.I Qa REncrvPLUC - - - -- ORARV woRxsPACE TEMP : -r rr -. wERANO Ca RERILTEROUTLEi - STING aoREw raR.ucxuDaoRE - -- - - -- Exisnrvo corvrouR lNnsaRl §0 rexvoReRr eamce �•�� sTREAN c urnory ErrrRArvCE E® R NO. DATE DESCRIPTION ENG. DRANM CNK. DRAIMNGNO. TITLE 1 D V23113 ISSUED FOR APPROVAL NF SR - .. -.. - - - - -. 5111 LOOP -EAST EROSION CONTROL PLAN FROM STATION 27 +00 TO STATION 54 +00 WAR NC. _ DRAWN BY: NF AP CHECKED BY: APPROVED BY: SCALE: SR DC 1 -60' JOB NO. ;9911 D24 DATE: 01t2 3/2017 DRAWING NO: SHEET 7 OF 48 Rev 5BLE- SEC- EC-002 1 }��� i_ B� GP5 5"9" — N —STING EASEt1ENT _ _ _. _ . . ._ _. W b G a3 W 4+�p 6 +00 �Z +00 B +00 59 +00 - .. 5y�0 �a� p (ta —, op's J GP5 — GPS —GPS — C — GPs — GI!S —GPs — GPv — — oat—*' GP.I 6 ----- ._ - - - -- - 5yrp0 GPg G" — GPS +oo GP6 —1 ? a+oo �g — G�69+o06" — C." �� +oCaPS v GP5 GP`s U U GAS +pp0_ ( \ \ \ \ Q �D 62+G4�5 GP5 .-3GP� _..- GP5 Q ENTRANCE TYP.) c v� - - - -� - - -- — - - - - -- As - - - - - - -- T[MPOMRY WGRKSMC[RYP.) - - - - - -- \ \ � � �' j \ \ 1 �-� SOL DELINEATION (T1'P) A.M. RGD H4 N O e ''� wETUND OELN1E11TNlN wt(e EXISTING GAS LRNE (TYP.) 1 TRENCC. PLUG % � SILT PE� (TYP.I 47 ��+g CPS OW GPS — GPS GP6 — Z+ o D I GP5 — G _ 69 +00 - c ONS — GP6�GP5 —GPS 71 +00 05 —GP5 �Z GP5 — GP5 73�aP5 — GP6 GPS ,, . s - ,. 0,"' u - 3.1 S `S —'0 GPS , GPS GP5 ^GP5 °GPS — PROPOSED GAS LINE (TYP) GPS — P5 GP5 92 3 GP5 — caps — GPS G 1 — �. � TEMPORARY WORK SPACE (TYf ' N tea..: ».,.. F 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS IHIS URSCoamimon- NOrlhC -224e NorN Cemlim License t C -2243 Piedmont 1 031 Natural Gas - fwd W,TER RtR - -- ' n —ES' -y s _ ,qr a »E _ suvEq sILT EENCE ­3 RROPOSED CL SOIL IRE E. . " GR G DDEIR.EX.,PD „NT __— EX wGR—CE O RE "GgPLOG � �. T .E ® eo SORE ,L, »D RE � ER oG LET »eEq ».. RE Rn EGR,AD� N,D Eslsn »c co»TOUR tMe�ogl TEIRORARY RIDGE �W..� STRE,» c ucno "EIn NCE ®" NO. DATE DESCRIPTION ENG. DRAWN INK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AIK 5B LOOP - EAST EROSION CONTROL PLAN FROM STATION 54 +00 TO STATION E1 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' 60' JOB NO 39911024 . DATE: 01232013 DRAWING NO: SHEET a OF 46 Rev 68LESEC -EC -003 1 GPi8 +00 GP5 — GPs ao +oi+P5 — VETLAND W219 - 'YDOPEMIPSS 0 PROPOSED GAS LINE (T,,P) EXISTING GAS LINE (TYR) SORE KIT FOR JACK PROPOSED GAS EASEMENT AND BORE (T 1 EXISTING —ENT -_----__------------------- 1-------------------- 1---------------- - - - - -- ----- ------------ - - - - -- ----- - - - - -- - - -- - -- -- - — GP5 E2 +lak A GPs GPs GPs -1151:400— GP5 — c>W' GPs — oswoo GPs — G 48 +00 GPs' — G a9 +ooGPS — 90 +0 PS P 91 +&Os — P5 8245 — GPs I — GPs jw� /p5 _ - U 1 BORE pTr PGR JACK AND BORE (TYP.) / BORE RT FOR JACK O / AND BORE(TYP)N,,,,w°"��' j EORE KIT FOR JACK AND SORE (TYPJ TEMPORARY CONST�TION ENTRANCE(TYR) —� --= MPO =RY CONS =N M MLT FENCE(TYR) 3 GPg+OB T — i i� o J - yj G N ------ -¢--�� � .---- - - - - -� SOL DLLINSATICN (TYP) - _._ -__.._ . -_ ._ ._ — O 96 9 +0 + 0 99 *00 1 0 +00 01400 102 +00 103 +0n 104 +0 10 +pR 1 +00 + 0 W 8 1 +.0 2+00 GPS — GP58 GP5 — �PSt +4FR / Gw j '— C `� — �'PF' —GPS — �aP� —GPS —GP5 —GPS —GP5 — GP5 ° 6P8 — 00, —GPS -° 60, 600— Ps — GPS —GP5 —GPS —GPs — GP5 — �aPS — op-s — i¢aPS — GP5 — W — GPS -Z 400 G� — 19 +00 GPg — GP 0 +00 GP5 — GPS = J U TEMPORARY CONSO NENTRANCEfTYPJ - q TEMPORARY CONSTRUCTON ENTRANCE o — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 7 — — — — — � TEMPORARY WORK SPACE (TYPJ bILTPQJOCE (TYP.) / 3 � / /I �p M PROPOSED OAS LINE (TYK) p M w 1 / o o M, 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS UM URSCorW,,b,n -Norm Carolina North Cambre Licanw b C -2243 0111 P i edm o n t Natural Gas —T[q Bnq B r xqv urve _ A. �j sBPErvRSILT FNCE P _c� a E Bo oEL E o INI P IEDEASMAKT q`E O AErvcgP Va Po - I. —S ND ® BEq NAT BORE PIT RaR JACK ANOeoRE _........._.. Exrenrvc corvrouR tNn1om reMPagAgr agioaE ���w nREnN ® Hoo ucT,oN ErnRANCE NO, DATE DESCRIPTION ENG, DRAWN CNK, DRAIMNG NO, TITLE 1 0123!13 ISSUED FOR APPROVAL NF SR AK_ .. 5B LOOP- EAST EROSION CONTROL PLAN FROM STATION 61 +00 TO STATION 106 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' � 60' JOB NO. 39911024 DATE. 0123/2013 DRAWING NO: SBLE- SEC -EC -004 SHEET 9 OF I8 Rev 1 10 ------ ----- -------- -- ------- ---- --------- -- tY - -------------------------- ---- r EXISTING EASEMENT ---------------- --- ------------ ------------------ ----- --------------- -D---(S-T-I- NG GAS LINE TYP.) d PROPOSED GAS EASEMENT O O c , 2'+,b + WLgMjWK 2 �+00 I t+01 1+0j 1 + I JS� W V4 +20 00 24+00 w,S —pe — cIs as — . 0! 3 ft's - eps A - e" - - Gos - - rps - cW- c" 0 4C C . cos C" 24s - C" % C*S C"_ 3 RCOS C C pS op J J yc 13 - - - - - - - - - - � TE - - - - - - - - - - - - - - - - - - - - - - O� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- .-RARY WORK SPACE PROPOSED GAS LIKE fTYR) R /V IK01DELERAT*"I�l (STING OAS LINE t-) O O -------------------------------- ---- --------------------------- -------- ------ ---------------------------------------------------------------- -------------------- i ---- ----------------------------------- ---------------- -- + -------- - -- --- ---- ----------- ------- + ,+o %, 120+ 121 24 OJ%00 +2I 2§ *10 l9+0 30+ 11 13& p1 0 itoo gl�+00 --Ps - G ps - W Ps - c, %S L - CpS CpS _G" C r _ GpS Gp C GC PS 0pSL&pS C & _C pS L & S C PS -4 ape, -a. CN S - Gps:- wLGos - ef- CNs - ep- c+s - x C) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - r- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - --- TEMPORARY WORK SPACE (TYP.) 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS I= URS C,rpo abon - North Carollra North C..Ii- L,-n. 8 C-2243 Piedmont ��� vatural Gas "E -TE L'I'E ly LIIE _.. 1-1111-11E PRI10-CL 501-PE PP-0- E..-T —E— TP—T .1—o IA—E- TREIC. PLIG TEIPORA-0-CE Z.R.AT ' .REE r. E EXISTIIG COIT01JR j-01) T... 3T-M -.TZ'-.­El4TR-E IDD NO DATE DESCRIPTION ENG. DRAWN "K. DRAWING NO. TITLE I 1 01/23/13 1 ISSUED FOR APPROVAL E. NF SR I 50 LOOP - EAST EROSION CONTROL PLAN FROM STATION 106 +00 TO STATION 135+00 WAYNE, NC. DRAWN BY: NF CHECKED BT APPROVED BY: I SCALE: SR DC DC I 1' 60, JOB NO. 39911024 DATE: 0I/2312013 DRAWING NO: 5BLE-SEC-EC-00, I SHEET_LO_OF 48 REV 1 waDEUwATIGN1irR1 —6166 133, asps — GPs ` &S — GP° — GPs 1,80 — Gp3 —VW,- Gps 00 0 +00 d1 +00 142 +0 143+ 144 +00 1 0 *00 LU +00 0 +00 —Gp5 —G + —Gps —Gp —G0+5 —Gp1S —GPs —Gps —�ap+s —Gp6 —i0ap5 —Gps — a s —Gp✓w— " —GPs —go -6" —vw .-GPs —d —Gps —Z —GPs —c —GPs — ----- - - - - - - - f- - - - - - - - - - - - - - - - - - - - - - - EXbTNG GAS LINE ITYP.I� "{ MOPoSED GAS EASEMENT J 5,{.E TEMPoMRY WORN SPACE (TYP.) AV I O EGNE P T - AND PROPOSED GAS LINE tTYP.I O O O N Y - 4�S+ 4s +ooGPS -- 0 Oo GPs — 1 �4 +00 1D Gat— GPs 148 +VpS GP 49%s — GI's O % — GP Q. — GPs — G— GPs — dwq, C." — G4v +00 GP — GPV5 +00 GPs — GpbS�O c-" — Gps5T09" — GP 158 +9 $,5 — C." 15. — C." !'&* — C." —U-90 — GPS - Z GP — G700 g J J 2 2 U U — _ _ _ _ _ _ _ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — TEMPORARY WORK SPACE ITYP.1 A / / 0 30 so 120 / Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS CDrporaGOn -North Carolina North Carolina License t C -2243 Piedmont 0111 Natural Gas I- AD xur[a ana —Ef- -E Rr uue — wPER *ITT PD+c, —6A►� PR i� eD�rrPE CL P QR oDeEDEASENErvT R rv..EETRrEX,T,o,NT eXS<NDRASE "ENT p T--P— -- TENPDRAaY WORK9PADE D�REPLreRDUr�ET ® iNBER MAT eDREPrr IIFSv1cNAN D BO RE - -- - -- E.ISriNC CarviauR (MAJOR) TENPORARr eRIDCE ®N urnoN EtPRArvw NO. PATE DESCRIPTION ENG. DRANM CNK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR -- _' _...... _ =' - =- - 511 LOOP •EAST EROSION CONTROL PLAN FROM STATION 135 +00 TO STATION 162 +00 WAYNE, NC. :. 0 MOPOSEDGASLINEITYP.) EXISTING EASEMENT . ... - DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC V-60, 00 0 +00 d1 +00 142 +0 143+ 144 +00 1 0 *00 LU +00 0 +00 —Gp5 —G + —Gps —Gp —G0+5 —Gp1S —GPs —Gps —�ap+s —Gp6 —i0ap5 —Gps — a s —Gp✓w— " —GPs —go -6" —vw .-GPs —d —Gps —Z —GPs —c —GPs — ----- - - - - - - - f- - - - - - - - - - - - - - - - - - - - - - - EXbTNG GAS LINE ITYP.I� "{ MOPoSED GAS EASEMENT J 5,{.E TEMPoMRY WORN SPACE (TYP.) AV I O EGNE P T - AND PROPOSED GAS LINE tTYP.I O O O N Y - 4�S+ 4s +ooGPS -- 0 Oo GPs — 1 �4 +00 1D Gat— GPs 148 +VpS GP 49%s — GI's O % — GP Q. — GPs — G— GPs — dwq, C." — G4v +00 GP — GPV5 +00 GPs — GpbS�O c-" — Gps5T09" — GP 158 +9 $,5 — C." 15. — C." !'&* — C." —U-90 — GPS - Z GP — G700 g J J 2 2 U U — _ _ _ _ _ _ _ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — TEMPORARY WORK SPACE ITYP.1 A / / 0 30 so 120 / Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS CDrporaGOn -North Carolina North Carolina License t C -2243 Piedmont 0111 Natural Gas I- AD xur[a ana —Ef- -E Rr uue — wPER *ITT PD+c, —6A►� PR i� eD�rrPE CL P QR oDeEDEASENErvT R rv..EETRrEX,T,o,NT eXS<NDRASE "ENT p T--P— -- TENPDRAaY WORK9PADE D�REPLreRDUr�ET ® iNBER MAT eDREPrr IIFSv1cNAN D BO RE - -- - -- E.ISriNC CarviauR (MAJOR) TENPORARr eRIDCE ®N urnoN EtPRArvw NO. PATE DESCRIPTION ENG. DRANM CNK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR -- _' _...... _ =' - =- - 511 LOOP •EAST EROSION CONTROL PLAN FROM STATION 135 +00 TO STATION 162 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC V-60, JOB NO. 39911024 DATE: 01232013 DRAWING NO: Rev 68LE- SEC -EC -006 SHEET 11 OF 48 1 C' 0 BORE ORE TVP.)N AND ; -..... \ \ WATER CROSSING ...M ` f]eT W/- O PROPOSED GAS LINE (TYP) PROPOSED GAS EASEMEN /'— '� . — — — — — _ + + 5 +00 160 +00 16� W _ \ - _- -.V. -- -_- - _ _.. _.._. - TE BRIDGE —��N _ EXISTING EASEMENT GPS — G —Gp5 + _ -- - --- - -- �53 / ., G" Z GP +� d d - -- +pp 5�qq - --- - -- -- - - -L ,y+8� �'�' '" iZ 78+ —oOG� — GP51p GP5 178 +00 _ —Gp5 — 5, —GPS — GPS .� — G 67� 168+00 P• V \. a P5 —Gp5 — GpS -- GpS 16% _ — GP�70+ a00 1 �+p 73 — — — / GP5 _tea 17P5 — c" — p50 _GPS �aps� G�S GP5, !H — — — — — — — — (J� �N THE PLUG �.� — G� — — — — — ...i / TEMPORARYCONSTRUCTICNENTRANCE ITYP.I ------- -- -- . -- -_ n .— TEMPORARY WORK SRICE ITYP.) -'� � - -- -. � -- - - -- / ', d \ wn'•' °�' WETLAND v 217,; — -� — — — — — — — �1LANDDELINEATION - ,...,. \ t p0 \ TEMPORARY BRIDGE \ / NLTP CEITVP.) SOILDELINEATION(TYP.) / WETLAND VV216 ,-'" � \ "°• TYPE PE } \ F ,P \ \s F — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 192 ISTNG EASEMENT _ +� ° 191�0� ° Al / — GPS i CaP5 — GP5 — 1�7777� 77gg X79+ {: 162+06, ', fig@ r ° ° Gps� GPS — Ca1pS GPS — GPs Gp5 — G i + 7+00 G05 _.- Gpeb GP5 18 m Gp5 Gp'S - - - -- - - --- -------- L ` 1 P5 GP6 — GP56t +00GP — GP — , 5 — GP t&1 +� 5 — (gyp 184+W — GP5 185+0 — GPSr — P5 — GP4 — GP y ° h -..., --------- pppp +Qp c 7GPS 173 GPG —Gp5 774 +11(1 _ —tla _ - - --- - --- -._ BPS _ - - --- --- - -- -- - -- - - - - - ---- ----- - -- - -' -- ' - ------ - - - - - -- - - - --- -- --- ---- - -- -- ---- - -- '- - - - _— .._ ___ —_. BODE PIT -- "' — " —— - -- — AND EXISTING GAS LI WiL DBURERTGNRYP.) s, 0" 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS 1� URS CorporaEOn -North Carolina North Camlim License B C -2243 Piedmont 0111 Natural Gas w- EREgR - -T F nRr LINE — .1ER s0 EENCE +� ": s01—PE L R A R seo E °sENE O „DOENTR.Ex,TLI.T ND E�sENEN - - - ° p --- -- E ENT ACE TRENCREwa aARr ND RERLTERD ET _T aDRER E R,AcAN,DEDRE - -_. _.. _... E°IeTWO CONTOUR INe1ORI TENPOReRr ERIDCE ITREAM ®„nD L_ NErnR —E NO. DATE DESCRIPTION ENG, DRAWN CNK, DRAIMNGNO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR AK "- _... - 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 162 +00 TO STATION 159 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' � 60' JOB NO. 39911024 DATE: 01232013 I DRAWING NO: SHEET 12 OF 46 REV 1 5BLE- SEC -EC -007 EOIL DELINEATION(TYP.) aoh, rZAM.", 6�{ TEMPS OMRY WORN SPACE (TYP.1 — — —I[::� O N H 9 00 - +00 2 +00 W 03 +00 204 +0 205+ 206 20 + 2 0 '+ +Otl +00 32+00 33 +0 214+ 215+ W 3 2 0 — GOB -.GW — C v* — op — GP5 — i z — GP5 — GP5 — �+p� — ope — i s — C." — as — G04 —w — C." i ;— c" — .— Gts — d — CAP" — G� ° GPg — G4�s — GP5 — GV4 K," — G" —6OS — C*6 — 4e — GPE AL 0", — — c>" —'did —Gas J U - ---- -- - - - -- -- - - -- - - - - - - - -- ----------------------------------------------- - - - - J -- -- - --- - - - - - - - - - -"- -- - - - - - -.._ - - -- - -- - - - - -- - - -- -- - - PROPOSEDGASLINE(TYP) EXISTING GAS LIRE (TY -' PROPOSED GAS EASEMENT z EXISTING EASEMENT rr` Gl .... 1110 30 60 120` p000vIIS TM Feet NOTES LEGEND t t. REFERENCE DRAWINGS - - SILT Fj E(TYP) vMrEaenR 3 Rv uRE 11- 111 PD,<E —611F! PR L j SO L TYPE • -was� E. �� iN � � " O EABEMENT O OPOBE RODENT 1 TP —T EXS.o p rRER< PI,O - - - -- reMPORARYwORXBPA<E " ` vEn+ "O � ca RE PATER OOTLEr ® riMaER 'AT BORE PIT PORACA Arm BORE -- - - - -- EA STING c<N— IMA—I TEMPoaeaY a..00E STREAM Bl♦ < TRUCrro "ErrrRANCE ®" NO. DATE DESCRIPTION END. y� CRK. DRAWING NO TITLE 1 0123113 ISSUED FOR APPROVAL yF` SR \ \ ■s\ 8F \\ \ \ .. J TEM� P. c\ MRY WOM SPADE ITY 1 . � _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -� - - - - - - + SIR iF M BOp 8 + 387+ 188 W 8 Eve — 93 — G" — +dk — 0 J — Gp5 7 0 0 00 — — ba3 — — GPg — ;,:'. < .. — 95 +00 196 +0 Gp5 Gps — Ga3 — �aP6 — Gp5 O N 797+ 798 19 + 2 0 00 +00 W •— 5 — bp5 — — ba3 — — Ga3 — — GP■3 -- — Gp5 — — Gp5 —? J +00 4 +00 05 +0 — GPS —Opp° — bpg — s\ \ -------- _..__.__ —.__. ____._.._.. _.___— _.___________ __. _.. _.._.._.. _..__._.._ ._.__.._.__.._..___.._. -_ ._.._. ._.__..__.— _._.._.._.._.__.._.. _.._.._ ____.._ ._..___.._.__.._.._..___.__.. ■ _. \ \ —. \msµ .__.. _.. \ \ \._.. _.__.._.._ _.._____.__.__..____..___ -. ---------------------------------------- _.____. ------- ..___ ._..._ ___.. _...___ . _.._..____.____- ___.__.._.__.__ __- -------------------------- . ---------------------- BOREPITFORJACN TEMPOMRY CONS (�rTIONENTRANCE(TYP.) AND BORE (TYP.) \ \ \ EOIL DELINEATION(TYP.) aoh, rZAM.", 6�{ TEMPS OMRY WORN SPACE (TYP.1 — — —I[::� O N H 9 00 - +00 2 +00 W 03 +00 204 +0 205+ 206 20 + 2 0 '+ +Otl +00 32+00 33 +0 214+ 215+ W 3 2 0 — GOB -.GW — C v* — op — GP5 — i z — GP5 — GP5 — �+p� — ope — i s — C." — as — G04 —w — C." i ;— c" — .— Gts — d — CAP" — G� ° GPg — G4�s — GP5 — GV4 K," — G" —6OS — C*6 — 4e — GPE AL 0", — — c>" —'did —Gas J U - ---- -- - - - -- -- - - -- - - - - - - - -- ----------------------------------------------- - - - - J -- -- - --- - - - - - - - - - -"- -- - - - - - -.._ - - -- - -- - - - - -- - - -- -- - - PROPOSEDGASLINE(TYP) EXISTING GAS LIRE (TY -' PROPOSED GAS EASEMENT z EXISTING EASEMENT rr` Gl .... 1110 30 60 120` p000vIIS TM Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS X� URSCo,Wrabon - Norm Carolina Norm Carolina Licarm E C -2243 Piedmont r6111 Natural Gas vMrEaenR 3 Rv uRE 11- 111 PD,<E —611F! PR L j SO L TYPE • -was� E. �� iN � � " O EABEMENT O OPOBE RODENT 1 TP —T EXS.o p rRER< PI,O - - - -- reMPORARYwORXBPA<E " ` vEn+ "O � ca RE PATER OOTLEr ® riMaER 'AT BORE PIT PORACA Arm BORE -- - - - -- EA STING c<N— IMA—I TEMPoaeaY a..00E STREAM Bl♦ < TRUCrro "ErrrRANCE ®" NO. DATE DESCRIPTION END. DRAWN CRK. DRAWING NO TITLE 1 0123113 ISSUED FOR APPROVAL NF SR A,K,: SBLOOP - EAST EROSION CONTROL PLAN FROM STATION 1E9 +00 TO STATION 216 +00 WAYNEE NC. DRAWN BY: NF CHECKEDBY: APPROVED BY: SCALE: SR DC 1 .60, JOB NO. 39911024 DATE: 01232013 DRAWING NO: SHEET 13 OF 48 REV SBLE- SEG -EC -008 1 J / I / ,4'Q Gp 53igy �' G IIE M SOIL DELINEAMN (TYP.) _ /.f O YEETl.A1D DlLINlATpx —y. CttMPORARYWORKa..(TYP) PROPOSED GAS LINEfjYP.� T11ENLUO , J r•_ t�. PROPO ED GAS EASEMENT * A /p —_ AS �L BB \y,rr ^� j FAR COx EHTMNCEI ES / / ETR T x TYP.1 ,.�,�, \ ` TMBER MAT w / OAS 1 TFEN X PLUG TRENCH PLUG • TESBER MAT / / / + �r G ;\ `� VM1iS ��.. 2y q , '.4� TT'•T' y 4 "^ P TREN PL _� On TREN LUG O j58 GA3 --• 3 ' +�= .,,.L.�. npp * ++ G _ V '� AS -. q57 +0 '� _ TRFyG�iPwc G `WETLAND, Al �G yI•., N n REHCH PLUG - TYP PFO- SILT FETE ITYP.) - . \ •'I�7L GA ;�:1 T-- ,.,,,,, _O WATE11R031ING 'TEMPo ORIl1GE VpSi -Z s 11 --TING GAS LINE ITYF.1 3122 Y _ Yp GAS _ fjffjjp .. oRo PIT FOR 10� H Type PFO W l . t cc _ r _ , • ISORE FIT FOR JACK /� J-..:, , •` ..� ._ ,. .._. ttMPO MRYCON [NTRA ( 1 A ND /ORE w STIIII�Tgx MC! 1YP. . (J . �Y O ""f . _. M ~ /w � / Y TIRANCEITYP.) FIT CONS WFTUND DELINEATION i r W13t (EASEMENT _w ` TWEER IMT \ ••8� TRENCH PLUG O —�— TIMBER MAT * O TREND PLUG TMBER MAT - f O TRENCH PLUG O .►. . TRlNLUE TRENCH U= TRENCH PL RECXPWG + 2-0NWIf� k •. TREN C NPWD 0-/ qE �... LU i1{y a. w ». — G — — �a" Z — G ><3 : i$�•.. - — �'kj"i � rwrh Ewoae S �.��� 2 T rR 'PLUG PLUG. 7+ Ns TENPo wV �s VM st Type PFO G T.EEn eu �-r l r�l GA .,. ._ 237 +pp `4 All <\ ,r.,. x 'F!� � �sf� t _ S IV- u. VLy I his °"'�6�'.. , • :: _ _ '/ TRENn P, LUG —TER CROSSING - -- - -_ - SID7 WpTAOU122 » F F3ISTING GAS LINE (TYP.) LJ MLT FEE (TYP.1 BB GqS GPg+pr G 0 30 60 .:,120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS CO—Ii- 0UO -seh C-2243 North CBtDliro LkenSe Y C -2213 Piedmont 0111cESSR°AO Natural Gas fwd R� - - RRORERry uNe — BF-- -s m�rvwce Rv uNE _ SuvER sLr PENCE —01A.0 PR Wig soil r.vE --camps Ev sC—u.Ie ^rloN aE NEN DEASE T 0 rAE cNE .RnNr -. -- NG E ^sBNEN, R ^Rr °R R` °E CORE F10ER O—ET ® xAT a° JACK Um BORE rexoORARr 3R�ocE ..R.�w.w STREAM Co °s MON E—ANCE ® R NO. DATE DESCRIPTION END. DRAWN CMK. DRAWING NO. TITLE 1 0123/13 ISSUED FORAPPROVAL NF SR Af( 56 LOOP -EAST EROSION CONTROL PLAN FROM STATION 216 +00 TO STATION 243 +00 WAYNE NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SIR DC 1 -60' JOB NO. 39911024 DATE: 01232013 � DRAWING NO: 5BLESEC -EC -009 SHEET 14 OF 48 REV 1 x. , Is SOL DELRIEATION(11.) E ' :-00- ._- .___._. _ ___ -- - _ _.._ - -_ - -_ _.._ -_..+ . -__ .._ ___ _. _.._.._- .._.._ - -_ _ ._- -_.__. _.._._ _. . -. _ . _ __._.._ _._.._ -.___ _ -. _._ . -.._. _ _.. -. -. _ -._ .._.. _. -_ _.._. -_... -. _.. _.. -_. - ._ -._.._ _._.._.._ - _. -_. -_ ._ _.____ __. __ ___ _._.._ -- - _.._ -._- .._._ - -_ _- _ - -___ _ -.._ -. - - _. -_.._- .._..__._ .._.._. _ HLME s ��pp �6 �6� 2� pp a _ 0� app ����p u =0a PS — GF�"✓5 *00 GAS — GPSSB+DOGPS — G 2 �� — Gp5 256 +&q — GA5 259 — GPS iiR5 — GP5 ZcsPE+ — GP5 -- VPv GPS — a%" 00 GP5 — o *00 GP5 '^ GPI5+00 Gp5 — G�66 +0� - — GP5267* VAS —GAS 266 +�ip�r — GPS 26�aP"JI —GAS 2 �PaP� — GP5 —vP's — GP5 v J J v v i g — — — — — — — — — — — — — � TEIRPDRAR N O _ a s 0 30 60 120 r' Feet NOTES LEGEND 3 REVISIONS REFERENCE DRAWINGS U� URS ('iDlPOlation -North Carolina Nor Carolina License S C -2243 Piedmont �41 Natural G a s - ^o f -w � vur[a ena — onpup ar uuE wPEa sLr �wcP �bAM P L""/ soar TYPE r XT " D K.._RYIEXITPaII„ -_ -- E wGaKRP E O RE « =aPLGG ENPpRX En ^ "D C.— ILTERG1— TINBERNAT aoREPnPpR _K HGBGRE - -- - - -- —TING coRTOUa (M 10R) —PORARr BR -E ....N..� STREAN c ucTON RAece ®" NO. DATE DESCRIPTION C DRAM r DRAIMNG NO. TITLE 1 01123/13 ISSUED FOR APPROVAL NF SR � ACCESS ROAD Ytb 4 3 AK » -° -'- 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 243 +00 TO STATION 270 +00 WAYNE NC. r Ft EXISTING GAS LINE(TYP.) 17 i i TRENp(PLUG LILTFEND EXISTING EASEMENT MOPOlED GA! LINE ._ -. . -_- . ._ .. -. _ - -. _ _ . _ . -_.. ---- — M4 1 �..,.��.,x �.n 2 O +Q ` GPs — GPS + 244+00 ._. -___. �p� s�'.. — ` . �- - -; -. °- - - -- -- -- --- -- ---- - ----- °� 2 + 0— GPS — GP5 — n m GPS — GPS GPS Gp,559+00 -- '�'��''S ,. s mGPS +t+ +QQ y� 257 GP5 252+Q0_ —GP5 y�g�0 _ G� —2yp GPS_ GPS -- - . N A -. A . ° y{S+DO y{ °GP5 249+BD G" '_ Jp5 ^— CYAS — Gp`S —GP5 to CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' w y�5+pp 2A6+00 AS —GP5 o I GAS —GP5 —GP5 —GP5 — GPS GP5 -- G —GP5 — '.. °' WETI.A ND W12 - • ' - -_- �..__i -� .1 — — — — — — . IR000lED GAS EASEMENT — — — — — — — — — — — — — — — — TEMPORARY WORK SPACE(TYP.) /V 111 _.. ...,,......�.„.° } S x. , Is SOL DELRIEATION(11.) E ' :-00- ._- .___._. _ ___ -- - _ _.._ - -_ - -_ _.._ -_..+ . -__ .._ ___ _. _.._.._- .._.._ - -_ _ ._- -_.__. _.._._ _. . -. _ . _ __._.._ _._.._ -.___ _ -. _._ . -.._. _ _.. -. -. _ -._ .._.. _. -_ _.._. -_... -. _.. _.. -_. - ._ -._.._ _._.._.._ - _. -_. -_ ._ _.____ __. __ ___ _._.._ -- - _.._ -._- .._._ - -_ _- _ - -___ _ -.._ -. - - _. -_.._- .._..__._ .._.._. _ HLME s ��pp �6 �6� 2� pp a _ 0� app ����p u =0a PS — GF�"✓5 *00 GAS — GPSSB+DOGPS — G 2 �� — Gp5 256 +&q — GA5 259 — GPS iiR5 — GP5 ZcsPE+ — GP5 -- VPv GPS — a%" 00 GP5 — o *00 GP5 '^ GPI5+00 Gp5 — G�66 +0� - — GP5267* VAS —GAS 266 +�ip�r — GPS 26�aP"JI —GAS 2 �PaP� — GP5 —vP's — GP5 v J J v v i g — — — — — — — — — — — — — � TEIRPDRAR N O _ a s 0 30 60 120 r' Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS ('iDlPOlation -North Carolina Nor Carolina License S C -2243 Piedmont �41 Natural G a s - ^o f -w � vur[a ena — onpup ar uuE wPEa sLr �wcP �bAM P L""/ soar TYPE r XT " D K.._RYIEXITPaII„ -_ -- E wGaKRP E O RE « =aPLGG ENPpRX En ^ "D C.— ILTERG1— TINBERNAT aoREPnPpR _K HGBGRE - -- - - -- —TING coRTOUa (M 10R) —PORARr BR -E ....N..� STREAN c ucTON RAece ®" NO. DATE DESCRIPTION ENG. DRAM CNK, DRAIMNG NO. TITLE 1 01123/13 ISSUED FOR APPROVAL NF SR AK » -° -'- 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 243 +00 TO STATION 270 +00 WAYNE NC. r DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 " =60' JOB NO. 39911024 DATE. 01/23!2013 DRAWING NO: 5BLE- SEC -EC -010 SHEET 15 OF 48 REV t PROPOSED GAS LINE (TYPI ---------- ----- ------------ ----- -- ---- - - ---- -- -------- -- -- -- ------------ - -------- --- -- WGjS G-279+08 ------ ----------- --Q GAS 28p+pp 2$7 GIW!n C + &S PftL 0. -------------------------- > OWN - --- - - - - - - - - --- > GAS --- -------- - 0 IS Z 273. 2 0 'a G" G" G" AS --- ---------- ------ x +0 271*ep ea -G" GAS _I-glm - GAS 67 +00 268+00 Gp5 ^ P'S Z- US 'GAS - GAS -2 -GAS PROPOSED GAS EASEMENT GA-tE CS 4 — — — — — — — — — — — --- -- + — — — — — — — O— — — — — — — — — — — — — — — — — — — — — --- TEMPO—Y WORK 3PRCE(TYP) tv 11 W41,31,13 WERE IRENCN O ACCESS ROAD $1. M— P WATMMM DW 'AD --------- - ---- c� 13 ------------ - ---------------- ---------- ---------------- ----------- -- --- — --------------------- --------------------------------------------- ------- ------ ---------------- ---------- -------- - ----- --- --- ------- C-4 GpS WC ' 00 V+20 '!'' 'L+" 2L+' 20 9 P 6 * GAS -GAS - GAS - K - GAS J-"s - c-"s -GAS -GAS GAS 21AS - GAS 26WS - "S -gIM GAS 28W - GAS I - GAS - O- O- GAS C GAS, -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - p sJ �D- TRI MUG W-MUs — roAgt—oc —SILT FE110El —1 — -- -- A\S� WATER CROI sill N 1 0-- 0 30 60 120 T!M Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS URS - North Callolina North Caml— LICE— 0 C-2243 � Piedmont 0111 Natural Gas 11.11,T1 LINE F— -T —C. SUPER — FENCE --GA" mopoSED CL SOIL T— 'L 111LIELINE11*1 E. • .. —T POINT PR E-ER— E-TR IOU—G E—MENT TRENC.1UU5 — -- — — TEMPOR.RY MRKVACE Co- F LTE' "T"T N. ` GORE P�­R T7DRAWN CONTOUR W—R) T R"' E No. NO DATE DESCRIPTION ENG. D— CHK DRAWING NO TITLE 01123/13 ISSUED FOR APPROVAL NF SR AK 50 LOOP - EAST EROSION CONTROL PLAN FROM STATION 270+00 TO STATION 297+00 WAYNE, NC. BY: NF CHECKED BY: DC I SCALE: 1'.60- — JOB NO. 39911024 DATE: 0123/2013 DRAWING NO: SHEET 16 OF 46 5BLE-SEC-EC-011 I S TRENCH PLUG WATERBAR DIVERSION )TYP.) O O n. g% WATER6AP DIVERSION (TYR) { f EXISTING EASEMENT co, TREQ NPLUG � —3G GAS LINE TYP) Pr — 1111- PROPOSED GAS LINE ITVP.) + +00 5+00 - � / .. 1111- 1111 -- � °- `-- - - W►5 —GAS — GA-- GAS — G Z 7+0� 29g+ - GAS DO }0000 pp+pp --- - - - - - - 3�p 3�3 F:. = GAS A CSpS — GAS 9 GA_S --..�� —3� +.�� GAS — �: 3p.�.+00 �pq .30 - 1111-- - � -._. 1111-- - - -- �- - --- - -- -- - - -- -- - --- GAS LZ 1�o GAS — GAS GAS +� GAS -- GAS — GAS +pp GAS — GAS 5�00GAS — 306 +p0 307 +0o U — — — — { —i GAS ^ GAS — GAS 308+OGQ 3 b h - _ — — — —�—` — _ — / —GAS _.._ * —GAS -j I C %L�TYP.1 a3 ,... - - _.._. ------------------ SWATEKCRO331NG ,1 �' — — — — — — — — -- _. _. PRO I-ED GAS EASEMENT _ / — — — — — J y N 1\ �p SOIL DELINEATION(TYP.) �f4 © - O 0 r..�.. , ._z a X35 TGIPOMRY WORK SPACE ITYP.) 7 — / — LORE FlLj)<R OUTLET 0 T GEED GAS LINE (TYP.) + O HE RIMT � r a.a 7�'Jysj,.. ,�6n — GA? 11 +8%S — GAS �I%Wt — GAS = SpS -- GAS — V5W *�--- GAS — MOO GAS —� G� +00 GAS — GA�7 +oo GAS — GAS�IB +OOGAS — GAS319+%AS -- GAS J20 +&S — GAS 321 ,,,-_ GAS 3244 — GAS � ga — G � �1fiai�' -2 r r �'`'""GAS� = GARa� +oo x . ------------------------------ „SCORE IRSU . OUTTLHEE T — S9 Ob 2 (C� LUG 98+ GAS _..__.__ .._.__.._ _ _.. _ __.__.__ _._.__.._ ..___. __ —..-- ._ —. -__ _ . _. __ _ . _. _. - __ _. _. _. ____ _ . —.. . _ .._.__.._ .___ __ _ -_ -_.._ __.____ M = ! J t' �y.rN — _ PP WATER CROSSING — — — — — — — — — J / fie,' aim 1t �t v r ` N 1 0 30 360 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS CurpooEOn - Norm Carolina Norm Carolina Lksnas E C -7143 0111 Piedmont Natural G a s �..- wniENO. - ° ^' RY L —!!I -{ 9 E suvea saE VErycE vR t_-) son TVA X IE � O OO " *OINT _—P OE O RENP= O RAR NO OOREP�EOUTLET ® MAT ® - R-1EOR,I --ROBE -- - -- .,1111 CONTOUR IM110R) TEMPORARY BROCE �"'���+ sRE..M c �cTIONErnRA ® R DATE DESCRIPTION ENG. DRANM CNK. pRANnNGNO. TITLE t 0123!13 ISSUED FOR APPROVAL NF SR AK . -" 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 287 +00 TO STATION 325 +00 WAYNE, NC. DRAWNBY: NF CHECKEDBY: APPROVEDBY: SCALE: SR DC 1" 60' JOB NO. 39911024 .ATE: 01232013 DRAWING NO: REV. SHEET 17 OF 48 5BLE- SEC -EC -012 1 t r - rROIDx nuG n t III f -,, � —�• :A \ � ,' .�'. rxovoacD CAS UNE (rvv.) 6 3 `\ O �'-.�� P rtOO - - •,�,� wwETUwhELINEATax / / _ ` R ._ "may ' q Te�PO saooc }� / 3 dVol 33G',• '�-•� ♦� / \ RE OUTLET OUTL NiETLANDYV423 ' �� .+ w lJ / ..- .Type PFb `� / 3D Qg / d / / _ GpsOp rx ylCRii?L / - n PLUG GlxpD II�JJ { �yj �' / / ` ~ GA5 G3 *p # 7 0 G P5 a o o I` GA,38{±00 G_ !J TEMPORARY WORN SPACE (TYP.) -_ \ P J - � • �r \G `c � I Q E%LRTING EASEMENT Tr 8 r \ t TEMPORARYCONSTRUCTION ENTRANCE(—) T � 7 +00 GPI .all, saw GP9 300 GAS _ 1 0 ^+yi, MORE PIT FOR JACK ''`�,, AND aaRE RrP.i f ,, V7°RK SP,,GE ("P1 SOLDELINEATIONRYP) — — — — — PROPOSED GAS EASEMENT _---------- — — — — — — — — — — I — — — — — — — — — — — — — — — — — — — — — — — — y ' ' G — — � ' 3y,:oo�, -, GPI' 3q�A 3f) +pp 3q� y t •3 0-i CIO ;GAS — GAS —GAS —GAS —GAS GAS — GAS GAS — G 387+00 C3 = - — — AS GAS -- GAS — GAS — GAS GAS — pg u G 350+00 r �. GPI" , _ — — -- ..� ._...�— — — — -- — — — — — — — — — _'. — — — — — — — — G — � —GAS G _.._ � 351+00 — GOW IN, PEIiCE RYP.) I �� G w ' N f jr , �� —' - - - - -� G N G EXISTING GAS LINE (TYP.) 0 '!0. 60 120 F NOTES LEGEND REVISIONS REFERENCE DRAWINGS URSCNTparabo -NOM Carolina NoM Carolim License a C -2243 Piedmont 0111 Natural Gas Al - w.rERNO. R Rr N —OF—t - PCI LIE —pP— suPER SLE PENCE �aiMal PR �` soR rvoE - -cASe Ex oPONEO E.sEMENr O PR • NnDENTRrEx PGINT - - 7 — PRGESEMERT TRENORPL G -- N.RrwoRKeP CE '." Y.s .NO � caREPLTER OUTLET R M.r ® !� SORE PI PeR JACK III EORE -- Es 6rwG COnT0UR P4n�0R) TEMPOR.RV BP OGE erRE.M Co UCTIONENra..RCE ® H c DATE DESCRIPTION ENG. DRAWN GHK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK, 56 LOOP - EAST EROSION CONTROL PLAN FROM STATION 325 +00 TO STATION 352 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' 60' JOB NO. 39911024 DATE: 01232 013 DRAWING NO: 8 REv SHEET 58LE- SEC -EC -013 18 OF 4 1 ® O .0 � O \ RMPoIURY WORK fPACC (TYP.1 .^ \ \ \.\ \ PROPoSED OAS LINE (TYP.1 =".{ MOPOSED GAS EASEMENT ... ,- ^„�w" �" w» — — — — — — — — — — — — — — — — - — — — — — — — — — — — — - C2, GAS �L�. 0 GAS357N0 N .J' ESUTNC EASEMENT — v 356 +pp +00 8 +00 3 + 0 60 +00 361 +0. 362+ - 6p 3�q +pQ ��+p0 6 — GP5 — 363 }pD 36 +0p 3 S+ 0 W 66 ±00 \ ` \ \ �SiZ +GPS — GP+3 s �+ ps —GPs — G9� — GM5 =GPS — GPh — oP+s —GP5 — G —GP5 —aPjs GPS — GPg — GP`> — GP3 — CsPS —GPS — GN3 — GV�Ii — cap5 — GW — raP9 — GPS — �aN3 —GP5 - J PP55 —GPS — G0+3 GP5 G-- P5 __.._�_— J r S U 2 Q Ens •� nNG Gq , is Lfte(7yp) \- 301E DEUNEATONITYP.) O U MTTNG GAS UNE (TYP.1 { a , ".,; . .'•..- ACCESS *,T F A w ve. - r, fUPEKg FENCE fGfEl� !J v S`tfr — �� — — — — — --- — — — — — — — — — — — — — — — — — �- 516F- !� !bf— lSP�.!lf��blfi flf��flf�- bbf•�blf�� ��!lf-- blf— !!f —!�� !!f— /bf— !!f!!f� !f` — — + y� 33EE�� r 367 +00 368 +0 3 Pa +00 pg' GPS .._. GPs5+00 GP5 ?�A m— GPs ° GPS ° GPS — GPS — GP+S — GP6 — Gi+s — OPS 37 - P6 °GAS 37GP =+ —GPS —3GP5 —GPS -- GPS =GPS G3P7� GPS -- GPS vP5 — GP+576+ GP5 — GA�+3n P5 -- GP5 378 +pppp� g+�p �a6�p� �a1+pp . g GPS — GP? 7 4S — GP9 — GPs — GOS 6= +�y8Pg GP5 2 0 -- - -- - - - -- - - - - - -- — -- --- -- - -,.. WETIANO WI2 - ' Typ PFD ` a E%ISTNG GAS LINE (TYP) ACCESS ROAD 417 -"�.- P�.�N �P1 .w" 0 39 60 ,OE0 ® Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corpra4on -NorN Caroline North CaRohm License S C -22,9 0111 Piedmont Natural G a s ree.,�, e. PUBLIC Ro 0 mow' w r[a eaR N PER snT FEr�cE —a !. PROPOSED= °'— anLTYPE _ c 9 eImNG= I„ AT, N O DDENTR..xITP=N, TE w 11PA =E HE „ = „P'U.. EMPORAAY ME A »D OOREPI�IER 1- TWBERMAI BORE PIT..GR`CAANOEXIBnNG CONTOUR (MAJOR) TEMPORARY BRIDGE r.r,rr aTREAN ®M UcTwu ENTRANCE NO DATE DESCRIPTION ENG. DRAWN C DRAW NG NO E 1 01/23113 ISSUED FOR APPROVAL NF SR SIR AKI _ - 5B LOOP - EAST EROS ION CONTROL PLAN FROM STATION 352 +00 TO STATION 379 +00 WAYNE, NC. DRAWN BY NF CHECKED BY: APPROVED BY: 3CAlE: SR DC 1 "�60' JOB NO. 39911024 DATE: 01/232013 DRAWING NO: REV. 5BLE- SEC -EC -014 SHEET 19 OF 46 1 Sgf\ GPs - 1_i.l TEMPOIGRY WORN 3MCE ITYP.1-•�� ��- egf\ TRENCH PLUG SSf\ SUPS TFENCE O WETLAND DELINEATION " `'Sf /- wit¢ i ` ND W126 O SE GAS EASEMENT T7po#,,pPf1 Y 3' &LT CE ITYP TIAAR�ER AT � ^� 380fp0 neoro �\ f Mq vulrrPl oAl •.' .�{r�'^" .� ^\ 1 / \ r \ �`''�^ ,. l :.WE7CA ND Wj25, • ` . - � ... ���(_ `17tI1tIN4• Y� • • 7 . TXpe PFO Msr n y� mTvtcR v c V , i f SOR DILNMATgN ITYR) I , , 5 Z! , • . IN v » . r r - , / ... � �•�, O ' it / i ,.... ,;h. S,. ': ', her !.; , 71 ->. - - , i i a �.•. �\ y1 - 4 \. , . DELINEATION I :i \• 'E�L'AND.W126 p • ` • . � :•:/ � to .. , , � .:. -._:. .,� >, •i%. _ ,1. I 1 L..,._. M -1 j!;,t4' ,. .►r >-• t- �,, :,,- �Y T�,4NbWf26 �.. ��� i � r - Y a a_ 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS CmporlEOn -NOT CSrotirM North Cirolm Li- F C -2243 Piedmont 0,11 Natural Gas AccESS ROAD wAER3AR _.,- .,,..,. MOPERry LINE —SP —� PIr FENCE euc ROAONDA Rv uuE BUPFR s,Lr PENCE --YAFw PROP.11 CL --PE --cava E. INO a 1 OEUNEATION oPOEEDEA3EMENT O FA G NDDENT.1 -1 ­NT L - -_ NGEA9EENr M © TRENCH PtuO -- v R RYwoR.iPACE FFAA COREFLTEROUTLET NAr ®SORE Pn FOR .MCA AND SORE - GCONTOURW—RI :. EMPORMVERDOE �.�.� REAM ® :oN3rn__ ENTRANCE ND NO. DATE DESCRIPTION ENO. DRAM CHK. DRAIMNO NO. TRLE r olrz3ru ISSUED FOR APPROVAL NF SR AK , - -._- SB LOOP -EAST EROSION CONTROL PLAN FROM STATION 379 +00 TO STATION 406 +00 WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR JOB NO. 39911024 DATE: 0123/2073 DRAWING NO: SHEET 20 OF 48 REV 1 58LE- SEC -EC -015 G WETILAND DELINEATION TREZ��LUG 'EMMRY ER DGE THE PLUG MAT IHLT FIE (TYP.) — — — — — — — — — — — — — — — — — — WETLAND W1 6, ` O + TRE49 PLUG WATER CROSSING Stti C \TE \MPO Y') MOPOSED GAS EASEMENT OPOSED GAS LINE (TV =,) THE ME MI O 0094-200" GA91-51%116 GAO.+- GAS 11-745 G" -AM GAS iF .!-77s,77—`f.-7!7--".f. —771,f WET ---- --------- - 77, 2 Ty ❑ — "S — ep's — 6W,— C'As T.gNUkT —0 'ce TEMPORARY WORK SPACE T WSAS" Ov DSED GAS LINE (TYP.) T . . . . . -- . . . . . . . . . . . . . . . . 7- 7 v O .7 7— 7- -:- 4 K.W5, "i'77, 47,L'N 1. 0 W L 8+&S Cp, 190S C.AS 417+0 418+ C G" jj AS —GAS AS 5 6" WETLAND W128: PFQ IS I I ' I E-TLAND'W220 .s �Gf—sf—sf- -of ORE M FOR JACK AND BORE (TYP. ---------- -------------- — ----- ----------- ---------- --- ------ --- ------------ :-7-z .7- PLUG MT�AFJ'413 WI?7 - p LUG EXUITING EASEMENT IHLI� MR$ LUG EXISTING GAB LINE • ------ - ----- % 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS URS - N.dh C—In. NoM C-1— Lice— III C�2243 Piedmont 0111 Natural Gas —TER F cougar oono.R +ulrE —a F—I SLTFEKCE P -L —S3 III 1ILT F111 --GBA�* ZPOSED CL L T. C'��71 .010SEDEISEREt4T .OENTRI T�111T —1- —EIENT TRENC. TAIR—A-11PACE PLU. -1— — FILTER OUTLET TIIIER 1AT SIRE PIT FORD CI — BORE -B— —'—w—) T—ONIAI BRIDQE SIR— 1111TRIOTION E RINCI NO, DATE DESCRIPTION ENG. DRA� CHK, DRAWING NO, TITLE 1 01123/13 ISSUED FOR APPROVAL NF SR AK- 58 LOOP - EAST CONTROL PLAN EROSION CON FROM STATION 406+00 TO STATION 433+00 WAYN E , NC. — — D -- APPROVED BY: CHECKED BY: SR I APPR -60' JOB NO. 39911024 DATE: 01/2312013 DRAWING NO: v 6LE-SEC-EC-0161 S"EET 21 OF 48 1 T11figNAT TO NAT �a ', >•,� si' ^' TEMPORARYWORNSPACE(m) ,• TIMBER MAT f __ _. WE TLANDDELINEATION - IRE PLUG qT AOR / ` ....", (_yLF•� -J� [y,�� ^-.t •� �L .'.. TRT PLUG - n PwG 1 ROM 440 GQ5 — v45 G45 aP� .44 GP6 _ l • , E ITY 1 * . . —WET NE)VVZ2 ♦ 9 _ Q � , LVET •' � . ... ,. -. ... ..... ,..,. . _.. ... :.. FRENCX PLUG , NWTER LhLOaNNa T • ✓, ` - - ' °� .._.. .. . -. - ,....» ,.. -...n ,... . ., � �:,r .' ER MAT �4�J - 1 " - : •t l� \ r N. « eFs T� cam. } '. • � EOL BLLNlA ITT) -_ "_- - - TM)N .� - Ezlsnuc cnsu 1 - - 65+ OS ...• -GAS '�� Ij ', ice' • ^. , �i, —EN� _ - 4162 -8&Ej y W PROPOSEDO1b LINE(TT.I _ - GAS 4 GAS 4NE'[LANO W,136 41A8 2 0 448. - 1 -- - - rOQA GAS �.+� QII�$ — /449 +00 v ----- _- ` TIMe�C S z� \ \` ,, _ -9 +-0G GpS As %+s TILT PEry4EInPI _ -- fJ.00 G Cj — .w 457.00.,- G ACS GAS ACCESS ROADSIS / TH C'N PROPOSED GAS EASEMENT C, / �f ' N i Fq - -y �'•p� 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Cor FD1-L -NOM C -224. NoM Cwlro LipnE1 P C -2243 2,1 P i e d m o n t �g Natural Gas ' Fu 1— SUPER silt cwcE war uNE —;� FDA!! PROPOSED CL - -GA9 -a E< a iN i N �_ Pao oseoE +sENENT NDOEN.PY, —POINT t - -__? Ex woaasPADE aEN<Nxuo ' "` KTEaoDTEr ® =AT ®RoaE Prt coa,MCK ANDeoaE EKISTNOCONTOURINAIORI TEMPORARY RRIDOE naEAM c s* ON ENraANCS " NO. DATE DESCRIPTION ENG. DRAWN CNK. DRANRNG NO. TRLE 1 01I23IU ISSUED FOR APPROVAL NF SR AK 56 LOOP - EAST EROSION CONTROL PLAN FROM STATION 432 +00 TO STATION 461 +00 WAYNE i GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' JOB NO. 39911024 DATE: 012312073 DRAWING NO: Rev. SBLE- SEC -EC -017 SHEET 22 OF 41 1 BORE PIT AND BC TEMPORARYCONST u—N EXISTING OAS L%E (TYP.) - O 4eA's ' GPM Sys 464 5 'L*00 CAS 60 GAS LEGEND GA S r G / j F� sR.T PENCe 1rYR1 +OB�O$ EXISTING GAS LINE(TTP.) URS Corporation -North Carolina North Carolina License E 0-2243 ON Piedmont Natural Gas _ -ROaO wArERenR Ev eOUnoarxv I'll —EP- -s — wPEa sar RErvcE ROAO PR l_) SO'ry PE --- -cas -w a I� url . I H ao DE E T o PROPGaEGE,aEMERT Q IS<ING`L „DOEN RI E ITPOI+T - __ -_ - -_l OGarINGEXaEMENr Q. rRERCR Pwc GR.R wGR aRX E D CORE FILTER OUTLET ER Uer ORE Pn FOR JXCR UIO ® ®e FORE - -- - - - -- EXIaTINO CCRroUR I—OR) TEMPORARY aemGE arREAM c ucr�oR EIRR.r.ce ® Do E�1/ / # DESCRIPTION ENG, / ND/ •/ DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR Access ROAD W / I / R JACK / .1 - - -- - -- . Z �� PORE %T FOR JACK ROa / ,. , /_ ASEM EXISTING EENT / J AND BORE Alls 1 aA� \- TEMPORARY CONSTRUCTION ENTRAN9( OO \ / \ G &4ja GAS473 \ \ 4sr ' + /I� v vOPSs1, ' R / \ \ \ GPIS 491 - � oov If \ ! 0 30 $ 60 120 \ �__.... _.. Feet , NOTES LEGEND REVISIONS REFERENCE EXISTING GAS LINE(TTP.) URS Corporation -North Carolina North Carolina License E 0-2243 ON Piedmont Natural Gas _ -ROaO wArERenR Ev eOUnoarxv I'll —EP- -s — wPEa sar RErvcE ROAO PR l_) SO'ry PE --- -cas -w a I� url . I H ao DE E T o PROPGaEGE,aEMERT Q IS<ING`L „DOEN RI E ITPOI+T - __ -_ - -_l OGarINGEXaEMENr Q. rRERCR Pwc GR.R wGR aRX E D CORE FILTER OUTLET ER Uer ORE Pn FOR JXCR UIO ® ®e FORE - -- - - - -- EXIaTINO CCRroUR I—OR) TEMPORARY aemGE arREAM c ucr�oR EIRR.r.ce ® Do NO. DATE DESCRIPTION ENG, / ND/ '--� 481 oiz. DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR Ile m � / TEMPORARY WORK SMCE(TYP.) \ \ / PROPOSED GAS BASEMENT - A B \ \ _ y11 � \ lu y�- \ \. . 475 +eo 474 +00 z / bIL DEL INGTION 4sr ' + /I� v vOPSs1, ' R / \ \ \ GPIS 491 - � oov If \ ! 0 30 $ 60 120 \ �__.... _.. Feet , NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corporation -North Carolina North Carolina License E 0-2243 ON Piedmont Natural Gas _ -ROaO wArERenR Ev eOUnoarxv I'll —EP- -s — wPEa sar RErvcE ROAO PR l_) SO'ry PE --- -cas -w a I� url . I H ao DE E T o PROPGaEGE,aEMERT Q IS<ING`L „DOEN RI E ITPOI+T - __ -_ - -_l OGarINGEXaEMENr Q. rRERCR Pwc GR.R wGR aRX E D CORE FILTER OUTLET ER Uer ORE Pn FOR JXCR UIO ® ®e FORE - -- - - - -- EXIaTINO CCRroUR I—OR) TEMPORARY aemGE arREAM c ucr�oR EIRR.r.ce ® Do NO. DATE DESCRIPTION ENG, DRAWN CHK. DRAWING NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR _ AK _ _ SS LOOP -EAST EROSION CONTROL PLAN FROM STATION 461 +00 TO STATION 489+00 GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 ".60' JOB NO, 39911024 DATE 01232013 DRAWING NO: REV SOLE- SEC -EC -016 I SHEET 23 Of 46 1 EXISTING EASEMENT "STING GAS LJNE(TYP.) PROPOSED GAS EASEMENT {� - •XY y�rp� \ ACCESS ROAD 11. - DELINEATION ITYP.1 _ y S • - / i / i �!��QS"DD/ / \ \ \ c*VS ♦ \ j y _ _ _ — 50gy ..— GA c) 503+ S GAS (� /� \ � lEMPOMRY WORK SPACE ITVP.I \ \ 04S ,. JL- �.ILg0 -50GAS ''� fn — / yo S PROPOSED OAS LINE (TYP\ {�•Vy' \ ^- \qq(�°\ \ _ -��qg99,, J- S N _ CaA�y00 GAS o ` -r0 GAS — — — QvS S tp /• \ \\ _____- N / / / �5 / \ 5 \ \ \ \ A �Pt ♦t \ 4� g \\ \ 5 mss,;• MLTTE(TYP.) � se v / \ \ \ /°_ / AS \ / 1. � / \ \ _ 52'j° / 511+A vyrr \ 508y0Q yr (,p�07+ -00 zy \ \ \ \ ti 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� UFS Corporation -NOM Carolina NOrtN Carolina Licenas E C -2243 Piedmont 0111 Natural G a s PROPER` 11— _EP,_..� war uNE suPEa rPEN<E Pa "L�`j R LIPE E. solLOEUNEwnoN D NDOErnRYEXITPOU„ 57 n E SENEN TE Ana RP, E O TRENnRPLUG NPOawRr 1.EnANn �` CORE ­ER ourLEr ® TNRER'Ar eoaE Plr voa JwcK woeoaE _.... __._... E —TINOC 1..RINA10 1 m, TEMwawPraP'..E «,..� erREwN c sraNCrioN ErJrawNCE a NODATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR .AK - - -. 513 LOOP -EAST EROSION CONTROL PLAN FROM STATION 489 +00 TO STATION $17 +00 GREENE, NC. DRAWN BY NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' 60' NO: REV. JOB NO. 39911024 DATE: 01232013 DRAWING SBLE- SEC-EC -019 SHEET 24 OF 46 1 SDK. DELEG rlox (TYP.) EXISTING GAS LINE (TYP.) \ -� BORE PIT FOR JACK AND BORE (TYP.) \ \ PROPOSED GAS 5 P — G 5 535+Op 536+00 - — - - — - - - - - - - -- -- - - - 53 P P 52 +`° GP G `� 3 oovp O — — G 5 — 7 +� g pp ! P — GPS — — GP9 — PS — GP6 \ - - -- - - - - - — --- _..- - _ _541 +00 Sy2��G� — W vPF csPS GPS py± 544+ — P�° GOy53` m �GP _ _ _ _ _ _ �. _ _ ____ �_ ___ _ _ __ Grp _ — —�J 'G��' Vw V �' TEMPOMRY CONSTRUCTION ENTRANOE ITYPI ... a - - - � _ _ - TEMPORARY WORK � \ I PROPOSED OAS USEMENT r �{ 0 30 60 120 Feet NOTES LEGEND SOIL DELINEATION(TYP.) �► REFERENCE DRAWINGS Corporation URS NO Caroline North C.rofi LiC enx S C -2243 ON Piedmont N a t u ra I Gas - �At� WATER BAR _ aF I" E —"P— 1118 Sir 110E 3 TYPE mmmti'"' "°" ` "E "T10N O DDEN,KYE ITP°I„T L._.. -.._7 IDIIST11GEISEIENT - -- R.R.• N °RSPA °E D / ,REELrERD LET ® -� KoRE aNAr KoREPn E�R�u .T E TINOCONTWRIN.JOR) ��'°�n°'°' °. TeNPOaART ROCE ��».. a EAN c urn° „Err<R E » NO DATE DESCRIPTION ENG, DRAWN CNK. DR NGNO. TITLE — — - PS ISSUED FOR APPROVAL NF 532 +p0 PS a G S – eANITING EASEMENT +°p C, • c*S �- S .: ,•. x+04 f+PS /O — — _. -- _ _ ----- --." GAS SST 00 I CUPS �y I SB LOOP - EAST EROSION CONTROL PLAN FROM STATION 517 +00 TO STATION 545 +00 GREENE, NC. GAS ��Sp pp °>AS3 +pp 52.x— +CPS — 611`6 S `�wS GAS ,L9.a e� 52+O&�j X2 � .� I PROPOSED GAS EASEMENT BI t Qy I \ _ .,.•... �.b PROPOSED GAS LINE ITYP.I \ \ \ \ TEMPORARY WORK SPADE ITYP.) DRAWN BY: NF w / SDK. DELEG rlox (TYP.) EXISTING GAS LINE (TYP.) \ -� BORE PIT FOR JACK AND BORE (TYP.) \ \ PROPOSED GAS 5 P — G 5 535+Op 536+00 - — - - — - - - - - - - -- -- - - - 53 P P 52 +`° GP G `� 3 oovp O — — G 5 — 7 +� g pp ! P — GPS — — GP9 — PS — GP6 \ - - -- - - - - - — --- _..- - _ _541 +00 Sy2��G� — W vPF csPS GPS py± 544+ — P�° GOy53` m �GP _ _ _ _ _ _ �. _ _ ____ �_ ___ _ _ __ Grp _ — —�J 'G��' Vw V �' TEMPOMRY CONSTRUCTION ENTRANOE ITYPI ... a - - - � _ _ - TEMPORARY WORK � \ I PROPOSED OAS USEMENT r �{ 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS Corporation URS NO Caroline North C.rofi LiC enx S C -2243 ON Piedmont N a t u ra I Gas - �At� WATER BAR _ aF I" E —"P— 1118 Sir 110E 3 TYPE mmmti'"' "°" ` "E "T10N O DDEN,KYE ITP°I„T L._.. -.._7 IDIIST11GEISEIENT - -- R.R.• N °RSPA °E D / ,REELrERD LET ® -� KoRE aNAr KoREPn E�R�u .T E TINOCONTWRIN.JOR) ��'°�n°'°' °. TeNPOaART ROCE ��».. a EAN c urn° „Err<R E » NO DATE DESCRIPTION ENG, DRAWN CNK. DR NGNO. TITLE 1 ISSUED FOR APPROVAL NF SR _. K - I SB LOOP - EAST EROSION CONTROL PLAN FROM STATION 517 +00 TO STATION 545 +00 GREENE, NC. DRAWN BY: NF SR DC 1 60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: REV 5BLE- SEC-EC -020 SHEET 25 OF 48 1 wETUto DEl1NEAT1pN - � �•' , .•• � �+ -'' WATEREAR DIVERSION ITYI EXISTING GAS LNEITYP.) WETLAND W2 PROPOSED GAS LINE (TYP) TREN LUG TEMPOR�I�ERIOOE T��i - �4 C -- -- -- - - -- — — - -- — — _ _ ----------------------------------------------------------- WATEREAR DIVERS ( ) WATEREAR DIVERSION I I v 1 R qMT + _ -_. _.__ .._.. -... .._ -. .. -. - -__ _ .._.._.._ ..__ -___ _ — __.. - -- __- .. - -_. .__- -_.. -------------------- .._.._ _ - ._.._. -------- — ._ _. -_ _ _ __ - — SO co ON TYP TYP. NLl iEd_OE ITVP O - + -T - - So 1ff0 543 W + 0 00 +00 +DO 8 +00 50+ 551+ 552° 55 5 56+ M W +004859 +0 4s�/� 560 +0 HE LS — c" — ai + — GPs = i ° c'-S Z a — GPS — la GP6 — C — GP6 — owl—, GPS - - ow 0 GPs — GP55 %ps — GPS ° &S — G45 -y; caps — GP6 — L*P% — C." — — "S —9;90— a" -�G GP6 -=- Z Gf GPI✓ ° GM3 — GP6 —gate — GA J J S �.. TRENLtl PLUG r,� _ e. ,.,.r -� TRENCH PLUG TRUDTION ENTRANCE (T/P.) Q — — — — — — — — — — - — — — — — — — — — — — — — — — — - — — — — — — — — — — — — — —.,.- / TENPORARY WORK SPACE ITYP.) r s° Q • — — �T--�, ,.I, : � -- �-- - - - - -- is - - -- TREZZL LUG / ATER CROSSING �� v /Sf1E 0 TNBfi �t / /..• / .. / Imo- i SO WA. RCROSSIND - / O j,. V r� SOILDELINEATION(TYP.) V WATEREAR DIVERSION (TYP.) V Il - ACCESS ROAD WATEREAR DIVEIISION ITYP. /� 1 —TI—EASEMENT O n 10 5 + 0 3 00 '6+00 5 5 +00 r 66 +00 567 +0 568 +Q0 569+ _11&A 5�7+ 0 W +00 00 – 5L4 +00 — GP5 — Fa 'P — GP.�s — caPCa — GPS G °GAS+ —GPs — GPS GpSS — GP6 — GPS — �sPti+ — GPS — c+Py — Gpb — — GPS — &A — G" — caps — GPS Z — GPs ° CaSP�+ 0 GPS —caps — J — — — — — a — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- �\7TE­ r' PROPOSED GAS EASEMENT TEMPO tV 0 0 30 60 120 NOTES LEGEND REVISIONS REFERENCE DRAWINGS 1� J� URS corROration -Nora, Carolina North Carolina License M C -2243 Piedmont 0111 Natural Gas YA —.P—. TER aAR ARr uRE — IIER "I 111E YAM vR CJ S01-1 s �L �r� 11 N 0 oEL E O RR „o :EDEASENIT HER "P. "a Po Roo E "TRY Exsr '��`� "E - - -- ENPDRARVIVORRaPA�E TZ.'Z L DoRE1 TERo WE ARD ET ® T RNAT aoRE Pn 1oR SACK N+o eoaE _.. _.._. E.�sTNC CORTOOR INA�aR) TENPORARr eRiDOE aTREAM ® X �cTio "ErrrRARCE NO. DATE DESCRIPTION ENG. DRAWN CHK, DRAWING NO. TITLE / 01/23113 ISSUED FOR APPROVAL NF SR _.. ,• _ -` 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 545 +00 TO STATION 572 +00 GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVEDBY: SCALE: SR DC 1 - -80' JOB NO. 39911024 DATE: 011232013 DRAWING NO: REv 5BLE- SEC -EC -021 SHEET 26 OF 48 1 ACCESS ROAD M PROPOSED GAS EASEMENT EASEMENT O Lc) 1n0 10 co * '4'9 " t" 3"' "a'e t' ' T " ops 570+ 99-- — G" ±& — G" 9 V — Gpe — W— G" — WL aws —GPs o" — opw— C" — C" —45 — C" E-Us —o" 2s — G" 1a — ops 2&? — G" — W— ops — cW- G" — 3 Gps — Gatops — Gpe—&" — cw. P80POSED GAS LINE YP� 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - IT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7TEMPORkRY WORK SPACE (TYR) -• - ACCESS ROAD #2l — — — — — — — — — - - - --- ------------ c. 18 O Qp -------- -- —x w "S _r _ c ;s u +00 r + , E ops I 0NS A Gpe — ow cws —GPs GPS +00 r S G'S C _ C Q MS - R _ -------------- ---- -------------------------------------------------------- - - - - -- — — — — — — — — — — — — — - 11 IL -LINEATION 111) N 0 30 60 120 Feet NOTES LEGEND REVISIONS ----T— REFERENCE DRAWINGS URS LIRS N.nh C-lim. N.� C-Ii- Li-n- III, C-2243 Piedmont Natural Gas �W� nwY LIIE "E SUP- �11T F-E P� A. PROPOSED CL 111L TIRE 'E" PR EAll-T • R..LEOlSlE-1O'1.lNT ..... ""'T lR.P.R-..-PA.E 0 t, CORE I`- OUTLET =.*.-T ..RE PIT R Z '­ I TEMPORASY"ER DGE' - -RE T= 111TIUR 0-LORI on I.CIT111111" l-l'-E -- NO DATE DESCRIPTION END -A- C- DRAWING NO, TITLE 1 01/23/13 ISSUED FOR APPROVAL AK 5B LOOP - EAST EROSION CONTROL PLAN 0 0 FROM STATION 572+0 TO STATION 599+00 GREENE, NC. DRAWN BY: NF �DRAWING 6HffEQK­EDBY SCALE: SR I APPROVED BY: NO: DC V- 60' N . - 0. 39911024 DATE: 01/2 (,13 5BLE-SEC-EC-0221 SHEET 27 OF 48 JR" I Eel � GAS o�0 &Li FENCE ITYP.J J 1 M _ r r'. W I j :a GAS Z 2 +00 _ 3 GAS - .r'Ggi +00 — — — V GAS GAg614+ I- Gpp AS GAS 6-15+ �.� "AS GAS 616 +00 / / / PROPOSED OAS uRE / o j--- .- TEMPORARY CONSTRUCTION ENTMNCE(TYP.) \ A /SF G�'I %}� _,-,� _ — _ — _ _ — — J►5 GAS 6Gp56 GAS 1+00— — GAS GAS GAS 1! WET— ELINEATNIN WISE Yj _ WETLAND-W135 Type POW 6> LEGEND M m EXISTING EASEMENT REVISIONS PROPOSED GAS EASEMENT REFERENCE CD v � N I , - NO NO. -� TJ GP5 G °AS _.. may 6ot+ . - WW —GAS +00 , TEMPORARYCONSTRUCTiON ENTRANCE(TYP.) T _ — _ / C1 4 0 — GPg "' -- GAS — 6' +OFaPS 6p6 GAS GAS .-- G��p7 +00 � 6� A5 -- GAS -- GAS 2 GAS / 01/23/13 GP --- GA5� / SR -- — _ _ . — — _ — '�• _ BORE MT FOR yP )K AND FORE )TYPJ TEMPORARY WORK SPACE,,".., — - ._ -__' / O_ •�. ��99�� �b +0'C'%� _ �- � I aN.T FEpt�e mR)� 5y�ioo -- I° G a � 5 BLOOP-EAST EROSION CONTROL PLAN FROM STATION 599 +00 TO STATION 625 +00 GREENE, NC. I � GAS o�0 &Li FENCE ITYP.J J 1 M _ r r'. W I j :a GAS Z 2 +00 _ 3 GAS - .r'Ggi +00 — — — V GAS GAg614+ I- Gpp AS GAS 6-15+ �.� "AS GAS 616 +00 / / / PROPOSED OAS uRE / o j--- .- TEMPORARY CONSTRUCTION ENTMNCE(TYP.) \ A /SF G�'I %}� _,-,� _ — _ — _ _ — — J►5 GAS 6Gp56 GAS 1+00— — GAS GAS GAS 1! WET— ELINEATNIN WISE Yj _ WETLAND-W135 Type POW 6> W iGt�S GAS 2 6 GA$,%►S -- GAS _..- - MYETUND pELINEATWN W ET LAND +fJ135 Was ¢� Typo POLY; fJJ/ 3 , I — sa - L � � m I — T� TEMPORARY WORK SPACE(Typ1 i \ \ /y y a EORE PIT FOR JACK \ \ ,t N AND BORE (TYP.) ±! SILT FENE 111) 0 30 60 120 Feet NOTES LEGEND M m r REVISIONS r REFERENCE CD v � N I , W iGt�S GAS 2 6 GA$,%►S -- GAS _..- - MYETUND pELINEATWN W ET LAND +fJ135 Was ¢� Typo POLY; fJJ/ 3 , I — sa - L � � m I — T� TEMPORARY WORK SPACE(Typ1 i \ \ /y y a EORE PIT FOR JACK \ \ ,t N AND BORE (TYP.) ±! SILT FENE 111) 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� 7 URS Corporation -North Carolina N.M CaroNna Lic.— S C -2243 011 Piedmont Natural Gas - - f -w� WATER ' — aF-- -E a nRV ewe 1PE1 III 110E " `�„ " TE weR „RP E RR „o Po EAEEMERT R. oREFUERO ET naRER MAT ® SORE Prt rcR .v.« woaoRE - -- - -- - EFISTNC coNTDUR)M "�oR) TEMPOR.Rr _O_ A..«r.� ATRFAM c ­­01 ENTR"RCE ® „ o NO NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK - ... 5 BLOOP-EAST EROSION CONTROL PLAN FROM STATION 599 +00 TO STATION 625 +00 GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' � 60' NO: REv JOB NO. 39911024 DATE: 01/23/2013 DRAWING SHEET 28 OF 48 SBLE- SEC-EC -023 1 / / \ /GOS c � /PROPOSED GAS LINE ((TYP.) PROPOSED GAS USEMENT � 6 r / SOIL DELINEATION ITYP.) TEMPD"RY WORN SPACE IT 'w"ARY CONSTRUCTlW7E A EITYP.) / / / CA 11 � 11 1 \ 1 U , �e 1 c� � 1 +00 GAS TCN`1,SNE g36 T+ 0 GPS G oo \ \ \ a��;" r11A GAS SOAP,# GAS \ G \ _ 665po_ GPG GqS \ ^xo bg2a00 . --GP'3 00 C46 1 GAS `83go�GPS � �ye.,A,.:........ -:ray.- ..»e»..«,....., m..... �.. ...,.,....�..;.w"`..m..,;..,. , / M GAS i4i� 1�1 \ aRy CDM3� O\ 60 120 ODE Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS Corpara3on -North c.rmina North Carolina License a C -2243 Piedmont ON N a t u ra I G a s ,nY —sI —t TEReeR RY ONE — 11ER III PENCE PU AC �6Y`aT PR SOIL TYPE nsgE, nr„ sEn EASEMENT O G El R „Ex,,,o,,,, — - -' Ez E'_T A E O TRENCR PLUG - -- RARY Nn REP�rERO�T�E, ® MAr aoaE Pr POR UCK ArIO eoRE E.,snrvo c01T11R PAAJORI TENPOanareIIIIE ITREArA � c ucnONErnRARCE ®” NO. DATE DESCRIPTION ENO, DRAWN CNK, DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR .. AK .:. -: 56 LOOP -EAST EROSION CONTROL PLAN FROM STATION 625 +00 TO STATION 651 +00 GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1 JOB NO. 39911024 DATE. 0123/2013 DRAWING NO: 58LE- SEC -EC -024 SHEET 29 OF 46 REV. 1 A 649+00 A4v4/ \ \ 7S ` / 6� /��p$ GAS 657 +ppAS GAS 656p0 _ — — _ � x G GAS GAS 66p+ CD / \ \iQ G '2 �,..••:, _ / / F5�rjG y GAS _... DO o _GAS `GAS ��gg� O _ GAS Gps +00 A6� -►� PRa G � Gpy / _ — — "GAS G a +O �GAS "-- f LU +00 _ —GAS GAS 666 +0p _j -- GAS _• / V -OAS I/ w� TEMPoRARl CONSTRUCTIONN ENTRANCE RYP.1 I Iw ¢ � O I TEMPoRARY WORK SPACE I �1 J au E1nP.l M Q �y w { N E ism IS NQ DWNEATWN(TYP.) \ \ PROPOSED OAS EASEMENT PROPO.AED GAS LINE ITYPI G \ `n t — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — GA5663 +04i1A� — GAS 664 +& _ GA RS -- GAS 66 — GA�67 +0 —GAS -- [aA, 0 GAS —&&R-0—GAS -- G +00 GAS --- GAL71 +00 GAS „_,_ GASb72 +0 5 ,_,,,,, GAS 873 +WAS --- GAS 874 GA, —GAS 67% GAS 67C+ffi —GAS —, Z +fiO -- GAS ,— 00 GASS _ _ +00 V Q - - ------------ --- . � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEMPORARY WORK SPACE InPI � N 0 30 NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS CorI orabon -Norm Carolina Norm Cemliru License x C -2243 Piedmont r6111 Natural G a s - �--�w� WATER ePR —fPti A Rv ui+e — suPER sir taut[ �CRl� RR �!++j sJll rvPE Eo DEL E o aE0 E,SENEnT o • DDEnTarE TPOI1„ L 1 IX RGE,aE..E "T O THE "D "PLUD -- RARV WORKSPACE "D t OOR 1R OUTLET 0II® NAT ® aORERnrOR,AOR,r,DaDRE -- - - -- T. TIRa co"TOUA INAIORI TENPO._.RDCE �.�..� STREAM c urno "ENTRANCR " NO. DATE DESCRIPTION ENG. DRAWN CNK, DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR -- ' 5B LOOP -EAST EROSION CONTROL PLAN FROM STATION 651 +00 TO STATION 679 +00 GREENE NC DRAWN BY NF CHECKED BY: APPROVED BY: R SCALE: S DC 1". 60' JOB NO. 39911024 DATE: 01232013 DRAIMNG NO: SHEET 30 OF 46 REv 5BLE- SEC- EC-025 1 BORE PTTFORJACK LEGEND EXISTING EASEMENT AND BORE RYP.1 EXISTING GAS LINE I-) REFERENCE DRAWINGS M� U North Ca IrS L- w IF C-2 Carolina North Carolina License b C -2243 � Pit r l n t Natural Gas R _ ._ -- _ - 1_1E ena war une _ wPER sIiT.ENCE SCAM Pq _� soil riPE 1oL0EL E oPOSEOE,sENEn. O • DDEnTRYE TPOnT waRKS1ACE Q rRENCN Pw., - - - -- TENPORARr ' ..fn, „D cDREP ­ER 0—ET ® 12-7 Ar 801E PI FOR JA «V+D WRE 1A11RI TEMPDRAer e....E w.��»+ arREAN c ucrlDn ErrtRANCE ®H DATE _ DESCRIPTION ENG. DRAWN CHK. -- — — -- -- ------------ - -- — — r - - -- - - -- -- . 7C C I�` C — - -- - 91 , OWAO 679 +pENTRANCE(TYR) � o f TBAPOPARY CONSTRgN _ Ana — u+o - � ,Id, ` � -� _- O� �� -- s M PROPOSED GAS LINE jTYP.) __ -- -• I I {O �. �7 PROPOSED GAS EASEMENT I/ + TEMPOgARY WORK bMCE ITYP,) D,,L,,EATON I I I i01L DELINEATION ITYP.) 1 SILT FEO (NP) 1 j I 1 I VVV 11 ' T I 2 I � I ! I j DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1'' 60' 0 30 60 120 Feet BORE PTTFORJACK LEGEND AND BORE RYP.1 REFERENCE DRAWINGS M� U North Ca IrS L- w IF C-2 Carolina North Carolina License b C -2243 � Pit r l n t Natural Gas R - 1_1E ena war une _ wPER sIiT.ENCE SCAM Pq _� soil riPE 1oL0EL E oPOSEOE,sENEn. O • DDEnTRYE TPOnT waRKS1ACE Q rRENCN Pw., - - - -- TENPORARr ' ..fn, „D cDREP ­ER 0—ET ® 12-7 Ar 801E PI FOR JA «V+D WRE 1A11RI TEMPDRAer e....E w.��»+ arREAN c ucrlDn ErrtRANCE ®H NO. DATE _ DESCRIPTION ENG. DRAWN CHK. - 1I fj T19AIORARY CONBTR rN ENTRANCE (Y ) o O - - -- - - -- -- I y Of SR t0 s a 56 LOOP -EAST EROSION CONTROL PLAN FROM STATION 678 +00 TO STATION 886 +00 GREENE, NC. SILT I IT III) - ' R\ D,,L,,EATON I � j I I ! ' I t 1 j `4z Y \ 2 I � I ! I j DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1'' 60' 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS M� U North Ca IrS L- w IF C-2 Carolina North Carolina License b C -2243 � Pit r l n t Natural Gas R - 1_1E ena war une _ wPER sIiT.ENCE SCAM Pq _� soil riPE 1oL0EL E oPOSEOE,sENEn. O • DDEnTRYE TPOnT waRKS1ACE Q rRENCN Pw., - - - -- TENPORARr ' ..fn, „D cDREP ­ER 0—ET ® 12-7 Ar 801E PI FOR JA «V+D WRE 1A11RI TEMPDRAer e....E w.��»+ arREAN c ucrlDn ErrtRANCE ®H NO. DATE _ DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE 01/23/13 ISSUED FOR APPROVAL NF SR A .,. _.� -. -.-: ..... .. 56 LOOP -EAST EROSION CONTROL PLAN FROM STATION 678 +00 TO STATION 886 +00 GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1'' 60' JOB NO. 39911024 DATE: 0123/2013 DRAWING NO: SHEET 31 OF 48 REV. 581E- SEC -EC-026 1 ` MLT7EITVP.1 Oo F \ \ TEMPORARY CONSMTION ENTRANCE ITYP.I +`�£ ch y� • ACCESS ROAD #14 ` ; IS / w. ACCESS ROAD # 15 da / / I 0 30 60 120 ryyti/ / I Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS COrpora4on -NOM Carolina Nlr Camfim Licansa a C -3243 Piedmont 0111 Natural Gas nccESS ROnD ��� wArER I R — - -- vnovERTr uNe _ar--a R�TEENCE RvuNE _ sPEP saTEENCe :.. PROPOSED — 111111 soRT.RE E'T � L so DE `11 o oD , E POINT E n INI EMENT O , - - - -- TEMRORARw E REN P —TLAII (P CORE FILTER OUTLET ® HIRER MnT —PIT FOR UCRAN. —E _.._ ewa —T -RCM —I TENPORAR. e..... .�.�.. STREAM c T ucTI N ENTRANCE E� N NO. DATE DESCRIPTION ENG. DRAWN CNK. DRANtNG NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK- . 5B LOOP -EAST EROSION CONTROL P LAN ACCESS ROADS WAYNEE NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1" 60' REV JOB NO. 39911021 DATE: 01232013 DRAWING NO: 5BLE- SEC- EC-027 SHEET 32 OF 48 1 r" v TEMPORARY CONSTRUCTION ENTRANCE (TYR) O Fy m Z A A cuss Ro N ACCESS ROAD # 15 NOTES LEGEND .w REVISIONS s / REFERENCE DRAWINGS .� Piedmont 0111 Natural G a s w' R - —aE—a a *_CE RY uNE s PEfls TFE GE GAM PRO—ED, rys— soI�TYPE °°-GAOKt 0 IX ,N C L SHG i, OE LI I,E A r 11 FflOPOaEENT OORRYE.TPONT L -- EASTHGEASEMENT TREHOHP— -- EMFORAR1--CE CORE FITEROU— ® rNaER NAr IIORE PT FOR,ACK AHG a - -- - - - - -- EAISTNG CONTOUR R —RI '. TEMPORARr P—E .•�•.•� aTREAN c UCTIO —RANCE ® HoU - -- DATE DESCRIPTION ENG, - /Cps LNK. DRAWING NO. Cos i 01/23/13 ISSUED FOR APPROVAL / 2g3'GP`S NF SR ,'- -- GpS/ GAS Gpr AK SBLOOP - EAST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. 99: op Gp m— � GI► / .:' - l�r` et`` S t� CES,S•R6AD #16 a / , 0 30 60 120 �gs'jb�AS — ' 280•" / / / TT Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS CGr ti Nortll Carolina pera an - North Carolina Lice -0C -2293 Piedmont 0111 Natural G a s w' R - —aE—a a *_CE RY uNE s PEfls TFE GE GAM PRO—ED, rys— soI�TYPE °°-GAOKt 0 IX ,N C L SHG i, OE LI I,E A r 11 FflOPOaEENT OORRYE.TPONT L -- EASTHGEASEMENT TREHOHP— -- EMFORAR1--CE CORE FITEROU— ® rNaER NAr IIORE PT FOR,ACK AHG a - -- - - - - -- EAISTNG CONTOUR R —RI '. TEMPORARr P—E .•�•.•� aTREAN c UCTIO —RANCE ® HoU NO. DATE DESCRIPTION ENG, DflAWN LNK. DRAWING NO. TITLE i 01/23/13 ISSUED FOR APPROVAL NF SR AK SBLOOP - EAST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. _ DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' 60' REV. JOB NO. 39911024 DATE: 01232013 DRAVA NG NO: SBLE- SEC-EC -028 SHEET 33 OF 48 1 �- - 1 t � JI r -ar � S 5 gX k L� Q 1 b Q – y i Uum Mill Ln i - - - - - -- - J 2 U U a� N 0 1 ACCESSROAD # 16 yDM1DEPNFlTwN QyV1 s ACCESS ROAD # 16 P, a z 0 ` 30 60 120 Feet _ NOTES LEGEND REVISIONS REFERENCE DRAWINGS URS C.,p— b— - North Carolina North Carolina L ioense• C -2243 V� Piedmont Natural Gas rccESS ROnc ww� WPTERefR vR:.vERTr ur,E —aati r TFENDE Rr uNe — s�P.R SUr FE�_E �Owt PR _ soa True PRGP0$e —E—T - - - E...IRGE,.E 11 Re "P ENPDR Rr CORE RL,ERGG.�er ON^ GR gPPCe O DDXPIrRP.xAPo^ R ® nNeER ® .DRe DR a Grc o.o E -- - - -- -- Evlsrwc colvroUR pnuoRr rENP— Al."DGE ..�+�.. nRE.N c Ucno"eNTR —E " NO. DATE DESCRIPTION ENG, DRAWN CNK. DRAWnNG NO. TITLE 1 0123113 ISSUED FOR APPROVAL NF SR A . _ .. 58 LOOP - EAST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC V- 60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: REv SHEET u OF {6 fiBLE- SEC-EC -029 1 f f Ilk If 5 / G j Uj ACCESS ROAD # 17 0 30 60 120 / ® Feet i NOTES LEGEND REVISIONS REFERENCE DRAWINGS �� URS Corpma4- - N.r Carolina North Camlirw License 4 C -2243 0111 Piedmont Natural G a s M� W _„y •,Ee a,R nRr LINE sNVER sat cEH E PROPOSED_ salL rrvE 0 0 --E—IT .GE TR NT - N. 1- —E —T REr O r,GI PLUG - RAR.w. -..GE No oREE TERO r Er ® Ram .ORE RT FOR 111 ANO —E - - - -- E.ISr�NOCONTOUR I 0R) 1e, .rte° §'3 TZ P'.R_ ..�e.� aTREAa < _ Rucr�O., ENTR.NCe ® 'ro NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR _ c" 58 LOOP - EAST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY: SCALE: SR DC 1' 60' RE' JOB NO. 39911024 DATE: 01/23/2013 DRAWING NO: SHEET 35 OF 48 1 SBLE- SEC -EC -030 3 0 x x r � z , m 3 o d d m ACCESS ROAD # 17 r� a. Marc / 01 o / TEMPONARY CONSTRUCTION ENTRANCE (TYP.) S t� A ACCESS ROAD # 18" 4 / f b i °tee ,10 30 60 120 a fie° Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URA URS Corporation -NOM Carolina North Carolina Li— t C -2243 Piedmont 0111 Natural Gas AccESS aonO fM1 wnTEa BAR - - - - -, vaDVEarr uNe —aP—y mLT VENCE s�vEa sar RE.cE ---Q .. _ _ so, r.� --A3— � .,_ oR uNFArION aIBr�N� O O „ooE ,a,Ex,r,a, ...'N EO EABENENT I--- Ex�nINOEASENE* +r p TaENCRPwc - - - -- TENPORAR.wORAaPA�E ' WETLAND CORE-TERODTIET TINBER"AT ® BORE PT FOR ,ACK AND BORE -- - ErlsvNa coNroDa (MBJOR) TemvoaARV eamDE �.�...» —EA. „ uenON ENTRANCE EEM NO. DATE _ DESCRIPTION ENG. DRAWN CMK, DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK - 58 LOOP - EAST EROSION CONTROL PLAN ACCESS ROADS WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY SCALE: SR DC 1' � 60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: Rev. 5BLE- SEC -EC -031 SHEET 76 OF 46 1 t I \ I I I C I r 1 x Cow Town Dr - _ m _. — D \ # , ` p MATCHLINE 502 ACCESS ROAD # 19 I a Cow Town Dr ACCESS ROAD # 19 Z 0 30 60 120 Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS URoSCorpora5on- NohCarolina North Carolim License t C -2243 Piedmont V� Natural Gas - - _ „� •qr urve _ suPEq sir sE "cE ��•A♦� _, soK true Gns s N so of r,Er.T o aseoE eENErvr O• r n ErvrB.,e n Po NT a oR aPe<e O ,REN —L °o R . T ROrvT- BRe Net sops P r roR �ecK eNo conT- R,NUOR, TEMPORARY BgooE ..�.�.� —AN O coNSTRURION ENrgARCE ® ” NO. DATE DESCRIPTION ENG. DRAWN CHK. DRAWING NO. TITLE 1 0123/13 ISSUED FOR APPROVAL NF SR AK _ . .: ,: 56 LOOP - EAST EROSION CONTROL PLAN ACCESS ROADS GREENE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY SCALER SR DC 1". 60' JOB NO. 39911024 DATE: 01232013 DRAWING NO: SBLE- SEC -EC -032 SHEET 37 __0F_48 Rev 1 r I h I 1 I � a TEMPORARY CONSTRUCTION ENTRANCE ITYP.) I I � I �o I I I f I � I I MATCHLINE 572 I ACCESS ROAD # 20 { I T \ TEMPORARY CONSTRUCTION ENTRANCE (TYP.) O 0 \ G t i \ ACCESS ROAD # 21 \ \ \ Z 0 30 60 120 \ Feet NOTES LEGEND REVISIONS REFERENCE DRAWINGS 0111 NO. DATE DESCRIPTION ENG. DRAWN CNK. DRAWING NO. TITLE Piedmont fwd wnrEn e,R - - - -- = T —fPy s 1 01!23/13 ISSUED FOR APPROVAL NF SR URS Corporation -NorN Carolina Natural Gas 11Pe1sur rE »-E North Carolina Lkenee f C -2243 ��.��• PR _ � sou rrae — tip., -c:. " : IL L�, � r, 5B LOOP -EAST Q , G "ppErv. » „PO,rvT EROSION CONTROL PLAN Ex wpaKSP.�E O ,aE »� »P�Un paEpE sENErvr »� E,aENErvr A,P ACCESS ROAD ,' Np � coaEFaEaOmEr GREENE, NC. _ PN,T epPE "I,EOa,­,,.paoRE - -- -- Erlsnrva corvrouR (M,JORI reNPOR,RV ae�ocE AK ' DRAWN BY CHECKED BY: APPROVED BY: SCALE: NF SR DC 1' - 60' ..�.... srRE,M < "nio »exrre, "cE JOB NO. 39911024 DATE: DRAWING NO: REv 01/232013 SBLE- SEC -EC -033 SHEET 38 OF 48 1 t (i� 3 �z r a Combs Rd Grp `c n suntlow Or H!/I St c` 7 \ 01 1 7 Z .., \ 0 LAYDOWN YARD °0 Hubert Or GOOD 'EAR 61)68 -!: DEED Tr6 E,L_1 N PALL E av'. FE JEEP 237c I, P"- J,11J 511 DEED D56 F F —K Ell LY1 ' RCEL J 71L r 'ODC. F R C & RICE RL- L E, I q 1 a . P. D - 0 G_EC EE 1 1 IRK I C E 3 y ra E.i.,I LOr & TF;I 1 ,EL' C' ED 261 b _ R _L5 E, D - D34G, e , � —. P •.. _. _e t =t i ­E 09T1 293 �OOOYEA 606BY3 �+ PAPCEL 3.66U29' eEED ­1 K74 FA RCEL ­23C,7556 c .J. 'N AI C F q O A UJ - ._41GF UCF = EE] 2 P4 IE,LE FE H L C F -0P ?E LL SA tL LbY C`R Jihv PE P2I1 5 ,5 SEED 557 ;RO j '.?E 21!.14.. I t PAR a +- -ANA • A G IDA J f L L h ...- 128' N- LAYDOWN 9.84 ACRE: VE L_ 8-1F PERT I NOTES LEGEND DEED 1 9 3E 24 326�i REVISIONS '`E`A R �E G_ _Gri =. T • F 1),E L L E C.I .. E:. S GEL 0 6 P -RR C C P PAR EL 4.- DRAWINGS P... — ­210-21- I OOONTi +6OF YVAV?1[ DEEC 10 -2'S ACCE59 ROAD f.,,� WATER �R - w�VE.ED PROPERTr U „E —aEti s ACCEIS0A0 Rv LIME _ WEER SILT FEN_E --6At� PROPCSeD a 1 T ��I 1 O B OOEITR „E TPOIM L - - --_] TE EASEmE «ro T� „P CD MAMR.wORKSOADE � R FITERODTL OO E L ET AT E eoPEPITFORJACKAND804E EK ING COWOUR iN—RI TENPOPAR,.R E c UCTIa „E „TRAIICE � woo NO. GATE DESCRIPTION ENG. DRAWN C.I. pRAWING NO. COLATY OF. NIA'NE SAES IIAIK E 01/23/13 DEED I.,7J-274 pA iC __6 y DEED11 Ca'] -1- P ?.RCEL 3601 96752 NF SR Y ; KES FR-1E G ' � - - DEEC 125.¢2/ -- d __ - a x - .__.. PA FRSEl36_ig9;'S0 � ' -.., FiJNELL ECVA E' -.... 'd -_ S,'nE5Fi4NKlEG DEED J'e0 ]. A.,,,EL _y DEL • >� �':a WORLEY M L K A._41 i`�• ?,.0 ED1 2 FCEL - > -.. _: ,.. D G ?411 _ SS %o r.._LASDE�.I 5a E S'A— t KRD \ CCJY - "OF DEED '.67 .2>6 P R E 3 0!,_6 ♦ D R 1 411 ❑c EC 23 5 d P:.RCEI iEC14Bi1 ^6 LEEGLL t1 A 0 a CEeC C19 ^45h RAHn `. . ,- •( b .P:.FCEL IS L' D r ED f PAR EL 3�JIe 93r�3 BEN E IX PAR., LY,� 5,�3a•` PEED 022 -01A FA PER, 360149 -185 LED M - DEED 26 -456 d - P`FCEL}J59 1305 - a , v RE _ G OM85 _ 4 BFYS.V' 1F DE C - r - _ _ r " a Lc WI LIAM1I FRANK 4. I C FD 0.91 9d 1PP.RCE 2 ,52,E ! - l _ / 1 l DE C 61 -d5G 2 r PAFCCL 9_Jt0.. X55 -6 �4]- +NATiANI_LP,' "-K 3605­6 i d - -- - - - - -_ ❑ ED 032 _EE V, R VK ROSTOI 4TPJR LB`,h FE 'P.vRCEI .,_0, 1_4'; i C C'' -62 - SC CAP CHM11': E x PEE 11 -., Sd� . - - - -. d i SIR LL F�EC S6CI499�,0 CCED 1 y1F, 9159.126 P` 01 9C AFCEL3 JI T9 "C .EE RAN. r S LDEELL L,;12- L i _ . 1 _ d _ c c , D2614 T C C 262 56 PA 4.. __360'(,e' ^G6 DEED 252 NOTES LEGEND REVISIONS REFERENCE DRAWINGS U� URS COrponeon -NoM Carolina North Carolina License t 02243 Piedmont 0111 Natural Gas ACCE59 ROAD f.,,� WATER �R - w�VE.ED PROPERTr U „E —aEti s ACCEIS0A0 Rv LIME _ WEER SILT FEN_E --6At� PROPCSeD a 1 T ��I 1 O B OOEITR „E TPOIM L - - --_] TE EASEmE «ro T� „P CD MAMR.wORKSOADE � R FITERODTL OO E L ET AT E eoPEPITFORJACKAND804E EK ING COWOUR iN—RI TENPOPAR,.R E c UCTIa „E „TRAIICE � woo NO. GATE DESCRIPTION ENG. DRAWN C.I. pRAWING NO. TITLE 1 01/23/13 ISSUED FOR APPROVAL NF SR AK . .... S LOOP ' EAST EROSION CONTROL PLAN LAYDOWN YARD WAYNE, NC. DRAWN BY: NF CHECKED BY: APPROVED BY SCALE: SR DC 1'.100' JOB NO. 39911024 DATE: 01123/2013 DRAWING NO: R6Y SBLE- SEC- EC-034 SHEET 39 OF 48 11 STEP 1 ARRANGE HAY BALES OVER GEOTEXTILE FABRIC ON LEVEL LAND TIGHTLY PACKED AS SHOWN TO COVER AN AREA APPROXIMATELY 12' x 12' INSTALL ON THE NOTES: 1. WHERE POSSIBLE STRUCTURE SHALL BE PLACED ON A LEVEL. WELL VEGETA SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WOR 2. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF DEWA1 STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEF1 IN PLACE FOR A PERIOD OF TIME GREATER THAN 48 HOURS AFTER DEWATL",.,, OPERATIONS ARE COMPLETE. 3 STRUCTURE SHOULD BE POSITIONED SUCH THAT WATER WILL NOT FLOW INTO ANY WETLANDS OR WATERBODIES. ` A INSTALL SEDIMENT BARRIER, IF REQUIRED BY COMPANY REPRESENTATIVE, AROUND ENTIRE HAY BALE STRUCTURE AS SHOWN. NOTES DEWATERING STRUCTURE TEMPORARY EROSION CONTROL MEASURE D5. SCALE: N.T.S. STEP 4 INSTALL ANOTHER LAYER OF HAY BALES ON THE OUTSIDE OF THE SEDIMENT BARRIER AND SECURE IN PLACE BY DRIVING REBAR OR WOOOEN STAKE THROUGH EACH OF THE OUTER HAY SALES.(STAKES NOT SHOWN FOR CLARITY PURPOSES) NOTES SEDIMENT RAMER 1. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES (DOWN ROPE SANE) (Ty) OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVY SET LADEN WATER ENTERS THE SPOIL PILE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT -OF -WAY ;g -" - g - - - - (*(.) 2. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MMNUNE DITCH FROM THE WATERBWY CROSSING UNTIL THE WATERBODY CROSSING IS INSTALLED AND I BACKFELED. 3. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE UNTIED TO THAT NEEDED / I TO PERFORM CONSTRUICMIN. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (SEC). PUMP (SEE NOTE 5) 4. 57AFAC ARFA(S) FOR WATERBODY CROSSNC(S), WHEN REOWRED, SHALL BE LOCATED AT LEAST TPDIO FM (P) 50 FEET FROM WATER'S EDGE AND SHALL BE (SEE NOTE 9) OF A IMPLEMENTATION Off NEEDED FOR CONVENIENT CROSSING 5. (PERFORMANCE OF TINE DM- AND -PUMP CROSSING METIH00 MUST MEET THE FOLLOWING PERFORMANCE CRITERIA (A) USE S F ICENT PUMPS INCLUDING ON -SITE BACKUP PUMPS, TO MANTAN DOWNSTREAM ROWS. EROSION (B) CONSTRUCT DAMS NTH MATERIALS THAT PREVENT SEDIMENT AND OTHER POLLUTANTS FROM (SEE NOTE / 7) ENTERING THE WATERBODY (E.C., SANDBAGS OR CLEAN GRAVEL NTH PLASTIC LINER). (C) SCREEN PUMP INTAKES (D) PREVENT STREAMSED SCOUR AT PUMP DISCHARGE. N lm INTAKE NOV (E) MONITOR 714E DAM A PUMPS TO ENSURE PROPER OPERATION THROUGHOUT THE FUS/50M WATERBODY CROSSING. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DALY AND REPARCD F NECESSARY. >< INSTALL REMOVABLE SEDIMENT 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO BARRIER OR DRIVEABLE BERM ACROSS ROADWAY THE WATERBODY. 8. CHEMCALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. �IEWOMT S11FN1 QNSSFK (III PER DERAIL 9, INSTALL TRENCH PLUGS ON BOTH DES OF THE WATERBODY TO PREVENT INVERSION (SEE NOTE 1 3) OF WATER 1170 UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ._._._.- ._. -.___. ___._ ACCUMULATED TRENCH WATER OUT OF THE WATERBODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED MD WORK IN THE WATERBODY IS READY TO COMMERCE. DAM AND PUMP CROSSING TEMPORARY EROSION CONTROL MEASURE yr A SCALE: N.T.S. R E F E R E N C E D R A W I N G 5 DRAWING 70. TITLE MAT E R IAL 5 U M MARY DESCRIPTION REVISIONS DESCRIPTION INSTALL GEOTEXTILE FABRIC COMPLETELY 2 LAYERS OF 2' x 2' x 4' BENEATH ENTIRE DEWATERING SECURELY TIED BALES OF STRUCTURE AS SHOWN TO HAY OR STRAIT PREVENT SCOURING INSTALL A LAYER OF ?MGH EFFICIENCY 565 NR FILTER MEDIA' BETWEEN ROWS OF MAY OR STRAW BALES. 2' x 2' WOODEN STAKE (TYP.) CHIMN WIRE FENCE SECURED TO 2' x 2' WOODEN POSTS. WRE TO EXTEND BENEATH BALES. NOTE STAKES SECURING "HIGH EFFICIENCY 865 AIR FILTER MEDIA' AND CHICKEN WIRE FENCE ARE NOT SHOWN FOP. CLARITY PURPOSES. NOTES 1. STRUCTURE SHALL BE PLACED ON A LEVEL WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WORK AREAS. 2. ROW RATES THROUGH DISCHARGE AND DIVERTOR PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW, 3. WHERE CONDITIONS WARRANT A 30' x 30' RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY BE VARIED DEPENDING UPON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 48 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE. 6. "HIGH EFFICIENCY 865 AIR FILTER MEDIA" CAN BE PURCHASED FROM THE FOLLOWING: UNITED AIR FILTER COMPANY 1000 WEST PALMER STREET CHARLOTTE, NORTH CAROLINA 28234 (704) 334 -5311 HYDROSTATIC DEWATERING STRUCTURE DS2 TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. UM URS CmpOWUOD • W* C"m N.M CNDERM 1J.- W =43 A JOB NO. 39911024 0111 Piedmont Natural Gas 56 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA 3 DEC I N.T.S. SHEET 40 OF 48 A SPOIL (TYP.) PILE _WTENCH "-\ RUG (7 (511 NOTE 1) g1D190N N (SEE NOTE E 7) SANDBAGS MTN PLASTIC LINER TO FOFWI UPSTREAM 8 DOWNSTREAM DAMS (SEE NOTE 5) WATERBODY IfMI PLAN SCALE: N.T.S. NOTES DEWATERING STRUCTURE TEMPORARY EROSION CONTROL MEASURE D5. SCALE: N.T.S. STEP 4 INSTALL ANOTHER LAYER OF HAY BALES ON THE OUTSIDE OF THE SEDIMENT BARRIER AND SECURE IN PLACE BY DRIVING REBAR OR WOOOEN STAKE THROUGH EACH OF THE OUTER HAY SALES.(STAKES NOT SHOWN FOR CLARITY PURPOSES) NOTES SEDIMENT RAMER 1. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES (DOWN ROPE SANE) (Ty) OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVY SET LADEN WATER ENTERS THE SPOIL PILE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT -OF -WAY ;g -" - g - - - - (*(.) 2. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MMNUNE DITCH FROM THE WATERBWY CROSSING UNTIL THE WATERBODY CROSSING IS INSTALLED AND I BACKFELED. 3. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE UNTIED TO THAT NEEDED / I TO PERFORM CONSTRUICMIN. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (SEC). PUMP (SEE NOTE 5) 4. 57AFAC ARFA(S) FOR WATERBODY CROSSNC(S), WHEN REOWRED, SHALL BE LOCATED AT LEAST TPDIO FM (P) 50 FEET FROM WATER'S EDGE AND SHALL BE (SEE NOTE 9) OF A IMPLEMENTATION Off NEEDED FOR CONVENIENT CROSSING 5. (PERFORMANCE OF TINE DM- AND -PUMP CROSSING METIH00 MUST MEET THE FOLLOWING PERFORMANCE CRITERIA (A) USE S F ICENT PUMPS INCLUDING ON -SITE BACKUP PUMPS, TO MANTAN DOWNSTREAM ROWS. EROSION (B) CONSTRUCT DAMS NTH MATERIALS THAT PREVENT SEDIMENT AND OTHER POLLUTANTS FROM (SEE NOTE / 7) ENTERING THE WATERBODY (E.C., SANDBAGS OR CLEAN GRAVEL NTH PLASTIC LINER). (C) SCREEN PUMP INTAKES (D) PREVENT STREAMSED SCOUR AT PUMP DISCHARGE. N lm INTAKE NOV (E) MONITOR 714E DAM A PUMPS TO ENSURE PROPER OPERATION THROUGHOUT THE FUS/50M WATERBODY CROSSING. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DALY AND REPARCD F NECESSARY. >< INSTALL REMOVABLE SEDIMENT 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO BARRIER OR DRIVEABLE BERM ACROSS ROADWAY THE WATERBODY. 8. CHEMCALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. �IEWOMT S11FN1 QNSSFK (III PER DERAIL 9, INSTALL TRENCH PLUGS ON BOTH DES OF THE WATERBODY TO PREVENT INVERSION (SEE NOTE 1 3) OF WATER 1170 UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ._._._.- ._. -.___. ___._ ACCUMULATED TRENCH WATER OUT OF THE WATERBODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED MD WORK IN THE WATERBODY IS READY TO COMMERCE. DAM AND PUMP CROSSING TEMPORARY EROSION CONTROL MEASURE yr A SCALE: N.T.S. R E F E R E N C E D R A W I N G 5 DRAWING 70. TITLE MAT E R IAL 5 U M MARY DESCRIPTION REVISIONS DESCRIPTION INSTALL GEOTEXTILE FABRIC COMPLETELY 2 LAYERS OF 2' x 2' x 4' BENEATH ENTIRE DEWATERING SECURELY TIED BALES OF STRUCTURE AS SHOWN TO HAY OR STRAIT PREVENT SCOURING INSTALL A LAYER OF ?MGH EFFICIENCY 565 NR FILTER MEDIA' BETWEEN ROWS OF MAY OR STRAW BALES. 2' x 2' WOODEN STAKE (TYP.) CHIMN WIRE FENCE SECURED TO 2' x 2' WOODEN POSTS. WRE TO EXTEND BENEATH BALES. NOTE STAKES SECURING "HIGH EFFICIENCY 865 AIR FILTER MEDIA' AND CHICKEN WIRE FENCE ARE NOT SHOWN FOP. CLARITY PURPOSES. NOTES 1. STRUCTURE SHALL BE PLACED ON A LEVEL WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WORK AREAS. 2. ROW RATES THROUGH DISCHARGE AND DIVERTOR PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW, 3. WHERE CONDITIONS WARRANT A 30' x 30' RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY BE VARIED DEPENDING UPON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 48 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE. 6. "HIGH EFFICIENCY 865 AIR FILTER MEDIA" CAN BE PURCHASED FROM THE FOLLOWING: UNITED AIR FILTER COMPANY 1000 WEST PALMER STREET CHARLOTTE, NORTH CAROLINA 28234 (704) 334 -5311 HYDROSTATIC DEWATERING STRUCTURE DS2 TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. UM URS CmpOWUOD • W* C"m N.M CNDERM 1J.- W =43 A JOB NO. 39911024 0111 Piedmont Natural Gas 56 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA 3 DEC I N.T.S. SHEET 40 OF 48 A c V c e� �x IPIAND A�A oR Non TTPE M R Aw REMOVABLE SEDIMENT sEOlwEnr BARD - _ BARBER (SEE NOTE T) RETAND BUFFER LMR Y a $EpMENi BARRIER 1I' SEDIMENT (SEE NOTE 4) BARRIER (SEE E 1) �YL -T r TOPS gt _p-A ` eARREP sAinRR - assaisis �° SEA VIII/ IC' RAN, _ IOU MR. BARRIER WORKING 40E 1MilER EgMREMi YATS 9 Fes' MO05ED PIPEi1NEvr, GBH WORN CORnR" qi rEry n�iAD CONS .-OF-Al E - - CROSS SECTION EDP °` p1CM WEnArHP SP GL SIDE 3WLc DIVER" TERRACE CROSS SECTION - SCALE: N.T.S. eAaRIwE., (SEE NOTE 2) - eR (rw.) SCALE: N.T.S. Spgl TRENCH RUG (SEE NOTE 3) tl°ARrs pVERSW TERRACE (SEE NOTE 2) PLAN NEW SCALE: N.T.S. > RPELI e.,.KHOE ilAn T sEOY <Nr ON PROCEDURE NOTES- BARBER CONSiPROCEDURE PL AN y_. TIEILAND BQUNGARr (ss NoTE s) T. FLAG WETLAND BOUNDARIES AND INSTALL BOUNDARY SIGNS PRIOR TO CLEARING. PLAN NEW 2. NO OVERNIGHT PARKING OR REFUELING OF MOEN E EQUIPMENT IS ALLOWED WITHIN 100 FEET OF WETLAND. PLACE 'NO FUELING" CONSTRUCTION PROCEDURE NOTES: SCALE: N.T.S. SON POSTS 100 FEET BACK FROM WTLAND BOUNDARY. REFUEL STATIONARY EQUIPMENT AS PER SPCC PLAN. PJIBEP YAT r- EMWIN Rawv 1. FLAG WETLANO BOUNDARIES AND INSTALL WETLAND BOUNDARY SGNS PRIOR TO CLEANING. 3 INSTALL TEMPORARY ACNE BREAKERS UPSLOPE OF WETLAND BWNOARIES AS SHOWN ON DRAWINGS AND SPECIFICATIONS. / 2. NO OVERNIGHT PARKING CR REFUELING OF MOBILE EQUIPMENT 15 ALLOWED WITHIN 100 FEET OF NOTES 4 INSTALL PREFABRICATED EQUIPMENT MATS THRWCH ENTIRE WETLAND AREA ON THE WORKING SM OF THE CONSTRUCTION r WETLAND. PUCE 'NO FUEUNG' SIGN POSTS 100 FEET BACK FROM WETLAND CORRIDOR. BOUNDARY. REFUEL STATIONARY EQUIPMENT AS PER SPCC PLAN. 1. INSTALL REMOVABLE SEDIMENT BARRIERS OR DRIVEABLE BERMS ACROSS THE TRAVEL LANE AT BOTH 5. AVOID ADJACENT WETLANDS. INSTALL SEDIMENT BARRIERS AT OUTER BOUNDARIES OF THE WETLAND. INSTALL SEDIMENT 3. INSTALL TEMPORARY ROPE BREAKERS UPSLOPE a WETLAND BOLXHDAPIES A5 SHOWN 0tH DRAWINGS AND SPECIFICATIONS. WETLAND BOUNDARIES. THE REMOVABLE SEDIMENT BARRIERS CAN BE REMOVED WRING THE CONSTRUCTION DAY, BUT MUST BE RE- INSTALLED AFTER CONSTRUCTION HAS STOPPED FOR THE DAY AND/OR WHEN HEAVY BARRIERS ALONG THE EDGE OF THE SPOIL SOE OF THE CONSTRUCTION CORRIDOR THROUGH THE WETAND AND ALONG THE DOWNSLOPE EDGE OF THE WETLAND, F THE DOWNSLOPE EDGE OF THE WETLAND IS THE SPOIL SIDE, THEN SEDIMENT PROFILE 4. AM ADJACENT WETLANDS, INSTALL SEDIMENT BARRIERS AT OUTER BOUNDARIES OF WETLAND AND ALONG PRECIPITATION IS IMMINENT. BARRIERS ARE NOT REWIRED ON NE WORKING SIDE OF THE CORRIDOR UNLESS EQUIPMENT TRAARSNC THRWOH THE BOTH WETLAND EDGES. WETLAND CAUSES SPOIL AND SEDIMENT TO EMT THE CONSTRUCTION CORAOOR. 2. INSTALL DIVERSION TERRACES IMMEDIATELY UPSLOPE OF BOTH WETLAND BOUNDARIES TO PREVENT SEDIMENT FROM B LIMIT PULLING OF TREE STUMPS AND GRADING ACTVITES TO DIRECTLY OVER THE TRENCHLNE. DO HOT GRADE OR 5. LIMIT PULLING OF TREE STUMPS AND GRACING ACTIVITIES TO DIRECTLY OVER TRENCHLWE, W NOT GRADE OR REMOVE STUMPS OR ROOT SYSTEMS MOM THE REST OF THE RIGHT -OF -WAY IN WETLANDS UNLESS THE CHIEF N5PECTOR AND ENTERING THE WETLAND. REMOVE STUMPS OR ROOT SYSTEMS FROM NE REST OF THE RIGHT -OF -MAT W WETLANDS UNLESS THE CHIEF INSPECTOR AND COMPANY ENVIRONMENTAL INSPECTOR DETERMINE THAT SAFTY - RELATED CONSTRUCTION CONSTRAINTS REWIRE REMOVAL OF NOTES COMPANY ENVIRONMENTAL INSPECTOR DETERMINE THAT SAFTY RELATED CONSTRUCTION CONSTRAINTS REWIRE REMOVAL OF TREE STUMPS FROM UNDER THE WORKING SIDE OF THE RGHT -OF -WAY. 3, INSTALL TRENCH PLUGS AT BOTH WETLAND BOUNDARIES TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS TREE STUMPS FROM UNDER THE WORKING SIDE M THE RIGHT -CF -WAY. I. PERIODICALLY CHECK INSTALLATION AND REMOVE BUAD -UP OF SECMENT OR OF THE PIPELINE TRENCH AND TO KEEP ANY ACCUMULATED UPLAND TRENCH WATER OUT OF WETLAND. CONDUCT TRENCH UNE TOPSCL STAFFING (F TOPSOIL IS NOT SATURATEO). SALVAGE TOPSOIL TO ACTUAL DEPTH DEBRIS. G. TOPSOIL SiRWPNG SHALL NOT BE REQUIRED IN SATURATED SOIL CONDITIONS. T' OR A MAXMUM DEPTH OF 12 INCHES. AS DETERMINED BY THE COMPANY ENVIRONMENTAL INSPECTOR. SEGREGATED TOPSOIL 2 MATERIALS PLACED IN WETLANDS SHALL BE COMPLETELY REMOVED DURING r. UTILIZE AMPHIBIOUS EXCAVATORS (PONTOON MOUNTED BACKHOES) OR TRACKED BACKHOES SUPPORTED BY PREFABRICATED 4, FOR TYPE II ('SATURATED`) AND TYPE 111 ('FLOODED') WETLANDS, INSTALL SEDIMENT BARRIERS AT WETLAND ALE MAY BE LOCATED ON SPOIL SEE, AS REWIRED. FINAL CLEAN -VP. REMOVAL OF THIS STRUCTURE 15 NOT CONTINGENT UPON EQUIPMENT MATS OR FLOATS, TO EXCAVATE TRENCH. F PREFABRICATED EQUIPMENT MATS ARE USED FOR STABILIZATION. BOUNDARIES AND ALONG BOTH WETLAND EDGES. FOR TYPE I ('DRY) WETLANDS, INSTALL SEDIMENT BARRIERS D. LEAVE HARD PLUGS At THE EDGES OF WETLAND UNTIL JUST PRIOR TO TRENCHING. ESTABLISHMENT OF PERMANENT VEGETATION. THE BACKHOE SHALL GRADUALLY MOVE ACROSS THE WETLAND BY MOVNG THE MATS FROM IMMEDIATELY BEARD TO IMMEDIATELY IN FRONT OF THE BACKHOE'S PATH. AT WETLAND BOUNDARIES, ALONG THE EDGE OF THE SPOIL SIDE OF THE CONSTRUCTION CORRIDOR AND ALONG THE DOWNSLOPE EDGE OF THE WETLAND. IF THE DOWNSLOPE EDGE OF THE WETLAND IS THE SPOIL SIDE, THEN 9. BENCHING THROUGH WETLANDS MAY PROCEDE 'WHEN THE PPE SECTION IS FABRICATED AND READY TO LAY. ONCE TRENCHING 3 IF A WATERBODY IS LOCAM WITION A WETLAND SYSTEM, EXTEND FINGER EQUIPMENT MATS TO THE BRIDGE EQUIPMENT CROSSNG (DEC) USED TO CROSS THE B. FABRICATE APE IN A STAGNG AREA OUTSOE THE TTPE III WEMND AS INDICATED ON THE CONSTRUCTION DA WINGS. SEDIMENT BARRIERS ARE NOT REWIRED ON THE WORKING SIDE OF THE CORRIDOR UNLESS EQUIPMENT COMMENCES. CONSTRUCTION THROUGH THE WETLAND IS TO PROCEDE COHTATWSLY UNTIL THE CROSSING M COMPLETED. WATERBOOY M ORDER TO ALLOW FOR CONTINUOS TIMBER EQUIPMENT MAT COVERAGE NO CONCRETE COATING ACTIVITY 'WITHIN 100 FEET OF WETAND BOUNDARY, UNLESS APPROVED BY COMPANY TRAVERSING THROUGH THE WETLAND CAUSES SPOIL AND SEDIMENT TO EXIT THE CONSTRUCTION CORRIDOR. BACKFUED AND RESTORED IN ORDER TO MINIMIZE THE LENGTH OF TIME THE TENCH IS OPEN. NRWCH THE WETLAIID AND WATEROODY AREA, ENVIRONMENTAL INSPECTOR_ 10. PIPE SECTW MAY BE FABRICATED MTHN THE RETARD ADJACENT TO PIPE TRENCH, OR IN STAGING AREA OIUTSIDE THE 4. USE ADDITIONAL TMBER MAT LAYERS TO RAISE CROSSING ABOVE GRADE WERE POOR SOW GONDITONS EMST. 9. LEAVE HARD PLUGS AT THE EDGE OF TYPE NI WETLAND UNTIL JUST PRIOR TO APE PLACEMENT. WETLAND AND WALKED IN. NO CONCRETE COATING ACTIVITY WITHIN iQU FEET OF WETLAND BOUNDARY UNLESS APPROVED BY COMPANY ENVIRONMENTAL INSPECTOR. S TIMBER EOOPMENT MATS SHALL EXTEND A MINIMUM OF 10 FEET OUTSM 10. FLOAT PIPE IN PLACE, LOWER -IN, INSTALL TENCH PLUGS IN ACCORDANCE MiM DRAWINGS AND SPECIFICATIONS. LOWER -IN PINE. PRIOR TO BACNFlLLNG TRENCH, INSTALL TRENCH PLUGS W ACCORDANCE WITH DRAWINGS AND O THE WETLAND BOUNDARIES. AND BACKRLL IT SPECFCATIONS. 6. INSTALL EARTHEN RAMP APPROACHES TO TIMBER EQUIPMENT RATS. EARTHEN RAMPS 11. RESTORE GRADE TO NEAR PRE - CONSTRUCTION TOPOFRAPHY qNp INSTALL PERMANENT EROSION CONTROL. RESTORE GRADE TO NEAR PRE- CONSTRUCTION TOPOGRAPHY, REPLACE TOPSOIL AND INSTALL PERMANENT TO BE CONSTRUCTED OF UPLAND MATERIAL, TOP SOIL SHALL NOT BE USED TO CONSTRICT EARTHEN RAMPS. 12. REMOVE ANY MATS UTILIZED TO SUPPORT AMPHIBIOUS EQUIPMENT FROM WETLANDS UPON COLPLETON. 12, EROSION CONTROL. 13. WETLANDS CROSSED USING PUSH/PULL METHOD TEND TO BE TOO WET FOR EFFECTIVE SEEDING, HOWEVER, IF THE SITE 13. REMOVE PREFABRICATED MATS FROM WETANDS UPON COMPLETION. IS DRY ENOUGH AND IF DIRECTED BY THE ENVIAGHMENTAL INSPECTOR, THE RIGHT -OF -WAY SHALL BE SEEDED IN ACCORDANCE WITH DRAWINGS. 14. g O DISTURBED WETLANDS AREA AS DETERMINED BY THE ENVIRONMENTAL INSPECTOR AND AS SHOWN ON DRAWINGS. WETLAND CROSSING CONFIGURATION WETLAND EQUIPMENT CROSSING TYPE III "FLOODED WETLAND" (TYPE I, II AND III WETLANDS) TYPE I "DRY WETLAND" TEMPORARY EROSION CONTROL MEASURE TT` INSTALLATION PROCEDURE INSTALLATION PROCEDURE 1 SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. SIDE RAIL (TYP. BOTH SDES �flSl���lll� I 11 TINDER EOPMENT .AT NOIF< GEOTEXTLE I. TIMBER BADGES SHALL BE ADEQUATELY ANCHORED AT BOTH ENDS. FABRIC 2. PERIODICALLY CHECK BRIDGE INSTALLATION AND REMOVE BUILD -UP OF SEDIMENT OR DEBRIS ON BRIDGE. 3. BRIDES APPROACHES SHALL BE TIMBER EQUIPMENT MATS SiRAI 4. MATERIALS PLACED ALONG STREAM CHANNEL SHALL BE COMPLETELY REMOVED DURING IT NAL CLEAN -LA. REMOVAL O THIS STRUCTURE IS NOT CONTINGENT UPON ESTABUSHMENT OF PERMANENT VEGETATION. USE CULVERTS CULVERTS SHALL BE USED TO SUPPORT THE TIMBER BRIDGE TO PREVENT S TO �FN'OPT SETTLEMENT O< THE BRIDGE, F THE GEOMETRY OF THE STREAM ALLOWS q� TOM" FOR SUCH INSTALLATION, THE TIMBER BADGE AND GEOTEXTLE FABRIC SHALL CONSIST 0" REMAIN ABOVE THE WATER SURFACE ELEVATION AT ALL TIMES. �'IN US`O PINE B. SIDE RAILS SHALL BE INSTALLED W BOTH SIDES OF THE BRIDGE EQUIPMENT � KNEE OF DENTS. GROS4NG IN ORDER TO PREVENT SEGMENT FROM ENTERING THE WATERBODY. .0ES AND "UST. SIDE RAILS TO BE CONSTRUCTED OF PLYWOOD NAKED TO THE CUTER EDGES OF THE TA BER EQUIPMENT MATS. SITE RIMS T. TIMBER EQUIPMENT MATS SHALL EXTEND A MINIMUM OF 10 FEET OUTSIDE OF THE WATERBODY OR WETLAND BOUNDARIES. HINGE BIIDi GEOTEXTLE FABRIC TO BE PROFILE nAGD BENEATH BADGE APPROACHES AND EXTEND UNDER TINDER BADGE. BRIDGE EQUIPMENT CROSSING ` TEMPORARY EROSION CONTROL MEASURE UNLESS OTHERWISE INDICATED ON PLAN, CROSSM SHALL SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED. SCALE: N.T.S. N O T E S E F E R E N C E D RIAE I N G S MATE RIAL R E V I S 1 OWN SSCxroTgN S Piedmont DRAWING NO TITLE NO DESCRIPTIDNSUMMARY CITY (ACTUAL) NO. DATE �. Corporgon C 0111 Natural Gas A 1 23 1 Br ISSUE FOR APPROVAL North CxaFNB LicansW M G224.i -2243 5B LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA '.�.- •:='..:-- '.'..: ".'' DRAWN BY: CHECKED B Y: APPROVED BY: SCKE: DHW SR D N.T.S. C DATE 5ALWING No: SHEET 41 OF 46 q JOB NO. 39911024 01/23/13 _ SE(MID BE TA r- ,.33 UIJURER FOOT STEEL POST (TVP.) SEEK T BANNER (ASTM 0 6461) UNDISTURBED GREW IT- 'A END OF SEDIMENT BARER FILL POST TRENCH DETAIL (np) 0 BEGINNING O SEGMENT BARRIO? OVERLAP DETAIL NOTES T. SEDIMENT BARRIER SHALL BE INSTALLED TO FILTER SEDIMENT FROM SURFACE RUNOFF. 2. INSTALLATIONS SHALL BE PERIODICALLY CHECKED, THE SEDIMENT SHALL BE REMOVED WHEN IT REACHES 0.5 FEET IN HEIGHT AT SEDIMENT BARRIER. 3. SEDIMENT BARRIER SHALL BE LEFT IN PLACE UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. 4. SEDIMENT BARRIER SHALL BE REPLACED WHENEVER IT HAS DETERIORATED TO SUCH AN EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SEDIMENT BARRIER. 5. AREA DISTURBED AS A RESULT OF REMOVING THE SEDIMENT BARRIER SHALL BE RESTABLIZED BY BACKFILLING, COMPACTING. AND SEEDING IN ACCORDANCE WITH THE REVEGETATION PLAN. 6. SEDIMENT BARRIER SHALL BE PLACED TO FOLLOW (RUN PARALLEL TO) THE CONTOURS. 7. ON UPSLOPE INSTALLATIONS, BOTH ENDS OF THE SEDIMENT BARRIER SHALL BE TURNED AND EXTENDED UPSLOPE. S. SEDIMENT BARRIER SHALL BE CONSTRUCTED A SYNTHETIC FILTER FABRIC OF A LEAST 95X BY WEIGHT OF POLYOLEFNS OR POLYESTER, WHICH 15 CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USEABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120' F. SEDIMENT BARRIER TEMPORARY EROSION CONTROL MEASURE � SCALE: N.T.S. NOTES tl b 7 MA ERIA. AND -MASH / IEOAITE NORTH AMERICAN GREEN C1258N • BELTON NDUSTRES t C ANDHOR N ACCORDANCE IWIVI MMA)FACTLRER'S NSTMICTOVS. ONE STAPLE PER FOOT LENGTH. FOLD BA 6' ,,,IUAAL GROUND FOLD BA 1' -6' SEOIRELT STAPLE N PLACE am" INSTALL STARES �pET T6' TO 24' APART RAAET THROUGHOUT 6' 10 2 TIE RAN ET/MAT, STARES SHALL BE 11 -GUAM COLD DR ON STEEL WERE FORMm SECTION 6-6 N A V SHAPE NOT PLAN LESS THAN It LENGTH. -- EMBANKMENT INSTALLATION ED SHALL COVER OWNEL AN04OR N ACCORDANCE BOTTOM IAEIE REWGETATI NTH MA0.FAC7URER'S LxI rl x I x F L 3� A x x B C x x x VAw•iATrM PLAN OVMAP C CONTROL FOLD BAO( C -C EROSKW SEC-FAY STARE CONTROL M RACE OIL FOOT RAKEi APMi SECTION A -A RE PATTERI MA ERIA. AND -MASH / IEOAITE NORTH AMERICAN GREEN C1258N • BELTON NDUSTRES t C ANDHOR N ACCORDANCE IWIVI MMA)FACTLRER'S NSTMICTOVS. ONE STAPLE PER FOOT LENGTH. FOLD BA 6' ,,,IUAAL GROUND FOLD BA 1' -6' SEOIRELT STAPLE N PLACE am" INSTALL STARES �pET T6' TO 24' APART RAAET THROUGHOUT 6' 10 2 TIE RAN ET/MAT, STARES SHALL BE 11 -GUAM COLD DR ON STEEL WERE FORMm SECTION 6-6 N A V SHAPE NOT PLAN LESS THAN It LENGTH. -- EMBANKMENT INSTALLATION ED SHALL COVER OWNEL AN04OR N ACCORDANCE BOTTOM IAEIE REWGETATI NTH MA0.FAC7URER'S LxI rl x I x F L 3� A x x B C x x x VAw•iATrM 2 C CONTROL 225 or g EL 200 I'S RE PATTERI 6' C MULCHED PRIOR TO INSTALLATION. 12 12 5 B CONTRA r D tOO TWO-THRE E MES SEDIMENT BARRIER TS A EXCESS OF 3:1 (H:V) TO SUPPORT VEGETATION. A SO n STAPLE N RACE V Ff. AGGREGATE (T') ALONG DECK SLO! INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. 7., 2 1:1 ra OF SLOPE EMBANKMENT INSTALLAT, AP PA RN TA .I,� O CHANNEL BOTTOM IS NSTRIICIRNS X rr X REOARm, NATURAL GROUND XIIxI X TO�Of'�x x x x x D x SECTION C —C 55 n. i ��NEL�ST�LATM AS FOLONS -..- 0-31{ Jx 25 EXISTING DRAINAGE DITCH X BANK PTYPE STAFlL PATTERN !'MIX CONTROL DSTAPLE H or g EL BEEN TO DIVERT RE PATTERI 6' OVERLAP V MULCHED PRIOR TO INSTALLATION. FINAL r GROU) AIA/DT UPSLOPE Qf CONTRA r D > ; ` TWO-THRE E MES SEDIMENT BARRIER o rc x EXCESS OF 3:1 (H:V) TO SUPPORT VEGETATION. ZS' R. 2' - 7' COARSE STAPLE N RACE V AGGREGATE (T') ALONG DECK SLO! INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. O F O CEDTEATLE FARM..^ ONE FOOT APART BLANKET SHALL BE LOOSELY INSTALLED AND TAMPED OR ROLLED IN PLACE AFTER INSTALLATION. STAPLES SHALL BE DRIVEN FLUSH WITH THE GROUND. SECTION D-D L 1 A W 2 A EROSION CONTROL BLANKET PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. TEMP, (IF RE PLAN EASING EERY r6 +N. MIN. ROADWAY 1 GRADE x t WNW- NOTE 5 SECTION 'A -A' NOTES ,. STABILIZED ENTRANCE SHALL BE INSTALLED WHERE EWTPMENT ENTERS AND EXITS CONSTRUCTION SITES ONTO PAVED ROADWAY OR OTHER IMPROVED SURFACE. 2. LOCATE ALL ROADWAY CROSSINGS AND ENTRANCES TO ENSURE SAFE AND ACCESSIBLE CONDITIONS THROUGHOUT THE CONSTRUCTION PHASE. 3. THE ENTRANCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION IN A CONDITION WHICH WILL MINIMIZE TRACKING OF SEDIMENT ONTO A PUBLIC ROADWAY. 4. ALL SEDIMENT TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING OR SCRAPING. 5. TOP SOIL SHALL BE REMOVED TO A MINIMUM DEPTH OF 6 INCHES PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC AND STONE. 6. WERE DRAINAGE DITCH EXISTS, CONTRACTOR SHALL PROVIDE AND INSTALL A FLUME PIPE IN ORDER TO PREVENT IMPEDEMENT OF WATER FLOW. 7, THE CONSTRUCTION ENTRANCE SHALL BE REMOVED AND AREA RESTORED AS PART OF FINAL GRADING AND CLEAN UP. REMOVAL IS NOT CONTINGENT UPON ESTABUSHMENT OF PERMANENT VEGETATION. R E F E R E N C E D R A W I N G 5 M A T E R I AL S U M M A R Y R E Y I S 1 0 N 5 DRAWING NO. TITLE N0. DESCRIPTION OTY (ACTUAL) NO. I DATE BY I DESCRIPTION A 11/23/1 BT 1 ISSUE FOR APPROVAL URS CapwaMon- "Cuaira NaAI Carolina License N C -2243 1024 CONSTRUCTION ENTRANCE VC TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. Piedmont Natural Gas SB LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA ONAWTNG NO' I SHEET 42 OF 48 I A SBLE— SEC —DTL -003 PTYPE STAFlL PATTERN !'MIX CONTROL DSTAPLE H EROSION CONTROL BLANKETS SHALL EXTEND COMPLETELY ACROSS DISTURBED AREA TO EL RE PATTERI EROSION CONTROL BLANKET PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. TEMP, (IF RE PLAN EASING EERY r6 +N. MIN. ROADWAY 1 GRADE x t WNW- NOTE 5 SECTION 'A -A' NOTES ,. STABILIZED ENTRANCE SHALL BE INSTALLED WHERE EWTPMENT ENTERS AND EXITS CONSTRUCTION SITES ONTO PAVED ROADWAY OR OTHER IMPROVED SURFACE. 2. LOCATE ALL ROADWAY CROSSINGS AND ENTRANCES TO ENSURE SAFE AND ACCESSIBLE CONDITIONS THROUGHOUT THE CONSTRUCTION PHASE. 3. THE ENTRANCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION IN A CONDITION WHICH WILL MINIMIZE TRACKING OF SEDIMENT ONTO A PUBLIC ROADWAY. 4. ALL SEDIMENT TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING OR SCRAPING. 5. TOP SOIL SHALL BE REMOVED TO A MINIMUM DEPTH OF 6 INCHES PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC AND STONE. 6. WERE DRAINAGE DITCH EXISTS, CONTRACTOR SHALL PROVIDE AND INSTALL A FLUME PIPE IN ORDER TO PREVENT IMPEDEMENT OF WATER FLOW. 7, THE CONSTRUCTION ENTRANCE SHALL BE REMOVED AND AREA RESTORED AS PART OF FINAL GRADING AND CLEAN UP. REMOVAL IS NOT CONTINGENT UPON ESTABUSHMENT OF PERMANENT VEGETATION. R E F E R E N C E D R A W I N G 5 M A T E R I AL S U M M A R Y R E Y I S 1 0 N 5 DRAWING NO. TITLE N0. DESCRIPTION OTY (ACTUAL) NO. I DATE BY I DESCRIPTION A 11/23/1 BT 1 ISSUE FOR APPROVAL URS CapwaMon- "Cuaira NaAI Carolina License N C -2243 1024 CONSTRUCTION ENTRANCE VC TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. Piedmont Natural Gas SB LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA ONAWTNG NO' I SHEET 42 OF 48 I A SBLE— SEC —DTL -003 EROSION STAFlL PATTERN !'MIX CONTROL NOTES EROSION CONTROL BLANKETS SHALL EXTEND COMPLETELY ACROSS DISTURBED AREA TO 6' PROTECT ERODIBLE SURFACES. THE SOIL SHALL BE PROPERLY PREPARED. SEEDED AND 6' OVERLAP V MULCHED PRIOR TO INSTALLATION. FINAL r GROU) FOLD BACK 4'-4' D TWO-THRE E MES INSTALL EROSION CONTROL B BLANKETS ON FRESHLY GRADED EMBANKMENTS ON SLOPES IN AND SHREEO EXCESS OF 3:1 (H:V) TO SUPPORT VEGETATION. STAPLE N RACE ALONG DECK SLO! INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. ONE FOOT APART BLANKET SHALL BE LOOSELY INSTALLED AND TAMPED OR ROLLED IN PLACE AFTER INSTALLATION. STAPLES SHALL BE DRIVEN FLUSH WITH THE GROUND. SECTION D-D EROSION CONTROL BLANKET PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. TEMP, (IF RE PLAN EASING EERY r6 +N. MIN. ROADWAY 1 GRADE x t WNW- NOTE 5 SECTION 'A -A' NOTES ,. STABILIZED ENTRANCE SHALL BE INSTALLED WHERE EWTPMENT ENTERS AND EXITS CONSTRUCTION SITES ONTO PAVED ROADWAY OR OTHER IMPROVED SURFACE. 2. LOCATE ALL ROADWAY CROSSINGS AND ENTRANCES TO ENSURE SAFE AND ACCESSIBLE CONDITIONS THROUGHOUT THE CONSTRUCTION PHASE. 3. THE ENTRANCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION IN A CONDITION WHICH WILL MINIMIZE TRACKING OF SEDIMENT ONTO A PUBLIC ROADWAY. 4. ALL SEDIMENT TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING OR SCRAPING. 5. TOP SOIL SHALL BE REMOVED TO A MINIMUM DEPTH OF 6 INCHES PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC AND STONE. 6. WERE DRAINAGE DITCH EXISTS, CONTRACTOR SHALL PROVIDE AND INSTALL A FLUME PIPE IN ORDER TO PREVENT IMPEDEMENT OF WATER FLOW. 7, THE CONSTRUCTION ENTRANCE SHALL BE REMOVED AND AREA RESTORED AS PART OF FINAL GRADING AND CLEAN UP. REMOVAL IS NOT CONTINGENT UPON ESTABUSHMENT OF PERMANENT VEGETATION. R E F E R E N C E D R A W I N G 5 M A T E R I AL S U M M A R Y R E Y I S 1 0 N 5 DRAWING NO. TITLE N0. DESCRIPTION OTY (ACTUAL) NO. I DATE BY I DESCRIPTION A 11/23/1 BT 1 ISSUE FOR APPROVAL URS CapwaMon- "Cuaira NaAI Carolina License N C -2243 1024 CONSTRUCTION ENTRANCE VC TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. Piedmont Natural Gas SB LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA ONAWTNG NO' I SHEET 42 OF 48 I A SBLE— SEC —DTL -003 pwxacE pla SDIEM RAWER --7 -■ \ \ \\ \ \ \ \� SURFACE RUNOFF -■I �l�■ /� y■■yI " \` \\ - i iR3H-� % / //: / / / / / / / :.� / / / / / / / /// no ADD LOGS AS t _ N iii,,,, �/ i//// H/// / / / / / / / / / / / / /// / / / / / / / / / / / / / /// ■■ ■■ RAILROAD OR PAYMENT NOTES 1. SEDIMENT BARRIER SHALL BE INSTALLED AT THE BASE OF SLOPES ADJACENT TO ROAD CROSSINGS WHERE VEGETATION IS DISTURBED, TO INTERCEPT SURFACE RUNOFF. 2. PROTECTION FOR SPOIL PILES SHALL BE INSTALLED ONLY WHERE SEDIMENT BARRIERS ACROSS THE ENTIRE DISTURBED AREA ARE NOT REQUIRED. 3. SEDIMENT BARRIERS SHALL REMAIN IN PLACE UNTIL PERMANENT REVEGETATION IS ESTABLISHED. A. WATER REMOVED FROM BORE PIT AND RECEIVING PIT SHALL BE FILTERED THROUGH A DEWATERING STRUCTURE OR FILTER BAG. 5. IF WELL POINTING IS REQUIRED PRIOR TO EXCAVATING BORE PITS, CONTRACTOR SHALL CONSULT WITH COMPANY'S ENVIRONMENTAL INSPECTOR PRIOR TO COMMENCEMENT OF WORK IN ORDER TO DETERMINE PROPER DEWATERING LOCATION. 6. CONTRACTOR SHALL BE REQUIRED TO KEEP THE ROAD CLEAN OF DEBRIS AT ALL TIMES. 7. CONTRACTOR MAY ELECT TO UTILIZE SHEET PILING IN ORDER TO STABILIZE BORE PITS. 8. DEPENDING ON TOPOGRAPHY AND STATE REQUIREMENTS, SEDIMENT BARRIER MAY BE REQUIRED ACROSS THE ENTIRE CONSTRUCTION RIGHT OF WAY AT THE EDGE OF ROAD. IN ADDITION TO THIS DETAIL, REFER TO THE ENVIRONMENTAL ALIGNMENT DRAWINGS FOR PLACEMENT OF SEDIMENT BARRIERS. BORED ROAD /RAILROAD CROSSING TEMPORARY EROSION CONTROL MEASURE 12X.2 SCALE: N.T.S. NOT SURFACE RUNOFF / I 1 SPOIL FILE > DIVERSION TERRACE (Tip.) / 11 1 1 SEE CORE FILTER OUTLET DETAIL M , ,�gSPC l \II NI11 DIVERSION TERRACE II IIII III II\ ENRANCE SEDWNT BAKRER TO BE INSTALLED FLUSH 10 I SEDWENT BARRIER SHALL DIVERSION "W" TOP O BERN BE TRENCH 0 INTO ER a SOIL (SE DETA0.) I ELEVATION SEDIMENT BARRIER (AMOCO CEF -2019) OR CO WAVY APPROVED EQUAL COMPACTED BACXRII RUNOFF A pp5 TOE ANCHOR TRENCH NOTES TRENCH DETAIL 1. SEDIMENT BARRIER HOOKS SHALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PLAN. 2. ONCE THE DISTURBED AREA IS STABILIZED, THE SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED 3. SEDIMENT SHALL BE REMOVED WHEN IT REACHES 0.5 FEET IN HEIGHT AT SEDIMENT BARRIER. SEDIMENT BARRIER HOOK ps) SCALE: N.T.S. REFERENCE DRAWINGS DRAWING N0. TITLE MATERIAL SUM MARY DESCRIPTION DIVERSION TERRACE III IIII l l i l i t SEDIMENT BARRIER TO BE INSTALLED FLUSH TO SEDWINT BARKER SOUL DIVERSION TERRACE BE TFEHCED PTO TOP OF BAN 500. (SE DETAIL) L STANDAM SEDIMENT BAKRER T b r FRAWCUS CORE lGGS ELEVATION SED EARRIIR (MIDW CET -2D19) PERT OR COWART APPROVED EQUAL BAORLED AQ ACT RUNCfF A' POST TOE ANOHON TRHHOR NOTES TRENCH DETAIL 1. CORE LOG FILTER OUTLETS SHALL BE PLACED ALONG SEDIMENT BARRIERS AS INDICATED ON THE PLAN, AS WELL AS WHERE DEEMED NECESSARY BASED ON FIELD OBSERVATIONS. 2. THE FIBROUS CORE LOG SHALL BE REPLACED WITH A NEW CORE LOG WHEN THE ACCUMULATION OF SEDIMENT IS SUCH THAT THE CORE FILTER OUTLET CANNOT EFFECTIVELY FILTER DISCHARGE WATER. 3. ONCE THE DISTURBED AREA IS STABILIZED, THE CORE FILTER OUTLET SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY THE REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETA TED . CORE FILTER OUTLET w � SCALE: N.T.S. R E V I S 1 0 N 5 um DESCRMTK)N IE FOR APPROVAL URS CoWabon. North CaroEna North Carohm LbIowi 0 C-2243 NO. 39911 Piedmont Natural Gas 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA SHEET 43 OF 48 SURFACE RUNOFF t 1 > DIVERSION TERRACE ✓ ADD LOGS AS t _ ___✓" L111�1. .. .Yl l�`� MATERIAL SUM MARY DESCRIPTION DIVERSION TERRACE III IIII l l i l i t SEDIMENT BARRIER TO BE INSTALLED FLUSH TO SEDWINT BARKER SOUL DIVERSION TERRACE BE TFEHCED PTO TOP OF BAN 500. (SE DETAIL) L STANDAM SEDIMENT BAKRER T b r FRAWCUS CORE lGGS ELEVATION SED EARRIIR (MIDW CET -2D19) PERT OR COWART APPROVED EQUAL BAORLED AQ ACT RUNCfF A' POST TOE ANOHON TRHHOR NOTES TRENCH DETAIL 1. CORE LOG FILTER OUTLETS SHALL BE PLACED ALONG SEDIMENT BARRIERS AS INDICATED ON THE PLAN, AS WELL AS WHERE DEEMED NECESSARY BASED ON FIELD OBSERVATIONS. 2. THE FIBROUS CORE LOG SHALL BE REPLACED WITH A NEW CORE LOG WHEN THE ACCUMULATION OF SEDIMENT IS SUCH THAT THE CORE FILTER OUTLET CANNOT EFFECTIVELY FILTER DISCHARGE WATER. 3. ONCE THE DISTURBED AREA IS STABILIZED, THE CORE FILTER OUTLET SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY THE REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETA TED . CORE FILTER OUTLET w � SCALE: N.T.S. R E V I S 1 0 N 5 um DESCRMTK)N IE FOR APPROVAL URS CoWabon. North CaroEna North Carohm LbIowi 0 C-2243 NO. 39911 Piedmont Natural Gas 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA SHEET 43 OF 48 SEDIMENT BARRIER SEOMENT BARRIER (DOM SLOPE SIDE) (TYP.) (DOWN SLOPE SIDE) (TYP.) i' SPOL PRF MIN. SPOIL p MIN. OIL D?AINAGE OI ?CH (T�') WAIERBppY BAMN I I I SPOIL) PILE (TYP.) WATERBODY BANK I I I (TTP.) PILE rSPOIL PILE ff(=TEL /� N/ Y 1 hf1II 4T 11 �1 1I1' I 1 1 1! N I1I ( 11 I1 f / l cTYP> II II I I E NOTE 11) (TIP) (SEE NOTE I) G (TIP) TRENCH PLUG (7P) TRENCH (SE E NOPE UG ) z s � I I I I N DIVER O / I I I I roR (SEE I NOTE 9) (SEE NOTE / 9) Z (SEE NOT DIVERSION Wa � (SEE n07E i 4) I I II I I � (SEE NOTE / 9) BER SUDIMENT BARRIER 1 CONSTRUCTION ENTRANCE (SEE DETAIL CE) NOTES 1. SEDIMENT BARRIER SHALL BE INSTALLED AT THE BASE OF SLOPES ADJACENT TO ROAD CROSSINGS WHERE VEGETATION IS DISTURBED, TO INTERCEPT SURFACE RUNOFF. 2. PROTECTION FOR SPOIL PILES SHALL BE INSTALLED ONLY WHERE SEDIMENT BARRIERS ACROSS THE ENTIRE DISTURBED AREA ARE NOT REQUIRED. 3. SEDIMENT BARRIERS SHALL REMAIN IN PLACE UNTIL PERMANENT REVEGETATION IS ESTABLISHED. 4. CULVERTS TO BE SIZED AND PLACED WHERE REQUIRED TO MAINTAIN WATER FLOW. 5, CONTRACTOR SHALL BE REQUIRED TO KEEP THE ROAD CLEAN OF DEBRIS AT ALL TIMES. 6 CONTRACTOR MAY ELECT TO UTILIZE SHEET PILING IN ORDER TO STABILIZE PIPE TRENCH. 7 CONTRACTOR MAY ELECT TO UTILIZE WELL- POINTS IN ORDER TO REDUCE THE WATER TABLE PRIOR TO COMMENCING EXCAVATION. DEPENDING ON TOPOGRAPHY AND STATE REQUIREMENTS, SEDIMENT BARRIER MAY BE 8' REQUIRED ACROSS THE ENTIRE CONSTRUCTION RIGHT -OF -WAY AT THE EDGE OF ROAD. IN ADDITION TO THIS DETAIL, REFER TO THE ENVIRONMENTAL ALIGNMENT DRAWINGS FOR PLACEMENT OF SEDIMENT BARRIERS. TRENCHED ROAD CROSSING TEMPORARY EROSION CONTROL MEASURE E SCALE: N.T.S. G TEMPORARY STREAM CROSSING. (BEC) PEP. DETAIL (SEE NOTE / 6) INSTALL REMOVABLE SEDIMENT —4— I N I I I BARRIER OR DRIVEABLE BERM �s911E' ACCROSS ROADWAY NOTES 1. THIS METHOD APPLIES TO MINOR WATERBODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME OF CROSSING. Z SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFlLLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE UMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S). WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER OUT OF THE WATERODY, 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -CF -WAY IMMEDIATELY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11. EXCEPT FOR BLASTING AND OTHER ROCK BREAKING MEASURES, COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (INCLUDING TRENCHING, PIPE INSTALLATION, BACKFILL, AND RESTORATION QU THE STREAM BED CONTOURS) WITHIN 24 HOURS. STREAM BANKS AND UNCONSOLIDATED STREAM BEDS MAY REQUIRE ADDITIONAL RESTORATION AFTER THIS PERIOD. WET MINOR WATERBODY CROSSING m TEMPORARY EROSION CONTROL MEASURE (APPLIES TO WATERBODRS 10' WIDE OR LESS AT WATERS EDGE AT TIME OF CROSSING) SCALE: N.T,S. RE FE R E N C E DRAWINGS DRAWING N0. TITLE WATEFrB00Y -/ / ' TEMPORARY STREAM PER DETAIL CROSSING. (BEL) DETAIL (SEE NOTE f 6) INSTALL REMOVABLE SEDIMENT BARRIER OR OR WARZ BERM ACCROSS ROADWAY NOTES 1. THIS METHOD APPUES TO INTERMEDIATE WATER BODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE GREATER THAN 10 FEET WIDE BUT LESS THAN OR EQUAL TO 100 FEET WIDE AT THE WATERS EDGE AT THE TIME OF CONSTRUCTION. 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFlLLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S), WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEGMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY. 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. CHEMICALS. FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPEUNE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER GUT OF THE WATERODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11. COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (NOT INCLUDING BLASTING AND OTHER ROCK BREAKING MEASURES) WITHIN 48 HOURS, UNLESS SITE SPEORC CONDITIONS MAKE COMPLETION WITHIN 48 HOURS INFEASIBLE. M A T E R I AL S U M M A R Y OESCRIPTION WET INTERMEDIATE WATERBODY CROSSING (wC TEMPORARY EROSION CONTROL MEASURE (APPLIES TO WATERBODIES GREATER THAN 10' WE)E BUT LESS TRW 100' WIDE AT WATERS EDGE AT TIME OF CROSSING) SCALE: N.T.S. REVISIONS DESCRIPTION URS Cmpw*m - W* Cadina N.M Ca wLic6w6MC -,VC AK JOB NO. 39911024 0111 Piedmont Natural Gas 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA CHECKED BY: APPROVED ON: SGLE: SR EK N.T.S. 3 DWI' No: SHEET 44 OF 48 A pTL 5BLE.-SEC- _0051 Mow SEDIMENT BARRIER SEOMENT BARRIER (DOM SLOPE SIDE) (TYP.) (DOWN SLOPE SIDE) (TYP.) i' SPOL PRF MIN. SPOIL p MIN. OIL D?AINAGE OI ?CH (T�') WAIERBppY BAMN I I I SPOIL) PILE (TYP.) WATERBODY BANK I I I (TTP.) PILE rSPOIL PILE ff(=TEL /� N/ Y 1 hf1II 4T 11 �1 1I1' I 1 1 1! N I1I ( 11 I1 f / l cTYP> II II I I E NOTE 11) (TIP) (SEE NOTE I) G (TIP) TRENCH PLUG (7P) TRENCH (SE E NOPE UG ) z s � I I I I N DIVER O / I I I I roR (SEE I NOTE 9) (SEE NOTE / 9) Z (SEE NOT DIVERSION Wa � (SEE n07E i 4) I I II I I � (SEE NOTE / 9) BER SUDIMENT BARRIER 1 CONSTRUCTION ENTRANCE (SEE DETAIL CE) NOTES 1. SEDIMENT BARRIER SHALL BE INSTALLED AT THE BASE OF SLOPES ADJACENT TO ROAD CROSSINGS WHERE VEGETATION IS DISTURBED, TO INTERCEPT SURFACE RUNOFF. 2. PROTECTION FOR SPOIL PILES SHALL BE INSTALLED ONLY WHERE SEDIMENT BARRIERS ACROSS THE ENTIRE DISTURBED AREA ARE NOT REQUIRED. 3. SEDIMENT BARRIERS SHALL REMAIN IN PLACE UNTIL PERMANENT REVEGETATION IS ESTABLISHED. 4. CULVERTS TO BE SIZED AND PLACED WHERE REQUIRED TO MAINTAIN WATER FLOW. 5, CONTRACTOR SHALL BE REQUIRED TO KEEP THE ROAD CLEAN OF DEBRIS AT ALL TIMES. 6 CONTRACTOR MAY ELECT TO UTILIZE SHEET PILING IN ORDER TO STABILIZE PIPE TRENCH. 7 CONTRACTOR MAY ELECT TO UTILIZE WELL- POINTS IN ORDER TO REDUCE THE WATER TABLE PRIOR TO COMMENCING EXCAVATION. DEPENDING ON TOPOGRAPHY AND STATE REQUIREMENTS, SEDIMENT BARRIER MAY BE 8' REQUIRED ACROSS THE ENTIRE CONSTRUCTION RIGHT -OF -WAY AT THE EDGE OF ROAD. IN ADDITION TO THIS DETAIL, REFER TO THE ENVIRONMENTAL ALIGNMENT DRAWINGS FOR PLACEMENT OF SEDIMENT BARRIERS. TRENCHED ROAD CROSSING TEMPORARY EROSION CONTROL MEASURE E SCALE: N.T.S. G TEMPORARY STREAM CROSSING. (BEC) PEP. DETAIL (SEE NOTE / 6) INSTALL REMOVABLE SEDIMENT —4— I N I I I BARRIER OR DRIVEABLE BERM �s911E' ACCROSS ROADWAY NOTES 1. THIS METHOD APPLIES TO MINOR WATERBODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME OF CROSSING. Z SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFlLLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE UMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S). WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER OUT OF THE WATERODY, 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -CF -WAY IMMEDIATELY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11. EXCEPT FOR BLASTING AND OTHER ROCK BREAKING MEASURES, COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (INCLUDING TRENCHING, PIPE INSTALLATION, BACKFILL, AND RESTORATION QU THE STREAM BED CONTOURS) WITHIN 24 HOURS. STREAM BANKS AND UNCONSOLIDATED STREAM BEDS MAY REQUIRE ADDITIONAL RESTORATION AFTER THIS PERIOD. WET MINOR WATERBODY CROSSING m TEMPORARY EROSION CONTROL MEASURE (APPLIES TO WATERBODRS 10' WIDE OR LESS AT WATERS EDGE AT TIME OF CROSSING) SCALE: N.T,S. RE FE R E N C E DRAWINGS DRAWING N0. TITLE WATEFrB00Y -/ / ' TEMPORARY STREAM PER DETAIL CROSSING. (BEL) DETAIL (SEE NOTE f 6) INSTALL REMOVABLE SEDIMENT BARRIER OR OR WARZ BERM ACCROSS ROADWAY NOTES 1. THIS METHOD APPUES TO INTERMEDIATE WATER BODY CROSSINGS THAT ARE DEFINED AS WATERBODIES THAT ARE GREATER THAN 10 FEET WIDE BUT LESS THAN OR EQUAL TO 100 FEET WIDE AT THE WATERS EDGE AT THE TIME OF CONSTRUCTION. 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBODY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATERBODY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BACKFlLLED. 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING (BEC). 5. STAGING AREA(S) FOR WATERBODY CROSSING(S), WHEN REQUIRED, SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE OF A MINIMUM SIZE NEEDED FOR CONVENIENT PREPARATION. 6. EROSION AND SEGMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY. 7. INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. CHEMICALS. FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF THE WATERBODY. 9. INSTALL TRENCH PLUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPEUNE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER GUT OF THE WATERODY. 10. CONTRACTOR SHALL POSTPONE GRADING OF RIGHT -OF -WAY ADJACENT TO WATERBODY UNTIL STAGING AREA IS PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE. 11. COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (NOT INCLUDING BLASTING AND OTHER ROCK BREAKING MEASURES) WITHIN 48 HOURS, UNLESS SITE SPEORC CONDITIONS MAKE COMPLETION WITHIN 48 HOURS INFEASIBLE. M A T E R I AL S U M M A R Y OESCRIPTION WET INTERMEDIATE WATERBODY CROSSING (wC TEMPORARY EROSION CONTROL MEASURE (APPLIES TO WATERBODIES GREATER THAN 10' WE)E BUT LESS TRW 100' WIDE AT WATERS EDGE AT TIME OF CROSSING) SCALE: N.T.S. REVISIONS DESCRIPTION URS Cmpw*m - W* Cadina N.M Ca wLic6w6MC -,VC AK JOB NO. 39911024 0111 Piedmont Natural Gas 513 LOOP - EAST SOIL EROSION CONTROL DETAILS NORTH CAROLINA CHECKED BY: APPROVED ON: SGLE: SR EK N.T.S. 3 DWI' No: SHEET 44 OF 48 A pTL 5BLE.-SEC- _0051 36 � x rMENT BARRIER DOIN SLOPE SOIL) (TYP,) 1.3Y8 1.331SAKR FOOT SPOIL PILE `' WATERBCOY BMtlf I SPA PILE CREEK BANK SAD SAG (TIP., DAMS I, -Q, MAX. STEEL POST (TIP.) FIRE FENCE FILTER STEEL. POSE (i1P.) - -- -- -I — - Y - - -- - - -- - - - - -- '`�, —� — — - -- - FABIIC I..AA" WATER LEVEL FLUME PPE I (/ \ 1 I I I WATER ROW F�ENFRS N CREEK BOTTOM PPELIE BACKFLL - -- - -- -.— - TRENCH PLUG (1P) 11NDICN RUC (TP) (SEE NOTE 10) a• 1`4 W00^11 'd (SEE NOTE 10) EXCAVATED TRENCH a I "88° a SECTION "A—A' p lINNOTE I a) pp CREEK BANK SAND BAG DAM 14 GAUGE WTH 71 6 NATIVE Milk SOIL 4• OPE FLUME PPE ( R DENTS WATER LEVEL F HOLES AND SDIMENT BARRIER 10 BE TIED SADBAGS MTIf SANDIA LINER TO UPSTREAM a — - '~ — — \ % FLUME PPE - •� 5' MIN. TO WR FENCE AT TOP t BOTTOM NTH RE AT 7 f00i w'ERVALS SECTION rpS0EM i (SE�NOIE 5)D� WA7ERBODY NOTES R� EIXOSSNG. (.C) -PER DETAIL TRENCH PLUG \ PAN � TRENCH PLUG 1, REINFORCED SEDIMENT BARRIER SHALL BE INSTALLED i0 FILTER SEDIMENT N AREAS WHERE EXCESAYE END OF SEDIMENT BARRIER (SEE NOTE 1 3) SLOPE RE'DERS STANDARD SEDIMENT BARRIER NEFTECTIVE. TIE ENDS OF SEGMENT — .— �- -------- `- - -- -�— 1 1 SECTION 'B —B" 2. NSTMUna5S SHALL HE PET THE SEDIMENT STALL BE REMOVED MEN IT FEET 4 -G. BARKER TOGETHER FLOW INSTALL RTIOVASLE SEGMENT BARRIER OR DINYEABIF BGA1 r I� I AT SEDIMENT NT BARRIER. REACHES 0.5 N HEIGHT AT SEDIMENT BAAREA. MN. FLOW ACCROSS ROABWAY 1 REINFORCED SEDIMENT BARRIER SHALL BE LETT IN PLACE UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED. NOTES t. SEDIMENT BARRIERS SHALL INSTALLED AS AND ALONG GRADIENT SEES 6. THE RATE PPE MUST BE 97E0 TO PREVENT IMPEDENENT OF THE FLOW AND TO 4. REINFORCED SEDIMENT BARKER SHALL BE REPLACED MIENEVTER IT HAS DETERIORATED TO SUCH AN EXTENT POST ( T'YP. ) OF IN THAT NO W ERR( ARIAS AND STAGING C AREA$ 4X71 THAT OF HEAVY SILT LADEN WATER ENTERS THE ADEN WATER E FA1Ef�90DY OR LEAVES THE CONSTRUCTION R(9NT -OF -WAY. THE LNG DOWNSTREAM FLOW RATES TO PROTECT AQUATIC UFC AND PREVENT THE N'ERUPiKN a EXISTING DOIINSIREAM USES. THAT IT REDUCES THE EFFECTIVENESS OF THE REINFORCED SEDIMENT BARRIER. NAX 2. HARD RUGS MUST PLACE CONVENIENT LOCATIONS TO SEPARATE MANLIKE 1. ERDSWN AND SEGMENT CONTROL MEASURES $HALL INSPECTED DAILY AND e. AREA DISTURBED AS A RETLT OF REMOVING THE REINFORCED SEGMENT BARRIER SHALL BE FROM DYCR S DITCH FROM THE FA7ERBODY CROSSING WILL THE WA'F/®OOY CROSSING IS INSTALLED AND IL BACFIIED. REPAIRED K NECESSARY RESTABILRED BY SEEDING N ACCORDANCE NTH THE REYEGETATION RAH, BEGINNING a SEGMENT BARRIER 3. EQUIPMENT OPERATING IN THE WAIERBODY SHALL BE LIMITED TO THAT NEE= TO PERFOM CONSTRUCTION, IF OTHER TYPES OF EQIPMENT MUST CROSS S. INSTALL L DIVERSION TRENCHES AT THE BAS OF ALL SLOPES ADJACENT TO THE 6. REINFORCED SEDMENT BARRIER SHALL BE PLACED TO FOLLOW (RUN PARALLEL TO) TK CONTOURS. OVERLAP DETAIL THE WAERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM M-BNG (BEC). 9. CHEMICALS, FUELS AND LUBtICATiNG OLS SHALL NOT BE STORED AND EQUIPMENT 7. ON UPSLOPE INSTALLATIONS, BOTH ENDS OF THE REINFORCED SEDIMENT BARRIER SHALL BE TURNED 4. STAGING AREA(Sl FOR WATERBOOY GROSSNGI IMLRRII1� ,W, §,WEKM�Nk@ jPARAnON. SHALL NOT BE REFUELED WTHN 100 FEET OF TIE WATERBODY. AND EXTENDED UPSOPE. 50 FEE' FROM WATER'S EDIT AND SHALL BE 10. INSTALL TRENCH RUGS ON BOTH SIDES OF THE WAW?BWY TO PREVENT DIVERSION OF 5. FLLA'I LROSSING METHOD REOUREIIETI75 INCLUDE: WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH All TO KEEP ANY ACCUMULATED (A) INSTALL fWNE PIPE(5) AFTER & ALONG (IF NEQSSARY), BUT BEFOd ANY 7RQNCIINC. B USE SAND BAG OR D TTRNCH WATER OUT OF THE RATERSOOY. BAC A!D RASnC SFEEIINC VERSION S7RUCILRE Ot EQAVALEN7 TO DEVELOP AN EFFECITVE SEAL AND 10 OVERT STREAM FLCW THP.O.DW ME RULE PPE 11 CONTRACTOR SNDML POSTPONE GRADING OF RIGHT -OF -WAY IMMEDIATELY ADJACENT TO WATEABODY SERI). PRO UNTIL STAGING AREA IS PREPARED AND WORK IN THE FATERBODY IS READY TO COMMENCE. () PERLFY�IdHGNRUE PPE(SD TD PAEKN7 BAKKYEROSIONWA S7REANBED SCWEFFECTVE (p) DO NOT REMOVE FLUME PIPE dFtlNG 7RENLIING, RIPE EALING, OR BACKFLLINC AC71N11E5, OP M'IAL STREAK 8E0 RESTCRAITON GFORTS. (El ROOK ALL RUNG APES AND DAN$ THAT AR NOi AL50 PART CF THE EQIIPMENT BRIX,E AS SOON 45 fiNAL CIEPNUP Qi THE 511EAY BED PID BAN! b LUPLEE. FLUME CROSSING REINFORCED SEDIMENT BARRIER Fx Rio TEMPORARY EROSION CONTROL MEASURE TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. SCALE: N.T.S. i i i ti S I t i N O T E 5 R E F E k E N C E D RD -- I N G S MAT S U N M A R Y R E V I S D O u04M Piedmont DRAWING NO TITLE NO DESCRIPTION DTI (ACTUAL) NO DATE By DESCRIPTION URS Ca Li- Rah Grata 0111 Natural Gas A 1 23 13 ELT ISSUE FOR APPROVAL ,*w Naar CenTBnF License M C•7143 513 LOOP - EAST SOIL EROSION AK. CONTROL DETAILS NORTH CAROLINA .. DFAWN 9Y: CHECKED W: APWROVED 81': SCALE: OHW SR OC N.T.S. JOB NO. 39911024 DATE 01 23/13 DRAWING NO: _ T - SKEET 45 OF 46 I A 3� e PLAN GEOTEK fE FABRIC (iOEXNE lABDC i0 & RAap BENEATH S1HUIf. 12" 0 O.SD MIN. p NSA R -2 (1.5' - 3.5) COARSE GATE � SEE NOTE 4 WHERE: PROFILE D -PIPE DIAMETER (SEE ALIGNMENT SHT) NOTES C = COVER DEPTH (12• MIN) 1. PERIODICALLY CHECK BRIDGE INSTALLATION AND REMOVE BUILD -UP OF SEDIMENT OR DEBRIS ON BRIDGE. 2. CULVERTS SHALL BE PLACED AT LEAST ONE -HALF (112) THEIR DIAMETER APART, 3. MATERIALS PLACED IN STREAM CHANNEL SHALL BE COMPLETELY REMOVED DURING FINAL CLEAN -UP. REMOVAL OF THIS ITEM 15 NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION. 4. RIPRAP (OR ROCK) TO 10" AVERAGE DIAMETER CAN BE USED FOR ALL BUT THE TOP 6" OF STONE FILL. THE TOP 6" MUST CONSIST OF NSA R -2 (1.5" - 3.5•) COARSE AGGREGATE. CULVERT EQUIPMENT CROSSING cEc SCALE: N.T.S. NOTES WARM POST TO K PLACED N RNO DRECILY MFR RPEIX 1001A, SURFACE RUNOFF SEDIMENT BARRER (DORN SLOPE SIDE) (TYP.) t SPOIL PILE -T MIN. f- 5POL PILE (TYP.) \ WATERBODY BANK —+ I (TTYR) SOFT PLUG -NT N Ll 'Y /-(SEE MOTE 13) DIVERSION E) STRING ACE SPAN DETAIL BRN b NOTE 9) t lJ (SE NOTE 11❑ (SEE NOTE 3) AO G NRE TOME" e, .VERSION TERRACE GGeIEC1ro ro RNCE POlr Wrx ❑ NI IIEAim IWBA IRAA'E. EE DOLTS ( R) Trot DOTTOM (1 I I I�I II�I��I WIN. TI LE FOR 10full O 1001A, SURFACE RUNOFF SEDIMENT BARRER (DORN SLOPE SIDE) (TYP.) t SPOIL PILE -T MIN. f- 5POL PILE (TYP.) \ WATERBODY BANK —+ I (TTYR) SOFT PLUG -NT N Ll 'Y /-(SEE MOTE 13) SCALE: N.T.S. NOTES 1. CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL TO RESTORE FENCE TO ORIGNAL CONDITION. 2. POSTS. WRE AND OTHER MATERIAL SHALL BE SAME AS OR EQUIVALENT MATERIAL TO MATCH EXISTING FENCE. 3. BRACE SPAN TO BE CONSTRUCTED QH EACH SIDE OF PIPELINE RIGHT -OF -WAY, PRIOR TO INITIAL ONSIUMTUNG Of FENCE, 4. ACTUAL DEPTH REQUIRED TO BE SET BY MAT IS REQUIRED TO ACHIEVE A STABLE SUPPORT POST. 5. UNDER NO CNCUMSTANCES SHALL FENCE POSTS BE PLACED DIRECTLY OVER COMPANYS PIPELINES. CONSULT COMPANY AUTHORIZED REPRESENTATIVE FOR LOCATIONS OF FENCE POSTS ADJACENT TO COMPANY PIPELINES. FENCE RESTORATION SCALE: N.T.S. R E F E R E N C E D R A W I N G S DRAWING NO. TITLE SEBMDIT BARRIER (AMOCO CEF -2019) OR COMPANY i APPROVED EQUAL HA BA E ELEVATION CO/PACRD BAIXFAI RINOlF 4 1 6 POST- TOE AN. 7RENOH TRENCH DETAIL NOTES 1. REINFORCED SEDIMENT BARRIER HOOKS SHALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PLAN. 2. ONCE THE DISTURBED AREA IS STABILIZED, THE REINFORCED SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED. 3. SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE -THIRD THE HEIGHT OF THE SEDIMENT BARRIER, MAT E RIAL S U M MARY DESCRIPTION REINFORCED SEDIMENT BARRIER HOOK osz SCALE: N.T.S. REVISIONS DESCRIPTION NOTES T. THIS METHOD APPLIES TO WATERBODIES THAT ARE DRY AT THE TIME OF CROSSING. 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBOOY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. SOFT PLUGS SHALL BE INSTALLED FOLLOWING EXCAVATION OF MAINLINE DITCH THROUGH THE WATERBODY, 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (BEC). S. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED DAILY AND REPAIRED IF NECESSARY. 6. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF WATERBODY. 7, INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. MAINLINE FABRICATED PIPE STRING MAY SPAN DRY WATERBODY CROSSING IN PREPARATION FOR LOWER IN PHASE OF CONSTRUCTION. 9. DRY WATERBODY MAY BE TRENCHED IN SEQUENCE WITH NORMAL TRENCHING OPERATIONS AND PIPE INSTALLED THROUGH DRY WATERBODY CROSSING MAY BE INSTALLED IN CONJUCTION WITH UPSTREAM AND DOWN STREAM PIPE. DRY WATERBODY CROSSING TEMPORARY EROSION CONTROL MEASURE (APPLIES TO IIATERBODIES �W AT TIME OF CROSSING) SCALE: N.T.S. um URS Corporation • NOrti Cadna Nbfi Ca0&M License t C-nQ AK_ JOB NO. 39911024 HPiedmont AVINatural Gas 5B LOOP - EAST SOIL EROSION CONTROL DETAILS SR I DC N.T.S. DATWNG NO: SHEET 46 OF 48 A 3 5BLE- SEC -DTL -007 — DIVERSION E) STRING ACE SPAN DETAIL BRN b NOTE 9) t lJ (SE NOTE 11❑ (SEE NOTE 3) AO G NRE TOME" e, .VERSION TERRACE GGeIEC1ro ro RNCE POlr Wrx ❑ NI IIEAim IWBA IRAA'E. EE DOLTS ( R) Trot DOTTOM (1 I I (i1P) EACH DM0WAL NNE 0 HAVE A WIN. TI LE FOR 10full O ❑ 111 ( (l Q 0 DRY WATERBODY EOUPIENi CROSSING _ yy f? �� O O SEDIMENT BARRIER TO M (SEE NOTE 1 4) "1 Q INSTALLED FLUSH TO DIVERSION TERRACE INSTALL RENOVABE SEDIMENT ❑ ❑ ❑ ❑ . p BARRIER OR DRIVEABLE BERM H ii! f OA PEATEU ACCROSS ROADWAY ' RIME PAST (M.) SEGMENT BARRIER SHALL BE TRENCHED INTO I C -0• MR.1 SOR (SEE DETAIL) i} n SCALE: N.T.S. NOTES 1. CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL TO RESTORE FENCE TO ORIGNAL CONDITION. 2. POSTS. WRE AND OTHER MATERIAL SHALL BE SAME AS OR EQUIVALENT MATERIAL TO MATCH EXISTING FENCE. 3. BRACE SPAN TO BE CONSTRUCTED QH EACH SIDE OF PIPELINE RIGHT -OF -WAY, PRIOR TO INITIAL ONSIUMTUNG Of FENCE, 4. ACTUAL DEPTH REQUIRED TO BE SET BY MAT IS REQUIRED TO ACHIEVE A STABLE SUPPORT POST. 5. UNDER NO CNCUMSTANCES SHALL FENCE POSTS BE PLACED DIRECTLY OVER COMPANYS PIPELINES. CONSULT COMPANY AUTHORIZED REPRESENTATIVE FOR LOCATIONS OF FENCE POSTS ADJACENT TO COMPANY PIPELINES. FENCE RESTORATION SCALE: N.T.S. R E F E R E N C E D R A W I N G S DRAWING NO. TITLE SEBMDIT BARRIER (AMOCO CEF -2019) OR COMPANY i APPROVED EQUAL HA BA E ELEVATION CO/PACRD BAIXFAI RINOlF 4 1 6 POST- TOE AN. 7RENOH TRENCH DETAIL NOTES 1. REINFORCED SEDIMENT BARRIER HOOKS SHALL BE PLACED AT THE OUTLET OF DIVERSION TERRACES AS SHOWN ON THE PLAN. 2. ONCE THE DISTURBED AREA IS STABILIZED, THE REINFORCED SEDIMENT BARRIER HOOK SHALL BE REMOVED AND ANY DISTURBED AREAS CAUSED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED. 3. SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE -THIRD THE HEIGHT OF THE SEDIMENT BARRIER, MAT E RIAL S U M MARY DESCRIPTION REINFORCED SEDIMENT BARRIER HOOK osz SCALE: N.T.S. REVISIONS DESCRIPTION NOTES T. THIS METHOD APPLIES TO WATERBODIES THAT ARE DRY AT THE TIME OF CROSSING. 2. SEDIMENT BARRIERS SHALL BE INSTALLED AS DEPICTED AND ALONG DOWN GRADIENT SIDES OF WORK AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATERBOOY OR LEAVES THE CONSTRUCTION RIGHT OF WAY. 3. SOFT PLUGS SHALL BE INSTALLED FOLLOWING EXCAVATION OF MAINLINE DITCH THROUGH THE WATERBODY, 4. EQUIPMENT OPERATING IN THE WATERBODY SHALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION. IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY, CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING (BEC). S. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED DAILY AND REPAIRED IF NECESSARY. 6. CHEMICALS, FUELS AND LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT SHALL NOT BE REFUELED WITHIN 100 FEET OF WATERBODY. 7, INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT TO THE WATERBODY. 8. MAINLINE FABRICATED PIPE STRING MAY SPAN DRY WATERBODY CROSSING IN PREPARATION FOR LOWER IN PHASE OF CONSTRUCTION. 9. DRY WATERBODY MAY BE TRENCHED IN SEQUENCE WITH NORMAL TRENCHING OPERATIONS AND PIPE INSTALLED THROUGH DRY WATERBODY CROSSING MAY BE INSTALLED IN CONJUCTION WITH UPSTREAM AND DOWN STREAM PIPE. DRY WATERBODY CROSSING TEMPORARY EROSION CONTROL MEASURE (APPLIES TO IIATERBODIES �W AT TIME OF CROSSING) SCALE: N.T.S. um URS Corporation • NOrti Cadna Nbfi Ca0&M License t C-nQ AK_ JOB NO. 39911024 HPiedmont AVINatural Gas 5B LOOP - EAST SOIL EROSION CONTROL DETAILS SR I DC N.T.S. DATWNG NO: SHEET 46 OF 48 A 3 5BLE- SEC -DTL -007 — SURFACE RUNOFF PLAN MIN MIN. GRADED COIAPaCTEO EARTH MDGE 3:1 OR MTTER SLOPE 3;1 OR FATTEN SLOPES CC!`7I(1A1 A - A TEMPORARY AND PERMANENT DIVERSION TERRACES PERCENT OF LAND SLOPE SPACING (IN FEET) 15 - 25Z 50 10 - 15Z au 6 - 10% 125 3 - 6S 200 lu 300 NOTES 1. DURING CONSTRUCTION, DIVERSON TERRACES SHALL BE PREPARED AT THE END OF EACH WORK DAY. 2. WHERE SLOPE OF CONSTRUCTION AREA EXCEEDS THAT FOR SAFE INSTALLATION, TERRACES SHALL BE INSTALLED AT BASE OF SLOPE ONIY. 3. AFTER EARTH DISTURBING WORK HAS BEGUN, DIVERSION TERRACES SHALL BE INSTALLED AS SOON AS IS PRACTICABLE AT THE SPACING SHOWN IN THE ABOVE TABLE OR AS 94OWN ON THE DRAWINGS. 4. TEMPORARY AND PERMANENT DIVERSION TERRACES ARE REWIRED AT ALL WATERBODY CROSSINGS AND UPSLOPE FROM ALL WETLAND BOUNDARIES. 5, THE DIVERSION TERRACE OUTLET SHALL BE LOCATED INHERE RUNOFF WILL BE RELEASED ONTO AN EXISTING WELL- VEGETATED AREA. IN THE ABSENCE OF A WELL- VEGETATED AREA, AN OUTLET STRUCTURE (OSI) MUST BE INSTALLED AT THE DIVERSION TERRACE OUTLET. 6. PERMANENT DIVERSION TERRACES SHALL BE REVEGETATED WITH THE RIGHT OF WAY STABILIZATION. CHANNEL LINERS MAY BE REWIRED FOR VELOCITIES GRATER THAN 25 GPS. DIVERSION TERRACE (WATERBAR) TEMPORARY AND PERMANENT ov EROSION CONTROL MEASURE SCALE: N.T.S. RIM PLUG TO BE KEYED PTO aOTTOI O TRENCH. (SEE NOTE 2) 2' MIN.�I i 1 8077 II I I � OHfryOH > I LSPAQNG AS SNO,N OI FLAN 1 8• Y6L (AT NOTE 2) PROFILE Woo PLUS Two PLUG DESCRIPTION PLUG MATERIAL SACK 1/2 N. FT. SACKS LT TRENCH PLUG WELL SIFTED SOIL OR SAND FOAM URE7HA 4 AMED FO P PLACE TRENCH PLUG I —All TRENCH PLUG CROSS - SECTION NOTES 1. TOP SOIL SHALL NOT BE USED IN TRENCH PLUGS 2. TRENCH PLUG SHALL BE KEYED TO SIDES AND BOTTOM OF TRENCH. 3. TRENCH PLUGS SHALL BE INSTALLED AT THE BANKS OF ALL WATERBODIES AND AT THE BOUNDARIES OF ALL WETLAND CROSSINGS AND AS INDICATED ON THE CONSTRUCTION DRAWINGS IMMEDIATELY AFTER TRENCH EXCAVATION. THE PLUGS MAY BE TEMPORARILY REMOVED DURING PIPE PLACEMENT, BUT THEN REPLACED. 4. TRENCH PLUGS SHALL BE LEFT IN PLACE WHEN THE TRENCH 15 BACKFILLEO TRENCH PLUG /BREAKER TP TEMPORARY AND PERMANENT EROSION CONTROL MEASURE SCALE: N.T.S. REFERENCE DRAWINGS DRAWING NO. I TITLE STNS IRROUGH CONSIRrnm FENCE TO RESTRAIN, N AWE IS GREATER MAN 5 PERCENT 2' . 2' STAKES SEE NOTES FOR CONNECTION O 1105E TO FILTER BAG (NOTE 6) ISTAKE AT 2.5' C.0 CONSIRLIC" SAFETY F94CE III HOLD ON SLOPES =A111C - AD EAG M//i D . 119 SLOPE �i SECTION NOTES 1. FILTER BAG SHALL BE PLACED ON A SLOPING OR LEVEL, WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM DEMCE AND ANY WORK AREAS. 2. THE FILTER BAG MUST BE STAKED IN PLACE IF THE FILTER BAG 15 PLACED ON A SLOPE GREATER THAN 5 PERCENT. 3. FILTER BAG SHALL NOT BE USED FOR DISCHARGE FLOWS GREATER THAN 300 GPM, 4. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF USED FILTER BAGS IMMEDIATELY UPON COMPLETION OF DEWATERING OPERATIONS. UNDER NO CIRCUMSTANCES SHALL USED FILTER BAGS BE LEFT IN PLACE FOR A PERIOD OF TIME GREATER THAN 46 HOURS AFTER DEWATERING OPERATIONS ARE COMPLETE. 5. SEDIMENT FROM BAG SHALL BE SPREAD IN AN UPLAND AREA WITHIN THE CONSTRUCTION CORRIDOR AND THE AREA SHALL BE STABILIZED AND REVEGETATED. 6. TO ATTACH HOSE, CUT OPEN CORNER OF FILTER BAG, GATHER UP MATERIAL AND CLAMP TO A SHORT SECTION OF STEEL PIPE. CLAMP HOSE TO OTHER END OF PIPE. BOTH CONNECTIONS SHALL BE WATERTIGHT. 7. CONTRACTOR SHALL ONLY INSTALL ONE DEWATERING HOSE PER FILTER BAG. S. RUNOFF SHALL NOT CHANNEL OR CREATE EROSIONAL ISSUES. MATERIAL 5 U M M A R Y DESCRIPTION FILTER BAG �D TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. REVISIONS DESCRIPTION SFO PILE sucTaN uR tPFEUNENCM FILTER FABRIC FLOATING INTAKE TO OENAIERPG STRUCTURE (DSI) OR FILTER BAG (FB). NOTES 1. WATER PUMPED OUT OF TRENCH SHALL NOT BE DISCHARGED INTO WATERWAYS. WATER SHALL BE DISCHARGED INTO A FILTER BAG OR DEWATERING STRUCTURE. 2. PUMP SHALL BE CONTROLLED SO THAT DISCHARGE DOES NOT OVERFLOW DEWATERING STRUCTURE. 3, PUMP SUCTION HOSE MUST NOT BE ALLOWED TO COME IN CONTACT WITH TRENCH BOTTOM. PROVISIONS MUST BE MADE TO ELEVATE THE SUCTION HOSE TO AT LEAST ONE FOOT ABOVE THE BOTTOM OF THE PIPE TRENCH UNTIL BOTTOM DEWATERING IS NECESSARY. 4, DEWATERING SHALL NOT OCCUR DURING TIMES OF HEAVY RAINFALL EXCEPT AS REQUIRED TO PREVENT FLOODING OF CONSTRUCTION EQUIPMENT LOCATED IN BORE PITS AND TRENCHES. 5. PUMPS UTILIZED DURING DEWATERNG SHALL BE PLACED WITHIN SECONDARY CONTAINMENT IF POSITIONED WITHIN 100 FEET OF A WETLAND OR WATERBODY. TRENCH DEWATERING TEMPORARY EROSION CONTROL MEASURE SCALE: N.T.S. URS CogvAw • No* Caa6AA NOM Cw** LimuI a C•2243 JOB NO. 39911024 NZIPiedmont Natural Gas 51113 LOOP - EAST SOIL EROSION CONTROL DETAILS SHEET 47 OF N.T A OTYPICAL CONVENTIONAL PIPELINE CONSTRUCTION 25' PROPOSED 2 TIE IN (BELL HOLE) EXCAVATION PROFILE [MISIYW SD' ORIGHT PARALLEL LAY WITH EXISTING PIPELINE VIFiES 12' TRENCH DESCRIPTION SI_T FENCE N O T E S 1. ALL EXCAVATION SHALL MEET THE REQUIREMENTS OF OHSA 29 CFR 1926. 56 LOOP - EAST SOIL EROSION TYPICAL WORKSPACE CONSTRUCTfON METHOD OPEN CUT - CONVENTIONAL 2. ONLY AUTHORIZED PERSONNEL ARE PERMITTED IN EXCAVATED AREA. 3. CAVE —IN PROTECTION BY SLOPING: a. IF THE SOIL 15 ANALYZED, CATEGORIZED AND DOCUMENTED BY A QUALIFIED AND COMPETENT PERSON AS DRAWN BY DHW TYPE A, B. OR C SOIL, THE SLOPE WILL BE AS FOLLOWS: TYPE A — 3/4 (H) TO 1 (V), TYPE B — 1 TO 1, TYPE C — 1% TO 1. DRAWING NO: SHEET 48 OF 48 A 0. IF THE SOIL IS NOT ANALYZED AND CATEGORIZED BY A QUALIFIED AND COMPETENT PERSON, THE SOIL SLOPE r�SYa�. WILL BE CONSIDERED TYPE "C" k SLOPED ACCORDING TO OSHA STANDARDS CFR 1926 SUPPORT "P ". THE SLOPE WILL BE FROM THE TOE OF THE TRENCH AND WILL BE CONSISTENT THROUGHOUT THE TRENCH WALL. 4. VERTICAL WALL (DOES NOT INCLUDE BENCHES) AND VERTICAL CUTS ARE ALLOWED ONLY AS LISTED BELOW: ORIGHT PARALLEL LAY WITH EXISTING PIPELINE URSCarporab.I- N.MCamh. NNorth Caro&w Licence ► C -2243 ON NON - WORKING SIDE DESCRIPTION IE FOR APPROVAL N O T E S 1. ALL EXCAVATION SHALL MEET THE REQUIREMENTS OF OHSA 29 CFR 1926. 56 LOOP - EAST SOIL EROSION TYPICAL WORKSPACE CONSTRUCTfON METHOD OPEN CUT - CONVENTIONAL 2. ONLY AUTHORIZED PERSONNEL ARE PERMITTED IN EXCAVATED AREA. 3. CAVE —IN PROTECTION BY SLOPING: a. IF THE SOIL 15 ANALYZED, CATEGORIZED AND DOCUMENTED BY A QUALIFIED AND COMPETENT PERSON AS DRAWN BY DHW TYPE A, B. OR C SOIL, THE SLOPE WILL BE AS FOLLOWS: TYPE A — 3/4 (H) TO 1 (V), TYPE B — 1 TO 1, TYPE C — 1% TO 1. DRAWING NO: SHEET 48 OF 48 A 0. IF THE SOIL IS NOT ANALYZED AND CATEGORIZED BY A QUALIFIED AND COMPETENT PERSON, THE SOIL SLOPE JOB NO. 39911024 WILL BE CONSIDERED TYPE "C" k SLOPED ACCORDING TO OSHA STANDARDS CFR 1926 SUPPORT "P ". THE SLOPE WILL BE FROM THE TOE OF THE TRENCH AND WILL BE CONSISTENT THROUGHOUT THE TRENCH WALL. 4. VERTICAL WALL (DOES NOT INCLUDE BENCHES) AND VERTICAL CUTS ARE ALLOWED ONLY AS LISTED BELOW: TYPE A — VERTICAL CUT CAN BE A MAX. OF 3% FT. IN HEIGHT WITH A 3/4 (H) TO 1 (V) SLOPE BUT CAN NOT BE MORE THAN 8 FT. DEEP. VERTICAL CUT CAN BE A MAXIMUM OF 3% FT. IN HEIGHT BETWEEN 8 TO 12 FT. IN DEPTH BUT THE SLOPE INCREASES TO 1 TO 1 ABOVE THE VERTICAL CUT. TYPE B — VERTICAL CUT NOT ALLOWED, EXCEPT FOR A BENCH CUT IN COHESIVE 8 SOIL. TYPE C — VERTICAL CUT NOT ALLOWED. SLOPE TO TOE. SLOPE H V� VERTICAL WALL 6" BEDDIN REQUIRED SLOPE OF UNSHORED EXCAVATION WALLS N CTES R E F E P. EN CE DRAWINGS i MATERIAL SUMMARY DRAWING NO. TITLE 1 NO. 1 DESCRIPTION CITY (ACTUAL) I NO, I DATE i ToPSOa PRDPOSED 1Z' RED40Ni �. lMTURAL GAS NP[LK _� SLDPE (1' YaNYUY COrLR) {� l0' TRENCHED E[UVAMM ENiSfiYG ID" GAS PWELiNE 6- BCDDING (TIT.) ZS' I SS' G LEFT PARALLEL LAY WITH EXISTING PIPELINE ON NON - WORKING SIDE REVISION S URSCarporab.I- N.MCamh. NNorth Caro&w Licence ► C -2243 Piedmont 0111 Natural Gas DESCRIPTION IE FOR APPROVAL AK 56 LOOP - EAST SOIL EROSION TYPICAL WORKSPACE CONSTRUCTfON METHOD OPEN CUT - CONVENTIONAL DRAWN BY DHW CHECKED BY: APPROVED BY: SCALE: SR DC N.T.S. DATE: 01 /23/13 DRAWING NO: SHEET 48 OF 48 A JOB NO. 39911024