HomeMy WebLinkAboutNOV-2018_PC-0129_No Response Letter_20190227Date: February 25, 2019
To: Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDENR
From: J. D. Logging, Inc
Pro Logger#6661
Darrell Jones
592 Brown Town Rd.
Magnolia, NC 28543
Assisted by: Larry Walters
Pro Logger #3198
259 Providence Ch. Rd.
Goldsboro, NC 27530
Subject: Buffer Violation on Robert G. Poole tract. November 2018-PC-0129 Wayne County
Logging on Poole tract began August 23, 2018 and was completed September 21, 2018. Logging
was delayed several days due to excessive rain, wind and flooding caused by Hurricane
Florence.
1. After completion of logging, cutter operator was asked to clean out SMZ crossing and be
sure no debris was left in buffer area. After the operator had removed some larger trees
from Zone 1 and Zone 2 of buffer, he then began removing damaged smaller trees. He
thought this the proper course of action.
2. See map (attached) area of buffer impacted.
3. Restoration Plan: We have planted mostly Ash and some Sweetgum seedlings on Zone 1
and Zone 2 on 11X11 spacing on 322 linear feet of the violated buffer area.
4. In the past we have done an excellent job on protecting buffers and water quality. Prior
to this job we should have requested a pre -inspection, especially after storm damage.
Signature, plJ Date
I
/ljV.4, 7 � jl/� 3 i- -?9'rd
North Carolina Departmeni of Environmental Quality Division of Water Resources. Washington Regional Office
943 Washington Square Mail, Washington, North Carolioa22889
252-946-6481