Loading...
HomeMy WebLinkAbout20051206 Ver 3_401 Application_20130501�,(ZY4 q- 6 rtq 1A .7 41 North Carolina April.18, 2013 Mr. David Schaeffer, Geographer U.S. Army Corps of Engineers Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Ms. Jennifer Burdette, 401 Coordinator Wetlands, Buffers, Stormwater Compliance and Permitting Unit N.C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 RE: Re- Application for Nationwide Permits 3, 27, 33 Northshore Lake Rehabilitation Project Raleigh, North Carolina USACE Action ID Nos. 200421569 & 200420766 DWQ Project No. 05 -1206 Dear Mr. Schaeffer and Ms. Burdette: www.raleighnc.gov $]PalH APR 1 9 2013 D NR - WATER OUALITY Enclosed are supporting documents for a re- submittal of our prior Nationwide (NWP) /General Certification (GC) permit application, under Section 404/401 of the Clean Water Act (CWA), for the Northshore Lake Rehabilitation Project. The City of Raleigh contracted HDR Engineering, Inc. of the Carolinas (HDR) to perform a preliminary study of both the Northshore and Brentwood Today Lakes, prepare alternative recommendations, coordinate public input, and complete a final design. This submittal addresses the need for a new set of 404 and 401 approvals for construction of the Northshore portion of the previously - submitted project. We hereby request Section 404 permit approval under NWP 3/27/33, as well as re- issuance of the corresponding DWQ 401 GC's. Background Northshore Lake and Brentwood Today Lake are located in the City of Raleigh (City) near New Hope Church Road and west of U.S. Highway 1 (Capital Blvd.). The purpose of the projects is to repair high hazard dams that have spillways in poor condition. The dams have been overtopped several times in recent years, causing flooding in the surrounding residential area as well as downstream erosion and spillway destabilization. There is also concern that New Hope Church Road, located just downstream of Northshore Lake's dam, has the potential to wash out during an overtopping event. The Brentwood Today dam has at least partially ONE EXCHANGE PLAZA CITY OF RALEIGH MUNICIPAL BUILDING 1 EXCHANGE PLAZA POST OFFICE BOX 590 222 WEST HARGETT STREET RALEIGH, NC 27601 RALEIGH, NC 27602 -0590 RALEIGH, NC 27601 (MAILING ADDRESS) the potential to wash out during an overtopping event. The Brentwood Today dam has at least partially breached and easement acquisition has slowed, so the City is not re- applying for that portion of the project at this time. The impacts are primarily related to the repair and rehabilitation of the spillway and dam and the reduction of water level in Northshore Lake. Buffer impacts, which total 3.55 acres for Northshore Lake, will primarily be temporary for construction access purposes, with replanting /reseeding of buffers to match the pre- existing conditions -on -site. The current construction- schedule calls for Northshore Lake's improvements to begin in mid -2013. Current Permitting Scenario A 404 /401 /Neuse Buffer pre - construction notification (PCN) for this project was filed in September 2008. Per a request from the Corps, the City filed the permit application under a combination Nationwide 3/13/33 PCN and the associated DWQ General Certifications (3687, 3689, and 3688). We were never issued a Nationwide 3/13/33 permit from the Corps, so statutorily it became valid after 45 days. DWQ issued a 401 Certification and Buffer Authorization on October 1, 2008 (DWQ Project #05 -1206, Ver. 2). The Nationwide Permits at that time were valid thru March 2012, with a Corps- defined one -year extension to March 2013 to allow for construction of applicable projects. The 401 Certification references the Corps' expiration date, so both the Nationwide and the 401 Certification expired in March 2013. The Buffer Authorization is still valid due to the Permit Extension Act of 2009 (Session law 2009 -406) that extended state permits and authorizations. Based on our recent coordination with both DWQ and Corps staff, and because of the expirations noted above, the parties generally concurred it would be best for the City to resubmit the old PCN for the project and provide the latest planset for the project. The Brentwood Today information has been removed from the attached documents where feasible, but continues to be referenced to aide those reviewers with past knowledge of the project. We appreciate your time and efforts in working with the City on these projects, and look forward to providing this watershed a safer series of streams and lakes. Sincerely, Veronica L. High, Stormwater Services Engineer City of Raleigh, Public Works - Stormwater Services Division Cc: Ken Trefzger, Project Manager, HDR Attachments: Site Vicinity Maps (Figures la and 1b) Permit Impact Drawings (Figures 2 and 3) Northshore Lake Planting Plan (Figure 5) r WA T§? r o < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification PC Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit E] Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3, 27, 33 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Northshore Lake & Dam Rehabilitation 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Raleigh (easements) 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: PO Box 590 3e. City, state, zip: Raleigh, NC 27602 -0590 3f. Telephone no.: (919) 996 -3030 3g. Fax no.: (919) 996 -7638 3h. Email address: Cad.Dawson @raleighnc.gov Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgentfConsultant Information (if applicable) 5a. Name: John Jamison 5b. Business name (if applicable): HDR Engineering, Inc. of the Carolinas 5c. Street address: 3733 National Drive 5d. City, state, zip: Raleigh, NC 27612 -4845 5e. Telephone no.: (919) 232 -6625 5f. Fax no.: (919) 785 -1187 5g. Email address: john.jamison@hddnc.com B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Northshore Neighborhood Assoc. (see attached plans, with City- acquired easements shown) 1b. Site coordinates (in decimal degrees): Latitude: 35.837 Longitude: - 78.588 (DD.DDDDDD) (- DD.DDDDDD) 1c. Property size: 7.8 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: New Hope Tributary - >Marsh Creek -> Crabtree Creek 2b. Water Quality Classification of nearest receiving water: C, NSW (tributary to Index 27- 33 -20 -1) 2c. River basin: Neuse Page 2 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Northshore Lake is located in a watershed that has experienced significant development, which has caused large amounts of runoff and sedimentation to enter the drainage basin. The lake has filled in with sediment over the past several decades, thereby decreasing water quality and the recreational value of the lake. The lake has an earthen dam and a recent history of overtopping. Both the dam and spillway are in need of repair. The lake is surrounded by residential homes and apartments that are subject to flooding. The vast majority of the wetlands adjacent to the lake appear to be created by decades of sedimentation building up where the surface water conveyances outlet into the lake. 3b. List the total estimated acreage of all existing wetlands on the property: less than one acre 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: less than 300 feet of perennial stream, the property is primarily encompassed by the lake 3d. Explain the purpose of the proposed project: The purpose of this project is to repair a hazardous dam with a spillway in very poor condition. The lake is a privately owned earthen dam with a history of overtopping during"flbod events. The lakes are surrounded by residential homes and apartments that are subject to flooding. New Hope Church Road, just downstream of Northshore Lake, could wash out due to an overtopping event. The lake has filled in with sediment over the past several decades, thereby decreasing their storage capacity (for aiding in flood control) and their potential for recreational use. 3e. Describe the overall project in detail, including the type of equipment to be used: The proposed work at Northshore Lake will include the construction of a concrete spillway structure that is 30 ft wide and 15 feet deep. The structure will control the level of the lake and safely convey the 1/3 probable maximum precipitation (PMP) flood event. The downstream end of the spillway will include an energy dissipator which will be approximately 2 feet deep and will include concrete blocks to help dissipate energy. In order to provide additional hydraulic head that is not currently available, the normal pool elevation will be lowered by 1.2 feet, which would effectively drain any existing wetlands immediately adjacent to the lake. Improvements to the lake area will include the construction of a sediment forebay at the upstream end of the lake. This forebay will have a normal pool with a 0.5 acre surface area and depth between 2.5 to 4 feet. The forebay will collect sediment from the upstream area and provide a convenient location to remove the collected sediment. The forebay will discharge to a -1 acre wetland area on the upstream end of the lake. The main body of the lake will have a surface area of 6.5 acres and will be between 4 to 12 feet in depth, with a transition area near the wetland that will gradually go from 0.5 to 2 feet in depth. The water's edge will be graded to provide a 10 foot wide flat bench area that will have approximately 0.5 foot of inundation at normal pool and will be vegetated. The dam embankment will be rehabilitated by cutting all the existing trees near the ground surface and hauling in good earthen material to level the top and increase the downstream breadth of the base of the dam. The dam embankment will be seeded with grass per dam safety requirements. In order to construct these improvements, heavy construction equipment will be needed to excavate and haul the dirt and to construct the concrete spillway. It is estimated that more than 16,000 cubic yards of earthen material will need to be hauled offsite. Multiple access points will be needed for the contractor to access and maneuver equipment, store construction material and effectively haul material. All areas that are either being improved or needed for construction access and storage will be within a temporary construction easement or permanent access and drainage easements. The temporary construction easement will be cleared of trees and shrubs and zones 1 and 2 of the Neuse Buffer will be re- vegetated based on pre - existing conditions. Fences will be temporarily relocated and reinstalled or replaced. Buildings such as sheds will be relocated if feasible or avoided if possible. The lake will be drained during construction and much of the work will be done from within the lake area; however, given the large amount of sediment in the lake bottom and the potential for rain events to drive the equipment out of the lake bottom, the contractor will likely need to operate from the bank for a significant portion of the work. For these reasons, the temporary construction easements extend beyond the lake edge and into the buffers. The temporary construction easements will be in place during the construction and warranty period and then turned back over to the property owner. Page 3 of 12 PCN Form - Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: HDR Engineering Name (if known): John Jamison and Phil May Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Action ID 200420766, a site visit was performed with David Shaeffer 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. An Individual 404/401 Permit Application was submitted in 2005 based on preliminary designs for both Northshore and Brentwood Today Lakes. DWQ issued a 401 and Neuse Buffer Authorization based on that application on August 24, 2005. After issuing their public notice, the USACE provided a round of comments, to which the City responded. A 404 Permit was never issued, however ( USACE Action ID # 200421569 and 200420766). In 2008 a new permit application was submitted under Nationwides 3, 13 and 33, to which DWQ issued a 401 Certification and Buffer Authorization, but to which the Corps did not respond. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 12 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary 1A ®P ❑ T Lowering water level, grading Lacustrine fringe ® Yes El No ® Corps [I DWQ 0.005 1 B ®P ❑ T Lowering water level, grading Lacustrine fringe ® Yes ❑ No ® Corps ❑ DWQ 0.01 1 C ®P ❑ T Lowering water level, grading Lacustrine fringe ® Yes El No ® Corps [I DWQ 0.004 1 H ®P ❑ T Lowering water level, grading Lacustrine fringe ® Yes El No ® Corps [I DWQ 0.006 1J ®P ❑ T Lowering water level Scrub -shrub ® Yes ❑ No ® Corps ❑ DWQ 0.04 11K ® P [IT Lowering water level, grading Scrub -shrub ® Yes ❑ No ® Corps ❑ DWQ 0.05 1 L ®P ❑ T Lowering water level, grading Scrub -shrub ® Yes El No ® Corps [I DWQ 0.20 1M ®P ❑ T Lowering water level, grading Lacustrine fringe ® Yes El No ® Corps [I DWQ 0.02 2g. Total wetland impacts 0.34 2h. Comments: The overall impacts are mostly limited to the original footprint of the lake and spillways, prior to the sedimentation and infilling that has occurred over the previous decades (Figure 2). At Northshore, 0.34 acres of wetlands (a mix of riparian forested and scrub - shrub) will be indirectly impacted due to the drop in the normal pool elevation of the lake (Sites 1A,1 B,1 C,1 H,1 J,1 K,1 L,1 M). This will alter the hydrologic conditions and possibly change the soil characteristics of these areas. 0.8 acres of existing pond will be converted to wetland. This area will be planted with wetland vegetation in order to provide a filtration effect, to stabilize the zone between the forebay and the lake, and to replace the potential habitat lost in the draining of the current wetland areas (Figure 5). Approximately 0.21 acres of the 0.34 acres of existing wetlands will be excavated to allow for the construction of a 0.8 acre sediment pool or forebay within the historic footprint of the lake (Site 1 D). This forebay will be used to minimize the amount of maintenance required in the future and limit this activity to an easily accessible area. The forebay construction will also impact a portion of former stream channel that is currently inundated backwater from the lake. 0.02 acres of current fringe wetlands are located around Northshore Lake as shown in the Northshore Figure 2 (Sites 1A,16,1 C). These wetlands have formed in the flatter portions of the lake margin where water is shallow enough to allow colonization by hydrophytic plants. Lowering the water level will indirectly impact all of these wetlands. The dredging and re- grading of the lake will recreate similar margins by creating a shallow shelf along the edge of the lake. Fringe wetlands are likely to re -form in areas that supply suitable depth and these areas will be re- vegetated with emergent marsh species per the planting specification in Figure 5. Page 5 of 12 PCN Form — Version 1.3 December 10, 2008 Version 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non -404, width (linear Temporary (T) (INT)? other) (feet) feet) 1D ®P ❑ T Bank grading / Spillway UT to Marsh ® PER ® Corps 12 218 Improvements Creek ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 218 3i. Comments: The construction of the Northshore spillway device will impact approximately 0.05 acres of open waters (Site 1 E). 153 feet of stream channel will be impacted by the improvements (Site 1 D). This stream channel is currently concrete and rock - lined. This material will be removed and re- constructed to provide a safe spillway, based on the attached construction plans. An additional 65 feet of stream channel will be impacted by grading and outlet protection activities around the base of the spillway. During construction, the stream will be diverted around the current channel. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 1E ®P ❑ T Northshore Lake Fill for spillway structure Pond 0.05 1F ❑ P ®T Northshore Lake Temporary - draining and Pond 6.50 grading due to aquatic restoration 1G ®P ❑ T Northshore Lake Lower water level, conversion to Pond 0.80 shallow bench for wetlands 4f. Total open water impacts 7.35 4g. Comments: See comments above in 3i. 5. Pond or Lake Construction If Pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: Project is rehab of an existing dam, not new construction. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 PCN Form - Version 1.3 December 10, 2008 Version S. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑Tar- Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact re uired? B1 ❑P ❑T El Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Buffer impacts have been previously authorized as discussed previously in this application. The Buffer Authorization issued by NCDWQ on October 1, 2008 (DWQ Project #05 -1206, Ver. 2) is still valid due to the Tolling Bill. The plans have not significantly changed since that submittal. The buffer impacts from the project are generally related to the rehabilitation/ maintenance of the dam and spillway and to the enhancements to the lake, which are considered Exempt or Allowable under the Neuse Buffer Rules. Thus, no mitigation is proposed. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. At Northshore, the avoidance of riparian wetland impacts was not practical due to the heavy historical and current sediment load that has led to the conditions described above. An off -line sediment pool or forebay was considered for this location in order to avoid impacting the current stream channel and wetlands. This would have divided the forebay into two sections on either side of the stream and greatly reduced the volume of water controlled. In addition, normal base flows would have been passed by the stream without contact with the sediment pools. Since the entire lake is currently acting as a sediment basin for the upstream drainage, it was determined that an in -line forebay was the most practical option. Draining of the current wetland areas was examined to determine if there were options to avoid this impact. However, since flood control is a primary concern below the dam, the normal pool water level needed to be decreased 1.2 feet to provide additional flood storage and spillway capacity, which brings the dam's spillway capacity into compliance with the NC Dam Safety Act. Alternative flood control strategies, such as raising the existing dam elevation, were considered but found to not be practical due to the potential impacts on adjacent landowners. As stated above, avoidance of the water level decrease was examined but deemed not practical due to flood control and spillway capacity issues necessary to comply with the NC Dam Safety Act. Therefore, the impacts to the fringe wetlands are necessary. Minimization of these impacts is being achieved through the grading of adjacent shallow waters to maintain the current lake banks and create shelves along the shore. This will allow for the natural reestablishment of fringe wetlands in suitable locations around the perimeter of the lake. Impacts to 0.15 acres of wetland are being avoided and are considered preserved wetlands adjacent to the proposed wetland area at the top of the lake (Figure 2, in blue). Other wetlands in that vicinity will attempt to be avoided during construction, but the erosion control measures deemed necessary make it difficult to predict how much additional wetland can be avoided. Avoidance of the Northshore dam and spillway impact was deemed impractical due to the high flood hazard conditions, the current state of the spillway, and lack of compliance with the NC Dam Safety Act. The enlarged weir will remove some open water, but is necessary to control the flows entering the spillway and reduce downstream velocities and flooding potential. The current spillway is cracked and a portion of the base flow is bypassing the spillway through voids underneath. This would eventually lead to the failure of the spillway and degradation of the downstream channel. The spillway length has been limited to minimize additional impacts to the stream channel. The leveling and improvement of the dam will not impact the stream or open water. Page 7 of 12 PCN Form — Version 1.3 December 10, 2008 Version 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. see 1 a above. Additionally, the project will mitigate for any permanent losses of waters and buffers through a variety of measures. At Northshore, the targeted natural community in the areas to be forested will be a Piedmont Bottomland Forest, and native woody species will be used to restore the riparian buffer zones. Species selection for planting will depend upon availability of local seedling sources, but a planting palette is provided below and on Figure 5. Advanced notification /coordination with local nurseries will facilitate availability of various non - commercial elements. After preparing the soil appropriately (soil amendments, ripping, etc.), bare -root seedlings will be planted within the specified areas at a minimum density of 436 stems per acre (based on an average 10' by 10' spacing) to achieve a mature survivability of 320 stems per acre. Woody vegetation planting will be conducted during dormancy. Amongst the 320 trees per acre, a species diversity goal of no more than 20% of any one species is proposed. Along stream banks, live stakes and /or bare root seedlings will be used to provide natural stabilization in conjunction with temporary stabilization measures. Appropriate species identified for live staking include elderberry (Sambucus Canadensis), silky willow (Salix sericea), silky dogwood (Cornus amomum), and black willow (Salix nigra). The following species in the table below are targeted for use in the project. Vezetativ e Species List Trees Herbs / Seed Mixture American Sycamore Platanus occidentalis Swamp sunflower Helianthus an sti olius American Elm Ulmus americans Ironveed Vernonia noveboracensis Green ash Fraxinus en /vania Swamp milkweed Ascle ias incarnate River Birch Betula ni a Joe- e-weed Eu atorium istulosum Su arbe Celtis laevi ate Tearthumb Pol onum sa ittatum Willow Oak uercus hellos Bushy beard grass Andro o on lomeratus Water Oak uercus ni a Deerton ue Panicum clandestimum Tulip Poplar Lirodendron tuli i era Switch ass Panicum vir atum Shagbark Hickory (Ca rya ovate Bitternut Hickory (Ca rya cordi ormis Shrubs / Understory Upland treespecies where appropriate Tag Alder Alnus serrulata Northern Red Oak ercus albs American beau be Callicar a americans Black Gum N ssa bi ors Black willow Salix ni a American Elm Ulmus americans Buttonbush Ce halanthus occidentalis Bitternut hickory (Ca rya cordi ormis Elderberry Sambucus canadensis White Ash Fraxinus americans Silky dogwood Cornus amomum Persimmon (Diospyros vir iniana Silky willow Salix sericea 2. Compensatory Mitigation for Impacts to- Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee ram program ❑ Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 9 of 12 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No ® Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? <1 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: lake rehabilitation, not adding substantial impervious surfaces 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Raleigh ® Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply): ❑ Session Law 200 6-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state/local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. In 2004, Titan Atlantic identified the Northshore and Brentwood Today, Lake dams as small, high hazard dams. This project will repair and rehabilitate the spillway and dam of Northshore. Additionally, the lake levels of Northshore will be reduced by 1.2 feet in order to safely convey the 1/3 PMP flood event. This area is a highly developed residential area in which these proposed improvements will enhance the downstream waters by properly conveying sediment load from the surrounding watershed and preventing future flood events from overtopping the dam. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? FED Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: the necessary floopdplain and dam safety coordination has occurred for this rehabilitation project 8c. What source(s) did you use to make the floodplain determination? 4 1 zi //3 Carl R. Dawson, Jr., PE Applicant/Agent's Printed Name Applicant/Agent's ature elo Date (Agent's signature is valid only if an authortAtion letter the applicant is provided.) tM y - as —/3 Page 12 of 12 PCN Form — Version 1.3 December 10, 2008 Version 8 Umstead 1 Chart S t i" k, C t< � �Rich nd j IIII Virainia Beach Are -of Deta ak6SS' le,OecArea L 1 inch equals 5 miles , w�e 0 5 10 s Miles 0 9 NEW LG4J/ r Northshore /Brentwood Tod } Drainage Area 11 laq Location Map Figure 1a ONE COMPANY I Many Solutions- City of Raleigh I Northshore & Brentwood Today Lakes /Dams Rehabilitation I Preliminary Design Report Site Map �� Figure lb ONE COMPANY Many Solutions- City of Raleigh I Northshore & Brentwood Today Lakes /Dams Rehabilitation I Preliminary Design Report .... . ....... ........... .. .... ...... .. . ...... . .... "2 uum ... ... ..... EAO-TER - ETLAA. . ...... ..... . ... ....... ...... .. ......... . . ............. . 7 . . ..... . ...... . . . ....... !W-5 EMEKENT MARSH BENCH I . OTHER DISTURBED AREAS S— BE SEEDED PER THE EROSION CONTROL SEEDING . .. .... . ... SPECIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . .. ....... ...... o - — — — — — — — — — M.,d,Mw W,11,,d Sp,,I,, P,I,tt, EM.1g.It M—h B Sp—l.. P.I.H. TI— B,W .'p,,,s (T ... d,,. 1,0,hu- Gan l .— (1-d—ll. / Water tupelo (Nyasa squat cal GI. arrow prom IPaltanera virginica) Swamp t�p (NY... wl,,) Scarlet rose Hallow (HMSCUa ceccneusl a,( W.dIgR— birch S.W. s p t"el—. (S.�s d"', G— , h (F--I,­Y,w—) Pi"ed P-R cordatal Bo. ld A— -d,) B,—.1 —l'" (1,P'Ims ­—sl Sb,.- SXhy 3d1- (Al Ted . CW, hW,,IW , U—". IAN (911,111A S .lky ,WAH (S,h. s,i... ,dd�l,b) -1.1 (T�H . WHO,.) ( B= wigow (Salta igd) ..".1d 'I'd I... pd—ty InlWN some m th, species fisted b- V HA .,I.. (ft.e ll�qhb— blueberry (V—H— —ymb... G-1 -- (k..d.,1.11. gIgIl..) SoH rush (Jonas eHusus) Jewelweed (11patill, ­11M I) Eldl—, IS-- ---) New York (Vmo- -1-d seed .., P.-My Inclutling some 11 the 1p N W M 0 A-z w AV � ifs +X�bLT'��7�,` ��� �����: � � -•� On It i► � ♦111 ♦/ 1111111����;,.`�1C� s 1♦i�111111jr 11��111111j111 ♦1 ` !`�1�•� 7 (. 1 `j 111 ♦ 11111 1111: 1.. ■ �, �� . -_ �, � �, �� 111 111111111111111111111111111111 �� � �1�i � - _ •� �h1,ii;� 1 1111111111111j111111111�11 ••���� i�i!�V� Ii���1��� - ���� ��i� hi .�. 11111111111111111111111 11♦hi � �1, ii���= =- ����I�o��1� - =- !•�1�� � ���� 1��' �. �v.���1�1: 1111111111:1111111 j1111111111111�11111 ♦���;\ II ♦ ♦� �, 111 1111 111 1111 •��� • -1 �♦ ♦i• ��. /'�� / / %%� �1hIIIII�II�� .'Z ♦�_1�/�• 4�1����1�������1��� -_ �A�l�i���` _ ' _' •__- "�i1�1�1��i���►��w`���1���- u�= = =" — / ��r' %�i� LEGFND BUILDING FOOTPRINT ROAD ROW EXISTING TOPOGRAPHY (5 FT INTERVALS) PROPOSED CONTOURS TEMPORARY CONSTRUCTION EASEMENT A STREAM. LAKE I• r SPILLWAY J n A WETLANDS IMPACTED - DRAINED IMPACTED - GRADING _ PRESERVED FM H°R Et o — ft ham. & tM C.ral — .tla4 Oriw� 8 W ]Oi IWMIpI., NC: ,a.00 �����: 1�% ���!- ��1' 11�1����111�11� 111i1!�i,11�����1��,11i= _ !_ii!!� %rriLj�1�1�0 ;f,��%��!��� \�IIIi�111��!.1i�1�11�� �!!�♦ 11 �� ii1 �,; �. ♦cam _ �����•i�i�: ��1111.�`` �1�� ♦o �111�� X11111♦ I�I�IIIj1111�j�U_,1•1�i1� 11 ♦i��i �1 — .1 1 i ,v � 1♦ \���111:11 .�AQ111111�j�i1:1�=1� �� �►'�1�111i1�!1/ j11���1O��i 1 • • :,��,i'(w���i�1����. ������11111�w�1����1��1�1��1�1i�1����i1���111�� •���11��1��ii,�If �� ', �' Q�� \1�� 1111 �' �`_�,�'� -� � - � � � � 111 ♦ iii 1i . ACCESSI AREA 'J ■ a �G�� n 1 B. 01 , ao►a cgye _ y 1 L, 0.20 AC trF,; =AR �� L wn LA w MEE f IMPACTED WETLANDS: 0.34 AC NEUSE BUFFER (ZONE 2): 0.72 AC 1 SEDIMENT POOL IMPACT: 0.32 AC (tA) REDUCED WATER LEVEL IMPACT: 0.02 AC (1 M) STREAM IMPACT: 218 LF (1 D) t_ PRESERVED WETLANDS: 0.15 AC OPEN WATER IMPACT: 0.85 AC REDUCED WATER LEVEL IMPACT: 0.80 AC (1G) PROPOSED WETLANDS: 0.80 AC SPILLWAY IMPACT: 0.05 AC (1 E) NEUSE BUFFER (ZONE 1): 2.83 AC PROJECT MANAGER I K. TREFZGER, PE J. JAMISON. PWS NORTHSHORE LAKE J. TISDALE City of Raleigh EXHIBIT J. POWERS Northshore ' • 1�, FIGURE 2 G. BLUE Lake and Dam ` Rehabilitation 0 1. 2• FILENAME 02H- 01.dw9 SHEET PROJECT NUMBER 010913 -52595 -018 SCALE 1• =60' 02H -01 Mw UTILITY IMPROVEMENT QUANTITIES CITY OF RALEIGH UTILITY DETAILS PHASE NUMBER(S)0 EROSION CONTROL DETAILS NUMBER OF LOTS 0 LOT NUMBERS BY PHASE 0 NUMBER OF UNITS 0 LIVABLE BUILDINGS 0 OPEN SPACE 0 NUMBER OF OPEN SPACE LOTS 0 PUBLIC WATER (I-F ) 0 PUBLIC SEWER (I-F ) 1 424 PUBLIC STREET (I-F ) 1 304 PUBLIC SIDEWALK (I-F ) 1 37 rm THE CITY OF RALEIGH PUBLIC WORKS DEPARTMENT STORMWATER UTILITY DIVISION J. RUSSELL ALLEN CITY MANAGER PROJECT SITE NORTHSHORE LAKE STATE ID — WAKE 175 OWNER: NORTHSIDE NEIGHBORHOOD ASSOCIATION/ BOB CHATHAM VICINITY MAP NTS Northshore (SM 2011 -0025) (Wake 175) Lake /Dam Rehabilitation Civil /Structural City of Raleigh Project Nos. SM 2011 -0025 - Northshore City of Raleigh Public Works Department Stormwater Utility Division P.O. Box 590 Raleigh, NC 27602 (919) 996 -3940 Veronica High, Project Manager HDR Project No. 010913- 52595 -016 November 2012 PERMIT REVIEW NANCY McFARLANE MAYOR DS- 13-01, v3 APRE NR - IzVATEF? GUALI &Iamff. 9 cv_�_ M PRELIMINARY PLANS W NOr Ui IW WMILRTlT I dw,19-14 NOR EnonndM bM .—C—U- 3733 NaOaW DAw. Sulft Wr I RWpII. ID !1312 (919) T@N113 (313IT3S11AHfa N.C.BP.LA Uk— Na1101N' F-0H3 SHEET NO UTILITY INSTALLATIONS AND OTHER PUBLIC FACLTIES. INCLUDING SIDEWALKS AND HANDICAP RAMPS ARE TO BE CONSTRUCTED ON ALL STREETS AS SPECIFIED BY CITY ODE THESE FACI OWE HAVE SEEN APPROVED BY THE CITY OF RALEIGH AND SHALL BE SO INSTALLED UNLESS A CHANGE IS AUTHORIZED BY WRITTEN APPROVAL PUBLIC SANITARY SEWER EASEMENTS ARE TO BE RECORDED PRIOR TO FINAL ACCEPTANCE- TRANSPORTATION SERVICES PUBLIC UTILITIES CONSERVATION THE CITY OF RALEIGH CONSENTS TO THE CONNECTION AND EXTENSION OF THE CRY'S PUBLIC SEWER SYSTEM AS SHOWN ON THIS PLAN THE MATERIAL AND CONSTRUCTIDN METHODS USED FOR THIS PROJECT SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE CITYS PUBLIC UTILITIES HANDBOOK CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT PERMIT A AUTHORIZATION TO CONSTRUCT INDEX OF DRAWINGS GENERAL "I COVER 602 GENERAL LEGENDI 603 ORIENTATION PLAN CIVIL X-01 EXISTING CONDITIONS X-02 EXISTING CONDITIONS X-03 DEMOLITION PLAN X-04 DEMOLITION PLAN O01 SEDIMENT AND EROSION CONTROL PLAN INITIAL PHASE C-02 SEDIMENT AND EROSION CONTROL PLAN INITIAL PHASE C-03 SEDIMENT AND EROSION CONTROL PLAN SECOND PHASE C-04 SEDIMENT AND EROSION CONTROL PLAN SECOND PHASE C45 GRADING PLAN C-N GRADING PLAN -01 C SPILLWAY IMPROVEMENTS C48 ACCESS AREA GRADING AND EROSION CONTROL PLANS C-09 APARTMENT PARIGNG AREA C•10 WETLAND PLANTING PLAN U-01 SPILLWAY PROFILES 602 SPILLWAY CROSS SECTIONS U-03 DAM BASELINE AND LOW FLOW DRAIN PROFILES AND AQUATIC BENCHING " CONSTRUCTION BASELINE PROFILE U-05 LAKE CROSS SECTIONS AND UTILITY PROFILES CIVIL DETAILS D-01 CITY OF RALEIGH UTILITY DETAILS D-02 EROSION CONTROL DETAILS 0-03 EROSION CONTROL DETAILS D.04 EROSION CONTROL DETAILS D-09 SITE CONSTRUCTION DETAILS D-0B SITE CONSTRUCTION DETAILS D41 TRAFFIC CONTROL DETAILS STRUCTURAL 8-0, STRUCTURAL PAN S02 STRUCTURAL SECTIONS 5-03 STRUCTURAL SECTIONS SOa STRUCTURAL NOTES SAS STRUCTURAL STANDARD DETAILS ,••tN CARp� %. 2, fT CIVIL a 0 I SITE PLAN SYMBOLOGY EMBANKMENT SLOPE -505— CONTOUR © VEGETATION (SIZE) w�- PROPOSED MANHOLE - TD._TD -- EXISTING MANHOLE OTEMPORARY WATER METER -O —D- STORM DRAIN CATCH BASIN -w UTILITY VAULT 0 UTILITY POLE ® TELEPHONE PEDESTAL - - - - - FIRE HYDRANT 0 YH -X YARD HYDRANT - - - - LIGHT POLE —aq STREET SIGN X75 5 EXISTING SPOT ELEVATION 758 FINISHED SPOT ELEVATION XXX HORIZONTAL CP -X, - w - > -•— CONTROL POINT — �— BENCHMARK 0TH IDENTIFICATION AND APPROXIMATE -'X' LOCATION OF SOIL TEST HOLE O WSL WATER SURFACE ELEVATION — DOWNGUY CHECK DAM WITH WEIR ( NCOENR 6.87) — > -> CHECK DAM (NCDENR 6 83) ® ROCK PIPE INLET PROTECTION ® ( NCOENR 6 55) w�- FLOW ARROW - TD._TD -- TEMPORARY DIVERSIONS OTEMPORARY (NCDENR 6.20) -O —D- DIVERSION DIKE (PERIMETER) OMULCHING (NCDENR 6 22) RR TEMPORARY SEDIMENT TRAP ® (NCDENR 6 60) ® ROCK DAM (NCDENR 6 63) ® POROUS BAFFLES (NCDENR 6 65) —X —X— TEMPORARY STREAM CROSSING (NCDENR 6 70) — - - — PROPERTY LINE OTEMPORARY SEEDING (NCDENR 610) PS PERMANENT SEEDING (NCDENR 611) OMULCHING (NCDENR 614) RR RIPRAP (NCDENR 615) ® CATCH BASIN PROTECTION mss+ elm. came NOTES: UTIUTIES THAT ARE SUSPENDED ABOVE GRADE ARE DESIGNATED BY THE PREFIX "OH" T TELEPHONE LINE -----E ELECTRIC LINE —� FIBER OPTIC —� COMMUNICATION HANDRAIL PIPELINE T —; LARGE PIPELINE UTILITY BENEATH STRUCTURE RAILROAD --------------4- DRAINAGE FLOW N NATURAL WATERWAY —X —X— FENCE — - - — PROPERTY LINE — - — CENTERUNE RB A - _ _ _ ROCK BERM ----- - - - - -- TEMPORARY CONSTRUCTION EASEMENT - • -• -•- - - TEMPORARY ACCESS EASEMENT - - - - - PERMANENT DRAINAGE EASEMENT ---- - - - - -- PERMANENT ACCESS EASEMENT - - - - LIMITS OF DISTURBANCE —aq STANDARD TEMPORARY SILT / BM TREE PROTECTION FENCE --- aF - - -aF- TREE PROTECTION FENCE XXX SILT FENCE - w - > -•— CHAIN LINK FENCE — �— CHAIN LINK AND SILT / TREE CATCH BASIN, CABLE BOX PROTECTION FENCES CF GUARD RAIL - - - - - - EASEMENT — LIMITS OF CONSTRUCTION X RIGHT OF WAY / PARCEL / SHORELINE RECP ROLLED EROSION CONTROL PRODUCT "`O (NCDENR 6 17) CONT GRASS -LINED CHANNEL GL (NCDENR 6 30) CONTRACTOR RIPRAP -LINED CHANNEL RR (NCDENR 6 31) • • •tot CONSTRUCTION ROAD STABILIZATION • •• •• (NCDENR 680) ® STEEL PLATE REF CONSTRUCTION ENTRANCE ® TEMPORARY SEDIMENT AREA nb Rmel m�a, s`- mr��RFr� Re =m� 0 TREE PROTECTION (NCDENR 6 05) X TREE REMOVAL GENERAL SYMBOLOGY ELEVATION IDENTIFICATION ELEVATION LETTER % X %% • SHEET WHERE POINT OF NEW MARKER CAN BE FOUND • IF PLAN AND SECTION, OR DETAIL CALL-OUT AND DETAIL ARE SHOWN ON SAME SHEET, SHEET NUMBER IS REPLACED BY A LINE ( -) ELEVATION LETTER ARROW INDICATES X POINT OF VIEW xx • SHEET WHERE ELEVATION IS LOCATED SINGLE ELEVATION OR PHOTO MARKER TARGET ELEVATION �_4 _ II_ s KEY NOTE NUMBER MANAGER K TREFZGER, PE D CROWELL. PE P BLANDFORD, J POWERS G BLUE PROJECT NUMBER 1010913-52595-0181 DETAIL NUMBE N %XX • SHEET WHERE AT ARROW INDICATES AFG DETAIL NUMBEQ OF A PLAN PLAN PLAN NORTH AVG 1/4- = 1• -0" NIC DRAWING WHERE DETAIL SECTION UETrEg BET BETWEEN FLAG INDICATES DIRECTION BLDG BUILDING OF SECTION CUT BM x OH BOT OR B/ XXX YNnY eerMawrwxe 111m Ow1Eit P11alC FMLIIEe, OQIIOINO BIOE1YM10IIM W W emFFnt�w eFecsmercnr 9Weovor BST BITUMINOUS SURFACE TREATMENT • SHEET WHERE CB CATCH BASIN, CABLE BOX SECTION VIEW IS LOCATED CUT CF SECTION MARKER SECTION LETTEB CL SECTION PSF X 3/8• - 1' -0• PSI XXX CONCRETE • SHEET WHERE CONT CONTINUOUS SECTION VIEW IS CONTR CONTRACTOR FIRST CUT CRS ELEVATION IDENTIFICATION ELEVATION LETTER % X %% • SHEET WHERE POINT OF NEW MARKER CAN BE FOUND • IF PLAN AND SECTION, OR DETAIL CALL-OUT AND DETAIL ARE SHOWN ON SAME SHEET, SHEET NUMBER IS REPLACED BY A LINE ( -) ELEVATION LETTER ARROW INDICATES X POINT OF VIEW xx • SHEET WHERE ELEVATION IS LOCATED SINGLE ELEVATION OR PHOTO MARKER TARGET ELEVATION �_4 _ II_ s KEY NOTE NUMBER MANAGER K TREFZGER, PE D CROWELL. PE P BLANDFORD, J POWERS G BLUE PROJECT NUMBER 1010913-52595-0181 DETAIL NUMBE %XX • SHEET WHERE AT OETAIL IS LOCATED DETAIL MARKER AFG DETAIL NUMBEQ DETAIL A APPROXIMATE N AVG REPRESENTATIVE NIC DRAWING WHERE DETAIL WAS CALLED OUT ELEVATION IDENTIFICATION ELEVATION LETTER % X %% • SHEET WHERE POINT OF NEW MARKER CAN BE FOUND • IF PLAN AND SECTION, OR DETAIL CALL-OUT AND DETAIL ARE SHOWN ON SAME SHEET, SHEET NUMBER IS REPLACED BY A LINE ( -) ELEVATION LETTER ARROW INDICATES X POINT OF VIEW xx • SHEET WHERE ELEVATION IS LOCATED SINGLE ELEVATION OR PHOTO MARKER TARGET ELEVATION �_4 _ II_ s KEY NOTE NUMBER MANAGER K TREFZGER, PE D CROWELL. PE P BLANDFORD, J POWERS G BLUE PROJECT NUMBER 1010913-52595-0181 NORTH NOW OR FORMALLY NORTHING NOT IN CONTRACT NOT TO SCALE OUTSIDE DIAMETER OVERHEAD PEDESTAL, PEDESTRIAN PAGE PAINT POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH POINT PAVEMENT POWER RADIUS REFERENCE ROCK PIPE INLET REQUIRED REVISED, REVISION RIGHT OF WAY SOUTH SCHEDULE SATELLITE DISH SECTION SHEET SILT FENCE SPECIFICATION SQUARE STAINLESS STEEL STANDARD STEEL STRUCTURAL SYMMETRICAL SYSTEM TEMPORARY TELEPHONE TRANSFORMER THICK TOP OF CONCRETE SURFACE TOP OF CURB TOP OF GABION TOP OF SLAB TOP OF WALL TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE VALVE Box VITRIFIED CLAY PIPE VERTICAL WEST WOOD FENCE WIREUNK FENCE WATER METER WITH WITHOUT WATER SURFACE ELEVATION � o NOTES PROJECT NOTES: A LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND WERE COMPILED BASED ON THE BEST INFORMATION AVAILABLE THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES AND SHALL FIELD VERIFY THE LOCATION, TYPE AND SIZE OF ALL UTIUTIES PRIOR TO CONSTRUCTION B THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED WITH THE WORK UNDER THIS PROJECT AND FOR COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL HEALTH AND SAFETY LAWS, CODES, REGULATIONS, AND ORDINANCES INCLUDING BUT NOT LIMITED TO THOSE CURRENTLY MANDATED BY THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) C THE SURVEY AND 1' CONTOURS WERE PERFORMED TO MEET THE STANDARDS OF PRACTICES FOR LAND SURVEYING IN NORTH CAROLINA CHAPTER 56 SECTION 1606 OF THE NORTH CAROLINA ADMINISTRATIVE CODE AERIAL TOPOGRAPHIC MAPPING WAS PROVIDED BY SOUTHWEST AERIAL MAPPING AND SUPPLEMENTED BY CH ENGINIEERING. D HORIZONTAL DATUM IS BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM (NAD 83) VERTICAL DATUM IS BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGVD 29) GENERAL NOTES: 1 THIS IS A STANDARD SHEET SHOWING COMMON SYMBOLOGY ALL SYMBOLS ARE NOT NECESSARILY USED ON THIS PROJECT. 2 SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING COMPONENTS OR TO DE- EMPHASIZE PROPOSED IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK REFER TO CONTEXT OF EACH SHEET FOR USAGE DASPHALT i GENERAL ABBREVIATIONS O AT N AFG ABOVE FINISHED GRADE N/F APPR APPROXIMATE N AVG AVERAGE NIC EARTH (SECTION) NTS BET BETWEEN BLDG BUILDING OD BM BENCH MARK OH BOT OR B/ BOTTOM YNnY eerMawrwxe 111m Ow1Eit P11alC FMLIIEe, OQIIOINO BIOE1YM10IIM W W emFFnt�w eFecsmercnr 9Weovor BST BITUMINOUS SURFACE TREATMENT PED CB CATCH BASIN, CABLE BOX PG CF CUBIC FEET PNT CL CHAINUNK FENCE PSF CMP CORRUGATED METAL PIPE PSI CONC CONCRETE PT CONT CONTINUOUS PVMT CONTR CONTRACTOR PWR CRS CONSTRUCTION ROAD STABILIZATION CTO CENTER, CENTERED RAD CTRL CONTROL REF CUFT CUBIC FOOT RPI REDD DEM DEMOLITION REV DB DEED BOOK ROW DBL DOUBLE DIP DUCTILE IRON PIPE S OW DIAMETER SCED DIM DIMENSION SO DH DOG HOUSE SECT DWG DRAWING SHT SF E EAST SPEC E EASTING SO EA EACH S EL ELEVATION STTD O EST ESTIMATE STL EX EXISTING srRL SYS FDN FOUNDATION SY FM FORCE MAIN FT FOOT OR FEET TEMP FTC FOOTING TELE FWD FORWARD TF THK/TH GPM GALLONS PER MINUTE TOC GRD GROUND HOPE HIGH - DENSITY POLYETHYLENE TOG TOS HORIZ HORIZONTAL TOW HT HEIGHT TYP ID INSIDE DIAMETER OR INTERIOR DIMENSION UG IE INVERT ELEVATION LINO IN INCHES INC INCLUDING VBX INSTL INSTALL. INSTALLATION VCP VERT LPT LOW POINT W L LENGTH WD MAX MAXIMUM WL MH MANHOLE WM MIN MINIMUM W/ MISC MISCELLANEOUS W/O MSL MEAN SEA LEVEL WSL MATERIALS IN PLAN /SECTION NORTH NOW OR FORMALLY NORTHING NOT IN CONTRACT NOT TO SCALE OUTSIDE DIAMETER OVERHEAD PEDESTAL, PEDESTRIAN PAGE PAINT POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH POINT PAVEMENT POWER RADIUS REFERENCE ROCK PIPE INLET REQUIRED REVISED, REVISION RIGHT OF WAY SOUTH SCHEDULE SATELLITE DISH SECTION SHEET SILT FENCE SPECIFICATION SQUARE STAINLESS STEEL STANDARD STEEL STRUCTURAL SYMMETRICAL SYSTEM TEMPORARY TELEPHONE TRANSFORMER THICK TOP OF CONCRETE SURFACE TOP OF CURB TOP OF GABION TOP OF SLAB TOP OF WALL TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE VALVE Box VITRIFIED CLAY PIPE VERTICAL WEST WOOD FENCE WIREUNK FENCE WATER METER WITH WITHOUT WATER SURFACE ELEVATION � o NOTES PROJECT NOTES: A LOCATION OF EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE AND WERE COMPILED BASED ON THE BEST INFORMATION AVAILABLE THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES AND SHALL FIELD VERIFY THE LOCATION, TYPE AND SIZE OF ALL UTIUTIES PRIOR TO CONSTRUCTION B THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED WITH THE WORK UNDER THIS PROJECT AND FOR COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL HEALTH AND SAFETY LAWS, CODES, REGULATIONS, AND ORDINANCES INCLUDING BUT NOT LIMITED TO THOSE CURRENTLY MANDATED BY THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) C THE SURVEY AND 1' CONTOURS WERE PERFORMED TO MEET THE STANDARDS OF PRACTICES FOR LAND SURVEYING IN NORTH CAROLINA CHAPTER 56 SECTION 1606 OF THE NORTH CAROLINA ADMINISTRATIVE CODE AERIAL TOPOGRAPHIC MAPPING WAS PROVIDED BY SOUTHWEST AERIAL MAPPING AND SUPPLEMENTED BY CH ENGINIEERING. D HORIZONTAL DATUM IS BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM (NAD 83) VERTICAL DATUM IS BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (NGVD 29) GENERAL NOTES: 1 THIS IS A STANDARD SHEET SHOWING COMMON SYMBOLOGY ALL SYMBOLS ARE NOT NECESSARILY USED ON THIS PROJECT. 2 SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING COMPONENTS OR TO DE- EMPHASIZE PROPOSED IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK REFER TO CONTEXT OF EACH SHEET FOR USAGE DASPHALT (PLAN OR SMALL SCALE SECTION) ® ASPHALT (LARGE SCALE SECTION) CONCRETE (PLAN /SECTION) ® DEMOLITION /DREDGING (PLAN /SECTION) EARTH (SECTION) GRANULAR FILL (SECTION) METAL (SECTION) YNnY eerMawrwxe 111m Ow1Eit P11alC FMLIIEe, OQIIOINO BIOE1YM10IIM W W emFFnt�w eFecsmercnr 9Weovor RIPRAP (PLAN /SECTION) •ern=u A=O �="FAaG urtuer��nwi�iov�i�t v�im�ic�BE m11eTM3Y OEriER Fw�rtRre Nre m ee RECOIO7E0 FWOR ro FIIe1L N;CEVfMaf. ,..�^ �u1 SAND (SECTION) rn•racanr•now aR aaceRV�naR FNOVeeEli '1 � �f��L% SOD SECTION RwFw �cRla, a�cr.rc�..m. meary ar wusmH CONSVM M nE aQWa AND EVEwaaN W TW ertre FIMLICSEWFAwvwi "a GNn Pu n WTEIMl COr6fWcrwM � AQUATIC VEGETATION (PLAN) aEn100!08E0 FOR 1M!PW =7C=MANTOnE HfNOeRO�NO aR!RiGnON00F TIIE ClY9 FUmIC 100.1f1[D RwNCwOCw om of RM PAL POaW RE3 CEGNtIMFMf iEWeT . MRRCIRA MOWWT UCf ;2pQ'�o �SSipH:�yv =; x z E „11/011L City of Raleigh Northshore Lake and Dam Rehabilitation GENERAL LEGEND AND ABBREVIATIONS 0 1 • 2- FILENAME OOC -02 <19. SCALE NONE 0 n 0 0 L J 4 N 4 PINE KNOLL OR 1-M HBTI ma aBT.eaMmle P7a7 MPBSIY OHw, W EPTI RrYy� MO Em: laaaei.a uw. Rrr Palo O1 O sIn, TQ p0 b CAPITAL BLVD 0ptE5 OR \VE PROJECT MANAGER IK TREFZGER, PE D CROWELL, PE P BLANDFORD, PE J POWERS G BLUE PROJECT NUMBER 010913 - 52595 -01 KILCULLEN DRIVE SPILLWAY STRUCTURE O AND ENERGY INLET DISSIPATION LAKE AND LAKESHORE GRADING AREA y NORTHSHORE SPILLWAY BAYRIDGE CROSSING ALIGNMENT 0 //� ACCESS AREA 'F' yG'pol ACCESS AREA "I' 30 +00 r 12 1 RYEGATE DRIVE 13 yx '� I `` `` ```�` 1 r•� ACCESS AREA ` I 00 18 i I 45 +00 �} �g J 17 16 ACCESS AREA 'K egg ACCESS AREA 'J' EARTHEN •�_ AREA H' �•� ' SI,wOc Oa EMBANKMENT WATERBURY ROAD UTILITY RELOCATION POTENTIAL STAGING AREA 9 a NORTHSHORE LAKE r U � LAKE RIDGE DRIVE r u W a 0 r z 4� J4 0 CONSTRUCTION BASELINE DOE 0 NORTHING FASTING BEARING GI L NGTH 1 o�a�loo 2121074 76 N 16' 18 E 388 87 2 756749 75 n 2 �O 237 80' 3 756984.76 2121220 26 r G� 4 757096 60 2121252 41 N24'40'0I'E 178 26' 5 757258 60 2121326 80 N00'00'00 "E 40 50' no 75729910 212132680 INGRAM DRIVE 10214' 7 P 2121365 92 u� 114 61' 8 757477 62 2121443 70 N 18'07'51 -E 53 11' 9 757528 09 2121460 23 N15'25'04'E 624 44' 10 75813005 2121626 24 0+00 g +00 3 10 +00 14+00---' � 16 +5 23 20 +00 N05'2 I'll 4"E 1 2 759151 90 -- N27'34'33E 446 39' 13 759547 58 2122074 26 N36- 11 :25 "E �0 14 759609 17 2122119 32 N31'1326E yyy 15 759870 95 2122278 01 N38'59'52E 437 74' 16 76021 1 15 2122553 48 N1624'43 "E CONSTRUCTION BASELINE I j 2122759 85 N00'21'041W 358 90' 18 761270 71 GREYW000 DRIVE r- BRENTWOOD TODAY LAKE N 4 PINE KNOLL OR 1-M HBTI ma aBT.eaMmle P7a7 MPBSIY OHw, W EPTI RrYy� MO Em: laaaei.a uw. Rrr Palo O1 O sIn, TQ p0 b CAPITAL BLVD 0ptE5 OR \VE PROJECT MANAGER IK TREFZGER, PE D CROWELL, PE P BLANDFORD, PE J POWERS G BLUE PROJECT NUMBER 010913 - 52595 -01 KILCULLEN DRIVE SPILLWAY STRUCTURE O AND ENERGY INLET DISSIPATION LAKE AND LAKESHORE GRADING AREA y NORTHSHORE SPILLWAY BAYRIDGE CROSSING ALIGNMENT 0 //� ACCESS AREA 'F' yG'pol ACCESS AREA "I' 30 +00 r 12 1 RYEGATE DRIVE 13 yx '� I `` `` ```�` 1 r•� ACCESS AREA ` I 00 18 i I 45 +00 �} �g J 17 16 ACCESS AREA 'K egg ACCESS AREA 'J' EARTHEN •�_ AREA H' �•� ' SI,wOc Oa EMBANKMENT WATERBURY ROAD UTILITY RELOCATION POTENTIAL STAGING AREA 9 a NORTHSHORE LAKE r U � LAKE RIDGE DRIVE r u W a 0 r z 4� J4 0 CONSTRUCTION BASELINE POINT NO NORTHING FASTING BEARING GI L NGTH 1 756376 52 2121074 76 N 16' 18 E 388 87 2 756749 75 2121183 94 NOW47'08 "E 237 80' 3 756984.76 2121220 26 N16'02'12'E 116 37' 4 757096 60 2121252 41 N24'40'0I'E 178 26' 5 757258 60 2121326 80 N00'00'00 "E 40 50' 6 75729910 212132680 N22- 31 -14-E 10214' 7 757393 44 2121365 92 N42'44'1 7E 114 61' 8 757477 62 2121443 70 N 18'07'51 -E 53 11' 9 757528 09 2121460 23 N15'25'04'E 624 44' 10 75813005 2121626 24 N18'28'58"E 638 29' 11 758735 42 2121828 58 N05'2 I'll 4"E 418 30' 12 759151 90 2121867 61 N27'34'33E 446 39' 13 759547 58 2122074 26 N36- 11 :25 "E 7631' 14 759609 17 2122119 32 N31'1326E 306 13 15 759870 95 2122278 01 N38'59'52E 437 74' 16 76021 1 15 2122553 48 N1624'43 "E 730 43' 17 760911 82 2122759 85 N00'21'041W 358 90' 18 761270 71 2122757 65 City of Raleigh Northshore Lake and Dam Rehabilitation H i/ 1/TRITY V=T TWNA Of PUMX FA=TEB, PICWW4810EYTAUO ATO MAImICI1P AAIPB AIB: ro BE COMBTRUCIEO OM Au a1HFEia A9 aPEaPEU BT Cm COQ TMEEE FAQOTia WVE BEF]I APMIOYED B1�TIF CT'OF RAVERRI ATU X BE BOOIafN1EO E SEM M3AR TOM FRIQEIIAPPROVAL PUBLIC awarARr aEwER FwvErExTa ARE roeE MEealmmwmn To PWAL ACCF7TAlICE TRAT9VffAT1 MSMWXEM Pue<IC ummEa COIA9ERVATIOM EMOBEER THE W RA1EIm1 � M 1 COIWER 1 ElRE119WI W THE PLIBU:6EWER OM M"aHOM M TIBa TV W.216 WTERMI AMO COkSTTRUCTWM TEt11008 vaEB FORTKB PROIECf BIIALL t�WB1 ro T1E arATmwma ATD 6PECFIGTIOT06 THE Cf1YT{ f�ICUT¢IT�9 M11TmBU01( ary W RMEIOM PusTC vrMnTEa oEFrmEHr PQOaT AurMOmATIaM ro mMamutT wre ORIENTATION PLAN 0 1 2• I FILENAME OOG -03 dg. SCALE 1- = 200' D C 8 A a 0 1 °o TOP -1e8.1 I / 411e �sNm �' / -259 35" �� N F ,�''7 Q OB 12155 170 OANID 0 N �p i,3 I \ OCIPCLEI C 8Y 19 1 DB 9479 PC 1 1 — / 32 BN 1968 PG 1 / / I /_/ �"� o �\ 1728.17 -20 -00 J l� / UEr P NFA9FA�N/F /,�1 '�W 792 IAA N. 7 t , , \`\ 12 —� 1907 PG 38 v ` / D / 1728 OS- 199084 /r C ` • ' / / A 4090 TOP-276 90' -1C4 / LAN +> I 18. OUT -273 Bg _ - �{,QjE.�+ 1 I 1�� \/ /' //�\\ `'r•t ` \/ �' �\ oy' \ o/ a \ \ e� _ 1 THE SPOT SHOT ELEVATIONS SHOW THE wn F �\ - _ _ ` ,: " 1 `tv \ 08 7� 473 PC 3- / (_ - - DEPOSi 0NT THESE ELEVATIONS SILT em 1 80 PCI84 u12 I ' R \ ESTIMATED IN 2008 AND ONLY REPRESENT i Nn 17x6.17 - 20-101 1 172" 1 r v -2679 ' 0 u �F 1 I I � � �Y� OTTOMMAT THE LOCATION ORIGINAL LAKE STABILITY PB:a 1 " 85N- 287.70' / 06 2778 PC 4981 ' I III I OF THE ORIGINAL LAKE BOTTOM IS 1 % �� 125N -251 92 8M 1906 PC 194 ! ' EK 20' G N N P UNKNOWN IT57UT. , 1 1 ' I DB tOg19 PG \ 1xrouT -251 79' iD1 201 PG 791 I , I 44x0 �� 1 I PIN 17x817 -20 -1010 1 4404 BN 1 194 /.' "' / nsv -Y8S g / / / •GGERS N , ; I RKJNRO eEL2Apo n/T 67 PD 701 2 SEE SHEET C -02 FOR CONSTRUCTION 37 +0 `/ / 09 293 PG o -E E WAl 10575 PG 1 zan -p -3465 BASELINE COORDINATES `\ .f O `+� TOP1-252 9 ` / N 172817�'2(I� 1x7 ® ' PAPo'E wN.L 9M 1988 125N -2$209 _f. ` 1T72- 72• I P ilCE w wN11E n/c 2• 1 1 9 Pc 9 PIN Ina17_�; -�1 3 THE OUTLET FOR THE EXISTING LOW FLOW 0 Sp 1 / \ 11:rxE son Pc sex I ' 9ee Pm � ^°"t_� DRAIN COULD NOT BE FOUND \ \ PIN 172e 17 -20_3 7 EX. 20' SANITARY BY J M 20' SANITARY 1 N • ' , ` N H RE - -'�-- __r_SEMER EASEMENT 1 PKR 17" 17 -20- 1 SEWER ----- ----Nf 4 EXISTING CONTOUR INTERVAL IS 1 FOOT . QSRPI L [QY 1889 PC W MEIVT 1 _- - - - - -_ -_ __---- __--- - -_ - -_ - _ -_ -__� em 1:5003 PG I BLOCK WALL 1c 2 \ _ /2 _ zee n' --- ------ - - - - - -- IzbCF -, ro�P -x71 sa tlticP N 17.-j9 -0618 `/ ,� - - - _ \> I A '- �y +tt15N -294 14' • CAN LINK FENCE i , X61___ - ix- OUT -292 - - - -_ T -T� / (x•Ol(T- 25409' C,INM �' • �EASEMEM O \ /'� 'y�/ ` t 1 �,;y "'�f S•ti `,� / WY -269 i 72• WOOD FENCE IX bw �� YYY...��� 1 /' PIER r 100 � L� 'W 11 ��B RETAINING 1 uw C KELLY F OB a PG 24 ,� ' J' v. \ r RETAKING WALL = f� P 1 1725 29 49 ` s , \ �7' 1 �p / REIA1l I W Irp Tov- 24995' a PERMANENT DRAINAGE �� a ``\ IN 12'M 'OUT -223 2,x1 EASEMENT Z 2.OUT -242 b' __ t O r CS7 ACCESS AREA "G I- ---� h,7x ALREXL/ DIA1P r `t 12�+ d tpp p4 36± Y 37 +00 �-t 125N -242 74' 1 25657 O 41_fIi5X1T- x4254' `�� QIO NOT 38 +00 U Yip " -J 0 sourt0 2go O] 2sx 76 '/ - 7eiLec 0755 N �T S� EE (UNDtsruR ®l 39 +pp (uNOlstuRem) qq +00 IO 0qe 980 PG YYE S I YYY��� U. BM 7 PG Nph n PAN 171!3 29 -17 /'' 1- 1 40 +00 °~t i � 43 +00 Q 41 +00 la CONSTRUCTION BASELINE "4.00 z i� alOT-244 ``\ BUY 30 pu 1 NORTING LAKE IZ ' I CNq = ` EXISTING NORMAL WATER ELEVATION 263 = PERMENENT / 3011 PG 0753 ' B�\ ''i1` IU B �— \ ACCESS `G w vC 36 154 1 /� / \` \ �\ EA am t Pc 781 \ \ MEAT \ • \ 1725 z9 -n7o '` , / NORTNSNORE \ 90E1TALK 1` \ \V f \ NEIGHBORHOOD As N/F 8 WILLIAMS V` BM 2 67 PO 761 Pm 77x0 17- zo -853a \ \ EXISTING O� 1 / SHOREUN i hyR dm.e.me Nlw, alb Jm I aM LL IJr�w IAmON POLE POOL TEMPORARY R�" 4 CONSTRUCTION EASEMENT r NOT FOR CONSTRUCTION 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW ISSUE I DATE DESCRIPTION �(—,��-S��'�/' I -117 PC PC MB F `- III Y PAD 29-8617 \ �! .`� / ; \ � 2i�1 21\ li' 3111 511] i 420] h , / FRAIN Y9Ea N//F \ �� ` i GG�/ / cARCLYN aAN IJ1f0 11 N/F OB 70]89 PC Oi52 g1 P / OB C 0 BM 1970 PC 323 gt 1 OB -29 -793] � 0Y M9 1 BI DEANA I ' / PIN 172918f20 77 I I! SEE INSET/ \ IROJECT MANAGER K TREFZGER, PE P BLANDFORD, PE "" "" "• City of Raleigh J POWERS G BLUE = 2 E < NorthShore 32 = Lake and Dam Rehabilitation PROJECT NUMBER 010913 -52595 -018 n'10IIti 1p I ,r� C I crcNn 24080 APPX BOTTOM OF SEDIMENT `I /•1` ��\ ` ' ,\� UTARY MaTALLAT1a1a AMDOf1ERPIBIC FAQfITEa ,,NQl10MO B10ERIMNa AMD IMNIIW n A�ro6E WNl1MlC1EjsNL81REE13A6sfEQ Eo 6Y 1 \ arr caoE. n1eJEC,�wnESNAV9 eEEN �FFRweo er ne ufr lFweslaN A I, i? \`' 11PRIWK PUB4C f8EWEgAFAff11EN191Y@7"�OComED PWON It `yam 20 DRAINAGE �^ roFwAL ACf�.PTAN�. TRANS o AtwN 8ERYIQa ` ` PumlcuTanEJI 1� CYNTNIA LYNN III Ns , �AnON ENGDEER Do 1 8 1970 32] BM "T`"'to�cnaN1[zrFNSlw _-mTEN BM .19 361 \ THE (=OF RALEIGH fdra9ENra ro TIE CaIREtnOx AND FJRENWa9 ac lIE `\ M1 _ L 618 -20 82 7 crTr9wmICsE IIrsTEMA9twOMNONTN9PIArt THE YATERUIL ANo C ANDARCrI9N)`IlMc DBu XONFar 1rA1 PRDECT9c 14 VFORMroTHE N/F `\ ,`\ BTANDARDa AIm aAElalrwnao4TlE arcs AtrdlD UT4JTIEl NAlmaOaC f' III R�El1CIRa�R1E�l DEPARTMENTFflWNF 1 AuTNOaQwTwnromnTlwo t EXISTING CONDITIONS 0 1 • 2• 1 FILENAME OOX -01 dgn poor, I SCALE 1• - 40' - v ^` BE77 yi' � / / � ,..p / /�zl�j`�• /. / P / 113 i CARaYN DUN N/F DB 1 W PC C 0 0396 BM 4 / i0N 1 908- ?9 -79]] PIN 17 hyR dm.e.me Nlw, alb Jm I aM LL IJr�w IAmON POLE POOL TEMPORARY R�" 4 CONSTRUCTION EASEMENT r NOT FOR CONSTRUCTION 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW ISSUE I DATE DESCRIPTION �(—,��-S��'�/' I -117 PC PC MB F `- III Y PAD 29-8617 \ �! .`� / ; \ � 2i�1 21\ li' 3111 511] i 420] h , / FRAIN Y9Ea N//F \ �� ` i GG�/ / cARCLYN aAN IJ1f0 11 N/F OB 70]89 PC Oi52 g1 P / OB C 0 BM 1970 PC 323 gt 1 OB -29 -793] � 0Y M9 1 BI DEANA I ' / PIN 172918f20 77 I I! SEE INSET/ \ IROJECT MANAGER K TREFZGER, PE P BLANDFORD, PE "" "" "• City of Raleigh J POWERS G BLUE = 2 E < NorthShore 32 = Lake and Dam Rehabilitation PROJECT NUMBER 010913 -52595 -018 n'10IIti 1p I ,r� C I crcNn 24080 APPX BOTTOM OF SEDIMENT `I /•1` ��\ ` ' ,\� UTARY MaTALLAT1a1a AMDOf1ERPIBIC FAQfITEa ,,NQl10MO B10ERIMNa AMD IMNIIW n A�ro6E WNl1MlC1EjsNL81REE13A6sfEQ Eo 6Y 1 \ arr caoE. n1eJEC,�wnESNAV9 eEEN �FFRweo er ne ufr lFweslaN A I, i? \`' 11PRIWK PUB4C f8EWEgAFAff11EN191Y@7"�OComED PWON It `yam 20 DRAINAGE �^ roFwAL ACf�.PTAN�. TRANS o AtwN 8ERYIQa ` ` PumlcuTanEJI 1� CYNTNIA LYNN III Ns , �AnON ENGDEER Do 1 8 1970 32] BM "T`"'to�cnaN1[zrFNSlw _-mTEN BM .19 361 \ THE (=OF RALEIGH fdra9ENra ro TIE CaIREtnOx AND FJRENWa9 ac lIE `\ M1 _ L 618 -20 82 7 crTr9wmICsE IIrsTEMA9twOMNONTN9PIArt THE YATERUIL ANo C ANDARCrI9N)`IlMc DBu XONFar 1rA1 PRDECT9c 14 VFORMroTHE N/F `\ ,`\ BTANDARDa AIm aAElalrwnao4TlE arcs AtrdlD UT4JTIEl NAlmaOaC f' III R�El1CIRa�R1E�l DEPARTMENTFflWNF 1 AuTNOaQwTwnromnTlwo t EXISTING CONDITIONS 0 1 • 2• 1 FILENAME OOX -01 dgn poor, I SCALE 1• - 40' a b 0 °o RDRIpbrEYq, ba dd.c—u— YsaW OiLw.�_� jRLYYLRG: PRELIMINARY — NOT FOR 11/2012 JISSUED FOR REVIEW 06/2012 JISSUED FOR REVIEW ISSUE I DATE _ DESCRIPTION MANAGER K TREFZGER, PE P BLANDFORD, P J POWERS G BLUE 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation NIB ■� ■c NM EXISTING CONTOUR INTERVAL IS 1 FOOT I EGENn /- 24080 APPX BOTTOM OF SEDIMENT RNlATLOXSN OTIER PUBLIC FACMS:s. MDLWBIO ®EWILlONO SR O E VCFO As a O B @W l Bg MA QfV NULL BE A MU W•ClUraiEw NRNCRIgDarwwnv.AP ao PuBUC sevrER ewBErmas,we Ta � aECamEO PNOR ro FB Ml N�fNIQ RATLOB BERUCE9 uTEe tt10l1EIG00 =Q1 F RIBFJNI CCRBFNTB TO TIE OO.EC N EXfDOM OFT flfY'B RERsysr M� OR TusP THEWT N corns CfWN UBFDFORT PROJECTNULLC0160fWTOTEBTAMp N HORS OF THE Pubm WK." RNBIBOOIL ums OIDNTIENT PETORT LTLOBmcohsm= EXISTING CONDITIONS 0 1 • 2• FILENAME OOX -02 dgn SCALE 1• = 40' c rn 9 n 0 I 0 Im "00.P 01 1^0. Wa of On Carcdm m f ?dn!=2:I� .t XM2 RAL NOT 1 THE PROJECT GOAL IS TO PERFORM THE IMPROVEMENTS WHILE MINIMIZING THE DISTURBANCE AROUND THE EXISTING LAKE PERIMETER THE CONTRACTOR SHALL NOT DISTURB THE SELECTIVE CLEARING AND GRUBBING AREAS WITHOUT PRIOR APPROVAL FROM THE CITY'S REPRESENTATIVE 2 THE AREA BETWEEN THE EXISTING LAKE NORMAL POOL AND TEMPORARY CONSTRUCTION AND ACCESS EASEMENTS NOT IDENTIFIED AS A SELECTIVE CLEARING AND GRUBBING AREA SHALL BE CONSIDERED A COMPLETE CLEARING AND GRUBBING AREA UNLESS NOTED, THESE AREA SHALL BE COMPLETELY CLEARED AND GRUBBED 3 REMOVE ALL DEMOLITION DEBRIS FROM THE WORKSITE NO DEBRIS IS TO BE BURIED ON THE WORKSITE OR PLACED ON ADJOINING PROPERTIES 4 DO NOT DISTURB EXISTING REVETMENTS OR RETAINING WALLS UNLESS OTHERWISE NOTED 5 REMOVE EXISTING TREES /SHRUBS WITHIN THE LIMITS OF DISTURBANCE UNLESS NOTED OTHERWISE DO NOT REMOVE ANY TREES /SHRUBS BEYOND THE LIMITS OF DISTURBANCE 6 EXISTING FENCING WITHIN THE LIMITS OF DISTURBANCE UNLESS NOTED OTHERWISE SHALL BE EITHER REMOVED OR RELOCATED INSTALL TEMPORARY FENCE AND GATES OR RELOCATE EXISTING FENCE AND GATES TO ENSURE THE INTEGRITY OF ANY REMAINING FENCE BEYOND THE LIMITS OF DISTURBANCE IS RETAINED DO NOT REMOVE ANY FENCING BEYOND THE LIMITS OF DISTURBANCE PROVIDE TEMPORARY FENCING TO MAINTAIN YARD ENCLOSURE 7 RESIDENTIAL SEWER SERVICE MUST BE MAINTAINED AT ALL TIMES SEE SHEET 01C -05 FOR SANITARY SEWER REPLACEMENT PLANS REMOVE AND REPLACE GRAVITY SEWER ONLY WITHIN THE LIMITS OF DISTURBANCE AS INDICATED ON THE PLANS 8 THE PROPERTY OWNER SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING PUMPS AND ASSOCIATED APPURTENANCES, CONTRACTOR SHALL NOTIFY PROPERTY OWNER AT LEAST 7 DAYS PRIOR TO REMOVING 9 ALL TREES LOCATED ON THE EXISTING EMBANKMENT SHALL BE CUT DOWN WITH A CHAIN SAW THE STUMPS AND ROOTS SHALL BE REMOVED BY DIGGING, NOT PULLING SPECIAL CARE SHALL BE TAKEN TO MAINTAIN THE INTEGRITY OF THE EXISTING DAM 10 COORDINATE WITH THE PROPERTY OWNER TO SHUT OFF POWER PRIOR TO DEMOLITION OF THE CONCRETE POOL AND POOL HOUSE 11 THERE IS AN EXISTING GEOTHERMAL PIPING WITHIN THE LAKE COORDINATE WITH THE PROPERTY OWNER TO HAVE PIPING REMOVED THE OWNER SHALL BE RESPONSIBLE FOR REPLACING THE PIPING KEY NOTES RELOCATE OR REMOVE 10 LF OF 18" RCP STORM REMOVE (TO BE REPLACED) DRAINAGE PIPE REMOVE 17 LF OF 18" RCP STORM l� DRAINAGE PIPE 3/ REMOVE 26 LF OF 15" RCP STORM SELECTIVE CLEARING DRAINAGE PIPE I FCFN ] RELOCATE OR REMOVE (TO BE REPLACED) ®DEMOLISH (DO NOT REPLACE) SELECTIVE CLEARING AND GRUBBING LIMITS PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER IK TREFZGER, PE P BLANDFORO, PE ``SH 1 CARpG, City of Raleigh DEMOLITION PLAN J POWERS `:2pQ` •QESSip1,. v G BLUE _ Northshore a ti Lake and Dam 11/2012 ISSUED FOR REVIEW N E:•S �,.` SHEET Rehabilitation 0 2" FILENAME OOX -03 Ogn ISSUE 06 /DATE ISSUED DESCRIPTION PROJECT NUMBER 010913 -52595 -018 �'��'Z SCALE 1" = 40' X -03 a 0 °o s5oe s CHARLES F SIM 197700 8Y 1 987 n s-2, -m361 ob NORrNSHORE Assuc., INC p� 27 a PAC 97 -� C %� `\ ` \ PIN 172616 -21 -71 `\ OB 12171 PG 71 pvFGATE ROAD _ BY 1970 PC —� �', PR 172818 i- 18'17T8BIRCH (STING 12' SANITARY SEWER 5 PPCc t1egzoo � — \ T y TO BE R� ED , x 1 24 �� 68 9771 BiN i9v6i MYRTLE 9, ACCESS' "20 N N� C stivrt7r '1 \ 17zs /e zo-69w \ � \ , yL AREA , I MI6 I NATIa C sAVIErT Un- �LI MAWEIIE� I JOSH W TWNI DB 2009 PG 27J1 O 1j 1 08 861 PO 0 {� gY ,988 1N I� BY 1968 PO t8}J i > y+ EXISTING 8• ' ROBDIISOp WI 1968 PC 154 POI I - 18-0797 1987 T , +��1 • +S"r� C MATLE \i �- \ OB 729 PO4' 172611 -20- 7 ' I - _ 172 III�2 ; - t , z -; T,�- . SANITARY SEWER 1 BY 7z--: "T 1 1 =` TO BE RELOCATED OI NOB\ em 3e, T -- I ` r Y -' /� 2ss DISTURB \ M&47- 20 -IS+. - I J_ �� � J 1 \/ i _ _ >;: iNL ` I 1 1 V y,.0 �i ACCESS AREA 'K' 20• _I SEWER NE �SED:R T12 CARRASCO BLANCA ESTELA ( '� -✓f - , , •, N ,y- . ' (00 NOT �� p0 11 �/� , ,,��``�� 8984 PD 1803 .A.^'1,Y, '•`•� _ •+' pSTUge) y0x /� / i.� `� BM 73 PD 461 eM I 1 1726 8- 1- Y _ 18 15 NORTHSHORE LAKE to 1291 r- EXISTING NORMAL WATER ELEVATION: 263.8 'asvwE ;2R Y CONCRETE Pzr�wwc vuu ag p0 TEMPORARY •,�/ e0� �� \ \� \ ` e9RE CONSTRUCTION 3,1e 20 vRE 48' 5000 16�WRCl M (DO NOT DISTURB) _ / 0 ,o"Po+E PENCE 12 28'DAK 1 -PINE EASEMENT RETAINING WAIL 1991NE 48 +DG 2 IB'p1M 2 / _ •l / '1 pal (DO NOT DISTURB) le oAN 12•GUM REMOVE OR 49 6'Q_ 47 +00 CONSTRUCTION RELOCATE 12 TRIM BASELINE % �(- otxDN jo• \ - - \ ` / �^ \ g ° RELOCATE OR _ p REMOVE (TO BE REPLACED) SHCRE O NE1GHHM B ASSMISI 46 +00 161 / I / �t� C0 ° \\ W DEMOIJSH ��7 1907 PC 686 -20 -65u '� � A '�io� '11n, 11 ,\ \ ® (00 NOT REPLACE) 45" 16\ e= , 6--0._ "E / 23 �v; _� �� '����� SELECTIVE CLEARING (L ,I'MAPIE - - i6-P.',E EASE ` ;it 1 ` .t '.t1;'. +;•, AND GRUBBING LIMITS 10•WMMML ' 6 PNE �� B�OAII WOOD RETAINING WALL ' -1C T K _ (DO NOT DISTURB Q� s�`*1 �1 u13 --�-�. OAK SHED 6-RIE 1 4409 ' ' Z 1 914'GMI /��IIETAINING E ROVED) 2iWPPA1M _ -1, ��;j 9.OAK 23 "P VE `�,', G NUI UISTUR0`9'✓'NE '\ 8067 PC $ t37ME r! 9`G 4i 32'OUADOAK '•4 =Y} ,2 D ,I E 8 �✓" ) 1 pp��'')17261 - ; �2 891NE 121MPLE c 1 '� ' • POOL / y FR!WC6i +• g•.m ITTUfa \ 7 P \1 -- • -_ - — - '2.0At 9'MAPLE iS G.0 '227Ly - ? 1 �T2'� JBbBIMARD � 1 DAR 25'P 1E 6'PIE DDD Y? \ / r ACCESS 1 `, AREA 'J; SHED CAROL OBB C SB1S '1 II PC, 18J0 `I , fA PIN 718 - 2918574 '1 o MtcRN / \ Die 75992 0 144 , 1 -�� \8M 1970 PC \ 4217 18/4 2018 38I YYON /uYES ` PIN1-1 TL618- ZAWH eN 1979 PC 323 PIN�728 18�2,3h1 \ hv,R MR P.IIaS4N1Ry k. dtmcwd - 4401 PI 9 Mao E Y ••'"t'y ••Ap_E 12 -•,fib` 1 OB 8615sUSAlIS SCOTT t0"'A E `y�Ep/9�)M BM 1972 PG 22 -P �� 121DAK \c F M 1726 13 f�pj \ �\ SHED ROTA E yDC'�Y 'BEES \ 71 1 QocNOCO 08 1957 PG 1" 99278N IXSEWER E115EIIEIIT \TAi ^'�\ BM 1'967 61 .� 17261 7 4309 DB 9621 PC 2560 — PG- a6 5 \ �3�/ � J 2Y - NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE P BLANDFORD, PE J POWERS 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW ISSUE I DATE DESCRIPTION PROJECT NUMBER J 0 City of Raleigh Northshore Lake and Dam Rehabilitation ROFD 1 ID IC �W COOS. THE9E FACILIIEB HAYE BEEN APPRDVEDBY THECT OF RMEN,N AIIDIDWLBE A SOMTM M.E69A0UN(E19ALITI4M SYWM+ENAPPROYAL PLOJC SANRAFW 6E W ER EASEMENTS AM TO BE � MIOR TO FINN. ACCEPtANCE. TRANSPORTATION BFfMf PLELM UTILITIES CONSFRYAT10N t7gNEER THE QTY OP RALEKi CO 3 TH8 C04YECRp1 AND EiTEMSM aP THE 0-3 PUBLIC SEWER SYSTEM AS SHOWN ON THIS PLAN. TKE MATIMAL AND COIIHO6ICIWN IS:TN009 USED FOR TIAS P CT SHALL CONFRW TO THE STANDARDSAND SPFWXATKW1S OF THE CffY9 PIIDNC UTILITIES HNmBOOR CRY OF RALEION PUBLIC M" ES RPARtIm1T REIOSTj AUTIIOR9ATM TO COIBN WCT MlE DEMOLITION PLAN 0 1 • 2' FILENAME OOX -04 dgn SCALE 1- = 40' /'L_. •B� v s 1 0 y� 248 I A I EP01 T MP \ \i/ I 1 - -� i N ETJN/A r�y� //F ♦\- ` \ NORFLEET ` CIRCLE pe 17 5119- 9J2�- tB j / 3112 / \ HUEY L ER /F WE '// ♦ \ .' / I A S -. I �\ C DOROTH a A ETi N VEPED AL / / DB 8 PG 352 / • SEM i y BM 960 PG IBS / �� .r ♦\ A F' '0' �`I t GENERAL NOTES. a +967 Pc Js' 'a� /�' t' °'� i c B CONSTRUCT N D -03 PROTECTION P »2505 -+9 86 �I 4 ER 1 1 SEE CONSTRUCTION SEQUENCE NOTES ON 0 -06 ENT E., ` �� \ m.EC4 7E ROAD D -02 0 \ SHEET �: a309 / - _ - - - _ - - - - - - - - 2 DRAIN (LAKE USE EXISTING O ANY GRADING DING TRU 1 JIMMI Sc N/F \ I' _ \ _ FLOW •SENTERLNE� 2 e c f a• ALecH D so ER JR T _ - De Pc DRAIN M SLOWLY DRAIN THE LAKE A 11 BM t 68 tes 4 }. � ^ MAXIMUM OF 1 FOOT PER DAY THE �y / PI7 -z 101 i EXISTING VALVE HAS NOT BEEN OPERATED 6 °3�" AIN NK acv "a���� u" F IN YEARS AND MAY NOT WORK THE ��� 0B'zai PG 4981R ' ( l ' CONTRACTOR WILL BE RESPONSIBLE TO _0 +961 -tC-11 I BLAf1 PROVIDE A PUMP TO DRAIN LAKE IF 1 BM 61 EMI sA00 1 P 2817 -20- I -I \ / n DM '519 PG EXISTING LOW FLOW DRAIN DOES NOT 01 �- A oa L eIC G 0" i J/ 'HA ELZANO n " B 67 P PROPERLY FUNCTION j v / 1968 PG SALLY WALL 10578 PC 68 12 -20 IN -227 D ` }20 E B 3 THE CONTRACTOR SHALL REMOVE FISH AS FE 01 5 c 562 ENO B I 9 PG 6 9 IN 361 SOON AS POSSIBLE THE CONTRACTOR z0 SAN, 196 SHALL NOT RELOCATE THE FISH INTO SE PUBLIC WATERS 7 -20 -3 47 `� / n• _�� 1 PIN 1 wER EASEMEn• - CTION 1 17 -20 - }' ER- E.15EMENt' -� - -- -n•_ NC E, >R 4 INSTALL TEMPORARY STORM SEWER IN VCP - -rti _ 1 CP SAME TRENCH REQUIRED FOR THE LOW _,,,--_ - -a" N FLOW DRAIN SIPHON THE TEMPORARY STORM SEWER PROVIDES RELIEF DURING A 1 \ ll INV` 60 0 \\� `` -` - LARGE RAINFALL EVENTS THE l 1 �`n�. 72' W°OD iENCE CONTRACTOR MAY PROVIDE ADDITIONAL BYPASS J Cj INSTALLATION OF THE SIPHON OR PUMPS TO REDUCE THE AMOUNT OF PONDING DURING RAINFALL EVENTS ANY ADDITIONAL \ + \ 1r AINNG WAL TYP, N2 � BYPASS MEASURES MUST BE APPROVED BY C = THE OWNER AINI h 5 IF THE EXISTING LOW FLOW DRAIN DOES \ \ \ \ \ \ _ { LLJ NOT FUNCTION, THE CONTRACTOR SHALL SERVE 1 A \ �� e, )L''I INSTALL THE PERMANENT LOW FLOW \ ,\ `\ - ' j / O `!C (n SIPHON DRAIN AND TEMPORARILY DRAIN TO 1 y' CON T C ION \ Q y /\ y Z THE OUTLET OF THE TEMPORARY STORM BASEL O SEWE DE THE CONTR FIOR THE SHALL ALSO \ 1 l\ 1' J< AND /OR KEEP THE LAKE AT AN ELEVATION 11 II I , ,1 G�7 00 1 \ �,\ END TEMPORAR i .\ \ — - _ - - - IZ OF 255 OR LOWER, WHILE PERFORMING It 100.331 t 1 I \ - , CONVEYANC C NN C 1 - �r- -- THE GRADING 4CCES5 •./ / y \ z5s5T -_ - IH- "2 a +0° — — — - - - -- _ _ — III z Q RPI 5 CENTER Lt E, 1, 1\ - _ FLOWLINE „E. 6 PRIOR TO DISCHARGE OF RUNOFF FROM ' I 1 1111 i I 1 1 I \\ 250 DJ _ - -' - - - DISTURBED PROJECT AREAS V THE IN 1 (uNDI�aEO) i - � 0 (uN t�RBEO DESIGNATED TEMPORARY CONVEYANCE \ / \ �� 44 +00 � CHANNELS, ALL PROJECT RUNOFF FLOWS A X\LC�}tpN I I OT FOUPfD SHALL BE COLLECTED. CONVEYED AND t '�'0 E ISTt�J K lD IN � E12- 4 TE 5) / /� / �� - - 4 _ _ - - - - _ - - - - -- =- -� Ili TREATED IN ACCORDANCE WITH PROJECT - � I SEDIMENT AND EROSION CONTROL PLAN �\ % \ -- --- --'�4i +001, - / ] 5 TEMP NVEYANCE Q PROVISIONS 42 +00 / D -02 CH NEL, TYP 4 2 SIZED TEMPORARY O CONVEY EAK DISCHARGE FROM R / /�Z THE 2 -YEAR STORM EVENT TRA HOUR �l / f DISTRIBUTION) AT THE CONTRACTORS OPTION, THE CONTRACTOR MAY PREPARE, 6 L `�� / / /I= SUBMIT AND REQUEST APPROVAL OF PLANS !\ / I J / / 1 A.n V FOR ANY TEMPORARY DRAINAGE FACILITIES B INL K, PIPI, D -02 NEIGHBORHOOD 6 SPI 36u5 N/F �.\ `C� /N / / Q FORA DIFFERENT STANDARD GREATER F �'� THAN THE 2 -YEAR STORM EVENT F / / (24 -HOUR DISTRIBUTION) PIN 1726 17 -20 -6533 1L f 8 THE CONTRACTOR SHALL FIELD LOCATE THE TEMPORARY CONVEYANCE CHANNELS AND MOVE THE LOCATIONS TO ADJUST TO THE WORK BEING PERFORMED y�y_y•y � 04 SEDI OENT 4 r P. TYP A6 / j Np C Au, -o`er POOL HARKING 09 hq \ ' O � , 1 / 7> } 4 J S }}LT /TREE 4 9- • 7 PRO \ % / ENCE./ TECT D -U3 P / /SILT FEN C LIN NC / DEANt� CANE 1 I \ - Im NOR Enp -W ft hIa OBI. cnrdh- PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE P BLANDFORD, PE J POWERS G BLUE 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW n.wtl WjRdWIK MII ISSUE I DATE DESCRIPTION PROJECT NUMBER 010913 -52595 -018 - Rmner P4N1/ City of Raleigh Northshore Lake and Dam Rehabilitation O / � IITIIITY MBTAWl10N9 AND OTHER RIRIC FAfAIIIEB. NClIID016 ANO / INNDIGDR,MO+B ARE TO BE CONBTRUOIED ON ALL HII�ETB AB I�EC6E0 BY CRV CODE THESE FAfAfDEB NAVE BEOI APPROVED BY THE CRY OFRAIEION ANOBWML Be WLI ACE BOVM=UI6E4.9ACIN11OEtl AUR40R9:E0 BY WRRTE//AAROVAL PO$!C A &WRARYSEWER EABELENfB AREroBE REraIaED PRIORroP1fY1L ACDePTANYE. mARVarsunan sERUNs NmuC UTWTE9 HI LYN CONSERVATON ENOMEFR DB tl /BM I As,so , rnONI ><+eN?ON Ararcr ryBM 8 THE CRY OF RALFJGN CONSFNTBTO Emma AND E%IENSWN Oi 11IE PTY9 RIBLIC SEWER BYBTEM AB SNDWN DNTWS PLAn THE IMTEWALANO cOreTqucRaN / ME CWIC USED FOB T199 WIDA:CT 8IMLLCMS HA roTHE BTANOAI✓fl9ANO 9PECBIGTM7N9 OF TIB: diY9 PUBl1C IlTlR1E9 NANDBODK / CITYOF RAtflON PUBLIC UIWTES OEPMTI�NT PERIOT /l AUINORQAT1011 TO CONBIRIICf SEDIMENT AND EROSION CONTROL PLAN INITIAL PHASE 0 1^ 2- FILENAME OOC -01 dl. SHEE SCALE 1" = 40' ED v �no e a20} a2 31n aln ORO LYN 0001 PC 0396 + FIJI }69 PG F BM 1 /32I 625 BN V I 506 -29 -]933 67 \ - PIN 1 0- 19]( N City of Raleigh Northshore Lake and Dam Rehabilitation O / � IITIIITY MBTAWl10N9 AND OTHER RIRIC FAfAIIIEB. NClIID016 ANO / INNDIGDR,MO+B ARE TO BE CONBTRUOIED ON ALL HII�ETB AB I�EC6E0 BY CRV CODE THESE FAfAfDEB NAVE BEOI APPROVED BY THE CRY OFRAIEION ANOBWML Be WLI ACE BOVM=UI6E4.9ACIN11OEtl AUR40R9:E0 BY WRRTE//AAROVAL PO$!C A &WRARYSEWER EABELENfB AREroBE REraIaED PRIORroP1fY1L ACDePTANYE. mARVarsunan sERUNs NmuC UTWTE9 HI LYN CONSERVATON ENOMEFR DB tl /BM I As,so , rnONI ><+eN?ON Ararcr ryBM 8 THE CRY OF RALFJGN CONSFNTBTO Emma AND E%IENSWN Oi 11IE PTY9 RIBLIC SEWER BYBTEM AB SNDWN DNTWS PLAn THE IMTEWALANO cOreTqucRaN / ME CWIC USED FOB T199 WIDA:CT 8IMLLCMS HA roTHE BTANOAI✓fl9ANO 9PECBIGTM7N9 OF TIB: diY9 PUBl1C IlTlR1E9 NANDBODK / CITYOF RAtflON PUBLIC UIWTES OEPMTI�NT PERIOT /l AUINORQAT1011 TO CONBIRIICf SEDIMENT AND EROSION CONTROL PLAN INITIAL PHASE 0 1^ 2- FILENAME OOC -01 dl. SHEE SCALE 1" = 40' v c r 0 I o . o . L �I J 4 0 a5C8� r ` O 1 2 00.0 VF �'�OrG E 20 NAGE 01726 PG S3 / /ASEM i 970 P 2 \ J 19fi7 161 8-71 -6106 ,r� 2 INLET •`\ `� TE IVEWAY, \ \G/,��R�7�pG \LE NOR SHCRE W 4 O`N\ Jz \ \ ASSCC C 50 „ / \Y/ VARTMA B 1 ' - ADEVNA G K CH VC Z- 03 2375 P R,EGATE ROAD TEMP GATE - 1\2C, 06 12171 PC 71 • 4 PIN 1 72618 B 1970 HC SHED X 20 ORAKaAGE PIV `5 172615 p TO'•. v50N tb - a7EnC y o f I o 2y C CH1 0 '0.11L' & G �05 971 PG 2 • n 4a24 Bf 9J0 vC 2 i..J •�' B`5 19� 36' #4 1 7 ` L p p aa_6 ,4zo1 K 12618 20 -6909 SNE •' t - 4412 L _ _� tG'.CY C .A$NF ` \t�,� J ,�• /" i / � /' SH, ••ATF �/r I SH .! ..KSC C8 zn— N/F CHA CaR 0 R U"1 N/F I .I 8 BBS t B'• '9"6H�P"�IP4 0" 968 PG 19 `% ,•g6fl .' RPI` 11 P R08'72 I• 4 t96 PQI NCR. tii..' y / -T8 -5757 - •�` / BY 11468 PC 729 po •� V P:IY 1 Vl.1I P_ r- - -,cam C` �1 } i�� ,� i •••• •'.•.• 3451 ,s�P Bu 196` 7 PGA 1 a� �E t ^� `W 3�+ — - •�66 •ACCESS'• pCP S rte ✓ sHEB `�' ARE/A�p'KK •r AREA E1 20 WN, w 1- - -� -- �'' SNE \i RS •�. 2 �SFt.FR FASO•' � / SHEO J ---^•__ - 'z �w �_ nF�- Tw - - -- J:� �r"'i 12• v CP m>r - -' -� - '- 'Q')•- 'w - -- n ( / C,U.V LINK FEn:.E — i� i `l z srcar SEDIMENT 4 R O INLET ��--- " �� TRAP. TYP D -02 U1 '� /_�- \NE CONSTRUCTION O / b4thc��� .� \ BASELINE % �' 177 ~p0 to Lv OREUNE / i' ROCK PIPE / I 1 3116 CONVEYANCE / -�/ / HY A LL8BER5 NX6-1 O� +00 I 0-02 /1 pF� �a CARD, A LLBBER CHANNEL / i' / '� / / -Tw ca 2541 PC 6741 - / PI 1]2618 -7 11 Q' CENTERLINE, TYP / �/ bq TYp 5. ; �/ ♦T -- LNCER SHED 1rte, FI �� TH$•j�QQ@@�� J6 Chq Z _ EIEICHppP.J00t? ASf TR ^JJ+• - 1 N 4AJZTHA 0 1•.�LLIAMS ~ x.00 1 STREAM �� �' VAk COKC ev 19fj7_GG�}6l__ _ CROSSING, / / / / -� • 0 SHED',°'• `�'a YYY! Ui_ - == 1Y-f7f6 i1 -20 -6533 � D -04 TYP. N4 C - ^�, a �� / / ' .A1' d7 X. — — *5, -�— 2C N TAq- SE n 441 ] 1 IL' �•� \ \ ` / / �__1. \� �� � pF' R EA 1 Z ' LOAN i OL n/f , I \� ' ` \ / 1 P 1'/26518 3' '3220 RPI 9 / `�'�/ �{� m 4413 11 / r7 '/ / SHC'D ? � A aa09 HuBERi H REH'a N/F 1 `W Z \ \ / / .'W RETAI ALL 2 G REE'91.4�THCMPS 7� {,iB II -91]1 ,,,///���/ PROTECTION \ Hefia6en� U W00a 0 -� I'OCD RETC\ v� Wn%i `� } / /'/ FENCE, TYP �a Br 361 - BETANING �- �, r PR 1]261 -2 �I WALL '� ` ` ` / '�' .�� POCL &fRAIIL05 E R e'/ 1 •' �, \ � / `` �� - a •\ p �/ C` ^ \ Cie 19 no �J _ / \ •\ � 4401 P 2626 ` I -- -t - <O • \ WIN h SUSAN K OT, 1/1\1 Zn ' I YlAT FBV0./ 0.0p0 +wi �fi" E - - -� - _ - ,a ,f''] CB 6615 PG 51 �\ r Mf i/ 1 \ `t1J \- tN 1922 PG 1 Pmf 1726 t3 ` r T -.A - -- . \ \ PO ANC , D -02 CHANNE C 4313 s1 CHAIN UN 3 W sr NE HARRISOV N t` 1 t,O.SO OB TI 51 PG 1927 m �o FENCE. TYP \ gj'yTL. 'o�Ex SD ORNNAGE 0. \�2fG „E B'E I97t PG ] \% OA �,j O\ 1D -04 1 i \ SEWER EASEMENT 84 2 61 P 61 gyp:.• 11ttci i Pi\ ' 726 1 00 ��'J �—_ DQ 1(+ml la 4 }09 \ �O ( 3 \ GEORGE C FI\CH SYL A JEAN '/I F'NCH ! 1 ACCESS 08 9621 PC 256 1 L AREA •J• BM 1972 PC \ CID P L 1 $HE •• �'•• /� � P ,4lf+,+}�� '(,•% S, nE0\ \, SHED v011 �FLFDRD V 45 N/F p•: 1 P SILT/ CHAIN^ 60 CAROL C CMS DB loser Pc 1630 D-93 4 NK FENCE, TY . 1fi ARPOR 1\ BM 197 C 430 i.J 60 P W '2D 6574 F �L�SA 5 vCCCV\ELL - 1\ 1970 PP 0414 O \ `V gg 0 yl ONE S 4217 HAYLS N/ 11 P NU']i6 l8 _ 161 9711 PG 1) 45 / N 1970 PC 32 \ 2 INLET U 11 1967 Pcs36'3' 1 ` P 0 /FI PIN 1726�LS(M O - - v C I\tl\ 2819 HR NORE.O. —V N,4. dtlwcw.u- xn N.BAINI DR.•. B,b 7e7I Rrrm4Re I • uP...Nl.rr Rau - NOT FOR CONSTRUCTION 11/2012 JISSUED FOR REVIEW 06/2012 JISSUED FOR REVIEW DATE I DESCRIPTION MANAGER K TREFZGER, PE P BLANDFORD, P J POWERS 13- 52595 -01 City of Raleigh Northshore Lake and Dam Rehabilitation N 15 LRARYMBTALATIONB AND OVER POBMC FAMIM . MMUMO RDEWAL10At0, NANQd1P RAAIPB m IE CON9TRU0TED aN Au 81 "®EG11EL BYa COOL THESEFAOR71E9H11VEBEENAPPROV DBYT QE WR&!V,IINAND® SE 80 MSTALIEOI.. •4• AdMNOE M AUngROED BY V I- MEYC BANRARY 3SNER FJUOENTS NE TD BE IECONp® PRIOR ro FMAL AC ®TANCE. TRANSPORTATION ®LYK�S CM49ERNAlNi4 EIIW�R •e„ev I[CTtDN /F•TFNRIDM HYAf[M THE QTY OF RALEM CONgMB ro TNE COWMIM N AND E%TENSMI OF ME CRYB PUBLIC BEINEI, SYSTEM AS yIWM DR TNIBPLAN TNE WTEIDAL AFM COrO1RIO M IE1M00911?£D FOR 1,16PROEMAC CONFMW roTNE BTANMimB AIO SPECffIGT1M,S OF THE CRY! PUBLIC 1/141TE9 NAI090OIL QTY OF RNFJON PIELIC UTLRES OEPART4ETIT PER4OT NIMORIZAT MCWSIRUCT MTE SEDIMENT AND EROSION CONTROL PLAN INITIAL PHASE 0 1 • 2• FILENAME OOC -02 dgn SHEE SCALE 1• = 40' D C B A v 0 0 0 Im "an E.0-04 m dIw canw- T88 west o �+. w. mr��R+ii�Ne mn K TREFZGER, PE P BLANOFORO. PE PROJECT NUMBER 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation GENERAL NOTES 1 UPON COMPLETION OF THE SPILLWAY, LOW FLOW DRAIN AND MAJORITY OF THE LAKE GRADING, THE CONTRACTOR SHALL REMOVE THE TEMPORARY STORM SEWER AND COMPLETE THE DAM EMBANKMENT GRADING THE CONTRACTOR SHALL MAINTAIN A MINIMUM LAKE ELEVATION OF 255.0 UNTIL ACCEPTANCE BY NORTH CAROLINA DAM SAFETY REPRESENTATIVES AND THE CITY. 2 UPON ACCEPTANCE OF THE SPILLWAY AND CONTRACTOR SHALL STALL THEAWtAAD PLANTINGS PER WETLAND PLANTING PLAN THE CONTRACTOR SHALL MAINTAIN THE NORMAL POOL BELOW THE PLANTINGS UNTIL VEGETATION IS ESTABLISHED 3 THE CONTRACTOR SHALL TEMPORARILY SEED ALL R FOR MRTH 21DS 4 UPON ESTABLISHMENT OF THE PERMANENT VEGETATION AND ACCEPTANCE BY THE OWNER, THE CONTRACTOR SHALL REMOVE THE REMAINING EROSION CONTROL MEASURES AND TEMPORARY TREE PROTECTION FENCING. lIB/TY 0147 nQMN OTNERN C FACQITEB, XXLUOWB I�ANDNNmIG1P M - TOBECOMSiWICfm BMALL ttt0:ET8A48GECff1EB BY CRYCOOE TNEBEFN]UnEBWwwm w.g1w D"n CRY w RNEtWNIB BNNLBE80Ot8TNLEDUN A YINIOE O NITMCF M BY eBenF11 FPPROVN_ PUBLIC BMR BEYIER 'ARYENT TORERECORDEDM=TO- N%EPTNICE VANBPORTADM FEmnrx MXRICUT8 s X1N9ERUAnM ENOeIEFJT W CRY of RNEXNI COTag1RB TO n CONI = MN EXIENOW OF WC PUMCBEW BYBTEM AS SHMI OM THM FUW, n wn]O1LL uroCOMBTRUCnCFI REn= WED FOR TWO PROTECT W1 CcwS TO nec srlwoFlaos NIB aPEaRUTweaoF THE Crna P1RIC u*uTB[B wmeBO¢ JIYOF RILLEXW MXtuc uTBInES OEPNtTFOR vERMT ...WR TTON TO co" WCr SEDIMENT AND EROSION CONTROL PLAN FINAL PHASE p 1 • 2• FILENAME OOC -03 dgn SHEE SCALE 1• = 40' ID IC 18 IA a a I °o HOR NOR EnyaMNMN, laa rm n.aamo %�ft 1wr�IRd.^NCr 'ROJECT MANAGER K TREFZGER, PE P BLANDFORD, PE J POWERS G BLUE PROJECT NUMBER 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation .1up ■ t9 .lu- uvw. u�s•r�roeEwu,.a�.�a�•.,�.•.e�mgo o. a.. p naaa ••cartNS N•VE er�N •PVROUED ar nE ctrr ac N•lE1GM •Ia] BMwi E MY SEMEN E�IINE TO BE RECORDED R80RT0FNK ACCEPTANCE. o'a AMOK.smnexi c urwriE9 e ATTON ENOVEFA OR aNaNx C a•auercu. wxsErrs M rC caaaaw1•rm E%IEN810N os ne CT9 C griEN arsEN nua niu nre WiEw•LAND cansrNUrnw c°O row 0•�Cm �, MO�aaw oa erNmiwosam F urovanv�rvFmn• zmwnoN ro caanwcr SEDIMENT AND EROSION CONROL PLAN FINAL PHASE p 1• 2• FILENAME OOC -04 dgn SHE SCALE 1• = 40' P 9 0 I 0 NpR EnpnFwmp, eIa eIOU CadhsF BsR1 OBR BW AT I RW� ML .C8P16IA•�v%MUe� Fall i N _NERAL NOTES. EXCAVATE AT UPPER LIMITS OF EXCAVATION TO ELEVATION INDICATED MAINTAIN A MINIMUM DISTANCE OF 5' FROM EXISTING D REVETMENTS AND STRUCTURES PROGRESS ENERGY SHALL RELOCATE AND INSTALL OVERHEAD POWER AS SHOWN CONTRACTOR SHALL PROTECT AND WORK AROUND RELOCATED POWER POLES THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOLLOWING OSHA GUIDELINES FOR WORKING AROUND HIGH VOLTAGE POWER THE CONTRACTOR SHALL REPAIR ALL FENCES DISTURBED DURING CONSTRUCTION WITH NEW MATERIAL OF THE SAME TYPE AND SIZE THE CONTRACTOR SHALL INSTALL A 12' WIDE DOUBLE CATE CENTERED ON THE SANITARY SEWER SEE SHEET 0-04, DETAIL 5 PROPOSED CONTOUR INTERVAL IS 1 FOOT WHERE THE STORM DRAINAGE PIPE EXTENDS THROUGH A PROPOSED RETAINING WALL, NO FLARED END SECTION IS REQUIRED AND THE PIPE SHOULD EXTEND 2 -6 INCHES BEYOND THE WALL mm =v M1 M4TALLAlICN9M OTHER PN c FIIC6RIES BICLwm BIOEWA A MIWGCID RAAd's MmwwCON9TROCf MA STREETBAB BFECiED BY CRY COpE TNEBE FAClR�B WIVE BEER APPROVED BY ME CRY OF RAIEIBH AIm SHALL BE 80IRSTAUEO UIlES9 ACHMOE �.9 A AUnIBR ®BYnWT Pft= i f PHBLIC BAHITARY BEVYEA EABFAErRB IJIE TO BE AECOROEO PRIOR TO fBMLACCEYFANGE TWWSPORTATM SCE% PUBLICOrum COHffiiVAnm EHEIIEER ME clTr of RME�IRI CoraEmaro ME CaaErnoR AIA EXTElL40R aF ME clrrs Pusuc sEwER srsTEU As sHOwH off THa PIAR ME wATFnnl,vm CORBIROCnON YETHOCO n FORT PROECr C CO 3HATOME srAHwRw AHO sPECSTwnaro aP THE crtra vusuc uramES HANBBOCIL CRY OF RAtFJGH Puuc � DEPART MEW FvBm AUnIBRItAnfkl TO COH8RBIR wTF PRELIMINARY — NOT FOR CONSTRUCTION PROJECT MANAGER IK TREFZGER, PE P BLANDFORD, PE CA'R"- City of Raleigh J POWERS ,:ot ;oEss45.94, GRADING PLAN G BLUE ; =,<¢•z, Northshore z = Lake and Dam 11/2012 ISSUED FOR REVIEW ',FTy E" ` `� FILENAME OOC —OS d n SHEET 06/2012 ISSUED FOR REVIEW gg/r I1 Rehabilitation o 1" z' 9 ISSUE DATE DESCRIPTION PROJECT NUMBER 010913- 52595 -018 "'r'Jt�/�L SCALE 1" — 40' C-05 / TEMP LI/ MAO E4 6 / CROSS NGMANHOLE N PROTECTION ` N CHM,ES RUD;.Wa'ni1.D N/F �YG 20 A1N E TOP -2707Y (�` ll S26 P� 3 . °� 4SFlA T 8' -264 7G' 1 �B A�NI7ARY � �R� ' ' f b� _ /_i /J V+i.Q SEE; ew se (PLUG) I �� / / ! `\ .27NOTE 4 2' 2s6ef 3 d _ f M . —`- —� - -- — ND 36" M skORE HE HOOD 1OP -2w 83. \ PI E TO W9TER'S FD SANITARY SEWERssoc 1nC N/ ce , 4504 11� OUT = 263 /?. MANHOLE NO 51RTHA 11 tYILLIA4 a y A _AD 12" c K c7r'ajSEE N6TE 3 `\ k1e D8 23]B PG 9] 2 - n OH 12L)1 PG 7+ ` `50' PiN )2619 -21 -]12 RrEWTE ROAD `\ BL 970 PC 2 •1 �'' Z _ z° °Rar:.GF Pmr 1]z7. + -so s.+EO` `6. _ --0 -- - X01 '`fin Et SE1dENT 3 �V/ '''',\ - I� j TOP- 28928' LIMTSDSTOWN rr 27 J� M.262 i0ML 05 4771 Bb 1910 1 6Y 1957 61 ,.. '�•%` j�� i G TOP- 20927- \I ' II-- K HA`FS SA_.^T /Y, ':1,- 'Y''726 +e 26 -69°S ��UTLET G� IB' OUT�289 1 1 I a 16 ' , ° -2] r.A.cv 'a. STABIUZATION� �4 _ ^w I dd 12i - I 1 1 1 v<9.� \E Sv. ••AiE 1/F I,DyH 5 TC' -�XS /G R 2009 PG 27_ + 1`5.. _�% If HA Fa O R N' N N F l ' DB B63 P V I - 6'e '96tl PG iHa f� STRUCTUREi'- ` / 1 G ° E t e's ' ST6 P tea lOP- 28731' TEMP UTILITY' P.�N'`N e•d +96e PO na PN 77 -la 5757 1 R`• i;w�- rc-3Kr _12'w.zsa,u' `,ter CROSSING' _ 1 , wN 177617 -20 +� ' i _ 1 `-15 1q 15-34 SEes IZ'OuT_- 2SB.w'. y � � �2Ea PROTECT10NI6 1`^il ` �)_, j - _ `OUTLET = l y; 'I` -�� STABILIZATION 4 \y, \ _ •'' �O ACCESS tOP 89 pp4 -i STRUCTURE 0- "1 d/, PROPOSED �� �K� SHORtLINty y1# i 7s` Our A Ex 20' SANITARY _ _ -V•�r �� (_ SHED PRNATE LIGHT (I H N 6 PVC mK I F I _SE4ER F6sevz.c- / \ N S 1,TARY 12" �u - - - --� - _r- - -- - -- ! '. ? IN( / 7 ��EWE , 28817' _ __I- -___l --ter �� °i'RALE CH F 12- 1q- 255.13= - - - -- I I AQUATIC 26 1 : ' c6 5944 Pc I46 12 "OUT -2e493 BENCHING '� 11 -- - - / // / 19]3 PG set CE V SECTION BV 967 PC 361 36' CHAN L'VK FE 2 zLCRY / A ``\ - 24 I.V 1 8 1 -81]5 - f 5 0 �a n UPPER EXCAVATION 11 ''' •� ` / ' // ' / rcE It / MANHOLE SEWER, 3 '28275' 261 5' v c E ISTI C OR A R LEV TIO ZI OP S N R ATE A 01 �I UPPER EXCAVATION SHORELINE <I LIMIT, ELEVATION 2620-1- 62 0 1. I G� HO ELI E Z +0 z rHb "ORE R OS D HO LI Z NEGHBORHOOD ASSOC Iv N/F O POP SE - Q NART'A B W LLiA45 46 +� W D VI B 1 2 6] PG 361 u) PN 1726 •] -2J -65 ]J / �I 45+00 Z6t '1. 9^\ r L UPPER EXCAVATION I ELEVATION 263 0 EXISTING OUTLET ' Lj SHORELINE STABILIZATION 4 / STRUCTURE D -04 ' UPPER EXCAVATION 261 5 _ IT, ELEVATION 2650 OPOSED HOREUNE RETAVV- 'L �I � 1 AQUATIC BENCHING U-0] `\ sNED SECTION EXTEND 27 LF 688.1 TOP - 26 'INV -OF 36 RCP 1 4313 m, 1 ' 11 5'7 E HAPR:SO.N N 1 WN- 267 yy+ INV OUT 262 5 c.a ° d 8'OUf -281 ♦� 1 �` —Ex _m 'RNKAOE A �2 '8 t99] PGG192] 1\ \ SEµ E+ EASE'- Tom\ EV 261 P 61 ECQ1+ \`t1 4309 \ +1\ 1 1 GEORGE C F NCH N/ 1 5 V A EAR FINCH 1 TEMP UTILITY '' D;'96211 PG 256 `\ 1\ CROSSING 605 r1 `\� 1 e•+ 972 P_/ 1 P L PROTECTION D -02 1 P v 6 19-1 6 5 0 1 11 D 1 S "F 1 SHED VSO ,ELFOAJ N V$ v/ fi0 ` CA40 C vs ` \ + OB C6e1 PC G �1630 1 1 �\ 9POR T_. \ 1 e`1 97 G 1 1 1 n �7 •' N L ^00Y 1 Zz _20�es]4 t '(.. -���/ L SA S I C \\EU' SEE NOTE 7 ,DB 79E2 PG Ja 14 VNE'S YEI P\ 'BE'k B NCH 9 9711 PC 0165 V I X170 PG 373 e` tn67 PCf36y \ 'mil TOP- 27073' PI V 72b tH- £y- a• = 11 �i 76' OUi -265 21' TOP - 27087' \ ma- 261 21' m n "OR c � - °' Nd18. ImR P ero. Caamle 0 UI N O O � 5731 Due."D'Im b m/ I OaWSIV Ile Ems aeasi.a lluls RlYNr1011s HE . /' X X• /, // / NEW 8* PVCI\ \\ i3 /.., SSEEEERSHEET EU EOR5NXw 26 5 •rybh /'� a PERMANENT oB 2ss1 ac math •i SEE NOTE 5/ 6 SANITARY SEWER P\�( nz6 1e- 'zys211 \ SHED EASEMENT' b^ _6 TEMP UTILITY C CROSSING 0 PROTECTION - R SEE 1 U H utiF ,.F Y cor+c ` NOTE- 4 SANITARY SEWER 1 \ \-CX 20'R EASE TAR' MANHOLE NO 2 SANITARY SEWER` LOAN T OU N/F � / UPPER EXCAVATION LIMITOI + MANHOLE NO 1 ' 9125 P o o Y�3 ELEVATION VARIES `' , n 1 Pi I ne ter 220 ioP -zee s9:' - "' � ;i ^ 1 P. '8V -LZ2wee w 5Hfl7 1-5 _ X1 UER7 „H s :4 1 N/F 1 R'TA G WAS 2 ' CE E iM0 0 N/F V G - \ 'Et. V 6067 PG 079 �11 1]16 21 -9171 1 /' e” 19n IV r MPO RY \ - ' �ONST dC�O �238a ]R 2.6 EASE NT e� 19 s _ 4401 \ 2620 D„V d SUSAN K 0" N /F+ :1A, R.-R• ROAD DB 6615 PC 5 eM 1972 PC \ RN 1726 t3 1 \ c° Q3 Zn W \ ?G° �A7 c_.cnlcaa NnTES. 1 EXCAVATE AT UPPER LIMITS OF EXCAVATION TO ELEVATION INDICATED MAINTAIN A MINIMUM DISTANCE OF 5' FROM EXISTING REVETMENTS AND STRUCTURES 2 RELOCATE EXISTING SANITARY SEWER AS INDICATED WITHIN THE LIMITS OF DISTURBANCE REPLACE EXISTING SEWER PER THE REQUIREMENTS OF THE CITY OF RALEIGH UTILITY DEPARTMENT FOR RIM AND INVERT ELEVATION INFORMATION, SEE SHEET 02C -08 FOR SEWER PIPING PROFILES 0 3 EXISTING STORM SEWER PIPE COULD NOT BE FOUND AND IS ASSUMED BURIED THE ALIGNMENT IS ASSUMED TO BE IN THE CENTER OF THE EXISTING DRAINAGE EASEMENT 4 THE CONTRACTOR SHALL INSTALL A 12' WIDE DOUBLE GATE CENTERED ON THE SANITARY SEWER 5 THE CONTRACTOR SHALL SUBMIT A SEPARATE SEWER BYPASS PLAN SEALED BY A NC PROFESSIONAL ENGINEER TO THE PUBLIC UTILITIES DEPARTMENT PRIOR TO PUMPING OPERATIONS PUMPING OPERATIONS MUST BE MONITORED 24 HOURS A DAY FOR EACH DAY OF PUMPING BY QUALIFIED PERSONNEL IN ORDER TO RESPOND TO PROBLEMS OR FAILURES 100% REDUNDANCY IS REQUIRED FOR PUMPING OPERATIONS BACK UP PUMPS SHALL BE CONNECTED TO THE BYPASS FORCE MAIN TO FACILITATE IMMEDIATE USE UPON FAILURE OF THE PRIMARY PUMPS - BYPASS FROM MH 1 TO MH 6 • PEAK FLOW - 450 GPM • TDH = 57 FEET WITH A 4 -INCH FORCE MAIN - BYPASS FROM MH 5 TO MH 6 • PEAK FLOW = 1750 GPM C • MH - 78 FEET WITH A 6 -INCH FORCE MAIN 6 PROPOSED CONTOUR INTERVAL IS 1 FOOT 7 THE CONTRACTOR SHALL NOT REPLACE FENCE WITHIN EXISTING EASEMENT KEY NOTE. O1 TRANSITION EXCAVATION ELEVATION FROM 262 5 TO 262 0 IN THIS AREA AIL �10 TRAI6PORTAWIN 9ERVIGEs PIBI101174AfE3 CONSERVAT01a ENCV ®i THE G7fr OF RAIFJON OONBFTTS TO TE COIOERlp1 Ms) ElnE1+9O1 CF T11E Qf r,AUC 6E1VFR s1's1EM As daTwl ON T+W nl+l. T16 wIEWKMm NIL1fR0OfIOII 1ET1ams Low raR rNS PmECT BIYLLL 00160101 ro f1E sTMOSimsA10 s1E061GT1 doc THEafYef{B1O1mifES+Wa8o0K art'oflkmxl N F11T61c umOEs oEP.RTIEIai IEf0i1I NIT OWAT TO 0345TRUCT wTTL PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER IK TREFZGER, PE P BLANDFORD. PE .,N ...... City of Raleigh J POWERS COQ- SO•�SSIp;�` GRADING PLAN G BLUE = 2' Northshore 32 Lake and Dam 111/2012 ISSUED FOR REVIEW , %,FTy' SHEET 06/2012 ISSUED FOR REVIEW E' t •'��" Rehabilitation 0 1' 2' FILENAME OOC -06 d9n ISSUE DATE DESCRIPTION PROJECT NUMBER 010913 -52595 -018 MIS SCALE 1- = 40' C -06 P s I 0 I L �� 36 L, C8 I \ - -T� -.- f�HCr, 4104 C8A1t013 PG 9 - - - 1 y'A �1H TOP 26] p0 + WLLAV A 1tO1,7...i 1 B \• 1968 Re 'b4 -- �1 -- m 6�- 12I11ry 25117 Oe RI885 PC 0428 -CP +269 a8i z - `-!V P - 5 - - - 6Y r161 Pc Js1 z 3 K FENCE n 12'PUT zs' 29 I/ 9.1 1966 PC 184 PIN 1725C5 -19 9786 12" p 48 - �$I P V t 7250 S -29 Cb 5 17�dT 250 -M ! I N cNp,N Nx TOW {-EL 2_67_5 �: - 1 / TOW EL 267 5 TOW EL 1 — — — — 1Z I FOU ION DRAIN SPILLWAY STRUCW i�E -- W S- — -•a. 0 1 I A Y LIGHT .SEA SHEETjS�01 TOW (RET) 266.25/2655 z 1� 1 UNDAZTI406NO DRAIN - / __- -__ --- POWER C7 D \ BOTH SIDES) _ -- i j r ". R 5 5/264 7 � ,,77cccC'0000*nnntc��CR ��a =� °a, SLOTTED �I•,I E� 267 0, \ aE \ <EI V: •P BLRC I APRON T OF FLOOR DRAIN PI f '239, PC 2499 \gam EL 24575 Ex 20 aM1r 1 v aJ 6tr 19tr8 PG 184 a A \\ S8,.fB ASE•IT IT / / - — Q ORSVACE CCVC E \ 9 'GR 2a9 95 .' Yu ' 72S °P- 79 -OS49 ' "fl T j4c 35 P 6 �` c z 30 #OW EL 258 0 x� \ OW (RET) �64 7� 164 Q ac \ \ 1� \ � ° � 1 w �{"� ;� �� G � � . �� '� 1' � i 1 ac EI(TMP) �' GENERAL NOTES. h J 1,- V a \ nP 3S I RIP RAP 1VEL BOUNDARY / FIL' ER FABRIC J rCP_ 255 C7 d'o.,r 244 7 � TOWM725TT TqW EL 263 5 CLASS I RIP RAP-AV GRAVEL FA 1 NORMAL POOL ORIFICES 6 A L,VIYL.RLIC GCL 6-02 STOP (TYP) 3c7s� 90 CLARE CW�'i& ,R PO'.1 CHATHA CD C8 361 C 075„ flu 1968 G 184 "!;1 1961 361 P•. 2505- '�3C \n A D R IV � 7 A FM of UM e.00ims after 04w, 11 t 3371 RdI RC Ilaneia Tae. Nrr wfu 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW ISSUE I DATE I DESCRIPTION 1. ter. 019w lop •\ jj �q DROPlNLEL� D -0I INV = 248 5 \ 8 LF 18• RCP 0 3 SR \ \ �-- ---aye -- PERMANENT ACCESS EASEMENT- RUCTION PROJECT MANAGER K TREFZGER. PE D CROWELL. PE J POWERS G BLUE !i ( - � � 1 UPON COMPLETION OF SPILLWAY STRUCTURE, LOW FLOW DRAIN AND MAJORITY OF LAKE I �� GRADING. ABANDON EXISTING LOW FLOW DRAIN J THROUGH DAM AND FILL WITH NON- SHRINK Kfc c GROUT SEE DETAIL 7 ON SHEET D -05 REMOVE THE EXISTING LOW FLOW DRAIN tNV +2635] CHIN `fN VALVE BEYOND THE TOE OF THE a EMBANKMENT T011/ L X67 5 H r ! U- Its EXCAVATION LIMI ON DAM EMBANKMENT eJ I I rOP .z z, 2 CONTRACTOR SHALL MODIFY EXISTING RCP LIMITS THE PROPOSED RIPRAP DOES NOT 1 / 0D / OREUNE,/ �6 I I/ 1 1 x"12'0 251 79 INTERFERE WITH THE OUTFALL 1 i •� E 2122262 53 SPILLWAY CENTERLINE D 759849 92 II 1 3 CHAIN LINK FENCE TO BE PLACED ON WALL FROM POINT P TO POINT M E j ra, SPILLWAY CENTERLINE F 1 2122096 36 SPILLWAY G 759705 66 30v BEND WI RESTRAINED J01 TS INSIDE WALL OF STRUCTURE H 759770 27 2122058 60 INSIDE WALL OF STRUCTURE AND FROM POINT F TO POINT J 759838 83 7 INSIDE WALL OF STRUCTURE J '\ 2122039 40 INSIDE WALL OF STRUCTURE K 4 ALL PIPE PENETRATIONS THROUGH THE C i 45, BEND WITH �. 1 / 759867 22 2122084 93 INSIDE WALL OF STRUCTURE M 759837 19 SPILLWAY WALLS SHALL COMPLY WITH DETAIL 1• SHEET D -05 INSIDE WALL OF STRUCTURE TI N RE TRAINED JOINTS' i 759784 72 2122084 89 INSIDE WALL OF STRUCTURE 0 759720 22 MANUAL 0 05 AIR RELIEF, I \ 759715 64 2122136 10 INSIDE SOUTHEAST CORNER OF WINGWALL H GIM 1 0 ID E/ 7 1 GATE VALVE Se D 5 NOWHS40W I n6GH8OR1000 ASSCC IC/ i MARTHA 8 11,UIR4S B1 1967 PC 361 •\ \ I N PN 172617 -20 -653 } / Y *OP 267 d \. "OP NTAIN 12' WIDTH i ! TOP OF DAM ' $ 1 / 9 P OCK \ \.\ ,Your 25200 .\ • \• 7 ATION 267 0 I / D -05 L \ 7 9 BSERVATION WE I PERMANENT \ 1 I i / DRAINAGE EASEMENT I j� ROPOSED SHORED E 16• DI LOW FLOW I i i SIPHON DRAIN 6_ vk, / / B i ! i ENO OT P NZ), APPROXIMATE / r 7 i i 7 i I r ice �t I ! I I ! I ' I I i I NUMBER 010913 -52595 -018 it r / / i s2 / EXCAVATION LIMI ON DAM EMBANKMENT _ 7 i SEE NOTE 1 ! / i EASTING 0 -05 1 1 / 759714 25 i I I I/ B 1 �7 N 759875 07 1 i 759838 01 E 2122262 53 6 LOW FLOW D -05 DRAIN INLET II / / 250 03 (�nD SiuRBEO; h/ 1 / I / / City of Raleigh Northshore Lake and Dam Rehabilitation YfNIY R19TNJAMRI9 AMD OfNER PUBLIC FAeJERES UAXUW1090ER1LL10 AN0 MANOIaW RA1�B ATE ro ee C°NBfTWCTED on AEL 811EE18A88f£IS1E0 er arc CCCE TIEEFACaITES MAYEB JTY OF RALENiM AND BMNLBE O WLLEMNE MAU TM GR= WV MTEN O AI BNarR SEWER FASOMErtAro IIEAE WW ro M ➢TAT E . TRA1a BFIMCFA omuEmrAnp4 eRescR TIE Cm OF IIDI CONSORTS TO MNOIZI MN E%IV19w OF TIE arcs rueLlc sEwER snnEr As clown w TMn nAN THE NMiFJBN. ANO WNS1RULTwN YE USEC FOR Tag PROIER BIIAIL COMFORY TOTME RfAN0AR0l Alm BfECaCS *1aUlOTq OF THE Cffl'8 PUBLK Ul¢TRF! MAN ®OOl T C UrLITF90EPNRYEMf F A- NnMaRPA—IN ro CGN5TRUCf SPILLWAY IMPROVEMENTS 0 1• 2• FILENAME OOC -07 dgn SCALE 1• = 20' MEST SPILLWAY LAYOUT POINT NORTHING EASTING NOTE A 759714 25 2122106 51 SPILLWAY CENTERLINE B 759777 49 212207174 SPILLWAY CENTERLINE C 759838 01 2122056 74 SPILLWAY CENTERLINE D 759849 92 2122057 30 SPILLWAY CENTERLINE E 759673 48 2122077 11 SPILLWAY CENTERLINE F 759686 79 2122096 36 INSIDE SOUTHWEST CORNER OF WINGWALL G 759705 66 2122094 11 INSIDE WALL OF STRUCTURE H 759770 27 2122058 60 INSIDE WALL OF STRUCTURE 1 759838 83 2122038.28 INSIDE WALL OF STRUCTURE J 759862 65 2122039 40 INSIDE WALL OF STRUCTURE K 759879 71 2122069 31 INSIDE WALL OF STRUCTURE L 759867 22 2122084 93 INSIDE WALL OF STRUCTURE M 759837 19 2122075 19 INSIDE WALL OF STRUCTURE N 759784 72 2122084 89 INSIDE WALL OF STRUCTURE 0 759720 22 2122120 34 INSIDE WALL OF STRUCTURE P 759715 64 2122136 10 INSIDE SOUTHEAST CORNER OF WINGWALL YfNIY R19TNJAMRI9 AMD OfNER PUBLIC FAeJERES UAXUW1090ER1LL10 AN0 MANOIaW RA1�B ATE ro ee C°NBfTWCTED on AEL 811EE18A88f£IS1E0 er arc CCCE TIEEFACaITES MAYEB JTY OF RALENiM AND BMNLBE O WLLEMNE MAU TM GR= WV MTEN O AI BNarR SEWER FASOMErtAro IIEAE WW ro M ➢TAT E . TRA1a BFIMCFA omuEmrAnp4 eRescR TIE Cm OF IIDI CONSORTS TO MNOIZI MN E%IV19w OF TIE arcs rueLlc sEwER snnEr As clown w TMn nAN THE NMiFJBN. ANO WNS1RULTwN YE USEC FOR Tag PROIER BIIAIL COMFORY TOTME RfAN0AR0l Alm BfECaCS *1aUlOTq OF THE Cffl'8 PUBLK Ul¢TRF! MAN ®OOl T C UrLITF90EPNRYEMf F A- NnMaRPA—IN ro CGN5TRUCf SPILLWAY IMPROVEMENTS 0 1• 2• FILENAME OOC -07 dgn SCALE 1• = 20' MEST 0 0 I 0 N DURIN C H UCTION 0 MP DR AY 2 'OP =266 - O6 8'CL' -259 36' �} / 4304 DAVID G LISOV/E 9479 G - 479 P G TEMP ACC e, 1968 184 �''� N 1 v 0015 , 0 O CHAIN FENCE -04 0 TOP= 26 7 20 12 =252 47 � 7 COJ § UCTION 2"O UT 251 29'� �� 0 EE CE \ / V ( „ Xi V F�SOO E o<c • • � ``� \- i Q� ' • •+ •i ' 0-02 COAD�ABILIN ION \ 8 "tN =263 30' JIV H SOUTHERN LAND /F 12' IN =251 RFaLEGH G SOUTHERLA 'D „R 12 "OUT 251 79' OB 673 371 8M 1968 PC PIN 1 726 17 -20- TO i I TOP =267 84 \ Z 12 "IN =252 09 tz'ou = ACCESS AREA "F" 1 " = 30' TEMPORARY 2 N O DRIVEWAY (TYP) 0-06 CONS UCTI N 7 N i TEMP 3 P p CATE CHAIN NK f�\ NC i I '• ..20'• , SILT FEN n_m ? �L-. -� L. MARLCNT_ HLV E N/F 4412 P: CP CB 883 PG -E 1ND' RO8tNSONAGQi'ESS �: :� 8V 1968 PC 184 THIq ROBiNSOJREA "I, PIN 1 726 1 7 -21 -564 7 O5t9 8 ! 1968 PG 184 I ' CTION ROAff 126 17 96LPr t61 !,• CI 0 STABILIZATION (TYP) PIN 17 -20 -4651 - 6 TEMP UTILITY v • 14 D -02 CROSSING PROTECTION --------------- 12 VCP----------------- / �'POP�263 13 -254 -- - -- ACCESS AREA "I" 1” = 30' fm MR EnWwM4 he Ow. c.10— 06/2012 17f)IYORW G,M- �1•RtltlIC>Ca11 ISSUE I DATE - NOT FOR CONSTRUCTION FOR REVIEW DESCRIPTION 4 D8 t1woo •�� I TEMP ACCESS AREA "G" 1 " = 30' 1110 , 1 .10 ,' S FEO CE PROT&CCO N 0 6 ° '0 N O 1 TOP =266 88 11 'NV= 26Q.10' \• P 8'IN =261 53 \p� V AREAS PRIOR TO PERFORMING ANY WORK 8 OUT-261 49 1 1 v EX 30 DRAINAGE AND ACCESS SEVER t t1t EASEMENT \ AREA °Jf is ° 1\�ttt 4309 TEM ORARY TILITY 6 III K 11 GEORGE C, FINCH SYLVIA JEAN PNCH DB 9621 PC 256 CRO INC D ` BV1 1972 PG -02 PROTEC ON t1: • \ t` PIN t 7 6�'2b= 6 5 05 \1`• b`I: 9 e 11 - 7933 VIELFORD SIDS `\ t1 4 N LINK FENCE CAROL C IV1S \t •\1`' D8 10681 PG '830 p \ >t 1 ` -04 1 0� BV' 97 G 1 6 P20 \ ` Sll, FENCE 8574 c" aR R4LEx11 2 TEMP �TE O RY R 0 -06 DRIVEWAY � TOP 270 73 �i ` /a7FR� 36' OLT 76573' TOP= J 70 83 ��y% 8 "OLT -261 2 J ACCESS AREA "J" 1" = 30' _ PROJECT MANAGER K TREFZGER, PE _ P BLANDFORD, PE J POWERS G BLUE PROJECT NUMBER 1010913 -52595 -018 O O ri 0, � r1•9 ACCESS AREA "H" 1 " = 30' ACCESS AREA "W" 1 " = 30' City of Raleigh ACCESS AREA Northshore GRADING AND PELRAO�SION CONTROL Lake and Dam SHEi Rehabilitation D , • z- FILENAME OOC -08 dgn SCALE 1• - 30' F'"'*49 pt ;0), ,41) WIE MC m1r: C 0 46' GENERAL NOTES -. \• P 1 THE CONTRACTOR SHALL VIDEO THE ACCESS \p� V AREAS PRIOR TO PERFORMING ANY WORK rs `GRADE ACCESS 2 APARTMENT PARKING LOT AREA SHALL BE TO APPROX COMPLETE BEFORE WORK COMMENCES ON FtiY�2 10% SLOPES ACCESS AREA G /� _ HAIN _., 3 UPON COMPLETION OF THE WORK, THE uI ENCEM9fMlAi CONTRACTOR SHALL REMOVE ALL THE Sa-O4 A10OMFAP1nlR.•F�IG6RIF9. R1G1xR10 ExEWNIn wuxx�v RNIP9ME io eE rEO aR LT FENCE AREAS ALONG WITH THE ASSOCIATED AY/ipN warwnrgwea .•E•s•,• ro IN RECORDED PRxll ro Ftl IxfF➢nIXE. X396 Twnsortu'1°„s'.+' ]$4- wax - 7933 CONSIMATM EMOV�FJt \ \ EEYYER �' ..cwneR RrsreR ON ENTRANCE n1E C1fYOP RNH011CVtSEIrtEron�COrlECrxR N1DE%TENSx11wn�Cms wax �r,m srsrEr w+m+orm aR naswva n1E wmuK no m1olaxnoR FOtTMO wroECl'BUHL COK0101T0 T1n 6T11RON✓flE wo �L cQ EREanunorn or mE orvs wax u,uT�s+uraROa¢ c Tw > c" aR R4LEx11 j wax IRLn1EE �ARItEH>• PFWiOf R P TE .u1H0RRwnMMC0N9TR+c+ ACCESS AREA "H" 1 " = 30' ACCESS AREA "W" 1 " = 30' City of Raleigh ACCESS AREA Northshore GRADING AND PELRAO�SION CONTROL Lake and Dam SHEi Rehabilitation D , • z- FILENAME OOC -08 dgn SCALE 1• - 30' F'"'*49 pt ;0), ,41) WIE MC m1r: C 0 46' GENERAL NOTES -. 1 THE CONTRACTOR SHALL VIDEO THE ACCESS AREAS PRIOR TO PERFORMING ANY WORK 2 APARTMENT PARKING LOT AREA SHALL BE TOP 269 27 COMPLETE BEFORE WORK COMMENCES ON ' Ol,'-265 2!�, ACCESS AREA G /) 3 UPON COMPLETION OF THE WORK, THE 40NSTRUGTION CONTRACTOR SHALL REMOVE ALL THE ROAD / TEMPORARY ACCESS DRIVES AND PARKING ILL ZATION AREAS ALONG WITH THE ASSOCIATED GRAVING AND RESTORE AREAS AND \ DRIVEWAYS TO PRE - PROJECT CONDITIONS \ 4 IF ANY PORTION OF AN EXISTING DRIVEWAY \` IS DAMAGED BY THE CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL REPAIR A MINIMUM 10 FEET SECTION OF DRIVEWAY ON EITHER SIDE OF THE DAMAGE �L cQ 5 THE CONTRACTOR SHALL PROVIDE THE SAME LANDSCAPING AS EXISTING CONDITIONS WHEN MATURE TREES AND SHRUBS WERE j REMOVED, THE CONTRACTOR SHALL REPLACE P TE WITH TREES AND SHRUBS AT LEAST 2 YEARS OLD 6 PROVIDE TREE PROTECTION FENCING OR SILT A FENCING AT LIMITS OF DISTURBANCE, TYPICAL 11 _ 7 SILT FENCE SHOULD BE OFFSET 1' CLOSER 0 TO ENTRANCE FROM THE CHAIN LINK FENCE G�4 E IN AREAS WHERE BOTH FENCES ARE NEEDED 7 1973 PG 4E 8 THE CONTRACTOR SHALL INSTALL A WOOD DECK PER CITY BUILDING CODES THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE REQUIRED BUILDING PERMITS WOOD DECK SHALL BE SET FLUSH WITH EXISTING APARTMENT PATIO m v 0 I 0 1 L J ZgY REMOVE DIRT 16 / RE LACE SIDEWALK TO TIE EXISTING NTO EXISTING SIDEWALK 4 PU \'p TIO HOOP AR GRAD / \ /� 26 �/ d 12 SPACES UOjE t BOTH ENDS OF TO TIE INTO EXISTING 511 o, HANDICAP PARKING SIGN CONCRETE WHEEL STOP (TYP 19) HANDICAP gCCT RAMP (TYP 2) 6 C SPA( l EXISTING P4VEI'ENT TO RE,VA;N (SEE NOTE 1) INSTALL SILT FENCE DURING INITIAL DEMOLITION PHASE REMOVE WHEN CURB AND GUTTER IS INSTALLED DIRECTIONAL ARROWS (TYP 4) N= ENW—ft uW"C..U— an 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW 3ss1YB od.A�Mi RYIIP.NCfm3 ISSUE I DATE DESCRIPTION KC s °, • 11rMNAMIrr PMt� D d 6 d SPACES d 15 85' 9. Jr / TIE INTO EXISTING SIDEWALK •- /� T STRIPE PARKING ST a / TEMP PARKING eq SEE NOTE 1. e 1/=1 6 SPACES SPACES EXISTING PAVEMENT TO H ICAP PAR C d REJ-AIN (SEE NOTE 1) 0 V AN CES$A� s 0. NEW PAVED PARKING AREA � GRADE UNIFORMLY TO NORTH - AND SOUTH EXISTING LOTS D END SIDEWALK SAW CUT EXISTING D d PAVEMENT /aA ACES f d \ 1-11 wo /N�FlLL AS NECESSARY, DRAIN AWAY FROM- PARKNG LOT (TYP) —NEVy EDGE OF PARKING /ALONG R O W CURB AND GUTTER FPO pE C'TGREN NEW CURB AND GUTTER, TRANISITION TO EXISTING SIDEWALK MANAGER P BLANDFORD, PE G HETZLER, PE ,``SH 2�PQ' ss rp4;e y G BLUE =F 2 1 PROJECT NUMBER 010913 - 52595 -018 GUYWIRE TO REMAIN WHEELCHAIR RAMP RETROFIT OF EXISTING CURB (TYP OF 2), NCDOT STD 84806 EXISTING GUTTER City of Raleigh Northshore Lake and Dam Rehabilitation ■v NOTES % 1 TEMPORARY PARKING Q SPACES) SHALL BE IN PLACE FOR RESIDENTS TO USE DURING CONSTRUCTION OF APARTMENT PARKING AREA WHEN CONSTRUCITON IS COMPLETE, THE GRAVEL IS TO BE REMOVED, SIDEWALK SHALL BE INSTALLED AS SHOWN ON PLANS AND LAWN / RESEEDED 2 CONTRACTOR SHALL RESURFACE ENTIRE PARKING LOT PRIOR TO / MARKING 3 POWER POLE GUY WIRES CANNOT BE RELOCATED THE CONTRACTOR \ SHALL COORDINATE WITH PROGRESS ENERGY TO MAINTAIN THE POLE STRUCTURAL STABILITY WHILE PERFORMING WORK ■M ■IE YID1rY D�4rALLATNIN9 MID Or1ER wax FAWI�E &OIGIIDi108OkWAUf.9 AND A NANd(M RAIR9 A18 ro eE Ca4TRUCTEn ON Au BIiEET8A8 serngD er arr W T DFACSIIIACKAPI BEENAPNIOYEDe1TIE clrrff RAIEIDN ANDanalBE w FmALD UNIE98ACNANDE W AUMOIRZED BY WltlrrEN APPROVK. FIIaIC wmARV SERER Ew5E/rENra ARE ro se RECDRDED FRwRro FDNL ACCEPTANT TRNISPCIPTAT 31MICE4 wax uwTlEs CONBERVATNIN ENDMEEA SEVER C1ILLECDD11 I E— N BYBTEM THE MRME1O CaN9F/n8 TO THE CIPWI IOI MID EXTOOIDN OF THE Crrre FL6L1C BEYYER BYBTEM AB BNDwN aN T169 RMl THE WTETDM ANO DD1mwICnDN SPECR�TICPIS NAImB%OraK EiMOIVao9 MID a 0FRMENRI PUBLIC iaiu :B DEPArtr1�11r FErBDr A M'OPILV oro CDFCrm1Cr urg APARTMENT PARKING AREA p 1 . 2• FILENAME OOC -09 dg. __ .___SCALE 1 • = 10' i MARCRETT WAUACE/ I a, II 'as CLARK CHAniAh 1M Y 1 cmrA1 3511 PC 0755 1965 PG 38 1 PG 361 1 72505-29-17X 50 �m -nx 2F \ tiA F cy G,g-Y PC 31 1�3 aM 1968 PC 1 -� t 376.17- \ 3 �. RYEGATE R04D • ; , / ' r, .xre FUSAKO C i ' I I (mow A° IUM � JOSH w TOM° LI 1 DNe zo0�9 �,, T s p" ex.312 �°281B�zomPosii GM 1997 3 -PURSER 20- PC 3 M1R1EN .pMAOE / , { Oa 237a PC A95 ' I �, \j 1 sL,—r M 0 { OR 1965 PG ,G 3t ��I ' r— �1.; v ROaM5d1 Oe 9a3 Pc O 9M 1985 la " BM 1988 PS. 76J 1iAtEniN oe 757] x 37 39f BM 1987 PC 391 // r N L - —, ' 0 } -__' y 09 1_7 Pc 18M 1 PC n9 1I 1 a PO , s , ,7 - ,9 -s7s 19i /gee PG1M wN 1na /7 -20 -1018 oe 293 Pc 0 -E ' =1 WALL l iii PC 3e " _ E� ✓ ; ,'` ` '' ' ` ` BM 1967 PO 3 &1 ` AN 172817 -ZO -1018 , I�A1 1988 PC /Mi ' 1]i0 i EARIE wNll 6p pC - poi ins IT- 20X185 ye +\� _ -�.V , p0�. 1n517-20 -�70 I A wM(fE ; ' p ell -i48T Pfi 3UP1, �n617 -zO -Ills/ ------ - - - -- - r "`III___ , ' — i 9 \ 1 --F I ' _ 1965 �1 s I WN /n817- 20 -3epS —_ I - -- --- -- _ ! Ex 20 SANSARY 1 3y7 -EX 20 5A18TARY SPI A - -� , — _ SEWER EASEMENT y _ •c A VG I Pai°1172 8 20- �1________ ------ ( SM-EASEMENT ' 1 , STRU E _ ---�- - - — _ - - - - -- • "--------------- - - - - -- , �� - — -- -- - -- - - -- -- - - — -wA r - r I I . IV 1 12171NF M 1970 P 0 a v 0 Im. NOR Engl— yma. du.ceeew• PIN y W D AR \ 1 RE Fa7 ASSOC. we / /�YYY C 811 1947 PO ♦� / N 172617 -20 -6533 aF �' - 265 \%/ N a l cr can S coo ayYn�c ,'I y PIN sh ®HEADWATER WETLAND / — VY� Zoa�'0 256 5 EMERGENT AQUATIC BENCH ,1/ '� ` w snNE ,� OS 1957 PC 192 Ex 30' ORAI AFQ 198, R�¢^,7s 725 s GENERAL NOTE SGEO n 1 OTHER DISTURBED AREAS SHALL BE SEEDED B 08 9621 PG 2 ,`� PER THE EROSION CONTROL SEEDING 2 266 1 / �' �e96 -2ogqJJ9 15 ' g 1 SPECIFICATION 5919 /f� ,`\ Headwater Wetland Specks Palette Emergent Aquatic Bench Spades Palette _ — — — — i — t — �1 —r— — —1 r �\ �C� l� )� Trees Said cypress (Taxodam dstahum) Grant cane (Arundowe ggantea) 1W cURlc' IN �— / , AREA "H' v rE EASEMEN �` EuzABETNNE Ty "'al�94", Pe (Nyasa aq ) ( O9 ) Water tupelo N uabca Green arrow Peltandra v mica 9. 2837 PO 888 i , i I _ -_ �\ J�l -- -` / , `� ` \ 09, 9711 Pc 0145 '` Swamp tupelo (Nyasa brfl-a) Scarlet rosemallow (HIbwus coornleus) 85 PO 15. a 3 aM 1970 PG}23 3a1� V eM119e7 Oven up oak (Quartos grata) Crurlsaleyad rosertlalkwr (H�ISCUS rnoscheutos) �/ i s :�1 ,,\ `, \ ,`,'� % �`PVN Ina' - 25-631 I, Rover dreh (Betide rogue) Woolgrass (Scopus cyperiros) Green ash (Fra emus permsytvaraca) Pldcerekaeed (Pon[ederla cordate) Box elder (Ater negundo) Brtadeaf arrowhead (Sagffana lahfoba) Jewelweed (InVahens capensrs) Shrubs SIOry dogwood (Comas arnonxan) Soft rush (Juncus elf isus) Tag alder (Alnus serrukft) L cards tall (Saururus cerrwus) Bunonbu9h (Cephalanthus otcidentalis) Broadleaf cattail (Typha latrbfia) S1Iky 9wlbw (SalOc sencea) Black wiflow (Sallx ngra) Welland seed ma, possibly Inckudmg some of the species fisted above Virginia welbw plea vargmuca) umrrrr PsrAUwnoxaANO o,FaeR PumK: PACarrr�9,1NCLU7P199af:wAW AN0 Highbush blueberry (Vaccmium corymboscml) NANaw wu�a AIw rose mrarRUC,eo 6N Au SIREEraAa 9PECIFFDBY err A amE. nESE FAaUnEa 1NVE BEeN MwiorED ar nIECm OFIaaF]OIIAID 91NL 6E BOwar' i�Rretw Arw9eraENr° 6,vrEro6e� F ro .Nr�. Herbs- Guar cans (Arurdmanaggwfta) rRAN9PO5ATXI. ti M=fL Soft rush (Juncus athusus) �c WO04rass (Scopus cypermus) CONSMAno, ermgeR JeWetweed (Impabens capenss) Elderberry (Sambucus canaderss) r,g CRYOF RA11]d1 tonseNra TO,Ig W96lR1al Arxl Exrea910N OF ME aura New York ironwood (VernOroa noveboratenss) wauc sEnw arsrvA ors s,lovm oN nail FIAIa ng MArEmA� Aro tolarla,erlorl Fgnlooa useowNnne Forger aNAU Cawaral ro nee arANOAao9 AM aPeMr�°oFa�'F R4 E8M �O°` wetland seed mix, possibly Including some of the species fisted above err s RAIEIC+1 AunrolmwrwN ro coMaraucr PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER 1K TREFZGER, PE J JAMISON, PWS . "'C4R.. City of Raleigh J POWERS P�o'ESS ��y % ( WETLAND PLANTING PLAN Northshore 2 Lake and Dam ' .,E}N E� `` Rehabilitation 0 1" 2" FILENAME OOC -10 dgn SHEET 06/2012 ISSUED FOR REVIEW ISSUE DATE DESCRIPTION _ PROJECT NUMBER 010913 -52595 -018 oIrL SCALE 1" = 50' 1 [/V 265 260 255 250 4" INV 245 240 240 0 +00 1 +00 2 +00 0 +00 SPILLWAY WEST INSIDE WALL AND FOOTING PROFILE H 1 - 20', V 1 - 5- 270 265 260 255 250 - -- 3!45' 240 a O 0 °o APPROXIMATE ELEVATION 265 265 260 TOW = 267 5 TOW L 256 5 J 255 255 TOW 63 0 N M_= 250 250 L 4" INV 245 245 240 OW EL 263 5 57 0 - - -- FOUNDATION OUTSIDE OF K T 7110 WINGA i ALL TOW E L 258.0 TOC FTC TOC L 255.79 FDN EL 2569 FCUNDATION DFAJN ON OUTSIDE OF WALt POOLE TOC FDN BTM FDN PE SLO FROM EJ / - - - - -- -- -- - - -- - APPROX MM r F i T � 4" HOPE St DRAIN FRO FTG EL 2 TOC FTC 1 OTTED EJ 1 0 - - - -- L 2540 -- - BTM FTC 32.'15 4" HOPE SLOTTED FROM UNDER DRAIN SPILLWAY LAS ELEVATIC ------ EL 245 0 / - -- i i TOC FTGi RWi BTM FTG E L 243.0 240 i TOC FrG ALL DRAIN: EL 2481 RW4 R BTM G EL 246 5 WEST WALL - --"`�- EL 245 0 TOC FT OF WALL TOC F70 RW3 EL 2420 BTM FRO RO DE R SP EL UN DE 0 LLWAY SLAB I BTM FTG E. 240 0 RW4 I 240 240 0 +00 1 +00 2 +00 0 +00 SPILLWAY WEST INSIDE WALL AND FOOTING PROFILE H 1 - 20', V 1 - 5- 270 265 260 255 250 - -- 3!45' 240 a O 0 °o APPROXIMATE ELEVATION 265 265 260 260 L 258 0 TOW L 256 5 WINGWALL 255 255 TOW 63 0 N M_= 250 250 L 4" INV 245 245 240 240 240 0 +00 1 +00 2 +00 0 +00 SPILLWAY WEST INSIDE WALL AND FOOTING PROFILE H 1 - 20', V 1 - 5- 270 265 260 255 250 - -- 3!45' 240 a O 0 °o APPROXIMATE ELEVATION TOP OF WEIR TOW EL 267 5 END OF SPIL1 TOW EL 63 0 N TOW EL 263 5 M L EL 258 0 - 263 -0 TOC FTG T 255 75 FON EL --- 57 0 - - -- FOUNDATION OUTSIDE OF DRAIN ON WALL T 7110 P TO 4" H DRAIN G EL 2516 TOC FTG 540 - -- - --+ RWI B FIG 5 POOLE 262 5 PE SLO FROM EJ / - - - - -- APPROX MM r PROXIMATE RWI , TOC FT 48AINi- T TOC FTO EL 248 0 1 -- 1` RW2 BTM FTG EL 2465 4" HOPE SLOTTED FROM UNDER DRAIN SPILLWAY LAS ELEVATIC ------ EL 245 0 RW3 i i TOC FTGi 2420 BTM FTG E L 243.0 240 BTM FTG EL RW4 240 240 0 +00 1 +00 2 +00 0 +00 SPILLWAY WEST INSIDE WALL AND FOOTING PROFILE H 1 - 20', V 1 - 5- 270 265 260 255 250 - -- 3!45' 240 a O 0 °o APPROXIMATE ELEVATION TOP OF WEIR END OF SPIL1 CH - 263 -0 TOP F DAM EL 67 5 PROPOSE D NORMAL POOLE 262 5 APPROX MM r PROXIMATE -� -- 1` -CONC FILL ELEVATIC N AL ONG TOP ALONG IOP 0 WEST WALL --"`�- OF WALL / / APPROXI ATE ELEVATI N AT TOP OF ALLS AT EN OF -S LLWAY SPILLWAY _ i •8' 256 I - - - -_- END OF OPE - 1 4 R SPI WAY r CH EL 252 0 yG PROPOSED EH&c rt NORMAL POOL ORIFICES "A" RON TOP / _ (SEE DETAIL) EL 45 75 _ 8 TTOM EL 26 5 i - XI N EXIS1 NG EXISTING C I ANN EL CUTOFF 258 0 C EL 1 1 SLOPE EL 245 0 _ EXP SION JOINT (TYP) - --" — IN TOP O FLOOR 1. 2430 DISSIPATER CLASS 1 11RIPRA P LOCKS OUTLET ANNEL 35 +00 HR aa.e.me 36 +00 SPILLWAY CENTERLINE PROFILE H 1 " =20'. V- 1 " =5' PRELIMINARY - NOT FOR CONSTRUCTION 11/2012 ISSUED FOR REVIEW 06/2012 JISSUED FOR REVIEW ISSUE I DATE I DESCRIPTION o/ +uu 0 CROWELL. PE J POWERS G BLUE PROJECT NUMBER 010913 -52595 -018 270 265 260 255 250 245 240 1 +00 SPILLWAY EAST INSIDE WALL AND FOOTING PROFILE H 1 - 20'. V 1 - 5- City of Raleigh Northshore Lake and Dam Rehabilitation 270 D 265 260 FDN EL 258 0 I FDN EL 256 5 255 250 245 C 240 2 +00 1 URRY AVAMMY OTET PUKI FAfJV &EICVmMD BIOEVrAtNe ANDNAIm . RMRa ARE TO eEcDNERaIneDaAu SIREETEASyrlE OBY CRY CODE. THESE FApll11E31Y1VE BEEN AFFgOVEO eY THECmaF RMEION AND8IMLL EE 90 �AUeo,AaEssA p oMNDEnN1T110«DBYMWRENKPROVIIL Fu8,10EAnfARY SE \ER �ARE ro ee aECORDFD AFRDR ro FMIIL A4TEi+fANfE TRArnFORr•TgN BEImCF• COMSEAVATUIN FrmoaF !� "m - TNECRYOFRAIEIONCONS MT COFMV NANOE%TOLWONDF THE fJTYT FUBVC BEWER sysT "eNOTR oNT Ft MI RAE NATEM& AND CONSTRIRR01MET WUSEDFpi T05FRp,ECf ENALLCONFO,W MT ST fN =AM VECST MM OF THE CR FURM YTOlrEs NAIDSOOK CRY aF RAlEJO, PUBl1C UTLRF9 OEI+NR V ERf FEAYT AUTIORVATON TO CONSTRI,Cf p9TF NORTHSHORE LAKE SPILLWAY PROFILES 0 1 • 2• FILENAME OOU -01 dg. SCALE AS NOTED r M 260 240 CHANNEL CROSS SECTION A SCALE 1' - 10' C -07 I. o� �WI IL •.• , 0 . ISTING SUR 10 Z6 0 - -- - - - Is EXI SUR NG- ACE 260 MEOW- -z .. ..e 2 .. d C WITH ANQ S 1 RIP RAI GRAVEL BE FILTER FABR DING IC - - E �-. rocra.+rxa+v +r r.��raaca�es:a� MENEENNE 260 240 CHANNEL CROSS SECTION A SCALE 1' - 10' C -07 I. 60- 240 o� �WI IL •.• , 0 . ISTING SUR 10 ,� -;A • a Is TOW EL 2 7.5 260 MEOW- -z .. ..e 2 .. d Min, o E 60- 240 260 FC 240- W Iasi o� �WI IL •.• , 0 . ISTING SUR 10 ,� -;A • a TOW EL 2 7.5 260 MEOW- _. -z .. ..e 2 Min, o E �-. rocra.+rxa+v +r r.��raaca�es:a� MENEENNE 240 . ............. 260 FC 240- W Iasi o� �WI IL •.• , 0 . ISTING SUR 10 ,� -;A • a TOW EL 2 7.5 260 MEOW- _. -z .. ..e 2 o �-. rocra.+rxa+v +r r.��raaca�es:a� MENEENNE 240 EL 242 0 -40 -30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 1I0 2I0 3I0 40 CHANNEL CROSS SECTION SPILLWAY CROSS SECTION C n SCALE 1' = 10' C -07 SCALE: 1' - 10' C-0T W I 260- 7 242 240 M'"MMEI-m- o� �WI IL ME ISTING SUR ACE ,� -;A • a TOW EL 2 7.5 260 MEOW- _. -z .. ..e N EL 258 o _L 24E i F-- I I I I I I I 1 I -40 -30 -20 -10 0 10 20 30 40 -40 -30 -20 -10 0 10 20 30 40 SPILLWAY CROSS SECTION D SPILLWAY CROSS SECTION E SCALE 1' = 10' C -07 SCALE: 1' = 10' C -07 W 280 280 SPILLWAY CROSS SECTION G SCALE 1' = 10' ,Z HE xoa ebe.n�, ne. aarcamr LL Uvr Mir 260- MAE,N-Eplpt o� �WI IL ISTING SUR ACE ,� -;A • a TOW EL 2 7.5 260 MEOW- TOC F N EL 258 240 SPILLWAY CROSS SECTION G SCALE 1' = 10' ,Z HE xoa ebe.n�, ne. aarcamr LL Uvr Mir 260- MAE,N-Eplpt Ell ,� -;A • a MEOW- 240 1 -40 -30 -20 -10 0 10 20 30 40 SPILLWAY CROSS SECTION H n SCALE. 1' = 10' C -07 PROJECT MANAGER 1K TREFZGER, PE r R. GEIGER. PE PROJECT NUMBER 010913- 52595 -018 CAR E 32 = F lg � F •, �lN E ` ... SPILLWAY CROSS SECTION F SCALE: 1' = 10' C -0T City of Raleigh Northshore Lake and Dam Rehabilitation NORTHSHORE LAKE SPILLWAY CROSS SECTIONS 0 1' 2 FlLENAME 00U- 02.dwg SCALE 1' - 10' ID IC fit: IA . ............. SPILLWAY CROSS SECTION F SCALE: 1' = 10' C -0T City of Raleigh Northshore Lake and Dam Rehabilitation NORTHSHORE LAKE SPILLWAY CROSS SECTIONS 0 1' 2 FlLENAME 00U- 02.dwg SCALE 1' - 10' ID IC fit: IA 1 i a v n 0 I °o I L .3 4 0 b / b D C B A 1b '8 D Z 270 Z C O 270 270 3NN < 5' 12' 5' GATE VALVE o w P OF DAM D / MANUALI AIR 3 V PROPOSE NORMAL w L 267 0 _ _ 265 RELIEF VE p-05 POOLE 262 5 a EM STING GRAD / 265 I PROPOSED NORMAL POOL EL 262 5 265 / - MIN COMPLETE G qUBBING EXISTING GRADE z / I OF EES AND ROOT 2' 2 / - - -- - - - - -- -- -- - - - - -- -- - -- - -- -- -- - --- -- -- --- - - - - -- -- -- - ----- BEL W EXISTING RADE.TYP I \ PROPOSED GRADE O1 = ----- - - ---- c -� \ - -_ - -- ___ _ _ j _ - -- -- - - - - -- - 260 N w - 260 31 PROPOSED MBANKMENT SLOPE I 1 ", XISTING DAM EMBANKMENT 260 I WIN GWALL i 0 -06 DOSE RV ON WELL, I I EL 258 0 \ � ' 1 � 255 � i 255 1 EL 255 0 � 255 — — O MIN 2' DE BENCH E 253 0 � HINTEL INVERI 260 INSTALL AT A CONTI UOUS 250 _ -- SLOPE 0 INLET 250 15' �\— _�_ - -- 250 I O V4'HPOE COLLAR D-05 0-01 16" DIP SIPHON 245 CATE VAL D PIPE 245 245 KEY NOT NOTI 7S IPE PEN ETRA ON DETAIL 1 O 22 ' BEND WI 1 VERTICAL BENDS SHALL E I EL 248 5 0 W RE NED J01 TS RESTRAINED JOINTS 240 O RE RAI ED J01 TS 2 DRAI INSTALL L8 LOWOFlNALH RADE 240 240 0 +00 1 +00 2 +00 3 +00 1 +00 2 +00 3 +00 LOW FLOW DRAIN PROFILE i1 DAM BASELINE PROFILEi2 H 10 - 20'. V 1" a 5' 1 C -05 H 1 B- 201, V 10 - 5' 265 J w jj ARBITRARY I EXISTING 1 J GRADE 264 1 �_ P RY RIMA SPILLWAY ELEVATION 263 5' N\ _ _ _ _ _ _ 9 X263 16' - 1 -INCH STORM WSJ 263 47T Q 263 j112 - POOL_WSL_ 2625'_SMAINTAINED BY LOW - FLOW ORIFICES) L t5 262 Li )NORMAL 1 ) 261 75' NORTHEAST FACE 5 v 262 25' Z 261 25' O 261 EXCAVATE 0 5 FEET H AND BACKFILL WITH \ WETLAND SUBSTRATE [aj 10' \i WMARSH 260 EAST - INSIDE WALL EMERGENT MARSH BENCH \ 259 AQUATIC BENCHING SECTION \ 258 IIRIrYB14rAVJlTldrBAIBI Oi1ERPIRIC FACRIr1EA EICLl10N6 BEIE1rMAWEC01 ARE M BEFACL 12 10 8 6 4 2 0 2 4 6 8 10 12 14 16 18 20O�N19 WRAAPB MONALL BmEBrBA9 BPEaFIEb BY Cf1YGmE 11Bi3E PAaUiFl IIAYF BEER APPRBY M B+rnB arrbP RAtE1m1AB0 s1MU ®BO w,rA1, c^ VaEat CMAN@IBAUiIA]I�DBV WRITTEN AFPROVAI PUBl1C BAgTARY t1E1IF11 * 0'l�Cp1�DP10d1OFE'"`"`CE"AHM DISTANCE FROM SHORELINE (FEET) rRANBPBmAna� COMMATM"04WFE• TYPICAL AQUATIC BENCHING SECTION %1 Q crrrs P ,, " „,,,E, NOT TO SCALE CON smut' ro" rE"'maUSWMR^°BPro°1EC`su"`ors°°' roTlre srANBA1msANB eFeecxwimrn a rNe arcs FuBU� urwres NAImBOaI a nRALEcH Max UTKOW aFARTKIM EWBf PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE Aumamwrrorl M as�sTwln a D CROWELL. PE ,. 11 City of Raleigh oP LOW FLOW SIPHON DRAIN PROFILE J POWERS G BLUE �;Pt� E55Tptit� 9��= Northshore DAM BASELINE PROFILE AND - - =" Z - Lake and Dam TYPICAL AQUATIC BENCHING SECTION mw 11/2012 ISSUED FOR REVIEW %NTH Rehabilitation FILENAME OOU SHEET 06/2012 ISSUED FOR REVIEW ES ,,,. 0 1' 2' -03 dgn »»N.ear bllW,emmFIR++Bn 18 ISSUE DATE DESCRIPTION PROJECT NUMBER 010913 -52595 -018 ILP • • • • Ilan N1rr PO1rB �� iel�a SCALE AS NOTED U -03 D C B A o 280 280 270 12 TOP OF a W EL 267 0 EXIST] 4G LAKE B01 TOM EXISTING Ni jRMAL PR POC POSED NOR L EL 262 5 PROPOSED LAKE BOTTO' POOL EL 263 8 F, 270 PROPOSED V7 EMBANKMENT 3 1 SLO IE 260 ------------------------- -------- --------- ----------------- ---------- -------- ------------ ----- ---- -- ------- ----------------- --------- ----- --------- ---- ------------- -------- ------------------ -- 260 04 - -- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 250 - - - - 250 v) W Z 240 240 la 230 230 220 22 35+00 37+00 39+00 41+00 43+00 45+00 280 1 I GD 280 — 04 270 + 1 ETLAND AR Ek — PROPOSED NOR I 64 G LAKE BOTTOM EE LANDS IE PLANS EXISTING PO L EL 263 8 PO EL EXI IN 2625 P OPOSED LAKE BOTTOM LIJ 270 ----------- ---- --------- -------- ------- -7— 260 LLJ ------------------ ------ -------- ------- —.rz ------- - -- --- - -------- -- ---- -- - - - -- -- ------------- 260 _Z RIP RAP S E05 71 SANITA PROPOS 0 8" SEWER GRADING P FOR LIMITS I Of 250 7 250 0 240 240 Z LAJ 230 230 220 woe n SO.W�LOGEWACNAMMMAUTHO�W�APPROVw� wmx 47+00 49+00 51+00 53+00 TRANSPMATM SERVCEA- syffrEm PRELIM PRELIMINARY NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE AUTHOR"r rocwraucr ans P BLANDFORD, PE ................ c City of Raleigh CONSTRUCTION BASELINE PROFILE J POWERS 2oP G BLUE Im Northshore 2 Lake and Dam MW .1d.c.r.p— 11/ ISSUED FOR REVIEW ISSUED 2012M 06/2012 ISSUED FOR REVIEW , ly Rehabilitation 0 1• 2 • FILENAMEjOOU-04d9r, ISSUE DATE DESCRIPTION XCJLLLL�uumbw�ls — NUMBER 1010913-52595-Olil L SCALEIH 1• =40, V 1'=10' E;;;:] 270 270 270 PROP SED NORMA RMAL WATEF ELEVATION ° = _ WA ELEVATION OOTTOM ONSTRUCTIO s 265 �� \ sN XF NG -LAKEOM J "_� o ELINE — —'— 265 260 265 ?N II 1z1 m�� �I °0,n°m� ¢�inop G -- --- -- -- -- / -- -_- -- 265 = - -- -- - --- — -------- \ -� NNF LAKE BOTTOM 260 �NNpN ^'r� _ in No 260 - - - - -- -- k `" o ? z o -I �^azr. n - � „Q1, °' - - - -- - - - - --- -- - - - - -- --- - - - - i �w — 255 Xp= 260 NaZZ�O p _ INE I —' — 255 250 260 255 w °z 270 p 2 I 250 245 — _ — — — 255 NN e0�� KD?° o 250 0�0 245 240 • 2 w w m 250 245 °o� 240 GRADE m 1 270 245 240 -- — I APPROX 67 LF 0 240 SECTION n H 1 " =20',V 1 " =5' C -08 270 270 ° ROPOSED N RMAL WATEF ELEVATION ° = _ PRO OSED LAKE OOTTOM s 265 �� sN XF NG -LAKEOM J "_� o — — —'— 265 260 ?N II 1z1 m�� �I °0,n°m� ¢�inop - -- --- -- -- -- -- ---- -- -_- -- I- -- -- = - -- -- - --- — -------- -� NNF uIp 260 �NNpN ^'r� _ in No 260 - - - - -- -- k `" o ? z o -I �^azr. n - � „Q1, °' I I CONS rRUCTION i �w 255 Xp= NN NaZZ�O p BASEI INE NlV 255 250 ZQ w °z 270 p 2 tl :) 250 245 — _ — — — NN e0�� KD?° o 260 0�0 245 240 • 2 w w m w °o� 240 270 290 270 u*vu C N o� 8 0 0 I Ty hr1R. NOR. 2 +00 MANHOLES NOS. 4 - 6 H 1 " =40'.V 1 "= 10' PRELIMINARY - NOT FOR 11/2012 JISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW o - an+IT� aw Eww<Ta. mrinr.Iy�MC m+a ISSUE DATE DESCRIPTION 280 260 270 260 250 240 SECTION /_B_�\ H 1 " =20',V• 1 " =5' 1 C-05 290 260 290 ° n 0 x ° = _ o s 290 sN N I ^�^ J "_� o 260 ?N II 1z1 m�� �I °0,n°m� ¢�inop 0 o N Y NNF uIp O]N� �NNpN ^'r� in No M m EXISTING GRADE " ° `" o ? z o -I �^azr. n - � „Q1, °' a w z o Ln i �w NN Xp= NN NaZZ�O p Z� OJ NlV N� ZQ w °z 270 p 2 tl :) S tl O — _ — — — NN e0�� KD?° o 260 0�0 • 2 w w m w °o� EXISTING GRADE m 1 270 -- — I APPROX 67 LF 0 — - - EXIST NG 8" VCP ® 2 39% - -- 250 - -- - -- — — — — -- ,\ /r— OF 260 EXISTIN 12" VCP 0 76X RIPRAP APPROX. 53 LF OF EXISTING 12" VCP O D 76X 240 APPROX 153 LF OF APPRO% 17 LF OF u*vu C N o� 8 0 0 I Ty hr1R. NOR. 2 +00 MANHOLES NOS. 4 - 6 H 1 " =40'.V 1 "= 10' PRELIMINARY - NOT FOR 11/2012 JISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW o - an+IT� aw Eww<Ta. mrinr.Iy�MC m+a ISSUE DATE DESCRIPTION 280 260 270 260 250 240 SECTION /_B_�\ H 1 " =20',V• 1 " =5' 1 C-05 290 260 4 +00 4+000+00 2 +00 saw co Tc uI Exmms ETT uTEm wsrAUATIacAwonFnnale FAC11TIFd,wauovlo �YHILIOATO - MAlaltMWWPCLff" EVE WM AWROEDALL BTEt AE 70'ECff® 8KAY TIfE CITY OF W1LEIfi1CWgM8ro TIE COMECTIOM AMO EITpf90n ai THE CTYB •�` b � �� � ro � MANHOLE NOS. 1 - 4 TVgT 8ETQ1EASD M &%M N IMCOFOEDiWOR ro Fw ACCE #J= EfEfFIGT WTIDE CT glBLIC UTE,rns IIAImO TMASPMAT $MVILO q OFgµF H 1 = 40, V 1" 10 OE AItll1C UT WT f•AOTETTT {Fear nlnt ur¢T�s COI�RRVATWN EA`OIIEFA AOTb1WTgF ro TbTSi1E1CT WE IROJECT MANAGER K TREFZGER, PE P BLANOFORD, PE City of Raleigh .`'ZN C4Rp' J POWERS ;•OP �EssLy':; G BLUE Al <' Northshore 'Z - Lake and Dam Rehabilitation PROJECT NUMBER 010913 -52595 -018 I/ 4 +00 LAKE CROSS SECTIONS AND UTILITY PROFILE 0 1 • 2• FILENAME OOU -05 dgn SCALE AS NOTED D N B 260 270 260 250 240 A x x s 290 K ¢� 0 o N n ap ^'r� in No M m o 280 „Q1, °' a w z o Ln i ,ii ,,, J Ln tl N ~ zNN W N 1 Z� OJ NlV N� ZQ 11 Ii p p 2 tl :) S tl O NN e0�� KD?° o xz 0�0 • 2 w w m w °o� EXISTING GRADE m 270 -- — y\ — - - '� - -- -- - -- - -- — — — — -- ,\ /r— " 260 RIPRAP APPROX 153 LF OF APPRO% 17 LF OF APPROX 1 LF 166 LF EXISTING ' VCP O EXISTING 8' DIP O 43% OF 8" DIP O 0 43% OF 8 OF 81 DIP • 0 4 X 250 13% 240 240 4 +00 4+000+00 2 +00 saw co Tc uI Exmms ETT uTEm wsrAUATIacAwonFnnale FAC11TIFd,wauovlo �YHILIOATO - MAlaltMWWPCLff" EVE WM AWROEDALL BTEt AE 70'ECff® 8KAY TIfE CITY OF W1LEIfi1CWgM8ro TIE COMECTIOM AMO EITpf90n ai THE CTYB •�` b � �� � ro � MANHOLE NOS. 1 - 4 TVgT 8ETQ1EASD M &%M N IMCOFOEDiWOR ro Fw ACCE #J= EfEfFIGT WTIDE CT glBLIC UTE,rns IIAImO TMASPMAT $MVILO q OFgµF H 1 = 40, V 1" 10 OE AItll1C UT WT f•AOTETTT {Fear nlnt ur¢T�s COI�RRVATWN EA`OIIEFA AOTb1WTgF ro TbTSi1E1CT WE IROJECT MANAGER K TREFZGER, PE P BLANOFORD, PE City of Raleigh .`'ZN C4Rp' J POWERS ;•OP �EssLy':; G BLUE Al <' Northshore 'Z - Lake and Dam Rehabilitation PROJECT NUMBER 010913 -52595 -018 I/ 4 +00 LAKE CROSS SECTIONS AND UTILITY PROFILE 0 1 • 2• FILENAME OOU -05 dgn SCALE AS NOTED D N B 260 270 260 250 240 A 0 0 0 0 0 E Tad SEE C OR STANDARD S-25 FOR MANHOLE FRAME AND COVER% MAMCONE AND BARREL NS AESTM STADS OSE AS PER SEAL OR e• N7 mOI DOE pp G BAR SZE NOD.MI Q[/WANQ BUTYL -NEK OR C APPROVED SEALANT - BEIYEEN FRAME A P k - RUBBER BOOT LATERAL INVERT SHALL NOT BE LOWER 01mwTNm NOTES. �25 1/ wxxwv MQ p[/NAIa 33 1/4- a M , ➢, A 8 L THAN YAN SPRM- ur - YANNOI£ NEEDS TO BE ABOVE I W YEAR ROOD PLAN as SEALED AND VENT ro BE 1' 1 T--& IImFnMOnt ~ 0. tom fNm ar q 9' ABOVE 1 W YEAR FLOOD PLAIN WHEN Op 327 tlN gIAM m1�I rq T MANHOLE TOPS ARE IN EXCESS OF 7 ABOVE 2. No rocks or bmWm. {' or NrW to b. teed m m,bol MONO SECTION A-A aum wmoE sTEP3 MU5T BE PROVIDED SEE STANDARD S -20 FOR 3. N b.WM moMrW Wsss a "too" MGT. ""A"" STEP DETAIL IN NON TRAFFIC AREAS. TOP 4 0 = .Nd� Im, ,n e- bro m tnMAc anNr.. 12' n SEC CH OR KING WITH A MM�N OF { B0.1S PER OF FRAME AND COVEN SHALL BE INSTALLED A WI OF I' ABOVE FINISHED trO/FK CRaND SLIRFACE S earnpocUw n n.n-troff ones. m0 951E cmnpodw n A A SEE SEWER DESIGN SECTION t�� �, I MN 9' COMPACTED 157 STONE BIL4 TO B .p.enmq {' and 112-1c 1.m'"Ist RO , Aral —+ E INSTAL. ONOER NEW MANGLE 7 No b.WdM e' m d,mNtm or IN NON - TRAFFIC AREAS, TOP OF FRAME 9. r P aEowed m al f�M AND COVER SL BE NSTALLEO A MN HAL O F OF V ABOVE FN,SIED GROUND SURFACE. TRENCH BOTTOM DIMENSIONS AND BACKFILUNG REQUIREMENTS FOR DUCTILE IRON AND REINFORCED CONCRETE PIPE r1 NTS CITY OF RMMG M OFAA M RIME OF "uC UTILITIES I . III 1 I, 1 � III MANHOLE FRAME AND COVER COVER 120 IBS YNp1UM x5 1/,6- BAR SZE 23 1 1/16— 4 BUTYL -NEK OR C APPROVED SEALANT - BEIYEEN FRAME �- 22--L A O COVEN 3'-6- 18 �25 1/ tt. A- CONCRETE 33 1/4- Norm 5/873' LACSNEID N HOLE I) ALL HANMOLE'Wan WALL E DRILLED INTO CONE 09 RING WITH ANCHOR SLINK TO E DOESTICALY CAST DESIGN DEPTH. AND 5/873- x) FFME WALL E A H.MAM In" OF 1132 IBA WNWN HOT LIPPED GALVANIZED LAC BOLT AND WASHER PIARX ROW AND 1[0 LOS. WITHIN EA30AE N3. 3) COVER COWL WOGH A uNQ 120 LOS 4) ALL MANHOLE FRAMES 0VF= or PAVED SYIOAES COWL E BOLTED TO THE can SEC CH OR KING WITH A MM�N OF { B0.1S PER STANDARD MANHOLE COVER e NS CITY OF RALEIGH DEPARTMENT OF PUBLIC UTILITIES 5 -2! Im NOR ew sob IMa e/6NC.eOre RD NNe.M D*r SX62D I Rddgk NC 2m4 MeaEld u�. MksMr IdIRM STANDARD PRECAST SANITARY SEWER MANHOLE �1 M9 CRY OF RAEICH OEPARTENT OF PUBLIC IRLITIES S-20 li I. IETfFEn11M. MINIMUM A/C WEIGHT RECD FRAME 202 COVEN 170 TOTAL {32 Am �w 7 - 2 DAL HOLES AT I' LIFTING DEVICE MANHOLE FRAME AND WATERTIGHT COVER r71 NTS CRY OF RALEIGH DEPARTMENT OF PUBLIC UTILITIES S -28 - NOT FOR CONSTRUCTION 11/2012 ISSUED FOR REVIEW 06/2012 ISSUED FOR REVIEW DATE _ DESCRIPTION ZO I 0 I r I e BILL OF MATERIAL FOR {' MANHOLE BAR SZE LD=H NO Wr LOS n /s 3'-6- 18 103 tt. A- CONCRETE TOTAL W TO9 1.000 TI BARS AT iv,10 I_7 -0—, !'J �� MANHOLE FOR L T2 BARS TR,!L I— • • ALL BASES ARE MNRIUY 9' THICK 0 1 c FOR PRECAST MANHOLE f-Tf OR n BAR-1 I- STRAIGHT BAR -1 EXTENDED BASE OR CAST —IN —PLACE REINFORCED CONCRETE BASE n NTS CITY OF RALEIGH OEPARTMENT OF PUBLIC UTILITIES S -21 BILL OF WTETaAL FIXt {' MANHOLE BILL OF MATERIAL FOR {' MANHOLE BAR SQE LENGTH NO WT 184. T /s e' -6- m 1aa CL 'A' CONCRETE TOTAL CU YDS 1.701 T2 BARS TR,!L I— • • ALL BASES ARE MNRIUY 9' THICK 0 1 c FOR PRECAST MANHOLE f-Tf OR n BAR-1 I- STRAIGHT BAR -1 EXTENDED BASE OR CAST —IN —PLACE REINFORCED CONCRETE BASE n NTS CITY OF RALEIGH OEPARTMENT OF PUBLIC UTILITIES S -21 BILL OF WTETaAL FIXt {' MANHOLE BAR S SIZE I IENCM N NO M M LB9 T2 / /s r r -e' z z{ 1 1aa 0. A' CONCRETE IOTK W YDd 1,778 E 27 1/2' 26 1/{ 1 3/8' S /8• 2{ I/16• 7 1/2' ❑ ❑ r zea,6� �N� Q FRAME SECTION 7 7 /e' (2) CAM LOCX5 (2) SS ROLL PN5 ELI 5/16• /1e• 1 5 /8' 1/x Oth . 1 3/4' 3/{' S e SS /- TYPICAI_ CAM LOCI( MANHOLE WIPER GASKET BOTTOM a FRAME FINNED GASKET N VERTICAL FACE OF COVER ro MANE OPEN WATERTIGHT POSITM O K COYER BOTTOM OF CLOSED LDCIONC DEVICE Q POSTN M FRAME STANDARD - PENTAGON HEM S.S. OPTIONAL - 55 HEAL HEAD BOLT BOTTOM OF FRAME TYPICAL LOCKING DEVICE RING MUST BE ANCHORED N ACCOPO94M WITH S -25 WATERTIGHT MANHOLE FRAME WITH CAM LOCK COVER n NTS CT' OF RALEIGH EPARTMENT OF PUBLIC VTXMES S -27 - MANAGER K TREFZGER, PE D CROWELL. PE P BLANDFORD, PE J POWERS G BLUE NUMBER 010913 -52595 -018 GRATE PER C.. NOTES, M AP A 1�1 a •� it0 W P p N.vo �saMMTmaa nAm Amay. �isn �°OriQ °N rare ..0 w.Am. E lL 9';B B;B;,1111111! .; O e I� /3 OR /{ REBAR J IL .CORROSION RESRTANi MATERIAL r SIDE ELEVATION SECTION A - A STANDARD SUP RESISTANT MANHOLE STEP DETAIL n NITS CRY OF RALEIGH DEPARTMENT OF PUBLIC UTILITIES S -28 - City of Raleigh Northshore Lake and Dam Rehabilitation TRANSPORTATION >0�3 PIELICLRILITIEe • SEE VENT ETA. VENT OPENING ro BE 011E POOR ABOVE HUNDRED YEAR ROW ELEVATION SEAL AROUND WENT OPENING CALM -LOK VENT PIPE ro E SCREENED "HOT WATER i1CM MANHOLE MROUW MANHOE NOT DIPPED AND CUM FACTS DAILY ME PLACE POE FIANCE IZ• ABOVE MH TOP ,x• PTE -CAST TOP sue PROPOSED WALL COLLAR %� SLOPE FINISHED GRADE MARNKKE TO AWAY FROM MANHOLE HAVE CAST IN ALL SUES. RISER OPPOSITE STEPS ro ACOOMODATE FIANCE {• NOT OPPED' GALVANIZED POE 1 LJ lip CA9LEr VENT DETAIL srANLESs •- OTHER ACCEPTABLE STEEL BOL MOTES 19' STONE 1 VENT MUST BE FACTORY WOO FABRICATED AND 'MOT DIPPED' QAWAOZED 2 MANHOLE NUMBER NEEDS TO CCeKxE RIM VENT NUMBER STANDARD SEAL TIGHT MANHOLE WITH VENTED STACK n NIS CITY OF RALEIGH DEPARTMENT OF PUBLIC UTILITIES S -24 I. NOTES 1 No rocks W boUkIM {' or Nrw to be U w .. b..Nnl 2 AN bockfill mew-I SARI be dam mrr0onlonml mot-W 7 Bodd.a shall b. tomp.d m {' GNs non- troff.. areas { Act— 95% cmnpocbon 5 Sp-9 core Owl be token to compact —tanW around Ppe to prssnt VoNe between p.pe m a bacldR TRENCH BOTTOM DIMENSIONS AND BACKFILLING REQUIREMENTS A FOR DAM EMBANKMENT PIPES ,D NITS IE TIE COY OF RALEIGH CONSENTS ro THE CONNECTION AND EXMMON OF THE CITYS PIIBLIG eEYNER 6Y6,EMA9 tiHONT1 ON T1aR PLAN TIE wTE1W AND OOILTTWICnOR NElHW3HS¢0 F'ORTHI8PROECI I WLJM NN B FIE DADADS AND ffPECIFIGAT10lT9 OF THE CTYW RBD ITLrtE9 HANDBOOK. CITY W MLEGH AATD Yskk TO CONvommm CITY OF RALEIGH UTILITY DETAILS 0 1 • 2• FILENAME OOD -01 dqn SCALE AS NOTED 0 0 0 0 0 Bf 12- OF 057 STON CLASS B Rif WITH GEOTEXTILE F L JtulIVIN 0 —ID NOTES 1 CONSTRUCT SEDIMENT STORAGE AREA TO DIMENSIONS AND VOLUME NOTED 2 WATER IMPOUNDMENT SHALL NOT EXCEED A DEPTH OF 24' ROCK PIPE INLET DETAIL (RPI) e!� NOT TO SCALE I C -01 J 12' OF 057 STONE—, 5' MIN. 4 WEIR CREST CLASS 8 RIP RAP 2 -11 SEDIMENT IMEN E _ - 35'-MAX _ _ _ _ - SEE NOTE 1 PLACE GEOTEXTILE UNDERNEATH ALL RIP RAP (ALL SIDES) VARIES —4' MIN BERM 1 �1 BERM 2 2 CEOTEXTILE WEIR CLASS B RIP RAP BASIN AREA NOTES 1 SEDIMENT STORAGE AREA AND VOLUME © TO BE PROVIDED BY THE NATURAL OR EXCAVATED POND AREAS 2 PROVIDE BAFFLES AS DIRECTED AFTER FINAL GRADE IS OBTAINED SEE BAFFLE DETAIL SEDIMENT TRAP OUTLET n 140T TO SCALE FABRIC TENSION WIRE rSUPPORT POST, 24' INTO rSTAKE TO SUPPORT TO PREVENT SAGGING 1 BOTTOM OR SIDE 1 TENSION WIRE GALVANIZED WOVEN 1 BAFFLE SPACING SHOWN IS AN 1 1 1 1 1 1 1 WIRE FIELD FENCE, ILLUSTRATION OF TOTAL 700 g /m' COIR EROSION 14 CUACE, WITH 6* SURFACE AREA IN A BLANKET, CINT MESH OR SIMILAR, z MAXIMUM VERTICAL RECTANGULAR CONFIGURATION TRENCHED INTO BOTTOM OR SIDE STAY SPACING 2 BAFFLES SHALL BE SPACED SECTION A `N TO CREATE 4 SURFACE AREAS -A' 35 OF 35X, 25X, 252, AND 152 3,948 2,160 OF THE TOTAL SURFACE AREA 35 20 OF THE TRAP 5,400 5 35 SEDIMENT TRAP 6,316 5,760 NOT TO SCALE C -01 hal ms wemam►wemr I rtr•im� ■e nna u•.w wrr rau b SCHEDULE OF SEDIMENT TRAPS /RPI INLETS RPI ID MIN. HEIGHT BOT. EL TO TOP BERM EL (FT) QD HEIGHT BOT. EL TO SPILLWAY EL (FT) O REQUIRED BASIN SURFACE AREA AT SPILLWAY (SF) OF REQUIRED BASIN STORAGE VOLUME (CF) 1 35 20 2,659 3.600 2 35 20 5.527 1 8.640 3 35 20 3,948 2,160 4 35 20 4,895 5,400 5 35 20 6,316 5,760 6 35 20 7,579 9,720 7 35 20 5.211 6,120 8 35 20 5.369 5,400 9 35 20 2,211 3,960 10 35 20 1,105 1,440 11 35 20 1,421 1,440 12 35 1 20 6 000 3 600 o UNEREMBRAN2 t F21 21 ER 21 SELECT FILL OR NATURAL B I GROUND FLOWUNE SLOPE B D E 0001 15 3 F 0 001 2 2 G 0 001 2 2 H 0 001 5 2 1 0 001 2 2 J 0 001 2 2 TEMPORARY CONVEYANCE CHANNEL NOT TO SCALE C -0I D CROWELL. PE P BUWDFORD. C BLUE 0913 - 52595 -018 VARIES (12' MIN) 2 SLOPE 4X (MIN) y 2 PREPARED CEOTEXTILE �!11!MIIEIREGATE BASE FABRIC BASE COURSE MINIMUM 6* DEPTH CONSTRUCTION ROAD STABILIZATION (CRS) NOT TO SCALE C -0i 4'X8'X3/4- STEEL PLATE —� CENTERLINE OF SANITARY SEWER J DRIVEWAY ACCESS CROSSING LOCATION '•� �� �:�'.:%t•;� .: :pct•:•_ a SEDIMENTATION AND EROSION CONTROL GENERAL CONSTRUCTION SEOUENCE 1 INSTALL THE CHAIN LINK FENCE, TREE FENCE PROTECTION AND SILT FENCE/TREE FENCE PROTECTION AROUND THE LIMITS OF CONSTRUCTION AS SHOWN ON THE DRAWINGS 2 INSTALL THE CURB INLET PROTECTION, DRIVEWAYS, TEMPORARY PARKING AREAS AND CONSTRUCTION ENTRANCES 3 REPLACE OR RELOCATE THE SANITARY SEWERS WITH DIP 4 CLEAR AND GRUB THE ACCESS AREAS. GRADE AND INSTALL THE CONSTRUCTION ROAD STABILIZATION STONE AND TEMPORARY UTILITY PROTECTION AS SHOWN ON THE DRAWINGS 5 DRAIN THE EXISTING LAKE AND INSTALL THE TEMPORARY BYPASS STORM SEWER 6 INSTALL THE TEMPORARY CONVEYANCE CHANNELS AND ROCK PIPE INLETS 7 ISOLATE THE SPILLWAY STRUCTURE BY INSTALLING DIVERSION DIKES, IMPERVIOUS BERM AND SILT FENCE KEEP THE SPILLWAY STRUCTURE WORK AREA DRY BY DEWATERINC INTO A SILT SAC OR SEDIMENT TRAP B CLEAR AND GRUB AS NECESSARY TO PERFORM THE WORK 9 CONSTRUCT THE SPILLWAY STRUCTURE AND PERFORM THE LAKE GRADING MAINTAIN THE EROSION CONTROL MEASURES AS NECESSARY RELOCATE THE TEMPORARY CONVEYANCE CHANNELS AND ROCK PILE INLETS AS NECESSARY TO PERFORM THE WORK. STOCKPILE THE EXCAVATED MATERIAL AND ALLOW THE SOIL TO DRAIN PRIOR TO HAULING OFFSITE 10 INSTALL THE TEMPORARY CULVERT CROSSINGS AS REQUIRED TO MOVE EQUIPMENT BETWEEN AREAS MULTIPLE ACCESS AREAS ARE PROVIDED TO MINIMIZE THE NUMBER OF TEMPORARY CROSSINGS REQUIRED 11 MAINTAIN THE EROSION CONTROL MEASURES AS NOTED ON THE DRAWINGS AND DESCRIBED IN THE STATE EROSION CONTROL MANUAL ALL MEASURES SHALL BE INSPECTED ONCE EVERY 7 CALENDAR DAYS AND AFTER EVERY RAINFALL EVENT OF % INCH TOTAL RAIN WITHIN A 24 HOUR PERIOD ALL FAILED MEASURES SHALL BE REPAIRED IMMEDIATELY WHEN MEASURES HAVE REACHED THE ALLOWABLE SEDIMENT STORAGE, REMOVE THE SEDIMENT AND PLACE IN THE STOCKPILE AREAS OR PROPERLY REMOVE FROM THE SITE AND RESTORE THE EROSION CONTROL MEASURE WHEN THE EXISTING MEASURES ARE NOT ADEQUATELY CONTAINING SEDIMENT WITHIN THE PROJECT AREA ADD ADDITIONAL MEASURES UPON CONCURRENCE WITH THE CITY'S REPRESENTATIVE 12 TEMPORARILY SEED DISTURBED AREAS THAT WILL NOT BE DISTURBED FOR MORE THAN 7 DAYS AND ARE EITHER NOT READY FOR THE PERMANENT GROUND COVER OR WILL BE INUNDATED BY LAKE NORMAL POOL 13 UPON COMPLETION OF THE SPILLWAY STRUCTURE, LOW FLOW DRAIN AND MAJORITY OF LAKE GRADING REMOVE THE TEMPORARY BYPASS STORM SEWERS AND COMPLETE THE DAM EMBANKMENT IMPROVEMENTS 14 WHILE PERFORMING THE DAM EMBANKMENT IMPROVEMENTS, DIRECT THE TEMPORARY CONVEYANCE CHANNELS TO THE LOW FLOW DRAIN TEMPORARILY SEED THE LAKE BOTTOM AND SIDE SLOPES THAT REMAIN EXPOSED AND PERMANENTLY SEED THE AREAS ABOVE THE NORMAL POOL AND INSTALL THE REQUIRED REPLACEMENT TREE SEEDLINGS IN ALL AREAS EXCEPT THE ACCESS AREAS 15 PERMANENTLY SEED THE DAM EMBANKMENT SIDE SLOPES UPON COMPLETION OF FINAL GRADES AND INSTALL THE FABRIC MATTING ON THE SIDE SLOPES 16 UPON COMPLETION OF THE DAM EMBANKMENT AND LAKE GRADING, REMOVE THE TEMPORARY CONVEYANCE CHANNELS AND ROCK PIPE INLETS AND KEEP THE LOW FLOW DRAINS OPENS 17 INSTALL THE WETLAND PLANTINGS 18 UPON COMPLETION OF THE WETLAND PLANTINGS, CLOSE THE LOW FLOW DRAIN VALVES AND ALLOW LAKE TO FILL UP MAINTAIN THE WERAND PLANTINGS, LIVE STAKES AND SHRUBS BY PERIODICALLY WATERING 19 UPON ESTABUSHMENT OF THE PERMANENT GROUND COVER, REMOVE THE TREE PROTECTION FENCING, SILT FENCE, CONSTRUCTION ACCESS, TEMPORARY DRIVEWAYS, AND CONSTRUCTION ROAD STABILIZATION STONE AND RETURN THE DISTURBED AREAS TO EXISTING CONDITIONS GRADES AND CONDITIONS INCLUDING PERMANENT DRIVEWAYS, CURB AND GUTTER AND LANDSCAPING 20 REMOVE THE CURB INLET PROTECTION City of Raleigh Northshore Lake and Dam Rehabilitation UfCllt OL4fNlAT1 MOaOKS MCI (W l 8 V "AS aECW C MuCIGV awmBw� ro ee CCn91WIC1E0 MML Bn�e M BPEC6�DT' Cm eaanwr 9EwEn EwsErEwre � ro ee MCOrmEOwaon roswaw<cEnuMX �An PLO= ne ary ar aNt� rnnairre ro me caraxcrwn NO E1ill161d1 bi na aTYB .MTHOa:rENarsroiwv ROJE wnm•wane YTHM KVOCWOrnllCflo/ IR111009115E0 FOPTw9 N•OIECT B)MLL fa1F011Y TOTR 9fM0NOS NO lPECF1GTIOpl OF TXE CRYT WRIC UTLLRF2NMOBOOt ary w PPLEIOM are EROSION CONTROL DETAILS 0 1' 2- FILENAME OOD -02 cign SCALE NOT TO SCALE D C B A GEOTEXTILE FABRIC \ M r \ .N \ k\ \ \ \ \ \ rl. r, PREPARED 4' X 8' X 3/4' 1 � STEEL PLATE SHALL BE CENTERED BASE STEEL PLATE OVER IN- SERVICE OR PROPOSED SEWER LINE WITH THE LONG SIDE SANITARY SEWER PERPENDICULAR TO THE SEWER LINE 2 THE CONSTRUCTION ROAD STABILIZATION MATERIAL SHALL BE PLACED ON TOP OF THE STEEL PLATES EVEN IN AREAS SECTIQd WHERE AN ACCESS ROAD IS NOT IDENTIFIED 3 SUBSTITUTE MATERIAL SHALL BE ALLOWED PROVIDED THE CONTRACTOR DEMONSTATES EQUAL OR GREATER LOAD TEMPORARY UTILITY BEARING PERFORMANCE CROSSING PROTECITON NOT TO SCALE C-05 City of Raleigh Northshore Lake and Dam Rehabilitation UfCllt OL4fNlAT1 MOaOKS MCI (W l 8 V "AS aECW C MuCIGV awmBw� ro ee CCn91WIC1E0 MML Bn�e M BPEC6�DT' Cm eaanwr 9EwEn EwsErEwre � ro ee MCOrmEOwaon roswaw<cEnuMX �An PLO= ne ary ar aNt� rnnairre ro me caraxcrwn NO E1ill161d1 bi na aTYB .MTHOa:rENarsroiwv ROJE wnm•wane YTHM KVOCWOrnllCflo/ IR111009115E0 FOPTw9 N•OIECT B)MLL fa1F011Y TOTR 9fM0NOS NO lPECF1GTIOpl OF TXE CRYT WRIC UTLLRF2NMOBOOt ary w PPLEIOM are EROSION CONTROL DETAILS 0 1' 2- FILENAME OOD -02 cign SCALE NOT TO SCALE D C B A 7■ ANN 300 i OME a r1S R O a W N a I u Fu z _ swo oN, u � / , ono � / � vJi , / O atiO1 , / H vi3Tdz o W / / W V N / W 0. W NN Z NN o 1 J , CL I LI W ^ 0 W N°V 3 a /my Li m �s � z w < x i aJCijil Ft�<t+ o yp� N Z N w4m4 U' � bibs � u g qqo � C x FN2 (V < y o F Ld x I O Z � 2,1 I I a Z W LL !awl kill il OW� ee •�0 a!O _J Z ee 'b = N i 0 N1 �. (n o m x N in S/ N ! 10 T ' O oo ��o Z Z Fn O Mto �� d o d, e,s #� Q Ir- mU �a «\ W 0. °� e Q.,sl F- VO N Z o Q = . r ' u= A b i z L' Fi tr F ,YA•�O a •. I I HIC M9 MR .cc Z Q Z w G I I I z gg Y �<yy Y°W I I .9L Z W U YW ° IL I✓ I _ g� ar a•.c ,D -.c � w < i aJCijil Ft�<t+ o CL Z gB � bibs � u O d F ! F o qqo � C x J v g y o F Ld ig I O Z Z Rp��pppp� E e i M Z W LL !awl kill il eye 6 e _J Z W i 0 N1 �. (n N N J W W Z Z o Q = b i z L' Fi tr u� (, HIC M9 MR .cc L S w G gg Y w z �� .9L Z �� ° IL d L � ar a•.c ,D -.c � Lq Q Q o Q I? b z j w = = O g 2 Q 3 O V1 W = b x CITY OF RALEIGH CITY OF RALEIGH PURL IC VMS DEPARTMENT I O of PUBLIC 9T]itES DEPARrWNr REVISION •9P TE, r4no VRAM 97+ Jrl rrr " a +-01 9s STANDARD TEMPORARY a g eas wawa RIP RAP LINED CHANNELS SILT FENCE STD. tt 40.24 STO. U 40.02 w < J L:� a I � T o CL Z 9 �11olw � u O d F ! F o w � y e e � V, J v g y o F ig I O Z Z Rp��pppp� E e 111.1 !awl kill il eye 6 e _J Z W i 0 N N J W W Z Z o Q = W z L' Fi tr (, L S w d$ gg Y w z �� Z �� ° IL ar u, w o Lq Q o �s j w = = O g 2 Q 3 O V1 W = b x CITY OF RALEIGH I O of PUBLIC 9T]itES DEPARrWNr REVISION rtr r1349 pH•V ar. 7 a eas wawa RIP RAP LINED CHANNELS STD. tt 40.24 J L:� a I � T a w = Z 9 � � u O d F ! F o w � y e e � V, J v g y o F ig I O Z Z Rp��pppp� E e 111.1 !awl kill il eye 6 e _J 11111111ME Q O N 2 ice g Y li a a � AHII Ld Ld s n en •oW`u 9 a5 W �n�W a S ee r� gtl .Bgp g!g N w "OHS � �1� � W • ar aka- Q Z 0-5 Lj h�eBSS52�b y�9�gtl yISP1� y og�ai4�g@ Q W e Z g�"al € &�gge O� z z CITY OF RALEIGH m• ••M .tc LL 3 PUBLIC 90RRS DEPARTMENT REVISION M, rnn°• m- all in ,u nr 3427 STANDARD TEMPORARY SILT / TREE E PROTECTION FENCE STD. A 40.03 !� b° RAN!. Is ur)p£0 -000 J w V, J v O y o F I O Z Z w V z _J Z W O N N W Is ur)p£0 -000 a 0 I °o 1 I L I J -7 MIN WIDTH BASED ON EQUIPMENT USED y57 WASHED STONE 20 FT MIN TOP OF ROADWAY 4" THICKNESS (MIN) APPROACH LENGTH 1/2 PIPE DIAMETER OR r B" MIN DEPTH 12 ", WHICHEVER IS GREATER 11 5 FT MAX. FILL HEIGHT INSTALL NON -WOVEN GEOTEXTILE FROM LOW POINT OF FABRIC BENEATH APPROACHES ORIGINAL CHANNEL L CLASS B RIPRAP •\ ALL PIPE INVERTS SHOULD BE 12" MIN LEVEL WITH THE LOW POINT OF BETWEEN PIPES ELEVATION ORIGINAL CHANNEL INSTALL CULVERT PIPES TO NATURAL CHANNEL GRADE, U NO CROSSING NUMBER DIAMETER OF CULVERT (INCHES) MIN NUMBER OF CULVERT PIPES N1 18 1 N2 18 1 N3 42 5 N4 18 1 N5 18 1 NOTES, 1 DO NOT EXCAVATE STREAMS WITH ROCK BOTTOMS IN ORDER TO PLACE ALL PIPES AT THE SAME LEVEL PLACE AS MANY PIPES AS PRACTICAL WITHIN THE LOW AREA OF THE STREAM PLACE REMAINING PIPES REQUIRED TO CROSS THE STREAM ON THE EXISTING STREAM BOTTOM 2 INITIATE PUMP AROUND DIVERSION PRIOR TO ANY EXCAVATION IN STREAM TEMPORARY " CULVERT '• STYLE STREAM CROSSING DETAIL ri NOT TO SCALE C -0I Temporary Erosion Control Mix, Permanent Seeding Mix, March 1 through August 31 - Summer March 1 through May 10 - June 25 through September 15 (NCDENR 611, Tables 610 a,b,c) (NCDENR 611, NO 8 M) Botanical Name Common Nome Rate (lb/acrel Botanical Name Common Name Rate (lb /acre) _ Toll Fescue 175 -200 Setano itolico German Millet 40 - Kentucky Bluegrass 20 Temporary Erosion Control Mix, September 1 through February 28 - Winter Botanical Name Common Name Rate (lb/acrel Secole cereals (Abruzzi) Rye Grain 120 SEED SCHEDULE NOR Eno -NWy an •fe»hld•I•• t 1/20 12 06/2012 •Ta•NMbW Der•,aw 7•fl RrMyR Ne 7rgt ISSUE DATE ne.ael.a usa. rr. •nT• BARREL MIN. 1' WIDER TI Ei TOP OF BANK FLOW DIRECTION OF CHANNEL TOP OF BANK NOTE- IMPERVIOUS SELECT MATERIAL MAY BE SUBSTITUTED WITH SAND S. MIN I a. APPROVAL OF THE CDR — IMPERVIOUS X111' X \Il' �U\�11 SELECT MATERIAL POST FABRIC (TYP ) DEPTH BELOW CROSS ON aE)USTING CHANNEL GRADE IMPERVIOUS BERM NOT TO SCALE O I OCKING r TERMINAL LINE POSTS BARREL FLARED END SECTION PLAN RIPRAP (STONE) ALL APRONS NCDOT CLASS B RIPRAP 24" THICK 2' ANCHOR---' FILTER FABRIC m 2' ANCHOR SECTION GRAVEL BEDDING 6' NO 57 STONE OUTLET STABILIZATION STRUCTURE DETAIL NOT TO SCALE 1 C-05 - NOT FOR CONSTRUCTION PROJECT MANAGER IK TREFZGER, PE D CROWELL. PE P BUWDFORD, F G HETZLER, PE J POWERS G BLUE FOR REVIEW DESCRIPTION PROJECT NUMBER 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation CAP BRACING CHAIN LINK LTOP JOINTS (TYP) ew - MATCH ONE USED POST FABRIC (TYP ) RAIL IN FENCE O I OCKING r TERMINAL LINE POSTS II �I ♦ !Z-.PAOLOCK HOLE POST "P ) 0 i 't1 ENTER STOP 3/8" GALV BOTTOM X 11 1 ROD TRUSS TENSION CONC. FOR • • •• L) THE CONTRACTOR IS NOT REQUIRED TO ;M= USE THIS GATE DETAIL THE TEMPORARY WIRE 12"0 WIDTH VARIES 12" DIA TERMINAL I ' Nnrcc 10" DIA LINE POST 1 SEE DETAIL 12. SHEET S -OS WHEN MOUNTING FENCE ON DAM OR SPILLWAY eQST v STRUCTURE 2 FOR TEMPORARY INSTALLATION, THE FOUNDATIONS SHOWN ARE NOT REQUIRED THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORT 3 WHEN SILT FENCE IS TO BE INSTALLED ALONG WITH THE CHAINUNK FENCE, THE SILT C FENCE IS TO BE SEPERATE AND ON THE INSIDE CHAIN LINK FENCE i31 NOT TO SCALE C -01 2' ANCHOR SECTION GRAVEL BEDDING 6' NO 57 STONE OUTLET STABILIZATION STRUCTURE DETAIL NOT TO SCALE 1 C-05 - NOT FOR CONSTRUCTION PROJECT MANAGER IK TREFZGER, PE D CROWELL. PE P BUWDFORD, F G HETZLER, PE J POWERS G BLUE FOR REVIEW DESCRIPTION PROJECT NUMBER 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation CAP DOUBLE SWING GATE n NOT TO SCALE C -Ot UTUiTY MtP TIONS AND OTHER PUBUC- CuInES.• IxxNG S1EWA&NB ANo NANRG1P RAriBARE ro se Car4TRICTeD ON AIt e1ReETe AS ®ECtFED BY CRY CAP CODE.THMNCUR MVEMMMAPPROVEDBYIIQ ?CRYOFRNFJOMMIDSWNLE TIEORYOFW4EItYi�TO COPOECTMN FME11S1an OFlIQ:G 60MST tff t"SACNNR MAUI OnaE WVMTTENMAiOV URIC PUBLIC SEWER SY AS SHOWN ON THIS ' THE WTERIIL AND CONSTRUCNON 81WTMYR: VYERPIISEMENISMEMWMC010FDWDORTOF ACCyn NEIlC09 USED FOR IM9 PROECfRW1 WIFO101 TO TMB SfA1mNaDS 11Pm ^T �" BPECIFIGTRINB OF THE a `SPUBLC UTURES HANDBOOK CRYOFRALEM TIRO UTERIES— PIHICU nEs DEPARIYpa PERMR• COIIS¢RV•TION EIWp1EFA _T xxi DARo. ro COIL4IRUCT EROSION CONTROL DETAILS 0 1" 2" FILENAME OOD -04 dgn SCALE NOT TO SCALE 11E ■ ■:1 72' FABRIC TO JOINTS (TYP) ew - MATCH ONE USED IN FENCE OCKING r .. II �I ♦ !Z-.PAOLOCK HOLE 't1 ENTER STOP '� NOTF Z CONC. FOR • • •• L) THE CONTRACTOR IS NOT REQUIRED TO ;M= USE THIS GATE DETAIL THE TEMPORARY GATE SHALL BE APPROVED BY THE CITY 12"0 WIDTH VARIES DOUBLE SWING GATE n NOT TO SCALE C -Ot UTUiTY MtP TIONS AND OTHER PUBUC- CuInES.• IxxNG S1EWA&NB ANo NANRG1P RAriBARE ro se Car4TRICTeD ON AIt e1ReETe AS ®ECtFED BY CRY CAP CODE.THMNCUR MVEMMMAPPROVEDBYIIQ ?CRYOFRNFJOMMIDSWNLE TIEORYOFW4EItYi�TO COPOECTMN FME11S1an OFlIQ:G 60MST tff t"SACNNR MAUI OnaE WVMTTENMAiOV URIC PUBLIC SEWER SY AS SHOWN ON THIS ' THE WTERIIL AND CONSTRUCNON 81WTMYR: VYERPIISEMENISMEMWMC010FDWDORTOF ACCyn NEIlC09 USED FOR IM9 PROECfRW1 WIFO101 TO TMB SfA1mNaDS 11Pm ^T �" BPECIFIGTRINB OF THE a `SPUBLC UTURES HANDBOOK CRYOFRALEM TIRO UTERIES— PIHICU nEs DEPARIYpa PERMR• COIIS¢RV•TION EIWp1EFA _T xxi DARo. ro COIL4IRUCT EROSION CONTROL DETAILS 0 1" 2" FILENAME OOD -04 dgn SCALE NOT TO SCALE 11E ■ ■:1 a 0 0 °o FILL VOID WITH 1'0 CLOSED CELL POLY BACKING G WATER STOP AND t COLLAR ( -SEAL TYPE kL.L SLEEVE ;ARRIER LINE ( -SEAL TYPE 1 PENETRATION SEAL PIPE PENETRATION DETAIL NOT TO SCALE U -OJ PROVIDE 2' SQUARE 3000 PSI CONCRETE COLLAR 6' DEEP AROUND VALVE BOX IN UNPAVED AREAS CAST IRON VALVE BOX W/ LOCKABLE COVER WORD WATER' WITH ARROW AND PROVIDE 2' SQUARE 3000 PSI "OPEN" INDICATING DIRECTION CONCRETE COLLAR 6' DEEP TO OPEN VALVE ON COVER AROUND VALVE BOX IN UNPAVED AREAS WRENCH NUT - 2' SQUARE TURN CLOCKWISE TO OPEN VALVE BOX SHALL BEAR ON MECHANICAL JOINT WITH EARTH AND NOT DIRECTLY RETAINER GLANDS ON THE VALVE GATE VALVE INSTALLATION DETAIL i21 NOT TO SCALE U -03 WORD 'WATER' WITH ARROW AND 'OPEN" INDICATING DIRECTION TO REMOVE CAP ON COVER CAST IRON VALVE BOX — W/ LOCKABLE COVER 2' GALVANIZED SCH 80 WITH THREAD END AND CAP THREADED ENO WITH CAP MANUAL AIR RELEASE STEM I VALVE BOX SHALL BEAR ON 16x6 TEE, M J EARTH AND NOT DIRECTLY ON THE VALVE MANUAL AIR RELIEF DETAIL i1 NOT TO SCALE U-03 4' SOLID HOPE �j I DRAIN PIPE � I 3' MINI A- 4' SLOTTED DRAIN PIPE (YP) P; F TRENCH 7YP ANTI -SEEP COLLAR ASTM C33 SAND 1 DIP SIPHON 4' SLOTTED DRAIN PIPE PLAN VIEW e _ TRASH RACK TOP DRAIN INLET EL 253 50 �C t NOT TO SCALE CLASS A STONE I C-07 - TOP OF SPILLWAY WIER • LOAM & SEED. SLOPED TO WALL. DO -NO 6 BARS • 6' ABANDON NOT INSTALL OITCN BEHIND THE WALL, 0 C EACH WAY BENT INV OUT EL 249 50 16' ABOVE INLET TOP 1 CONSTRUCT A BULKHEAD AT EACH END OF THE UTILIZE 1 OR 2 FREE- STAROINC UN115 AS NCDOT /57 REQUIRED ro MAINTAIN IN 4• EXPOSED AT BACK OF WALL (PER SIZE PLANS) UMINUM TRASH COVER FREE- STANWNC HALF UNITS ro z_ BE USED ALONG TOP OF WALL PRESSURE ALUMINUM TRASH COVER FILTER FABRIC (MIRM 1AON OR EQUAL) BOLTED TO SPILLWAY TO SEPARATE LOAM FROM BIICKFlLL INSTALL NIPPLE ON DOWNSTREAM BULKHEAD TO J -ernr coNNECraR USED FOR FREE- STANDING UNITS W FILTER FABRIC in AGAINST CUT SLOPE ,QOM _ w !! DOWNSTREAM 24'� INSTALL A VENT AT BOTH BULKHEADS THAT 0�L0 60 16' DUCTILE IRON EXTEND ABOVE THE TOP OF THE EXISTING LOW PIPE TO DRAIN 30• T 1 • �. SO • FLOW DRAIN 6' DtA PRECAST DRY WELL CRUSHED STONE BEDDING EXISTING GROUND • WIN ---------- -_ -_- - - -_ • 4 INJECT THE NON - SHRINK GROUT AT A MAXIMUM 4' SOLID HOPE �j I DRAIN PIPE � I 3' MINI A- 4' SLOTTED DRAIN PIPE (YP) P; F TRENCH 7YP ANTI -SEEP COLLAR ASTM C33 SAND 1 DIP SIPHON 4' SLOTTED DRAIN PIPE OPENING `(2) 5 -INCH PLAN VIEW SECTION A TRASH FILTER DIAPHRAGM t NOT TO SCALE NOT TO SCALE I C-07 - TOP OF SPILLWAY WIER • LOAM & SEED. SLOPED TO WALL. DO -NO 6 BARS • 6' ABANDON NOT INSTALL OITCN BEHIND THE WALL, 0 C EACH WAY BENT 16' ABOVE INLET TOP 1 CONSTRUCT A BULKHEAD AT EACH END OF THE UTILIZE 1 OR 2 FREE- STAROINC UN115 AS REQUIRED ro MAINTAIN IN 4• EXPOSED AT BACK OF WALL (PER SIZE PLANS) FREE- STANWNC HALF UNITS ro z_ BE USED ALONG TOP OF WALL PRESSURE ALUMINUM TRASH COVER FILTER FABRIC (MIRM 1AON OR EQUAL) j TO SEPARATE LOAM FROM BIICKFlLL INSTALL NIPPLE ON DOWNSTREAM BULKHEAD TO J -ernr coNNECraR USED FOR FREE- STANDING UNITS W FILTER FABRIC in AGAINST CUT SLOPE _ w !! OPENING `(2) 5 -INCH LOW FLOW DRAIN INLET TRASH RACK 8 DIAMETER ORIFICES NOT TO SCALE C -07 NOT TO SCALE - TOP OF SPILLWAY WIER ABANDON IN PLACE PROCEDURE EL 263 50 1 CONSTRUCT A BULKHEAD AT EACH END OF THE PIPE TO RESIST THE NON- SHRINK GROUT z_ TEMP VENT (TYP) PRESSURE ALUMINUM TRASH COVER % LOW FLOW DRAIN PIPE 2 INSTALL NIPPLE ON DOWNSTREAM BULKHEAD TO in INJECT NON- SHRINK GROUT DOWNSTREAM UPSTREAM 3 INSTALL A VENT AT BOTH BULKHEADS THAT EXTEND ABOVE THE TOP OF THE EXISTING LOW LL::: .. . • �. _ FLOW DRAIN •• 4 INJECT THE NON - SHRINK GROUT AT A MAXIMUM 0 = PRESSURE OF 30 PSI UNTIL IT FLOWS FROM - -- ' . . •• DOWNSTREAM VENT INSTALL DOWNSTREAM := : PERMANENT CAP TEMP BULKHEAD (TYP) 5 INJECT THE NON- SHRINK GROUT AT A MAXIMUM 9' GROUT NIPPLE NON- SHRINK PRESSURE OF 30 PSI UNTIL IT FLOWS FROM UPSTREAM VENT F� CEMENTITIOUS GROUT 6 ALLOW THE NON- SHRINK GROUT TO CURE AND ABANDON PIPE IN PLACE REMOVE BULKHEADS AND VENTS NORMAL POOL ORIFICES SECTION VIEW DETAIL NOT TO SCALE NOT TO SCALE C -07 hR HDR em..fts ba .f UVS C.F.WHIS ANBNItl TANP, TAb Bm I RrrBA ND r • u®. Nu�r Fmu PROJECT MANAGER K TREFZGER, PE D CROWELL, PE P BLANDFORD, PE J POWERS G BLUE 8 City of Raleigh Northshore Lake and Dam Rehabilitation sw ■o NCDOT /57 STONE EXISTING EARTH OR MIDDLE BLOCK COMPACTED FILL (PLACED PER SPECIFICATIONS BY BASE BLOCK JJI' OTHERS) & A LEVELING PAD OF NCDOT ABC STONE, 12' DEEP AND EXTENDING AT LEAST 12' BEYOND THE FRONT AND BACK OF THE BASE BLOCK. B SwW. BE INSTALLED 12' MIN 12' MIN THE MINIMUM REQUIRED BEARING CAPACITY OF THE BASE SHALL BE 1600 PST PRECAST ROCK WALL NOT TO SCALE C -07 UIRRY DLRTAI1ATKx1S ATm OTHER PUBYC FACILITIES. AmLUDWO W AUKS MID nAImIW RAIRBARE ro BE � DN AL BTiEETeAS MC BY GAY cmE. TNEBE FACSRIES NAVE BEES APPRDVT�Br THE aTra RME®1A•D BHNL eE BDDIBTALLED,m=59A MARE BEDR�Der PRIM v AR AC nMlm swmARr sE1vER EASEMEN1s ARE ro Be RECOImEO vma+ro FMA ACCETRANL4 TRANS ORATKIN SERVICES PIBIICU s CONSERVAnM ESDUBFR PEHIEw HN � eCIl01l fi..:.I_.MH B.B,9. nE rnrff RIUEKiII CONdENTa TD THE CuaIEeTHE Alm EXiENBI)C rN THE C"M 1 m8Mm8�i1>�ED WAN TNU I IUECCTSHALI. RMTOTHEsTADRDS ®EC6KJ.11IX96 THE aTn PUOUC uTILITK:B IIANDeaac arr aF RAIEKIII PUBLIC urwTIES DEPARTMENT PFAMT A MLTHQ wIm TO CONBTRIICT SITE CONSTRUCTION DETAILS 0 1 • 2• FILENAME OOD -05 dgn SCALE AS NOTED ■I_1 c 1D 0 I 00 SLOPES FOR VARIABLE SUPER ELEVATION RATE FOR STANDARD 2' -6" CURB AND GUTTER ,ti "CAR,` RO, .•'•Q.S Fg'ss = F 2 = F'Ai • E Z 1 ; WON, MOUNT SIGN _• o WHITE LETTERS, SYMBOL AND J POWERS \ BORDER ON BLUE BACKGROUND 13/16" DIA HOLES PLAN 12" X 8" VAN - ACCESSIBLE SIGN 3:1 SAND AND CEMENT z NON- SHRINK GROUT SEALANT ALL ti _21 �b to (2) #6 BARS TYP ELEVATION - SLOPE DOWN 0 1/4 " MrT- 0 3/16 �(2) #3 BARS 8" MIN �� 10" MAX DETAIL e 24' y Y.�AISI n B- I �� B I " , 12" a 1 30" CURB • GUTTER 2 30- VALLEY TYPE GUTTER NOTES L O•MMGSN BETWEEN CON;rnLcr0N ANTS. q'MAOAN BETWEEN CONSTwwx ANTS ON MACHINE PONS 2 Ur EMANSON ANT EVERY SD' A 3000 PS CONCRETE AMARAL 4• SLUMP MAI➢IY 4 LOW MEMBRANE CU7M". COIPOINO SMALL MEET M RECUIR1EMTS OF SECTOR 1020 -2 OF MCDOT STANDARDS 0 SPE?ICAT'IONS MR ROADS AND SHEET i OF 2 srE%c VE1 S ALL CO4TRICTDA ANTS BALL BE FILED CITY OF RALEIGH OM ANT FILLER AND SEALER N ACCORDANCE PUBLIC VMS DEPARTMENT BIN RNCDOT ROADWAY STANDARD DETAIL SMOL THE ANT MATERIAL SILL COMFORII TO SECTION V S rt. TMLM 1020 -2 OF ACOOT'S STANDARD SPECIFICATIONS FOR Ma GUM m CURB ROADS AND STRICTWES vo eT v AND IT. ABC STONE REOIMEO LODER ALL CUB A CUTTER NvNAT rT GUTTERS STD- A 20.21 CURB AND GUTTERS % +1 140T TO SCALE 4 7/8 ° 12" X 18" HANDICAP SIGN ,ti "CAR,` RO, .•'•Q.S Fg'ss = F 2 = F'Ai • E Z 1 ; WON, MOUNT SIGN 18 GAUGE STEEL BAKED ENAMEL o WHITE LETTERS, SYMBOL AND J POWERS \ BORDER ON BLUE BACKGROUND 13/16" DIA HOLES PLAN 12" X 8" VAN - ACCESSIBLE SIGN 3:1 SAND AND CEMENT z NON- SHRINK GROUT SEALANT ALL 12" CLR z 1" DEPTH TYP WHITE LETTERS AND BORDER ON to (2) #6 BARS TYP ELEVATION - SLOPE DOWN 0 1/4 " APPLICABLE 0 3/16 �(2) #3 BARS 8" MIN �� 10" MAX DETAIL BACK OF CURB 12' MIN OR AS SHOWN ON 5" SF9 5A �-6• COMPACTED ABC STONE FACE OF CURB UP OF GUTTER PARKING LOT SECTION P REMOVE CURB AND GUTTER NOT TO SCALE NOTES 1 IF SIDEWALK IS WITHIN DISTURBANCE OF DRIVE ACCESS. EXTEND DRIVEWAY PAVEMENT TO SIDEWALK 2 POSITIVE SLOPE FROM R/W DOWN TO CURB UNE 3 DRIVEWAY CURB CUT WIDTH SINGLE VEHICLE WIDTH - 12FT DOUBLE VEHICLE WIDTH - 24FT PARALLEL LENGTH - 20FT (VEHICLE) 2 5' EXISTING F. r1 ROAD EXISTING DRAINAGE FLOWLINE TO BE MAINTAINED REMOVE EXISTING - CURB AND GUTTER CRS R/W — TEMP DRIVEMENT PAVEMENT (1 5" ASPHALT) 4" TEMP PAVEMENT BASE COMPACTED TEMPORARY DRIVEWAY DETAIL NOT TO SCALE PROPOSED 90EWAUN GRASSED N1UTY STRIP (CONCRETE 7000 P SL) aax' ' EMITTING Y-I• COPACED TO A DENSITY IIST CURB AND GUTTER OF No LESS THAN WW TYPICAL SECTION AM FILLER 1/4• SIDE 1RNlt SURFACE TRANSVERSE E %PANSION JOINT MAIM 1 TRANSRASE EIPANSON ANTS TO BE A MARMYY OF 00 FEET 2 ALL CONCRETE TO BE FISHED MTN CMD Ca1POUD, 3 A 0 MCI DEPTH IS REOURED AT LOCATIONS OF DRIVEWAY OIOSMNCS• AT STREET IMTERSEC009 (ALONG THE LENGTH (IF RADIUS CAB REWMXS) AND M THE HANDICAP RAMPS. CONCRETE SIDEWALK NOT TO SCALE N a 'G n 711\_2" DIA PIPE 0� 0 1 X• DIA STEEL PIPE. FILL WITH CONCRETE AND DOME TOP 1/2- EXPANSION JOINT WITH SEALANT GRADE PAVING (SEE PLANS) LOCKABLE WELL CAP - •n o� FLUSH - MOUNTED BOLTED DOWN WELL COVER `WELL PAD 2' X 2' X 4• /-WELL PAD / — EXISTING GROUN `GALVANIZED SKIRT - BENTONTTE SEAL -2• SOLID PVC PIPE -2• SLOTTED PVC PIPE SAND ¢¢ TMRE40M PVC CAP •� b 1 BOTTOM OF BORING OBSERVATION WELL /_91 NOT TO SCALE SEWOMT ON STE STONE TO E USED 12' MM OR ti a M SURGE STCE OR AS SHOWN W �e°�� RAILROM BALAST l ON ORAMODS PLAN NOTES I PIT SLT FENCE OR TREE PROTECTION FORCE VP TO ENSURE CONSTRUCTION ENTRANCE 13 USED 2 W CONSTRUCTION ON M SITES ARE SAN THAT THE MD 13 NOT REMOVED BY THE VEHNXE TRAVEINO OVER THE STONE. THEN THE TEES OF THE VEHICLE MUST BE MASHED BEFORE ENTERING THE PBUC ROAD 3 6 A PNECT CONTIRES TO PLLl IM1D MID OE®OS WI TO THE ROCK ROM. THE COVOSWIO AUT1018TV MNU CENT THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL RES'O®IJTY TOM �� rEW �sTA�r�M EHtgTINO ROADWAr T�as•Ip � 1s•/ON �•I \` MM I I 2- MA �F'9�1111� � 'Ii101111v ''IIM1111�11 111 III= FAB= UNDER STOW CROSS SECTION CONSTRUCTION ENTRANCE CONCRETE WHEEL STOP %si HANDICAP PARKING SIGN BOLLARD CONSTRUCTION ENTRANCE NOT TO SCALE NOT TO SCALE NOT TO SCALE - NOT TO SCALE - uruNrr MTALUnow AHO MTRHWN P11RIC FAgl1T1E8 MRDOMOIDDEWKIGAAO HANDICAPRAIPBARE SCOE THESE FUATACEI1S1SEs BNE E sEEm CIFD (mIN KL eTRcirr 0 AB am AND, HAL L O AY RITTEIAFPR0VA. PU8UC TIE an SEMEN N SENRI M[0N119BEMOMPI ON Cq PO IM TTHE WTERIAL ANDCONSTIH0ECaM SANITARY SEINER EASEMENTS ANE InMERECORDED WRD FINK 1CC5TAM P NEOIOD9 USED FqL nIB NgffCT 91WLCOIPORY TO NE 8TAIOMW RIND BPECWCATIOHO C& nE DITY'B PIAIAC Uf0N11E9 NMOB0011 TRMISPDRrAnOI sERUN�s arr of RALEIGH PLMUC UIlNTR9 RIRIC LNr8T11ES0EPARNNFM PERMTI CONSERVATION EApIEEti AUNION@ATKAITO NSIWCT U DAIF MRBI1 w wft Arc A1MC —ONAR 11/2012 ST3I NMINMI a1A 1MIRH2BIRMNPL Ne R1N1 ISSUE I DATE r�Na.A LA�.INme.� IJ1tI - NOT FOR CONSTRUCTION FOR REVIEW FOR REVIEW DESCRIPTION IROJECT MANAGER 12" X 18" HANDICAP SIGN ,ti "CAR,` RO, .•'•Q.S Fg'ss = F 2 = F'Ai • E Z 1 ; WON, MOUNT SIGN 18 GAUGE STEEL BAKED ENAMEL SECURELY TO WHITE LETTERS, SYMBOL AND J POWERS I.T POST BORDER ON BLUE BACKGROUND RESERVED PARIONG 12" X 8" VAN - ACCESSIBLE SIGN 18 GAUGE STEEL BAKED ENAMEL SEALANT ALL 010913 -52595 -018 WHITE LETTERS AND BORDER ON m AROUND — BLUE BACKGROUND, WHERE - SLOPE DOWN APPLICABLE N I " TYP — PROVIDE BREAK -AWAY CONNECTION STEEL POST n FINISHED GRADE o ` N a 'G n 711\_2" DIA PIPE 0� 0 1 X• DIA STEEL PIPE. FILL WITH CONCRETE AND DOME TOP 1/2- EXPANSION JOINT WITH SEALANT GRADE PAVING (SEE PLANS) LOCKABLE WELL CAP - •n o� FLUSH - MOUNTED BOLTED DOWN WELL COVER `WELL PAD 2' X 2' X 4• /-WELL PAD / — EXISTING GROUN `GALVANIZED SKIRT - BENTONTTE SEAL -2• SOLID PVC PIPE -2• SLOTTED PVC PIPE SAND ¢¢ TMRE40M PVC CAP •� b 1 BOTTOM OF BORING OBSERVATION WELL /_91 NOT TO SCALE SEWOMT ON STE STONE TO E USED 12' MM OR ti a M SURGE STCE OR AS SHOWN W �e°�� RAILROM BALAST l ON ORAMODS PLAN NOTES I PIT SLT FENCE OR TREE PROTECTION FORCE VP TO ENSURE CONSTRUCTION ENTRANCE 13 USED 2 W CONSTRUCTION ON M SITES ARE SAN THAT THE MD 13 NOT REMOVED BY THE VEHNXE TRAVEINO OVER THE STONE. THEN THE TEES OF THE VEHICLE MUST BE MASHED BEFORE ENTERING THE PBUC ROAD 3 6 A PNECT CONTIRES TO PLLl IM1D MID OE®OS WI TO THE ROCK ROM. THE COVOSWIO AUT1018TV MNU CENT THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL RES'O®IJTY TOM �� rEW �sTA�r�M EHtgTINO ROADWAr T�as•Ip � 1s•/ON �•I \` MM I I 2- MA �F'9�1111� � 'Ii101111v ''IIM1111�11 111 III= FAB= UNDER STOW CROSS SECTION CONSTRUCTION ENTRANCE CONCRETE WHEEL STOP %si HANDICAP PARKING SIGN BOLLARD CONSTRUCTION ENTRANCE NOT TO SCALE NOT TO SCALE NOT TO SCALE - NOT TO SCALE - uruNrr MTALUnow AHO MTRHWN P11RIC FAgl1T1E8 MRDOMOIDDEWKIGAAO HANDICAPRAIPBARE SCOE THESE FUATACEI1S1SEs BNE E sEEm CIFD (mIN KL eTRcirr 0 AB am AND, HAL L O AY RITTEIAFPR0VA. PU8UC TIE an SEMEN N SENRI M[0N119BEMOMPI ON Cq PO IM TTHE WTERIAL ANDCONSTIH0ECaM SANITARY SEINER EASEMENTS ANE InMERECORDED WRD FINK 1CC5TAM P NEOIOD9 USED FqL nIB NgffCT 91WLCOIPORY TO NE 8TAIOMW RIND BPECWCATIOHO C& nE DITY'B PIAIAC Uf0N11E9 NMOB0011 TRMISPDRrAnOI sERUN�s arr of RALEIGH PLMUC UIlNTR9 RIRIC LNr8T11ES0EPARNNFM PERMTI CONSERVATION EApIEEti AUNION@ATKAITO NSIWCT U DAIF MRBI1 w wft Arc A1MC —ONAR 11/2012 ST3I NMINMI a1A 1MIRH2BIRMNPL Ne R1N1 ISSUE I DATE r�Na.A LA�.INme.� IJ1tI - NOT FOR CONSTRUCTION FOR REVIEW FOR REVIEW DESCRIPTION IROJECT MANAGER K TREFZGER, PE ,ti "CAR,` RO, .•'•Q.S Fg'ss = F 2 = F'Ai • E Z 1 ; WON, D CROWELL, PE P BLANDFORD, PE J POWERS G BLUE PROJECT NUMBER 010913 -52595 -018 City of Raleigh Northshore Lake and Dam Rehabilitation SITE CONSTRUCTION DETAILS 0 1 • 2" FILENAME OOD -O6 dg. SCALE AS NOTED IC I IA J v'vT ROADSIDE ACCESS POINT ACCESS THROUGH TWORARY BARRIER To �• 5 35 DETAIL 6X00 FOR LEFT SIDE, GAVE PRINCIPLE APPLIES FOR RIGHT SIDE ACCESSES 1 h a yD 950 850 TM=me => su F U rR -dT9N MULTILANE ROADS TNWf ^C OOa== EXTEND DRUM LEMONT 80 TRUICK WHEN LANE IS CLOSED. CAN VERSE TO EXISTING TRAFFIC DAMS MAY BE BEMOAAED « HmH=iyxD NOD m BDIAl1O • SPEED - - - • _ r FOR TRUCK EGRESS -• - r 7 - • - • - • - 7 � •- w qq zaN x 71Z . AA ' j//1% „ LL x rC7aOQ x[0 0 0 =p,R 'or 71 • ACCESS POINT F FQ-S Zy�j N • ••• .....•.....•...•....•.. �.•. -4 INTERFEEIMM, ETC. GAMIER , • • • Cc Z O -4 • - _ _ _ _ • j SEE RSD.1101 11 SWEET S « �'jj''� FOR BARRIER FLARE RATES t,( J1 1 HN-1 > Np CRASH CUSHION IS REQUIRED WHEN '`-� TLUCI N 0 0 = IL _ _ - _ - _ t • EXPOSED END OF BARRIER IS WITHIN 80' OF EDGE OF TRAVELERY. 0M1NAN(1? NOTES: p RIGHT LAM CLOSURES MAY BE USED •• 200' 18 A MAXIMUM DIVERSION KEEP THIS DIMENSION AS SHORT AS POSSIBLE. eau D O:N ALLOWED BY THE EMIIEF111. N LEFT LAKE CLOSUME SHALL BE USED FON ACCESS. UNLESS M ENGINEERED ROAD ACCESS TB DESISTED. SEE SID. 1101.02, SHEET S. 0 2 -LANE, 2 -WAY ROADS TM HAUL ROADS � 9 m BIDAIIO BUMP FOR 2 -L4ME. 2 -WAY rDA MYS IffiA® 1_x z ACCESS ea a SIOB SHOW FUR ONE APPROACH. � SAME SIGNINO APPLIES FOR LL W H POINT BOTH APPROACH DIRECTIONS e Z ca 0N.N B HAILL ROAD `W O mTRI O( a a a a J FK7%X MEN DIRECTED BY THE ENGINEER, TRAFFIC NAY BE STOPPED TO ALLp WORK vE11ICLE ACCESS uGE 7RE SAME BIONTMO PE TIT BARRICADES WHEN FOR NAIL ROADS AS GIOIT IN INS ADJACENT DETAIL. OAD 18 NOT BEING USED m = 009 G) GENERAL NOTES M N T 1 -IMEOR SIGNS ON BOTH LEFT AND RIGHT SIDES ON DIVIDED ROADMAYS. SIGNS ARE REQUIRED ONLY ON THE RIGHT SIDE OF THE ROADWAY FOR J Z Y QWW7 0 w URDIVIDED MONISM. LM M 2 -PP04M MINIMUM STOPPING SIGHT DISTANCE FOR EACH FLAOOER LOCATION. LEGEND 3-REFER 70 810. 1101.11 SHEETS 2 L 4 FOR STOPPING BIGHT DISTANCE AND SIGN SPACING. ■ ■ PORTABLE CONCRETE BARRIER TEMPORARY CASH CUSHION 4 -UPON COMPLETtON Of EACH HALING OPERATION, REPAIR, SWEEP, AND RESTORE THE ROADWAY TO BE SAFELY TRAVERSABLE AT NOMIAL • DRUM OPERATING SPEEDS. F- STATIONARY a= S- 'BUMP' SIGNS (23-1) ARE REQUIRED ONLY IF A BUMP OVER THE ROADWAY EXISTS AS A RESULT OF IMPLENWIMO THE HAUL ROAD. USE FLAGGERS IQ POTABLE SIGH AT ALL TIMES TO STOP TRAFFIC WREN BUMS ARE LOCATED ACROSS THE ROADWAY. CONSTRUCT BUMPS TO PROVIDE A SMOOTH TRANSITION FOR EET 1 OF 1 f FLA60ER TRAFFIC CROSSING THEN REMOVE BUMPS PRIOR TO ALLOWING TRAFFIC TO RESUME NORMAL OPERATING SPEEDS ` DIRECTION OF TRAFFIC FLOW 8 -SHER NOT SPECIFIED IN IRE PLANS OR BY THE ENGINEER. PAYMENT FOR CONVENIENCE RILL NOT BE MADE. SHEET 1 CE 1 1 1 01 . AC 1 1 01 . 0 O POSTED SPEED LIMIT (MPH) vm ® O STO DWG 110111 5 35 :. ... .. ... 40 -50 950 850 TM=me => FLASHING ARROW PANELS 0m 0-1 .. ......... ' CONTROLLED ACCESS ) ROADS ( 2 88 1000 1600 = DDOD o GENERAL NOTES Z-ur71 FLAGGERS 00°'1 1 -USE THIS STANDARD DRAMING IN CONJUNCTION WITH OTHER TRAFFIC CONTROL ROADWAY D STANDARD DRAWINGS WIDE SIGN SPACING DISTANCES A. B. C, ME SPECIFIED. �}� p 2 -APPLY THE ADVANCE WARNING SIGN SPACING CHART WERE A SERIES OF 2 OR MORE SIGNS ARE USED. ALL SIMI SPACING DINEMBION8 ARE APPROXIMATE. FIELD ADJUST Z AS VMI0LIS CODITIONS OCCUR, SUCH AS LIMITED SIGHT DISTANCE, OBSTRUCTION INTERFEEIMM, ETC. N D A Z M Z O M O O � w n x cc -'N O Z N 0 = r! cp O v r < v Nm0 N O TZn p M Z-1m TIT g 20 a r GO 1011 Ta n 0 I °o V CONSEC1lflVE SHWAS r D18TMC8 TO SRO SIGN Im NOR E.0­0% aa.Cwww_ ADVANCE WARNING SIGN SPACING CHART POSTED SPEED LIMIT (MPH) RECOOENDED DISTANCE BETWEEN SIGNS (FEET)* ® O STO DWG 110111 5 35 :. ... .. ... 40 -50 950 850 850 FLASHING ARROW PANELS ....... ........... .... • .. ......... ' CONTROLLED ACCESS ) ROADS ( 2 88 1000 1600 2700 r DISTANCE TO 2102 SION r DISTANCE TO 1ST SION kP/ T STATIONARY OR PORTABLE SIGNS m9Nm�.arflT_•onw1� m+•�R++NClm2 ISSUE_�DATE FOR REVIEW REF emm POINT 'ROJECT MANAGER K TREFZGER, PE G BLUE PROJECT NUMBER 010913 - 525957 Z oN 6 a �¢�YJ U. Lu i O F ti ¢-L'q O 0 N IL � M N 0 0 0 N W w J P'R Q W LL f Z Z M Z H Co Cc 0 W N p C } J Z Im O QFD- v ~ x N LL O IIZ 1116 Z U Q F N 1) TRAFFIC CONTROL PLANS (TCP) FOR THIS PROJECT CONSIST OF SEVERAL TYPICAL DRAWINGS AND STANDARDS SHOWING TRAFFIC CONTROL DEVICES TO BE USED WHERE VARIOUS TYPES OF CONSTRUCTION ACTIVITIES ARE OCCURRING ON THE PROJECT THESE DRAWINGS ARE FOR TYPICAL SITUATIONS AND SHOULD BE ADAPTED TO THE ACTUAL FIELD CONDITIONS WHICH EXIST DUE TO THE UNFORESEEN FIELD SITUATIONS, IT MAY BE IMPOSSIBLE TO ADAPT THE PRESCRIBED TYPICAL DRAWING OR STANDARD EXACTLY AS MOWN TO THE ACTUAL FIELD SITUATIONS THE CONTRACTOR, AT THE DIRECTION OF THE ENGINEER, SHALL MOVE, SUPPLEMENT, CHANGE, AND /OR REMOVE THE TRAFFIC CONTROL DEVICES ASSOCIATED WITH THESE TYPICAL DRAWINGS AND /OR STANDARD DRAWINGS TO ENSURE THAT THE MOTORIST CAN PASS THROUGH THE CONSTRUCTION AREA IN A SAFE AND EFFICIENT MANNER 2) CONSTRUCTION PHASING MAY DICTATE THAT TWO OR MORE TYPICAL DRAWINGS OR STANDARDS BE USED IN ONE AREA OF CONSTRUCTION, CHANNELIZING DEVICES ASSOCIATED WITH THESE TYPICALS SHALL BE MOVED. SUPPLEMENTED, CHANGED, OR REMOVED AS REQUIRED BY THE CONSTRUCTION PHASING OF THE PLANS THE LOCATION AND POSITIONING OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER TO ENSURE THAT THE MOTORIST DOES NOT RECEIVE FALSE INFORMATION WHEN TWO OR MORE TYPICALS AND /OR ROADWAY STANDARD DRAWINGS OVERLAP 3) OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS THESE ARE NORMALLY USED FOR SHORT -TERM OPERATIONS TO WARN AND GUIDE TRAFFIC THROUGH OR AROUND CONSTRUCTION AREAS WITHIN A CONSTRUCTION ZONE OPERATIONAL SIGNS SHALL BE INSTALLED PRIOR TO THE START OF OPERATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER SIGNS SHALL BE MAINTAINED IN PROPER POSITION AND KEPT CLEAN AND LEGIBLE AT ALL TIMES IF NEED BE, THEY SHALL BE BALLASTED OR WEIGHTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTIONS THEY SHALL BE REMOVED WHEN NOT APPLICABLE 4) THE CONTRACTOR SHALL MARK ALL HAZARDS WITH IN THE LIMITS OF THE PROJECT WITH WELL- MAINTAINED SIGNS. BARRICADES, WARNING AND /OR CHANNELIZING DEVICES ON CONNECTING ROADS. ALL BARRICADES. SIGNS, WARNING, AND /OR CHANNELIZING DEVICES SHALL BE MOVED, SUPPLEMENTED, CHANGED, OR REMOVED AS REQUIRED DURING THE PROGRESS OF CONSTRUCTION AS APPROVED BY THE ENGINEER 5) FLAGGERS' ATTIRE SHALL INCLUDE A FLUORESCENT ORANGE VEST, SHIRT, OR JACKET COMPLYING WITH ANSIASEA 107 CLASS 2, STEEL TOED BOOTS AND HARD HAT THE FLAGGER SHALL BE EQUIPPED WITH A STOP /SLOW PADDLE (SEE MUTCD, NCDOT STD 1150 01) FLAGGERS SHALL BE REWIRED TO UTILIZE HAND -HELD RADIOS FOR COMMUNICATIONS RED FLAGS WILL BE ACCEPTABLE IN LIEU OF THE PADDLE IN EMERGENCY SITUATIONS ONLY FLAGGERS, PROPERLY EQUIPPED AND INSTRUCTED, WILL BE PROVIDED BY THE CONTRACTORS AND STATIONED AT THE LOCATIONS SPECIFIED OR AS DIRECTED BY THE ENGINEER A FLUORESCENT ORANGE CAP MAY BE REQUIRED MORE THAN TWO FLAGGERS SHALL BE TRAINED AND PROVIDED TO ALLOW FOR COVERAGE DURING BREAKS AND LUNCH 6) THE CONTRACTOR SHALL BE REQUIRED TO FURNISH, INSTALL, RELOCATE, AND MAINTAIN ALL TRAFFIC CONTROL DEVICES, SIGNS, BARRICADES, WARNING AND /OR CHANNELIZING DEVICES FOR WORK SITES AND DETOUR ROUTES AS SHOWN IN TRAFFIC CONTROL PLANS UNLESS OTHERWISE SPECIFIED WITHIN THE TRAFFIC CONTROL PLANS 7) WORK ON THE PROJECT OR ANY SEPARATE ACTIVITY THEREIN SHALL NOT START UNTIL ALL OF THE REQUIRED SIGNS, BARRICADES. WARNING, AND /OR CHANNELIZING DEVICES ARE INSTALLED • BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIALS PLACED IN SUCH A POSITION THAT THEY 00 NOT BECOME MISSILES OR CAUSE UNREASONABLE DAMAGE IF HIT THE FOLLOWING ROADWAY STANDARDS THAT APPEAR IN - ROADWAY STANDARD DRAWINGS• ROADWAY DESIGN UNIT, N C DEPARTMENT OF TRANSPORTATION, RALEIGH, N C. DATED JULY 1995 AND THE LATEST REVISION THERETO ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS CAP $r r/ I,,N''�1E�HL,•aj�/ City of Raleigh Northshore Lake and Dam Rehabilitation NCDOT STANDARD DRAWING TO BE USED STD DWG 0101 WORK ZONE ADVANCE WARNING SIGNS STD DWG 110102 TEMPORARY LANE CLOSURES STO DWG 110111 TRAFFIC CONTROL DESIGN TABLES STD DWG 111001 STATIONARY WORK ZONE SIGNS STD OWG 11 10 02 PORTABLE WORK ZONE SIGNS STD DWG 11 15 01 FLASHING ARROW PANELS STD DWG 11 30 01 DRUMS STD DWG 11 35 01 CONES STD DWG 11 45 01 BARRICADES STD DWG 115001 FLAGGERS 8) THE PROJECT NOTES ARE NOT INTENDED TO BE USED AS GENERAL NOTES FOR THE PROJECT THEY ARE TO BE USED AT SPECIFIC LOCATIONS AS REQUIRED BY THE DETAILS OF THE TRAFFIC CONTROL PLANS 9) THE FOLLOWING LEGEND SHALL APPLY TO ALL TRAFFIC CONTROL SHEETS WITH THE EXCEPTION OF STANDARDS AND TYPICALS WHICH HAVE A LEGEND SHOWN ON THEM INDIVIDUALLY 10) THE CONTRACTOR MUST HAVE A MINIMUM OF TWO FLAGMEN PRESENT DURING ALL PERIODS OF CONSTRUCTION ACTIVITY TO ASSIST IN THE MOVEMENT OF TRAFFIC THROUGH THE WORK AREA ADDITIONAL FLAGMEN MAY BE REQUIRED AS DIRECTED BY THE ENGINEER OR NCDOT 11) ANY EXISTING PAVEMENT MARKINGS DETERMINED BY THE ENGINEER TO BE MISLEADING OR IN CONFLICT WITH THE TRAFFIC CONTROL PLAN SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR PRIOR TO PROCEEDING WITH ANY CONSTRUCTION ACTIVITY 12) ALL PAVEMENT MARKINGS APPLIED BY THE CONTRACTOR SHALL BE COMPLETELY REMOVABLE REFLECTIVE PAVEMENT MARKING TAPE MEETING PROJECT SPECIFICATIONS PAINT MAY BE USED IF CONDITIONS ARE UNSUITABLE FOR TAPE WHEN AUTHORIZED BY THE ENGINEER 13) THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC ON ALL PORTIONS OF THIS PROJECT UNLESS OTHERWISE SPECIFIED HEREIN, AND WILL BE REQUIRED TO PROVIDE PROPERTY OWNERS ACCESS TO THEIR PROPERTY THROUGHOUT THE PROJECT, INCLUDING INGRESS AND EGRESS FOR BUSINESSES 1 TRAFFIC CONTROL DEVICES SHALL BE LOCATED NO CLOSER THAN 5 FT TO A TRENCH AT EXISTING GRADE MEASURED FROM THE SIDE FACING TRAFFIC 2 CONTRACTOR SHOULD BE AWARE THAT WHEN THE CONSTRUCTION AREA IS IN OR NEAR A VERTICAL CREST OR HORIZONTAL CURVE, THE WORK AREA SHALL BE EXTENDED SO THAT LANE CLOSURE BEGINS IN ADVANCE OF THE CURVE AND MINIMUM STOPPING SIGHT DISTANCE 15 MET SEE STANDARD 110111 3 WHEN TRAFFIC PROCEEDS THROUGH OR ADJACENT TO CONSTRUCTION ACTIVITY OR A WORK ZONE, FLAGGER(S) AND FLAGGER SYMBOL SIGN(S (W20 -7A) SHALL BE USED AS REQUIRED TO SLOW ANO /OR STOP TRAFFIC AND DIRECT IT THROUGH THE WORK AREA SIGN W20 -7A SHALL NOT BE DISPLAYED EXCEPT WHEN FLAGGER IS PRESENT 4 THE CONTRACTOR SHALL NOT BE ALLOWED TO STOP TRAFFIC FOR MORE THAN 5 MINUTES AT A TIME IN ANY ONE DIRECTION 5 THE CONTRACTOR SHALL BE REQUIRED TO REPLACE ANY EXISTING PAVEMENT MARKINGS WHICH HAVE BEEN OBLITERATED BY CONSTRUCTION PROCEDURES AT THE END OF EACH DAYS OPERATIONS 6 IF A TRENCH OR A DIFFERENCE IN GRADE, GREATER THAN 1 FT NEEDS TO REMAIN OPEN OVERNIGHT A TEMPORARY CONCRETE MEDIAN BARRIER SHALL BE USED IN LIEU OF DRUMS AROUND THE WORK ZONE 7 INGRESS AND EGRESS SHALL BE MAINTAINED TO ALL BUSINESSES AND DWELLINGS AFFECTED BY THE PROJECT 8 ALL TRAVEL LANES SHALL REMAIN OPEN DURING PERIODS OF CONSTRUCTION INACTIVITY ArTRTIr YQIALLIDKNI9 Aro RIMER Y1•UC fAL4AT1E4 R1n1m9w 6WEWALNSANO I•NDICIIP RA•P8 AREro E COIISTItlIC1ED ON ALL sNEETa AT �ECFXD BYCm COOSTIESEFALMECHAHGEDIUTHOFV RBYI/R'.CRY RF N4FJRNMA SIWLBE RO X4TALLT]] 111AJJi3 A ONN TO BE WCOR EDP. TAPgRVAL PUNIC •NAIAViY SEER EAE]IFMB ARE ro N RECRT(OED PRgR TO FPY16 ACCEETAYaf. TRAFCM O TATWN SERVKX CONSERVATION ENRV ®l TIE CT' OF ARENA CON UM TO THE COINECnRN EXTENRION OF THE GAYS PAX1C BEWFA 9T9TEN A9 S.O..ON n93 PAK TIE WTEM_AND CR mmmTm SPECF" OFTHEEC PPURJCULUTILMES�0 BTANDARR9020 STY of RAAEroII PsucumREaOEPARrN®1r1EImT AUIHOIipAT.m ro COTL4RRUf.T TRAFFIC CONTROL DETAILS 0 1 • 2• FILENAME OOD -07 dgn SCALE NOT TO SCALE 0 0 0 0 fal MDR 01. N.e1G k- GMACMBOMB aTaN.emroRaelrml' _Rr.Ly�Renw ISSUE I DATE - NOT FOR SAFETY COMMENTS :D FOR REVIEW DESCRIPTION 0 GENERAL NOTES- 1 SEE SHEETS C -07 AND U -01 FOR ALL TOP OF WALL AND SLAB ELEVATIONS AND TABLE OF COORDINATES 2 WALLS DESIGNED FOR A 200 PSF VERTICAL SURCHARGE LOAD APPLIED ADJACENT TO THE SPILLWAY STRUCTURE 3 FOR LOCATION SEE CIVIL 4 WORK POINTS AT ALL INTERIOR CORNERS (TYP ) 5 BACKFILL OF WALLS SHALL NOT TAKE PLACE UNTIL ALL SLABS ARE COMPLETED AND ATTAIN 28 DAY STRENGTH BRING UP BACKFILL AT UNIFORM RATE ON EACH SIDE OF STRUCTURE - WALL & FTG '� ; •1 ,0" 'A- `1tO r CP KEY NOTES . --- 20 WALL CJ2 ` ` 37 +00 `�� o, 1 O VERTICAL SLOPE TRANSITION IN WP's ® ALL INTERIOR 36 +50 9p. �• SPILLWAY, SEE CIVIL DRAWINGS C -07 •O TMLPL FACE CORNERS �� C ( ) Cpi(.0 � F��`9,y N ` 2 O AND RETAININGI WALL FOOTING STEP t 5-01 G2 1111 �`` Illl WALL CJ4 � vs ^ LOCATIONS AND DROP DIMENSIONS MAY BE MODIFIED DURING CONSTRUCTION p6'. 36 +20 BY THE CITY'S EJ �i ,� ,� ' UPON APPROVAL & FTG 1._10" �� �2 S; p`� REPRESENTATIVE WALL FOOTING SHALL N 17 CJ Il �� REMAIN 1' -0" (MINIMUM), 4' -0" 18 2 ` TI SPILLWAY / ✓� //% / 111 / ION VER ICAL STEP S LAB ELEVATION E SHALL NOT EXCEED 4' Sp2 __-- ___ - -- Il / /�/ -;,� ' DIMENSIONS -0" ' w __ -- -�� ,- ' 3 O PROPOSED SHORELINE, SEE SHEET C -07 TOC FTG "� 1 /' 1 WALL CJ2 0 %� TOC FDN HP AND U -01 EL 254 00' \ .' J1C 5 -02 -� 3Q B',0. -- EL 25800' ,y0 O TRANSITION IN SPILLWAY SLAB THICKNESS, SEE SECTIONS TOC FTG iMgk� TOP OF FOUNDATION SLOPES, SEE P 501• (OPP) EL 25575' O (SIM) A O SHEETS C -07 AND U -01 �� J 13 31•, 5 -02 Z" O SEE SECTION "A" AND "A" (SIM) FOR WALL AND FOUNDATION DETAILS - - - - OO FOUNDATONUDETALSI A 53,'4 3 - - FOR WALL AND OSEE RETAINING WALL SCHEDULE, RW2. / FOR WALL AND FOUNDATION DETAILS O O SEE RETAINING WALL SCHEDULE, RW3, s ti FOR WALL AND FOUNDATION DETAILS °•-� 10 SEE RETAINING WALL SCHEDULE, RW4, FOR WALL AND FOUNDATION DETAILS it WEEP DRAINS IN SPILLWAY SLAB, SEE DETAILS 8 AND 12 ON S -02 (NOT SHOWN ON PLAN FOR CLARITY) ' p1 SEE SECT A FOR 12 TERMINATE AS SHOWN, AT 4" BAR REBAR DETAILS & SPACING MAX SPACING 13 ALL JOINTS TO RECEIVE WATERSTOP 'I" t11'LO S E00 O� 14 CHAIN LINK FENCE, SEE SHEET D -04 1 L' ER XN NN 01.Oy5 15 EDNG/UNRDRAJN (SEE DE JNOI? FON CJ1 SECT�C,85o 012) FULL DOWNSTREAM C9 Pt1O fit• LENGTH OF SPILLWAY OQ INDICATES SLAB SLOPE DIRECTION ^ 16 TOP OF FILL ASAME (SEE SHEET C -07 AND U -01) SLOPEUAT RATE AS FOUNDATION SLAB BEVEL TERMINATION EDGE AT A PLAN - NORTHSHORE CHANNEL LAP ONTO BARS SLOPE OF 1 HORIZ TO 3 PERT " (TMP) 17 CONSTRUCTION JOINT SIMILAR TO DETAIL SCALE 3/32 =1' -0" 2 ON S -05 �d 18 FOUNDATION DRAIN, SEE SECTION B, \ 2 PROJECT MANAGER K TREFZGER, PE P BLANDFORD, F H ANTSHEL, PE J POWERS NUMBER 10109 13-52595-018 1 CA ,20P'ESS1p;F\�y Q 'f t SEAL F 3 26320 j :(ni lug DETAIL FDN REINFORCING i1 NOT TO SCALE City of Raleigh Northshore Lake and Dam Rehabilitation MUTT MBYAl1ATNW AND OTER {VMBn FACILMES. BA%UMBO SOEWAUM AND RN01GP It 1 ARE W BE COOMITRUCTEO ON ALL SfREEfS AS SPeCFED BY CITY COME TESE PAOaRESIMMIM APPROVED BYTE CT'nF RAIEONANp BMALLBE EMBOTALLEM UNLESBACMATAE gAUTOIUEDSY WRTTIEN APMDVAL PUBLIC SAIBfARV SEWER EASEOENIS ARE TO BE RECOROEDNiORTOiBNI ACCEPTANCE TRAMSPC 1TAnM SERVO= COIASERVATWN EMMee°.ER _ TUBLIC SDP R 1FlO11 CONSFHOM M ONSI TgNA TERIAL NBONOPTEeRYa PUBLIC SEWER FOR TO As ROJEC IR T/B8 0 TIE O T EI OTANCAC0161RUCI0N iMTNMOB USED FOR TMSPRQEOSERAITI COES HANDBOOK THE eTAlON08AND SPEC6N'aTlpp OF TNe CTIY'B wean UTB1TES IIANMBn00 CTTYMPAIETGII PIAUC UTILITIES DEPARTMENT PEReeT e AURORRATONTOCONBTRUCT_ NORTHSHORE LAKE NORTHSHORE CHANNEL STRUCTURAL PLAN 0 i" 2" FILENAME OOS -01 dg. SCALE 3/32- 1' -0" c rn 0 n 0 I °o fi ■ 1 1/8 "0 SMOOTH BAR DWL x 2' -0' LONG 0 1' -0" OC, PROVIDE SLEEVE AND GREASE ONE END, MID rHK - TOC FDN TOC EJ PLAN SHOWN) (NO WALL WATERSTOP, REO'D) DETAIL , SCALE 1/2 " =1' -0" S -Ol ii ■ TOC WALL EL. 267 50' (EL 263 50' 0 'A' SIM 8708 (85012 0 SIM) 10 8708 DOWELS (85012 0 SIM) W/ STD END HOOKS AND EMBEDMENT APPROVED. EXCAVATED SUBGRADE, MOISTURE CONDITIONED AND COMPACTED AS BACKFILL (TYP), a SEE SPEC 02200 v 88012 � y TOC FDN M FTC STEP SEE PLAN VERTICAL WALL DRAINAGE SPECS) 1 85012 () LAP 85 HAIRPINS 0 12 CONT WS (SEE SPECS) 85 0 12. (UNO) Z-B RS TO MATCH WITH 90• 85012 VERTS & CIVIL SHEETS & SPECS) END HOOK c EA _ FACE WALL OWLS TO FTG STD HOOK c o Z r TOC FDN C SIM ° w � J EL SEE PLAN)/ J2 r ISSUED FOR REVIEW 85 0 12, BEND AS DESCRIPTION SHOWN 1010913-52595-0181 1 1/8 "0 SMOOTH BAR DWL x 2' -0' LONG 0 1' -0" OC, PROVIDE SLEEVE AND GREASE ONE END, MID rHK - TOC FDN TOC EJ PLAN SHOWN) (NO WALL WATERSTOP, REO'D) DETAIL , SCALE 1/2 " =1' -0" S -Ol ii ■ TOC WALL EL. 267 50' (EL 263 50' 0 'A' SIM 8708 (85012 0 SIM) 10 8708 DOWELS (85012 0 SIM) W/ STD END HOOKS AND EMBEDMENT APPROVED. EXCAVATED SUBGRADE, MOISTURE CONDITIONED AND COMPACTED AS BACKFILL (TYP), a SEE SPEC 02200 v 88012 � y TOC FDN SECTION D SCALE 3/8 " =1' -0' S -01 SEE PLAN FOR CHAIN LINK FENCE EXTENT TOC WALL EL VARIES (SEE SHEET C -07 AND U -01) 85012 (TYP) V2 (SEE SCH) FTC STEP SEE PLAN VERTICAL WALL DRAINAGE SPECS) 1 85012 () LAP CONT WS (SEE SPECS) CONT WS (SEE SPECS) 84 OWLS 0 4' -0" GRID (UNO) Z-B RS TO MATCH W /DRAINAGE GRAVEL (SEE UNDISTURBED CIVIL SHEETS & SPECS) FTG w � a STD HOOK L2 (SEE SCH) r TOC FDN DAM SAFETY COMMENTS EL SEE PLAN)/ J2 r ISSUED FOR REVIEW DESCRIPTION PROJECT NUMBER 1010913-52595-0181 1 ALL JOINTS TO RECEIVE WATERSTOP. O SEE GENERAL NOTE 5 ON 5 -01 urwnasuuwnaaswo ones wms cwsrtes .saws WALL ID ID 90' OR 1110' Z V1 D2 END HOOK o EXIST H7 H2 N UNDISTURBED 2 SEE SHEET S -01 AND 5 -02 FOR 2 3/4.0 SMOOTH SST BAR DWL z 2 - -0' O WECW W wearwnawaswe ro eE cacao as.0 smssn ws eaaaFeoer cnr spa1llwlIDlDaMAC1Ma0EUw UfiY wR1TTEa wswovK eusw swan.arse�aFw,EUV. WSEWCormmawaTO w AC vrw RWt SUBGRADE 85012 _MAX (Tf(1), Tf(2)) SECTION D SCALE 3/8 " =1' -0' S -01 SEE PLAN FOR CHAIN LINK FENCE EXTENT TOC WALL EL VARIES (SEE SHEET C -07 AND U -01) 85012 (TYP) V2 (SEE SCH) ONLY, SEE PLAN VERTICAL WALL DRAINAGE SPECS) 1 85012 () BOARD (SEE (TYP 0 RW 1 -RW4) CONT WS (SEE SPECS) CONT WS (SEE SPECS) 84 OWLS 0 4' -0" GRID FDN DRAIN 84012 EA WAY (SEE DET 1, S -01) W /DRAINAGE GRAVEL (SEE UNDISTURBED CIVIL SHEETS & SPECS) 3' COVER H2 (SEE SCH) L2 (SEE SCH) a TOC FDN DAM SAFETY COMMENTS EL SEE PLAN)/ LEAN CONC FILL 0 "A' (SIM) ISSUED FOR REVIEW SECTION A SCALE 3/8 " =1' -0" 5 -01 CONT DRAINAGE BOARD PER SPECS. INSTALL W /RIGID BACKER TO CONC WALL — PROVIDE 8" SO PIECE OF DRAINAGE BOARD MATERIAL ON BACK SIDE 0 WEEP DRAIN LOCATION, RIGID BACKER TOWARD WALL, SECURE W /APPROVED ADHESIVE—" GEOTEXTILE SIDE — CUT RIGID BACKER 0 WEEP DRAIN LOCATIONS. LEAVE GEOTEXTILE INTACT 3"0 SCH 40 PVC WEEP DRAIN TOC SLAB DETAIL NOT TO SCALE - SUBGRADE SEE PLAN SEE PLAN FOR CHAIN LINK FENCE EXTENT Ll (SEE SCH) V1 (SEE SCH) D2 (SEE SCH) D1 (SEE SCH) 3'0 PVC DRAINS 0 8' -0" OC -CONT STRIP TYPE WS (SEE SPECS) 85012 LOCATED IN TOP HALF OF SLAB SECTION SCALE 3/8' =1' -0' 5-01 0 z 0 TOC SLAB -WEEP DRAINS AS ' INDICATED -SEE SECT C FOR BEDDING /UNDERDRAIN -85 OWLS 0 12 W /90' END HOOKS & "FORM SAVER" COUPLERS O H1 (SEE SCH) INSIDE FACE OF WALL TYP SIZE & SPCG �• DISSIPATOR BLOCK TYP SIZE & SPCC 3 6 �J • `�{Qi 4 %yQl i 9 NOTE SEE SECTION "E" ON SHEET S -03 FOR ADD'L INFORMATION DETAIL — PLAN 3/8" =1, -0" S -Ot 0 6 TEAR -WEB WS 0 5" BELOW ' -0 TOG, CENTERED ON JOINT � 2 3" LAP D ° TYP roc SLAB 1z _ = SLOPE SLOPE EL VARIES ;m I I � J2 \ .I q V iV 7 85 0 12' w 190' \ \ END HOOKS, BEND EXIST UNDISTURBED AS SHOWN SUBGRADE 85 BENT 0 12 ", TRIM VERTICAL LEG FOR WS SECTION G SCALE 3/8 " =1' -0" 5 -01 6" TEAR -WEB WS 0 5" BELOW TOC, CENTERED ON JOINT 3 4" EJ z SEALED H 1' -0 2 n TOC SLAB (TMP) o .L VARIES SLOPE i ;o _I co ap 3 A_ I " I EXIST UNDISTURBED 4" HDPE WELL SUBGRADE SCREEN DRAIN TO FOUNDATION DRAIN 85 BENT 0 12", TRIM VERTICAL LEG FOR WS 1' -0" CUTOFF SECTION E SCALE 3/8 " =1' -0" S -Ot ■r ■C (FOOTING PROJECT MANAGER ONLY, SEE PLAN ,. S•!LG!! '�� - R�1`••: yam, City of Raleigh Northshore Lake and Dam Rehabilitation 1 P BLANDFORD, PE 84 OWLS 0 4' -0" GRID APPROVED, H ANTSHEL. PE SPCC W /STD 90• END UNDISTURBED J POWERS HOOKS, EMBED Ldh AS SUBGRADE MIN. SECTION A SCALE 3/8 " =1' -0" 5 -01 CONT DRAINAGE BOARD PER SPECS. INSTALL W /RIGID BACKER TO CONC WALL — PROVIDE 8" SO PIECE OF DRAINAGE BOARD MATERIAL ON BACK SIDE 0 WEEP DRAIN LOCATION, RIGID BACKER TOWARD WALL, SECURE W /APPROVED ADHESIVE—" GEOTEXTILE SIDE — CUT RIGID BACKER 0 WEEP DRAIN LOCATIONS. LEAVE GEOTEXTILE INTACT 3"0 SCH 40 PVC WEEP DRAIN TOC SLAB DETAIL NOT TO SCALE - SUBGRADE SEE PLAN SEE PLAN FOR CHAIN LINK FENCE EXTENT Ll (SEE SCH) V1 (SEE SCH) D2 (SEE SCH) D1 (SEE SCH) 3'0 PVC DRAINS 0 8' -0" OC -CONT STRIP TYPE WS (SEE SPECS) 85012 LOCATED IN TOP HALF OF SLAB SECTION SCALE 3/8' =1' -0' 5-01 0 z 0 TOC SLAB -WEEP DRAINS AS ' INDICATED -SEE SECT C FOR BEDDING /UNDERDRAIN -85 OWLS 0 12 W /90' END HOOKS & "FORM SAVER" COUPLERS O H1 (SEE SCH) INSIDE FACE OF WALL TYP SIZE & SPCG �• DISSIPATOR BLOCK TYP SIZE & SPCC 3 6 �J • `�{Qi 4 %yQl i 9 NOTE SEE SECTION "E" ON SHEET S -03 FOR ADD'L INFORMATION DETAIL — PLAN 3/8" =1, -0" S -Ot 0 6 TEAR -WEB WS 0 5" BELOW ' -0 TOG, CENTERED ON JOINT � 2 3" LAP D ° TYP roc SLAB 1z _ = SLOPE SLOPE EL VARIES ;m I I � J2 \ .I q V iV 7 85 0 12' w 190' \ \ END HOOKS, BEND EXIST UNDISTURBED AS SHOWN SUBGRADE 85 BENT 0 12 ", TRIM VERTICAL LEG FOR WS SECTION G SCALE 3/8 " =1' -0" 5 -01 6" TEAR -WEB WS 0 5" BELOW TOC, CENTERED ON JOINT 3 4" EJ z SEALED H 1' -0 2 n TOC SLAB (TMP) o .L VARIES SLOPE i ;o _I co ap 3 A_ I " I EXIST UNDISTURBED 4" HDPE WELL SUBGRADE SCREEN DRAIN TO FOUNDATION DRAIN 85 BENT 0 12", TRIM VERTICAL LEG FOR WS 1' -0" CUTOFF SECTION E SCALE 3/8 " =1' -0" S -Ot ■r ■C (FOOTING Im. MW E .0— ft%sm. QMACRm 06/2012 a ma�me...sr.mrIA - aesm: ISSUE I DATE nr. • • • urwerrer� smu PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE ,. S•!LG!! '�� - R�1`••: yam, City of Raleigh Northshore Lake and Dam Rehabilitation 1 P BLANDFORD, PE H ANTSHEL. PE GENERAL NOTES KEY NOTES. J POWERS RETAINING WALL SCHEDULE DAM SAFETY COMMENTS ISSUED FOR REVIEW DESCRIPTION PROJECT NUMBER 1010913-52595-0181 1 ALL JOINTS TO RECEIVE WATERSTOP. O SEE GENERAL NOTE 5 ON 5 -01 urwnasuuwnaaswo ones wms cwsrtes .saws WALL ID ID Tf 01 V1 D2 V2 Ll L2 H7 H2 NOTES 2 SEE SHEET S -01 AND 5 -02 FOR 2 3/4.0 SMOOTH SST BAR DWL z 2 - -0' O WECW W wearwnawaswe ro eE cacao as.0 smssn ws eaaaFeoer cnr spa1llwlIDlDaMAC1Ma0EUw UfiY wR1TTEa wswovK eusw swan.arse�aFw,EUV. WSEWCormmawaTO w AC vrw RWt 15" 85012 85012 8708 8708 85012 85012 86012 8608 STRUCTURAL NOTES AND DETAILS LONG 0 1' -0' OC, LOCATE MID mwMFoar.rwn 8BWCE THICKNESS OF SLAB 12" THICKENED Haut urnmes RW2 18" 87012 87012 8708 8708 8508 85012 86012 8708 EDGE AND CONTINUE INTO WALL FIGS masear ^nw..•,.s,:n RW3 24• 87012 87012 8708 8708 8508 85012 86012 8708 PROVIDE SLEEVE AND GREASE ONE END RW4 24' 87012 87012 8808 8808 8508 85012 8608 8808 O PROVIDE SINGLE LAYER 85 DOWELS 0 tee uevoc awseon caa�ns ro ras careecnaa wo F><rvuroa av rte titre wauc sEreasrsrew ns ®aa+m an resacux ne wtsww wm cwsrawreaa 72" W /90' END HOOK & "FORM SAVER" spr�� wa>�scnr Urenes arwowms wo COUPLER 0 SLAB MID THICK 0 8 "SIM" ary Op w Haut ummES oerw+Tevrt vwar a wna0emwnaa ro �cr Im. MW E .0— ft%sm. QMACRm 06/2012 a ma�me...sr.mrIA - aesm: ISSUE I DATE nr. • • • urwerrer� smu PRELIMINARY - NOT FOR CONSTRUCTION PROJECT MANAGER K TREFZGER, PE ,. S•!LG!! '�� - R�1`••: yam, City of Raleigh Northshore Lake and Dam Rehabilitation 1 P BLANDFORD, PE H ANTSHEL. PE J POWERS ISSUED FOR REVIEW DAM SAFETY COMMENTS ISSUED FOR REVIEW DESCRIPTION PROJECT NUMBER 1010913-52595-0181 NORTHSHORE LAKE STRUCTURAL SECTIONS 0 1 . 2' 17FILEENAMEOOS -02dgn SCALE AS NOTED c n 0 1 0 h MDR En0- 0%Nia. dDeCWW- SECTION 3/4• =1' -0• S -Ol MANAGER K TREFZGER, PE P BLANDFORD, PE H ANTSHEL. PE J POWERS NUMBER 010913 -52595 -018 O 12 (TYP)- 1 • -0• S�1C�!iir 177 ?9 City of Raleigh Northshore Lake and Dam Rehabilitation OCONCRETE ENERGY DISSIPATORS TO BE 1' -0• WIDE O ROUGHEN JOINT v r i �A. 8E mCEI Pu9UC UrW 8 Cpl¢ -ON ENCpEIII SEWER cam_:. _.1 EX _.+per SYSTD T C WRILLEIOH CO MSMT COPE MN EXTENSM WT�CJTYa PVBIIc SEWER avurm M NNDWN M TSS P T INM: • cCNSTRUCIWtI wE1M008 u P n PROJECT S CDNPO W THE WA/6U=MW SPECPGT d a THE fJTTS Pub Utah VANDB Gw CRT w a1lEmN PISIUCUTSRIESDEV� PER1ot. SUrMDtRAT TD cowaAliCP wrE NORTHSHORE LAKE STRUCTURAL SECTIONS 0 1 • 2• FILENAME OOS -03 dgn SCALE 3/4• = 1' -0• ID IC �W IA PREUMINARY — NOT FOR CONSTRUCTION 11/2012 ISSUED FOR REVIEW 06/2012 DAM SAFETY COMMENTS 06/2012 ISSUED FOR REVIEW ISSUE I DATE DESCRIPTION SECTION 3/4• =1' -0• S -Ol MANAGER K TREFZGER, PE P BLANDFORD, PE H ANTSHEL. PE J POWERS NUMBER 010913 -52595 -018 O 12 (TYP)- 1 • -0• S�1C�!iir 177 ?9 City of Raleigh Northshore Lake and Dam Rehabilitation OCONCRETE ENERGY DISSIPATORS TO BE 1' -0• WIDE O ROUGHEN JOINT v r i �A. 8E mCEI Pu9UC UrW 8 Cpl¢ -ON ENCpEIII SEWER cam_:. _.1 EX _.+per SYSTD T C WRILLEIOH CO MSMT COPE MN EXTENSM WT�CJTYa PVBIIc SEWER avurm M NNDWN M TSS P T INM: • cCNSTRUCIWtI wE1M008 u P n PROJECT S CDNPO W THE WA/6U=MW SPECPGT d a THE fJTTS Pub Utah VANDB Gw CRT w a1lEmN PISIUCUTSRIESDEV� PER1ot. SUrMDtRAT TD cowaAliCP wrE NORTHSHORE LAKE STRUCTURAL SECTIONS 0 1 • 2• FILENAME OOS -03 dgn SCALE 3/4• = 1' -0• ID IC �W IA a v I °o STRUCTURAL GENERAL NOTES G1 SCOPE THE NOTES ON THIS SHEET AND ALL THE STANDARD STRUCTURAL DETAILS ARE GENERAL AND APPLY TO THE ENTIRE PROJECT WHETHER SPECIFICALLY CALLED OUT OR NOT, UNLESS OTHERWISE SPECIFIED G2 APPLICABLE SPECIFICATIONS AND CODES 1 NORTH CAROLINA BUILDING CODE, 2006 EDITION (INTERNATIONAL BUILDING CODE 2003) 2 ACI 318 -02 3 ACI 350 -01 4 AISC ASO MANUAL, NINTH EDITION (1989) 5 AWS D1 1 -00, STRUCTURAL WELDING CODE - STEEL 6 AWS Di 3 -98 STRUCTURAL WELDING CODE - SHEET METAL G3 DESIGN CRITERIA 1 MINIMUM VERTICAL LIVE LOADS SEE INDIVIDUAL PLANS 2 WIND LOADS A BASIC WIND SPEED 95 MPH B WIND EXPOSURE C C WIND IMPORTANCE FACTOR (IW) 1 15 3 SEISMIC A SEISMIC USE GROUP III B SEISMIC IMPORTANCE FACTOR (IE) 1 25 C SPECTRAL RESPONSE ACCELERATIONS SS =O 208, S1 =0 081 D ASSUMED SITE CLASS D E SPECTRAL RESPONSE COEFF SOS =O 222. SDI =O 130 F SEISMIC DESIGN CATEGORY B G BASIC SEISMIC FORCE RESISTING SYSTEM CONCRETE BEARING WALLS H ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE 6 FUTURE LOADS UNLESS SPECIFICALLY NOTED, THERE ARE NO PROVISIONS MADE FOR FUTURE FLOOR. ROOF, OR OTHER LOADS G4 GE07ECHNICAL ENGINEERING REPORT 1 THE FOLLOWING GEOTECHNICAL ENGINEERING REPORT WAS DEVELOPED FOR THIS PROJECT 'PROPOSED IMPROVEMENTS TO THE NORTHSHORE LAKE DAM AND BRENTWOOD TODAY LAKE IN RALEIGH, NORTH CAROLINA" DEVELOPED BY TITAN ATLANTIC GROUP (TERRACON) REPORT No 70045018. DATED JULY 20, 2004 2 DESIGN SOIL BEARING CAPACITY A ALL STRUCTURES 3,000 PSF 5 ALTERNATE DIRECTION OF HOOKS HOOK OPTIONAL 4 -0" LAP SEE NOTE 3 SEE DRAWINGS FOR REINF SIZE AND LOCATION, TYP G5 SITEWORK /EXCAVATION 1 IF OPEN CUT EXCAVATIONS ARE PERFORMED, THEY SHALL BE SLOPED NO STEEPER THAN 1V 2H IF DOING THIS BRINGS THE TOP OF THE EXCAVATION SLOPE WITHIN 5 -FEET OF AN ADJACENT STRUCTURE OR UTILITY SUPPORTED ON SHALLOW FOUNDATIONS, THEN AN EXCAVATION SUPPORT SYSTEM WILL BE REQUIRED TO SAFEGUARD THE ADJACENT STRUCTURE 2 EXCAVATION SUPPORT SYSTEMS SHALL BE DESIGNED AND INSTALLED BY THE CONTRACTOR 3 FOR EXCAVATION REQUIREMENTS SEE SPECIFICATION 02200 4 ALL STRUCTURAL WALLS SHALL BE BACKFILLED WITH MATERIAL AND PLACED IN CONTROLLED AND ADEQUATELY COMPACTED LIFTS PER SPECIFICATION 02200 G6 SAFETY SAFETY AND STRUCTURE STABILITY DURING CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR STRUCTURES HAVE BEEN DESIGNED TO RESIST THE DESIGN LIVE LOADS ONLY AS A COMPLETED STRUCTURE G7 OPENINGS OPENINGS FOR PIPES, DUCTS, CONDUITS, ETC ARE NOT ALL SHOWN ON THE STRUCTURAL DRAWINGS PROVIDE THESE OPENINGS IN ACCORDANCE WITH THE OTHER CONTRACT DRAWINGS REINFORCEMENT AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE SHOWN G8 SPECIAL INSPECTIONS SPECIAL INSPECTIONS ARE REQUIRED IN ACCORDANCE WITH BUILDING CODE SECTION 108 AND CHAPTER 17 SEE THE "STATEMENT OF SPECIAL INSPECTIONS" FOR REQUIREMENTS G9 STANDARD DETAILS THE STANDARD DETAILS DEPICT TYPICAL DETAILING TO BE USED ON THIS PROJECT IF CONDITIONS ARE NOT EXPLICITLY SHOWN ON THE DRAWINGS THEY SHALL BE MADE SIMILAR TO THE STANDARD DETAILS OBTAIN ENGINEER APPROVAL IN WRITING FOR SIMILAR CONDITIONS PRIOR TO CONSTRUCTION G10 CONFLICTS IF THERE ARE CONFLICTS BETWEEN CONTRACT DRAWINGS AND SPECIFICATIONS, THE MORE STRINGENT INTERPRETATION SHALL CONTROL NOTE" t ALL HOOKS SHALL BE STD 90 DEGREE HOOKS 3 OPTIONA LAP LOCATION APPLIES TO BOTH DOUBLE AND SINGLE LAYER CONDITIONS TYP 2 SEE DRAWINGS FOR ADDITIONAL HORIZONTAL BARS STAGGER BETWEEN TYPICAL REINF SPACING, EXTEND TO 1/5 OF DISTANCE TO NEAREST ADJACENT WALL IN EACH DIRECTION. LINO TYPICAL WALL REINFORCEMENT AT CORNERS & INTERSECTIONS i1 NTS - FaR POR1'AIEh_d. ,laC A ThOnNI?An 1V RdRdAn RC rM2 CONCRETE C1 DESIGN PROPERTIES fc' = 2500 PSI LEAN CONCRETE) fc' = 4500 PSI ALL OTHER REINFORCED CAST -IN -PLACE CONCRETE) Fy = 60,000 PSI C2 CONCRETE COVER, UNLESS OTHERWISE NOTED, PROVIDE CONCRETE COVER FOR REINFORCING AS FOLLOWS CONCRETE DEPOSITED AGAINST EARTH 3" UNDER WATERSTOPS (WALL TO SLAB) 3" ALL OTHER 2' SEE DRAWINGS FOR EXCEPTIONS C3 SEE SPECIFICATIONS FOR REINFORCING PLACEMENT REQUIREMENTS C4 REFER TO OTHER DISCIPLINE DRAWINGS PRIOR TO CONSTRUCTION FOR EMBEDDED ITEMS AND PENETRATIONS NOT SHOWN ON STRUCTURAL DRAWINGS C5 PROVIDE 3/4" CHAMFERS AT ALL EXPOSED EDGES AND 1/2" CHAMFERS AT JOINTS AS SHOWN NOT ALL CHAMFERS MAY BE SHOWN ON DRAWINGS C6 FIELD ADJUST REINFORCING AT OPENINGS AND EMBEDDED ITEMS AS SPECIFIED OR AS REQUIRED C7 ANCHOR BOLTS NOT SPECIFIED BY ENGINEER SHALL BE DESIGNED BY CONTRACTOR IN ACCORDANCE WITH APPLICABLE PROJECT CODE REQUIREMENTS COORDINATE LOCATION, SIZE AND EMBEDMENT PRIOR TO CASTING CONCRETE C8 CONTINUOUS WATERSTOP SHALL BE INSTALLED IN ALL JOINTS SUBJECT TO STATIC WATER PRESSURE C9 ABSOLUTELY NO WELDING OF REINFORCING BARS OR TORCHING TO BEND REINFORCING BARS SHALL BE ALLOWED WITHOUT WRITTEN SPECIFIC APPROVAL FROM THE STRUCTURAL ENGINEER CIO FOR ADDITIONAL CONCRETE NOT SHOWN ON STRUCTURAL DRAWINGS SEE CIVIL DRAWINGS STEEL S1 STRUCTURAL STEEL DESIGN PROPERTIES WIDE FLANGE AND TEES Fy =50 KSI PIPES Fy =35 KSI STAINLESS STEEL Fy =33 KSI HSS SECTIONS Fy =42 KSI ALL OTHER PLATES AND SHAPES Fy =36 KSI S2 DIMENSIONS TO CENTERLINES OF COLUMNS AND BEAMS, TOP SURFACES OF BEAMS AND TUBES AND BACKS OF CHANNELS AND ANGLES UNLESS NOTED OTHERWISE S3 ELEVATIONS REFER TO TOP SURFACE OF MEMBER OR FLANGE UNLESS NOTED OTHERWISE S4 UNLESS OTHERWISE NOTED, BOLTED BEAM CONNECTIONS SHALL BE SIMPLE FRAMED SHEAR CONNECTIONS BOLTED STEEL CONNECTIONS SHALL BE IN ACCORDANCE WITH THE AISC MANUAL OF STEEL CONSTRUCTION LATEST EDITION USING ASTM A325 GALVANIZED BOLTS USE ASTM A593 FOR STAINLESS STEEL CONNECTIONS WHERE REQUIRED ALL BOLTED STRUCTURAL CONNECTIONS SHALL BE BEARING TYPE CONNECTIONS UNLESS OTHERWISE INDICATED TO BE SLIP - CRITICAL S5 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, CONNECTIONS SHALL BE DESIGNED FOR THE REACTIONS, AXIAL LOADS, AND MOMENTS AS PER THE FOLLOWING CRITERIA 1 WHERE BEAM REACTIONS ARE NOT SHOWN, BEAM CONNECTIONS SHALL BE DESIGNED TO 50 PERCENT OF THE TOTAL UNIFORM LOAD CAPACITY OF THE LATERALLY- BRACED BEAM 2 CONNECTIONS SHALL BE DESIGNED FOR AXIAL LOADS WHERE INDICATED THUS ( +- 60) AS KIPS, ( +) INDICATES TENSION IN MEMBER AND ( -) INDICATES COMPRESSION 3 MOMENT CONNECTIONS (MC) SHALL BE DESIGNED FOR THE MOMENT INDICATED ON THE DRAWINGS IN FOOT -KIPS WHERE MOMENTS ARE NOT SHOWN, CONNECTIONS SHALL BE DESIGNED TO DEVELOP THE ALLOWABLE FLEXURAL STRENGTH OF THE SMALLER MEMBER 4 UNLESS OTHERWISE NOTED, BRACING MEMBER CONNECTIONS SHALL BE DESIGNED FOR THE MAXIMUM ALLOWABLE CAPACITY OF THE MEMBER S6 WHEN FILLET WELD SIZE IS NOT INDICATED, PROVIDE MAXIMUM WELD SIZE IN ACCORDANCE WITH AISC SPECIFICATIONS S7 GROUT UNDER COLUMN /POST BASE SHALL NOT EXTEND ABOVE BOTTOM OF BASE PLATE CHAMFER GROUT AT 45 DEGREES NOTES. 1 PROVIDE ADDITIONAL REINFORCING THE SAME SIZE AS DISCONTINUOUS REINFORCEMENT AT OPENING QUANTITY OF REINFORCING IN EACH DIRECTION SHALL BE EQUAL TO OR ONE GREATER THAN THE NUMBER OF DISCONTINUOUS BARS PLACE 1/2 OF ADDITIONAL REINFORCING BARS EACH SIDE OF OPENING PLACE ADDITIONAL REINFORCEMENT AT 3" OC (TYPICAL BOTH DIRECTIONS AND ALL LAYERS OF REINFORCEMENT) START FIRST BAR 2" CLEAR TO OPENING 2 EXTEND ADDITIONAL REINFORCING BEYOND EDGE OF OPENING AS SHOWN ABOVE ADDITIONAL BARS MAY TERMINATE AT THE END OF THE WALL WITH A STANDARD HOOK WHERE THE LENGTH OF THE WALL WILL NOT PERMIT BARS TO EXTEND AS SHOWN ABOVE 3 TYPICAL WALL OR SLAB REINFORCING NOT COMPLETELY SHOWN FOR CLARITY TERMINATE TYPICAL REINFORCING 2" CLEAR TO OPENING WITH STANDARD 90- HOOKS 4 OPENINGS 12" OR LESS IN SLABS AND OPENINGS 18" OR LESS IN WALLS, NO EXTRA REBARS ARE REQUIRED UNLESS SHOWN OTHERWISE TYPICAL REINFORCING SHALL BE RESPACED (NOT CUT) TO ALLOW FOR OPENINGS TO BE MADE 5 UNLESS SHOWN OTHERWISE ON DRAWINGS, PROVIDE EXTRA REINFORCING AROUND OPENINGS AS SHOWN AND INDICATED ABOVE 6 PROVIDE ADDITIONAL DOWELS PER NOTE t ABOVE FOR ALL OPENINGS NEAR THE FLOOR SLAB, BASE SLAB, OR CORNERS FOR CONSTRUCTION 12 DAM SAFETY COMMENTS 12 ISSUED FOR REVIEW DATE REINFORCING AROUND OPENINGS i21 NOT TO SCALE — MANAGER SYMM ABOUT 2 - #5 X 4' -0" EACH SYMM ABOUT D CROWELL, PE P BLANDFORD, PE OPENING FACE (TYP 4 LOCATIONS) rt OPENING SEE NOTE 3 "'`' Z L/2 + W/2 I 0/2 + SEAL PERIMETER PVC WATERSTOP LAP LENGTH Rehabilitation ADDITIONAL REINF I LAP LENGTH W /WATER - SWELLING ® WALL JOINT Typ SEE NOTE t TYP SEALANT —� METAL T- LAP 6' MIN o SCALE I I FABRICATION (® INTERSECTION) o, !/FOOTING OR SLAB -'--- - - -I - --- ° - --- -- -- --- - - -- -- --SYMM ABOUT -- -- - -- ----- - - -- --- � � OPENING METAL WATERSTOP ® WALL BASE t SEAL SEE NOTE 3 , \w \wZ �JI1 i 1 SEE NOTE 3 PVC /METAL WATERSTOP ° INTERSECTION i31 s g I NTS — RECTANGULAR I OPENING DEFAIL CIRCULAR OPENING DETAIL NOTES. 1 PROVIDE ADDITIONAL REINFORCING THE SAME SIZE AS DISCONTINUOUS REINFORCEMENT AT OPENING QUANTITY OF REINFORCING IN EACH DIRECTION SHALL BE EQUAL TO OR ONE GREATER THAN THE NUMBER OF DISCONTINUOUS BARS PLACE 1/2 OF ADDITIONAL REINFORCING BARS EACH SIDE OF OPENING PLACE ADDITIONAL REINFORCEMENT AT 3" OC (TYPICAL BOTH DIRECTIONS AND ALL LAYERS OF REINFORCEMENT) START FIRST BAR 2" CLEAR TO OPENING 2 EXTEND ADDITIONAL REINFORCING BEYOND EDGE OF OPENING AS SHOWN ABOVE ADDITIONAL BARS MAY TERMINATE AT THE END OF THE WALL WITH A STANDARD HOOK WHERE THE LENGTH OF THE WALL WILL NOT PERMIT BARS TO EXTEND AS SHOWN ABOVE 3 TYPICAL WALL OR SLAB REINFORCING NOT COMPLETELY SHOWN FOR CLARITY TERMINATE TYPICAL REINFORCING 2" CLEAR TO OPENING WITH STANDARD 90- HOOKS 4 OPENINGS 12" OR LESS IN SLABS AND OPENINGS 18" OR LESS IN WALLS, NO EXTRA REBARS ARE REQUIRED UNLESS SHOWN OTHERWISE TYPICAL REINFORCING SHALL BE RESPACED (NOT CUT) TO ALLOW FOR OPENINGS TO BE MADE 5 UNLESS SHOWN OTHERWISE ON DRAWINGS, PROVIDE EXTRA REINFORCING AROUND OPENINGS AS SHOWN AND INDICATED ABOVE 6 PROVIDE ADDITIONAL DOWELS PER NOTE t ABOVE FOR ALL OPENINGS NEAR THE FLOOR SLAB, BASE SLAB, OR CORNERS FOR CONSTRUCTION 12 DAM SAFETY COMMENTS 12 ISSUED FOR REVIEW DATE REINFORCING AROUND OPENINGS i21 NOT TO SCALE — MANAGER K TREFZGER, PE , •" "" ;ZH C4R0�''•,, ; 2r4ir ESS �'iv _ = SEAL F S 20.320 STRUCTURAL DETAILS D CROWELL, PE P BLANDFORD, PE H ANSHEL, PE J POWERS "'`' Z t Lake and Dam PROJECT NUMBER 1010913 -52595 -018 HOOK ORIENTATION AS SPECIFIED ON STRUCT SECTIONS - (TYP) SLAB BOTT MAT REINF POSITION HOOKS AT SAME ELEV AS LOWEST BAR OF BOTT MAT WALL DOWEL HOOK LOCATION NTS — UTIITT BBTALUT AND OTHER PUBUIC FACUTIMA P UW8 BBIEWAM AND HANORM RAA89 ARE TG BE CONSTR11CTIMON ALL �AS 8PEaiVID BY OW 0o THIMEFALdfI@ MWBEENAPPFNVEDBFTI CWMRAlEl011A1D&U W 80 DBTAI E waEeS A OIWDEL4 AU� BY OMEN APPROVAL Pu BA ARVff e/SEEWM AIM V BE RECOIDED PRIOR TO F ACCEFrAAM TRANSPORTAT SERVICES _ Pu -- OONSERVATRRIENGI®t THE CITY OF RAIEEJN COTLSflRa TO TI@ co d'G mAND DaEN wTHEq PUBLIC SEW SrB1EY AS MOAA, M TNB PIAPI THE MTERW. AAO Gpt4TRUCTON ancAmma MP arv� un HMOroSGG�ic STArDAROSMD B'r �IBLC PI uR�R� GEPMTIE�Nf PERIBfA AJTHGRPAT TGcaNMT%XT_ H CAkn '•'• City of Raleigh STRUCTURAL DETAILS �c4°R s "W Northshore "'`' Z t Lake and Dam MARTIN "C•• Rehabilitation 0 1• 2' FILENAMC OOS -04 dg SCALE NONE I o` D 0 I °o REINFORCING SPACING CALLED OUT ON DRAWINGS ALTERNATE REBAR PROJECTION AS SHOWN, SPLICE LAP LENGTH � CONSTRUCTION JOINT STAGGERED REINFORCING (HORIZONTAL AND VERTICAL) AT CONSTRUCTION JOINT NTS T T/2 INTENTIONALLY ROUGHENED (Y4" AMPITUDE) HORIZ JOINT T /FOOTING •< OR SLAB • . e ; w ' • • Q O WATERSTOP PER SPECS u (WHERE INDICATED) TOP MAT h iv REBAR WALL SLAB CONSTRUCTION JOINT (CJ) NOT TO SCALE CONCRETE JOINT z H w u I ca0 u j °oz � J w J J Z * - o Q I t H - HW= COVER*. HOOK LENGTH HOOK WI 90' STD HOOK 180' STD HOOK BAR SIZE GRADE 60 HL I HW TL D "c =4000 psi OR GREATER Ldh #3 6" 3" 3" 2 1/4" 6" #4 8" 4" 4 1/2" 3" 7" #5 10" 5" 5" 3 3/4" 9" Q6 1'-0" 6" 6" 4 1/2" 10" #7 1' -2" 7" 7" 5 1/4" 12" a8 1' -4" 8" MOUNTING TO CONCRETE 6 14" b9 1' -7" 11 3/4" 1/2" 15" #10 1' -10" 1' -1 1 /4" q/2 3/4" 17" #11 2-0 1-2 3/412' 19" * COMPLYING WITH MINIMUM COVER REQUIREMENTS OF ACI 318. 12 5 3 OTHERWISE Ldh MUST BE RE- CALCULATED REINFORCING HOOK SCHEDULE n NTS FR ON Ensk -d g,k- am. C-0— I.SuW oMAI bMiR n.NCI 0 1 WATERSTOP LOCATED WET SIDE OF KEYWAY (CJ1 ONLY)-----\ KEYWAY CTD ON JOINT (SEE SPECS FOR KEY DIMENSIONS) CONSTRUCTION JOINT CJ1 & CJ2� NOT TO SCALE I - NOTE REBARS ALTERNATE AS SHOWN 1 APPLIES TO SLABS AND WALLS (BOTH HORIZONTAL AND VERTICAL) REINFORCING SPLICE WHEN NOT AT CJ NOT TO SCALE - LAP SPLICE pp AND EMDEDMENT LENGTHS I'c =4 5 ksi ty - 60 ks, BAR BARS SPACED GREATER THAN 4" BARS SPACED LESS THAN OR EQUAL TO 4" #3 14" 14" #4 19" 19" #5 24" 30" #6 29" 43" N7 46" 74" #8 60" 96" #9 76" 122" #10 97" 155" #11 120" 191" NOTES i PROVIDE MINIMUM LAP SPLICE LENGTHS AND EMBEDMENTS PER TABLE UNLESS NOTED OTHERWISE EMBEDMENT LENGTH EQUALS THE LAP SPLICE LENGTH UNLESS OTHERWISE NOTED 2 BAR SPACING AT LAP SPLICE IS THE MINIMUM CLEAR DISTANCE BETWEEN LAPPED BARS PLUS ONE BAR DIAMETER 3 ALL SPLICES TO BE CONTACT SPLICES AND WIRED TOGETHER UNLESS OTHERWISE APPROVED BY ENGINEER REINFORCING LAP AND EMBEDMENT SCHEDULE ,D NTS - PRELIMINARY - NOT FOR CONSTRUCTION PRI OJECT 06/2072 DAM SAFETY COMMENTS 06/2012 JISSUED FOR REVIEW ISSUE I DATE I DESCRIPTION MANAGER K TREFZGER, PE D CROWELL. PE P BLANDFORD, PE H ANSHEL, PE J POWERS PROJECT NUMBER 010913 -52595 -018 pa HAIRPENS 0 12 0 REQUIRE KEYWAY, CONSTRUCTION JOINT CJ3 NOT TO SCALE - (3/16 "x1" DEEP) SAWED OR FORMED CONTROL JOINT, FILL WITH SEALANT WATERSTOP CENTERED +WIRED rAT JOINT (WHERE INDICATED) INTERRUPT 2/3 OF -- REINFORCING PASSING THRU JOINT, ALL MATS I ONLY WATER BEARING SLABS OR WALLS REQUIRE WATERSTOP, SEE SECTIONS 2 JOINT MAY BE FORMED WITH 1/2" CHAMFER STRIPS BACK -TO -BACK AT WALLS, CONTRACTOR'S OPTION CONTROL JOINT (CLJ) � NTS I - ILK W ur NSTRUCTION JOINT D KEYWAY CONSTRUCTION JOINT CJ4r4--� NOT TO SCALE I - WATER FLOW 3" 0 PVC PIPE WEEP DRAINS. DIRECTION C5 EXTEND 2" MIN INTO DRAINAGE o STONE n 1/4" x 1/4" SST SCREENING, SECURE W /SST BAND CLAMP 30' 1 45' SEE SECT C ON S-02 FOR BEDDING /UNDERDRAIN EXST SUBGRAOE OR COMPACTED FILL TYPICAL SLAB WEEPDRAIN i1 NTS VERTICAL POST OR LADDER RAIL I ;,6 bf�SSlp4,q�l�:; � I I i 8" LONG Northshore I SOLID ROD ' 1 ` I "'�' :7%P/t.,S�.(a (TIGHT FIT) �2'� •"'F•''Y.�,,YFiP'f tiU�� FTH E• 5�4�`` M I-:f ��J�• M�k ;N Rehabilitation u i EDGE u I CONCREOF TE i PIPE TO t t /a" TYPICAL P I PLATE p I 0 o BASE PLATE -�}- ' u T I w ROD TO PLATE HOLE FOR TYPICAL VERTICAL POST FASTENERS BASE PLATE FOR MOUNTING TO CONCRETE ALUMINUM VERTICAL POST BASE ,2 NTS gRp City of Raleigh ;,6 bf�SSlp4,q�l�:; Northshore SEAL _>t 20320 ` ' 1 ` I "'�' :7%P/t.,S�.(a Lake and Dam �2'� •"'F•''Y.�,,YFiP'f tiU�� FTH E• 5�4�`` M I-:f ��J�• M�k ;N Rehabilitation ururr P4TALLATIdl4ANOOTNER POSl1C PAQ11@S. PNSOOWO AND llANOxaP RAws ARE To eE CO1aTRIA:IED GN ALL STREETS AB SPECF ®er ary BD Yl4: FlNE49ACHl��OEa N/f110R��BYNRIfTEN�APP PPuwx sAMARr rrEwwER EASEN ARE TO eE RECORDED PRm W PSNLAGCEPfN1CF" TRANSP AT SEWOM - C01 MATION PuY TIE pryaF RALEx'+i COrI5ENT4 TOTI@ WMEGI1011 AND EXTEN810N W M CT PU&IC D_vlFlt BYSIEII A861mWN ON TNPI PIAII THE WIEliI11L Alm OONSTRIICTION 1@TIIpO9 USED iLR ffiEC6IG,IONS O THG PS R IID ISIIG NVpW TO H SANDAIM AND N�MSOOK OFPARTIENTPEIOYTJ_ STANDARD STRUCTURAL DETAIL 0 1 ^ 2" FILENAME OOS -05 d9n SCALE NOT TO SCALE ■■J ■M mom IN w