Loading...
HomeMy WebLinkAbout20050732 Ver 44_Stormwater Info Ph 12_20180926�M�I�vt&cREED TO NCDENR — Division of Water Resources 401 & Buffer Permitting Unit 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 ATTENTION: Ms. Karen Higgins LETTER OF TRANSMITTAL DATE: September 25, 2018 PROJECT NO: 2735-0231 TASK NO: REIMB RE: Briar Chapel — Phase 12 TRANSMITTAL NO: 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg Rev. Description Status No. Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks REMARKS: Ms. Higgins, Please find the enclosed documents for your review and approval. Please let us know if you have any questions or comments. Thank you. Cc: 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919/233-8091 Fax 919/233-8031 McKIM & CREED, INC. Signed Gareth Avant, PE vMCKIM&CREED ENGINEERS S U R V E Y O R S P L A N N E R S September 25, 2018 Ms. Karen Higgins 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 RE: Briar Chapel — Phase 12 Ms. Higgins, Please find enclosed the plans, caclulations, supplement forms and operation and maintenance agreements for Phase 12 at Briar Chapel. This letter is to formally request approval of the stormwater management plan for the enclosed plans in accordance with Water Quality Certification as issued by the Division of Water Resources on February 3, 2017. Please let me know if you have any questions on this. Thank you for your assistance. Sincerely, McKIM & CREED, INC. Venture IV Building ear of awn Suite 500 Gareth Avant, PE Project Engineer 1730 Varsity Drive Raleigh, NC 27606 919.233.8091 Fax 919.233.8031 www.mckimcreed.com �>>�I I1111TIff��, W O r 0 W < srnyG WCDw C] I w n) 1460 Co: > o _ m o a = W 3 -0 O W �D 7oN T�Co 0 O W W 21 0 FD- ° 3 O W .3w (n 0' A7 CD O o' C O. = W (D N N= Q 7 IDa w�(Q om m (wn o o w (=D c 3 _o p3j m == W D w m W cwiow o m W o oom C-,) c�a� N (Q' o_ W� m 0 � W 6 -. 3 (n D W (D o w W o� a �' 30� �?2 N CD H, O :T a W N = A7 03 W W C o. o0. mom 3 = m 3 y, Z W CL o . o ° m 0 3 (n n m a o (n 5 c m a T (n 0 3 W o 6 cD CD N O = .r n � W O = o N w CD 3 = ' b .=1� N.a O 3 N o w 3 C ao W a O o (n s w _ (o (D a o (D 7 R (A W m m 0 p z 3c w o co CD U) W c m oaa °i. a N N Xw o W R Z w n w w W. O E CD w -c 3 S w w C) 3 WZ (n Q T � N `� < 3 C) � m 0 < a QCD c� p �. O o 3 0 0 I j I t I I� r � A) o 6 N a g .0W� z `° a IN IW i� � To o a� 'w' N w mo o z Iw su u -o cn' CW = W CL � o tr m Im n 8 � a CD I I � w N I m I I i I I 0 W O r 0 W < U) WCDw W o 00 W m o {� cn w m o a = W 3 -0 O W �D 7oN T�Co 0 Q -nO N - o G CQ= < w o W - C CD (D C) 3(D CD W W = = 3 = a C Al (D W I � 1 I R f I I � I � i I o' I � I � E �I O i 7 CL M CCD N N C r m m z 74 m N TI 0 0 m m v m c�3- WET POND Briar Chapel Phase 12 THE DRAINAGE AREA 0 1 Drainage area number 2 (BMP #39) Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) sf - Parking / driveway (sq ft) Total surface water area (sq ft) sf - Sidewalk (sq ft) 14370 sf Total drainage area (sq ft) 491610 at - Roof (sq ft) 191400 at BUA associated with existing development (sq ft) sf - Roadway (sq ft) 59257 sf Proposed new BUA (sq ft) 285678 sf - Other, please specify in the comment box below (sq ft) 20651 sf Percent BUA of drainage area 58% ITotal BUA (sq ft) 285678 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM IDesign rainfall depth (in) 1.0 in Stormwater program(s) that apply (please specify): IDesign rainfall depth (in) 1.0 in 19021 ct GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Minimum volume required (cu ft) Design volume of SCM (cu ft) 23474 cf 24345 of GENERAL MDC FROM 02H.1050 #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #12 Is there an O&M Plan that complies with General MDC (12)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 W hat is the method for dewatering the SCM for maintenance? Pump (preferred) #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SADA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 11382 sf #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 33922 of #6 Elevation of top of shelf (fmsl) 452 ft #2 Average depth of the main pool (feet) 3.0 #6 Elevation of bottom of shelf (fmsl) 451 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 446.5 ft #7 Diameter of drawdown orifice (inches) 2.5 in #2 Elevation of the top of the permanent pool (fmsl) 451.5 ft #7 Drawdown time for the temporary pool (hours) 59 hrs #2 Elevation of the top of the temporary pool (fmsl) 453 ft #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #5 Volume of the forebay (cubic feet) #9 If yes, is documentation provided per Wet Pond MDC (9)? #11 Are the dam and embankment planted in non -clumping turf grass? Berm has been provided between forebay and permanent pool to promote a longer flow path than without #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 6148.5 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment 18 in Yes 18 in Yes #5 Depth of forebay at entrance (inches) 40 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? 18 in Yes 18 in Yes Vegetated shelf is planted around the main pool with shallow water (sweetflag, pickerelweed, blue frag iris, soft rush, and three square bulrush) and shallow land (swap milkweed, cardinal flower, scarlet rose mallow, dwarf joe pye weed, spooled trumpetweed) plantings. Hybrid bermuda sod is planted on the berm between the forebay and main pond. ADDITIONAL INFORMATION Other BUA - 32,000 sq ft provided as additional contingency Please use this space to provide any additional information about this wet pond that you think is relevant to the review: Other BUA - 5,651 sq ft of open space and 15,000 sq ft provided as additional contingency THE DRAINAGE AREA Drainage area number 3 (BMP #40) Break down of BUA in the drainage area (both new and existing): Total coastal wetlands area (sq ft) sf - Parking / driveway (sq 1t) Total surface water area (sq ft) sf - Sidewalk (sq ft) 7598 at Total drainage area (sq ft) 493218 sf - Roof (sq ft) 133600 at BUA associated with exis9ng development (sq ft) at - Roadway (sq ft) 29508 sf Proposed new BUA (sq ft) 211288 sf - Other, please specify in the comment box below (sq ft) 32000 sf Percent BUA of drainage area 43.7% Total BUA (sq ft) 211288 at COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): IDesign rainfall depth (in) 1.0 in Minimumvolume required (cu ft) Design volume of SCM (cu 11) 17860 cf 19021 ct GENERAL MDC FROM 02H .1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) #13 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 #1 Method used SA/DA #6 Width of the vegetated shelf (feet) 6 ft #1 Surface area of the main permanent pool (square feet) 12603 at #6 Location of vegetated shelf @ Normal Pool #1 Volume of the main permanent pool (cubic feet) 37384 of #6 Elevation of top of shelf (fmsl) 504 ft #2 Average depth of the main pool (feet) 3 ft #6 Elevation of bottom of shelf (fmsl) 503 ft #2 Was the vegetated shelf included in the calculation of average depth? Yes #6 Slope of vegetated shelf (H:V) 6:1 #2 Elevation of the bottom of the permanent pool (fmsl) 498.0 #7 Diameter of drawdown orifice (inches) 2.5 in #2 Elevation of the top of the permanent pool (fmsl) 503.5 #7 Drawdown time for the temporary pool (hours) 56 hrs #2 Elevation of the top of the temporary pool (fmsl) 504.5 #7 Does the orifice drawdown from below the top surface of the permanent pool? Yes #3 Depth provided for sediment storage (inches) 6 in #8 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? Yes #4 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #9 Are fountains proposed? No #4 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #9 If yes, is documentation provided per Wet Pond MDC (9)? Berms between the forebay and main pool outlet to promote a longer flow path #10 Is a trash rack or other device provided to protect the outlet system? Yes #5 Volume of the forebay (cubic feet) 5976 #11 Are the dam and embankment planted in non -clumping turf grass? Yes #5 Is this 15-20% of the volume in the main pool? Yes #11 Species of turf that will be used on the dam and embankment #5 Depth of forebay at entrance (inches) 42 in #11 Describe the planting plan for the vegetated shelf: #5 Depth of forebay at exit (inches) #5 Does water flow out of the forebay in a non-erosive manner? #5 Clean-out depth for forebay (inches) #5 Will the forebay be cleaned out when the depth is reduced to less than the above? 18 in Yes 18 in Yes Vegetated shelf is planted around the main pool with shallow water (sweetflag, pickerelweed, blue frag iris, soft rush, and three square bulrush) and shallow land (swap milkweed, cardinal flower, scarlet rose mallow, dwarf joe pye weed, spooled trumpetweed) plantings. Hybrid bermuda sod is planted on the berm between the forebay and main pond. ADDITIONAL INFORMATION Please use this space to provide any additional information about this wet pond at you think is relevant to the review: Other BUA - 32,000 sq ft provided as additional contingency Wet Pond 2 8:41 AM 9/25/2018 STORMWATER WETLAND Briar Chapel Phase 12 THE DRAINAGE AREA Drainage area number Total coastal wetlands area (sq ft) Total surface water area (sq ft) 1 (BMP #38) Break down of BUA in the drainage area (both new and existing): Parking /driveway (sq ft) Sidewalk (sq ft) 1 8000 sf Total drainage area (sq ft) 74000 sf Roof (sq ft) 7200 sf BUA associated with existing development (sq ft) Roadway (sq ft) 28000 sf Proposed new BUA (sq ft) 47520 sf Other, please specify in the comment box below (sq ft) 4320 sf Percent BUA of drainage area 164% ITotal BUA (sq ft) 47520 sf COMPLIANCE WITH THE APPLICABLE STORMWATER PROGRAM Stormwater program(s) that apply (please specify): Design rainfall depth (in) 1.0 in Minimum volume required (cu ft) 3872 cf Design volume of SCM (cu ft) 3899 cf GENERAL MDC FROM 02H.1050 #1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes #7 If applicable, with the SCM be cleaned out after construction? Yes #2 Is the SCM located on or near contaminated soils? No #8 Does the mainetenance access comply with General MDC (8)? Yes #3 What are the side slopes of the SCM (H:V)? 3:1 #9 Does the drainage easement comply with General MDC (9)? Yes #3 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No #10 If the SCM is on a single family lot, does the plat comply with General MDC (10)? #4 Are the inlets, outlets, and receiving stream protected from erosion (10 -year storm)? Yes #11 Is there an O&M Agreement that complies with General MDC (11)? Yes #5 Is there a a bypass for flows in excess of the design flow? Yes #12 Is there an O&M Plan that complies with General MDC (12)? Yes #6 What is the method for dewatering the SCM for maintenance? Pump (preferred) #13 Was the SCM designed by an NC licensed professional? Yes STORMWATER WETLAND MDC FROM 02H.1054 #1 Permanent pool elevation (fmsl) 435.75 ft #8 Total surface area of the shallow water zone at temporary pool (square feet) 1368 sf #1 Temporary pool elevation (fmsl) 437 ft #8 SW wetland surface area comprised of shallow water zone at temporary pool (%) 35% #1 Ponding depth (inches) 15 in #8 Depth of the shallow water zone below permanent pool (inches) 12 in #2 Is the SW wetland designed for peak attenuation? Yes #8 Elevation of bottom of the shallow water zone (fmsl) 435 ft #2 If so, peak attenuation depth (inches) #9 Total surface area of the temporary inundation zone at temporary pool (square feet) 1620 sf #3 Surface area of SW wetland at temporary pool (square feet) 3810 sf #9 SW wetland surface area comprised of temp inundation zone at temp pool (%) 43% #4 Depth of soil amendment (inches) 12 in #9 Height of the temporary inundation zone above permanent pool (inches) 15 in #4 Describe how the soil is being amended to promote plant growth: #9 Elevation of bottom of the temporary inundation zone (fmsl) 435.75 ft #10 Drawdown time for the temporary pool (hours) #10 Does the orifice drawdown from below the top surface of the permanent pool? #11 Does the pond minimize impacts to the receiving channel from the 1 -yr, 24 -hr storm? 55 hrs Yes Yes #6 Are the inlet(s) and outlet located in a manner that avoids short-circuiting? Yes #12 Has a landscaping plan that meets SW Wetland MDC (12) been provided? Yes #6 Describe any measures, such as berms or baffles, that will be taken to improve the flow path: #13 Number of plants per 200 square feet (#) in the shallow water zone: 50 Internal grading for shallow land area is oriented in order to increase flow path through the wetland #6 Surface area of the forebay at temporary pool (square feet) #6 Overall SW wetland surface area comprised of forebay at temporary pool (%) 409 sf 11 #13 Describe the planting plan for the shallow water zone: 50 plants per 200 sf, plants chosen as outlined in C-4 of NCDEQ Stromwater Design Manual #6 Depth of forebay below permanent pool (inches) 24 in #14 Does planting for the temporary inundation zone comply with SW Wetland MDC (14)? Yes #6 Elevation of bottom of forebay (fmsl) 433.25 ft #14 Describe the planting plan for the temporary inundation zone: #6 Will the forebay be cleaned out when depth is reduced to 15 inches or less? #7 Total surface area of the non-forebay deep pools at temporary pool (square feet) Yes 384 sf 50 plants per 200 sf, plants chosen as outlined in C-4 of NCDEQ Stromwater Design Manual #7 SW wetland surface area comprised of non-forebay deep pools at temporary pool (%) 101/6 #15 Are the dam structure and temporary fill slopes planted in non -clumping turfgrass? Yes #7 Depth of non-forebay deep pools below permanent pool (inches) 24 in 1#16 Will cattails be planted in the wetland? No #7 Elevation of bottom of non-forebay deep pools (fmsl) 433.25 ft 1#17 Is a trash rack or other device provided to protect the outlet system? Yes ADDITIONAL INFORMATION Please use this space to provide any information about this stormwater wetland that you think is relevant to the review: Wetland 3 8:41 AM 9/25/2018 Operation & Maintenance Agreement Project Name: Project Location: Briar Chapel - Phase 12 Along Great Ridge Parkway, Pittsboro, NC Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: nding O&M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): be added automatical I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Lee Bowman Senior Project Manager, NNP -Briar Chapel, LLC 1342 Briar Chapel Parkway Chapel Hill, NC 27516 (919) 951-0700 (bowman@newlandco.com , a Notary Public for the State of , do hearby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, STO,RZ Version 1.4 Date: and My commission expires 9/25/2018 O&M manual Page 1 of 7 Stormwater Wetland Maintenance Requirements Important maintenance procedures: Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, it shall be inspected monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. Forebay Sediment has accumulated in Search for the source of the sediment and remedy the problem if the forebay to a depth that possible. Remove the sediment and dispose of it in a location where it inhibits the forebay from will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). STORM -EZ 9/25/2018 Version 1.4 O&M Manual Page 3 of 7 Stormwater Wetland Maintenance Requirements (Continued) Deep pool, shallow water Algal growth covers over 50% Consult a professional to remove and control the algal growth. and shallow land areas of the deep pool and shallow water areas. Cattails, phragmites or other Remove invasives by physical removal or by wiping them with invasive plants cover 50% of pesticide (do not spray) — consult a professional. the deep pool and shallow Shallow land remains flooded Unclog the outlet device immediately. more than 5 days after a storm event. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices Prune according to best professional practices. show that pruning is needed to maintain optimal plant Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth of will not cause impacts to streams or the BMP. Embankment A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by Make all needed repairs. appropriate professional shows that the embankment Evidence of muskrat or Consult a professional to remove muskrats or beavers. beaver activity is present. Micropool Sediment has accumulated Search for the source of the sediment and remedy the problem if and reduced the depth to 75% possible. Remove the sediment and dispose of it in a location where it of the original design depth. will not cause impacts to streams or the BMP. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM -EZ 9/25/2018 Version 1.4 O&M Manual Page 4 of 7 Wet Detention Pond Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM -EZ 9/25/2018 Version 1.4 O&M Manual Page 5 of 7 Wet Detention Pond Maintenance Requirements (Continued) The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM -EZ 9/25/2018 Version 1.4 O&M Manual Page 6 of 7 Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 1 - BMP #39 Permanent Pool EI. 451.5 Permanent Pool EI. 451.5 Temporary Pool EI: 453 Temporary Pool EI: 453 Pretreatment other No Clean Out Depth: 3 Clean Out Depth: 4.5 than forebay? Sediment Removal EI: 448.5 Sediment Removal EI: 447 Has Veg. Filter? No Bottom Elevation: 448 Bottom Elevation: 446.5 WET POND ID FOREBAY MAIN POND 2 - BMP #40 Permanent Pool EI. 503.5 Permanent Pool EI. 503.5 Temporary Pool EI: 504.5 Temporary Pool EI: 504.5 Pretreatment other No Clean Out Depth: 4.5 Clean Out Depth: 6.5 than forebay? Sediment Removal EI: 499 Sediment Removal EI: 497 Has Veg. Filter? No Bottom Elevation: 499.5 Bottom Elevation: 497.5 STORM -EZ 9/25/2018 Version 1.4 O&M Manual Page 7 of 7 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Phase 12 Chatham County, North Carolina September 18, 2018 Prepared for: BRIAR,%Z'CHAPEC by c MMUNITIES NNP Briar Chapel, LLC 1342 Briar Chapel Parkway Chapel Hill, North Carolina 27516 Prepared By: MCKIMF>CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 02735-0231 9 436348 PROJECT DESCRIPITON The purpose of the project is to construct water, sewer and roadway infrastructure to support 132 residential lots in the Phase 12 section of the overall Briar Chapel Development. Based on the conditions of the approved 401 Water Quality Certification, NCDENR-DWR will require runoff from the roads to be captured and treated for 85% TSS removal before being discharged into existing stream buffers. To meet this requirement, the runoff from the general area of Phase 12 construction will be directed to one of three stormwater devices designed per the latest version of NC DEQ's Minimum Design Criteria. Calculations for these new facilities are included in this package. Upon completion of the project's construction, the proposed public roads will be turned over to and maintained by NCDOT. SITE DESCRIPTION The project area is approximately 36 acres of disturbed area located west of Phase 13 (DWR# 05-0732 v40) within the BC North development area, which is located on the northern half of Great Ridge Parkway. The site slopes towards a stream located near the western edge of the project area, and drains, generally, to the west and into adjacent buffered streams. Slopes on the site range from 5% to greater than 20% in localized areas. SOILS According to the Chatham County Generalized Soil Survey, the soils located on the site are classified as Helena sandy loam, 6 to 10 percent slopes (HeC); Wedowee sandy loam, 2 to 15 percent slopes (WeB, WeD); and Wedowee sandy loam, 15 to 35 percent slopes, bouldery (WdC, WdE) The following soil descriptions are associated with the soils found on the site: Ch(X) - Chewacla fine -loamy soils are often found in piedmont uplands and coastal plains. Permeability is moderate and the soils are somewhat poorly drained. Soils have a low sink/swell potential. The seasonal high water is perched at a depth of 0.5 to 2.0 feet. Va(X) - Vance sandy loam soils are often found in the piedmont uplands on ridges and side slopes, from 2 to 25 percent slopes. Permeability is slow and the soils are well drained. Soils have a moderate sink/swell potential. The seasonal high water is below 6.0 feet. We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink/swell potential. The seasonal high water is generally more than 6.0 feet below the surface. Wd(X) - Wedowee sandy loam, bouldery soils carry the same characteristics of Wedowee We(X) soils, listed above, with the exception that large boulders are more commonly found. WET DETENTION DESIGN The wet detention ponds for this project have been designed to remove 85% of the total suspended solids entering from the surrounding drainage areas before discharging into the adjacent stream buffers. The calculations provided with this package include all projected future drainage areas that might be captured by the ponds. Treated runoff will be dissipated by a riprap outlet protection device before entering any stream buffers. Design parameters were taken from the BMP manual, DEQ's design supplement forms, and the latest version of NC DEQ's Minimum Design Criteria for stormwater Control Measures. STORMWATER WETLAND DESIGN The stormwater wetland on this site has been designed to remove 85% of the total suspended solids entering from the surrounding impervious drainage areas before discharging into the adjacent stream buffer. To obtain the goal of keeping the footprint as small as possible the temporary ponding depth for the design is 12". Any runoff exceeding the ponding depth will be discharged. The calculations provided with this package include all projected future drainage areas that might be captured by the pond. Treated runoff will be dissipated by a riprap outlet protection device before entering adjacent stream buffers. Design parameters were taken from the BMP manual, DEQ's design supplement forms, and the latest version of NC DEQ's Minimum Design Criteria for stormwater Control Measures. BMP SUMMARY OF RESULTS In order to meet the requirements of the development, two wet detention basins and one stormwater wetland have been designed based on an assumption of the full buildout condition of the site. A summary table is provided below and the supporting calculations have been included with this submittal. MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements included with this submittal. Any measure that fails to function as intended shall be repaired immediately. BMP #38 BMP #39 BMP #40 1 -yr 10 -yr 100 -yr 1 -yr 10 -yr 100 -yr 1 -yr 10 -yr 100 -yr Pre -Development Discharge cfs 1.32 4.62 9.00 4.39 16.07 31.62 4.64 16.99 33.39 Post -Development Controlled 1.27 4.29 10.10 4.25 16.04 33.63 4.41 15.36 50.91 Discharge cfs Peak Water Surface 437.39' 438.40' 438.80' 453.71' 455.60' 457.04' 504.91 ' 506.26' 507.23' Elevation ft MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements included with this submittal. Any measure that fails to function as intended shall be repaired immediately. Maps Soil Map—Chatham County, North Carolina F, F 670000 670200 670400 670600 670800 671000 350 50'52'N 8 8 5r rS 8 n 35o 49' 49" N 670000 670200 670400 670600 670800 671000 3 Map Scale: 1:9,440 f printed on A portrait (8.5" x 11") sheet. Meters N 0 100 200 400 600 Feet 0 450 900 1800 2700 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 671200 QD io 350 50'52" N g _8 _8 350 49'49" N 671400 3 F 671200 2/28/2017 Page 1 of 3 SaUI� • . • . r' A0 ;3)f.o, a qw l +4r- ����1 $9E0DW FEET 197DDW FEET 760000 FE ET Ta'�'y'r 79'7nOw rp�n'w r5'�9oW 780000 FEET -, �o'O-N ¢ �•� f � • � � � Ti v r � _ iO rP. � ! 3` 5Q0'N '•� � LL�11:. .� —.'fit. • :`i - .. �r • r 1 r-; .• - try ' : %!"' nr `7-� - • - r I '� arl�rly A.= �k,R e "+. Y j �"�"� ;:r.q�� {� ?fit'•, r°, �I�s} � ., �� ��`9rd�-'l�.v. �j• ', r; �'Nj•' �h[I �i=� 4'�''. •'L i'iJ �' .... � �• �Y y°�n,c, � � V k,&�c '+c 351980'H ".. f s- ' I r 7 ' S I Jim. _ • xy I : 1 : `i.1so.. a fi • ate. �. 4K 0. 1 N• a. { f 750OW FE ET 750000 FEET 7e•enw rer'=0„V T9•'Ip•w rn [ _ov. 1960000 FEC r +070000 FEE T -4 y.l.km Inw-nw R.1. wP IhRMI e-. raedac.d mown. ualM'. w pvmenn- [cone, tr- Moo ox laorm Gro--. r-tne Feder- Eme,oncy M-newe Agency IFERLAj. TM SM1e cr lleM Gmkn. A.e .ydMmenred a vayp term 4".h b M Pule --P—.w datt.Ha p. anglW min lMad�g TngbbmM+MrkW gm. ar-MY m.nMm-nt q mp M W M1rcFarn urea. al 110IxN N+W. AI ■ pPd N mq elMrtVrF51F11 W 'loon C-ronn. nmpined in a .-phg FIRM I—S-- FJM.pe.nero w.n F10 0 ­end mllnpinlM ngrk RRM FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR ZONED E5 C RtP IONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION AREALSO AVAILABLE IN DIGITAL FORMATAT Npr1Fl 1-1109 51.t. PIBne P - Feet (Zone 3100) HTTP:// FR IS. N C.G QV/ FR I S DAN NAD 1983{H—Full)eMAVD I RBe IV.rr,wy Base Flood Elevation [BFE7 -Without With BFEorOepthZ/ cnr An, AH, 'rF,AR SPECIALIFLOOD ® Regu "'Oryry Floodway HAZARD AREAS AREA Msmn FlRAtp n-osn Mena .ilea 0 Z50 500 1.000 — 0.2%Annual Chance Flood Hazard. Areas Feet of 1% Ann Lis I Chance Flood with Average Meters Depth Less Than One Foot or With Dra Inge 0 75 154 300 Areas of Less Th an One 5 qua re M Ile [ane x �-T--r — Future Conditions 1%Annual PANEL LOCATOR Chance Flood Hazard'•••� OTHER AREAS OF — Arya with Reduced Flood Risk due to Lsvee FLOOD HAZARD See Notes '::-: • ' OTHER Are Determined to be Dutside the AREAS . 0.245 Annual Chance Floodplain Channel, Culvert or Storm Sewer C-eAT-AM CODNir 370399 9TH R AAA_l,d„r_r, Accred ited or Provisional ly Accredited GENERAL Levee. Dike, orFloodwaII STRUCTURES 611"•.1.... Nan -accredited Levee, Dike,oTFloodwoll 11 SM5510x North Ca roil noGeodetl06urveybench mark 1y.ieemarinu-d-rce-Ie.rl.nd Emergency Aeuon Nan,mJn lrve ayanmlal .lnxnaa pprAl'prwF�dlbrl. BMa5101y Natio naIGeodetleSurvey benchmark rN5 Blf•6 .A BM55100 Contractor Est. NCFMP Survey bench mark OI %a— C rocs Secti ails with f% A ruroo l Chance pWbn VN Wj Ka -IM FENM}160.'1011 DIP 4ymWrer'v.pm+'Wn'ee6YnrgM1iWex Nlm Water Surface Elevation (RFE) 7]5 ISS Fl15 155 c1 - - - - - Coastal Tra -sect ppn --•—•-- Coastal Tra nsect Baseline -PPa.nemmNo — - — Profilet3aseline Hydrographic Feature OTHER Limit of Study FEATURES JurisdlctlonBlwndary F. FrhrmNlen rk paealan. ahaul T.m-P..rWhk Pnaaer awd-rd xldl MW FIRM hekdhg Mw P -Oe : alr3rn FMA FFRN new m o- wT. xgkl M Fnpo .2 P -p -m .n. -I, Npr1Fl 1-1109 51.t. PIBne P - Feet (Zone 3100) h.r, .c a P- reoeFEMAM.p mbrm.rone-@..M rar7FEMw-MAP11477—M6.2S6 yWinne m.FEAUAA smite Aril-per.M wmmpergFr Flood Silky neera Lenerof Mae DAN NAD 1983{H—Full)eMAVD I RBe IV.rr,wy a4in��e (LOFAnende rrIP'rmeu R.earon tLaM-a or Leaer a N1eP Arn.nenyem (COMA} -m-ard wnena Ann. p-nl. ante egd-I .enia.e or 1M. FIRM m.yM BVa'MPt1. 4'IeF'e NFRn GB'of'n FMpdpba Mlppr'r-1pF'.m IxMIM FI ^�+7NMr.nclbpdm-p1, finch -500 feet prep) w>en-wv5an..com., 8 Msmn FlRAtp n-osn Mena .ilea 0 Z50 500 1.000 ,l MR.,_ Thmndlecem Lhomor mora, Ms pwtem FIRM Ione., mea. mry G oMenod'reary pdnl dM Nrp s-rp,n Cenur Ft vw nwlleel 10166 060,6 tx rrm im ca Feet For 3prrrrurry one m.tnr wtle..... ..ger m TI ppod II.W rwce SW., rep a A'a M. NnW Rtan Meters % eeenmymedAy j.W. 1h.ummny, mm ,d I—. ape. or ar me N.6e.yu 0 75 154 300 Fbpd indrawn Prapram ax r�p�g-9{?p. �-T--r Flooe ln.0-me laWey tF151 Awdnevrea.=P.-.q r anrw.er.uons.roee_.M l,Ik mdea ander. Toed d- 3en 1., sauce AY m. Nam Groh- PANEL LOCATOR Fbeepbn eoaPpea Pcpeem 1NCFMPI. TM Fred xuerenee Srudr (FIST a eamryred el ft Iorr=, Pnend- aF.d eppelA.r a1. Avco FMW H-7am D -M--., M NN1.r 5wYp Mw ,Rao—iN 04UV d.r%nd. aklpger-rare FgW mlvano- Rar Map -Id 1h. Food Inwraml Sarvyy Rapart A Food In.yrarwl SI-vay G a Roodrukd$.lor ebod ansa WAN c=OMI.b MM P. ilei ConWiRs' �mPla'.ol-- ii MPNnonof I.,., FIRM,nd . eibod a [alrxunnr npM dMude en.rd Mod eNralMrl ml e: eon I.Elnann FIRM In 001 L FIS epmplered Ma. NFIP.IM diewl InM.mwMn. IepmF EM ++epe .r..narnt.-d axe an FIS Inpr--Win MaAn an OO W W Oil FIRM MprPiWNb1AI%FR* bM F'MP7_"Lp AWFngM0a IMIFIRM Ws VOVdr d,1. mq a-Crw.. T--qonmree dokr ny A- ma melaeale ewilems - mF C-eAT-AM CODNir 370399 9TH R dgUl F LOCO d.deue ardor F.h Terhi Supwd 9.r Nvl.bwk tTSMi s AC REDI ED LEVEE NOTE5 TO VSERS Ran eine-d M,ea nal.q m on All pan-1ywrbFF — 11 mr-rty M aM.ln mpn mfom-YOR wPa. file esrmTead 3wee of pmeed,w provgW iwbp� 1rMr mwd py 1y.ieemarinu-d-rce-Ie.rl.nd Emergency Aeuon Nan,mJn lrve ayanmlal .lnxnaa pprAl'prwF�dlbrl. .. rN5 Blf•6 .A Ta neeeodo.'m or re- M,d reedenrsareenm� eame.eeee F,-.nrin enc FeeOp�eonnp or ane preunp s�rneaaun Fer man nbrmnien o5 Rood .+Np.nu, iM-nN-tl Tr6 T 706 t6 i 6 iM 11 pWbn VN Wj Ka -IM FENM}160.'1011 DIP 4ymWrer'v.pm+'Wn'ee6YnrgM1iWex Nlm 7]5 ISS Fl15 155 PROVIShONALLY ACCREDITED LEVEE NOTES TDCMERS: if, Pr orny AWM,PALlne ppn B1» r{F9F Q.. � TY49i/I 1; -PPa.nemmNo pra etim W% -4@d {Wx0 m.ya,med Ne 1-pxrpaaFaenuBl-Glance It Ij and Em 'Nmey Athan Plan. tie h. Mir. -yWnAF!o,l—pa we anp PnMonnn re --.,oarum�ralwn, eM I—vamp. �rrm.noy. r.g,YW lo ruhmd tM tl.la rod documoa.lnn —,to comply Wim Seomn 65.tdalV-NFIP-p.ilefan.. r F{) r7] EW 15s 7 6xx a Ojos na ie] r# BM1 F u R as xvmatnty dr ormer does notprvr�ee the �.eces.ery dela one domnrnlnan dr d -1 -dao and eo.vnamuM a.Md.a nVkeMalxe Nie I'_doe. na comp}wen 0enan 6s 10 �eennemenn, FEW etd orae ,. Med .$ 6Th 1 rry ill r31 .M1 761 lo -1 -w to -nen w-ecaennrana,n.....y.am mnrpp-M Wood r�rm , - nppwrrW Aman. PepOny o•nn.ra and rygenl. an enrarpppdW ppnodlr nppe ln-FrFw.-r-Ma vvlmrq prem. prygpx.. measures Fw nnre nbmulron on noud inwranm, ii --.Md Irne.mw- r -n na F{VA Iyap Im sm IN 710 .30 tw woo 1 YNNLAt agb�lw.a•.rme gowbuemeeunfipinden vibn LIMBAIOOERATE YWVE ACr�DN NL1TESTOusF.RS Fw svnvm IWFOV-AE p 1{td {I{F F{eF Fe{{ Fefi{ 9FFfl 911. .*wry wqlOwoplM. p. 1 JkldMd0 rd . T.. M.0mbemeVE Zoo. AoL WhMaA eaMOFeaMtheLARINAW roANe 1EZNaro atlroire1 01 b. MALE n. —lln6-1 q .T-nwr.. vE Win. Aatd [ta�iu 1{rF Ip{{ res 9Ft6 IJmltofModerate Wave ALctlon (UMWA) COASTAL BARRIER RESOURCES SYSTEM [CBRSI NOTE TAN meP rT.y lnHuae.ppnxime-FeurA.M1M MTF CORS MnbmuuenN pwpeeeeenh. Flaon Fr-dr.ne. reel -9MolAe or N lope FW 1p NRaeFnO N-t.n F, WIr P Ikgn IS A. N pe asole-r earh .WWdd%.^-P .—tFefpmv.—At1400544-VA.gw.'p>.., m. FIS P.prc wo-p-M,8. FMn 11d wddxre sen,l3eed-mmer Wena, cem..L TaoaaeF.vaLD. ® CBRS Area Otherwise Protected Area 1:6,000 ®i� N 2=:Md�11 iEfiYY E XI MM® {wF 0600 VERSION NU M BER 2.3.3.2 r• 1. MAP NUMBER une'1• 3710976500H � MRP RE415 ED November 17. 2017 NORTH CAROLINA FLOODPLAIN MAPPN G PROGRAM NATIONAL FIND INSU RANCE PROGRAM FLOOD 1NSURANCE R47E MAF' NORTH CAROLINA ❑ 8 P-Nw 19765 W a p,. Q' i I ' 1 ', �-T--r ` P. ilei ConWiRs' { L COMMUNITY CID PANEL SUFFIX C-eAT-AM CODNir 370399 9TH R ❑ .V C 4V 6.. {wF 0600 VERSION NU M BER 2.3.3.2 r• 1. MAP NUMBER une'1• 3710976500H � MRP RE415 ED November 17. 2017 FLOOD HAZARD INFORMATION SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAPAND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMATAT Map Pro lOn: HTTP: FRIS.NC.GOV FRIS North Carolina $tate Plane Projection Feel (Zone 3200) Base Flood Elevation (BFE) Datum: NAD 1983 Horizontal,.AVD 1988 (Vertical) ( ) ( ) -Without Zone A,V, A99 With BFE or Depth zone AE, AO, AH, VF, AR SPECIAL FLOOD — Regulatory Floodway HAZARD AREAS Communities annexing land of adjacent FIRM panels must—in a canard copyafthe edacent panel as well as D 25D 5DD 1,DDD —0.2% Annual Chance Flood Hazard, Areas Feet of 1% Annual Chance Flood with Average Meters Depth Less Than One Foot or With Drainage 0 75 150 300 Areas of Less Than One Square Mile zone x O — Future Conditions 1% Annual PANEL LOCATOR Chance Flood Hazard ZUoCX OTHER AREAS OF — Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes zone x OTHER — Areas Determined to be Outside the AREAS 0.2%Annual Chance Floodplain zone x Channel, Culvert; or Storm Sewer GuilloN Accredited or Provisionally Accredited digael lomat by the NCFMP The source of Mis inM.timn ran be determined Min,Me mefaaafa available in the Levee Dike, , orFloodwall STRUCTURES I r l l l r l l l l r r Non -accredited Levee, Dike, or Hoedwall Alamance BM5510 x North Carolina Geodetic Survey bench mark ACCREDITED LEVEE NOTES TO USERS. If an —ted levee note appears on Mis panel check.0 your local BM55100 National Geodetic Survey bench mark BM5510® Contractor Est. NCFMP Survey bench mark 9*d 976) pts iI.2— Cross Sections with 1% Annual Chance Ran�olph 8)46 Water Surface Elevation (BFE) 9)46-- 9). 736 97 a - - - - - Coastal Transect ------- Coastal Transect Baseline — - Profile Baseline 87x 8744 Hydrographic Feature OTHER Limitof Study FEATURES Jurisdiction Boundary NOTES TO USERS SCALE NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONALFLOOD INSURANCE PROGRAM 4r.IPAx.11i- Farr —p inrormation andguehOb about thi—lip, available protluds associated arid, this FIRM including Map Pro lOn: h stork versions of Mis FIRM, howto 11prode—Me Nation9 Flood Insurance Program in genera, �() North Carolina $tate Plane Projection Feel (Zone 3200) please mllthe FEMAMap lnfvrmatio XcIMMW at td]]-FEMA-NIAP(1.8]]-336-262])or visit the FEMA Map Service Carder website at nnpJ/meefema.Dov. An accompanying Flood Insurance Swtly report, Letter of Map Datum: NAD 1983 Horizontal,.AVD 1988 (Vertical) ( ) ( ) Revision (LOMR) or Lefler of Map Amendnlem (LOMA) revising potions At— panel, and digital versions of this FIRM may be available. Visit the North Carolina Flmdplain Mappirg Program website at IMIP11ww flloodmaps.can, 1inch le 5500 feet or ,nn Me FEMA Map Ser,ice Center. Communities annexing land of adjacent FIRM panels must—in a canard copyafthe edacent panel as well as D 25D 5DD 1,DDD the current FIRM Index. These may be —red directly from the Map Service Comer at Ne number lisle] abve. o Feet For community and county— map dates referto he Flood Insurance Study report for hrejunsdimion. Meters To determe dvai in flomeaunhoe—tableinthe mmmunily,wntad your lnmra—Wnlor roll the National 0 75 150 300 Flmd Insance Program at 1-800638-6620. O Flmdineurence Sway(HS)meansanoxamirabon,,valuefion,amdeterminaeonofflpoaha7ams,wresppnding surpmekva8ons, flood M1azartl risk zones, and other flood dap In a community issued by Me NOTM1 Carolina PANEL LOCATOR Flwtlplain Mapping Program ;NCFMP). The Flood Insurance Study (FIS) is wmpnsetl of Ne wllowing products sed togetherMe Digital FIPM Haze. Database, Me Water Surface Elevation Rasters, Me digitally tlelivetl, u Flood Ineue— Rate Map and Me Flood Insurance Survey Nemn. A F.od Insurance Survey as Wheratetl ompitalion and presentation of fi,W risk data for specific wet—, rs,,, takes, and coastal flood haz.N ......thin unity Th. repod ohr in detailed lbotl elevation date, data tables and FIRM indibee When a tood etutly is ompated car Me NFIP, the digital infP n nation, reports and maps are assembled into an FIS. Information shown on his FIRM is provided in digital format by he NCFMP. Base map information shown on Mi. FIRM was provided in GuilloN 4-1 co digael lomat by the NCFMP The source of Mis inM.timn ran be determined Min,Me mefaaafa available in the orange digital FLOOD dahbase and i) the Technical Support Dale Notebook (TSDNT Alamance ACCREDITED LEVEE NOTES TO USERS. If an —ted levee note appears on Mis panel check.0 your local mrounRyMobtaI..ore'mfevel) crmation, such as Me obar-ed level of protection MoP,amd(Which may exceed the 9*d 976) 1-peard-anmr,-onmo,land Emergency Action Plan, on the levee syetarlahown as providing protection. To..I— Wnsk in residual risk areas, property awriers andre W.-are.—Maned to -,side, flood Ran�olph 8)46 8768 B6 m 08 9) 9)46-- 9). 736 97 on fld insurance, mte'eeEC - ce and Ileodproofing o' other protective measures. For more info-atim oo parties shmid visit Me FEMA Webs al lN�lPaeanalema.9ovlbusinesslnhplaidea—hr. 87x 8744 8764 8)84 9)04 97:59]359]459]55 7fi597 PROVISIONALLVACCREDITED LEVEE NOTES TO USERS.Ifo Provisionally Accredited Levee(PAL)note appears on Ms parole check.ith your lomlmmmuniy.obtain more inprmmim, sutlr as the estimated level of 9]:49)349744 )54 ifi497 ropGian romaed which m e ceea the 1 mannnal-cnanw level dna Eme n Action Plan on me P P ( ay x 9erw ) rye ry 8763 8773 9743 9113 7fi3 97 levees k shown as ro din n. Ta maintain accre<itation Me levee owner ormmmun117 is ys euta P 9 Prapcdio aired w submit lM1e data and tlocumentadion ramssa w ..ply wiM Section 65.10 of Me NFIP re dations. reg re -marry PY 9 8122 8742 8782 9702 9722 g the community or owner does not Provide tM1e necessary data and te, FE dap and id iisinthelevees/stem doesnotcomply Section FEMA the Hntat.n 8762 8772 9)42 9752 )62 97 provided .10 ragnt.ion w5N -11 revise rieflood ee hazamand risk information fo'thi of the reg yethah. of the tbeed Md 8741 8751 8720 8761 8)]I 8780 9700 9).19)3) 9)41 1 el 97 ineuomfl fibdriskin an araccreditation geotlproofng resitlusl tisk arra; property e.For antlres.ensare..oil ed toconteabbed r other measures.Formore flood insuance,Interested should visit M: FEMA 87408]5087608770 97:097309740 ]50 7fi097 pensuremeand thtp/A Vndphrdionon pahae Website at M1tlp://vmw.fema 9avlbusinesslnfi�ndex.shtm, itain hi LIMIT OF MODERATE WAVEACTION NOTES TO USERS: Forspme wastalnoodingzorres the AE Zane ea 68 6e 60 62 64 8 6 oideo hoebeendividedbya LimitmModmmw Wave Action(LiNWA). The—VIAMIabeerrath approximate hrMwa o li b—Me l.5 -fool treakhg ao— The alfe—f wave h—rd, beter e i he VE Zone and the LiMWA (oro—enthesM1orelineantl Me Li Mbrina—Ma VEZonee.—blideMiried) wtllim sinnilri-,but less severe Man Mose in Me VE Zane. 662fi CAe)hem 1166 SM. 9606 9647 57 a62fi 9666 _ 6 6 Limit of Moderate Wave Action (UMWA) COASTAL BARRIER RESOURCES SYSTEM (CBRS) NOTE Tharrapmay ILeapp.xmatebountlarresmthr CBRSpr'nkrnatonalpurphe only Fli—nsurance'snot available ar CBRS areas farstructurhe thatare newly bolt or I-Abrt ally -.pro m,r,ha,th,d,ta(,) ntl mptl M1 p- For mae'nformat in eea M1bp I/wvrvafws govlcboi the FIS Reliant, or roll the U 5 F ah and WtllfeS - Customer Service Ce ,at 1400.344WILD ® CBRS Area 0 Otherwise Protected Area 1:6,000 10; :M®®3 Emil ®�Lr�Lr��F�II �YXill ossa s f Dsx VERSION NUMBER 4 9614 96.4 Lee , a�rE;, 2.3.3.2 mare He, Itt ) 1 Z MAP NUMBER I(/ I��I'''''''... 3710976600K ,,1' z� MAP REVISED November 17, 2017 NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONALFLOOD INSURANCE PROGRAM 4r.IPAx.11i- Farr —p u,o NORTH CAROLINA^A y W L �rOr� k..✓V Cja z z PANEL 9766 4xx ssc' O FEMA co V/ Panel Contains: COMMUNITY CID PANEL SUFFIX CHATHAM COUNTY 370299 9766 K ORANGECOUNTY 370:342 9766 K O O 4-1 co z ossa s f Dsx VERSION NUMBER 4 9614 96.4 Lee , a�rE;, 2.3.3.2 mare He, Itt ) 1 Z MAP NUMBER I(/ I��I'''''''... 3710976600K ,,1' z� MAP REVISED November 17, 2017 Stormwater Wetland #38 Design STORMWATER WETLAND #38 SIZING CALCULATIONS Project Name Briar Chapel - Phase 12 Project Number 02735-0231 Date July 23, 2018 3rd revision 2nd revision 1 st revision Stormwater Wetland Drainage Area Data Project Briar Chapel - Phase 12 Project No. 02735-0231 Date July 23, 2018 Total site area 74,000 square feet = acres Impervious areas Drainage area to pond Other Drainage Area Existing Proposed Change Existing Proposed [sf] [sf] [sf] [sf] [sf] On-site buildings 0 7,200 7,200 0 0 On-site streets/parking 0 28,000 28,000 0 0 On-site Sidewalk 0 8,000 8,000 0 0 On-site Equipment 0 0 0 0 0 Contingency 0 4,320 41320 0 0 Total Impervious 0 47,52(- 47,520 0 0 Non -impervious areas Drainage area to pond Other Drainage Area Existing [sf] Proposed Change [sf] [sf] Existing Proposed [sf] [sf] On-site grass/landscape 0 28,000 28,000 0 0 On-site woods 74,000 0 -74,000 0 0 Total non -impervious 74,000 28,000 -46,000 0 Total Drainage Area 74,000 74,000 0 Percent Impervious 0.0 64.2 64.2 Notes: 2018.09.12.BMP#38 Phase 12 Wetland.xls BMP Drainage Area Data Page 2 of 6 Printed 9/23/2018 8:09 AM Stormwater Wetland Runoff Volume Calculations Project Briar Chapel -Phase 12 Project No. 02735-0231 Date July 23, 2018 Drainage area 74,000 square feet Impervious area 47,520 square feet Rainfall depth 1.00 inches Percent Impervious 64.2 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.63 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 3,872.3 cubic feet Notes: 2018.09.12.BMP#38 Phase 12 Wetland.xls Runoff Volume Calcs Page 3 of 6 Printed 9/23/2018 8:09 AM Project Project No. Date Briar Chapel - 02735-0231 July 23, 2018 Phase 12 Stormwater Wetland Volume Calculations Stage -Storage Data for Wetland - Temporary Pool Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 435.75 0 2,167.0 0.050 2,167.0 0.0 0.0 0.0 0.0 0.0 436 0.25 2,758.0 0.063 2,758.0 0.0 615.6 0.0 615.6 0.0 437 1.25 3,810.0 0.087 3,810.0 0.0 3,284.0 0.1 3,899.6 0.1 438 2.25 5,039.0 0.116 5,039.0 0.0 4,424.5 0.1 8,324.1 0.2 439 3.25 6,458.0 0.148 6,458.0 0.0 5,748.5 0.1 14,072.6 0.2 440 4.25 8,118.0 0.186 8,118.0 0.0 7,288.0 0.2 21,360.6 0.3 2018.09.12.BMP#38 Phase 12 Wetland.xls Stage Storage (Temp Pool) Page 4 of 6 Printed 9/23/2018 8:09 AM Stormwater Wetland Dewatering Time Calculations Project Briar Chapel - Phase 12 Project No. 02735-0231 Date July 23, 2018 Water quality treatment volume Total treatment volume Maximum head of water above dewatering hole Driving head Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 3,872 cubic feet 3,900 cubic feet 1.25 feet 0.41 feet 0.60 1.25 inches I 0.009 square feet 1.2 square inches 0.006 square feet 0.9 square inches 2.3 days 54.4 hours 2.3 days 54.8 hours Notes: Dewatering time formula: t (days) = V / (Cd*A*Sgrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) Pre -Development Subcat Reach on Link 2S Post- Development 3 P 6 M P #34 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 6 Time span=1.00-70.00 hrs, dt=0.05 hrs, 1381 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=1.734 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=514' Tc=16.1 min CN=70 Runoff=0.00 cfs 0.001 of Subcatchment2S: Post -Development Runoff Area=75,520 sf 62.92% Impervious Runoff Depth=0.28" Flow Length=248' Tc=10.5 min CN=89 Runoff=0.70 cfs 0.041 of Pond 3P: BMP #34 Peak Elev=436.14' Storage=1,006 cf Inflow=0.70 cfs 0.041 of Primary=0.02 cfs 0.041 of Secondary=0.00 cfs 0.000 of Outflow=0.02 cfs 0.041 of Total Runoff Area = 3.468 ac Runoff Volume = 0.042 of Average Runoff Depth = 0.14" 68.54% Pervious = 2.377 ac 31.46% Impervious = 1.091 ac 2018.09.12.BMP #38 -Wetland Type Il 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: BMP #34 Inflow Area = 1.734 ac, 62.92% Impervious, Inflow Depth = 0.28" for 1 -Inch event Inflow = 0.70 cfs @ 12.03 hrs, Volume= 0.041 of Outflow = 0.02 cfs @ 16.02 hrs, Volume= 0.041 af, Atten= 97%, Lag= 239.0 min Primary = 0.02 cfs @ 16.02 hrs, Volume= 0.041 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Peak Elev= 436.14' @ 16.02 hrs Surf.Area= 2,903 sf Storage= 1,006 cf Plug -Flow detention time= 558.6 min calculated for 0.041 of (100% of inflow) Center -of -Mass det. time= 559.6 min ( 1,430.4 - 870.8 ) Volume Invert Avail.Storage Storage Description #1 435.75' 21,361 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 435.75 2,167 0 0 436.00 2,758 616 616 437.00 3,810 3,284 3,900 438.00 5,039 4,425 8,324 439.00 6,458 5,749 14,073 440.00 8,118 7,288 21,361 Device Routing Invert Outlet Devices #1 Primary 435.25' 15.0" Round Culvert L= 27.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 435.25'/435.00' S=0.0093'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 435.75' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 437.00' 20.0" W x 4.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 438.30' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 439.00' 15.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.02 cfs @ 16.02 hrs HW=436.14' (Free Discharge) L1=Culvert (Passes 0.02 cfs of 2.53 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.02 cfs @ 3.00 fps) 3=Orifi ce/G rate ( Controls 0.00 cfs) 4=Orifi ce/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=435.75' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.09.12.BMP #38 -Wetland Type II 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 10 i 1 -///////////////// ►ilii ■ Inflow ■ outflow 0 Primary ❑ Secondary Pond 3P: BMP #34 Hydrograph 0.70 cfs I LL 1L I T L-Ifi -13181 �£1 0.75 i T T1 T T I TI TI T Jot` F%h _Elldvl _43b:1W 0.7- 0.65 1 L1 Irt �I Irt ��grpp7tQ96 Cf 0.6 0.55 H I T I H 1—� I T I t-1 I -t I T I -I 1—� T H 0.5 0.45 / H 1+1 H I_+ ITI H 4 1+1 HI rt i 0.4 LL 0.35 1 — 0.3 0.25 III L I L1 1-111 Ll I-1111 UI U I -' i 1 -///////////////// ►ilii ■ Inflow ■ outflow 0 Primary ❑ Secondary 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1-YrRainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 11 Time span=1.00-70.00 hrs, dt=0.05 hrs, 1381 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=1.734 ac 0.00% Impervious Runoff Depth=0.69" Flow Length=514' Tc=16.1 min CN=70 Runoff=1.32 cfs 0.100 of Subcatchment2S: Post -Development Runoff Area=75,520 sf 62.92% Impervious Runoff Depth=1.86" Flow Length=248' Tc=10.5 min CN=89 Runoff=4.75 cfs 0.269 of Pond 3P: BMP #34 Peak Elev=437.39' Storage=5,474 cf Inflow=4.75 cfs 0.269 of Primary=1.27 cfs 0.269 of Secondary=0.00 cfs 0.000 of Outflow=1.27 cfs 0.269 of Total Runoff Area = 3.468 ac Runoff Volume = 0.369 of Average Runoff Depth = 1.28" 68.54% Pervious = 2.377 ac 31.46% Impervious = 1.091 ac 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: Pre -Development Runoff = 1.32 cfs @ 12.11 hrs, Volume= 0.100 af, Depth= 0.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (ac) CN Description 1.734 70 Woods, Good, HSG C 1.734 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.8 50 0.0400 0.09 Sheet Flow, ��nl o , _ �p� T=10 69'1 Flow Len th-514 Woods: Light underbrush n= 0.400 P2= 3.58" 7.3 464 0.0450 1.06 Shallow Concentrated Flow, I I ICM46 Woodland Kv= 5.0 fps 16.1 514 Total 3 0 LL Subcatchment 1S: Pre -Development Hydrograph 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) ❑Runoff I I 1.32 cfs VIII 4-1� Rainfall=i96'� fi l fi l fi l fi l l It rtotff Ar" --i .,734 Od ��nl o , _ �p� T=10 69'1 Flow Len th-514 LL I I ICM46 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) ❑Runoff 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 2S: Post -Development Runoff = 4.75 cfs @ 12.02 hrs, Volume= 0.269 af, Depth= 1.86" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (sf) CN Description 28,000 74 >75% Grass cover, Good, HSG C 47,520 98 Paved parking, HSG C 75,520 89 Weighted Average 28,000 37.08% Pervious Area 47,520 62.92% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.8 36 0.0519 0.21 Sheet Flow, Grass: Short n= 0.150 P2= 3.58" 1.4 212 0.0150 2.49 Shallow Concentrated Flow, Paved Kv= 20.3 fps 6.3 Direct Entrv. Pine 10.5 248 Total Subcatchment 2S: Post -Development Hydrograph e � 4.75 cfs y� 4 VIII IMM V I I Runoff AtOa�--75,5210 V 0 3 nl a�ff Qelp�=11 8�'l LL Flow Len th-48 2 TI -rI _rI _rI _ _rI -rI _rI rI t --I SCI= IMM I CM=90 � II IIIIIIII IIIIII ❑Runoff 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1-YrRainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: BMP #34 Inflow Area = 1.734 ac, 62.92% Impervious, Inflow Depth = 1.86" for 1 -Yr event Inflow = 4.75 cfs @ 12.02 hrs, Volume= 0.269 of Outflow = 1.27 cfs @ 12.23 hrs, Volume= 0.269 af, Atten= 73%, Lag= 12.9 min Primary = 1.27 cfs @ 12.23 hrs, Volume= 0.269 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Peak Elev= 437.39' @ 12.23 hrs Surf.Area= 4,288 sf Storage= 5,474 cf Plug -Flow detention time= 596.6 min calculated for 0.269 of (100% of inflow) Center -of -Mass det. time= 595.6 min ( 1,411.0 - 815.3 ) Volume Invert Avail.Storage Storage Description #1 435.75' 21,361 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 435.75 2,167 0 0 436.00 2,758 616 616 437.00 3,810 3,284 3,900 438.00 5,039 4,425 8,324 439.00 6,458 5,749 14,073 440.00 8,118 7,288 21,361 Device Routing Invert Outlet Devices #1 Primary 435.25' 15.0" Round Culvert L= 27.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 435.25'/435.00' S=0.0093'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 435.75' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 437.00' 20.0" W x 4.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 438.30' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 439.00' 15.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.27 cfs @ 12.23 hrs HW=437.39' (Free Discharge) L1=Culvert (Passes 1.27 cfs of 7.20 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 6.16 fps) 3=Orifi ce/G rate (Orifice Controls 1.22 cfs @ 2.20 fps) 4=Orifi ce/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=435.75' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.09.12.BMP #38 -Wetland Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #34 Hydrograph I I I I I i I I I I I I I I I I I I I I I I II I I INInflow 4.75 cfs 7 outflow 1416b i Ari ash i7134IaCC ❑Primary � =jj {{�� El Secondary SW090=A474 Of 4 Ilillllllllllllllllll 3 4-I H I-4 114—I I- 0 Ililllllllllllllllllllll 2 1.27 cfs I H III I TIF I I 11 IIIIIIIIIIIIIIIIIII 1 1 1%////////////////////////////////////////////////%///////////////////////////////////////%/ ������ 2018.09.12.BMP #38 -Wetland Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 16 Time span=1.00-70.00 hrs, dt=0.05 hrs, 1381 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=1.734 ac 0.00% Impervious Runoff Depth=2.17" Flow Length=514' Tc=16.1 min CN=70 Runoff=4.62 cfs 0.314 of Subcatchment2S: Post -Development Runoff Area=75,520 sf 62.92% Impervious Runoff Depth=3.94" Flow Length=248' Tc=10.5 min CN=89 Runoff=9.71 cfs 0.570 of Pond 3P: BMP #34 Peak Elev=438.40' Storage=10,463 cf Inflow=9.71 cfs 0.570 of Primary=4.29 cfs 0.569 of Secondary=0.00 cfs 0.000 of Outflow=4.29 cfs 0.569 of Total Runoff Area = 3.468 ac Runoff Volume = 0.884 of Average Runoff Depth = 3.06" 68.54% Pervious = 2.377 ac 31.46% Impervious = 1.091 ac 2018.09.12.BMP #38 -Wetland Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: Pre -Development Runoff = 4.62 cfs @ 12.09 hrs, Volume= 0.314 af, Depth= 2.17" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.18" Area (ac) CN Description 1.734 70 Woods, Good, HSG C 1.734 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.8 50 0.0400 0.09 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.58" 7.3 464 0.0450 1.06 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 16.1 514 Total 5 - in 3 3 0 LL Subcatchment 1S: Pre -Development Hydrograph �������������������������������������VAOI ❑Runoff -k-I + 4.62 cfs i i - 10 -Yrs kainfall=i5.l1e V li i RunolffArea=i1.734 �id ��nl aoff Qelp "1=12 1�'1 Flow Len h-;14 l i l l l l l l l l l l l l l l l l l l l l ICIN��� �������������������������������������VAOI ❑Runoff 2018.09.12.BMP #38 -Wetland Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: Post -Development Runoff = 9.71 cfs @ 12.02 hrs, Volume= 0.570 af, Depth= 3.94" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.18" Area (sf) CN Description 28,000 74 >75% Grass cover, Good, HSG C 47,520 98 Paved parking, HSG C 75,520 89 Weighted Average 28,000 37.08% Pervious Area 47,520 62.92% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.8 36 0.0519 0.21 Sheet Flow, cfs 9 1 Grass: Short n= 0.150 P2= 3.58" 1.4 212 0.0150 2.49 Shallow Concentrated Flow, _L I Paved Kv= 20.3 fps 6.3 7 - Direct Entrv. Pine 10.5 248 Total 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) ■Runoff Subcatchment 2S: Post -Development Hydrograph 10-/9.71 cfs 9 1 I _L I _L I 1113u1n-OffAte[W=7 1,520 sf 7 - 1 1 1 4-1 4-1 4�upgff YR1gTp'f01•_j7 p�af 0 ISI- +I+I+I+I�I+I+I��In�ff��fp�9 'j - 5 FL fit t I t I t t I t I t I Flow Len h= t I t t t in 4 3 ISI TITITITITITITITITIFIFIFIC*64_0 2 1111 1111111111111111111111111111 1 1111 III IIID 111111111 II 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) ■Runoff 2018.09.12.BMP #38 -Wetland Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: BMP #34 Inflow Area = 1.734 ac, 62.92% Impervious, Inflow Depth = 3.94" for 10 -Yr event Inflow = 9.71 cfs @ 12.02 hrs, Volume= 0.570 of Outflow = 4.29 cfs @ 12.17 hrs, Volume= 0.569 af, Atten= 56%, Lag= 9.0 min Primary = 4.29 cfs @ 12.17 hrs, Volume= 0.569 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Peak Elev= 438.40' @ 12.17 hrs Surf.Area= 5,609 sf Storage= 10,463 cf Plug -Flow detention time= 311.1 min calculated for 0.569 of (100% of inflow) Center -of -Mass det. time= 312.3 min ( 1,106.4 - 794.1 ) Volume Invert Avail.Storage Storage Description #1 435.75' 21,361 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 435.75 2,167 0 0 436.00 2,758 616 616 437.00 3,810 3,284 3,900 438.00 5,039 4,425 8,324 439.00 6,458 5,749 14,073 440.00 8,118 7,288 21,361 Device Routing Invert Outlet Devices #1 Primary 435.25' 15.0" Round Culvert L= 27.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 435.25'/435.00' S=0.0093'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 435.75' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 437.00' 20.0" W x 4.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 438.30' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 439.00' 15.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.14 cfs @ 12.17 hrs HW=438.39' (Free Discharge) L1=Culvert (Passes 4.14 cfs of 9.38 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.06 cfs @ 7.83 fps) 3=Orifi ce/G rate (Orifice Controls 2.96 cfs @ 5.33 fps) 4=Orifi ce/G rate (Weir Controls 1.12 cfs @ 1.00 fps) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=435.75' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.09.12.BMP #38 -Wetland Type 1124 -hr 10 -Yr Rainfall=5.18" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 20 Pond 3P: BMP #34 Hydrograph 9.71 cfs _ / I L I I ''LIN,� �,-1 /� � II ,,,� H -1 I -L I klll" k"" =i 7� ISI El 10 H I H H I4 I+ I H P66k EAtiv�=438.4$'I 9 / T I H I -T IT I TI StOrr-09#t 0,463 0 8 / 7- / IIII Illlllllllllllllllllllllll 6 0 5 / 4.29 cfs it l fi l H I -t I fi l t -I I1-1fi l 1-I I� fi l LL 4 / II IIIIIIIIIIIIIIIIIIIIIIIIII 3 / 2 II IIIIIIIIIIIIIIIIIIIIII 0.00 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) 2018.09.12.BMP #38 -Wetland Type 1124 -hr 100 -Yr Rainfall=7.67" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: BMP #34 Inflow Area = 1.734 ac, 62.92% Impervious, Inflow Depth = 6.36" for 100 -Yr event Inflow = 15.23 cfs @ 12.01 hrs, Volume= 0.919 of Outflow = 10.10 cfs @ 12.11 hrs, Volume= 0.919 af, Atten= 34%, Lag= 5.7 min Primary = 10.10 cfs @ 12.11 hrs, Volume= 0.919 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-70.00 hrs, dt= 0.05 hrs Peak Elev= 438.80' @ 12.11 hrs Surf.Area= 6,171 sf Storage= 12,796 cf Plug -Flow detention time= 211.5 min calculated for 0.919 of (100% of inflow) Center -of -Mass det. time= 211.2 min ( 992.3 - 781.1 ) Volume Invert Avail.Storage Storage Description #1 435.75' 21,361 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 435.75 2,167 0 0 436.00 2,758 616 616 437.00 3,810 3,284 3,900 438.00 5,039 4,425 8,324 439.00 6,458 5,749 14,073 440.00 8,118 7,288 21,361 Device Routing Invert Outlet Devices #1 Primary 435.25' 15.0" Round Culvert L= 27.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 435.25'/435.00' S=0.0093'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 435.75' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 437.00' 20.0" W x 4.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 438.30' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 439.00' 15.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=10.09 cfs @ 12.11 hrs HW=438.79' (Free Discharge) L1=Culvert (Inlet Controls 10.09 cfs @ 8.22 fps) 2=Orifice/Grate (Passes < 0.07 cfs potential flow) 3=Orifi ce/G rate (Passes < 3.41 cfs potential flow) 4=Orifi ce/G rate (Passes < 13.45 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=435.75' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.09.12.BMP #38 -Wetland Type 1124 -hr 100 -Yr Rainfall=7.67" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 25 ■ Inflow ■ Outflow ■ Primary ■ Secondary • i la PijkEf6vF=439.8011 . i i � I I 1 1 ■ Inflow ■ Outflow ■ Primary ■ Secondary DATE: 9/23/2018 DESIGNED BY: LEG F'KUJLU I NAML: briar chapel - Phase 12 NKUJt=U I NU: UHLUKLU bY: UUA PROJECT LOCATION: Chatham Countv. NC 2735-0231 Pond Name= BMP #38 Riser Outer Width = 4 ft Riser Outer Length = 4 ft Riser Inner Width = 3 ft Riser Inner Length = 3 ft Riser Height = 3.55 ft Concrete Base Length = 6 ft Concrete Base Width = 6 ft Concrete Base Depth = 6 in Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety 3,728 Ib 2,700 Ib 6,428 Ib 3,544 1 b 1,123 Ib 4,668 Ib 1.38 Design Acceptable DATE: 09/23/2018 DESIGNED BY: LEG PROJECT NAME: Briar Chapel Phase 12 PROJECT NO: CHECKED BY PROJECT LOCATION: Chatham County, NC 2735-0231 GCA Storm Outlet Structure Structure= BMP #38 Out Q10/Qfull = 0.69 Size= 15 in V/Vfull = 1.07 Q10 = 4.29 cfs V = 5.4 fps Qfull = 6.22 cfs Vfull = 5.07 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B s Apron Thickness = 22 in 3 Apron Length = 7.5 ft Length Apron Width = 3 x Dia = 4.0 ft Wet Detention Pond #39 Design Wet Detention Pond #39 Design WATER QUALITY POND CALCULATIONS Project Name Briar Chapel - Phase 12S BMP #39 Project Number 02735-0231 Date September 23, 2018 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Project No. Date Total site area Briar Chapel - Phase 12S BMP #39 02735-0231 September 23, 2018 491,610 square feet = 11.29 acres Impervious areas Drainage area to pond Existing Proposed Change [sf] [sf] [sf] Other Drainage Area Existing Proposed [sf] [sf] On-site buildings BUA 0 191,400 191,400 0 0 On-site streets 0 59,257 59,257 0 0 On-site alleys 0 0 0 0 0 On-site sidewalks 0 14,370 14,370 0 0 On-site future (open space) 0 5,651 5,651 0 0 Off-site future development 0 0 0 0 0 Contingenc 1 0 15,000 15,000 0 0 Total Impervious 1 0 285,678 285,678 0 0 Non -impervious areas Drainage area to pond Existing Proposed Change [sf] [sf] [sf] Other Drainage Existing [sf] Area Proposed [sf] On-sitegrass/landscape 0 360,900 360,900 0 0 On-site woods 635,900 0 -635,900 0 0 Other undeveloped 0 0 0 0 0 Total off-site non -impervious 0 0 0 0 0 Total non -impervious 635,900 360,900 1 -275,000 0 0 Total Drainage Area 491,610 491,610 0 0 0 Percent Impervious 0.0 58.1 58.1 n/a n/a 2018.07.31. Phase 12S #39 Western Pond.xls Site Drainage Area Data Page 2 of 15 Printed 9/23/2018 12:30 PM Water Quality Pond Surface Area Calculations Project Briar Chapel - Phase 12S BMP #39 Project No. 02735-0231 Date September 23, 2018 Total on-site drainage area to pond 491,610 square feet Total impervious area in drainage area 285,678 square feet Average water depth of basin at normal pool 3.0 feet Location of site Chatham County Site region Piedmont % Impervious cover 58.1 percent If the site is in a coastal area, will a vegetative filter be used? Surface Area/Drainage Area Ratios: For a site in the Piedmont For a site in a Coastal County Required surface area of pond: For a site in the Piedmont For a site in a Coastal County Notes: 2018.07.31. Phase 12S #39 Western Pond.xls Pond Surface Area Calcs Page 3 of 15 2.0 77 percent percent 10,000.0 square feet 11,490.0 square feet Printed 9/23/2018 12:30 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Phase 12S BMP #39 Project No. 02735-0231 Date September 23, 2018 Drainage area 491,610 square feet Impervious area 285,678 square feet Rainfall depth 1.00 inches Percent Impervious 58.1 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.57 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 23,474.2 cubic feet Notes: 2018.07.31. Phase 12S #39 Western Pond.xls Runoff Volume Calcs Page 4 of 15 Printed 9/23/2018 12:30 PM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Temporary Pool Briar Chapel - Phase 12S BMP #39 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 451.5 0 14,202.0 0.326 14,202.0 0.33 0.0 0.0 0.0 0.0 452 0.5 16,001.0 0.367 16,001.0 0.04 7,550.8 0.17 7,550.8 0.17 453 1.5 17,587.0 0.404 17,587.0 0.04 16,794.0 0.39 24,344.8 0.56 454 2.5 19,230.0 0.441 19,230.0 0.04 18,408.5 0.42 42,753.3 0.98 455 3.5 20,930.0 0.480 20,930.0 0.04 20,080.0 0.46 62,833.3 1.44 456 4.5 22,686.0 0.521 22,686.0 0.04 21,808.0 0.50 84,641.3 1.94 457 5.5 24,498.0 0.562 24,498.0 0.04 23,592.0 0.54 108,233.3 2.48 458 6.5 26,367.0 0.605 26,367.0 0.04 25,432.5 0.58 133,665.8 3.07 2018.07.31. Phase 12S #39 Western Pond.xls Stage Storage (Temp Pool) Page 5 of 15 Printed 9/23/2018 12:30 PM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Main Pool Briar Chapel - Phase 12S BMP #39 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 447 0 4,779.0 0.110 4,779.0 0.1 0.0 0.0 0.0 0.0 448 1 5,915.0 0.136 1,136.0 0.0 5,347.0 0.1 5,347.0 0.1 449 2 7,112.0 0.163 1,197.0 0.0 6,513.5 0.1 11,860.5 0.3 450 3 8,367.0 0.192 1,255.0 0.0 7,739.5 0.2 19,600.0 0.3 451 4 9,725.0 0.223 1,358.0 0.0 9,046.0 0.2 28,646.0 0.4 451.5 4.5 11,382.0 0.261 1,657.0 0.0 5,276.8 0.1 33,922.8 0.3 2018.07.31. Phase 12S #39 Western Pond.xls Stage Storage (Main Pool) Page 6 of 15 Printed 9/23/2018 12:30 PM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Forebays Briar Chapel - Phase 12S BMP #39 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 448 0 552.0 0.013 552.0 0.0 0.0 0.0 0.0 0.0 449 1 1,161.0 0.027 609.0 0.0 856.5 0.0 856.5 0.0 450 2 1,877.0 0.043 716.0 0.0 1,519.0 0.0 2,375.5 0.1 451 3 2,691.0 0.062 814.0 0.0 2,284.0 0.1 4,659.5 0.1 451.5 3.5 3,265.0 0.075 574.0 1,489.0 0.0 6,148.5 0.1 2018.07.31. Phase 12S #39 Western Pond.xls Stage Storage (Forebays) Page 7 of 15 Printed 9/23/2018 12:30 PM Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Phase 12S BMP #39 Project No. 02735-0231 Date September 23, 2018 Water quality treatment volume Total treatment volume Maximum head of water above dewatering hole Driving head Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 23,474 cubic feet 24,345 cubic feet 1.50 feet 0.50 feet 0.60 2.50 inches I 0.034 square feet 4.9 square inches 0.034 square feet 4.9 square inches 2.4 days 56.5 hours 2.4 days 58.6 hours Notes: Dewatering time formula: t (days) = V / (Cd*A*Sgrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) Water Quality Pond Summary Information Project Briar Chapel - Phase 12S BMP #39 Project No. 02735-0231 Date September 23, 2018 Drainage area to pond 491,610 square feet = 11.29 acres Impervious area in drainage area 285,678 square feet= 6.56 acres Bottom of pond elevation 447.00 feet Normal pool elevation 451.50 feet Main pond volume at normal pool 33,923 cubic feet Forebay volume at normal pool 6,149 cubic feet Forebay % of total volume 18.1% Required volume for design rainfall 23,474 cubic feet Required surface area for main pool 10,000 square feet Volume provided for storage of design rainfall = 24,345 cubic feet at elevation Surface area provided at normal pool of main pond = 11,382 square feet Average Depth 3.00 feet nr,I 2018.07.31. Phase 12S #39 Western Pond.xls Summary Data Page 9 of 15 Printed 9/23/2018 12:30 PM 1S Pre -Development Subcat Reach on Link 2S Post -Development 3P 12S BMP 39 2018.07.20. Phase 12S Western BMP #39 Type Il 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: 12S BMP 39 Inflow Area = 11.290 ac, 58.10% Impervious, Inflow Depth = 0.25" for 1 -Inch event Inflow = 3.32 cfs @ 12.09 hrs, Volume= 0.238 of Outflow = 0.10 cfs @ 19.31 hrs, Volume= 0.195 af, Atten= 97%, Lag= 433.3 min Primary = 0.10 cfs @ 19.31 hrs, Volume= 0.195 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Peak Elev= 451.94' @ 19.31 hrs Surf.Area= 15,799 sf Storage= 6,657 cf Plug -Flow detention time= 757.6 min calculated for 0.194 of (82% of inflow) Center -of -Mass det. time= 675.7 min ( 1,558.3 - 882.5 ) Volume Invert Avail.Storage Storage Description #1 451.50' 133,666 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 451.50 14,202 0 0 452.00 16,001 7,551 7,551 453.00 17,587 16,794 24,345 454.00 19,230 18,409 42,753 455.00 20,930 20,080 62,833 456.00 22,686 21,808 84,641 457.00 24,498 23,592 108,233 458.00 26,367 25,433 133,666 Device Routina Invert Outlet Devices #1 Primary 449.00' 18.0" Round Culvert L= 56.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 449.00'/448.00' S=0.0179'/' Cc= 0.900 n=0.013 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 451.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 453.00' 30.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 455.35' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 456.50' 10.0' long x 19.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.10 cfs @ 19.31 hrs HW=451.94' (Free Discharge) L =Culvert (Passes 0.10 cfs of 12.60 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 2.81 fps) 3=Orifi ce/G rate ( Controls 0.00 cfs) 4=Orifi ce/G rate ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=451.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 10 Pond 3P: 12S BMP 39 Hydrograph I I El Inflow 3.32 cfs Eloutflow Infl�Wl Ares=i 1 1240 ac ElEl Primary Secondary l Peak Elev=451.94' 3 Storage=6,657 cf 2 0 LL V I I I I I I I I I I I I I 1 I I I I I I I I I 0.10 cfs i 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 11 Time span=1.00-45.00 hrs, dt=0.05 hrs, 881 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=11.290 ac 0.00% Impervious Runoff Depth=0.69" Flow Length=1,436' Tc=42.9 min CN=70 Runoff=4.39 cfs 0.651 of Subcatchment2S: Post -Development Runoff Area=11.290 ac 58.10% Impervious Runoff Depth=1.78" Flow Length=1,751' Tc=15.2 min CN=88 Runoff=25.60 cfs 1.677 of Pond 3P: 12S BMP 39 Peak Elev=453.71' Storage=37,179 cf Inflow=25.60 cfs 1.677 of Primary=4.25 cfs 1.386 of Secondary=0.00 cfs 0.000 of Outflow=4.25 cfs 1.386 of Total Runoff Area = 22.580 ac Runoff Volume = 2.328 of Average Runoff Depth = 1.24" 70.95% Pervious = 16.020 ac 29.05% Impervious = 6.560 ac 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: Pre -Development Runoff = 4.39 cfs @ 12.46 hrs, Volume= 0.651 af, Depth= 0.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (ac) CN Description 11.290 70 Woods, Good, HSG C 11.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 107 0.0607 0.13 Sheet Flow, Sheet flow 77, Woods: Light underbrush n= 0.400 P2= 3.56" 4.6 711 0.0295 2.58 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 9.5 618 0.0470 1.08 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.0 Direct Entrv. 42.9 1,436 Total 3 0 LL 2 Subcatchment 1S: Pre -Development Hydrograph 1 2 3 4 5 6 7 8 9 1'6 I'l 1'2 1'3 14 1'5 1'6 1'7 1'8 1'9 20 2122 23 24 25 26 27 2829 30 3132 33 34 35 36 37 38 3940 4142 43 44 45 Time (hours) ❑Runoff I l l l l l l l l i i i 4.39 cfs 1 1 1 1 1 1 1 �����i11411ir fthlolff AllrOA#1 11 .290 Iah I ���I�f� �Q�����Qh•I�I�'11 �fl unoff �Q�1 ti "XPi "' le � , i=0" ' Ll4121 i ii�� I I I I I I I I I I I I I I� j�ld7lpl 77, 1 2 3 4 5 6 7 8 9 1'6 I'l 1'2 1'3 14 1'5 1'6 1'7 1'8 1'9 20 2122 23 24 25 26 27 2829 30 3132 33 34 35 36 37 38 3940 4142 43 44 45 Time (hours) ❑Runoff 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 2S: Post -Development Runoff = 25.60 cfs @ 12.07 hrs, Volume= 1.677 af, Depth= 1.78" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (ac) CN Description 4.730 74 >75% Grass cover, Good, HSG C 6.560 98 Paved parking, HSG C 11.290 88 Weighted Average 4.730 41.90% Pervious Area 6.560 58.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0500 0.26 Sheet Flow, I I� 1` i� i� .I 24 -I 141 -H � Grass: Short n= 0.150 P2= 3.56" 1.8 289 0.0303 2.61 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 7.0 1,362 3.24 Direct Entry, 15.2 1,751 Total 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 2122 2324 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 4142 43 44 45 Time (hours) ■Runoff Subcatchment 2S: Post -Development Hydrograph 28- :25.60 26 1 cfs 1 1 1 1 1 1 I I� 1` i� i� .I 24 -I 141 -H � +I H I �I 141 + I���-j lla-IIA al1��21�',I 22 20 1 1 1 1 1 1 1 1 1 11 I I I I I I I ROhdff A0601:01.290 la�1 18 �I 141 LI �--I H -I -IuIqf�ypl4Mp7j�67171�f1 c 14 III 1 1 1 1 1 1 1 1 1 1 171 1 1 n 7 1,I — u 12 4-I 141 � l�I � 4-I W L �/ 141 � I4 � Z 1 5 10-4 8 ITI IT 1 1 F ITI FJ TI .�l 17 171 IT I 7 IT FJ dN44 6 -I141-�- k14-1�4 -I1414-1I4 k14-1�4 -I�41 4 2 -I 1717-1 1 7 ITI 17171 IT I 7 1T1 7 TI IT 1 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 2122 2324 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 4142 43 44 45 Time (hours) ■Runoff 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: 12S BMP 39 Inflow Area = 11.290 ac, 58.10% Impervious, Inflow Depth = 1.78" for 1 -Yr event Inflow = 25.60 cfs @ 12.07 hrs, Volume= 1.677 of Outflow = 4.25 cfs @ 12.52 hrs, Volume= 1.386 af, Atten= 83%, Lag= 26.9 min Primary = 4.25 cfs @ 12.52 hrs, Volume= 1.386 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Peak Elev= 453.71' @ 12.52 hrs Surf.Area= 18,748 sf Storage= 37,179 cf Plug -Flow detention time= 413.6 min calculated for 1.385 of (83% of inflow) Center -of -Mass det. time= 339.4 min ( 1,163.2 - 823.8 ) Volume Invert Avail.Storage Storage Description #1 451.50' 133,666 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 451.50 14,202 0 0 452.00 16,001 7,551 7,551 453.00 17,587 16,794 24,345 454.00 19,230 18,409 42,753 455.00 20,930 20,080 62,833 456.00 22,686 21,808 84,641 457.00 24,498 23,592 108,233 458.00 26,367 25,433 133,666 Device Routina Invert Outlet Devices #1 Primary 449.00' 18.0" Round Culvert L= 56.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 449.00'/448.00' S=0.0179'/' Cc= 0.900 n=0.013 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 451.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 453.00' 30.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 455.35' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 456.50' 10.0' long x 19.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.25 cfs @ 12.52 hrs HW=453.71' (Free Discharge) L =Culvert (Passes 4.25 cfs of 16.92 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 6.98 fps) 3=Orifi ce/G rate (Orifice Controls 4.01 cfs @ 3.21 fps) 4=Orifi ce/G rate ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=451.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 15 N V 3 0 LL / / / / / / / / / / / � 25.60 cfs TIT �I-4 III I AI 4.25 cfs Pond 3P: 12S BMP 39 Hydrograph -L- I_ -L- I —L I —T �— 1 T —fr f["—A%"=41 X24J T T 1 T 1 7PO—a* Ea r ---#5i.7-1' I —� t 1-1 T 1-1 -tSto-rpWL7,179tcfl --� 4-1 1 T I I T 1 1T �-1-4 �- fit I T I T I t- ����%//////////////////////////////////////////////////////////////////////////////////////% ■ Inflow ■ outflow ■ Primary ■ Secondary 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 16 Time span=1.00-45.00 hrs, dt=0.05 hrs, 881 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=11.290 ac 0.00% Impervious Runoff Depth=2.16" Flow Length=1,436' Tc=42.9 min CN=70 Runoff=16.07 cfs 2.035 of Subcatchment2S: Post -Development Runoff Area=11.290 ac 58.10% Impervious Runoff Depth=3.83" Flow Length=1,751' Tc=15.2 min CN=88 Runoff=53.60 cfs 3.604 of Pond 3P: 12S BMP 39 Peak Elev=455.60' Storage=75,681 cf Inflow=53.60 cfs 3.604 of Primary=16.04 cfs 3.304 of Secondary=0.00 cfs 0.000 of Outflow=16.04 cfs 3.304 of Total Runoff Area = 22.580 ac Runoff Volume = 5.639 of Average Runoff Depth = 3.00" 70.95% Pervious = 16.020 ac 29.05% Impervious = 6.560 ac 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: Pre -Development Runoff = 16.07 cfs @ 12.42 hrs, Volume= 2.035 af, Depth= 2.16" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.17" Area (ac) CN Description 11.290 70 Woods, Good, HSG C 11.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 107 0.0607 0.13 Sheet Flow, Sheet flow Woods: Light underbrush n= 0.400 P2= 3.56" 4.6 711 0.0295 2.58 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 9.5 618 0.0470 1.08 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 15.0 Direct Entrv. 42.9 1,436 Total Subcatchment 1S: Pre -Development Hydrograph 18 I I I I I IP I I i I i I i I i I I I I I 1 16 �I Irt 16.07 cfs 1-r I r -t Irt I n I rt l ri jy-1pe-15 ` I 14 t 1-t I fit 1iI t 1� I t l I -t I t 11 OL 6-k1at1 Aaa l � =t 4"I — — — — — — — — — — — — 13 -I 1-� I -H IH 1+1 H 1-� Rtiddff AJr6&".2N AtI 12 11 t_� �_1 �4 4_I Jou )gTpq�043151gf1 10 4-I IT I S I S I J_ I IT I� n 1 i ��:1 - 8 = 4 LL 7 LITIL uIII aIEITIAI1IaIjL4�A1 6 4 V ITIfi 11-1 r-tTI ITIfit I1r IrtI TI IT 3 1 / ISI ITIt . I t_1 ISI ISI �_t I 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 2122 2324 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 4142 43 44 45 Time (hours) ■Runoff 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: Post -Development Runoff = 53.60 cfs @ 12.07 hrs, Volume= 3.604 af, Depth= 3.83" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.17" Area (ac) CN Description 4.730 74 >75% Grass cover, Good, HSG C 6.560 98 Paved parking, HSG C 11.290 88 Weighted Average 4.730 41.90% Pervious Area 6.560 58.10% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.4 100 0.0500 0.26 Sheet Flow, III` �r �I� 50 Grass: Short n= 0.150 P2= 3.56" 1.8 289 0.0303 2.61 Shallow Concentrated Flow, 45 LI 141 1+1 Grassed Waterway Kv= 15.0 fps 7.0 1,362 40 3.24 Direct Entry, 15.2 1,751 Total 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 2122 2324 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 4142 43 44 45 Time (hours) ■Runoff Subcatchment 2S: Post -Development Hydrograph 60- 55 53.60 cfs III` �r �I� 50 LI IL I Ll L LI IL �11A�-`tic �a�r�fl�l 1��1 45 LI 141 1+1 H L 114 RjAhdff A"600'I-4.290 01c1 40 LI 171 Tl IT1 FJ T -Ljp f�yMgTp7�ffl141�f1 35 0 30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 nQ#F r � .1 25 ILLIL I!I�I�I!I!I�I�I�I!I W�� � 1' / II151.1 20 LI 4 1 I4 I H 141 H d'N481 15 10 fit Irt L l l Irt 5 11111111 1111111111111111111111111111 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 2122 2324 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 4142 43 44 45 Time (hours) ■Runoff 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: 12S BMP 39 Inflow Area = 11.290 ac, 58.10% Impervious, Inflow Depth = 3.83" for 10 -Yr event Inflow = 53.60 cfs @ 12.07 hrs, Volume= 3.604 of Outflow = 16.04 cfs @ 12.33 hrs, Volume= 3.304 af, Atten= 70%, Lag= 16.0 min Primary = 16.04 cfs @ 12.33 hrs, Volume= 3.304 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Peak Elev= 455.60' @ 12.33 hrs Surf.Area= 21,981 sf Storage= 75,681 cf Plug -Flow detention time= 234.4 min calculated for 3.300 of (92% of inflow) Center -of -Mass det. time= 191.6 min ( 993.7 - 802.1 ) Volume Invert Avail.Storage Storage Description #1 451.50' 133,666 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 451.50 14,202 0 0 452.00 16,001 7,551 7,551 453.00 17,587 16,794 24,345 454.00 19,230 18,409 42,753 455.00 20,930 20,080 62,833 456.00 22,686 21,808 84,641 457.00 24,498 23,592 108,233 458.00 26,367 25,433 133,666 Device Routina Invert Outlet Devices #1 Primary 449.00' 18.0" Round Culvert L= 56.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 449.00'/448.00' S=0.0179'/' Cc= 0.900 n=0.013 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 451.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 453.00' 30.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 455.35' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 456.50' 10.0' long x 19.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=15.93 cfs @ 12.33 hrs HW=455.60' (Free Discharge) L =Culvert (Passes 15.93 cfs of 20.57 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.33 cfs @ 9.62 fps) 3=Orifi ce/G rate (Orifice Controls 9.21 cfs @ 7.37 fps) 4=Orifi ce/G rate (Weir Controls 6.39 cfs @ 1.62 fps) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=451.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 20 Pond 3P: 12S BMP 39 Hydrograph 53.60 cfs 60 55 50 A 45 40 -4 y 35 � � 3 30 LL25 20 /L16.04 cfs 15 / 10 I-hifF"-A"=41 X240 �cI 1-1 -TOak EJO--455.00' 1 1 I Storpgle7l6�11cf1 --14- 1 1 141-t�I '�� I�IIIIIIIIII rZZZZZZZZZ ■ Inflow ■ outflow ■ Primary ■ Secondary 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 100 -Yr Rainfall=7.62" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: 12S BMP 39 Inflow Area = 11.290 ac, 58.10% Impervious, Inflow Depth = 6.20" for 100 -Yr event Inflow = 84.58 cfs @ 12.07 hrs, Volume= 5.830 of Outflow = 33.63 cfs @ 12.27 hrs, Volume= 5.526 af, Atten= 60%, Lag= 12.5 min Primary = 22.97 cfs @ 12.27 hrs, Volume= 5.295 of Secondary = 10.66 cfs @ 12.27 hrs, Volume= 0.231 of Routing by Stor-Ind method, Time Span= 1.00-45.00 hrs, dt= 0.05 hrs Peak Elev= 457.04' @ 12.27 hrs Surf.Area= 24,570 sf Storage= 109,181 cf Plug -Flow detention time= 172.4 min calculated for 5.526 of (95% of inflow) Center -of -Mass det. time= 142.0 min ( 930.8 - 788.8 ) Volume Invert Avail.Storage Storage Description #1 451.50' 133,666 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 451.50 14,202 0 0 452.00 16,001 7,551 7,551 453.00 17,587 16,794 24,345 454.00 19,230 18,409 42,753 455.00 20,930 20,080 62,833 456.00 22,686 21,808 84,641 457.00 24,498 23,592 108,233 458.00 26,367 25,433 133,666 Device Routina Invert Outlet Devices #1 Primary 449.00' 18.0" Round Culvert L= 56.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 449.00'/448.00' S=0.0179'/' Cc= 0.900 n=0.013 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 451.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 453.00' 30.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 455.35' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 456.50' 10.0' long x 19.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=22.95 cfs @ 12.27 hrs HW=457.03' (Free Discharge) L =Culvert (Inlet Controls 22.95 cfs @ 12.99 fps) 2=Orifice/Grate (Passes < 0.38 cfs potential flow) 3=Orifi ce/G rate (Passes < 11.69 cfs potential flow) 4=Orifi ce/G rate (Passes < 99.77 cfs potential flow) te5 Secondary OutFlow Max=10.33 cfs @ 12.27 hrs HW=457.03' (Free Discharge) =Broad -Crested Rectangular Weir (Weir Controls 10.33 cfs @ 1.96 fps) 2018.07.20. Phase 12S Western BMP #39 Type 1124 -hr 100 -Yr Rainfall= 7.62 " Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 25 Pond 3P: 12S BMP 39 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (hours) Hydrograph cfs -4f'a�OSecondary LIn84.58 w4 / —f � i- I I + I I -POA E leV 457.Q4'I 85 85 / $5 t 1-1 t 1-170 65 /Tl EIS :1 Z I I Z ID I E I Z E:1::1 EI 60 / w 55 50 0 45 / / 33.63 cfs — 4- 1-1 1+ 1-1 1� u 40 / 30 / / 22.97 cfs fi l 25 20 / 15 , 10.66 cfs 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (hours) DATE: 9/23/2018 DESIGNED BY: LEG F'KUJt=U I NAML: briar Uriapel - Phase 12 bw I;ju NKUJL(: I NU: UNLUKLU bY: UUA PROJECT LOCATION: Chatham Countv. NC 2735-0231 Pond Name= BMP #39 Riser Outer Width = 5 ft Riser Outer Length = 5 ft Riser Inner Width = 4 ft Riser Inner Length = 4 ft Riser Height = 6.85 ft Concrete Base Length = 7 ft Concrete Base Width = 7 ft Concrete Base Depth = 15 in Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety 9,248 Ib 9,188 Ib 18,435 Ib 10,686 Ib 3,822 Ib 14,508 Ib 1.27 Design Acceptable DATE: 09/23/2018 DESIGNED BY: LEG FKUJtt- I NAIVIt: briar Gnapel F-nase -iz F'KUJtkl I IVU: UNIZUKtU by PROJECT LOCATION: Chatham County, NC 2735-0231 GCA Storm Outlet Structure Structure= BMP #39 Out Quo/Qfull = 1.14 Size= 18 in V/Vfull = MAX Quo = 16.04 cfs V = 9.1 fps Qfull = 14.03 cfs Vfull = 7.94 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAx = 15 in Riprap Class = 1 s Apron Thickness = 24 in 3 Apron Length = 12.0 ft Apron Width = 3 x Dia = 5.0 ft Length Wet Detention Pond #40 Design WATER QUALITY POND CALCULATIONS Project Name Briar Chapel - Phase 12N (BMP #40 Project Number 02735-0231 Date September 23, 2018 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Briar Chapel - Phase 12N (BMP #40) Project No. 02735-0231 Date September 23, 2018 Total site area 483,218 square feet = 11.09 acres Impervious areas Drainage area to pond Existing Proposed Change [sf] [sf] [sf] Other Drainage Existing [sf] Area Proposed [sf] On-site buildings (BUA) 0 133,600 133,600 0 0 On-site streets 0 29,508 29,508 0 0 On-site alleys 0 8,582 8,582 0 0 On-site sidewalks 0 7,598 7,598 0 0 On-site future open space 0 0 0 0 0 Off-site future development 0 0 0 0 0 Contin enc 0 32,000 32,000 0 0 Total Impervious 0 211,288 211,288 0 0 Non -impervious areas Drainage area to pond Existing Proposed Change [sf] [sf] [sf] Other Drainage Area Existing Proposed [sf] [sf] On-site grass/landscape 0 267,999 267,999 0 0 On-site woods 483,218 0 -483,218 0 0 Other undeveloped 0 0 0 0 0 Total off-site non -impervious 0 0 0 0 0 Total non -impervious 1 483,218 1 267,999 1 -215,219 0 1 0 Total Drainage Area 1 483,218 1 483,218 1 0 1 0 1 0 Percent Impervious 1 0.0 1 43.7 1 43.7 1 n/a I n/a 2018.07.23.BMP#40 Phase 12N.xls Site Drainage Area Data Page 2 of 16 Printed 9/23/2018 10:17 AM Water Quality Pond Surface Area Calculations Project Briar Chapel - Phase 12N (BMP #40) Project No. 02735-0231 Date September 23, 2018 Total on-site drainage area to pond 483,218 square feet Total impervious area in drainage area 211,288 square feet Average water depth of basin at normal pool 3.0 feet Location of site Chatham County Site region Piedmont % Impervious cover 43.7 percent If the site is in a coastal area, will a vegetative filter be used? Surface Area/Drainage Area Ratios: For a site in the Piedmont For a site in a Coastal County Required surface area of pond: For a site in the Piedmont For a site in a Coastal County Notes: 2018.07.23.BMP#40 Phase 12N.xls Pond Surface Area Calcs 1.6 percent percent 7,810.0 square feet 8,960.0 square feet Page 3 of 16 Printed 9/23/2018 10:17 AM Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Phase 12N (BMP #40) Project No. 02735-0231 Date September 23, 2018 Drainage area 483,218 square feet Impervious area 211,288 square feet Rainfall depth 1.00 inches Percent Impervious 43.7 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.44 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 17,860.0 cubic feet Notes: 2018.07.23.BMP#40 Phase 12N.xls Runoff Volume Calcs Page 4 of 16 Printed 9/23/2018 10:17 AM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Temporary Pool Briar Chapel - Phase 12N (BMP #40) 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 503.5 0 16,577.0 0.381 16,577.0 0.38 0.0 0.0 0.0 0.0 504 0.5 19,473.0 0.447 19,473.0 0.07 9,012.5 0.21 9,012.5 0.21 504.5 1 20,564.0 0.472 20,564.0 0.03 10,009.3 0.23 19,021.8 0.44 505 1.5 21,679.0 0.498 21,679.0 0.03 10,560.8 0.24 29,582.5 0.68 506 2.5 23,961.0 0.550 23,961.0 0.05 22,820.0 0.52 52,402.5 1.20 507 3.5 26,282.0 0.603 26,282.0 0.05 25,121.5 0.58 77,524.0 1.78 508 4.5 28,660.0 0.658 28,660.0 0.05 27,471.0 0.63 104,995.0 2.41 508.5 5 29,887.0 0.686 29,887.0 0.03 14,636.8 0.34 119,631.8 2.75 2018.07.23.BMP#40 Phase 12N.xls Stage Storage (Temp Pool) Page 5 of 16 Printed 9/23/2018 10:17 AM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Main Pool Briar Chapel - Phase 12N (BMP #40) 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] 499 0 4,979.0 0.114 4,979.0 0.1 0.0 0.0 0.0 0.0 500 1 6,364.0 0.146 1,385.0 0.0 5,671.5 0.1 5,671.5 0.1 501 2 7,821.0 0.180 1,457.0 0.0 7,092.5 0.2 12,764.0 0.3 502 3 9,349.0 0.215 1,528.0 0.0 8,585.0 0.2 21,349.0 0.4 503 4 10,946.0 0.251 1,597.0 0.0 10,147.5 0.2 31,496.5 0.4 503.5 4.5 12,603.0 0.289 1,657.0 0.0 5,887.3 0.1 37,383.8 0.4 2018.07.23.BMP#40 Phase 12N.xls Stage Storage (Main Pool) Page 6 of 16 Printed 9/23/2018 10:17 AM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Forebays Briar Chapel - Phase 12N (BMP #40) 02735-0231 September 23, 2018 Contour ID Stage Area [sq. ft.] Area [acres] Incremental Area [sq. ft.] Incremental Area [acres] Incremental volume [cu. ft] Incremental volume [acre -ft] Cumulative volume [cu. ft] Cumulative volume [acre -ft] Western Forebay 500 0 412.0 0.009 412.0 0.0 0.0 0.0 0.0 501 1 794.0 0.018 382.0 0.0 603.0 0.0 603.0 502 2 1,292.0 0.030 498.0 0.0 1,043.0 0.0 1,646.0 503 3 1,916.0 0.044 624.0 0.0 1,604.0 0.0 3,250.0 503.5 3.5 2,721.0 0.062 805.0 0.0 1,159.3 0.0 4,409.3 Eastern Forebay 501 0 164.0 0.004 164.0 0.0 0.0 0.0 0.0 0.0 502 2 463.0 0.011 299.0 0.0 313.5 0.0 313.5 0.0 503 3 883.0 0.020 420.0 0.0 673.0 0.0 986.5 0.0 503.5 3.5 1,438.0 0.033 555.0 0.0 580.3 0.0 1,566.8 0.0 2018.07.23.BMP#40 Phase 12N.xls Stage Storage (Forebays) Page 7 of 16 Printed 9/23/2018 10:17 AM Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Phase 12N (BMP #40) Project No. 02735-0231 Date September 23, 2018 Water quality treatment volume Total treatment volume Maximum head of water above dewatering hole Driving head Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 17,860 cubic feet 19,022 cubic feet 1.00 feet 0.33 feet 0.60 2.50 inches I 0.034 square feet 4.9 square inches 0.034 square feet 4.9 square inches 2.2 days 52.6 hours 2.3 days 56.0 hours Notes: Dewatering time formula: t (days) = V / (Cd*A*Sgrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) Water Quality Pond Summary Information Project Briar Chapel - Phase 12N (BMP #40) Project No. 02735-0231 Date September 23, 2018 Drainage area to pond 483,218 square feet = 11.09 acres Impervious area in drainage area 211,288 square feet= 4.85 acres Bottom of pond elevation 498.00 feet Normal pool elevation 503.50 feet Main pond volume at normal pool 37,384 cubic feet Forebay volume at normal pool 5,976 cubic feet Forebay % of total volume 16.0% Required volume for design rainfall 17,860 cubic feet Required surface area for main pool 7,810 square feet Volume provided for storage of design rainfall = 19,022 cubic feet at elevation Surface area provided at normal pool of main pond = 12,603 square feet Average Depth 3.00 feet F,nn r, 2018.07.23.BMP#40 Phase 12N.xls Summary Data Page 10 of 16 Printed 9/23/2018 10:17 AM Pre -Development Subcat Reach on Link 2S Post -Development 3P Phase 12 North - BMP #40 2018.08.13. Phase 12N Wet Pond BMP #40 Type II 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 6 Time span=1.00-60.00 hrs, dt=0.05 hrs, 1181 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=11.090 ac 0.00% Impervious Runoff Depth=0.00" Flow Length=880' Tc=38.8 min CN=70 Runoff=0.01 cfs 0.004 of Subcatchment2S: Post -Development Runoff Area=11.090 ac 43.73% Impervious Runoff Depth=0.15" Flow Length=110' Tc=11.5 min CN=84 Runoff=1.85 cfs 0.140 of Pond 3P: Phase 12 North - BMP #40 Peak Elev=503.69' Storage=3,341 cf Inflow=1.85 cfs 0.140 of Primary=0.07 cfs 0.139 of Secondary=0.00 cfs 0.000 of Outflow=0.07 cfs 0.139 of Total Runoff Area = 22.180 ac Runoff Volume = 0.145 of Average Runoff Depth = 0.08" 78.13% Pervious = 17.330 ac 21.87% Impervious = 4.850 ac 2018.08.13. Phase 12N Wet Pond BMP #40 Type Il 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Phase 12 North - BMP #40 Inflow Area = 11.090 ac, 43.73% Impervious, Inflow Depth = 0.15" for 1 -Inch event Inflow = 1.85 cfs @ 12.06 hrs, Volume= 0.140 of Outflow = 0.07 cfs @ 18.89 hrs, Volume= 0.139 af, Atten= 96%, Lag= 409.4 min Primary = 0.07 cfs @ 18.89 hrs, Volume= 0.139 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 503.69' @ 18.89 hrs Surf.Area= 17,706 sf Storage= 3,341 cf Plug -Flow detention time= 642.5 min calculated for 0.138 of (99% of inflow) Center -of -Mass det. time= 636.9 min ( 1,549.1 - 912.2 ) Volume Invert Avail.Storage Storage Description #1 503.50' 119,638 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 503.50 16,577 0 0 504.00 19,473 9,013 9,013 505.00 21,679 20,576 29,589 506.00 23,961 22,820 52,409 507.00 26,282 25,122 77,530 508.00 28,660 27,471 105,001 508.50 29,887 14,637 119,638 Device Routing Invert Outlet Devices #1 Primary 502.25' 18.0" Round Culvert L= 41.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 502.25'/ 502.00' S= 0.0061 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 503.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 504.50' 30.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 505.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 506.50' 20.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.07 cfs @ 18.89 hrs HW=503.69' (Free Discharge) L =Culvert (Passes 0.07 cfs of 5.93 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.07 cfs @ 2.13 fps) 3=Orifi ce/G rate ( Controls 0.00 cfs) 4=Orifi ce/G rate ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=503.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.08.13. Phase 12N Wet Pond BMP #40 Type II 24 -hr 1 -Inch Rainfall=1.00" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 10 Pond 3P: Phase 12 North - BMP #40 Hydrograph I44I4I4-4I�I�N 1.85 cfs I�f64r�a1=i 11.090 ac 2 POak EIIe*:�503.69' StQrpge7�,�41 cf Illllliiiiii 0 1 LL I I I I 0.07 cfs 0.00 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Inflow ■ outflow 0 Primary ❑ Secondary 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 11 Time span=1.00-60.00 hrs, dt=0.05 hrs, 1181 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=11.090 ac 0.00% Impervious Runoff Depth=0.69" Flow Length=880' Tc=38.8 min CN=70 Runoff=4.64 cfs 0.640 of Subcatchment2S: Post -Development Runoff Area=11.090 ac 43.73% Impervious Runoff Depth=1.48" Flow Length=110' Tc=11.5 min CN=84 Runoff=23.74 cfs 1.371 of Pond 3P: Phase 12 North - BMP #40 Peak Elev=504.91' Storage=27,640 cf Inflow=23.74 cfs 1.371 of Primary=4.41 cfs 1.284 of Secondary=0.00 cfs 0.000 of Outflow=4.41 cfs 1.284 of Total Runoff Area = 22.180 ac Runoff Volume = 2.011 of Average Runoff Depth = 1.09" 78.13% Pervious = 17.330 ac 21.87% Impervious = 4.850 ac 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: Pre -Development Runoff = 4.64 cfs @ 12.41 hrs, Volume= 0.640 af, Depth= 0.69" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (ac) CN Description 11.090 70 Woods, Good, HSG C 11.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.0600 0.13 Sheet Flow, Sheet flow Woods: Light underbrush n= 0.400 P2= 3.56" 10.7 780 0.0590 1.21 Shallow Concentrated Flow, Concentrated Flow Woodland Kv= 5.0 fps 15.0 Direct Entrv. Subcatchment 1S: Pre -Development Hydrograph 5 4.64 cfs 4 Iylrtainf�ll�2�.�6�' IRiihotff (Area=11.090 ad rt i� I��Tyc4ume=0.1640 af w 3 R nlOff Dep�h-0.69'I LL low 'Len t r=s$0' 2 I I I I I I I I I I I I I +el_�8181 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ❑Runoff 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 2S: Post -Development Runoff = 23.74 cfs @ 12.04 hrs, Volume= 1.371 af, Depth= 1.48" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (ac) CN Description 6.240 74 >75% Grass cover, Good, HSG C 4.850 98 Paved parking, HSG C 11.090 84 Weighted Average 6.240 56.27% Pervious Area 4.850 43.73% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.56" 0.2 60 0.0500 4.54 Shallow Concentrated Flow, Paved Kv= 20.3 fps 6.0 Direct Entrv. 11.5 110 Total Subcatchment 2S: Post -Development Hydrograph 23.74 cfs V I�Ar_- 1tlt1—f N 14- 0 4 3 U. 12 10 T II r Artl IfiIrt1I III IIIIIIII 6 4 II �I J- I fLyrk"f�11�4.wl' �—Rlarholff lAret#MM tarp I�upqfl�"utnp7 l •13711 of nPff 1p�h �I low Len th=1101 11 .—Ctrru i II twd&4 �I4- -4' I 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■Runoff 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: Phase 12 North - BMP #40 Inflow Area = 11.090 ac, 43.73% Impervious, Inflow Depth = 1.48" for 1 -Yr event Inflow = 23.74 cfs @ 12.04 hrs, Volume= 1.371 of Outflow = 4.41 cfs @ 12.36 hrs, Volume= 1.284 af, Atten= 81 %, Lag= 19.7 min Primary = 4.41 cfs @ 12.36 hrs, Volume= 1.284 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 504.91' @ 12.36 hrs Surf.Area= 21,480 sf Storage= 27,640 cf Plug -Flow detention time= 543.3 min calculated for 1.283 of (94% of inflow) Center -of -Mass det. time= 509.9 min ( 1,345.0 - 835.1 ) Volume Invert Avail.Storage Storage Description #1 503.50' 119,638 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 503.50 16,577 0 0 504.00 19,473 9,013 9,013 505.00 21,679 20,576 29,589 506.00 23,961 22,820 52,409 507.00 26,282 25,122 77,530 508.00 28,660 27,471 105,001 508.50 29,887 14,637 119,638 Device Routing Invert Outlet Devices #1 Primary 502.25' 18.0" Round Culvert L= 41.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 502.25'/ 502.00' S= 0.0061 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 503.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 504.50' 30.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 505.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 506.50' 20.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.39 cfs @ 12.36 hrs HW=504.91' (Free Discharge) L =Culvert (Passes 4.39 cfs of 11.22 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 5.72 fps) 3=Orifi ce/G rate (Orifice Controls 4.20 cfs @ 2.05 fps) 4=Orifi ce/G rate ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=503.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 1-YrRainfa11=2.96" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 15 -------- -------- ����%/////////////////////////////////////////////////////////////////////////////////////////% IN Inflow ' Outflow ❑ Primary IN Secondary Pond 3P: Phase 12 North - BMP #40 Hydrograph HH H �� H H H HI H ///-r 23.74 cfs -t H 14%f Ar"i=f1l.0 6 it� 26 24 I T I rt H H H H H HP F11e"504.%l � � ����0�� 20 18 IT 11 77I7I-TI7HHHHIHIHIHI 16 14 012 1111 111111 LL 10 / I�I�IHHHHHH IHI 8 4.41 cfs -------- -------- ����%/////////////////////////////////////////////////////////////////////////////////////////% IN Inflow ' Outflow ❑ Primary IN Secondary 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 16 Time span=1.00-60.00 hrs, dt=0.05 hrs, 1181 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: Pre -Development Runoff Area=11.090 ac 0.00% Impervious Runoff Depth=2.16" Flow Length=880' Tc=38.8 min CN=70 Runoff=16.99 cfs 1.999 of Subcatchment2S: Post -Development Runoff Area=11.090 ac 43.73% Impervious Runoff Depth=3.43" Flow Length=110' Tc=11.5 min CN=84 Runoff=53.81 cfs 3.166 of Pond 3P: Phase 12 North - BMP #40 Peak Elev=506.26' Storage=58,691 cf Inflow=53.81 cfs 3.166 of Primary=15.36 cfs 3.075 of Secondary=0.00 cfs 0.000 of Outflow=15.36 cfs 3.075 of Total Runoff Area = 22.180 ac Runoff Volume = 5.166 of Average Runoff Depth = 2.79" 78.13% Pervious = 17.330 ac 21.87% Impervious = 4.850 ac 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: Pre -Development Runoff = 16.99 cfs @ 12.37 hrs, Volume= 1.999 af, Depth= 2.16" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.17" Area (ac) CN Description 11.090 70 Woods, Good, HSG C 11.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.0600 0.13 Sheet Flow, Sheet flow 16.99 cfs T Woods: Light underbrush n= 0.400 P2= 3.56" 10.7 780 0.0590 1.21 Shallow Concentrated Flow, Concentrated Flow TI T 1 T 7I Woodland Kv= 5.0 fps 15.0 T TI rt Direct Entrv. 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff Subcatchment 1S: Pre -Development Hydrograph 9 19- — _ — 116. 17 16.99 cfs T T T I T T ���Ii:i4� 15 17 T I I T 1—I TI T 1 T 7I 14 T TI rt 1 t --I rt I I r - ft hOTff AteTd#'�r.M rat12- T— - q�y———•1191- w11 0 19 — fi fi fi% I�If I e�p�h� A LL 7� I� t' 1 T I t I� �I low �_ I. T I S8 I_t 1 t I t I_f I -t 1� t- I t 5 I— � I t I_f t -I t I 3 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: Post -Development Runoff = 53.81 cfs @ 12.03 hrs, Volume= 3.166 af, Depth= 3.43" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.17" Area (ac) CN Description 6.240 74 >75% Grass cover, Good, HSG C 4.850 98 Paved parking, HSG C 11.090 84 Weighted Average 6.240 56.27% Pervious Area 4.850 43.73% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 50 0.0200 0.16 Sheet Flow, Grass: Short n= 0.150 P2= 3.56" 0.2 60 0.0500 4.54 Shallow Concentrated Flow, 1-1 LI LAL)fr_kainfajl�_-6.11!7�' 45 Paved Kv= 20.3 fps 6.0 1 - 1 � Direct Entrv. 11.5 110 Total 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff Subcatchment 2S: Post -Development Hydrograph 60 55 I I I 53.81 cfs 50 I� 1 _ I I LI 1 1-1 LI LAL)fr_kainfajl�_-6.11!7�' 45 14 1 - 1 � � trholff IA e�MKO�IO Olt 40 T 1-I rt l fit rt I� I��u�"�•I61 35 30 -II 0 nIo#f1rr��I , - LL25 _J� LI I ILIIIA I lr1 � LILI�I� 1tl � rrij ii 20 -I 4 1 -H -t . H4-14 1 1 &N 4A 15 10,/r 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: Phase 12 North - BMP #40 Inflow Area = 11.090 ac, 43.73% Impervious, Inflow Depth = 3.43" for 10 -Yr event Inflow = 53.81 cfs @ 12.03 hrs, Volume= 3.166 of Outflow = 15.36 cfs @ 12.25 hrs, Volume= 3.075 af, Atten= 71 %, Lag= 13.1 min Primary = 15.36 cfs @ 12.25 hrs, Volume= 3.075 of Secondary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 506.26' @ 12.25 hrs Surf.Area= 24,562 sf Storage= 58,691 cf Plug -Flow detention time= 260.1 min calculated for 3.075 of (97% of inflow) Center -of -Mass det. time= 242.8 min ( 1,054.0 - 811.2 ) Volume Invert Avail.Storage Storage Description #1 503.50' 119,638 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 503.50 16,577 0 0 504.00 19,473 9,013 9,013 505.00 21,679 20,576 29,589 506.00 23,961 22,820 52,409 507.00 26,282 25,122 77,530 508.00 28,660 27,471 105,001 508.50 29,887 14,637 119,638 Device Routing Invert Outlet Devices #1 Primary 502.25' 18.0" Round Culvert L= 41.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 502.25'/ 502.00' S= 0.0061 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 503.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 504.50' 30.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 505.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 506.50' 20.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=15.36 cfs @ 12.25 hrs HW=506.26' (Free Discharge) L =Culvert (Inlet Controls 15.36 cfs @ 8.69 fps) 2=Orifice/Grate (Passes < 0.27 cfs potential flow) 3=Orifi ce/G rate (Passes < 14.77 cfs potential flow) 4=Orifi ce/G rate (Passes < 34.56 cfs potential flow) te5 Secondary OutFlow Max=0.00 cfs @ 1.00 hrs HW=503.50' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 20 Pond 3P: Phase 12 North - BMP #40 Hydrograph I I I I I I I 53.81 cfs i i T i i I T i i I i i T i i i i i i i i i i i i �Lr����� /� /— E Inflow ■ outflow ■ Primary 60 / rtf 11 fGW Tir-.IJV ■ Secondary 55 / It I T I T It It IT I� I—POak Flev�5O6.261 50 / 45 / lO�a�ICI 40 / ITI TI4TTTTTTTTTT F35:/ / /TIT I T I7 I7 I7 IT IT T TI TI F -I 11 71 330 0 LL / /19; 25 1A r1f 20 / 15.36 cfs I� IT IT TI TI TIT T 15- 51n 10 / 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 100 -Yr Rainfall=7.62" Prepared by McKim & Creed Printed 9/23/2018 HydroCAD® 10.00-15 s/n 04927 @2015 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: Phase 12 North - BMP #40 Inflow Area = 11.090 ac, 43.73% Impervious, Inflow Depth = 5.73" for 100 -Yr event Inflow = 87.84 cfs @ 12.03 hrs, Volume= 5.296 of Outflow = 50.91 cfs @ 12.15 hrs, Volume= 5.203 af, Atten= 42%, Lag= 7.4 min Primary = 17.51 cfs @ 12.15 hrs, Volume= 4.485 of Secondary = 33.41 cfs @ 12.15 hrs, Volume= 0.718 of Routing by Stor-Ind method, Time Span= 1.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 507.23' @ 12.15 hrs Surf.Area= 26,836 sf Storage= 83,723 cf Plug -Flow detention time= 173.1 min calculated for 5.199 of (98% of inflow) Center -of -Mass det. time= 163.8 min ( 960.5 - 796.7 ) Volume Invert Avail.Storage Storage Description #1 503.50' 119,638 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 503.50 16,577 0 0 504.00 19,473 9,013 9,013 505.00 21,679 20,576 29,589 506.00 23,961 22,820 52,409 507.00 26,282 25,122 77,530 508.00 28,660 27,471 105,001 508.50 29,887 14,637 119,638 Device Routing Invert Outlet Devices #1 Primary 502.25' 18.0" Round Culvert L= 41.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 502.25'/ 502.00' S= 0.0061 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 503.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 504.50' 30.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 505.50' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 506.50' 20.0' long x 16.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=17.50 cfs @ 12.15 hrs HW=507.23' (Free Discharge) L =Culvert (Inlet Controls 17.50 cfs @ 9.91 fps) 2=Orifice/Grate (Passes < 0.32 cfs potential flow) 3=Orifi ce/G rate (Passes < 18.96 cfs potential flow) 4=Orifi ce/G rate (Passes < 101.38 cfs potential flow) te5 Secondary OutFlow Max=33.31 cfs @ 12.15 hrs HW=507.23' (Free Discharge) =Broad -Crested Rectangular Weir (Weir Controls 33.31 cfs @ 2.28 fps) 2018.08.13. Phase 12N Wet Pond BMP #40 Type 1124 -hr 100 -Yr Rainfall= 7.62 " Prepared by McKim & Creed Printed 9/23/2018 HydroCADO 10.00-15 s/n 04927 © 2015 HydroCAD Software Solutions LLC Page 25 Pond 3P: Phase 12 North - BMP #40 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) Hydrograph H I H 4 H H H H I H ■ Inflow 87.84 Cfs I H It H It � f r"1=�1.(qb utflow IN Primary secondary 95 90 i I 111 H H H FP"k FzlIe` W.23i IN 85 80 / / H H --4 H IH 1---4I ti°�a1g�7�k? 7570 / 65 j 50.91 cfs It I� IH H H H HI HI �I �I 60 X55 / H HHHH H 11El FIHH 50 045 4 -4 -4 HHHHHHH u. 40 / 33.41 cfs 35 / H H H H H H H H H H H H 30 25 20 / j 1 cis H H H H HI HI H fi t 15 / 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) DATE: 9/23/2018 DESIGNED BY: LEG F'KUJLU I NAML: briar chapel - Phase 12 NKUJt=U I NU: UHLUKLU bY: UUA PROJECT LOCATION: Chatham Countv. NC 2735-0231 Pond Name= BMP #40 Riser Outer Width = 5 ft Riser Outer Length = 5 ft Riser Inner Width = 4 ft Riser Inner Length = 4 ft Riser Height = 3.75 ft Concrete Base Length = 6 ft Concrete Base Width = 6 ft Concrete Base Depth = 12 in Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety 5,063 Ib 5,400 Ib 10,463 Ib 5,850 Ib 2,246 Ib 8,096 Ib 1.29 Design Acceptable DATE: 09/23/2018 DESIGNED BY: LEG FKUJtt- I NAIVIt: briar Gnapel F-nase -iz F'KUJtkl I IVU: UNIZUKtU by PROJECT LOCATION: Chatham County, NC 2735-0231 GCA Storm Outlet Structure Structure= BMP #40 Out Quo/Qfull = 1.36 Size= 18 in V/Vfull = MAX Quo = 11.12 cfs V = 9.9 fps Qfull = 8.19 cfs Vfull = 4.63 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAx = 15 in Riprap Class = 1 s Apron Thickness = 24 in 3 Apron Length = 12.0 ft Apron Width = 3 x Dia = 5.0 ft Length COUNTY AND AGENCY CONTACTS A. Chatham County Planning Department Dunlap Building 80 East Street Pittsboro, NC 27312 (919) 542-8204 phone Contact: Jason Sullivan Email: jason.sullivan@chathamnc.org B. Chatham County Environmental Services Dunlap Building 80 East Street Pittsboro, NC 27312 (919) 542-8268 phone Contact: Morgan DeWit Email: morgan.dewit@chathamnc.org C. Chatham County Soil Erosion and Sedimentation Control Dunlap Building 80 East Street Pittsboro, NC 27312 (919) 542-8268 phone Contact: Morgan DeWit Email: morgan.dewit@chathamnc.org D. Chatham County Public Works 964 East Street, 2nd Floor, Suite 205 Pittsboro, NC 27312 (919) 542-8270 phone Contact: Larry Bridges Email: larry.bridges@chathamnc.org BC PHASE 12 CONSTRUCTION DRAWINGS U.S. HWY 15-501 and MANN'S CHAPEL ROAD E. NCDOT Division 8, District 1 300 DOT Drive P.O. Box 1164 Asheboro, NC 27204 (336) 318-4000 phone Contact: Matthew Kitchen, PE Email: mwkitchen@ncdot.gov F. NCDENR Division of Environmental Health Public Water Supply Section 1634 Mail Service Center Raleigh, NC 27699-1634 (919) 707-9064 phone Contact: Shashi Bhatta Email: shashi.bhatta@ncdenr.gov H. NCDENR Division of Water Quality Surface Water Protection 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 phone Contact: Danny Smith Email: danny.smith@ncdenr.gov G. NCDEQ Division of Water Quality 512 N. Salisbury St Archdale Building, 9th Floor Raleigh, NC 27604 (919) 807-6373 phone Contact: Karen Higgins Email: karen.higgins@ncdenr.gov CHATHAM COUNTY, NORTH CAROLINA DATE: SEPTEMBER 18, 2018 TO CHAPEL HILL MANN'S CHAPEL RD ------------- 5 GREAT o SITE RIDGE ,n -----� PKWY BOULDER �_- BRIAR CHAPEL -- POINT DR PKWY _ J�------1--------� ---- rte' -----1 �- -- L-�/ REws s TORIC - TO ..00,� NORTH PITTSBORO VICINITY MAP NTS v 44 BRIAR_ CCHAP L° by Newland COMMUNITIES PROJECT DATA NAME OF PROJECT: BC PHASE 12 NORTH CHATHAM COUNTY, NORTH CAROLINA OWNER: NNP BRIAR CHAPEL, LLC 1382 BRIAR CHAPEL PARKWAY CHAPEL HILL, NC 27516 PHONE: (919) 951-0700 FAX: (919) 240-4963 CONTACT: LEE BOWMAN EMAIL: (bowman@newlandco.com PREPARED BY: McKIM & CREED 1730 VARSITY DRIVE, SUITE 500 RALEIGH, NORTH CAROLINA 27606 PHONE: (919) 233-8091 FAX: (919) 233-8031 CONTACT: GARETH AVANT, PE EMAIL: gavant@mckimcreed.com PROJECT AREA: 36.19 AC These improvements shall be constructed in accordance with the following plans, and the Standard Specifications of NCDOT and Chatham County. MCI<IM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com SHEET INDEX CO.1 COVER SHEET C0.2 EXISTING CONDITIONS/DEMOLITION PLAN C1.0 OVERALL SITE PLAN C1.1 SITE PLAN C1.2 SITE PLAN C1.3 SITE PLAN C2.0 OVERALL UTILITY PLAN C2.1 UTILITY PLAN C2.2 UTILITY PLAN C2.3 UTILITY PLAN C3.1 STAGE 1 EROSION CONTROL PLAN C3.2 STAGE 1 EROSION CONTROL PLAN C3.3 STAGE 1 EROSION CONTROL PLAN OVERALL STAGE 2 GRADING, DRAINAGE, AND EROSION C3.4 CONTROL PLAN OVERALL STAGE 2 GRADING, DRAINAGE, AND EROSION C3.5 CONTROL PLAN STAGE 2 GRADING, DRAINAGE, AND EROSION CONTROL C3.6 PLAN PLAN & PROFILE ROAD A C4.1 STA. 10+00.00 TO STA. 21+14.68 PLAN & PROFILE ROAD F (1 OF 3) C4.2 STA. 10+00.00 TO STA. 21 +00.00 PLAN & PROFILE ROAD F (2 OF 3) C4.3 STA. 21 +00.00 TO STA. 31 +00.00 PLAN & PROFILE ROAD F (3 OF 3) C4.4 STA. 31 +00.00 TO STA. 40+09.81 PLAN & PROFILE ALLEY H C4.5 STA. 10+00.00 TO STA. 24+26.66 PLAN & PROFILE ALLEY I C4.6 STA. 10+00.00 TO STA. 12+40.64, SEWER OUTFALL, STA 10+00.00 TO 13+65.57 PLAN & PROFILE GREAT RIDGE PARKWAY (1 OF 2) C4.7 STA 14+50.00 TO STA 25+50.00 PLAN & PROFILE GREAT RIDGE PARKWAY (2 OF 2) C4.8 STA 25+50.00 TO STA 32+50.00, STA 38+50.00 TO 42.50.00 PLAN & PROFILE SANITARY SEWER FORCE MAIN C4.9 STA 10+00.00 TO STA 22+00.00 PLAN & PROFILE SANITARY SEWER FORCE MAIN STA 10+00.00 TO STA 22+00.00 C4.10 PUMP STATION ACCESS ROAD STA. 10+00.00 TO STA. 17+50.00 D1.1 EROSION AND SEDIMENTATION CONTROL DETAILS D1.2 EROSION AND SEDIMENTATION CONTROL DETAILS D2.1 NCDOT ROADWAY DETAILS D2.2 NCDOT DRAINAGE DETAILS D3.1 UTILITY DETAILS D3.2 UTILITY DETAILS D4.1 BMP #38 PLAN & DETAILS D4.2 BMP #39 PLAN & DETAILS D4.3 BMP #39 PLAN & DETAILS D4.4 BMP #39 PLAN & DETAILS D4.5 BMP #40 PLAN & DETAILS D4.6 BMP #40 PLAN & DETAILS D4.7 BMP #40 PLAN & DETAILS D4.8 ISTORM DRAINAGE AND SANITARY SEWER TABLES "p ESSION % G�2- SEALM' 036348 09/18/2018 %q�Q FNGIN0, CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UTILITY \ DAMAGE / FINAL DRAWINGS FOR REVIEW PURPOSES ONLY N W Cn Q 2 n 0 00 co N 0 co N 0 J z 0 U) W Cn 0 a_ n W_ LU 0 z_ Q 0 J Q z H N/F MEACHAM MARVIN KEITH ETAL DB 15E, PG. 0,382 DEMOLITION NOTES: 1. NO EARTH -DISTURBING ACTIVITIES SHALL COMMENCE UNTIL ALL PERIMETER EROSION CONTROL MEASURES ARE IN PLACE IN ACCORDANCE WITH THE EROSION CONTROL SEQUENCE SHOWN IN THESE PLANS. 2. NO EARTH -DISTURBING ACTIVITY OR OTHER WORK SHALL TAKE PLACE WITHIN WETLAND AREAS NOTED ON PLANS. CONTRACTOR SHALL FIELD VERIFY WETLAND LIMITS FLAGGING IS IN PLACE AND SHALL NOT ENTER WETLAND AREAS. IF WETLAND FLAGGING IS MISSING OR OTHERWISE DAMAGED, IT IS CONTRACTOR'S RESPONSIBILITY TO NOTE WETLAND LIMITS AND PREVENT DISTURBANCE OR OTHER ACTIVITY WITHIN WETLANDS. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE PROTECTION OF ALL PROPERTY CORNER MONUMENTS, AND SHALL HAVE, AT HIS EXPENSE, ALL CORNER MONUMENTS REPLACED WHICH ARE DISTURBED BY CONSTRUCTION ACTIVITIES AKPAR: 2190 _ _ - _ - -�" ZONING: R1 � �------_- ACREAGE. -,30.59 \ - - �- - _ � --'- -� f -- - - 4. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING IMPROVEMENTS, AT HIS EXPENSE, DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE PUBLIC DURING CONSTRUCTION, WHICH INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION FENCING, BARRICADES, SIGNAGE, ETC. ....... --- ; - J - N,/ 6. CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH ALL REGULATIONS GOVERNING THE DEMOLITION, REMOVAL, TRANSPORTATION AND DISPOSAL OF 46&- , r \ - \ - / / --�7 I / `-��� \ --I 'Ale / ALL DEMOLITION DEBRIS. _ \0- 7. CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST OSHA STANDARDS FOR EXCAVATION AND TRENCHING PROCEDURES. CONTRACTOR _ - - ✓ / 1-�_-�-- / - / - \ ) �l�%y / \ / SHALL USE SUPPORT SYSTEMS, SLOPING, BENCHING, ETC. AS NECESSARY FOR THESE OPERATIONS, AND SHALL COMPLY WITH ALL OSHA PERFORMANCE CRITERIA. 8. CONTRACTOR SHALL TAKE SPECIAL CARE TO PROTECT ALL UTILITIES AND APPURTENANCES TO REMAIN. �,--� /i CHATHAM _ - / / I \ ( \ \ \ 100' PERIMETER i - - / - COUNTY STREAM / ! \ / BUFFER (TYP.) BUFFER (TYP.) I 4�1! CHATHAM COUNTY 10' /lc NO -BUILD BUFFER (TYP.) \ c-1 N\ 500 -YEAR FLOOD LINE - / \ J / 1 1 � / / 1 1/ i FLOOD WA Y I \ I N/F l I I \ _ �8� \ / / I 100 -YEAR FLOOD LINE NNP BRIAR CHAPEL LLC / l / Il \ / _ \ / // - - / / ! I / / I r /' / 1 \ I / DB 1544 PG. 0674 / AKPAR: 88053 \ L 1 / ZONING: R I ACREAGE: 26.98 *** NOTICE TO CONTRACTOR *** THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY, IN WRITING, OF ANY DISCREPANCIES OR OMISSIONS TO THE TOPOGRAPHIC INFORMATION. THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION (HORIZONTAL AND VERTICAL) OF ANY BURIED CABLES, CONDUITS, PIPES, AND STRUCTURES (STORM SEWER, SANITARY SEWER, WATER, GAS, TELEVISION, TELEPHONE, ETC.) WHICH IMPACT THE CONSTRUCTION SITE. THE CONTRACTOR(S) SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES ARE FOUND BETWEEN THE ACTUAL CONDITIONS VERSUS THE DATA CONTAINED IN THE CONSTRUCTION PLANS. ANY COSTS INCURRED AS THE RESULT OF NOT CONFIRMING THE CONDUITS, PIPES, AND STRUCTURES SHALL BE BORNE BY THE CONTRACTOR. It NIF I I I 1 I I r / / MEDLIN DONALD F / DB 1544, PG. 0674 CT p / /AKPAR: 62269 � ! ZONING: RI NIF ACREAGE: 7.77 WILSON RICHARD B & , - - �� _/ / J I 1 ' _ MARGARET D �- / ---r-- II 1 l / �� Y \ GENERAL NOTES: LEGEND: 10' NO BUILD BUFFER LINE RIPARIAN BUFFER LINE EX. WETLANDS FLOODWAY 100 -YEAR FLOODPLAIN 500 -YEAR FLOODPLAIN EX. CONTOUR - - - PHASE BOUNDARY OVERALL PROPERTY BOUNDARY ` 1 I OB 495, PG. 0676 / ,� �� AKPAR: 62256// ZONING: R 1 ACREAGE: 7.44 / 00, I\\ \ \ \--� \ I / I i/ �� \� \ I I \ \ �,,'���� I I I I I I l r I1_�-- I---- r� I7� / I I \ 101 If --- HALF DOLLAR ROAD -- 100' PERIMETER ✓r I / / \ \\ 1 \\ \ -\ 1 I I I \ \ \ > \ \ '---- (so'PusucR,w \ - I / EXISTING HALF DOLLAR 1 I I \ ) 1 - _ _ - --_-----L -----I------� / I I BUFFER (TYP.) 1 \ ROAD ROW EX. LIMITS OF DISTURBANCE EX. WATER MAIN EX. STORM DRAINAGE PIPE REFER TO THE FOLLOWING MCKIM & CREED, INC. CONSTRUCTION PLANS, AND ALL SUBSEQUENT CONSTRUCTION BULLETINS FOR INFORMATION ON EXISTING SITE INFRASTRUCTURE: - BRIAR CHAPEL - PHASE 13 SECTIONS 1 & 2 CONSTRUCTION PLANS SEALED FEBRUARY 2, 2018 - BRIAR CHAPEL - GREAT RIDGE PARKWAY NORTH CONSTRUCTION PLANS SEALED FEBRUARY 6, 2018. REFER TO THE FOLLOWING JOHN R. MCADAMS COMPANY CONSTRUCTION PLANS, AND ALL SUBSEQUENT CONSTRUCTION BULLETINS FOR INFORMATION ON EXISTING SITE INFRASTRUCTURE: - GREAT RIDGE PARKWAY NORTH, AND SUBSEQUENT REVISIONS SEALED JUNE 22, 2007 1 \ / '� \ j -' \ � .� - T _ \ I 1 2. THIS PROPERTY IS ZONED CUD -CC. L.A.RCP CULVER I ( \ / \ BRIAR CHAPEL PROPERTY I L \ \ _ - - \ 1 \ \ TO REMAIN ( / BOUNDARY (TYP.) ) I I I \ 3. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND MEASUREMENTS. I 1 � --, \ / / � I CHATHAM COUNTY 10' ( I / I I �' I Q NO -BUILD BUFFER (TYP.) I 1 / N/F - - _ - / / J 1 / / / / I _ I I I 4. BEARINGS SHOWN HEREON ARE BASED ON NC GRID NAD83. THIS \ / \ to \ c�i I I 1 ( PROJECT IS LOCALIZED ABOUT NCGS MONUMENT "MEACHAM" HAVING ROBERTS BRENDA NEL/ / - r' / / �� I I I) I I ( I I I I NC GRID COORDINATES N: 768,395.12', E: 1,963,424.93' USING A \ N/F F �/ �' DB 1741, PG. 0854 I ( / J/ / / / _ 1 ) I I I I I COMBINED FACTOR OF 0.99990676. \ \ 1 I ( / \ \ I AKPAR: 74741 1 \ \ ROBERTS DOUGLAS DONALD I = . N/F ) 1 / / / / \ \ 1 CHATHAM DB 1741, PG. 0856 //�' J/ � � \ \ I ZONING: R1 / I / 1 \ I COUNTY STREAM � \ \ 5. EXISTING TOPOGRAPHIC DATA IS BASED ON AERIAL MAPPING AKPAR: 2246 I /` / / \ / \ I ACREAGE. 4.38 - NNP BRIAR CHAPEL LLC / / I c� / �n \ \ \ 1 `\ PERFORMED BY ABASEDGE MAPPING SERVICES IN FEBRUARY 2" WITH ZONING: R1 / / / / / \� / I 1 I 1 \ \ I \ / I DB 1198, PG. 0510 I II I / / / / / / \ W` \ \ \ I BUFFER (TYP.) ELEVATIONS ARE BASED ON NAVD 88 NCGS MONUMENT "F-92" WITH ACREAGE: 7.12 / / / \ / I I \ \ v \ \ r / _ ` AKPAR: ZONINGS R 18 I N I 1 / I l / ) I I ( / I I \ \ _ \ 1 1 \ I AN ELEVATION OF 476.06'. \ ) / - J / / / f / \ // I I I 1 \ \ ✓ - J / 1 J I ACREAGE: 5.35 1 \ \ I � I I I I I \� \ 6. HORIZONTAL AND VERTICAL CONTROL FOR THIS SITE WAS INSTALLED BY GPA PROFESSIONAL LAND SURVEYORS OF NC. NIF I I , I \ l - / 1 / I I I I EXISTING MANHOLE \ / / G \ I \ \ \ \ \ \ ` \ ` _ _ - / I NNP BRIAR CHAPEL LLC I ) I \ I ` 7. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. / / J / I ! / AND DOWNSTREAM } \ 1 \ \ / I DB 1574, PG. 0075 \ I \ / / / ( /Ic / / // ) �I I RUN TO BE REMOVED ,-- ) c� \ l I \ \ _ _ AKPAR: 87088 I / I \ \ 8. STREAM AND WETLAND LOCATIONS ARE BASED ON INFORMATION i \ / t ) / I \ I 1 I \ \ \ \ \ \ \ l ZONING: R1 \ I a \ \ \ PROVIDED BY HUYSMAN AND BANDY, INC. - CONTACT CHRIS EX/ST/NG 8" GV I \ EX/ST/NG MANHOLE D DOWNSTREAM -,� / ACREAGE: 34, 92 / 1 \ \ HUYSMAN AR 336-306-0906. EX. ROADWAY STUB 8" STUB ' �9�q I EXISTING R/W� 1 \ RUNTOBE REMOVED EXISTING 8" GV \ I I \ \ I ) J \\ \ 9. NO PORTION OF THIS PROPERTY IS LOCATED IN SPECIAL FLOOD I I 1 ( \ \ \ \ HAZARD AREA "AE" AS SHOWN ON FEMA FIRM MAPS #3710976500K TO BE ABANDONED EXISTING 8" WW I / \ A — 1 8" STUB \ / / ��s\� \�� \ \ ;/� EXISTING 8" WM \ \ \ \ DATED NOVEMBER 17, 2017 AND #3710976600K DATED NOVEMBER 17, , �. \ �.. �t F - I I ( \ I \ \ 2017. h REFER TO CONSTRUCTION PLANS TITLED BRIAR �_� \ ; \ . CHAPEL -GREAT RIDGE GREAT RIDGE PARKWAY NORTH \. EX1 PARKWAY NORTH & �� PREVIOUSLY APPROVED) I I - - � _ -� \ LIMITS OF DISTURBANCE WATERLINE EXTENSION BRIAR CHAPEL PROPERTY / PROTECT EX. 06/22/2007 / l l/I /l l / - / / j /j oo�� BOUNDARY (TYP.) ,�// UTILITIES TO �' / RE, MA-teIN (lT�Y� P.�) , --- EX--� 20' T0� I ' - - IIIIi li DRAINAGE , II.�-_ YDPUBLIC EXISTING HRANT I EASEMENT 'go, I ' � \-,Vl�� _� - �\PI-�EX 20' PUBLIC SEWER EASEMENT T EXISYPHASE 13TIHRANT111/ �\��74_�,I I -_ VOUS/ Y APPROVED) 1 (E JI I A II I / l III � \ I I - --Al �v 1 i �I _ ii l/ l/ v V I• (� J i� / / / ♦' i � i �, �� i�\� AVS PHASE 13 t l - \ l / 7 EXISTING HYDRANT l>� �� \ \\ CONTRACTOR TO EXISTING MANHOLE AND DOWNSTREAM RUN TO BE REMOVED / ( EX. ROADWAY STUB TO BE ABANDONED \\\I 1 AND RELOCATED \ ,�P �� I (PREVIOUSLY APPROVED) _ EXl TING LEVEL SPREADER - \- - - _-- _ _ _ _ / / , / \ \� EXISTING 8" GVH \ \ _ / i I / \ - - _ _ \/i/ / \ �. \\ \ COVER IN ON ABANDON EXISTING PIPE, _ 8" STUB _/ / \ EX/S17NG HYDRANT / - - _ --r I /� // \ - - _ ---- �__ \ // // ��/ S- _` \ DOWNSTREAM STRUCTURE / l T // o� / -- EXISTING 8" WM' �/ -I �' / I / �\ / \\ / \� / l �\ / I l / /, / J \\ - Z \ , �<, '� / / l o i �� I \� \ 1 r` !-'' =--- / , / O� EX/S /NG RETA/N/NG WALL // �I\ /i/ / /��\ oif / Z -A T '' �S / / / \ \ \ \ // Y` / / , \ \ ♦ EXISTING HYDRANT _ \ \ EXISTING 8" WM ( xI_-- - /�/�� A �� V A EXISTING 12" WM �/ � � � � / / EX' 8XlSTING 8» GV STUB UTILITIES TO / \ I I\= fi \ / / ,/ / ^ �f� K \ \ \ \ EXISTING MANHOLE�� I ++ I l REMAIN (TYP.) / EXISTING \ \ \ �� \ \ �� \ / / / / / / may_ T� - - \ ��/ - \ �\ / \ y/ V \e I i'' / LEVEL \ \ \ \ ` - / / / , / / / �- - �, // / \ \. PROTECT EX. I \ l "/' SPREADER \ \ \ \ \ \ / / / / / / / / i _ J \ \ \ \ �\ REMAINS(TYP.)O EXISTING \ \ \ \ \ _ r - _7 - L- I l STORMWATER \ \ \ \ \ \ / / -' - \ _ '4961- ,1 EXISTING I I \ \ BMP \ \ EX BMP ACCESS EASEMENT /� / / / _ 1 \ _ \ \ �' �r \ ` - _ - J // // % / / / - - \ \ � EX/ST/NG RETAINING WALL4851 -� STORMWATER l _ \ > EXISTING HYDRANT \ \ \ \ �9 \ _ / // / / / - \ \ \ - \ - - = - BMP I ( / EX BMP ACCESS EASEMENT - CP 84 SEAL 1 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS SAN CAR011 0E sslON /j,/,9 / �GOZ" - SEALC 036348 6, 09/18/2018 SEAL A, vNIcKEW &CR'ED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com BRIAR CHAPEL by Newland COMMUNITIES CONTRACTOR TO ABANDON EXISTING PIPE, _COVER INVERT ON UPSTREAM STRUCTURE i 'I / // ,, , / / / _ IN0 TH f/ - T 00' / / 0 /I 100' 200' SII l ,SCALE: /�"=100' (Hori .) BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA OVERALL EXISTING CONDITIONS/ DEMOLITION PLAN DATE: SEPTEMBER 18, 2018 MCE PROJ. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PROJ. MGR. CHS VERTICAL: C O . 2 STATUS; REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY M&C FILE NUMBER SCALE C0.2 HORIZONTAL' DRAWING NUMBER AS NOTED VERTICAL: C O . 2 N/A STATUS; REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY w-----------------------------------------------------------------------------\ -----� SITE GENERAL NOTES: C1.2 N/F 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED MEACHAM MARVIN KEITH HAL��� BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY OWNER IF ANY DISCREPANCIES EXIST PRIOR TO CONSTRUCTION. NO ADDITIONAL DB 75E, PG. 0382 �� I COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR ANY WORK DONE DUE TO ZONING: AKPAR: 2RI _ ��� DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THE PLANS IF SUCH A CRH GE: 300.. 59 /�� I NOTIFICATION HAS NOT BEEN GIVEN. — � � � � � ��� � I BRIAR CHAPEL ��� I 2. REFER TO THE FOLLOWING MCKIM & CREED, INC. CONSTRUCTION PLANS, AND ALL PROPERTY BOUNDARY_--�_ SUBSEQUENT CONSTRUCTION BULLETINS FOR INFORMATION ON EXISTING SITE (TYP.) ��� I INFRASTRUCTURE: _ _ I - BRIAR CHAPEL - PHASE 13 SECTIONS 1 & 2 CONSTRUCTION PLANS SEALED FEBRUARY 2, 2018. �' -BRIAR CHAPEL - GREAT RIDGE PARKWAY NORTH CONSTRUCTION PLANS SEALED FEBRUARY 6, 2018. 00 �- N I REFER TO THE FOLLOWING JOHN R. MCADAMS COMPANY CONSTRUCTION PLANS, �, r + 42H.7 50.00' 74.10' 4 9 CD-- I AND ALL SUBSEQUENT CONSTRUCTION BULLETINS FOR INFORMATION ON EXISTING 4 63.33 I +I I I 73 - I SITE INFRASTRUCTURE: 5 GREAT RIDGE PARKWAY NORTH, AND SUBSEQUENT REVISIONS SEALED JUNE 22, 0 I 2017. 1101--�—��I_ U H - - - \ \ �/ 100.0' 4 2146 �4 al 14849D2151 3. STREAM AND WETLAND LOCATIONS ARE BASED ON INFORMATION PROVIDED BY � _�" / 0 c9 �1�1 HUYSMAN AND BANDY, INC. - CONTACT CHRIS HUYSMAN AT 336-306-0906. 0 2145 1,0 \ �C 50 -2144 �� i �0 cS I i I (10) 20X9' PARKING SPACES.�O o 4. NO PORTION OF THIS PROPERTY IS LOCATED IN SPECIAL FLOOD HAZARD AREA 100' PERIMETER BUFFER (TYP) 143 I - I ��� OOZ � � 214 � � �` fi, .�� •�� 2152 �-� I "AE" AS SHOWN ON FEMA FIRM MAPS #3710976500K DATED NOVEMBER 17, 2017 AND #3710976600K DATED NOVEMBER 17, 2017. STORM WA TER I -O 50 � 0 � . �� 4 �-� � BMP I 0 40 00 21410 _-� --I� 1 I\�. I 5. ALL PROPOSED ROADWAY DIMENSIONS AS SHOWN ARE MEASURED FROM BACK OF f / p �� ��� X0.0 0��214� 120.06 I CURB TO BACK OF CURB. 06 k 6g �o �_D 2139 ko9 -------------------- �� / N N o 2130 �o - - n2153 °0 I 6. BEFORE STARTING ANY CONSTRUCTION OF IMPROVEMENTS WITHIN ANY NCDOT 500 -YEAR FLOOD LINE / + P N I STREET OR HIGHWAY RIGHT-OF-WAY, CONTACT NCDOT DISTRICT OFFICE AND LEGEND: — — — NEW R/W LINE OVERALL PROPERTY BOUNDARY NEW SUBPHASE BOUNDARY EXISTING R/W LINE ----------- HOA EASEMENT LINE — — PUBLIC UTILITY EASEMENT LINE PRIVATE UTILITY EASEMENT LINE PUBLIC DRAINAGE EASEMENT PRIVATE DRAINAGE EASEMENT 10' NO BUILD BUFFER LINE RIPARIAN BUFFER LINE 100' PERIMETER BUFFER F4,0--,c� .00' 40.00' 40.00' 40.00' 40.00 7.9 40.02' 40 02 40 �_ 0 213po E I �/� _ 4 20 X9' PARKING SPACES OBTAIN ALL PERMITS AND ENCROACHMENTS. KEEP COPIES ON CONSTRUCTION FLOOD WAY N A W 021310 �r 3g�6� 12165 O I SITE. ALSO CONTACT NCDOT DISTRICT OFFICE 24 HOURS IN ADVANCE BEFORE EX. WETLANDS �- 0 13� I o I PLACING CURB AND GUTTER AT 336-629-1423. 100 -YEAR FLOOD LINE ^o o^o o^o o^o o ��� �� ��13� o� 0� ���� I n2154 FLOODWAY 1of o 0 of 100 r��13v ��� Sal) N 1 � I 1 _ _1457 _ I 7. REFER TO PLAN AND PROFILE SHEETS FOR DETAILED SANITARY SEWER AND STORM 0,121101210,12110,121]c,131�1 oho,-I.JA N QOP s I —1 I DRAINAGE INFORMATION WITHIN PUBLIC ROADS. NDNN N NDN NDN NDN N N N� �/ �' ge, 2166 \� 21641 n� I 100 -YEAR FLOODPLAIN (13) 20 X9' PARKING SPACES --- 2155 o ,. � I CHATHAM COUNTY REQUIRED SITE NOTES I/;----- ��r OO 500—YEAR FLOODPLAIN y I / + 2168 / 2163 �/ `� — - - I 1. PROPERTY OWNER /DEVELOPER: 20+81.64 I _ �r216'(.\ �l C ' 35+94.38 I NNP BRIAR CHAPEL, LLC N/F 1342 BRIAR CHAPEL PARKWAY MEDLIN DONALD F ' CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UTIUTY DAMAGE / NORTH 100' 0 100' 200' SCALE: 1"=100' (Horiz.) .� 0 21 2161�i I � , CHAPEL HILL, NC 27516 DB 1544, PG. 0674 I o �'C "� 2156 I PHONE: (919) 951-0700 AZONNG62�69 it, I; C� 217 oQ 2, 60 I - _ C 1 3 I - �o, s� ^o I I o 0 0 0 0 0 D o^_ 0 01217' \ / H �� I —�— ■ I I I o CD) o 0 0 0 01 r117�0! 21 Zq 0' 0� 4 N 2159 I I I 2. SITE AKPAR f 82829, 1184, 2177, 80420, 22 88053, 8041 87088 A HH GE: 7.77 T 2183 182 181 '180 179 178 177 17f , �C "'" �,�' 0 a a a a a a - o II I '� N�N�N�N�N�N�N� 2� o Q , 2158 N/F V\ II 49?� PHASE 12 SECTION 2 V 10 8 I I I WILSON RICHARD B & / 1 �I I� L5500'1_0.00' 40_00' 40.00' 40.00' 40.00' 40 0'471,37 52_31' 52'3 I MARGARET D / - � �� � �09 ��� � I I �3� � I DB 495, PG. 0676 � I I 63_46, _ - I AKPAR: 62256 19+03.23 I II I ZONING: R7 / / " I I AGRHGE:7.44 � _ --- I----------------------------------------- I � _ 1-,, 5 000 I 4 764 I 1832' � \\I NNP /rt �_ _ 47.__ BRIAR CHAPEL PEL LLC DB 7574, PG. 0075 AKPAR: 87088HALF DOLLAR I1 I ROAD i I o ZONING R7 1 (60' PUBLIC R/W) ,� I C222E] 222 2230 2231 2232233'��•A HH GE- 34.92 -CC�I �-- \-------------------------------- —---------------------------- s. I22346 II < —— ---------- — o� �� K,, �� ° 50.0' N/F _ � P C'• \�\ ,, - ROBERTS BRENDA NEL L ' 1 _ — _ -��� . 2235 �\ _ V DB 7741, PG. 0854 0 / _-_ \ AKPAR: 74747 CHATHAM COUNTY 10' ZONING: R7 I � 725.00' II ROBERTS DOUGLAS DONALD NO -BUILD BUFFER / / I ACRHCE: 4.38 1 � I o� 2223 �22�36 I I I I 1 I 1 PHASE 12 SECTION 3 N 2225 c1 222 , CO' , II I DB 1747 PG. 0856 TYP. / i� C� (TYP.) / O , ; 2224 , I AKPAR: 2246 / / BRIAR CHAPEL Ln��• �' �� N ��� V\ ZONING: R7 / _ 98.34' - �� �A m PROPERTY BOUNDARY _ o0 o , 2237 \ \ 1 ACREAGE. 7.72 I I // (TYP.) ff I� - _—_ �__= a--- ALLEY I� a ALE Fi - 55.7' / k3 -PT: 22+PRIVATERiw� STORM WATER BMP CHATHAM COUNTY ++ � � (2.23)8, 50' STREAM BUFFER 2220 ��-N150' VOLUNTARY BUFFER (TYP.) A \ - I , _, A� � _ � (223)9, - A 21!84�) 8 A 8 nl 8 `� � to ! � I �„ 22190, � � z5 �°o ' � v /L14 I� I .0N d X18 9 0 0 I �_�o i o v / ----------- I. I� 19 0 o �2 N , - o / -� -- 19 0 d �\ �412)l�- '�� ,I I I � X19 X19 � , � ��, �,. � 2240/ - I �t I I o I I � i 2218 , - I �� X197 1 --� � 22414 2217, 5 PHASE 12 SECTION 1 '�70 1 , s` \ \ \ 1 o � �(224)2PARKING SPACES o12—�\(7) 20 X9 50 \\ — -- �— — — - _ _ , C ��, \\ (2243 t2i 2# --- - ,OVERALL BRIAR CHAPEL 1 1�1,�1� 1 PROPERTY BOUNDARY 120 0'510�- ✓ - - - �-\ - 5 ---- - I Iv I I \ I II 'I 1953�I 1III1I 1 I 9529 - - II54 19O59 95 IIIII I II I I I II O 1951 �I1II 10I1I9-50 �I1 II 1/ �94-9 l 3jk PHASE 13 II(PREVIOUSLYAPPROVED) ► \I �� �C� \ I\ / I'PHA SE 1 J 2118 0�'� / �_� �\ ' - 1� I I I I (PREVIOUSLY APPROVED) �\ `\ \ �� i •. i I 1 a- �\ i / / / 1� V A 196 196 I V IIIA _ �% \ 11 11 I _ _ // �� �� ♦ A��` `j O � 7 1945 /� // �/ k�' 0 1 I STORM WATER I) I -- - �� l O Il I �� \ i �\ I BMPL---��- - � � 41 • - -- � \\ 97 1943 �� �'• � � I �� � " � � � \ 97 \ \� - - _ _ - - i � V - - l i 1942 / � � C � O 'S`1' i I I I i 21 1941 N O � I II ��1939 o / /�� �� �� i / /� I---- --- II Iv k�1 Jp�/ / - --��l/ /^� �938� p� I I I 1 k / \s' -1 _71 �� � // //1937/ I' I F Go / / // / �� �� /,/ / A io o //� EXISTING STORM WATER / _ _ _ _ EXISTING 1� i // BMP � / / / � - � � � � - - �� � STORM WATER I BMPOf Ikk X �=-� --_---- ------ K --------------------------------_ ----'---------�-- _ 7-_ _- Ly -� --- �— — /--1— J _-------------_ ------_ - I IF 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE Ikk REVISIONS , OARp'''%, 0E sslpy l 036348 6, 09/18/2018 n v v N4cK1A4&C_ 'ED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com BRIAR -- _i C1 _ - - � PUMP STA TION ACCESS ROAD i 1; \ -- L----------J CHAPEL by Newland COMMUNITIES BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA OVERALL SITE PLAN DATE: SEPTEMBER 18, 2018 MCE PROJ. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PROJ. MGR. CHS N/A SCALE M&C FILE NUMBER C 1 . X HORIZONTAL' DRAWING NUMBER AS NOTED VERTICAL: C 1 . O N/A STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY , EROSION CONTROL NOTES: LEGEND: -----------------------------------------------------------------------------�,r- - / _ - \� /�� 1. PRIOR TO BEGINNING CONSTRUCTION, AN ON SITE PRE -CONSTRUCTION MEETING SHALL C3.2 - =7�:_:;� `:� YS?�:::: ­- - - === ==;�� =­ - __ - -_ -- - �� -, _'01 _ BE HELD. CHATHAM COUNTY OFFICIALS, THE ENGINEER, OWNER'S REPRESENTATIVE AND - - OVERALL PROPERTY BOUNDARY CONTRACTOR MUST ATTEND. NOTICE MUST BE GIVEN 48 HOURS NOTICE PRIOR TO - � — = 7 I ; = _ - �_ � �� �// - / /-' / / SCHEDULING. ��� \ "�_ _ - \ -\`-�\ t,7ti° / _ /-_- � I � � NEW SUBPHASE BOUNDARY / 1 \\� �-� ���_�_—^ __ � r- J /f'%��=/// /' moi/ _ � ` l \\ \ \ — � `� �('� I // / =_ i -� -- 1 2. THE CONTRACTOR IS TO NOTIFY CHATHAM COUNTY PUBLIC WORKS REPRESENTATIVES 48 _/ - - - \ �\ L _� \ t�-�\ ✓ 1 (I / ( _� / y� "-_ I HOURS PRIOR TO COMMENCING WITH LAND DISTURBING ACTIVITIES. EXISTING R�W LINE 1-1 ��// ' __ - / `� -_-��- �/ ��/��-VIII I) ( // � °/// / / ��\ \\ \ �,%// /� \ ` \ // =_% //� / = �` ` - moi% /I I ( �/ /�// //r I 3. ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL ' i �_ -/i/ �/ -' \ '� ' � / /'�' II -��//% �\ \ '-� lti f l j 1 BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND LIMITS OF DISTURBANCE BRIAR CHAPEL \ \\`\ i /iii ' ~ '\ �C -ii % �� / J/ �.-; +— � _ _ \ -- , \ l � //j i /,,\ / /, PROPERTY BOUNDARY TYP. � ���� \ \ \\ \�" ��r/ % \ -' / \ - ^�/ % �' :_-5� % � _ � �- / ^ lI I ''/'// /� /\� ` / l / / SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. � � \ _ /� // % /// - _ -- \� = \1 =^� \ / EXISTING LIMITS OF DISTURBANCE / ^ �� \ _ _ f \� _ ,/�/� _ / �� �`� ��� \- \\ I ` ��\\ \\\ I / / / // 1 4. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT �� � _ _ ✓/ ( \\\� I ( - ��- - -/� // /- _ _ i \ _ / =� %\\\ \\ I I I 1 I ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL =� f�-C \///j//� J/ �� ///,, TDD #7 CJs \11\1111) ( 1 \ 1 FINAL STABILIZATION IS ACHIEVED. COMBINATION SILT/TREE SF/TPF PROTECTION FENCING T-- r J I/ 5, �I— / ,, ///// --/ _ / / ) 1 �. J. _ll / / \ / � //� //////�� �_ j I _ _ _ - - F \ \\i \ 1 5. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED l / /// /�- /- _ - �� - SED/MENT BAS/N #3 \ \ / / / _ ;- / / J / J // ////j// '-� - ` �\\\\ \ \ AREAS WITHIN FOURTEEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF EXISTING CONTOUR i r.0 100' VIEWSHED BUFFER (TYP) _ % / /// // / / l - \ �- / / - _ �y �\\ \ J // j , J / // / ( (r / ��J- � / / / / � ♦ `,�\ ) \ THE SITE, SEVEN DAYS WHERE SLOPES ARE 3:1 OR STEEPER. TEMPORARY SOIL +�=- .� / \ _ --_I- = / � `��- / I P` \ / // // - 1 I STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY T /--%/� _ _- ��_ _ ii \ �\ / / - /1-/l I l_IJ �- / f - 1 NEW DIVERSION DITCH // /^ -// _ - \\ �- ` j/- -- �_ / / / / \ / _ I - - I NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT UNDISTURBED FOR LONGER / -� �� /- -/� _' - < - - - � - / ` /// / 1 / / / / / / % _ •� / � (1 I / - - THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE _ / .\ \ / ♦ TDD #11 LEFT TO BE DORMANT FOR MORE THAN ONE YEAR. o°o°o°o°o TEMPORARY CONSTRUCTION ENTRANCE SEDIMENT BASIN #2 / - \= _ _ __ - J / 1 TDD 5 J I / / �\ \ TDD 10 N �. (STORMWATER BMP #39) _ _ - - J \ \ # / / 1/l/( '- I ` L i # I ; /- - . AND AFTER EVERY HALF INCH OF RAINFALL. ANY NECESSARY REPAIRS OR CLEANUP ® NEW ROCK CHECK DAM 1 tr ------__�/ _- _ _ _/-_ / III` II `� / / I -� - / // '/ .// - _ = / "I,,, // / J / 1\ I \ I l ITOD #6� \ TDD 8 \ \ ` , -'_ / / // I ` ./- � I TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE 1 I, I(< / I ♦ / - - / = - -_ \ / / // / \ \ - I III` \ I 1 # \ \ / TDD #9 - _` / i , / -- IMMEDIATELY. ANY MEASURE THAT FAILS TO FUNCTION AS INTENDED SHALL SF/TPF�SF/TPF SILT FENCE OUTLET � �\\\ / / - \\11 / / / / / / , / � / 11\\\ \ I / I ( , �\ \\ \ = // '' / _ / - , / I // / / �� IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER OR OWNER'S \ 1 I SFS / - / / - \ ., ` / / / \ i \ �v I I I \ / i/ / / / -- / / / %-: - _ I REPRESENTATIVE. 111 /,-__\\\_-, / / / // �� �\ 1 ) 11 \ \ III ♦ �\ \/�/ , _/ / // /// / / =// NEW BAFFLE 1\\III _ / :--� \ -- I / / / // / \-\\\_, / // I I I) Ill 1 \ III( ' _\ \\ /�/ _/ / /- / / / / / Of / I I / � / i / - / \\ \- -_ - / / I �, r - \ \ / 1 I I I I 1 I I I -11 \ / -_ / / - - � / / I 11 / � 1 7. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF ANY ADDITIONAL EROSION fil \ /// / \\ / / / •r.�% I I \ \ ----I / / / /) / I I / '� \� \ \ _ \ / l / z / - / // I I ( / / CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS _ _ _ _ _ _ RIPARIAN BUFFER LINE 1 I 1 / / \ - / /ice - \ \ \ - _ / / / �� I \ s / / / I I I I \ I I I ) \ \\ \ ///e/ _/^ -_ -- �, / I I I I DETERMINED TO BE NECESSARY DURING CONSTRUCTION ACTIVITIES. \I ( jjj I l // \\\ \-_//s�J f I ) -1 `�\ /// l/III ) I III / /\..-,� \\ /1 ) 1 i /,� \ ) \ _ ./- 1 J � l I / // / l l I \ / / / I / /. I / , // 8. NO PORTION OF THIS PROPERTY IS LOCATED IN SPECIAL FLOOD HAZARD AREA "AE" AS 10' NO BUILD RIPARIAN BUFFER LINE 111 \ I 1 I /1 I \ - - ) ( 1 / ��/ \ J r / / / / / 1 / / _ \ \ _� _ / / / / /� F95'_ - `/ I SHOWN ON FEMA FIRM MAPS #3710976500J DATED NOVEMBER 17, 2017 AND 1 I I I I I I I / I/, T"'7 T ( / - / ) ( 1 L ,l• / 11 \\ / // / / / / / / // / ' I I I l J 1 _ \ - ` ^ / // , / /// ��/ i f �/ � ` CWD #3 1 #3710976500) DATED NOVEMBER 17, 2017. (I ' \ 11 I /�c �� I -/' / l__ -// ,-' / l / / / / I I I l II \/� \\-\ \//, // , � /__ , , / .I ./ �,,, 111 ♦ 11\\\\ (\I(- \ �, (�� /,_I �/ / //I I __�/ //// // / ( \\ // ///_ �\�/- / --"/ It/ // 1I j \ / / \ / I I /�I I )III `-�\\ - / /// //, 1//// I1\ ll \ l \ \/ /�J / / I I / / I \ _/ / i/ / / / \\� I 1I\\1� 1�\\ \ I \ `) \\-���� // SPOIL AREA (TYP.) "-1 //) III III / /III \ II1��\ \\ \ / ////'/ / // / �/ 1,////' //, I . I h i// TDD #4\ --- _ r / / / I / 1 I( I I ( ) \__ J / // // //, / I "►I/ '� /' ' \ \ \ ,,Q -'Tr \�-- / \/ / -� ) ) I ) / I I I I I I \ / / / / //_/�- I ////. / i (I \(\11 / \ I l \ \ \ \\,/\�\�, ( I I I \_/\ / / / 1 / -//__� / / /// I I / / ) 1 I I \---// / // ,,/ // \\ 1 I( \II 1 \ 1( /-�\\\ II \-�/ / �J /f- / 'I / J� _ // j I /- �%'/ /,/", _ 1 //`� /' \ )Il I I ( I I /\\ Il I I I I I - / f --/ ' / l / /l I 1 1 /� _ ' /, ' -_ / _& -./.,- / I ► I I I \ - I / i, / / / �/ / / ' (/ / / / / / iii/ / / / /, //7�� 1\\\\\1A I I` iTD6#3► I IIIII11I I I ( 1I / / P/ / - Y'') Il // // / 1 / / _' /'�/ //le f- /- 1 1/ ( \ ,\ 1 \ \`�\\ ,_,� \, 1 /11 I///!�J`,\` I I I ' � �/ // / / // / / / �// / / // I / Y' II // / \ ( 1 11 i i \ ` 11))1\\ \\\ \\ \\t /III\ )r,J /1 \ I� 1 \.,J 11 \(I ��_-�/ �- // / // / // ' �- / _/'l / ' / 1 (I I II \\\))1\ \\ \\ J( I I1� \\ `- I I /\ / J // / -/ � / I / I I I II \ �� \ \ \ , \ I ( l l I 11\\\ 11111 // I I / \ \ \� I I\ )� 40 / ?/ // r, _ / / � / _ / 1 1 1 I //// /_/—/ I // \ \ I \III\\\\� I \\ \ I\ \ I I II III )11111 (_/ �,-I//// \'\\// ��- ,,---„ , , //,j I (y, //� I I / / �//// I / /- /Z-/ I I 1 \ 11' II A \` \\\\\ \ \ �� \ I I ) 1 I I ( \ / ,_ /i ♦'r ♦ \ - s� w I ( / / , " / , \ I \ I \ \ 11\\ ) \ N \\ I I I I 11 1 111 \\\/ / �_-.\� I I, -Zi " \ \\ 1\\\I \ 1 \ I I I \ \ I - - - \ / I / I LIMITS OF DISTURBANCE (TYP.) - I / \ I \\ PHASE 12 DRAINAGE AREAS DRAINAGE AREA NUMBER TOTAL AREA WITHIN DRAINAGE AREA 1 3.61 ACRES 2 8.85 ACRES 3 5.21 ACRES 4 2.20 ACRES 5 3.54 ACRES 6 6.32 ACRES 7 5.03 ACRES EX. WETLANDS - - - - - EXISTING DRAINAGE DIVIDE 2 DRAINAGE AREA ' CALL N.C. ONE ' CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UTILITY \ DAMAGE / NORTH 100' 0 100' 200' SCALE: 1"=100' (Horiz.) --- -- � /I11 I LI �s�--oto-�-�— —� __r; --- --r-- ) ) TI ) r II ( I/ (/ I �I. �� I 3.3 . , // / I / I /I 1� I \ \ / //-/) I/ �� / I I r- 1 I I I I / I / /J// I /' \” I I \\ (/// %, I ( / 10 & \\ I I I I. ,,--') \ 1 I /- \ I I I I I _� �, `�. \ . I / 1" \ ,\ \ \ \ 1 / // I / / ,I' I/ \ �, J Y III _ I / ( / /WIr // III I \ / -1 ,III \ I \ 1 _ _ % / - / ( - - � �---- - 1 / I - \\ 1 \ I .. , / : I , . , n / /I I \ , 1 ( ( /' ( / f/ .1 /, , , _ -I-� \ / \\\\\\\' I I \ \ //,ir I 11 I I I /- t 1 1 1 I \ \/ - + \ \ �\ -��_=- \ \ \\�1�r(�-� L-- I�� Ir ��, _ _ 1 /\� \\ .\ \\ \Ill \ �// I) \ I I I - / 1 - ,f-\ / r 1 \``�� / / \ - I \ \ _- - II 1 ^ ` �\ ��� r ' 'S �_--/, \\ I \ (, / // ` // II // I I / I \ \ \ \ \ \ 1 \\\ \`` — �i� - \ \ \\ 1 \ 1 \ \ \ I I \ \ ) I \\ \\ \ \\\\ -� _ \ /�\\�� / _\ - — � � �� \4 \� �\ \ \\\\ \ LIMITS OF DISTUR \NCE (TYP.) a� /,� ' f /011 W / 75'I / / / cC ( / I I \ \ \ \1 I / _ /1/- / -- - �, L �`-��-- -- /_ _ - \. 1 lll��\�\� 1 `-��� _;_-� G Jam- \ I I I ( / /%IJ I ,_ I I I \ I // I_// 7 \ _ \ \ r - \ \ •- `� _ �� \ 1 TDD #16 J ( `\ ) \ /// /` (( / \ II I / (\ / ♦ \1 \\ \\\-�\ \\ J -� \ 1 1 \ 11 \ 1 \ \\\-\ \ \ �_� _ \ ���\ \ 1_ e� .���{�\\�\111 J_ _ ` ate! , \ (/� J I \ ( I ' I I I 1 / 1 \ ► I r I' 1 \ \ _ �� \ \\ - I _%�� \\ - � / //- - \ \ I ) 1 / I / J \ Ii l I I 1 1 //� \ \ \ \ , \\ \ \ �\\ — = \ -� \ \ \ \ \ I I \ \ \ \\ —\\\ ,\ 11 T _+ I I, L \\ \ / \ - �" /o\ \ HALF DOLLAR ROAD - / 7 > / \ \ I I / \ I 1 / .. I I I I I ((/ / / \ " \\ \ \ _ � \\ \ I 1 1 I \\ \ \ \ \\\\ 1 \I\\ \ , -,— ,_ —> ` `\ 1 \ —, \�\r- \ �„- (EX. 60' PUBLIC RM/ \ /--- - A -/ 7 % — / , I 1 I I I 1 1 \ I / I \ \ , _ - � \ 11 1 1l \ 1 t� -I 1 \\ \ \ `� / � - - 1 / � _ I _ l /-/ f � _/11 {-Z 1-r�"T � --� 1 / \\ I I 1 II ( / I I I // (I I I I \ ( V I I III(( � \ \�\,_� \\:.\ \ \ �\ \ I \\\-\\ \ \ \\\ 1� \ \� -ZZ7 �� _, �-�\ \� �'-'`��`\ - ( , �// )� II r /.,�(,/(/ \ \ \ \ '� _ \ \\\ r _ / \ \ ( ( \--\ �� \ 1 �\� \_�� �_� / / / / l \ \ \ I 1 / I TDD #17I ) 1 I / \ \ V . \ , l \ 1 I \\� \ \\ 1 1(/) I \ \\�) / / 1 ) -�, \-V 1 1 I \ I / Y' I /� I I ( 1\ I / (�» \�-� �� // \ \ \\\\ \ >-I�/� I1 1 I I S(. / / I 1 ( I \ I 1 / I \ \ \ \ \\ �\ _ / �/� \ - \ \ / \ / \\\� \ Z ( // / / ) \ , \ 1 1 I 1 , L -- ---- _y11�� �-s- 1L�%61= �-1 �fitrrrt-4----=----- - -- ��llv__ 1 1 1 \ 1 / ( l SEDIMENT BASIN #5 / 1 (' I I I) 1 ( 1 -\"C\ r - \ - s - \ � _- �_ - \ \ \� cwD #2 �- �1� / 1rt� �� r� \ \\ \ \��( ��- \\ \� \ \ \III l / l / I // / / / ( \ I I I - I / I �' I 1 LLI ♦ \ \ \\ \ 1 1 // // / j' j ` / _/ \ \ 1 \`0 I `�\1 ��" 1 �' - -� \� ���\� � 1 11,, ) 1 / / _ I , - r \ ) (1 1 / l / / / \ l ( I ) \ 1 , ' / / ♦ ) 1 \ I I i I , \ I I I \ \ \� -\`-�� l/1// / / / `\ \ II may_\ ��\\� --,-�\ 111/)P\/ __ I ,,-�Zw� \\/�)�-- \\ I 1( I/ ///1////II/////// // /// \ )I I 1 IIII \ ) ,\/ // ♦ //II J I �; ( \I 1�\ ♦�� ���\ \� "�\_ \_ ) / / // / > > ) 1 1 \,�>>>> `\ \_ a. ��\`�\,- _� "\ \l 11(1 f / r 1 ��/t_ \ /J /I 1 (/ /// /// ,/ )///'/ /�. // // / \ 1 II 1 `�I I << SII ♦ I I t I I 1 I I I 1)1 1\ \ �\ I 1"I'111 //-� / / I'll / \ \\\ .� -,_ �� \ 11 f I `---_ ----•\ \, �'/ / // //% /' \ / �, 1 1 ( \ \ 1 1 I I/ ,/I I I I \ � \�� � �\I 1 ) :� \�\1 I` -�� I /�\�\ \ l iJ I /il '/ //mill //i// '//// % / // / �\ 1 \ x,111 I I I ) ) 1 1 I I ' \ I 111 \1 -- \\ , I�\III /// /-/ / -,/ -1 , �.�\� \\y /� ✓ \��\\�--\ \ 1 II I /// w I I \ I l/ \ 1� \ li l �� .��\ \N \ I \ )\ \ /_ \/ I - I \\�J(// I ,// ,JI ,>,, ///i/ //;/•� /// 1I I 1 I l T �\\/\ `1\ /� / \ ♦ \ I\\\ ) \� \\���\<<\\I IIIIII ( � .•-' CHATHAM COUNTY 10' \\` �i%/i�,\�\ \� �\ \11\\\\\ t \ \- �-I / ) _ \ ��ll,r/c. ) I (////��///- ////// /// /�-. -1-�/ //\�_ 1 \) I I l \ I / ) a �I I 1 I I \� ) ,. /\\ \`� \� �\ ♦ \\\ � \\III 1 I \ / /i -,\\ \\ \ \\\ \1 1 \\ \( \ _ - >' I A / / //,)[ � / ) ( I I \ ( l / 1 I 1 I \ \ \ 1 - �I' \\\ � \ _/ / _ 1 1 / / 1111 1 /( _ /// ///// / // r� , � / � l I I \ \ rDD 16 1 \ \ , I I 1 I 1 I 1 / 1 I 1 �\ AL \ \ ) ,1 // 11\\ \ 111 I I 1 1 -) / / - � NO -BUILD BUFFER / ✓�/� f \ \ \ \\ 1 11 1 \ \\ �� I , \ , / / //1 _ � // \ ( I ( \ # \ \ I I I ,, / - \ 1 I rr 1 1 /// TYP.) // i�J/ \\ I\� \\'\ II II \\ llr -\\� �\-/' `�/ I / ) \) 1 I/// / /�/ // \�, \♦ I I III 1 1 ( \\\ I\. \I., III I\.\\ \, // TDD I /1111 / / / I I",sof ,/ 1( `�'�\J\\\\ \\ \ I \�\\�� 11\ � `� \,/\ �It I I /�\ /I \\11 \ I (\ \\\ \ \ ! I� ♦ \ti ♦ \ 111 I 111) II \\)II \Il ////- /\ /= / //j \ \,��` 1 \ I \ \r\\\�-\ ,�/�- 1`,\\ / I (` / // // - \ 1 _ \\I I i I \ \ \1 \_�\\ \_- \ �\ / % \ - \ \ / / I l / / l 1 I f / , �, // / \ \ EX. GREA T RIDGE PARK Y NORTH \ -. ,, / _ �-1 \ - / i//r! I \ .. I ) I (( / / / �/ / ( ) \ ) \) 1 \ \ 1 / I , I \ TDD #19 j i �- - i - \ III //// J / ) 1 /I I ///// // \ - ` /_%_ / \ I \ I I,- / \ (\a I I I I III I I I \ I \ \ \ \ \ \ \ \\ 1 \ \ \ \ ( I I //// I / //I I I I I / / \ - / i \ / / ' LIMITS OF DISTURBANCE ✓ _ /`� / �// I I) \ \� \\ 1 11 "(jl\\\ 11 I I I i TDD #13 / i \ \ - \ ` I \ ) I \ I /� /// / ) I (1 1 II// / / / 1 I /// \ \ // // PREVIOUSLY APPROVED \ / mac, I - \ \ 1 \ \ \ \ - ; / 11(1 ( I 1\ I II ) I I I I ♦ \ \) I \ \ \ - '\ \I \ 1 /\ I / 1 / I I I I Ill / / (/(� I I tll(Ii \ ( I (^ /� _ _ # \ \ \ \\ \\ \ \� / / I I III I I I` 0. i \ L \ I / I I \ \ +�j \ \ \ •, \ 1 I / \ I \I\ 1(I I \ . \ \ \ ( ) SEDIMENT BASIN 4 \\ \\ 1 \ \ \\ \\\\\� \\\ \ Illi\\� \ \ \ \ J 11 1� I ( ` 1\\\ \ 1 \ CHATHAM COUNTY I \ I I I�/ \ \� ` / / I 1 1 \\ �\\\\�\ �\\\\\\ \\\\_� ., \ - �\ •\ `- / 1 / / l/ _ _ _ I I / 1 I I 1 ♦ i \ 4 /1\) \ \\ \ \ \ I \ I 1 ,III) 1 I I I Q 11 / I I \ \\\\ f \ 50' STREAM BUFFER I I I �,\ \ \ - - / // L ,' \ \\ \\ \\ \\\\�_� �\� \\ \ \ ` - - \ \ - / / / i T ` ( /Ci'I/// 1 I I /, I `^ \ \ 150' VOLUNTARY BUFFER (TYP.) 1 \ \ � y- �__ , - \ \\ \, \ �� � - \ _ / // ( 'I'I I 1 1 I I 1 1 I / / 1 1 1 I I ` -�� - 1 I I ( \'\ \ 1 \ 1 �1(I \ (TYP.) // /) ' I \ \ // \\ \\ \\ \ .\\ - / >` \ \ T I // I 11 \\ \ TD \#20 \ \ y \ \ \ /// / 11 II �\ I\ I � // ,-/ 1 \ \�' _\ \ .\\` \\\ \� -- / \ \ I /// �+- \ ,,- / 1 \ /i I \\ \ \ - \ \ _ TDD #2 \� //, //,�//I I \ I \ \ '-� iii///i' �// , I .I I I .\ 1 -// \ \ c_ \� \\\\\\� �\\\���\\ \\_ \ --/// -� / I \ \ \ y I / I I -D� \ 1 _ ( � \� l l l l l \�\\ \ I /- - /� _ / 1,(�►jl\ \.� \'c\, \ \_- // I , �� \� \ \ / /T� I I I \ I \ \\ I I \ I I \ ♦ a �\ \ �\\ 1 \ \ I I 1 \ \\\ -\ /i///�_J \ J/n �` - 01 X \.1 ���\�\\\\\ \\��\�� \.�,\\\� \�_\\\ % \ I \ \ 1 \ \ '� I / I I 1 ��� \ \ \\\\\\\\\\ _ l \ I �\ > 1.�� \ \1\ �� �T # — . / \\ - - \\ \�\� \ TDD #1 \ / - _ /' ' �\ \ 1 JI I l ( \ l I O // I I I 1 1 I 1 ` \� ` . \ \ 1 1) \ 1 \ / / / \ \ \ / I \ \ / 1- �\ /� / / _ J / -1 / -. 7 1 \\ �c�- / o \ \ \ \\ \ / / / - { \ 1 \ \ \\\- -ice'= I / l\ �` ^ - � ° \ \ \ ��\\ \- — \ �_ / \ ♦ \ I \ +a 1 ( I \ \ / / \ iii /l-� - /i / - < �) / r / _ -- -- y,- �\ �� - - �' / _ I 1 / \ 1 I I I \ _ \ 1 \ \� ,( ( \ I // / JI / - - \ `\ .\ \ I ° �\� , �� \/ �- 1 I 1 I \ \ \ ♦ \ I \_111 1 \ 1 >0 ♦ 1 \ '\\\ \ l /J/ 11/-\�\ \'/ //ri% //� I / i� \, \\ \\ --V _ I I I I ( I I \ \ \ - \ \ \ 'I I \ \ 1 \� \ I //--\ v\--/ s/ // //lI I I1.I` - `\�'� \� _mss Ste, t '_� , �� I I I I \ I I I I I \ \ 1 1 1 \\ I \%\ 1\ \[,, 1 I \ \ \ i I I, \ ( _ r- / /_� � /// I q%. s l J j) - ---_ SPOIL AREA (TYP.) � J I I I I I \ \ \ `t. \\ \ I \ ��„ I - /\ ��; I J I I 1/ I I \1 I I I \ 1 1 1 1 I I III \\ 1 1\1\ \\ 11 Nil I 1 / / V \ I 1 \ 1 \\\ I l t`I 1 ) \ \i �� - \ Jiii _===='i; / (I\\ -lel \ r/ ��l/I \� . �- I _ _ _ _ —� - _- - Jrrrc�� l,\vs.- _ �C // I I l 1 1 I 1 / \11 11 SEDIMENT BASIN I #1 \ -,\,S \ I / ( ` / / // -- \ I \\\ \\��\ I��/(� - �� - - TEMPORARY CONSTRUCTION Z-- _ _ = - / i�i(� / / / / I I► 1 1 I 1 I 1 I j I I I ��I /� /I 1 l \I I (I / I I 1 I \ I / \-- c-- - _ ♦.. / _i' // / III I 1 \ I I 1 A \, /III ( \ -1 �. I \ ( // '/ \ / I / \ Il l I I / \ \• f /��- `� \ \\ \\` � i / -, ,,/ _ ENTRANCE (TYP.) _\ ` \ \ \ - \ \ �� I- / _ __ / / I 1 \ �� / l / I - - / /- - a ,% - ,� \ � ,,�, \ / / I\ I I I I I / 1 / / \ \ ( \ \ 1 ( \ ( - Ji�I / I I �'� �� - I -PA I -��- \ \\ \\ \� \\\ ^ ' ' . - / - / / / ( I I I L I I \ �I �\ / ///// /////II ,�- I/ / ��7� / /� - — - r - \ \ \ � �� �� �. �/ I \ / / ( I tIl/ ,,11\pI (I \ \\ I// / ` / �/ / // \ l / ,� _ice _// / .- - _ _ _ - - � - r. �- \ \\ \\\\ \` — - - / , J \ I I I I / -\ ` I I //// \\� I 1 \1 \ \ \ \ \ \ I " /// 11 / I 1 \ �''� / / 'r i% i � I- __/ / % _ - _ 1 - - -- - -- - --- _ ��\ \ I) ; I/ � / �� _ I I I I / I I �l\f\ \ \ \ �\ \ III / \ I i _ - _ i J - l �i _ I \ - TDD #21 I 1 \ \ 1 \ `I Ii \ 1 I I// / I I / 1 / `�- - % /i /� j //fid ;;5�ox .11 �` ;/ / PPR\��P / ® ' _ / II, /^1�/ 1i �� 11 I \ \� \ : r- I� ���11 \_1\, \� __ _ _ '� `` G \ TDD #23 `, , \\ `\\ \ 1 r � - % I // I / / I •` �% � _% %� R�OG�gLlc l` %- i I X11 11 �. 1 \ I ) � \ \ 1— I-'� �`I\ \ ,\ � , \�� _ R,'- \� ` /�I ) 1'( C'1 I \ -� --- r \ 1 - /�/��/ / P _ III i �1 \ F Rc A ` / l \ �/ I/\N / I I f \ \ \\ x/ o I\ ♦ > l/l l - - ,' - /• / `S - �_ _ Ih �\ I �-�- I\\ 1 �I VI \ STN cF - - _ 1 , \ / / 111 \\ � � .:::7;5' � L- I )I 1 /ri / i Ex _ I 1 / i ✓ �, ���-ii \ q `SEDIMENT BASIN 6 1 ` i / /// / I �� I / / / J i /i .�>, _ EXISTING PHASE 13' �I I ) / \' e(/c ��11i \\ / r {•I f ♦ l / / i l / // _ _ - \I',fi I , z �\I \\\ \ I\ \ II\ l I I II'� I l R� qy \ # 1 I I I 1 � \ �- •� (- 11, /l / / I ' CONCRETE WASHOUT TYP. / �Y - — - �� I - I I \ \ I 111 / // - �. / \ \I i \� \ \ l \\// -\ "�/ \ ` (STORMWATER BMP #40) 1 I 1))> >/ r �j i / - 11 z! %I I J// / , i /, / // - i / / / /•/ �. s / 'Or I- - �' . . ' ' / - \ '` I, _ _ \ l/ \\ \ z ` \ __ �� \ \ i: 1�,� j- . ` \ \\ TDD 22 1 ! 1 \ �1 i - - / s / // TDD #1- - - - - // - / -. "'\ �/ /�X'/ / f/ /� j %. / ✓i _ _ - \ \�\ \ I_)- f 7 f / / I \ \ \\ \' -\\ \\�� _ �! \_ \ \ _ \ \ \ �` \ 1 \ \\ \ \ \\ \ ♦ J _ — / i / / 0 J r� �� //// ��� 111I��"yy/I' / /// /11 /`I, /' _ - - y ,\\ \\ )r�) IJJ�/j//" I \ � \ \\\\��_\\\ 11 �» 1 \\ /�\ \\ \\ � �� \ �\ \ \ ` `� �'r— / //��1 /// / / / I ° / / j ' f �\ J I / - -// _<.. \ \ \ 11 III/lI///,/// I --1 J \��� \ \\\�_ \ \\ > /� \ % I /1 l I j__--_- � ` I I I 1 / / I \I lit / r, \\ '� ///// ////lI / 7, 1 1 J / -\\'� ��\ \\ \ \ - \ _ ��< \ \ \ \ \ i ` J _-el /i/ - - .I �\ ! SII,/,I I //III r f/I ��_ /,, ✓ �l >111 ,, /, ;�/ / ,�\ \ \\ \ .\\ \ l ; / -//- � 1 . 'C / ` ! J I I r�`, I I i / > > l /,ll/ l /. ,/�/ /,. / J �,�� . \ \\�\ \\� \ \ /i __ i/' / \\ \ I I �� �� \ �( I I \III II`III �I ( III f/// // //// /r /�/ // / , KEBERR / 1 \ - �� \\\ \ -\ - \ . �I ♦ ► / 1_ �� //i / 1 \ \\ \ %-' \ ( �( - '� I 1`` \l� II ( 1111 1 II 11 1 \ 11\ll\l(l\\\ _ /// /i//// /. / / / / / //_ Y C I Z��\�i\\\\ \\ �\\ �\-\ ><- s S /�l I \ /: 1 /% //'0� ��� �/ / \\ 1 \( �i / /� I \ , / \ \ \\\\ \ 1 I I I� "\ \ \ 1 \ \\\ �\-'/////j// j/�/,/ / l /,�> : r/I� -�I_ � \ I \�\J�\\\\\\ `--�-7 -\\ _ \\ �. �_ �' ��\ J I / / //�// �_//_ I \ \ t \) \ ( I l l \l t \ \\ \\\ - / // / / ,/ / / / ^' �� 1 = \ \ \\\\\\• \\��� _ \ _ = \ °O 1 / / / i/ +� l/� J // . \\\\. \ , I I ( \ �� TEMPORARY CONSTRUCTION \' "\ \I 1 \\\ \ \ I \ \\\ \\um-\�­\ \\ \ �\\ �\\\\ \\ _ _ // // I / // ////� / / / j/� / / 1- -T - \\\\� \moi _ \\ \\ \\\\���\\ s /// /� I l // / ji/icr / I ' I \\/ 1\ / ENTRANCE (TYP.) \ I \\\ \ \\� \ \ \\ \ \ \\ \ \ \ , \\\\ \\ _ - /// / // //, ///i/ �, = �� \ \ \\� \� �\\� - :\ -� - f \\ - \\ r� r / /J// 1I JII / / // / / J \ 1 I\ h ♦ �' / 1 1 \ \\\\\� �\ \\\ \\\\\\\ \\�\ \ -. / ////. i// �/ / I _ \ I \ _,�\� , \ \ \ I I i/ / / ///�_ t 111II W / w /i / / •/ / / '111 ( 1 \\ \,,\, \\ \ `\ \\\\�\\\\\\�\ \ \\ ��� = //// //j//� //f / / �i%////'/- _ ���\•. \` \ L \ �\1�\���� �� ��`\\\�\ Z ���\ \\ \I\, (//// /r//// / // / -t l \\ \\ I, \ ♦ - I // I / \ \_ \\ \ \ �\ \ \ \ \ \ \\\\ \ / /, //// //// �I -- �- \ \\`,— � ^ \\_\\\\ \\\ 1 \ \, / / //// ��_ \ I / 1. \ ��_ / (l /i I / 111 l \ \\ \\\ \\\ \\\\�\\\\\\\\� \\� \\�\\�\�\\: /i/�! // / // //�// __--\\\��,� _ -,�--- \\\\\- \_�\\\\\z `--.{-\\\ \,\ �1111� i I 11 ,V//////// / / /� ,- ^\�1 II 1 / \ / \ , I , 1 I/ / 1 \ \ \\ \ \ \ \ \\� \\\\\\\\ \ �\ \ \�\� \�� =��� / / // / / , / ////,v/i /ice I - -� - - - \\ �\ _ = ,'moi,- Q \\\\\�-- _: \ .I\ \ // J I / / / /� I�� _�\) \� I / �' `' ( I, //I \ \ Il \ \ \ /// /// / // /// »--�\ \� -(,'` fie, \ \ \ \ \ / /- /(11) I✓ I I�U//// // // / /// / \� \ I I' \ 1\.,� �1\\ I \ \ \ - \�\ \ ��\ \ 1 I / //�// / / Iwy/ TZ�z \- is \ yy /� J I I %�/ /// /'-� \ 1 \ / 111 �l I ( 11 I \ _ \\\\ \ _ \ \ \ \ �\ \ \ = /i // J // 11 �// / / / -/ \\\ \\ \\ ��\ \ \ 1 /I i l l l �l / l l /// /// _- _ J \ / \ / -� I �\ I 111 �\ \\\ \��J�,-- - \�\\,=��\ \ , `= %�!/ %ti 1 ///////I///// ///i1 = =— \\ \\ \\� \�\\; \\� - ` -- ----- \-_ - ��=_� �� � � .,/ - ---- --- J �/ LI LLI / -/ I I l \\ \ \\ \\\ \ 5\ \ r l \ \. -� f I / / I / \, >{l / ( \ \ I 1 I \ \ \�\ \ _ / y _ �\ \\ \N \�\ G �, 111 / l !j/ / // // / / // - _�\ \ \\ \ \ \�\ \\\\\ _ \ _ _ \`` - '�� \� - r _ _ -/ 1"Y -;- �_ - �J' \ \-, 1 I / ) 1 \ \ \ �\ ./i/ � / ! \ \ - \ \ �� \ = i / (I / �l /////// // / /' I ' , - �\\\ \\\\ \ �\\\ �\ �\� \ \ - �' I - - _ - � '' /1 / l / / - \ \ / �\ \ I/II�I\ III Il \ ,,�,�-�� \\\�\ \\����\\_\`�\_-- ///�/ II / / \\\ \� \- \_ \ 1\ /r/ l I \ I /� \ \ 11 I I, I �I \ \ \��\,\ \ \ / /��/ L Ill/ / / /Il 11 / / / /// - \\ \\ \ \ �` _ \ 1 f / \ � \ I TDD 24 � \ , � �� I _ i / - / /// / / / l �, / / -I/ - _ - r \\ 11 J//// III\)\ I►III \ \\ \ � � ��'� \ , - �\: \\'�`�� \ _ Ji/l SII l// 111////////i/� �'I'/�/�\\�\\\\\\\\����\�\�\�� ��� __ _ # - . - ,% �� �l / / (I //ll ,:!�\ / <\1 \ I \ ./// I / \\\ \\�: -��� �\• �, \.I_-� \ �</� / Ill 11 /� / 11 /// /�,/ / ss \1L\\ \\\lam\ �,�--r _ 4 ------ --, - \ _., _ ` ?�/7-/ / ���.W. I / -- //-�/ \ / / f� �e T -�� ------ ----- ` i I _ _ - ►' r � \fit 't� 1 \ �� - - - L i?3 / `�-1 �r - �c ->� > h�Y / _.\\ ,\ \\ \ \ \\\ ' \ �1� / / I l / l / / l f I � - - ��,�\:. ��� \\ \,III//� ��. +I\\`\:.1 . Y/. i// I \`�\ �-�� — _ 1 i \ \\ \ \ I� ' \` — / \ — \ -J / \ �l /// I / I �%. - \ SEDIMENT BASIN #7 r` `• /- - � / \/ / /// l 1 LIMITS OF DISTURBANCE NOTES: I \ T /�l �` - - - /) I %/'L � � \) _ 1 ^.i' //// //%i/ / / /I/ / I /, I - \ I 1. SILT FENCE AND TREE PROTECTION FENCE LINES ALSO DELINEATE THE LIMITS OF DISTURBANCE. ALL SILT FENCING OR TREE PROTECTION FENCING SHALL BE INSTALLED INSIDE LIMITS OF DISTURBANCE. 2. LIMITS OF DISTURBANCE BEYOND PREVIOUSLY APPROVED AREAS: 36.19 ACRES 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE \\-,_1 ! ///// ///// /// // /�-//- /`' // ( /�//I (I /l/ -/I // /�/// ✓e \_�-- <1'I� I/1/ //' ///'I/ /\��If - 11 \ l I 11) / / ///- .A \ `k%. \ \\ III (. ( ( / SEAL \\\\\\\\\\111111111/I////// ♦ BRIAR CHAPEL DATE: SEPTEMBER 18, 2018 M&C FILE SCALE l..J X VICE PRO]. # 02735-0231 1�" BARO - ; BC P HAS E 120 l/9/ v CREED LEGDRAWING NUMBER pFESS/O,y DRAWN HORIZONTAL:�', � CHATHAM COUNTY NORTH CAROLINA DESIGNED LEG AS NOTED C3.0 AL - VERTICAL: 036348 = 1730 Varsity Drive, Suite 500 CHECKED GCA _ 0 09/18/2018 ,`\ Raleigh, North Carolina 27606 B R I A R C H A P EL STAGE 1 PRO]. MGR. CHS N/A -,9� FNGINtF- ` ,,,�$� Phone: (919)233-8091, Fax: (919)233-8031 OVERALL GRADING DRAINAGE AN D '1i,�F/'L, n P, \ \� F-1222 by 7 STATUS: REVISION ///'''////77/III IIII1n100 LL// FINAL DRAWINGS www.mckimcreed.com Newland COMMUNITIES EROSION CONTROL PLAN FOR REVIEW PURPOSES ONLY STAGE 1 CONSTRUCTION SEQUENCE: 1. THE INTENT OF THE CONSTRUCTION SEQUENCE IS TO PROVIDE THE CONTRACTOR WITH A GENERAL GUIDE FOR CONSTRUCTION PURPOSES. THIS SEQUENCE IS NOT INTENDED TO OUTLINE ALL CONSTRUCTION ACTIVITIES ON THIS PROJECT. 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 3. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 4. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. CONTACT CHATHAM COUNTY ENVIRONMENTAL QUALITY DEPARTMENT, OWNER'S REPRESENTATIVE AND ENGINEER WITH ANY ADDITIONAL MEASURES NEEDED. 5. CONTRACTOR SHALL ESTABLISH GROUNDCOVER ON DISTURBED AREAS WITHIN THE NUMBER OF CALENDAR DAYS AFTER COMPLETION OF GRADING PER THE SCHEDULE BELOW: GRADUAL SLOPES: (14) CALENDAR DAYS MODERATE SLOPES: (10) CALENDAR DAYS STEEP SLOPES: (7) CALENDAR DAYS STAGE 1 CONSTRUCTION SEQUENCE: 7. OBTAIN LETTER OF PLAN APPROVAL FOR SEDIMENTATION AND EROSION CONTROL FROM CHATHAM COUNTY SOIL EROSION & SEDIMENTATION CONTROL. 8. CONTRACTOR TO POST EROSION CONTROL PERMIT PROMINENTLY ON SITE AT ALL TIMES. 9. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES TO AVOID CONFLICT DURING INSTALLATION OF EROSION CONTROL MEASURES AND STORM DRAINAGE. CONTRACTOR IS TO CALL 1-800-632-4949 FOR `tJC ONE CALL" TO HAVE UTILITIES LOCATED. 10. CONTRACTOR TO HAVE A PROFESSIONAL LAND SURVEYOR FLAG PROPERTY LINES, EASEMENTS, LANDSCAPE BUFFERS, STREAM BUFFERS, TREE PROTECTION AREAS AND LIMITS OF DISTURBANCE. 11. INSTALL TEMPORARY CONSTRUCTION ENTRANCES. CONTRACTOR SHALL ONLY ACCESS SITE THROUGH BRIAR CHAPEL PARKWAY ENTRANCE. NO CONSTRUCTION TRAFFIC SHALL USE PHASE 6N ACCESS FROM CLIFFDALE FOR CONSTRUCTION ACTIVITIES. 12. INSTALL TREE PROTECTION FENCING AND SILT FENCING AS SHOWN AND DETAILED ON PLAN. TIMBER ONLY AS NECESSARY TO INSTALL THESE DEVICES. 13. CONSTRUCT TEMPORARY SKIMMER SEDIMENT BASINS & TEMPORARY SEDIMENT TRAPS TO THE REQUIRED DIMENSIONS AND ELEVATIONS AS DETAILED IN THESE PLANS. GRUB ONLY AS NECESSARY TO INSTALL THE BASINS. MATERIAL EXCAVATED DURING THE CONSTRUCTION OF SEDIMENT BASINS SHALL BE TEMPORARILY STOCKPILED ADJACENT TO BASINS. ONCE ROUGH GRADING OPERATIONS BEGIN, THESE MATERIALS SHALL BE PLACED AS NEEDED IN AREAS OF FILL OR MOVED TO LARGER STOCKPILE AREAS. SLOPES ARE AS DEFINED IN THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 14. COVER LOW FLOW ORIFICES OF SEDIMENT BASIN #2 (BMP #39) AND SEDIMENT BASIN #6 (BMP #40) THROUGHOUT STAGE 1 AND STAGE 2 GRADING ACTIVITIES IN ORDER TO ACHIEVE THE REQUIRED SURFACE AREA AND STORAGE VOLUME. 6. CONTRACTOR SHALL ARRANGE PRE -CONSTRUCTION MEETING WITH THE OWNER'S REPRESENTATIVE, ENGINEER AND CHATHAM COUNTY. 15. INSTALL BAFFLES PER PLAN. SEED AND MULCH SIDE SLOPES OF SEDIMENT BASINS UPON COMPLETION. INSTALL BIODEGRADABLE MATTING ON SIDE SLOPES OF BASINS IF NECESSARY TO ESTABLISH COVER. I ♦ilf l \1 \� \__ _ I \ \� 11 \ \ _\ \ I -f✓ ►'lid ���\\\_ ���f�\,\ \ DOUBLE LINED SIL T/TREE \^ I PROTECTION FENCE (TYP.) - \ -�I 2)II !; � ♦ � . \ \\\\ � CWD #2 ` 1 LINED W/ P550-\ \ \ I I I I 1 1 \ 1 � � \ \ \\ III \ TDD #2 \\ \� ` \ \ \1111 / / LINED W/STRAWW/NET ��,\\� \� ,\ I III(rI11I III / ��_---��/ ,�� / ���/�\\� 111\\ II I 1111\\\\11��r\ ♦ � `-,� ♦ 1 I I 1) I I \\III �//I / r �\ /�� �� �////�/ � \ \ �l 1 111 1111 \ \ \\\\ �,\ \\��\�_r � �/�/ (3) TEMPORARY 24" SLOPE DRAINS // !0/w \ • �,fl / / I /III � I I I\ \ \ \ \�� � \. � -' � - c �i/� � /,� � SILT/TREE PROTECTION FENCE (TYP.) � �, I � 11, �I I l / ) 1 \\\\ / J / BRIAR CHAPEL 1 ` \\ / I �� \ \ / PROPERTY BOUNDARY (TYP.) EX. GREAT RIDGE PARKWAY NORTH LIMITS OF DISTURBANCE (PREVIOUSLY APPROVED) ISI�> CWD 1 / / / / \ 71/ = 7 ` \ LINED W/ SYNTHETIC MAT -z::- J i� -) r / / -T '7`L 000 4k, oOO SKIMMERSKIMMER SEDIMENT BASIN#1\ �/i TOP DIMENSIONS 122' X 56' / 1 V _l- r- _ o TEMPORARY 24" SLOP DRAIN �� / / /� / i F- / � / / // (_ i / ��i///moi � � � � S \ TEMPORARY 18" SLOPE DRAIN / I / , / // //j//// / - G�EP \S��NG I // �/ ( 1 // i SEX ROCK CHECK DAM (TYP.) oo o_ r o ♦ \ I 1) LIMITS OF DISTURBANCE (TYP.)�// �` // // j j // // / / / --� \ / PHASE 13 ` I I I 1 III I I /z //� (PREWOUSL Y APPROVED)_ l it �/ ♦ / / /- J �/ / TDD #1 LINED W/ STRAW W/ NET // - / V / yy Y\ CONCRETE WASHOUT (TYP.) po op / f I ,I/ l/�,�i ✓ /i �'/-/ ii�-�\%��/�TEMPORARY CONSTRUCTION ENTRANCE (TYP.) Op// \ \\ I l\ \1 /I //// 11/l // Z'/ l / EX 20' PUBLIC/ SEWER EASEMENT li moo c !\ •�1�\'G / /� 1 <<N \\ I I DOUBLE LINED SIL T/TREE / %/// -� \� l I I I I I I \I I I (I / l �/ / / \\ ' PROTECTION FENCE (TYP.)I\�\\(((\/ 1 I \j I 1�- \ EX 20' PUBLIC DRAINAGE \ \ \ \ \ \ \\ \\ = \ / / / EASEMENT \\ \ \ \ \ \ \ \ \ \ \\ \\ /� / //�l /�// EXISTING \ STORM WA TER` �\ EXIST /// \ I \��►//� i I / / / 1 I I I \ \ BMP I� -31 EX` BMP MAINTENANCE & I I \ ACCESS EASEMENT .\�\\_ \� �/ .� \� ; // l/ \ a�\�\\_ f ////r 1)1111 %l/ I/l//// wI I I I \ \\\ ��� \moi/���// �\ �� \ ����- ��� ����= ��-= �-�/�! 11 \ \ �- � / SEAL) 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS �PQ�pFESS/ON 9 G�Z- - SEALC 036348 09/18/2018 c�I����a SEAL 1 A 4k!k# &CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com 19 0 p CHAPELTM by Newland COMMUNITIES NPDES GROUNDCOVER STABILIZATION TIMEFRAMES SITE AREA STABILIZATION TIMEFRAME DESCRIPTION 2 EXCEPTIONS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES, 5 3.54 ACRES SLOPES 6.32 ACRES 7 HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES SLOPES STEEPER 7 DAYS 14 DAYS FOR SLOPES THAN 3:1 10' OR LESS IN LENGTH AND NOT STEEPER THAN 2:1 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES FLATTER GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE, EXCEPT FOR WITH SLOPES FLATTER PERIMETERS AND HQW THAN 4:1 ZONES STAGE 1 CONSTRUCTION SEQUENCE (C0 16. CONSTRUCT DIVERSION DITCHES AS SHOWN AND DETAILED IN THESE PLANS. SEED, MULCH AND INSTALL REQUIRED LINERS IN THESE DITCHES. INSTALL CHECK DAMS IN DITCHES AS SHOWN AND DETAILED ON PLANS. CLEAR ONLY AS NECESSARY TO INSTALL THESE EROSION CONTROL MEASURES. 17. CONTACT CHATHAM COUNTY SOIL EROSION & SEDIMENTATION AT 919-545-8339 AND ENGINEER UPON COMPLETION OF INITIAL EROSION CONTROL MEASURES. 18. ONCE TEMPORARY SKIMMER SEDIMENT BASINS AND DIVERSION DITCHES HAVE BEEN INSTALLED, GRUB WITHIN DELINEATED DRAINAGE AREAS ASSOCIATED WITH THE INSTALLED TEMPORARY SKIMMER SEDIMENT BASINS. 19. CONTRACTOR SHALL STRIP TOPSOIL AND STORE AT DESIGNATED LOCATION. PROVIDE SILT FENCE AROUND PERIMETER OF SLOPE OF ANY STOCKPILE LOCATIONS. CONTRACTOR SHALL REMOVE ALL ROOT MATTER AND ORGANICS FROM WITHIN THE CLEARING LIMITS. 20. AFTER COMPLETION OF CLEARING AND GRUBBING, THE SITE SHALL BE TEMPORARILY STABILIZED EXCEPT IN AREAS OF ACTIVE CUT/FILL. ACTIVE AREAS SHOULD NOT EXCEED 25 ACRES AT ONE TIME. 21. BEGIN ROUGH GRADING WITHIN CLEARING LIMITS, INCLUDING GRADING FOR PERMANENT WET DETENTION POND. 22. MAINTAIN AND PROTECT EXISTING UTILITIES AT ALL TIMES. MAINTAIN DIVERSION DITCHES, BASINS, SILT FENCE AND OTHER EROSION CONTROL MEASURES UNTIL THEY ARE APPROVED TO BE REMOVED. 23. PERFORM SEEDING AND MULCHING AS REQUIRED IN ACCORDANCE WITH THE PLANS. 24. ONCE GROUNDCOVER HAS BEEN ESTABLISHED AND OTHER CONSTRUCTION IS COMPLETE, CONTACT CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION AND ENGINEER FOR SITE INSPECTION BEFORE REMOVING ANY TEMPORARY EROSION CONTROL MEASURES. SELF INSPECTION NOTICE: NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH STAGE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH STAGE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 413.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM HTTP: //WWW.DLR.ENR.STATE.NC.US /PAGES /SEDIMENTATION _ NEW.HTML. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. PHASE 12 DRAINAGE AREAS DRAINAGE AREA NUMBER TOTAL AREA WITHIN DRAINAGE AREA 1 3.61 ACRES 2 8.85 ACRES 3 5.21 ACRES 4 2.20 ACRES 5 3.54 ACRES 6 6.32 ACRES 7 5.03 ACRES LEGEND: BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA OVERALL PROPERTY BOUNDARY NEW SUBPHASE BOUNDARY EXISTING R/W LINE I i LIMITS OF DISTURBANCE EXISTING LIMITS OF DISTURBANCE SF/TPF COMBINATION SILT/TREE PROTECTION FENCING EXISTING CONTOUR 000000000 SF/TPFE___� SF/TPF STAGE 1 GRADING, DRAINAGE AND EROSIONI CONTROL PLAN -PHASE 12 SOUTH NEW DIVERSION DITCH TEMPORARY CONSTRUCTION ENTRANCE NEW ROCK CHECK DAM SILT FENCE OUTLET NEW BAFFLE RIPARIAN BUFFER LINE 10' NO BUILD RIPARIAN BUFFER LINE EX. WETLANDS EXISTING DRAINAGE DIVIDE DRAINAGE AREA ' CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID U11UTY DAMAGE / NORTH 60' 0 60' 120' SCALE: 1"=60' (Horiz.) DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.X DRAWING NUMBER C3.1 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY rt� SCOUR HOLE \\ j SILT FENCE \ OUTLET (TYP.) u \ SKIMMER - �\ SKIMMER SEDIMENT BASIN #7 - T •TOP DIMENSIONS 160" X 56' v>� MINIMUM DEPTH 3.0' / PROVIDED SURFACE AREA: 8,960 SF -SKIMMER SIZE 3.0" W/ 2.5" ORIFICE TEMPORARY 24" SLOPE DRAIN DOUBLE LINED COMBINATION SILT/TREE SILT/TREE PROTECTION FENCE (TYP.) I I \� \ \ ` ___ / I I I I / PROTECTION FENCE (TYP.) \ ` BAFFLES (TYP.) \ J F/T TEMPORARY - f '- 15" SLOPE DRAIN - \ \� \ \ ACCESS ROAD F/n,' TDD 424 INSET - PUMP STATION ACCESS EX. GREAT RIDGE PARKWAY NORTH I LIMITS OF DISTURBANCE 1 �/ �\n (PREVIOUSLY APPROVED) 1 _ TEMPORARY / \ BERM (TYP.) \ \ \ _ LINED W/ SYNTHETIC MAT ��` 1\ \ \ ' (CONSTRUCTION ENTRANCE 10' -\ \� \ \�\ \ /" \ / l \ \\ LIMITS OF DISTURBANCE (T\P.)SOON LINED W1 SC250 NOR�N \ NOR! ONE NOR ENO NOR�—� / ( I/ \\\\ 111\I \1\\\1� DOUBLE LINED SIL T/TREE ' L \ k BRIAR CHAPELf PROTECTION FENCE (TYP.) PROPERTY BOUNDARY (TYP.) �-.\� _ -� /� / / \ i j/% �7 i �j / / i �/` _ v �- SILT FENCE OUTLET (TYP.) 1 I I00007 4 x4'x12" ENERGY 1 22.0" DAM DISSIPA TER TYP. r/�'�� ( ) WIDTH TDD #7 i ^ \\ \ \ / �j �i�� j/// �� I \ \ I (� i \. / / /// - LINED W/ STRAW W/ NET s v 11 \ 1 1 \ \ III 16 now // �/ 1 I STORMWATER BMP #39 �� ! w/// / / /j% �/ / - / / !� SF ARC FILTER TO BE USED AS SKIMMER SEDIMENT BASIN #2 _ �i /-f INLET PROTECTION TYP.) 00 DIMENSIONS PER BMP DETAIL SHEET D4.1 �-}-� / _ ROCK CHECK DAM (TYP.) i _ / TEMPORARY 18" SLOPE DRAIN MINIMUM DEPTH 3.0' / TEMPORARY 24" SLOPE DRAIN �� �� / PROVIDED STORAGE: 51,587 CF \ / ^ _ /l ' it F ` // // TEMPOR� Y 15" SLOPE DRAIN _ ,� _ / / PROVIDED SURFACE AREA: 17,587 SF `-0� \ // _�mommmm DOUBLE LINED //j SKIMMER SIZE 6.0" W/ 5.9" ORIFICE ��� �� // _/ 1—_�-� ��� -� / / - BAFFLES (TYP.) / SIL T/TREE PROTECTION FENCE (TYP.) / / �� ' /\\ TDD #11 / / -jr / _�� `' /// / / / / ` / / / l / / /� / / + LINED W/ SC250 / � -�,I� -� " ��\�- -_ �/ ,- / / / I' �� \ / / / / / / -� SKIMMER TDD #10 ♦ 2 TEMPORARY 24" SLOPE DRAINS �- _ O / jjj_'11111lk %411/ /� LINED W/ SC250 RON \_ now 00 SKIMMER SEDIMENT BASIN #J-- // TOP DIMENSIONS 142" X 66' ♦ - / - - / TDD #8 PMINIMUM ROVIDED STORAGE. 21 060 CF - / LEGEND: / ^ ` / LINED W SYNTHETIC MAT / PROVIDED SURFACE AREA: 9,372 SF TDD #5 I \ \\ \ I I I TEMPORARY 24" SLOPE DRAIN / SKIMMER SIZE 3.0" W/ 2.5" ORIFICE ♦ '- - OVERALL PROPERTY BOUNDARY LINED W/ SYNTHETIC MAT l I 1 �� I I I I ` \ / TDD #9/� III Im Z / ISKIMMER / RIPRAP OUTLET I1 ` PROTECTION (TYP.) DOUBLE LINED SIL T/TREE 11 PROTECTION FENCE (TYP.) TDD #2 LINED W/ SYNTHETIC MA `1J �� I �\I 1 \\ \\\ \ \\1 \\\\\� \ �\ � II\I\�I III\ I � �I�I I l��r / I II /�I II�`// \/I I �1 IJ \.\� 1I I�I� II �\ �1'I �I\lIII1I I�II\ �1I/ / I'/ I I1l��,\I)1 1!rj/,�I 1 I_�\ /�III/\ 1II1 /�/ \ II II— �= \ \ 1/��/JI I G��—/I1 /\/-/ i�.=�// -_/ // I/ ^�� �f//\\ �\_/�/`\�'/\-\, � - \ /\I(\ I -l _ \ \ I\ I \ /�/ \ -\ \\//' / ^✓ 1 ---\\ ��� /—�\ �//\I // �///�/ a//LI I /�\\' ) /I/ ♦\ SfP'F l/ I I 1 I I� �S/� � I I1 � /'/`, I 1�/ / \` ��l I vI -_ l/\i/\ I—% \I,\�I I�i � I_ �\/ /\ ,l / // /\ �/`�- / _7 \,I,���J//�� //l� / ��_ /�/ _/ fI// l -/// / —� / ///r /�—S/ I — L//J/ I / / �//�II///IJ /�l' �/l/l � 1/I , l\/J 1 /s II 1/ / I 1�I 1/ / II �1/ II1 /y II,\ I/ / � /f / �/ / ,l /\/�I/ 1�/Il//\/I I I �/I /l\1 I I(I / �I% I\I II�I II /I /II III // II II/I II I �/ )I /II //' II I / IIIlI / /lIII / /i/ 1 �I l\ / I♦//r,,I�I I / //II �1 /I� 1/I�♦/I \\ /\-\J \/\ / , / // `v, _,/J / � / I I L/� INE\\D \\\W\I/ / S/C\� 2 \ 5--/ 0 \ I -- NEW SUBPHA S E BO U N D A RY J / ,\ \I EXISTING R/W LINEROCK CHECK DAM (TYP.) 0100 i NONE LIMITS OF DISTURBANCE 1000 TDD #6NANNNNNO EXISTING LIMITS OF DISTURBANCE -R, *00 LINED W/ SYNTHETIC MAT 000 too\ SF/TPF COMBINATION SILT/TREE PROTECTION FENCINGI i—T EXISTING CONTOUR I NEW DIVERSION DITCH �//00p CWD#3 TEMPORARY CONSTRUCTION ENTRANCE TDD #4 ISYNTHETIC MAT LINED W/ SC250 SPOIL AREA BOUNDARY (TYP.) LINED WNEW ROCK CHECK DAM (2) TEMPORARY 24" SLOPE DRAIN / _ SIF�SFITPF SILT FENCE OUTLET NEW BAFFLE RIPARIAN BUFFER LINE TDD #J LINED W/ SYNTHETIC MAT 10' NO BUILD RIPARIAN BUFFER LINECTEX. WETLANDS / -------- EXISTING DRAINAGE DIVIDE T/TREE PROTECTION FENCE (TYP.) DRAINAGE AREA ROCK CHECK DAM (TYP.) ROCK CHECK DAM (TYP.) T \II \ LIMITS OF DISTURBANCE (TYP.) ddl ddl JS SF/TPF id \ `VOLUNTARY BUFFER DOUBLE LINED SILT/TREE I i \ % 11 I I I I ,� '\ \ > > is _ PROTECTION FENCE (TYP.) \ 1 I 1 I \ \� -� s �` `� j�-\ ` I �_ \ - \ I CALL N.C. ONE 1 \ / \ CALL CENTER BEFORE YOU DIG ��_=—� STOP _\�C 1 800 632-4949 � � � � � \ _ � � \ � � � �\ �\ \ ` - — / - - � � i = — � �\�\ \ AVOID uTIUTY \ \ \ \ \ \ \ ` -� \ I I \ \ -- \ �-- — �-� DAMAGE NORTH CWD 112 \ \ \ I BRIAR CHAPEL PROPERTY BOUND\ ` TYP. I V 1 \\ \ \ r \l f/ - \ r \ \ _LINED W/ C350` 60 0 60 120, INN 0 \ \ • / // / \ \ \ \ \ \ \ \ 1 / ��\\\\ \ // ` / \ _\\ % \ _ SCALE. 1"=60' (Horiz.) SEAL 1 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS \\\\\\\��o��N ARp��,,���i PQoliEss/ON 9 �G�Z- - SEALC 036348 09/18/2018 c�I�I��a SEAL 1 A v &CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com CHAPEL'S by Newland COMMUNITIES BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA STAGE 1 GRADING, DRAINAGE AND EROSION CONTROL PLAN -PHASE 12 SOUTH DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.X DRAWING NUMBER C3.2 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY CD— \ --- / �/ I J� _ t��1 1) I I � /� ` -17 � ►�-�\ \\ \ \\ \ � / /��//� r/ / / I III \ \ I I / / / I / � 5 - ,� 1 I I � \tel TDD #16 w o f // LINED W SYNTHETIC MAT / i \ \ \ I \ \ Z \ r /,/ �,�l I / \ I - - r. Mftftft EX. CUL VERT \ \\ TO REMAIN (TYP.) i / " I/ �\ 1 \ \ I I I I I 1 HALF DOLLgR OAD JL / z- - � ( -( _ J- _f 7/1/ ( TEMPORARY 24" SLOPE DRAIN (TYP.) — — — — — 1 (Ex. so' PUBLIC F;vw) I I TDD 17 _ \ LINED W/ SYNTHETIC MAT 10 SKIMMER SEDIMENT BASIN 5 VOLUNTARY 50' BUFFER (TYP.) /J LIITS OF DISTURBANCE (TYP.) DOUBLE LINED SILT/TREE LINED W/ SC250 TOP DIMENSIONS 120" X 55' MINIMUM DEPTH 3.0' / 1 PROVIDED STORAGE. 13,932 CF 1 J \ PROVIDED SURFACE AREA: 6,600 SF (-.Ti I I ( / / SKIMMER SIZE 5" W/ 2.2" ORIFICE c' w TDD #18 - / LINED W/ SYNTHETIC MAT PROTECTION FENCE (TYP.) BAFFLES (TYP.) \TEMPORARY 18" SLOPE DRAIN (TYP.) — � IIS I II �lll 1 I � DOUBLE LINED SILT/TREE PROTECTION FENCE (TYP.) � I� I I►/ I II I� I� 111�\� SIL TlI FENCI OUTLET (TYP.) 4'x4 x12" ENERGY I DISSIPATER (TYP.)--- SIV) �L \� TDD #19 ' I \ \ \ TEMPORARY 12" SLOPE DRAIN (TYP.) 11 l I /C/ \ C \ \\ \ l l r LINED W/ STRAW W/ NET SKIMMER J I I \ "I-- --/ \ \ \ \\ \ o TDD #14 LINED W/ STRAW W/ NET\ I 1SKIMMER SEDIMENT BASIN #4 \\\` \ \ \ \ TDD #20 4x4 x12" ENERGY J I 1 ' \ \\ TOP DIMENSIONS 95" X 45' \\ \ ` LINED W/ SC250 r \ SIPATER (TYP.) \\ \\ \ MINIMUM DEPTH 3.0' \\ _� \ y PROVIDED STORAGE: ,2 CF PROVI LINED W/ SC250 DED SURFACE AREA: 4,275 SF\ TDD #13 \ \\ \ \\ ♦ / I \ \ I 1 I I ` \\ \ / \ \ \ �_ SKIMMER SIZE 2.0" W/ 1.8" ORIFICE \ \ \\ _\ 411 SKIMMER BAFFLES (TYP.)\\S _ i ♦ ` \ I \ \ \ 1 \ I I I I / I I I I `� \ I 1 \\ \ -jam \ ` \ \ ` \ I I p O TEMPORARY 18" SLOPE DRAIN (TYP.) �\ TDD #12 O \ LINED W/ SC250\1 \ OT TDD #20 \��-�_� _a / \\ _ SPOIL AREA BOUNDARY (TYP.) I I I I ` I I I I LINED W/ SC250 1 �s s � _--�----_ 1 TEMPORARY CONSTRUCTION 1 I \ I (TYP.) I � < > \ \ \ _ �_ � _ ,, ♦ � — / � / l 1► I I Irl I G\C \� c EX. GREAT RIDGE PARKWAY NORTH REg7 RID LIMITS OF DISTURBANCE♦� I \ - (EX,-' , ", PARKWAY \� , \ ( (PREVIOUSLY APPROVED) \ ' R/W) \ \ \ 11� / �\` ` ♦ ` ARC FILTER I (2) TEMPORARY 24" SLOPE DRAINS (TYP.) \ \ INLET PROTECTION (TYP.) \\ \ `� ♦ �_ :_ _ _ _ _ � � T \ �\\ \ �� '' � \ � DOUBLE LINED ♦ I - o rn � � ��� ' ' \ \ � \ I SILT/TREE PROTECTION FENCE (TYP.) ♦ ` I = �v I I \ \ \ �\ EX 20' PUBLIC TDD #21 DRAINAGE \ \� \ =`\ v l �\ �` ���� ` �LINED W/ P550 EASEMENT �\ I— r- \"� \ I\ ��\ �2 ♦ \�\\ \ \ \ ,— ��= LSI LINED W/ SYNTHETIC MAT, PHASE 13 \ l \ �J \ \ \ _�� �-- J \ \ \\ \ \ \ \ ` TDD #22 (PREVIOUSLY APPROVED) LINED W/ STRAW W/ NET - CONCRETE WASHOUT (TYP.) \ \ \ \ CHA THAM COUNTY 10'- NO-BUILD 0 NO -BUILD BUFFER (TYP.) \ \\ \ \\ CHATHAM COUNTY • /_ ���R� �\ \� I \ \ � �\ \� \\ \\ \ 50' STREAM BUFFER � \ � \ � �� � `�"/— ��- \ \ '� CONSTRUCTION �',',,�TEAIPORARY ENTRANCE (TYP.) - p \\ \ / \\ \ \r �\� \\ � GE -EA EAS � \\ \ � I I\� ,EMPORAR18" SLOPE DRAIN _ 7� \\ \ \� EXISTING \ \ \ \ \� — ✓ STORM WA TER ��\✓ , \ �� 7:, BMP g EX BMP MAINTENANCE & _��� � ACCESS EASEMENT SEAL 1 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE REVISIONS _'te\Q�pFESS/ON 9 . Z�r�AL 036348 09/18/2018 //////III 1I�I0a SEAL 1 A v &CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com 19 0 by Newland COMMUNITIES STORM WATER BMP #40 1 TO BE USED AS SKIMMER SEDIMENT BASIN 116 DIMENSIONS PER BMP DETAIL SHEET D4.4 MINIMUM DEPTH 3.0' i I PROVIDED STORAGE. 36,168 CF %r PROVIDED SURFACE AREA: 20,564 SF I - t I SKIMMER SIZE 6.0" W/ 4.8" ORIFICE / BAFFLES (TYP.) o DOUBLE LINED SILT/TREE PROTECTION FENCE (TYP.) i SKIMMER EX.I GREAT RIDGE PARKWAY NORTH I LIMITS OF DISTURBANCE (PREVI SL Y APPROVED) EL TM LEGEND: OVERALL PROPERTY BOUNDARY NEW SUBPHASE BOUNDARY EXISTING R/W LINE LIMITS OF DISTURBANCE EXISTING LIMITS OF DISTURBANCE SF/TPF COMBINATION SILT/TREE PROTECTION FENCING — — EXISTING CONTOUR 000000000 SF/TPFE___� SF/TPF BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA STAGE 1 GRADING, DRAINAGE AND EROSIONI CONTROL PLAN -PHASE 12 NORTH NEW DIVERSION DITCH TEMPORARY CONSTRUCTION ENTRANCE NEW ROCK CHECK DAM SILT FENCE OUTLET NEW BAFFLE RIPARIAN BUFFER LINE 10' NO BUILD RIPARIAN BUFFER LINE EX. WETLANDS EXISTING DRAINAGE DIVIDE DRAINAGE AREA ' CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID U11uTY DAMAGE / NORTH 60' 0 60' 120' SCALE: 1"=60' (Horiz.) DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.X DRAWING NUMBER C3.3 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY BMP #38 STORMWATER WETLAA SEE DETAIL SHEETS D4.,1 -D4. RIP RAP OUTLET PROTECTION (TYP.) L7 L7 L7 L711L7 ' � 1 o SILT FENCE OUTLET (TYP.) I A�\ Lo PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES, L7 Lf\\\T\�i HIGH QUALITY WATER 7 DAYS NONE 18" TEMPORARY SLOPE DRAIN SLOPES STEEPER 7 DAYS 14 DAYS FOR SLOPES THAN 3:1 10' OR LESS IN - 3:1 LENGTH AND NOT STEEPER THAN 2:1 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES FLATTER X� GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE, EXCEPT FOR X PERIMETERS AND HQW THAN 4:1 ' 4 PRIVATE UTILITY STAGE 2 CONSTRUCTION SEQUENCE: 1. THE INTENT OF THE CONSTRUCTION SEQUENCE IS TO PROVIDE THE CONTRACTOR WITH A GENERAL GUIDE FOR CONSTRUCTION PURPOSES. THIS SEQUENCE IS NOT INTENDED TO OUTLINE ALL CONSTRUCTION ACTIVITIES ON THIS PROJECT. 2. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 3. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 4. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. CONTACT CHATHAM COUNTY ENVIRONMENTAL QUALITY DEPARTMENT, OWNER'S REPRESENTATIVE AND ENGINEER WITH ANY ADDITIONAL MEASURES NEEDED. 5. CONTRACTOR SHALL ESTABLISH GROUNDCOVER ON DISTURBED AREAS WITHIN THE NUMBER OF CALENDAR DAYS AFTER COMPLETION OF GRADING PER THE SCHEDULE BELOW: GRADUAL SLOPES: (14) CALENDAR DAYS MODERATE SLOPES: (10) CALENDAR DAYS STEEP SLOPES: (7) CALENDAR DAYS \ SLOPES ARE AS DEFINED IN THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. C1-706 6. CONTRACTOR SHALL ARRANGE PRE -CONSTRUCTION MEETING WITH THE OWNER'S REPRESENTATIVE, ENGINEER AND CHATHAM COUNTY. 7. OBTAIN LETTER OF PLAN APPROVAL FOR SEDIMENTATION AND EROSION CONTROL FROM CHATHAM COUNTY SOIL EROSION & \ _ SEDIMENTATION CONTROL. 8. CONTRACTOR TO POST EROSION CONTROL PERMIT PROMINENTLY ON SITE AT ALL TIMES. 9. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES TO AVOID CONFLICT DURING INSTALLATION OF EROSION CONTROL MEASURES AND STORM DRAINAGE. CONTRACTOR IS TO CALL 1-800-632-4949 FOR 'NC ONE CALL" TO HAVE UTILITIES \ 4' PRIVATE UTILITY LOCATED. EASEMEN TTYP. T(TYP.) 10. CONTRACTOR TO HAVE A PROFESSIONAL LAND SURVEYOR FLAG PROPERTY LINES, EASEMENTS, LANDSCAPE BUFFERS, STREAM EX. CWD 112 BUFFERS, TREE PROTECTION AREAS AND LIMITS OF DISTURBANCE. Cl -?04 11. REHABILITATE ALL EXISTING EROSION CONTROL MEASURES THAT WILL REMAIN THROUGHOUT STAGE 2 EROSION CONTROL. THIS IS INCLUDES EXISTING DIVERSION DITCHES, EXISTING SKIMMER SEDIMENT BASINS, EXISTING SEEP BERM, EXISTING SILT FENCE AND SILT 50 VOLUNTARY BUFFER (TYP.) FENCE OUTLETS, AND TREE PROTECTION. 12. CONSTRUCT BMP #39 AND BMP #40, WHICH WILL ACT AS SKIMMER SEDIMENT BASINS DURING STAGE 2 EROSION CONTROL, WITHIN 4' HOA EASEMENT (TYP.) EXISTING LIMITS OF DISTURBANCE TO THE REQUIRED DIMENSIONS AND ELEVATIONS AS DETAILED IN THESE PLANS. GRUB ONLY AS NECESSARY TO INSTALL THE BASINS. MATERIAL EXCAVATED DURING THE CONSTRUCTION OF SEDIMENT BASINS SHALL BE TEMPORARILY STOCKPILED ADJACENT TO BASINS. ONCE ROUGH GRADING OPERATIONS BEGIN THESE MATERIALS SHALL BE PLACED AS NEEDED IN AREAS OF FILL OR MOVED TO LARGER STOCKPILE AREAS. NEW R/W (TYP.) 1 13. INSTALL BAFFLES PER PLAN. SEED AND MULCH SIDE SLOPES OF SEDIMENT BASINS UPON COMPLETION. INSTALL BIODEGRADABLE \ 1 MATTING ON SIDE SLOPES OF BASINS IF NECESSARY TO ESTABLISH COVER. 1 14. INSTALL THE ADDITIONAL TREE PROTECTION FENCING AND SILT FENCING AS SHOWN AND DETAILED ON PLAN. TIMBER ONLY AS ` / / Dei Cl'- �2 NECESSARY TO INSTALL THESE DEVICES. , \ , 1 /i/ /// EX. CWD #1 r \ \ C) /-INLET PROTECTION (TYP.) STAGE 2 CONSTRUCTION SEQUENCE (CONT.) 15. CONSTRUCT ADDITIONAL DIVERSION DITCHES (TDD #25) AS SHOWN AND DETAILED IN THESE PLANS. SEED, MULCH AND INSTALL REQUIRED LINERS IN THESE DITCHES. INSTALL CHECK DAMS IN DITCHES AS SHOWN AND DETAILED ON PLANS. CLEAR ONLY AS NECESSARY TO INSTALL THESE EROSION CONTROL MEASURES. 16. CONTACT CHATHAM COUNTY SOIL EROSION & SEDIMENTATION AT 919-545-8339 AND ENGINEER UPON COMPLETION OF INITIAL EROSION CONTROL MEASURES. 17. ONCE TEMPORARY SKIMMER SEDIMENT BASINS AND DIVERSION DITCHES HAVE BEEN INSTALLED, GRUB WITHIN DELINEATED DRAINAGE AREAS ASSOCIATED WITH THE INSTALLED TEMPORARY SKIMMER SEDIMENT BASINS. 18. CONTRACTOR SHALL STRIP TOPSOIL AND STORE AT DESIGNATED LOCATION. PROVIDE SILT FENCE AROUND PERIMETER OF SLOPE OF ANY STOCKPILE LOCATIONS. CONTRACTOR SHALL REMOVE ALL ROOT MATTER AND ORGANICS FROM WITHIN THE CLEARING LIMITS. 19. AFTER COMPLETION OF CLEARING AND GRUBBING, THE SITE SHALL BE TEMPORARILY STABILIZED EXCEPT IN AREAS OF ACTIVE CUT/FILL. ACTIVE AREAS SHOULD NOT EXCEED 25 ACRES AT ONE TIME. 20. BEGIN ROUGH GRADING WITHIN CLEARING LIMITS, INCLUDING GRADING FOR PERMANENT WET DETENTION POND. 21. MAINTAIN AND PROTECT EXISTING UTILITIES AT ALL TIMES. MAINTAIN DIVERSION DITCHES, BASINS, SILT FENCE AND OTHER EROSION CONTROL MEASURES UNTIL THEY ARE APPROVED TO BE REMOVED. 22. PERFORM SEEDING AND MULCHING AS REQUIRED IN ACCORDANCE WITH THE PLANS. 23. ONCE GROUNDCOVER HAS BEEN ESTABLISHED AND OTHER CONSTRUCTION IS COMPLETE, CONTACT CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION AND ENGINEER FOR SITE INSPECTION BEFORE REMOVING ANY TEMPORARY EROSION CONTROL MEASURES. RETAINING WALL NOTES: 1. RETAINING WALL DESIGN IS BY OTHERS. OWNER SHALL PROCURE A QUALIFIED RETAINING WALL DESIGNER FOR THE PROJECT. RETAINING WALL INFORMATION SHOWN ON THESE PLANS ARE FOR LOCATION AND GRADE INFORMATION ONLY. OWNER RESPONSIBLE FOR PROVIDING NECESSARY INFORMATION TO WALL DESIGNER AS REQUIRED FOR PROPER DESIGN OF RETAINING WALLS. 2. TOP GRADE OF WALL AND BOTTOM GRADE OF WALL SPECIFIED IN PLANS ARE INTENDED TO BE THE FINISHED PAVEMENT OR EARTH GRADE. THE WALL DESIGNER SHALL ADJUST SHOP DRAWING WALL ELEVATIONS FOR THE TOP AND BOTTOM OF WALL TO MEET SPECIFIC PRODUCT DESIGN CRITERIA AND WALL GEOMETRY AS NECESSARY TO ACHIEVE DESIRED FINISHED GRADES. THE HORIZONTAL WALL LOCATION AS SHOWN IS THE FINISHED LOCATION OF THE BOTTOM OF WALL. THE WALL DESIGNER SHALL COORDINATE WITH THE ENGINEER TO VERIFY WHETHER CONFLICTS EXIST. THE WALL DESIGNER SHALL NOTIFY THE ENGINEER IN CASE OF ANY CONFLICTS, INCLUDING BUT NOT LIMITED TO EXISTING OR PROPOSED UTILITIES WALL BATTER GEOGRID PLACEMENT ETC., OR IF ANY ASPECT OF WALL PLACEMENT CAN NOT BE ACCOMPLISHED. ALL WORK RELATED TO THE RETAINING WALL CONSTRUCTION SHALL BE ACCOMPLISHED WITHIN THE BOUNDARIES OF THE PROJECT PROPERTY WITHOUT IMPACTING BUFFERS. 3. IT IS THE RESPONSIBILITY OF THE OWNER AND WALL DESIGNER TO ASSURE THAT THE REQUIRED SOIL BEARING PRESSURE SUBSURFACE DRAINAGE AND SURFACE DRAINAGE ARE ACHIEVED AS RELATED TO THE RETAINING WALL DESIGN. THIS SHOULD BE VERIFIED BY A GEOTECHNICAL ENGINEER. SPECIAL ATTENTION IS REQUIRED TO ENSURE BEARING CAPACITY HAS BEEN ACHIEVED AT LOCATIONS WHERE PIPE PENETRATIONS ARE TO OCCUR. IT SHALL BE THE RESPONSIBILITY OF THE CLIENT TO PROVIDE QUALITY CONTROL / QUALITY ASSURANCE TESTING ASSOCIATED WITH THE WALL CONSTRUCTION. THE GEOTECHNICAL ENGINEER OR WALL DESIGNER SHALL PROVIDE ANY CERTIFICATIONS AS MAY BE REQUIRED TO SHOW COMPLIANCE WITH ORIGINAL DESIGN DOCUMENTS AS RELATED TO THE WALL DESIGN AND CONSTRUCTION. BRIAR CHAPEL � ROPERTY BOUNDARY (TYP.)if 000 EX 2C/Jj NEW RIW (TYP.) / ) IJ D1-77? i - i APPLY RECP ON SLOPES 3: 1 � �-c �il � � / 1 / / � - � - \ \ \OR GREATER TYP. c,�- C !- 1 I/ /y / 17 / / A�\ \ l ��\� I � 21 / / //��`/� ir/ O 9 '// �<//�// / \�\s� \ I �\ 1 / 1Il / ��/// ��i� / 21,6 ♦ C \lig ��\\� E lK A E 0 Q , I �l fir 2„5 _ I I D1-709 / / l //� / /�� // EX. C854 1 l l iii/// /�// //i/�� ` I I l � � - �//� � /` / \\ ��il�� 2,13 ��/;�i�%� _ \ l 1 i� , I \ I \ \\ 1 �\\� \ / / /// /i/� J -� \ �, I I I - - / / // /� \\ I I „2 �� i, Ill \ \ III I\ fi 1 \ \ \ \\ \ ////// / / EX. TEMPORARY CONSTRUCTION 11 \ \ EX 20' PUBLIC I I //// / ��// ENTRANCE (TYP.) � \ \ \ \\ \ \� \ \ \ ii ' I I DRAINAGE l \ \\ \�- \\ , I �s i% EX. CB 53 // / �/ I I rI 1 11 EASEMEN T� \ \\ \ \\\\\\\ / i l / 11 r I� I'� I \ 1 EXISTING \\ \ I / I \ \ STORMWATER'� \ \\ \ \ \ EX BMP MAINTENANCE & / /l / I� I I \ BMP \\ �\ �\ _\ / \ �C��ACCESS EA �FMENT \ \\ \� /j / I / LX CB57 OV EX. C858 .�/i � -' \� \ _- \///���/��////� / /z INLET PROTECTION (TYP.) / C, �-_�.�\�\\��// / // / l , e4 1000' . �- alp. �\\ , � I I \ , , � \,, ,, , .\ -,- ,,. \, \ \\ _ _\\ ._\_ ,► r �.� ,.. , SEAL) 1 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. I DESCRIPTIONS DATE REVISIONS \A CARO.1,11111 �PQ�0ss/ON 9 G�Z- - SEALC 036348 09/18/2018 c�I�I��a SEAL 1 A v CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com CHAPELTM by Newland COMMUNITIES NPDES GROUNDCOVER STABILIZATION TIMEFRAMES SITE AREA STABILIZATION TIMEFRAME DESCRIPTION DESIGNED EXCEPTIONS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES, SLOPES HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES SLOPES STEEPER 7 DAYS 14 DAYS FOR SLOPES THAN 3:1 10' OR LESS IN LENGTH AND NOT STEEPER THAN 2:1 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES FLATTER GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE, EXCEPT FOR WITH SLOPES FLATTER PERIMETERS AND HQW THAN 4:1 ZONES STORM DRAINAGE NOTES: 1. STORM DRAINAGE PIPES SHALL BE: • RCP/CLASS III FOR STORM DRAINAGE INSIDE PUBLIC RIGHT-OF-WAY OR CONNECTING INTO STRUCTURE INSIDE PUBLIC RIGHT-OF-WAY IN ACCORDANCE WITH NCDOT STANDARDS UNLESS NOTED OTHERWISE. 2. ALL CONCRETE SHALL MEET A MINIMUM 3,000 PSI COMPRESSIVE STRENGTH. 3. ALL PIPE IN STORM DRAIN STRUCTURES SHALL BE STRUCK EVEN WITH INSIDE WALL. 4. THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE POINTED UP AND SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS. 5. ALL BACKFILL SHALL BE NON -PLASTIC IN NATURE, FREE FROM ROOTS, VEGETATION MATTER, WASTE CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. UTILIZED MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING. 6. MATERIALS DEEMED AS UNSUITABLE FOR BACKFILL PURPOSES BY THE OWNER'S REPRESENTATIVE SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL. 7. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST. THE TOP EIGHT (8) INCHES SHALL BE COMPACTED TO 100% STANDARD PROCTOR. 8. UNDER NO CIRCUMSTANCES SHALL WATER BE ALLOWED TO RISE IN UNBACKFILLED TRENCHES AFTER PIPE HAS BEEN PLACED. 9. ALL FLARED END SECTIONS DISCHARGING INTO WATER QUALITY PONDS WILL HAVE A CONCRETE PAD POURED UNDERNEATH THE FLARED END SECTION IN ACCORDANCE WITH PROVIDED CONSTRUCTION DETAILS. 10. RIM ELEVATIONS OF STORM DRAIN STRUCTURES SHALL BE FIELD VERIFIED. 11. STORM DRAINAGE WITHIN PRIVATE EASEMENTS TO BE OWNED, OPERATED AND MAINTAINED BY HOME OWNER'S ASSOCIATION OR AGENT THEREOF. 12. LENGTHS SHOWN FOR STORM DRAINAGE PIPES ARE MEASURED FROM CENTER OF STORM STRUCTURES AND TO ENDS OF FLARED END SECTIONS. SLOPES CALCULATED ARE BASED ON THIS LENGTH. 13. CB DENOTES CATCH BASINS TO BE INSTALLED IN THE CENTERS OF PAVED ALLEYS AND NON -PAVED AREAS. REFER TO NCDOT DETAILS 840.19 AND 840.24 ON SHEET D-2.2. 14. CI DENOTES CURB INLETS TO BE INSTALLED IN THE CURB LINES OF ROADWAYS. REFER TO NCDOT DETAILS 840.02 AND 840.03 ON SHEET D-2.2. LEGEND: OVERALL PROPERTY BOUNDARY FUTURE R/W LINE EXISTING R/W LINE I i LIMITS OF DISTURBANCE EXISTING LIMITS OF DISTURBANCE SF/TPF COMBINATION SILT/TREE PROTECTION FENCING EXISTING CONTOUR 480 NEW CONTOUR 000000000 -S,/TPF BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA STAGE 2 GRADING, DRAINAGE AND EROSIONI CONTROL PLAN -PHASE 12 SOUTH EXISTING DIVERSION DITCH NEW DIVERSION DITCH TEMPORARY CONSTRUCTION ENTRANCE NEW ROCK CHECK DAM SILT FENCE OUTLET RIPARIAN BUFFER LINE 10' NO BUILD RIPARIAN BUFFER LINE EXISTING WETLANDS BMP MAINTENANCE & ACCESS EASEMENT EXISTING DRAINAGE DIVIDE DRAINAGE AREA ' CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID U11UTY DAMAGE / NORTH 60' 0 60' 120' SCALE: 1"=60' (Horiz.) DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.4 DRAWING NUMBER C3.5 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY rt �►a'� EX. SCOUR HOLE' ;i \ I I EX SILT FENCE OUTLET (TYP�� \ EX. SKIMMER SEDI\MENT BASIN #7 TO REMAIN THROUGH STAGE 2 EROSION CON TROL ±84 INSET - PUMP STATION ACCESS 77 ��^ l EX. GREAT RIDGE PARKWAY NORTH �� LIMITS OF DISTURBANCE RETAINING WALL s-- / EXISTING CULVERT (TYP.) \\ _ _ •� (PREVI li �OUSLY APPROVED) It EX. DOUBLE LINED — EX. COMBINA TION SILT TREE SILT/TREE PROTECTION FENCE (TYP.) ' I I PROTECTION FENCE (TYP.) ACCESS ROAD \ \�/ TDD 724 J EX. ROCK CHECK DAM _ -- ---------- -- ��_ - �� muumuu \ _ It LIMITS OF DISTURBANCE (TYP.*00000 ) \ 1 \ EX. CWD 114NORTL_ C3 N — _ \ � BRIAR CHAPEL \ \�--5� \ i�%/ / // f'� EX. SKIMME/7 _` SEDIMENT BASIN L PROPERTY BOUNDARY (TYP.) I r/ TO BE REMOVED AS GRADING ALLOWS AND \�� \\ /� �✓ / \\\\ \� l- .� =moi%/j �/ /�— DRAINAGE REDIRECTED TO BMP #39 \\ �'/ / JJJ��j \\ ��� ��--�j iii �/i /!�/ /� -� _ amp-� ��"_zz�z\ EX. COMBINA TION SIL VTREE, / �� -� �� ` PROTECTION FENCE (TYP.)TDD " Q , EX. TDD #11 EX. ROCK CHECK DAM (TYP.) / XEX. TDD #5 ��V l �lll/`i STORM WATER BMP #39 _ -i- _ / / 0 - TO " o') ' -` EX. TEMPORARY �� i= -____-_-- --- r o= _.�1 0 SLOPE DRAIN (TYP.) / TO BE USED AS SKIMMER SEDIMENT BASIN 2 --J �/� / i r _- _-- �— / THROUGH STAGE 2 GRADING ACTIVITIES CHATHAM COUNTY lI - //� / - -� l / \ SEE DETAIL SHEETS D4.1 -D4.3 - �� \ ,�" /� '\�/► / — I 1 50' STREAM BUFFER (TYP.) / / �■ / / ��\\_�� L EX. TDD #71§108/ /"0000,0% CHATHAM COUNTY 10' I I /man NO -BUILD BUFFER (TYP.) X\ I 1 \ \ 1 I ) I / ' / 2151 S / i `�- LEGEND: 214 r = I ; ; n ;.; �., ;500 45� �' EX % _ — — OVERALL PROPERTY BOUNDARY - i EX. TDD #5 — _ / O TDD #10 i �� EX. TDD #8 , — /// — / / EX. TDD #9 / J / — / FUTURE R W LINE / ��� �n EXISTING R/W LINE I � / / ' INLET PROTECTION (TYP.) - C/ _745 21 2 I - --:::7 _ C7-143- - - - \\\ / // LIMITS OF DISTURBANCE / I C1-132 -. APPLY RECP ON SLOPES 3: 1 EX. SPOIL AREA (TYP.) / / C1-142 I I; � — / EXISTING LIMITS OF DISTURBANCE OR GREATER (TYP.)T T T T \ r COMBINATION EE ` � 213 ,-%13 3 SF/TPF PROTECTION FENCING Cl—C1-1,5 C1-144 O EXISTING CONTOUR ]0 2 I 465 4 %Q 137 C1-130�j� 465 - - -� C/- 134 \ \ \ I \ 480 NEW CONTOUR �--/�, . EX. CWD 3 /� EXISTING DIVERSION DITCH h° `t 5 ! �i /' F -� 165 \ \ — \ I I ' / I / `� cD � � / � OPO �c�i.Nl � / � � -250 �\ � � � �� �� TO REMAIN / �� c1-251 i 77 , � P��` /j, \\\ c1-136 \ I I I 2154 / /� / i a6 O / ' NEW DIVERSION DITCH 134 � 2 2 c1-137 v �IE �j p 1 ' �'i 21 C1-128 /� ��,� I, / J/ / / / // o°o°o°o°o TEMPORARY CONSTRUCTION ENTRANCE / / // > % ♦ \ Cl -\1-138 \ / / 0 0 0 0 \ I 12 h_1 8 0l 2 0 �, � // / n ' / l 64 Cl 140 \ / NEW ROCK CHECK DAM Ex. TDD #4 i c/-252 �I I\ � I SF/TPF�SF/F SILT FENCE OUTLET 7_122140 p ±219 LF RETAINING WALL I I / 68 2163 i / / — — — — — — RIPARIAN BUFFER LINE C1-139 / / / s C1-729 �� � �. =.i � _ C1-125 _ NEW R/W (TYP.) 2169 _ , ff ✓j' / / l/ 10' NO BUILD RIPARIAN BUFFER LINE I I � PROTECTION (TYP.) C1-727 - - i � � � � �� _ _� / �� 4 4' HOA EASEMENT TYP. �� 2162 C1-141 �\ // �; � � / / / \ T" n --- --- - - -- - -- - --- - - - --- -- 2(TYP.) EXISTING WETLANDS „ Cl 123 , J / INLET PROTECTION (TYP.) N / 500 LF RE iAINING1WALL 1 217 / / / I I I / — — BMP MAINTENANCE & ACCESS EASEMENT I �� X40 ^p ^� �o \ � _ � �► 216 0 /, / / I I 2 3 4' PRIVATE UTILITY .� EXISTING DRAINAGE DIVIDE 21 I 500 / I I ----------- I I I EASEMENT (TYP.) \ EX. TDD #2 21 8 21 2 0 17 21 8 77 17 175 �%� i l l �/ — — \ T T.L 2158 157 �- / �_--_ �� — J / f� =onq,��5p5 h / I 1 I � I I \1 I DRAINAGE AREA O Q a s „� _ �` - �� \-EX. ROCK CHECK DAM (TYP.) \ \ \ \ I o'zT a _:_-_ T�"�;-� 480 i m \ ` dd1 ds�l 47� . LIMITS OF DISTURBANCE (TYP.)//� — \ — �� \ 1Gj �% \ \ \---------- --�— -- LSC �� _------------ / �\ \�\ c \�� \ �\ \ \ APPLY RECP ON SLOPES 3:1 \\ \\ AlA \ I /�' /`' �� / / ) -\ \ \ \ \ � � _ \ \ \ � mow_ 515 � � OR GREATER (TYP.) \ \ IA 'I''• \ EX. DOUBLE LINED I \ . COMBINATION _ I/ \ \ \ \\\ /� I CALL N.C. ONE PROTECTION FENCE (TYP.) 50' VOLUNTARY BUFFER I I 1 �\ I 1 I -� �� \ \ j� �� j -- - I \ \ 1 CALLCENTER BEFORE YOU DIG STOP 1-800-632-4949 _ _ .— — ��� TILITY EX. CWD #2 - �� AVOID UDAMAGE NORTH 60' 0 60' 120' SCALE: 1"=60' (Horiz.) SEAL) 1 I INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS �PQ�0ss/ON 9 G�Z- - SEALC 036348 09/18/2018 c�I����a SEAL 1 A v &CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com 19 0 by Newland COMMUNITIES EL TM BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA STAGE 2 GRADING, DRAINAGE AND EROSION CONTROL PLAN - PHASE 12 SOUTH DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.4 DRAWING NUMBER C3.6 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY Al 2156 / l i -� \ACHATHAM COUNTY �— _ J I I 1 II I I 1 I I I I ( I I / / / --� -1 / /' / / I 50' STREAM BUFFER (TYP.)oo BRIAR CHAPEL PROPERTY BOUNDARY (TYP.) CHATHAM COUNTY 10' J NO -BUILD BUFFER (TYP.) tlam snow �__-� �` / EX. SILT TREE PROTECTION 1 "� FENCING (TYP.) NEW TDD #25 LINED W/ SYNTHETIC MAT —, L'- o -�—\--� —r=�--{--T LFD L ����, l �� �j\�•../� �� 1� I O LAR ROAD — _ ( — J- — / _ �% (E� sCo' PUBLIC 33 NEW ROCK CHECK DAM (TYP.) I \ ) I I I I I sIrs�o ��.,, `� 71\ 1/0 \ I I I I �1\\1 Illi Kll/0' 1 ./ / /Ili / . ///v NEW TDD #24 / LINED W/ SYNTHETIC MAT EX. ROCK CHECK DAM (TYP.) EX SKIMMER SEDIMENT BASIN #4 \ 'l TO BE REMOVED AS GRADING ALLOWS AND EX. TD� #15 � DRAINAGE REDIRECTED TO BMP #40 D1-228 �I -=`�'S20 525 S3� S3S 540 545 D/-2 9 _TDD #14 LINED W/ STRAW�- O U- - �� �` �\ \ ♦ V - — J s ' EX. TDD #1 s — — \ \ cs' 3 0 INLET PROTECTION (TYP.) 19 9 i I y� SDMH-13-192 EX. TDD #12 96 �,-2„ 2 4 `I I I / )' _ - - - - - sus \ ; ♦ , I I� \� ( ) I 1 NEW 18" TEMPORARY SLOPE DRAIN V" "I"" I 1 �v _C1-209 V .! � EX. SKIMMER SEDIMENT BASIN #5 I \ TO BE REMOVED AS GRADING ALLOWS C1-212 \ \ I \ AND DRAINAGE REDIRECTED TO BMP #40 C1-274 'Cl- - - TDD #18� Ir.� I \��� I 1 \ \ \✓ \ / 23 l LINED W/ SYNTHETIC MAT ��— \ —C1' 207 EX. TDD #19 22 \ \ \ \\ \A \ \ \\ \ ` \ \ \ / \ \'s- \ \ \ -22 1 ��mom �A NEW 18-, TEMPORARY SLOPE DRAIN O \ \ \ \ V l \ �000 \\\ V\�\ / 2391\�� \ 22 \ h�` \ 1 � \ARC FlL TER \ INLET PROTECTION TYP. NEW TDD #25 2 $ ` \\ \ \\\\ 24U LINED W/ SYNTHETIC MAT \ \ \ \ 11 \ 22 � � ` ` \ \- `i -2o5 �uN�(rYP.)\� m \ � 17 C1-206 � � , �\\ 22 � \ \' � � _\ 111 \\ \ 1 / 53cD/-227 \Aj \ \ NEW BERM (TYP.) 13 22 \ \ 1 \ X22 2 \ ► . ' / �� D1-220 \ ` � \\\ \ `• 1 I \ \ INLET PROTECTION (TYP.) \ \\\ 24 j NEW 18" TEMPORARY SLOPE DRAIN 525 `C1-260 525 22 \ \ \\ c1-203 \ ► I I \ \ �7 �-^1�,�; ✓ A� ,,n�`:� j - , A EX. GREAT RIDGE PARKWAY NORTH \ ��` _ o _ LIMITS OF DISTURBANCE \\� 208 / EX 20' PUBLIC ` I z�9 G l�\ \ - - _ _ z (PREVIOUSLY APPROVED) � S 2 \ f 1� A D1-79 C1-204 \ / \ DRAINAGE / 7 EASEMENT �\ I_ \ I \ - ' \EX CB14_� ♦ 520 � -^ I 195 �J \ I ) �\\\ �At, 'Oq�, ♦ �\\ \ 1 HW -200 I � I i / i ,w1n195 - TDD #22 520 PHASE 13 \ \ \ \ \ ` `� \ i % ►� / 9/ (PREVIOUSL Y APPRO VED)' Al I \ 1 /�'?' \ � \\ Dl_ 201 D1-217�. EX. DOUBLE LINED SIL TI 1943 \ C1-202 H PROTECTION FENCING (TYP.) / \ \ \ , \ 1 l �( \ �\ x cB 11 2215 \ 5, CHATHAM COUNTY 10' NO BUFFER (TYP.Afto ) \ I \�� 7 \ \ ♦ \ / / / VIII Ilrll / / / / CHATHAM COUNTY 50' STREAM BUFFER (TYP.)jd ek STORM WATER BMP #40 H✓ \\ \ / \ \\ \ \ \ \� TO BE USED AS SKIMMER SEDIMENT BASIN #6 /� �\ \ \ \ \� \ \ \ \- ^\ " —\ T \\ — \ \ ♦ .moi ('� �I �/ THROUGH STAGE 2 GRADING ACTIVITIES \ \ ��\ �\ \�\��� _ \ \ \\�\\�� EX CB6 / �<\J SEE DETAIL SHEETS D4.4 -D4.6 i I--- GE -€A EAS EX. TEMPORARY CONSTRUCTION - CBz \ �� ENTRANCE EXISTING \\ \ n \ _ \ \ \ \ I \ ✓/ STOR BMP ( / ��` C •• ^ l 1ll\ ` RIPRAP OUTLET PROTECTION TYP.) \\\ EX BMP MAINTENANCE & �\�,--~�'�\✓ \\\�\ �\ \ \ / I ��/ /// /(r / I / / I f ACCESS EASEMENT SEAL 1 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS \\w��N ARp��,,���i �PQ'pFESS/ON 9 GDZ- - SEALC 036348 09/18/2018 cI SEAL 1 A v &CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com CHAPEL'S by Newland COMMUNITIES LEGEND: OVERALL PROPERTY BOUNDARY BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA FUTURE R/W LINE EXISTING R/W LINE LIMITS OF DISTURBANCE EXISTING LIMITS OF DISTURBANCE SF/TPF COMBINATION SILT/TREE PROTECTION FENCING EXISTING CONTOUR 0 NEW CONTOUR EXISTING DIVERSION DITCH NEW DIVERSION DITCH 000000000 TEMPORARY CONSTRUCTION ENTRANCE ® NEW ROCK CHECK DAM SF/TPFF-1 SF/TPF SILT FENCE OUTLET RIPARIAN BUFFER LINE 10' NO BUILD RIPARIAN BUFFER LINE EXISTING WETLANDS BMP MAINTENANCE & ACCESS EASEMEN- EXISTING DRAINAGE DIVIDE 21 DRAINAGE AREA STAGE 2 GRADING, DRAINAGE AND EROSIONI CONTROL PLAN -PHASE 12 NORTH ' CALL N.C. ONE CALL CENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UMUTY DAMAGE / NORTH 60' 0 60' 120' loon SCALE: 1"=60' (Horiz.) DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER C3.4 DRAWING NUMBER C3.7 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY i i J EMERGENCY SPILL LINED W/ SC250 MATTING - (NO MATTING WITHIN 10' NO -BUILD BUFFER) NORTH GALVANIZED 3.0'x3.0'x3/16" TRASH RACK PRECAST CONCRETE BOX FILL WITH GROUT 1.0' EACH SIDE 15" CONCRETE PRESSURE PIPE INV.= 435.25' 100 -YR FLOOD PLAIN (TYP.) / CHATHAM COUNTY - 10' NO BUILD BUFFER (TYP.) i STORMWATER WETLAND #38 PLAN VIEW SCALE = 1" = 20' TOP EL.=438.30' 20" WIDE X 4" TALL RISER OPENING 3.0' INV. EL. 437.00' 1 SIDE 1" 0 EXPANSION WITH HDPE FLAT ROOF TRASH RACK ANCHORS TYPICAL SIZED TO FIT OPENING EACH SIDE � 0 6.0' SECTION VIEW 6.0" LOW FLOW ORIFICE EL. 435.75' WITH TURNED -DOWN PVC ELBOW TO HAVE 1.00" HOLE DRILLED IN CAP BOTTOM EL.=434.75' � ANGLE IRONS: 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE FASTENERS: 1" 0 EXPANSION ANCHORS 8" O.C. PRINCIPLE SPILLWAY SCALE = 1 " = 2' 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS TO DIMENSIONS SHOWN. SEAL 1 PLAN VIEW 0\HCA,?O,.1,11111 �AL 036348 09/18/2018 ulC SEAL BMP #38 NORMAL WATER SURFACE \ ELEVATION 435.75' \� DEEP POOL OUTLET TOP EL. 435.75 BOTTOM EL. 433.75 PRINCIPLE SPILLWAY SEE DETAIL THIS SHEET STORMWATER WETLAND PLANTING SCHEDULE DEEP POOL ZONE: ALLOWABLE PLANT SPECIES COMMON NAME BOTANICAL NAME DEPTH RANGE SPACING QUANTITY PERCENTAGE SIZE COMMON NAME BOTANICAL NAME (INCHES BELOW (O.C., FT) QUANTITY PERCENTAGE SIZE PICKERELWEED PONTEDERIA CORDATA NORMAL POOL) 3.0 34 10% 2 IN PLUG (MIN) SPATTERDOCK NUPHAR POLYESPALUM 6-18 5 10 33% 2 IN PLUG (MIN) FRAGRANT WHITE LILY NYMPHAEA LUTEA 6-18 5 10 33% 2 IN PLUG (MIN) AMERICAN LOTUS NELUMBO LUTEA 6-18 1 5 1 10 1 33% 2 IN PLUG (MIN) SHALLOW WATER ZONE: ALLOWABLE PLANT SPECIES COMMON NAME BOTANICAL NAME DEPTH RANGE (NINCHES BELOW ORMAL POOL) SPACING (O.C., FT) QUANTITY PERCENTAGE SIZE ARROW ARUM PELTANDRA VIRGINICA 0-6 3.0 34 10% PINT PICKERELWEED PONTEDERIA CORDATA 0-6 3.0 34 10% 2 IN PLUG (MIN) DUCK POTATO SAGITTARIA LATIFOLIA 0-6 3.0 34 10% BARE ROOT SOFTSTEM BULRUSH SCHOENOPLECTUS TABERNAEMONTANI 0-6 3.0 34 10% 2 IN PLUG (MIN) SWEETFLAG ACORUS CALAMUS 0-6 3.0 34 10% BARE ROOT THREE WAY SEDGE DULICHIUM ARUNDINACEUM 0-6 3.0 34 10% BARE ROOT SPIKERUSH ELEOCHARIS OBTUSA 0-6 3.0 34 10% 2 IN PLUG (MIN) SOUTHERN BLUE FLAG IRIS IRIS VIRGINICA 0-6 3.0 34 10% 2 IN PLUG (MIN) LIZARD'S TAIL SAURURUS CERNUUS 0-6 3.0 34 10% 3 IN PLUG (MIN) SOFT RUSH JUNCUS EFFUSUS 0-6 3.0 34 10% 2 IN PLUG (MIN) SHALLOW LAND ZONE: ALLOWABLE PLANT SPECIES COMMON NAME BOTANICAL NAMEII DEPTH RANGE CHES ABOVE RMAL POOL) SPACING (O.C., FT) QUANTITY PERCENTAGE SIZE SWAMP MILKWEED ASCLEPIAS INCARNATA 0-12 3.0 36 9.0% 2 IN PLUG (MIN) FRINGED SEDGE CAREX CRINITA 0-12 3.0 36 9.0% 2 IN PLUG (MIN) GREAT BLADDER SEDGE CAREX INTUMESCENS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) HOP SEDGE CAREX LUPULINA 0-12 3.0 36 9.0% 2 IN PLUG (MIN) SHALLOW SEDGE CAREX LURIDA 0-12 3.0 36 9.0% 2 IN PLUG (MIN) SCARLET ROSE MALLOW HIBISCUS COCCINEUS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) ROSE MALLOW HIBISCUS MOSCHEUTOS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) SPIDER LILY HYMENOCALLIS EULAE 0-12 3.0 36 9.0% 2 IN PLUG (MIN) SWAMP LILY CRINUM ERUBESCENS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) CARDINAL FLOWER LOBELIA CARDINALIS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) SWAMP SUNFLOWER HELIANTHUS ANGUSTIFOLIUS 0-12 3.0 36 9.0% 2 IN PLUG (MIN) STORMWATER WETLAND PLANTING LEGEND: 435 DEEP POOL (9" BELOW - 30" BELOW) HW -400 ® SHALLOW WATER (NORMAL POOL - 9" BELOW) 27 LF 15" CONCRETE \PRESSURE PIPE ENDWALL PER NCDOT DETAIL 838.80 FOR 15" PIPE INV EL. 435.00 BURIED, WRAPPED, AND STAPLED PER MANUFACTURER'S SPECIFICATIONS IRON 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE TOP OF DAM v vNFKff\4&CMED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com 0 0 0 0 0 0 0 0 SHALLOW LAND (NORMAL POOL - 15" ABOVE) vvvvvvvv A FLOW FLOW ' CUT & REMOVE ANY COVERING AROUND ROOTS INSTALL PLANTS WHERE CROWN IS FLUSH WITH SOIL SURFACE + + + +\ + + + + + + + + + + + + + + + + + AMENDED TOPSOIL MIN. 12 IN DEPTH + + + +/+ + + + + + + + + + + + + + + TWICE ROOT DIAMETER I EXISTING SOIL GENERAL PLANTING DETAIL. NTS ir)•�l�.'�� � fir)♦ �_ .� t�1 � �, . • �� • • • • tea• ••�>•• - - PLAN VIEW CONCRETE ENDWALL FOR 15" PIPE PER NCDOT DETAIL 838.80 7.5' f�[•I�Z•If�•7I_G`Ic7 �:7IJ:7_1r' R P RAP OUTLET PROTECTION. NTS _ 3.0 SPILLWAY BOTTOM WIDTH = 15.0' I Ed 1 I = 1 EL. = 439.00 -111-111-111-� _--_-- =1 -III-I � 1-11 I -I � 1-11 I -I 11-11 I -I � 1-11 I -I 11= 1=111=1 I I=1 =11=111=1 11=111=1 I I- SECTION A -A 114 MD by Newland COMMUNITIES STORMWATER WETLAND PLANTING NOTES GENERAL PLANTING NOTES 1. AVOID COMPACTING TOPSOIL TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. 2. PLANTS OF THE SAME SPECIES SHOULD BE PLANTED IN CLUSTERS, THESE CLUSTERS SHOULD CONTAIN MIN. 4-6 PLANTS OF THAT SPECIES. 3. ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. 4. AVOID PLANTING INDIVIDUAL SPECIES IN LARGE GROUPS BY SPACING CLUSTERS A MIN. OF 5' APART. 5. SHALLOW WATER AND SHALLOW LAND AREAS TO BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 6. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKFILL WITH TOPSOIL AND LIGHTLY PLANT. 7. BEGIN PLANTING DURING LOCAL GROWING SEASON IN ORDER TO ENSURE THAT PLANTS HAVE ADAQUET TIME TO ESTABLISH BEFORE WINTER MONTHS. 8. OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252-482-5707), MELLOW MARSH FARMS (919-742-1200), CURE NURSERY (919-542-6186) OR ENGINEER APPROVED SUBSTITUTE. SHALLOW WATER PLANTING NOTES: 1. 70% OF SOFT STEM BULRUSH SHOULD BE PLANTED WITHIN 3-4 INCHES BELOW NORMAL POOL. 2. 70% OF PICKERELWEED AND 70% OF ARROW ARUM SHOULD BE PLANTED WITHIN 5-6 INCHES BELOW NORMAL POOL. 3. SEDGES SHOULD BE PLANTED WITHIN 0-2 INCHES BELOW NORMAL POOL. 4. 70% OF SWEETFLAG, 70% OF LIZARDS TAIL, AND 70% OF SOUTHERN BLUE FLAG IRIS SHOULD BE PLANTED IN THE 2-3 INCHES BELOW NORMAL POOL. 5. 70% OF SOFT RUSH SHOULD BE PLANTED AT THE NORMAL POOL ELEVATION. SHALLOW LAND PLANTING NOTES: 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. 2. 70% OF CARDINAL FLOWER AND 70% OF BLUE LOBELIA SHOULD BE PLANTED WITHIN 0-1 INCH OF THE NORMAL POOL ELEVATION. DEEP POOL PLANTING NOTES: 1. ENSURE ALL PLANTS ARE PLACED IN WATER NO DEEPER THAN 24 INCHES BELOW NORMAL POOL GRADING PLAN NOTES: 1. WETLAND MUST BE STABILIZED WITHIN 14 DAYS OF CONSTRUCTION 2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING AND PROTECTION OF EXISTING ABOVE AND BELOW GROUND UTILITIES AND STRUCTURES. ANY AND ALL MAINS OR INDIVIDUAL SERVICES LINES PRESENTLY IN SERVICE WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED IMMEDIATELY AT NO ADDITIONAL EXPENSE TO THE UTILITY OWNER. 3. CONTRACTOR SHALL KEEP ALL PARKING AREAS AND STREETS ADJACENT TO THE CONSTRUCTION SITE CLEAN AND OPEN AT ALL TIMES DURING CONSTRUCTION. 4. ALL SHALLOW WATER AND SHALLOW LAND AREAS WITHIN THE WETLAND CELL SHALL BE TOP DRESSED WITH A MINIMUM OF 12 IN OF TOPSOIL. 5. ALL ITEMS WHICH ARE SHOWN FOR REMOVAL SHALL BE REMOVED FROM THE CONSTRUCTION SITE AND LEGALLY DISPOSED OF OFF SITE. 6. CONTRACTOR SHALL AT ALL TIMES MAINTAIN ADEQUATE SAFETY MEASURES, ACTIVITIES, AND BARRICADES FOR THE PROTECTION OF ALL PERSONS ON OR ABOUT THE LOCATION OF THE SITE. 7. GRADE TO ELEVATIONS AND DIMENSIONS SHOWN ON DRAWINGS. ELEVATIONAL GRADING TOLERANCE IS t0.1 FT. 8. NO GRADING IS TO OCCUR IN THE DEEP POOL AREAS BEYOND THE SPECIFIED GRADING LIMITS. TOPSOIL SPECIFICATION: 1. TOPSOIL TO BE ADDED TO TOP OF WETLAND SHELF IS TO MEET CRITERIA SPECIFIED BELOW. 2. TOPSOIL SHALL BE WELL MIXED, FREE OF TRASH AND DEBRIS, UNCOMPACTED, AND VOID OF LARGE STONES (>2 INCHES) AND WOODY MATERIAL (>3 INCHES). 3. TOPSOIL SHALL MEET THE FOLLOWING SPECIFICATIONS: SOIL TYPE: CLAY < 60%, SAND < 80%, SILT < 80% ORGANIC CONTENT: 5-8% P -I: 20<50 pH: 6.0-7.0 4. IN THE EVENT THAT SELECTED TOPSOIL DOES NOT MEET SPECIFICATION LISTED ABOVE, SOIL CAN BE AMENDED BY ADDITION OF APPROPRIATE MATERIALS (MASON SAND OR MATURE STABLE COMPOST, OR LIME). 5. UPON PLACEMENT OF TOPSOIL, AREA SHOULD BE LIGHTLY COMPACTED TO ENSURE STABILIZATION OF MATERIAL. 6. EXCESSIVE TRAFFICKING OF EQUIPMENT OVER WETLAND PLANTING AREAS SHOULD BE AVOIDED. 7. MINIMUM DEPTH OF TOPSOIL SHOULD BE 12 INCHES. EARTHWORK SPECIFICATIONS 1. GRADE TO ELEVATIONS AND DIMENSIONS SHOWN ON DRAWINGS. GRADED ELEVATIONAL TOLERANCE SHALL BE f0.1 FT. 2. TOPSOIL MATERIAL SHALL BE APPROVED BY ENGINEER PRIOR TO USE BASED ON SOIL PROPERTY TEST SUBMITTALS THAT INCLUDE STANDARD TEST METHOD FOR PARTICLE -SIZE ANALYSIS (ASTM D422), PARTICLE SIZE ANALYSIS OF SOILS (AASHTO T88), AND NCDA SOIL ANALYSIS. 3. INSTALL FINAL COVER IN ACCORDANCE WITH PERMANENT SEEDING SPECIFICATIONS WHERE APPLICABLE. CLAY LINER SPECIFICATIONS IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALL INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE BMP AREA UP TO THE NORMAL POOL ELEVATION. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.01 IN/HR OR LESS IN ACCORDANCE WITH THE NCDENR BMP MANUAL. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A 4" MINIMIMUM LAYER OF TOPSOIL SHALL BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. SC250 PERMANENT TURF REINFORCEMENT MAT (PTRM) OR APPROVED EQUIVALENT LU 1-11 I I I 1-111-1 11-1 SPILLWAY SHOULD-/ EXTEND TO EXTENTS SHOWN ON PLANS EMERGENCY SPILLWAY DETAIL NTS VARIES VARIES --REFER TO - PLAN 1- 1 VARIES SECTION B -B BURIED, WRAPPED, AND STAPLED PER MANUFACTURER'S SPECIFICATIONS BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #38 PLAN & DETAILS TOP OF SPILLWAY SPILLWAY SHALL -------EXTEND TO EXTENTS SHOWN ON PLANS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PROJ. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER D4.1 jTATU S ; REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY I I 1 i BMP #39 z NORMAL POOL EL. 451.50' BOTTOM OF POND EL. 446.50' V va \CHATHAM COUNTY 455 10' NO–BUILD BUFFER 10.0' / v i \ a v \Na7\ 01 CHA THAM COON TY a EMERGEN C Y SPILL WA Y i STREAM BUFFER \� ° _ --SEE DETAIL SHEET D4.2 WET DETENTION POND #39 PLAN VIEW SCALE = 1 " = 30' 100 -YR, 24 -HR STORM EL. 457.04' 10 -YR, 24 -HR STORM EL. 455.60' 1 -YR, 24 -HR STORM EL. 453.71' NORMAL POOL EL. 451.50' BOTTOM OF POND EL. 446.50' ------ C 8" PVC TO BANK rR 10.0' 24.10' U HAND CRANK FOR GATE VALVE GALVANIZED 4'x4'x3/16" TRASH RACK PRECAST CONCRETE BOX FILL WITH GROUT 12" EACH SIDE in 18" CONCRETE PRESSURE PIPE INV.= 449.00' / ENDWALL PER NCDOT DETAIL 838.80 FOR 18" PIPE —INV OUT. 448.00 CLASS 1 RIPRAP PLACED A T / 22" DEPTH WITH SUBLA YER ' OF 6" FS -2 FILTER STONE LINING INSTALLED TO DIMENSIONS SHOWN. 17.96' ■■■ ■�■ INN d ° 4a Z<d d 7.0' SECTION VIEW r 0 TOP EL.=455.35' 30.0" WIDE X 6" TALL RISER OPENING COVERED WITH PLASTIC TRASH RACK ONE SIDE BOTTOM EL 453.00 2.5" LOW FLOW ORIFICE EL. 451.50' 6" PVC WITH TURNED DOWN ELBOW WITH 2.5" HOLE DRILLED IN CAP. CAP SHALL BE GLUED IN PLACE BOTTOM EL.=448.50' ANGLE IRONS: 4" X 4" X 5/8" X 4' LONG TYPICAL EACH SIDE FASTENERS: 1" 0 EXPANSION ANCHORS @ 8" 0. C. 1" 0 EXPO, ,� � , ANCHORS TYPICAL EACH SIDE PRINCIPLE SPILLWAY SCALE = 1 " = 2' PLACE CEMENT MORTAR CONCRETE PRESSURE PPE JOINT DETAIL 16.5 0' NTS 3 TOP OF BANK 3 EL. 458.00' EMERGENCY SPILLWAY EL. 456.50' _ _ _ 1 I MAINTAIN MIN. 1' OF COVER OVER PIPE FILTER DIAPHRAGM SEE DETAIL SHEET D-4.8 2.5' MAINTAIN MIN. 1' OF COVER OVER PIPE 56.0 LINEAR FEET 18" CONCRETE PRESSURE PIPE 2 / V 4 4 Q 4 J 4 4 a 4 _1 V / a a a4 -1 4 Al 9 �l 1.5' MIN J 2' CONCRETE CRADLE TO RUN LENGTH OF PIPE EL. 449.00' SEE DETAIL THIS SHEET NOTE: SEE DAM EMBANKMENT 6" PVC TO DAYLIGHT PRINCIPLE SPILLWAY DETAIL (SHEET D4.3) SEE DETAIL THIS SHEET SEAL 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS SECTION AT PRINCIPLE SPILLWAY SEAL ApG�ZALC 036348 09/18/2018 i�, i,I00`\\� SCALE = NTS v vN44QW&CMED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com Newland COMMUNITIES 3Y4"LAP PLACE CEMENT MORTAR IN JOINT SPACE SECTION H CONCRETE ENDWALL PER NCDOT STANDARD 838.80 EL. 448.00' RIPRAP OUTLET PROTECTION. SEE DETAIL THIS SHEET PLAN VIEW GATE VALVE JD CRANK ANGLE IRON 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE 18 -IN RCP PRESSURE PIPE SELECT FILL PLACED AND COMPACTED 12" AT 95% STANDARD PROCTOR MAX MIN) DRY DENSITY AT PLUS 2%-3% OF OPTIMUM MOISTURE CONTENT TO TOP OF PIPE 11.5" 4 4 III12" (MIN) -IIIIII 11- CONCRETE CRADLE SELECT FILL PLACED AND COMPACTED AT (MIN 2000 PSI CONCRETE) 95% STANDARD PROCTOR MAX DRY DENSITY AT OPTIMUM TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION CONCRETE CRADLE DETAIL NTS FLOW �I L �� • � fes• •f•• PLAN VIEW CONCRETE ENDWALL FOR 18" PIPE PER NCDOT DETAIL 838.80 2. 22" J_ T 6' FS -2 FILTER STONE SECTION A -A RIPRAP 0 UTLET PROTECTION BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #36 PLAN & DETAILS NTS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS D4.2 SCALE M&C FILE NUMBER D4.X HORIZONTAL. DRAWING NUMBER AS NOTED VERTICAL: D4.2 N/A STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY POW] TOP OF DAM I NIS SN�� I 6" THICK CONCRETE 3000 psi @ 28 DAYS 3.0 W1.4xW1.4 6X6 W.W.M. OR APPROVED EQUAL (MIN 2" COVER) 6" THICK CONCRETE 3000 psi © 28 DAYS NORMAL POOL SPILLWAY SHOULD - EXTEND TO NORMAL POOL ELEVATION ON BMP SIDE SPILLWAY BOTTOM WIDTH SEE TABLE THIS SHEET d a ME ME ME ME ME ME SECTION A -A VARIES VARIES --REFER TO— PLAN 3 1� a r d _� I Iii I I=1 11— W1.4xW1.4 6X6 W.W.M. OR APPROVED EQUAL (MIN 2" COVER) SECTION B -B VARIES 111.0 (MINI EMERGENCY SPILLWAY DETAIL NTS 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS --1011 TOP OF SPILLWAY SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE NOTE: EXPANSION/CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. SEAL 1 G%2ALC 036348 09/18/2018 uiC IiI0P``\\� SEAL LIMITS OF CONCRETE CRADLE 7' FLOW 7.$5' Do 2.67' LIMITS OF CONCRETE CRADLE 6" PERFORATED PVC COLLECTOR PIPE m 3' #57 WASHED STONE FLOW 1.5' MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18—INCH OVERLAP AT ALL SEAMS (TYP) 8' KEY TRENCH DAM EMBANKMENT DETAIL NTS 2' #57 WASHED STONE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ° ON OPEN END. 0 0 0 18" CONCRETE PRESSURE PIPE ----6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS PLAN VIEW PROPOSED GRADE ON DOWNSTREAM SIDE OF DAM 2' MIN. 2' 18" CONCRETE PRESSURE PIPE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. FILTER DIAPHRAGM DETAIL NTS A vNFKff\4&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com DAM EMBANKMENT NOTES: 1) TOPSOIL BENEATH THE EMBANKMENT SHALL BE REMOVED AND STOCKPILED. THE FOUNDATION WILL BE PROOF ROLLED AND ANY SOFT OR ORGANIC MATERIALS WILL BE REMOVED. 2) ALL MATERIAL SHALL BE COMPACTED IN 6-8 INCH LIFTS TO 95% OF MAXIMUM STANDARD PROCTOR DRY DENSITY OR HIGHER (ASTM D-698). THE CLAY CORE ZONE WILL HAVE A MOISTURE CONTENT OF OPTIMUM TO 4 PERCENT ABOVE OPTIMUM MOISTURE CONTENT. THE SHELL ZONE FILL WILL HAVE A MOISTURE CONTENT FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 4 PERCENT ABOVE OPTIMUM. 3) EMBANKMENT FILL: SHELL ZONE: SOILS WITH LESS THAN 30% PASSING THE NO. 200 SIEVE OR A PI OF LESS THAN 10 WHEN THE PERCENTAGE OF MATERIAL PASSING THE NO. 200 SIEVE IS GREATER THAN 30 PERCENT. SOILS WHICH ARE CLASSIFIED AS CLAYS (CH OR CL) SHOULD NOT BE USED AT THE FACE OF THE SHELL ZONES. CLAY CORE ZONE: CH, CL OR SC MATERIAL WITH A PI RANGING BETWEEN 15 AND 60 4) NO FILL SHALL CONTAIN ROCKS OR GRAVEL LARGER THAN 4 INCHES IN DIAMETER. 5) A PROFESSIONAL GEOTECHNICAL ENGINEER SHALL APPROVE ALL MATERIALS USED FOR THE EMBANKMENT AND SUPERVISE CONSTRUCTION. 6) ALL DISTURBED AREAS ABOVE PERMANENT POOL SHALL BE SEEDED USING THE FOLLOWING GRASS SEED MIX MANUFACTURED BY ERNST SEED COMPANY: Carolina FACW Meadow Mix ERNMX-182 by Newland COMMUNITIES CLAY LINER NOTES: NG GROUND IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALL INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE BMP AREA UP TO THE NORMAL POOL ELEVATION. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.01 IN/HR IN ACCORDANCE WITH THE NCDENR BMP MANUAL. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A 4" MINIMIMUM LAYER OF TOPSOIL SHALL BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #36 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 NORMAL TOP DAM SPILLWAY SPILLWAY DESIGNED POOL EL BOTTOM BOTTOM CHS EL. ' EL. WIDTH BMP #39 451.50 458.00 456.50 10' EMERGENCY SPILLWAY DETAIL NTS 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS --1011 TOP OF SPILLWAY SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE NOTE: EXPANSION/CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. SEAL 1 G%2ALC 036348 09/18/2018 uiC IiI0P``\\� SEAL LIMITS OF CONCRETE CRADLE 7' FLOW 7.$5' Do 2.67' LIMITS OF CONCRETE CRADLE 6" PERFORATED PVC COLLECTOR PIPE m 3' #57 WASHED STONE FLOW 1.5' MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18—INCH OVERLAP AT ALL SEAMS (TYP) 8' KEY TRENCH DAM EMBANKMENT DETAIL NTS 2' #57 WASHED STONE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ° ON OPEN END. 0 0 0 18" CONCRETE PRESSURE PIPE ----6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS PLAN VIEW PROPOSED GRADE ON DOWNSTREAM SIDE OF DAM 2' MIN. 2' 18" CONCRETE PRESSURE PIPE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. FILTER DIAPHRAGM DETAIL NTS A vNFKff\4&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com DAM EMBANKMENT NOTES: 1) TOPSOIL BENEATH THE EMBANKMENT SHALL BE REMOVED AND STOCKPILED. THE FOUNDATION WILL BE PROOF ROLLED AND ANY SOFT OR ORGANIC MATERIALS WILL BE REMOVED. 2) ALL MATERIAL SHALL BE COMPACTED IN 6-8 INCH LIFTS TO 95% OF MAXIMUM STANDARD PROCTOR DRY DENSITY OR HIGHER (ASTM D-698). THE CLAY CORE ZONE WILL HAVE A MOISTURE CONTENT OF OPTIMUM TO 4 PERCENT ABOVE OPTIMUM MOISTURE CONTENT. THE SHELL ZONE FILL WILL HAVE A MOISTURE CONTENT FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 4 PERCENT ABOVE OPTIMUM. 3) EMBANKMENT FILL: SHELL ZONE: SOILS WITH LESS THAN 30% PASSING THE NO. 200 SIEVE OR A PI OF LESS THAN 10 WHEN THE PERCENTAGE OF MATERIAL PASSING THE NO. 200 SIEVE IS GREATER THAN 30 PERCENT. SOILS WHICH ARE CLASSIFIED AS CLAYS (CH OR CL) SHOULD NOT BE USED AT THE FACE OF THE SHELL ZONES. CLAY CORE ZONE: CH, CL OR SC MATERIAL WITH A PI RANGING BETWEEN 15 AND 60 4) NO FILL SHALL CONTAIN ROCKS OR GRAVEL LARGER THAN 4 INCHES IN DIAMETER. 5) A PROFESSIONAL GEOTECHNICAL ENGINEER SHALL APPROVE ALL MATERIALS USED FOR THE EMBANKMENT AND SUPERVISE CONSTRUCTION. 6) ALL DISTURBED AREAS ABOVE PERMANENT POOL SHALL BE SEEDED USING THE FOLLOWING GRASS SEED MIX MANUFACTURED BY ERNST SEED COMPANY: Carolina FACW Meadow Mix ERNMX-182 by Newland COMMUNITIES CLAY LINER NOTES: NG GROUND IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALL INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE BMP AREA UP TO THE NORMAL POOL ELEVATION. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.01 IN/HR IN ACCORDANCE WITH THE NCDENR BMP MANUAL. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A 4" MINIMIMUM LAYER OF TOPSOIL SHALL BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #36 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER D4.3 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE REVISIONS WET DETENTION POND #39 PLANTING PLAN SCALE = 1 " = 20' SEAL 1 ARO G%2ALC 036348 ,, 09/18/2018 FivcI NEED ulC SEAL 1 4kAw*j&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com PLANTING SCHEDULE SYM. ABB. COMMON NAME BOTANICAL NAME QUANTITY SPACING CONTAINER SIZE AT PLANTING SHALLOW WATER PLANTINGS 41111 LVA IN ** SF SWEETFLAG Acorus subcordatum 60 24"-30" O.C. 1 QT. PW PICKERELWEED Pontederia cordata 60 24"-30" O.C. 1 QT. ------ i BFI BLUE FLAG IRIS Iris virginica 60 24"-30" O.C. 1 QT. +++++ SR SOFT RUSH Juncus effusus var. pylaei or solutus 60 „ 24"-30" O.C. 1 QT. vVv v v v V TSB THREE SQUARE BULRUSH Schoericanutus americanus 60 24"-30" O.C. 1 QT. SHALLOW LAND PLANTINGS LLLL :LLLLL LLLL SM SWAMP MILKWEED Asclepias incarnata 55 24"-30" O.C. 1 QT. CF CARDINAL FLOWER Lobelia cardlnalls 55 24"-30" O.C. 1 QT. SRM SCARLET ROSE MALLOW Hibiscus coccineus 55 24"-30" O.C. 1 QT. JPW DWARF JOE PYE WEED Eupatoriadelphus dubius 54 24"-30" O.C. 1 QT. ST SPOTTED TRUMPETWEED Eupatoriadelphus maculatus 55 24"-30" O.C. 1 QT. GENERAL PLANTING NOTES: 1. AVOID COMPACTING TOPSOIL TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. 2. ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. 3. SHALLOW WATER AND SHALLOW LAND AREAS TO BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 4. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKFILL WITH TOPSOIL AND LIGHTLY PLANT. 5. BEGIN PLANTING DURING LOCAL GROWING SEASON IN ORDER TO ENSURE THAT PLANTS HAVE ADEQUATE TIME TO ESTABLISH BEFORE WINTER MONTHS. 6. OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252-482-5707), MELLOW MARSH FARMS (919-742-1200), CURE NURSERY (919-542-6186) OR ENGINEER APPROVED SUBSTITUTE. 7. REFER TO EROSION CONTROL DETAIL SHEET D1.2 FOR SEEDBED PREPARATION AND SEEDING SCHEDULES FOR AREAS NOT SPECIFIED IN THIS PLAN. SHALLOW WATER PLANTING NOTES: 1. 70% OF PICKERELWEED SHOULD BE PLANTED WITHIN 5-6 INCHES BELOW NORMAL POOL. 2. 70% OF SWEETFLAG AND 70% OF SOUTHERN BLUE FLAG IRIS SHOULD BE PLANTED IN THE 2-3 INCHES BELOW NORMAL POOL. 3. 70% OF SOFT RUSH SHOULD BE PLANTED AT THE NORMAL POOL ELEVATION. SHALLOW LAND PLANTING NOTES: 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. CUT & REMOVE ANY COVERING AROUND ROOTS INSTALL PLANTS WHERE CROWN IS FLUSH WITH SOIL SURFACE\ - AMENDED TOPSOIL 1 MIN. 12 IN DEPTH EACH VARIETY OF PLANT NOTED TO BE PLANTED SHALL BE IN GROUPS AS SHOWN ON THIS SHEET. SHALLOW WATER PLANT VARIETY 'A' 24" O.C. (TYP) _ NORMAL POOL LEVEL i{ + + + + ,r(1 + + + + + + + + y^jl + + + �++ + + + + + + + + + + + + . + + + + + + + + + + + + + + + _ + + + + + + + + + TWICE ROOT DIAMETER I EXISTING SOIL GENERAL PLANTING DETAIL. NTS IIIIN Till T--� by Newland COMMUNITIES d U 0 N LIMITS OF 6:1 SHELF SHALLOW WATER MCE PRO]. # 02735-0231 PLANT VARIETY 'B' LEG NOTES: LEG CHECKED 1. CONTINUE PLANTING SCHEME SHOWN FOR EACH PRO]. MGR. OF THE 5 PLANT VARIETIES NOTED BELOW AROUND 0 ENTIRE LENGTH OF THE SHALLOW WATER PLANTING ZONE 0 2. CONTINUE PLANTING SCHEME SHOWN FOR EACH OF THE 5 PLANT VARIETIES NOTED BELOW AROUND ENTIRE LENGTH OF THE SHALLOW LAND PLANTING 00 ZONE 3. \0 OTHER SPECIES WITH SIMILAR GROWTH HABITS AND MAY BE APPROVED AS LISTED IN THE "NCDEQ STORMWATER DESIGN MANUAL" SECTION C-3. SHALLOW LAND / _ PLANT VARIETY 'A' 24" O.C. (TYP) SHALLOW LAND PLANT VARIETY 'B' VEGETATED PLANTING SHELF DETA L NTS BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #39 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER D4.4 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY \ \ \ CHATHAM COUNTY STREAM BUFFER \ 10' CHATHAM COUNTY -\ \ NO -BUILD BUFFER I i SEDIMENT FOREBAY i BOTTOM EL. 499.50' BOTTOM SHALL BE GRADED SUCH THAT INLET IS LOWER THAN OUTLET POINT 1 NORTH i CLASS 1 RIPRAP PLACED AT -� \ r' T \i1 _ 1 22" DEPTH WITH SUBLAYER B a BMP #40 - OF 6" FS -2 FILTER STONE LINING 4" DEPTH \ NORMAL POOL EL. 503.50' \ \ INSTALLED TO DIMENSIONS SHOWN. V2.50' BOTTOM OF POND EL. 498.50' \ \ PER \ 7OTH \� \\ \ ENDDETAIL 8J8.80NCDOT - �\ 18" PIPE \\ � \ INV OUT. 502.00 \\ 41.3 LF \� CONCRETE PRESSURE PIPE z� W/FILTER DIAPHRAGM CI -202 = FILTER DIAPHRAM SEE DETAIL SHEET D4.2 \PRINCIPLE SPILLWAY SEE DETAILS THIS SHEET EMERGENCY SPILLWAY SEE DETAIL SHEET D4.2 1 A SEDIMENT FOREBAY BOTTOM EL. 501.50' BOTTOM SHALL BE GRADED SUCH THAT INLET IS LOWER THAN OUTLET POINT \ 10.0' i .1d WET DETENTION POND #40 PLAN VIEW SCALE = 1 " = 30' 10.0' 21.6' 12.0' GALVANIZED 4'x4'x3/16" TRASH RACK PRECAST CONCRETE - BOX FILL WITH GROUT - 6" EACH SIDE N 4.0 - d 4 ° d d 6.0' 18" CONCRETE-/ PRESSURE PIPE INV.= 502.25' SECTION VIEW 10.2' TOP EL.=505.50' 30.0" WIDE X 6" TALL RISER OPENING /COVERED WITH PLASTIC TRASH RACK TWO SIDES BOTTOM EL 504.50 2.5" LOW FLOW ORIFICE EL. 503.50' 6" PVC WITH TURNED DOWN ELBOW WITH 2.5" HOLE DRILLED IN CAP. CAP SHALL BE GLUED IN PLACE BOTTOM EL.=501.75' BANGLE IRONS: 4" X 4" X 5/8" X 4' LONG TYPICAL EACH SIDE I 4.0' I FASTENERS: 1" 0 EXPANSION-] 1" 0 EXPANSION ANCHORS ANCHORS TYPICAL ® 8" 0. C. EACH SIDE PRINCIPLE SPILLWAY SCALE = 1 " = 2' PLACE CEMENT MORTAR CONCRETE PRESSURE PIPE JOINT DETAIL SLOPE 3 TOP OF BANK PER PLAN 1 EL. 508.50' 100 -YR, 24 -HR STORM EL. 507.23' I 10 -YR, 24 -HR STORM EL. 506.26' - - - - EMERGENCY SPILLWAY EL. 506.50' - MAINTAIN MIN. 1' OF 0 COVER OVER PIPE FILTER DIAPHRAGM NORMAL POOL EL. 503.50' SEE DETAIL SHEET D-4.8 2' 41.3 LINEAR FEET - 18" CONCRETE PRESSURE PIPE Q ° d — — — d d BOTTOM OF POND ° 41 EL. 499.00' ° EL. 502.25' 2, PROVIDE 12" BETWEEN CONCRETE CRADLE TO RUN BOTTOM OF TURNDOWN PRINCIPLE SPILLWAY LENGTH OF PIPE AND TOP OF GRADE SEE DETAIL THIS SHEET SEE DETAIL THIS SHEET NOTE: SEE DAM EMBANKMENT DETAIL (SHEET D4.6) SECTION AT PRINCIPLE SPILLWAY SCALE = NTS SEAL 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE REVISIONS SEAL G%2ALC 036348 09/18/2018 /////allC IiII00`\\� v vN44QV & CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com NTS 3Y4"LAP PLACE CEMENT MORTAR IN JOINT SPACE SECTION H MAINTAIN MIN. 1' OF COVER OVER PIPE CONCRETE ENDWALL PER NCDOT STANDARD 838.80 EL. 502.00' RIPRAP OUTLET PROTECTION. SEE DETAIL THIS SHEET 6" PVC TO DAYLIGHT 1 19 Yj Newland COMMUNITIES ANGLE IRON 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE 18—IN RCP PRESSURE PIPE SELECT FILL PLACED AND COMPACTED 12" AT 95% STANDARD PROCTOR MAX __W4MIN) DRY DENSITY AT PLUS 2%-3% OF OPTIMUM MOISTURE CONTENT TO TOP OF PIPE 11.5" 4 4 III12" (MIN) .111TII- CON CRADLE SELECT FILL PLACED AND COMPACTED AT (MIN 2000 PSI CONCRETE) 95% STANDARD PROCTOR MAX DRY DENSITY AT OPTIMUM TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION CONCRETE CRADLE DETAIL NTS ta••t�1• \ u �22" T 6' FS -2 FILTER STONE SECTION A -A RIPRAP 0 UTLET PROTECTION BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #40 PLAN & DETAILS NTS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG d d LEG CHECKED GCA d 2" CHS d N/A 4 SPA. ® 8"=32" ° d d d 18" FASTENERS: 1" 0 EXPANSION-] 1" 0 EXPANSION ANCHORS ANCHORS TYPICAL ® 8" 0. C. EACH SIDE PRINCIPLE SPILLWAY SCALE = 1 " = 2' PLACE CEMENT MORTAR CONCRETE PRESSURE PIPE JOINT DETAIL SLOPE 3 TOP OF BANK PER PLAN 1 EL. 508.50' 100 -YR, 24 -HR STORM EL. 507.23' I 10 -YR, 24 -HR STORM EL. 506.26' - - - - EMERGENCY SPILLWAY EL. 506.50' - MAINTAIN MIN. 1' OF 0 COVER OVER PIPE FILTER DIAPHRAGM NORMAL POOL EL. 503.50' SEE DETAIL SHEET D-4.8 2' 41.3 LINEAR FEET - 18" CONCRETE PRESSURE PIPE Q ° d — — — d d BOTTOM OF POND ° 41 EL. 499.00' ° EL. 502.25' 2, PROVIDE 12" BETWEEN CONCRETE CRADLE TO RUN BOTTOM OF TURNDOWN PRINCIPLE SPILLWAY LENGTH OF PIPE AND TOP OF GRADE SEE DETAIL THIS SHEET SEE DETAIL THIS SHEET NOTE: SEE DAM EMBANKMENT DETAIL (SHEET D4.6) SECTION AT PRINCIPLE SPILLWAY SCALE = NTS SEAL 1 INITIAL SUBMITTAL 2018.09.18 REV. NO. DESCRIPTIONS DATE REVISIONS SEAL G%2ALC 036348 09/18/2018 /////allC IiII00`\\� v vN44QV & CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com NTS 3Y4"LAP PLACE CEMENT MORTAR IN JOINT SPACE SECTION H MAINTAIN MIN. 1' OF COVER OVER PIPE CONCRETE ENDWALL PER NCDOT STANDARD 838.80 EL. 502.00' RIPRAP OUTLET PROTECTION. SEE DETAIL THIS SHEET 6" PVC TO DAYLIGHT 1 19 Yj Newland COMMUNITIES ANGLE IRON 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE 18—IN RCP PRESSURE PIPE SELECT FILL PLACED AND COMPACTED 12" AT 95% STANDARD PROCTOR MAX __W4MIN) DRY DENSITY AT PLUS 2%-3% OF OPTIMUM MOISTURE CONTENT TO TOP OF PIPE 11.5" 4 4 III12" (MIN) .111TII- CON CRADLE SELECT FILL PLACED AND COMPACTED AT (MIN 2000 PSI CONCRETE) 95% STANDARD PROCTOR MAX DRY DENSITY AT OPTIMUM TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION CONCRETE CRADLE DETAIL NTS ta••t�1• \ u �22" T 6' FS -2 FILTER STONE SECTION A -A RIPRAP 0 UTLET PROTECTION BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #40 PLAN & DETAILS NTS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS F D4.5 SCALE M&C FILE NUMBER D4.X HORIZONTAL' DRAWING NUMBER AS NOTED VERTICAL: F D4.5 N/A STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY POW] TOP OF DAM I NIS SN�� I 6" THICK CONCRETE 3000 psi @ 28 DAYS 3.0 W1.4xW1.4 6X6 W.W.M. OR APPROVED EQUAL (MIN 2" COVER) 6" THICK CONCRETE 3000 psi © 28 DAYS NORMAL POOL SPILLWAY SHOULD - EXTEND TO NORMAL POOL ELEVATION ON BMP SIDE SPILLWAY BOTTOM WIDTH SEE TABLE THIS SHEET d a ME ME ME ME ME ME SECTION A -A VARIES VARIES --REFER TO— PLAN 3 1� a r d _� I Iii I I=1 11— W1.4xW1.4 6X6 W.W.M. OR APPROVED EQUAL (MIN 2" COVER) SECTION B -B VARIES 111.0 (MINI EMERGENCY SPILLWAY DETAIL NTS 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS --1011 TOP OF SPILLWAY SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE NOTE: EXPANSION/CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. SEAL 1 G%2ALC 036348 09/18/2018 uiC IiI0P``\\� SEAL LIMITS OF CONCRETE CRADLE 7' FLOW 7.$5' Do 2.67' LIMITS OF CONCRETE CRADLE 6" PERFORATED PVC COLLECTOR PIPE m 3' #57 WASHED STONE FLOW 1.5' MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18—INCH OVERLAP AT ALL SEAMS (TYP) 8' KEY TRENCH DAM EMBANKMENT DETAIL NTS 2' #57 WASHED STONE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ° ON OPEN END. 0 0 0 18" CONCRETE PRESSURE PIPE ----6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS PLAN VIEW PROPOSED GRADE ON DOWNSTREAM SIDE OF DAM 2' MIN. 2' 18" CONCRETE PRESSURE PIPE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. FILTER DIAPHRAGM DETAIL NTS A vNFKff\4&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com DAM EMBANKMENT NOTES: 1) TOPSOIL BENEATH THE EMBANKMENT SHALL BE REMOVED AND STOCKPILED. THE FOUNDATION WILL BE PROOF ROLLED AND ANY SOFT OR ORGANIC MATERIALS WILL BE REMOVED. 2) ALL MATERIAL SHALL BE COMPACTED IN 6-8 INCH LIFTS TO 95% OF MAXIMUM STANDARD PROCTOR DRY DENSITY OR HIGHER (ASTM D-698). THE CLAY CORE ZONE WILL HAVE A MOISTURE CONTENT OF OPTIMUM TO 4 PERCENT ABOVE OPTIMUM MOISTURE CONTENT. THE SHELL ZONE FILL WILL HAVE A MOISTURE CONTENT FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 4 PERCENT ABOVE OPTIMUM. 3) EMBANKMENT FILL: SHELL ZONE: SOILS WITH LESS THAN 30% PASSING THE NO. 200 SIEVE OR A PI OF LESS THAN 10 WHEN THE PERCENTAGE OF MATERIAL PASSING THE NO. 200 SIEVE IS GREATER THAN 30 PERCENT. SOILS WHICH ARE CLASSIFIED AS CLAYS (CH OR CL) SHOULD NOT BE USED AT THE FACE OF THE SHELL ZONES. CLAY CORE ZONE: CH, CL OR SC MATERIAL WITH A PI RANGING BETWEEN 15 AND 60 4) NO FILL SHALL CONTAIN ROCKS OR GRAVEL LARGER THAN 4 INCHES IN DIAMETER. 5) A PROFESSIONAL GEOTECHNICAL ENGINEER SHALL APPROVE ALL MATERIALS USED FOR THE EMBANKMENT AND SUPERVISE CONSTRUCTION. 6) ALL DISTURBED AREAS ABOVE PERMANENT POOL SHALL BE SEEDED USING THE FOLLOWING GRASS SEED MIX MANUFACTURED BY ERNST SEED COMPANY: Carolina FACW Meadow Mix ERNMX-182 by Newland COMMUNITIES 1 CLAY LINER NOTES: NG GROUND IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALL INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE BMP AREA UP TO THE NORMAL POOL ELEVATION. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.01 IN/HR IN ACCORDANCE WITH THE NCDENR BMP MANUAL. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A 4" MINIMIMUM LAYER OF TOPSOIL SHALL BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #40 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 NORMAL TOP DAM SPILLWAY SPILLWAY DESIGNED POOL EL BOTTOM BOTTOM CHS EL. ' EL. WIDTH BMP #40 503.50 508.50 506.50 20' EMERGENCY SPILLWAY DETAIL NTS 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS --1011 TOP OF SPILLWAY SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE NOTE: EXPANSION/CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. SEAL 1 G%2ALC 036348 09/18/2018 uiC IiI0P``\\� SEAL LIMITS OF CONCRETE CRADLE 7' FLOW 7.$5' Do 2.67' LIMITS OF CONCRETE CRADLE 6" PERFORATED PVC COLLECTOR PIPE m 3' #57 WASHED STONE FLOW 1.5' MIRAFI 140N GEOSYNTHETIC FABRIC WITH 18—INCH OVERLAP AT ALL SEAMS (TYP) 8' KEY TRENCH DAM EMBANKMENT DETAIL NTS 2' #57 WASHED STONE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ° ON OPEN END. 0 0 0 18" CONCRETE PRESSURE PIPE ----6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. COLLECTOR PIPE TO BE CAPPED ON BOTH ENDS PLAN VIEW PROPOSED GRADE ON DOWNSTREAM SIDE OF DAM 2' MIN. 2' 18" CONCRETE PRESSURE PIPE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END. FILTER DIAPHRAGM DETAIL NTS A vNFKff\4&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com DAM EMBANKMENT NOTES: 1) TOPSOIL BENEATH THE EMBANKMENT SHALL BE REMOVED AND STOCKPILED. THE FOUNDATION WILL BE PROOF ROLLED AND ANY SOFT OR ORGANIC MATERIALS WILL BE REMOVED. 2) ALL MATERIAL SHALL BE COMPACTED IN 6-8 INCH LIFTS TO 95% OF MAXIMUM STANDARD PROCTOR DRY DENSITY OR HIGHER (ASTM D-698). THE CLAY CORE ZONE WILL HAVE A MOISTURE CONTENT OF OPTIMUM TO 4 PERCENT ABOVE OPTIMUM MOISTURE CONTENT. THE SHELL ZONE FILL WILL HAVE A MOISTURE CONTENT FROM 2 PERCENT BELOW OPTIMUM MOISTURE CONTENT TO 4 PERCENT ABOVE OPTIMUM. 3) EMBANKMENT FILL: SHELL ZONE: SOILS WITH LESS THAN 30% PASSING THE NO. 200 SIEVE OR A PI OF LESS THAN 10 WHEN THE PERCENTAGE OF MATERIAL PASSING THE NO. 200 SIEVE IS GREATER THAN 30 PERCENT. SOILS WHICH ARE CLASSIFIED AS CLAYS (CH OR CL) SHOULD NOT BE USED AT THE FACE OF THE SHELL ZONES. CLAY CORE ZONE: CH, CL OR SC MATERIAL WITH A PI RANGING BETWEEN 15 AND 60 4) NO FILL SHALL CONTAIN ROCKS OR GRAVEL LARGER THAN 4 INCHES IN DIAMETER. 5) A PROFESSIONAL GEOTECHNICAL ENGINEER SHALL APPROVE ALL MATERIALS USED FOR THE EMBANKMENT AND SUPERVISE CONSTRUCTION. 6) ALL DISTURBED AREAS ABOVE PERMANENT POOL SHALL BE SEEDED USING THE FOLLOWING GRASS SEED MIX MANUFACTURED BY ERNST SEED COMPANY: Carolina FACW Meadow Mix ERNMX-182 by Newland COMMUNITIES 1 CLAY LINER NOTES: NG GROUND IN ORDER TO HELP SUSTAIN THE PERMANENT POOL AND TO PREVENT WATER FROM INFILTRATING TOO QUICKLY INTO THE UNDERLYING SOIL, THE CONTRACTOR SHALL INSTALL A 6" THICK CLAY LINER ON THE BOTTOM OF THE BMP AREA UP TO THE NORMAL POOL ELEVATION. THE LINER CAN BE ACCOMPLISHED BY BLENDING EXISTING SITE SOILS WITH CLAY TO ACHIEVE A LOW PERMEABILITY MIXTURE OR BY INSTALLING A GEOSYNTHETIC LINER MADE OF A BENTOMAT CL. IF THE CONTRACTOR CHOOSES TO BLEND THE EXISTING SITE SOILS WITH CLAY, THE ONSITE GEOTECHNICAL ENGINEER SHALL DETERMINE THE AMOUNT OF CLAY TO ADD, THE DEGREE OF COMPACTION, AND WILL OVERSEE THE INSTALLATION OF THE CLAY LINER. THE MAXIMUM PERMEABILITY RATE FOR THE LINER SHALL BE 0.01 IN/HR IN ACCORDANCE WITH THE NCDENR BMP MANUAL. THE PROPOSED MATERIAL FOR THIS LINER SHALL BE TESTED BY THE ONSITE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THE RESULTS OF THIS TESTING SHALL BE SUBMITTED TO THE DESIGN ENGINEER FOR REVIEW PRIOR TO PLACEMENT. UPON COMPLETION OF LINER INSTALLATION, A 4" MINIMIMUM LAYER OF TOPSOIL SHALL BE ADDED OVER THE LINER TO PROVIDE A HEALTHY MEDIA FOR VEGETATION GROWTH. BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #40 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY 4C C - 7- 16 JP W \\ 16 SRM 5 CF 15 SM �L11 �15 ST 15 JPW _ rAMM-14%. 1!zz, AN -h Im I %h,- m 1 'A • FROM PLANTINGS TO PRINCIPLE1SPILL WA Y PLANTING SCHEDULE SYM. ABB. COMMON NAME BOTANICAL NAME QUANTITY SPACING CONTAINER SIZE AT PLANTING SHALLOW WATER PLANTINGS 41111 LVA SF SWEETFLAG Acorus subcordatum 77 24"-30" O.C. 1 QT. PW PICKERELWEED Pontederia cordata 81 24"-30" O.C. 1 QT. ------ i BFI BLUE FLAG IRIS Iris virginica 77 24"-30" O.C. 1 QT. + ++ +++++ SR SOFT RUSH Juncus effusus var. pylaei or solutus 79 24„ —30„ O.C. 1 QT. �°v v v v Iv TSB THREE SQUARE BULRUSH Sc merit anus lectus americ 72 24"-30” O.C. 1 QT. SHALLOW LAND PLANTINGS LLLL :LLLLL LLLL SM SWAMP MILKWEED Asclepias incarnata 61 24"-30” O.C. 1 QT. CF CARDINAL FLOWER Lobelia cordinalis 60 24"-30" O.C. 1 QT. SRM SCARLET ROSE MALLOW Hibiscus coccineus 63 24"-30" O.C. 1 QT. JPW DWARF JOE PYE WEED Eupatoriadelphus dubius 54 24"-30" O.C. 1 QT. ST SPOTTED TRUMPETWEED Eupatoriadelphus maculatus 62 24"-30" O.C. 1 QT. — 15 1P ` 15 PW 15 BFl ° 1 GENERAL PLANTING NOTES: ° 16 SF / i + W a 15 ST LLL LL LL ° / 1. AVOID COMPACTING TOPSOIL TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. \� \ 1 2. ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. 15 CF ----- 3. SHALLOW WATER AND SHALLOW LAND AREAS TO BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 17 SRM TURF— TYPE 1 HYBRID BERMUDA SOD 4. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE \ _ ' PLANTED ABOVE ELEVATION 503.50 INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKFILL WITH 0 �_ = �, \ \ APPROX. 230 SF / TOPSOIL AND LIGHTLY PLANT. 5. BEGIN PLANTING DURING LOCAL GROWING SEASON IN ORDER TO ENSURE THAT PLANTS HAVE ADEQUATE TIME TO ESTABLISH BEFORE WINTER MONTHS. / 6. OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252-482-5707), MELLOW MARSH FARMS (919-742-1200), CURE NURSERY (919-542-6186) OR ENGINEER APPROVED SUBSTITUTE. \ N 7. REFER TO EROSION CONTROL DETAIL SHEET D1.2 FOR SEEDBED PREPARATION AND SEEDING SCHEDULES FOR AREAS NOT SPECIFIED IN THIS PLAN. WET DETENTION POND #40 PLANTING PLAN SHALLOW WATER PLANTING NOTES: SCALE = 1 " = 20' 1. 70% OF PICKERELWEED SHOULD BE PLANTED WITHIN 5-6 INCHES BELOW NORMAL POOL. 2. 70% OF SWEETFLAG AND 70% OF SOUTHERN BLUE FLAG IRIS SHOULD BE PLANTED IN THE 2-3 INCHES BELOW NORMAL POOL. 3. 70% OF SOFT RUSH SHOULD BE PLANTED AT THE NORMAL POOL ELEVATION. SHALLOW LAND PLANTING NOTES: 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. EACH VARIETY OF PLANT NOTED TO BE PLANTED SHALL BE IN GROUPS AS SHOWN ON THIS SHEET. -00 CUT & REMOVE ANY COVERING AROUND ROOTS SHALLOW WATER LIMITS OF 6:1 SHELF PLANT VARIETY 'A' INSTALL PLANTS WHERE 24" O.C. TYP SHALLOW WATER CROWN IS FLUSH WITH SOIL SURFACE AMENDED TOPSOIL PLANT VARIETY 'B' NOTES: MIN. 12 IN DEPTH 1. CONTINUE PLANTING SCHEME SHOWN FOR EACH OF 0 NOTED BELOW NORMAL POOL LEVEL UND D 0 ENTIRE NTI EE ENG HN OF THIETIES SHALLOW WATER PLANOTING + + + + + + + + + + + + 2. CONTINUE PLANTING SCHEME SHOWN FOR EACH + + + + + + + + + + + + 0 OF THE 5 PLANT VARIETIES NOTED BELOW AROUND . + + + + + + + + + + + + + ENTIRE LENGTH OF THE SHALLOW LAND PLANTING + + — �T—t�Tt+ + + — — + + + �Tt+ + + �7 0 0 0 � ZONE 0 3. OTHER SPECIES WITH SIMILAR GROWTH HABITS (D D 0 AND MAY BE APPROVED AS LISTED IN THE "NCDEQ N STORMWATER DESIGN MANUAL" SECTION C-3. SHALLOW LAND GENERAL PLANTING DETA L PLANT VARIETY 'A' 24" O.C. (TYR) SHALLOW LAND PLANT VARIETY 'B' NTS VEGETATED PLANTING SHELF DETA L NTS SEAL 1 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS ARD ApG�ZALC 036348 09/18/2018 eNGINEE� uIC IiW�P``\\� SEAL A4kA**j&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com �iiq 'nil 1101 7r-� by Newland COMMUNITIES BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA BMP #40 PLAN & DETAILS DATE: SEPTEMBER 18, 2018 VICE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER D4.7 3TATU S : REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY SANITARY SEWER SUMMARY TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE UPSTREAM INVERT DOWNSTREAM INVERT PIPE DIAMETER PIPE MATERIAL LENGTH (ft) SLOPE EX SSMH-218 SSMH-704 497.20 496.90 8" PVC 57.5 0.52% SSMH-300 EX-SSMH-201 435.90 435.60 8" DIP 50.4 0.59% SSMH-301 SSMH-300 437.05 436.10 8" PVC 179.0 0.53% SSMH-302 SSMH-301 437.90 437.25 8" DIP 116.1 0.56% SSMH-303 SSMH-302 439.00 438.10 8" DIP 152.4 0.59% SSMH-304 SSMH-303 441.30 439.20 8" DIP 383.6 0.55% SSMH-305 SSMH-304 443.80 441.50 8" PVC 270.4 0.85% SSMH-306 SSMH-305 448.20 443.90 8" PVC 252.3 1.70% SSMH-307 SSMH-306 469.05 448.50 8" PVC 383.1 5.37% SSMH-308 SSMH-307 473.50 469.25 8" PVC 155.6 2.73% SSMH-309 SSMH-308 477.55 473.70 8" PVC 257.7 1.49% SSMH-310 SSMH-309 479.48 477.65 8" PVC 183.2 1.00% SSMH-311 SSMH-310 483.28 479.58 8" PVC 63.7 5.81% SSMH-312 SSMH-311 486.00 483.18 8" PVC 94.1 3.00% SSMH-313 SSMH-312 492.00 486.50 8" PVC 182.8 3.01% SSMH-314 SSMH-313 495.00 492.20 8" PVC 192.7 1.45% SSMH-315 SSMH-310 486.00 479.58 8" PVC 102.7 6.25% SSMH-316 SSMH-315 488.08 486.10 8" PVC 102.2 1.94% SSMH-317 SSMH-316 493.30 488.18 8" PVC 153.2 3.34% SSMH-401 SSMH-400 504.80 504.40 8" PVC 43.3 0.92% STORM DRAINAGE SUMMARY TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE UPSTREAM INVERT DOWNSTREAM INVERT PIPE DIAMETER PIPE MATERIAL LENGTH (ft) SLOPE CI -103 DBL CI -101 445.95 444.66 18" RCP 120.3 1.08% CI -104 CI -103 446.30 446.05 15" RCP 24.6 1.00% CI -105 CI -103 448.10 446.05 15" RCP 147.4 1.39% CI -106 CI -105 448.45 448.20 15" RCP 24.8 1.00% CI -107 DBL CI -101 446.87 444.66 18" RCP 215.2 1.03% CI -108 CI -107 447.22 446.97 15" RCP 24.5 1.00% CI -122 DI -121 453.00 452.88 36" RCP 11.9 1.00% CI -123 CI -122 456.00 455.75 15" RCP 24.5 1.02% CI -124 CI -122 462.60 453.10 36" RCP 161.1 5.90% CI -125 CI -124 464.16 463.91 15" RCP 24.5 1.02% CI -126 CI -124 472.90 462.70 30" RCP 172.3 5.92% CI -127 CI -126 473.96 473.71 15" RCP 24.5 1.02% CI -128 CI -126 476.75 473.00 30" RCP 134.0 2.80% CI -129 CI -128 477.85 477.60 15" RCP 25.4 0.98% CI -130 CI -251 480.10 478.00 30" RCP 139.8 1.50% CI -131 CI -130 481.15 480.90 15" RCP 24.5 1.02% CI -132 CI -249 483.20 481.10 30" RCP 128.5 1.63% CI -133 CI -132 484.20 484.05 24" RCP 24.9 0.60% CI -134 CI -133 485.25 484.30 24" RCP 40.7 2.34% CI -135 CI -134 485.50 485.35 24" RCP 24.5 0.61% CI -136 CI -135 489.80 486.20 18" RCP 96.7 3.72% CI -137 CI -136 490.32 490.00 15" RCP 33.6 0.95% CI -138 CI -136 492.80 490.00 15" RCP 89.6 3.12% CI -139 CI -138 493.00 492.80 15" RCP 33.5 0.60% CI -140 CI -138 496.30 492.90 15" RCP 100.7 3.38% CI -141 CI -140 496.60 496.40 15" RCP 33.5 0.60% 1 INITIAL SUBMITTAL 2018.09.18 REV.NO. DESCRIPTIONS DATE REVISIONS SANITARY SEWER SUMMARY TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE UPSTREAM INVERT DOWNSTREAM INVERT PIPE DIAMETER PIPE MATERIAL LENGTH (ft) SLOPE SSMH-402 SSMH-401 512.00 505.00 8" PVC 107.5 6.51% SSMH-403 SSMH-402 519.70 512.75 8" PVC 160.5 4.33% SSMH-404 SSMH-403 520.65 519.90 8" PVC 154.1 0.49% SSMH-500 EX-SSMH-208 471.55 471.19 8" PVC 65.1 0.55% SSMH-501 SSMH-500 483.35 472.90 8" PVC 189.4 5.52% SSMH-502 SSMH-501 501.85 485.15 8" PVC 294.6 5.67% SSMH-503 SSMH-502 514.50 502.00 8$$ PVC 295.7 4.23% SSMH-600 EX-SSMH 506.20 501.05 8" PVC 117.1 4.40% SSMH-601 SSMH-600 511.24 506.30 8" PVC 121.9 4.05% SSMH-602 SSMH-601 521.49 511.34 8" PVC 305.1 3.33% SSMH-603 SSMH-602 525.10 521.59 8$$ PVC 150.4 2.34% SSMH-604 SSMH-603 528.96 525.20 8" PVC 93.9 4.00% SSMH-605 SSMH-604 538.54 529.06 8" PVC 158.0 6.00% SSMH-606 SSMH-605 546.30 538.64 8" PVC 83.3 9.20% SSMH-701 SSMH-700 488.80 488.40 8$$ PVC 72.4 0.55% SSMH-702 SSMH-701 489.80 489.00 8" PVC 160.1 0.50% SSMH-703 SSMH-702 495.80 490.00 8" PVC 333.7 1.74% SSMH-704 SSMH-703 496.70 496.00 8$$ PVC 99.8 0.70% STORM DRAINAGE SUMMARY TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE UPSTREAM INVERT DOWNSTREAM INVERT PIPE DIAMETER PIPE MATERIAL LENGTH (ft) SLOPE CI -142 CI -135 486.50 486.10 18" RCP 39.3 1.02% CI -143 CI -142 486.95 486.70 15" RCP 24.5 1.00% CI -144 CI -142 494.20 486.70 15" RCP 228.4 3.28% CI -145 CI -144 494.55 494.30 15" RCP 33.5 0.73% CI -163 CI -162 432.70 432.32 18" RCP 67.8 0.56% CI -202 DI -201 509.80 509.40 30" RCP 10.1 3.95% CI -203 CI -202 517.05 511.50 24" RCP 117.7 4.71% CI -204 CI -203 517.70 517.45 15" RCP 33.8 0.74% CI -205 CI -203 521.95 517.20 18" RCP 164.9 2.88% CI -206 CI -205 522.45 522.20 15" RCP 24.5 1.02% CI -207 CI -205 527.05 522.45 15" RCP 200.1 2.30% CI -208 CI -207 527.40 527.15 15" RCP 24.5 1.02% CI -209 CI -207 529.90 527.15 15" RCP 94.7 2.90% CI -210 CI -209 530.24 530.00 15" RCP 24.5 0.98% CI -211 CI -209 534.20 530.15 15" RCP 93.6 4.33% CI -212 CI -211 534.55 534.31 15" RCP 24.5 1.00% CI -213 CI -211 542.35 534.30 15" RCP 136.4 5.90% CI -214 CI -213 542.70 542.45 15" RCP 24.5 1.02% CI -215 CI -213 546.50 542.45 15" RCP 63.1 6.42% CI -216 CI -202 512.05 511.75 18" RCP 24.5 1.22% CI -249 CI -130 481.00 480.20 30" RCP 56.4 1.42% CI -250 CI -249 482.05 481.80 15" RCP 24.6 1.00% CI -251 CI -128 477.90 476.85 30" RCP 87.1 1.20% CI -252 CI -251 479.15 478.90 15" RCP 24.6 1.02% CI -260 EX. C131 521.25 519.18 15" RCP 92.3 2.24% DBL CI -101 HW -100 441.00 437.50 18" RCP 49.2 7.11% SEAL 1 4?0,1,11111 G%2ALC 036348 ,, 09/18/2018 eNGINEE� uIC SEAL 1 AJ&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 F-1222 www.mckimcreed.com SANITARY SEWER RIM TABLE STRUCTURE UPSTREAM INVERT RIM ELEVATION SSMH-301 PIPE MATERIAL LENGTH (ft) 442.34 SSMH-302 DBL CI -101 444.90 450.24 SSMH-303 RCP 24.5 454.45 SSMH-304 EX. CB58 443.09 449.89 SSMH-305 RCP 150.4 452.79 SSMH-306 DI -109 444.20 457.33 SSMH-307 RCP 50.6 478.27 SSMH-308 DI -110 447.46 482.67 SSMH-309 RCP 96.2 486.53 SSMH-310 HW -120 451.75 490.40 SSMH-311 RCP 44.6 492.37 SSMH-312 HW -200 507.00 495.39 SSMH-313 RCP 51.8 501.23 SSMH-314 CI -216 512.60 502.63 SSMH-315 RCP 17.9 493.50 SSMH-316 DI -217 513.30 496.58 SSMH-317 RCP 34.8 501.17 SSMH-400 DI -218 517.27 511.40 SSMH-401 RCP 136.0 512.26 SSMH-402 DI -219 524.60 518.24 STORM DRAINAGE SUMMARY TABLE UPSTREAM STRUCTURE DOWNSTREAM STRUCTURE UPSTREAM INVERT DOWNSTREAM INVERT PIPE DIAMETER PIPE MATERIAL LENGTH (ft) SLOPE DBL CI -102 DBL CI -101 444.90 444.66 15" RCP 24.5 1.00% DI -109 EX. CB58 443.09 441.58 15" RCP 150.4 1.01% DI -110 DI -109 444.20 443.19 15" RCP 50.6 2.00% DI -111 DI -110 447.46 444.30 15" RCP 96.2 3.28% DI -121 HW -120 451.75 451.50 36" RCP 44.6 0.56% DI -201 HW -200 507.00 503.50 30" RCP 51.8 6.76% DI -217 CI -216 512.60 512.15 18" RCP 17.9 2.51% DI -218 DI -217 513.30 512.70 18" RCP 34.8 1.72% DI -219 DI -218 517.27 513.55 15" RCP 136.0 2.74% DI -220 DI -219 524.60 517.37 15" RCP 120.3 6.01% DI -221 DI -220 529.91 524.70 15" RCP 92.0 5.66% DI -222 DI -221 533.82 530.01 15" RCP 80.0 4.77% DI -226 EX SDMH-13-112 491.43 488.28 15" RCP 45.0 7.00% DI -227 DI -226 501.70 494.75 18" RCP 134.8 5.15% DI -228 DI -227 503.06 501.90 18" RCP 24.3 4.80% DI -229 DI -228 512.30 503.26 15" RCP 150.6 6.00% DI -230 DI -229 520.03 512.50 15" RCP 136.0 5.53% DI -231 DI -230 529.94 520.23 15" RCP 161.9 6.00% DI -232 DI -231 534.90 530.14 15" RCP 112.0 4.25% EX C134 HW -300 503.55 503.25 18" RCP 48.8 0.61% EX CB16 EX CB19 521.02 518.10 15" RCP 84.0 3.48% EX. CB54 EX. CB57 446.52 444.50 18" RCP 92.4 2.19% EX. CB58 CI -163 441.25 436.13 18" RCP 92.8 5.52% FES -403 SDMH-402 443.00 442.58 30" RCP 28.2 1.47% SDMH-401 HW -400 435.90 435.00 30" RCP 132.6 0.68% SDMH-402 SDMH-401 436.40 436.00 30" RCP 45.9 0.87% by Newland COMMUNITIES SANITARY SEWER RIM TABLE STRUCTURE DRAWN RIM ELEVATION SSMH-403 -142 CHECKED 526.29 SSMH-404 -143 525.38 SSMH-500 -144 480.13 SSMH-501 -145 489.54 SSMH-502 -202 508.50 SSMH-503 -203 520.49 SSMH-600 -204 514.80 SSMH-601 -205 520.64 SSMH-602 -206 529.62 SSMH-603 -207 533.51 SSMH-604 -208 537.52 SSMH-605 -209 546.85 SSMH-606 -210 552.08 SSMH-700 -211 497.00 SSMH-701 -212 498.87 SSMH-702 -131 495.97 SSMH-703 -214 506.32 SSMH-704 -215 509.21 STORM RIM TABLE STRUCTURE DRAWN RIM ELEVATION CI -103 -142 CHECKED 450.80 CI -104 -143 450.79 CI -105 -144 452.98 CI -106 -145 452.96 CI -107 -202 451.82 CI -108 -203 451.83 CI -122 -204 459.38 CI -123 -205 459.38 CI -124 -206 468.64 CI -125 -207 468.64 CI -126 -208 478.42 CI -127 -209 478.42 CI -128 -210 482.25 CI -129 -211 482.35 CI -130 -212 485.66 CI -131 485.66 CI -132 -214 489.05 CI -133 -215 488.99 CI -134 -216 491.39 CI -135 -249 491.39 CI -136 -250 494.69 CI -137 -251 494.72 CI -138 -252 497.45 CI -139 -260 497.49 CI -140 CI -101 450.36 500.68 CI -141 500.67 STORM RIM TABLE STRUCTURE DRAWN RIM ELEVATION CI -142 CHECKED 491.45 CI -143 491.45 CI -144 498.85 CI -145 498.88 CI -202 517.11 CI -203 522.19 CI -204 522.36 CI -205 526.97 CI -206 526.97 CI -207 531.91 CI -208 531.91 CI -209 534.74 CI -210 534.74 CI -211 539.09 CI -212 539.12 CI -213 547.22 CI -214 547.22 CI -215 551.00 CI -216 517.12 CI -249 486.50 CI -250 486.50 CI -251 483.56 CI -252 483.55 CI -260 526.11 DBL CI -101 450.36 449.40 DBL CI -102 449.40 BRIAR CHAPEL BC PHASE 12 CHATHAM COUNTY, NORTH CAROLINA STORM DRAINAGE & SANITARY SEWER TABLES STORM RIM TABLE STRUCTURE DRAWN RIM ELEVATION DI -109 LEG CHECKED 446.42 DI -110 CHS 448.81 DI -111 451.93 DI -121 460.06 DI -201 517.74 DI -217 517.10 DI -218 517.82 DI -219 522.37 DI -220 529.20 DI -221 534.51 DI -222 538.32 DI -226 501.61 DI -227 506.53 DI -228 508.12 DI -229 516.96 DI -230 525.04 DI -231 534.64 DI -232 539.34 FES -403 445.88 HW -100 439.71 HW -120 455.83 HW -200 507.29 HW -300 505.46 HW -400 438.79 SDMH-401 450.36 SDMH-402 448.75 DATE: SEPTEMBER 18, 2018 MCE PRO]. # 02735-0231 DRAWN LEG DESIGNED LEG CHECKED GCA PRO]. MGR. CHS SCALE HORIZONTAL: AS NOTED VERTICAL: N/A M&C FILE NUMBER D4.X DRAWING NUMBER D4.8 STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES ONLY