HomeMy WebLinkAbout20050732 Ver 28_Stormwater Info Ph 9_20130910C>S -0�3 a U a.g 401 NARRATIVE & SUPPORTING CALCULATIONS Briar Chapel Development Phase 9 Chatham County, North Carolina September 8, 2013 Prepared for: BRIAR CHAPEL'S by Newland commmm NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Prepared By: MCMM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 02735 -0096 12@19MM N SEP 1 0 2013 036348 �:, 0910812013 4 "R= MCKM&C TO. NCDENR — Division of Energy, Mineral and Land Resources, North Carolina Stormwater 1612 Mail Service Center Raleigh, NC 27604 ATTENTION- Ms. Annette Lucas Z) 5 - 0-13a. L) aS LETTER OF TRANSMITTAL DATE September 4, 2013 PROJECT NO: 2735 -0096 TASK NO EXP RE. Briar Chapel — Phase 9 TRANSMTTTAL NO 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg No. Rev. Description Status 2 Stormwater Design Plans G 2 Narrative & Supporting Calculations G 2 BMP #14 O &M Agreement and Design Supplements (1 Original, 1 copy) G 2 BMP #15 O &M Agreement and Design Supplements (1 Original, 1 copy) G 2 BMP #16 O &M Agreement and Design Supplements (1 Original, 1 copy) G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks REMARKS: Annette, Please find the enclosed documents for your review. Please let us know if you have any questions or comments. Thank you. 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919233 -8091 Fax 919/233 -6031 Cc: McKIM & CREED INC. .-. r-, r. r� n'c1 n r= r1 , Gareth Avant, PE IPROJECT DESCRIPITON ' The purpose of the project is to construct water, sewer and roadway infrastructure to support 114 residential lots within the Briar Chapel development. This will be the third of several phases of construction in this proximity. Based on the conditions of the approved 401 Water Quality Certification, NCDENR -DWQ will require runoff from the roads to be captured and treated for 85% TSS removal before being ' discharged into existing stream buffers. To meet this requirement, the runoff from the northern portion of this phase of construction will be directed to Wet Detention Pond # 14. The runoff from the southern portion of this phase will be directed to a new BMP, Wet Detention Pond # 15. To capture drainage from the existing portion of Boulder Point Drive that currently drains to a ' previously approved temporary LS /VFS measure (NCDENR -DWQ Project #05- 0732v21), a stormwater wetland will be constructed to ensure the site meets the requirements of the 401 certification. Calculations for these new facilities are included in this package. 1 Upon completion of the project's construction, the proposed public roads will be turned over to and maintained by NCDOT. ' SITE DESCRIPTION ' The project area is approximately 30 acres of disturbed area located within the BC South development area, adjacent to Boulder Point Drive and north of Margaret B Pollard Middle School. ' This portion of the site drains to the north on the north side of Boulder Point Drive and south on the south side of road. ' SOILS ' According to the Chatham County Generalized Soil Survey, the soils located on the site are classified as Wedowee sandy loam, 2% to 15% slopes (WeB, , WeD) and Wedowee sandy loam, 2% to 15% slopes, bouldery (WdC). ' The following soil descriptions are associated with the soils found on the site: We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges ' and side slopes. Permeability is moderate and the soils are well drained. Soils have a low shrink /swell potential. The seasonal high water is generally more than 6.0 feet below the surface. ' WdC - Wedowee sandy loam, boulder soils carry the same characteristics of Wedowee We(X) soils, listed above, with the exception that large boulders are more commonly found. ' WET DETENTION DESIGN The wet detention pond on this site has been designed to remove 907o of the total suspended solids entering from the surrounding impervious drainage areas before discharging into the adjacent stream. The calculations provided with this package include all projected future drainage areas that might be captured by the pond. Treated runoff will be dissipated by a riprap outlet protection device before entering any stream buffers. ' Design parameters were taken from the BMP manual and from DWQ's design supplement forms. ' STORMWATER WETLAND DESIGN The stormwater wetland on this site has been designed to remove 85% of the total suspended solids entering from the surrounding impervious drainage areas before discharging into the ' adjacent stream. The calculations provided with this package include all projected future drainage areas that might be captured by the wetland. Treated runoff will be dissipated by a riprap outlet protection device before entering any stream buffers. Design parameters were taken from the BMP manual and from DWQ's design supplement forms. I MAINTENANCE CONSIDERATIONS ' The property owner shall be responsible for periodic inspection and maintenance of all temporary erosion control measures devices. Any measure that fails to function as intended shall be repaired immediately. 1 1 1 1 MAPS { ` 101 is r O� 4- F®R, NJ .R x 'rtir� ra C 8 s 3 Zt t _ n n m U � � ID 41 ,�y ♦3 f 'IR ` `�aH � ` U U I i v v ' V e L 3 � ` �t m ?S U U cu J a jo S m 3 m 3 ? U v w ` n = tp m a m 0 m m m 4 LO o Lo ujnu S b hays BMP #14 DESIGN 1S 2S Pre - Development Post -De elopment 3P BMP #14 Subcat Reach on Link Routing Diagram for 2013.08.19.BMP #14 Prepared by McKim & Creed, Printed 9/8/2013 HydroCAD®10.00 s/n 04927 0 2011 HydroCAD Software Solutions LLC ' 2013.08.19.BMP #14 Type// 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 12 ' Summary for Subcatchment 1 S: Pre - Development ' Runoff = 7.12 cfs @ 12.15 hrs, Volume= 0.544 af, Depth> 0.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" Area (ac) CN Description 10.710 70 Woods, Good, HSG C ' 10.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, ' Subcatchment 1S: Pre - Development Hydrograph ' 7.12 cfs Runoff 7. Type II 24 -hr 6 1 -Yr Rainfall= 2.96" Runoff Area = 10.710 ac 5 Runoff Volume =0.544 of A - - - - - - - - - - - - - - - Runoff - Depth >0:61-" - ... 4 LL Tc =20.0 min ' 3 CN =70 1 a 1 1 1 1 1 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ' 2013.08.19.BMP #14 Type 11 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 C 2011 HydroCAD Software Solutions LLC Page 14 ' Summary for Pond 3P: BMP #14 Inflow Area = 10.710 ac, 61.62% Impervious, Inflow Depth > 1.73" for 1 -Yr event ' Inflow 29.86 cfs @ 12.01 hrs, Volume= 1.545 of Outflow = 6.79 cfs @ 12.25 hrs, Volume= 0.927 af, Aften= 77 %, Lag= 14.4 min Primary = 6.79 cfs @ 12.25 hrs, Volume= 0.927 of ' Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 491.20'@ 12.25 hrs Surf.Area= 22,936 sf Storage= 35,921 cf Plug -Flow detention time= 157.7 min calculated for 0.924 of (60% of inflow) Center -of -Mass det. time= 85.8 min ( 862.0 - 776.1 ) Volume Invert Avail.Storage Storage Description #1 489.50' 136,442 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 489.50 18,132 0 0 490.00 20,871 9,751 9,751 491.00 22,590 21,731 31,481 492.00 24,366 23,478 54,959 493.00 26,198 25,282 80,241 494.00 28,086 27,142 107,383 495.00 30,031 29,059 136,442 tDevice Routing Invert Outlet Devices #1 Primary 484.00' 18.0" Round Culvert L= 105.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 484.00'/482.00' S=0.01907 Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 489.50' 2.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 490.65' 20.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 490.90' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir ' Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 ' Primary OutFlow Max =6.77 cfs @ 12.25 hrs HW= 491.19' (Free Discharge) t- E3=Orifice/Grate ulvert (Passes 6.77 cfs of 21.27 cfs potential flow) = Orifice /Grate (Orifice Controls 0.24 cfs @ 6.06 fps) (Orifice Controls 1.29 cfs @ 3.11 fps) = Orifice /Grate (Weir Controls 5.23 cfs @ 1.78 fps) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 489.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2013.08.19.BMP #14 Type// 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #14 Hydrograph N v 3 0 a_ 301 I Inflow Area = 10.710 ac Peak Elev= 491.20' - - - - - - - - - - - - Storage =35,921 cf - LV 18 -- - - - - - - - - - - ----- - - - - -- 16 - - - - - - - - - - - ----- - - - - -- 14 12 - - - -- 10 --- 6.79 cfs 8] 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow C Outflow El Primary ❑ Secondary ' 2013.08.19.BMP #14 Type 1124 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: Pre - Development Runoff = 25.22 cfs @ 12.14 hrs, Volume= 1.753 af, Depth> 1.96" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall =5.17" Area (ac) CN Description 10.710 70 Woods, Good, HSG C ' 10.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Subcatchment IS: Pre - Development Hydrograph 28 26 25.22 Cfs O Runoff - - - - --- -------- - - - - -- 24 - -- - - - - - Type 1124 -h r - - -- -- ---- - - - - -- - -- -- - 10 -Yr Rainfall= 5.17" - 2o Runoff Area = 10.710 ac 18- Runoff Volume =1.753 of 16 Runoff Depth >1.96" 14 - -- - LL 12 - - - Tc =20.0 m i n- 101 -- - -- - - - - - -- ---- - - - - -- ----------------------- CN=70- 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ' 2013.08.19.BMP #14 Type 11 24 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCADS 10.00 s/n 04927 C 2011 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: BMP #14 [82] Warning: Early inflow requires earlier time span Inflow Area = 10.710 ac, 61.62% Impervious, Inflow Depth > 3.69" for 10 -Yr event Inflow = 60.90 cfs @ 12.01 hrs, Volume= 3.289 of ' Outflow _ 22.79 cfs @ 12.17 hrs, Volume= 2.624 af, Atten= 63 %, Lag= 9.6 min Primary 22.79 cfs @ 12.17 hrs, Volume= 2.624 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of ' Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 492.34' @ 12.17 hrs Surf.Area= 24,984 sf Storage= 63,281 cf Plug -Flow detention time= 104.2 min calculated for 2.615 of (80% of inflow) Center -of -Mass det. time= 50.7 min ( 809.6 - 758.9 ) Volume Invert Avail.Storage Storage Description #1 489.50' 136,442 cf Custom Stage Data (Prismatic)Listed below (Recalc) ' Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 489.50 18,132 0 0 490.00 20,871 9,751 9,751 491.00 22,590 21,731 31,481 492.00 24,366 23,478 54,959 493.00 26,198 25,282 80,241 ' 494.00 28,086 27,142 107,383 495.00 30,031 29,059 136,442 Device Routing Invert Outlet Devices #1 Primary 484.00' 18.0" Round Culvert L= 105.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 484.00'/482.00' S=0.01907 Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 489.50' 2.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 490.65' 20.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 490.90' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =22.78 cfs @ 12.17 hrs HW= 492.33' (Free Discharge) t = Culvert (Barrel Controls 22.78 cfs @ 12.89 fps) 2= Orifice /Grate (Passes < 0.32 cfs potential flow) 3= Orifice /Grate (Passes < 2.50 cfs potential flow) = Orifice /Grate (Passes < 35.95 cfs potential flow) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 489.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2013.08.19.BMP #14 Type 1124 -hr 10 -Yr Rainfall= 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Pond 3P: BMP #14 Hydrograph 60.90 cfs ® Inflow _ ._ C outflow Inflow Area = 10.710 ac El Primary -- - - - - -- - -- - -- - -- _ _ ❑Secondary 65 Peak Elev= 492.34' 60 Storage= 63,281 cf 55 50 45 N 40 w , 35 3 99 70 e-f 30 22.79 cfs 25 20 . 15 10 7" 0.00 c 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t 1 1 1 2013.08.19.131YIP #14 Type 11 24 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HvdroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 1 S: Pre - Development Runoff = 49.00 cfs @ 12.13 hrs, Volume= 3.397 af, Depth> 3.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" Area (ac) CN Description 10.710 70 Woods, Good, HSG C 10.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftift) (ft/sec) (cfs) 20.0 Direct Entry, Subcatchment 1 S: Pre - Development Hydrograph 40 30 3 25 LL 20 15 10 1 149.00 cfs Type 11 24-hr 100 -Yr Rainfall= 7.62" Runoff Area = 10.710 ac Runoff Volume =3.397 of. Runoff Depth >3.81" Tc =20.0 min CN =70 NeO4 rZZZZZOZ� Time (hours) p Runoff 1 2013.08.19.BMP #14 Type 11 24 -hr 100 -Yr Rainfafl= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: BMP #14 ' [82] Warning: Early inflow requires earlier time span Inflow Area = 10.710 ac, 61.62% Impervious, Inflow Depth > 5.91" for 100 -Yr event Inflow = 95.02 cfs @ 12.01 hrs, Volume= 5.277 of Outflow 42.75 cfs @ 12.15 hrs, Volume= 4.590 af, Atten= 55 %, Lag= 8.7 min Primary 24.24 cfs @ 12.15 hrs, Volume= 4.293 of Secondary = 18.51 cfs @ 12.15 hrs, Volume= 0.297 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 493.50' @ 12.15 hrs Surf.Area= 27,139 sf Storage= 93,528 cf Plug -Flow detention time= 90.4 min calculated for 4.574 of (87% of inflow) Center -of -Mass det. time= 49.3 min ( 799.0 - 749.7 ) Volume Invert Avail.Storage Storage Description #1 489.50' 136,442 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 489.50 18,132 0 0 490.00 491.00 20,871 22,590 9,751 21,731 9,751 31,481 492.00 24,366 23,478 54,959 493.00 26,198 25,282 80,241 ' 494.00 28,086 27,142 107,383 495.00 30,031 29,059 136,442 ' Device Routing Invert Outlet Devices #1 Primary 484.00' 18.0" Round Culvert L= 105.1' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 484.00'/482.00' S=0.0190? Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 489.50' 2.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 490.65' 20.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 490.90' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.00' 20.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =24.23 cfs @ 12.15 hrs HW= 493.49' (Free Discharge) ' t = Culvert (Barrel Controls 24.23 cfs @ 13.71 fps) 2= Orifice /Grate (Passes < 0.38 cfs potential flow) 3= Orifice /Grate (Passes < 3.31 cfs potential flow) = Orifice /Grate (Passes < 48.47 cfs potential flow) econdary OutFlow Max =18.25 cfs @ 12.15 hrs HW= 493.49' (Free Discharge) = Broad - Crested Rectangular Weir (Weir Controls 18.25 cfs @ 1.85 fps) 2013.08.19.BMP #14 Type 1124 -hr 100 -Yr Rainfall= 7.62 " Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 25 Pond 3P: BMP #14 Hydrograph 95.02 cfs ■ Inflow E, outflow Inflow Area = 10.710 ac 0 Primary 105 ❑ Secondary 100 - - - - - - - - - - - - - Peak Elev= 493.50' 95 -- -- - - - - -- - - - -- - - 90 Storage =93,628 85 - - - -- - -- _ _cf 80 - - -- - -- 75 70 " 60 42.76 C& -- - - - - -- ----------------- 55 3 -- -- LL45 - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 40 35 24.24 cfs: - -- - - - -- - - - - -- ---- - - - - -- 30 - -- - --- - -- - - - - - - - - - - - - - - - - -- 25 18.51 cfs - 20 15 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 1 1 1 1 1 1 1 1 r WATER QUALITY POND #14 CALCULATIONS Project Name Briar Chapel - Phase 9 - Section 1 Project Number 02735 -0096 Date August 6, 2013 3rd revision 2nd revision 1 st revision 1 1 1 1 1 1 t Water Quality Pond Drainage Area Data Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 Date August 6, 2013 Total site area 466,607 square feet = 10.71 acres Impervious areas Drainage area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed [Sfl On -site buildings BUA 0 192,000 192,000 0 0 On -site streets 0 44,537 44,537 0 0 On -site alleys 0 23,182 23,182 0 0 On -site sidewalks 0 13,072 13,072 0 0 On -site future (open space) 0 1,000 1,000 0 0 Off -site streets 0 0 0 0 0 5% Contingency 0 13,690 13,690 0 0 Total Impervious 1 0 287,481 287,481 0 0 Non-impervious areas Draina a area to and Other Drainage Area Existing s Proposed s Change 1sfl Existing [Sfl Proposed s On -site grass/landscape 0 179,126 179,126 0 0 On -site woods 466,607 0 - 466,607 0 0 Other undeveloped 0 0 0 0 0 Total off -site non-impervious 0 0 0 0 0 Total non-impervious 466,607 179,126 - 287,481 1 0 0 Total Drainage Area 466,607 466,607 0 3,167,850 3,167,850 Percent Impervious 0.0 61.6 61.6 0.0 0.0 Notes: 2013.08.06.Wet Detention Pond #14.Gareth.xis Site Drainage Area Data Page 2 of 18 Printed 9/8/2013 5:36 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Surface Area Calculations Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 Date August 6, 2013 Total on -site drainage area to pond 466,607 square feet Total impervious area in drainage area 287,481 square feet Average water depth of basin at normal pool 3.0 Location of site Chatham County Site region Piedmont % Impervious cover 61.6 percent If the site is in a coastal area, will a vegetative filter be used? Surface Area /Drainage Area Ratios: feet n/a For a site in the Piedmont (85 %) 2.5 percent For a site in the Piedmont (90 %) 3.6 percent For a site in a Coastal County w/ Vegetative Filter 5.2 percent For a site in a Coastal County w /out Vegetative Filter 7.2 percent Required surface area of pond: For a site in the Piedmont (85 %) 11,560.0 square feet For a site in the Piedmont (90 %) 16,710.0 square feet For a site in a Coastal County w/ Vegetative Filter 24,090.0 square feet For a site in a Coastal County w /out Vegetative Filter 33,490.0 square feet Notes: 2013.08.06.Wet Detention Pond #14.Gareth.xis Pond Surface Area Calcs Page 3 of 18 Printed 9/8/2013 5:36 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 Date August 6, 2013 Drainage area 466,607 square feet Impervious area 287,481 square feet Rainfall depth 1.00 inches Percent Impervious 61.6 percent R(v) =0.05 +0.009 *(Percent impervious) Runoff coefficient - R(v) 0.60 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 23,505.2 cubic feet Notes: 2013.08.06.Wet Detention Pond #14.Gareth.xls Runoff Volume Calcs Page 4 of 18 Printed 9/8/2013 5:36 PM 1 1 1 1 1 r L 1 Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Temporary Pool Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 Date August 6, 2013 Contour ID Stage Area ft. Area acres ] Incremental Area [sq ft. Incremental Area acres Incremental volume cu ft Incremental volume acre -ft Cumulative volume ICU. ft Cumulative volume acre -ft 489.5 0 18,131.9 0.416 18,131.9 0.4 00 0.0 00 0.0 490 0.5 20,871.1 0.479 20,871.1 0.1 9,750.8 0.2 9,750.8 0.2 490.65 1 15 21,982.0 0.505 21,9820 00 13,927.3 03 23,6780 05 491 1.5 22,590.1 0.519 22,590.1 0.0 7,800.1 0.2 31,478.2 0.5 492 2.5 24,365.6 0 559 24,365.6 0.0 23,477.8 0.5 54,956.0 07 493 3.5 26,197.6 0.601 26,197.6 0.0 25,281.6 0.6 80,237.6 1.1 494 4.5 28,086.2 0.645 28,086.2 0.0 27,141.9 0.6 107,379.5 12 495 5.5 30,031.4 0.689 30,031.4 0.0 29,058.8 0.7 136,438.3 1.3 2013.08.06 Wet Detention Pond #14.Gareth As ' Stage Storage (Temp Pool) Page 5 of 18 Printed 9/8/2013 5.36 PM 1 1 1 1 Il 1 r 1 Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Permanent Pool Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 Date August 6, 2013 Contour ID Stage Area ft. Area acres ] Incremental Area [sq ft Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 484 0 6,021.5 0.138 6,021.5 01 0.0 0.0 00 0.0 485 1 7,553.4 0.173 1,5319 0.0 6,787.5 0.2 6,7875 0.2 486 2 9,218.0 0212 1,664.6 0.0 8,385.7 0.2 15,173.2 0.3 487 3 10,983.7 0 252 1,765.7 0.0 10,1009 02 25,274.0 0.4 488 4 12,862.4 0295 1,878.8 0.0 11,923.1 0.3 37,197.1 0.5 489 5 14,854.3 0.341 1,991.9 0.0 13,8584 0.3 51,055.4 0.6 489.5 5.5 18,131.9 0.416 3,277.6 0.1 8,246.5 0.2 59,302.0 0.5 2013.08.06.Wet Detention Pond #14.Gareth.xis ' Stage Storage (Perm Pool) Page 6 of 18 Printed 9/8/2013 5.36 PM 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Forebays Project Briar Chapel - Phase 9 - Section 1 Project No 02735 -0096 Date August 6, 2013 Contour ID Stage Area ft. Area acres Incremental Area . ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 484 0 749.2 0.017 7492 0.0 0.0 0.0 0.0 00 485 1 1,139.6 0.026 390.4 0.0 944.4 00 944.4 0.0 486 2 1,603.2 0.037 463.5 00 1,371.4 00 2,315.8 0.1 487 3 2,114.0 0.049 510.9 0.0 1,858.6 0.0 4,1744 0.1 488 4 2,681.5 0.062 567.4 0.0 2,397.7 0.1 6,572.2 0.1 489 5 3,305.4 0 076 624.0 0.0 2,993.4 0.1 9,5656 0.1 489.5 5.5 4,471.0 0.103 1,165.6 0.0 1,944.1 0.0 11,5097 0.1 2013.08.06.Wet Detention Pond #14.Gareth.xis ' Stage Storage (Forebays) Page 7 of 18 Printed 9/8/2013 5:36 PM 1 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 square feet 5.9 Date August 6, 2013 0.041 Water quality treatment volume 23,502 square feet Total treatment volume 23,678 square feet Maximum head of water above dewatering hole 1.15 feet Driving head 0.38 feet Orifice coefficient 0.60 Diameter of each hole 2.75 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 0.041 square feet 5.9 square inches 0.041 square feet 5.9 square inches 2.2 days 2.2 days Notes: Dewatering time formula: t (days) = V / (Cd *A *Sgrt (2 *32.2 *H) *86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) 1 IWater Quality Pond Summary Information 1 1 n 2013.08.06.Wet Detention Pond #14.Gareth.xls ' Summary Data Page 10 of 18 Printed 9/8/2013 5:36 PM Project Briar Chapel - Phase 9 - Section 1 Project No. 02735 -0096 ' Date August 6, 2013 Drainage area to pond 466,607 square feet= 10.71 acres ' Impervious area in drainage area 287,481 square feet = 6.60 acres Bottom of pond elevation 484.00 feet Normal pool elevation 489.50 feet Pond volume at normal pool 59,302 cubic feet ' Required volume for design rainfall 23,505 cubic feet Required surface area for pond 16,710 square feet ' Volume provided for storage of design rainfall = 23,678 cubic feet at elevation 490.65 Surface area provided at normal pool 18,132 square feet 1 1 n 2013.08.06.Wet Detention Pond #14.Gareth.xls ' Summary Data Page 10 of 18 Printed 9/8/2013 5:36 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 rf[VJCV I IY/11VI G. DIlal VIlapul - rlla3w v PROJECT LOCATION: Chatham County, NC Storm Outlet Structure Structure= BMP #14 Out Size= 18 in Q10 = 22.79 cfs Qfull = 14.45 cfs Vfull = 8.18 fps From Fig. 8.06.b.1: TE: 9/3/2013 DESIGNED BY: IDJB Q10 /Qfull = 1.58 V/Vfull = MAX V = #VALUE! fps Zone = 5 D50 = 14 in _ DMAx = 21 in Riprap Class = 2 Apron Thickness = 36 in —' Apron Length = 15.0 ft �ngt" Apron Width = 3 x Dia = 5.0 ft (PROJECT LOCATION: Chatham Countv, NC Pond Name= BMP #14 Riser Outer Width = 3.5 ft Riser Outer Length = 3.5 ft Riser Inner Width = 2.5 ft Riser Inner Length = 2.5 ft Riser Height = 6.9 ft Concrete Base Length = 4.5 ft Concrete Base Width = 4.5 ft Concrete Base Depth = 12 in DATE: 8/23/2013 02735 -0096 Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety DESIGNED BY: GCA 6,210 lb 3,038 lb 9,248 lb 5,274 lb 1,264 lb 6,538 lb 4.41 Design Acceptable 1 1 1 1 1 1 1 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. GCA C3.3 -C3.4 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GCA D4.1 -D4.3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip. GCA D4.1 -D4.3 3. Section view of the wet detention basin 0" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. GCA N/A 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 1 1 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. GCA Included 9. A copy of the deed restrictions (f required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.8- 9/17/09 Part III Required Items Checklist, Page 1 of 1 GCA Calc Booklet GCA C3.1 ' GCA Calc Booklet GCA Included 1 1 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. GCA Included 9. A copy of the deed restrictions (f required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.8- 9/17/09 Part III Required Items Checklist, Page 1 of 1 1 1 1 1 1 1 1 Permit No (to be provded by DWG) Red triangles at the upper right hand comer indicate design comments Please complete the yellow shaded items. ot VVATF9O� MEW ' o < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be Alled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along w/th all of the required information I. PROJECT INFORMATION Y (Y or N) Project name Briar Chapel Development - Great Ndge Parkway Extension Contact person Gareth Avant, PE Phone number 919 233 8091 Date 30- Aug -2013 Drainage area number 1- Wet Pond #14 II. DESIGN INFORMATION 0.12 1rdhr Site Characteristics Pre - development 1 -yr, 24 -hr peak flow Drainage area 466,528 fe Impervious area, post- development 287,496 f? % impervious 61.62% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 23,506 ft3 OK Volume provided 23,678 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft" Pre-development 1 -yr, 24 -hr runoff ft3 Post - development 1 -yr, 24-hr runoff ft" Minimum volume required ft" Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1 -yr, 24-hr rainfall depth 3.0 in Rational C, pre - development 0.40 (undless) Rational C, post-development 0.86 (unitless) Rainfall intensity, 1 -yr, 24-hr stone 0.12 1rdhr Insufficient Check intensity calculation. Pre - development 1 -yr, 24 -hr peak flow 12.87 f3/sec Post - development 1 -yr, 24-hr peak flow 47.65 ft3 /sec Pre/Post 1 -yr, 24-hr peak flow control 34.78 f3 /sec Elevations Temporary pool elevation 495.00 fmsl Permanent pool elevation 489.50 fmsl SHWT elevation (approx. at the pens. pool elevation) fmsl Top of 1Oft vegetated shelf elevation 490.00 imsl Bottom of 1Oft vegetated shelf elevation 489 00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment deanout, top elevation (bottom of pond) 485.00 frnsl Sediment deanout, bottom elevation 484.00 fmsl Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 ft Is there additional volume stored above the state - required temp pool? N (Y or N) Elevation of the top of the additional volume find Form SW401 -Wet Detention Basin -Rev 8. 9/17/09 Parts I & 11 Design Summary. Page 1 of 2 1 1 1 1 1 1 1 Permit No (to be provided by DWQ) 11. DESIGN INFORMATION Surface Areas Area, temporary pool 30,031 fe Area REQUIRED, permanent pool 11,663 ft SAIDA ratio 2.50 (unitless) Area PROVIDED, permanent pool, A�rm_p d 18,132 fe OK Area, bottom of 10fl vegetated shelf, Aye uw 14,854 ft' Area, sediment deanout, top elevation (bottom of pond), Ab„_pow 6,022 fe Volumes Volume, temporary pool 23,678 ft3 OK Volume, permanent pool, V,,,,,_,w 59,302 ft3 Volume, forebay (sum of forebays N more than one forebay) 11,510 ft3 Forebay % of permanent pool volume 19.4%% OK SAIDA Table Data Design TSS removal 90% Coastal SAIDA Table Used? N (Y or N) MountairdPiedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.50 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, V,,,,_pw 59,302 ft3 Area provided, permanent pool, Av,, _pw 18,132 fe Average depth calculated 3.27 It OK Average depth used in SAIDA, da,,, (Round to nearest 0.5ft) 3.5 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ate,,, w 18,132 fe Area, bottom of 10ft vegetated shelf, Abo dvr 14,854 ft' Area, sediment deanout, top elevation (bottom of pond), A 6,022 fe 'Depth' (distance b1w bottom of 1Oft shelf and top of sediment) 4.00 ft Average depth calculated ft Average depth used in SAIDA, dam„ (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.70 in Area of orifice (d- non-circular) in2 Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 1.15 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.,) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1 -yr, 24 -hr peak flow 712 ft3 /sec Post-development 1 -yr, 24-hr peak flow 6.79 g3 /sec Storage volume discharge rate (through discharge orifice or weir) 0.24 f3 /sec Storage volume drawdown time 2.20 days OK, draws down in 2 -5 days. Additional Information Vegetated side slopes 3-1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 1.5 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.5 It OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: 8' DIP with gate valve Form SW401 -Wet Detention Basin-Rev 8-9/17/09 Parts I & 11 Design Summary, Page 2 of 2 ' Permit Number: (to be provided by DWQ) ' Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement fl 1 1 1 1 I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the ' vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial ' fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. ' — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and /or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401 -Wet Detention Basin O &M -Rev.4 Page 1 of 4 1 1 1 1 1 1 1 1 1 1 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401 -Wet Detention Basin O &M -Rev.4 Page 2 of 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919 -733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.50 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 489.50 Sediment Removal EX. 485.00 - - - - - - - 1 Pe anen Pool L8� Volume Sediment Removal Elevation 485.00 Volume ottom E evatio ft Mm. Sediment Bottom Elevation 484.00 1 -ft r. Storage Se imei Storage FOREBAY Form SW401 -Wet Detention Basin O &M -Rev.4 MAIN POND Page 3 of 4 I, G. I-Cool Alowote t , a Notary Public for the State of A' ' ! / C , County of ch'11(4 , do hereby certify that � fy :�'► iFm personally appeared before me this ' day of _ k a� , �! /, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ytv� Form SW401 -Wet Detention Basin O&M -Rev.4 Page 4 of 4 Permit Number: ' (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the ' performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:Briar Chapel - Phase 9 BAP drainage area number: l - Wet Detention Pond # 14 Print name:Kevin Graham Title:Vice President, Operations Address:16 Windt/ Knoll Circle, Chapel Hill, NC 27516 ' Phone; 919 951 -0709 Signature• ,." c 'Date: z Note: The legally responsible party should not be a homeowners association unless more than 50016 of the lots have been sold and a resident of the subdivision has been named the president. I, G. I-Cool Alowote t , a Notary Public for the State of A' ' ! / C , County of ch'11(4 , do hereby certify that � fy :�'► iFm personally appeared before me this ' day of _ k a� , �! /, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ytv� Form SW401 -Wet Detention Basin O&M -Rev.4 Page 4 of 4 1 1 1 1 1 1 1 1 1 BMP #15 DESIGN 1 1 1 1 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 1S 2S Pre - Development Post -Development 3P BMP #15 Subcat Reach on Link Routing Diagram for 2013.08.21.BMP 915 Prepared by McKim & Creed, Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC 1 2013.08.21.BMP #15 Type 11 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1 S: Pre - Development Runoff = 10.18 cfs @ 12.15 hrs, Volume= 0.778 af, Depth> 0.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" ' Area (ac) CN Description 15.310 70 Woods, Good, HSG C 15.310 100.00% Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Subcatchment IS: Pre - Development Hydrograph 10.18 cfs O Runoff 10 Type e 1 124 -h r 9 1 -Yr 8' Runoff Area= 15.10 ac - -- ----------- - - - - -- - - Runoff Volume =0.778 of 6 Runoff Depth >0.61" LL 5 Tc =20.0 min - 4 CN =70 2013.08.21.BMP #15 Type 1124 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: BMP #15 ' Inflow Area = 15.310 ac, 60.16% Impervious, Inflow Depth > 1.65" for 1 -Yr event Inflow 41.01 cfs @ 12.01 hrs, Volume= 2.109 of Outflow - 8.93 cfs @ 12.26 hrs, Volume- 1.259 af, Atten= 78 %, Lag= 14.9 min Primary = 8.93 cfs @ 12.26 hrs, Volume= 1.259 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 466.55' @ 12.26 hrs Surf.Area= 25,732 sf Storage= 48,489 cf Plug -Flow detention time= 155.8 min calculated for 1.255 of (60% of inflow) Center -of -Mass det. time= 83.3 min ( 862.7 - 779.4 ) Volume Invert Avail.Storage Storage Description #1 464.50' 182,141 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 464.50 20,017 0 0 465.00 22,898 10,729 10,729 466.00 24,702 23,800 34,529 467.00 26,562 25,632 60,161 468.00 28,479 27,521 87,681 469.00 30,453 29,466 117,147 470.00 32,483 31,468 148,615 471.00 34,569 33,526 182,141 Device Routing Invert Outlet Devices #1 Primary 458.00' 18.0" Round Culvert L= 108.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 458.00'/456.00' S=0.01857 Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf ' #2 Device 1 464.50' 3.2" Vert. Orifice /Grate C= 0.600 #3 Primary 465.95' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 466.20' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 468.50' 30.0' long x 12.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max - 8.86 cfs @ 12.26 hrs HW= 466.55' (Free Discharge) = Culvert (Passes 7.20 cfs of 22.89 cfs potential flow) ' 2= Orifice /Grate (Orifice Controls 0.37 cfs @ 6.67 fps) = Orifice /Grate (Weir Controls 6.83 cfs @ 1.94 fps) 3= Orifice /Grate (Orifice Controls 1.66 cfs @ 3.32 fps) ' econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 464.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2013.08.21.BMP #15 Type 1124 -hr 1- YrRainfa& 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Pond 3P: BMP #15 Hydrograph 141. U I 44 42 - - -- -- --- - - - --- 40 38 - - - -- -- - - - - - -- - -- - -- 36 34 ------------------------- 32 ------------------------- 30 28 - -- - -- - - - - - -- w 26 v 24 3 22 LL 20 18 16 14 - - 8.93 cfs 12 10 -- - - - - -- 8 6 ■ Inflow � � Outflow Inflow Area= 15.310 ac ■Primary ® Secondary Peak -Elev= 466.55'- - Storage= 48,489 cf ------------------------ - -- 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 1 1 1 1 1 1 1 1 1 1 2013.08.21.13MP #15 Type 11 24 -hr 10 -Yr Rainfall =5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment IS: Pre - Development Runoff = 36.06 cfs @ 12.14 hrs, Volume= 2.506 af, Depth> 1.96" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall =5.17" Area (ac) CN Description 15.310 70 Woods, Good, HSG C 15.310 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Subcatchment IS: Pre - Development Hydrograph 40 O Runoff 38 36.06 cfs - -- - - - -- --- - - - - -- -- -- - 36 Type II 24 -hr -- - -- -------- -- - - - - -- - - - - - -- - 32 10 -Yr Rainfall = 5.17" 26 _ - Rulnoff Area =_15.310 ac - 24 - - - - - - - - Runoff Volume =2.506 of 22 Runoff Depth >1.96" 20 - - - — LL 18 Tc =20.0 min 16 -------- ---- ----------- - - - - -- ------------------ 14 - -- CW70 - 12 - 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 1 1 1 1 1 1 2013.08.21.BMP #15 Type 1124 -hr 10 -Yr Rainfall= 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: BMP #15 Inflow Area = 15.310 ac, 60.16% Impervious, Inflow Depth > 3.59" for 10 -Yr event Inflow = 85.34 cfs @ 12.01 hrs, Volume= 4.574 of Outflow = 28.13 cfs @ 12.19 hrs, Volume= 3.668 af, Atten= 67 %, Lag= 10.6 min Primary = 28.13 cfs @ 12.19 hrs, Volume= 3.668 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 468.07' @ 12.19 hrs Surf.Area= 28,618 sf Storage= 89,691 cf Plug -Flow detention time= 103.2 min calculated for 3.656 of (80% of inflow) Center -of -Mass det. time= 50.3 min ( 811.9 - 761.6 ) Volume Invert Avail.Storage Storage Description #1 464.50' 182,141 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 464.50 20,017 0 0 465.00 22,898 10,729 10,729 466.00 24,702 23,800 34,529 467.00 26,562 25,632 60,161 468.00 28,479 27,521 87,681 469.00 30,453 29,466 117,147 470.00 32,483 31,468 148,615 471.00 34,569 33,526 182,141 Device Routing Invert Outlet Devices #1 Primary 458.00' 18.0" Round Culvert L= 108.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 458.00'/456.00' S= 0.0185 'f Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 464.50' 3.2" Vert. Orifice /Grate C= 0.600 #3 Primary 465.95' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 466.20' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 468.50' 30.0' long x 12.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max =28.12 cfs @ 12.19 hrs HW= 468.06' (Free Discharge) = Culvert (Barrel Controls 24.73 cfs @ 13.99 fps) 2= Orifice /Grate (Passes < 0.50 cfs potential flow) = Orifice /Grate (Passes < 4 1. 10 cfs potential flow) 3= Orifice /Grate (Orifice Controls 3.40 cfs @ 6.79 fps) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 464.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2013.08.21.BMP #15 Type 1124 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #15 Hydrograph 60 w 55 50 0 45 " 40 28.13 cfs 35 30 25 - - - -- - -- - -- - - -- 20 15 0.00 Cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 85.34 cfs ■ Inflow [ -, outflow Inflow Area = 15.310 ac E3 Primary 95 DSecondary go Peak Elev= 468.07' 85 80 -- - - - - - -- ---- - - - - -- -------- Storage= 89;691 -c# - . 75 - - - - - -- --------------------- 70 ------------ ..----- - - - - -- -------------------------------- 65 60 w 55 50 0 45 " 40 28.13 cfs 35 30 25 - - - -- - -- - -- - - -- 20 15 0.00 Cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 1 1 1 1 2013.08.21.BMP #15 Type// 24 -hr 100 -Yr Rainfall = 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment IS: Pre - Development Runoff = 70.05 cfs @ 12.13 hrs, Volume= 4.856 af, Depth> 3.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" Area (ac) CN Description 15.310 70 Woods, Good, HSG C 15.310 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, Subcatchment IS: Pre - Development Hydrogmph - - - - — - - - ' 75 70 1 1 1 1 1 1 170.05 cfs �^ 4b 40 u35 - - - - - - - -- - - - - -- - - - - - - - - J- --- - - - - - -- - -- -- - - - - - -- -- Type 1124 -h r 100 -Yr Rainfall= 7.62" Runoff Area = 15.310 ac Runoff Volume =4.856 of Runoff Depth >3.81" Tc =20.0 m1n CN =70 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) p Runoff 1 ' 2013.08.21 AMP #15 Type // 24 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 ' Summary for Pond 3P: BMP #15 ' [82] Warning: Early inflow requires earlier time span Inflow Area = 15.310 ac, 60.16% Impervious, Inflow Depth > 5.81" for 100-Yr event Inflow = 134.27 cfs @ 12.01 hrs, Volume= 7.407 of Outflow 81.77 cfs @ 12.12 hrs, Volume= 6.473 af, Atten= 39 %, Lag= 6.6 min Primary 30.35 cfs @ 12.12 hrs, Volume= 5.645 of Secondary = 51.42 cfs @ 12.12 hrs, Volume= 0.828 of ' Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 469.24' @ 12.12 hrs Surf.Area= 30,947 sf Storage= 124,619 cf Plug -Flow detention time= 87.5 min calculated for 6.472 of (87% of inflow) Center -of -Mass det. time= 46.7 min ( 798.5 - 751.8 ) ' Volume Invert Avail.Storage Storage Description #1 464.50' 182,141 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store ' (feet) (sq -ft) (cubic -feet) (cubic -feet) 464.50 20,017 0 0 ' 465.00 466.00 22,898 24,702 10,729 23,800 10,729 34,529 467.00 26,562 25,632 60,161 468.00 28,479 27,521 87,681 ' 469.00 30,453 29,466 117,147 470.00 32,483 31,468 148,615 471.00 34,569 33,526 182,141 ' Device Routing Invert Outlet Devices #1 Primary 458.00' 18.0" Round Culvert L= 108.0' RCP, square edge headwall, Ke= 0.500 ' Inlet/ Outlet Invert= 458.00'/456.00' S=0.01857 Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 464.50' 3.2" Vert. Orifice /Grate C= 0.600 #3 Primary 465.95' 24.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 ' #4 Device 1 466.20' 30.0" x 30.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads ' #5 Secondary 468.50' 30.0' long x 12.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 ' Primary OutFlow Max =30.30 cfs @ 12.12 hrs HW= 469.21' (Free Discharge) = Culvert (Barrel Controls 26.04 cfs @ 14.73 fps) 2= Orifice /Grate (Passes < 0.58 cfs potential flow) ' = Orifice /Grate (Passes < 52.25 cfs potential flow) 3= Orifice /Grate (Orifice Controls 4.27 cfs @ 8.53 fps) econdary OutFlow Max =48.62 cfs @ 12.12 hrs HW= 469.21' (Free Discharge) ' = Broad - Crested Rectangular Weir (Weir Controls 48.62 cfs @ 2.27 fps) 2013.08.21.BMP #15 Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Pond 3P: BMP #15 Hydrograph N V 3 O LL 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ® Inflow L: Outflow E3 Primary ❑ Secondary 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WATER QUALITY POND #15 CALCULATIONS Project Name Briar Chapel - Phase 9 - Section 2 - BMP #15 Project Number 02735 -0096 Date August 6, 2013 3rd revision 2nd revision 1 st revision 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Drainage Area Data Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No. 02735 -0096 Date August 6, 2013 Total site area 666,950 square feet = 15.31 acres Impervious areas Drainage area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed s On -site buildings BUA 0 238,000 238,000 0 0 On -site streets 0 104,466 104,466 0 0 On -site alleys 0 6,701 6,701 0 0 On -site sidewalks 0 31,922 31,922 0 0 On -site future (open space) 0 1,000 1,000 0 0 Off -site streets 0 0 0 0 0 5% Contingency 0 19,104 19,104 0 0 Commercial building 0 10,000 10,000 0 0 Commercial pavement 0 25,000 25,000 0 0 Total Impervious 0 401,193 401,193 0 0 Non-impervious areas Drainage area to and Other Draina a Area Existing s Proposed [Sfl Change Isf] Existing s Proposed s On -site grass/landscape 0 265,757 265,757 0 0 On -site woods 666,950 0 - 666,950 0 0 Other undeveloped 0 1 0 1 0 0 0 Total off -site non-impervious 0 1 0 0 0 0 Total non-impervious 666,950 1 265,757 1 - 401,193 0 0 Total Drainage Area 666,950 666,950 0 3,167,850 3,167,850 Percent Impervious 0.0 60.2 60.2 0.0 0.0 Notes: 2013.08.06.Wet Detention Pond #15.xis Site Drainage Area Data Page 2 of 18 Printed 9/8/2013 5:58 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Surface Area Calculations Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No. 02735 -0096 Date August 6, 2013 Total on -site drainage area to pond 666,950 square feet Total impervious area in drainage area 401,193 square feet Average water depth of basin at normal pool 4.0 feet Location of site Chatham County Site region Piedmont % Impervious cover 60.2 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area /Drainage Area Ratios: For a site in the Piedmont (85 %) 2.0 percent For a site in the Piedmont (90 %) 2.8 percent For a site in a Coastal County w/ Vegetative Filter 3.8 percent For a site in a Coastal County w /out Vegetative Filter 5.3 percent Required surface area of pond: For a site in the Piedmont (85 %) 13,580.0 square feet For a site in the Piedmont (90 %) 18,730.0 square feet For a site in a Coastal County w/ Vegetative Filter 25,420.0 square feet For a site in a Coastal County w /out Vegetative Filter 35,420.0 square feet Notes: 2013.08.06.Wet Detention Pond #15.xls Pond Surface Area Calcs Page 3 of 18 Printed 9/8/2013 5:58 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Phase 9 - Section 2 - BMP Project No. 02735 -0096 Date August 6, 2013 Drainage area 666,950 square feet Impervious area 401,193 square feet Rainfall depth 1.00 inches Percent Impervious 60.2 percent R(v) =0.05 +0.009 *(Percent impervious) Runoff coefficient - R(v) 0.59 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 32,868.5 cubic feet Notes: 2013.08.06.Wet Detention Pond #15.xis Runoff Volume Calcs Page 4 of 18 Printed 9/8/2013 5:58 PM t 1 1 1 1 1 1 Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Temporary Pool Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No. 02735 -0096 Date August 6, 2013 Contour ID Stage Area [sq ft. Area acres Incremental Area ft. Incremental Area acres Incremental volume cu ft Incremental volume acre-ft Cumulative volume cu ft Cumulative volume acre -ft 464.5 0 20,017.0 0.460 20,0170 05 00 00 00 00 465 0.5 22,898.0 0.526 2,881.0 01 10,728.8 02 10,728.8 02 465.95 1.45 24,610.3 0.565 1,7123 00 22,5664 0.5 33,2952 0.8 466 1.5 24,702.0 0.567 91.8 00 1,232.8 0.5 34,528.0 0.8 467 2.5 26,562.0 0.610 1,860.0 0.0 25,632.0 0.6 60,160.0 1.1 468 35 28,479.0 0.654 1,917.0 0.0 27,520.5 0.6 87,680.5 1.2 469 4.5 30,453.0 0.699 1,974.0 0.0 29,466.0 0.7 117,146.5 1.3 470 55 32,483.0 0.746 2,030.0 0.0 31,4680 0.7 148,614.5 1.4 2013.08 06 Wet Detention Pond #15 As ' Stage Storage (Temp Pool) Page 5 of 18 Printed 9/8/2013 5.58 PM 1 1 1 Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Permanent Pool Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No 02735 -0096 Date August 6, 2013 Contour ID Stage Area [sq ft. Area acres Incremental Area . ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 394 0 6,007.0 0.138 6,007.0 0.1 0.0 0.0 0.0 0.0 395 1 7,474.0 0.172 1,467.0 00 6,7405 0.2 6,740.5 0.2 396 2 9,071.0 0208 1,597.0 0.0 8,272.5 0.2 15,013.0 0.3 397 3 10,770.0 0.247 1,6990 0.0 9,9205 0.2 24,933.5 04 398 4 12,583.0 0.289 1,813.0 0.0 11,676.5 0.3 36,6100 05 399 5 14,509.0 0 333 1,926.0 0.0 13,546.0 0.3 50,156.0 0.6 400 6 16,547.0 0 380 2,038.0 0.0 15,5280 0.4 65,684.0 07 400.5 65 20,017.0 0 460 3,470.0 0.1 9,141.0 0.2 74,825.0 06 2013.08 06 Wet Detention Pond #15.x1s ' Stage Storage (Perm Pool) Page 6 of 18 Printed 9/8/2013 5:58 PM 1 Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Forebays Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No. 02735 -0096 Date August 6, 2013 Contour ID Stage Area ft Area acres Incremental Area . ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 458 0 636.0 0.015 6360 00 00 00 0.0 0.0 459 1 1,005.0 0 023 369.0 0.0 820.5 0.0 820.5 0.0 460 2 1,442.0 0 033 437.0 0.0 1,223.5 0.0 2,0440 0.0 461 3 1,927.0 0.044 485.0 0.0 1,684.5 00 3,728.5 0.1 462 4 2,469.0 0.057 542.0 0.0 2,198.0 0.1 5,926.5 0.1 463 5 3,068.0 0 070 599.0 0.0 2,768.5 0.1 8,695.0 0.1 464 6 3,723.0 0.085 655.0 0.0 3,395.5 0.1 12,090.5 0.1 464.5 6.5 4,940.0 0.113 1,217.0 0.0 2,165.8 0.0 14,256.3 0.1 2013 08.06.Wet Detention Pond #15.x1s Stage Storage (Forebays) Page 7 of 18 Printed 9/8/2013 5:58 PM 1 1 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Phase 9 - Section 2 - BMP #15 Project No. 02735 -0096 Date August 6, 2013 Water quality treatment volume 32,869 square feet Total treatment volume 33,295 square feet Maximum head of water above dewatering hole 1.45 feet Driving head 0.48 feet Orifice coefficient 0.60 Diameter of each hole 3.25 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 0.058 square feet 8.3 square inches 0.058 square feet 8.3 square inches 2.0 days 2.0 days Notes: Dewatering time formula: t (days) = V / (Cd *A *Sgrt (2"32.2 *H) *86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) 1 1 1 1 1 0 1 1 El v v v a A Water Quality Pond Summary Information Project Briar Chapel - Phase 9 - Section 2 - Project No. 02735 -0096 Date August 6, 2013 Drainage area to pond 666,950 square feet = 15.31 acres Impervious area in drainage area 401,193 square feet = 9.21 acres Bottom of pond elevation 457.00 feet Normal pool elevation 562.50 feet Pond volume at normal pool 178,071 cubic feet Required volume for design rainfall 32,868 cubic feet Required surface area for pond 18,730 square feet Volume provided for storage of design rainfall = 71,862 cubic feet at elevation 463.9 Surface area provided at normal pool 46,957 square feet 2013.08.06.Wet Detention Pond #15.xis Summary Data Page 10 of 18 Printed 9/8/2013 5:58 PM 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Storm Outlet Structure Structure= BMP #15 Out = 14 in Size= 18 in Q10 = 24.93 cfs Qfull = 14.45 cfs Vfull = 8.18 fps From Fig. 8.06.b.1: Apron Length Apron Width = 3 x Dia Q10 /Qfull = 1.72 VNfull = MAX V = 10.9 fps Zone = 5 D50 = 14 in DMAx 21 in Riprap Class Apron Thickness 2 = 36 in Apron Length Apron Width = 3 x Dia = 15.0 ft = 5.0 ft 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 rrw -JF-%.. i onai %ol WPM - ot. aUuui PROJECT LOCATION: Chatham County, NC Storm Outlet Structure Structure= BMP #16 Out Size= 12 in Quo= 7.19 cfs Qfull = 3.98 cfs Vfull = 5.06 fps From Fig. 8.06.b.1: I Length TE: 9/3/2013 NO: DESIGNED BY: DJB GCA Quo / Qfull = 1.81 V/Vfull = MAX V = #VALUE! fps Zone = 5 D5o = 14 in DMax = 21 in Riprap Class = 2 Apron Thickness = 36 in Apron Length = 10.0 ft Apron Width = 3 x Dia = 3.0 ft M M M M M M M M M M M w M s s M M M M ECT LOCATION: Chatham County, NC Pond Name= BMP #15 Riser Outer Width = 3.5 ft Riser Outer Length = 3.5 ft Riser Inner Width = 2.5 ft Riser Inner Length = 2.5 ft Riser Height = 8.62 ft Concrete Base Length = 4.5 ft Concrete Base Width = 4.5 ft Concrete Base Depth = 12 in DATE: 8/23/2013 02735 -0096 Riser Resisting Force = Base Resisting Force = Total Resisting Force = Riser Buoyant Force = Base Buoyant Force = Total Buoyant Force = Factor of Safety GNED BY: GCA 7,758 lb 3,038 lb 10,796 lb 6,589 lb 1,264 lb 7,853 lb Design Acceptable 1 1 1 1 1 1 1 1 1 1 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. GCA C3.3 -C3.4 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. GCA D4.1 -D4.3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip. GCA D4.1 -D4.3 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. GCA N/A 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. GCA Calc Booklet 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. GCA C3.1 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GCA Calc Booklet 7. The supporting calculations. GCA Included 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. GCA Included 9. A copy of the deed restrictions (if required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.8- 9/17/09 Part III. Required Items Checklist, Page 1 of 1 IPermit No ' Red triangles at the upper right hand comer indicate design comments Please complete the yellow shaded items. EWA A � =7AA MOM STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part Ill) must he pnnied, filled out and submitted along with all of the required Information (to be provided by DWQ) 1. PROJECT INFORMATION ' Project name Bnar Chapel Development - Great Ridge Parkway Extension Contact person Gareth Avant, PE Phone number 919 233 8091 Date 30 -Aug -2013 1 a 1 r 1 1 Drainage area number 2 - Wet Pond #15 O ?OF W A Z ;q 1 II. DESIGN INFORMATION Site Characteristics Drainage area 666,904 ft2 Impervious area, post -development 401,188 fe % impervious 60.16% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre development 1 -yr, 24-hr runoff Post - development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr stone peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre-development Rational C, post -development Rainfall Intensity 1 -yr, 24 -hr storm Pre-development 1 -yr, 24-hr peak flow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx at the pens. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume Form SW401 -Wet Detention Basin -Rev &9/17/09 32,869 ft3 OK 33,295 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft" ft3 tt3 Y (Y or N) 3.0 In 0 40 (unitless) 0.86 (undless) 0.13 inthr OK 12.87 f3 /sec 47.65 ft"/sec 345 ft3 /sec 471.00 fmsl 464.50 imsl fmsl 465.001ms1 464.00 fmsl Data not needed for calculation option #1, but OK I provided. 459.00 fmsl 458 00 fmsl Data not needed for calculation option #1, but OK If provided. 1.00 ft N (Y or N) Mid Parts I & 11 Design Summary. Page 1 of 2 I Permit No (to be provided by DWQ) 1 1 1 II, DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ace,,,, Area, bottom of 1 Oft vegetated shelf, Abo swf Area, sediment cleanout, top elevation (bottom of pond), Ab„_mw ft2 16,673 ft2 2.50 (unitless) 74,689 ff2 OK 16,547 ff 7,474 ft2 Volumes Volume, temporary pool 33,295 ft3 Volume, permanent pool, Vpe, _pw 74,689 ft3 Volume, forebay (sum of forebays If more than one forebay) 14,256 fti Forebay % of permanent pool volume 19.1%% SAIDA Table Data ' Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vce,,,,yw ' Area provided, permanent pool, A,_pw Average depth calculated Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ace,,,, Area, bottom of 1 Oft vegetated shelf, Ab di Area, sediment cleanout, top elevation (bottom of pond), Abo_p.d 90% N (Y or N) Y (Y or N) 2.50 (umdess) Y (Y or N) 74,689 ft3 74,689 fy 3.73 ft 3.5 It N (Y or N) 74,689 ft2 16,547 ft2 7,474 ft2 ' 'Depth' (distance b/w bottom of 1Oft shelf and top of sediment) 5.00 It Average depth calculated ft Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) ft 1 0 1 r 1 Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if- nonciroular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (Q Length of weir (L) Driving head (H) Pre-development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Forth SW401 -Wet Detenhon Basin -Rev 8- 9117/09 Y (Y or N) 3.50 in in 0.60 ( unitess) 1.50 ft N (Y or N) ( unitless) ( unitless) It It 10.18 fe /sec 5.92 fP /sec 0 38 fP /sec 2.23 days OK OK OK OK OK, draws down in 2 -5 days. 3 :1 OK 10 :1 OK 10.0 It OK 3 :1 OK 1.5 :1 OK Y (Y or N) OK 1.5 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK 8' DIP with gate valve Paris I & 11 Design Summary, Page 2 of 2 ' Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement ' Potential problem: How I will remediate the problem: I will keep a maintenance record on this BMP. This maintenance record will be kept in a Trash debris is present. log in a known set location. Any deficient BMP elements noted in the inspection will be ' corrected, repaired or replaced immediately. These deficiencies can affect the integrity Regrade the soil if necessary to of structures, safety of the public, and the removal efficiency of the BMP. erosive gullies have formed. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. ' This system (check one): does ® does not incorporate a vegetated filter at the outlet. ' one -time fertilizer application. This system (check one): Vegetation is too short or too does ® does not incorporate pretreatment other than a forebay. lon approximately six inches. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. t — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the ' maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and ' within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and /or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of lon approximately six inches. Form SW401 -Wet Detention Basin O &M -Rev.4 Page 1 of 4 1 1 1 1 1 1 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spray in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. IForm SW401 -Wet Detention Basin O &M -Rev.4 Page 2 of 4 1 1 1 1 1 1 1 1 1 1 1 1 1 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919 -733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.50 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 464.50 Sediment Removal 459.00--- - - - - -- Pe amen Pool - - - -- -- Volume Sediment Removal Elevation 459.00 Volume Bottom E evatio 458.00 ft Mm. -------------------------------------- - - - - -- --- - -- Sediment Bottom Elevation 458.00 1 -ft n Storage Sedimei Storage FOREBAY MAIN POND Form SW401 -Wet Detention Basin O &M -Rev.4 Page 3 of 4 F- I i Permit Number:_ _ ' (to be provided by DWQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. 1 1 Project name:Briar Chapel - Phase 9 BMP drainage area number: l - Wet Detention Pond # 15 Print name:Kevin Graham Title:Vice President, Operations Address:16 Windy Knoll Circle, Chapel Hill. NC 27516 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. &w~ , a Notary Public for the State of /VC,. . , County of GWrrh[ts• , do hereby certify that JL{hoh &1144M personally appeared before me this day of 4 st I• t and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires R "10 r� Form SW401 -Wet Detention Basin O&M -Rev.4 Page 4 of 4 1 1 1 1 I 1 1 BMP #16 DESIGN 1 1 1 1 1 1 1 1 1S Pre - Development Subcat Reach on Link 2S Post- Devjelopment 3P BMP #16 ' BMP #16.Gareth Type 11 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 7 ' Summary for Subcatchment 1 S: Pre - Development Runoff = 2.23 cfs @ 12.09 hrs, Volume= 0.144 af, Depth> 0.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" ' Area (ac) CN Description 2.820 70 Woods, Good, HSG C ' 2.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, 1 1 1 0 LL Subcatchment IS: Pre - Development Hydrograph 2.23 cfs - -- - - - - -- Type II 24 -hr 1 -Yr Rainfall= 2.96" Runoff Area =2.820 ac Runoff Volume =0.144 of Runoff Depth >0.61" -- -- ----------- Tc =15.0 min - CN=70 Time (hours) 18 19 20 O Runoff ' BMP #16.Gareth Type 1124 -hr 1- YrRainfall= 296" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 C 2011 HydroCAD Software Solutions LLC Page 9 ' Summary for Pond 3P: BMP #16 ' Inflow Area = 2.820 ac, 49.65% Impervious, Inflow Depth > 1.50" for 1 -Yr event Inflow 6.94 cfs @ 12.02 hrs, Volume= 0.353 of Outflow = 1.97 cfs @ 12.22 hrs, Volume= 0.225 af, Atten= 72 %, Lag= 12.2 min Primary = 1.97 cfs @ 12.22 hrs, Volume= 0.225 of ' Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 492.37' @ 12.22 hrs Surf.Area= 6,711 sf Storage= 7,607 cf Plug -Flow detention time= 144.6 min calculated for 0.225 of (64% of inflow) Center -of -Mass det. time= 72.1 min ( 857.5 - 785.4 ) ' Volume Invert Avail.Stora a Storage Description #1 491.00' 29,289 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) ' 491.00 4,139 0 0 492.00 6,302 5,221 5,221 493.00 7,418 6,860 12,081 494.00 8,590 8,004 20,085 495.00 9,819 9,205 29,289 _Device Routing Invert Outlet Devices ' #1 Primary 489.00' 12.0" Round Culvert L= 40.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 489.00'/488.50' S=0.01257 Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 0.79 sf #2 Device 1 491.00' 1.3" Vert. Orifice /Grate C= 0.600 #3 Device 1 492.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 492.25' 24.0" x 24.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.25' 10.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =1.93 cfs @ 12.22 hrs HW= 492.36' (Free Discharge) L = Culvert (Passes 1.93 cfs of 6.40 cfs potential flow) ' 2= Orifice /Grate (Orifice Controls 0.05 cfs @ 5.51 fps) 3= Orifice /Grate (Orifice Controls 0.87 cfs @ 2.33 fps) = Orifice /Grate (Weir Controls 1.01 cfs @ 1.10 fps) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 491.00' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) BMP #16.Gareth Type 1124 -hr 1 -Yr Rainfall = 2.96" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Pond 3P: BMP #16 Hydrograph 6.94 CfS ■ Inflow G Outflow Inflow Area =2.820 ac ® Primary ❑ Secondary 7f// Peak Elev= 492.37' Storage =7,607 cf 6 5 N_ _ _ _ _ _ - _ _ - _ .. _ _ _ _ _ _ _ _ _ _ _ _ _ u 4 3 0 LL s 1.97 cfs 2 1 1 1 1 1 1 1 1 1 1 BMP #16.Gareth Type 1124 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1 S: Pre - Development Runoff = 7.75 cfs @ 12.08 hrs, Volume= 0.462 af, Depth> 1.97' Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall = 5.17' Area (ac) CN Description 2.820 70 Woods, Good, HSG C 2.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment IS: Pre - Development Hydrograph 7.75 cfs 5 a4------------------- - - - - -- - -- LL Type II 24 -hr 10 -Yr Rainfall = 5.17" uno ff A rid a =2. 92 0 -ac- Runoff Volume =0.462 of Runoff_ _ Depth >1.97" TC =15.0 min - -- - - - - -- - - - - -- -------- CN =70- wiii� i���ii�i���. �Z'Zzww"Ovsov' � Runoff BMP #16.Gareth Type 1124 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCADS 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 14 ' Summary for Pond 3P: BMP #16 ' Inflow Area = 2.820 ac, 49.65% Impervious, Inflow Depth > 3.39" for 10 -Yr event Inflow 15.05 cfs @ 12.01 hrs, Volume= 0.796 of Outflow = 7.19 cfs @ 12.14 hrs, Volume= 0.661 af, Atten= 52 %, Lag= 8.0 min Primary = 7.19 cfs @ 12.14 hrs, Volume= 0.661 of ' Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs ' Peak Elev= 493.11' @ 12.14 hrs Surf.Area= 7,552 sf Storage= 12,935 cf Plug -Flow detention time= 90.5 min calculated for 0.661 of (83% of inflow) Center -of -Mass det. time= 41.3 min ( 808.3 - 767.0 ) Volume Invert Avail.Storage Storage Description #1 491.00' 29,289 cf Custom Stage Data (Prismatic)Listed below (Recalc) ' Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) ' 491.00 4,139 0 0 492.00 6,302 5,221 5,221 493.00 7,418 6,860 12,081 ' 494.00 8,590 8,004 20,085 495.00 9,819 9,205 29,289 Device Routing Invert Outlet Devices ' #1 Primary 489.00' 12.0" Round Culvert L= 40.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 489.00'/488.50' S= 0.0125 '/' Cc= 0.900 ' n=0.013 Concrete pipe, bends & connections, Flow Area= 0.79 sf #2 Device 1 491.00' 1.3" Vert. Orifice /Grate C= 0.600 #3 Device 1 492.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 492.25' 24.0" x 24.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.25' 10.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 ' Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =7.19 cfs @ 12.14 hrs HW= 493.11' (Free Discharge) L = Culvert (Inlet Controls 7.19 cfs @ 9.15 fps) 2= Orifice /Grate (Passes < 0.06 cfs potential flow) 3= Orifice /Grate (Passes < 1.79 cfs potential flow) = Orifice /Grate (Passes < 17.87 cfs potential flow) ' econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 491.00' (Free Discharge) 5= Broad - Crested Rectangular Weir( Controls 0.00 cfs) BMP #16.Gareth Type// 24 -hr 10 -Yr Rainfall= 5.17" Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #16 Hydrograph ® Inflow 15.05 cfs outflow Inflow Area =2.820 ac Else Secondary - - - 15 ,. Peak Elev= 493.11' 13 Storage= 12,935 cf 12 - - - - - -- - -- - - - -- - - - - - -- -- 10 9 1 7.19 cfs I[ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 ' BMP #16.Gareth Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD ®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 17 ' Summary for Subcatchment 1S: Pre - Development ' Runoff = 14.99 cfs @ 12.07 hrs, Volume= 0.896 af, Depth> 3.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" ' Area (ac) CN Description 2.820 70 Woods, Good, HSG C ' 2.820 100.00% Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, ' Subcatchment IS: Pre - Development Hydrogimph ' 16 - - 14.99 cfs Runoff 15 Type 11 24-hr 14 13 1 - 100 -Yr Rainfall= 7.62" -- - - - - - -- ------ - - - - -- - - -- - -- - - - -- 12 Runoff Area =2.820 ac 11 10 Runoff Volume =0.896 of 9 - - - - -- - -- - -- - - - -- ------ - - - - -- -- - -- - - ._Runoff Depth >3.81" _ ° 8 Tc =15.0 min 6 - -- --- - - - - -- - - - - -- - - - - - -- - --- - 5 1 0 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ' BMP #16.Gareth Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 9/8/2013 HydroCAD®10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 ' Summary for Pond 3P: BMP #16 1 1 1 1 1 1 1 1 1 1 [82] Warning: Early inflow requires earlier time span Inflow Area = 2.820 ac, 49.65% Impervious, Inflow Depth > 5.59" for 100-Yr event Inflow = 24.11 cfs @ 12.01 hrs, Volume= 1.313 of Outflow = 16.71 cfs @ 12.10 hrs, Volume= 1.172 af, Atten= 31 %, Lag= 5.6 min Primary = 7.78 cfs @ 12.10 hrs, Volume= 1.040 of Secondary = 8.93 cfs @ 12.10 hrs, Volume= 0.133 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 493.73' @ 12.10 hrs Surf.Area= 8,271 sf Storage= 17,793 cf Plug -Flow detention time= 73.2 min calculated for 1.172 of (89% of inflow) Center -of -Mass det. time= 36.9 min ( 792.9 - 756.0 ) Volume Invert Avail.Storage Storage Description #1 491.00' 29,289 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 491.00 4,139 0 0 492.00 6,302 5,221 5,221 493.00 7,418 6,860 12,081 494.00 8,590 8,004 20,085 495.00 9,819 9,205 29,289 Device Routing Invert Outlet Devices #1 Primary 489.00' 12.0" Round Culvert L= 40.0' RCP, square edge headwall, Ke= 0.500 Inlet /Outlet Invert= 489.00'/488.50' S=0.01257 Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 0.79 sf #2 Device 1 491.00' 1.3" Vert. Orifice /Grate C= 0.600 #3 Device 1 492.00' 18.0" W x 3.0" H Vert. Orifice /Grate C= 0.600 #4 Device 1 492.25' 24.0" x 24.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 493.25' 10.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =7.77 cfs @ 12.10 hrs HW= 493.72' (Free Discharge) L = Culvert (Inlet Controls 7.77 cfs @ 9.90 fps) 2= Orifice /Grate (Passes < 0.07 cfs potential flow) 3= Orifice /Grate (Passes < 2.28 cfs potential flow) = Orifice /Grate (Passes < 23.38 cfs potential flow) econdary OutFlow Max =8.82 cfs @ 12.10 hrs HW= 493.72' (Free Discharge) = Broad - Crested Rectangular Weir (Weir Controls 8.82 cfs @ 1.86 fps) BMP #16.Gareth Type 11 24 -hr 100 -Yr Rainfall= 7.62 " Prepared by McKim & Creed Printed 9/8/2013 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Pond 3P: BMP #16 Hydrograph N V 3 O LL 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow G Outflow ■ Primary ■ Secondary 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 BMP SIZING - SIMPLE METHOD Briar Chapel Phase 9 BMP #16 Stormwater Wetland Project: 02735-0096 Prepared by: GCA Date: 8/19/2013 Drainage area: 122,794 sf Impervious area: 61,033 sf Volume to Catch The First 1.0 Inches of Runoff: Runoff : Rv = 0.05 + 0 9 * la Simple Method, Schueler la (actac)= 0.497 Rv = 0.497 Volume. V = 3630 * P * Rv * A P = 1.00 in Rv = 0 497 A = 2.82 ac V = 5,089 cf Surface Area: SA = Volume / Depth Depth = 12 in SA = 5,089 sf STORMWATER WETLAND #16 CALCULATIONS Project Name Briar Chapel Phase 9 Project Number 2735 -0096 Date August 19, 2013 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Briar Chapel Phase 9 Project No. 2735 -0096 Date August 19, 2013 Total site area 122,794 square feet = 2.82 acres Impervious areas Draina a area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed s On -site buildings lots 0 33,400 33,400 0 0 On -site streets 0 20,672 20,672 0 0 On -site sidewalks 0 6,961 6,961 0 0 On -site future (open space) 0 0 0 0 0 Off -site buildings 0 0 0 0 0 Off -site streets 0 0 0 0 0 Off -site sidewalks 0 1 0 1 0 0 1 0 Total Impervious 0 61,033 61,033 0 0 Non-impervious areas Drainage area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed s On -site grass/landscape 0 785,984 785,984 0 0 On -site woods 1,639,768 30,917 - 1,608,851 0 0 Other undeveloped 0 1 0 1 0 0 0 Total off -site non-impervious 0 1 0 0 0 0 Total non-impervious 1,639,768 1 816,901 - 822,867 0 0 Total Drainage Area 122,794 122,794 0 3,167,850 3,167,850 Percent Impervious 0.0 49.7 49.7 0.0 0.0 Notes: 2013.08.19.Wetland #16 Design Worksheet.Stage Storage.xls Site Drainage Area Data Page 2 of 5 Printed 9/8/2013 6:06 PM 1 1 1 F Stormwater Wetland Volume Calculations Stage -Storage Data for Wetland - Temporary Pool Project Briar Chapel Phase 9 Project No. 2735 -0096 Date August 19, 2013 Contour ID Stage Area [s q. ft. Area acres Incremental Area . ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre-ft 491 0 4,139.0 0.095 4,1390 0.1 0.0 0.0 00 0.0 492 1 6,302.0 0.145 2,1630 0.0 5,220.5 0.1 5,2205 0.1 493 2 7,418.0 0.170 1,116.0 0.0 6,860.0 0.2 12,080.5 0.3 494 3 8,590.0 0.197 1,172.0 0.0 8,0040 0.2 20,084.5 03 495 4 9,819.0 0 225 1,229.0 0.0 9,204 5 0.2 29,289.0 0.4 IF 2013.08.19.Wetiand #16 Design Worksheet Stage Storage.xls ' Stage Storage (Temp Pool) Page 3 of 5 Printed 9/8/2013 6:06 PM 1 1 1 1 Water Quality Basin Dewatering Time Calculations Project Briar Chapel Phase 9 Project No. 2735 -0096 Date August 19, 2013 Water quality treatment volume 5,089 square feet Total treatment volume 5,221 square feet Maximum head of water above dewatering hole 1.00 feet Driving head 0.33 feet Orifice coefficient 0.60 Diameter of each hole 1.33 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 0.010 square feet 1.4 square inches 0.010 square feet 1.4 square inches 2.2 days 2.3 days Notes: Dewatering time formula: t (days) = V / (Cd *A *Sgrt (2 *32.2 *H) *86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 @MMMM@UM DATE: 9/3/2013 DESIGNED BY: BEAM 1DJ13 PROJECT NAME: Briar Chapel - BC South PROJECT NO: CHECKED BY PROJECT LOCATION: Chatham County, NC 102735-0096 GCA Storm Outlet Structure Structure= BMP #16 Out Q10 /Qfull = 1.81 Size= 12 in VNfull = MAX Q10 = 7.19 cfs V = #VALUE! fps Qfull = 3.98 cfs Vfull = 5.06 fps From Fig. 8.06.b.1: Zone = 5 r — D50 = 14 in DmAx = 21 in i' Riprap Class = 2 Apron Thickness = 36 in i—' Apron Length = 10.0 ft Lengtn Apron Width = 3 x Dia = 3.0 ft I Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to ' indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. ' Initials Page/ Plan Sheet No. ' GCA D4.7 -D4.8 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), ' - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, ' - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GCA D4.7 -D4.8 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) ' - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), ' - Design at ultimate build -out, - Off -site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. GCA D4.7 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower ' - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth ' Option 2, clay liner: Depth of topsoil on top of liner, liner specifications GCA D4.7 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: ' - A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, ' - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. GCA C3.1 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. ' GCA Calc Book 6. The supporting calculations (including drawdown calculations). GCA Included 7. A copy of the signed and notarized operation and maintenance (0 &M) agreement. ' GCA N/A 8. A copy of the deed restrictions (if required). GCA N/A 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. SW401- Wetland -RPv 6- 11/16/09 Part III nacre 1 of 1 1 pF WA le;9 pG 1 T HOM ' STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT 1 This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION 'Project name Briar Chapel Development - Phase 9 Contact name Gareth Avant, PE Phone number 9193233.809 1 Date September 8, 2013 Drainage area number 3 - BMP #16 DESIGN INFORMATION 'II. Site Characteristics Drainage area 122,794.00 fe Impervious area 61,033.00 fe Percent impervious 1 49.7%% Design rainfall depth 1.00 inch Peak Flow Calculations 1 -yr, 24 -hr rainfall depth 1 3.00 in 1 -yr, 24 -hr intensity 0.12 in/hr Pre - development 1 -yr, 24-hr runoff 2.23 ft3 /sec 1 Post - development 1 -yr, 24 -hr runoff 6.94 ft3/sec Pre/Post 1 -yr, 24-hr peak control 4.71 ft3 /sec Storage Volume: Non -SA Waters Minimum required volume 1 5,089.00 ft Volume provided (temporary pool volume) 5,221.00 ft3 OK 1 Storage Volume: SA Waters Parameters 1.5" runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff volume ft3 Post - development 1 -yr, 24 -hr runoff volume ft3 Minimum volume required ft3 'Volume provided ft3 Outlet Design Depth of temporary pool/ponding depth (DPI) 12.00 in OK Drawdown time 2.20 days OK Diameter of orifice 1.33 in OK 1 Coefficient of discharge (CD) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 0.33 ft Provide calculations to support this driving head. Forth SW401- Wetland -Rev 6- 11/16/09 Parts I and 11 Project Design Summary, Page 1 of 3 1 'Surface Areas of Weiland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: 'Shallow Water The shallow water percentage is: Deep Pool 'Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non - forebay portion of deep pool 'The non - forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones ' Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) 'Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom 'Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: 'This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, ' Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool 'Shallow Water Deep Pool (shallowest) Deep Pool (deepest) 'Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: ' Herbaceous (4'cubic -inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4'cubic -inch container), OR ' Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) Number of Plants provided in Shallow Water Area: Herbaceous (4'cubic -inch container) ' Number of Plants provided in Shallow Land Area: Herbaceous (4'cubic -inch container) Shrubs (1 gallon or larger) ' Trees (3 gallon or larger) and Grass -like Herbaceous (4+ cubic -inch) IForm SW401- Wetland -Rev 6- 11/16/09 6,301.00 f? OK 2,215.00 fe OK 35%% 2,602.00 fe OK 41 %% 648.00 fe OK 10%% 836.00 f? OK 13%% 6,301.00 fe OK 0.00 fe 492.00 ft amsl 491.00 ft amsl 490.50 ft amsl 489.50 ft amsl 489.00 ft amsl (Y or N) ft amsl OK Y (Y or N) 4.00 in OK 12.00 in OK 6.00 in OK 18.00 in OK 24.00 in OK N (Y or N) OK 700 600 96 12 and 480 700 OK 600 OK Parts I and 11 Pro ject Design Summary, Page 2 of 3 1 Form SW401- Wetland -Rev 6- 11/16/09 Parts I and II Project Design Summary, Page 3 of 3 9 N 9 Additional Information 'Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? ff yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? N/A ft 'Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK The length to width ratio is: 2.85 :1 OK Approximate wetland length 137.00 ft 'Approximate wetland width 48.00 ft Approximate surface area using length and width provided 6,576.00 � This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK 1 Form SW401- Wetland -Rev 6- 11/16/09 Parts I and II Project Design Summary, Page 3 of 3 9 N 9 ' Permit Number: (to be provided by DWQ) tDrainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: ' — Immediately following construction of the stormwater wetland, bi- weekly inspections will be conducted and wetland plants will be watered bi- weekly until vegetation becomes established (commonly six weeks). L— No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problenr Entire BMP Trash debris is present. Remove the trash debris. Perimeter of wetland Areas of bare soil and /or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. -damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. IForm SW401-Wetland O &M -Rev.4 Page 1 of 3 1 1 n L Permit Number: (10 be provided by DWQ) BMP element: Potential problem: How I will remediate the problem: Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion roblems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. plant health. Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Wafter Quality occurred at the outlet. 401 Oversight Unit at 919 - 733 -1786. IForm SW401-Wetland O &M -Rev.4 Page 2 of 3 ' Permit Number. (lobe provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the ' maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. 1 Project name:Briar Chapel - Phase 9 BMP drainage area number:3 - Stormwater Wetland # 16 Print name:Kevin Graham Title:Vice President, Operations Address: 16 Windy Knoll Circle, Chapel Hill, NC 27516 Phone:(919) 951 -0709 Signature: T e Date: � 3 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, G, Leh'+ djwmo, a Notary Public for the State of NL , County of CAIAf M , do hereby certify that %LG►i)l personally appeared before me this P? day of i4fteW ,'[3 , and acknowledge the due execution of the forgoing stormwater wetland 1 41 maintenance requirements. Witness my hand and official seal, SON 60W %%OTARV AU9LIG SEAL My commission expires Form SW401- Wetland O &M -Rev.4 Page 3 of 3