Loading...
HomeMy WebLinkAbout20050732 Ver 23_Individual_20120619THE JOHN R. McADAMS COMPANY, INC LETTER OF TRANSMITTAL To Annette Lucas PE NCDENR Division of Water Quality Wetlands & Stormwater Branch 512 N Salisbury Street 9t" Floor Raleigh North Carolina 27604 Re Briar Chapel Phase 6 North Final Stormwater Management Plan Submittal I am sending you the following item(s) Date June 18 2012 05-015Z 00%3 ** FEDERAL EXPRESS Job No NEW 12000 COPIES DATE NO DESCRIPTION 2 For review and Final SW M mt Permit Application 2 BMP Supplement O &M Agreement 2 SW M mt Final Design Plans 2 SW M mt Final Design Calc Books 2 Proposed SW M mt Plan Approval Conditions These are transmitted as checked below ❑ As requested ® For approval ❑ For review and Remarks Copy to ❑ For your use EJ Signed V FOR INTERNAL USE ONLY ® Copy Letter of Transmittal Only to File ❑ Copy Entire Document to File ENGINEERS PLANNERS SURVEYORS ENVIRONMENTAL RESEARCH TRIANGLE PARK CHARLOTTE WILMINGTON 800 7.0 3646 ww%� johnmicadams coin 05-0 'I 3al u0-c3 DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph II Post Construction (select all that apply) ❑ Non Coastal SW HQW /ORW Waters ❑ Uruversal Stormwater Management Plan ❑ Other WQ Mgmt Plan State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original GENERAL INFORMATION Project Name (subdivision facility or establishment name should be consistent with project name on plans specifications letters operation and maintenance agreements etc) Briar Chapel Phase 6 North 2 Location of Project (street address) The project site is located off from US HWY 15 501 (west side) south of intersection of US HWY 15 501 and Manns Chapel Road and north of intersection of US HWY 15 501 and Andrews Store Road City County Chatham Zip 27516 3 Directions to project (from nearest major intersection) From intersection of US HWY 15 501 and US HWY 64, go north on US HWY 15 501 Approximately 5,000 feet north of the intersection of US HWY 15 501 and Andrews Store Road, the project site will be on the left 4 Latitude 35 49 37 N Longitude 79 06 56 W of the main entrance to the project II PERMIT INFORMATION 1 a Specify whether project is (check one) ®New ❑Modification b If this application is being submitted as the result of a modification to an existing permit list the existing permit number its issue date (if known) , and the status of construction ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer s certification 2 Specify the type of project (check one) ❑Low Density ®High Density ❑Drams to an Offsite Stormwater System ❑Other 3 If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application list the stormwater project number if assigned and the previous name of the project if different than currently proposed 4 a Additional Project Requirements (check applicable blanks information on required state permits can be obtained by contacting the Customer Service Center at 1 877 623 -6748) ❑LAMA Major ®Sedimentation /Erosion Control 29 47 ac of Disturbed Area ❑NPDES Industrial Stormwater ®404/401 Permit Proposed Impacts Impacts to streams & 404 wetlands b If any of these permits have already been acquired please provide the Project Name Protect /Permit Number issue date and the type of each permit 401 Permit Briar Chapel, DWO Project #20050732, Ver 13,08/31/09 404 Permit Briar Chapel, USACE Action ID #200121252,08/21/09 Form SWU 101 Version 07Jun2010 Page 1 of 6 III CONTACT INFORMATION 1 a Print Applicant / Signing Official s name and title (specifically the developer property owner lessee designated government official individual etc who owns the protect) Applicant /Organization NNP Briar Chapel, LLC Signing Official & Title Bill Mumford, Assistant Vice President b Contact information for person listed in item 1a above Street Address 16 Windy Knoll Circle City Chapel Hill State NC Zip 27516 Mailing Address (if applicable) City State Zip Phone (919 ) 9510713 Fax (919 ) 9510711 Email bmumford@newlandco com c Please check the appropriate box The applicant listed above is ® The property owner (Skip to Contact Information item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information item 2a and 2b below) ❑ Developer* (Complete Contact Information item 2a and 2b below) 2 a Print Property Owner s name and title below if you are the lessee purchaser or developer (This is the person who owns the property that the project is located on) Property Owner /Organization Signing Official & Title b Contact information for person listed in item 2a above Street Address City Mailmg Address (if applicable) City Phone ( ) Email State State Fax Zip WE 3 a (Optional) Print the name and title of another contact such as the project s construction supervisor or other person who can answer questions about the project Other Contact Person /Organization NNP Briar Chapel, LLC Signing Official & Title Lee Bowman, Project Manager b Contact information for person listed in item 3a above Mailmg Address 16 Windy Knoll Circle City Chapel Hill State NC Zip 27516 Phone (919 ) 9510712 Fax (919 ) 9510711 Email lbowman@newlandco com Form SWU 101 Version 07Jun2010 Page 2 of 6 4 Local jurisdiction for building permits Chatham County Point of Contact lenny Williams IV PROJECT INFORMATION Phone # (919 ) 5428230 1 In the space provided below bneflv summarize how the stormwater runoff will be treated Stormwater runoff from impervious areas associated with the development of Phase 6 North of Briar Chapel will be captured and directed to a wet pond designed with an SA /DA ratio based upon the 90 /o TSS design 2 a If claiming vested rights identify the supporting documents provided and the date they were approved ❑ Approval of a Site Specific Development Plan or PUD Approval Date ❑ Varid Building Permit Issued Date ❑ Other Date b If claiming vested rights identify the regulation(s) the project has been designed in accordance with ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3 Stormwater runoff from this project drams to the Cape Fear River basm 4 Total Property Area 36 62 (PH6N) acres 5 Total Coastal Wetlands Area _N /A acres 6 Total Surface Water Area N/A acres 7 Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area 36 62 (PH6N) acres Total project area shall be calculated to exclude the following the normal pool of impounded structures the area between the banks of streams and rivers the area below the Normal High Water (NHW) line or Mean High Water (MHW) line and coastal wetlands landward from the NHW (or MHW) line The resultant project area is used to calculate overall percent built upon area (BETA) Non coastal wetlands landward of the NHW (or MHW) line may be included in the total project area 8 Project percent of impervious area (Total Impervious Area / Total Project Area) X 100 = Approx 37% % 9 How many drainage areas does the project have ?1 (For high density count 1 for each proposed engineered stormwater BMP For low density and other projects use 1 for the whole property area) 10 Complete the following information for each drainage area identified in Project Information item 9 If there are more than four drainage areas in the project attach an additional sheet with the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Pokeberry Creek Stream Class * WS-IV NSW Stream Index Number * 16-37 Total Drainage Area (sf) 901 256 On site Drainage Area (sf) 901256 Off site Drainage Area (sf) 0 Proposed Impervious Area ** (so 446 926 % Impervious Area ** (total) Impervious Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area On site Buildings/ Lots (sf) 290 685 On site Streets (sf) 123 537 On site Parking (sf) Inc in Streets On site Sidewalks (so 32 704 Other on site (sf) Future (sf) Off site (sf) Existing BUA * ** (sf) Total (sf) 446 926 * Stream Class and Index Number can be determined at http & ortal ncdenr orgAveblzvqlpslcsulclasszficatzons Form SWU 101 Version 07Jun2010 Page 3 of 6 Impervious area is defined as the built upon area including but not limited to buildings roads parking areas sidewalks gravel areas etc Report only that amount of existing BUA that will remain after development Do not report any existing BUA that is to be removed and which will be replaced by new BUA 11 How was the off site impervious area listed above determined? Provide documentation N/A all impervious is from onsite sources, which was measured based upon proposed development plan Projects m Union County Contact DWQ Central Office staff to check of the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per NCAC 02B 0600 V SUPPLEMENT AND O &M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O &M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from htto / /mortal ncdenr ore /web /wa /ws /su /bmo manual VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below A detailed application instruction sheet and BMP checklists are available from http / /portal ncdenr org /web /wq /ws /su /statesw /forms_docs The complete application package should be submitted to the appropriate DWQ Office (The appropriate office may be found by locating project on the interactive online map at http / /portal ncdenr org /web /wq /ws /su /maps ) Please indicate that the following required information have been provided by initialing in the space provided for each item All original documents MUST be signed and mitialed in blue ink Download the latest versions for each submitted application package from http //portal ncdenr org /web /wq /ws /su /statesw /forms_docs Initials 1 Original and one copy of the Stormwater Management Permit Application Form 2 Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants NIA - 5VE PRIW Form (if required as per Part VII below) KAOrr C64W 3 Original of the applicable Supplement Form(s) (sealed, signed and dated) and O &M -JF A""W agreement(s) for each BMP 4 Permit application processing fee of $505 payable to NCDENR (For an Express review refer to http / /www envhelp org /pages /onestopexpress html for information on the Express program and the associated fees Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting ) 5 A detailed narrative (one to two pages) describing the stormwater treatment /management for the project This is required in addition to the brief summary provided in the Project Information item 1 6 A USGS map identifying the site location If the receiving stream is reported as class SA or the receiving stream drams to class SA waters within Y2 mile of the site boundary include the Vz mile radius on the map 7 Sealed signed and dated calculations 8 Two sets of plans folded to 8 5 x 14 (sealed signed & dated) including a Development /Project name b Engineer and firm c Location map with named streets and NCSR numbers d Legend e North arrow f Scale g Revision number and dates h Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures the banks of streams and rivers the MHW or NHW line of tidal waters and any coastal wetlands landward of the MHW or NHW Imes • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures the banks of streams or rivers and the MHW (or NHW) of tidal waters i Dimensioned property /project boundary with bearings & distances ) Site Layout with all BUA identified and dimensioned k Existing contours proposed contours spot elevations finished floor elevations 1 Details of roads drainage features collection systems and stormwater control measures in Wetlands delineated or a note on the plans that none exist (Must be delineated by a qualified person Provide documentation of qualifications and identify the person who made the determination on the plans Form SWU 101 Version 07Jun2010 Page 4 of 6 JN /A If n Existing drainage (including off site) drainage easements pipe sizes runoff calculations o Drainage areas delineated (included in the main set of plans not as a separate document) p Vegetated buffers (where required) 9 Copy of any applicable soils report with the associated SHWT elevations (Please identify WT (PROW elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs Include an 8 5 x11 copy of the NRCS County Soils map with the project area clearly delineated For projects with infiltration BMPs the report should also include the soil type expected infiltration rate and the method of determining the infiltration rate (Infiltration Devices submitted to WiRO Schedule a site visit for DWQ to verify the SHWT prior to submittal (910) 796 7378 ) 10 A copy of the most current property deed Deed book Page No Ndr *&'go 11 For corporations and limited liability corporations (LLC) Provide documentation from the NC Secretary of State or other official documentation which supports the titles and positions held by the persons listed in Contact Information item 1a 2a and /or 3a per NCAC 2H 1003(e) The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State otherwise the application will be returned http / /www secretary state nc us /Corporations /CSearch aspx VII DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions outparcels and future development the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot If lot sizes vary significantly or the proposed BUA allocations vary a table listing each lot number lot size and the allowable built upon area must be provided as an attachment to the completed and notarized deed restriction form The appropriate deed restrictions and protective covenants forms can be downloaded from http /portal ncdenr org /web /wq/ws /su /statesw /forms docs Download the latest versions for each submittal In the instances where the applicant is different than the property owner it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded By the notarized signature(s) below the permit holder(s) certify that the recorded property restrictions and protective covenants for this project if required shall include all the items required in the permit and listed on the forms available on the website that the covenants will be binding on all parties and persons claiming under them that they will run with the land that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot VIII CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and /or firm (such as a consulting engineer and /or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information) Consulting Engineer Jeremy V Finch, PE Consulting Firm EcoEngmeermg (A Division of The John R McAdams Company Inc) Mailing Address PO Box 14005 City Research Triangle Park Phone (919 ) 3615000 Email jfmch@ecoengr com State NC Zip 27709 Fax (919 ) 3612269 IX PROPERTY OWNER AUTHORIZATION (if Contact Information item 2 has been filled out complete this section) I (print or type name of person listed in Contact Information item 2a) , certify that I m own the property identified this permit app icathon and thus give permission to (print or type name of person listed in Contact Information item 1a) with (print or type name of organization listed in Contact Information item 1a) to develop the project as currently proposed A copy of the lease agreement or pending property sales contract has been provided with the submittar which indicates the party responsible for the operation and maintenance of the stormwater system Form SWU 101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge understand and agree by my signature below that if my designated agent (entity listed in Contact Information item 1) dissolves their company and /or cancels or defaults on their lease agreement or pending sale responsibility for compliance with the DWQ Stormwater permit reverts back to me the property owner As the property owner it is my responsibility to notify DWQ immediately and submit a completed Name /Ownership Change Form within 30 days otherwise I will be operating a stormwater treatment facility without a valid permit I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143 2151 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25 000 per day pursuant to NCGS 143 215 6 Signature a Notary Public for the State of do hereby certify that before me this _ day of Date County of personally appeared and acknowledge the due execution of the application for a stormwater permit Witness my hand and official seal SEAL My commission expires X APPLICANTS CERTIFICATION I (print or type name of person listed in Contact Information item 1a) ULU-AAI' 3 MU+iFc�20 certify that the information included on this permit application form is to the best of my knowledge correct and that the project will be constructed in conformance with the approved plans that the required deed restrictions and protective covenants will be recorded and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H 1000 SL 2006 246 (Ph II - Post Construction) or SL 2008 211 Signature Date & 04 to 17- I Q,o 61X� a Notary Public for the State of NzW�aCA YD L County of AAecweinloux do hereby certify that 4)klu ju S M i nr.-A YA personally appeared before me this -Way of TIA XNX , 17,and ac ho wledge the due execution of the application for a Stormwater permit Witness my hand and official seal W SEAL My commission expires_! I a 1 Form SWU 101 Version 07Jun2010 Page 6 of 6 Permit No (to be pro ded by DWQ) AV O�O� W ATF9OG A r NCDENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted The Required Items Checklist (Part III) must be printed filled out and submitted along with all of the required information I PROJECT INFORMATION Project name Bnar Chapel Phase 6 North Contact person Jeremy V Finch PE Phone number 919 361 5000 Date 6/14/2012 Drainage area number 1 II DESIGN INFORMATION Site Charactenstics Drainage area 901 256 fe Impervious area post development 446 926 fe / Impervious 4959 / Design rainfall depth 10 In Storage Volume Non SA Waters Minimum volume required Volume provided Storage Volume SA Waters 15 runoff volume Pre- development 1 yr 24 hr runoff Post - development 1 yr 24 hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre /post control of the lyr 24hr storm peak flow required? 1 yr 24 hr rainfall depth Rational C pre development Rational C post - development Rainfall intensity 1 yr 24 hr storm Pre - development 1 yr 24 hr peak flow Post -development 1 yr 24 hr peak flow Pre /Post 1 yr 24 hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx at the perm pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment deanout top elevation (bottom of pond) Sediment cleanout bottom elevation Sediment storage provided Is there additional volume stored above the state required temp pool Elevation of the top of the additional volume 37 264 ft" 80105 ft3 OK volume provided Is equal to or in excess of volume required ft3 ft3 ft3 ft3 N (Y or N) in (unifless) (unifless NOVE in/hr N/A ft3/sec N/A ft3lsec #VALUE' ft3lsec 474 50 fmsl 47200 fmsl N/A fmsl 47250 fmsl 47150 fmsl 46600 fmsl 46500 fmsl 100 ft Y (Y or N) 474 5 fmsl of ftw eov*01- of I -YL 7,q-m4 tw#" (f RtW11100 &( DIY w�T " If pelf w 78 stab ^0 sia►- I f �' 1t% se f;'R IN It f wrA cuenw1 cawm Data not needed for calculation option #1 but OK if provided Data not needed for calculation option #1 but OK if provided OK Forth SW401 Wet Dete t on Bas n Re 9- 4118112 Parts I & 11 Design S mmary Page 1 of 2 II DESIGN INFORMATION Surface Areas Area temporary pool Area REQUIRED permanent pool SA/DA ratio Area PROVIDED permanent pool Aw„_j. Area bottom of 1 Oft vegetated shelf Abot �,en Area sediment cleanout top elevation (bottom of pond) AWLmd Volumes Volume temporary pool Volume permanent pool VPL,,,-Pw Volume forebay (sum of forebays 9 more than one forebay) Forebay / of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SAIDA Table Used? SA/DA ratio Average depth (used in SAIDA table) Calculation option 1 used? (See Figure 10 2b) Volume permanent pool Vp--Pw Area provided permanent pool Ap.,r,_pw Average depth calculated Average depth used in SA/DA dam, (Round to nearest 0 5ft) Calculation option 2 used? (See Figure 10 2b) Area provided permanent pool Ace,,,,,,, Area bottom of 10ft vegetated shelf ki �nen Area sediment cleanout top elevation (bottom of pond) AnoLce„d Depth (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA d.„ (Round to down to nearest 0 5ft) Drawdown Calculations Drawdown through onfice? Diameter of onfice (if circular) Area of onfice (if non - circular) Coefficient of discharge (Cc) Driving head (H ) Drawdown through weir? Weir type Coefficient of discharge (Cw) Length of weir (L) Driving head (H) Pre-development 1 yr 24 hr peak flow Post - development 1 yr 24 hr peak flow Storage volume discharge rate (through discharge onfice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & onficel Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is Permit No (to be pro ded by DWG) 34 957 fe 23 072 fe 256 (unitless)E SAICA AMA N,N I#JVfC~ 25 869 fe OK CoAMw (gar pawofi) ** Mot 22 332 ft` 11880 fe 80105 1`0 OK 99 911 ft3 24103 ft3 241/ / Insufficient forebay volume 90 A N (Y or N) Y (Y or N) T5-6 ( unitless) Y (Y or N) 99 911 ft' 25 869 ft1 ft Need 3 It min It (Y or N) 25 869 ft` 22 332 ft` 11880 fe 5 50 It 3 86 It 39ft Y (Y or N) 3 00 in in 0 60 ( unitless) 037ft N (Y or N) ( unitless) (unitless) ft ft N/A ft3 /sec N/A ft3 /sec 014 ft3 /sec OK OK,!�— 5A10A Imp &cod UuMA~ OW L w a##jIrto CWr Soto) nY& 00" 2 99 days OK draws down in 2 5 days 3 1 OK 10 1 OK 100 It OK 3 1 OK 30 1 OK Y (Y or N) OK 11 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK 8 DIP drain pipe w/ valve operable from top of nser Form SW401 Wet Detention Bas n Re 9-4118/12 Parts I & 11 Des g Summary Page 2 of 2 d A Permit No III REQUIRED ITEMS CHECKLIST (to be provided by D WQ) Please Indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result In a request for additional Information This will delay final review and approval of the prdject Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent the agent may Initial below If a requirement has not been met attach justification Form SW401 Wet Detention Basin Rev 9- 4/18/12 Part III Required Items Checklist Page 1 of 1 Page/ Plan Initials Sheet No ?F C;4 1 Plans (1 50 or larger) of the entire site shoving C11 Design at ultimate build out G.11 _ _ Off site drainage (if applicable) 5 5W if Delineated drainage basins (include Rational C coefficient per basin) Basin dimensions Pretreatment system High flow bypass system Maintenance access Proposed drainage easement and public right of way (ROW) Overflow device and Boundaries of drainage easement �'- 2 Partial plan (1 = 30 or larger) and details for the wet detention basin showing Outlet structure with trash rack or similar Maintenance access Permanent pool dimensions Forebay and main pond with hardened emergency spillway Basin cross section Vegetation specification for planting shelf and Filter strip ' 2 3 Section view of the wet detention basin (1 = 20 or larger) showing Side slopes 31 or lower Pretreatment and treatment areas and Inlet and outlet structures ''- 4 If the basin is used for sediment and erosion control during construction clean out of the basin is specified on the plans prior to use as a wet detention basin t SF ? fO EICA — 5 A table of elevations areas incremental volumes & accumulated volumes for overall pond and for forebay to verify volume provided 6 A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized NWA 7 The supporting calculations P"kW IAJ 44C 641111111114 8 A copy of the signed and notarized operation and maintenance (0 &M) agreement NIP NIA 9 A copy of the deed restrictions (if required) CIA _ MIA 10 A sods report that is based upon an actual field investigation sod borings and infiltration tests County soil maps are not an acceptable source of soils information Nd11E- SW-;W U. W #f RWOW $Je- pbo.0 lit WMW &+ "W ltfW&9t Sl��aft ICE 9111111111illm W fo $MUT' IS Ex&lft 1a dt- M*W ee& *to& j,�pl0,IM i f fue IN TM; &0eftoov Form SW401 Wet Detention Basin Rev 9- 4/18/12 Part III Required Items Checklist Page 1 of 1 Permit Number (to be provided by DWQ) Drainage Area Number Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected repaired or replaced immediately These deficiencies can affect the integrity of structures safety of the public and the removal efficiency of the BMP The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) ❑ does ® does not This system (check one) ❑ does ® does not incorporate a vegetated filter at the outlet incorporate pretreatment other than a forebay Important maintenance procedures - Immediately after the wet detention basin is established the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed until the plants become established (commonly six weeks) - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin - If the basin must be drained for an emergency or to perform maintenance the flushing of sediment through the emergency drain should be m,mmized to the maximum extent practical - Once a year a dam safety expert should inspect the embankment After the wet detention pond is established it should be inspected once a month and within 24 hours after every storm event greater than 10 inches (or 15 inches if in a Coastal County) Records of operation and maintenance should be kept in a known set location and must be available upon request Inspection activities shall be performed as follows Any problems that are found shall be repaired immediately BMP element Potential problem How I will remediate the problem The entire BMP Trash /debris is present Remove the trash /debris The perimeter of the wet Areas of bare soil and /or Regrade the soil if necessary to detention basin erosive gullies have formed remove the gully and then plant a ground cover and water until it is established Provide lime and a one time fertilizer application Vegetation is too short or too Maintain vegetation at a height of long approximately six mches Form SW401 Wet Detention Basin O &M Rev 4 Page 1 of 4 Permit Number (to be provided by DWQ) Drainage Area Number BMP element Potential problem How I will remediate the problem The inlet device pipe or The pipe is clogged Unclog the pipe Dispose of the swale sediment off site The pipe is cracked or Replace the pipe otherwise damaged Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible Remove the sediment and sediment storage dispose of it in a location where it will not cause impacts to streams or the BMP Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present Remove the weeds preferably by hand If pesticide is used wipe it on the plants rather than spraying The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health Plants are dead diseased or Determine the source of the dying problem soils hydrology disease etc Remedy the problem and replace plants Provide a one time fertilizer application to establish the ground cover if a soil test indicates it is necessary Weeds are present Remove the weeds preferably by hand If pesticide is used wipe it on the plants rather than spraying The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP Algal growth covers over Consult a professional to remove 50% of the area and control the algal growth Cattails phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray) the basm surface Form SW401 Wet Detention Basin O &M Rev 4 Page 2 Of 4 Permit Number (to be provided by DWQ) Drainage Area Number BMP element Potential problem How I will remediate the problem The embankment Shrubs have started to grow Remove shrubs immediately on the embankment Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree An annual inspection by an Make all needed repairs appropriate professional shows that the embankment needs repair if applicable) The outlet device Cloggmg has occurred Clean out the outlet device Dispose of the sediment off site The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office or outlet the 401 Oversight Unit at 919 733 1786 The measuring device used to deternune the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads feet in the main pond, the sediment shall be removed When the permanent pool depth reads feet in the forebay, the sediment shall be removed Sediment Removal Bottom 46600 BASIN DIAGRAM (fill in the blanks) f ft Min Sediment Storage Pool Permanent Pool Elevation 472 00 Sediment Removal Elevation 466 00 j Volume Bottom Elevation 465 00 11 ft Storage FOREBAY MAIN POND Form SW401 Wet Detention Basin O &M Rev 4 Page 3 of 4 Permit Number (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Project name Briar Chapel Phase 6 North BMP drainage area number Wet Pond Print name Bill Mumford, PE Title Assistant Vice President NNP Briar Chapel LLC Address 16 Windy Knoll Circle Chapel Hill, NC 27516 Phone 919 951 0713 Signature 6t w.Ad l,. Date 1- t 4 - toy Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I —�[4 � r w a Notary Public for the State of �f 0 C�axpL-y-a, County of Wen6urq do hereby certify that Q.M S personally appeared before me this day of TLLAe, aol a., and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal d" 0- SEAL My commission expires Form SW401 Wet Detention Basin O &M Rev 4 Page 4 of 4 PROPOSED BRIAR CHAPEL PHASE 6N DWO PERMIT CONDITIONS 1 The plans and specifications for Phase 6N approved by DWQ are incorporated by reference into this approval and are enforceable by DWQ, provided however, that any modification to the design of the stormwater management system reflected in the as built certification for the system that is accepted by DWQ shall take precedence over the original plans and specifications 2 All stormwater management devices shall be located in either public rights of way dedicated common areas, or recorded easement areas The final plats for the project showing all such rights of way, common areas, and easement areas, in accordance with the approved plans 3 The stormwater management system for Phase 6N which includes one (1) wet detention pond, and the signed and notarized Operation and Maintenance Agreement as approved by this office, and the drainage patterns depicted on the plan sheets, must be maintained in perpetuity No changes to the structural stormwater practices shall be made without written authorization from DWQ The stormwater management conveyances, detention and treatment structures shall have maintenance access and at least 10 foot drainage easement on each side to allow for the ability to maintain the structures and to perform corrective actions The stormwater easement shall be recorded to provide protection of the structures from potential alterations by future property owners 4 All operation maintenance activities shall be followed as stipulated in the Operation and Maintenance Agreement signed by you and notarized on 2012 and received in our office on 2012 5 The applicant and/or authorized agent shall provide a completed Certification of Completion Form to the DWQ 401 Program within ten (10) days of the project completion 6 The applicant shall submit three (3) copies of executed Deed Restrictions and Protective Covenants within thirty (30) days of recording with the Register of Deeds, Chatham County, North Carolina The applicant shall cause a copy of the executed Deed Restrictions and Protective Covenants to be provided to all lot owners in Phase 6N 7 In lieu of the property restrictions and protective covenants referred to in and required by DWQ s Stormwater Management Permit Application Form (Section VII ), the Deed Restrictions and Protective Covenants required by Condition 6 shall limit the maximum built upon area (BUA) for each drainage area in Phase 6N as follows Drainage Area (SF) Maximum Allowable BUA (SF) I Drainage Area 1 (To Wet Detention Pond) 901 256 446 926 Note Built upon area (BUA) includes but is not limited to roofed structures asphalt concrete gravel brick stone slate coquina and parking areas but does not include raised uncovered open slat decking or the water surface of swimming pools US2000 12449463 3 8 Until the project is completed (i a full build out has occurred) and the development common areas have been transferred to the Homeowner's Association (HOA), the applicant shall be responsible for verifying that the total (BUA) within each drainage area identified in Condition 7 does not exceed the maximum allowed by this approval and by the Deed Restrictions and Protective Covenants To comply with this condition, the applicant shall be responsible for reviewing and tracking all new lot construction, for the purpose of maintaining compliance with the allowable BUA limits within each drainage area The plans reviewed by the applicant must show all proposed BUA The applicant shall keep copies of all approved lot construction plans for the purposes of recordkeepmg and auditing and shall make those records available to DWQ upon request 9 Once the project is completed (i a full build out has occurred) the applicant shall transfer to the HOA responsibility for the stormwater management system serving Phase 6N and for ensuring compliance with the conditions contained in this approval The HOA shall carry out these responsibilities through an Architectural Review In connection with the transfer of such responsibilities the applicant shall ensure that the HOA is aware of and understands the constructed stormwater treatment system, the maximum BUA allowed by the permit the executed Deed Restrictions and Protective Covenants, and its responsibility for meeting the BUA limitations 10 The applicant shall submit to DWQ and shall have received approval for revised plans specifications, and calculations prior to construction, for any significant modification to the approved plans, including, but not limited to those listed below a Addition to the approved amount of built upon area to a BMP b Further subdivision acquisition, or sale of all or part of the project area c Transfer of ownership Upon receipt of a proposed revision(s), DWQ shall advise the applicant as to the appropriate review /approval process US2000 12449463 3 LIMITED LIABILITY COMPANY v A ANNUAL REPORT NAME OF LMTED LIABILITY COMPANY NNP Briar Chapel LLC SECRETARY OF STATE L L C ID NUMBER 0631973 NATURE OF BUSINESS Real Estate Development REGISTERED AGENT National Registered Agents Inc REGISTERED OFFICE MAILING ADDRESS 120 Penmarc Drive Raleigh NC 27603 E Filed Annual Report 1-05468752 Do not data enter manually STATE OF INCORPORATION DE REGISTERED OFFICE STREET ADDRESS 120 Penmarc Drive Raleigh NC 27603 Wake County PRINCIPAL OFFICE TELEPHONE NUMBER 8584557503 PRINCIPAL OFFICE MAILING ADDRESS PRINCIPAL OFFICE STREET ADDRESS MANAGERS/MEMBERS /ORGANIZERS Aame Newland National Partners LP Title Manager Address 9820 Towne Centre Drive Suite 100 San DteQo CA 92121 9820 Towne Centre Drive Suite 100 San Diego CA 92121 9820 Towne Centre Drive Suite 100 San Diego CA 92121 CERTIFICATION OF ANNUAL REPORT MUST BE COMPLETED BY ALL LMTED LIABILITY COMPANIES Newland National Partners LP FORM MUST BE SIGNED BY A MANAGER/MEMBER Dolores A Valle 04/15/2011 DATE Manager TYPE OR PRINT NAME TYPE OR PRINT TITLE ANNUAL REPORT FEE $200 NvLAIL TO Secretary of State Corporations Division Post Office Box 29525 Raleigh, NC 27626 -0525 EcoEngineering A division ofThe John R McAdams Company Inc Ds - fl '73 a. ua 3 CHATHAM COUNTY NORTH CAROLINA FINAL STORMWATER MANAGEMENT PLAN DESIGN NEW -12000 June 2012 Jeremy V Finch PE Project Manager Research Triangle Park NC Post Office Box 14005 Reseach Triangle Park, North Carolina 27709 2905 Meridian Parkway North Carolina 27713 5646 91 m-&W -4262 919361 7269 Fax wwwecoengrcorn I Design Services Focused On Client Success BRIAR CHAPEL — PHASE 6 NORTH Final Stormwater Management Plan Design General Descrinnon Located off of US Highway 15 501, north of Andrews Store Road and south of Mann s Chapel Road in Chatham County, NC is the proposed development known as Briar Chapel Phase 6 North of the proposed development is approximately 37 acres and will consist of the construction of single family lots along with the associated utility, parking and roadway infrastructure The overall proposed Briar Chapel development is located within the Cape Fear River Basin, and drains to a stream (Pokeberry Creek) classified as Water Supply IV (WS IV), and Nutrient Sensitive Waters (NSW) As a result of the proposed development exceeding the maximum allowable limit for stream impacts, an individual permit issued by The United States Army Corps of Engineers (USACE) was required (Clean Water Act Section 404 permit) Also, a Clean Water Act Section 401 Water Quality Certification from NCDWQ was attached to the individual permit Under the 401 Water Quality Certification issued by NCDWQ, the proposed site will be required to comply with the following stormwater management requirements I A final written stormwater management plan for each subwatershed (including signed and notarized Operation and Maintenance agreements) shall be submitted to the 401 Oversight and Express Permitting Unit The stormwater management plan maybe submitted to DWQ in phases for written approval as long as no impact to wetlands or streams occur in that phase until written approval is received from DWQ 2 The stormwater plans shall utilize constructed wetlands bioretention areas wet ponds followed by forested filter strips and similar best management practices designed to remove nutrients The stormwater management plan must include plans specifications and worksheets for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NCDENR Stormwater Best Management Practices Manual 3 For low density areas of the project with low impervious surface area engineered stormwater management facilities are not expected For these areas of lower impervious area similar best management practices that remove nutrients such as grassed swales and vegetated riparian buffers should be sufficient rather than more intensive engineered stormwater devices such as constructed wetlands In addition to the above DWQ stormwater requirements the following stormwater quality and quantity items are required per Section 8 3 (` Stormwater Controls ) of the Chatham County Compact Communities Ordinance 1 Control and treat the first inch of runoff from the project site and from any offsite drainage routed to an on -site control structure Ensure that the draw down time for this treatment volume is a minimum of forty eight (48) hours and a maximum of one hundred and twenty (120) hours 2 Maintain the discharge rate for the treatment volume at or below the pre- development discharge rate for the 1-year 24 -hour storm The proposed stormwater management plan for Phase 6 North of Briar Chapel will be designed to protect the downstream environment The plan incorporates biologically based stormwater management techniques to manage both water quantity and quality aspects of site runoff As can be seen in this report stormwater management for Phase 6 North will be accomplished by incorporating an engineered stormwater best management practice facility to capture and treat the stormwater runoff from developed areas The specific stormwater treatment device that will be used is a wet detention basin designed to remove a minimum of 90% average annual total suspended solids (TSS) provide slow release (i e 2 to 5 days) of the difference in pre to post development peak runoff rate for the 1 year 24 hour storm This report contains the final design calculations for the proposed wet detention basin located in Phase 6 North of Briar Chapel Please refer to the summary of results and discussion of results sections of this report for additional information Calculation MethodoloQv ➢ Rainfall data for the Chatham County, NC region is from NOAA Atlas 14 with a partial duration series assumption The rainfall depths were entered into a spreadsheet that calculated a center weighted storm based upon the NOAA Atlas 14 depths The 1 year /24 hour rainfall depth is 2 95 inches, the 2 Year /24 hour rainfall depth is 3 56 inches the 10 Year /24 hour rainfall depth is 5 16 inches, and the 100 year /24 hour rainfall depth is 7 62 inches All of these computed storms were modeled within the hydrologic model Please reference the rainfall data section within this report for additional information ➢ Using maps contained within the Chatham County Soil Survey, the watershed soils were determined to be from hydrologic soil group (HSG) B soils Since the method chosen to compute the post development peak flow rates and runoff volumes is dependent upon the soil type all hydrologic calculations are based upon the assumption of HSG B soils ➢ A composite SCS Curve Number was calculated for the post development condition using SCS curve numbers and land cover conditions Land cover conditions for the post development condition were taken from the proposed development plan ➢ The post development time of concentration to the wet detention basin was assumed to be 5 minutes in the post development condition ➢ All on site topo was taken from a flown aerial topographic survey by others provided to The John R McAdams Company, Inc by McKim & Creed The drainage map for the post development condition has been included in this report ➢ PondPack Version V81, by Haestad Methods was used to generate post development peak flow rates and generate the stage discharge rating curve for the proposed wet detention basin Final routing calculations for the wet detention basin were also performed within Pondpack ➢ The stage storage rating curve and stage storage function for the proposed wet detention basin was generated externally in a spreadsheet and then input into Pondpack ➢ A velocity dissipater is provided at the end of the principal spillway outlet for the wet detention basin to prevent erosion and scour in the downstream area The dissipater is constructed using nprap, underlain with a woven geotextile filter fabric The filter fabric is used to minimize the loss of soil particles beneath the nprap apron The dissipater is sized for the 10 year storm event using the NYDOT method It is a permanent feature of the outlet A Water quality sizing calculations for each facility were performed in accordance with the N C Stormwater Best Management Practices manual (NCDENR July 2007) The wet detention basin surface area was sized by multiplying the drainage area to the facility by the interpolated SA/DA ratio from the Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 90% TSS Pollutant Removal Efficiency in the Mountain & Piedmont Regions The minimum temporary pool volume was determined by calculating the 1 inch runoff volume using the Simple Method Conclusion If the development on this tract is built as proposed within this report then the requirements set forth in the Water Quality Certification #3402 (WQC #3402) and Section 8 3 ( Stormwater Controls ) of the Chatham County Compact Communities Ordinance will be met with the proposed wet detention basin However, modifications to the proposed development may require that this analysis be revised Some modifications that would require this analysis to be revised include 1 The proposed site impervious surface exceeds the amount accounted for in this report 2 The post development watershed breaks change significantly from those used to prepare this report The above modifications may result in the assumptions within this report becoming invalid The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward 1 SUMMARY OF RESULTS 2 USGS MAP 3 SOILS INFORMATION 4 FEMA FIRM PANEL MAP 5 RAINFALL INFORMATION 6 HYDROLOGIC CALCULATIONS WET POND FINAL DESIGN 7 CALCULATIONS SUMMARY OF RESULTS BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 BRIAR CHAPEL PHASE 6 NORTH SUMMARY OF RESULTS J FINCH PE NEW 12000 6/14/2012 WET POND Return Period Inflow [cfs] Outflow [cfs] Max WSE [ft] Freeboard [ft] 1 Year 4346 036 47439 261 2 Year 6048 220 47460 240 10 Year 9667 2441 47504 196 25 Year 11439 5033 47538 162 100 Year 13831 7098 47594 106 Design Drainage Area = 2069 acres Design Impervious Area = 1026 acres / Impervious = 496/ Top of Dam = 47700 ft Normal Pool Elevation = 47200 ft Surface Area at NWSE = 25 869 sf Minimum Required Surface Area at NWSE = 23 085 sf Water Quality Volume Storage Provided = 80 105 cf Mimmum R u►red Water Quality Volume Storage = 37 264 cf Design Drawdown Time = 262 days Riser Lengdi = 5 ft Riser Width = 5 ft Riser Crest = 47450 ft Barrel Diameter = 30 mches # of Barrels = 1 Invert In = 46600 feet Invert Out = 46200 feet Length = 83 feet Slope = 00482 ft/ft USGS MAP BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 r n , y �\ \,lJj � w jam" _ . '` 'i �} / V ✓�' J '/'` i' Y r:. ` 1' � T �. - � ' ' °..ir^ /`� :'j'ti�� - `°tL %r � V r Q"�.� \.�J; r1�- { � i�r r�;J �I ^•,t�_ \t `�,. fJ� C. ' 7. IN 0 � �,,1 ,',,i\ rr � \ i �.�.. t �'• � t ' \t,l�•.,,, �"i'\ \ \ (� �':. tt 0J / 1 1. �. U j "1 �� �^' � 77JJ�JJ / /,►, l � JY� ! �� A y�j �, �, � t f� °r!, -°\r/ yA� �� •!c .�-%� 1 � �...�� -? � ��n� .- �. * a�?�' `r./ O 1 ;�' 1 8 ,�i� i�� i 'Ati f '* /� '�'" ' a \\ �'/ `'! 'i ° -1a � • s , t r 7 _ rr V.�-\ t/f (1i i � ( Kfa,�-r�` �• -�, l sE �`�� ' �r �? /� �' �1'� t J f ! t� `/ ;'' -- _ t \.�` \t $ � it � —* r% � \ r.....�.. 6`�`� 4�� "� � f ` •..% � r 15 ,..... „!' a �'�` .. f' , 3 / 9 3 d Name: m:\NC3pro \35079G1A.P24 Location: 035' 49'36.37" N 079° 06'41.37" W Date: 3/15/2012 Scale: 1 inch equals 2000 feet (C) 1998, SOILS INFORMATION BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 FEMA FIRM PANEL MAP BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 RAINFALL INFORMATION BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 G O 1/1 y W O M 3 0 F o ' N ; W T � Q O w O , F ,w v w w y o .� G O 4. .S _ N � T W O o Q O C ¢ m O U E M ! ,? p9998 O U 4 O b y ° m g O � z E Ez L>'3 �SUo,n.0 c. d c a, U S C4 ^ e e li O- � p S OO 0 0 0 0 O'OO 0 0 O'O O O'O 0100 O O OO 0 0 0 0 0 0 0 0 0 0 O�d O G O O E T p O�SIO O O�oj0 p 0 O':C O C O O.rO o O C d�0 O Cj0�0 O;O OO w, 1„7 j fI I I Y ppp 0 O , N MM7 �...".-T h r e ,- 10 O 0 O OVO O OiO -I^ i, 's O OIIiO O Oi 0!O OO'C O O O O OO.O O O, O�..O O!O O O� � 1 � I i 0 - r E- O -- i, �O O'O 0 0 0 0 OO'i0 O� O OO'CO O O OO O O O O O C O 0 0 0 0 0 0 0 OIG�OjO O�CGI C� L• S10 I^ p O N N'M M.18 7 0 0 Cc, v) n d C O O O O O a o c o o;c o o d d�d d d o 0 o,d o d o'o did d d d Z 1� 17100 Mr NV' Ov�i. vii q�� O� °oj,o o O o.0 0 o�S 0 00 0 So 0 o co o�g C O OI OiO O O O O O10 0 O O O O O O 0 0 0 0 0 0 0 O� 7 •7 Q�M: rO e_r. -: V'. a0 - v� oo N �. P. N'V� G� V' CT�M �O O M C q Sp �IS 110 O.O O OO�OO O O.O O O;O O,O OOiO O O O o 0 o:6 0 0 0 0 0'0 0 0 0 0 0 0 oloao!o o�o o olo T l 0. 7 O O rnrn _ -v r_ o � oo - yr OM��n oo -v r o vioo: p O O 010 O'O O OOO O O O. MO S S'. SOO:O.00', O d O O O,O C OO O OO O OO 0 0 0 0 0 0 0 O�O�01616 } E � E I OM ojMlt�� O CO \] � h M �.. O DD 'V '. v1 •� O 00 rV Vl M O 00 �O i h M..7 v' r,w C O O - N � .. v1V'il� E oio oic,00 0 o d.00 o - _�..,I,_ Q O r 0 N? � O N e v1 l� a0 N N N ��N•• iN O p I O 00 r L1 � h M h V•1 Oa-. 0 < e OoO 7 of h� 00 C\ O •. N M e O S M e C.1 M N� M �O M h el• Y1 h C, V1 C\ G yycc YY i 4 I F 1 e.i V• vi y r w 042 N f O` N M N 00 H'o OC ' p �f� #ffl i M 7 Y1 Vl b n 00 P o^ M O O o O C), W l- z h e e (Sag-4) gldaQ vii O 00 4 N b e M Q\ ^ N N M M O 44 h h O v� OO' M O ^ N N N N M M M ^ �•-� N N N N N N V^ C0 C - - - O O O C ^ d: P A 7 - .�, O d d o 0 o O d o d .,N.v�o.n000Q S C4 ^ e e li O- � p S OO 0 0 0 0 O'OO 0 0 O'O O O'O 0100 O O OO 0 0 0 0 0 0 0 0 0 0 O�d O G O O E T p O�SIO O O�oj0 p 0 O':C O C O O.rO o O C d�0 O Cj0�0 O;O OO w, 1„7 j fI I I Y ppp 0 O , N MM7 �...".-T h r e ,- 10 O 0 O OVO O OiO -I^ i, 's O OIIiO O Oi 0!O OO'C O O O O OO.O O O, O�..O O!O O O� � 1 � I i 0 - r E- O -- i, �O O'O 0 0 0 0 OO'i0 O� O OO'CO O O OO O O O O O C O 0 0 0 0 0 0 0 OIG�OjO O�CGI C� L• S10 I^ p O N N'M M.18 7 0 0 Cc, v) n d C O O O O O a o c o o;c o o d d�d d d o 0 o,d o d o'o did d d d Z 1� 17100 Mr NV' Ov�i. vii q�� O� °oj,o o O o.0 0 o�S 0 00 0 So 0 o co o�g C O OI OiO O O O O O10 0 O O O O O O 0 0 0 0 0 0 0 O� 7 •7 Q�M: rO e_r. -: V'. a0 - v� oo N �. P. N'V� G� V' CT�M �O O M C q Sp �IS 110 O.O O OO�OO O O.O O O;O O,O OOiO O O O o 0 o:6 0 0 0 0 0'0 0 0 0 0 0 0 oloao!o o�o o olo T l 0. 7 O O rnrn _ -v r_ o � oo - yr OM��n oo -v r o vioo: p O O 010 O'O O OOO O O O. MO S S'. SOO:O.00', O d O O O,O C OO O OO O OO 0 0 0 0 0 0 0 O�O�01616 } E � E I OM ojMlt�� O CO \] � h M �.. O DD 'V '. v1 •� O 00 rV Vl M O 00 �O i h M..7 v' r,w C O O - N � .. v1V'il� E oio oic,00 0 o d.00 o - _�..,I,_ Q O 0 O a iN O p I O i 10 W I I O IS C i nl G yycc YY i 4 I F 1 = pp FF F F F C C I I C C C O y N y y I � I O o0 Rv i. �. T ' p �f� #ffl i I I i Q O O O OO O O pOp O 0 o O O O O Opp O O O O o O C), W l- z h e o O o 0 M N ^ O (Sag-4) gldaQ S C4 ^ e e li O- � p S OO 0 0 0 0 O'OO 0 0 O'O O O'O 0100 O O OO 0 0 0 0 0 0 0 0 0 0 O�d O G O O E T p O�SIO O O�oj0 p 0 O':C O C O O.rO o O C d�0 O Cj0�0 O;O OO w, 1„7 j fI I I Y ppp 0 O , N MM7 �...".-T h r e ,- 10 O 0 O OVO O OiO -I^ i, 's O OIIiO O Oi 0!O OO'C O O O O OO.O O O, O�..O O!O O O� � 1 � I i 0 - r E- O -- i, �O O'O 0 0 0 0 OO'i0 O� O OO'CO O O OO O O O O O C O 0 0 0 0 0 0 0 OIG�OjO O�CGI C� L• S10 I^ p O N N'M M.18 7 0 0 Cc, v) n d C O O O O O a o c o o;c o o d d�d d d o 0 o,d o d o'o did d d d Z 1� 17100 Mr NV' Ov�i. vii q�� O� °oj,o o O o.0 0 o�S 0 00 0 So 0 o co o�g C O OI OiO O O O O O10 0 O O O O O O 0 0 0 0 0 0 0 O� 7 •7 Q�M: rO e_r. -: V'. a0 - v� oo N �. P. N'V� G� V' CT�M �O O M C q Sp �IS 110 O.O O OO�OO O O.O O O;O O,O OOiO O O O o 0 o:6 0 0 0 0 0'0 0 0 0 0 0 0 oloao!o o�o o olo T l 0. 7 O O rnrn _ -v r_ o � oo - yr OM��n oo -v r o vioo: p O O 010 O'O O OOO O O O. MO S S'. SOO:O.00', O d O O O,O C OO O OO O OO 0 0 0 0 0 0 0 O�O�01616 } E � E I OM ojMlt�� O CO \] � h M �.. O DD 'V '. v1 •� O 00 rV Vl M O 00 �O i h M..7 v' r,w C O O - N � .. v1V'il� E oio oic,00 0 o d.00 o - _�..,I,_ Q O h >w L O V a 9 O a O O a k7 E B w Q 9 O olo O O C O O C O O C O h C y Y O O C P O C p O O c O M od od a 0 o c O O O M � C M � V N N N 'ol0000 t N d0 h Zo I N N N N N X 0 0 0 0 0 I M M A h vl I N N N N N 0 0 0 0 0 N n I N N n O O C PO+ a C O O C O O C N wt O O O C o_ -d o O c D h K N K M M K I =i°-In O O C O O c _ o n O O c M M K INININ C P K N O O N O r O 7 O O °o O O O N c d n lol000l0000000l00000� a h N w of -- e .M.. { O [� O b M Pl a0 w a O O N N M M i M M M M M M M M 7� R O O O O O O O O O O O O O O O O O O C M M M M M M M M M M M M •f V' a 7<� Cloaca O O O O O O c o o O O O O C O M M M M M M M M M M M M M M M M M� d O O O O O O O O O O O O O 00 O O O C O h O h O h O h O h O vt O h O V1 O vt C N N N N N N M M M M M M M M M M M M 00000c:100 O O O O O O O O O O C o0 N A od 7 V �n v� 10 10 1� t- N N N N N N N N N N N N M M M M M M O O O O O O O O O O O O O O O 00 O C 10 a M 10 O M r Y N 0 0 0 0 0 e O N - O N ' • 0 0 0 N n O N O N O N O N O N O a N b O O N C '7 r a N mr— v n T N" - ;z f ao o _o 2% c n v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O c OMr,oMr"pMnoM oM oM c O o0 �O Vf M O m 10 v, M O o0 Vf M C O O O wt O N O h O h O Vl O Yl O N O Yt O Vl c N N N N N N M M M M M M M M M M M M K >4 L ad+ d tn a a 0 ti a W A 0 O1 N b O\ m h O V D- v1 W y P M V0 O 7 n 7 00 N �n D\ m �o O m h^ t OO ;; ^- N w- N W-� 00 ^? b 00 O M h C N \J O M n a O O O O O O O O O O O O O O O O O O O O O r r r r r r r r - In N v Ol M O W V1 N Ot V7 M O b -0 n r 00 O n v V m V1 T �O M O 00 V1 M O W h M O p P N m O m P R h O C T p 7 �t h V1 N h vi V7 b V7 b h h n h h h 00 W 00 00 aD QO Q\ C\ G� Q\ Q\ O+ 0 0 0 0 0 r r N N N M M 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0^ r O L v1 D` V 00 M W N n-+ V1 O h O ee}} D• M 00 m n N V7 ^ �rl O N O� V 00 M 00 N n^ V0 O Vl T _M 00 N O 7 W N a v1 V7 00 O� ^ N V' h n 00 O r m 7 1n n 00 O M V' h D\ O M �o h w O N m of V7 W m 00 M V1 q sf V' � 'n h vi V1 h h���� VJ V O h h h h h h h oD o0 a0 00 m 00 DD D\ D\ T T T T 0 000 - i. 'J O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O O O O O O r ^^ -. - N- h O N h n O N" h O N- h O N h n O N- h O N v2 h O N m b h O0 a N m R O h OD P N m? b a h- O^ N m h 00 O+ ^ N m b 00 O N b 00 O N v vv�vvvvv,.nhhhhhh�e10 e 10 10 10 10 nnnhhnnhoow oo oo op op Ora, o+O�rnooc Vo 0 0 0 0 0 0 O O O O O o O o 0 0 L 0 0 0 0 0 0 OI O O O O O O O O O O O O O O O O O O O O O O O O O O O O O n v't N O n N O C W h W P O N M Vl V7 h DD O+ O N m 7 W T O N m et b n 00 a O N m h h 0\ O N a 00 C vl Vl Vl Vt Vl Vf h h n h h q) aD DD 00 q O O O O O O O O O O O C � v M N O 00 n v1 M N O W M R h �/t n 00 0• O O N M V1 N b h 00 O O N M Yf Vt VJ n 00 Ot O O N V7 V7 a0 G1 N �} 10 C, V7 b V7 V7 h h h C O O O O O O O O O O O O O O O O O O O O O O O O O O O c n M O V7 m U O N T h N a0 h -+ W r 00 er h 7 0 h _M O V7 m D` b N T �n N W �n h O` h n n w 00 O` O O^ N N m O a vl V7 h DD DO 0. O O N N M M e} �n vl V0 n h Do D\ O N m h m T O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O c m m oo a Q\ h O h r W N n M CD m y 7 m m O b^ h N oo m m 00 T ON O O O O O O O O O C ^ N N m M 7 V7 Vl n h OO W ON T O O N m m 7 7 h N �o �O n n W 00 O\ O N m 7 V1 v n v O S N N N N N N N N N N N N N N N N N m m m M 7 V e} m _ M n o M _n pp m h o m n O M n o m h p m h o M o m h o m o M n o M n o M n o m _n O m n c 00 V7 vl M O - ,o N m r O 00 O N M O ao V7 N M O 00 b h M O 00 \ h m O a0 ^ h m O W V v 1O DID 1O 10 101O 1O 1O 00 CT O O N m V7 h C w w Ol oa a a a O, O. oa O,O o�.,o�.,o no no_�.,o no no no no�,o noho�.,ohohohow,ohohohow,ov y b n h 00 00 D` P O O N N M M h v� V0 h n 00 00 D\ D` O O N N m M R w7 h O n n 00 d W i d 7 pO G Vl u a 4 S O O 4 O O a W a Q o � O d � I O o� N e t n F n a ti V M a ly N O 0 n b O b ibl� i � e iv c< h v N lC G\ O 7 C O r ad vd h r r a M N vt n N r h r 0o C N N o a H v O v1 r r IK.J"E noo0 O O � V1 V1 V 7 a C O N v � a n m oo c M M M M M M 00 d lorr N N r NINir n o � lohn .era 0 r r n r V1 V1 h n N N N h 00 w1 N 00 V7 r n } 00 N h T ' N M M V 7 V1 Vl Vl �O 10 10 n n r n n r n n n n n aaalolo�o�omlol��o n Vl M N O 00 M n Vl M 10 CT N h r G\ N V n T M M M C of V 7 V7 Vl V1 Vl V1 V1 V1 Vl V1 V1 Vl Vl V7 V1 Vl V V 7? R V 7 7 V V< Vl N O n Vl N O n Vl � O v v v v v v v o v v v oD N lD O h U � 0\ of o0 M M M M M M M M M M M 00 D\ O N M 00 00 00 00 00 00 oo ooarnrn N N N N N N N N N N N M of V� n L\ O N M M M m M M M m M M Y v [f 'Iry N N N N N N N N N N N 10 M O W eMn n O O h O v1 O vl O of O N O r 000 000 00 00 ONO ONO w 00 W A L a u O u a 0. 'O Q O O a W Y 9 a Q 9 u B�MI��OIV�h 00 00 c h h h h 100 C, O, C h h r• h C ^ M 00 N .fir O u .. ooao ^nee 00 h M O 0p h r >,E avvvvvd M 00 M h N h- h 00 O M V K a �o�hnhhr A v y P a, b n rn O D` T O C N N ry N N M M V v C O O o 0 o C V7 b h W P C zr 00 V7 h M O OC •a ^ . ��ool oo�o'^olml��ohola N 00 h a N v7 P M h O V DO ^ N OO N B C 00 00 OO W 00 OD 00 00 00 00 00 00 OD 00 00 00 00 0 00 M VJ 00 O N 7 vl h 00 O M a C> h a0 C DD o0 00 P - U a-- O O O O O O p h h - v, h u, w, 10 DD T O M Vl OD M h 00 O M h a0 O M Vl O T ! h V7 h C' O N '7 Vl b h Cn O C ^ N N N N N N M M M M M M M M V� h V1 N N h Vl Vl h h h h h V1 h v1 h h v vt M O O O O O O O O O O O O O O O C v v v v v v v v v v v v v v v v v s V' O h M N O OO h wl M N O a0 h w1 M N C 00 OD 00 00 00 00 00 00 00 00 a P a a � a Cn O M M M M M M M M M M M M M M M M M N ^ M h N w h 00 V h V O h M 0 n h b h 00 00 C> O O_ 0 0 0 0 0 0 --� M M M M M M M M M M M M M M M M M M O O O h b N h M oo M Cn V O h O O- M ul ul Vl V7 V7 V1 V7 V1 h ul h V) b � V^ \O � � N N N N N N N N N N N N N N N N N r M h O M h O M h p M h p M h O M h V 0o a 0 0 N M V M h V' h ao a O O r a P O O N N M M V V u1 h h r 00 00 P a Ln a O. 0\ O\ ol C, P CT C, Cn 0\ C, C iI'Dw0I'o�I °INI -It i C,Nv��IIV l 00 - N I a M O -,t 00 h M O h eC ^ W Vl V' b 00 P M h V] 00 O^ M 0 h 00 O ^ Vl ' Do m DD DD C, C, C, C, CT 0 0 0 0 0 0 ^ � %0 � O 17 %0 V7 b 1 h h h h h h h r• h h V h Cn O N M Vt u7 h P O N M h VO 00 M^ ^ N N N N N N N M M M M M M M eC h m O M wt oo O M vi oo O M B DD O M vt m O h h h h h h h h - h h h h h O O O O O O O O O O O O O O O O O O O N M V V VO h w C, O^ N M V H h 00 O � v7 b V' V. O b b r• h h h h h h h h h o0 v v v v v v v v v v v v v v v v v v v h M N _O 00 h h M N O 00 h Vl M N O 00 h h Cn O� 0 0 0 0 0 0 0 0 0 0 0 0 V V V V 7 V V V V M C V7 N a- N W-^ 00 IN N N N N . Vt N N N N N N N N N M M M M M M M e+f M M M M M M M M M M M M M NIN N N N N NIN N N N N NININ N N N N %Ir- �0Iv7 Ohlh h N h h O hia1011� h�O a s o0 o 0' 0 0 0 0 0 VV 0 0 8 o 8 vvo 0 vvn o^ w 0 0 0 0 0 0 W r E� N V W a �o d O a W O Q od - N a' O M O n ^ W h N D\ VJ M O h V m h N D\ M O W h N C\ b M O n w V O N N M V) n 00 D\ N M M V Vt n 00 00 O+ O O N M M Vt V n 00 00 T O O N N o E 0000a, O +rnaac,aac�rnrno+aaaaaaac,ac,Ol 01,rnaaac,aao101 a , arno + aaaac c m M T m w tp V] n oD 00 O+ O O N N M M V V7 Vl h n o0 P Q` O -- N N M V V m m m h m m Cn O O N N M M v V T= -' N N N N N N N N N N N N N N N N M M M M M M M M M M M M M M M V V V V V V V� V! C n h n n r r r n r n r h h r n n n n n h r r h h h n r r n n n h r r h h r n n n h r h r h r r N w V h M G1 V'1 ^ n M P N 00 V O N 00 a ^ h M T h n M V7 ^ W V O b N 00 V^ n M P Vl C NV NV M� y V1 h 10 h h m m 01 O O N N M M 7 vt h 10 ID n 00 W P T O N M M V V Vl V7 D n n W P C V V V V V V V - - N N N N - Vl V7 - - - h Vl - N - b V7 V7 V7 V7 V7 � VJ VJ � VJ to V7 V7 V VJ ID O V' V7 lo VJ lo O V' V 'o V' O ID lo V7 'o 'c VJ O V7 V' V7 V7 ID ID lo 'o "D V7 V7 VJ b to 'V VJ O V7 ID D V V7 n M 00 V O V7 r M 00 V O W X 0 0 N M M V V Vl vl lo n h QD W D\ P - N N M M V V V1 b ID r n 0 0 0 0 0 N N M V V u1 i^� h h r r n r r r h r h n n h r h r r m oo ao 00 00 00 00 00 00 0o ao 00 00 od ao 00 0o a\ a o` a s c� rn rn c a` c s E Vl Vl Vl Vl VI Vl V7 V7 Vl Vl Vl h N V7 V7 Vl Vl V) Vl h h V1 N V7 V1 Vl ul V7 - - - - - - - - - - - N - - - Vl V7 h V h O Vl O h O Vl O Vl O vt O Vf O h O V1 O h O h O h O N O h O Vf O v1 O Vt O Vt O of O vt O h O h O h O V O ^- N N M M V V Vl h V' n n o0 a0 D\ T O O - N N M M V V vt u1 V1 r n 00 00 P fT O O N N M a N^ d0 00 00 W a0 00 00 00 ad W DD 00 00 00 00 00 00 00 Oo a a a a\ a D\ T 01 C\ a Q\ a T P T T Cn U P o+ O O O O O O O C ,E avavavvavevvvaavavvvvvvvvvevvvvvvvvvvvvv ,�A V, v, v, v,v,v o r, OV P M DD N r- b O h a\ V OD M r s V7 - h O V P M oD N h-� O vl a� V 00 M 00 N r- 1p O h G\ V 00 M C V Vt b r Od 00 00 a O O ^ N N M M M V V Vl Vl b r n n w W a m O O- N N N M M V! ?? D ^ N N N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M M n w N Vl U N V7 M b T M V1 O M h 0 a n ^_ n W -+ h m N Vt w N h T N b Cn M 'V O H ^ N N N M M M V V V - - - V7 lo ID n n n w w P Ol a\ 0 0 0 N N N M M M h V7 V7 m'o n C M M M M M M M M M M M M M M M M M M M M M M M M M V V V V V V? V !} 7 0 V V V v V V V e V' a N- w M V] a, N of W .. M N vt do O M V7 D\ N V1 w O M b ol N Vt w O M b O1 N Vl r O M O a L V V7 vl vt vt b O o;o - N N N M M M M V V V Vl rt of h VJ VJ n n n C nrnnnnrhrnnnhrnnrhhoo oo 000 0 00 00 00 00 oo oo ao ao oD OO OO OO OO OO OO OO ao oom ood M n p M n O M n p O M n O M C �A 00 b Vl M - O DD h M O 00 O V1 M r O 00 V7 N M - O OD b ut M �+ O OD ul M - O 00 V1 M- O m V7 v1 M y 0- N M V V1 V1 V' h 00 w O O ^' N M V V1 V1 lD n 0p 01 O O^ N M V Vl h� n w ol O O- N M V V) vl lD n 00 a O 00 DD 00 00 W d0 CD 00 00 W a U a Q O� Q` O. T a P a` D\ O O O O O O O O O O O O - '� �' N N N N N N N N N N N N N N N N N N P 00 O h O N O h O Vt O w9 p h O wt O h O h O h O h O h O h O Vl O V1 O h O Vl O V O V O V O" O V) O V a P O O -- N� M M V V h V1 V7 V7 r h 00 Do P D\ O O- N N M M V V Vf Vf V7 � h r 00 00 P O+ O O �+ p 0 0 --------------------------- C IC IC C N rn�oMOnv- pt T M M M M M M O E C, T Q` Q` C V) y n�o`�ornac`3� T^ 7? 7 V? h V o E n n n n n n r o a7 7 O V O N N M R d � n n n n n n C N y T h O V7 N d) b n of 0o Cn Cn c ^ arnao,o.ac >,E hw,hhvivi.� v O h O h O V V1 V7 V' n d^ O O O 0 O O O c C T E �n vi vi vi vi �n v � O v a p M M M M M M M h v ovn — voo h p V V a V VC' o v a° °o a00o aOOO C, a, C, al c a ° i N N N N N N r ` CC CL M n O M� 0 WY y W `G w1 M O V N N N N N N n N N N N n Qv1 O vi O h O I N M O i a i h n . n i n o :I2 a p C, O N n O � N n h G m o � Cn n n O O 00 N N -I- - MCIO N K O M MIM K N N n I IN i n aMO a C, C, P 1°O b 0 n yn' n M V h 0 0 ° h h b vll4lL" a a v < 7 � M M M n o N N N oMOICnIO M M � N N N � V HYDROLOGIC CALCULATIONS BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 BRIAR CHAPEL PHASE 6 NORTH HYDROLOGIC CALCULATIONS J FINCH PE NEW 12000 Post Development To Wet Pond 6/14/2012 ISCS CURVE�NUMBERS ` r Assume HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG A = 00% HSG B = 1000% HSG C = 00% HSG D = 00% Cover Condition SCS CN Comments Impervious 98 Open 61 Assume good condition Wooded 55 Assume good condition Water 100 H POST DEVELOPMENT _> To Wet Pond A Watershed Breakdown Total Number of Single Family 50 Lots = 37 lots Assumed Impervious Area Per Single Family 50 Lot = 3 500 square feet Total Impervious Area from Single Family 50 Lots = 129 500 square feet 2 97 acres Total Number of Single Family 60 Lots = 2325 lots Assumed Impervious Area Per Single Family 60 Lot = 3 800 square feet Total Impervious Area from Single Family 60 Lots = 88 350 square feet 2 03 acres Total Number of Single Family 50 Corner Lots = 11 lots Assumed Impervious Area Per Single Family 50 Corner Lot = 3 700 square feet Total Impervious Area from Single Family 50 Corner Lots = 40 700 square feet 0 93 acres Total Number of Single Family 60 Corner Lots = 55 lots Assumed Impervious Area Per Single Family 60 Comer Lot = 4 000 square feet Total Impervious Area from Single Family 60 Corner Lots = 22 000 square feet 0 51 acres Total Open Space Lots = 2 lots Assumed Impervious Area Per Open Space Lot = 5 000 square feet Total Impervious Area from Open Space Lots = 10 000 square feet 0 23 acres Total Sidewalk Impervious Area = 32 704 square feet 0 75 acres Total Roadway Impervious Area = 123 537 square feet 284 acres BRIAR CHAPEL PHASE 6 NORTH HYDROLOGIC CALCULATIONS NEW 12000 Post Development To Wet Pond J FINCH PE 6/14/2012 Contributing Area SCS CN Area [acres] Comments On site open 61 984 Assume good condition On site impervious 98 1026 On site wooded 55 000 Assume good condition On site pond 100 059 Off site open 61 000 Assume good condition Off site impervious 98 000 Off site wooded 55 000 Assume good condition Off site pond 100 000 Total area = Composite SCS CN = /o Impervious = 2069 acres 00323 sq mi 80 496% B Time of Concentration Information Due to the amount of piped and overland pavement,Jlow the post development time of concentration was assumed to be S minute Time of Concentration = 500 minutes SCS Lag Time = 300 minutes (SCS Lag = 0 6* Tc) = 00500 hours __ Time Increment = 087 minutes (= 0 29 *SCS Lag) [jEcoEngineering A di o f Th J h R. M Adan C mpany ! Scenario Post Wet Pond Out SWMF FinalDesign ppc Page 1 of 1 SWMF FinalDesign ppc 6/14/2012 F4-]EcoEngineering A drvi on f Th J hn R M Adam Company Inc Subsection Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3 /s) ( vears) (ft3) TO WET POND Post 1 1 90 942 000 722 000 4346 TO WET POND Post 2 2 126 338 000 721000 6048 TO WET POND Post 10 10 227 527 000 721 000 9667 TO WET POND Post 25 25 290 462 000 721 000 11439 TO WET POND Post 100 100 395 443 000 L 721000, 13831 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3 /s) ( vears) (ft3) Wet Pond Out Post 1 1 14 621000 1440 000 036 Wet Pond Out Post 2 2 45 610 000 901 000 220 Wet Pond Out Post 10 10 146 061000 751 000 2441 Wet Pond Out Post 25 25 208 656 000 729 000 5033 Wet Pond Out Post 100 100 313 207 000 728000, 7098, Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3 /s) (years) (ft3) Maximum Maximum Water Pond Storage Surface (ft3) Elevation M WET POND (IN) Post 1 1 90 942 000 722 000 4346 (N /A) (N /A) WET POND (OUT) Post 1 1 14 621 000 1440 000 036 47439 76 322 000 WET POND (IN) Post 2 2 126 338 000 721 000 6048 (N /A) (N /A) WET POND (ate Post 2 2 45 610 000 901 000 220 47460 83 510 000 WET POND (IN) Post 10 10 227 527 000 721 000 96 67 (N /A) (N /A) WET POND (ate Post 10 10 146 061000 751 000 2441 47504 99 361000 WET POND (IN) Post 25 25 290 462 000 721 000 11439 (N /A) (N /A) WET POND (OUT) Post 25 25 208 656 000 729 000 5033 47538 111 706 000 WET POND (IN) Post 100 100 395 443 000 721 000 13831 (N /A) (N /A) WET POND (OUT) Post 100 100 313 207 000 728 000 7098 47594 131 884 000 SWMF FinalDesign ppc Page 1 of 1 SWMF FinalDesign ppc 6/14/2012 WET POND FINAL DESIGN CAL CULA TIONS BRIAR CHAPEL - PHASE 6 NORTH NEW 12000 BRIAR CHAPEL PHASE 6 NORTH WET POND J FINCH PE NEW 12000 5/10/2012 Stage - Storage Function Project Name Briar Chapel Phase 6 North Designer J Finch PE Job Number NEW 12000 Date 5/10/2012 Average Incremental Accumulated Estimated Contour Contour Contour Contour Volume Contour Stage Area Area Volume Volume w/ S S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (CF) 47200 1 00 1 25869 47250 -4_73 05 MI 29 691 _ 27780 L 1 13890 wow 13890 _ -"--09-9 —1152-0o­+ 051 TM 00 0 a 31,131 30411 Y 290396_ _ M 474 00 1 2 0 33 737 32434 32434 ' 61529 1W - - --�—� - 3 0 _.__.. 4 0 _-� 475 00 .,.__.__-v._ 476 _T6 -2 36 442 _ _. _ --37-84-47-1 - , I 35089 ( 35089 �j -9C6 19 _ -1-3446-2 � � —2 97 _ ^4 00 477 00 �v 5 0 39 246 i2-150 37844 134462 —4069-8---T— 40698 175160 O1 31-0 Storage vs Stage 200000 180000 160000 y= 29293x , 0979 140000 RZ = 0 9997 v 120000 00100000 $ 80000 60000 40000 20000 - ,,o0000000000000000000 0 00 10 20 Stags Beet) 40 50 60 Ks = 29293 b = 10979 BRIAR CHAPEL PHASE 6 NORTH WET POND NEW 12000 _> Stage Storage Function Ks = 29293 b = 10979 Zo = 47200 Elevation ! Storage [feet] i [cf] [acre -feet] 47200 0 0 000 47220 5005 0 115 47240 10712 0 246 _472 60 F 16718 4 0 384 472 80 a 22928 0 526 473 00 y 9 47320 35785 47340 4 42384 0 672 0 822 0 973 _ 4_73 60 49076 1 127 38 S851 ; 1 282 47400 62700 1 439 474 20 E 69616 1 598 1 7440 76595 -T-75-8-1 � — 474 60 83630 j 1 920 _474 80W 90719 E 2 083 47500 97858 2 247 47520 105043 2 411 47540 112273 119544 2 577 274-4 47560 475 80 126855 2 912 47600 134204 3 081 476 20 1415_89 3 250 476-46— 149008 3 421 47660 156461 3 592 476 80 163945 3 764 l 47700 171460 3 936 J FINCH PE 5/10/2012 [4ECoEngineering Ad j fT4 Min n1 Adim C mo, v I Subsection Outlet Input Data Label Wet Pond Requested Pond Water Surface Elevations Minimum (Headwater) 472 00 ft Increment (Headwater) 0 10 ft Maximum (Headwater) 477 00 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall E1 E2 (ft) (ft) Inlet Box Puser 1 Forward Culvert 1 47450 47700 Onfice Circular Orifice 1 Forward Culvert 1 47200 47700 Culvert - Circular Culvert 1 Forward TW 46600 47700 Tallwater Settings Tallwater (N /A) (N /A) SWMF FinalDesign ppc Page 1 of 4 SWMF FinalDestgn ppc 5/11/2012 AEcoEngneenng d swn fT&Jh RMAd n C p ! Subsection Outlet Input Data Label Wet Pond Structure ID Riser 1 Structure Type Inlet Box Number of Openings 1 Elevation 474 50 ft Orifice Area 25 0 ftZ Orifice Coefficient 0 600 Weir Length 20 00 ft Weir Coefficient 3 00 (ft-0 5) /s K Reverse 1000 Manning s n 0 000 Kev Charged Riser 0 000 Weir Submergence False Orifice H to crest False SWMF FinalDesign ppc Page 2 of 4 SWMF FinalDesign ppc 5/11/2012 F4EcoEngineering A da y n M 1 t R AdcAA C p n 1 Subsection Outlet Input Data Label Wet Pond Structure ID Culvert 1 Structure Type Culvert Circular Number of Barrels 1 Diameter 30 0 in Length 83 00 ft Length (Computed Barrel) 83 10 ft Slope (Computed) 0 048 ft/ft Outlet Control Data Manning s n 0 013 Ke 0 500 Kb 0 009 Kr 0 000 Convergence Tolerance 0 00 ft Inlet Control Data Equation Form Form 1 K 00098 M 20000 C 00398 Y 06700 TI ratio (HW /D) 0 000 T2 ratio (HW /D) 1 283 Slope Correction Factor -0S00 Use unsubmerged inlet control 0 equation below T1 elevation Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control interpolate between flows at T1 & T2 TI Elevation 466 00 ft Tl Flow 27 16 ft3 /s T2 Elevation 469 21 ft T2 How 3105 ft3 /s SWMF -Fins lDeslgn ppc Page 3 of 4 SWMF- FinalDesign ppc 5/11/2012 [4EcoEngineenng Adiv nn ofTh i I n R A4 Ad s mpany Inc Subsection Outlet Input Data Label Wet Pond Structure ID Onfice 1 Structure Type Onfice Circular Tallwater Type Number of Openings 1 Elevation 472 00 ft Orifice Diameter 3 0 In Orifice Coefficient 0 600 0 01 ft (Minimum) Structure ID TW Structure Type TW Setup DS Channel Tallwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0 01 ft (Minimum) Tallwater Tolerance 0 50 ft (Maximum) Headwater Tolerance 0 01 ft (Minimum) Headwater Tolerance 0 50 ft (Maximum) Flow Tolerance (Minimum) 0 001 ft3 /s Flow Tolerance (Maximum) 10 000 ft3 /s SWMF FinalDeslgn ppc Page 4 of 4 SWMF FInalDeslgn ppc 5/11/2012 [aEcoEngineenng 4191 3 1 f Th J 1 R M Ad m ('o p y l Subsection Composite Rating Curve Label Wet Pond Composite Outflow Summary Water Surface Flow Tallwater Elevation Convergence Error Elevation (ft3 /s) (ft) (ft) (ft) 47200 000 (N /A) 000 47210 002 (N /A) 000 47220 006 (N /A) 000 47230 010 (N /A) 000 47240 012 (N /A) 000 47250 014 (N /A) 000 47260 016 (N /A) 000 47270 018 (N /A) 000 47280 019 (N /A) 000 47290 021 (N /A) 000 47300 022 (N /A) 000 47310 023 (N /A) 000 47320 025 (N /A) 000 47330 026 (N /A) 000 47340 027 (N /A) 000 47350 028 (N /A) 000 47360 029 (N /A) 000 47370 030 (N /A) 000 47380 030 (N /A) 000 47390 031 (N /A) 000 47400 032 (N /A) 000 47410 033 (N /A) 000 47420 034 (N /A) 000 47430 035 (N /A) 000 47440 036 (N /A) 000 47450 037 (N /A) 000 47460 227 (N /A) 000 47470 574 (N /A) 000 47480 102S (N /A) 000 47490 1557 (N /A) 000 47500 2162 (N /A) 000 47510 2829 (N /A) 000 47520 3555 (N /A) 000 47530 4336 (N /A) 000 47540 S163 (N /A) 000 47550 6031 (N /A) 000 47560 6926 (N /A) 000 47570 6996 (N /A) 000 47580 7039 (N /A) 000 47590 7082 (N /A) 000 47600 7125 (N /A) 000 SWMF- FinalDeslgn ppc Page 1 of 3 SWMF F1nalDeslgn ppc 5/11/2012 [4EcoEngineenng Ad m of TI J hn R. McAd m f Mt a Y I Subsection Composite Rating Curve Label Wet Pond Composite Outflow Summary Water Surface How Elevation W /s) (ft) 47610 47620 47630 47640 47650 47660 47670 47680 47690 477001 7167 7210 7252 7293 7334 7375 7417 7457 7498 75381 Tailwater Elevation (ft) (N /A) (N /A) (N /A) (N /A) (N /A) (N /A) (N /A) (N /A) (N /A) (N /A) 1 Convergence Error (ft) 000 000 000 000 000 000 000 000 000 000 Contributing Structures (no Q Riser i Orifice 1 Culvert 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert i (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert i (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice i Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Orifice 1 Culvert 1 (no Q Riser 1) Onfice 1 Culvert 1 (no Q Riser 1) Riser 1 Orifice 1 Culvert 1 Riser 1 Orifice 1 Culvert 1 Riser 1 Orifice 1 Culvert 1 Riser 1 Orifice 1 Culvert 1 SWMF FInalDeslgn ppc Page 2 of 3 SWMF FinalDeslgn ppc 5/11/2012 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND NEW 12000 Above NWSE (FSTAGE STORAGE FUNCTION ABOVE NORMAL POOL 7 —� Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S S Fxn (feet) (feet) (SF) (SF) (CF) (CF1 (feetl 47200 000 25 869 47250 050 29 691 27780 13890 13890 051 47300 100 31 131 30411 15206 29096 099 47400 200 33 737 32434 32434 61529 197 47500 300 36 442 35089 35089 96619 297 47600 400 39 246 37844 37844 134462 401 47700 500 42 150 40698 40698 175160 510 Ks = 29293 b = 1097 J FINCH PE 6/14/2012 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND NEW 12000 Below NWSE Main Pool ��SfA STORAGE FUNCTION MAIN Ks = 10313 b = 11011 J FINCH PE 6/14/2012 Storage vs Stage 80000 — Average Incremental Accumulated Estimated R = 0 9995 60000 Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 46600 000 10 127 46700 100 10 897 10512 10512 10512 102 46800 200 11 692 11294 11294 21806 197 46900 300 12 512 12102 12102 33907 2 95 47000 400 13 357 12934 12934 46842 395 47100 500 14 227 13792 13792 60633 500 47150 550 14 672 14449 7225 67858 553 47200 600 17 128 15900 7950 75808 6 12 Ks = 10313 b = 11011 J FINCH PE 6/14/2012 Storage vs Stage 80000 — 70000 y = 10313x' 01 R = 0 9995 60000 V 50000 40000 0 N 30000 20000 10000 0 000 100 200 300 400 500 600 700 Stage (feet) Ks = 10313 b = 11011 J FINCH PE 6/14/2012 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND NEW 12000 Below NWSE Forebay #1 STAGE STORAGE FUNCTION RO—RTH F A7Y Contour (feet) 46600 Stage (feet) 000 Contour Area (SF) 744 Average Contour Area (SF) Incremental Contour Volume (CF) Accumulated Contour Volume (CF) Estimated Stage w/ S S Fxn (feet) 46700 46800 46900 47000 47100 47150 47200 100 963 853 853 853 105 200 1 320 1142 1142 1995 191 300 1724 1522 1522 3517 285 400 2 174 1949 1949 5466 388 500 2 615 2395 2395 7861 501 550 2 821 2718 1359 9220 560 600 4 156 3488 1744 10964 633 Ks = 79132 b = 14250 J FINCH PE 6/14/2012 12000 Storage vs Stage s 10000-- y = 791 32X1425 R2 = 0 9954 C 8000 v 6000 y 4000 2000 0 000 1 00 200 300 400 500 600 700 Stage (feet) Ks = 79132 b = 14250 J FINCH PE 6/14/2012 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND NEW 12000 Below NWSE Forebay #2 FSTAGE STORAGE FUNCTION NORTH FOREBAY L— Ks = 11049 b = 13463 J FINCH PE 6/14/2012 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 460 00 000 1009 46100 100 1333 1171 1171 1171 104 46200 200 1693 1513 1513 2684 193 46300 300 2090 1891 1891 4575 287 46400 400 2 524 2307 2307 6882 389 46500 500 2 994 2759 2759 9641 500 46550 5 50 3207 3100 1550 11191 558 46600 600 4 586 3896 1948 13139 629 L— Ks = 11049 b = 13463 J FINCH PE 6/14/2012 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND NEW 12000 Summary I TOTAL VOLUME OF fACII/TY- �, � � �- �- Volume of Main Pool = 75 808 cf Volume of Forebay #1 = 10 964 cf Volume of Forebay #2 = 13 139 cf Total Volume Below NWSE = 99 911 cf = 229 acre ft Total Volume Above NWSE = 175 160 cf 402 acre ft Total Volume of Facility = 275 071 cf 631 acre ft Il FOREBAY PERCENTAGE OF ER. NENT POMOLUME Per NCDWQ design guidelines the forebay volume should equal approximately 20Y of the total permanent pool volume Total Volume Below NWSE = 99 911 cf Volume of Forebay #1= 1 10 964 cf Volume of Forebay #2 = 1 13 139 cf Total Volume of Forebays = 2 24 103 cf V Forebay = 2 24 19' )TZ,79 Total Volume Below NWSE = 99 911 cf Surface Area at NWSE = 25 869 sf Average Depth = 386 ft J FINCH PE 6/14/2012 NCDENR Stormwater BMP Manual Chapter Revised 06 16 09 Table 10 -3 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 0 Percent TSS Pollutant Removal Efficiency in the Mountain an redmon Regions Adapted from Driscoll 1986 Percent Impervious Cover 30 35 40 Permanent Pool Average Depth (ft) 45 50 55 60 65 70 75 80 85 90 10% 09 08 08 07 06 06 05 05 05 05 04 04 04 20% 15 13 11 10 10 09 09 09 08 08 08 07 07 30/ 19 18 17 15 14 14 13 11 10 10 10 09 09 40% 25 23 20 19 18 17 16 16 15 14 13 12 11 50/ 30 28 25 23 20 19 19 18 17 16 16 15 15 60% 35 32 28 27 25 24 22 21 19 19 18 18 17 70% 40 37 33 31 28 27 25 24 22 21 20 20 19 80% 45 41 38 35 33 30 28 27 26 24 23 21 20 90% 1 50 45 40 38 35 33 30 29 28 27 26 25 24 Table 10-4 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 90 Percent TSS Pollutant Removal Efficiencv in the Coastal Reown Arlanterl from Drmrnll 1 Qszti Percent Impervious Cover 30 35 40 Permanent Pool Average Depth (ft) 45 50 55 60 V 65 70 75 10% 13 10 08 07 06 05 04 03 02 01 20% 24 20 18 17 15 14 12 10 09 06 30% 35 30 27 25 22 19 16 13 11 08 40% 45 40 35 31 28 25 21 18 14 11 50/ 56 50 43 39 35 31 27 23 19 15 60% 70 60 53 48 43 39 34 29 24 19 70% 81 70 60 55 50 45 39 34 29 23 801 94 80 70 64 57 52 46 40 34 28 90% 107 90 79 72 65 59 52 46 39 33 100% 12 100 88 81 73 66 58 51 43 36 The engineering design of a wet detention basin must include a 10 foot wide (minimum) vegetated shelf around the full perimeter of the basin The inside edge of the shelf shall be no deeper than 6 below the permanent pool level and the outside edge shall be 6 above the permanent pool level For a 10 wide shelf the resulting slope is 101 With half the required shelf below the water (maximum depth of 6 inches) and half the required shelf above the water the vegetated shelf will provide a location for a diverse population of emergent wetland vegetation that enhances biological pollutant removal provides a habitat for wildlife protects the shoreline from erosion and improves sediment trap efficiency A 10 wide shelf also provides a safety feature prior to the deeper permanent pool Short circuitmg of the stormwater must be prevented The most direct way of minimizing short circuiting is to maximize the length of the flow path between the mlet and the outlet basms with long and narrow shapes can maximize the length of the flow path Long and narrow but irregularly shaped wet detention basms may appear more Wet Detention Basin 1015 July 2007 BRIAR CHAPEL PHASE 6 NORTH WET DETENTION POND J FINCH PE NEW 12000 Surface Area Calculation 6/14/2012 ET DETENTION BASIN SUMMARY From Stormwater Best Management Practices Manual NCDENR Division of Water Quality October 2007 Enter the drainage area characteristics = => Total drainage area to pond = 2069 acres Total impervious area to pond = 1026 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond notjust the impervious surface from on site development Drainage area = 2069 acres @ 496% impervious Estimate the surface area required at pond normal pool elevation = => Wet Detention Basins are based on an minimum average depth of = 386 feet (Calculated) From the DWQ BMP Handbook (1012007) the required SA /DA ratio for 90% TSS Removal = => 35 386 40 Lower Boundary => 400 23 20 Site Y impervious => 496 278 256 25 Upper Boundary => Soo 28 25 Therefore SA /DA required = 256 Surface area required at normal pool = 23 085 ft 2 = 053 acres Surface area provided at normal pool = 25 869 ft 2 BRIAR CHAPEL PHASE 6 NORTH WATER QUALITY VOLUME NEW 12000 CALCULATIONS > Determination of Water Quality Volume (1 Rainfall Depth] Proposed Conditions => WQ v = (P)(R v)(A) 112 where WQv = water quality volume (in acre ft) Rv = 0 05 +0 009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data Total area A = 2069 acres = 901 122 sf Impervious area = 1026 acres = 446 791 sf Percent impervious cover I = 496 % Rainfall P = 10 inches Calculated values RV = 050 WQv = 0 855 acre ft 37 264 cf > Associated Depth above Wet Pond Permanent Pool Ks= 29293 b = 10979 V = 37264 Normal Pool Elevation = 47200 feet Riser Crest Elevation = 47450 feet WQ Elevation = 47325 feet J FINCH PE 6/14/2012 BRIAR CHAPEL PHASE 6 NORTH NEW 12000 Inverted Siphon Design Sheet D orifice # orifices Ks b Cd siphon Normal Pool Elevation Volume @ Normal Pool Orifice Invert WSEL @I Runoff Volume 3 inch 1 29293 10979 060 47300 feet 0 cf 47300 feet 47425 feet WSEL feet Vol Stored (c f) Siphon Flow (cfs ) Avg Flow (cfs ) Incr Vol (c ) Incr Time (sec) 47425 37264 0 250 47414 33691 0 237 0 244 3573 14673 47403 30152 0 224 0 231 3539 15344 47392 26649 0 210 0 217 3503 16136 47381 23187 0 195 0203 3462 17092 47370 19770 0 179 0 187 3416 18278 47359 16406 0 161 0 170 3364 19810 47348 13102 0 141 0 151 3304 21908 47337 9872 0 117 0 129 3230 25057 47326 6735 0 087 0 102 3137 30683 473 15 37264 0 040 0 064 3008 47222 Drawdown Tune = 2 62 days By comparison if calculated by the average head over the orifice (assuming average head is one third the total depth) the result would be Average driving head on orifice = 0 373 feet Orifice composite loss coefficient = 0 600 Cross sectional area of 3 orifice = 0 049 sf Q = 0 1444 cfs Drawdown Time = Volume / Flowrate / 86400 (sec /day) Drawdown Time = 2 99 days Conclusion Use 1 3 Diameter Inverted Siphon to drawdown the accumulated volume from the 10 storm runoff with a required time of about 2 62 days J FINCH PE 6/14/2012 J BRIAR CHAPEL NEW 12000 Input Data => Square Riser/Barrel Anti- Flotation Calculation Sheet Inside length of riser = 500 feet Inside width of riser = 500 feet Wall thickness of riser = 600 inches Base thickness of riser = 800 inches Base length of riser = 600 feet Base width of riser = 600 feet Inside height of Riser = 850 feet Concrete unit weight = 142 0 PCF OD of barrel exiting manhole = 4400 inches Size of dram pipe (if present) = 80 inches Trash Rack water displacement = 6174 CF Concrete Present in Riser Structure => Total amount of concrete Adjust for openings Base of Riser = 24 000 CF Riser Walls = 93 500 CF Opening for barrel = 5 280 CF Opening for dram pipe = 0 175 CF J FINCH PE 5/10/2012 Note NC Products lists unit wt of manhole concrete at 142 PCF Total Concrete present adjusted for openings = 112 046 CF Weight of concrete present = 15911 lbs Amount of water displaced by Riser Structure => Displacement by concrete = 112 046 CF Displacement by open air in riser = 212 500 CF Displacement by trash rack = 61 740 CF Total water displaced by riser/barrel structure = 386 286 CF Weight of water displaced = 24104 lbs Calculate amount of concrete to be added to riser => Safety factor to use = 125 (recommend 125 or higher) Must add = 14220 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 7960 PCF Buoyant with safety factor applied = 6368 PCF Therefore must add = 223 301 CF of concrete Standard based described above = 24 000 CF of concrete Therefore base design must have = 247 301 CF of concrete BRIAR CHAPEL NEW 12000 Calculate size of base for riser assembly => Length = 9 000 feet Width = 9 000 feet Thickness = 37 0 inches Concrete Present = 249 750 CF OK Check vandcty of base as designed => Total Water Displaced = 612 036 CF Total Concrete Present = 337 796 CF Total Water Displaced = 38191 lbs Total Concrete Present = 47967 lbs Actual safety factor = 126 OK Results of design => Base length = 9 00 feet Base width = 9 00 feet Base Thickness = 37 00 inches CY of concrete total in base = 9 25 CY Concrete unit weight in added base >= 142 PCF J FINCH PE 5/10/2012 Briar Chapel — Phase 6 North Project # NEW -12000 VELOCITY DISSIPATOR DESIGN Designed By J Finch, PE Velocity Dissipator — Proposed Wet Pond NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe assuming the Mammngs roughness number is constant over the entire length of the pipe flow Q in cfs 25 Flow depth (ft) = 0 90 slope S in % 4 82 Outlet velocity (fps) = 15 698 pipe diameter D in in 30 Manning number n 0 013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 250 Outlet velocity (fps) 1570 Apron length (ft) 2000 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 6 B 22 » 13 Bor1 22« 23 2 27 Width Calculation WIDTH = La + Do WIDTH =20 +25 WIDTH = 23 FEET CONCLUSION Use NCDOT Class `1' Rip Rap 20'L x 23'W x 22 "Thick