Loading...
HomeMy WebLinkAbout20180699 Ver 1_401 Inspection Letter_20200312ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Town of Kitty Hawk Attn: Mr. Andy Stewart, Town Manager PO Box 549 Kitty Hawk, NC 27949 Dear Mr. Stewart: NORTH CAROLINA Environmental Quality March 12, 2020 Subject: 401 Water Quality Certification Inspection Town of Kitty Hawk — Moor Shore Road Living Shoreline DWR Project # 18-0699 On October 7, 2019, Anthony Scarbraugh and Megan Davis of the Division of Water Resources (DWR) inspected proposed living shoreline at the subject properties located at 3789, 3793, 3801 and 3809 Moor Shore Road in Kitty Hawk, Dare County. This project was inspected for compliance with the General Water Quality Certification (GC) #4144 with Additional Conditions issued on June 11, 2018 for the proposed project. The GC approved impacts of 0.04 acres of open waters to complete your project as described in your application received by DWR on May 22, 2018. The inspection revealed that the project has been completed. Impacts did not exceed beyond the footprint of those approved. The inspection revealed that the inspected portion of this project is currently compliant with the GC #4144. As a reminder, if you change your project you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. Upon completion of all work approved within the 401 WQC, and any subsequent modifications, the applicant is required to return the enclosed certificate of completion to the 401 & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1617. This document can also be submitted electronically through the DWR 401 & Buffer Permitting Unit website at https://edocs.deg.nc.gov/Forms/Certificate-of- Completion. Violations of any condition set forth in the Certification and Additional Conditions may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to water as depicted in your application and as authorized by this Certification shall expire upon the expiration of the 404 or CAMA Permit. E Q�� North Carolina Department of Environmental Quality I Division of Water Resources _ Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 NORTH CAROHNA ..w.0Enw—montaigwfity /� 252.946.6481 Should you have any questions regarding these matters, please contact me at (252) 948-3924. Sincerely, Anthony Scarbraugh, Environmental Specialist II Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure: Certificate of Completion cc: Laserfiche ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director DWR Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: NORTH CAROLINA Environmental Quality County: Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date D_E NORTH CARW AQ�� Ueparhnant of E,W—Mental Qwlity North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481