HomeMy WebLinkAbout20180699 Ver 1_401 Inspection Letter_20200312ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Town of Kitty Hawk
Attn: Mr. Andy Stewart, Town Manager
PO Box 549
Kitty Hawk, NC 27949
Dear Mr. Stewart:
NORTH CAROLINA
Environmental Quality
March 12, 2020
Subject: 401 Water Quality Certification Inspection
Town of Kitty Hawk — Moor Shore Road Living Shoreline
DWR Project # 18-0699
On October 7, 2019, Anthony Scarbraugh and Megan Davis of the Division of Water Resources (DWR)
inspected proposed living shoreline at the subject properties located at 3789, 3793, 3801 and 3809 Moor
Shore Road in Kitty Hawk, Dare County. This project was inspected for compliance with the General Water
Quality Certification (GC) #4144 with Additional Conditions issued on June 11, 2018 for the proposed
project.
The GC approved impacts of 0.04 acres of open waters to complete your project as described in your
application received by DWR on May 22, 2018.
The inspection revealed that the project has been completed. Impacts did not exceed beyond the
footprint of those approved. The inspection revealed that the inspected portion of this project is currently
compliant with the GC #4144.
As a reminder, if you change your project you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of the Certification and approval
letter and is thereby responsible for complying with all conditions. Upon completion of all work approved
within the 401 WQC, and any subsequent modifications, the applicant is required to return the enclosed
certificate of completion to the 401 & Buffer Permitting Unit, North Carolina Division of Water Resources,
1617 Mail Service Center, Raleigh, NC 27699-1617. This document can also be submitted electronically
through the DWR 401 & Buffer Permitting Unit website at https://edocs.deg.nc.gov/Forms/Certificate-of-
Completion.
Violations of any condition set forth in the Certification and Additional Conditions may result in revocation
of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with
your proposed impacts or to conduct impacts to water as depicted in your application and as authorized
by this Certification shall expire upon the expiration of the 404 or CAMA Permit.
E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
_ Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NORTH CAROHNA
..w.0Enw—montaigwfity /� 252.946.6481
Should you have any questions regarding these matters, please contact me at (252) 948-3924.
Sincerely,
Anthony Scarbraugh, Environmental Specialist II
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure: Certificate of Completion
cc: Laserfiche
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
DWR Project No.:
Applicant:
Project Name:
Date of Issuance of Wetland Permit:
NORTH CAROLINA
Environmental Quality
County:
Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any subsequent
modifications, the applicant is required to return this certificate to the 401 & Buffer Permitting Unit, North Carolina Division of
Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to DWR by the applicant, the
applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
Agent's Certification
I, hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the
construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature:
Registration No. Date
D_E
NORTH CARW AQ��
Ueparhnant of E,W—Mental Qwlity
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481