HomeMy WebLinkAboutNCC200958_ESC Approval Submitted_20200312ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Brian Wrenn
Acting Director
March 4, 2020
LETTER OF APPROVAL
Davidson County Community College
Attention: Keith Raker
PO BOX 1287
Lexington, NC 27293
RE: Project Name: Davie Campus Parking Lot Expansion
Acres Approved: 4
Project ID: DAVIE-2020-011
County: Davie
Location: S State St - Mocksville
River Basin: Yadkin -Pee Dee
Submitted By: Fleming Engineering
Date Received by LQS: March 2, 2020
Plan Type: Institutional — New - Express
Dear Sir or Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST
obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas ncdenr.gov or Paul Clark at Paul. clarkkncdenr.gov. If the owner/operator of this project
changes in the future, the new responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Ole Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105
r' 336-776-9800
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Cott
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
cc:
Fleming Engineering
8518 Triad Drive
Colfax, NC 2 723 5