HomeMy WebLinkAboutNCC200952_NOI Application_20200312Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 3/10/2020 3:23:54 PM (NCG01 NOI Submission)
Approve by McCoy, Suzanne 3/11/2020 7:55:33 AM (Review- Construction NOI 22959)
. The task was assigned to McCoy, Suzanne by round robin distribution 3/10/2020 3:24 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 12, 2020 5:00 PM.
The priority is: High 3/10/2020 3:24 PM
Submit by McCoy, Suzanne 3/12/2020 10:35:36 AM (Payment Verification for NCC200952)
* Patricia Monroe Loyd Builders
• McCoy, Suzanne assigned the task to McCoy, Suzanne 3/12/2020 10:34 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 22, 2020 5:00 PM. The
priority is: High 3/11/2020 7:55 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
la. Project Name * Greystone Farms, Section Five, Part Two - Lot 194
1 b. Specific Lot This field rrey be used to list specifc lot numbers.
Numbers
2. County* Cumberland
3. Highway or Street Touchstone Drive
Address* Street name only is acceptable if no address nunber assigned yet
4. City or Township* City of Fayetteville
5. State * NC
6. Zip Code* 28311
7. Latitude* Enter the latitude in decinal degrees
35.1613
8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative)
-78.8570
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
03/04/2020
Estirrated Construction Project Start Date
10. Date to End*
03/31/2022
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Single
Family Houses (SFE)
(1521)
Standard Industrial Classification for Development
12. Acres to be
0.47
disturbed*
(including off -site borrow and waste areas)
13. Total site area 0.50
(acres)*
14. Post- 0.19
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-CUMBE-2020-Greystone Farms, Section Five, Part Two - Lot
Tracking ID 194
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Carvers Creek
Wate rbody* %rre of waterbody into which stormwater runoff will discharge
15b. Waterbody 18-24
Index No.* NCWaterbody Index Number
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Loyd Builders of Fayetteville
Name * If pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name* F. Royal
IF Corporation, enter Fbgistered Agent First Barre
3. Last Name* Loyd
If Corporation, enter Faegistered Agent Last Wre
3b. Title President
4. Permitee E-mail buzzJoyd@nc.rr.com
Address *
5. Permittee 910-4848180
Telephone No.*
6. Permittee Mailing Street Address
Address* 4140 Ferncreek Drive, Suite 101
Address Line 2
city State / F rovince / Faegion
Fayetteville NC
F ostal / Zip Code Country
28314 us
Check box if the rJ Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
4140 Ferncreek Drive, Suite 101
Address Line 2
City
State / Ffovince / ilegion
Fayetteville
NC
Flostal / Zip Code
Country
28314
us
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
F. Royal
Contact - First
Name *
2. Primary Site
Loyd
Contact - Last
Name *
3. Title
President
4. Site Contact E-
bualoyd@nc.rr.com
mail Address*
5. Site Contact
910-489-4150
Telephone No.
6. Organization
Loyd Builders of Fayetteville
Name
7. Site Contact
Street Address
Mailing Address*
4140 Ferncreek Drive, Suite 101
Address Line 2
City
Fayetteville
Fbstal / Zip Code
28314
8. Consultant Name
(Optional)
Dennis A. Gilbert
First and Last nacre
9. Consultant E-mail
dgilbert@mkrinc.com
This person will be copied on all correspondence.
10. Consultant
910-484-5191
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
............................................................................................................................................................................................................................................................................................................................__
1. Date E&SC Plan 03/04/2020
Approved *
2. E&SC Plan Project CUMBE-2020-131
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan CUMBE-2020-131-Express Approval-LOYD.pdf 76.19KB
Approval letter or Mist beRDFformat
Grading Permit
Site Map (Optional) Helpful for linear project review
EC Greystone Farms - Lot194-Approved Plan-
1011.71 KB
p1.pdf
Mast be R7Fformat
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies for linear projects if necessary.
6. NOI Certification Loyd 194 Greystone NOI Certificate.pdf 49.91KB
Form Mast be FDFformat
This is an Express f No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * F. Royal Loyd
Title President
Organization Loyd Builders of Fayetteville
Date * 03/10/2020
F. Tracking and COC Info
NOI Tracking No. 22959
NC Reference No. NCG01-2020-0952
Uses 'count number' variable (incremrented by SP)
Certificate of NCC200952
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 952
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)