Loading...
HomeMy WebLinkAbout20200353 Ver 1_Shoreline Stabilization_20200305CVn�' a�2 "'Al"'R8 Ip"IAP"; "' LPFER NOTIFICATION FORM Project Nance/ad Owner: 1(l Yl Print Contractor/agent: _ Print ZOO aW% County: IrPAP.�t � C The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Signature Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved_ Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] C nowledger en-6- of NoLflrcaiior? �WC`ra S hereby state that I have been i = Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated irl'the ad of the i cat anand Catawba a by the Division of Water Resources (DWR) is a violation and subject to enforcement. Due diligence willpbeoved taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved Plan(s) and specification(s), and other supporting materials. Signature (owner):_AJc V Date: J/;Z 21 �20 Stateoi "10rth Carolina Emircnmmml Qualir, ; \Voter Resottrces �12 ti. SaiisEurgStreet Jail tvlaii Scraee Center c Raleigh N*C 27699-1611 '719'707.9000 State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 02-2017 Shoreline Stabilization Application Fore Three copies of the application (including attachments) and the � sF l; : _ _ should be sent to: If sending via US Postal Service Karen Higgins DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Karen Higgins DWR-401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 A. Applicant Information [15:1 NCAC 02H .0502(a)] 1. Owner Information Name: Jbhn �.c�w�r�S Mailing Address: _a 00 1S i ye rwa \ 1�, Telephone Number:-1S-)—`1(,,3 V(o1-7 Fax Number: E-mail Address: 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: I .. f i (�!_»�� jtt,,�yLrt:L;SuI�`J.11SaC�.�al�rtl�j iTlllj!'OI lcl5 r5`'�i `O'S/!-a •- / UlatOi'Vile C'ocsI errnil s S iVIPLE ,,GJCi f U' U i7�T r Z / riU i IL 1.01,E _FGRINALQdf ) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information [1 SA NC,,C 02i { .0502( j 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: `w e- &d 1 Nearest Town: Lake/ river/ ocean adjacent to property: Lo D Property size (acres): Subdivision name or site address (include phase/lot number): -mil i UP_rw 0 i K h..4 11 Directions to site - please include road names and numbers, landmarks, etc.: - S G car.? Latitude (in decimal degrees)35,1, q L 0 3 Longitude (decimal degrees) 03 C71 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): U y,\ cJry >!I a hQ d, _ ,P -nq���- 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): P' 1 r' p ra-U) 4p so, S l r.e_ Ana -F -i5 _2rv�cna -kk"..k A4 Y.ok a '2W b«.:(� C.V. ijr 7. Will work be conducted from land?] From water? 3. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Sol be_,_ a r-23 sue-'E- A— I I Temporary impacts in square feet: V 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: - 5u ' I0hc1 X above 1�D <o .0 - Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): n p ri p 11. Signature O er/Agent's Signature' [i,_SA 02;, .(? Q?( )i Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation iFull Pond/ Normal Water Shoreline La ke (At Full Pond/ Normal Water Level) 5 01 DIP- V- rc` P �r4' A \� "Full Pond/ Normal Water r Shoreline 2 ft. a SO ft addrtwnal dearin ' If necessary Lake (Ft Ful Pond/ timmal lWater keel) Existing Dock 3 ft :15o ft 80m, fu➢pond/ tn;rL ftx 150 ft Ab-- fidt P-d! UNI. ( i Plan View FORM: SSGP 02-2017 Page 3 of 4 5 - --- _.; La sir (At Full Pond/ Normal Water Le I Side Vie LL- -� i J 3 ft below full pond water level QW1 I 4 ft. above full pond water le•✓el Z ft. additional clearing if necessary Existing bank e' f } I 10 ft bank height ( a sr' de < Side V� _ FORM: SSGP 02-2017 Page 4 of 4 r x " e �'k3.G= E���:a Y � NiN/,• � a e e- _ � �s � I � _ � e5€.=92' j x x�.?$c:_;�OA= a, ;;E=n gSL:zsS 8Es i �' �� � s y pair a�:sgg'< 'sK eq. �; m ''9x `=g�4 € =m o L» €5L I a » 8k1,"-'n L.0'='�3`� - 5 _ n s9 = �^•a•- L WPM E a t9 >4 �!r ;a Fee ga u �I ;�g�gaa gg ggs t Ys:�9gifi$:Y- W.M.k.6 S« 3 8: E R S L 8 « 8= L 8^°.: °- .L...: o S 3« S - Q « s» ... • s - . .. - _ .. « a .. r ei_ . ..IL IL J N d.b.N rHtl �p I 1N3Wd0�3A30 3N17117d �� § $ to - - - .,1 .sHIN s in 1 1^t3N'do +/ew k >d Q Fazgy a. �- 1 �9Y6609 • � tl3»AOLfi1tlNJ mVA :d'9 Hd .Wkltl3 SJItltldS Otl03NN5.. ass Via: :si«aa� mass- s: 6A ^ass m� . ® •NYbFa o l a 3 � HOfl ,y � � G / Q � / Fags '. .62.bd >. •B / .pgN � 'HF° - c .2C'y66 I G Or✓ --.BtbN2_ a - 8/ieC-•.p oed O I`� .b ^ O •9 iE g "I OO j�o t � \ c d•HH y__ �'__.i O Y ® o NN � _ get s s r s s • • • • • • • 77 sg�c^s? �zssse eagg =° assess ss= .t mzae=.:ggse== � is / Addresses A, Infrastructure NonResidential Use ` Residential Use Streets Interstate Ramp US H%vy State Hvey — Main Road Local Road Residential Private Inactive Parcels Hooks Parcels El City Limits Lake Norman Iredell Countyline t.. °r NC Counties bing maps A Mooresville 53 min , 35.5 miles B 200 Riverwalk Rd, Stony Point, NC 28678 Light traffic (6 min delay) Via 1-77 N, 1-40 W I ` A Mooresville i '(' 1 Head northwest on W McLelland Ave toward S Academy St 0.9 mi 2 Bear left onto NC-150 1.8 mi Take ramp right for 1-77 North toward Statesville i 3, ♦ Construction: At 1-40/Exit 51 - Construction work. Narrow lanes. 14.9 mi, 14 min j f I i ♦ Minor Congestion � Atexit5l-,���.-.. 4 ake ramp right for US-21 toward Statesville 12.2 mi, 12 min jA 5. At exit 141, take ramp right and follow signs for Sharon School Rd 0.1 mi (% 6 Turn right onto Sharon School Rd 1.4 mi i rf 7 Turn left to stay on Sharon School Rd 2.3 mi i 8 Road name changes to Paul Payne Store Rd 85 ft 9 Bear left onto Stewart Rock Rd 1.1 mi Road name changes to Ste � i a 10 9 wart Rock Dr 0.3 mi I f 11 Turn left onto Riverwalk Rd 0.4 mi Arrive at Riverwalk Rd I 12.The last intersection is Stewart Rock Dr ..... ..... B 200 Riverwalk Rd, Stony Point, NC 28678 These directions are subject to the Microsofty Service Agreement and are for informational purposes only. No guarantee is made regarding their completeness or accuracy. Construction projects, traffic, or other events may cause actual conditions to differ from these results. Map and traffic data © 2020 HERE'". 7IDrojeCt Owner: Yin Print 'i antrcactar/'agent: Print �C, bound-: 1�-ea��11 A re Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Sire specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the But rer (within 30 ft of the full pond elevation), unless approved_ Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious %ralkways, erc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .02L'.3(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging,spoil, construction material must be outside the buf ter. 1`15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocitiesco the lalce. [15A NCAC 02B .0243(5), (6)] F4C;mawledgeraenis O1 mEatlifcCrtion 1r\h 1� tiJ�rd S hereby state that i have been informed of the Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the alicat on and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence willpbe talcen such that the construcrion will be built within substantial compliance and intent of the 402 W2-cer Quality Certification and Buffer Rules, the approved Plan(s) and specification(s), and othersuppor-Ling materials. .� Signature (owner): Date: Starr oriqortir Carorma - Errvirenrrental Quality ; ;Vatcr I US CeS SL v.se{isEorrStrc.`' Ic111iailScrviecCCntCr RaleioSttiC?764q-16ll nte.FOi 4000