Loading...
HomeMy WebLinkAbout710072_NOV-2017-PC-0655_20171011r'x'd v. 9, Water Resources Enaironmental Quality October 11. 2017 CERTIFIED MAIL 7017 1450 0000 3937 2816 RETURN RECEIPT REQUESTED Donald H. Hall 4571 NC Hwy 133 Rocky Point, NC 28457 Subject: NOTICE OF VIOLATION NOV-2017-PC-0655 Administrative Code 15A NCAC 2T .1304 Ponderosa Farm 71-72, Permit No. AWS710072 Duplin County Dear Mr. Mall: ROY COOPER Govei no.!- MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Upon review of our non-compliance reporting records by staff from the Wilmington Regional Office (WIRO) of the Division of Water Resources (DWR), it was determined that this facility was not in compliance in regards to maintaining the waste level in lagoon/storage pond to not exceed the maximum level specified in the facility's CAWMP. You are hereby notified that, having been permitted to have a non -discharge permit for the subject animal waste management system pursuant to 15A NCAC 2T .1304, you have been found to be in violation of your Certified Animal Waste Management Plan (CAWMP) and the Swine Waste System General Permit No. AWG100000 as follows: Violation 1: Failure in maintaining the waste level in lagoon/storage pond to not exceed the maximum level specified in the facility's CAWMP. At a minimum, maximum waste level for lagoons/storage ponds must not exceed the level that provides adequate storage to contain the 25-year, 24-hour storm event plus an additional one (1) foot of structural freeboard except that there shall be no violation of this condition if: (a) there is a storm event more severe than a 25-year, 24-hour event, (b) the Permittee is in compliance with its CAWMP, and there is at least one (1) foot of structural freeboard, in accordance with Condition V. 2. of the Swine Waste System General Permit No. AWG100000. On August 29, 2017, the staff from the Wilmington Regional Office (WIRO) received notification of the Ponderosa Farm 1 lagoon being out of compliance with the freeboard levels specified in the facility's CAWMP. Lagoon 1 Fifteen (15) inches The lagoons design freeboard is nineteen (19) inches for lagoon 1. a State of North Carolina I Environmental Quality I Water Resources 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 910-796-7386 Required Corrective Action for Violation 1: A thirty (30) day Plan of Action must be submitted for Lagoon 1. Please provide to our office, a description of the corrective action you will take to resolve this issue. You are required to provide a written response to this Notice by November 13, 2017. Please include in your response all corrective actions already taken and a schedule for completion of any corrective actions not addressed. You may wish to contact your County Soil & Water Conservation District Office, County Extension office, a qualified technical specialist, and/or a professional engineer for any assistance they may be able to provide. If you have any questions concerning this Notice, please contact me at (910) 796-7386. Sincerely, Jun Gregson, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ cc: WQROS CAFO Unit Jason Tuner, Fender County Soil and Water Conservation District Kraig Weslerbeek, Murphy Brown LLC DWR Wilmington Animal Files 71-72 Sam Edwards NCDA G:\WQ\Shared\ANWALS\PENDER\2017\71-72 NOV k November 3, 2017 RECEIVED/NCDENR/DWR RE: Notice of Violation NOV-2017-PC-0655 NOV 13 2017 Water Quality Regional Will ection nOinngtoniOns Regional Office Dear Mr. Gregson: I am responding to the Notice of Violation dated October 11, 2017 by your department. This violation was issued to Ponderosa Farm Permit number AWS710072 for a freeboard level of 15" . The farm strives to remain in compliance at all times however during the month of August it received over 8 "of rainfall. The farm staff notified DEQ that they were out of compliance. A 30 day POA is enclosed and the lagoon was drawn down to below 19" as the staff land applied. Sincerely, Donald PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-72 County: Ponder 300, z m o v Facility Name: Ponderosa oQ -+ � Certified Operator Name: Donald Hall Operator Number: o' m o 'v 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to thg' d z lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Ponderosa Spillway(Y or N): no Level(inches): 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/4/2017 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Donald Hall Phone: 910-520-3555 nFa�cilityy(O�w/nner/Mannag]eer (print) Q90 `--/ la 70- C- Date: Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JPonderosa 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 15.0 inches 19.0 inches 4.0 inches 1020360 ftz 2544098 gallons 180 days g. volume of waste produced according to structural design 495720 ft3 h. current herd #F--3-6-72-1 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines In + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/20/2017 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 495720 ft3 Oft3 73500 ft3 709628 gallons 1.34 Ibs/1000 gal. 4360.0 Ibs. PAN PoA (30 Day) 2/21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Ponderosa 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 4360.0 lb PAN line m = Ill PAN line m = lb PAN line m = lb PAN line m = Ill PAN line m = lb PAN 4360.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN DCDInn nn ranT I ICT PIFI nC Tn UlAi PAN CANNnT RP APPI IFn ❑IIRING THIS 3n DAY PERIOD. o. tract # p. field # Q. crop r. acres s. remaining IRR 2 PAN balance (iblacre) t. TOTAL PAN BALANCE FOR FIELD(Ibs.) u. application window' Zonal Pull 1&2 Bermuda 7.16 185.00 1324.6 Zone 2 Pull 3&4 Bermuda 12.45 223.00 2776.4 Zone 3 Pull Bermuda 4.36 72.00 313.9 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4414.9 lb. PAN IV. FACILITY'S FDA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 4360.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4414.9 lb. PAN y. Overall PAN balance (w - x) = -55 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21/00