Loading...
HomeMy WebLinkAbout310242_Compliance Evaluation Inspection_20200121— Division of Water Resources Facility Number `� - I O Division of Soll and Water Conservation O Other Agency Type of Visit: (3) Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O.'Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: i Arrival Time: Departure Time: ® County: Region: Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: CA" �v� � C�� � � Title: Onsite Representative: Certified Operator: i Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Phone: n'j 10 ISN Ids i_ Integrator: Certification Number: 144 Certification Number: Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Pni ltry Canacity Pon. Layers Non -Layers Pullets Turkeys U Turkey Poults Other I Longitude: Design Current Cattle 'Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No [3"NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ONA ❑ NE ` . c. What is the estimated volume that reached waters of the State (gallons)? 09 d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters El Yes qNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of Inspection: Z Z Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [2*No ❑ A ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No WNNA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes YNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmta threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑enNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E7 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window - ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [�] Yes ❑ No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [� No ❑ NA 0 NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes � o ❑ NA ❑ NE P properly 18. Is there a lack of ro erly operating waste application equipment? El Yes ;0 0 NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? es ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check 0Yes ❑ No ❑ NA ❑ NE the appropriate b WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Ot r: 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall Stocking [ r p Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio21No 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ NA ❑ NE ❑ Weather Code ®'Sludge Survey ❑ NA NE ❑ Yes ❑ No ❑ NA NE Page 2 of 3 21412015 Continued Facility Number: - Date of Ins ection: 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? Ye ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes 0 No ❑ NA ❑ NE the appropriate box(es) below. Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ N 0 NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Z/1 No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ' No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 2 No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 2610 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes fMo o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). QeD A '�D C it-, Ke-'ZO. 13�erbl�, :�10;10 1-C."11*41 V\pe v v/ r C s C_ i Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ^l (f 1 5C;:�' C01r 1(I (r'jue ) V a <,- Phone: II 0 320 S_ 24 c ) Date: 24 U 2 120I