HomeMy WebLinkAbout310242_Compliance Evaluation Inspection_20200121—
Division of Water Resources
Facility Number `� - I O Division of Soll and Water Conservation
O Other Agency
Type of Visit: (3) Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: Routine O.'Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: i Arrival Time: Departure Time: ® County: Region:
Farm Name: Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Phone:
Facility Contact: CA" �v� � C�� � � Title:
Onsite Representative:
Certified Operator:
i
Back-up Operator:
Location of Farm:
Design Current
Swine Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Latitude:
Phone: n'j 10 ISN Ids i_
Integrator:
Certification Number: 144
Certification Number:
Design Current
Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Pni ltry Canacity Pon.
Layers
Non -Layers
Pullets
Turkeys
U
Turkey Poults
Other
I
Longitude:
Design Current
Cattle 'Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
[3"NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
ONA
❑ NE
` . c. What is the estimated volume that reached waters of the State (gallons)?
09
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ No
NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
o
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
El Yes
qNo
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: jDate of Inspection: Z Z
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [2*No ❑ A ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No WNNA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes YNo
❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmta threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑enNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E7 No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window - ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? [�] Yes ❑ No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [� No ❑ NA 0 NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes � o
❑ NA
❑ NE
P properly 18. Is there a lack of ro erly operating waste application equipment?
El Yes ;0
0 NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
es ❑ No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
0Yes ❑ No
❑ NA
❑ NE
the appropriate b
WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Ot r:
21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall Stocking [ r p Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspectio21No
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ NA ❑ NE
❑ Weather Code
®'Sludge Survey
❑ NA NE
❑ Yes ❑ No ❑ NA NE
Page 2 of 3 21412015 Continued
Facility Number: - Date of Ins ection: 1
24. Did the facility fail to calibrate waste application equipment as required by the permit? Ye ❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes 0 No ❑ NA ❑ NE
the appropriate box(es) below.
Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ N 0 NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Z/1 No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ' No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 2 No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA
❑ Application Field ❑ Lagoon/storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 2610 ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes fMo
o ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
QeD A '�D C it-, Ke-'ZO.
13�erbl�, :�10;10 1-C."11*41
V\pe v v/
r
C s
C_
i
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
^l (f 1 5C;:�' C01r 1(I
(r'jue )
V a <,-
Phone: II 0 320 S_ 24 c )
Date: 24 U
2 120I