HomeMy WebLinkAbout520014_NOD-2020-PC-0029 Response_20200304To Whom it May Concern:
Subject: Issue, Out of Compliance
In the month of December 2019, we had 2.6 inches of rai
n.
RFCF/Va
w Pq,? 1 �
Q�Q/i
�esh� �t nl0lk a
rs Seeg/6,7
1e60, ec%
a/ ice
Levels were good.
In the month of January 2020, rainfall was 3.6 inches and it rained often. Harder to
Pump.
In the month of February 2020, rainfall was 7.2 inches. Land was saturated, couldn't
Pump.
We are steadily pumping as conditions allow. If there are no major events, we will be
back in compliance as soon as possible.
Thank you
Billie Turner
B & S Turner Farms, Inc.
#5214
AWS 520014
Jones County NOD-2020-PC-0029
C C: IPC) 0--S�ld
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Billie Turner
1799 Hwy 258
Pink Hill, NC 28572
NORTH CAROLINA
Environmental Quality
February 10, 2020
Subject: Notice of Deficiency
B&S Turner Farms, Inc. #52-14
AWS520014
Jones County
NOD-2020-PC-0029
Dear Mr. Turner:
On February 7, 2020, staff of the NC Division of Water Resources (DWR), Water Quality
Regional Operations Section (WQROS), were notified of high freeboard levels at your facility.
As a result of this incident, you are hereby notified that, having been permitted to have a non -
discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T
Section .1300, you have been found to have insufficient freeboard in accordance with your
Certified Animal Waste Management Plan and the Swine Waste System General Permit No.
AWG100000 that you are covered to operate under.
Deficiency 1:
Failure to maintain waste level in your lagoon/storage pond in accordance with the facility's
Certified Animal Waste Management Plan in accordance with Condition V. 2. of Swine Waste
System General Permit No. AWG100000.
On February 7, 2020, a lagoon/storage pond level was documented at 17 and 24 inches in
lagoons 1 and 2. A level of 19.5 and 27 inches in the lagoons is the maximum level allowed by
your permit and Certified Animal Waste Management Plan.
rooll
D North Carolina Department of Environmental Quality ! Division of Water Resources
Washington Regional Office ; 943 Washington Square Mail I Washington, North Carolina 27889
!�Q
252.946.6481
Required Corrective Action for Deficiency 1:
The Division has received a 30-Day Plan of Action for the high freeboard occurrence. Take all
necessary additional steps to insure lagoon levels remain in compliance with Section 2 of your
permit.
You are required to take any necessary action to address the above violation. You are
required to provide a written response to this Notice, including any additional information
that you wish to provide related to this incident that you wish for the Division to consider,
within 30 days of receipt of this letter. Please include in your response all corrective actions
already taken and a schedule for completion of any corrective actions not addressed.
Failure to comply with conditions in a permit may result in a recommendation of enforcement
action, to the Director of the Division of Water Resources who may issue a civil penalty
assessment of not more than twenty-five thousand ($25,000) dollars against any "person" who
violates or fails to act in accordance with terms, conditions, or requirements of a permit under
authority of G.S. 143-215.6A
If you have any questions concerning this Notice, please contact me at (252)948-3939.
Sincerely,
Via kzu
J� C_ r �?
i ay, L.G., Superviso
ater Qua i y egional Operations Section
division of Water Resources
Washington Regional Office
7Y
cc: DWR - WQROS - CAFO Unit — Central Office
Jones County Soil and Water Conservation District
NCDSWC - WaRO
WaRO Laserfiche Files
Smithfield Hog Production
f
;Y
0.9—
;j