Loading...
HomeMy WebLinkAbout670056_Compliance Evaluation Inspection_20200220Division of Water Resources Facility Number 6 `� - �b O Division of Soil and Water Conservation O Other Agency Type of Visit: U Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: (3 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: i Departure Time: L !�� County: Farm Name: &' j 6 a <r'"vw Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: ` i bV�Gvid Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Integrator: Region: Phone: 9fn 3 4,6 63(j'7 Certification Number: Certification Number: Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Capacity Poo. Layers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Design Current Cattle Capacity Pop. y Cow y Calf y Heifer Cow Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No NA ❑ NE b. , Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No YNA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ N NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA Zo ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Zf No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ET<A ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes O N ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 476 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes To ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes to ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [KNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No 0 NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [s'No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 640 ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Flo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes ❑ No ❑ NA ❑ NE the appropriate bo . UP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes R<o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA EKE Page 2 of 3 21412015 Continued Facility Number: jDate of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes <NoF] NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes r No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes gTNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No �A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes To ❑ NA ❑ NE ❑ Yes To ❑ NA ❑ NE ❑ Yes E24o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA a Ie 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE [rNo ❑ NA ❑ NE No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). S✓t9 i 1 S ct ,.-� 2 c� Zcs, L)aQ dy - CW ; .S vs� ., Q ��� V_ v Sri wJ ..i ^t S S-� 1 -iff Q . � vim? 2cG 11 A'D ir—F • A i 5 \v\ ( z gL31) (1 il\Q Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: 00 j l Date: a `70 214 01 S