HomeMy WebLinkAboutNCG550766_Compliance Evaluation Inspection_20061218 •
•
United States Environmental Protection Agency Form Approved.
E n q Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection'Report Approval expires 8-31-98
Section A: National Data System boding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 I NI 2 15I 31 NCG550766 111 121 06/12/18 117 18U 191 Gl-I 20I I
Remarks -
2111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII66-
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -------------------------Reserved -
671 169 70 U 71 U 72 U 73 I I 174 75I I I I I I I 180
Section B: Facility Data-. -
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number)
10:30 AM 06/12/18 02/08/01
Joe & Shirley Gerrald - SFR
Lot 9 Rivers Rest US Hwy 176 • Exit Time/Date Permit Expiration,Date
Saluda NC 28773 10:45 AM 06/12/18 07/07/31
• Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible Official/Title/Phone and Fax Number '
Contacted
Joe Gerrald,966 Myrtle Dr Rock Hill SC 29730//803-329-9818/ No
Section C: Areas Evaluated During Inspection(Check only those areas evaluated)
El Facility Site Review
Section D: Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Larry Frost %� ARO WQ//828-296-4500 Ext.4658/
Keith Haynes ARO WQ//828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type 1
31 NCG550766 111 121 06/12/18 117 181_'
• Section D: Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
This inspection was intended to confirm the proposed site for the SFR. The SFR has yet to be constructed.
•
•
•
Page#. 2