Loading...
HomeMy WebLinkAboutNCC200914_ESC Approval Submitted_20200310ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality February 19, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Geosurfaces Southeast, Incorporated Attention: Lance Rosenberger, SVP Construction Services 150 River Park Road Mooresville, North Carolina 28117 RE: Project Name: Jay M. Robinson High School Turf Field (Express Review) Acres Approved: 2.4 Project ID: CABAR-2020-047 County: Cabarrus, City: Concord Address: Pitts School Road River Basin: Yadkin -Pee Dee Stream Classification: Others Submitted By: Geosurfaces Southeast, Incorporated Date Received by LQS: February 14, 2020 Plan Type: New Dear Mr. Rosenberger: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. Q ��` North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources e:!0r5f�dJ/� Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 WMH CAROL] ft"rb mm6"°"""" 'aw."ft\ 704.663.1699 Letter of Approval with Modifications Geosurfaces Southeast, Inc. February 19, 2020 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, v Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Kevin Herring, PE, Kevin E. Herring Engineering Letter of Approval with Modifications Geosurfaces Southeast, Inc. February 19, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Jay M. Robinson High School Turf Field Project ID: CABAR-2020-047 County: Cabarrus Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] oro z� �f a Ell -1 eom-. A� C owow • ►-] 0--d omi' M �• ° � ow ow ° ►-► '� ow �• ow m elf, 0 y