Loading...
HomeMy WebLinkAboutSW6191202_AddInfoRequest_20191216ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director William Chris Crosby, PE Electric Consulting Engineers 115 Oakland Avenue, Suite 102 Rock Hill, SC NORTH CAROLINA Environmental Quality December 16, 2019 Subject: Request for Additional Information Stormwater Permit No. SW6191202 Allendale 115kV Substation Hoke County Dear Mr. Crosby: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on December 4, 2019. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Documentation from the NC Secretary of State or other official documentation showing the title and position held by the person who signed the application is required [I 5A NCAC 02H .1042(b)(ii)]. This can also be in the form of a letter signed by the registered agent or a principal executive office of the level of vice-president or higher [15A NCAC 02H .1040(1)] granting authority to the individual who signed the application. 2. Please complete Part III.4 of the SWU-101 application with the contact information for the local jurisdiction for building permits. 3. Please complete a low density supplemental form. The Supplement EZ form can be downloaded from the Stormwater Design Manual website. 4. Please place the swale in a permanent recorded easement that extends to the nearest public right-of-way in accordance with General MDC 9. The substation does not need to be included in the easement. 5. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hltps:Hedocs.deq.nc.gov/Forms/SW ProjectSubmittal D EQ �� North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA Depadm.mofEnmmnm.maaualfty /� 919.707.9200 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 15, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6191202 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen(d),ncdenr.gov or (919) 707-3649. Sincerely, 6rvj/ &I, Corey Anen Environmental Engineer Stormwater Program cc: Fayetteville Regional Office