Loading...
HomeMy WebLinkAbout20200356 Ver 1_CAMA Application_20200306ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director March 6, 2020 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) arena bodnar(ancdenr.00v SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Sunset Village Home Owners Association, Inc. Project Location: 0 Lands End Way (Parcel #015031016), Frisco in Dare County Proposed Project: Replace and expand an existing boat ramp, add a lower platform to an existing pier, construct two groins on either side of boat ramp. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by March 27, 2020. If you have any questions regarding the proposed project, contact Yvonne Carver (252-264-3901, ext. 237) when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" PRINT NAME AGENCY SIGNATURE DATE This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Oepaknnl W imMa'.menW Owl North Carolina Department of Environmental Quality I Division of Coastal Management Elizabeth City office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252.264.3901 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Sunset Village Home Owners Association, Inc. 2. LOCATION OF PROJECT SITE: Association's northern section of docking facility/boat basin, 0 Lands End Way (Parcel #015031016), Frisco, Dare County Latitude: 35°14'16.61"N Longitude:75°37'37.13"W 3. INVESTIGATION TYPE: CAMA & D&F 4. INVESTIGATIVE PROCEDURE: Date of Site Visit — 02/06/20 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete — 02/10/2020 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP - Residential (B) AEC(s) Involved: EW, PTA, PTS (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — N/A Planned - N/A (F) Type of Structures: Existing — Bulkhead, docks, mooring piles, boardwalk Planned - Bulkhead, boardwalk, docks, mooring piles (G) Estimated Annual Rate of Erosion: N/A Source -Application 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Shallow Bottom; EW, PTA N/A 516 sf N/A AECs (B) Open Waters; EW, PTA N/A N/A 126 sf shading (C) High ground — PTS N/A N/A 723 sf shading 3000 sf disturbance (D) Total Area Disturbed: 4,365 sf (0.10 acre) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW Open: Closed to Shellfish Harvesting 8. PROJECT SUMMARY: The applicants propose to replace an existing bulkhead, boardwalk, docks and mooring piles in the Sunset Village HOA basin. Field Investigation Report Page 2 Project Setting The proposed development is located in the northern section of a man-made basin in the Sunset Village subdivision, off of Lands End Way and Hwy 12 in the town of Frisco, Dare County. The canal of the basin connects to the waters of the Pamlico Sound. Work proposed will involve the shoreline of Parcels #015031016 and 53192 Lands End Way. The Sunset Village Home Owners Association (HOA) has a deeded easement that comprises of the installation and maintenance of the existing bulkhead, boardwalks, docks, piers and boat slips in the northern and southern sections of the basin. The existing slips are assigned to the subdivision's property owners and are not leased. The Sunset Village subdivision's parcels equate to approximately 11,000 square feet (sf), and the elevation is approximately 3' above normal water level (NWL). There is no Coastal Wetland vegetation on the project site; existing vegetation consists of indigenous yard grass, ornamental shrubs, and trees (including pine and Atlantic White Cedar. The shoreline of the development site is hardened by bulkheading. There is no notable erosion onsite; however, the existing bulkhead and dock/slips have deteriorated due to weather and age. The existing 3-foot wide, wooden boardwalk is slanted and crooked, and is not flush with the bulkhead cap, creating a safety hazard for property owners. The existing small docks are cantilevered to the bulkhead wall, and there are tie pilings creating 6 slips on the northern side of the basin. The bulkheaded shoreline around the Association's basin is approximately 650± feet. The depths in the basin range from -3.5' NWL at the end of the docks to -6' waterward of the of slips. The width of the canal in the project site area varies from 27' to 63'. The man-made canal and basin that are contiguous with the Pamlico Sound were permitted through CAMA Major Permit #50-92. Sunset Village HOA was issued a General Permit, #70013A, in 2017 for maintenance excavation of the entrance of the canal after Hurricane Matthew. The riparian property to the north is developed with a single-family dwelling, utility shed and swimming pool. The residence is located approximately 18' from the Association's bulkhead/basin. The riparian property to the southeast is developed with a building, and 6 slips with 2 finger piers. The south/southeast sections of the basin's shoreline are owned by the Association, and development includes 16 slips, 2 small docks, a kayak launch and boat ramp. The riparian property to the south is developed with a single-family dwelling, swimming pool, and pier/walkway. The waters of the Pamlico Sound are classified as Coastal Waters, and are in the Pasquotank River Basin. The Environmental Management Commission's water classifications for this tributary are SA and High Quality Waters (HQW). The project area is not within a PNA, and is closed to shellfish harvesting. Field Investigation Report Page 3 Development Proposal The applicants are proposing to replace 258' of wooden bulkhead with a vinyl bulkhead a maximum of 2' waterward of NWL. A 3' wooden bulkhead cap is also proposed waterward of the boardwalk. Approximately 516 sf of sand fill from an upland source is proposed below NWL. The 6 existing 7'x3' docks will be removed during the bulkhead construction, and reconstructed with the same dimensions after the bulkhead is replaced. In addition, the 6 existing tie pilings that incorporate the 6 slips will be replaced 12' from the new bulkhead wall. The existing boardwalk adjacent the bulkhead will be replaced in a footprint of 241'x3'. Equipment for construction of the project will consist of a barge, backhoe, utility truck(s), and tractor. Anticipated Impacts The installation of the replacement bulkhead will result in the filling of ±516 sf of Shallow Bottom habitat in the EW, PTA AECs. Temporary disturbance will impact approximately ±3,000 sf of High Ground habitat in the PTS AEC as a result of work related to tiebacks and grading. The replacement of the boardwalk will shade ±723 sf of the PTS AEC. The replacement of 6 docks will shade 126 sf of EW, PTA AECs. Submitted by: Yvonne B. Carver Date: 02/26/2020 fEU G <<TJ PROJECT NARRATIVE �� FOR SUNSET VILLAGE HOME OWNERS ASSOCIATION, INC. PROJECT LOCATION: In the flood end of a canal that is contiguous to the Pamlico Sound and borders the platted lots of Sunset Village Subdivision and Lands End Way, Frisco, NC, 27936 CHARACTER OF PROJECT: Maintenance of the northern most portion of a private exclusive neigborhood docking facility, that constitutes less than 50% of the total docking facility in the canal. This north portion of the docking facility has 6 boatslips (6 small docks & 6 mooring piles) including a bulkhead and boardwalk. The boat slips are specifically assigned to the private property owners of the subdivision and are not for lease or commercial use. The docks, piers and boat slips are the property of and entrusted to the Sunset Village Home Owners Association, Inc., which includes installation and maintenance of these facilities; who have been granted easements for this purpose. (See DB 1201, Pg 572 attached). PURPOSE OF PROJECT AND METHODOLOGY: To provide safe protected dockage and safe direct access to navigable waters for residents of Sunset Village Subdivision and their guests, by replacing the existing deteriorating, boardwalk, and boat slips (docks and mooring piles). And to maintain erosion control and storm protection for the canal boat basin and existing upland homes and their facilities, by replacing the existing deteriating bulkhead with a new bulkead. OTHER SPECIAL AND RELEVANT CONSIDERATIONS: No fueling and/or maintenance work shall be conducted at the boat slip locations within Sunset Village Subdivision. (See DB 1201, Pg 572) R1Y10-1 Received APPLICATION for BAN 31 2626 Major Development Permit DCM-EC (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicantl Landowner Information Business Name SIMSe7 V111AGE ,<//i%/IF Project Name (It applicable) MVAIM [15SOC/A'1/aN+ LNG. Applicant 1: First Name MI Last Name L/NDA . MONMi PR(.S1Df1qT Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO BOX City State S427 JDR/AN RD,, W1136AI Me ZIP ZIP Country Country Phone No. FAX No 27896 7�. ZS2-�Z3S-7963 ext. Street Address(rf different fmm above) city Slate ZIP 6naif lirhaeol cal ao(,LJm 2. Agent/ContractorInformation Business Name Agent/ ontractor 1: First Name MI Last Name Agen Contractor 2: First Name MI Last Name Ji'--AIAI r-[R Mailing Address PO Box City State 11771 S.C. LnFnYF7r£ S7 .9RIA97 l2 ZIP Phone No. 1 Phone No. 2 3 L! 9 9 7 Z62 - 305- ra 3 q 7 ext. ext. FAX No. N/A ContraActtor.1# �1 /V /A Street Address (d different fmm above) City State ZIP Email haHergmrf ®Yclhonr Cam <Form continues on back> Received Form DCM MP-1 (Page 2 of 4) JAN 3 1 MCI APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address Z .: State Rd. # D6FR MANS END WAY o/So3/�/c� _.a»�.A AIM - Subdivision Name City State Zip SUNSET VILLA9F FKISCD MC Z7936 Phone No. Lot No.(s) (if many, attach additional page with list) - A/M - ext. 15, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project PASO(In TdA/K MAN-MADE CAIVAL c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ermanmade ❑Unknown G4 M L 1 CD SOUND e. Is proposerwork within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Lres []No work falls within. DAW COUNTY 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fl.) DARCE L 015177 `% 9 642' /0j/.38S.f/PARl?EL"'D/10Y16 1A•-9095f: c. Size of individual lot(s) M/A d. Appropmate elevation of tract above NHW (normal high water) or r NWL (normal water level) 3 (If many lot sizes, please attach additional page with a list) ❑NHW or jff,�WL a. Vegetation on tract L4WA/G..he .e,4lA7 tII. VEGE.T/�7/0/J I. Man-made features and uses now on tract BULK/lf.Abi SOA2DW/JLKIDnt1CS,rMn/1 A16PMfr g. Identify and describe the existing land uses admacent to the proposed project site. h. How does local government zone the tract? 1. Is the proposed project consistent with the applicable zoning? RESIDENT/dL (A�ttaf� zoning compliance certificate, if applicable) �'es ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes &ro k. Has a professional archaeological assessment been done for the tract? if yes, attach a copy. ❑Yes 6C, ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Dyes EINo ❑NA National Register listed or eligible properly? <Form continues on next page> Form DCM MP-1 (Page 3of 4) Received APPLICATION for 1AN 31 2020 Major Development Permit m. (1) Are there wetlands on the site? D fl �VI A E C oyes 03ko (ii) Are there coastal wetlands on the site? llod []Yes I j< (ill) If yes to either (I) or (il) above, has a delineation been conducted? []Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/d p. Describe existing storm water management or treatment systems. N/Q 5. Activities and Impacts a. Will the project be for commercial, public, or private use? j ❑Commercial ❑PubliclGovemment %a%' ( VA M rivatelCommunity i b. Give a brief description of purpose, use, and daily operations of the project when complete. (PRIVATE TFMPt7(CA/lY MAI RIA/F c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it Is to be stored. YROVIDL,SAPi Pn;-65EA IoncKdrresnFe DIRFUA(CESS TMV/MUr WATERS FOR kl':SIDLN SOFSC/VS(lVll.(Arl BYRAPLALINA orl57/NC-2 bt77k11A,r"I11G EDAPDWALK,BOAT 211P AID6a(xueAL TDMdI!✓7dln/EXOSIpNCOI/ kbL� s7pnM pr,DrrCrinN.,,�pDENDUM d. List all development activities you propose. R6PI.4C(-,M9N7' Or 6 X/STING EUIK/#Ea Di tdOil RD Vld d /<.S DDCKSt AM lAHRINA' PUS e. Are the proposed activities maintenance of an existing project, new work, or both? MAIAITE/VANCE I. What is the approximate total �jdisturbed land area resulting from the proposed project? [L]S'q,Ft or []Acres31 OOA g. Will the proposed project encroach on any public easement, public accessway or other area []Yes No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NONE i. Will wastewater or stormwater be discharged into a wetland? []Yes []No CRIQA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes [:)No ❑NA j. Is there any mitigation proposed? ❑Yes []No WA If yes, attach a mitigation proposal. <Form continues on back> SUNSET VILLAGE HOA MAJOR PERMIT APPLICATION Addendum to page to form DCM MP -1 (Page 3 of 4) 5 Activities and Impacts (c) METHODOLOGY: Remove deteriated boardwalk, docks, and mooring piles; and dispose of in an approved landfill. Construct new bulkhead 2' in front of existing bulkhead and backfill as required with clean sand. Construct new docks, set morring piles and construct new boardwalk. Stabilize all disturbed areas as required in accordance with accepted erosion control standards. TYPES OF CONSTRUCTION EQUIPMENT; NUMBER OF EACH; and WHERE STORED: (1) floating barge with lift; (1) backhoe; (1) dump truck; (3) utulity trucks; all equipment to be stored off site in private yard, except for barge to be moored in canal and secured. Received JAN 31 K20 DCM-EC Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit B. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted In order for the application package to be complete. Items (a)— (t) are always applicable to any major development application. Please consult the application Instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate• dated work plat (Including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management, Name FRISCo cOVEeoarr I LC Phone No. Address 2y04 IAICLIAIE C7'r 60604U Affli VAS "t)63 Name JOS 6 PH 6, TUOM PSOA! I' Phone No. Address PD B0X CS PWISCb/Al('a 2r1934 Name sLLRE74RY6F 1460SI/16'd U99dA/ OEVEILPMENT Phone No. Address �/,$�/—%Uf sT $,�t/it W4SRIA16 TOM 01'-, 2600 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and Issuing dates. -Sa-%).r Joe d31io1/99S P ao/3 S a a //S%7 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. N/la j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed bypropedy owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. to Enter on Land understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. further certify that the information provided in this application is tr thful to the at of my knowledge. Date 4 N12-0 Print Name Signature 6*L7 Received JAN 31 Y2J 7se indicate application attachments pertaining to your proposed project. CM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts 11 it pl"'!1 ❑DCM DFgM MP-3 Upland Development EC ZDCM MP-4 Structures Information Received Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) J0 3 170,13 DMEC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Grain Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project Depth NA NA 1. EXCAVATION [g'fhis section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards, C. () Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL []None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? ❑Yes []NO ❑NA (11) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: d. High -ground excavation In cubic yards. This section not applicable b. Dimensions of disposal area. d. (i) Willa diogosal area be available for future maintenance? ❑Yes So ❑NA (ii) If yes, where? f. (1) Does the disposal include any area in the water? ❑Yes []No ❑NA (11) If yes, how much water area is affected? Form 0CM MP-2 (Fxcavniiou arid Y'w, i"aefc Z ref Z) 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Tyge of shoreline stabilization: b. Length: 7 .26 EjBulkhead ❑Rlprap ❑Breakwater/Sill ❑Other. _ Width: / t c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 V//VYL months? ���� ❑Yes ❑No C311A (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. Bulkhead backfill 5145 Riprap Breakwater/Sill Other 1. Source of fill material. UfZAND DF'FS14F h. Type of fill material. SAND J0 312020 ®MEC 4. OTHER FILL ACTIVITIES Mfhis section not applicable (Excluding Shoreline Stabilization) a. (I) Will fill material be brought to the site? ❑Yes []No ❑NA b. () Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged equaticvegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (lit) Dimensions of fill area ❑CW ❑SAV _ ❑SB _ (iv) Purpose of fill ❑WL []None (i) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on she and erosion controlled? &IM1JEd 0 c. 0) Will navigational sk}15 be required as a result of the project? ❑Yes []No LNNA (ii) If yes, explain what type and how they will be implemented. N-D'/-2D Date S1/.0S67 YA11415,E , Al)A Project Name b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? RAPIS 1 &AcKNo6 D(Imp T2/rlK Inn t• Zare. U71117V 711PIM(S d. Q) Will wetlands be crossed in transporting equipment to project site? []Yes ❑No PfA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. L/NDA MIITT14EWS f✓/1f �IUEXl7 Applicant Name J411VS11' /��IDAX�� oes Applicant Signature lASt4'f) Received Form DCM MP-4 STRUCTURES JAN 31 202) (Construction within Public Trust Areas) DCM-EC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: �/ ❑Commercial ❑Pubiic/Govemment N)Private/Community c. (1) Dock(s) and/or pier(s) (11) Number 6 (iii) Length 71 (iv) Width 31 —/ a, (v) Floating ❑Yes e. (i) Are Platforms included? ❑Yes MNo If yes: (ii) Number (iii) Length _ (iv) Width _ (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (!)Number of slips proposed O (11) Number of slips existing C, i. Check the proposed type of siting: ❑ Land cut and access channel Ven water, dredging for basin and/or channel n water, no dredging required ❑Other; please describe: k. Typical boat length: II I W AM ) m. (1) Will the facility have de pilings? 4Y'es ❑No (ii) If yes number of tie pilings? 6 ❑This section not applicable b. (i) Will the f�ac/ility be open to the general public? ❑5Yes No d. (i) Are Finger Piers included? []Yes MN. If yes: (ii) Number (iii) Length (iv) Width _ (v)Floating ❑Yes []No I. '(i) Are Boadifls included? []Yes MNo If yes: (ii) Number (iii) Length _ (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips') only, number of slips: 6 ❑ Dry storage; number of boats: _ ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). MI XL4 IWO CHA&7E R Z I. (1) Will the facfli a open to the general public? ❑Yes MNo Form DCM MP-4 (Structures, Page 2 of /e) 2. DOCKING FACILITY/MARINA OPERATIONS ffThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. Received J0 31 K29 d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on ovemight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? Received Form DCM MP-4 (StructureF, Page 3 of a) J0 31 K^D m. Is the marina/docking facility proposed within a primary or secondary nursery area? J� [:]Yes []No ®CM -EC n. Is the marinaidocking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes []No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) his section not applicable a. (i) Is the boathouse stmcture(s): , ❑Commecial ❑Public/Govemment ❑Private/Community (it) Number (Ili) Length r (Iv) Width Note: Roofed areas are calculated from ddpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-Z Excavation and Fill.) his section not applicable a. (1) Number (it) Length (Ili) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) O his section not applicable a. Length b. Average distance from NHW, NWL, orwetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ❑This section not applicable a. Is the structure(s): // ❑Commercial ❑Public/Govemment E rivata/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, If present. e. Am of the swing _ b. Number d. Description of buoy (color, inscription, size, anchor, etc.) IV14 is 0R',M IV((<,4 (Sivur.trirv�„. Page A of l) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of stmcture(s) to adjacent docking facilities. ONQDJet1 E N7Rt9�R./!ill Pk/1PEY(TY /IV CEtrMPIT C/o SE_ 37" ;'MIC.TURe /B- Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body VASYS P.7' 63' e. (1) Will navigational aids be required as a result of the project? ❑Yes (�o ❑NA (ii) If yes, explain what type and how they will be implemented, d. Water depth at waterward and of structure at NL orNWL 35'G�dU[KE/aU /6�ritt74R/�/5 l.tS & OTHER his section not applicable a. Give complete description: ' ' 0/- D 4.2D Dale ,ADJACCRT BIJUA Bp Project Name SUAISG7 VIUA6C AMC 6 WAICRS ASSbe,s 1AP UN)AMAT71IM3, Pkf.'S!O[AIT Applicant . Appllcant Signature C Received JAN 31 ZCD DCM-EC MAJOR PERMIT FEE MATRIX Annlicant: Sunset Villaee Home Owners Association. Inc. Selection Development Type Fee DCM % DWQ % (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: Major Modification to a $250 - 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: Private, nonercial development, if $250 100%($250) 0%($0) al Water Quality cation No. 4175 (See k ed can be a lied: Publicor commercial pment, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 4175 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4175 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) rFE] 4175 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or III open water areas: lN�ny • ,� ,Xol 7 Jy 2.! 1 a > t9-' O Zytn0 g LJj[1� ![per Ww � v z RI IT•% O a ° Pi off, <O< LIJ yz Cc) o. ._ 'O A 9 N pw� C24 N ❑ p N y O w � gry ® _ V /� m 0/q ♦Y �� Co `,� O CD CL p z o � «r. v 0 � Q h►n� CID 7 1 I-+ ✓ Y u z 0 ryp 0 M M < t+l O YM H. ° K T V O � 3 - t" D O ° n ' 1 u � i� 8 o ao S e o w �a ay wv o a a• s 9 w o. o •O. w a- Q' o `� > s o o ° T `� 'o o• a• g 00 9rOa.R<y° B�"0a��ov» �m soaa @�.`a90 Wo R.-p- o oR°n$yv 3A EL 6r Eva E; R ° w C. y y `< �c fie N �T . 1 b °Lp.S c m m ..0.a°Tp.�O�y'w m 8,9 Ea • °mSww a• °o w oa oR rn a. Cw ° R.'a 0 eF �. o. 'tp�°' pep. �• n v :Q2_$' o' w° aaa o �+ C.3 a• 5, ry' w N N O "q H, t5 C. K l."� gq m 'O R o O Ot OR a p < O Q, rd 13 oE)o ��<o�° w voS< ogRs p� . omc.c3o m c.eooBs�o��ToS<�m 'ao.�°���om w ^ M W e n rn R y m 5, a �•v M Pa• v E PP y 00 � a 2: Tj v cw a sytea'rn .o °w eNT, �• m ogoo it o s M H � � R °• B m ® CD C7 CD Am ; <` J cl N O f�l v cm 0 0 x N O M Gt ca fD r s r 0 O �C tw'+ C° O C 009. Pf b �• R w" A R .an .ai cD 7a on y w 5. o' :.. fD m e ^ w o° m bo• �. a 3 tc1 w v aao S. � 5 a' y o-a� a xc ❑._.row ° e 3 a .g °° m � °,,, ay a o' O a cwi m, m y °� (�c,`�°y w o Ala 5'.Co •�.l�yA7° 5'' ° o•(o�•o' �•c' Sao .,, o •o cao o$yN o a N. R :n ro° N p. Y N° F °a � a ti o.°'y � a y x x c ,ca, c�'o •• » . 3 � ° o nut + �. b O `'° " '°'^ °^ o a o. w ^ w '° 5 ao a•: o ❑o a 7 $ ° o B o a �aep. �': Ww = o as w O• �. �. a ""{ w m �° C c� a w o f. a ° `< o coo ° c t�C a v c5 O N 3 m '.co o f:o R!_. v>,.n p.=.a � � "'tom y c'So e �' n a' o. • w o owo° ���Hn,°go .y°.a-�X ��3x^.m'� A .y,�� °oo'y'� •w.5 �w �G$°ca° o,yv ya <y o" s v atlO H —1 �. �• .O C Wry O w � '� ° ;' °e �. a: E � •p B• H: a m y ° `r � rn ay a `-4 GG�;w rn x v ffi o 14. o 0 s a$ a y 5 m y y y m •, °= cSe °❑ wcp er°a'OOa vaq°9+'� T'..•e��Tm5w : OCaT. a�. C°roiwR Orar 'n �°Oo w N R oO y _ ® CD u' CD N °,o o y a•rn ° O c•e ao a .�+, o w a�''m °'c�.o �• �' E �°, m y oOQ 0. v sao og �'°.g.».a•a `a° y ° 5•X � m Y co a+ao a,S�. ` 5 o•v o 0 o• �.ma6o < o -0 R ..rN op s 6 .O <O 5 �N �^ Y y p O .�F°•3. 2 go. vNmgw.�og '°s"y�.c Coy�oRd'om�� a2 so R oo Y „oq �.E 7Cr°o o L+ » ° 0. W N no •�1 Q Qi ij � � Y � � � � °• °rc y m P S °o o`r. ° = $.'< �w oo �a e m S: .Nrn.v s ^ rn �f° -o'a�� y.� moo. y w� ?w' ° a$ rr �P 5 y ° m ° CL $ °e R no `' 3 � A �S. t6 g' M C', �• O° O O C T Q o MCIo. R G W .pae C ° o .a, a c o E c o. 0 �.� o y " rn yjg rye &�, a � � � aa• ?q �0 ry7 ct =, w N C m O T. (C 3. w N w V rl .I� T •3• y y °. °° !1 iw., R� cw o' O o: ;; N ° N w Y cse o 'p' . E; �' `�< io •c. ° .wM a M S, N m s 3.� y w 8 5'� c°i a o sop aMS.3 0� o 4� N 9 tj 7N7 Y s w w m° " c°»° �. + fD 00 i. g a ❑ Fr R v N a o° rso a oEr Um o 5. a � �• w O M `G 'O w ° < N g. M �i N `c i{ w O VI CFO' m CD co 0 M+ • V A n> ♦ / CL � e i W O O N a CD Ul V W A ® �_ 6V M♦ C, V 1 m W �. wCo.cScc�m3c�°o oo� oc<�' c",`��,��Yr��"°y�y�o•o� m y a' m c o. �°, �. 1 o o m w m- o v° i d o 0 0° � w w� �. 0. a W y C O� Y� .° m y. w n �. �. a• o Q v, a: Kf 5 y °' c � �e d ! c 2 oP' o ? x o a. s �. s C'. ° `°' as , o w b° °• �' N a O y SOS y0 O O. A O tD p»c�pind y �-Opi +G�� O G O d O p a C ^ [� G V p A 7Vw°' .fi ' 'O N ^ w ° G. a G. � :i � S. w` v_ v_ y ° � y ;° �o c �• � �, o^ �D � v � �D °rs, -'r ° ° °- E o • � ° ° o �. yp �j (°p m '�•' �p ,., -+ o ° a cry; .°, dot 5. l9 E o d o b m E°° w c y a° l7 o a mV ace a nmwo o °jai x,Io 1. '.?O. < a °• -Gi �4ry0. 0 0 Od mTpp q3 , a*rnGaoO m c• c ay.sm o'� 4 o'v N °'� o. C a o C o a a. a a °` o a+ �. w c° �' w B m oc E_'. R-° m � RA S , .iy � °' �. � t0 a m w' H �'`< �' og 0 a o• ,°, '� o '., x o 2 o m 3; P °. o ti r3 = H �. so ° cs o y ?ao3°dNa^v°w5e o�� o° o�oorn °P °a Sm»yo rn03. ow ooyo pTQ°p.��ci m2 C G pip. °' L" » y ° y N S 1 y C, n O• N e(' �J" g ° �. » P. ° ry w d 5 N N S ° i'n _ [j ((C�� d a �• ° UC 'O ((11 [nY D p: NNpo Q w w y' y w5` NE 0 I. y f°»0 o T �. d W O. cso o p. m $. o ao Q moo• a g o °� a w y�� o v m c� � m o R ,» _� m ° N W O O X N O ..a La O CD W V A • ;a C CD q � q.� GV T {.m • V ^> �� 1'1 r > CD u CL A a 5 o a o w C• m 0 to d a w o a p sg ry� R ^>> ° C+ O ty C w -• �C. g•°a° t3 0' o p o E _smz. $• o o e1 a S9 R_E. o a a 3• a w L w mw a Y �• � 4.8Et o � •° � V+ 7 S w `G} 45 • ry w d rjr,o {°{avv 0 a �� a 22. eno -0 o w c � o n c o"sya r, OQ o:3° 0 ay'S �p&p°�ri @ p. 5. $. C. 00 G N 7 ry yaN a o' ]. O O �i D, 'O 9 y w 0 00 P. �' N N N�N � (p P+ G 00y p0'L. 7RG w a a `G C C. O d vai rJ C O it7 z a ,y M �7 N S2 �d c4 w SO CJ ao D . l�7 yy `� ° o � 0 0 fib° 5'n m N fiy7� » 9 y a y a o RY T7 N m N Oa0 N G O O G. - z N S2� m y° a a O o �O y 0 ��°�y Y �� �� a•� w w'e y El Fr 8 O CppOqppC S • a t _. CD n M 18 ev b _D C o a. o pya c.g o'o'F,� morn -.wo c ryrnry {� w ff a �Op M 'J_ '°.5 w ppP.. y opN p Y'o C ro fC• C R- rn y R°+ ,,� 6az k�LWiiY (°g W rn .5 � °e � o' �. `� '� rn�e �_. � � ° goy •2 8 y �' �. W '~U' '^ t [f a w m � ^ w ~ a bpt � � � � w m pyy O�!, C N y 0• p ° � 3 .?wc a •Q�' sOa aaap. o -n$� rn ' < m e :.Cao rn @ �° o .fie o•2.rn ••a m E S Q w _,, 3° ' A° c 9 "= a $ v° o O1 S•' S a° r w rn o v o ry 0 %.pro •� rn o y a a•e �?� 0 2 y •4°� � `� N'o �. a• g P.p 1c o a'F p Og$_E C.°- 2 ° '�^.� � � �.� c°^' � $.� m°0 cam•. � m nrn � �, � Z�'� � n �•"'� ?•E c-` yy�' m � �• n � ? � ((Epp Q �• a rn �' � � � �• O C r w- O 2 O2. o r y< �' O' Oq M N O a -i n rn ti w p w Fy U� •' to p rn o. ,y-.. oo' > c ��co.°• °-o i.y E `; cT.� am <<°w H S. .o ° �•y: `= 0 " 3 -", 3 R xB. `�•o s C» o co.rn rn Gtla to g � w< T EL SOti O m in 00 H y - �. O p w a co O O N O .D w CD N cn N w O N 1 w `. O w Wn °cm O K O m O C. ('fin -� � a• w R �. C. S O a• O � H a' O N G. G � b°. m ^^ x e o (oii •, m c �,• 2 a o p a $. S oo m a• H 5: 2' M O �' ,g a° w 0 0 0 » �• ,.,, �• oo 0 __ rT d'o E .'< ° B UQ 2 gym+ ff. �. ❑ 8 SC �_•7. O M `� °��' Y �' `� m p S „' O C N n 'Ors Yy '. �D E4. O �i' f'� L7 d+ o'5v 0 n» c•o 3•5'S o'er S' .o a z o c ? a • a m E• o °, ya o or3°. °< �. car., w y oper+ o G w p3�.' o t" z Q 0 .Pw•a°a m T w w »' y y m .� o cw ^+c c 2 e a'o B Q G o y a0 0 c y o•c CT. 0 3 o sop 2 73, x8.�°�4 y a m 5 w �°,�.�0' �w$0•0 �wnmewo8.- �0'2-`^°�°�q2 00�"'� c'o6fv S �° w a a a. N o m 4 ,a• `a. a _°. '` °op K °° `-3 �. v° o 3 O 2 �Cpp oPO3C[�lyawm m L-Go n O n aw ,O o 2•0 s C r� . m 9 �i A N m S m OC m R. o^ °�^n ^c cQrr°+, CaO C�. a iOEs$ca 'flO SC^' aO ep+ O' wO • ^ t�S7D mC ^ma COwC '0n ' %q CT w ° m $08 w= oo 5 0. no o - m a S os5 P d 5- S. x 00 T�p 03 mF O N m O N N a w $ ^ ° ° � to 2 0•A g ° 4 L° ° � a•5 �0 c � m Z� � y�"^ a•0 � ° 0.0 n N a G 4 »'< � .°, o•m ° 5 c aTa'o:w w -. cT�.o-N�•. 2 ° ?� ° �5'sE •q a '�- °°<p o ry»ry a. �' q�• m°a p; c`Oi n �°-e v'�, �' t E 3 •� c ? O Er. O °' m H d �. i' O. M m m y `< �' S O m N 'F'. N C• 00 cr ' CD N GO •N w 6 A q( bi u co 0 O N o_ v 0 W V V A as CD. CL co O O N O v CD CD CA V co O.k. w s o > °' A � a w o r �` 9.54 m a, o, N 9 'B m 5� ro � T �^ � H. o �yy °oymB ppo 0 o H o o w Od d a y cOdn.N mEl o°°d .� Or OW OW o aaa �� o. S- fD B °, w o ❑ ».°n• f0 0 `�° ID' < t o °y1 ° tl0 {{oo G+ O O .ry O5' tp m 'O O O C w` 0. m c°i 0 S' E K K R 0 o,w � oy 9 3 o fit° � - Sw 5� cT. a� 5 n �3 = tl0 �_ o a°� � W'a 0 � �p �. 5°, T ry 'o o o s 4 O �i. i p° y C w w 'o 9, w 0 2 r•.J' p. c w g 3 a W K �• o c: y 8 y m '°- 9 `� 5- m '�• w» o v .� 3 <o 2. w m ,»�° y m' n S. ° �' o o- o- Z w 4 S `a m a. ,? ='. x• c °a g °a° c �- '�. `�° no c m •° ° `3° a m c 5 910 7 b7 • o. T G' ro m `° c o° o.m E , Fr A c 9 o c o. �C (2p 2 O em. y' n CJ p 5' m A fj m m Ox � LE n -Oi m O u�l' R ..1 w O° 00 O O w a tl0 d O O �... O ° t0• p -i R w M C. N O 2 0 S N g y' Yi�i C O• C 9'- .ws R O°�� � m T, 3, gE. a �. o� ' 3 A 3 �• �' c °W m m o° x (5p ?, m c'o° ° c'o .O O 'G. d C: .Opi .0 d H rn C, p y b O g O O C m o 9 0 3 »' o» ,ram c m53avn° SB6S o0 3G`° 05k�ow �° 5' m''om O O =' O •n C �_ 'U w g7 m 0 R a ' O a y • 'y^d `G 7 b $7• �• 7 R m^. Q09 R' N fS4 l �. m'O v+ .". f9 �'. m 0.$ >p� my m 9 5 .O. n'^ `G O S N y Oti d u -Oi m R O ^ w G ^® r CD �- � IV CJ ♦V TT Iti C) N CL I aiw 00 O O x N O_ CD W N V + CD < OC* cw . vN wc na " fy° y v N a •e v°~; p YnwN $A+ la S °»° O11 ' C. `Ia ° as t�D °� ,< a: � g :{$�'° F a �, m ° m �• o �T w a• m^ o� �ry5� f. 'n a $�� '°'e �', � � °, `�` `i.'Sy� � c. `° £'' » � CJ °-1 tl0 B 1 a Y 4 in ti H N G. p• Wj � a i 5 s ry O � ��3 � N � .�d S C_ � N 0 � •�Cq 'C J ry C o. ai' a• B °' N .T a w � �n a c �°, � �^ •'' .., " a a• � O N B '�' � �° � d S � � a 3�ry^� s .Os. N lY Y w'a ii fD a s K'� O (0 '1 Y �p a O N f4 N �• f�l O ��1 N�q' o ,°e w � � H' �" '�' a "°_* �. "� '"' � .ca. c w =" `° � � e ��Bpp 'e »• °o<'. � �O; �V y � F � o Fy ^O O YY m w i O' Y O..°y R nV. rys C 5 - C ° a m p. �°-n » F G• �' cai w C ° OY C �' cj•.0 �p ^ <° ° °> >'F �•°pGa tom "oa'o o F no o o w'».MW � 0 0 or c c o Q p n °' = 2 0 o w o p rn 9 3 a 3 0 o a o' m 3 B° y R o° ° 'o ,"' a L' » w z '— a m v 'a° "• ` 3 .fDa. H a• o ono w $ 3 0 9 a .�.. ,yam.., .'"'. `G 'S OG O SP ti O.ap OR loc. y ro `� 3 �,� �� gog `�i.°1 0, iB DoO w�p°,•'° o.t�Pma`3�rnww�'�ooe."vB`e 3'w�oHO°°�yy Ta•�<�,a•O5-�w cr"� 3 m m 00 O •^ w a w �' O °' °. c `• N F �' X m oo cci � w.-so W ym a w 0 0 N O Ti V m CA 00 0 9 �• Q' K G N y co C o CA <_ 8x 9^ 'w OC O w y C m op o°° y O y C 5 a d y p 5 O �' a b�° ». Q N tGD z= x o O .i 0 a C p < O• O w 0 f 'S- w C G O. 3 •p '•� �. f0 y 2 R R .� g eF�°oweF,9 a•6 asH'� 0 6 y ac. w'» ov "Td Ow d"' o» w 0 wa ,fDa„ e 59. orOpO� TO�Ew N qp. O o.0 �� � n � P'j. o•� w o-o. � �° S. w<�ry C U7 �C da'O O O r7yyr7l y 2 oc ° L"—.0 OQ s^'�+ m, a. ? 'o'^ 00 ...» w 5? y O 55 S ••� .. �U C� m o y< ua x s �q ip ° d w F m < o ^ y� ^ �, �.< o o pyp'S yo.saf �- < � C M O• N R N O N FO" '� A C N a' `aG ^ 0CA `� "°', Yn• � w � m ° � � � � �• 6 °^ O C°i w ❑ �p O O 0 � 0y 9 � a' x C O'vg 3 w. y y O' .. •C• 'iG. 0. 2 .O+ .y. C 6 ^ y N .R 7. •- ry h p Eggry o �, �, a `� ~ B w �x°° �• y y 3 o s^o y, rn -' o O C R 6 O y N H 6 fV °• H m .ai y �. ... �. R d O 0 � O' o =. S o E—'. °—' ry C Y� �'' y ;� o o e co y, x° `° Bo < a, 9 0. m m " �°, 5' �. ^ n c°l. m wOQ — y G1 O 0-0 '3. M �? L< o C. O p. o�•e°� t"wy��4a. 02,897'wow5. �H �� P mo p� � m � y �°n H �' Tom+ M p � bl � ? y m � c`� � coo tSo p• n, ti �i �• w � N fm d � � P o' ° m �. 6 � � O � � a y' T � � .ar O � y �• ._. ,< m < � m o• a rn � o » �• < CD 0 S c n a S m °a w _ rim'may ry CD / rV' N c: C' 1 O w 0 O a y 0.9 y$y w 5 v ao w e- y'�w-f P3�' 3 o c+ ❑ a o 9` a- o 7 y (G ° .7. M N S. o m m w o' `�'.. N' ca. m 1 o o Lr.v w Q O '-1 y' � y .' � o• � y ry�i � � y y ^ 6 � 7. `� � � e� � � vi EF ' S ❑ PO< w ❑ O a O �' y, 0 a v a x a ❑ 0 5. O _ � O o. .Ci.'11 l7 a- ye ❑ N 0 7 a f9 3 ,o roow` o a �. w 5, 5• °� y Cc:_ryryC. ,. ry�_ry to O .� 'd O ry N A FF CD CV`1 M ♦✓ rn C r=J :v O �l co A ®CD s C7 0 t Y u CD • rt w C w 7 n � µ o w O Q m n0 Q R "1 O 111111 fin, °f°1f �y�, •; ?O�ay � �•�� ildi�w � e o s, ` • O ry GQ v p'no. .w H . �• � ti O .i p O Gm m F o N 1 R 20 W z w O' 0. Ct n Nil Y- m C .,f E co }CA 11 11 'TO,o \\\ PROPERTY up) �49 Fki PPp r s d �. '�1'pF 9@20f AiQ �'SF�6�, 9! r9s 9N\ gyFgo ?for OI/�^ Coro 1. \ � ass EXISTING BULKHEAD 1 AND APPROXIMATE I ROPERTY LINE FOR LOT 1)'1— LOT \ ` APO:: HUD CAMA PLAN FOR SUNSET VILLAGE HOMEOWNERS ASSOSIATION, INC / SUNSET VILLAGE LANDS END WAY FRISCO, NC 27936 Date 01/04/20 Scale 1" = 40' 1 30 1 10 1 40 80 PAMLICO Received SOUND FEB 10 %iil ;'• �= 9 • SUNSET VILLAGE .•u •UU. LOT A Oas LOT rtic (PROPERTY OWNER DOUGLAS C. HICKS) LOT 14 THOMPSON 0 by2o o � MARL FRISCO, NC LOCA LOT 7 \ LOT 6 / LOT 5 CAMA PLAN FOR SUNSET VILLAGE HOMEOWNERS ASSOSIATION, INC SUNSET VILLAGE LANDS END WAY FRISCO, NC 27936 Date 11/21/2019 Scale 1" = 20' PAGE 2OF2 PAMLICO SOUND cF \ AoR�° q Ago PROPOSED DOCK —� NVJL MOORING PILE \ PROPOSED BULKHEAD (s.a) \ \ 0/0 \ /I LEGEND 11nB" (LE EXISTING GROUND ELEVATION / sue ooc LN �P.yy (-6.0') EXISTING WATER DEPTH BELOW NAIL nm EXISTING GROUNDFRIKj SUNSETS POST OFFICE ' NOTES: FRISCO, NC —�D 2) ALL MATERIALS SUITABLE FOR ALL CONSTRUCTION TO BE DONE IICONSTRUCTION.NE IN ACCORDANCE WITH ACCEPTED 3) NWL AT EXISTING BULKEAD LINE �M1 TOBILLYMITCNEL PA ROA0 AIRPORT �--a OCATION SKETCH IS NOT TO SCALE 20 0 20 40 3 —1— 3 '1 ,,�IIIIII"II EXISTING BOARDWALK I I \ PROPOSED WOOD CAP I —EXISTING BULKHEAD ------ L PROPOSED SAND BACKFILL SUNSET VILLAGE HOME OWNER'S ASSOCIATION, INC. 'S MA/NTFH \ \ A,9 ACF�SFM \ \ 94�2acF� �� NT 9Bs NS