Loading...
HomeMy WebLinkAbout20200349 Ver 1_08_BlueRidge_ImpactDrawings_202003060 t 0 N Ln GRAPHIC SCALE 20 0 40 PLANS 20 0 40 PROFILE (HORIZONTAL) 2 0 4 PROFILE (VERTICAL) DESIGN ADT 2020 ADT 2040 PERMIT DRAWING SHEET 1 OF 4 BEGIN CONSTRUCTION -L- STA 10 + 41.08 THE PROJECT REFERENCE NO. SHEET NO. ES -2018 -04 / DOCUMENT NOT CONSIDERED FINAL CITY OF RALEIGII UNLESS ALL SIGNATURES COMPLETED IN(OMPL ET E PLANS DO NOT USE FOR 1RW ACQUISITION ENGINEERING SERVICES DEPARTMENT THE DESIGN AND CONSTRUCTION DIVISION 7,500 VPD 12,000 VPD RUFFIN BLUE RIDGE ROAD (SR 1670) WIDENING PROJECT CITY PROJECT NO: ES-2018-04 FROM DURALEIGH ROAD (SR 1664) TO HALL CITY MANAGER STREAM C RABTRE E VALLEY AVENUE PACTS TYPE OF WORK: WIDENING, GRADING, DRAINAGE, PAVING, CULVERT, SIGNALS, SIDEWALK, AND SIGNING Posted = 35 mph Speed NANCY McFARLANE MAYOR &O1 T /T7 T' TF G G'o' END PROJECT END CONSTRUCTION -L- STA 114 + 18.00 3 @ 8' X 11' RCBC 14' X 10' RCBC PLANS PREPARED FOR THE CITY OF RALEIGH BY: Ki'mley))Horn @2019 NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 PERMIT DRAWING SHEET 2 OF 4 O O 41 N Ln DETAIL 1 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL GROUND— — — FROM STA. 2 8 + 65 TO STA. 2 9 + 90 —L— LT FROM STA. 30 + 35 TO STA. 30 + 85 —L— LT FROM STA. 39 + 50 TO STA. 43 + 00 —L— LT FROM STA. 49 + 25 TO STA. 51 + 00 —L— LT FROM STA. 90 + 15 TO STA. 95 + 20 —L— LT DETAIL 6 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural 1 of Fill Ground ? J 3 ��e< Slope d �. D Fla Geotextile B Min. D =1.5 Ft. Max. d =1.5 Ft. B = 5.0 Ft. Type of Liner= CL-1 Rip -Rap FROM STA. 112 + 65 TO STA. 113 + 50 -L- RT 6" ° fL0.06 0.00 7" 7"° 0.06 6„ ° °0.06 0.02 \ 7" 0.06 DETAIL 2 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural ny1 ae< Fill Ground 3• J ��a�� D Slope 1 Min. D = Ft. FROM STA. 43 + 00 TO STA. 46 + 30 -L- LT FROM STA. 51 + 00 TO STA. 51 + 95 -L- LT FROM STA. 84 + 25 TO STA. 85 + 80 -L- RT FROM STA. 74 + 60 TO STA. 76 + 00 -L- RT DETAIL 8 TOE PROTECTION ( Not to Scale) Natur Groui d=1.� b=3.V Type of Liner= CL-B Rip -Rap FROM -L- STA. 75 + 35 TO STA. 76 + 50 LT. FROM -L- STA. 84 + 50 TO STA. 86 + 00 LT. DETAIL 7 SPECIAL 6% BACK CURB (NOT TO SCALE) 6" ° ° 06 0.04 \ 7" 0.06 6" 0.06+ \ 7" 7" 0.06 FROM STA. 13 + 50 TO STA. 17 + 25 -L- LT FROM STA. 50 + 00 TO STA. 52 + 00 -L- LT FROM STA. 56 + 50 TO STA. 57 + 50 -L- RT FROM STA. 65 + 70 TO STA. 68 + 00 -L- LT REV. No.e I REVISION: DATEe DRAWN BY: I CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2019 PREPARED IN THE OFFICE OFo DETAIL 3 " FALSE SUMP ono ( Not to Scale) Outside Ditch Traffic Flow 2 I' �S— S = Ditch Slope ll� Proposed Ditch FROM STA. 51 + 97 TO STA. 52 + 12 -L- LT FROM STA. 94 + 77 TO STA. 94 + 92 -L- LT DETAIL 9 RIP RAP AT EMBANKMENT ( Not to Scale) Ordinary High 10'min. Water Mark [/_ Pipe outlet 1.0'2.0' min. GEOTEXTILE Stop Rip Rap and Geotextile at Ordinary High Type of Liner= Class II Rip Rap Water Mark STA. 111 + 50 —L— (LT) D ETAI L 4 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL GROUND FROM STA. 38 + 00 TO STA. 39 + 50 -L- LT DETAIL 10 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground n5 Ground d D Geotextile B f Min. D =1.5 Ft. Max. d = 2.0 Ft. *When B is < 6.0' B = 3.0 Ft. Type of Liner= CL-1 Rip -Rap AT STA. 111 + 50 LT. DETAIL 12 CONCRETE DITCH BEHIND RETAINING WALL ( Not to BONDaIe) RETAINING WALL BREAKER NATURAL GROUND rx Min. D = 1.0' B = (1.0') FROM STA. 13 + 55 TO STA. 15 + 00 -G2- (LT) ■ NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2019 DETAIL 5 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural A o� � Fill Ground 2. J F����e Slope D IMin. D = Ft. FROM STA. 79 + 30 TO STA. 80 + 95 -L- LT FROM STA. 10 + 00 TO STA. 11 + 70 -Y14- RT DETAIL 11 BERM BASE DITCH ( Not to Scale)�y I I Natural 1 GRNWY Ground 2 D O� B Min. D=1.0 Ft. B = 1.0 Ft. b =1.0 Ft. FROM -G2- STA. 15 + 00 TO STA. 15 + 50 LT. DETAIL 13 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural o� Fill Ground 2. J D 3 `a'\\el Slope F B Min. D =1.5 Ft. B = 5.0 Ft. FROM STA. 113 + 50 TO STA. 113 + 95 —L— RT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DRAINAGE DETAILS I ���I OT iIFvA YT��,A _'R 'iJE:T. JCB NUMBER: BLUE RIDGE ROAD WIDENING 0 1 1063094 SHEET NUMBER: PERMIT DRAWING SHEET 3 OF 4 O O C) N SITES -G2- PC , Sta. 20 +06.00 UND \ G2 PC Sta I9 +38.03 ,3/ -G2- PT Sta 18+96.85 c P� m -G2- PC Sta. 18+48.65 \ \ \ SITE 3 / ,� F " 55 \ m C),G2 C y c RCP / C \ \ s -- ; -G2- PRC Sta 16 +19.16 ' \ 102- PC Sta 14 37.59 / PUE ���� F - F SITE 4 y \ c_ - - - - - c EPUE E r -Y2/ _ PC � St l5 +35.09 S N \ \ -Y20 - PT Sto. 10 +43.61 R '' 8„ - - - - s -G2- PT Sto. 17+45.14 \ O - D ss \ \ \\ _ _ + _ N P Ro -Y20 - PC Sta l0 +0 .00 Q 8:: ss \ > L POT to. l04 58.60 P -L - PT Sto. +28.90 \\ -Y20- PO to. 11+00.00 v/ - \ T 0 = 12 90° RETAINU�ICRWA\L - 3 -L POT Sto.106 +60.69 = �;/ ��- \ \ ►� G2 POT Sto. 13+I1.97 c } - Q ' Tee - 45 / \. F �TB TB TB S f - �r ,� E / �TB --- TB $f T-_.-�Sf� -�T�� �� F OR T� 10" CONIC RI �6 S[ S �T f �6 JS -TB-TB Q Al J$ g '� SIP i CC PU je �TB- �_-TB TB TB - LlJ T'C'E�/ RCP = r^ E � --- i L " Q �' a' S g �Sf g �5: fG' F �C� _TE � (� p. S�� F. PEE TE�' FPSE- �PsE J �� PS-E P&E � � - - - • � PEE p S{ - E ��� . ��' , v i F IP \ E iw C E S RCP R - _ - _ F C -- ----- - ---- _ ---- ---- -- - I5" RCP •� �_ - - - l- ETF ---- -- xI� r,° - _U - - - - - - - - - - ��ZZI,•. - -- .. --..-..-..-. .. -.. - WL -- -- � - •� 8" RCP = .. .. .. - - - .. - • - - - . ;. .. R/W EXIST •� AP ►'�E IST R w F - - - - - F= - -rF� C /f -\- - - - o R - -ETF RAP - 6„ RCP . - _ • • p-' p4 EIP P WE�c� G S - FD F S F PD P E �Q� -L - P T Sta. 1/ '+36. - �--G2-- - � PT Sto. 12+52.77 � �a T cE i • / s T o � �. - �� 9%O011.2"a /5 +118 _ _ -G2 - PRC Sto. l2 +34.49 ! C �F w A Y - �' - - + �f L PT Sta l04 55.26 . � :, R � i �z, �- i• E F -L - POT Sto. 108 +35.66 = / - P ARK END BRIDGE W -Gl - POT Sta.14+35.00 -G2- PC Sta. 11+92.09 A = ll5° wo RETq �Nc w A 0 0 MARO AT CRABTREE LUNG CANCER 5_1 �l- �;�; ••:• _,. ./ /.�. A INITIATIVE OF F �\ ) NORTH CAROLINA -L- PC Sto. //0+04.29 / _E� 3 ci � • •' F , . '• �' • � BLUE RIDGE RD c -Gl - o.1+6/.60 (SR 1670� S U M M I T \\ , � PARK - BEGIN BRIDGE F /F / • ��• ' ` rY- �.,� I / E . F G E / Y2/ POT Sta 17+75.00 -Y2/ - PT Sto. 17+48.13 -Y2/ - PCC Sta. 16 +42.02 -G2- POT Sta. 11 +12.09 . •� F. ,,. \ P Noy EEN SITE 2 SITE I -Gl - PC Sta. 12 +62.45 MARSHALL L ' MEMORIAL FPS PARK I i -Gl - PT Sto. 11 +48.76 • -Gl - PC Sta. 10 +48.34 •F LEGEND DENOTES PERMANENT IMPACTS X, Zz -G2 - PT Sto. l0 +45.25 � IN SURFACE WATER � BEGIN CONSTRUCTION (BANK STABILIZATION) -Gl - POT Sta. 10 +10.34 = \ DENOTES PERMANENT IMPACTS -G2- PC Sta,10+10.34 IN SURFACE WATER (CULVERT) ®DENOTES TEMPORARY N 190 18' 3.8" E IMPACTS IN SURFACE WATER -Gl- POT Sto. 10+00.00 = -G2- POT Sta l0 +00.00 X - • • - .. _ DENOTES LIMITS OF DISTURBED AREA DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OFo _'R',"):IE:�T. 20 40 BLUE RIDGE ROAD WIDENING INC LICENSE #F_°'02 PERMIT DRAWINGS O REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: 421 FAYETTEVILLE STREET, SUITE 600 IN�O�VUPLETFi CO1.AIT RALEIGH, NORTH CAROLINA 27601 DO NOT USE FOR RW ACQUISITION This document, together with the concepts and designs presented herein, as an instrument of service, is RALEIG ,NOR919) 7HCAR STREAM IMPACTS intended only for the specific purpose and client for which it was prepared. Reuse of and improper im e >)) Horn I PHONE: reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc, ©2019 shall be without liability to Kimley-Horn and Associates, Inc, JOB NUMBER: SHEET NUMBER: Copyright Kimley-Horn and Associates, Inc., 20I9 0 1 1063094 O O I C) N PERMIT DRAWING SHEET 3 OF 4 -Si TE _ —�� C -G2 PC Jta• 20 +06.00 - / - - - - - / ------------ e UND 41 �/ G2- PC Sta 19+38.43' , �' C PT Sta. l 96.85;=c - // / / �/ / / �/ / / / J ------ / /i� ��' j / v i t S / / / / -- -- - ,�0, /, , // C - / / _ _ / / G2 PC Sto +48� l8 5 � - � —foo — — — — — — �'�'"/� \ ',r" SITE C) V - - - - - r 295 — — _ �=5 , ��/ / / , / , i / / ��/, / / ///,, ,// / / //. /n� / /eS / ' / 0 , ,) / /_ / / / /�/ / /i//%�/ C / �� "l it ' ' / / // i � , i//, ,,/ ` V/ice%� i / ems- �� / _ , j �, ////�� ��/,//i /, A �� /��F�- / / / I A>m ✓ , 111 �� _. / CRABTREE c- / I , N PC S 3 591 ta 14+ 7 _ _ _ SITE T - - / ' Y2/ P� eta. SE -Y20 - PT Sto. 10 +43.6/ = ' " - - , ' - , % _ ; �- - - , ,,,, , - �� - - = _ %' - - - = ' / r 9 _ _ ; , _ / / 8' - G2 T—Sto. t 45.14 gO-Ne7 9 I \ _, -' -Y20 - PC Sto. l0 .00 _s - o -L- 0 � 504 58.60 = ,,,';= 1 �, -, - �-sto. +28.90 I �3 - -Y20 POT ta. 11+00.00 ��' ,'/ ''Q '�•`' '/ - ,l / l ' _ (.� f I �) /� �(/� °O Q = 90' _ _ ' / / /, 7 c Hoch / TAIN/� WAU �+ POT Sta. l06 60.69 - �; J _ , , ,' / l , ►� /F , , fit/► /- _ _ , - - _ _ _ - - - - - - - _ _ -_ / / �,� / 0 � / rem �P-S c13+11.97 — —BSI / 2 Za r Tg Rc)o *C FA�� FPSE PEE - PSE� - _ _ F �r — =�d5" RAP T % - -- / - - — / \ - - -- ---- -— .—. /--------- - --— — — — — — �T�• 5 I - J -- - - -- --- — — - -- - . .. . .. //z/z 094-� , Z114Z ST —-—------ — — — —— —-—- _ _ — �'T R/W / E IF w- - - ,--- - - ---- - ' -,€� _ C / /F ETF� S�� /�F — - RAP , - =c_ -- _ _ — •) / i%�,% _ - • — — — _ _ _ _ pp ' V�� E—�TCE -- p �,; ,.1; =G _ - PT StogyL - - - -TCp C _�-,POC Sto• ++ P E , / _ E - 2/ L POT Sta ll4 �&C SW v)�I A / /// / I I � // ��� �''' ' ' _ - STO /� I /. � ` - - - - - - - / -„ , / ` - - � � - 9/�©, /.2 - �,�G� ; - - �6�. l2 +34.49 C F ��: w A Y- __.- -L- PT, S .1Q4,55 6� --- - = / /J. zz 2 �'(—L-I Gl POT St l4 3 0 35.66 END BRIDGE - - - - __-- - _ - t+ 1150 _7/1 _ cam-0or- - '� LUNG CANCERFri / - I ' OF /-'��1�(�, iG''A' \ \ 11 III//��/� \`� �ii �ii '/__'C'// // / �\ �. // / � // � %\"/♦ / \� INITIATIVE OI �-\ �' / '�'' � .:_V- - -' I /ice'/; 11 j�1 -1 j/ ��-/ /%/ �� , / .�0 � _ �" , // / , - ♦ F �: O+G RTH CAROLINA i O L PC Sto. 11 4.29 2 / BLUE RIDGE . M �. � Gl 60 (SR _ / PARK � BEGIN BRIDGE / / F F Y21POTSta.5.00 A(Lip 7- _ - 2Y2/ - PT Sto• 17+_240--G2 POT Sta. 11+12.09,SITE� 48.131 E � o � SHALL/ -Y l- P CC St - a. /6 +42.02 14 MEMORIAL'P -� �o / _ P A R K `/ /F - - ta. 11 +48.76 loe-Gl Pl. Jta.10+48.34 -G2 - PT Sta. 10+45.25 /I DENOTES PERMANENT IMPACTS _ , ' ` I\I / / ' / ' \ _ \ ��/b - IN SURFACE WATER (BANK STABILIZATION) BEGIN CONSTRUCTION -Czl - POT Sta. l0 /0.34 = - , , i - �� _ _ = - / / Q) DENOTES PERMANENT IMPACTS �- - G PC Sta- l(� 10.34 IN SURFACE WATER (CULVERT) � DENOTES TEMPORARY _ - - / 1/'/ ri' ® _ - / IMPACTS IN SURFACE WATER -Gl- POT Sta. 10+00.00 ' / ' / , ' �\ '/ / /' �, ( / s -G2- POT Sta. 10+00.00 ; / i/ I' ��_ -��� DENOTES LIMITS OF - - DISTURBED AREA _ - / // / �i�� i / - v '/ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OFo -'F "JJE:�T. INC LICENSE 2 20 40 BLUE RIDGE ROAD WIDENING REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: >)) 421 FAYETTEVILLE VILLE STREET, SUITE 600 PERMIT DRAWINGS IN�MPLETFi PLA�1O This document, together RALEIGH, NORTH CAROLINA 27601 DO NOT USE FOR RW ACOUISITION im e r r with the concepts and designs presented herein, as an instrument of service, is PHONE:(919)677-2000 STREAM IMPACTS intended only for- the specific purpose and client for which it was prepared, Reuse of and improper - reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc, ©2019 shall be without liability to Kimley-Horn and Associates, Inc, BER: SHEET NUMBER: �oB NUM Copyright Kimley-Horn and Associates, Inc., 2019 0 1 1063094 SUMMARY TABLE (STREAM IMPACTS) SITE NUMBER BANK STABILIZATION (P) CULVERT EXTENSION (P) TEMPORARY (T) ACRES LINEAR FT. ACRES LINEAR FT. ACRES LINEAR FT. 1 0.0228 143 0.0000 0 0.0000 0 2 0.0245 112 0.0010 6 0.0117 43 3 0.0161 41 0.0052 15 0.0124 69 TOTAL 0.0634 296 0.0062 21 0.0241 112 0 t 0 N Ln GRAPHIC SCALE 20 0 40 PLANS 20 0 40 PROFILE (HORIZONTAL) 2 0 4 PROFILE (VERTICAL) DESIGN ADT 2020 ADT 2040 PERMIT DRAWING SHEET 1 OF 4 BEGIN CONSTRUCTION -L- STA 10 + 41.08 THE PROJECT REFERENCE NO. SHEET NO. ES -2018 -04 / DOCUMENT NOT CONSIDERED FINAL CITY OF RALEIGII UNLESS ALL SIGNATURES COMPLETED IN(OMPL ET E PLANS DO NOT USE FOR 1RW ACQUISITION ENGINEERING SERVICES DEPARTMENT THE DESIGN AND CONSTRUCTION DIVISION 7,500 VPD 12,000 VPD RUFFIN BLUE RIDGE ROAD (SR 1670) WIDENING PROJECT CITY PROJECT NO: ES-2018-04 FROM DURALEIGH ROAD HALL CITY MANAGER 1664) TO CRABTREE VALLEY AVENUE BUFFER IMPACTS TYPE OF WORK: WIDENING, GRADING, DRAINAGE, PAVING, CULVERT, SIGNALS, SIDEWALK, AND SIGNING Posted = 35 mph Speed NANCY McFARLANE MAYOR SITE TF G G'o' END PROJECT END CONSTRUCTION -L- STA 114 + 18.00 3 @ 8' X 11' RCBC 14' X 10' RCBC PLANS PREPARED FOR THE CITY OF RALEIGH BY: Ki'mley))Horn @2019 NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 PERMIT DRAWING SHEET 2 OF 4 O O 41 N Ln DETAIL 1 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL GROUND— — — FROM STA. 2 8 + 65 TO STA. 2 9 + 90 —L— LT FROM STA. 30 + 35 TO STA. 30 + 85 —L— LT FROM STA. 39 + 50 TO STA. 43 + 00 —L— LT FROM STA. 49 + 25 TO STA. 51 + 00 —L— LT FROM STA. 90 + 15 TO STA. 95 + 20 —L— LT DETAIL 6 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural 1 of Fill Ground ? J 3 ��e< Slope d �. D Fla Geotextile B Min. D =1.5 Ft. Max. d =1.5 Ft. B = 5.0 Ft. Type of Liner= CL-1 Rip -Rap FROM STA. 112 + 65 TO STA. 113 + 50 -L- RT 6" ° fL0.06 0.00 7" 7"° 0.06 6„ ° °0.06 0.02 \ 7" 0.06 DETAIL 2 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural ny1 ae< Fill Ground 3• J ��a�� D Slope 1 Min. D = Ft. FROM STA. 43 + 00 TO STA. 46 + 30 -L- LT FROM STA. 51 + 00 TO STA. 51 + 95 -L- LT FROM STA. 84 + 25 TO STA. 85 + 80 -L- RT FROM STA. 74 + 60 TO STA. 76 + 00 -L- RT DETAIL 8 TOE PROTECTION ( Not to Scale) Natur Groui d=1.� b=3.V Type of Liner= CL-B Rip -Rap FROM -L- STA. 75 + 35 TO STA. 76 + 50 LT. FROM -L- STA. 84 + 50 TO STA. 86 + 00 LT. DETAIL 7 SPECIAL 6% BACK CURB (NOT TO SCALE) 6" ° ° 06 0.04 \ 7" 0.06 6" 0.06+ \ 7" 7" 0.06 FROM STA. 13 + 50 TO STA. 17 + 25 -L- LT FROM STA. 50 + 00 TO STA. 52 + 00 -L- LT FROM STA. 56 + 50 TO STA. 57 + 50 -L- RT FROM STA. 65 + 70 TO STA. 68 + 00 -L- LT REV. No.e I REVISION: DATEe DRAWN BY: I CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2019 PREPARED IN THE OFFICE OFo DETAIL 3 " FALSE SUMP ono ( Not to Scale) Outside Ditch Traffic Flow 2 I' �S— S = Ditch Slope ll� Proposed Ditch FROM STA. 51 + 97 TO STA. 52 + 12 -L- LT FROM STA. 94 + 77 TO STA. 94 + 92 -L- LT DETAIL 9 RIP RAP AT EMBANKMENT ( Not to Scale) Ordinary High 10'min. Water Mark [/_ Pipe outlet 1.0'2.0' min. GEOTEXTILE Stop Rip Rap and Geotextile at Ordinary High Type of Liner= Class II Rip Rap Water Mark STA. 111 + 50 —L— (LT) D ETAI L 4 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL GROUND FROM STA. 38 + 00 TO STA. 39 + 50 -L- LT DETAIL 10 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground n5 Ground d D Geotextile B f Min. D =1.5 Ft. Max. d = 2.0 Ft. *When B is < 6.0' B = 3.0 Ft. Type of Liner= CL-1 Rip -Rap AT STA. 111 + 50 LT. DETAIL 12 CONCRETE DITCH BEHIND RETAINING WALL ( Not to BONDaIe) RETAINING WALL BREAKER NATURAL GROUND rx Min. D = 1.0' B = (1.0') FROM STA. 13 + 55 TO STA. 15 + 00 -G2- (LT) ■ NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2019 DETAIL 5 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural A o� � Fill Ground 2. J F����e Slope D IMin. D = Ft. FROM STA. 79 + 30 TO STA. 80 + 95 -L- LT FROM STA. 10 + 00 TO STA. 11 + 70 -Y14- RT DETAIL 11 BERM BASE DITCH ( Not to Scale)�y I I Natural 1 GRNWY Ground 2 D O� B Min. D=1.0 Ft. B = 1.0 Ft. b =1.0 Ft. FROM -G2- STA. 15 + 00 TO STA. 15 + 50 LT. DETAIL 13 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural o� Fill Ground 2. J D 3 `a'\\el Slope F B Min. D =1.5 Ft. B = 5.0 Ft. FROM STA. 113 + 50 TO STA. 113 + 95 —L— RT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DRAINAGE DETAILS I ���I OT iIFvA YT��,A _'R 'iJE:T. JCB NUMBER: BLUE RIDGE ROAD WIDENING 0 1 1063094 SHEET NUMBER: O 0 O N N Liji I IF • � \ SITE 5 �•.� \ \ \ \ - -G2- PCC Sto. 20+06.002 \ \ \ \ UND 5 65 -G2- t + 6„ G2 C S a l9 38.03 S -G2- PT Sto. I8+96.85 rd� C -G2 - PC Sto.18 +48.65 SITE 3 ` F 1 "5 0xC \ \ \\ \ RCP i C -G2- PC Sto.14+31.59 -G2- PRC Sto.16+19J6 \ \ \ \ \\ u — e � iE SITE 4 H Y21- PC t 15 +35.09 Q \\ F E S ' -G2- PT Sto.17+45J4 Va� Bz 2 Aj 4) -L- PT Sto. + E SS28.90 'c \ -41 c��e�,. TB�T S(T— 41 5 \ RETAINING WALL �� S[ S( S TB \: �' • \ 10" GOING BLOCK �TB �- 7777777 JS- -- JS- _ ' PU o lg `S (8 ,,$� TB TB g TB �.�-•T•C•E-r'�E-�'� / T6� -L S PEE PSrE— FPS — TF --- - WIL O/F --- s -- -.._.. 12' WILModommaRI RA P 8"RCP - — wn ST R/W EXIST 12" PC R/W -- -- P ►SSE , EIP RAP RCP / . � • O l F — _ — — •� — flINE�._Q ,ODE eti 2 � — — -� PBE � F TCE P E AP � E � _ - -G2 - PT t 1 + 77 T CE T CE��� / -L - P T Sto. - / -Y2/ POC ,Std. 15 +8 -L- PT Sto.104+55.26 -G2- RC Sto.12+34.49 / iE _ � L POT Sto.108+35.66 I P / END BRIDGE /. G/_POT Sto.14+35.00 �� )) j o� G2_PC Sto. 11+92.09 ,. , ,� ,� • 0 = ll5 yp wo RE / �� �� �� ti / LUNG CANCER m1 I� �ANN6 SITE 1 - T ti Y / !• INITIATI E OF \ m �t— Wq� NORTH CAR _ —� � • • � •F � -L - PC Sto. 110+04.29 / E ° BLUE RIDGE RD LEGEND Bz •�. l -Gl- o.l +61.60 (SR 1670) s�MMIT \ / PARK PERPENDICULAR ROADWAY ZONE 1 F • /• �� ���� �0� _Y21 _ POT Sta. 17+75.00 PERPENDICULAR ROADWAY ZONE 2 F �` •! • • - - PS°^ 0�7� ENS` SITE 2 A _ � —�� � • • � �. � ,v ��y� N RE TEMPORARY ROADWAY ZONE 1 ti I , , �� L � � , Pi -GI PC Sto. 12+62.45 -Y2/ - PT Sto. 17+48J3 ARS H A L v �F -GI- PT Sto. 11 +48.76 M -Y2/- PCC Sor 16+42 PARALLEL ROADWAY ZONE 1 0 L RK .,� ��� pF REGI BRIDGE PARALLEL ROADWAY ZONE 2 �F •' -G2- POT Sto.11+12.09 UTILITY ZONE 1 -G1- PC Sto.10+48.34 F UTILITY ZONE 2 -G2- PT Sta. 10+45.25 BEGIN CONSTRUCTION GREENWAY ZONE 1 -Gl - POT Sto. 10+10.34 = I GREENWAY ZONE 2 -G2 PC Sto.I0+10.34 N 19°I8' 3.e E STREAMBANK STABILIZATION ZONE 1 -GI- POT Sto. 10+00.00 = STREAMBANK STABILIZATION ZONE 2 -G2- POT Sto. 10+00.00 DENOTES LIMITS OF DOCUMENT NOT CONSIDERED FINAL DISTURBED AREA UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OFo R,"iJET. 20 40 BLUE RIDGE ROAD WIDENING INC LICENSE VILLE 2 PERMIT DRAWINGS REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: >)) 421 FAYETTEVILLE STREET, SUITE 600 I�i�OD'IPLETE PLA�1$ RALEIGH, NORTH CAROLINA 27601 DO NOT USE FOR RW ACQUISITION im e This document, together with the concepts and designs presented herein, as an instrument of service, is PHONE: (919)677-2000 BUFFER IMPACTS intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc, ©2019 shall be without liability to Kimley-Horn and Associates, Inc, JOB NUMBER: SHEET NUMBER: Copyright Kimley-Horn and Associates, Inc., 20I9 0 1 1063094 PERMIT DRAWING SHEET 3 OF 4 0 0 MARO AT CRABTREE -Y20 - PT Sto.10 +43.61 Zp-GE pR P RID -Y20- PC Sto. 10+0 .00 -L POT to.104+58.60 -Y20 - /APO to. 11 +00.00 1211 T 0 = 9V RETAIg0LvA\L co�j -L - POT Sta. 106+60.69 = /// / -G2- POT Sto.13+11.97 �F 0 = 45" R N \ n S 18" RC m _ i4. U 3 / PJ „ RCP E /w �'�� vE F 15" RCP — — oil •` '� '. O O O N N REV. No.: I REVISION: DATE: DRAWN BY: I CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc, Copyright Kimley-Horn and Associates, Inc., 2019 PERMIT DRAWING — — — _ —500/ _ f, / �.° I I�i'I I SHEET 3 OF 4 — _ / / iy i a (� J c I 11����'N / ✓ i/ 6� //� / J I /� / i i i I . � o /� /�/� / 1 ' � /% ��/ i / /j/�i j / / ✓ - r - SITE 5 -G2- Ppp Sta 20+06.00' 777 // �� / i UND - - PC Sta.l + /X — ,�,� -G2 PT Sta. 18+96.85 ' G2 - PC Sto. 18 +48.65 - i// / — — — — — — — — — = �/ // / ///i // // /i / / ' /// —�c� v SITEI J/ / / / / / // / /% / - / // / 90 /� �C, i / 1V1 5 Ilk Ile MAR 0 AT CRABTREE =: � -- � eee — ran PC Sta./ ♦ \ / / \\ 3 401 SITE m� 4 -Y21- -P to. 15 +35.09 _ Q - -Y20- PT Sto.10+43.6/ ���� - 5 - , v v / // / // // /// / 11 = _ _ v �� I / / / - - _ -G2- PT—Sto. jf+45.14 0 I �( oN�,sW�`(- l v P -Y20- PC Sto. 10+0 .00//� - - Bz 2— / �o + _ N/ / / -L POT to: l04 58 / / �Q / — /i / /� / / l - ti f B 2 _ y / i/ �L T //ti / - , r / sta. T � — 90' ll+ , / r TAIN lIU S/E ) Z / -Y20 - P0� _ ta. �� v / WA�� y _ �// /ll /// / S �20 -L - POT Sta.10+6�.6�9 r , 09-0 10" CON� BLOCK —'' — _ = �Sf tip--7) 15 �T F♦ R-PTAININ,C- ire n rc ''_ _ — 75S — - U �e �B — J _ . --— — -- — — — Sty — \ �£E f CF------ T'C� v /J n _ - . - - � - � � i � _ - F - / UE UE— - / / t Ts, , S� --P-SE PSE— —_ —771 ° - cP �/� —� _� - /xt / / 1 , 4-1 I -- i / ----------------- — - r9r�WL cP 12' WL i E -- i -_ - , Raw � - — T — p — — E E $ tLDE �( ��� — _ — �F TCE�� � ��' to. 114+ 6- IF _ lee,/�I P � T l POC Sto. l5 82. 9r03"l1z -L PT Sto.104+55"26 =G2- St . +34"49 -_�� i / � _ T - - - _ _ -L - POT Sto 108+35.66 = - _ - v I - K END BRIDGE '�- /- _POT Sto /4+35 00 o -G2--�to —I� �/ LUNG CANCER s = I� — '/�� '�� // _ _ i INITIATI E OF — Y �� ���)11/l��j/�� ��i/� s - / / / �� V ••�•>�� / �/ �� NORTH CAROLINA -L- PC Sta.11 - /i L Flo / BLUE RIDGE RDDv � _ s , LEGEND / / Ilr 22 ! (- �Gl- a l +6/.60 (SR 1670J I �r l / �� SPARKT ) o / — PERPENDICULAR ROADWAY ZONE 1 ` ! jF / / .t' �/ 1� E� %� / -Y2/ - POT Sto. 075.00 = v PERPENDICULAR ROADWAY ZONE 2 SITE 2 F • � � / � - � � � \ -- - �� � � -Y2/ - PT Sto 17+48.13 TEMPORARY ROADWAY ZONE 1 �Gl -- -PC Sto" 12 +62.45 Gl — PT Sto II �� A RS H A L - " Y2/ PCC Sto. 16+42A2 PARALLEL ROADWAY ZONE 1 �iGl K .F/ /� �� aBRIDGE\VA / i b� ii / I �� PARALLEL ROADWAY ZONE 2 / / I �� - -G2- POT $to" 11+12.09 /� /��/i '/ /9���� i / \\ \ ��/i'���i��' / �- ` / �- • - -Gl- PC Sto.10+48.34 UTILITY ZONE 1 - ) J / �/ � / -G2- PT Sta. 10+45.25 UTILITY ZONE 2 BEGIN CONSTRUCTION GREENWAY ZONE 1 -GI _POT Sto. lO tIO.34=_ _ o / GREENWAY ZONE 2 �� ir�� G2 PC Sta. lb 10.34 j /� �/� /// r / j / / i V ( 1 �� / N /9°18 3.8E� L STREAMBANK STABILIZATION ZONE 1 �� -Gl _ POT Sto. l00000 + STREAMBANK STABILIZATION ZONE 2 f' L \ -G2 POT Sto.10+00.00 DOCUMENT NOT C • • • • 1 N _ 1 J / / / Z/�' \ ' UNLESS ALL SIGNATURES COMPLETED DENOTES LIMITS OF � � � - / � � � -� / / // � � - S DISTURBED AREA ) �� \ N � _ � / \ I PREPARED IN THE OFFICE OFo ■ NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 im e >))Horn, RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 © 2019 PERMIT DRAWINGS BUFFER IMPACTS 20 40 IN OMPLETE PLAN$ DO NOT USE FOR RW ACQUISITION -'R 'iJE:T. JOB NUMBER: BLUE RIDGE ROAD WIDENING 0 1 1063094 SHEET NUMBER: SUMMARY TABLE PERMANENT BUFFER ZONE 1 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 1 725.22 0 5970.59 0 0 2 500.96 4297.93 0 3043.66 0 3 2967.01 0 0 4356.55 1298.93 4 0 0 0 0 5080.58 5 0 0 0 0 0 TOTAL (SF) 4193.19 4297.93 5970.59 7400.21 6379.51 TEMPORARY BUFFER ZONE 1 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 3 0 0 0 658.50 0 PERMANENT BUFFER ZONE 2 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 1 2404.65 0 162.56 0 0 2 1999.34 2583.56 0 95.57 0 3 4309.46 673.86 0 1059.62 0 4 0 0 0 0 3471.6 5 0 596 0 0 0 TOTAL (SF) 8713.45 3853.13 163 1155.19 3471.60