HomeMy WebLinkAbout20200347 Ver 1_B-5825 Mitigation packet_20200306ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TIM BAUMGARTNER
Director
Mr. Philip S. Harris, III, P.E.
Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Harris:
NORTH CAROLINA
Environmental Quality
March 4, 2020
Subject: Mitigation Acceptance Letter:
B-5825, Replace Bridge Number 35 over the Yadkin River on NC 67, Yadkin County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory wetland mitigation for the subject project. Based on the information supplied by you on March 2, 2020, the
impacts are located in CU 03040101 of the Yadkin River basin in the Central Piedmont (CP) Eco-Region, and are as follows:
Yadkin
Stream
Wetlands
Buffer (Sq. Ft.)
03040101
CP
Cold
Cool
Warm
Riparian
0.11
Non-
Riparian
0
Coastal
Marsh
0
Zone 1
0
Zone 2
0
Impacts (feet/acres) 1
0
0
0
*Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application
for details.
The impacts and associated mitigation needs were under projected by the NCDOT in the 2020 impact data. DMS will
commit to implement sufficient compensatory wetland mitigation credits to offset the impacts associated with this project as
determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated
July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid
and a new mitigation acceptance letter will be required from DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
James B. Stanfill
DMS Asset Management Supervisor
cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: B-5825
�, D���
__"\.41000�1
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 W. Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976
Brushy Mountain Mitigation Site
The Bushy Mountain mitigation site is in western North Carolina. Specifically, the site is located on
Macemore Road, three miles south of Elkin, in Yadkin County, North Carolina, within the Yadkin River
Basin Cataloging Unit (03040101).
In order to offset impacts associated with B-5825, NCDOT will be debiting the Brushy Mountain
mitigation site for 764 linear feet. Impacts are shown below in the table.
Site
Name
Stream
Type
Bank
Developer
Stream
Mitigation
Credits (If)
B-5825Stream
Impacts (lt)
B-5825
Mitigation
Required
Notes
298 LF perm.
Impacts to
perennial stream @
2:1 ratio = 596 LF
Brushy
Warm
Restoration
1539
466
764
Mountain
Systems
168 LF re -location
of Intermittent
stream @
1:1 ratio = 168 LF
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
151 PATTON AVENUE
ROOM 208
ASHEVILLE, NORTH CAROLINA 28801-5006
January 24, 2020
Regulatory Division
Action ID No. SAW-2017-01463
Re: Monitoring Year 1 Credit Release of the Yadkin 01 Umbrella Mitigation Banking Instrument
and Brushy Mountain Mitigation Site
Restoration Systems, Inc.
Attn: Raymond Holz
1101 Haynes Street, Suite 211
Raleigh, North Carolina 27604
Dear Mr. Holz:
This correspondence is in reference to the Yadkin 01 Umbrella Mitigation Bank, Brushy
Mountain Mitigation Site Year 1 Annual Monitoring Report received November 25, 2019. The
Brushy Mountain Site is located on Macemore Road, three miles south of Elkin, in Yadkin
County, North Carolina, within the Yadkin River Basin Cataloging Unit (03040101). This 23.29
acre project involves stream and wetland restoration, enhancement and/or preservation of
approximately 5,593 linear feet of stream and 5.31 acres of wetland, with the goal of generating
5,130 Stream Mitigation Units (SMU's) and 4.75 Riparian Wetland Mitigation Units (WMU's).
The purpose of this letter is to provide comments on the reports and to confirm the release of
credits from the Bank pursuant to the completion of required tasks, as described in Section VII,
of the Mitigation Banking Instrument (MBI) for this project.
We have reviewed the Year 1 Monitoring Report and did not identify any outstanding
concerns associated with overall performance of the bank. We did note several items and
recommend that these areas be monitored for future evaluation. A late planting occurred for this
site, although monitoring was pushed back to account for this and all vegetation monitoring plots
met success criteria, it will be important to monitor success in Monitoring Year 2. Also, 1,000
live stakes were planted along approximately 1,300 linear feet of UT-1 and UT-2 on December
9, 2019 and their success will not be known until at least Monitoring Year 2. Groundwater
monitoring gauges were installed at various times during the first monitoring year and several
did not meet success criteria. Future monitoring years will help indicate whether this was due to
the delayed installation times or whether other issues meeting success criteria become apparent.
Finally, some cross-section profiles depict minor incision in riffles or filling in pools which
should be monitored for ongoing trends as the newly constructed channels adjust.
With regard to the annual credit release, the Mitigation Banking Instrument (UMBI)
entitled, Yadkin 01 UMB-Brushy Mountain Mitigation Site, approved January 25, 2019,
stipulates that ten percent (10%) of the Bank's total credits for streams shall be available for sale
immediately after submittal of the first year monitoring report, provided the channel is stable and
all other success measures are met. By copy of this correspondence, we confirm that you have
satisfied the above requirements for the Monitoring Year 1 credit release and 513 SMU's and
0.475 WMU's are now available for sale. This total includes 10% of the additional credits as
approved in the final mitigation plan for non-standard buffer widths and 10% of stream
preservation which was to be released throughout the monitoring period instead of in the initial
release. As of the date of this correspondence, a total of 2,052 SMU's and 1.9 WMU's (40% of
the Bank's total credit potential) have been released.
Thank you for your interest in restoring and protecting waters of the United States. If you
have questions regarding this letter, please contact Steve Kichefski, Asheville Regulatory Field
Office at steven.l.kichefski@usace.army.mil or telephone (828) 271-7980, Extension 4234.
for
Electronic Copies Furnished:
Todd Bowers — USEPA
Mac Haupt — NCDWR
Erin Davis — NCDWR
Byron Hamstead — USFWS
Olivia Munzer — NCWRC
Todd Tugwell — USACE
Kim Browning — USACE
Scott Jones - USACE
Sincerely,
Scott Jones, Chief
Asheville and Charlotte Regulatory Field Offices
BRUSHY MOUNTAIN MITIGATION BANK
TRANSFER OF CREDIT AFFIDAVIT
Permittee: NC DEPARTMENT OF TRANSPORTATION
Project Name: Transportation Improvement Projects
Compensatory Mitigation Credits: 769.5 stream credits
Mitigation Site Debited: Brushy Mountain Mitigation Bank
Mitigation Site Info: Located in Yadkin County, Yadkin River Basin, and Cataloging Unit
03040101 and authorized by the Interagency Review Team (IRT) pursuant to the Yadkin 01
Umbrella Stream Mitigation Bank "Mitigation Banking Instrument" (MBI) approved January
23, 2019 (Bank).
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am
authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and
I certify that the Sponsor agrees to accept full responsibility for providing the mitigation
identified in this document, associated with the USACE Permittee shown. I also verify that
released credits, as approved by the USACE, are currently available at the mitigation site
identified above.
Mitigation Sponsor Name: Restoration Systems, LLC
Name of Sponsor's Authorized Representative: John Preyer
/-D 01/29/2019
Sign u of Sponsor's &uthorized Representative Date of Signature
BRUSHY MOUNTAIN MITIGATION BANK
TRANSFER OF CREDIT AFFIDAVIT
Permittee: NC DEPARTMENT OF TRANSPORTATION
Project Name: Transportation Improvement Projects
Compensatory Mitigation Credits: 769.5 stream credits
Mitigation Site Debited: Brushy Mountain Mitigation Bank
Mitigation Site Info: Located in Yadkin County, Yadkin River Basin, and Cataloging Unit
03040101 and authorized by the Interagency Review Team (IRT) pursuant to the Yadkin 01
Umbrella Stream Mitigation Bank "Mitigation Banking Instrument" (MBI) approved January
23, 2019 (Bank).
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am
authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and
I certify that the Sponsor agrees to accept full responsibility for providing the mitigation
identified in this document, associated with the USACE Permittee shown. I also verify that
released credits, as approved by the USACE, are currently available at the mitigation site
identified above.
Mitigation Sponsor Name: Restoration Systems, LLC
Name of Sponsor's Authorized Representative: John Preyer
�/- 10/02/2019
Sign ! e of Sponsor's 6Vuthorized Representative Date of Signature