Loading...
HomeMy WebLinkAbout20140189 Ver 1_Adaptive Management Plan_20200227Strickland, Bev From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Thursday, February 27, 2020 1:33 PM To: Dailey, Samantha J CIV USARMY CESAW (USA); Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Bowers, Todd Subject: [External] RE: Arrington Bridge III Adaptive Management Plan Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Sam, Looking at the proposal, I would suggest they either reduce or remove the green ash (due to the emerald borer) from the list and increase the cypress plantings. Also, the plan indicates that the low stem growth is approx. 24% of the site, which is significant. After the year 4 release, I think we will have 30% of the credits remaining (assuming they used the standard schedule). If we do release the credits, I don't think we would want to release any more until we know the plants are surviving, and I think we should consider requiring additional monitoring since we would only have three years worth of data at close out. Thanks, Todd -----Original Message ----- From: Dailey, Samantha J CIV USARMY CESAW (USA) Sent: Monday, February 24, 2020 11:09 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov> Subject: FW: Arrington Bridge III Adaptive Management Plan Good morning IRT, I wanted to forward the adaptive management plan for the Arrington III site. A few of us met with RES last week, and there was a brief mention of some of the methods they planned to use to mitigate the open water area. Please provide any comments within 15 days (March 10th). At the conclusion of the 15-day comment period, pending there are no concerns, I will issue the Year 4 Monitoring Credit Release, as outlined in my October 31, 2019 email. Best Regards, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil -----Original Message ----- From: Katie Webber <kwebber@res.us> Sent: Wednesday, February 12, 2020 4:42 PM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Bradley Breslow <bbreslow@res.us>; Ryan Medric <rmedric@res.us>; Jamey Mceachran <jmceachran@res.us> Subject: [Non-DoD Source] Arrington Bridge III Adaptive Management Plan Hi Sam, We would like to submit the Arrington Bridge III adaptive management plan for dissemination to the IRT and subsequent review and approval. We hope that upon approval of this document we may anticipate release of Year 4 Monitoring Credits. If you need any additional information, please do not hesitate to reach out to me. Thank you, Katie Webber, LPSS, CPSS Project Manager RES I res.us <Blockedhttp://www.res.us/> Direct:540.905.4388 1 Cell:410.279.5741 "We're moving on March 2nd! Our new office will be located at 3600 Glenwood Avenue, Suite 100, Raleigh, North Carolina 27612.