From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Thursday, February 27, 2020 1:33 PM
To: Dailey, Samantha J CIV USARMY CESAW (USA); Kim Browning; Haupt, Mac; Davis, Erin
B; Wilson, Travis W.; Bowers, Todd
Subject: [External] RE: Arrington Bridge III Adaptive Management Plan
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Sam,
Looking at the proposal, I would suggest they either reduce or remove the green ash (due to the emerald borer) from
the list and increase the cypress plantings. Also, the plan indicates that the low stem growth is approx. 24% of the site,
which is significant. After the year 4 release, I think we will have 30% of the credits remaining (assuming they used the
standard schedule). If we do release the credits, I don't think we would want to release any more until we know the
plants are surviving, and I think we should consider requiring additional monitoring since we would only have three
years worth of data at close out.
Thanks,
Todd
-----Original Message -----
From: Dailey, Samantha J CIV USARMY CESAW (USA)
Sent: Monday, February 24, 2020 11:09 AM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY
CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B
<erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>
Subject: FW: Arrington Bridge III Adaptive Management Plan
Good morning IRT,
I wanted to forward the adaptive management plan for the Arrington III site. A few of us met with RES last week, and
there was a brief mention of some of the methods they planned to use to mitigate the open water area. Please provide
any comments within 15 days (March 10th). At the conclusion of the 15-day comment period, pending there are no
concerns, I will issue the Year 4 Monitoring Credit Release, as outlined in my October 31, 2019 email.
Best Regards,
Sam
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil
-----Original Message -----
From: Katie Webber <kwebber@res.us>
Sent: Wednesday, February 12, 2020 4:42 PM
To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Cc: Bradley Breslow <bbreslow@res.us>; Ryan Medric <rmedric@res.us>; Jamey Mceachran <jmceachran@res.us>
Subject: [Non-DoD Source] Arrington Bridge III Adaptive Management Plan
Hi Sam,
We would like to submit the Arrington Bridge III adaptive management plan for dissemination to the IRT and subsequent
review and approval. We hope that upon approval of this document we may anticipate release of Year 4 Monitoring
Credits. If you need any additional information, please do not hesitate to reach out to me.
Thank you,
Katie Webber, LPSS, CPSS
Project Manager
RES I res.us <Blockedhttp://www.res.us/>
Direct:540.905.4388 1 Cell:410.279.5741
"We're moving on March 2nd! Our new office will be located at 3600 Glenwood Avenue, Suite 100, Raleigh, North
Carolina 27612.