Loading...
HomeMy WebLinkAboutNC0024376_staff comments_20001227 The Wilds Camp and Conference Center NC0024376 12/27/00 NOTES to File Current PF = 0.08 MGD Equalization required (0.25 x 0.08) = 0.02 MGD The facility plans to add an EQ basin of 0.05 MG and convert the existing EQ to sludge holding. The EQ basin is separated into 3 cells with 2 submersible 100 gpm pumps. • Although regional office comments indicate that 50,000 gallons may be less than is needed at peak time, this is much greater than what is required per current rules, so this will be approved as is. Consultant provided detailed information regarding flow fluctuations, etc. Permittee wished ATC approved rapidly due to strict construction schedule. Needed to perform installation when camp was shut down.