Loading...
HomeMy WebLinkAboutSW1190901_SW Report_20200306STORMWATER MANAGEMENT REPORT FOR ASHEVILLE REGIONAL AIRPORT PARKING LOTS FLETCHER, NORTH CAROLINA INITIAL SUBMITTAL: AUGUST 7, 2019 REVISION #1: AUGUST 20, 2019 REVISION #2: DECEMBER 2, 2019 RFC: DECEMEBER 13, 2019 REVISION #1: JANUARY 28, 2020 REVISION #2: FEBRUARY 26, 2020 STORMWATER ENGINEER: AULICK ENGINEERING, LLC DAVID A. SKURKY, P.E. 4364 S. ALSTON AVENUE, SUITE 300 DURHAM, NC 27713 11l1A 1a ,"I' C 0 40195 1 `5I A. SN -/IIIII1111 �lr �Ilrl����hr4trQ ulltl'e a AULICK ENGINEERING LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL tyAIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION TABLE OF CONTENTS Section 1 PROJECT OVERVIEW 1.1 Narrative..............................................................................................................................3 1.2 Introduction and Site Description......................................................................................3 1.3 Construction Sequence and Cost........................................................................................3 Section 2 HYDROLOGY 2.1 Project Methodology...........................................................................................................4 2.2 Drainage and Erosion Control Design..................................................................................7 2.3 Operation and Maintenance Manual.................................................................................7 2.4 Design Software and Manuals............................................................................................7 Appendices Appendix A - Vicinity, Soil Survey, FEMA Maps and NOAA Rainfall Data Appendix B - Low Density & BUA Exhibit Appendix C - Stormwater Sheets & Details, Pipe Profiles Appendix D - Operation and Maintenance Manual Appendix E - Supplemental EZ Storm & Drainage Calculations Appendix F - Swale Segment Calculations REFERENCE MATERIAL Section 1 PROJECT OVERVIEW 1.1 Narrative The Asheville Regional Airport - Parking Lots project includes the construction of a new parking lot, Lot A, and associated grading, drainage, landscaping and erosion control. This report includes the Built -Upon Area (BUA) computations that show compliance with the NCDEQ Low Density Project. Therefore, no stormwater management or stormwater conveyance measures (SCMs) are proposed. 1.2 Introduction and Site Description The site is located at Asheville Regional Airport in Fletcher, NC, south of Asheville, North Carolina near Airport Road (35° 26' 10.38" N. 82° 32' 8.61"W). The area that includes airport related operations encompasses approximately 580 acres. For a larger vicinity map, see Appendix A. The Asheville Regional Airport Parking Lots project site is located on an existing undeveloped area in the eastern portion of the airport, located along Airport Road. For hydrologic planning purposes, the site is comprised of Hydrologic Soil Group (HSG) B soils. Appendix A contains the NRCS Soil Survey Maps for the parking lot. The existing land use of the project is grass, gravel, forest, and impervious. The proposed land use will impervious (parking lot) with a small amount of grass for landscaping. "g asnev�ne Asheville a Regional a.a.e,a o Airport 0 0 As shown in the FEMA FIRM 3700964300K (January 6, 2010) in Appendix A, the disturbance is not located within 200ft of a FEMA floodplain. 1.3 Construction Sequence and Cost There are no SCMs so the construction sequence and cost are not applicable. 3 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1:8/20/19; VISION 2: 12/2/2019; RFC REV 1: 1/28/2020, RFC REV 2: 2/26/2020 STORMWATER MANAGEMENT REPORT Section 2 HYDROLOGY 2.1 Project Methodology In order to qualify for a Low Density Project as outlined in Appendix E1 of the February 11, 2018 NCDEQ Stormwater Design Manual, several criteria must be met. Calculation of Project Density Project Density = Total Built -Upon Area / Total Project Area Total Project Area: 13.41 ac Total Built -Upon Area: 2.31 ac See Appendix B1 for a sketch illustrating the BUA values above. Densitv Thresholds T sbla i; Tlrresi7olds far' Low Derisiry Pi,ojecrs Stormwater Program MS4 Stormwater CO' St' 1 COU I7ty - SA Maximum Percent BUA for Low Density 24% 12% Coastal Counyy - Freshwater OR'MV 12% Coastal County - Other 24% Non -Coastal County - OF;N and HQ"JV 12% Water Suppty VVatershed Varies based on W0 classification: see 15A NCAC 02P RLIIeS. Dispersed Flow Projects shall be designed to maximize dispersed flow through vegetated areas and minimize channelization of flow. The upper parking lot drains to a curb cut and level spreader, which disperses the flow along the length of the vegetative filter strip. The level spreader takes the concentrated flow from the curb parking and converts it to sheet flow by means of a level weir. The level spreader will be straight as to avoid any flow concentration downstream. The filter strip located directly downstream of the level spreader is an existing vegetated slope that is at least 30' wide. Part of this filter strip is the existing undisturbed stream buffer. See Appendix C2 for the Stormwater plans and details. Table 2: Level Spreader flow Rates Level Spreader Area (Ac) i in/hr C Flow Rate cfs Minimum Flow 0.64 0.75 0.9 0.43 10 year Storm 0.64 7.04 0.9 4.06 4 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1:8/20/19; VISION 2: 12/2/2019; RFC REV 1: 1/28/2020, RFC REV 2: 2/26/2020 STORMWATER MANAGEMENT REPORT Vegetated Conveyances Stormwater that cannot be released as dispersed flow shall be transported by vegetated conveyances. The curb outlets will discharge through rip rap protection pads and then grass conveyance swales. In order to get the upper parking lot down to the low-lying area, the conveyance will be lined with rip rap protection but leading up to the steep channel it will be vegetated. See Appendix C2 for the Stormwater plans and details. Vegetative conveyance #1 receives runoff from curb cuts located along the west edge of the parking lot. The conveyance was designed to meet the requirements stipulated in the NCDEQ Stormwater BMP manual, section 15A NCAC 2H .1003(2)(d). Specifically, the Swale was designed to have a minimum length of 100' between the outlet and the nearest curb cut. The dimensions of the Swale are such that the meet the minimum bottom width requirements and all other dimensional requirements. The Swale receives flow from 4 separate curb inlets, meaning the flow in the Swale depends on the specific segment being analyzed. A comprehensive of every segment of flow length in the Swale can be found in Appendix F of the report. Curb Outlet Systems Low density projects may use curb and gutter with outlets to convey stormwater to grassed swales or vegetated areas. The Asheville Regional Airport Parking Lots project will utilize curb breaks at the low-lying areas to convey the stormwater runoff from the parking lot to the vegetated conveyance. The curb outlet systems shall be designed as follows: • The curb outlets shall be designed such that the Swale or vegetated area can carry the peak flow from the 10-year storm at a non -erosive velocity; • The longitudinal slope of the Swale or vegetated area shall not exceed five percent, except where not practical due to physical constraints. In these cases, devices to slow the rate of runoff and encourage infiltration to reduce pollutant delivery shall be provided; • The Swale's cross-section shall be trapezoidal with a minimum bottom width of two feet; • The side slopes of the Swale or vegetated area shall be no steeper than 3:1 (horizontal to vertical); and • The minimum length of the Swale or vegetated area shall be 100 feet Vegetated Setbacks Vegetated setbacks shall be required adjacent to waters as specified in the stormwater rules to which the project is subject pursuant to this Section, in addition to the following requirements applicable to all vegetated setbacks: • The width of a vegetated setback shall be measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline; • Vegetated setbacks may be cleared or graded, but shall be replanted and maintained in grass or other vegetation; • Built -upon area that meets the requirements of G.S. 143-214.7(b2)(2) shall be 5 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1:8/20/19; VISION 2: 12/2/2019; RFC REV 1: 1/28/2020, RFC REV 2: 2/26/2020 STORMWATER MANAGEMENT REPORT allowed within the vegetated setback. • Built -upon area that does not meet the requirements of G.S. 143-214.7(b2)(2) shall be allowed within a vegetated setback when it is not practical to locate the built -upon area elsewhere, the built -upon area within the vegetated setback is minimized, and channelizing runoff from the built -upon area is avoided. Built - upon area within the vegetated setback shall be limited to: o Publicly -funded linear projects such as roads, greenways, and sidewalks; o Water Dependent Structures; and o Minimal footprint uses such as poles, signs, utility appurtenances, and security lights. • Stormwater that has not been treated in an SCM shall not be discharged through a vegetated setback; instead it shall be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. • Artificial streambank and shoreline stabilization shall not be subject to the requirements of this Item. Stormwater Outlets Stormwater outlets are designed so that they do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event. See Appendix C1 for the Erosion Sheets which have the rip rap design for the curb outlets. Deed Restrictions and Protective Covenants As discussed with NCDEQ, this section is only for subdivisions which does not apply to the Asheville Regional Parking Lots project Compliance with other Regulatory Programs Other applicable local government ordinances and federal and state environmental regulations that might apply will be checked and complied with. Permit Issuance Stormwater management permits issued for low density projects shall not require permit renewal. Even though low -density permits issued by DEQ do not require renewal, low density projects may still be subject to inspection to ensure that they continually comply with the approved plans and specifications. The Rational Method was used for the parking lot design on the development. The Intensity Duration Frequency (IDF) curve for Fletcher, NC below was used for the calculations: 6 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1:8/20/19; VISION 2: 12/2/2019; RFC REV 1: 1/28/2020, RFC REV 2: 2/26/2020 STORMWATER MANAGEMENT REPORT MEMENE MESS 0 SEEM== nom The following runoff coefficients were also used for hydraulic (storm inlet, pipe) analysis of Lot A: c = 0.30 (Grass, HSG B) c = 0.50 (Gravel, HSG B) c = 0.95 (Impervious area) 2.2 Drainage & Erosion Control Design The curb inlets and limited pipes were designed for the 25-yr storm. Open conveyances such as channels for the 10-yr storm. Pipe Charts can be found in Appendix E1 showing pipe capacity and gutter spread. Energy Dissipators at the proposed pipe outfalls can be found in Appendix C. Erosion Control design and calcs can be found in Appendix C. 2.3 Operation and Maintenance Manual The vegetated conveyance require maintenance in order to work properly. An O&M plan has been developed and can be found in Appendix D. 2.4 Design Software and Manuals The following design software programs were used in analysis and development of the stormwater and documents: • Hydraflow Hydrographs for AutoCAD Civil 3D 2019 • Hydraflow Storm Sewers for Auto CAD Civil 3D 2017 • AutoCAD Civil 3D 2018 • Microsoft Office 2017 The following design manuals and literature were used in analysis and development of the stormwater documents: • NCDEQ Stormwater Design Manual— 2017 Edition 7 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1:8/20/19; VISION 2: 12/2/2019; RFC REV 1: 1/28/2020, RFC REV 2: 2/26/2020 STORMWATER MANAGEMENT REPORT APPENDIX A VICINITY MAP, SOILS SURVEY, FEMA MAPS & NOAA RAINFALL DATA U s Q �. Asheville w '3, ❑ W IS LT17 El �1.EMO VII LAll Woodside r �❑ Hills C9 33 Enka Village Candler 7 � BEltmore e Forest 0 Bern Creek 75 Beaverdaan i3r 4E • RoynlPines @ Avery Creek Arden Asheville Regional Alrpon Regionaall Fletcher Naples 'J:'lls RiYer Mountain him Home VICINITY MAP NTS Goodluck Swannanoa iffiv --T i4 Fairview Fruitland o�ua MoUntai Gerton 11Li 74 Edneyville STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM LEGEND w0000e JOINS 11NE1 SPECIAL FILOD HAZARD AREAS (SPHAII) SUBJECT TO INUNDAT01O1-111AINUAICIAIC—OD 'Ile L.-- 0 F ZONE X �PP �A `1� Lg"A!`XAaZ�. V"mama.— ZONE AS IE AE I IS ZONE -.P AP AS I N. —P AP RIVER TRIBUTARY 149 ZAE°ey area - ZONE A ZONE Aoedna admen — v ME ZONE A i,o, r .d AE 2ZPMEAM B.— PON A -NE OP. --ZAY AREAS IN ZONE AE ZINE VE PLO. S3 ... T1. 1­ 1. ft UN-1 1 11. ­ B,I hirl, OT.- 11OOD AREAS —,—,cd A— :n UU31 DATUM INFORMATION 37 P'. Tp...C..) Th—PPI—Ph— C, OTHER ARE. A 37oo3i =�A MI.' nhiVd.� The.�MCOASTAL SARI SR RESOURCES SISIPM (CHIP3) A— p —E. OTHERVASE PROTECTED AREAS (OPA.) R.U.. .f E ('Ag 1 =.,n) no°eeerelxneremugN 1 and A� —p . .... I. meNgmaDmmVe­0 IN—d to 2,13 ZONE X .................. I FIRM Th==muane - ZONE AE —i., Ch— I- S.* Phea„u 17 0 -Si . 11M 32 BUNCOMBE COUNTY —y.1 (11) 111—Z HIT.D—H C.— N BUNCO— 10— uj N- —d — . ......... 0.mex 2111 H-11101 COUNTY I —I NC l—I cerium 3701?5 1111. INIT oel Sl A =rIPM NE 11. P, egdlNI ih— egaw were meeemM sae \. I`` EX ZONE A BMI hr=. P ZONE A I Pl. 4 5 ZONE AE P—hP arery FLOOD HAZARD DATA TABLE —TrenT.— E er '7056'8 as A FRENCH BROAD RIVER 37 025 MZONE SE E ;N`E7 'A H,,I Chhhh, U-I­p1,1t1d A—, ZONE X 2134 370125 2132 ZONE X Parkin g Lot A] A `—T IS Hand Pro 2111 Areas 2122 DERSON IOU- S. I 111CCOUN- oa - 211S U, ..E E­ 2 L A.R.-11 —Ex Ti, -t klifl, Ri,11 21. 376025 LIT, of A111— 3 NO' B F-11 ZONE X ZONE 11 E.NI 0 He — C ... I, 37UQI�, N, FFF .11111EPI JOINS PANEL 9642 NOTES TO USERS NEPC.S.�.RY I Ni— NPiPt IT- S— 'IP. hh.- 44 E- danF al Ian P. . NPPUI I— -.SF -.1 .. Th. mmnwbulmwvme1. Th— �==—ATC -1 PANEL 05) S­ d E11— 11 1-1, —1 - M =P P 1111) 1. FIR. Pi_P "Tuxry _P PFE. N_ "P. FE­ —.—1 RP. I= —UANIE-l' (ORS) P-1,­ . hh"Ii. S ­hl. =Up — th� SPI Cii.h. hh. —.1 INS, 1. R—NU III, IN, ..0 IFENVI). Th. t.. 'th- -h—P. It 1h h. N.I.h. MhPhh 11. ft NM.1PI Ii,ih. 'U.. h—r. 11— 1a1 I I —A MAP (I BI TV,—) arm.,, t'. EI - —ih. er ;1. 11 1, .1Lam11— ILI 1. —N. 11. H-1 "T `h.Z retie I—th. — I.—. — — ­uI. --.r. — . uh—hi I - — =- =1d=-'- 1,— 1--- 1. .- A, OP. Ini—V. S­ —h, — I Map R) .1 L., 111 FE.A i. .—..d IIBI FIRM. OV, P." - T, dihh,l=� n—in 1— P . - AIn.— — Nih—I 1.1 In —II. P­. I h,h N—C I_ In hh. Fl. PPT . hhh, 11h— — RE —h th. PENI 11 111 C— rl—hl N, P. �.ncflmdmapsxom P-- ­— �thth.T- , UVAP ', I— h, I h. —S. NC D-I E.M­ 1.S,MM. N.— — In..n. .:.P B..L. I 6nb (I : 61 rw PANEL 16— FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 9643 "Imwim.prtawanrneaihi MAP SED MAPNUMBER JANUARYS2010 3700964300K S"' `­ ­i. —PTDhi,B­--DPI II-Wiillyp RI Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* �'It Latitude: 35.4347*, Longitude:-82.5374* Elevation: 2145.24 ft * *source: ESRI Maps 'w,�w, source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 4.38 (3.95-4.87) 5.22 6.25 1 (5.64-6.95) 11 7.04 (6.32-7.81) 11 8.08 (7.20-8.94) 8.86 1 (7.86-9.79) 9.65 1 (8.52-10.7) 10.4 1 (9.16-11.6) 11.5 1 (9.92-12.8) 12.3 1 (10.5-13.8) 3.50 4.17 5.01 5.63 6.43 7.06 7.67 8.27 9.07 9.68 10-min (3.16-3.89) 1 (4.51-5.57) 11 (5.06-6.24) 11 (5.74-7.12) 1 (6.26-7.80) 1 (6.77-8.50) 1 (7.25-9.19) 1 (7.85-10.1) 1 (8.30-10.9) 2.92 3.50 4.22 4.75 5.44 5.96 6.46 6.96 7.61 8.10 15-min (2.63-3.24) 11 (3.16-3.88) 1 1 (4.85-6.02) (5.28-6.58) 1 (5.70-7.16) 1 (6.10-7.73) 1 (6.59-8.50) 1 (6.94-9.10) 2.00 2.41 3.00 3.44 4.03 4.48 4.95 5.42 6.05 6.56 30-min (1.80-2.22) 1 (2.70-3.34) 11 (3.09-3.81) 11 (3.59-4.46) 1 (3.98-4.96) 1 (4.37-5.48) 1 (4.75-6.02) 1 (5.24-6.77) 1 (5.62-7.37) 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 60-min (1.12-1.39) (1.37-1.68) (1.73-2.14) 1 1 (2.39-2.97) 1 (2.69-3.36) 1 (3.01-3.78) 1 (3.33-4.22) 1 (3.76-4.85) 1 (4.10-5.38) 0.729 0.885 1.12 1.30 1.56 1.77 2.00 2.23 2.56 2.83 2-hr (0.655-0.809) (0.796-0.980)1 1 (1.16-1.44) 11 (1.39-1.73) 1 (1.56-1.97) 1 (1.75-2.22) 1 (1.94-2.48) 1 (2.20-2.86) 1 (2.40-3.18) 0.520 0.626 0.786 0.916 1.11 1.26 1.43 1.62 1.88 2.10 3-hr (0.469-0.581) (0.564-0.698) (0.706-0.873) (0.820-1.02) (0.982-1.23) 1 (1.11-1.41) 1 (1.25-1.60) 1 (1.40-1.80) 1 (1.60-2.11) 1 (1.76-2.37) 0.325 0.387 0.477 0.554 0.666 0.761 F 0.864 F 0.976 1.14 1.27 6-hr (0.297-0.358) (0.353-0.425) (0.435-0.524) (0.503-0.609) (0.600-0.732) (0.680-0.835) (0.764-0.951) (0.853-1.08) (0.978-1.26) (1.08-1.42) 0.204 0.243 0.298 0.342 0.404 0.454 0.506 0.560 0.635 0.694 12-hr (0.188-0.223) (0.223-0.265) (0.274-0.325) (0.314-0.373) (0.368-0.440) (0.412-0.496) (0.457-0.553) (0.502-0.614) (0.563-0.702) (0.609-0.773) 0.121 0.145 0.179 0.206 0.243 0.273 0.303 0.335 0.380 0.415 24-hr (0.112-0.131) (0.135-0.158) (0.166-0.194) (0.190-0.223) (0.223-0.262) (0.250-0.295) (0.277-0.328) (0.305-0.362) (0.342-0.411) (0.371-0.450) 0.072 0.086 0.105 0.120 0.140 0.157 0.174 0.192 0.216 0.235 2-day (0.067-0.078) (0.080-0.093) (0.097-0.113) (0.111-0.129) (0.130-0.151) (0.145-0.169) (0.160-0.188) (0.175-0.207) (0.196-0.234) (0.212-0.255) 0.051 0.061 0.074 0.084 0.098 0.109 0.120 0.131 0.147 0.159 3-day (0.048-0.055) (0.057-0.066) (0.069-0.079) (0.078-0.090) (0.091-0.105) (0.100-0.117) (0.110-0.129) (0.120-0.141) (0.133-0.158) (0.144-0.172) 0.041 0.049 0.058 0.066 0.076 0.084 0.093 0.101 0.112 0.121 4-day (0.038-0.044) (0.045-0.052) (0.054-0.062) (0.061-0.071) (0.071-0.082) (0.078-0.090) (0.085-0.099) (0.093-0.108) (0.102-0.120) (0.110-0.130) 0.027 0.032 0.039 0.044 0.051 0.056 0.062 0.067 0.075 0.081 7-day (0.025-0.029) (0.030-0.035) (0.036-0.041) (0.041-0.047) (0.047-0.054) (0.052-0.060) (0.057-0.066) (0.062-0.072) (0.069-0.081) (0.074-0.088) 0.022 0.026 0.031 0.034 0.040 0.044 0.048 0.052 0.057 0.062 10-day (0.021-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.037-0.042) (0.041-0.046) (0.044-0.051) (0.048-0.055) (0.053-0.061) (0.057-0.066) 0.015 0.017 0.020 0.022 0.025 0.027 0.030 0.032 0.034 0.036 20-day (0.014-0.016) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.029) (0.028-0.031) (0.030-0.033) (0.032-0.036) (0.034-0.038) 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.024 0.025 0.027 30-day (0.011-0.013) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) (0.024-0.027) (0.025-0.028) 0.010 0.012 0.014 0.015 0.016 0.017 0.018 0.019 0.020 0.020 45-day (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.018-0.021) (0.019-0.021) 0.009 0.011 0.012 0.013 0.014 0.015 0.015 0.016 0.017 0.017 60-day (0.009-0.010) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.016-0.018) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 1 /4 6/20/2019 Precipitation Frequency Data Server I161616I6161 10.000 C 41 1.000 C GJ a-� C � 0.100 L Ld a 0.010 PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.4347°, Longitude: -32.5374' 0.0011 t t Jr t L N N O r{4 N rq rq rq N rq N Alb A q r, O O O Ln O ,1 r-1 rn w 1-4N rn v Ln Duration 100.000 10.000 L k 1.000 w c e 0.100 4.1 49 0.010 0.001 1 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Thu Jun 20 13:16:24 2019 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 30-rnw — 7-day — 6 Wain — 10-day — 2fir — 20-day — "r — 30-day — 8fir — 45-day — 12fir — 60-day - 24--hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Fletcher" Fa.1i MIL15 a. xNaa, f 3km 2mi + _ Nanles Large scale terrain Kingsport' Bristol Johnson City' 3 Winston -Soler Knoxville' ti h•1t Nlit&rell rk�}l1 ', 1Asherille NORTH C Charl t •Greenville lookm SOUTH CARD 6 mi V Large scale map Johnson City i � mston� f to f 100km —. Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 3/4 I::iNIMI ] Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 4/4 II-Wiillyp RI Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* �'It Latitude: 35.4347*, Longitude:-82.5374* Elevation: 2145.24 ft * *source: ESRI Maps 'w,�w, source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.365 0.435 0.521 0.587 0.673 0.738 0.804 0.870 0.955 1.02 5-min (0.329-0.406) (0.393-0.483) (0.470-0.579) (0.527-0.651) (0.600-0.745) (0.655-0.816) (0.710-0.891) (0.763-0.966) (0.827-1.07) (0.878-1.15) 0.584 0.695 0.835 0.939 1.07 1.18 1.28 1.38 1.51 1.61 10-min (0.526-0.649) (0.628-0.772) (0.752-0.928) (0.843-1.04) (0.956-1.19) 1 (1.04-1.30) 1 (1.13-1.42) 1 (1.21-1.53) (1.31-1.69) (1.38-1.81) 0.729 0.874 1.06 1.19 1.36 1.49 1.62 1.74 1.90 2.02 15-min (0.657-0.811) (0.789-0.971) (0.951-1.17) 1 (1.07-1.32) 1 (1.21-1.50) 1 (1.32-1.65) 1 (1.43-1.79) 1 (1.53-1.93) (1.65-2.13) (1.74-2.28) 1.00 1.21 1.50 1.72 2.01 2.24 2.47 2.71 3.03 3.28 30-min (0.901-1.11) 1 (1.09-1.34) 1 (1.35-1.67) 1 (1.80-2.23) 1 (1.99-2.48) 1 (2.18-2.74) 1 (2.37-3.01) (2.62-3.38) (2.81-3.69) 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 60-min (1.12-1.39) (1.37-1.68) (1.73-2.14) (2.01-2.48) (2.39-2.97) (2.69-3.36) (3.01-3.78) (3.33-4.22) (3.76-4.85) (4.10-5.38) 1.46 1.77 2.24 2.60 3.13 3.55 3.99 4.47 5.13 5.67 2-hr (1.31-1.62) (1.59-1.96) (2.00-2.47) (2.33-2.88) (2.77-3.47) (3.13-3.93) (3.49-4.43) (3.88-4.96) (4.39-5.73) (4.81-6.37) 1.56 1.88 2.36 2.75 3.33 3.80 4.31 4.86 5.65 6.30 3-hr (1.41-1.75) (1.70-2.10) (2.12-2.62) (2.46-3.06) (2.95-3.70) (3.35-4.23) (3.76-4.79) 1 (4.19-5.41) (4.80-6.34) (5.29-7.11) 1.95 2.32 2.86 3.32 3.99 4.56 5.18 5.85 6.82 7.64 6-hr (1.78-2.14) (2.11-2.55) (2.60-3.14) (3.01-3.65) (3.59-4.38) (4.07-5.00) (4.57-5.69) 1 (5.11-6.44) (5.86-7.56) (6.48-8.52) 2.46 2.93 3.59 4.12 4.87 5.47 6.09 6.74 7.65 8.36 12-hr (2.26-2.68) 1 (2.69-3.20) 1 (3.30-3.92) 1 (4.44-5.31) 1 (4.97-5.97) 1 (5.50-6.66) 1 (6.05-7.40) (6.78-8.45) (7.34-9.31) 2.91 3.49 4.29 4.94 5.82 6.54 7.28 8.05 9.12 9.97 24-hr (2.69-3.15) (3.24-3.79) (3.97-4.66) (4.56-5.34) (5.36-6.30) (6.00-7.07) (6.65-7.86) (7.31-8.70) (8.21-9.87) (8.90-10.8) 3.46 4.13 5.03 5.75 6.74 7.54 8.36 9.20 F 10.4 11.3 2-day (3.22-3.73) (3.84-4.45) (4.67-5.42) (5.33-6.19) (6.23-7.25) (6.94-8.11) (7.67-9.00) (8.40-9.93) (9.39-11.2) (10.2-12.2) 3.69 4.39 5.32 6.04 7.03 7.82 8.62 9.44 10.6 11.4 3-day (3.44-3.96) (4.10-4.72) (4.95-5.71) (5.62-6.48) (6.52-7.54) (7.22-8.39) (7.93-9.27) (8.65-10.2) (9.60-11.4) (10.3-12.4) 3.92 4.67 5.60 6.34 7.33 8.10 8.89 9.68 10.7 11.6 4-day (3.66-4.19) (4.35-5.00) (5.22-5.99) (5.90-6.78) (6.80-7.84) (7.50-8.67) (8.20-9.53) (8.90-10.4) (9.81-11.6) (10.5-12.5) 4.57 5.42 6.50 7.36 8.52 9.44 10.4 11.3 F 12.6 13.7 7-day (4.27-4.89) (5.07-5.82) (6.07-6.97) (6.86-7.88) (7.92-9.11) (8.75-10.1) 1 (9.59-11.1) 1 (10.4-12.1) (11.5-13.6) (12.4-14.7) 5.23 6.19 7.34 8.25 9.49 10.5 11.4 12.4 F 13.8 14.8 10-day (4.93-5.56) (5.83-6.58) (6.92-7.81) (7.77-8.77) (8.90-10.1) (9.79-11.1) 1 (10.7-12.2) 1 (11.6-13.2) (12.7-14.7) (13.6-15.9) 7.11 8.36 9.71 10.8 12.1 13.2 14.2 15.1 16.4 17.4 20-day (6.72-7.51) (7.91-8.84) (9.18-10.3) (10.2-11.4) (11.4-12.8) (12.4-13.9) 1 (13.3-15.0) 1 (14.2-16.0) (15.3-17.4) (16.1-18.5) 8.72 10.2 11.7 12.8 14.2 15.3 16.2 17.2 F 18.3 19.1 30-day (8.28-9.20) (9.72-10.8) (11.1-12.3) (12.2-13.5) (13.5-15.0) (14.4-16.1) 1 (15.3-17.1) 1 (16.2-18.1) (17.2-19.4) (17.9-20.3) 11.1 13.0 14.6 15.8 17.3 18.3 19.2 20.1 F 21.1 21.8 45-day (10.6-11.6) (12.3-13.6) (13.9-15.3) (15.0-16.6) (16.4-18.1) (17.4-19.2) 1 (18.2-20.2) 1 (19.0-21.1) (20.0-22.2) (20.6-23.0) 13.3 15.5 17.3 18.6 20.2 21.3 22.3 23.2 24.2 24.9 60-day (12.7-14.0) (14.8-16.3) (16.5-18.2) (17.8-19.6) (19.2-21.3) (20.2-22.4) (21.2-23.5) (22.0-24.4) (22.9-25.6) (23.5-26.3) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 1 /4 6/20/2019 Precipitation Frequency Data Server Pas -based depth -duration -frequency (DDF) curves Latitude: 35.4347", Longitude: -32.5374" �J-I 20 c n t t Jr t L N N r{4 N rq rq rq N rq O N Alb A q r, O O O Ln O ,1 r-I rn ro � N rn v Ln Duration 25 20 c 0 I I I I I I i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, VoIume 2, Version 3 Created {GMT}: Thu Jun 20 13:18:29 2019 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 30-rnw — 7-day — 6 Wain — 10-day — 2fir — 20-day — "r — 30-day — 8fir — 45-day — 12fir — 60-day - 24--hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=engIish&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Fletcher" Fa.1i MIL15 a. xNaa, f 3km 2mi + _ Nanles Large scale terrain Kingsport' Bristol Johnson City' 3 Winston -Soler Knoxville' ti h•1t Nlit&rell rk�}l1 ', 1Asherille NORTH C Charl t •Greenville lookm SOUTH CARD 6 mi V Large scale map Johnson City i � mston� f to f 100km —. Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 3/4 I::iNIMI ] Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 4/4 APPENDIX B BUILT -UPON AREA MAP MPERVIOUS SURFACE AREA CALCULATIONS i lt37430 N07° —� SO4°s4\- S29,26Oro .28„E A 53 826 63.136 Ii �, 281.414 N N1$�i h PROPOSED ON SITE PARKING: 97,915 SF ad o� a� a� N co m olo I I N-SITE PARKING (SF): 97,915 KISTING BUA (SF): 2,732 TOTAL IMPERVIOUS AREA (SF): 100,647 DTAL IMPERVIOUS AREA (AC): 2.3 AL PROJECT AREA (AC): 13.41 ECT PERCENT OF IMPERVIOUS AREA: (TOTAL IMPERVIOUS AREA / TOTAL PROJECT AREA) X 100 2.3 AC / 13.41 AC X 100 = 17.2 PROPERTY AREA: 13.41 ACRES u S15° 23' 36.38' 1138.670 — �- \ sZ9° 43.608 L=433.155, R_15 N18° 16' 35. 34 s$2 454.778 _ _ _ ` 3 1.346 x� BUILT -UPON -AREA MAP ULICK ENGINEERING LLC FOR HYDRAULICS& HYDROLOGY I EROSION CONTROL ASHEVILLE REGIONAL AIRPORT AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION PARKING LOTS 200' 0' 200' 400' 1 " = 200' APPENDIX C STORMWATER SHEETS & DETAILS, PIPE PROFILES 0 N O N N CM 0 J D_ w O C/)I Nt 0 C7 0 0 U z LLI 0 07 r0 V z Y a J a 0 0 0 J a 0 z O a I 0 H U LI.1 ry D_ (D z w w z z w 'w a J D_ Y O Y a O H g U % ba SS�y^asb V l./ b . 90,9 \ m W Ql � . 0 / aQ INV / 3g co N SOS -zz- �41I------- --- ` RECONSTRUCT "/\ I �\ — DROP INLET ,,- '� ` DI A2.2A /4/ 41 EXISTING 12" CPP TO __ `♦ ��DI A2' '------------- -- BE REMOVED �' 1 .3-� / I ! , ------------ —" / i/ Fi�� rJ �� � 1 1 � ,o�7e�♦�t�♦ems♦♦�♦?�i��♦♦♦� e♦�♦� ��♦��♦��♦♦� �� �'_,®er® yt,♦ ♦G, ♦♦ r� �� • •� ter► ♦� �'���i ���,iv ��♦,=♦♦y� _ - — _ - �,� ,bwr r�♦=♦♦r♦♦_t►.C�♦♦ `♦�1♦S♦i♦,♦`n..♦r ��+`, +tom •i1 1 1 1 1IDE FILTER STRIP. _ LI 1 � � 1 STORMWATER LEGEND — PRECAST CONCRETE CATCH BASIN ® CONCRETE DROP INLET l PRECAST CONCRETE J ENDWALL ---- EXISTING PIPE X-X=�Z EXISTING PIPE REMOVED ® PROPOSED PIPE 30FT STREAM BUFFER SPILLWAY, SEE DETAIL ON SW-05 lCURCUT— lf 0.22 ACRES 0.44 ACRES I 1 ���'� � ��.♦ --�- cam-_ ins. �i/GVi.�.7/ `n I��j North 015' 30' 60' GRAPHIC SCALE IN FEET ■ ■ ■ ■ ■ ■ ■ ■ mm aim awn N.M op - 11• 1 � � 1 1 I 1 11 1 1 1 ` 1 1 40f 1 CURB CUT A3.2 0 50 ACRES CURB CUT A3.3------- -f + 1 ACRES ♦ _ 1 ------ -----' ---_--- ----- --` --- . ........... ------------ lb W ace OCK DAM SEE BUFFER I I DETAIL ON SW-05 2140 —2139 _____--- v —-------------- i -------------------------------------- no--- -- tna—na— _--r��_ DMEMM ---- a — WRW --- _ a VEGETATED a as CONVEYANCE #1. SEE DETAIL ON SW-05 Irll�ll�ll�ll� >fr 001. -"1 sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 --coninc.com ULICK ENGINEERING LLC HYDRAULICS HYDROLOGY EROSION AIRFIELD DESIGN I CONSTRUCPON MANAGEMENAGEMEN T &INSPECTION RELEASED FOR CONSTRUCTION CAR UIN 11111111111000, nA I I nKv0\\• DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY DESCRIPTION 1 1/28/2020 WMM RFC REVISION #1 2 2/26/2020 AKM RFC REVISION #2 DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER sw-01 O N 0 N ti N Uj J H LLI 0 of LU O I- 0 I L0 O C7 r) r) U 0 z U) LL I N_ U) I- O J z Y a D_ J a 0 0 O a O 0 z O a of U) I- U LLJ ry D_ (D z ry LU LU z (D z LU 'Lu U a J D_ Y ry O Y U) a O H g U SHALLOW TYPE (5 FEET OR LESS IN DEPTH) INTERMEDIATE TYPE (4'X4') DEEP TYPE (5'X5') (5 FEET TO 20 FEET IN DEPTH) (OVER 20 FEET IN DEPTH) STANDARD a 7�_STEPS 16' REINFORCED ° 36" °,. FORCED ON CENTER 36„ CONCRETE CONCR °.. CONCRETTE SLAB SLAB 6" ^.° 36" ° ° STANDARD 48 STANDARD 60" ^9 ° STEPS 16" ON PAVED INVERT CENTER STEPS 16' 1 mp, ON CENTER °°. 6" '° a 6 PAVED INVERT M O MIN. as n .y >�' . ^»>, i M , f �``•i1`,;�: 4 ..,- 6 •1 ° , , • ° 8 .1 MAX O PAVED INVERT ..,: •. IN. 6" NCDOT #57 , g �.:,:- 4 u.:....: 6 �; s STONE BEDDING . .:;..: \MIN6' ° FRAME. GRATE &HOOD _ ... .,;+ .:x' ._`,._:.' .. PER D.O.T. STD. 840.03 NCDOT #57 MIN. 6" NCDOT #57 STONE BEDDING FRAME, GRATE & HOOD STONE BEDDING FRAME, GRATE & HOOD PER D.O.T. STD. 840.03 PER D.O.T. STD. 840.03 26" REINFORCED X REINFORCED `� a CONCRETE SLAB .° n26"NOT TO EXCEED 5' CONCRETE SLAB` 6„ a: MIN. °� O: ' -26" .a' 60" OVER 20' 6„ a MIN. MIN. 6" NCDOT #57 ° STONE BEDDING 6"1, :: ..,`.. �� s1...w . 48" 6" Q FROM 5' TO 20' MIN. i 6' MIN. < A ° < O NOTE 1. CONCRETE SHALL BE 4000 PSI MIN. FOR ALL PRECAST 6" CONCRETE CATCH BASINS. 2. PRECAST CONCRETE STRUCTURES MAY ONLY BE INSTALLED TO DEPTHS CERTIFIED AS ACCEPTABLE BY THE 6"� :{ ti_M:. v ..• r, :� __._...:,...,:3 r y F -` MANUFACTURER. MIN. 6" NCDOT #57 SLAB DETAIL MIN. 6" #57 3. "WAFFLE" (KNOCK OUT) BOXES ARE ACCEPTABLE FOR STONE BEDDING STONE BEDDING SHALLOW TYPE CATCH BASINS WITH MAXIMUM 30 INCH DIA. PIPE ALLOWED. SLAB DETAIL 4. ALL STRUCTURES 4' OR DEEPER SHALL HAVE ACCESS STEPS. STEPS SHALL BE INSTALLED 16" ON CENTER. ~6 SLAB THICKNESS AND 6" SLAB THICKNESS AND 36 REINFORCEMENT FOR 5. EACH DRAINAGE STRUCTURE SHALL HAVE A PAVED INVERT REINFORCEMENT FOR 72" SOIL AND TRAFFIC 28 WITH A MAXIMUM 5:1 SLOPE FROM THE INVERT OF THE PIPE 60" 36„ SOIL AND TRAFFIC LOADING BY AN TO THE WALL OF THE STRUCTURE. 26" LOADING BY AN ENGINEER LI 6. APPLY NON -SHRINK AROUND PIPE. ENGINEER 7. HORIZONTAL, RISER, AND BOXES MUST BE SEALED WITH BUYTL RUBBER JOINTS. �-60"� �72 City of Asheville, NC PRECAST CONCRETE REVISIONS STD. NO. DATE DESCRIPTION 6/9/15 REV. 12" O.C. TO 16" IN DETAIL Standard Specifications 8.03 and Details Manual CATCH BASIN 6" E �� #4 BARS "V"0 Ix „ 6" EQUAL SPACES 3" r 1.5" 1.5" 4'-6" PERMD.O.T. 840.03 HOOD 3" 3" F � OO�O�OOOOO� / M M F C MIT L -1 #4 BARS #4 BARS EQUAL EXPANSION JOINT 6' „WIg EQUAL C SPACES PLAN SPACES CURB & GUTTER WITH CATCH BASIN ON STEEP GRADES 3" 3" TOP ELEVATION tUSE ON FLAT GRADES 2% &UNDER x PLAN OF TOP SLAB SECTION S-S s" EXPANSION JOINT 3' 3' 1 5" ELEVATION #8 "W" BARS NORMAL CURB &GUTTER ON LIGHT GRADES #4 BARS #4 "V" BARS ® 12" TOP ELEVATION EXPANSION EQUALS SPACES 8" - -JOINT 6" USE ON GRADES OVER 2% g" 1.5" - - ----- #4 "U" BARS 6" 10" MAX" DEPRESSED GUTTER LINE SECTION R-R DOWEL 1 6 ELEVATION NORMAL CURB & GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN (BASED ON MIN. HEIGHT, H, WITH NO RISER) * DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU. YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U BARS-V BARS-W TOTAL LBS. TOP SLAB BOTTOM SLAB TOT. CONC. FOR MINIMUM HEIGHT, H D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH C.M. R.C. 12" 3'-O" 2'-2" -- -- 2'-9" -- -- -- -- -- -- -- -- -- -- 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-0" -- -- -- -- -- -- -- -- -- -- 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" -- -- -- -- -- -- -- -- -- -- 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" -- -- -- -- -- -- -- -- -- -- 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-0" 4 1'-5" 2 S-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-O" 2'-2" S-10" 4'-9" 1'-8" 4'-0" 4 1'-11" 3 S-9" 3 1 3'-9" 43 0.161 0.358 1.714 10.132 0.178 42" S-O" 2'-2" 4'-5" 5'-3" 1'-5" 3'-2" 4 1'-8" 2 2'-11" 3 2'-11" 32 0.122 0.318 1.738 10.180 0.243 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-2" 4 1 2'-3" 3 2'-11" 3 2'-11" 35 0.145 0.352 2.052 10.235 0.317 2'-2" 5-7" 1 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.180 0.386 2.387 0.297 0.401 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT City of Asheville, NC PRECAST CONCRETE DATE REVISIONS DESCRIPTIONSTD. NO. Standard Specifications CATCH BASIN 8.03A and Details Manual WITH GRATE & FRAME REMOVED (DI SEE NOTE -11 WEEP HOLES J BRICK COPING(INCIDENTAL) TOP ELEVATION STD. 840.16 FRAN & GRATE A 6„ io DOWEL(SEE NOTE) SECTION X-X GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. PIPE THIS SIDE - 18" SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT . HT • Torn CONCRETE R MINIMUM HEIGHT, H C . M. R . C . 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" 2'-3" 0.648 0.023 0.036 18" 2'-6" 0.703 0.033 0.049 24' 3'-O" 0.814 1 0.059 1 0.085 30" 3'- 0" 2' - 0" 3' - 6" 1 0.222 0.222 1 0.925 1 0.092 1 0.127 DROP INLETS TO BE USED ON: A2.2A, A2.3, A2.4 ,It nrnnrSSION SECTION G-G SECTION H-H Co N PLAN OF GRATING CAST IRON 1/8 if 1/$ If 1 It 1 If 3' - 33/4 I, 1/8 It 3 it I, 1/18II _ /4 d 3'-2" KIIA 21/81I 3'-13/4" N N 3'-611 SECTION E-E 3'-61I F I F PLAN OF FRAME CAST IRON 1/$,I 1/8,I II 1 2'-33/41I� 1 1/8 I, I 3 I 8 ,I 3 ,I 1/II /4 /4 2'-2" I� 21/8,I 2'-13/II N N 2' - 6 // SECTION F-F z O Cn �r Q Q Iz-IoC�U LL -1 a_ OOCn2 z aU=010-I H Cnl-U_OJ 000 Z H 1 0� O 1- LL W c� J z Z Lu H Q ~ H a � � o � 0 Q � 0 Q W = cn W 0 U T O 0 cc HEET 1 OF 1 840.14 z O Cn Q Q Iz-IoC�U LL _j 0- OOU)= Er Z a0�010D H CILL0 n- 0 O U) Z H � � H LU 0 LO T N W 00 O z LL Q 0 � Q T Q Z O Q 00 � W o � cc Q � CD � � O a . CnLLJ ~ H } J U) < Z = Q H O a °C O Lu cc Cn O LL HEET 1 OF 1 840.16 sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS HYDROLOGY EROSION AIRFIELD DESIGN I CONSTRUCPON MANAGEMENAEEMEN T &INSPECTION RELEASED FOR CONSTRUCTION .... ...0l'L��'', DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-02 0 N 0 N ti N c� J LLI ry Lu a 75 ry U� O_ r) r) a U r) N z (7 U) w 0 N U) 1-- 0 z Y a D_ J a 0 0 O i J a 0 0 z O a c:)I U) H w ry D- z Of Lu w z z w 'w a J D_ Y O U) O g U SHEET 1 OF 2 1840.03 v vm H � H Z 7oOp0 rD- 0 -n CD 1miz�=D =-nzDm x CA o 0 zHar-TI 00" 0DDD < Cn o z � m O m M z c 0 Cn r m m cn h1 O � m z ^ Cn cl) y n z D D(mj�o V v v D n ^^z yJ 03 D o cn SHEET 2 OF 2 1840.03 43" NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED. 0 A PLAN FRAME,GRATE, & HOOD ASS'Y 3,a 3j/4n 6" 6'r 3%2rr 31-0'r 3/2rr SECTION - KK DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. TYPE "G" TYPE "E" lmlntt�t ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT WALL SECTION � SECTION - BB T� SECTION - PP Lo r N N co v r rswnm r L-mn 3'-0%g" R --W-1 Ll_______ 1/2 n I 6rr 2r-0rr Err 1 3/ rr T 7 3/" O �i43/rr T _ 1%is 6 2-111/2" R HOOD ELEVATION1/2 TYPE ►►F►► -�- WATER FLOW SAG E WATER FLOW ------------------------------------ ------------------------------------- - WATER FLOW - SAG E WATER FLOW — PE "F" � TYPE "E" /TYPE "0" P RAISED FLOW ARROW 23/4" %6" HIGH 0 0 _ P 1 V2 rr r\ I I 1/ rr 1 �2 rr 13/4'�I 8 2'-113/4" awl �2 1 %2' �� �$►/ i i 13/ rr SECTION A -A TYPE - F 2'-113/4" Lu cr m cr 0 � ET 13/4n11/4n SECTION A -A L z o� H P�� 3�,r P z�= r �� HoCOU LL. J � 1--1 z oo�x z -�i �21/8rr QU�O� F- H N N c~n 11o� SECTION - MM � O � � Z H I, T SECTION - NN Iz-I � — TN O 0 � � � m = v = x 1z-1 V 13j" rn Q Z a o p a U N � � N Q z ~ Q TcT'jLo �SECTIONJJ � � O 55/8rr 1-1 W w �2rr J � � 311 R w /2 LL T 1/2 rr T SECTION - RR SHEET 1 Of 2 s4o.o3 0 23/4 n 1 %2 " rr� I 9%g" I 9%8" 13/ II 13 SECTION B-B TYPE - E 9 RAISED FLOW ARROW %6" HIGH D c� r\ T T 1 %2 " T r a V �Q it ,N 9 � II F V r\ 1 �21I RI r 2'-113/4" 1 %2 II I � TYPE G C\ T 7" 1 24" Iv 1 /2 0 6" M PIPE BEDDING N.T.S. NHERE WATER IS -NCOUNTERED IN RENCH, PLACE GRANULAR MATERIAL -0 TOP OF PIPE )R AS DIRECTED. JSE #57 STONE ~n 1--1 PROPOSED c o pC m FINISHED GRADE NEW MANHOLE LID x U Q Z a NEW 3500 PSI CONCRETE Luo 12 MIN. STRUCTURE CAP z a ¢ #5 REBAR, 2-FT a oC c~n LONG MIN, 12" � CUT AND REMOVE a d `n � z EXIST. STRUCTURE C-C, EPDXIED TO \° c=n W � WALLS AS NEEDED TO EXISTING CONCRETE Q ? PLACE NEW LID AND EXISTING z CAP AT PROPOSED INSET 8rr "' � o ELEVATION. >frool- -I 1 %2 " Vm000 j $ It SECTION A -A SHEET 2 OF 2 840.o3 INLET ADJUSTMENT DETAIL N.T.S. 1. STRUCTURE MAY BE CAST IN PLACE OR PRECAST 2. WALLS SHALL BE REINFORCED WITH WIRE MESH AT 0.2 IN. SQ./FT. 3. CAP SHALL BE REINFORCED WITH #4 REBAR AT 12" O.C. EACH WAY.- WIRE MESH MAY BE SUBSTITUTED FOR #4 REBAR AT 12" O.C. AT 0.2 IN.SQ/FT. CA Ro AGhevlles i IONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS & HYDROLOGYI EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT& INSPECTION RELEASED FOR CONSTRUCTION 0rgl��y 40195 Z¢ DAVID A. SKURKY, P.E. NC SEAL #040195 ASHEVILLE REGIONAL AIRPORT FLETCHER NORTH CAROLINA KEY PLAN PARKING LOTS STO RMWATE R DETAILS NO. 2 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 11/28/2020 I WMMI RFC REVISION #1 i ') PIP I n Is DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-03 0 23/4 n 1 %2 " rr� I 9%g" I 9%8" 13/ II 13 SECTION B-B TYPE - E 9 RAISED FLOW ARROW %6" HIGH D c� r\ T T 1 %2 " T r a V �Q it ,N 9 � II F V r\ 1 �21I RI r 2'-113/4" 1 %2 II I � TYPE G C\ T 7" 1 24" Iv 1 /2 0 6" M PIPE BEDDING N.T.S. NHERE WATER IS -NCOUNTERED IN RENCH, PLACE GRANULAR MATERIAL -0 TOP OF PIPE )R AS DIRECTED. JSE #57 STONE ~n 1--1 PROPOSED c o pC m FINISHED GRADE NEW MANHOLE LID x U Q Z a NEW 3500 PSI CONCRETE Luo 12 MIN. STRUCTURE CAP z a ¢ #5 REBAR, 2-FT a oC c~n LONG MIN, 12" � CUT AND REMOVE a d `n � z EXIST. STRUCTURE C-C, EPDXIED TO \° c=n W � WALLS AS NEEDED TO EXISTING CONCRETE Q ? PLACE NEW LID AND EXISTING z CAP AT PROPOSED INSET 8rr "' � o ELEVATION. >frool- -I 1 %2 " Vm000 j $ It SECTION A -A SHEET 2 OF 2 840.o3 INLET ADJUSTMENT DETAIL N.T.S. 1. STRUCTURE MAY BE CAST IN PLACE OR PRECAST 2. WALLS SHALL BE REINFORCED WITH WIRE MESH AT 0.2 IN. SQ./FT. 3. CAP SHALL BE REINFORCED WITH #4 REBAR AT 12" O.C. EACH WAY.- WIRE MESH MAY BE SUBSTITUTED FOR #4 REBAR AT 12" O.C. AT 0.2 IN.SQ/FT. CA Ro AGhevlles i IONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS & HYDROLOGYI EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT& INSPECTION RELEASED FOR CONSTRUCTION 0rgl��y 40195 Z¢ DAVID A. SKURKY, P.E. NC SEAL #040195 ASHEVILLE REGIONAL AIRPORT FLETCHER NORTH CAROLINA KEY PLAN PARKING LOTS STO RMWATE R DETAILS NO. 2 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 11/28/2020 I WMMI RFC REVISION #1 i ') PIP I n Is DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-03 >frool- -I 1 %2 " Vm000 j $ It SECTION A -A SHEET 2 OF 2 840.o3 INLET ADJUSTMENT DETAIL N.T.S. 1. STRUCTURE MAY BE CAST IN PLACE OR PRECAST 2. WALLS SHALL BE REINFORCED WITH WIRE MESH AT 0.2 IN. SQ./FT. 3. CAP SHALL BE REINFORCED WITH #4 REBAR AT 12" O.C. EACH WAY.- WIRE MESH MAY BE SUBSTITUTED FOR #4 REBAR AT 12" O.C. AT 0.2 IN.SQ/FT. CA Ro AGhevlles i IONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS & HYDROLOGYI EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT& INSPECTION RELEASED FOR CONSTRUCTION 0rgl��y 40195 Z¢ DAVID A. SKURKY, P.E. NC SEAL #040195 ASHEVILLE REGIONAL AIRPORT FLETCHER NORTH CAROLINA KEY PLAN PARKING LOTS STO RMWATE R DETAILS NO. 2 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 11/28/2020 I WMMI RFC REVISION #1 i ') PIP I n Is DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-03 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-03 O N O N_ uj N J H w ry w a 75 ry O I-_ U) I Ln O 0 0 a U r) N_ z W w U) H 0 z Y a D_ J a O O O Ict a O O z 0 a oI 07 H w ry D_ z ry w z z w 'w U a J D_ Y ry O Y U) a O H g U v v m 7D000 DD-n�cn mz =� _ z D m = cn O 0 2 , _0 r I 0 c7DDD O O Z 1, T m cn !7 z C-) " m yco N cn -+pz C D � � N m v �m> m m r-I Z z CD o O o � m cn SHEET 1 OF 1 838.80 W1 (FT.) � 3 CS/RCP ELEVATION W2 (FT.) 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE D 6" ] F 1'-0" 0 H2 H1 �l J- L \\- 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE PIPE Hw ip DIA. A2.0 1.5' SIDE NOTES: * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, 838.39, 838.51, 838.57, 838.63 AND 838.69. * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. * USE 4000 PSI CONCRETE. * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR * ALL ELEMENTS PRECAST TO MEET ASTM C913. * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT B" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ B" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 @ B" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ B" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.0 #5 @ 8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 1 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 1 #5 @ 8" 4.50/5.00 1 7.50/8.50 3.25/4.00 1 7.75/9.25 14.75/16.75 z oU) �a Q HocDV U_J�I-1Z 00OLIJ QUmLL 0C.D H CHLLOJ n O O CO z ,>� - D_ UJ Cl 1 Q 3 Lu J Y SaoLL o �3a) -4 Z q W a I --I p W °- 0 ~ N � � n < v � Z Z = Q O Cn N T x O y w J 0 z ZLu W W CC O LL HEET 1 OF 1 838.80 m v NOTES: INSTALL ALL STEPS PROTRUDING 4" FROM INSIDE FACE OF STRUCTURE WALL. z 00 CO < STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED Q Q �-I Z D THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. H O m U Hz�=D � 0Oco=z =�DDm - Lu< LL 0 r 1„ Qzw xD�C0N3 �0 0 C)O� OLL0_Cx7j �QD m f-;t ODO z*cn I �T r 0- 1" PLAN SIDE PLAN LAN SIDE ELEVATIONcl - N �Z� cca a 0 LL 1"1 r n �' 1' o" �� 14 �� (AO = '� CAST IRON CAST IRON z ELEVATION ELEVATION W mcn r. N D QcC o D v 1 8� #6 BAR OR #8 BAR Q cc 0 J'X4 GALV D. QD T OWm y O I cf)¢ ~ Z m PLAN POLYPROPYLENE SIDE PLASTIC J pq 0 3/22 = �8„SIDE ELEVATION PLAN ELEVATION a w OC CA COMPOSITE 0 PL7777�3REINFORCING STEEL 12' ELEVATION NOTE: #3 DEFORMED 12 DO NOT USE IN STEEL ROD SECTION A -A `��' ELEVATION SANITARY SEWER MANHOLES. SHEET 1 OF 1 SHEET 1 OF 1 $4O.6G $40 _ ss v v m Z 70cn00 r0-I--1 Icn m-Iz�=D =-nZym = O O 0 -o -n • 00H C")DDD �� cn ~ O _ Z w m a m ar H j T N � y ' r cn m y x C Pill 0 cc) to 0 v x Z m v I -I Z _n v� H � m m SHEET 1 OF 1 840.52 v v m Dcn 0 0 DmmO Im-I z -1 = D =0Zym _U)xoO 0 G) I -I nDyD I~ o Z . A z Z 0 = 1--I Ocn mN -1 > � v D mo A0 Z v� C.) Z O O Z� m0 SHEET 1 OF 1 840.54 GENERAL NOTES USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS ACCORDANCE WITH AASHTO M199. ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" FROM THE TOP TO THE BOTTOM OF THE MANHOLE. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF BOTTOM SLAB. THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE THINNEST PORTION OF THE TOP/BOTTOM SLAB. * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS A DISTINGUISHABLE TOP AND BOTTOM. ,D, + 2 ,W, 1" MIN. ADDITIONAL CLR. #4 REBAR T, 1" MIN. USE MIN. AREA OF STEEL IN TOP CLR. SLAB OF #4'S @ B" CTS. EACHWAY/EACH FACE *. FLAT TOP SLAB ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE PLACE BARS DIAGONAL TO CORNERS (TYP.) FRAME AND GRATES STD. NO. TRAFFIC BEARING 840.37 NONTRAFFIC BEARING: 840.22 640.24 840.20 840.29 840.33 11r-- --il I_ _ _11 1 \ IIII _ JL _ ,I I_ _I IIF -- JL GRATED INLET OPTION A ALTERNATE CONE SECTION D W T AS INTERNAL DIAMETER (FT.) MIN. WALL THICKNESS (IN.) MIN. TOP/BOTTOM SLAB THICKNESS (IN.) MIN. CIRCUMFERENTIAL AREA OF STEEL PER VERTICAL FT. (SQ. IN.) 4 4 6 0.12 5 5 8 1 0.15 6 6 8 1 0.18 I GRADE RING 0 o MIN. AREA OF STEEL ,p IS 0.07 in.2 ECCENTRIC CONE ---- LOCATE WALL REINFORCEMENT IN MIDDLE 'THIRD OF WALL ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE) RISER =L STEP STD. NO. 840.66 AS (CIRCUMFERENTIAL REINFORCEMENT) -LONGITUDINAL REINFORCEMENT - 'W' 'D' W' FRAME & GRrE- SEE STD. 840.54 FOR MANHOLE BASE_ 7„ RING AND COVER / A 7? 1 / 3� '' r� 6, REINFORCED CONC I \ �( i?' ,P"v'O.�:i?'•n.v j• FTG. (SEE STD. _ 1525.01 IF USE MIN. AREA OF STEEL i REQUIRED) IN BASE SLAB OF I 0.12 in2 PER LINEAR i - - - - - - - - - - - FOOT EACH WAY - , TYPICAL MANHOLE SECTION MANHOLE OPTION SOLID COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIFIED. STATE USE OF SYSTEM ON COVER (I.E.: SEWER, STORM DRAIN, ELECTRICAL) TOP OF COVER B BOTTOM OF COVER PLAN OF FRAME 2'-11/411 1'-11�14 1'-10 TYPE #1 I \ /� \ ALTERNATE \ 43/t" 2'-01/2" 2'-91/4" y \ SECTION A -A I TYPE #2 1" R. PLAN OF COVER 1'-111/ It CV tr7 3�/4' 1/2 43/4 „ 1'- 10-5/8" SECTION B-B MINIMUM WEIGHTS - LBS. FRAME- 180 COVER 120 TOTAL 300 MANHOLE LID TO BE USED ON EXISTING INLET BEING RAISED z ON �Q Q He-,0 LL J I --I ooNxLu z Z Q 0 CC 2 LL O HH O�ONQ Z 1 ,>� ° 1 Q 0 Q W t- W O � LL G7 � Z Lu 0 Z �aCL C3 _ 0In co � n z I W O J = O N �n T v_j Q J CD Ft W co W cc a. HEET 1 OF 1 840.52 Z O O �a Q -,CDU LLJa�"Z 0 0 O x °C z Q U O H COHLLOJ 0O�Q z I -I x 1 0-~ oC O ; O z Q0 z CC Q 0 W Q <LL. cn = J `n O CD Z HEET 1 OF 1 840.54 >too,. sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS & IIIIOLOIIIEROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT& INSPECTION RELEASED FOR CONSTRUCTION -\H C A Rp 040195 Z1Z •FHGINE�-. /ll/III I I I I nl�\` DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-04 0 N 0 N ti N c� 0 ui J a Lu 0 Lu 75 ry 0 UI L0 fo V r) a U r) N z (7 U) Lu U) I— O J C� z Y ry a D_ J a 0 0 O J a O 0 z O al 0 U) I- w ry D_ z Lu LJ z (D z Lu 'Lu U a J D_ Y O Y U) a O g U r ■C Cm MhISTRUCM ps 0 J� 1 Hr)m; 11 CMCRIM HASH PM Sf -:Z AHERF A'0F� P l--JgS 1 ' ID L f1 C OM rk T-'. rL 1`0 MAKffMN FRGW SPiASH PAD TO 1ePSOL 36 SFf_ `� 10A]L FOR CU�9 7- URN aLrF WFLET I [I L E CT ILL 4. EI�uIhfM IC F'RC N!M SPAO.IWC C4 C L�ffOE FOR CjM "URNDrlM 116 --W RF PON DM W11h fN M EET F 114jj1<{Ik I ILIt9 l•FILL UHI; S3 FER E:%I' DV ATI MTA REW FMYS. 1 T J' r r 1 • _APER�9 FI ! _0-4i • I Mg rArE I A=C&V� WT�jEPR+ 3 F DE . L AZi-I PAD _Cic-�W OF OWMEaE k HQCH & 4-,K :u 0L'- ouLi lwD IT DESF-iNER CURB CUT DETAIL N.T.S. 31 Rol BLIND SWALE, FLAT BOTTOM LEVEL SPREADER - PLAN VIEW BLIND SWALE BOTTOM ELEVATION 2150.00' CAP END OF PARKING BLIND SWALE PAVEMENT WITH LEVEL SPREADER RIP RAP PROTECTION 3:1 SLOPE FILTER STRIP. SLOPE TO FOLLOW EXISTING GRADES \m 0.50' 2.50' — 0.50' i`; FOUNDATION DESIGN BY OTHERS ROCK DAM SPILLWAY N.T.S. GRASS LINING 0.50' r—\/IC`TINI/'\ VEGETATED CONVEYANCE N.T.S. • THE LONGITUDINAL SLOPE OF THE SWALE OR VEGETATED AREA SHALL NOT EXCEED FIVE PERCENT, EXCEPT WHERE NOT PRACTICAL DUE TO PHYSICAL CONSTRAINTS. IN THESE CASES, DEVICES TO SLOW THE RATE OF RUNOFF AND ENCOURAGE INFILTRATION TO REDUCE POLLUTANT DELIVERY SHALL BE PROVIDED; • THE SWALE'S CROSS-SECTION SHALL BE TRAPEZOIDAL WITH A MINIMUM BOTTOM WIDTH OF TWO FEET; • THE SIDE SLOPES OF THE SWALE OR VEGETATED AREA SHALL BE NO STEEPER THAN 3:1 (HORIZONTAL TO VERTICAL); AND • THE MINIMUM LENGTH OF THE SWALE OR VEGETATED AREA SHALL BE 100 FEET 3" TALL LEVEL SPREADER TOP ELEVATION = 2145.25' RIP RAP PROTECTION - 1 .00, N T S LLVtL blIkUtK - I YF'IC:AL StL; I IUN N.T.S. FILTER STRIP >frool- --I sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS HYDROLOGY EROSION AIRFIELD DESIGN I CONSTRUCPON MANAGEMENAGEMEN T &INSPECTION RELEASED FOR CONSTRUCTION CAIR A Is`` DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 1 1/28/2020 1 WMMI RFC REVISION #1 DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-05 O N 0 N ti N C7 0 vj J a w 0 ry w a 75 ry O U) I 0 C7 r) r) a U r) N_ z (7 U) w N_ 07 1-- 0 J z Y ry a D- J a 0 O 0 J a O O z O U al 0 U) H U w O ry D- (D z ry w w z z w 'w U a J D_ Y ry O Y U) a O H g U 2155 2150 2145 2140 2135 2130 GRADE SIEE DETAIL o — — — . o 2155 2150 2145 2140 2135 2130 2125 2125 10+00 10+50 11+00 11+34 STORM LINE Al HORIZONTAL SCALE 111 = 20' VERTICAL SCALE 1" = 5' (A2.3) i (A2�4 .. CD aLo M CD N � + M z° ad w w o U) N am O� co N N M, LoN � + N az° ad O F-- co o co a Co N � tiN LoH N � O O � w 00 O� o r o 11+01 ZM LINE A2 4L SCALE 1" _ LSCALE 1"=5 M.H.: MANHOLE, SEE SW-02 D.I.: DROP INLET, SEE SW-02 E.W.: ENDWALL, SEE SW-04 2150 2145 2140 >frool- -I shevi le REGIONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ULICK ENGINEERING LLC HYDRAULICS HYDROLOGY EROSION AIRFIELD DESIGN I CONSTRUCPON MANAGEMENAGEMEN T &INSPECTION RELEASED FOR CONSTRUCTION c AIR SAL z tol ZC • t� ; DAVID A. SKURKY, P.E. NC SEAL #040195 ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 1 1/28/2020 1 WMMI RFC REVISION #1 DESIGNED BY: W.M.M DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: FEBRUARY 2020 STATE LICENSE # N.C. P-1430 PROJECT NO. 400102 SHEET NUMBER SW-06 APPENDIX D OPERATION AND MAINTENANCE MANUAL APPENDIX E SUPPLEMENTAL EZ STORM & DRAINAGE CALCULATIONS Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D0 Plan EX Al. 1 B 2 A1.1 A1.2 3 EX MH Outfall DI A2.4 6 DI A2.3 6 5 Outfall 4 CI A2.2 Outfall DI A2.2A Project File: Asheville Storm Sewers v2,stm Number of lines: 7 Date: 3/2/2020 Storm Sewers v2018 30 Storm Sewer Tabulation Page I Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line F(ac (ft) ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) I End 66,000 0,00 8,09 0,00 0,00 5,58 0,0 7.2 3,9 22,03 17.29 4.72 30 0,61 2132,30 2132,70 2134,46 2135,09 2135,00 2149,70 EX MH-A1.0 2 1 184,000 8,09 8,09 0,69 5,58 5,58 6.5 6.5 4.1 22,69 22.22 4,75 30 1,00 2132,70 2134,54 2135,14 2136,81 2149,70 2152,69 EXA1.1B-A1.1 3 End 15.828 0,64 0,64 0,95 0,61 0,61 5,0 5,0 4.4 2.65 11.20 3,15 18 1.14 2147.17 2147,35 2148,06 2147,97 2149,70 2151,83 Al. l&Al,2 Curb C 4 End 50.000 0,00 1,78 0,95 0,00 0,78 5,0 12.3 3,2 2.50 7,43 2.77 18 0,50 2141,20 2141,45 2142,09 2142.12 2142,33 2150,61 A2.2-A2.0 5 4 29,000 0,12 1,45 0,65 0,08 0,68 5,0 5,4 4,3 2.89 33.26 7,76 18 10.03 2144,08 2146,99 2144,38 2147,64 2150,61 2152,97 A2.3-A2.2 6 5 39.900 1,33 1,33 0,45 0,60 0,60 5,0 5,0 4.4 2.61 36.38 3,72 18 12.01 2146,99 2151,78 2147,64 2152,39 2152,97 2157,24 A2.4-A2.3 7 4 107,000 0,33 0,33 0,30 0,10 0,10 5,0 5,0 4.4 0,43 8,79 0,27 18 0,70 2140,40 2141,15 2142,29 2142,29 2150,61 2144,00 A2.2A-A2.2 Project File: Asheville Storm Sewers v2,stm Number of lines: 7 Run Date: 3/2/2020 NOTES:Intensity = 61,76 / (Inlet time + 13.40) A 0.91; Return period =Yrs, 1 ; c = cir e = ellip b = box Storm Sewers v2018+30 APPENDIX F SWALE SEGMENT CALCULATIONS APPENDIX F - Swale Segment Calculations CrossWetted Swale 10-year Long. Hydraulic 10-year Length* Upstream inlets Sectional Flow Depth Segment flow Slope Perimeter Radius Velocity Area ft cfs ft/ft sq ft ft ft fps A 35 A3.4 1.24 0.028 0.6 4.11 0.15 0.17 2.30 B 85 A3.4 + A3.1 4.03 0.010 1.81 5.74 0.32 0.34 2.30 C 80 A3.3 3.23 0.005 1.98 5.93 0.33 0.45 1.69 D 25 A3.4 + A3.1 + A3.2 7.19 0.040 1.64 5.54 0.30 0.49 4.41 E 100 A3.1 - A3.4 10.43 0.014 3.12 7.1 0.44 0.6 3.40 *Length does not include riprap or rockdams located between curb cuts and swale outlet. Includes grassed areas only. Flow Curb Cut Area i C Flow Rate Total Length Segments to outfall (Ac) in/hr cfs 3.1 0.44 7.04 0.9 2.79 B + E + D 210 3.2 1 0.50 1 7.04 0.9 1 3.17 1 E + D 125 3.3 0.51 7.04 0.9 3.23 C + E 180 3.4 0.22 7.04 0.8 1.24 A + B + D + E 245 uiagram A3.4 • A3.2 A3.1 D Out. E A3.3 • ,,N,111 CA,,,,,,,,,,,, 0 Sip'' •!�L�'' SEAL 0401 5 `*GIN Common Parameters for all Segments Side Slopes = 3H : 1V Bottom Width = 3' Maximum Allowable Velocity: Vmax = 4.5 fps for tall Fesque in sands and silts n = 0.03 for Grass Lined Channels Calculations Mannings Equation V = 1.489/n * R^(2/3) * S^(1/2) n = Mannings Number R = Hydraulic Radius R = Cross Sectional Area/Wetted Perimeter S = Channel Slope (ft/ft) Rational Method: Q = CiA C = runoff coefficient I = flow intensity A = Drainage Area