Loading...
HomeMy WebLinkAboutWQ0024577_NORR-2021-LV-0150_20200227NORTH CAROLINA ROY COOPER E7tw�renmrrttafQe�ar�ty Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director February 26, 2020 CERTIFIED MAIL 7017 3380 0001 0998 5980 RETURN RECEIPT REQUESTED Gary C. Sutton 4258 US 13 North Goldsboro, NC 27534 Subject: Notice of Regulatory Requirements: NORR-2020-LV-0150 Groundwater Quality Sutton's Retirement Center WWTF Permit No. WQ0024577 Wayne County Dear Mr. Sutton: Permit No. WQ0024577 was issued by the Division on October 25, 2018 and became effective on February 1, 2019 for the continued operation of the wastewater treatment and disposal system serving the above referenced facility. A review of the permit and Groundwater Monitoring Reports showed that total nitrate in Monitoring Well MW-2 were above the groundwater standard for the months of December 2018 and November 2019. This letter is to formally notify you of violations of 15A NCAC 2L (Groundwater Quality Standards) and to advise you of what you are required to do to correct these violations in accordance with 15A NCAC 2L .0106 (d). According to 15A NCAC 2L .0106 (d) (1) the permittee shall demonstrate through predictive calculations or modeling, that natural site conditions, facility design and operational controls will prevent a violation of standards at the compliance boundary. Alternately, the person may submit a plan for alteration of existing site conditions, facility design or operational controls that will prevent a violation at the compliance boundary, and implement that plan upon its approval by the Director, or his designee. North Carolina Department of Environmental Quality (Division of Water Resources - Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 Mr. and Mrs. Sutton February 26, 2020 Page 2 of 2 If contaminants are detected at or beyond the compliance boundary, the permittee shall respond in accordance with the requirements of 15A NCAC 2L .0106 (f). The permittee shall assess the cause, significance and extent of the violation of standards and submit the results of the investigation, and a plan and propose a schedule for corrective action to the Division. The permittee shall implement the plan as approved. Also, according to 15A NCAC 2L .0106 (f) an initial response is required to be conducted prior to or concurrent with the assessment required in 15A NCAC 2L .0106 (d). The permittee shall abate, contain, or control the migration of contaminants. The permittee shall remove, treat or control the primary pollution source. The site assessment shall be in accordance with 15A NCAC 2L .0106 (g) and the corrective action shall be in accordance with 15A NCAC 2L .0106 (h). We request that you respond to this notice within fifteen working days from its receipt. In your response, please confirm that Sutton's Retirement Center WWTF intends to comply with the above requirements. We appreciate your attention and prompt response in this matter. If you have questions, please do not hesitate to call Robert Tankard at (252) 948-3921 or Randy Sipe at (252) 948-3849. Sincerely, ROW Tic Robert Tankard, Assistant Regional Supervisor Water Quality Operations Section Washington Regional Office Division of Water Resources, NCDEQ cc: Laserfiche North Carolina Department of Environmental Quality IDivision of Water Resources - Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481