HomeMy WebLinkAboutNCG060098_DMR_No flow_20190831 September 9, 2019
Page 11
l^1
Vertellus
Smart Chemistry.Our Specialty.
FD
Division of Energy, Minerals, and Land Resources RR/
Attn: Storm Water Program SEP 1 9 2013
1612 Mail Service Center DENR-LAND QUA!ITY
Raleigh, NC 27699-1612 STORMWATER PERMITTING
RE: No Flow Report—August 2019
Tier 3 Stormwater Monitoring
On October 26, 2016, Vertellus Performance Materials Inc. (now Vertellus Greensboro LLC)
submitted notification that the site falls under Tier III stormwater notification requirements for
COD and TSS on Outfalls#1,#5,and#6.
This is to report that there was no measurable representative flow from these Outfalls on site
during a time when sampling was possible for the month of August 2019.
Please contact me at 336-834-4957 if you require additional information.
Sincerely,
Aaron R. Kramer
EHS Manager
Vertellus Greensboro LLC
Vertellus Greensboro LLC
2110 W.Gate City Blvd.
Greensboro, NC 27403
Phone.(336)292-1781 Fax.(336)854-4058 www.verteilus.corn