Loading...
HomeMy WebLinkAboutNCG060098_DMR_No flow_20190831 September 9, 2019 Page 11 l^1 Vertellus Smart Chemistry.Our Specialty. FD Division of Energy, Minerals, and Land Resources RR/ Attn: Storm Water Program SEP 1 9 2013 1612 Mail Service Center DENR-LAND QUA!ITY Raleigh, NC 27699-1612 STORMWATER PERMITTING RE: No Flow Report—August 2019 Tier 3 Stormwater Monitoring On October 26, 2016, Vertellus Performance Materials Inc. (now Vertellus Greensboro LLC) submitted notification that the site falls under Tier III stormwater notification requirements for COD and TSS on Outfalls#1,#5,and#6. This is to report that there was no measurable representative flow from these Outfalls on site during a time when sampling was possible for the month of August 2019. Please contact me at 336-834-4957 if you require additional information. Sincerely, Aaron R. Kramer EHS Manager Vertellus Greensboro LLC Vertellus Greensboro LLC 2110 W.Gate City Blvd. Greensboro, NC 27403 Phone.(336)292-1781 Fax.(336)854-4058 www.verteilus.corn