HomeMy WebLinkAboutNC0029246_Compliance Evaluation Inspection_20200211ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Joseph Williams
Norfolk Southern Railway Company
1200 Peachtree St NE
Augusta, GA 30909
NORTH CAROLINA
Environmental Quality
February 11, 2020
Subject: Compliance Evaluation Inspection Report
NPDES Permit NCO029246
Linwood Yard WWTP, Davidson County
Dear Mr. Williams:
On January 30, 2020, Paul DiMatteo of the Division of Water Resources (Division), Winston-
Salem Regional Office met with Leonard Stogner, Operator in Responsible Charge (ORC), to
conduct a Compliance Evaluation Inspection of the above referenced wastewater treatment plant.
This inspection consists of (1) a review of the permit and accompanying documentation to
determine compliance with permit conditions, and (2) an on -site inspection of several collection
system components. The attached inspection form notes the areas that were evaluated for the
inspection, with any notable findings outlined as follows.
Item of Concern — The Inspector noted one instance of an effluent analysis being conducted but
not reported on the DMR. In August 2019, the lab reported an Ammonia result of 0.28 mg/l, but
this was not on the DMR. Operators said that the lab may have run the analysis inadvertently. The
Inspector discussed proper reporting requirements with the operators.
If you have any questions concerning this report please contact Paul DiMatteo at (336) 776-9691
or Lon Snider at (336) 776-9800.
Sincerely,
EDocuSigned by:
�� -T sMacr
145B49E225C94EA...
Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
Enclosures — Inspection Report
CC: WSRO Laserfiche Files
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105
NOh �HCARO UHA
^^ •^ a^ma^� u�•i` r 336.776.9800
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NC0029246 111 12 I 20/01/30 I17 18 I S J 19 L G] 201 I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating 131 QA ---------------------- Reserved -------------------
671
70 I I 71 I I 72 I r I 73 I I 174 751 I I I I I I I80
u ty I I i
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
10:15AM 20/01/30
19/10/01
Linwood Yard
5281 Southern Railroad Sta Rd
Exit Time/Date
Permit Expiration Date
Linwood NC 27299
12:OOPM 20/01/30
24/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Leonard Earl Stogner/ORC/704-309-1109/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Joseph Williams,1200 Peachtree St Ne Augusta GA 30909//404-520-6990/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Paul DiMatteo /DocuSigned by: DWR/WSRO WQ/336-776-9691/
2/11/2020
10I; l
F10C7C2E5BB34D4...
Signature of Management Q A Reviewer DocuSigned by: Agency/Office/Phone and Fax Numbers Date
2/11/2020
FLI T Sn.
er
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO029246 I11 121 20/01/30 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
I noted one instance of a parameter being analyzed but not reported on the DMR. In 8/2019, the lab
reported a value of 0.28 mg/I for ammonia, but this was not on the DMR. I discussed reporting
requirements with operators.
Page#
Permit: NCO029246 Owner - Facility: Linwood Yard
Inspection Date: 01/30/2020 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment:
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Page# 3
Permit: NCO029246
Inspection Date: 01/30/2020
Record Keeping
Facility has copy of previous year's Annual Report on file for review?
Owner - Facility: Linwood Yard
Inspection Type: Compliance Evaluation
Yes No NA NE
❑ ❑ ■ ❑
Comment: One of the DMRs reviewed included a result for ammonia in the nitrogen series that was not
reported on the DMR. I discussed the reporting requirements with the operators.
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Grit Removal
Yes
No
NA
NE
Type of grit removal
a.Manual
❑
b.Mechanical
Is the grit free of excessive organic matter?
0
❑
❑
❑
Is the grit free of excessive odor?
0
❑
❑
❑
# Is disposal of grit in compliance?
0
❑
❑
❑
Comment: Grit drops out due to decreased velocity.
Pump Station - Influent
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
0
❑
❑
❑
Is SCADA telemetry available and operational?
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
Comment: Pump station is in a secondary storage basin, and pumps to the primary equalization basin.
Page# 4
Permit: NCO029246
Inspection Date: 01/30/2020
Owner - Facility: Linwood Yard
Inspection Type: Compliance Evaluation
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Yes No NA NE
❑
❑
■
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
■
❑
❑
❑
■
❑
■
❑
❑
❑
❑
❑
❑
■
■
❑
❑
❑
Comment: Petroleum floats on top, clear water is taken from bottom and proceeds to treatment.
Chemical Feed
Yes No NA NE
Is containment adequate?
0
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Are backup pumps available?
0
❑
❑
❑
Is the site free of excessive leaking?
0
❑
❑
❑
Comment:
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
❑ ❑
0
❑
Are surface aerators and mixers operational?
❑ ❑
0
❑
Are the diffusers operational?
0 ❑
❑
❑
Is the foam the proper color for the treatment process?
0 ❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0 ❑
❑
❑
Is the DO level acceptable?
❑ ❑
0
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑ ❑
0
❑
Comment: This is actually a dissolved air flotation unit. No issues were noted.
Filtration (High Rate Tertiary) Yes No NA NE
Type of operation: Down flow
Is the filter media present? ❑ ❑ ❑
Is the filter surface free of clogging? ❑ ❑ 0❑
Page# 5
Permit: NCO029246
Inspection Date: 01/30/2020
Owner - Facility: Linwood Yard
Inspection Type: Compliance Evaluation
Filtration (High Rate Tertiary)
Yes No NA NE
Is the filter free of growth?
❑
❑
0
❑
Is the air scour operational?
❑
❑
0
❑
Is the scouring acceptable?
❑
❑
0
❑
Is the clear well free of excessive solids and filter media?
❑
❑
0
❑
Comment: These are fully closed activated carbon filters. No issues were noted. Operators said that
not all of the water goes through filtration.
Lagoons
Type of lagoons?
# Number of lagoons in operation at time of visit?
Are lagoons operated in?
# Is a re -circulation line present?
Is lagoon free of excessive floating materials?
# Are baffles between ponds or effluent baffles adjustable?
Are dike slopes clear of woody vegetation?
Are weeds controlled around the edge of the lagoon?
Are dikes free of seepage?
Are dikes free of erosion?
Are dikes free of burrowing animals?
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
Is the lagoon surface free of weeds?
Is the lagoon free of short circuiting?
Yes No NA NE
Aerated
1
❑ ❑ ■ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ■ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ■ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: Lagoon has concrete sides, some woody vegetation was growing on the edges but they
didn't appear to be impacting the lagoon.
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0
❑
❑
❑
Comment:
Page# 6
Permit: NCO029246 Owner - Facility:
Inspection Date: 01/30/2020 Inspection Type:
Linwood Yard
Compliance Evaluation
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
0
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: There was some floating foam in the receiving stream. Operators said it was likely due to
stagnant water.
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment:
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑
sampling location)?
Comment:
Standby Power
Yes No NA NE
Is automatically activated standby power available?
0
❑
❑
❑
Is the generator tested by interrupting primary power source?
0
❑
❑
❑
Is the generator tested under load?
0
❑
❑
❑
Was generator tested & operational during the inspection?
❑
❑
❑
Do the generator(s) have adequate capacity to operate the entire wastewater site?
0
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
0
❑
❑
❑
Is the generator fuel level monitored?
0
❑
❑
❑
Comment:
Drying Beds Yes No NA NE
Is there adequate drying bed space? 0 ❑ ❑ ❑
Is the sludge distribution on drying beds appropriate? 0 ❑ ❑ ❑
Page# 7
Permit: NC0029246
Inspection Date: 01/30/2020
Owner - Facility: Linwood Yard
Inspection Type: Compliance Evaluation
Drying Beds
Yes No NA NE
Are the drying beds free of vegetation?
0
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
0
❑
❑
❑
Is the site free of stockpiled sludge?
0
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
0
❑
❑
❑
# Is the sludge land applied?
❑
0
❑
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
0
❑
Comment:
Page# 8